APPROVED PLN RESUB 2+PLN2021-0037+Tree Cost Estimate+8.17.2022_2.48.10_PM+3057548RAM Engineering Inc.
Tree Replacement Cost Estimate For 8/17/2022
Bracket's Reserve
PLN2021-0037
RAM No. 20-024
Erosion and Sediment Control Unit Price Unit Quantity Total
1.Deciduous Tree- 1.5" caliper $300.00 ea*54 $16,200
2.Evergreen Tree- 6-ft height $250.00 ea*176 $44,000
Sub-Total:$60,200
120% Bond Factor:$12,040
Total Bond Amount:$72,240
*Each unit cost includes cost and labor for plant materials, mulch, compost, fertilizer, tree stakes and water bag.
RAM Engineering 19109 36th Ave W, Suite 100 Lynnwood WA 98036 (425) 678-6960
RESUB
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
AUG 17 2022
APPROVED BY PLANNING
Sep 27 2022