ENG2022-0553 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of • • .
98020 ENG2022-0553
IL
www.edmondswa.gov i
Description: ZIPLY-REPLACE FALLEN POLE AND RE -ATTACH LINES ISSUED: 12/06/2022
Address: 18627 OLYMPIC VIEW DR EDMONDS WA 98020-2350
EXPIRES: 06/06/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434600301402
NAME TYPE NAME ADDRESS PHONE
APPLICANT VICTORIA COMER 1800 41ST STREET STE N-100, EVERETT WA 98203 (830)513-6614
CONTACT ZIPLY FIBER NORTHWEST, LLC 1800 41ST STREET STE N-100, EVERETT WA 98230 (402)670-8384
CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
OWNER STEVEN OLAV ALFSVAAG 18627 OLYMPIC VIEW DR, EDMONDS WA 98020-2350
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 12/06/2022
Printed: Tuesday, December 06, 2022 8:31:32 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUMIJBE
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
Printed: Tuesday, December 06, 2022 8:31:32 AM 2 of 2
RECEIVED
Lti�y of ED%�O�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
NOV 16 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General Info
Project Name 5518034
Site Address or if no site address use Property Address at NW corner of project area: 18627 Olympic View Dr
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17
PointofContact Mike Hakahan
Title Engineer
Address1800 41 st St., Ste. N 100
city Everett
State WA
zip 98203
Phone 425-949-0230
Email mike.hakahan@ziply.com
AuthorizedContractor and Agent •below)
NameofCompany Ziply Fiber Northwest, LLC
Primary Name Mike Hakahan
Agent Name Mike Hakahan
Title Engineer
Title Engineer
Mobile 425-949-0230
Addressl800 41st St. Ste. N100
Email mike.hakahan@ziply.com
city Everett
I State WA
zip 98203
Secondary Name
Phone 425-949-0230
Title
Email mike.hakahan@ziply.com
Mobile
City of Edmonds Business License No: 313-013-420
Email
State License No: ZIPLYFN782L3
I1 Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
A Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
VUtility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to
Remove old pole and set new pole and reattach strand with cables.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
N/A
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
N/A
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
* telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
1.
CompletedDetails of Work to be
Does the utility owner have existin overhead infrastructure in the area of work?
•
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
5.
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How many are to be added?
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: C_,61M 1& DATE: 11/15/2022
APPLICANT PRINTED NAME: Michael Comer
APPLICANT TITLE: Traffic Controll Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
EROSION CONTROLAND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
WHO: Ziply Fiber
WHAT: Replace 30/5 pole from 1964
WHERE: 18627 Olympic View Dr, Edmonds, WA 47.82969363360744,-122.36121235053805
WHEN: 11/8/2022 work already completed in the field
WHY: Storm damage pole fall
HOW: Line crew to set new pole and reattach strand with cables, remove old pole.
City of Edmonds
PERMIT REQUIRED!
Exchange:
Project:
51419 Halls Lake
5518034
ENGINEERING DIVISION
. A --,')TED
2/05/2022
EMEFkc3tNLY VVUKK COMPLETED
PRIOR TO PERMIT APPROVAL.
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
RECEIVED
NOV 16 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
APPROVED PROJECT
Mike HaKahan
Ziply OSP Engineer
mike. hakahanoaiolv.com
425-949-0230
Page 1 of 1
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
F OTU T �
I II}
z
I
Ir
rr c8,3pecs St
I
wl
Stamm
Ove rIDDk Park
9
-:jtt. Park
a
CID
i
CD
Southwest
, j',�l ,� County Perk
VICINITY MAP
eaview Park
PERRINVILLE
r
524 1 CA-t -I St SW
RECEIVED
NOV 16 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
MirwrMa
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish. WA 98290
ziPIy fiber
Everett, WA 98206
M
a
3
Cn
Y LLJ
a
L9
fn
Q
m
N
E
00
2
0
U
0
W
r
U
w
_
� a
U
U
a-
of
LLJ
J
�
0
r`
W
rr >
N
U
a
clf J
W 0
r
N
00
OH
Z
U W
Cn
W
m
W
w
M
Z
o
Q
U
U
0
O
w
w
Q
0�
0�
0
J_
d
IL
J
LL
DATE: 11.15.2022
REVIEWED BY: D. LAFLEUR
WSTCS# 013259
DESIGNED BY: M. COMER
ATCO CONTACT: 830.329.1982
michael.comer@atcotelecom.com
SCALE:
SHEET:
T T�
01
S� A E
NO: 1 OF 2
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
ZCI
Oly
�A
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
WARNING SIGN
ARROW E BOARD (WHERE REQUIRED)
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
IT
FLAGGER
(AS NEEDED)
W20-7A
k
= d' POLE
T�QgFIy� \< 9 '00,
�/C gAYF
SIGN LEGEND:
ROAD ONE LANE .
WORK ROAD
AHEAD AHEAD
< >
W20-4 T W20-7A
ONF\ S0,
Q �0 TRq FcF 70 0
MAN � T�AF��q
WORK
AREA
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
v �
18627
OLYMPIC
VIEW
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
co
PHASE 1
WORK DETAILS:
a N
WORK DESCRIPTI❑N
Remove old pole, set new pole and
reattach strand with cables,
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
ENGINEERING DIVISION
"7TED
W34 _ N(�Wv
2/05/2022
EMERGENCY WORK COMPLETED
PRIOR TO PERMIT APPROVAL.
W20-7
OLY�pIC V
NOTE:
MON. - FRI. = 7:00am TO 4:00pm 1
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 1 40
1 80
35/45 30
60
25/30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
W20—
W20—
RECEIVED
NOV 16 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES. LLC
www.otcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
cn
0
LO
LO
IY
w
m
z
U
w
0
ti
0
z
0
0
w
0
W
U
a
J
0
N
W
C0
w
IY
0
0
Q
U
w
0
d
a-
n
Wa
0
Q
U
0
J
z
Q
W
LL
LL
Q
Cz
I —
DATE: 11.15.2022
REVIEWED BY: D. LAFLEUR
WSTCS# 013259
DESIGNED BY: M. COMER
ATCO CONTACT: 830.329.1982
michael.comer@atcotelecom.com
SCALE: SHEET:
= 4C 02
NO: 2OF2