APPROVED ENG RESUB1 BLD2021-1103+Transportation_Impact_Form+1.7.2022_11.39.52_AM+2609371RESUB
Jan 07 2022 F pA
CITY OF EDMONDS y
DEVELOPMENT SERVIC
DEPARTMENT
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
BLD2021-1103
Name of Proposed Project:
Owner/Applicant
Loree Quade
Name
PO Box 14790
APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
Lot 4 of Adamant 240th 4-Lot SP (8717 240th St
Street/Mailing Address
PO Box 14790
City State Zip
Telephone:
Applicant Contact Person:
Loree Quade
Name
Street/MailingAddress
(425) 422-37
City State Zip
Telephone: (425) 422-9637
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
RAM Engineering, Inc. Rob Long, PE
Firm Name Contact Name
Telephone: (425) 678-6960
1. PROJECT DESCRIPTION
a. Location - Street address: 8717 240th St SW
E-mail: RobL@RAMengineeringlnc.com
(Attach a vicinity map and site plan.)
b. Specify existing land use: Single Family Residential
c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed:
e. Define proposed access locations:
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use I I$ I X I I -
New Use Fee: $ 1 - I Prior Use Fee: $
® NEW DEVELOPMENT
ITE Land Use Category
New Use I SFR, ITE 210
Per Unit
Fee Rate
$ 6,249.14 1 X
Units in
square feet,
# of dwelling,
vtp, etc.
1 —
Fee
❑ OTHER CREDIT FOR DEMO'D EXISTING SFR <6,246.14>
MITIGATION FEE RECOMMENDATION:
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
TOTAL TRANSPORTATION IMPACT FEE
$ 0
City of Edmonds, Engineering Division Approval Date ENGINEERING DIVISION
APPROVED.
02/07/2022
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.