HomeMy WebLinkAbout2016-05-03 City Council - Full Agenda-16540 p L D,yj
°mod Agenda
Edmonds City Council
COUNCIL CHAMBERS
250 5TH AVE NORTH, EDMONDS, WA 98020
MAY 3, 2016, 7:00 PM
CALL TO ORDER/FLAG SALUTE
1. ROLL CALL
0
4
5.
6.
7.
8.
9.
10.
APPROVAL OF THE AGENDA
APPROVAL OF THE CONSENT AGENDA ITEMS
1. Approval of Council Meeting Minutes of April 26, 2016
2. Approval of claim checks.
3. Resolution in Support of Sustainable Cities Partnership
4. Award of Tourism Grants to Edmonds Center for the Arts and Edmonds Waterfront Festival
5. 2016 1st Quarter Budget Amendment
6. Authorization to award a construction contract for the 2016 Waterline Replacement Program to
D&G Backhoe
7. Authorization to award a construction contract for the 2016 Sanitary Sewerline Replacement
Program to Kar-Vel Construction
8. Public Works Engineering Job Description Update & Reclassification
9. Removal of residence located at 820 Maple Street from the Edmonds Register of Historic Places
PRESENTATIONS/REPORTS
1. Puget Sound Starts Here Proclamation (5 min.)
2. Edmonds Cemetery Board Presentation (5 min.)
3. Alliance for Housing Affordability Presentation (20 min.)
4. March 2016 Quarterly Financial Report (10 min.)
AUDIENCE COMMENTS
ACTION ITEMS
1. Critical Area Ordinance Update (30 min.)
2. Dayton Street Plaza Project Budget authorization (10 min.)
MAYOR'S COMMENTS
COUNCIL COMMENTS
CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW
42.30.110(1)(1).
RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE
SESSION.
Edmonds City Council Agenda
May 3, 2016
Page 1
ADJOURN
Edmonds City Council Agenda
May 3, 2016
Page 2
3.1
City Council Agenda Item
Meeting Date: 05/3/2016
Approval of Council Meeting Minutes of April 26, 2016
Staff Lead: Scott Passey
Department: City Clerk's Office
Preparer: Scott Passey
Background/History
N/A
Staff Recommendation
Review and approve the draft meeting minutes on the Consent Agenda.
Narrative
N/A
Attachments:
04-26-16 Draft Council Meeting minutes
Packet Pg. 3
3.1.a
EDMONDS CITY COUNCIL DRAFT MINUTES
April 26, 2016
The Edmonds City Council meeting was called to order at 7:00 p.m. by Mayor Earling in the Council
Chambers, 250 5t1i Avenue North, Edmonds. The meeting was opened with the flag salute.
ELECTED OFFICIALS PRESENT
Dave Earling, Mayor
Kristiana Johnson, Council President
Michael Nelson, Councilmember
Adrienne Fraley-Monillas, Councilmember
Diane Buckshnis, Councilmember
Dave Teitzel, Councilmember
Thomas Mesaros, Councilmember
Neil Tibbott, Councilmember
ROLL CALL
STAFF PRESENT
N. Haughian, Police Officer
Phil Williams, Public Works Director
Carrie Hite, Parks, Rec. & Cult. Serv. Dir.
Shane Hope, Development Services Director
Scott James, Finance Director
Rob Chave, Planning Manager
Leif Bjorback, Building Official
Rob English, City Engineer
Jeff Taraday, City Attorney
Scott Passey, City Clerk
Jerrie Bevington, Camera Operator
Jeannie Dines, Recorder
City Clerk Scott Passey called the roll. All elected officials were present.
2. APPROVAL OF AGENDA
COUNCILMEMBER TEITZEL MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS,
TO APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED
UNANIMOUSLY.
3. APPROVAL OF CONSENT AGENDA ITEMS
COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS,
TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda
items approved are as follows:
A. APPROVAL OF DRAFT CITY COUNCIL MEETING MINUTES OF APRIL 19, 2016
B. APPROVAL OF CLAIM, PAYROLL AND BENEFIT DIRECT DEPOSIT, CHECKS AND
WIRE PAYMENTS
4. PRESENTATIONS/BEPORTS
A. YWCA STAND AGAINST RACISM DAY PROCLAMATION
Mayor Earling read a proclamation declaring April 29, 2016 to be Stand Against Racism Day in Edmonds
and calling upon all public officials, educators, business leaders and all people of Edmonds to observe this
Edmonds City Council Draft Minutes
April 26, 2016
Page 1
Packet Pg. 4
3.1.a
day and commit themselves going forward to fight against racism whenever and wherever it may appear.
He presented the proclamation to Mary Anne Dillon, Regional Director, YWCA Snohomish County.
Ms. Dillon expressed her appreciation for the City's Stand Against Racism again this year. The initiative
began in 2008 by the YWCA in Trenton, New Jersey. This campaign is designed to build community
among those who work for racial justice and to raise awareness about the negative impact of institutional
and structural racism. The Stand Against Racism campaign is one part of the YWCA's larger national
strategy to fulfill their mission of eliminating racism, empowering women and opening doors to
opportunity for women and families facing poverty, violence and discrimination. The Stand Against
Racism reminds there is still work to be done in the community and that together we can make a
difference.
5. AUDIENCE COMMENTS
There were no audience comments.
6. STUDY ITEMS
A. RESOLUTION IN SUPPORT OF SUSTAINABLE CITIES PARTNERSHIP
Planning Manager Rob Chave recalled a previous presentation to Council, advising this was an update
and decision point whether to proceed. The Council packet includes a draft resolution supporting the
Sustainable Cities Partnership. Staff is ready to submit an application; the City's application along with
other applications will be considered by Western Washington University (WWU). If WWU's program is
successful there will be opportunities to apply in succeeding years. Staff is excited about the opportunity
to pursue a number of smaller, well-defined projects, things that would not otherwise happen anytime
soon. The project is a way to jumpstart these projects for a small investment of time and money. He did
not view this as detracting from other projects because the projects fit within ongoing priorities. The list
of possible projects identifies connections to the Comprehensive Plan, Strategic Action Plan as well as the
Zero Waste Resolution. WWU is still reviewing projects; if Council is interested in adding a project for
WWU to consider, that can be done. The projects on the list are ones the WWU has expressed interest in.
Mayor Earling explained if Council approved the resolution, the City will still compete and if successful,
will eventually enter into an interlocal agreement. Mr. Chave advised according to City Attorney Jeff
Taraday's and David Davidson, Sustainable Cities Partnership, the City would sign a contract for services
with WWU. If the Council approves the resolution, it is a commitment to include funds in the 2017
budget. The intent is to keep the Council in the loop regarding projects and funding, etc., understanding if
the budget is approved, it is potentially within the Mayor's authority to sign the contract. If the Council
approves the resolution and the City is selected by WWU, the list and contract will be presented to
Council.
Councilmember Fraley-Monillas relayed a citizen's question about the cost per item that WWU would
work on. David Davidson, Sustainable Cities Partnership, answered as this is launch year for WWU,
they do not have a track record. For the University of Oregon, who has 6 years of experience and 100+
projects, the average cost to have one university course work on one city project cost is about $7,000.
Two other cities are applying; WWU will review the projects to determine what the faculty wants to work
on. For example, if Edmonds were WWU's first choice, WWU would provide a budget and a list of
projects that could be done for that budget before the final agreement is executed.
Councilmember Fraley-Monillas assumed projects that could be done locally for less than $7,000 would
not be included on the list. Mr. Chave responded the projects that are rising to the top are not ones that it
Edmonds City Council Draft Minutes
April 26, 2016
Page 2
Packet Pg. 5
3.1.a
would be affordable for the City to hire a consultant to accomplish. He was fairly confident the projects
that are the most attractive are the ones that make the most sense.
Councilmember Buckshnis asked when this would begin as it would be funded in the 2017 budget. Mr.
Chave answered the academic year that begins fall 2016. WWU is flexible; if it is included in the City's
2017 budget, funds would not be due to WWU until 2017. Councilmember Buckshnis observed the cost
in the resolution was a range from $65,000 to $85,000, basically 9-12 courses. Mr. Chave agreed.
Councilmember Buckshnis said relayed comments she received from two citizens that they could do some
of the items for less. Mr. Chave answered the scope is key. In additional conversation with Mr. Davidson
and WWU, there may be things City staff can do such as going to WWU, remote meetings etc.
Councilmember Buckshnis noted some of the items such as the Green Resource Room, staff is already
working on. She observed some items would not be an entire course activity and asked whether some
could be combined, noting some items had already been combined. Mr. Chave answered the
combinations were based on feedback from WWU with regard to doing both in one course. That will be
addressed in the detailed scope and budget.
Council President Johnson expressed interest in using WWU's GIS students to do the cemetery inventory.
She recalled the Cemetery Board estimated it would cost $100,000 to have a consultant map the existing
burial plots. She requested that be added to the list of possible projects as well as any other GIS mapping
projects such as Urban Forestry mapping. Mr. Chave agreed those could be added. Mr. Davidson agreed a
team of students in a GIS lab could accomplish the cemetery mapping.
Councilmember Teitzel commented this is an intriguing program and he was anxious to hear more about
it. However, he was concern about shifting focus. The City is preparing to embark on a National Citizens
Survey (NCS) at a cost of approximately $20,000 to help inform the City what citizens want to see
accomplished which may also refine the projects the City is interested in having WWU pursue. The City
has a lot of very talent people on its boards and commissions and he suggested in the near term asking
them to address these projects which could be done at virtually at no cost. He preferred to do that and wait
for the results of the NCS before engaging WWU. He would be happy to consider this idea next year once
the survey information is available. In addition, the City is still catching up on roads and sidewalk
maintenance; if there are discretionary funds available, in the near term he preferred to apply those funds
to street and sidewalk maintenance. For those reasons, he will not support the proposal.
It was the consensus of Council to forward this for approval on next week's Consent Agenda.
B. AWARD OF TOURISM GRANTS TO EDMONDS CENTER FOR THE ARTS AND
EDMONDS WATERFRONT FESTIVAL
Councilmember Nelson, Chair of Lodging Tax Advisory Committee (LTAC), advised the LTAC
reviewed the two grants and voted to recommend to Council approval of the two grant requests:
1. $2,500 for Edmonds Center for the Arts 10t' year anniversary birthday bash. Similar to KidStock
with free performances inside and outside.
2. $1,000 for Community Transit bus wrap advertising for the Edmonds Noon Rotary Club's
Waterfront Festival.
It was the consensus of Council to forward this for approval on next week's Consent Agenda.
C. 2016 1ST QUARTER BUDGET AMENDMENT
Finance Director Scott James presented:
• 19 Decision Packages
Edmonds City Council Draft Minutes
April 26, 2016
Page 3
Packet Pg. 6
3.1.a
• $313,200 in new revenues
• $165,382 are carryforward expenditures
• $192,500 are for expenditures previously discussed by Council
• $597,078 are new Items for Council to consider expenditures
Mr. James reviewed budget amendments:
Carryforward, previously discussed by Council
• Carryforward unexpended funds ($100,000) from 2016 for the Hwy 99 Subarea Plan
• Carryforward unexpended funds ($11,183) to cover 2016 consultant costs to complete the CAO
update
• Carryforward $54,100 for the Development Code rewrite
Previously discussed by Council
• Additional $16,500 for the public defender
• Additional $30,000 for Veterans Plaza planter beds benches and a seating area
• Additional $16,000 for a cover for the propane dispenser at the Public Works yard
• Additional $130,000 for construction of the downtown restroom
New Items for Council Consideration
• Prior to the close of 2015 the City received $16,254 from Washington State Department of Labor
and Industry for their Stay at Work Program. Human Resources would like to use the
reimbursement for accident prevention training
• $2,100 for videotaping of Planning Board meetings
• A Planning Division staff member will be on extended leave; the department is requesting
$15,200 to backfill position due to high work volume. Permit revenue will cover the additional
cost
• $12,391 for environmental testing at Marina Beach Park
• City received $10,000 to assist with the promotion of the Bird Fest and the Holiday Market
• Replacement of Frances Anderson Center bandshell was planned in 2016. An $81,870
carryforward budget amendment was approved in February to help fund the replacement. At that
time Council was informed an additional budget request would be made in the first quarter when
costs were determined. An additional $30,000 is required to cover the cost of demolition
• $31,913 used to pay water connection fees for the new spray park
• $43,523 grant that will be used for Safe Routes to School to pay for education and enforcement
• $90,000 TIB grant that will be used for the 238rh walkway from Hwy 99 to SR104
• $154,680 grant that will be used street overlays on 236t1i
• $176,000 for sewer pipe relining. Funded by 2015 budget savings ($60,000 from Sewer
Replacement project and the remainder from ending fund balance)
• During 2016 budget development, staff submitted a budget request for $50,000. Further research
led to a decision to purchase an entirely different software system which will result in significant
savings in annual software license costs in 2017 and beyond but will be $15,000 higher in 2016.
Mr. James summarized the budget amendment:
• Revenues increased $312,200
• Expenditures increased $954,960
• Change in beginning balance +$165,382
• Ending fund balance deceased $476,378
Edmonds City Council Draft Minutes
April 26, 2016
Page 4
Packet Pg. 7
3.1.a
Councilmember Buckshnis relayed her understanding that Planning Board videotaping would be a
permanent expenditure rather than a budget amendment. Mr. James explained when the 2016 budget was
developed, this amount was not included; he anticipated it would be included in future budgets.
Councilmember Buckshnis referred to the replacement staff in the Planning Division and asked whether
the person would be on long term disability. Parks & Recreation/Human Resources Reporting Director
Carrie Hite advised extended leave is 3-5 months which is too short for a long term disability payout. The
individual will be using vacation and sick leave and then unpaid. The vacation and sick leave are not
included in budget and the department has no way to fund backfilling a position without a budget
amendment.
Council President Johnson referred to the replacement of the bandshell, observing the total cost was
$191,870 but the item description refers to a $81,000 carryover and an additional $30,000. Ms. Hite
answered there was originally $160,000 in the budget; the additional $30,000 will bring the budget to
$191,000. Funds carried over at the beginning of the year were added to $80,000 budgeted in 2016. It was
anticipated that project would begin in October/November 2015 but that was not possible as the
construction documents were not complete.
Councilmember Teitzel referred to the $2,200 for the canopy cover for the propane dispenser and asked
why that was charged to the Equipment Rental Fund and not the General Fund. Mr. Williams explained it
would be paid from the 511A Fund not 51113 which is used for vehicle replacement. Equipment Rental
Funds was proposed as a funding source as it has general application across the fleet.
It was the consensus of Council to forward this for approval on next week's Consent Agenda.
D. REPORT ON BIDS FOR THE 2016 WATERLINE REPLACEMENT PROGRAM
City Engineer Rob English reported on bids:
• Advertised for bids in early April and bids opened April 21
• Four bidders responded
• Low bid provided by D&G Backhoe with a bid of $1,147,000
• Total construction budget including soft costs: $1.4 million
• Available funding: $1.9 million.
• Contract has 90 working days, June -November construction period
• Project scope: 5,000 feet watermain replacement on 7 sites
• Most of the pipe being replaced is cast iron from the 1930-1940s
Mr. English recommended approval on Consent Agenda.
Councilmember Mesaros asked Public Works Director Phil Williams to share information he provided
during their conversation earlier today regarding a hot topic in the news, lead in water. Mr. Williams
agreed lead in water is very topical in Tacoma and Seattle and other places in the United States. Lead in
water is related to age of the water infrastructure on both the city's and the customer's sides of the meter.
Cities are required to do lead sampling every three years; it was last done in Edmonds in September 2015.
At that time water in the oldest homes in the City were sampled in an effort to identify places where lead
concentrations might be the highest. He reported there were no problems in any of the samples taken. Due
to increased interest in this topic, he has asked the Water Division Manager to take additional samples
which will be done in the next couple weeks. He will inform the Council of the results as well as make
them available to the public.
Edmonds City Council Draft Minutes
April 26, 2016
Page 5
Packet Pg. 8
3.1.a
Mr. Williams relayed in the last 17 years, the City has never exposed a lead gooseneck in any of the
watermains that have been replaced. He explained lead goosenecks were used because galvanized pipes
are rigid and the more flexible lead connects were used to connect to the main. Much of the City's
infrastructure dates to the 1930s and earlier, about the time that technique was ceased. Another source of
lead in water is leaded joints in cast iron watermains. As the City continues replacing pipes, more and
more of those will be removed. In the meantime, sampling indicates suggests there are no issues in
Edmonds related to lead.
Councilmember Teitzel observed most newer homes have plastic or cooper water service inside the
house. Mr. Williams agreed. Councilmember Teitzel commented at one point there was lead in the solder
used to join copper pipes. He asked if residents should be concerned about lead in their water from that
solder. Mr. Williams said his best advice for homeowners is to run the water in the morning for a couple
minutes before use.
It was the consensus of Council to forward this for approval on next week's Consent Agenda.
E. REPORT ON BIDS FOR THE 2016 SANITARY SEWERLINE REPLACEMENT
PROGRAM
City Engineer English reported on bids:
• Bids opened today, five bidders
• Apparent low bidder is Carvel Construction with a bid of $1.5 million
• Project scope: 2,000 linear feet of sewer main and 750 feet stormwater pipe
Funded by sewer and stormwater funds
Contract has 80 working days, June -October construction period
Mr. English explained the sewerline replacement is to address maintenance issues where old concrete
sewer pipe has settled or eroded creating operational issues for cleaning and maintaining flows. The
stormwater portion is to correct a drainage issue on Sierra Place. That project was programmed in July
2015 but only design funds were included. It was later determined this stormwater project could be done
with the sewermain project and realize economies of scale by bidding all the work together. A budget
amendment will be required for award of this project. Assuming the bid review and checking of
qualifications is completed satisfactorily, staff recommends approval on the Consent Agenda.
Council President Johnson referred to the April to November construction period and asked if it was
necessary to wait until the following spring to resurface the construction area. She recalled a large project
done on Walnut last year had not yet been resurfaced. Mr. English answered several issues are considered
in determining whether a street receives a full width overlay. In the case of Walnut, there will be full
overlay as part of the overlay program. When utility work is done, a determination is made whether the
damage caused by the utility is sufficient to require the road to be overlaid. Typically overlays are done
the following year to allow any settling in the trench to occur. That determination is made based on the
condition of streets and the impacts of the utility work. All utility projects require a permanent trench
patch, HMA pavement, that is compacted in the trench so the street is restored at the end of project. That
would be done on both the sewer and watermain projects.
It was the consensus of Council to forward this for approval on next week's Consent Agenda.
F. PUBLIC WORKS ENGINEERING JOB DESCRIPTION UPDATE
City Engineer Rob English explained although the resignation of well qualified and experienced
Stormwater Engineering Program Manager Jerry Shuster to take a position in Bellevue left a void in the
Edmonds City Council Draft Minutes
April 26, 2016
Page 6
Packet Pg. 9
3.1.a
division, it also provided an opportunity to reevaluate how things are done in the division as well as
existing staff and their qualifications. He reviewed the proposed reclassifications:
Senior Utilities Engineer & Stormwater Engineer Reclassifications
Mr. English recommended the Senior Utilities Engineer position, who current programs and budgets for
capital projects related to water and sewer, take over long range planning for stormwater capital and
infrastructure. The benefit is one person coordinating all three utilities. The current Senior Utility
Engineer is a very qualified professional with many years of experience in the private sector designing
stormwater infrastructure and has been with the City since 2011 doing an outstanding job. This proposal
would add those duties as well as supervisory duties to the position. He proposed the Stormwater
Engineer's supervisory responsibility be shifted to the Senior Utility Engineer position and the
Stormwater Engineer and the Stormwater Engineering Technician position report to the Senior Utilities
Engineer position. The salary range for the Senior Utilities Engineer would be increased from 14 to 16
and the salary range for the Stormwater Engineer position would be decreased from from 14 to 13. He
anticipated it would be challenging to fill the position due to the high demand for engineers in the current
economy.
En ing eering Program Manager Reclassification
Mr. English explained the previous City Engineer in the early 2000s instituted a career progression plan
for the Engineer Technicians and Engineering Program Manager positions to help promote and retain
employees. The current Engineering Program Manager 1 has been in the position since 2007. He
recommended the job description be revised as well as the individual reclassified to the Program Manager
2 position. At the time the description was prepared, it included capital infrastructure work. Job duties and
assignments have changed within the division since early 2000s and all capital work is managed by other
engineering staff. The reclassification deletes that work from the job description and has the position
focus on development work only. The salary range remains the same.
Engineering Technician 3 Promotion
The request is to reclassify an Engineering Technician 2 to Engineering Technician 3. Following the
career progression plan, this individual has fulfilled the qualifications.
Mr. English referred to the estimated salary/benefits table in the packet that reflects a salary savings in
2016 due to the vacant Stormwater Engineer position. The reclassification of the Engineer Technician 2 to
Engineering Technician 3 is retroactive several months. The table reflects estimated salary/benefits
increases through 2020. Over 90% would be funded by the Utility Fund and permit fees and a small
portion by the General Fund. He acknowledged that could change year-to-year depending on permit
activity. He requested the Council approve the three job descriptions on next week's Consent Agenda.
Councilmember Buckshnis expressed concern there were things that needed to be done related to the
stormwater code this year and next year that Mr. Shuster had begun working on. She relayed Mr.
Williams' assurance that he and Mr. English will ensure that gets done. She asked who would do that
work. Mr. English answered it would be under the Stormwater Engineer position which is a new position.
The other two positions are already filled.
Council President Johnson relayed her understanding that the senior level person would be doing the long
range planning which would include the stormwater code. Mr. English said the Stormwater Engineer
position would be working on that. Long range planning for capital infrastructure would be shifted to the
Senior Utility Engineer position. Before Mr. Shuster left, he and the consultant did a substantial amount
of work rewriting the stormwater section of the code. There is also a portion of the stormwater code
related to development services.
Edmonds City Council Draft Minutes
April 26, 2016
Page 7
Packet Pg. 10
3.1.a
Council President Johnson referred to the retroactive pay increase, asking how that could occur prior to
Council approval. Mr. Williams explained staff researched how the progression of Tech 1, 2 and 3 had
been implemented in past based on the union contract; it needs to be done the same in the future to avoid
union issues. The last one was in 2010, the employee became eligible, competed the checklist and was
certified by the City Engineer as meeting all the requirements to qualify as a Tech 3. Because of the time
required for Council approval, the increase was retroactive. He recommended the same for this
reclassification because of past practice and the policy.
It was the consensus of Council to forward this for approval on next week's Consent Agenda.
G. DEVELOPMENT ACTIVITIES UPDATE
Development Services Director Shane Hope presented:
• Photo of staff teamwork — building community — behind the scenes
• Development Review Committee meetings
• Graph of Development Services Permit History 1985-2015 — revenues versus number of building
permits
o 2015 highest year in history
• Graph of building permits reviewed by Building, Planning and engineer 2014/2015 comparison
by type of permit, number issued and valuation
• Graph of land use permits (not a part of building permit reviews) including number of permits,
number completed over 120 days and under 120 days, mean processing time and standard
deviation.
• Engineering Division (right-of-way, street use encroachment and side sewer activity)
o Permits Issued 432
o Permit Revenue $35,347
o Inspection & Review Revenue $178,012
o Traffic Impact Fees $66,344
o Solar Permits
Year
Number of
Permits
# of Permits Applied
for Online
a
�o Online
kW
2012
3
0
0%
11
2013
6
5
83%
41
2014
39
35
90%
241
2015
32
29
91%
211
Total
1 80
1
86%
1 505
Graph of building permits per Development Services employee 1985-2015
Inspections
o Over 8,000 field inspections were performed by Building, Engineering and Planning Division
staff in 2015
Building Official Leif Bjorback displayed a map of key development projects and reviewed:
• Residential Projects
o Development Services Department currently has 44 active new single family residence
permits
o Shaw Lane Subdivision 6 lots
o Woodvale 105th Place W— 26 lots
o Edmonds Way
0 218th Street
0 7th Ave S
Edmonds City Council Draft Minutes
April 26, 2016
Page 8
Packet Pg. 11
3.1.a
o Maplewood Drive
Commercial Projects
o Prestige Care
■ 76th Ave W
■ Over 48,000 sq. ft. skilled nursing facility
■ Certificate of occupancy issued 10/29/15
o Swedish Hospital
■ 21601 76th Ave W
■ 77,000 sq. ft. hospital expansion, new emergency department
o Post Office Mixed Use
■ Phase 1 — 43 new residential units and 4,800 square feet commercial space
■ Phase 2 — 28 new residential units and 7,600 square feet commercial space
o Cedar Care Memory Care
■ 21006 72n Ave W
■ 70,9897 sq. ft.
■ 62 units with 80 beds
o MGP Retail Shell Building (Wino Site)
■ 21940 Highway 99
■ 6,162 sq. ft.
■ 4 tenant spaces
o Point Edwards Building #10 (apartments)
■ 150 Pine Street
■ 58 residential units
■ Structured parking
o Salish Crossing
■ New tenants include
- Cascadia Art Museum
- Spud Fish & Chips
- Scratch Distillery
- Brigid's Bottle Shop
- 190 Sunset Restaurant
- lst Financial Bank
- Hunniwater
- The Workshop fitness studio
- Top Pot Donuts
Madrona School
o School District plans to build a new building on the vacant portion of the property and once
the new building is complete, demolish the old building
Tenant Improvement Projects
o Krueger Clinic
o Whirly Ball
o City Projects
■ Frances Anderson Center bandshell
■ Fishing Pier
Ms. Hope reviewed other Develop Services work:
• Technology Update
• Special projects examples:
o Edmonds Community Development Code Update
■ Subdivisions
■ Signs
Edmonds City Council Draft Minutes
April 26, 2016
Page 9
Packet Pg. 12
3.1.a
■ Stormwater Regulations
■ LID Integration
o Critical Areas Ordinance
o Street Tree Plan Update
o Highway 99 Subarea Plan
o Public Works Standard Details Update
o Remodeled Permit Center and & Green Resource Center
■ Planning open house once completed
o Building, Planning and Engineering Divisions are now available at Permit Counter daily
■ Hours: M, T, T, F: 8:30 am — 4:30 pm and Wednesdays 8:30 am -noon
o Many resources can be found on City website — www.edmondswa.gov
■ City web map provides utility info, as-builts, zoning etc. — www.maps.edmondswa.gov
Councilmember Nelson inquired about the number of residential versus commercial solar permits. Ms.
Hope answered most are residential because they are simpler. Mr. Bjorback agreed residential are much
simpler. The number of solar permits in 2014 and 2015 are high due to the Solarize campaign during
those years. Solar permits have decreased in 2016. Councilmember Nelson asked if there were any plans
to revitalize the solar program. Ms. Hope said staff will be considering options, perhaps there will be an
opportunity with WWU to do some solar campaigning and outreach.
Councilmember Tibbott referred to the comparison of land use permits, noting all are completed in under
under 120 days. He asked how the mean processing time compared to other cities. Ms. Hope said she
would need to research that; she anticipated Edmonds was not far out of line with other cities.
Councilmember Tibbott asked how the 2015 mean processing time compare to slower years. Planning
Manager Rob Chave answered it is generally similar. He recalled the mean times were fairly consistent
year-to-year, but he could research and provide that information. Councilmember Tibbott said a developer
needs to know how long it takes to get through the process in order to plan. Mr. Chave explained land use
permits are somewhat unique and time intensive due to the extensive process that includes advertising,
noticing, involvement of other agencies such as the State, etc. Developers are informed how long the
review process will take.
Mr. Chave commented that due to Council and staff interest in improving review times, a lot of things
with process intensive permits were moved into the building permit process. For example, thresholds
have changed with regard to what goes to the Architectural Design Board for review versus having
standards in the code that enable staff to handle the design component which is a huge benefit. It retains
the ability to look at design but having identified design parameters allows the review process to be
compressed. Currently, most of the lengthy design review is for high level projects and smaller projects
are reviewed via the building permit.
Councilmember Tibbott commented it appeared the department was able to do more with the same
number of staff and asked if that was due to technology. Mr. Chave responded it is due to process changes
as well as a focus on technology. An example is online solar permitting and streamlining staff review that
resulted in shortening of the overall process. The goal is to move more permitting online, electronic plan
review to reduce paper, etc. He agreed technology is key.
H. HIGHWAY 99 AREA PLANNING UPDATE
Development Services Director Shane Hope reviewed:
• Purpose
o Create a vision for the corridor
Edmonds City Council Draft Minutes
April 26, 2016
Page 10
Packet Pg. 13
3.1.a
■ Historically, the corridor developed with little planning guidance.
■ The result is what we are left with today: poor connections, unsafe streets, and general
lack of cohesiveness between buildings.
■ Taking a more proactive approach will provide a "big picture" view of community goals
such as transportation, land use, and safety.
o Develop specific steps to accomplish community goals
■ Based on the vision and community goals, the subarea plan will identify action steps the
City can take
■ Attract investment
- Public funding
- Private investment
Map of Highway 99 subarea
Background: Building on previous work
o Highway 99 Task Force
■ Formed over 12 years ago
■ Helped provide insight for the 2004 report
■ The 2004 report held the City win $662,000 in federal grants for pedestrian safety and
lighting improvements
o Highway 99 Enhancement Project Report, Makers, 2004
o Highway 99 Enhancement Project Market Assessment, Berk & Associates, 2004
o Highway 99 Traffic Safety and Circulation Study, Perteet, Inc., 2007
o City of Shoreline Planning
Recent Steps
o Consultant team brought on board: Fregonese Associates
■ Reconnaissance/research
o Public workshop - over 50 attendees
■ Instant polling
- If you could do just one thing for the corridor, what would be your top priority for
infrastructure?
A. Address parking - management and shared parking - 9%
B. Public space improvements and beautification - 42%
C. Safety improvements for bikes and pedestrians - 12%
D. Better connections for bikes and pedestrians - 33%
- If you could do just one thing for the corridor, what would be your top priority for
housing?
A. Add more housing units - 24%
B. Add more affordable housing units - 32%
C. Beautification, blight removal, code enforcement - 39%
D. Homeowner assistance for rehabilitation - 0%
- If you could do just one thing for the corridor, what would be your top priority for
business?
A. Catalyst development on major sites - 39%
B. Storefront improvements - 7%
C. Bright new business and jobs to the area - 46%
D. Invest in homegrown entrepreneurs - 7%
Mapping exercise
Ms. Hope reviewed key observations from the public workshop:
• Improve safety
o Add pedestrian scale lighting and wider sidewalks along key pedestrian corridors (e.g.
Interurban Trail and neighborhood connections to Hwy 99).
Edmonds City Council Draft Minutes
April 26, 2016
Page 11
Packet Pg. 14
3.1.a
o Add more pedestrian crossings across Hwy 99.
o Slow traffic turning off Hwy 99 onto side streets.
Improve public space
o Include more wayfinding signs.
o Activate the street by bringing buildings to the sidewalks.
o Include landscaping as buffer between street and sidewalk.
o Concern expressed over the number of car lots. "Car lots do not make good neighborhoods."
Attract new businesses
o Diversify the business mix in the area
o Focus on attracting catalyst developments
Next steps include:
• Use results from public workshop and online survey to draft alternative scenarios
• Public Open house - Thursday May 19, 7:00 — 9:00 pm
o Swedish Hospital Auditorium, 21601 76"' Ae W, 4t1' floor, main building
Ways to participate include:
• Periodically check City websites
o www.edmondshwy99.org
o www.edmondswa.gov/2011-07-27-22-31-43/highway-99-planning-project.html
• Take the survey
o www.edmondshma99.org/workshop-survey
• Get on the City email list
• Watch for announcements in local media and City newsletters
• Send comments to brad. shipleykedmondwa.gov
Ms. Hope reviewed the project timeline
• March — April 2016: Understanding Existing Conditions
• April — June 2016: Develop Land use and Transportation Scenarios
• April — Oct 2016: SEPA & Planned Action Environmental Impact Assessment
• July — Sept 2016: Develop Subarea Plan
• Oct — Nov 2016: Final Sub -Area Plan
Councilmember Nelson thanked Ms. Hope and the consultant for the public workshop. He commented
the number of Councilmembers at the public workshop illustrates the Council's interest in Highway 99.
He also commented on the public workshop attendees' interest and their participation in the mapping
exercise.
Mayor Earling declared a brief recess.
I. UPDATE ON REVISING SIGN REGULATIONS AND OTHER PARTS OF THE
DEVELOPMENT CODE
Development Services Director Shane Hope explained sign codes are complex and have many issues such
as free speech, aesthetics, community character, public access, etc. Staff has has heard many different
concerns with the sign code over the years such as things that were unclear, things that other cities doing
such as replacing pole with monument signs, etc. The primary concern that has been expressed is
temporary signs in the downtown area. Most downtown businesses believe the opportunity for signage is
important, increases their business and keeps the area vital and lively. Conversely, signs can also get in
pedestrians' way if not placed carefully and can be viewed negatively. There is also an issue related to
Edmonds City Council Draft Minutes
April 26, 2016
Page 12
Packet Pg. 15
3.1.a
enforcement; the code provides for limitations on signs but there is no permitting or tracking system and
the City has only one code enforcement officer.
Planning Manager Rob Chave explained the Planning Board is initially focusing on temporary signs.
Sandwich/A-board signs are allowed downtown but not elsewhere in City. They are generally associated
with pedestrian environments and it makes sense to regulate them that way because pedestrian signs are
very different than other signs. Under the existing sign code temporary sign are allowed but only for 60
days; however, there is no permitting system to track those signs. The Planning Board is considering what
signs need time limits and how sandwich board signs are used.
Mr. Chave explained currently A -board signs are not used on a temporary basis for a specific number of
days; the temporary nature is related to their removal when the businesses are closed. Many A -board
signs are used for ongoing advertisement for things like menus, daily specials, or other temporary
statements that inform patrons what is occurring in the business. One of the challenges is the sidewalk
area downtown is limited, most downtown sidewalks are 8 feet wide. Although there is ample room, the
issue is not having to many A -board signs so they are ubiquitous, identifying the best location on a case -
by -case basis, determining a logical number based on number of storefronts, doorways, etc. Those details
are not reflected in the current code.
Mr. Chave said another issue under review with the assistance of the City Attorney is the recent Supreme
Court case that limits the ability to regulate signage; regulations have to be content neutral. The basic rule
is if a person has to read the sign to determine whether it's permitted, that is a problem Other
jurisdictions' codes cannot be used as samples because most allow specific signs. For example, a menu
sign; it would be necessary to read the sign to determine it was a menu sign. The City Attorney's office
has been reviewing the City's sign code and have identified definition problems as well as other issues.
Ms. Hope relayed the intent is for Planning Board to gather public input and provide a recommendation to
the City Council.
Councilmember Buckshnis recognized there are a lot of issues associated with the sign code. Many
temporary signs are not actually temporary; they have been in place for a very long item. She was unclear
why temporary signs are a freedom of speech issue. Other cities do not allow sandwich board signs; if the
City has never tried not allowing sandwich board signs, how do businesses know they are helpful. She
suggested not allowing A -board signs for a 30-60 day trial period. Ms. Hope anticipated options would be
presented to the Council that could include no temporary signs allowed on the sidewalk or other
regulations such as where and when they can be displayed. City Attorney Jeff Taraday said if the Council
was interested in completely prohibiting temporary signs, he would need to research whether that was
defensible.
Councilmember Fraley-Monillas asked whether a permit for A -board signs had been considered. She
wondered how many would be displayed if a permit were required. Ms. Hope answered consideration is
being given to requiring a permit; most other sign types require a permit. A -board signs in Edmonds do
not require a permit which makes them difficult to track.
Councilmember Fraley-Monillas relayed she has been contacted by members of the disability community
on more than one occasion with concerns about outdoor dining in the right-of-way blocking access; A-
board signs adjacent to outdoor dining further block access. After measuring some sidewalks downtown,
she found some are only 6 feet wide. Mr. Chave said the Planning Board is discussing the requirement for
a permit especially for signs in the right-of-way. Requiring a permit would allow the sign location to be
reviewed as well as whether there was a conflict with outdoor dining. Councilmember Fraley-Monillas
remarked people without a disability often don't think about signs blocking access
Edmonds City Council Draft Minutes
April 26, 2016
Page 13
Packet Pg. 16
3.1.a
Councilmember Fraley-Monillas asked if a permit fee was required for blade signs. Mr. Chave answered
no; a decision was made during Stephen Clifton's tenure not to require a permit. The signs are required to
be mounted at a certain height but there is no fee for the permit. Councilmember Fraley-Monillas liked
the blade signs and would like to see more. She remarked blade signs, A -frame, and signs in window can
all be too much. Mr. Chave agreed that was the difficult part about the sign code; there were no objective
studies that state what was more or less effective. There are only government ordinances regulating signs
and publications from the sign industry that state more is better. That is why jurisdictions look at other
jurisdictions' regulations; unfortunately, most are not in accordance with Supreme Court decision. Ms.
Hope said another challenge is whether the business is located where it can display blade sign.
Councilmember Teitzel said he attended a recent Edmonds Downtown Alliance meeting where the issue
of signs was raised and there was a lot of emotion about A -board signs. Most business owners at that
meeting believed it was the most cost effective sign method to attract customers. He agreed it would be
important to find research that would inform business of other other options that may be as effective or
more effective than an A -frame sign. Ms. Hope said it has been very difficult to find any academic
research; most information is anecdotal.
Council President Johnson recalled Natalie Shippen raising this issue in the past including the visual
pollution in downtown Edmonds, the number of signs she observed and what they advertised. Council
President Johnson said after a while, people become immune to what Ms. Shippen saw and she was
unsure whether people actually read the signs. She agreed a range of options would be helpful, one of
options should be a ban or a temporary ban and encouraged the City Attorney to work with the Planning
Board and staff on a ban. She acknowledged a ban may not be popular but several Councilmembers have
indicated they are not particularly supportive of sandwich -board signs. She recognized they are
inexpensive and serve a purpose but questioned whether they were in the best interest of downtown
Edmonds.
Councilmember Nelson expressed support for temporary signs that were actually temporary; A -boards
tend to be permanent. He supported options for temporary signs with regard to the type of signs, size,
location, etc. He noted visitors may not walk by the A -board signs every day and may be informed by the
information on the sign. He favored finding a balance to accommodate visitors, people with disabilities
and pedestrians but did not support a temporary or permanent ban at this point.
Councilmember Mesaros relayed as he was walking to tonight's meeting, the veterinarian was bringing in
the sandwich -board sign at the Veterinary Clinic on 5`h. The sign appears to be very temporary as it is
brought in every night. Councilmember Mesaros pointed out real estate sandwich boards are often
displayed outside the downtown area, typically on the weekend to direct people to open houses. He
anticipated regulating those would be difficult. Ms. Hope agreed that is an issue; staff is not proposing to
address those signs at this time. Mr. Chave clarified only commercial A -board signs are allowed
downtown; A -board signs are allowed in residential zones. The challenge with real estate sign is they are
located off -premise. Councilmember Mesaros commented there are two types of real estate signs, the A -
frame and the small arrow stake signs.
