Loading...
APPROVED PLN RESUB 2+PLN2021-0037+Tree Cost Estimate+8.17.2022_2.48.10_PM+3057548RAM Engineering Inc. Tree Replacement Cost Estimate For 8/17/2022 Bracket's Reserve PLN2021-0037 RAM No. 20-024 Erosion and Sediment Control Unit Price Unit Quantity Total 1.Deciduous Tree- 1.5" caliper $300.00 ea*54 $16,200 2.Evergreen Tree- 6-ft height $250.00 ea*176 $44,000 Sub-Total:$60,200 120% Bond Factor:$12,040 Total Bond Amount:$72,240 *Each unit cost includes cost and labor for plant materials, mulch, compost, fertilizer, tree stakes and water bag. RAM Engineering 19109 36th Ave W, Suite 100 Lynnwood WA 98036 (425) 678-6960 RESUB CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT AUG 17 2022 APPROVED BY PLANNING Sep 27 2022