APPROVED BLD-BLD2022-1231+Architectural_Plan+9.15.2022_1.21.51_PM+3110958GENERAL REQUIREMENTS REFER TO SUBSEQUENT PLAN AND DETAIL NOTES FOR VARIATIONS AND REQUIREMENTS SPECIFIC TO REFERENCED PROJECT. NOTES ON DRAWINGS TAKE PRECEDENCE OVER GENERAL STRUCTURAL NOTES. DESIGN CRITERIA BUILDING CODE CONFORMANCE (MEETS OR EXCEEDS REQUIREMENTS): 2018 INTERNATIONAL BUILDING CODE (IBC) 2018 INTERNATIONAL RESIDENTIAL CODE (IRC) 2018 WASHINGTON BUILDING CODE 2018 WASHINGTON RESIDENTIAL CODE 11101 0 won., Bill ROOF DEAD LOAD 15 PSF FLOOR DEAD LOAD 15 PSF WOOD WALL DEAD LOAD 12 PSF CONCRETE 150 PCF LIVE LOADS: ROOF SNOW LOAD 25 PSF FLOOR LIVE LOAD (RESIDENTIAL) 40 PSF PIN PILES MATERIALS: BRACKET PLATES - ASTM A36 (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu PIER TUBES - ASTM A500 GRADE B OR C (MIN YIELD STRESS, Fy = 50 KSI / MIN TENSILE STRESS, Fu EXTERNAL SLEEVE - ASTM A500 GRADE B (MIN YIELD STRESS, Fy = 50 KSI / MIN TENSILE STRESS, Fu PIER CAP - ASTM A529 GRADE 50 (MIN YIELD STRESS, Fy = 50 KSI / MIN TENSILE STRESS, Fu COIL ROD - ASTM A193 GRADE B7 City Of Edmonds Building Department Work FOUNDATION REPAIR Address 10116 241 ST PL SW Owner PETERSON Approved Date 10/11/2022 Building Official Permit Number BLD2022-1231 PIN PILES PIN PILE SPLICING: PIN PILES ARE TO BE GRAVITY SPLICED WITH FITTING COUPLERS. BUILDING WEIGHT WILL ENSURE JOINTS DO NOT SEPARATE. EXISTING UTILITY LINES: CONTRACTOR TO REPAIR UTILITY LINES THAT MAY BE DAMAGED DURING INSTALLATION. TESTING & INSPECTION CONTINUOUS SPECIAL INSPECTION IS REQUIRED DURING INSTALLATION PER 2018 IBC SECTION 1810.4.12. THE SPECIAL INSPECTOR IS RESPONSIBLE FOR VERIFYING AND RECORDING THE FOLLOWING: EXPIRES: 04/04/24 • PROJECT DESCRIPTION (ADDRESS, INSTALLATION DATE, PERMIT NUMBER • PILE AND BRACKET CONFIGURATION - _ - _ - _ - _ - _ - _ - _ - _ • PART DESCRIPTION (PRODUCT MANUFACTURER, BRACKET TYPE, PIER TYPE, PIER OUTSIDE DIAMETER, PIER �_ AS DEFINED BY THE SI AGREEMENT DATED 10/10/2022, WALL THICKNESS) THE FOLLOWING ITEMS WILL REQUIRE SPECIAL i • PIER INCLINATION, LOCATION, DEPTH, AND INSTALLATION PRESSURE ACHIEVED INSPECTIONS FOR THIS PROJECT: X Pin Pile Installation I LOAD TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM METHOD D1143 (QUICK METHOD) ON 20 ' PERCENT OF PIERS AND WILL BE SELECTED BY THE SPECIAL INSPECTOR. AN ALIGNMENT LOAD (AL) SHALL BE x Foundation Bracket Installation I APPLIED TO THE PILE PRIOR TO SETTING THE DEFLECTION MEASURING EQUIPMENT TO ZERO OR A REFERENCE ' x Grading/soils ,POSITION. THE AL SHALL BE NO MORE THAN 10% OF THE DESIGN LOAD. INCREMENTAL LOADING