7. REPORTS OF OUTSIDE BOARD AND COMMITTEE MEETINGS
Councilmember Buckshnis the WRIA 8's granting committee did two site visits for King County Flood
Control grant program and two visits for the Salmon Recovery Funding Board (SRFB) and submitted
their recommendations to the WRIA 8 Board. The WRIA 8 Board will review the recommendations on
May 19. She abstasined from voting on the recommendation related to the Edmonds Marsh. She reported
the Tree Board is hosting Cass Turnbull on May 5, 7:00 — 9:00 p.m. in Council Chambers to speak on
"The Seven Myths of Site, Selection and Care of Trees."
Edmonds City Council Draft Minutes
April 26, 2016
Page 14
Packet Pg. 17
3.1.a
Councilmember Nelson reported the Snohomish County Tomorrow Steering Committee had a
presentation from the PSRC on upcoming activities, the City of Mukilteo's Comprehensive Plan and a
briefing on the Alliance for Affordable Housing, He reported the US Corp of Engineer attended the Lake
Ballinger Watershed Forum meeting where there was interest expressed in collaborating with US Corp of
Engineer and shifting from flood mitigation to potentially improving Lake Ballinger's water quality in the
future. Federal Lobbyist Jake Johnson made at presentation at the Forum meeting about potential federal
legislation regarding a green stormwater tax credit that would provide residents a tax credit of up to 30%
for activities such as installing a rain garden.
Councilmember Fraley-Monillas reported on two Diversity Commission meetings she attended; at one,
members of the public were invited to speak about groups they are involved in. At the second meeting,
the Commission discussed participating in the 4th of July parade and prioritizing issues. She also attended
three Health Board meetings. One of the primary issues the Board is addressing is drug -take back.
Pharmacies have removed their drug take -back box; boxes are located in police departments including the
Edmonds Police Department. The Board is working on a policy to put drug take -back containers in
pharmacies, with funding from the drug manufacturers via a $0.02/prescription fee. In the meantime,
containers are located in many police departments.
Councilmember Fraley-Monillas reported the Disability Board is continuing to work on policy issues.
Several police departments attended the Law and Justice Committee meeting, the primary issue was
heroin overdose epidemic in Snohomish County. The Sheriff pointed out drug take -back boxes result in
less opportunity to abuse drugs as kids do not go straight to heroin, they begin with medications taken
from family/friend houses, eventually moving up to heroin. Heroin is a very inexpensive drug, making it
economical for users but it is killing children. She attended several other meetings this month.
Council President Johnson reported on an ECA reception she attended which was an opportunity to thank
donors including a large donation from Snohomish County Lodging Tax Advisory Board. She reported on
the Diversity Commission forum, an opportunity for the Commission to hear from community leaders on
a number of topics. She also attended the ST3 presentation in Everett last night.
Councilmember Mesaros reported the Seashore Transportation Forum had presentations regarding, 1)
ST3 proposal where a questions was raised regarding the interaction with other transit authorities such
Community Transit and Metro, and 2) King County Metro's Strategic Plan. He encouraged Metro to
coordinate with Community Transit.
Councilmember Mesaros reported the SnoCom Board meeting included discussion regarding a merger
with SnoPac and hiring a facilitator to lead those discussions. The Board also evaluated the SnoCom
Executive Director Terry Peterson who was hired on a temporary basis but with the potential merger, his
contract likely will be extended until that issue is resolved.
Councilmember Mesaros reported the Edmonds Public Facilities District meeting included a legislative
update regarding issues affecting PFD throughout Washington including extension of the PFD legislation
which was not passed. The meeting included routine finance items as well discussion of programming for
the remainder of this year and programming options for the upcoming season. He summarized the ECA is
very busy with its own programming as well as rentals.
Councilmember Teitzel reported the Disability Board is working through policy issues related to
how/when/if retirees should attend those meetings to plead their case. That occurred today and it was an
awkward exchange. He plans to attend the Law Enforcement Officer Firefighter annual meeting in Lake
Edmonds City Council Draft Minutes
April 26, 2016
Page 15
Packet Pg. 18
Chelan in May on behalf of the Disability Board to learn what other cities are doing to address new and
changing requests for reimbursement.
Councilmember Teitzel reported the Historic Preservation Commission meeting included a request from
the owners of a home at 8"' & Maple for historic registration. Following significant debate, the request
was denied due to major changes to upper floor windows that change the character of the house. He
reported the Civic Field Advisory Committee, after interviewing Walker I Macy, MIG and Lewis Berger
to prepare a master plan, selected Walker I Macy. They will begin an aggressive schedule of meetings; the
first public meeting, an open house format, will be held in May to learn what the public would like to see
at Civic Field. The master plan will be complete by the end of 2016 with a final plan forwarded to
Council for review in January 2017.
Councilmember Teitzel reported the Port of Edmonds meeting included reports on increased revenues,
discussion regarding the Coho fishing season; due to warm weather and water, this year's run is very
small and the fishery agencies are considering canceling the sport and commercial fishing season in this
area of Puget Sound. New restrooms were installed at the Port; the same vendor who will be installing the
downtown restrooms. Following a survey of tenants where most preferred ethanol free gasoline, the Port
will be shifting from ethanol augmented gas to clear. Ethanol attracts water which damages carburetors
especially in boats. The Sea Scouts are having an open house on April 30 from 10 a.m. to 1 p.m. on V
dock in front of Arnie's Restaurant.
Councilmember Tibbott reported he represents the Council on the Affordable Housing Alliance and took
a group interested citizens along with Ms. Hope and Councilmember Fraley-Monillas to look at a senior
housing project on 196"' in Lynnwood, Shepherds Garden. This project was initiated with 2.2 acres of
land gifted by a church which enabled them to attract another $10 million in grants. He displayed several
photos illustrating the quality of affordable housing projects including the entryway, a mural
commissioned for the lobby describing the history of Lynnwood, Pastor Chris Boyer whose church
donated the property and who is also a Lynnwood Councilmember, the courtyard in back and parking
shared with church. The donation of property increased the opportunity for federal, state and county
grants; the City of Lynnwood did not provide any funding but did help with zoning considerations and
land use accommodations. The building has 40 units as well as shared spaces; each unit is approximately
550 square feet with its own living space and kitchen. He found this to be a very exciting project and was
hopeful citizens with 2-5 acre properties would consider working with the City on an affordable housing
project.
Councilmember Tibbott reported he also provided feedback to Snohomish County on their draft housing
plan, voicing his concern that the plan was very Everett, Monroe and Marysville centric and included very
little in south Snohomish County and very little data from Edmonds School District which encompasses
five cities.
Councilmember Tibbott reported the Economic Development Commission has held two meetings since
his last report. Commissioners have diverse talents and a broad range experience. The Council can expect
a report from the Commission in June with objectives for the coming year.
Mayor Earling reported approximately 200-250 people attended the Sound Transit open house in Everett
last night on the ST3 plan. As expected no one is happy with light rail not reaching Everett until 2041.
The Snohomish County Sound Transit delegation identified ways to reduce costs and the timing to get
light rail to Everett sooner than 2041. The Sound Transit Board meeting will make a final decision in June
whether to proceed with a ballot measure.
8. MAYOR'S COMMENTS
Edmonds City Council Draft Minutes
April 26, 2016
Page 16
Packet Pg. 19
3.1.a
Mayor Earling relayed he received an email today from the Snohomish County Executive's office
indicating his plans to recommend to the County Council a ballot measure to increase sales tax by $0.002
to further fund criminal justice and fire protection. If successful, that funding mechanism would generate
$450,000-$480,000 in the first year in Edmonds. He offered to forward Councilmembers the information
he received, commenting the Council may want to schedule discussion on a future agenda. The
Snohomish County Council open house is May 13; placing it on the ballot would require Snohomish
County Council action.
Mayor Earling looked forward to the City's first daughter and son work day this Thursday at City Hall.
9. COUNCIL COMMENTS
Councilmember Teitzel reported Councilmember Fraley-Monillas and he are working on the August
Volunteer Appreciation Picnic to celebrate the City's volunteer boards and commission. They have
solicited donations from businesses for food and beverages for families as the City cannot pay for families
and he invited Councilmembers to donate.
Council President Johnson invited the public to a kickoff for the Civic Field Master Planning process for
the City Council on May 3 at a special meeting in the Brackett Room from 5:30 — 6;45 p.m. followed by
the regular Council meeting at 7:00 p.m.
Council President Johnson echoed Councilmember Fraley-Monillas' encouragement to put prescription
medications in the take -back box in the Police Department. She cautioned the public not to flush
medications as they cannot be removed at the treatment plant and enter Puget Sound, affecting aquatic
life.
Councilmember Fraley-Monillas said medications can also be put into coffee grounds or kitty litter. She
relayed the $0.002 sales tax increase was also discussed by the Law and Justice Committee; they
anticipate the funds could be used for 63 new deputies in Snohomish County as well as a percentage
going to the Health District.
With regard to Councilmember Tibbott's report, Councilmember Fraley-Monillas pointed out affordable
housing needs to be on a bus line and close to grocery stores, requires less parking as not everyone living
in a senior living facility drives. The community was excited about the project in Lynnwood and she
anticipated the same would be true in Edmonds. She pledged $50 to the Volunteer Picnic and challenged
Councilmembers to each donate $50.
Councilmembers Nelson and Buckshnis offered to contribute $50 each to the Volunteer Picnic and
Councilmember Mesaros offered to contribute $51.
10. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION
PER RCW 42.30.110(1)(i)
This item was not needed.
11. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN
EXECUTIVE SESSION
This item was not needed.
12. ADJOURN
Edmonds City Council Draft Minutes
April 26, 2016
Page 17
Packet Pg. 20
3.1.a
With no further business, the Council meeting was adjourned at 9:35 p.m.
Edmonds City Council Draft Minutes
April 26, 2016
Page 18
Packet Pg. 21
3.2
City Council Agenda Item
Meeting Date: 05/3/2016
Approval of claim checks.
Staff Lead: Scott James
Department: Administrative Services
Preparer: Nori Jacobson
Background/History
Approval of claim checks #219634 through #219756 dated April 28, 2016 for $509,556.76.
Financial Impact
Claims $509,556.76
Staff Recommendation
Approval of claim checks.
Narrative
In accordance with the State statutes, City payments must be approved by the City Council. Ordinance
#2896 delegates this approval to the Council President who reviews and recommends either approval or
non -approval of expenditures.
Attachments:
claim cks 04-28-16
FrequentlyUsedProjNumbers 04-28-16
Packet Pg. 22
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219634 4/28/2016 070322 A&A LANGUAGE SERVICES INC
219635 4/28/2016 069798 A.M. LEONARD INC
219636 4/28/2016 065052 AARD PEST CONTROL
Voucher List
City of Edmonds
Invoice
15-37181
15-38636
C116027753
368550
219637 4/28/2016 074306 AMWINS GROUP BENEFITS INC 4183511
219638 4/28/2016 074718 AQUATIC SPECIALTY SERVICES INC 10638
219639 4/28/2016 069751 ARAMARK UNIFORM SERVICES 1988550032
PO # Description/Account
INTERPRETER FEE
INTERPRETER FEE
001.000.23.512.50.41.01
INTERPRETER FEE
INTERPRETER FEE
001.000.23.512.50.41.01
Total
PM: EXTRACTOR FOR INCREMEME
PM: EXTRACTOR FOR INCREMEME
001.000.64.576.80.31.00
Total
WWTP - PEST CONTROL
April Service
423.000.76.535.80.41.23
9.8% Sales Tax
423.000.76.535.80.41.23
Total :
LEOFF 1 MEDICARE SUPPLEMENT,
LEOFF 1 Medicare supplemental insL
009.000.39.517.20.23.10
LEOFF 1 Medicare supplemental inSL
617.000.51.517.20.23.10
Total
CHLORINE, BRUSH, POLE
CHLORINE, BRUSH, POLE
001.000.64.576.80.31.00
9.8% Sales Tax
001.000.64.576.80.31.00
Total
FACILITIES DIVISION UNIFORMS
3.2.a
Page: 1
Page: 1
Packet Pg. 23
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219639 4/28/2016 069751 ARAMARK UNIFORM SERVICES
Voucher List
City of Edmonds
3.2.a
Page: 2
Invoice PO # Description/Account Amoun
(Continued)
FACILITIES DIVISION UNIFORMS
001.000.66.518.30.24.00
18.1, w
9.8% Sales Tax
001.000.66.518.30.24.00
a�
1.7£
1988554080 PUBLIC WORKS OMC LOBBY MAT:
E
PUBLIC WORKS OMC LOBBY MAT:
001.000.65.518.20.41.00
1.3: 6
PUBLIC WORKS OMC LOBBY MATE
o
111.000.68.542.90.41.00
5.0( 5
PUBLIC WORKS OMC LOBBY MATE
o
L
421.000.74.534.80.41.00
5.0( 0-
PUBLIC WORKS OMC LOBBY MATE
Q
422.000.72.531.90.41.00
5.0( N
PUBLIC WORKS OMC LOBBY MAT:
423.000.75.535.80.41.00
5.0(
PUBLIC WORKS OMC LOBBY MAT:
m
511.000.77.548.68.41.00
5.0E
9.8% Sales Tax
N
001.000.65.518.20.41.00
0.11 o
9.8% Sales Tax
Y
111.000.68.542.90.41.00
0.5(
9.8% Sales Tax
E
421.000.74.534.80.41.00
0.5(
9.8% Sales Tax
422.000.72.531.90.41.00
c
0.5(
9.8% Sales Tax
E
E
423.000.75.535.80.41.00
0.5( um
9.8% Sales Tax
Q
511.000.77.548.68.41.00
0.4£
1988554081 FLEET DIVISION UNIFORMS & MAT
FLEET DIVISION UNIFORMS
511.000.77.548.68.24.00 5.2E
FLEET DIVISION MATS
511.000.77.548.68.41.00 12.8,
Page: 2
Packet Pg. 24
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219639 4/28/2016 069751 ARAMARK UNIFORM SERVICES
Voucher List
City of Edmonds
3.2.a
Page: 3
Invoice PO # Description/Account Amoun
(Continued)
9.8% Sales Tax
511.000.77.548.68.24.00
0.5, w
9.8% Sales Tax
511.000.77.548.68.41.00
a�
1.2E
1988560826 WWTP - UNIFORMS, MATS AND TO
uniforms
M
423.000.76.535.80.24.00
3.0z 6
mats and towels
o
423.000.76.535.80.41.11
81.0z 5
9.8% Sales Tax
o
L
423.000.76.535.80.24.00
0.3( a
9.8% Sales Tax
Q
423.000.76.535.80.41.11
7.9z N
1988560827 PARKS MAINT UNIFORM SERVICE,
r
PARKS MAINT UNIFORM SERVICE,
001.000.64.576.80.24.00
101.3E w
PARKS MAINT MAT CLEANING
001.000.64.576.80.49.00
1.3� N
9.8% Sales Tax
o
001.000.64.576.80.24.00
9.9< Y
9.8% Sales Tax
001.000.64.576.80.49.00
0.1 z .
1988564848 PUBLIC WORKS OMC LOBBY MATE
PUBLIC WORKS OMC LOBBY MAT:
;
001.000.65.518.20.41.00
1.3:
PUBLIC WORKS OMC LOBBY MAT:
E
t
111.000.68.542.90.41.00
5.0E um
PUBLIC WORKS OMC LOBBY MAT:
r
Q
421.000.74.534.80.41.00
5.0(
PUBLIC WORKS OMC LOBBY MATE
422.000.72.531.90.41.00
5.0(
PUBLIC WORKS OMC LOBBY MATE
511.000.77.548.68.41.00
5.0E
9.8% Sales Tax
Page: 3
Packet Pg. 25
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219639 4/28/2016 069751 ARAMARK UNIFORM SERVICES
219640
219641
Voucher List
City of Edmonds
Invoice
(Continued)
1988564849
4/28/2016 012005 BALLAND GILLESPIE POLYGRAPH 2O15-185
4/28/2016 072455 BEAR COMMUNICATIONS INC 4471266
3.2.a
Page: 4
PO # Description/Account Amoun
001.000.65.518.20.41.00 0.1 <
9.8% Sales Tax
vi
111.000.68.542.90.41.00
0.5(
9.8% Sales Tax
421.000.74.534.80.41.00
0.5(
E
9.8% Sales Tax
CU
422.000.72.531.90.41.00
0.5( u
9.8% Sales Tax
o
423.000.75.535.80.41.00
0.5( 5
9.8% Sales Tax
o
L
511.000.77.548.68.41.00
0.4£ 0-
PUBLIC WORKS OMC LOBBY MATE
Q
423.000.75.535.80.41.00
5.0( N
FLEET DIVISION UNIFORMS & MAT
r
FLEET DIVISION UNIFORMS
511.000.77.548.68.24.00
5.2£ w
FLEET DIVISION MATS
o
511.000.77.548.68.41.00
12.8. N
9.8% Sales Tax
o
511.000.77.548.68.24.00
0.5, Y
9.8% Sales Tax
511.000.77.548.68.41.00
1.21 .
Total:
323Z
INV 2015-185 EDMONDS PD - PRE-1
m
PRE -EMPLOY EXAM - PERRY
E
001.000.41.521.10.41.00
225.0( U
PRE -EMPLOY EXAM - VANDELAAR
r
001.000.41.521.10.41.00
225.0( Q
Freight
001.000.41.521.10.41.00
7.0(
Total :
457.0(
PW RADIOS
PW Radios
Page: 4
Packet Pg. 26
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219641 4/28/2016 072455 BEAR COMMUNICATIONS INC
219642 4/28/2016 074307 BLUE STAR GAS
219643 4/28/2016 002800 BRAKE & CLUTCH SUPPLY
Voucher List
City of Edmonds
Invoice
PO # Description/Account
(Continued)
511.100.77.594.48.64.00
Freight
511.100.77.594.48.64.00
9.8% Sales Tax
511.100.77.594.48.64.00
Total:
5866
FLEET AUTO PROPANE 500.3 GAL
Fleet Auto Propane 500.3 Gal
511.000.77.548.68.34.12
5906
FLEET AUTO PROPANE 674.2 GAL
Fleet Auto Propane 674.2 Gal
511.000.77.548.68.34.12
5945
FLEETAUTO PROPANE 604 GAL
Fleet Auto Propane 604 Gal
511.000.77.548.68.34.12
Total:
560325
UNIT 11 -OIL SEALS
Unit 11 - Oil Seals
511.000.77.548.68.31.10
9.6% Sales Tax
511.000.77.548.68.31.10
560377
UNIT 37 - BRAKE SUPPLIES
Unit 37 - Brake Supplies
511.000.77.548.68.31.10
9.6% Sales Tax
511.000.77.548.68.31.10
560413
UNIT 37 - ROTOR TURN SVC
Unit 37 - Rotor Turn Svc
511.000.77.548.68.48.00
9.6% Sales Tax
511.000.77.548.68.48.00
560811
UNIT 138 - SUPPLIES
Unit 138 - Supplies
3.2.a
Page: 5
Page: 5
Packet Pg. 27
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher List
City of Edmonds
Voucher Date Vendor Invoice PO # Description/Account
219643 4/28/2016 002800 BRAKE & CLUTCH SUPPLY (Continued)
511.000.77.548.68.31.10
9.6% Sales Tax
511.000.77.548.68.31.10
560863 UNIT 106 - PARTS
Unit 106 - Parts
511.000.77.548.68.31.10
9.6% Sales Tax
511.000.77.548.68.31.10
219644 4/28/2016 067391 BRAT WEAR
219645 4/28/2016 067947 BROWNELLS INC
18542
12436692.00
Total:
INV#18542 - EDMONDS PD - PECK
DUTY BELT
001.000.41.521.22.24.00
9.8% Sales Tax
001.000.41.521.22.24.00
Total
INV#12436692.00 ACCT#00557761 -
GRACE 8PC BRASS PUNCH SET
001.000.41.521.40.31.00
5.56 MAX HEADSPACE GAUGE
001.000.41.521.40.31.00
APEX POLYMER ARMORERS BLOC
001.000.41.521.40.31.00
MILITARIA BORELIGHT
001.000.41.521.40.31.00
2 1/2" COTTON SQUARES
001.000.41.521.40.31.00
ALIGNMENT PIN SET
001.000.41.521.40.31.00
T SHIRT SQUARES
001.000.41.521.40.31.00
FIRING PIN GUAGE
001.000.41.521.40.31.00
Freight
3.2.a
Page: 6
Amoun
113.0E
0
10.8E C1
a�
t
38.7E
3.7: o
892.4, 16-
0
L
a
Q
59.0(
N
am
5.7£
64.71
N
31.5, N
22.3 1 E
26.4 ,
c
4.7E E
t
U
12.6z r
20.1 f
Page: 6
Packet Pg. 28
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 7
Bank code :
Voucher
usbank
Date Vendor
Invoice
PO # Description/Account
Amoun
219645
4/28/2016 067947 BROWNELLS INC
(Continued)
001.000.41.521.40.31.00
15.9E
Total:
188.5:
219646
4/28/2016 073029 CANON FINANCIAL SERVICES
15984715
RECEPTIONIST DESK CITY CLERK,
RECEPTIONIST DESK COPIER LEA
001.000.25.514.30.45.00
20.1'
9.8% Sales Tax
001.000.25.514.30.45.00
1.9 1
15984717
CONTRACT CHARGE-BLDG
CONTRACT CHARGE
001.000.62.524.10.45.00
36.2E
15995115
FLEET COPIER
Fleet Copier
511.000.77.548.68.45.00
33.0,
9.8% Sales Tax
511.000.77.548.68.45.00
3.2z
15995116
PW ADMIN COPIER
PW Office Copier
001.000.65.518.20.45.00
68.5E
PW Office Copier
111.000.68.542.90.45.00
38.8E
PW Office Copier
422.000.72.531.90.45.00
38.8E
PW Office Copier
421.000.74.534.80.45.00
27.4.
