Loading...
APPROVED BLD2021-0591+Civil_Plan+7.16.2021_3.22.44_PM+2306000PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. lm GREY SEA RESIDENCE 729 LAUREL STREET EDMONDS, WA 98020 BUILDING PERMIT #BLD2021-0591 M. �'1��/111��� ��C�il ■ IIY� �1��l�11�■ .. • , ME ■ �� �■®II Viwl VICINITY MAP N.T.S. LEGAL DESCRIPTION JULY 13,2021 PARCEL: 004845-007-036-01 LOTS 36, 37, 38, 39 AND 40, BLOCK 7, KELLOGG'S P[LAT TO EDMONDS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 2 OF PLATS, PAGE 42, RECORDS OF SNOHOMISH COUNTY, WASHINGTON; zZ PARCEL: 004845-007-034-00— LOTS 34 AND 35, BLOCK 7, KELLOGG'S P[LAT TO EDMONDS, ACCORDING TO THE ALLEY 12.00' (NOT OPEN) PLAT THEREOF RECORDED IN VOLUME 2 OF PLATS, PAGE 42, RECORDS OF ° ❑ ❑ ❑ a 6 ,� ° l SNOHOMISH COUNTY, WASHINGTON; 0 o ' G 59.94' — SITUATE IN THE CITY OF EDMONDS, COUNTY OF SNOHOMISH COUNTY, WASHINGTON. BASIS OF BEARINGS °° RECORD OF SURVEY FOR MARGARET LANGSTED BY ALLIED TWO, INC UNDER RECORDING _ NUMBER 199902175002, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. a g Y'O VERTICAL DATUM — �L--- —� ELEVATIONS SHOWN ON THIS DRAWING WERE DERIVED FROM INFORMATION PROVIDED BY _ WCCS SURVEY CONTROL DATABASE. I \ LEGEND THE MARK IS A MONUMENT IN CASE AT THE INTERSECTION OF 9TH AVENUE N AND ry ' .... I� ° ° WALNUT STREET. I r r I ;I4a ° ° ° \ PROPERTY LINE ° — — 'I �I�• •. \� 731 ECA BUFFER LINE POINT ID N0. 38/1030; — — ELEVATION: 205.43 FEET — NAVD 88 SETBACK LINE 2.0' CONTOUR INTERVAL — THE EXPECTED VERTICAL ACCURACY IS EQUAL TO 1 /2 THE CONTOUR INTERVAL OR PLUS / MINUS 1.0' FOR THIS PROJECT. �I [JJ I R/W CENTERLINE 5a I j l I�V<11 PROPOSED ASPHALT 00 0 PROPOSED CONCRETE �a------------ PROJECT INFORMATION ° ` `. ° EXISTING ASPHALT ._. APPLICANT: ARCHITECT:a. I GREY SEA LLC DEFOREST ARCHITECTS °° ®\ ° 0 8d ° 66 S HANFORD ST #300 1148 NW LEARY WAY a Gy' ° a SEATTLE, WA 98134 SEATTLE, WA 98107 ° MEREDITH KELLY 59.95' — — — — ENGINEER: (206) 262-0820 IB � k CECIL & ASSOCIATES, LLC GEOTECHNICAL ENGINEER: PO BOX 598 ' BOTHELL, WA 98041 PAN GEO ROGER CECIL, P.E. 3213 EASTLAKE AVENUE EAST, SUITE B (206) 484-3495 SEATTLE, WA 98102 N LAUREL STREET SCOTT DINKELMAN, LEG SURVEYOR: (206) 262-0370 —_Ss s I AI ICI QTMCCT SITE SURVEYING, INC. 21923 NE 11TH ST SAMMAMISH, WA 98074 SITE ADDRESS: THOMAS WOLDENDORP 729 LAUREL STREET 0 10 20 40HORIZ. (425) 298-4412 EDMONDS, WA 98020 Scale In Feet TAX PARCEL ID: 00484500703100 SHEET INDEX EARTHWORK QUANTITIES: SHEET SHEET TITLE CUT: 100 CY'S NO. FILL: 50 CY'S CO.00 COVER SHEET C0.01 GENERAL NOTES NET: 150 CY'S CUT Applicant shall repair/replace all C1.00 DEMO & TESC PLAN damage to utilities or frontage C1.10 TESL DETAILS ANY IMPORT FILL WILL BE FROM A JURISDICTIONAL APPROVED LOCATION. ANY EXPORT CUT WILL BE WASTED improvements in City right-of-way SITE LAYOUT & PAVING AT A JURISDICTIONAL APPROVED LOCATION. per city standards that is caused or C2.00 PLAN NOTE: THE QUANTITIES SHOWN ARE ESTIMATES ONLY INTENDED FOR PERMITTING PURPOSES. THE CONTRACTOR occurs during the permitted project. C3.00 GRADING & DRAINAGE SHALL VERIFY ALL EARTHWORK QUANTITIES NEEDED TO COMPLETED THE PROJECT IMPROVEMENTS. PLAN C3.10 DRAINAGE DETAILS C4.00 UTILITY PLAN CALL BEFORE YOU D;G 811 UNDERGROUND SERVICE (USA) BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/2021 BY: CITY ENGINEERING DIVISION LLJ� oa- . COV/ o L LU Z w o0 m an >, m >, m o z m -0 N m O U C p nla- U� �Q o0 11312D� U W0-1 00 00 Q Lo O � U M t i U J�O W I cn O 0 q- O m Ln U 0OOU 0 3 Uul Q m cD z Y �-- O w �wC O rn Q z��� U W Z O 0 QwD Z �O 2i LU Q J N 0 0 LU I-- LU LU U Z LU 0 CO NW Q LU Cn W w J U w U w 0 O LU W U) 0. LU O U RESUB Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT CO-00 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. CITY OF EDMONDS GENERAL NOTES STORM DRAINAGE GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND 1. PIPES: DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: A. ALL STORM SEWER PIPE SHALL CONFORM WITH CHAPTER 18.30 OF THE ECDC AND DIVISION 7 OF THE • CURRENT INTERNATIONAL BUILDING CODE (IBC) WSDOT/APWA SPECIFICATIONS. • 2021 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION • 2012 STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON, AS AMENDED IN DECEMBER 2014 (THE 2014 SWMMWW) B. ALL PIPE SHALL BE PLACED ON STABLE EARTH, OR IF IN THE OPINION OF THE CITY INSPECTOR, THE EXISTING FOUNDATION IS UNSATISFACTORY, THEN IT SHALL BE EXCAVATED BELOW GRADE AND BACK FILLED WITH COMPACTED GRAVEL MATERIAL TO SUPPORT THE PIPE. 