Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
_____________yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Select Homes Inc., 19508 88th Ave W 3-Lot Short Plat
19508 88th Ave SW
For alternate formats, call 206-296-6600.
__________________
4/20/2022
PLN 2021-0021
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Unit # of
Reference #Price Unit Quantity Applications Cost
EROSION/SEDIMENT CONTROL Number
Backfill & compaction-embankment ESC-1 6.00$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) 95.00$ CY
Ditching ESC-4 9.00$ CY
Excavation-bulk ESC-5 2.00$ CY
Fence, silt ESC-6 SWDM 5.4.3.1 1.50$ LF 420 1 630
Fence, Temporary (NGPE)ESC-7 1.50$ LF
Hydroseeding ESC-8 SWDM 5.4.2.4 0.80$ SY 1900 1 1520
Jute Mesh ESC-9 SWDM 5.4.2.2 3.50$ SY
Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 2.50$ SY
Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 2.00$ SY
Piping, temporary, CPP, 6"ESC-12 12.00$ LF
Piping, temporary, CPP, 8"ESC-13 14.00$ LF
Piping, temporary, CPP, 12"ESC-14 18.00$ LF
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 4.00$ SY 50 1 200
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) 45.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-17 SWDM 5.4.4.1 1,800.00$ Each 1 1 1800
Rock Construction Entrance, 100'x15'x1'ESC-18 SWDM 5.4.4.1 3,200.00$ Each
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 2,200.00$ Each
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 19.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 70.00$ LF
Seeding, by hand ESC-22 SWDM 5.4.2.4 1.00$ SY
Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5 8.00$ SY
Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 10.00$ SY
TESC Supervisor ESC-25 110.00$ HR 30 1 3300
Water truck, dust control ESC-26 SWDM 5.4.7 140.00$ HR 20 1 2800
WRITE-IN-ITEMS **** (see page 9)
100.00$ Each 6 1 600
4,500.00$ 1 1 4500
ESC SUBTOTAL:15,350.00$
30% CONTINGENCY & MOBILIZATION:4,605.00$
ESC TOTAL:19,955.00$
COLUMN:A
Page 2 of 9
Tree Protection
Catchbasin Protection
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-Way Right of Way Improvements
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
GENERAL ITEMS No.
Backfill & Compaction- embankment GI - 1 6.00$ CY 10 60.00 190 1,140.00
Backfill & Compaction- trench GI - 2 9.00$ CY
Clear/Remove Brush, by hand GI - 3 1.00$ SY
Clearing/Grubbing/Tree Removal GI - 4 10,000.00$ Acre 0.2 2,000.00
Excavation - bulk GI - 5 2.00$ CY 10 20.00 190 380.00
Excavation - Trench GI - 6 5.00$ CY
Fencing, cedar, 6' high GI - 7 20.00$ LF
Fencing, chain link, vinyl coated, 6' high GI - 8 20.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI - 9 1,400.00$ Each
Fencing, split rail, 3' high GI - 10 15.00$ LF
Fill & compact - common barrow GI - 11 25.00$ CY
Fill & compact - gravel base GI - 12 27.00$ CY
Fill & compact - screened topsoil GI - 13 39.00$ CY
Gabion, 12" deep, stone filled mesh GI - 14 65.00$ SY
Gabion, 18" deep, stone filled mesh GI - 15 90.00$ SY
Gabion, 36" deep, stone filled mesh GI - 16 150.00$ SY
Grading, fine, by hand GI - 17 2.50$ SY
Grading, fine, with grader GI - 18 2.00$ SY
Monuments, 3' long GI - 19 250.00$ Each
Sensitive Areas Sign GI - 20 7.00$ Each
Sodding, 1" deep, sloped ground GI - 21 8.00$ SY
Surveying, line & grade GI - 22 850.00$ Day
Surveying, lot location/lines GI - 23 1,800.00$ Acre
Traffic control crew ( 2 flaggers ) GI - 24 120.00$ HR
Trail, 4" chipped wood GI - 25 8.00$ SY
Trail, 4" crushed cinder GI - 26 9.00$ SY
Trail, 4" top course GI - 27 12.00$ SY
Wall, retaining, concrete GI - 28 55.00$ SF
Wall, rockery GI - 29 15.00$ SF 480 7,200.00
Page 3 of 9 SUBTOTAL 80.00 10,720.00
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public
Right-of-way Right of Way Improvements
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
ROAD IMPROVEMENT No.