SHALL BE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. X Stabilizer Base and Hardware Installation � PLEASE HAVE ALL REPORTS AND DOCUMENTATION TEST LOADING SCHEDULE I HOLD TIME MAX DEFLECTION AVAILABLE FOR INSPECTOR AT TIME OF INSPECTION. AL (.10 DL MAX) 0 MIN. -----------------' 0.25 DL UNTIL STABLE = 58 KSI) 0.50 DL UNTIL STABLE ALL WORK SUBJECT 0.75 DL UNTIL STABLE = 55 KSI) TO FIELD 1.00 DL UNTIL STABLE INSPECTION FOR 1.25 DL UNTIL STABLE = 62 KSI) 1.50 DL HOLD FOR CREEP TEST (SEE BELOW) 0.04 INCHES CODE COMPLIANCE 1.25 DL UNTIL STABLE = 65 KSI) 1.00 DL UNTIL STABLE 0.75 DL UNTIL STABLE APPROVED 0 50 DL UNTIL STABLE (MIN YIELD STRESS, Fy = 105 KSI / MIN TENSILE STRESS, Fu = 125 KSI) STEEL ANGLE SHAPES - ASTM A36 (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu PLANS MUST BE 0.25 DL UNTIL STABLE = 58 KSI) ON JOB SITE WELDING NOTES: CONFORM TO AWS D1.1. WELDERS SHALL BE CERTIFIED IN ACCORDANCE WITH AWS REQUIREMENTS. USE E70 ELECTRODES OF TYPE REQUIRED FOR MATERIALS TO BE WELDED. r-- — - — - — - — - — - — - — - — - — - — - — - — - — - — -- ALL WELDING TO BE DONE BY A WABO CERTIFIED WELDER OR WABO CERTIFIED FACILITY. CORROSION PROTECTION: L---------------------------- SACRIFICIAL DESIGN THICKNESS - CAPACITIES INCLUDE A SCHEDULED LOSS IN STEEL THICKNESS DUE TO CORROSION FOR BLACK, UNCOATED STEEL. ANCHORS ARE DESIGNED FOR 50-YEAR SCHEDULED SACRIFICIAL THICKNESS LOSS IN ACCORDANCE WITH ICC-ES AC358. INSTALLATION: SYSTEM TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. MINIMUM INSTALLATION REFUSAL REQUIREMENTS FOR PIN PILES AND MINIMUM INSTALLATION TORQUE IS TO BE DETERMINED BY THE FOLLOWING VERBIAGE/EQUATION: PIN PILES ARE TO BE DRIVEN TO REFUSAL. INSTALLATION REFUSAL IS CONSIDERED TO BE REACHED WHEN THE ENERGY FROM A 150 LB PNUEUMATIC HAMMER NO LONGER CARRIES A VERTICAL DISPLACEMENT OF ONE INCH MOVEMENT OBSERVED IN A ONE MINUTE TIME SPAN TO THE PILE. MINIMUM INSTALLATION DEPTH IS 10'-O" t UNO. RECEIVED Sep 19 2022 NOTIFY ENGINEER IF MINIMUM INSTALLATION CONDITIONS CANNOT BE ACHIEVED. CITY OFEDMONDS DEVELOPMENT SERVICES DEPARTMENT LOAD TESTING CREEP ACCEPTANCE CRITERIA SHALL BE NO GREATER THAN 0.04 INCHES WITHIN A 10 MINUTE PERIOD. IF MOVEMENT IS OBSERVED GREATER THAN 0.04 INCHES WITHIN THE 10 MINUTE PERIOD THE LOAD TEST SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES, THE PIER IS TO BE DEEPENED AND RE -TESTED, OR THE PIER IS TO BE ABANDONED AND REPLACED WITH A NEW PIER. IF THE LOAD TEST IS TO BE HELD THE PIER MOVEMENTS SHALL BE MEASURED AT 15, 20, 30, 40, 50, AND 60 MINUTES. THE CREEP VERSUS THE LOGARITHM