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE C. THE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE OR PIPE -ARCH IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6", MAXIMUM DEPTH 8", THOROUGHLY TAMPING EACH LAYER. THESE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. COMPACTED LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY (THE THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. (REFER CITY). OBTAIN APPROVAL IN WRITING PRIOR TO CONSTRUCTING IMPROVEMENTS. TO WSDOT STANDARD SPECIFICATION 7-04.3(3) AND STANDARD SPECIFICATION 2-03.3(14)C, METHOD B & C. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS-BUILTCONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT D. DOUBLE WALLED (SMOOTH INTERIOR) CORRUGATED POLYETHYLENE PIPE, MEETING THE REQUIREMENTS OF COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL AASHTO M 252 IN 8 INCH SIZE AND AASHTO M294S IN SIZES 12" THROUGH 36," IS AN ACCEPTABLE APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. ALTERNATIVE TO SCHEDULE A CULVERT PIPE, AS SHOWN ON WSDOT/APWA STANDARD PLAN B-17 AND 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. FOR STORM SEWERS IN ACCORDANCE WITH EDMONDS CITY STANDARDS. E. BAND SIZE SHALL BE 12" FOR PIPE LESS THAN 42" DIAMETER AND 49" X 33" ARCH PIPE. REFER TO ITEM 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY K: "CHARTS" FOR LARGER SIZE PIPES. OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY F. BACKFILL AROUND PIPE MUST BE COMPACTED TO A SPECIFIED AASHTO T-99 DENSITY OF 90%. USE LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE REASONABLE CARE IN HANDLING AND INSTALLATION. AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO G. ALL NON -PERFORATED METAL PIPE SHALL HAVE NEOPRENE GASKETS AT THE JOINTS. 0-RING GASKETS RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE MAY BE USED FOR TYPE F COUPLING BAND. DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE SO THAT A CODE-COMPLIENT SOLUTION CAN BE COORDINATED. H. DUCTILE IRON (DI) PIPE SHALL BE CLASS 50 PER WSDOT 9-05.13. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND 2. CATCH BASINS AND MANHOLES: UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. A. ALL CATCH BASINS WITH A DEPTH OVER 5.0 FEET TO THE FLOW LINE SHALL BE A TYPE II CATCH BASIN 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OR LARGER (MANHOLE). OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL MANHOLE, INLET, AND CATCH BASIN 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. PIPE LEGNTHS ARE GENERALLY FRAMES AND GRATES JUST PRIOR TO POURING OF CURBS AND PAVING. CALCULATED AS A HORIZONTAL LENGTH MEASURED FROM STRUCTURE TO STRUCTURE OR BEND TO BEND (WHICHEVER IS C. ALL GRATES SHALL BE DEPRESSED 0.1 FEET BELOW PAVEMENT LEVEL. APPROPRIATE). D. CATCH BASIN FRAME AND GRATES SHALL BE OLYMPIC FOUNDRY MODEL 5435, 5435A, OR 50503A, 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT AND SHALL BE FAMILIAR WITH THE CONTENTS THEREOF. ALL LOCKING TYPE OR EQUAL. MODEL 5435A IS REFERRED TO AS A "THROUGH CURB INLET" ON THE PLAN. SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. COORDINATE WITH THE MODEL 50503A IS REFERRED TO AS A 'ROLLED GRATE INLET" IN THE PLAN. OWNER'S GEOTECHNICAL CONSULTANT TO FIELD VERIFY THE ADEQUACY OF ALL STRUCTURE SUBGRADES, UTILITY TRENCH BEDDING & BACKFILL, AND TEMPORARY SLOPES. PROVIDE SUFFICIENT NOTICE SO THAT THE GEOTECHNICAL ENGINEER CAN SCHEDULE THE E. ALL TYPE II CATCH BASIN MANHOLES, INLET, AND CATCH BASINS SHALL HAVE LOCKING LIDS. APPROPRIATE RESOURCES. F. STANDARD LADDER STEPS SHALL BE PROVIDED IN ALL CATCH BASINS AND MANHOLES EXCEEDING 5 FEET 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL IN DEPTH. REPORT. 3. STORM WATER RETENTION/DETENTION FACILITIES, STORM DRAINAGE PIPES AND CATCH BASINS SHALL BE 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR FLUSHED AND CLEANED PRIOR TO CITY ACCEPTANCE. COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE 4. LOCATIONS OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY AND IT SHALL BE THE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL RECOMMENDATIONS. RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATIONS OF ALL UTILITIES AND 14. SEE CIVIL PLANS FOR LOCATIONS OF SITE FEATURES SUCH AS CURBS, RETAINING WALLS, PAVED SURFACES, AND UTILITIES. SEE IMPROVEMENTS TO AVOID DAMAGE OR DISTURBANCE. CIVIL PLANS FOR COORDINATES OF BUILDING GRID LINES. SEE ARCHITECTURAL PLANS FOR BUILDING DIMENSIONS. 5. FOR AID IN UTILITY LOCATION CALL 1-800-424-5555 PRIOR TO CONSTRUCTION. 15. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 16. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 17. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. CONTOURS ARE SHOWN FOR REFERENCE - SPOT ELEVATIONS SHALL SUPERCEDE CONTOURS. 18. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 4% IN LANDSCAPE AREAS AND 1.5% IN PAVED AREAS. 19. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 20. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 21. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. ALL UTILITIES SHALL BE PLACED UNDERGROUND. 22. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 23. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY THE ENGINEER OF RECORD AND CITY (IN WRITING). TRACK ALL CONSTRUCTION REVISIONS IN AS -BUILT SET. 24. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 95%. COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. CONTRACTOR TO COORDINATE. 25. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 26. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 27. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 28. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 29. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. 30. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. UTILITY GENERAL NOTES PURSUANT TO EDMONDS COMMUNITY DEVELOPMENT CODE (ECDC) 18.00.040, CITY OF EDMONDS CONSTRUCTION STANDARD DETAILS AND SPECIFICATIONS, HEREINAFTER REFERRED TO AS "EDMONDS STANDARD DETAILS", SHALL APPLY WHENEVER ANY PUBLIC OR PRIVATE WORK IS PERFORMED WITHIN THE CITY OF EDMONDS, INCLUDING WORK PERFORMED BY PRIVATE PARTIES AT THEIR OWN EXPENSE. EXCEPT WHERE THESE EDMONDS STANDARDS DETAILS PROVIDE OTHERWISE, DESIGN, CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE APPROPRIATE STANDARDS OF THE MOST CURRENT EDITION OF THE FOLLOWING PUBLICATIONS PRODUCED SEPARATELY BY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) OR JOINTLY BY WSDOT AND WASHINGTON STATE CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). • WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, HEREINAFTER REFERRED TO AS "WSDOT/APWA STANDARD SPECIFICATIONS". • WSDOT/APWA STANDARD PLANS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, HEREINAFTER REFERRED TO AS "WSDOT/APWA STANDARD PLANS". UTILITY LOCATES: 1. THE APPROXIMATE LOCATIONS OF EXISTING UTILITIES ARE SHOWN ON PLANS AND PROFILES FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF UTILITY LOCATIONS SHOWN AND FOR DISCOVERY OF POSSIBLE ADDITIONAL UTILITIES NOT SHOWN ON PLANS. 2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE LOCATED, BY APPROPRIATE UTILITY CITYS OR COMPANIES, ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. FOR UTILITY LOCATES, CALL 1-800-424-5555 PRIOR TO DIGGING. PERMITS: 4. THE DEVELOPER IS RESPONSIBLE FOR OBTAINING ALL REGULATORY PERMITS INCLUDING WORK WITHIN THE RIGHT-OF-WAY. 5. ALL WORK IN RIGHTS -OF -WAY SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMITTING AGENCY CITY OF EDMONDS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT). BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS co m w 0 w Q Ln C3 U > w z� Do m mpg �: m >, m o Z pp a) 6 CIA � o _ O o D > cV LO (7 a� o U U CL 0- U 0 � 0 or- Q o 0 )I- L W 0 00 - rn Q Q Ln O � U U J M O w I (1) O 0 00 O O � � m � 0 U �03 X 3 O Q m 0 H z w_ J U cD z Y F- O Q�LUw� Oor � Q �0 ZUw(n z0�� Z Q W O Lu Q J N 0 LU r- LU W CU Z W 0 W LW/ L.L W W NW L.L V w U w U w O V) W O Z N < ry W Z �W V RESUB Jul 16 2021 CITY OF EDMONDS VELOPMENT SERVICE DEPARTMENT DATE: BY: Cl _ _ ION CO-01 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. N N O 0 TYPE 4 (Np) STREAM TREE PROTECTION FENCING (ORANGE HI-VIS a, BARRIER FENCE) TO BE INSTALLED AT DRIP LINE. ❑ J ❑ 1 ❑ ❑ FOUND REBAR & / C / CAP (2A39) / / 59.94' /I " // 8 / / x It- / I I I fi I x I o / .IIl . .—.. m ...—..LO—.T LOT34 DECK p']7/13 LAUREL S 0Co AO}IIIf 3. - �—. SILT FEN( PER o / DTL ER-900 I I I N O I L' I I I I x: I I I I �4• CHI W ALLEY 1 OT OPEN SILT DTL FENCE PER REMOVE & SALVAGE EXISTING MAILBOX I I FOR RE -USE I I I I 8" ONC EWER UAUREL STREE{EET RIM=12. INV NE 8" RCP=119.72' INV W 12" RCP=119.32' INV E 12" RCP=119.32' FOUND REBAR & QAP (29539) 5 10 20 Scale In Feet TE 1. THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED PRIOR TO ALL OTHER CONSTRUCTION. 2. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 3. WHERE POSSIBLE NATURAL VEGETATION AND/OR EXISTING PAVEMENT WILL BE MAINTAINED FOR SILT CONTROL AND HAUL ROADS. 4. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS REQUIRED BY THE CITY ENGINEER TO ENSURE CONTINUING EROSION/SEDIMENTATION CONTROL. 5. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. 6. TEMPORARY SEDIMENTATION AND STORMWATER CONTROL FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITIONS UNTIL SUCH TIME THAT THE CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. IF PERMANENT DRAINAGE FACILITIES ARE UTILIZED TO CONVEY OR HOLD CONSTRUCTION RUNOFF THEY SHALL BE CLEANED PRIOR TO FINALIZING CONSTRUCTION. 7. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 8. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. APRIL 9. ALL DISTURBED LAND�AREAS THAT WILL BE LEFT FOR 30 DAYS OR MORE DURING THE PERIODS OF OCTOBER 1 TO MARCS-F30 SHALL BE COVERED WITH AN ACCEPTABLE EROSION CONTROL BMP GROUND COVER (PLASTIC, SEEDING, SODDING, ROCK, STRAW, ETC.) AND SHALL BE MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT. 10. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. SWEEP OR CLEAN SEDIMENT OR DEBRIS FROM ROADWAY IMMEDIATELY. 11. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO ENSURE SEDIMENT OR OTHER HAZARDOUS MATERIALS DO NOT ENTER THE CITY STORM DRAINAGE SYSTEM, AS CONSTRUCTION PROGRESSES AND UNEXPOSED SEASONAL CONDITIONS DICTATE. MORE EROSION CONTROL FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION CONTROL FOR THE FULL PERIOD OF CONSTRUCTION. IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AS MAY BE NEEDED TO ENSURE COMPLIANCE. 12. PROVIDE CONSTRUCTION ENTRANCE PER STANDARD DETAIL ER-901, MODIFIED TO FIT SITE CONDITIONS. CONTRACTOR TO COORDINATE WITH CITY INSPECTOR. 13. PROVIDE TEMPORARY SEDIMENT TRAPS FOR CATCH BASINS PER STANDARD DETAIL ER-902, FOR ALL FUNCTIONING DRAINAGE STRUCTURES AS DETERMINED BY THE CITY INSPECTOR. 14. ALL DISTURBED AREAS TO BE COMPOST AMENDED PER 2014 SWMMWW BMP T.5.13. 15. INLET SEDIMENT TRAPS SHALL BE INSTALLED IN ANY AFFECTED CATCH BASINS DOWNSTREAM FROM THE CONSTRUCTION SITE. COORDINATE LOCATIONS WITH INSPECTOR. 16. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE TESC LEGEND CONSTRUCTION LIMITS TREE PROTECTION FENCING TEMP. SILT FENCING CONSTRUCTION ENTRANCE (CE) CB INLET PROTECTION (IP) STRAW WATTLE (SW) CALL BEFORE YOU D;G 811 UNDERGROUND SERVICE (USA) X X BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/2021 BY: CITY ENGINEERING DIVISION CO m w O w. L U > w z� o0 m an m >, m o z Co U -0 N U O O U U 0 C C-4 p Co L o cc �a) or o0 L Wo 00 - rn Lo O � U m U JO w I co U) O 0 1 O m Ln U CO0LU 0 CY)U LC) C14 Ln 3 U0 Q m 0 z Y F- o W 0 W ocD F-Q z o U W ui Y 0 a'- 0 Z QWo Q J N 0 0 LU I-- LLJ W U Z W 0 CO W ry Q LLB W LLB �� V H U Q H z 0 U Z Q o U W W W O 2 LL1 0 RESUB Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT ci .00 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2' 14 GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL NOTES -i 1. SHALL MEET REQUIREMENTS OF BMP C233: SILT FENCE. FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS � WIRE MESH FENCE TO SUPPORT FILTER FABRIC MA ERIAOL 8O TO F 2FlLTER N 0 TEJ.- 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL- THROUGHOUT PROJECT, CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN REVISION DATE FILTER FABRIC FENCE JANUARY 2018 CITY OF EDMONDS FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTMENT DETAIL APPROVED BY- R. ENGLISH ER - 9 00 Straw rolls must be placed along slope contours Spacing depends on soil type and slope steepness �i DEPARTMENT OF ECOLOGY State of Washington 10'- 25' (3-8m) 3'- 4' \ 0.2m) � ` �z Sediment, organic matter, and native seeds are captured behind the rolls. 3" - 5" (75-125mm) 1" x 1" Stake l/ (25 x 25mm) 8" - 10" Dia. (200-250mm) NOTE: 1. Straw roll installation requires the placement and secure staking of the roll in a trench, 3" - 5" (75-125mm) deep, dug on contour. Runoff must not be allowed to run under or around roll. Figure II-4.2.14 Wattles NOT TO SCALE Revised November 2015 Please see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions, limitation of liability, and disclaimer. NOTES SHALL MEET REQUIREMENTS OF ENTRANCE/E"'- 1W C105: STABILIZED CONSTRUCTION _LS A TH IN DE FALL WIDTH GRESS/EGRESS DETAIL NOTES: O THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. ( ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. MOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE, WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS* c 1/4 ACRE 30 C 1 ACRE 50 [ 3 ACRE 100 ] 3 ACRE 100 *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL_ LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN CITY OF EDMONDS STABILIZED CONSTRUCTION ENTRANCE PUBLIC WORKS DEPARTMENT APPROVED BY- R. ENGLISH REVISION DATE JANUARY 2018 STANDARD DETAIL ER-901 `sf. 18y" CITY OF EDMONDS PUBLIC WORKS DEPARTMENT CATCH BASIN GRATE FILTER SOCK WITH OVER FLOW HOLES (TYP) CATCH BASIN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE --THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS APPROVED BY- R. ENGLISH REVISION DATE JANUARY 2018 STANDARD DETAIL ER-902 TOE IN SHEETING IN 4"X4" BUILDING PAD TRENCH A MINIMUM OF 8' 10' MAX CONVEY RUNOFF TO SETBACK FROM TOP OF SLOPE. APPROVED LOCATION. BACKFILL WITH WASHED ROCK. 4' MIN. SETBACK FROM TOP OF SLOPE TERMINATE AT LEVEL AREA. FOLD UNDER 4" AND STAPLE AT 12" INTERVALS. 