Building Permit (3)Type: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED
Parcel No: 00434600002901
Subdivision: 004346
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 19111 92ND AVE W EDMONDS,WA 98020-2319
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PLUMBING -WATER SERVICE LINE
Applied: 11/29/2022
Issued:11/30/2022
Final:
Expiration Date: 5/30/2023
Issued by: BAC
I WA State Contractor L & I #: PROCHJH859PL I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MARK INGOLD
19111 92ND AVE W, EDMONDS
(206)295-0316
MARK@INGOLD.ORG
WA 98020
CONTACT
MARK INGOLD
19111 92ND AVE W, EDMONDS
(206)295-0316
mark@ingold.org
WA 98020
CONTRACTOR
Prochnow, Joshua Harrison
, BOTHELL WA 98012
MARK W & SCHNEIDER
AL
19111 92ND AVE W, EDMONDS
OWNER
(206)295-0316
INGOLD
WA 98020-2319
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
11/30/22
R24702
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/30/22
R24702
PER PERMIT
WATER SERVICE LINE - REPAIR OR
001.000.322.10.000.00
$15.00
$15.00
11/30/22
R24702
REPLACEMENT
TOTALS: $105.00
$105.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, November 30, 2022 10:37:42 AM 1 of 2
PLUMBING Permit
-
City of • • •
•:� i 1
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
WATER LINE ASBUILT
FOR
Owner/Contractor to provide water service line asbuilt at final inspection.
NFORMATION
FOR
Refer to City of Edmonds Water service line handout for approved pipe materials,
WATER SERVICE HANDOUT
INFORMATION
inspections and other requirements.
CITY APPROVED PLASTIC PIPING MAY BE USED IN WATER SERVICE PIPING PROVIDED
THAT WHERE METAL WATER SERVICE PIPING IS USED FOR ELECTRICAL GROUNDING
FOR
PURPOSES, REPLACEMENT PIPING SHALL BE OF LIKE MATERIALS PER UPC 604.8. A STATE
WATER SERVICE PIPING
INFORMATION
ELECTRICAL PERMIT AND INSPECTION IS REQUIRED IF ELECTRICAL GROUNDING IS
ALTERED, REMOVED, IMPROVED, OR ADDED. CONTACT STATE DEPT. OF LABOR &
INDUSTRIES ELECTRICAL DIVISION AT 425-290-1309.
FOR
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it
WATER SERVICE SHUTOFF
INFORMATION
enters the building.
FOR
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it
WATER SERVICE SHUTOFF
INFORMATION
enters the building.
INSPECTIONTYPE INSPECTOR
COMPLETED RESULT
!NOnTES�����
B 3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Wednesday, November 30, 2022 10:37:42 AM 2 of 2