OF TIME SHALL BE PLOTTED. IF THE CREEP RATE IS LESS THAN 0.080 INCHES BETWEEN 6 AND 60 MINUTES, THE LOAD TEST SHALL BE CONSIDERED SUCCESSFUL. PIN PILE TEST PRESSURE (PSI): [DESIGN LOAD] X 1.5 / [AREA OF HYDRAULIC RAM]. DO NOT PLACE PIERS THIS ZONE W/O DIRECTIOI FROM ENGINEER NO PIER PLACEMENT ZONE DO NOT PLACE PIERS FHIS ZONE W/O DIRECTION FROM ENGINEER CONTRACTOR TO NOTIFY FOR IF (E) FOUNDATION CRACK IS PRESENT IN THE SPAN BETWEEN FOUNDATION BRACKETS SCALE: NTS sfa SFA Design Group, LLE 0, L A"i 5­11a , WA . x p. (563) 641 8311 www. ie' com U Z fr Z Q Z LU W O 0[:� N Z Z _j rn CL Q �- �U� 0 W � (n 0 C\I Z Z wCDO o C) O Z—Lu U) W w > I-_ W Q GENERAL NOTES [REVISIONS 1 PROJECT NO: MFR22-162 DESIGNED BY: MEK DRAWN BY: MEK CHECKED BY: JLD DATE: 09.05.2022 SHEET NO: Sill NCFI GEOTECHNICAL - TERRATHANE 24-010 POLYURETHANE FOAM TERRATHANE GEOTECHNICAL - 24-010 INSTALLATION SEQUENCE THE FOLLOWING INSTALLATION STEPS PROVIDE A BROAD OVERVIEW OF TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM INJECTION BENEATH A CONCRETE SLAB OR PAVEMENT. INTERMEDIATE STEPS, INSTALLATION EQUIPMENT AND TOOLS USED, AND CONSIDERATIONS FOR UNUSUAL CONDITIONS OR APPLICATIONS ARE NOT ADDRESSED. STEP 1: ACCESS/APPLICATION HOLES ARE DRILLED (9/8"0) AT STRATEGIC LOCATIONS IN THE SLAB. IN GENERAL, THE HOLES ARE SPACED 5 FEET APART AND 3 FEET FROM THE EDGES OF THE SLAB. LOCATIONS AND SPACING ARE OFTEN MODIFIED IN THE FIELD TO ACHIEVE THE DESIRED RESULT. STEP 2: INJECTION PORTS ARE PLACED TO SEAL THE HOLES. STEP 3: TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM IS INJECTED TO FILL VOIDS AND ALLOW FOR LIFTING. LIFT MAY BE MONITORED WITH SURVEY EQUIPMENT OR STRING LINES. STEP 4: THE INJECTION PORTS ARE REMOVED AND THE HOLES ARE PATCHED WITH MORTAR MIX, NEXUSPRO SILICONE JOINT SEALANT, OR EPDXY SEALANT. TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAMS ARE MOST OFTEN USED BENEATH EXTERIOR CONCRETE SIDEWALK AND PAVEMENT SECTIONS FOR STABILIZATION OR RELEVELING, BUT ARE ALSO UTILIZED FOR INTERIOR WORK AND OTHER SPECIALTY APPLICATIONS. TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM IS OFTEN CONSIDERED AS AN ALTERNATIVE TO MUDJACKING OR REMOVAL AND REPLACEMENT. SETTLEMENT OF RESIDENTIAL SLABS IS TYPICALLY THE RESULT OF CONSOLIDATION OF POORLY COMPACTED FILL SOILS AROUND FOUNDATIONS AND WITHIN UTILITY TRENCHES, SOFTENING OF WEAK NATIVE SOILS AND FILL DUE TO INCREASES IN MOISTURE CONTENT, AND EROSION OR WASHOUT CONDITIONS RESULTING FROM POOR DRAINAGE. CRACKED SLABS, FAULTING BETWEEN SLAB SECTIONS, AND/OR OTHER OBVIOUS DOWNWARD VERTICAL MOVEMENT