10' MIN 3' MIN PROVIDE ENERGY DISSIPATION AT TOE WHEN NEEDED NOTES ' 1. SHALL MEET REQUIREMENTS OF BMP C123: PLASTIC COVERING 2. TIRES, SANDBAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC SHEETING. 3. SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12" AND BE WEIGHTED OR TAPED. 4. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MIL. 5. DUE TO RAPID RUNOFF CAUSED BY PLASTIC SHEETING, THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY CONCENTRATED RUNOFF. 6. IF EROSION AT THE TOE OF SLOPE IS LIKELY, A GRAVEL BERM, RIP -RAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE OF SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF. BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/2021 BY: G(G /xis CITY E I14UIIVttKINU uIVISION c w O w .Q 0 U z W 0 m pp 00 O Z pp -0 N a) o O o U D > N O CO Q— a) .� 0 U (D U Q_ � cc c40- U Q o0 Ln W 00 00 Q LO C)) U J 0 0 0 DO v O 'd- � m V _ CO 0Ul U LC) 04 X 3 O Q m D_ Y PAI Y o w OLUoo 0) I— Q 0 J z U w Y0Of z Q w < 0 _ g Lu g J Q J N 0 U Owl-- w W U Z W 0 V ) wN ��W VJ W LU 11 J_ U w U IY LI.I (D O tY RESUB Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT C 1 . 10 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. N N O 0 i ° / 59.94' 1b 05Q TYPE 4 (Np) STREAM ALLEY 12 00' (NOT OPEN) v ° FOUND REBAR & / 0 0— CAP (29t39) / _ _ v — / N89`58'45"E � o 89.901 � o / CANTILEVERED MAIN Cl) M �2 / PRESERVE & PROTECT EXISTING / / FLOOR EXPANSION I j ROCKERY RETAINING WALL I I x/ SEE ARCH'L. A - So / / I I I 1 ti / / I / I I � I I / ROOF OVERHANG I / 1 x I F� z�L — — EXISTING CONCRETE TO REMAIN. / I -ECK I I--- ^B0VE -- X — 5� ROOF \ a OVERHANG I I I zl \ I I <1 I °F 0 15, BSBL• .,0: .. j I ARPc I o CD CD1 1 •• I CONCRETE PORCH AND STEPS. of I a I SEE ARCHITECTURAL. CD I _ _of1_ 1 °° �S0, BASEMENT FLOOR EXPANSION — 1 B� FTR�gM SEE ARCH'L I I I EXISTING RESIDENCE a a FIRST FLOOR EL=138.9 BASEMENT FLOOR EL=129.4 (SEE ARCH'L PLANS) a / I R = 149.5' / 1361 LOT 32 F = 137.9' r No�/N,00 I ' I I I FF BASEMENT — — — F� FENCE WITH GATE. PATIO PER ARCH'L PLANS o I � I 5' ' BSBL '. I � . I I ' I I I I CONCRETE DRIVEWAY SEE DETAIL 1 THIS SHEET. FOUND REBAR & , \ I PRESERVE & PROTECT EXISTING WATER METER. SERVICE TO BE RE -CONNECTED AS REQUIRED T ACOMMODATE EXPANS W �- W �V1� \ / I 8" �N cN RELOCATE MAILBOXES I I SEE ARCHITECTURAL ��'s I — 'I ................................... - REMOVE TREE No surcharge onto retaining wall from driveway permitted. O _ 89.92' \\ \ S89°59'24"W — — — 7 EXISTING \ UTILITY (POEE OHE - W /„ -I WATER \A/ PROTECT EXISTING UTILITY POLE AND OVERHEAD SERVICE LINES. NEW ASPHALT DRIVEWAY MATCH EXISTING PAVEMENT I 8"40NC SEWER 'LAUREL STREET FOUND REBAR & AP 29539) I 4 I I EXISTING ASPHALT PAVING TO REMAIN. I i I cn 0 —71 — — — — — — -- F31 LAUREL ST. uo co U? r - EXISTING ASPHALT DRIVEWAY TO REMAIN. REPAIR BY OVERLAY AS NECESSARY. PROTECT EXISTING HYDRANT. 1 c �FH H12-48 11n Dc1 E mow— tXIJ I IIAU rAVILU UNIVILWAT ArKUIN TO REMAIN. REPAIR AS NECESSARY. LAUREL STREET 0 HORIZ. N 5 10 Scale In Feet 20 4" CL 3000 CEMENT CONCRETE REINFORCING #4'S @ 16" O.C. EACH WAY (TYP) 4" CRUSHED SURFACING BASE COURSE SUBGRADE COMPACTED TO 95% NOTES: 1. COMPACTION SHALL BE 95% MAXIMUM DRY DENSITY PER ASTM D-1557. 2. GRAVEL BORROW SHALL HAVE LESS THAN 5% FINES (LESS THAN 5% PASSING THE No. 200 SIEVE). 1 CONCRETE PAVEMENT DETAIL N.T.S. LEGEND PROPERTY LINE BUILDING SETBACK LINE TREE PROTECTION FENCING HMA CLASS 1/2" CEMENT CONCRETE (CL 3000) 0 0 CALL BEFORE YOU D;G 811 UNDERGROUND SERVICE (USA) BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/2021 BY:'� CITY ENuilvttKllvu uIVISION U) z 0 W 0 an m m O C CD o U U 0 C .