Loading...
Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 00451900100401 Site Address: 23632 HIGHWAY 99 SUITE A EDMONDS,WA 98026- 9211 Subdivision: 004519, LLA LL-2001-101 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $30,000.00 Occupancy Type: M Construction Type: Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: XFINITY-NEW TI, INTERIOR REMODEL WA State Contractor L & I #: BUEHNC1914MB Applied: 10/20/2022 Issued:11/29/2022 Final: Expiration Date: 11/29/2023 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT AMY HODGSON 7299 US HWY 18 AND 151, (608)572-2365 AMY@WE-PERMIT.COM BARNEVELD WI53507 7299 US HWY 18 AND 151, CONTACT WE PERMIT, LLC (608)572-2365 amy@we-permit.com BARNEVELD WI53507 CONTRACTOR BUEHNER CONSTRUCTION 3158 S MAIN ST, SALT LAKE CITY (801)486-1888 djohnsen@bcinational.com INC UT 84115 XFINITY-FW WA -AURORA PO BOX 2539, SAN ANTONIO TX OWNER MARKETPLACE LLC 78299 FEE •' • DESCRIPTION ACCOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 10/21/22 R23898 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 11/21/22 R24579 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $640.00 $640.00 11/21/22 R24579 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $544.00 $544.00 10/21/22 R23898 TOTALS: $1,249.00 $1,249.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, November 29, 2022 10:18:14 AM 1 of 2 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2022-1448 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION EXIT SIGNAGE AND EMERGENCY FOR Final locations of illuminated exit signs and emergency lighting subject to field inspection LIGHTING INFORMATION by the Fire Marshal. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" B-4 FRAMING B-7 BUILDING OTHER INSP Printed: Tuesday, November 29, 2022 10:18:14 AM 2 of 2