Loading...
APPROVED PLN ENG RESUB 1-Site_PlanAPPROVED BY PLANNING Zone 4? + 'L7�� Aug 11 2021 RS-12 Corner Y : Flag � IN Setbacks: Required ----------- Actual ---------- 25' WESY > 25' STREET -------- STREET 25' EAST > 25' STREET 25' SOUTH' > 25' SIDE 10' NORTH > 10' NO Height ____25'_ _ :CHANGE ------------- OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED JdJ t#44trttiou 08/05/2021 VV Nothing in the permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, structure or site condition which is outside the scope of the permit application, regardless of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. RESUB Aug 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT