Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
required prior to final
BId2021-0591 NEED NOTICE ON TITLE AND MAINTENANCE BOND PRIOR TO FINAL. Maintenance Bond will be required once landscaping has been installed and inspected. Landscape bid amount is $6,930 = Maintenance Bond amt is $1,039.50.