ARE TYPICALLY THE FIRST OBSERVABLE SYMPTOMS OF SETTLEMENT FROM THE SURFACE, THOUGH VOIDS MAY ALSO BE PRESENT BELOW AS RIGID SLABS CAN SPAN BETWEEN SUPPORT POINTS. WHEN VOIDS ARE PRESENT, USING INERT, HYDROPHOBIC TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM ALLOWS FOR UNDERSEALING OF THE REGION, PREVENTING ANY FURTHER WASHOUT AND ACTING TO AGAIN PROVIDE UNIFORM SUPPORT TO THE BRIDGED CONCRETE. WHEN SLABS HAVE SETTLED, WITH OR WITHOUT THE PRESENCE OF VOIDS, FOAM CAN BE INJECTED TO CREATE LIFT WITHOUT ADDING SIGNIFICANT WEIGHT TO THE UNDERLYING SOIL. TERRATHANE GEOTECHNICAL 24-010 POLYURETHANE FOAM IS INSTALLED WITH CUSTOM—BUILT INSTALLATION RIGS AVAILABLE AS TRUCK —MOUNTED OR TRAILER UNITS. THE BASIC COMPONENTS OF THE SYSTEM INCLUDE MATERIAL STORAGE TANKS, A GENERATOR, AN AIR COMPRESSOR, PUMPS, A PROPORTIONER, AND APPLICATOR(S)/ GUN(S). THE PROPORTIONER INCLUDES A MATERIAL HEATER, PRESSURE REGULATOR, STROKE COUNTER, AND INSULATED AND HEATED HOSES. THIS ENSURES THAT THE TWO PARTS ARE DELIVERED TO THE APPLICATOR AT A CONSISTENT PRESSURE AND TEMPERATURE. TERRATHANE GEOTECHNICAL - 24-010 POLYURETHANE FOAM TABLES COMPONENT PROPERTIES COMPONENT B-24-010 A2-000 BROOKFIELD VISCOSITY AT 72°F 600 CPS AT 72°F 200 CPS AT 72°F SPECIFIC GRAVITY 1.08 1.24 WEIGHT PER GAL 8.9 LBS 10.3 LBS APPEARANCE CLEAR AMBER LIQUID CLEAR BROWN LIQUID STORAGE TEMPERATURE 60°-90°F 60°-90°F POLYURETHANE FOAM TABLES (CONT.) REACTIVITY AT 110°F CREAM TIME (SEC) 1 GEL TIME SEC 7 TACK FREE TIME SEC 12 RISE TIME SEC 17 PROCCESSING PARAMETERS ISO TEMPERATURE 100°-140°F POLY TEMPERATURE 110°-140°F MIXING PRESSURE STATIC 1000 PSI MIXING PRESSURE DYNAMIC 800 PSI MIX RATIO BY WEIGHT 100 PARTS POLY: 116 PARTS ISO BY VOLUME 100 PARTS POLY: 100 PARTS ISO NOTE: INSTALL PER MFR RECOMMENDATIONS EXPIRES: 04/04/24 PHYSICAL PROPERTIES PHYSICAL PROPERTIES TEST METHOD FREE RISE RESTRAINED DENSITY ASTM D1622 2.8 PCF 3.9 PCF COMPRESSIVE STRENGTH ASTM D1621 25.7 PSI 60.5 PSI COMPRESSIVE MODULUS ASTM D1621 695 PSI 1714 PSI TENSILE STRENGTH ASTM D1623 64.5 PSI 78 PSI TENSILE MODULUS ASTM D1623 96 PSI ------ WATER ABSORBTION ASTM D2842 < 0.08 Ib%tz < 0.08 Ib%tz CLOSED CELL CONTENT — — — — — — — > 90% > 90% MAX SERVICE TEMP — — — — — — — 180°F 180°F ELONGATION ASTM D1623 7.0% ------ SHEAR STRENGTH ASTM C273 38.7 PSI SHEAR MODULUS ASTM C273 486 PSI FLEXURAL STRENGTH ASTM D790 57.8 PSI ------ FLEXURAL MODULUS ASTM D790 1279 PSI — — — — —— SFA Design Group, LLL ` Po Il dRORIE Livermore,Livermore,CA I Seattle, WA p: (50) 91.8311 w .fmg. m U z _ U � Z Q Z 0— O_ W w O Cr N 0 � O z00 � J O