Building Permit 2020'S IDENTIAL BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
98020
1 1
wwm
www.edmondswa.gov
Type: RESIDENTIAL BLDG
Owner/ Business: LEIGH HARVEY
Status: ISSUED
Subtype: ACCESSORY STRUCTURE RES
Parcel No: 00476000000500
Site Address: 10608 231ST ST SW EDMONDS,WA 98020-6153
Applied: 8/27/2019
Subdivision: 004760, 005713,
005546 Lot:
Issued: 12/22/2020
Fire Sprinklers: No
Lot Area: 8,400 Zoning: RS-8
Final:
Valuation: $14,700.00
Occupancy Type: Construction Type: VB
Expiration Date: 12/17/2021
Code Edition: 2015
No. Stories: 1 # of Dwelling Units: 0
Issued by: NED
Scope of Work: HARVEY-DETACHED STORAGE SHOP (paper only)
WA State Contractor L & I #: ELAINMA832NS City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME ADDRESS PHONE
EMAIL
APPLICANT KEN MATTSON
PO BOX 234, EDMONDS WA (206)484-0228
KENMATTSONANDASSOC@GMAIL.CO
98020
M
CONTRACTOR ELAINE MATTSON & PO BOX 234, EDMONDS WA (425)828-8811
ASSOCIATES
98020
OWNER LEIGH HARVEY
10608 231ST ST SW, EDMONDS (206)730-1319
LEIGHHARVEY@ICLOUD.COM
WA 98020-6153
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
12/21/20
R9238
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
12/21/20
R9238
PERMITS
B-BUILDING PERMIT FEE
001.000.322.10.000.00
$357.00
$357.00
12/21/20
R9238
B-BUILDING PLAN REVIEW FEE
001.000.345.83.000.00
$219.00
$219.00
8/27/19
REC077282
B-STATE BUILDING CODE
001.000.237.150
$6.50
$6.50
12/21/20
R9238
SURCHARGE
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$45.00
$45.00
12/21/20
R9238
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$100.00
$100.00
12/21/20
R9238
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
12/21/20
R9238
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
12/21/20
R9238
EXPANSION TANK
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00
$35.00
12/21/20
R9238
TOTALS: $892.50 $892.50
• •
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, December 22, 2020 6:04:48 AM 1 of 3
'SIDENTIAL: Permit
PERMIT NUM
City of Edmonds
Edmonds •:� iJIL 1 1
ww, -. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
ALL BUILDING PERMITS
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
ESC Required
Maintain erosion & sedimentation control per city standards.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
Hold Harmless
officials, employees, and agents from any and all claims for damages of whatever nature,
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Final approval on a project or final occupancy approval must be granted by the Building
Occupancy
Official prior to use or occupancy of the building or structure. Check the job card for all
required City inspections including final project approval and final occupancy inspections.
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
and for which a variance has not been specifically identified, requested and considered
by the appropriate city official in accordance with the appropriate provision of city code
or state law does not approve any items not to code specification.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Underground Utility Locates
Call for locates of underground utilities prior to any excavation.
All new, extended, re -built or relocated electrical utility and/or service shall be placed
Underground Wiring
underground.
Printed: Tuesday, December 22, 2020 6:04:48 AM 2 of 3
L -
-
-.14471wffl. •
•'-
• • .- • so oil
COMPLETED RESULT
SEQID
INSPECTION TYPE INSPECTOR NOTES
DATE
X-2 ENGINEERING FINAL
1
A-1 BUILDING PRECON
2
B-1 SETBACKS
3
B-3 UNDERFLR FRAMING
4
B-3 PLUMB ROUGH IN
5
B-3 MECH ROUGH IN
6
B-4 FRAMING
7
B-3 EXT WALL SHEATHING
8
B-4 DRYWALL FASTENING
9
X-3 BUILDING FINAL**
Printed: Tuesday, December 22, 2020 6:04:48 AM 3 of 3