PW Office Copier
423.000.75.535.80.45.00
27.4,
PW Office Copier
511.000.77.548.68.45.00
27.4'
9.8% Sales Tax
001.000.65.518.20.45.00
6.7,
9.8% Sales Tax
111.000.68.542.90.45.00
3.8'
9.8% Sales Tax
422.000.72.531.90.45.00
3.8'
Page: 7
Packet Pg. 29
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219646 4/28/2016 073029 CANON FINANCIAL SERVICES
219647
219648
4/28/2016 071816 CARLSON, JESSICA
Voucher List
City of Edmonds
Invoice
(Continued)
15995117
15995120
15995121
20662 ADVENTURES IN
4/28/2016 075023 CAROLYN DOUGLAS COMMUNICATION 53
3.2.a
Page: 8
PO # Description/Account Amoun
9.8% Sales Tax
421.000.74.534.80.45.00
2.6t w
9.8% Sales Tax
423.000.75.535.80.45.00
a�
2.6�
9.8% Sales Tax
E
511.000.77.548.68.45.00
2.61 'M
WATER SEWER COPIER
6
Water Sewer Copier
o
421.000.74.534.80.45.00
70.6E
Water Sewer Copier
L
423.000.75.535.80.45.00
70.6E 0-
9.8% Sales Tax
Q
421.000.74.534.80.45.00
6.9z N
9.8% Sales Tax
rn
423.000.75.535.80.45.00
6.9,
C/A572105 CONTRACT#3091/0521z
m
Finance dept copier contract charge
o
001.000.31.514.23.45.00
209.6' N
9.8% Sales Tax
o
001.000.31.514.23.45.00
20.5z Y
CITY CLERKS COPIER LEASE
CITY CLERKS COPIER LEASE 4/20'
E
001.000.25.514.30.45.00
340.3�
9.8% Sales Tax
;
001.000.25.514.30.45.00
33.3E
Total:
1,104.6, E
U
20662 ADVENTURES IN DRAWING
r
20662 ADVENTURES IN DRAWING
Q
001.000.64.571.22.41.00 455.0(
Total : 455.0(
COMMUNICATIONS AND COMMUNI
Communications and outreach for Ap
001.000.61.557.20.41.00 2,500.0(
Page: 8
Packet Pg. 30
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
Bank code : usbank
Voucher Date Vendor Invoice PO #
219648 4/28/2016 075023 075023 CAROLYN DOUGLAS COMMUNICAT (Continued)
219649 4/28/2016 070144 CEDAR GROVE COMPOSTING INC 0000273763
219650
219651
219652
4/28/2016 067446 CEM CORPORATION
532075
4/28/2016 003710 CHEVRON AND TEXACO BUSINESS 47218526
4/28/2016 063902 CITY OF EVERETT
116000603
116000808
3.2.a
Page: 9
Description/Account Amoun
Total : 2,500.0(
FAC MAINT - ECOSAFE BAGS
vi
Fac Maint - ECOSAFE Bags
001.000.66.518.30.31.00
153.7,
Freight
U
001.000.66.518.30.31.00
15.9( .
9.5% Sales Tax
f°
001.000.66.518.30.31.00
16.1, c
Total :
185.71
WWTP - SUPPLIES, OPERATIONS
a
IDP 3110 PRINTER RIBBON
Q-
Q
423.000.76.535.80.31.11
132.0(
Freight
N
rn
423.000.76.535.80.31.11
24.1
9.8% Sales Tax
..
423.000.76.535.80.31.11
15.3'
Total :
171.5( N
INV#47218526 ACCT#7898305185 -
FUEL FOR BREAK IN TRAFFIC BIKE
001.000.41.521.71.31.00
54.9 1 E
FUEL FOR NARCS VEHICLE-POFF
104.000.41.521.21.32.00
141.9 1
TAX EXEMPT FILING FEE
001.000.41.521.71.31.00
0.5:
TAX EXEMPT FILING FEE
t
104.000.41.521.21.32.00
1.4, M
r
Total : 198.9' Q
WATER QUALITY - LAB ANALYSIS
Water Quality - Lab Analysis
421.000.74.534.80.41.00 615.6(
WATER QUALITY - WATER LAB AN/
Water Quality - Water Lab Analysis
Page: 9
Packet Pg. 31
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219652 4/28/2016 063902 CITY OF EVERETT
219653 4/28/2016 019215 CITY OF LYNNWOOD
Voucher List
City of Edmonds
Invoice
(Continued)
12193
219654 4/28/2016 073573 CLARK SECURITY PRODUCTS INC 23K-109459
219655 4/28/2016 005965 CUES INC
23K-110723
452982
452990
PO # Description/Account
421.000.74.534.80.41.00
Total :
E7AC.LYNNWOOD SIGNAL TECH E
E7AC.Lynnwood Signal Tech Efforts
112.000.68.595.33.41.00
Total
SPRAY PARK BUILDING KEYS 2
SPRAY PARK BUILDING KEYS 2
001.000.64.576.80.31.00
9.5% Sales Tax
001.000.64.576.80.31.00
SPRAY PARK BUILDING KEYS
SPRAY PARK BUILDING KEYS
001.000.64.576.80.31.00
9.8% Sales Tax
001.000.64.576.80.31.00
Total
SEWER TRUCK CAMERA DIGITAL
Sewer Truck Camera Digital Video
423.000.75.535.80.31.00
Handling Fees
423.000.75.535.80.31.00
Freight
423.000.75.535.80.31.00
9.5% Sales Tax
423.000.75.535.80.31.00
SEWER TRUCK CAMERA- PCU
Sewer Truck Camera - PCU
423.000.75.535.80.31.00
Freight
423.000.75.535.80.31.00
9.5% Sales Tax
3.2.a
Page: 10
Page: 10
Packet Pg. 32
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 11
Bank code :
Voucher
usbank
Date
Vendor
Invoice
PO # Description/Account
Amoun
219655
4/28/2016
005965 CUES INC
(Continued)
423.000.75.535.80.31.00
6.2E _
453835
SEWER TV TRUCK CAMERA - ADAI
vi
Sewer TV Truck Camera - Adapters A
423.000.75.535.80.31.00
535.1 , t
Handling Fees
423.000.75.535.80.31.00
5.9E
Freight
423.000.75.535.80.31.00
9.3E o
9.5% Sales Tax
423.000.75.535.80.31.00
52.3( o
454051
SEWER TV TRUCK CAMERA REPAI
L
a
Sewer TV Truck Camera Repair Kit
Q
423.000.75.535.80.31.00
644.80 N
Handling Fees
423.000.75.535.80.31.00
5.9E
Freight
423.000.75.535.80.31.00
89.4E
9.5% Sales Tax
N
423.000.75.535.80.31.00
70.3< o
454184
FREIGHT
N
Freight
423.000.75.535.80.31.00
38.8, .
9.5% Sales Tax
c°
423.000.75.535.80.31.00
3.6� ;
Total:
1,927.3: aa)
E
219656
4/28/2016
067794 DALCO INC
88107
SEWER - PRESSURE WASHER SUI
U
Sewer - Pressure Washer Supplies
r
423.000.75.535.80.31.00
172.2( Q
9.5% Sales Tax
423.000.75.535.80.31.00
16.3 ,
Tota I :
188.6,
219657
4/28/2016
070864 DEX MEDIA
610026848511
C/A 730211599
Basic e-commerce hosting 04/02/16 -
Page: 11
Packet Pg. 33
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 12
Bank code :
Voucher
usbank
Date
Vendor
Invoice
PO # Description/Account
Amoun
219657
4/28/2016
070864 DEX MEDIA
(Continued)
001.000.31.518.88.42.00
34.9E
610026848611
C/A 730211600
04/2016 Web Hosting for Internet
001.000.31.518.88.42.00
34.9E
Total:
69.9(
219658
4/28/2016
073757 DEX MEDIA WEST INC
651150804
CEMETERY ADVERTISING
CEMETERY ADVERTISING
130.000.64.536.20.41.40
37.7<
Total:
37X
219659
4/28/2016
063064 DEZURIK WATER CONTROLS
RPI/62005755
WWTP - REPAIR/REPLACE, MECH
4" PLUG LINDE CR (RS16) Cl
423.000.76.535.80.48.21
470.0(
9.8% Sales Tax
423.000.76.535.80.48.21
46.0(
Total:
516.0E
219660
4/28/2016
064531 DINES, JEANNIE
16-3650
ESDB.MINUTES THRU MARCH 201E
ESDB.Minutes thru March 2016
001.000.67.518.21.41.00
471.9(
16-3654
CITY COUNCIL MINUTES 4/19/16
04/19/16 CITY COUNCIL MINUTES P
001.000.25.514.30.41.00
330.0(
Total:
801.9(
219661
4/28/2016
075153 DOPPS, MARIA
12570
INTERPRETER FEE
INTERPRETER FEE
001.000.23.523.30.41.01
100.8z
12606
INTERPRETER FEE
INTERPRETER FEE
001.000.23.523.30.41.01
100.8z
Total:
201.6E
219662
4/28/2016
007675 EDMONDS AUTO PARTS
10059443
PM: BATTERY
PM: BATTERY
Page: 12
Packet Pg. 34
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219662 4/28/2016 007675 EDMONDS AUTO PARTS
Voucher List
City of Edmonds
Invoice
(Continued)
219663 4/28/2016 074302 EDMONDS HARDWARE & PAINT LLC 001484
219664 4/28/2016 069523 EDMONDS P&R YOUTH SCHOLARSHIP 21031 METZ JACKSON
219665 4/28/2016 038500 EDMONDS SENIOR CENTER
219666 4/28/2016 008705 EDMONDS WATER DIVISION
2016-04-01
1-00655
1-00925
1-01950
1-03950
1-05350
PO # Description/Account
130.000.64.536.50.31.00
9.8% Sales Tax
130.000.64.536.50.31.00
PM: BRAIDED ROPE
9.8% Sales Tax
001.000.64.576.80.31.00
PM: BRAIDED ROPE
001.000.64.576.80.31.00
Total :
Total
21031 METZ JACKSON YOUTH SCF
21031 METZ JACKSON YOUTH SCF
122.000.64.571.20.49.00
Total
04/16 RECREATION SERVICES COf
04/16 Recreation Services Contract F
001.000.39.569.10.41.00
Total
LIFT STATION #7 71 W DAYTON ST
LIFT STATION #7 71 W DAYTON ST
423.000.75.535.80.47.10
LIFT STATION #8 107 RAILROAD AV
LIFT STATION #8 107 RAILROAD AV
423.000.75.535.80.47.10
LIFT STATION #1 450 SUNSET AVE,
LIFT STATION #1 450 SUNSET AVE,
423.000.75.535.80.47.10
OLD PUBLIC WORKS (NORTH) 200
OLD PUBLIC WORKS 200 DAYTON
421.000.74.534.80.47.00
OLD PUBLIC WORKS (SOUTH) 200
3.2.a
Page: 13
Page: 13
Packet Pg. 35
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 14
Bank code : usbank
Voucher Date Vendor
Invoice
PO # Description/Account
Amoun
219666 4/28/2016 008705 EDMONDS WATER DIVISION
(Continued)
OLD PUBLIC WORKS (SOUTH) 200
_
421.000.74.534.80.47.00
92.1, vi
1-05705
LIFT STATION #6 100 PINE ST / ME1
LIFT STATION #6 100 PINE ST / MEl
t
423.000.75.535.80.47.10
87.3E
1-13975
CITY HALL 121 5TH AVE N / METER
CITY HALL 121 5TH AVE N / METER
001.000.66.518.30.47.00
626.9, o
1-14000
CITY HALL 115 5TH AVE N / METER
CITY HALL 115 5TH AVE N / METER
p
L
001.000.66.518.30.47.00
101.3( 0-
2-25150
WEST PLANTER IRRIGATION 870 C
Q'
Q
WEST PLANTER IRRIGATION 870 C
001.000.64.576.80.47.00
N
41.1 a�
2-25175
EAST PLANTER IRRIGATION 875 C)
EAST PLANTER IRRIGATION 875 Ci
m
001.000.64.576.80.47.00
41.1
2-26950
LIFT STATION #3 729 NORTHSTRE/
N
LIFT STATION #3 729 NORTHSTRE/
4
0
423.000.75.535.80.47.10
83.8( Y
2-28275
PLANTER IRRIGATION 1400 9TH AV
PLANTER IRRIGATION 1400 9TH AV
E
001.000.64.576.80.47.00
41.1 1
2-29118
LIFT STATION #2 702 MELODY LN /
LIFT STATION #2 702 MELODY LN /
m
423.000.75.535.80.47.10
44.7' E
2-37180
SAM STAMM OVERLOOK / METER £
U
SAM STAMM OVERLOOK / METER £
r
001.000.64.576.80.47.00
55.6E Q
4-34080
LIFT STATION #14 7909 211TH PL S'
LIFT STATION #14 7909 211TH PL S'
423.000.75.535.80.47.10
41.1 ,
Total:
2,010.71
219667 4/28/2016 075200 EDUARDO ZALDIBAR
12167
INTERPRETER FEE
Page: 14
Packet Pg. 36
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 15
Bank code : usbank
Voucher Date Vendor Invoice PO # Description/Account Amoun
219667 4/28/2016 075200 EDUARDO ZALDIBAR (Continued)
INTERPRETER FEE
001.000.23.523.30.41.01 106.4E
219668 4/28/2016 031060 ELECSYS INTERNATIONAL CORP 148229
219669 4/28/2016 008812 ELECTRONIC BUSINESS MACHINES AR18391
219670 4/28/2016 008975 ENTENMANN ROVIN CO
0117113-IN
0117122-IN
Total
RADIX MONTHLY MAINTAGREEME
Radix Monthly Maint Agreement - Ma
421.000.74.534.80.48.00
Total
WWTP- OFFICE MACHINE USE
9/10/15 to 10/09/15 use overage
423.000.76.535.80.45.41
9.5% Sales Tax
423.000.76.535.80.45.41
Total
INN#0117113-IN ACCT#0011847 - EC
2015 OFFICER OF YR BADGE
001.000.41.521.10.31.00
2015 EMPLOYEE OF YR BADGE
001.000.41.521.10.31.00
TIE TACKS WITH ATTACHMENTS
001.000.41.521.10.31.00
PACKAGEINSURANCE
001.000.41.521.10.31.00
PACKAGING, MATERIALS FEES
001.000.41.521.10.31.00
Freight
001.000.41.521.10.31.00
INV#0117122-IN ACCT#0011847 - E[
10 YEAR TIE TACK PINS
001.000.41.521.10.31.00
15 YEAR TIE TACK PINS
001.000.41.521.10.31.00
30 YEAR TIE TACK PIN
Page: 15
Packet Pg. 37
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219670 4/28/2016 008975 ENTENMANN ROVIN CO
219671 4/28/2016 066378 FASTENAL COMPANY
Voucher List
City of Edmonds
3.2.a
Page: 16
Invoice PO # Description/Account
Amoun
(Continued)
001.000.41.521.10.31.00
45.0(
_
PACKAGE INSURANCE
vi
001.000.41.521.10.31.00
8.0(
PACKAGING, MATERIALS FEE
t
001.000.41.521.10.31.00
4.5(
Freight
M
001.000.41.521.10.31.00
16.0(
6
0117264-IN INV#0117264-IN ACCT#0011847 - E[
o
FLAT OFFICER BADGE -RETIRED
001.000.41.521.10.31.00
98.0(
o
PLAIN BADGE CASE
L
a
Q.
