ENG2022-0490 ROW PERMIT�~ o� RIGHT OF WAY EUC PERMIT
o
fM.
City of Edmonds PERMIT NU�M ,
121 5th Ave N, Edmonds WA 98020 ENG2022--A04I
www.edmondswa.gov i
Elk
Description: PUD-RELOCATE & REMOVE 1 POLE FOR ELLIS STATION ENG2021-0183
ISSUED: 12/05/2022
Address: 23325 EDMONDS WAY - ESPERANCE EDMONDS WA 98026-8643
EXPIRES: 06/05/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00555300400600
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353
OWNER PACIFIC RIDGE-DRH LLC 17921 BOTHELL EVERETT HWY 100, BOTHELL WA 98012
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
ENGINEERING INSPECTION FEE $110.00 $110.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 12/05/2022
Printed: Monday, December 05, 2022 12:55:48 PM 1 of 2
RIGHT PERMIT
PERMIT NUM
City of Edmonds
www.edmondswa.gov / 425.1 1
CONDITIONS
CONDITION TYPE
NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL"
Printed: Monday, December 05, 2022 12:55:48 PM 2 of 2
of EOMotio� RECEIVED
RIGHT OF WAY CONSTRUCTION OCT 03 2022
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
P pp DEVELOPMENT
/'Vc. is') Requirements outlined in Right -of -Way permit Handout E6�. SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name IFIliq Station - RPlorntP (1) PnIP P. RPmnvP (1) Pnle (WC) 1000930941
Site Address or if no site address use Property Address at NW corner of project area: 123325 Edmonds Way. Edmonds
Associated Permits: BLD PLN ENG
Owner and Entity Holdingapplicable)
Franchise Ordinance No: N/A
Name of Company Snohomish County PUD #1 F
Point of Contact Cfanhnnia PhAiin
Title
RZnr nesinner
Address PO ROX 107
City 0
State
zip
9206
Phone
Email
sbelwin(cDsnooud.com
Contractor and Authorized Agent of Owner
Name of Company Same as above
(see note below)
Contractor Contacts During Construction
Primary Name
Agent Name
Title
Title
Mobile
Address
Email
City
State
Zip
Secondary Name
Phone
Title
Email
Mobile
City of Edmonds Business License No:
Email
State License No:
0 Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential X Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
X Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
This work is for the Constuction of the 29 Lot Plat of Ellis Station.
Relocation & removal of PUD equipment from poles should take 1-2 days & old poles will be stripped & topped for
communications. Pole removal and final restoration to be completed by the last communications off the old poles.
Communications on pole is Ziply and Comcast.
No tree trimming required.
Job may require a pole hold prior to relocation.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
0
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable @power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
x
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
I Ix
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Worl,, to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing?
3
1 How many are to be added?
0
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
2
What is the height of the existing poles?
45'
How many poles are to be removed?
Are additional poles to be laced?
no
How many? I I What is the heighturThe
additionalpoles?
6c. Are any poles to be modified/rebuilt/replaced? If yes:
How many? What is the hei ht of the poles after? 50'
X
Describe the in 1 'cation rebuild: 0AA1
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME: c+e.,►,,, - -1... in
APPLICANT TITLE: ISenior Designer
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
a
pEOO PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY
LOCATION 23325 EDMONDS WAY, EDMONDS 98026 LYNNWOODAREA
POLE NO. PLI 15208 NW 1/4S 31 T 27 R 4 DATE 11/28/2022 ORDER 100093094
REASON FOR WORK POLE RELOCATION & REMOVAL ENGINEER S. ELWIN OPERATION 0030
FOR THE PLAT OF ELLIS STATION DRAFTER U.G. NO.
SCALE
APPROVED SGW
& DATE PRINTED
DATE WORK COMPLETED
FOREMAN
FEES REQID ■ YES ❑ NO
PRIMARY OVERHEAD
❑ RESIDENTIAL
❑ COMMERCIAL
LEO NO.