W Q U c/) 0 w�� 0 N Z w`°o D cr o O z Lu U) W W W � W Q GENERAL NOTES If REVISIONS 1 PROJECT NO: M FR22-162 DESIGNED BY: MEK DRAWN BY: MEK CHECKED BY: JLD DATE: 09.05.2022 RECEIVED Sep 19 2022 SHEET NO: CITY OFF EDMONDS S1.2 DEVELOPMENT SERVICES DEPARTMENT 1 4'-0" 1 6'-0" 1 12'-4" I � � I � � I � � (E) CONC SLAB ON GRADE I I I I I I I I I I L I I r L- L- L6x6x%x3'-0" KEY PLAN SCALE: NTS N 2 S4.2 TYP U' 3 � 0 I 5'-6" 2,-0„ C, (E) FOUNDATION/(N) PIN PILE LAYOUT PLAN SCALE: 1/16=1'-0" EXPIRES: 04/04/24 E) FOUNDATION/ (N) PIN PILE LAYOUT PLAN NOTES: 1. REFERENCE S1.1 & S1.2 FOR GENERAL REQUIREMENTS 2. CONTRACTOR TO NOTIFY ENGINEER OF RECORD OF DISCREPANCIES BETWEEN FIELD CONDITIONS & THOSE SHOWN IN THESE DOCUMENTS PRIOR TO WORK TYP 3. INDICATES WOOD WALL ON (E) CONC STEMWALL ON (E) CONC FOOTING (CONTRACTOR TO VERIFY 8"WX1'-6"H (E) CONC STEMWALL AND 1'-6"WX10"DP (E) CONC FOOTING MIN TYP (NOTIFY ENGINEER OF RECORD IF FIELD CONDITIONS DIFFER IN THE AREA OF WORK)) 4, \ j INDICATES (N) CONC BACKFILL PER DETAIL 2/S4.2 ((1) TOTAL) 5. � x/sx.x SECTION CUT - DETAIL NUMBER/SHEET NUMBER 6. CQ INDICATES LOCATION OF 2%" 0 PIN PILE W/ FSI FS238B FOUNDATION BRACKET PER DETAILS ON S4.1 ((3) TOTAL)RECEIVI PIN PILE INSTALLATION NOTES: Sep 19 202 • MAX LOAD TO ANCHOR = 5,933 LBS CITY OF EDMONDS • 2.375" 0 PIPE PILE W/ 0.154" THICK WALL DEVELOPMENT ARTMENRVI( • MINIMUM 10'-0" INSTALLATION DEPTH • DRIVE UNTIL LESS THAN 1" MOVEMENT IS OBSERVED IN A 1 MIN TIME SPAN WITH A 11OLB (OR 140LB) PNEUMATIC HAMMER 7. PIN PILE SPACING SHALL BE AS INDICATED ON PLAN 8• CONTRACTOR TO NOTIFY ENGINEER OF RECORD IF (E) FOUNDATION CRACK IS PRESENT IN THE SPAN BETWEEN FOUNDATION BRACKETS 9. [�] INDICATES APPROXIMATE LOCATION OF NCFI GEOTECHNICAL TERRATHANE 24-010 POLYURETHANE FOAM OR EQUIVALENT PER CONTRACTOR AS REQ'D. REF DETAIL 1 /S4.3 10. FILL ALL VISIBLE CRACKS IN THE FOUNDATION WALL WITH HYDRAULIC CEMENT OR EPDXY sfa SFA Design Group, LLE po.la�a�oa L�A x p. (-) 6d1 8311 www. i dq — U Z DC z Q z Lu w> o N O � Z Z) O J O) �Q I— U�J) 3: 0 W ui � b CV Z w `� O o C) O z —Lu L1 >~ w W Q (E) FOUNDATION/ (N) PIN PILE _ LAYOUT PLAN REVISIONS PROJECT NO: MFR22-162 DESIGNED BY: MEK DRAWN BY: MEK CHECKED BY: JLD DATE: 09.05.2022 SHEET NO: S2.1 11. ALL CONSTRUCTION MATERIALS ON PLANS, ELEVATIONS & DETAILS ARE (N) UNO 1/ 4 T-/HOLES/PIER/ROD's 1/ 4 CAP R NOT SHOWN FOR CLARITY FS238B BRACKET - TOP SCALE: 1 1/2"=1 '-0" 1 S4.1 �-/HOLES/PIER/ROD's 2° �I 6 S4.1 1 FS238B BRACKET - RIGHT SCALE: 11/2"=1'—O" 4 1,_2„ 4 7" m �-/HOLES 6 S4.1 I III v/ /4 TOLES/PIER/ROD's FS238B BRACKET - LEFT SCALE: 