Loading...
Building Permit (3)FIRE OPERATIONAL PERMIT PerCity mit • • • ' Ave 98020 1 1 ' www.edmondswa.gov Type: FIRE OPERATIONAL Subtype: Status: ISSUED PERMIT Parcel No: 00449900000100 Site Address: 9643 FIRDALE AVE EDMONDS,WA 98020-6519 Applied: 11/21/2022 Subdivision: 004503, 004499 Lot: 0 Issued: 12/1/2022 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 6/1/2023 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: LA CASA DE AMIGOS FOOD TRUCK- TEMP STRUCTURE WA State Contractor L & I #: NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DIMAS CRUZ 9643 FIRDALE AVE, EDMONDS (626)766-5121 LACASADEAMIGOSI@GMAIL.COM WA 98020 CONTACT LA CASA DE AMIGOS LLC 9643 FIRDALE AVE, EDMONDS (626)766-5121 lacasadeamigosl@gmail.com WA 98020 OWNER FIRDALE ASSOCIATES LLC 9500 ROOSEVELT WAY NE 100, (626)766-5121 SEATTLE WA 98115 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/23/22 R24630 PER PERMIT FIRE - OPERATIONAL BLDG FEE 001.000.322.10.000.00 $50.00 $50.00 11/23/22 R24630 FIRE - OPERATIONAL PERMIT FEE 001.000.321.30.000.00 $50.00 $50.00 11/23/22 R24630 TOTALS: $140.00 $140.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, December 01, 2022 12:39:07 PM 1 of 2 _ OPERATIONALFIRE - City of • • • 98020 ' 1 1 . •. 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES F-1 FIRE DEPT INSPECTION X-1 FIRE FINAL" X-3 BUILDING FINAL Printed: Thursday, December 01, 2022 12:39:07 PM 2 of 2