� >O L r o n nl� U� �U� �UQ o0 113120� L W 00 00 —� CY) Q Q �Mo M U U JNOO w I U) O 0 1 U m U 0c) 0Ln U LC) C14 X 3: o Q m 0 Y F- o W C,4 w OLOL�l Cc,,)) Z(jQ J ZOUWuj W Y 0a-- 0 U U Q J Q W J QJc4O 00 U 0 LU 1-- LI.1 cl� U W U z W 0 CO LU L.L Q LU Cn LU �� V z _j 0- V z Q n W D O Q w I- REO;U B Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT C2.00 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. N N O 0 a� a� ALLEY 12.00' (NOT OPEN) FOUND REBAR & / O 0 — CAP (29t39) /g _ 4O N89`58'45_'E / 59.94' / o 89.90' 04 x / CANTILEVERED MAIN FLOOR EXPANSION. PORTION OVER EXISTING CONCRETE SLAB (TO REMAIN) IS NOT CONSIDERED REPLACED IMPERVIOUS SURFACE. / I I x/ i x x INSTALL FOUNDATION DRAIN PER GEOTECH RECOMMENDATIONS. CONNECT TO EXISTING FOUNDATION DRAIN SYSTEM. I DOWNSPOUT STUB ..... (TYP) I � m I SDCO (TYP) DS- -- IE 128.0 I I LOT LOT 34 / °, / / I o I I / Nod ,00 I N DEC F7//13 LAUREL S 101)�00 // I I ABC � I TIE FOUNDATION DRAINS INTO SD LINE. 129 I I I I < Minimum distance of 10' required prior to connection of foundation drains to downspout drains. Also connection cannot occur if the the elevation of the rim of the catch basin is higher than the elevation of the footing drains. TIE FTG DRAINS INTO ROOF DRAINS W 4" WYE IE=126.16 I I \ PROPOSED CROSSING OF STORM PIPE OVER EXISTING WATER MAIN. TOP EL=122.0 (EX 8" WA) IE=123.67 (8" SD) VERTICAL CLR=1.67' — w w CB#1, TYPE1 W/ SOLID LID INSTALL OVER EX. 8" SD o RIM 124.50 IE IN=123.26 (6"NE) IE OUT (EX)=123.26 (8"S) I A pre -construction meeting is required, prior to any work in cB the ROW. IVIf\I VII L/\IJI IIVU 1 r%VLIVILIVI Relocate Catch Basin such that the basin is located on private property. DOWNSPOUT STUB (TYP) SDCO (TYP) IE=135.30 4" ROOF DOWNSPOUT DRAIN LINES (TYP) 2% MIN. SLOPE FENCE WITH GATE.: SEE ARCHITECTURAL. JEM. SDCO (TYP) IE=134.00 ;TURAL �o oK F \ I 0 92' \ — SDCO (TYP) 24"W IE 126.90 \ 129.25 \ / \ \ 1 -EXISTING \ UTILITY � OOFOHE OHE PROPOSED CROSSING OF STORM PIPE OVER EXISTING SIDE SEWER. SEE w - I w NOTES ON UTILITY PLAN. I I i 1 / �UNC SEWER -S-S 4— I A I I CI C'TF73CCT FOUND REBAR & AP 29539) — — — — I [EXISTING ASPHALT DRIVEWAY AND CONCRETE SLAB TO REMAIN. — — — — — — -- 731 LAUREL ST. OT 32 I I I —EXISTING ASPHALT DRIVEWAY TO REMAIN. REPAIR BY OVERLAY AS NECESSARY. a I E mow— tAIJ I IIAU rAVLU UNIVt1NAT ArKUIN TO REMAIN. REPAIR AS NECESSARY. LAUREL STREET 0 HORIZ. N 5 10 Scale In Feet CONSTRUCTION NOTES 1. THE MAXIMUM FINAL GRADE IN LANDSCAPE AREAS SHALL NOT EXCEED 2(H):1(V). 2. SLOPE AWAY FROM THE BUILDING, ALL AREAS. FINAL GRADES ON THE SITE SHALL PROVIDE FOR FREE, POSITIVE DRAINAGE OF SURFACE WATER TO ITS NATURAL OR DESIGNED DISCHARGE LOCATION WITHOUT PONDING, FLOODING, OR OTHERWISE co CONCENTRATING UNLESS DIRECTED TO AN APPROVED STORMWATER COLLECTION DEVICE. p .Q � � U 3. THE CONTRACTOR SHALL COORDINATE DOWNSPOUT LOCATIONS (WHERE 'DS' IS SHOWN) w z TO VERIFY APPROPRIATE CONNECTIONS ARE PROVIDED. PROVIDE CONNECTION PER DETAIL 1 ON SHEET C3.10. m 4. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS OF UNDERGROUND UTILITY INSTALLATION INCLUDING ACTUAL (AS -BUILT) PIPE ELEVATIONS, RIM ELEVATIONS, AND PLACEMENT. FURNISH TO OWNER AND CIVIL ENGINEER FOR PERMITTING CLOSEOUT. 5. SEE SHEET C3.10 FOR DRAINAGE DETAILS. 6. IF THE DEPTH OF A STORM STRUCTURE, FROM RIM ELEVATION TO PIPE INVERT EXCEEDS 5 FEET, THEN A TYPE 2 MANHOLE WILL BE REQUIRED. SOILS AMENDMENT NOTE BMP T5.13 POST CONSTRUCTION SOIL QUALITY & DEPTH: o z ALL DISTURBED AREAS NOT RECEIVING GRAVEL OR PAVEMENT SHALL BE m m AMENDED PER BMP T5.13. (IMPORT TOPSOIL AS NEEDED FOR RESTORATION). z m 0 o O U U 0 C N O L N a U o DOWNSPOUT & FOOTING DRAIN NOTES 1. NEW ROOF DOWNSPOUT DRAINS AS SHOWN SHALL BE TIED INTO EXISTING ROOF DRAINS WHERE FOUND, AND ROUTED TO PROPOSED STORMWATER BMPS ON PLAN. 2. NEW FOUNDATION DRAINS SHALL BE TIED INTO EXISTING FOUNDATION DRAINS WHERE FOUND, AND ROUTED TO PROPOSED STORMWATER SYSTEM AND DISCHARGE LOCATION. DRIVEWAY SLOPE NOTES 1. EXCEPT WHERE MATCHING EXISTING PAVEMENT IN LAUREL STREET, THE MAXIMUM PROPOSED DRIVEWAY GRADE ON THE SITE IS APROXIMATELY 5.2%. MAXIMUM ALLOWED DRIVEWAY GRADE IS 14%. ANY REVISIONS IN GRADES FROM THE APPROVED PLAN SHALL NOT RESULT IN DRIVEWAY GRADES MORE THAN 14%. IMPERVIOUS AREA SUMMARY TABLE DESCRIPTION AREA (SF) TOTAL SITE AREA 9,895 HARD SURFACE SUMMARY EXISTING HARD SURFACES TO BE REMOVED 812 EXISTING HARD SURFACES TO REMAIN 4,092 NEW+REPLACED HARD SURFACES 1,545 NOTE: NEW + REPLACED SURFACES LESS THAN 2,000sf DRAINAGE REVIEW NOT REQUIRED ACCEPTABLE TIGHTLINE MATERIAL: SDR 35 SCH 40 N-12 F810 HANCOR 20 LEGEND PROPERTY LINE BUILDING SETBACK LINE SILT FENCING STORM LINE FOUNDATION DRAIN LINE DOWNSPOUT CLEANOUT HMA CLASS 1/2" CEMENT CONCRETE (CL 3000) CALL BEFORE YOU D;G 811 UNDERGROUND SERVICE (USA) ���11312021 L W 00 00 — rn a Q �Mo M U U __J O w I U) 0 O 1- � m U W Ln 0c) CY) O U 0 LC) C14 