001.000.41.521.10.31.00
27.0(
Q
SRANIMAL CONTROL OFFICER BA
N
001.000.41.521.10.31.00 98.0(
PACKAGEINSURANCE 77
001.000.41.521.10.31.00
0.6( co
PACKAGING, MATERIALS FEE
001.000.41.521.10.31.00
4.5( N
Freight
o
001.000.41.521.10.31.00
16.0( Y
Total :
977.1(
E
WAMOU39329 FLEET SHOP PARTS
Fleet Shop Parts
511.000.77.548.68.31.20
48.4' y
9.8% Sales Tax
E
511.000.77.548.68.31.20
4.7z U
WAMOU39330 PM: HIT PINS
r
PM: HIT PINS
Q
001.000.64.576.80.31.00
10.7(
Sales Tax
001.000.64.576.80.31.00
1.01
WAMOU39332 WWTP - SUPPLIES, FACILITIES
20x20x1 M13 LEED FILTERS
423.000.76.535.80.31.23
116.6'
Page: 16
Packet Pg. 38
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 17
Bank code :
usbank
Voucher
Date
Vendor
Invoice PO #
Description/Account
Amoun
219671
4/28/2016
066378 FASTENAL COMPANY
(Continued)
9.8% Sales Tax
423.000.76.535.80.31.23
11.4<
Total:
192.91
219672
4/28/2016
065427 FCS GROUP
2509-21604008
E6JA.SERVICES THRU 4/15/16
E6JA.Services thru 4/15/16
421.000.74.534.80.41.00
816.E 1
E6JA.Services thru 4/15/16
422.000.72.531.90.41.00
816.E 1
E6JA.Services thru 4/15/16
423.000.75.535.80.41.00
816.6(
Total:
2,450.0(
219673
4/28/2016
009880 FEDEX
5-393-20638
STORM PLAN REVIEW - COURIER I
Storm Plan Review - Courier for Plan:
001.000.67.518.21.49.00
27.8<
Total:
27.&
219674
4/28/2016
009815 FERGUSON ENTERPRISES INC
0501505
WATER METER INVENTORY --
Water Meter Inventory --
421.000.74.534.80.34.30
1,478.0(
#2031 M-MTRTRPL-0.625-010
421.000.74.534.80.34.30
830.4(
9.5% Sales Tax
421.000.74.534.80.34.30
219.3(
Total:
2,527.7(
219675
4/28/2016
011900 FRONTIER
253-007-4989
SEAVIEW RESERVOIR TELEMETR)
SEAVIEW RESERVOIR TELEMETR)
421.000.74.534.80.42.00
30.9E
253-011-1177
PUBLIC WORKS OMC RADIO LINE
PUBLIC WORKS OMC RADIO LINE
001.000.65.518.20.42.00
6.3�
PUBLIC WORKS OMC RADIO LINE
111.000.68.542.90.42.00
24.Z
Page: 17
Packet Pg. 39
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219675 4/28/2016 011900 FRONTIER
Voucher List
City of Edmonds
3.2.a
Page: 18
Invoice PO # Description/Account Amoun
(Continued)
PUBLIC WORKS OMC RADIO LINE
421.000.74.534.80.42.00
24.2( w
PUBLIC WORKS OMC RADIO LINE'
423.000.75.535.80.42.00
a�
24.2�
PUBLIC WORKS OMC RADIO LINE'
E
511.000.77.548.68.42.00
24.2(
PUBLIC WORKS OMC RADIO LINE'
422.000.72.531.90.42.00
24.3( o
253-012-9166 TELEMETRY CIRCUIT LINES
TELEMETRY CIRCUIT LINES
o
L
421.000.74.534.80.42.00
161.7 1 Q
TELEMETRY CIRCUIT LINES
Q
423.000.75.535.80.42.00
300.4z N
253-014-8062 TELEMETRY CIRCUIT LINE
TELEMETRY CIRCUIT LINE
421.000.74.534.80.42.00
19.7E w
TELEMETRY CIRCUIT LINE
423.000.75.535.80.42.00
36.7( N
253-017-4360 TELEMETRY CIRCUIT LINE
o
TELEMETRY CIRCUIT LINE
N
421.000.74.534.80.42.00
46.7 ,
TELEMETRY CIRCUIT LINE
E
423.000.75.535.80.42.00
86.8:
425-712-0417 TELEMETRY CIRCUIT LINE
;
TELEMETRY CIRCUIT LINE
m
421.000.74.534.80.42.00
33.3( E
TELEMETRY CIRCUIT LINE
U
423.000.75.535.80.42.00
33.3( Q
425-712-8251 PUBLIC WORKS OMC ALARM, FAX,
PUBLIC WORKS OMC FIRE AND IN'
001.000.65.518.20.42.00
16.3'
PUBLIC WORKS OMC FIRE AND IN'
111.000.68.542.90.42.00
81.5(
PUBLIC WORKS OMC FIRE AND IN'
Page: 18
Packet Pg. 40
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 19
Bank code :
Voucher
usbank
Date Vendor
Invoice
PO # Description/Account
Amoun
219675
4/28/2016 011900 FRONTIER
(Continued)
421.000.74.534.80.42.00
68.5' _
PUBLIC WORKS OMC FIRE AND IN'
vi
423.000.75.535.80.42.00
68.5'
PUBLIC WORKS OMC FIRE AND IN'
t
511.000.77.548.68.42.00
91.3z
425-712-8347
CIVIC CENTER ELEVATOR PHONE
CIVIC CENTER ELEVATOR PHONE
001.000.66.518.30.42.00
68.2< o
425-745-4313
CLUBHOUSE ALARM LINES 6801 M
CLUBHOUSE FIRE AND INTRUSIOI`
p
L
001.000.66.518.30.42.00
131.3(
425-775-2455
CIVIC CENTER ALARM LINES 250 5
Q
CIVIC CENTER FIRE AND INTRUSIC
001.000.66.518.30.42.00
N
62.4( a)
425-775-7865
UTILITY BILLING RADIO LINE
UTILITY BILLING RADIO LINE TO FI'
421.000.74.534.80.42.00
66.4<
425-776-3896
FRANCES ANDERSON CENTER ALj
N
FRANCESANDERSON CENTER FIF
4
0
001.000.66.518.30.42.00
131.3( u)
Total:
1,663.61 V
E
219676
4/28/2016 002500 GALLS LLC DBA BLUMENTHAL
005243078
1NV#005243078 ACCT#1 00 1074529
TRANSPORT HOODS
001.000.41.521.22.31.00
77.7(
9.8% Sales Tax
E
E
001.000.41.521.22.31.00
7.6' U
Total:
85.3' +°
r
Q
219677
4/28/2016 075163 GARCIA-GARCIA, CESAR
12452
INTERPRETER FEE
INTERPRETER FEE
001.000.23.512.50.41.01
105.3,
12686
INTERPRETER FEE
INTERPRETER FEE
001.000.23.512.50.41.01
105.3,
Page: 19
Packet Pg. 41
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 20
Bank code :
usbank
Voucher
Date
Vendor
Invoice
PO # Description/Account
Amoun
219677
4/28/2016
075163 GARCIA-GARCIA, CESAR
(Continued)
12789
INTERPRETER FEE
INTERPRETER FEE
001.000.23.512.50.41.01
105.3,
Total:
315.9E
219678
4/28/2016
012199 GRAINGER
9076142174
FAC MAINT SUPPLIES
Fac Maint Supplies
001.000.66.518.30.31.00
42.3(
9.8% Sales Tax
001.000.66.518.30.31.00
4.1(
Total:
46.5,
219679
4/28/2016
069733 H B JAEGER COMPANY LLC
169879/1
WATER - REPAIR SUPPLIES
Water - Repair Supplies
421.000.74.534.80.31.00
899.4z
9.5% Sales Tax
421.000.74.534.80.31.00
85.4(
170332/1
WATER - CUTTING BLADES
Water - Cutting Blades
421.000.74.534.80.31.00
680.0(
9.5% Sales Tax
421.000.74.534.80.31.00
64.6(
171199/1
WATER - VALVE EXTENSIONS
Water - Valve Extensions
421.000.74.534.80.31.00
319.9:
9.8% Sales Tax
421.000.74.534.80.31.00
31.3(
171200/1
WATER INVENTORY - #575 W-RES
Water Inventory - #575 W-RESET-0'
421.000.74.534.80.34.20
746.5£
#382 W-RESET-01-012
421.000.74.534.80.34.20
582.9'
Water Supplies, Resetters
421.000.74.534.80.31.00
2,906.2£
9.8% Sales Tax
Page: 20
Packet Pg. 42
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 21
Bank code :
Voucher
usbank
Date
Vendor
Invoice
PO # Description/Account
Amoun
219679
4/28/2016
069733 H B JAEGER COMPANY LLC
(Continued)
421.000.74.534.80.34.20
130.Z
9.8% Sales Tax
421.000.74.534.80.31.00
284.8,
Total:
6,731.7(
219680
4/28/2016
012560 HACH COMPANY
9873631
WWTP - REPAIR/MAINTENANCE, Li
pH GEL PROBE, STD, w/1 m CABLE
423.000.76.535.80.48.31
259.0(
Freight
423.000.76.535.80.48.31
30.8�
9.8% Sales Tax
423.000.76.535.80.48.31
28.4,
9884787
WATER QUALITY - MAINT KITS
Water Quality - Maint Kits
421.000.74.534.80.31.00
856.0(
Freight
421.000.74.534.80.31.00
52.7 ,
9.8% Sales Tax
421.000.74.534.80.31.00
89.0(
9888313
WATER QUALITY CHLORINE TEST
Water Quality Chlorine Test Kits
421.000.74.534.80.31.00
613.8(
Freight
421.000.74.534.80.31.00
41.6 ,
9.8% Sales Tax
421.000.74.534.80.31.00
64.2E
Total:
2,035.81
219681
4/28/2016
074428 HAMILTON PRINTING SYSTEMS
1031
EXPO TSHIRTS
EXPO TSHIRTS
001.000.64.571.22.31.00
773.5(
9.8% Sales Tax
001.000.64.571.22.31.00
75.8(
Total:
849.3(
Page: 21
Packet Pg. 43
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 22
Bank code :
Voucher
usbank
Date
Vendor
Invoice PO #
Description/Account
Amoun
219682
4/28/2016
070437 HARDIE, MARYANN
04/27/16
TRAVEL TO NPELRA CONFERENCE
Travel to NPELRA conference in Merr
001.000.22.518.10.49.00
274.7(
Total:
274.7(
219683
4/28/2016
074804 HARLES, JANINE
197339
PHOTOGRAPHY FOR APRIL 2016
Photography for April 2016
001.000.61.558.70.41.00
200.0(
Total:
200.0(
219684
4/28/2016
075615 HBD INC
IN00002363
INV#IN00002363 CUST#EDM01-EDP
EVIDRY 9X12 BAGS
001.000.41.521.80.31.00
24.0(
EVIDRY 15X18 BAGS
001.000.41.521.80.31.00
29.9E
EVIDRY 24X24 BAGS
001.000.41.521.80.31.00
36.0(
EVIDRY 30X36 BAGS
001.000.41.521.80.31.00
54.0(
Freight
001.000.41.521.80.31.00
23.2E
Total:
167.2(
219685
4/28/2016
013140 HENDERSON, BRIAN
30
LEOFF 1 REIMBURSEMENT
LEOFF 1 reimbursement
009.000.39.517.20.23.00
166.3,
Total:
166.3,
219686
4/28/2016
074966 HIATT, ELLEN
COE 2016 0426
TOURISM COMMUNICATIONS AND
Tourism communications and marketi
120.000.31.575.42.41.00
1,500.0(
Total:
1,500.0(
219687
4/28/2016
067862 HOME DEPOT CREDIT SERVICES
2021943
PM: DUCT TAPE, UTIL KNIF, SAW, C
PM: DUCT TAPE, UTIL KNIF, SAW, C
001.000.64.576.80.31.00
473.4(
Page: 22
Packet Pg. 44
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
Bank code : usbank
Voucher Date Vendor Invoice
PO # Description/Account
219687 4/28/2016 067862 HOME DEPOT CREDIT SERVICES (Continued)
9.5% Sales Tax
001.000.64.576.80.31.00
4053909
PM: RUBBER STRAP, MARKING WF
PM: RUBBER STRAP, MARKING WF
001.000.64.576.80.31.00
9.5% Sales Tax
001.000.64.576.80.31.00
6082543
PM: HOSE, HOSE REPAIR, SPLICEF
PM: HOSE, HOSE REPAIR, SPLICEF
001.000.64.576.80.31.00
9.5% Sales Tax
001.000.64.576.80.31.00
7253366
PM: STARTER FERTILIZER
PM: STARTER FERTILIZER
001.000.64.576.80.31.00
9.8% Sales Tax
001.000.64.576.80.31.00
9021011
PM: PEAT, SUPER GLUE, SPRAY PP
PM: PEAT, SUPER GLUE, SPRAY PP
001.000.64.576.80.31.00
9.5% Sales Tax
001.000.64.576.80.31.00
Tota I :
219688 4/28/2016 073548 INDOFF INCORPORATED
2783960 OFFICE SUPPLIES
Office supplies
001.000.22.518.10.31.00
Copy paper
001.000.61.557.20.31.00
Copy paper
001.000.21.513.10.31.00
Copy paper
001.000.22.518.10.31.00
9.8% Sales Tax
001.000.22.518.10.31.00
3.2.a
Page: 23
Amoun
44.9E vi
a�
t
59.8E E
5.6�
4-
0
65.9z
m
6.4E
N
0
235.2: Y
22.3: .
1,035.5E
c
m
E
187.5E U
a
r
r
25.3, Q
25.3'
25.3,
20.8E
Page: 23
Packet Pg. 45
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219688 4/28/2016 073548 INDOFF INCORPORATED
Voucher List
City of Edmonds
3.2.a
Page: 24
Invoice PO # Description/Account Amoun
(Continued)
9.8% Sales Tax
001.000.61.557.20.31.00
2.4£ Y
9.8% Sales Tax
001.000.21.513.10.31.00
a�
2.4�
2783962
OFFICE SUPPLIES
Office supplies
M
001.000.22.518.10.31.00
34.9z 6
9.8% Sales Tax
o
001.000.22.518.10.31.00
3.4,
2784659
OFFICE SUPPLIES
o
Office supplies
L
a
001.000.22.518.10.31.00
83.7z Q
9.8% Sales Tax
N
001.000.22.518.10.31.00
8.2, r
2785095
RETURN OF OFFICE SUPPLIES
Return of office supplies
m
001.000.22.518.10.31.00
-137.81
9.8% Sales Tax
N
001.000.22.518.10.31.00
-13.5' o
2785292
SUPPLIES -LEGAL PADS
N
SUPPLIES -LEGAL PADS
001.000.62.524.10.31.00
32.9, .
2786843
WWTP - SUPPLIES, FACILITIES
c°
W WTP SUPPLIES:-
;
423.000.76.535.80.31.23
59.6z y
9.8% Sales Tax
E
423.000.76.535.80.31.23
t
5.8z u
2788682
PW CONF RM FOR EOC RADIO - DI
r
PW Conf Rm for EOC Radio - Desk
Q
422.000.72.531.90.31.00
119.0(
PW Conf Rm for EOC Radio - Desk
421.000.74.534.80.31.00
119.0(
PW Conf Rm for EOC Radio - Desk
423.000.75.535.80.31.00
119.0(
Page: 24
Packet Pg. 46
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 25
Bank code :
Voucher
usbank
Date Vendor
Invoice
PO # Description/Account
Amoun
219688
4/28/2016 073548 INDOFF INCORPORATED
(Continued)
PW Conf Rm for EOC Radio - Desk
_
111.000.68.542.90.31.00
119.0( vi
PW Conf Rm for EOC Radio - Desk
511.000.77.548.68.31.10
a�
119.0(
9.8% Sales Tax
E
422.000.72.531.90.31.00
11.6E
9.8% Sales Tax
421.000.74.534.80.31.00
11.6E o
9.8% Sales Tax
423.000.75.535.80.31.00
11.6( 0-
9.8% Sales Tax
a
111.000.68.542.90.31.00
11.6( Q
9.8% Sales Tax
N
511.000.77.548.68.31.10
11.6( r
9.8% Sales Tax
001.000.65.518.20.31.00
10.3( co
PW Conf Rm for EOC Radio - Desk
ao
001.000.65.518.20.31.00
104.9E N
2789337
SUPPLIES
o
SUPPLIES
N
001.000.23.523.30.31.00
160.3�
2789415
OFFICE SUPPLIES -PAPER
E
OFFICE SUPPLIES -PAPER
001.000.62.524.10.31.00
128.4<
Total:
1,424.1E aa)
E
219689
4/28/2016 071634 INTEGRATELECOM
768328
C/A768328
U
PR1-1 & 2 City Phone Service
r
001.000.31.518.88.42.00
907.6( Q
Tourism Toll free lines 877.775.6929;
001.000.61.558.70.42.00
8.4E
Econ Devlpmnt Toll free lines
001.000.61.558.70.42.00
8.4E
Total:
924.5E
Page: 25
Packet Pg. 47
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 26
Bank code :
usbank
Voucher
Date
Vendor
Invoice PO #
Description/Account
Amoun
219690
4/28/2016
014957 J B INSTANT LAWN
539474
CITY PARK TURF
CITY PARK TURF
132.000.64.594.76.65.00
1,539.0(
9.8% Sales Tax
132.000.64.594.76.65.00
150.8.
539477
CITY PARK TURF
CITY PARK TURF
132.000.64.594.76.65.00
1,539.0(
9.8% Sales Tax
132.000.64.594.76.65.00
150.8,
539550
CITY PARK TURF
CITY PARK TURF
132.000.64.594.76.65.00
1,539.0(
9.8% Sales Tax
132.000.64.594.76.65.00
150.8,
Total:
5,069.4E
219691
4/28/2016
074295 JAMESON BABBITT STITES&LOMBARD
82314
E1CA.ROW MEDIATION
E1CA.ROW Mediation
112.000.68.595.20.61.00
1,267.5(
Total:
1,267.5(
219692
4/28/2016
075356 JENNIFER ZIEGLER PUBLIC
009
STATE LOBBYIST MARCH 2O16
State lobbyist March 2016
001.000.61.557.20.41.00
3,358.0(
010
STATE LOBBYIST APRIL 2016
State lobbyist for April 2016
001.000.61.557.20.41.00
3,358.0(
Total:
6,716.0(
219693
4/28/2016
064934 JOHN BARKER LANDSCAPE
4/20 RESTROOM FINAL
4/20/16 RESTROOM FINAL SITE DE
4/20/16 RESTROOM FINAL SITE DE
132.000.64.594.76.65.00
3,003.0(
Total:
3,003.0(
219694
4/28/2016
075265 KBA INC
3002741
E7AC.SERVICES THRU 3/31/16
Page: 26
Packet Pg. 48
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 27
Bank code :
usbank
Voucher
Date
Vendor
Invoice PO #
Description/Account
Amoun
219694
4/28/2016
075265 KBA INC
(Continued)
E7AC.Services thru 3/31/16
112.000.68.595.33.41.00
15,115.8,
Total:
15,115.8;
219695
4/28/2016
074240 KNIGHT, KAREN
20655 FUN FACTORY
20655 FUN FACTORY INSTRUCTIOI
20655 FUN FACTORY INSTRUCTIOI
001.000.64.571.22.41.00
756.0(
20657 FUN FACTORY
20657 FUN FACTORY INSTRUCTIOI
20657 FUN FACTORY INSTRUCTIOI
001.000.64.571.22.41.00
756.0(
Total:
1,512.0(
219696
4/28/2016
016850 KUKER RANKEN INC
INV-019183
INV#INV-019183 ACCT#1005003 - E
FLORESCENT ORANGE MARKING 1
001.000.41.521.22.31.00
53.6z
9.8% Sales Tax
001.000.41.521.22.31.00
5.2(
Total:
58.9(
219697
4/28/2016
017050 KWICK'N KLEEN CAR WASH
04052016-01
INV#04052016-01 - EDMONDS PD
21 CAR WASHES $5.03 (INCTX) 3/1,
001.000.41.521.22.48.00
105.6<
Total:
105.6:
219698
4/28/2016
066522 LAKESIDE INDUSTRIES INC
3260940MB
WATER - EZ STASPHALT
Water - EZ ST Asphalt
421.000.74.534.80.31.00
1,421.8E
9.5% Sales Tax
421.000.74.534.80.31.00
135.0E
Total:
1,556.9E
219699
4/28/2016
074417 LAW OFFICE OF CHRISTIAN SMITH
129
PUBLIC DEFENDER
PUBLIC DEFENDER
001.000.39.512.52.41.00
300.0(
130
PUBLIC DEFENDER
Page: 27
Packet Pg. 49
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 28
Bank code :
usbank
Voucher
Date
Vendor
Invoice PO #
Description/Account
Amoun
219699
4/28/2016
074417 LAW OFFICE OF CHRISTIAN SMITH
(Continued)
PUBLIC DEFENDER
001.000.39.512.52.41.00
300.0(
131
PUBLIC DEFENDER
PUBLIC DEFENDER
001.000.39.512.52.41.00
300.0(
132
PUBLIC DEFENDER
PUBLIC DEFENDER
001.000.39.512.52.41.00
300.0(
Total:
1,200.0(
219700
4/28/2016
075159 LIFE INSURANCE CO OF NO AMER
May Premiums
MAY CIGNA PREMIUMS
Life insurance premiums
811.000.231.550
11,099.3(
Total:
11,099.3(
219701
4/28/2016
074388 LONE MOUNTAIN COMMUNICATIONS
17303
UNIT 452 RADIO REPAIRS
Unit 452 Radio Repairs
511.000.77.548.68.48.00
332.0(
17304
UNIT 947 - REPAIRS
Unit 947 - Repairs
511.000.77.548.68.48.00
135.0(
Total:
467.0(
219702
4/28/2016
074263 LYNNWOOD WINSUPPLY CO
012074-00
PM: EXTENSION BODY, NIPPLES, F
PM: EXTENSION BODY, NIPPLES, F
001.000.64.576.80.31.00
111.9�
9.8% Sales Tax
001.000.64.576.80.31.00
10.9£
Tota I :
122.9 ,
219703
4/28/2016
072886 MACDONALD-MILLER FAC.SOLUTIONS
JC33367
PS - AIR COND SVC - TAX INCLUDE
PS - Air Cond Svc - Tax included the
001.000.66.518.30.48.00
5,055.1 £
Total:
5,055.11
219704
4/28/2016
075480 MADATH, DONNA
20874 LITTLE FISHES
20874 LITTLE FISHES INSTRUCTIO
Page: 28
Packet Pg. 50
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 29
Bank code :
usbank
Voucher
Date
Vendor
Invoice
PO # Description/Account
Amoun
219704
4/28/2016
075480 MADATH, DONNA
(Continued)
20874 LITTLE FISHES INSTRUCTIO
001.000.64.571.22.41.00
504.9(
Total:
504.9(
219705
4/28/2016
069961 MAIN STREET ELECTRIC INC
16-1083
PS - COURTS - REPAIRS
PS - Courts - Repairs
016.000.66.594.19.65.00
3,680.0(
9.8% Sales Tax
016.000.66.594.19.65.00
360.6z
Total:
4,040.61
219706
4/28/2016
020039 MCMASTER-CARR SUPPLY CO
49471040
COBALT DRILL BITS
cobalt drill bits
423.000.76.535.80.48.21
71.7,
Freight
423.000.76.535.80.48.21
6.2E
54698315
WWTP - SUPPLIES, MECHANICAL
Strut Channel, Solid, 304 Stainless
423.000.76.535.80.31.21
393.6E
Freight
423.000.76.535.80.31.21
29.2z
Tota I :
500.9,
219707
4/28/2016
020900 MILLERS EQUIP & RENTALL INC
231084
WATER - 2 CYCLE OIL
Water - 2 Cycle Oil
421.000.74.534.80.31.00
67.8(
9.5% Sales Tax
421.000.74.534.80.31.00
6.4z
232657
MARINA BEACH PLAY EQUIPMENT
MARINA BEACH PLAY EQUIPMENT
001.000.64.576.80.45.00
290.0(
9.8% Sales Tax
001.000.64.576.80.45.00
28.4,
232789
PM: STIHL PART
PM: STIHL PART
Page: 29
Packet Pg. 51
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219707 4/28/2016 020900 MILLERS EQUIP & RENTALL INC
219708 4/28/2016 072746 MURRAY SMITH & ASSOCIATES
Voucher List
City of Edmonds
Invoice
(Continued)
15-1662-12
15-1695-9
219709 4/28/2016 067834 NATIONAL CONSTRUCTION RENTALS 4411261
219710 4/28/2016 024302 NELSON PETROLEUM
PO # Description/Account
001.000.64.576.80.31.00
9.8% Sales Tax
001.000.64.576.80.31.00
Total :
E4JC.SERVICES THRU 3/31/16
E4JC.Services thru 3/31/16
421.200.74.594.34.41.00
E5JA.SERVICES THRU 3/31/16
E5JA.Services thru 3/31/16
421.200.74.594.34.41.00
Total
CITY PARK SPRAY PARK FENCE RE
CITY PARK SPRAY PARK FENCE RE
132.000.64.594.76.65.00
9.8% Sales Tax
132.000.64.594.76.65.00
Total
0580036-IN FLEET FILTER INVENTORY
Fleet Filter Inventory
511.000.77.548.68.34.40
9.8% Sales Tax
511.000.77.548.68.34.40
0580442-IN UNIT 57 - FILTERS
Unit 57 - Filters
511.000.77.548.68.31.10
9.8% Sales Tax
511.000.77.548.68.31.10
0580599-IN UNIT 138 - FILTERS
Unit 138 - Filters
511.000.77.548.68.31.10
9.8% Sales Tax
511.000.77.548.68.31.10
3.2.a
Page: 30
Page: 30
Packet Pg. 52
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219710 4/28/2016 024302 NELSON PETROLEUM
219711 4/28/2016 061013 NORTHWEST CASCADE INC
Voucher List
City of Edmonds
3.2.a
Page: 31
Invoice PO # Description/Account Amoun
(Continued)
Unit 57 - Filter
vi
511.000.77.548.68.31.10
46.6E
9.8% Sales Tax
511.000.77.548.68.31.10
4.5
Total:
424.4E
c�
2-1542945
SIERRA PARK HONEY BUCKET
o
SIERRA PARK HONEY BUCKET
@
001.000.64.576.80.45.00
113.8E
p
2-1543787
MARINA BEACH HONEY BUCKET
a
MARINA BEACH HONEY BUCKET
Q•
Q
001.000.64.576.80.45.00
2,938.8E
2-1613821
SIERRA PARK HONEY BUCKET
SIERRA PARK HONEY BUCKET
001.000.64.576.80.45.00
113.8E
m
2-1615301
MARINA BEACH HONEY BUCKET
MARINA BEACH HONEY BUCKET
00
N
001.000.64.576.80.45.00
2,938.8E
c
2-1617317
CIVIC CENTER 6TH & EDMONDS F
N
CIVIC CENTER 6TH & EDMONDS F
Y
001.000.64.576.80.45.00
113.8E
E
2-1617941
PINE STREET PARK HONEY BUCK[
PINE STREET PARK HONEY BUCKE
001.000.64.576.80.45.00
113.8E
2-1620326
CIVIC FIELD 6TH & BELL HONEY Bl
E
E
CIVIC FIELD 6TH & BELL HONEY Bt
U
001.000.64.576.80.45.00
113.8E
2-1626057
HAINES WHARF PARK HONEY BUC
r
Q
HAINES WHARF PARK HONEY BUC
001.000.64.576.80.45.00
218.7E
2-1627929
WILLOW CREEK HONEY BUCKET
WILLOW CREEK HONEY BUCKET
001.000.64.576.80.45.00
113.8E
Page: 31
Packet Pg. 53
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
Bank code : usbank
Voucher Date Vendor Invoice PO #
219711 4/28/2016 061013 061013 NORTHWEST CASCADE INC (Continued)
219712 4/28/2016 025690 NOYES, KARIN 000 00 644
219713
219714
219715
000 00 645
4/28/2016 026560 PACIFIC AMERICAN COMMERCIAL CO RI-37156
4/28/2016 065051 PARAMETRIX INC
4/28/2016 070962 PAULSONS TOWING INC
RI-37313
SI-30919
21-23825
110144
3.2.a
Page: 32
Description/Account Amoun
Total : 6,779.51
PLANNING BOARD MINUTES-4/13/1
vi
PLANNING BOARD MINUTES
Y
001.000.62.558.60.41.00
315.0(
HISTORIC PRES MEETING MIN-4/1z
HISTORIC PRES MEETING MIN
E
001.000.62.558.60.41.00
192.5( u
Total:
507.5( c
WATER - EQUIPMENT RENTAL
>
Water - Equipment Rental
a
421.000.74.534.80.45.00
58.2( 0-
9.5% Sales Tax
Q
421.000.74.534.80.45.00
5.5< rn
WATER - EQUIPMENT RENTAL
Water - Equipment Rental
421.000.74.534.80.45.00
198.0(
9.5% Sales Tax
N
421.000.74.534.80.45.00
18.8' 4
WATER - CHIPPER
Water - Chipper
N
Y
421.000.74.534.80.35.00
653.2( E
9.6% Sales Tax
c�
421.000.74.534.80.35.00
62.7'
Total:
996.4!
m
W WTP - PLC AND SCADA SYSTEM
E
t
Phase 04: PLC-301 Replacement Se
U
a
423.100.76.594.39.41.10 10,112.0z Q
Phase 06: PLC-601 Replace
423.100.76.594.39.41.10 41,025.0(
Total : 51,137.01
INV#110144 - EDMONDS PD
TOW 2000 CHRY #ARG7220
Page: 32
Packet Pg. 54
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219715 4/28/2016 070962 PAULSONS TOWING INC
219716 4/28/2016 028860 PLATT ELECTRIC SUPPLY INC
Voucher List
City of Edmonds
Invoice
PO # Description/Account
(Continued)
001.000.41.521.22.41.00
9.8% Sales Tax
001.000.41.521.22.41.00
Tota I :
J177212
CITY HALL PLANNING COUNTER EI
City Hall Planning Counter Elect
001.000.66.518.30.31.00
9.8% Sales Tax
001.000.66.518.30.31.00
J189163
WWTP- SUPPLIES, ELECTRICAL
MEL 61-1a013-1 POLY HANDLE - H�
423.000.76.535.80.31.22
9.8% Sales Tax
423.000.76.535.80.31.22
J201989
WWTP - SUPPLIES, ELECTRICAL
ELECTRICAL STOCK
423.000.76.535.80.31.22
9.8% Sales Tax
423.000.76.535.80.31.22
J227755
CITY HALL CAR CHARGING STATIC
City Hall Car Charging Station Supplii
511.100.77.594.48.64.00
9.8% Sales Tax
511.100.77.594.48.64.00
J236671
FAC - ELECT SUPPLIES
FAC - Elect Supplies
001.000.66.518.30.31.00
9.8% Sales Tax
001.000.66.518.30.31.00
J242179
CITY HALL CAR CHARGING STATIC
City Hall Car Charging Station Supplii
511.100.77.594.48.64.00
9.8% Sales Tax
511.100.77.594.48.64.00
3.2.a
Page: 33
Page: 33
Packet Pg. 55
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 34
Bank code :
Voucher
usbank
Date
Vendor
Invoice PO #
Description/Account
Amoun
219716
4/28/2016
028860 028860 PLATT ELECTRIC SUPPLY INC (Continued)
Total:
894.5!
219717
4/28/2016
075547 PRO -LONG ROOF CARE & REPAIR
4676
WWTP - GUTTER REPLACEMENT
vi
Install 100' K6 Gutters on Gazebo
Y
423.000.76.535.80.48.23
1,200.0(
9.5% Sales Tax
423.000.76.535.80.48.23
114.0( .
Total:
1,314.0(
219718
4/28/2016
064088 PROTECTION ONE
291104
ALARM MONITORING - PARKS MAII
ALARM MONITORING FOR PARKS I
>
001.000.66.518.30.42.00
21.3z a
ALARM MONITORING FOR PARKS I
Q-
Q
001.000.64.576.80.42.00
21.3z
ALARM MONITORING FOR FIRE ST,
N
rn
001.000.66.518.30.42.00
130.3E
Total:
173.0E ..
co
219719
4/28/2016
068697 PUBLIC SAFETY TESTING INC
2016-6664
1ST QUARTER 2016 POLICE TESTII
a&
1st quarter 2016 Police testing fees
N
001.000.22.521.10.41.00
721.0(
Total:
721.0( Y
219720
4/28/2016
030780 QUIRING MONUMENTS INC
00000163275
SHUTTER/INSCRIPTION-MURPHY
E
SHUTTER/INSCRIPTION-MURPHY
130.000.64.536.20.34.00
105.0(
00000163514
MARKER/INSCRIPTION-LEE
MARKER/INSCRIPTION-LEE
E
t
130.000.64.536.20.34.00
1,723.0( um
Total:
1,828.0( Q
219721
4/28/2016
070955 R&R STAR TOWING
110973
INV#110973 - EDMONDS PD
TOW 2006 VOLKSWAGON #ADE12:
001.000.41.521.22.41.00
166.0(
9.8% Sales Tax
001.000.41.521.22.41.00
16.2 ,
111114
INV#111114 - EDMONDS PD
Page: 34
Packet Pg. 56
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 35
Bank code :
Voucher
usbank
Date
Vendor
Invoice PO #
Description/Account
Amoun
219721
4/28/2016
070955 R&R STAR TOWING
(Continued)
TOW 2006 VOLKSWAGON #ADE12,
_
001.000.41.521.22.41.00
332.0( 6
9.8% Sales Tax
001.000.41.521.22.41.00
a�
32.5z
Total:
546.8, E
219722
4/28/2016
074156 RAZZ CONSTRUCTION INC
E4MB.Pmt 1
E4MB.PMT 1 THRU 3/31/16
f°
E4MB.Pmt 1 thru 3/31/16
c
016.000.66.594.19.65.00
107,695.8E
Total:
107,695.8E p
L
Q
219723
4/28/2016
031600 RELIABLE FLOOR COVERINGS
124646
GREEN RESOURCE CENTER - ROF
Q
Green Resource Center - Roppe
016.000.66.518.30.31.00
856.4z N
9.5% Sales Tax
016.000.66.518.30.31.00
124655
GREEN RESOURCE CENTER - COL
Green Resource Center - Counter Tol
00
N
016.000.66.518.30.48.00
7,178.8< 4
Total:
8,116.6: CD
219724
4/28/2016
073819 ROCK SOLID LEARNING LLC
20864 TERRARIUM
20864 EARTH DAY TERRARIUM INS
E
20864 EARTH DAY TERRARIUM INS
001.000.64.571.22.41.00
33.0(
Total:
33.0(
m
219725
4/28/2016
064769 ROMAINE ELECTRIC
5-008569
UNIT 796 - BATTERY
E
t
Unit 796 - Battery
U
511.000.77.548.68.31.10
64.9� Q
9.8% Sales Tax
511.000.77.548.68.31.10
6.3 1
Total:
71.3E
219726
4/28/2016
075601 RUSHWORKS
EDMON040116
CITY COUNCIL CHAMBERS UPGRA
City Council Chambers Upgrade HD �
Page: 35
Packet Pg. 57
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 36
Bank code :
usbank
Voucher
Date
Vendor
Invoice PO #
Description/Account
Amoun
219726
4/28/2016
075601 RUSHWORKS
(Continued)
016.000.66.518.30.41.00
5,050.0(
Total:
5,050.0(
219727
4/28/2016
074335 SAVAGE, LINDA
20784 ETIQUETTE
20784 ETIQUETTE INSTRUCTION
20784 ETIQUETTE INSTRUCTION
001.000.64.571.22.41.00
375.0(
Total:
375.0(
219728
4/28/2016
072440 SCORDINO, JOE
1
E7FG.STUDENTS SAVING SALMON
E7FG.Students Saving Salmon
001.000.39.554.90.49.00
117.3 1
Total:
117.3,
219729
4/28/2016
035250 SEATTLE LIGHTING FIXTURE CO
S3413530.006
CITY HALL PLANNING COUNTER - I
City Hall Planning Counter - Light
001.000.66.518.30.31.00
56.8E
9.8% Sales Tax
001.000.66.518.30.31.00
5.51
219730 4/28/2016 067076 SEATTLE PUMP AND EQUIPMENT CO 16-1728
219731 4/28/2016 074472 SEP CONSULTING LLC
219732 4/28/2016 036955 SKY NURSERY
EDMONDS 2016-1
T-0690031
Total :
UNIT 106 & 47 - BRASS LEVER GAT
Unit 106 & 47 - Brass Lever Gate Val)
511.000.77.548.68.31.10
9.8% Sales Tax
511.000.77.548.68.31.10
Total
EDMONDS 2016-1 EVIDENCE INVEI
EVIDENCE INVENTORYAUDIT
001.000.41.521.10.41.00
COPY CHARGES RELATED TO AUC
001.000.41.521.10.41.00
Total
CITY PARK PROJECT SOIL
CITY PARK PROJECT SOIL
Page: 36
Packet Pg. 58
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219732 4/28/2016 036955 SKY NURSERY
219733 4/28/2016 060889 SNAP -ON INDUSTRIAL
219735 4/28/2016 037375 SNO CO PUD NO 1
Voucher List
City of Edmonds
Invoice
PO # Description/Account
(Continued)
132.000.64.594.76.65.00
T-0690037
CITY PARK PROJECT SOIL
CITY PARK PROJECT SOIL
132.000.64.594.76.65.00
9.8% Sales Tax
132.000.64.594.76.65.00
T-0696357
FLOWER PROGRAM: SEEDS, PERE
FLOWER PROGRAM: SEEDS, PERE
001.000.64.576.81.31.00
9.5% Sales Tax
001.000.64.576.81.31.00
T-0696387
FLOWER PROGRAM: PLANTING MI
FLOWER PROGRAM: PLANTING MI
001.000.64.576.81.31.00
9.5% Sales Tax
001.000.64.576.81.31.00
Total:
ARV/ 28630648 PARKS - TOOL
Parks - Tool
001.000.41.521.22.35.00
Freight
001.000.41.521.22.35.00
9.8% Sales Tax
001.000.41.521.22.35.00
Total:
2002-0254-7 PEDEST CAUTION LIGHT 21930 95-
PEDEST CAUTION LIGHT 21930 95-
111.000.68.542.64.47.00
2002-0255-4 WWTP - FLOW METER 2400 HWY
WWTP FLOW METER 2400 HWY 9�
423.000.76.535.80.47.62
2002-6027-1 YOST POOL
YOST POOL
3.2.a
Page: 37
Page: 37
Packet Pg. 59
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 38
Bank code : usbank
Voucher Date Vendor Invoice
PO # Description/Account
Amoun
219735 4/28/2016 037375 SNO CO PUD NO 1 (Continued)
001.000.64.576.80.47.00
495.4( _
2003-4823-3
TRAFFIC LIGHT 22000 84TH AVE W
vi
TRAFFIC LIGHT 22000 84TH AVE W
111.000.68.542.64.47.00
41.1 t
2003-8645-6
CLUBHOUSE 6801 MEADOWDALE
E
CLUBHOUSE 6801 MEADOWDALE
001.000.66.518.30.47.00
51.2E 6
2003-9895-6
FIRE STATION #16 8429 196TH ST E
p
FIRE STATION #16 8429 196TH ST
001.000.66.518.30.47.00
562.4' p
2004-6859-3
LIFT STATION #4 8311 TALBOT RD /
a
LIFT STATION #4 8311 TALBOT RD /
Q'
Q
423.000.75.535.80.47.10
232.4 1
2004-9683-4
LIFT STATION #10 17526 TALBOT R
rn
LIFT STATION #10 17526 TALBOT R
423.000.75.535.80.47.10
59.5, m
2005-9295-4
TRAFFIC LIGHT 101 9TH AVE S / ME
TRAFFIC LIGHT 101 9TH AVE S / ME
N
111.000.68.542.64.47.00
15.7< c
2006-1131-7
LIFT STATION #9 19300 80TH AVE V
N
LIFT STATION #9 19300 80TH AVE V
cYi
423.000.75.535.80.47.10
158.3' E
2006-3860-9
OLD PUBLIC WORKS 200 DAYTON
f°
OLD PUBLIC WORKS 200 DAYTON
421.000.74.534.80.47.00
219.9, y
2006-7801-9
TRAFFIC LIGHT 200 3RD AVE S / MI
E
TRAFFIC LIGHT 200 3RD AVE S / MI
t
111.000.68.542.64.47.00
16.8E r
2007-1403-8
SEAVIEW PARK
Q
SEAVIEW PARK
001.000.64.576.80.47.00
38.71
2007-2302-1
TRAFFIC LIGHT 961 PUGET DR / MI
TRAFFIC LIGHT 961 PUGET DR / MI
111.000.68.542.64.47.00
25.5,
2007-3984-5
SEAVIEW RESERVOIR 18520 90TH
Page: 38
Packet Pg. 60
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219735 4/28/2016 037375 SNO CO PUD NO 1
Voucher List
City of Edmonds
3.2.a
Page: 39
Invoice PO # Description/Account Amoun
(Continued)
SEAVIEW RESERVOIR 18520 90TH
421.000.74.534.80.47.00
15.8E w
2008-6520-2
LIFT STATION #3 1529 NORTHSTRE
LIFT STATION #3 1529 NORTHSTRE
t
423.000.75.535.80.47.10
87.4
2011-9708-4
SEAVIEW PARK
SEAVIEW PARK
001.000.64.576.80.47.00
85.5E o
2012-3682-5
FISHING PIER RESTROOMS
FISHING PIER RESTROOMS
p
L
001.000.64.576.80.47.00
334.E 1 a
2012-6598-0
LIFT STATION #12 16121 75TH PL
Q'
Q
LIFT STATION #12 16121 75TH PL
423.000.75.535.80.47.10
N
162.1( M
2013-7496-4
LIFT STATION #11 6811 1/2 157TH P
LIFT STATION #11 6811 1/2 157TH P
423.000.75.535.80.47.10
18.0<
2014-3123-6
PEDEST CAUTION LIGHT 9110 OLY
N
PEDEST CAUTION LIGHT 9110 OLY
0
111.000.68.542.64.47.00
14.0E Y
2014-3124-4
PEDEST CAUTION LIGHT 9301 PUC
PEDEST CAUTION LIGHT 9301 PUC
E
111.000.68.542.64.47.00
17.9E
2014-4175-5
TRAFFIC LIGHT 21531 HWY 99 / ME
TRAFFIC LIGHT 21531 HWY 99 / ME
m
111.000.68.542.63.47.00
366.0( E
2015-5174-4
SNO-ISLE LIBRARY 650 MAIN ST / �
U
SNO-ISLE LIBRARY 650 MAIN ST / �
r
001.000.66.518.30.47.00
1.623.0E Q
2015-7289-8 TRAFFIC LIGHT 117 3RD AVE S / ME
TRAFFIC LIGHT 117 3RD AVE S / ME
111.000.68.542.64.47.00 38.7.