'@3 '=8
SECONDARY OVERHEAD
NESC VIOLATIONS
BASIC FEE
S
❑ NO ❑ YES (SEE NOTES)
@$ .=$
PERMITS (DATE GRANTED)
❑ TREE TRIM
❑ STATE
METER/CONV. POLE g
PRIMARY UNDERGROUND
❑ RESIDENTIAL
■ COUNTY
❑ COMMERCIAL
❑ CITY
BASIC FEE
S
❑
EASEMENTS
LEU NO.
■ REQUIRED ❑ NOT REQUIRED
SECONDARY UNDERGROUND
BASIC FEE
S
DATE RELEASED
1@$ .=g
UNDERGROUND PLAT
FOREIGN CONTACTS
■ JPN#
BASIC FEE
$
FT.0 '=8
❑ JOINT TRENCH ZIPLY & CATV
El JOINT BORE ZIPLY & CATV
STREET LIGHTING
El
POLE STENCILING
WORK IN RIGHT OF WAY
FROM TO
❑ PRIMARY
TAKE OFF POLE
❑ SECONDARY
PRE-CONST. REQUIRMENTS
❑ TREE TRIM ❑ PUD LOCATOR
(� FT.0 '=8
MISCELLANEOUS FEES
❑ BACKHOE ❑ FLAGGING
VAULT
■ ONE CALL DATE
PERMIT
No.
COST ESTIMATE
$22,6 00.00
STREET LIGHTING
$
❑ YES ■ NO
DATE 11/28/2022
SUBSTATION WSG
CIRCUIT NO. 12-407 PHASE 231
ENGR'S TEL. #
425.783.4356
ENGR'S CELL #
425.737.3987
ONEW PLI 15208
SET NEW CL1 50' P W/GRDS
7' DP 8' E AS STAKED
FRAME PER 12F337
INSTIL 8" AHR & 3/8" DIG
(AO101 & G0113) L=10'E AS STAKED
XFR (3) 336 3PH AAC PRI &
3/0 NEUT CNDCTS
OLD PLI 15208
N RMV 25KVA OH XFMR
DIST UTC #:25-455604
- PUD TO ENFORCE POLE ATTACHMENT
AGREEMENT.
- PUD IS RESPONSIBLE FOR ENSURING THAT THE
OLD POLES ARE REMOVED.
0
SER #:
STRIP, TOP & ABANDON P
TO JOINT UTILTIES
L I 15208
2-455604
OPLI 15211
TRANSFER OF UTILITIES, REMOVAL OF POLE, 1-n
PLI 15209 AND FINAL RESTORATION TO BE CONSISTENT , 0
37-15009 WITH POLE ATTACHMENT AGREEMENT. I
PLI 15209 O
37-15009 7
PLI 15208 CD
25-455604
0
0
PLI 15211
CA
$
a
0
M&R
AS -BUILT
$
22,640.00
GIS
PLI
270913 D
TOTAL DUE
DATE PAID
GIS QC
M&R
25-363069
0
RECEPT NO.
GIS Ph
JOINT USE
2 3 1
SERVICE ORDER NO.
LOCATION MAP PAGE 474-H2
Applicant shall repair/replace all
damage to utilities or frontage
LEGEND:
improvements in City right-of-way
OWNER/CONTRACTOR IS RESPONSIBLE FOR
BEFOREper
city standards that is caused or
EROSION CONTROL AND DRAINAGE
occurs during the permitted project.
2
3 1
o EXISTING POLE
X EXISTING POLE -TO BE REMOVED OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING AFTER
• NEW POLE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
X NEW POLE TO REPLACE EXISTING POLE UTILITIES MAY REQUIRE A SEPERATE PERMIT.