UlO 3 Q m z w_ J U _SD BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/2021 BY: CITY EfwlrvIzIzrvrNkj vl\/ISION (D z Y F- O w 0 W cD O � rno Q z0�� U W Y O 0-- 0 Z Q LLJ Q J N 0 0 LU r-- LLJ W U z LLB 0 CO LLB L.L Q LLB W �� V z Q 0- LL1 r V Q z_ NQ W z 0 NQ L.L R�U B Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT C3.00 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. w z a w SEE COE STD DTIr GU--410 BEDDING MATERIAL {5/8" MINUS) CRUSHED PER COE MOD 9-03A B.A.2 OR SUITABLE EXCAVATED MATERIAL AS APPROVED BY CITY ENGINEER (SEE NOTE 2 BELOW) FOUNDATION (IF REQUIRED) SEE NOTE 4 NOTES: 1. MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE • 36" FOR PIPE UP TO AND INCLUDING 12" DIAMETER ■ O.D. PLUS 18» FOR PIPE LARGER THAN 12" NOMINAL DIAMETER 2. REFER TO CITY OF EDMONDS MODIFICATIONS TO DIVISION 9 OF WSDOT STANDARD SPECIFICATIONS FOR MATERIAL GRADATION AND ADDITIONAL INFORMATION. 3. TRENCH BACKFILL SHALL MEET A MINIMUM COMPACTION OF 95% DENSITY PER ASTM D 1557. 4. IF UNSTABLE MATERIAL IS ENCOUNTERED BELOW PIPE ZONE, CONTRACTOR SHALL REMOVE AND REPLACE AS REQUIRED BY CITY ENGINEER. REVISION DATE CITY OF EDMONDS JANUARY 2U1a TYPICAL TRENCH SECTION PUBLIC WORKS STANDARD DEPARTIALINIT DETAIL APPROVED BY: R. ENGLISH G U — 40 0 12" AGGREGATE PER GEOTECH RECOMMENDATIONS PAVING OR SITE LANDSCAPE (AS SHOWN PER PLAN) SLOPE AWAY FROM STRUCTURE WRAP W/ NON -WOVEN FILTER FABRIC MIRAFI 140 N OR EQUAL 4" DIA. PERFORATED PVC D_R` PIPE SURROUNDED W/ 4" CLEAN PERMEABLE GRAVEL BACKFILL FOR DRAINS PER WSDOT 9-03.14(4)/ DO NOT DISTURB 1:1 BEARING ZONE EXTERIOR FOUNDATION AND FLOORING PER STRUCTURAL PLANS 2 FOUNDATION DRAIN DETAIL N.T.S. 24" min. Trench X-Section slope Plan View of Roof to road drainage system x 10' �vel trench /perf pipe NOT TO SCALE Figure III-3.1.8 Perforated Stub -Out Connection DEPARTMENT OF Revised December 2015 ECOLOGYPlease see http://Www.ecy.wa.gov/copynght.html for copyright notice Including permissions, State of Washington limitation of liability, and disclaimer. ""--D SQUARES, 1" HIGH 1 /2" WIDE, RAISED BORDER 10" 9 834" 00 Loll N R 7» `V 7 3/4" 8" 15" 3 STORM DRAIN CLEANOUT DETAIL - N.T.S. 24" 4 3/4" TERMINUS TINUATION COMPRESSIBLE BACKER ROD BUILDING WALL SEE ARCH PLANS DOWNSPOUT PER ARCH PLANS I 1 /2" EXPANSION JOINT L'4 USE 45, 22 1 /2% OR 11 1/4" BENDS TO CLEAR TOP OF FOOTING. SEE STRUCTURAL DWGS FOR FOOTING ELEVATIONS CAST IRON BELL & GRATE PLAN VIEW CLEANOUT (WHERE SHOWN) 4" MIN PIPE CONNECTION PROVIDE REDUCER AS REQUIRED SEPARATE FOUNDATION DRAIN 45° BENDS 1 DOWNSPOUT CONNECTION DETAIL N.T.S. ELEVATION VIEW 4 AREA DRAIN DETAIL N.T.S. FINISHED GRADE o .0 L U > w z� o0 m mpg m m � z Co o > (V o o .o U '� U CL IE PER PLAN ' Nli U� �0 �Q o0 T NCRETE CLASS" NOTES 1. AREA INLETS TO CONSTRUCTED FROM CONCRETE PIPE, IN ACCORDANCE WITH ASTM C 14 UNLESS OTHERWISE SHOWN ON THE PLANS OR NOTED IN THE STANDARD SPECIFICATIONS. 2. CUTOUT HOLE SIZE IS EQUAL TO OUTLET PIPE SIZE DIAMETER PLUS AREA INLET WALL THICKNESS. 3. CONNECTION TO OUTLET PIPE TO BE MORTARED AND MADE FLUSH WITH INSIDE OF THE AREA INLET WALL. 4. CAST IRON BELL GRATE SHALL MEET THE STRENGTH REQUIREMENTS OF FEDERAL SPECIFICATION RR-F-621 D. THE GRATE SHALL HAVE SLOTS (HOLES) THAT CONSTITUTE 50% OPEN AREA FOR DRAINAGE. INLET BELL SURFACE SHALL BE FINISHED TO ASSURE NON -ROCKING FIT WITH ANY COVER POSITION. BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/2021 BY: L�hvF CITY EN_.. ISION �I'13I2021 U W Q Q �Lr)O � U Uw J M O I � O 000 O m U W Ul 0o O U O � 3 Ln 3 O UX Q m 0 CD Z Y I.- o W twob o rn I.-Q z 0 U) U W Uj 0�z� Z Q W < O Q J N 0 O W I-- W U-1 U z LLI 0 U) U-1 0. Q LLI Cn U-1 11. V w J U W U w CD O U) Q I— U.. 0 W Q z ry�Q/ r) RESUB Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT C3.1 0 PERMIT #BLD2021-0591 PORTION OF THE NE 1/4, NW 1/4, SEC. 25, TWP 27 N., RGE. 3 E., W.M. N N O 0 ° FOUND REBXR & / CAP (29t39) / 59.94' APPROXIMATE LOCATION OF EXISTING WATER SERVICE. SERVICE LINE TO BE ADJUSTED AS NECESSARY TO AVOID CONFLICTS AND MAINTAIN SERVICE TO RESIDENCE. Per the Fire Department, a fire sprinkler system is required; therefore, a new meter and service line will be required. Any restoration required from the installation of the water meter and water line shall be completed by the RE -USE EXISTING contractor/homeowner TO BE PRO and not the City of Edmonds. Refer to the plumbing code and the City handout #E86 - �— W Water Service Specs. \ 1U.IE . EXISTING METER kT,CURRENT LOCATION. - OHE �\ \ /Zp,W ALLEY 12 00' (NOT OPEN) � ,moo � — _--- 0 N89`58'45"E _ / o . 