Building Permit 2020-ADU
Permit
PERMIT NU
City of Edmonds
www.edmondswa.gov
Type: ADU
Owner/ Business: TREECE TORRE L & KENDRA D
Status: ISSUED
Subtype: ADU ADDITION REMODEL
Parcel No: 27043000104100 Site Address: 8104 219TH ST SW EDMONDS,WA 98026-7867
Applied: 3/3/2020
Subdivision: 005277, 006688
Lot: 0
Issued: 7/20/2020
Fire Sprinklers: Lot Area: 24,025
Zoning: RS-8
Final:
Valuation: $87,992.96 Occupancy Type: R-3
Construction
Type: VN
Expiration Date: 7/15/2021
Code Edition: 2015 No. Stories: 1
# of Dwelling
Units: 0
Issued by: NED
Scope of Work: TREECE- ADU p&m incl
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT TREECE TORRE L & KENDRA D 8104 219TH ST SW, EDMONDS
(425)218-7098
ttreece@muellerwp.com
WA 98026-7867
CONTRACTOR TREECE TORRE L &
KENDRA D 8104 219TH ST SW, EDMONDS
(425)218-7098
ttreece@muellerwp.com
WA 98026-7867
OWNER TREECE TORRE L & KENDRA D 8104 219TH ST SW, EDMONDS
(425)218-7098
ttreece@muellerwp.com
WA 98026-7867
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
7/20/20
R6530
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
7/20/20
R6530
PERMITS
ADU - SUB BLDG PERMIT FEE
001.000.322.10.000.00
$200.00
$200.00
7/20/20
R6530
ADU - SUB BLDG PLAN REVIEW FEE
001.000.345.83.000.00
$205.00
$205.00
7/20/20
R6530
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
7/20/20
R6530
PUMP - 1.75 BTU OR LESS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
7/20/20
R6530
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
7/20/20
R6530
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$60.00
$60.00
7/20/20
R6530
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$330.00
$330.00
7/20/20
R6530
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
7/20/20
R6530
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
7/20/20
R6530
LARGE FORMAT COPY FEE
001.000.341.81.000.00
$5.00
$5.00
7/20/20
R6530
LETTER OR LEGAL COPY FEE
001.000.341.81.000.00
$0.15
$0.15
7/20/20
R6530
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,016.00
$1,016.00
7/20/20
R6530
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$863.60
$863.60
3/3/20
R4146
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
7/20/20
R6530
WATER HEATER - TANKLESS
001.000.322.10.000.00
$15.00
$15.00
7/20/20
R6530
Printed: Monday, July 20, 2020 8:49:42 AM 1 of 3
ADU Permit
PERMITNU
City • • • •
•:i 1 1 1 ..
www.edmondswa.gov
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
WATER SERVICE LINE - REPAIR OR
001.000.322.10.000.00
$15.00
$15.00
7/20/20
R6530
REPLACEMENT
TOTALS: $2,981.25 $2,981.25
Tok me we
CONDITION TYPE
STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
ALL BUILDING PERMITS
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from
construction sites/activities must comply with the noise limits of Chapter 5.30, unless a
variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a
project or final occupancy approval must be granted by the Building Official prior to use
or occupancy of the building or structure. Check the job card for all required City
inspections including final project approval and final occupancy inspections.
FOR
CARBON MONOXIDE SYSTEMS
INFORMATION
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities
DAMAGE TO FRONTAGE
FOR
and/or frontage improvements in city right of way per city standards that is caused by or
IMPROVEMENTS
INFORMATION
occurs during the permitted project.
ELECTRICAL PERMIT
O
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
ORMATION
ESC REQUIRED
FOR
Maintain erosion & sediment control per city standards.
NFORMATION
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
INSPECTION PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
FOR
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water
PRV REQUIRED
INFORMATION
shutoff.
Printed: Monday, July 20, 2020 8:49:42 AM 2 of 3
PERMIT NUM
City of Edmonds
L 2616
www.edmondswa.gov • M IL
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
UNDERGROUND UTILITY
FOR
Call for locates of underground utilities prior to any excavation.
LOCATES
INFORMATION
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
Installer shall provide the manufacturer installation, operating instructions, and a whole
FOR
WHOLE HOUSE FAN
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
INSPECTIONS
- Schedule Online
at: https://Inspection.MVBuildingPermit.com
COMPLETED
RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB GROUND WK
B-3 PLUMB ROUGH IN
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 FIRESTOPPING
B-4 FRAMING
B-S INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-3 EXT GYP SHEATHING
A-1 TESC AND MOBILIZE
E-4 WATER SERVICE LINE
X-2 ENGINEERING FINAL
Printed: Monday, July 20, 2020 8:49:42 AM 3 of 3