PLI 15208
0
a
PLI 270913
25-363069
PL I15209
37-1500c
I
I `
,I �I
115211
ENGINEERING DIVISION
"DTED
p(� 2/05/2022
L=10'
I
I
I
24
I
1 _
I
1 25
I
1
1
I
1 26
I _I
I
27
I
I
I
I
I
I
I
R B
PLI 270913 NOV 282022
25-363069 CITY OF EDMONDS
DEVELOPMENT
SERVICES
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
LANE CLOSURE ON A FOUR -LANE
UNDIVIDED ROAD
flplp
AxEAU
rmwo"; G20-2A
x i i x (OPTIONAL)
W20-1 O
1 1 N
NORTH
I I o�
I b
I b
I b7c 23325 EDMONDS WAY
I b
I a b
I
� 6®
I Q b
I 0 16
I 6O
I I O
I I O
G20-2A x I I x /\
awp"BilonK I I s \IW4-2R
(OPTIONAL) I I x
OLAE
s W2D-5LENGINEERING DIVISION
�r
x " DTED
Applicant shall repair/replace all ROAD
I I Im
damage to utilities or frontage s µ� W20-1 p� I� 2/05/2022
improvements in City right-of-way
per city standards that is caused or r13/
occurs during the permitted project. PORTABLE CHANGEABLE
MESSAGE SIGN WITH
LIGHTED ARROWS
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE - PUD TO ENFORCE POLE ATTACHMENT
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING LIGHTED ARROW AGREEMENT.
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY PUD IS RESPONSIBLE FOR ENSURING THAT THE
UTILITIES MAY REQUIRE A SEPERATE PERMIT. BOARD REQUIRED OLD POLES ARE REMOVED.
Iffi
MISH COUNTY
TRAFFIC CONTROL PLAN
TILITY DISTRICT NU 1
PROJECT ELLIS STATION
RESM
LOCATION 23325 EDMONDS WAY, EDMONDS WA 98026
ENGINEER STEPHANIE ELWIN DATE 11/28/2022 ORDER 100093094 NOV 282022
PHONE 425-783-4356 CITY OF EDMONDS
DEVELOPMENT
SERVICES
DEPARTMENT
CELLULAR 425— 737-3987
SIGN
SPEED
LIMIT
SPACING
X (FT)
MERGING
TAPER tFT)
(FOR @'LANE)
6uFFER
(FT)
25
200
125
155
30
200
180
200
35
350
245
250
40
350
320
305
45
500
540
360
50
500
600
425
55
500
660
495
RESUB
NOV 28 2022
X
PUBLIC UTILITY DISTRICT
TRANSMITTAL
DATE: 11/28/22
TO: Natalie Griggs, Engineering Technician
Engineeringpermits@edmondswa.gov
FROM: Ben Davis, PE TELEPHONE NO:
PROJECT: Application #: ENG2022-0490
Address: 2325 Edmonds Way
Project Description: Relocating Pole for Ellis Station
COPIES: Stephanie Elwin, file
DELIVERY METHOD:
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
425-231-2145
❑ REGULAR MAIL ❑ OVERNIGHT MAIL ❑ COURIER ❑ E-MAIL ® OTHER
ITEM
COPIES
DATE
DESCRIPTION
1
0
11/28/22
Site Plan
2
0
11/28/22
Traffic Control Plan
In response permit comments dated November 7, 2022, please see responses below in italics.
SITE PLAN
1) The plans show the new pole at location "A" being placed northeast of the existing pole. The notes for "A"
note that the new pole will be placed T west of the existing, which would put the pole within the travel
lane on Edmonds Way.
a. Please clarify and revise the site plan accordingly.
The location was incorrectly identified as "W' west instead of `E" east. This has been corrected. See revised
Site Plan.
2) This development is required to install a 6-foot-wide sidewalk and 5-foot-wide planter strip. Please
confirm the proposed pole will be behind the new sidewalk.
Yes. The new pole will be located behind the sidewalk within the utility easement.
TRAFFIC CONTROL PLAN
1) A lighted arrow board is required for all work on Edmonds Way; please add this to the traffic control plan.
A note for a lighted arrow board has been added. See revised plan.
® FOR YOUR REVIEW
File Name: B:\Eng\File Exchange\Ld-Pro Projects\ NOT REVIEWED and ACTIVE\Ellis Station 100085931\PERMIT JPN\Permit Resubmittal 11-28-
22\T 11-28-22_Ellis Permit Response.docx
1802 7511 Street SW Everett Washington 98203