AC Grinding, 4' wide machine < 1000sy RI - 1 30.00$ SY
AC Grinding, 4' wide machine 1000-2000syRI - 2 16.00$ SY
AC Grinding, 4' wide machine > 2000sy RI - 3 10.00$ SY
AC Removal/Disposal RI - 4 35.00$ SY 20 700.00
Barricade, type III ( Permanent ) RI - 6 56.00$ LF
Curb & Gutter, rolled RI - 7 17.00$ LF
Curb & Gutter, vertical RI - 8 12.50$ LF
Curb and Gutter, demolition and disposal RI - 9 18.00$ LF
Curb, extruded asphalt RI - 10 5.50$ LF
Curb, extruded concrete RI - 11 7.00$ LF
Sawcut, asphalt, 3" depth RI - 12 1.85$ LF 90 166.50
Sawcut, concrete, per 1" depth RI - 13 3.00$ LF
Sealant, asphalt RI - 14 2.00$ LF 90 180.00
Shoulder, AC, ( see AC road unit price ) RI - 15 -$ SY
Shoulder, gravel, 4" thick RI - 16 15.00$ SY
Sidewalk, 4" thick RI - 17 38.00$ SY
Sidewalk, 4" thick, demolition and disposalRI - 18 32.00$ SY
Sidewalk, 5" thick RI - 19 41.00$ SY
Sidewalk, 5" thick, demolition and disposalRI - 20 40.00$ SY
Sign, handicap RI - 21 85.00$ Each
Striping, per stall RI - 22 7.00$ Each
Striping, thermoplastic, ( for crosswalk ) RI - 23 3.00$ SF
Striping, 4" reflectorized line RI - 24 0.50$ LF
Page 4 of 9 SUBTOTAL 1,046.50
& Drainage Facilities
Private
*KCC 27A authorizes only one bond reduction.
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
ROAD SURFACING No. (4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing RS - 1 3.60$ SY
HMA 1/2" Overlay, 1.5" RS - 2 14.00$ SY 38 532.00
HMA 1/2" Overlay 2" RS - 3 18.00$ SY
HMA Road, 2", 4" rock, First 2500 SY RS - 4 28.00$ SY
HMA Road, 2", 4" rock, Qty. over 2500 SY RS - 5 21.00$ SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY RS - 6 35.00$ SY 38 1,330.00 30 1,050.00 290 10,150.00
HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SYRS - 7 42.00$ SY
Not Used RS - 8
Not Used RS - 9
HMA Road, 6" Depth, First 2500 SY RS - 10 33.10$ SY
HMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 30.00$ SY
HMA 3/4" or 1", 4" Depth RS - 12 20.00$ SY
Gravel Road, 4" rock, First 2500 SY RS - 13 15.00$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 10.00$ SY
PCC Road (Add Under Write-Ins w/Design) RS - 15
Thickened Edge RS - 17 8.60$ LF 36 309.60
Page 5 of 9 SUBTOTAL 2,171.60 1,050.00 10,150.00
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent)
Access Road, R/D D - 1 21.00$ SY
Bollards - fixed D - 2 240.74$ Each
Bollards - removable D - 3 452.34$ Each
* (CBs include frame and lid)
CB Type I D - 4 1,500.00$ Each 3 4,500.00
CB Type IL D - 5 1,750.00$ Each
CB Type II, 48" diameter D - 6 2,300.00$ Each 1 2,300.00
for additional depth over 4' D - 7 480.00$ FT 5 2,400.00
CB Type II, 54" diameter D - 8 2,500.00$ Each
for additional depth over 4' D - 9 495.00$ FT
CB Type II, 60" diameter D - 10 2,800.00$ Each 1 2,800.00
for additional depth over 4' D - 11 600.00$ FT 9 5,400.00
CB Type II, 72" diameter D - 12 3,600.00$ Each
for additional depth over 4' D - 13 850.00$ FT
Through-curb Inlet Framework (Add) D - 14 400.00$ Each
Cleanout, PVC, 4" D - 15 150.00$ Each
Cleanout, PVC, 6" D - 16 170.00$ Each 4 680.00
Cleanout, PVC, 8" D - 17 200.00$ Each
Culvert, PVC, 4" D - 18 10.00$ LF
Culvert, PVC, 6" D - 19 13.00$ LF 15 195.00
Culvert, PVC, 8" D - 20 15.00$ LF 11 165.00 5 75.00 146 2,190.00
Culvert, PVC, 12" D - 21 23.00$ LF
Culvert, CMP, 8" D - 22 19.00$ LF
Culvert, CMP, 12" D - 23 29.00$ LF
Culvert, CMP, 15" D - 24 35.00$ LF
Culvert, CMP, 18" D - 25 41.00$ LF
Culvert, CMP, 24" D - 26 56.00$ LF
Culvert, CMP, 30" D - 27 78.00$ LF
Culvert, CMP, 36" D - 28 130.00$ LF
Culvert, CMP, 48" D - 29 190.00$ LF
Culvert, CMP, 60" D - 30 270.00$ LF
Culvert, CMP, 72" D - 31 350.00$ LF
Page 6 of 9 SUBTOTAL 165.00 75.00 20,465.00
& Drainage Facilities
For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
*KCC 27A authorizes only one bond reduction.
