Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW COMMERCIAL BLDG I Status: ISSUED
Parcel No: 00449900000100
Subdivision: 004503, 004499
Fire Sprinklers: No
Valuation: $234,246.08
Code Edition: 2018
Site Address: 9617 FIRDALE AVE EDMONDS,WA 98020-6519
Lot: 0
Lot Area:
Occupancy Type: M
No. Stories: 0
Zoning: FVMU
Construction Type: VB
# of Dwelling Units: 0
Scope of Work: FIRDALE VILLAGE- MARKET- REBUILD (FIRE) P/M SEP
Applied: 9/6/2022
Issued:12/5/2022
Final:
Expiration Date: 11/30/2023
Issued by: NED
I WA State Contractor L & I #: GOLDECC809P1 I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JESSE BINFORD
3605 C ST NE, AUBURN WA
(253)833-5557
JBINFORD@BCIE.NET
98002
CONTACT
BC INVESTIGATIVE
3605 C ST NE, AUBURN WA
(253)833-5557
jbinford@bcie.net
ENGINEERS
98002
GOLDEN COAST
CONTRACTOR
CONSTRUCTION &
4811 CHIPPENDALE DR #301,
(800)609-0232
GREGT@GOLDENCOASTCO.COM
SACRAMENTO CA 95841
RESTORATION
CONTRACTOR 2
STATEWIDE RESTORATION
12838-A NE AIRPORT WAY,
(425)829-4050
mike.poor@gostatewide.com
INC
PORTLAND OR 97230
9500 ROOSEVELT WAY NE 100,
OWNER
FIRDALE ASSOCIATES LLC
SEATTLE WA 98115
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/29/22
R23258
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
12/5/22
R24799
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
12/5/22
R24799
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$2,272.00
$2,272.00
12/5/22
R24799
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$1,931.20
$1,931.20
9/29/22
R23258
TOTALS: $4,488.20
$4,488.20
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, December 05, 2022 1:35:40 PM 1 of 3
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2022-1181
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSPECTIONS
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INFORMATION
www.mybuildingpermit.com
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
'LORMWIN-• • •
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
!N0nTESJjNW
X-1 FIRE FINAL
A-1 BUILDING PRECON
Printed: Monday, December 05, 2022 1:35:40 PM 2 of 3
rMMERCIAL BLDG PermitCity •Edmonds PERMIT NU
Edmondslir 12,1 5th Ave N, 98020BLD2022-11811
www.edmondswa.gov
B-2 FOOTINGS
B-3 EXT WALL SHEATHING
B-3 PRE ROCK SHAFTS ETC
B-3 RETROFIT ANCHORAGE
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 INTERIOR SHEAR
B-5 INSULATION ENERGY
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
Printed: Monday, December 05, 2022 1:35:40 PM 3 of 3