APPROVED PLN ENG RESUB 1-Site_PlanAPPROVED BY PLANNING
Zone
4? +
'L7��
Aug 11 2021
RS-12
Corner Y : Flag � IN
Setbacks:
Required
-----------
Actual
----------
25' WESY
> 25'
STREET
--------
STREET
25' EAST
> 25'
STREET
25' SOUTH' > 25'
SIDE 10' NORTH > 10'
NO
Height ____25'_ _ :CHANGE
-------------
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
JdJ t#44trttiou 08/05/2021
VV
Nothing in the permit approval process shall be
interpreted as allowing or permitting the maintenance
of any currently existing illegal, nonconforming or
unpermitted building, structure or site condition which
is outside the scope of the permit application, regardless
of whether such building, structure or condition is
shown on the site plan or drawing. Such building,
structure or condition may be the subject of a separate
enforcement action.
RESUB
Aug 04 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT