Loading...
Permit_1234644CITY OF EDMONDS Mechanical Permit My6uildingPermitxom Permit Information Permit Number RI ngngq-1Rg4 Issued Date 11/27/2022 Expiration Date 5/26/2023 Job Address 9022 218TH ST SW Fee Paid $120.00 EDMONDS, 98026 Order Confirmation 1188131 Floor Related Permit# Suite Application ID 1234644 Contact Information Contact Name greg percy Contractor hearthside and home Ilc Phone Number (425) 771-6434 Property Owner Patrick Devrin LNI License# HEARTHL868BC Address 10016 EDMONDS WAY EDMONDS, Phone# (425) 771-6434 WA City Bus. License # 603215818 Property Owner Phone (425) 390-4579 Tenant Name Job Description A (Single Family Residential) (Alteration) Mechanical project involving ( 1 Gas Fireplace) Main Floor Living Room Conditions - Post Permit on site. Do not cover until inspected. Gas Fireplace Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: greg percy Page 1 of 2 t of EDAf 0 1;�_-o CITY OF EDMONDS Mechanical Permit My6uildingPermitxom Permit Information Permit Number RI n9n99_1F9� Issued Date 11/27/2022 Expiration Date 5/26/2023 Job Address 9022 218TH ST SW Fee Paid $120.00 EDMONDS, 98026 Order Confirmation 1188131 Floor Related Permit# Suite Application ID 1234644 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Gas Test/Pipe Mech Rough -in Mechanical Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2