11/2"=1'—O" CONFINING RING WELDED TO ONE SIDE 1 S4.1 1�1" 11 _ CAP V/403/40'-53/4" SECTION A -A fA Ai 0 0 0 0 _ a: cam' c cn N R R 0n n0 p p I T �-/HOLES IZ-/PIER/SYM 4 I 6 S4.1 FS238B BRACKET - FRONT SCALE: 11/2"=1'—O" �4 1 y4„ �-/HOLE/PIER/SYM 4 6 S4.1 EXPIRES: 04/04/24 FS238B BRACKET - BACK /4 2 S4.1 SCALE: 11/2"=1 ' —O" RECEIVE Sep 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 4 S4.1 /HOLE PIER/SYM FS238B BRACKET - BOTTOM 1 SCALE: 11/2"=1 ' —O" sfa 5FA Design Group, LLE o-sA"I rtl p6418311 ..'S63J www.hd, com t U Z z pC Q z 0- w a It O W � C) Z Z)_jrn Q �z U U) 0 W Ui � 0 CV Z w(DO moo O O w T >- cr W > W ~ W Q BRACKET DETAILS [REVISIONS 1 PROJECT NO: MFR22-162 DESIGNED BY: MEK DRAWN BY: MEK CHECKED BY: JLD DATE: 09.05.2022 SHEET NO: S4.1 (E) WALL SHEATHING (E) EXTERIOR SURFACES ((E) EXTERIOR GRADE AS OCCURS) Ball DIRECT INJECTION POLYURETHANE PER PLAN (E) WALL FRAMING (E) CONC STEMWALL PIN PILE PER PLAN NOTE: REF PLAN FOR LAYOUT & INSTALLATION REQ'S (N) PUSH PIER TO (E) FOUNDATION DETAIL SCALE: 1 "=1'-O" (E) WALL SHEATHING /CN CVTCDVnD CI IDEWIE-C` DIRECT POLYURETHANECD (E) WALL FRAMING (E) CONC STEMWALL (E) INTERIOR SLAB ON GRADE (E) CONC FOOTING (CHIP FLUSH W/ STEMWALL AS REQ'D) STEEL ANGLE LEDGER PER PLAN FOUNDATION BRACKET PER PLAN CONCRETE BACKFILL CENTERED ON PIER TUBE INSTALLED FLUSH W/ FOUNDATION BRACKET (f'c=2500 PSI MIN) PIN PILE PER PLANRECEIVED Sep 19 2022 NOTE. CITY OF EDMONDS DEVELOPMENT SERVICES REF PLAN FOR LAYOUT & INSTALLATION REQ'S DEPARTMENT (N) PUSH PIER TO (E) FOUNDATION DETAIL __r. SCALE: 1 "=1 '-O" sfa 5FA Design Group, Lir PortlandRORcI'Livermore,fCA (Seattle, WA I p: I503I 641�0311 www.sfatlg.com U z Z Q Z � W a W o ?> N 0 Z Z) J O) CL Q Iz U�� 0 w b N z Z wCDO O 5 O z Lu 12 W > W ~ W Q DETAILS REVISIONS PROJECT NO: MFR22-162 DESIGNED BY: MEK DRAWN BY: MEK CHECKED BY: JLD DATE: 09.05.2022 SHEET NO: S4.2 /— (E) WALL FRAMING (E) WALL SHEATHING —(E) CONIC STEMWALL EXTERIOR SURFACES a ° ,—(E) INTERIOR SLAB DIRECT INJECTION POLYURETHANE PER PLAN NOTE: REF PLAN FOR LAYOUT & INSTALLATION REQ'S DIRECT INJECTION VOID FILL DETAIL %" 0 HOLE DRILLED FOR PRIMARY INJECTION POINT SPHERE OF INFLUENCE TYP SCALE: 1 "=1'-0" EXPIRES: 04/04/24 RECEIVED Sep 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PortlandRORcI'Livermore,cCA (Seattle, WA I p: (503� fi41�8311 www.sfatlg.com U Z rr z Q z LL. LU 0_ w o Cr Z 0 � � o 00 J O') Q U c/) 0 w 0 N � C) z z wco0 D O Cc oTw o 0 U) W Ir w w � w Q DETAIL (REVISIONS 1 PROJECT NO: M FR22-162 DESIGNED BY: MEK DRAWN BY: MEK CHECKED BY: JLD DATE: 09.05.2022 SHEET NO: S4.3