APPROVED BLD2022-1391+Building_Elevations+10.11.2022_5.38.38_PM+3159138FLOOR I
�0'-0. kFIE
EAST
GROUND SLOPE
OBTAIN ELECTRICAL
PERMIT FROM
STATE LABOR &
INDUSTRIES
APPROVED
PLANS MUST BE
ON JOB SITE
0
10 20
Scale: 1 /8" = V-0"
2mD
FLOOR PLANS
2DFLOORPLANS.COM
600 NW Gilman Blvd. Suite E
Issaquah, WA 98027
425-677-7511
This drawing is an instrument of
semic.
and is the sole property of the
cli en listed. Any alteration of this
drawing without removal of
references to 2-D As -Built Floor
Plans, Inc. is prohibited.
Drawing scale and dimensions are
Provided for reference only. Refer to
CAD files for exact measurements.
02010 2-13 As -Built Floor Plans, Inc.
All Rights Reserved.
Project: C22-940
Date Action
Pro ea
Client:
Greg Wilson
Site:
Retail building
420-422 Main St. & 102 S 5th St
Edmonds, WA 98020
RECEIVED
Oct 12 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Exterior Elevations
N & E
Sides