2015-9448-8 LIFT STATION #15 7710 168TH PL S
LIFT STATION #15 7710 168TH PL S
423.000.75.535.80.47.10 17.1(
Page: 39
Packet Pg. 61
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219735 4/28/2016 037375 SNO CO PUD NO 1
Voucher List
City of Edmonds
3.2.a
Page: 40
Invoice
PO # Description/Account
Amoun
(Continued)
2016-1195-1
TRAFFIC LIGHT 20801 76TH AVE W
_
TRAFFIC LIGHT 20801 76TH AVE W
vi
111.000.68.542.63.47.00
28.0' 0
2016-5690-7
DECORATIVE LIGHTING 413 MAIN,'
t
DECORATIVE LIGHTING 413 MAIN,'
U
111.000.68.542.63.47.00
91.5E •@
2017-5147-6
TRAFFIC LIGHT 9932 220TH ST SW
U
TRAFFIC LIGHT 9932 220TH ST SW
p
111.000.68.542.64.47.00
36.3'
2017-8264-6
TRAFFIC LIGHT 901 WALNUT ST / �
p
TRAFFIC LIGHT 901 WALNUT ST / �
a
111.000.68.542.64.47.00
15.7: Q
2017-9000-3
ALDERWOOD INTERIE 6130 168TH
ALDERWOOD INTERIE 6130 168TH
rn
421.000.74.534.80.47.00
r
17.6E
2019-0786-2
TRAFFIC LIGHT 7133 212TH ST SW
m
TRAFFIC LIGHT 7133 212TH ST SW
111.000.68.542.63.47.00
co
29.91 N
2019-2988-2
WWTP - FLOW METER 8421 244TF
0
WWTP FLOW METER 8421 244TH
Y
423.000.76.535.80.47.62
16.8E u
2019-4248-9
PUBLIC WORKS OMC 7110 210TH ;
E
PUBLIC WORKS OMC 7110 210TH ;
f°
001.000.65.518.20.47.00
80.5�
PUBLIC WORKS OMC 7110 210TH :
y
111.000.68.542.90.47.00
306.21 E
PUBLIC WORKS OMC 7110 210TH :
U
421.000.74.534.80.47.00
306.2,1 r
PUBLIC WORKS OMC 7110 210TH ;
Q
423.000.75.535.80.47.10
306.2E
PUBLIC WORKS OMC 7110 210TH
511.000.77.548.68.47.00
306.2E
PUBLIC WORKS OMC 7110 210TH ;
422.000.72.531.90.47.00
306.2E
2020-8787-0
LIFT STATION #6 100 PINE ST / MEl
Page: 40
Packet Pg. 62
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher List
City of Edmonds
3.2.a
Page: 41
Voucher Date Vendor Invoice PO # Description/Account Amoun
219735 4/28/2016 037375 SNO CO PUD NO 1 (Continued)
LIFT STATION #6 100 PINE ST / MEl
423.000.75.535.80.47.10
163.4,
w
2022-8912-0
TRAFFIC LIGHT 23801 HWY 99 / ME
TRAFFIC LIGHT 23801 HWY 99 / ME
t
111.000.68.542.64.47.00
61.1E
2022-8945-0
TRAFFIC LIGHT 21931 HWY 99 / ME
TRAFFIC LIGHT 21931 HWY 99 / ME
111.000.68.542.64.47.00
85.2
0
2022-9166-2
CIVIC CENTER & FIRE STATION #1 ,
CIVIC CENTER & FIRE STATION #1 1
p
L
001.000.66.518.30.47.00
4,602.4'
a
2023-8937-5
STREET LIGHT 7601 RIDGE WAY / I
Q
STREET LIGHT 7601 RIDGE WAY / I
111.000.68.542.63.47.00
8.0,
N
M
2024-2158-2
LOG CABIN & DECORATIVE LIGHTI
LOG CABIN & DECORATIVE LIGHTI
001.000.66.518.30.47.00
75.4E
2024-3924-6
CITY HALL 121 5TH AVE N / METER
N
CITY HALL 121 5TH AVE N / METER
4
0
001.000.66.518.30.47.00
2,039.0E
Y
2028-0763-2
TRAFFIC LIGHT 8429 196TH ST SW
TRAFFIC LIGHT 8429 196TH ST SW
E
001.000.66.518.30.47.00
18.2E
2036-5215-1
FIVE CORNERS RESERVOIR 85191
FIVE CORNERS RESERVOIR 85191
m
421.000.74.534.80.47.00
237.6:
E
2044-2584-7
LIFT STATION #2 702 MELODY LN /
U
LIFT STATION #2 702 MELODY LN /
r
423.000.75.535.80.47.10
71.9,
Q
2202-1638-6 PEDEST CAUTION LIGHTS 8410 MF
PEDEST CAUTION LIGHTS 8410 MF
111.000.68.542.64.47.00 69.8�
2205-4757-4 TRAFFIC LIGHT SR104 @ 236TH Sl
TRAFFIC LIGHT SR104 @ 236TH Sl
111.000.68.542.63.47.00 71.9
Page: 41
Packet Pg. 63
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219735 4/28/2016 037375 037375 SNO CO PUD NO 1
219736 4/28/2016 037376 SNO CO PUD NO 1
219737 4/28/2016 063941 SNO CO SHERIFFS OFFICE
219738 4/28/2016 038100 SNO-KING STAMP
219739 4/28/2016 069844 SOFTWARE SOLUTIONS PLLC
Voucher List
City of Edmonds
Invoice
(Continued)
1900010115
2016-3056
2016-3056
PO # Description/Account
Total
ACCT #30000075
Advanced Contact fee on jointly owne
001.000.31.518.87.41.00
Total
CREDIT #2016-3056 SNO CO JAIL-F
73 HOUSING $89.38-VARIOUS 1/20'
001.000.39.523.60.51.00
11 MED/SPEC @52.01/VARIOUS 1/2
001.000.39.523.60.51.00
5 MENTAL HEALTH @124.72/VAR 1/
001.000.39.523.60.51.00
INV#2016-3056 - EDMONDS PD - FE
516.33 HOUSING @ $89.38 - 2/16
001.000.39.523.60.51.00
48.75 BOOKINGS @ $116.14 - 2/16
001.000.39.523.60.51.00
99 MED/SPEC @ $52.01- 2/16
001.000.39.523.60.51.00
42 MENTAL HEALTH @ $124.72-2/1E
001.000.39.523.60.51.00
11.25 VIDEO COURT @ $115.50 - 2/'
001.000.39.523.60.51.00
Total
59070 SEWER - STAMPS
Sewer - Stamps
423.000.75.535.80.31.00
9.5% Sales Tax
423.000.75.535.80.31.00
Total
1160415-1 WATER - TELEMETRY SUPPORT
Water - Telemetry Support
3.2.a
Page: 42
Page: 42
Packet Pg. 64
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219739 4/28/2016 069844 SOFTWARE SOLUTIONS PLLC
219740 4/28/2016 038300 SOUND DISPOSAL CO
219741 4/28/2016 038410 SOUND SAFETY PRODUCTS
219742 4/28/2016 068439 SPECIALTY DOOR SERVICE
219743 4/28/2016 040250 STEUBER DISTRIBUTING
Voucher List
City of Edmonds
Invoice
PO # Description/Account
(Continued)
421.000.74.534.80.41.00
1160415-2
WATER - 5 CORNERS TELEMETRY
Water - 5 Corners Telemetry Software
421.000.74.534.80.41.00
Total:
104757
WWTP - 200 2ND AVE SOUTH / ASI
W WTP 200 2ND AVE S / ASH
423.000.76.535.80.47.65
Total:
13136/4
SEWER - WORK JEANS (5) R WICH
Sewer - Work Jeans (5) R Wichers
423.000.75.535.80.24.00
9.5% Sales Tax
423.000.75.535.80.24.00
15849/4
SEWER - WORK JEANS (5) D CRAV
Sewer - Work Jeans (5) D Crawford
423.000.75.535.80.24.00
9.8% Sales Tax
423.000.75.535.80.24.00
Total:
43305
FS 17 - DOOR REPAIRS
FS 17 - Door Repairs
001.000.66.518.30.48.00
9.8% Sales Tax
001.000.66.518.30.48.00
Total:
2818672
FLOWER BASKETS PROGRAM: PLi
FLOWER BASKETS PROGRAM: PLi
125.000.64.576.80.31.00
9.8% Sales Tax
125.000.64.576.80.31.00
3.2.a
Page: 43
Page: 43
Packet Pg. 65
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 44
Bank code :
usbank
Voucher
Date
Vendor
Invoice PO #
Description/Account
Amoun
219743
4/28/2016
040250 040250 STEUBER DISTRIBUTING
(Continued)
Total:
854.5'
219744
4/28/2016
040430 STONEWAY ELECTRIC SUPPLY
S101593978.001
CITY HALL CAR CHARGING STATIC
City Hall Car Charging Station Supplii
511.100.77.594.48.64.00
7.91
9.8% Sales Tax
511.100.77.594.48.64.00
0.7i
Total:
8.7,
219745
4/28/2016
074797 SUPER CHARGE MARKETING LLC
2321
SOCIAL MEDIA SERVICES APRIL 2C
Social media services April 2016
001.000.61.557.20.41.00
300.0(
Total:
300.0(
219746
4/28/2016
040917 TACOMA SCREW PRODUCTS INC
18112290
FLEET SHOP SUPPLIES
Fleet Shop Supplies
511.000.77.548.68.31.20
5.3f
9.8% Sales Tax
511.000.77.548.68.31.20
0.5:
Total:
5.9'
219747
4/28/2016
071666 TETRATECH INC
35009-513
ESDB.SERVICES THRU FEBRUARY
ESDB.Services thru February 2016
001.000.67.518.21.41.00
22,297.0E
35009-613
ESDB.SERVICES THRU MARCH 201
ESDB.Services thru March 2016
001.000.67.518.21.41.00
65,784.9'
Total:
88,081.9(
219748
4/28/2016
075610 TRUEIT, TRUDI
4/21 BEST BOOK
4/21/16 BEST BOOK PRESENTATIOI
4/21/16 BEST BOOK PRESENTATIOI
117.100.64.573.20.41.00
100.0(
Total:
100.0(
219749
4/28/2016
043935 UPS
00002T4T13156
OUTBOUND DELIVERY-(BLD2016-(
OUTBOUND DELIVERY BLD201604(
001.000.62.524.20.41.00
46.1(
Page: 44
Packet Pg. 66
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219749 4/28/2016 043935 043935 UPS
219750 4/28/2016 062693 US BANK
219751 4/28/2016 064423 USA BLUE BOOK
219752 4/28/2016 067865 VERIZON WIRELESS
Voucher List
City of Edmonds
3.2.a
Page: 45
Invoice PO #
Description/Account
Amoun
(Continued)
Total :
46.1(
0017-8304
FACILITY ATTENDANT AD, #16-11
vi
Facility Attendant ad, #16-11
001.000.22.518.10.41.00
90.0(
Water/Sewer Maintenance Laborer a,
U
001.000.22.518.10.41.00
45.0( .
HR Assistant ad, #16-18
f°
001.000.22.518.10.41.00
90.0( o
Senior Office Specialist ad, #16-19
001.000.22.518.10.41.00
90.0( p
Accounting Manager, #16-01 ad
a
001.000.22.518.10.41.00
109.2E Q
2985
WWTP - MARCH 2O16 CC
WWTP - TRAINING TRAVEL/LODGI(
04
423.000.76.535.80.49.71
297.1 £
3249
POSTAGE FOR PASSPORTS
POSTAGE FOR PASSPORTS
001.000.23.512.50.42.00
64.5( N
Total :
785.9: c
921974
WATER - SUPPLIES
N
Y
Water - Supplies
E
421.000.74.534.80.31.00
520.41 'M
Freight
421.000.74.534.80.31.00
123.9z c
9.8% Sales Tax
421.000.74.534.80.31.00
63.1E
Total :
707.5'
r
Q
9763700446
C/A 671247844-00001
Cell Service -Bldg
001.000.62.524.20.42.00
18.4 ,
Cell Service-Eng
001.000.67.518.21.42.00
92.9E
Cell Service Fac-Maint
Page: 45
Packet Pg. 67
vchlist
04/28/2016 8:21:19AM
Bank code : usbank
Voucher Date Vendor
219752 4/28/2016 067865 VERIZON WIRELESS
Voucher List
City of Edmonds
Invoice PO # Description/Account
(Continued)
001.000.66.518.30.42.00
Cell Service -Parks Discovery Prograr
001.000.64.571.23.42.00
Cell Service Parks Maint
001.000.64.576.80.42.00
Cell Service-PD
001.000.41.521.22.42.00
Cell Service-PD 104 Fund
104.100.41.521.21.42.00
Cell Service-PW Street
111.000.68.542.90.42.00
Cell Service-PW Street/Storm
111.000.68.542.90.42.00
Cell Service-PW Street/Storm
422.000.72.531.90.42.00
Cell Service-PW Water
421.000.74.534.80.42.00
Cell Service-PW Water
421.000.74.534.80.35.00
Cell Service-PW Sewer
423.000.75.535.80.42.00
Cell Service-WWTP
423.000.76.535.80.42.00
Total:
219753 4/28/2016 068259 WA ST CRIMINAL JUSTICE 201126144 INV 201126144 EDMONDS PD - BLU
BLUE COURAGE WORKSHOP - SPI
001.000.41.521.40.49.00
BLUE COURAGE WORKSHOP - TR`
001.000.41.521.40.49.00
BLUE COURAGE WORKSHOP - ME
001.000.41.521.40.49.00
Total
219754 4/28/2016 073552 WELCO SALES LLC 7018 INV#7018 - EDMONDS PD
3.2.a
Page: 46
Amoun
94.7,
0
18.41
a�
t
58.5.
290.9E
0
146.1 E
0
L
18.8E Q
Q
28.Z N
rn
r
28.2.
m
119.5E ao
N
218.9� o
77.6'
E
I
37.1z 0
1,248.9,
m
E
t
U
65.0( r
Q
65.0(
65.0(
195.0(
Page: 46
Packet Pg. 68
vchlist
04/28/2016 8:21:19AM
Voucher List
City of Edmonds
3.2.a
Page: 47
Bank code :
Voucher
usbank
Date Vendor
Invoice PO #
Description/Account
Amoun
219754
4/28/2016 073552 WELCO SALES LLC
(Continued)
500 SAFEKEEPING FORMS
_
001.000.41.521.11.31.00
141.5( 6
9.8% Sales Tax
001.000.41.521.11.31.00
a�
13.8 ,
7019
INV#7019 - EDMONDS PD
E
1,000 FIR CARDS
001.000.41.521.11.31.00
60.0( 6
9.8% Sales Tax
o
001.000.41.521.11.31.00
5.8£ 5
Total:
221.2! o
L
Q
219755
4/28/2016 072634 WHISTLE WORKWEAR
TR-295990
PM: HARD HAT, BIB, VEST, JACKET
Q-
Q
PM: HARD HAT, BIB, VEST, JACKET
001.000.64.576.80.24.00
312.2z rn
9.2% Sales Tax
001.000.64.576.80.24.00
28.7:
Total:
340.91
co
N
219756
4/28/2016 065869 WSNLA
2016 CPH EDHOUSE
2016 CERTIFIED PROF HORTICULT
2016 CERTIFIED PROF HORTICULT
c
N
001.000.64.576.80.49.00
60.0(
Total:
60.0( E
M
122
Vouchers for bank code : usbank
Bank total :
509,556.7E u
122
Vouchers in this report
Total vouchers :
c
509,556.7E
E
t
U
a
r
r
Q
Page: 47
Packet Pg. 69
3.2.b
PROJECT NUMBERS (By Project Title)
Project
Engineering
Accounting
Project
Funding
Protect Title
Number
Number
STM
12th Ave & Sierra Stormwater System Improvements
c484
E5FE
STR
15th St. SW Walkway (Edmonds Way to 8th Ave)
c424
E3DC
SWR
2013 Sewerline Replacement Project
c398
E3GA
STR
2014 Chip Seals
c451
E4CB
STM
2014 Drainage Improvements
c433
E4FA
STM
2014 Lake Ballinger Associated Projects
c436
E4FD
ui
STR
2014 Overlay Program
c438
E4CA
t
WTR
2014 Waterline Overlays
c452
E4CC
U
E
STM
2014 Willow Creek Daylighting/Edmonds Marsh Restoration
c435
E4FC
STM
2015 Citywide Drainage Improvements/Rehab Projects
c466
E5FA
o
STR
2015 Overlay Program
c463
E5CA
0
SWR
2015 Sewerline Overlays
i007
E5CC
0.
a
SWR
2015 Sewerline Replacement Project
c441
E4GA
Q
STR
2015 Traffic Calming
c471
E5AB
rn
WTR
2015 Waterline Overlays
c475
E5CB
Z.
