Loading...
Building Permit (3)Type: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED Parcel No: 00573000001800 Subdivision: 005124, 005730 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Scope of Work: SOLAR Site Address: 7806 192ND PL SW EDMONDS,WA 98026-6122 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Applied: 12/5/2022 Issued:12/6/2022 Final: Expiration Date:6/4/2023 Issued by: BAC I WA State Contractor L & I #: SOLGEPL820BE I CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT KRYSTENE ALLEN 5715 BEDFORD STREET, PASCO (509)596-2254 PERM ITTING.WA@SOLGENPOWER.CO WA 99301 M CONTACT SOLGEN POWER LLC 5715 BEDFORD STREET, PASCO (855)709-1181 permitting.wa@solgenpower.com WA 99301 CONTRACTOR SOLGEN POWER 5715 BEDFORD STREET, PASCO (509)866-4845 permitting.wa@solgenpower.com WA 99301 DAVID & BROWN LINDSAY 7806 192ND PL SW, EDMONDS OWNER SALE WA 98026 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/5/22 R24809 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 12/5/22 R24809 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $60.00 12/5/22 R24809 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $60.00 12/5/22 R24809 TOTALS: $166.50 $166.50 CONDITION TYPE STATUS NOTES Printed: Tuesday, December 06, 2022 9:49:02 AM 1 of 2 SOLARPerCity mit • • • - •:D2022-1649 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Tuesday, December 06, 2022 9:49:02 AM 2 of 2