8990 � x co / - — — — — — — — — — I / 1 x DECK � I � ABovE L--- / II a \\ — -- I�j--___ a—�T\ i x — I �I I I I I I I I ............. I I _ _ I I EXISTING RESIDENCE � nor FIRST FLOOR EL=138.9 BASEMENT FLOOR^EL=129.4 I )OF /ERHANG I All utilities are required to be located underground. See Utility Notes. PROTECT EXISTING OVE WER AND LOW VOLTAGE SERVICES TO ID RE-ESTABLISH CONNECTIONS FOR RVICE TO RE NCE. 0 on nn \ ESTIMATED LOCATION OF EXISTING SIDE SEWER. PRESERVE AND PROTECT EXISTING SIDE SEWER IF POSSIBLE. SEE SIDE SEWER NOTES THIS SHEET. ANY WORK DONE ON SIDE SEWER _ SHALL BE DONE UNDER SEPARATE SIDE SEWER PERMIT. OHE 11T 'Tr U -6H rMAILBOXES I ICI WATER W \ PROPOSED CROSSING OF STORM PIPE co OVER EXISTING SIDE SEWER. SEE Cn UTILITY NOTES THIS SHEET. N I 1 / S I 8" ,�ONC SEWER _S_S LAUREL STREET A 12" Cast Iron Lamphole Cover with 1/2" hexbolts is required at the property line (with the entire cleanout located in the ROW). If a 6" cleanout does not currently exist, a cleanout is required to be installed. FOUND REBAR & AP 29539) Q\ 4 I I — — — — — — -- 731 LAUREL ST. CB RIM=138.77' LAUREL STREET 0 HORIZ. N 5 10 Scale In Feet 20 SIDE SEWER NOTES: LATERAL (the portion from the 1. THE CITY'S PUBLIC WORKS DEPARTMENT WILL TV INSPECT THE EXISTING SIDE SEWER 0 property line to the City sewer main). DETERMINE IF IT IS ACCEPTABLE FOR RE -USE. A 6" CLEANOUT WILL NEED TO BE MADE ACCESSIBLE FOR CITY CREWS TO TV THE LINE. CONTRACTOR SHALL CONTACT THE CITY OF EDMONDS ENGINEERING DIVISION AT engineeringpermits@edmondswa.gov TO SCHEDULE AN INSPECTION. The contractor/homeower shall TV the existing side sewer (the portion of sewer form the house to the property line) and the video shall be submitted to the City for review and approval to re -use. 2. IF THE CITY DETERMINES THAT THE EXISTING-S�BE SEWER IS ACCEPTABLE, THE CONTRACTOR SHALL POTHOLE EXISTING SIDE SEWER PRIOR TO CONSTRUCTION TO CONFIRM PIPE DEPTH AT CROSSING LOCATIONS AND POC AT BUILDING. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICTS OR DISCREPANCIES DISCOVERED WHILE POTHOLING. PORTIONS OF THE EXISTING SIDE SEWER MAY NEED TO BE REMOVED AND RE-LAID, IF DETERMINED BY THE ENGINEER, TO RESOLVE THESE CONFLICTS. ALL NEW PIPE SHALL CONFORM TO CITY OF EDMONDS CONSTRUCTION STANDARDS. 3. IF IT IS DETERMINED THAT THE EXISTING SEWER LATERIAL CANNOT BE RE -USED, A NEW SEWER And existing sewer lateral LATERAL CONNECTION AT THE SEWER MAIN SHALL BE CORE DRILLED OR CUT IN WITH A WYE. THE shall be 6" in diameter. CONNECTION AT THE MAIN SHALL BE INSTALLED PER CITY OF EDMONDS STANDARDS WITH A ROMAC / SADDLE OR EQUAL, OR CUT IN WITH A WYE. THE NEW SEWER LATERAL SHALL BE 6" IN DIAMETE , AND CAN BE REDUCED TO 4" ONCE ON PRIVATE PROPERTY. A 6" CLEANOUT IS REQUIRED AT THE PROPERTY LINE. THE CLEANOUT SHALL HAVE A 12" CAST IRON LAMPHOLE COVER WITH 1 /2" HEXBOLTS. AN ADDITIONAL CLEANOUT IS REQUIRED AT 2' FROM THE HOUSE. 4. ALL WORK TO EXISTING SIDE SEWER OR NEW SIDE SEWER SHALL BE DONE UNDER A SEPARATE SIDE SEWER PERMIT. WATER SERVICE NOTE: CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THE EXISTING WATER METER, AS IT IS INTENDED TO CONTINUE IN SERVICE TO THE RESIDENCE. IF THE EXISTING SERVICE LINE IS FOUND TO BE IN CONFLICT WITH ANY PROPOSED CONSTRUCTION, THE CONTRACTOR SHALL REMOVE AND REPLACE REQUIRED PORTIONS OF THE LINE IN ACCORDANCE WITH CITY OF EDMONDS CONSTRUCTION STANDARDS. UTILITY NOTES: 1. GAS SERVICE AND METER TO BE RELOCATED AS REQUIRED TO ACCOMODATE MODIFIED RESIDENTIAL STRUCTURE. PERMITTING TO BE THROUGH PUGET SOUND ENERGY UNDER SEPARATE PERMIT. 2. MODIFICATIONS TO ELECTRICAL POWER SERVICE TO BE PERMITTED SEPARATELY THROUGH SNOHOMISH COUNTY PUD. 3. ALL UTILITIES ARE REQUIRED TO BE UNDERGROUND. A MINIMUM OF 3' SEPARATION IS REQUIRED BETWEEN DRY UTILITIES AND SEWER, WATER, OR STORM UTILITIES. A MINIMUM OF 5' SEPARATION IS REQUIRED BETWEEN DRY UTILITIES AND ANY CITY MAIN LINES. LEGEND PROPERTY LINE BUILDING SETBACK LINE CEMENT CONCRETE (CL 3000) CALL BEFORE YOU D;G 811 UNDERGROUND SERVICE (USA) 0 BLD2021-0591 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 8/20/22021 BY:.F CITY EIVVIIVCCICIIvh uIVISION F- U) w O w 'Q � � U > Lu Z 0 m an m >, m o z Icao � N O U U 0 C .� >O co L - a) .0 0 U U 0- nla U0 �0 �Q o0 11312021 L W 00 00 — rn a Q �Lr)o C)) U U J O w O 1- � U mLUO 0 1 O Ul C0O ( U O � Ln O 3 Q m cD z Y o w 0 W CO O � rn Q z 0 U w Ui 0 z D z Q Lu Q J Lu 0') 0 0 LU I-- w LU U z W 0 CO Nw Q W W CD w J_ U w U w 0 O z Q 1 J RES U B Jul 16 2021 CITY OF EDMONDS .VELOPMENT SERVICE DEPARTMENT C4.00 PERMIT #BLD2021-0591