Loading...
APPROVED BLD2022-1391+Building_Elevations+10.11.2022_5.38.38_PM+3159138FLOOR I �0'-0. kFIE EAST GROUND SLOPE OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES APPROVED PLANS MUST BE ON JOB SITE 0 10 20 Scale: 1 /8" = V-0" 2mD FLOOR PLANS 2DFLOORPLANS.COM 600 NW Gilman Blvd. Suite E Issaquah, WA 98027 425-677-7511 This drawing is an instrument of semic. and is the sole property of the cli en listed. Any alteration of this drawing without removal of references to 2-D As -Built Floor Plans, Inc. is prohibited. Drawing scale and dimensions are Provided for reference only. Refer to CAD files for exact measurements. 02010 2-13 As -Built Floor Plans, Inc. All Rights Reserved. Project: C22-940 Date Action Pro ea Client: Greg Wilson Site: Retail building 420-422 Main St. & 102 S 5th St Edmonds, WA 98020 RECEIVED Oct 12 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Exterior Elevations N & E Sides