Loading...
RESUB 1-Architectural_PlanNORTH 1 EX SING DECK (shown dashed.) 2 24X60" WINDOW — 24" ABOVE DECK 60X24" Window 59" above deck 4 RAILING 1-1/2"SS PPE OR TUBE WITH MINIMUM 1/8" SS WIRE ROPE ON 3" CENTERS 5 Decking — TREX 1 99X699 or equivalent 6 Joists on north 24' of deck attached to 2"XB" with joist hangers with galvanized screws. O Joists on South 28' supported by existing beam and bolted to existing joists gO Ledger flashing top and bottom of Ledger g All footings — 1899X1899X12" Footings are ocated with the highest side at or below the lowest point of ground PRIOR TO ANY WORK TO BE DONE. PLEASE CALL IN FOR PRE CONSTRUCTION INSPECTION WHICH CAN BE FOUND ON THE INSPECTION CARD FROM THE CITY OF EDMONDS 10 All joists — 299X8 99 on max 16" Centers Support beam under joists — 4"X1099 11 Below grade because of stump remova 12 8" cement posts 1 Knee braces attached with 5/899 X 699 Galvanized Lag screws to Posts and Support beam 14 Railing support brackets attached with 3/81 ' Stainless Steel Bolts and Lag Screws (j3 Lateral bracing will be 2"X8"s nailed between joists above the 4"X10" support beam filling the space. 16 2X8's Nailed to joists above 4X10 support beam — alternating front and back for lateral bracing 91 (4) 28' II—Il 7 _T T T F F Fll � II II II II II II II II II II II II See Detail 20. Sheet for detail fisted 17,18,19 and 17 Detail of connection of rai ing brackets to deck a — front view with four 3/8" SS connectors b side view when bolts can be used on the 299X899 facing. Using 3/8" X 2-1 /2" SS Hex head bolts c — side view when joist is in line with bracket ho es. Using 3/899 X 6" SS Lag bolts 01 4'' X 4.. All lumber pressure treated posts All posts connected to support beam with 2"X nailed to both sides All cement rebar entities reinforced with 3/899 Property Owner: DALE LANE Property Address: 9110 0 YMP C VIEW DRIVE Proposed deck with stairs and sq feet Lot area = 12,020 sq feet House 2421 sq feet Scale 1 /499 1 9 andings = 410 Detail of connection between Joists. Both joists sitting on support beam Joined together with minimum 4 3/899 X 3 1/2" Galvanized th rou gh bo is with nuts and \^✓ash ers. Min im u m 2" from in y edge. -:.ltcll of ledger attaching deck to Du se. flashing above screwed through ding, flashing below attah ed before dger is lag bolted to studs with 1 /2" 4" ga vanized lag bolts to studs. fiery 16" maximum Detail of footing and column (single pour) 8 vertical rebar connecting footing to column with rings of rebar every 4" for the height of column. Simpson Strong —Tie post bracket or equal (typ.) APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE Stair Rise = 7 5/899 Run = 12" Stairs faced with 1 "X699 decking City Of Edmonds Building Department Work DECK -EXTEND EXISTING Address 9110 OLYMPIC VIEW DRIVE Owner DALE LANE Approved Date 8 / 11 / 2 0 21 Building Official Permit Number BLD2021-0580 RESUB Aug 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RESUB Aug 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT EXTERIOR SHEATHING EXISTING STUD WALL EXISTING 2x BAND JOIST OR ENGINEERED RIM BOARD 2- MIN. 1 5!i" MIN. J iw MAX. 2- MINT Q FLOOR FRAMING A 0ca C O d e p o EXISTING o v o FOUNDATION WALL v R n Q DECK JOIST LAG SCREWS OR BOLTS JOIST HANGER Ledger Section View (NTS) 5' 2" MIN LEDGER LAG SCREW OR BOLT STAGGER FASTENERS IN 2 ROWS 5.5' MIN. FOR 2 X 8' 6.5' MIN. FOR 2 X 10 7.5' MIN. FOR 2 X 12 314" MIN. 'DISTANCE SHALL BE PERMITTED TO BE REDUCED TO 4.5' IF LAG SCREWS ARE USED OR BOLT SPACING IS REDUCED TO THAT OF LAG SCREWS TOATTACH 2 X 8 LEDGERS TO 2 X 8 BAND JOISTS. Ledger Front View (NTS) The image below is the style of railing I intend to install. However I am still working on the method. I hope to either build it myself or with friends. If however I can't get the quality I require, I will hire it out to a professional company.