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
DRAINAGE CONTINUED
No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost
Culvert, Concrete, 8" D - 32 25.00$ LF
Culvert, Concrete, 12" D - 33 36.00$ LF
Culvert, Concrete, 15" D - 34 42.00$ LF
Culvert, Concrete, 18" D - 35 48.00$ LF
Culvert, Concrete, 24" D - 36 78.00$ LF
Culvert, Concrete, 30" D - 37 125.00$ LF
Culvert, Concrete, 36" D - 38 150.00$ LF
Culvert, Concrete, 42" D - 39 175.00$ LF
Culvert, Concrete, 48" D - 40 205.00$ LF
Culvert, CPP, 6" D - 41 14.00$ LF
Culvert, CPP, 8" D - 42 16.00$ LF
Culvert, CPP, 12" D - 43 24.00$ LF
Culvert, CPP, 15" D - 44 35.00$ LF
Culvert, CPP, 18" D - 45 41.00$ LF
Culvert, CPP, 24" D - 46 56.00$ LF
Culvert, CPP, 30" D - 47 78.00$ LF
Culvert, CPP, 36" D - 48 130.00$ LF
Ditching D - 49 9.50$ CY
Flow Dispersal Trench (1,436 base+) D - 50 28.00$ LF
French Drain (3' depth) D - 51 26.00$ LF
Geotextile, laid in trench, polypropylene D - 52 3.00$ SY
Mid-tank Access Riser, 48" dia, 6' deep D - 54 2,000.00$ Each
Pond Overflow Spillway D - 55 16.00$ SY
Restrictor/Oil Separator, 12" D - 56 1,150.00$ Each
Restrictor/Oil Separator, 15" D - 57 1,350.00$ Each
Restrictor/Oil Separator, 18" D - 58 1,700.00$ Each
Riprap, placed D - 59 42.00$ CY
Tank End Reducer (36" diameter) D - 60 1,200.00$ Each
Trash Rack, 12" D - 61 350.00$ Each
Trash Rack, 15" D - 62 410.00$ Each
Trash Rack, 18" D - 63 480.00$ Each
Trash Rack, 21" D - 64 550.00$ Each
Page 7 of 9 SUBTOTAL
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
Unit Price Unit Quant. Price Quant. Cost Quant. Cost
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow PL - 1 21.00$ SY NA NA
2" AC, 1.5" top course & 2.5" base coursePL - 2 28.00$ SY NA NA
4" select borrow PL - 3 5.00$ SY NA NA
1.5" top course rock & 2.5" base course PL - 4 14.00$ SY NA NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation UP-1
Street Light Poles w/Luminaires UP-2 Each
WRITE-IN-ITEMS
(Such as detention/water quality vaults.)No.
Traffic Control WI - 1 1,600.00$ Lump 1 1600
Water Service WI - 2 600.00$ Ea. 2 1,200.00
1-1/2" Water Service Line WI - 3 9.00$ LF 10 90 20 180.00 260 2,340.00
Sewer- 6" Cleanout WI - 4 200.00$ LF 1 200.00 2 400.00
Sewer- 6" PVC WI - 5 25.00$ Ea. 22 550 10 250.00 12 300.00
Mailbox Stand WI - 6 4,000.00$ LS 1 4000
Infiltration Trench System (pipe + rock) WI - 7 33,000.00$ LS 1 33,000.00
Stormwater Lift Station (pumps + pipe) WI - 8 12,500.00$ LS 1 12,500.00
Sewer- 2" force main pipe WI - 9 8.00$ LF 260 2,080.00
SUBTOTAL 6,240.00 1,830.00 50,620.00
SUBTOTAL (SUM ALL PAGES):9,703.10 2,955.00 91,955.00
30% CONTINGENCY & MOBILIZATION:2,910.93 886.50 27,586.50
GRANDTOTAL: 12,614.03 3,841.50 119,541.50
COLUMN: B C D
Page 8 of 9
& Drainage Facilities
Not To Be Used For Roads Or Shoulders
Lump Sum
*KCC 27A authorizes only one bond reduction.
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/23/2022
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Date:
PE Registration Number: Tel. #:
Firm Name:
Address: Project No:
Stabilization/Erosion Sediment Control (ESC) (A)
Existing Right-of-Way Improvements (B)
Future Public Right of Way & Drainage Facilities (C)
Private Improvements (D)
Calculated Quantity Completed
Total Right-of Way and/or Site Restoration Bond*/** (A+B)
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL (T) T x 0.30
Minimum is $2000. Minimum is $2000.
Maintenance/Defect Bond* Total
Minimum is $2000.
NAME OF PERSON PREPARING BOND* REDUCTION: Date:
* NOTE:The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off-site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
4/20/2022
PLN 2021-0021
4,113.9$
Rob Long, PE
19,955.0$
12,614.0$
3,841.5$
46,785.6$
(B+C) x
0.25 =
32,569.0$
119,541.5$
155,952.0$
4/20/2022
(425) 678-6960
FINANCIAL GUARANTEE REQUIREMENTS
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
Rob Long, PE
RAM Engineering, Inc.
16531 13th Ave W, Suite A108 Lynnwood WA 98037
PERFORMANCE BOND*
AMOUNT
36508
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
Page 9 of 9
19508 88th 3-Lot SP - Bond Quantity Worksheet.xlsx