W
WTR
2015 Waterline Replacement Program
c440
E4J13
V-
Ob
STR
2016 Overlay Program
i008
E6CA
N
v
0
SWR
2016 Sewerline Overlays
i010
E6CC
L
WTR
2016 Water Comp Plan Update
c460
E4JC
a�
WTR
2016 Waterline Overlays
i009
E6CB
Z_
SWR
2016-17 Sanitary Sewer Replacement Projects
c469
E5GA
°
a
WTR
2016-17 Waterline Replacement Projects
c468
E5JA
STR
220th Street Overlay Project
c462
E4CD
D,
STM
224th & 98th Drainage Improvements
c486
E6FB
a�
0
WTR
224th Waterline Relocation (2013)
c418
E3JB
a
a�
L
STR
228th St. SW Corridor Improvements
i005
E7AC
LL
STR
236th St. SW Walkway (Edmonds Way to Madrona School)
c425
E3DD
r
E
STR
238th St. SW Walkway (100th Ave to 104th Ave)
c423
E3DB
c�
STR
238th St. SW Walkway (Edmonds Way to Hwy 99)
c485
E6DA
Q
STM
3rd Ave Rain Gardens
i012
E6FC
STR
76th Ave W at 212th St SW Intersection Improvements
c368
E1 CA
STR
9th Avenue Improvement Project
c392
E2AB
FAC
A/V Upgrades - Council Chambers
c476
E5LA
STR
ADA Curb Ramp Upgrades along 3rd Ave S
c426
E3DE
STR
Bikelink Project
c474
E5DA
PRK
City Spray Park
c417
E4MA
SWR
Citywide CIPP Sewer Rehab Phase I
c456
E4GB
WTR
Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)
c482
E5J13
Revised 4/28/2016
Packet Pg. 70
3.2.b
PROJECT NUMBERS (By Project Title)
Project
Engineering
Accounting
Project
Funding
Protect Title
Number
Number
STM
Dayton Street & SR104 Storm Drainage Alternatives
c374
ElFM
PM
Dayton Street Plaza
c276
E7MA
STM
Dayton Street Storm Improvements (6th Ave - 8th Ave)
c472
E5FC
STM
Dayton Street Stormwater Pump Station
c455
E4FE
FAC
Edmonds Fishing Pier Rehab
c443
E4MB
STM
Edmonds Marsh Feasibility Study
c380
E2FC
ui
General
Edmonds Waterfront Access Analysis
c478
E5DB
t
FAC
ESCO III Project
c419
E3LB
U
E
WTR
Five Corners Reservoir Re -coating
c473
E5KA
STR
Five Corners Roundabout (212th Street SW @ 84th Avenue W)
c342
E1AA
o
PM
Fourth Avenue Cultural Corridor
c282
E8MA
0
0
STR
Hwy 99 Enhancements (Phase III)
c405
E2AD
Q.
a
SWR
Lake Ballinger Trunk Sewer Study
s011
E5GB
Q
STM
LID Retrofits Perrinville Creek Basin
c434
E4FB
rn
SWR
Lift Station #1 Basin & Flow Study
c461
E4GC
Z.
to
STM
North Talbot Road Drainage Improvements
c378
E2FA
T_
Ob
STM
Northstream Culvert Repair Under Puget Drive
i011
E6FA
N
v
0
STM
Northstream Pipe Abandonment on Puget Drive
c410
E3FE
L
STM
NPDES (Students Saving Salmon)
m013
E7FG
a�
STM
Perrinville Creek Culvert Replacement
c376
E1 FN
Z_
STM
Perrinville Creek Stormwater Flow Reduction Retrofit Study
c408
E3FC
°
a
FAC
Public Safety Controls System Upgrades
c444
E4LA
STM
Seaview Park Infiltration Facility
c479
E5FD
D,
WWTP
Sewer Outfall Groundwater Monitoring
c446
E4HA
0
STR
SR104 Corridor Transportation Study
c427
E3AB
a
a�
L
STR
SR104/City Park Mid -Block Crossing
c454
E4DB
u_
STR
SR99 Safety Improvements (224th to 216th)
s014
E6AA
r
E
UTILITIES
Standard Details Updates
solo
E5NA
c�
STM
Storm Drainage Improvements - 88th & 194th
c429
E3FG
Q
STR
Sunset Walkway Improvements
c354
E1 DA
STM
SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System
c379
E2FB
STM
SW Edmonds-1 05th/l 06th Ave W Storm Improvements
c430
E3FH
STR
Trackside Warning System
c470
E5AA
STR
Train Trench - Concept
c453
E4DA
STR
Transportation Plan Update
c391
E2AA
STM
Update Stormwater Management Code & Associated Projects
c467
E5FB
UTILITIES
Utility Rate Update
s013
E6JA
STM
Video Assessment of Stormwater Lines
c459
E4FF
Revised 4/28/2016
Packet Pg. 71
3.2.b
PROJECT NUMBERS (By Project Title)
Project Engineering
Accounting Protect
Funding Protect Title Number Number
WWTP WWTP Outfall Pipe Modifications c481 E5HA
Revised 4/28/2016 Packet Pg. 72
3.2.b
PROJECT NUMBERS (By Engineering Number)
Engineering
Project
Project
Accounting
Funding
Number
Number
Project Title
E1AA *
c34"
Five Corners Roundabout (212th Street SW @ 84th Avenue W)
STIR
ElCA
c368
76th Ave W at 212th St SW Intersection Improvements
c354
Sunset Walkway Improvement
STM
E1 FM
c374
Dayton Street & SR104 Storm Drainage Alternatives
c376
Perrinville Creek Culvert Replacement
STIR
E2AA
c391
Transportation Plan Update
c392
9th Avenue Improvement Project
STIR
E2AD
c405
Hwy 99 Enhancements (Phase III)
c378
North Talbot Road Drainage Improvement
STM
E2FB
c379
SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System
Edmonds Marsh Feasibility Study
STIR
E3AB
c427
SR104 Corridor Transportation Study
c423 W38th
St. SW Walkway (100th Ave to 104th Ave)
STIR
E3DC
c424
15th St. SW Walkway (Edmonds Way to 8th Ave)
STIR
E3DD
c425
236th St. SW Walkway (Edmonds Way to Madrona School
STIR
E3DE
c426
ADA Curb Ramp Upgrades along 3rd Ave S
STM
E3FC
c408
Perrinville Creek Stormwater Flow Reduction Retrofit Study
STM
E3FE
c410
Northstream Pipe Abandonment on Puget Drive
STM
E3FG
c429
Storm Drainage Improvements - 88th & 194th
STM
E3FH
c430
SW Edmonds-105th/106th Ave W Storm Improvements
SWR
2013 Sewerline Replacement Project
WTR
E3J13
c418
224th Waterline Relocation (2013)
FAC
STIR
E4CA
c438
2014 Overlay Program
2014 Chip Seals 91a"
WTR
E4CC
c452
2014 Waterline Overlays
220th Street Overlay Project
STIR
E4DA
c453
Train Trench - Concept
c454
SR104/City Park Mid -Block Crossing
STM
E4FA
c433
2014 Drainage Improvements
LID Retrofits Perrinville Creek Basild
STM
E4FC
c435
2014 Willow Creek Daylighting/Edmonds Marsh Restoration
c436
2014 Lake Ballinger Associated Projects
STM
E4FE
c455
Dayton Street Stormwater Pump Station
E4FF
c459
Video Assessment of Stormwater Lines
SWR
E4GA
c441
2015 Sewerline Replacement Project
E4GB
c456
Citywide CIPP Sewer Rehab Phase I
SWR
E4GC
c461
Lift Station #1 Basin & Flow Study
Revised 4/28/2016 Packet Pg. 73
PROJECT NUMBERS (By Engineering Number)
3.2.b
Engineering
Project
Project
Accounting
Funding
Number
Number
Project Title
-
E4HA
rddF
Sewer Outfall Groundwater Monitoring
WTR
E4JB
c440
2015 Waterline Replacement Program
2016 Water Comp Plan Updat
FAC
E4LA
c444
Public Safety Controls System Upgrades
City Spray Park EFW
FAC
E4MB
c443
Edmonds Fishing Pier Rehab
Trackside Warning System
STIR
E5AB
c471
2015 Traffic Calming
2015 Overlay Progra
WTR
E5CB
c475
2015 Waterline Overlays
2015 Sewerline Overlays
STIR
E5DA
0474
Bikelink Project
Waterfront Access Analysis
STM
E5FA
c466
2015 Citywide Drainage Improvements/Rehab Projects
STM
E5FB
c467
Update Stormwater Management Code & Associated Projects
STM
E5FC
c472
Dayton Street Storm Improvements (6th Ave - 8th Ave)
STM
E5FD
c479
Seaview Park Infiltration Facility
STM
E5FE
c484
12th Ave & Sierra Stormwater System Improvements
SWR
E5GA
c469
2016-17 Sanitary Sewer Replacement Prod
SWR
E5GB
s011
Lake Ballinger Trunk Sewer Study
�P Outfall Pipe Modificatio
WTR
E5JA
c468
2016-17 Waterline Replacement Proiects
Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)
WTR E51KA c473 Five Corners Reservoir Re -coating
EV Upgrades - Council Cham
UTILITIES E5NA solo Standard Details Updates
2016 Overlay Program i
WTR E6CB i009 2016 Waterline Overlays
2016 Sewerline Overlays
STIR E6DA c485 238th St. SW Walkway (Edmonds Way to
E6FA Northstream Culvert Repair Under Puget Drive
STM E6FB c486 224th & 98th Drainage Improvements
UTILITIES E6JA s013
STIR E7AC i005
m013
PM E7MA c276
8MA c282
3rd Ave Rain Gardens
Utility Rate Update
SR99 Safety Improvements (224th to 216th)
228th St. SW Corridor Improvements
NPDES (Students Saving Salmon)
Dayton Street Plaza
Fourth Avenue Cultural Corridor
Revised 4/28/2016
Packet Pg. 74
3.2.b
PROJECT NUMBERS (By New Project Accounting Number)
Engineering
Project
Project
Accounting
Funding
Number
Number
Project Title
PM
E7MA
c276
Dayton Street Plaza
PM
E8MA
c282
Fourth Avenue Cultural Corridor
STR
E1AA
c342
Five Corners Roundabout (212th Street SW @ 84th Avenue W)
STR
E1 DA
c354
Sunset Walkway Improvements
STR
E1 CA
c368
76th Ave W at 212th St SW Intersection Improvements
STM
E1 FM
c374
Dayton Street & SR104 Storm Drainage Alternatives
STM
E1 FN
c376
Perrinville Creek Culvert Replacement
STM
E2FA
c378
North Talbot Road Drainage Improvements
STM
E2FB
c379
SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System
STM
E2FC
c380
Edmonds Marsh Feasibility Study
STR
E2AA
c391
Transportation Plan Update
STR
E2AB
c392
9th Avenue Improvement Project
SWR
E3GA
c398
2013 Sewerline Replacement Project
STR
E2AD
c405
Hwy 99 Enhancements (Phase III)
STM
E3FC
c408
Perrinville Creek Stormwater Flow Reduction Retrofit Study
STM
EYE
c410
Northstream Pipe Abandonment on Puget Drive
PRK
E4MA
c417
City Spray Park
WTR
E3JB
c418
224th Waterline Relocation (2013)
FAC
E3LB
c419
ESCO III Project
STR
E3DB
c423
238th St. SW Walkway (100th Ave to 104th Ave)
STR
E3DC
c424
15th St. SW Walkway (Edmonds Way to 8th Ave)
STR
E3DD
c425
236th St. SW Walkway (Edmonds Way to Madrona School)
STR
E3DE
c426
ADA Curb Ramp Upgrades along 3rd Ave S
STR
E3AB
c427
SR104 Corridor Transportation Study
STM
E3FG
c429
Storm Drainage Improvements - 88th & 194th
STM
E3FH
c430
SW Edmonds-1 05th/1 06th Ave W Storm Improvements
STM
E41FA
c433
2014 Drainage Improvements
STM
E4FB
c434
LID Retrofits Perrinville Creek Basin
STM
E4FC
c435
2014 Willow Creek Daylighting/Edmonds Marsh Restoration
STM
E4FD
c436
2014 Lake Ballinger Associated Projects
STR
E4CA
c438
2014 Overlay Program
WTR
E4,113
c440
2015 Waterline Replacement Program
SWR
E4GA
c441
2015 Sewerline Replacement Project
FAC
E4MB
c443
Edmonds Fishing Pier Rehab
FAC
E41-A
c444
Public Safety Controls System Upgrades
WWTP
E4HA
c446
Sewer Outfall Groundwater Monitoring
STR
E4CB
c451
2014 Chip Seals
WTR
E4CC
c452
2014 Waterline Overlays
ui
U
m
t
v
E
2
U
0
0
L
Q
a
a
N
6�
r
Revised 4/28/2016 Packet Pg. 75
3.2.b
PROJECT NUMBERS (By New Project Accounting Number)
Engineering
Project
Project
Accounting
Funding
Number
Number
Project Title
STIR
E4DA
c453
Train Trench - Concept
STIR
E4DB
c454
SR104/City Park Mid -Block Crossing
STM
E41FE
c455
Dayton Street Stormwater Pump Station
SWR
E4GB
c456
Citywide CIPP Sewer Rehab Phase I
STM
E4FF
c459
Video Assessment of Stormwater Lines
WTR
E4JC
c460
2016 Water Comp Plan Update
SWR
E4GC
c461
Lift Station #1 Basin & Flow Study
ui
U
am
STIR
E4CD
c462
220th Street Overlay Project
STIR
E5CA
c463
2015 Overlay Program
E
2
STM
E5FA
c466
2015 Citywide Drainage Improvements/Rehab Projects
STM
E5FB
c467
Update Stormwater Management Code & Associated Projects
WTR
E5JA
c468
2016-17 Waterline Replacement Projects
o
L
SWR
E5GA
c469
2016-17 Sanitary Sewer Replacement Projects
C
STIR
E5AA
c470
Trackside Warning System
N
STIR
E5AB
c471
2015 Traffic Calming
CD
r
STM
E5FC
c472
Dayton Street Storm Improvements (6th Ave - 8th Ave)
WTR
E5KA
c473
Five Corners Reservoir Re -coating
ao
N
STIR
E5DA
c474
Bikelink Project
V
0
WTR
E5CB
c475
2015 Waterline Overlays
L
a�
FAC
E5LA
c476
AN Upgrades - Council Chambers
E
General
E5DB
c478
Edmonds Waterfront Access Analysis
3
Z
STM
E5FD
c479
Seaview Park Infiltration Facility
d
WWTP
E5HA
c481
WWTP Outfall Pipe Modifications
WTR
E5JB
c482
Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)
2,
STM
E51FE
c484
12th Ave & Sierra Stormwater System Improvements
STIR
E6DA
c485
238th St. SW Walkway (Edmonds Way to Hwy 99)
a
a�
STM
E6FB
c486
224th & 98th Drainage Improvements
Li
STIR
E7AC
i005
228th St. SW Corridor Improvements
SWR
E5CC
i007
2015 Sewerline Overlays
E
t
STIR
E6CA
i008
2016 Overlay Program
Q
WTR
E6CB
i009
2016 Waterline Overlays
SWR
E6CC
i010
2016 Sewerline Overlays
STM
E61FA
iol 1
Northstream Culvert Repair Under Puget Drive
STM
E6FC
i012
3rd Ave Rain Gardens
STM
E7FG
m013
NPDES (Students Saving Salmon)
UTILITIES
E5NA
solo
Standard Details Updates
SWR
E5GB
sol l
Lake Ballinger Trunk Sewer Study
UTILITIES
E6JA
s013
Utility Rate Update
STIR
E6AA
s014
SR99 Safety Improvements (224th to 216th)
Revised 4/28/2016 Packet Pg. 76
3.2.b
PROJECT NUMBERS (By Project Title)
Project
Engineering
Accounting
Project
Funding
Project Title
Number
Number
FAC
AN Upgrades - Council Chambers
c476
E5LA
FAC
Edmonds Fishing Pier Rehab
c443
E4MB
FAC
ESCO III Project
c419
E3LB
FAC
Public Safety Controls System Upgrades
c444
E41-A
General
Edmonds Waterfront Access Analysis
c478
E5DB
PM
Dayton Street Plaza
c276
E7MA
PM
Fourth Avenue Cultural Corridor
c282
E8MA
PRK
City Spray Park
c417
E4MA
STM
12th Ave & Sierra Stormwater System Improvements
c484
E5FE
STM
2014 Drainage Improvements
c433
E41FA
STM
2014 Lake Ballinger Associated Projects
c436
E4FD
STM
2014 Willow Creek Daylighting/Edmonds Marsh Restoration
c435
E4FC
STM
2015 Citywide Drainage Improvements/Rehab Projects
c466
E51FA
STM
224th & 98th Drainage Improvements
c486
E6FB
STM
3rd Ave Rain Gardens
i012
E6FC
STM
Dayton Street & SR104 Storm Drainage Alternatives
c374
ElFM
STM
Dayton Street Storm Improvements (6th Ave - 8th Ave)
c472
E5FC
STM
Dayton Street Stormwater Pump Station
c455
E41FE
STM
Edmonds Marsh Feasibility Study
c380
E2FC
STM
LID Retrofits Perrinville Creek Basin
c434
E4FB
STM
North Talbot Road Drainage Improvements
c378
E21FA
STM
Northstream Culvert Repair Under Puget Drive
i011
E61FA
STM
Northstream Pipe Abandonment on Puget Drive
c410
E31FE
STM
NPDES (Students Saving Salmon)
m013
E7FG
STM
Perrinville Creek Culvert Replacement
c376
E1 FN
STM
Perrinville Creek Stormwater Flow Reduction Retrofit Study
c408
E3FC
STM
Seaview Park Infiltration Facility
c479
E5FD
STM
Storm Drainage Improvements - 88th & 194th
c429
E3FG
STM
SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System
c379
E2FB
STM
SW Edmonds-105th/106th Ave W Storm Improvements
c430
E3FH
STM
Update Stormwater Management Code & Associated Projects
c467
E5FB
STM
Video Assessment of Stormwater Lines
c459
E4FF
STIR
15th St. SW Walkway (Edmonds Way to 8th Ave)
c424
E3DC
STIR
2014 Chip Seals
c451
E4CB
STIR
2014 Overlay Program
c438
E4CA
STIR
2015 Overlay Program
c463
E5CA
STIR
2015 Traffic Calming
c471
E5AB
STIR
2016 Overlay Program
i008
E6CA
ui
U
m
t
v
E
2
U
0
0
L
Q
a
a
N
6�
r
Revised 4/28/2016 Packet Pg. 77
3.2.b
PROJECT NUMBERS (By Project Title)
Project
Engineering
Accounting
Project
Funding
Project Title
Number
Number
STR
220th Street Overlay Project
c462
E4CD
STR
228th St. SW Corridor Improvements
i0o5
E7AC
STR
236th St. SW Walkway (Edmonds Way to Madrona School)
c425
E3DD
STR
238th St. SW Walkway (100th Ave to 104th Ave)
c423
E3DB
STR
238th St. SW Walkway (Edmonds Way to Hwy 99)
c485
E6DA
STR
76th Ave W at 212th St SW Intersection Improvements
c368
ElCA
STR
9th Avenue Improvement Project
c392
E2AB
STR
ADA Curb Ramp Upgrades along 3rd Ave S
c426
E3DE
STR
Bikelink Project
c474
E5DA
STR
Five Corners Roundabout (212th Street SW @ 84th Avenue W)
c342
E1AA
STR
Hwy 99 Enhancements (Phase III)
c405
E2AD
STR
SR104 Corridor Transportation Study
c427
E3AB
STR
SR104/City Park Mid -Block Crossing
c454
E4DB
STR
SR99 Safety Improvements (224th to 216th)
s014
E6AA
STR
Sunset Walkway Improvements
c354
E1DA
STR
Trackside Warning System
c470
E5AA
STR
Train Trench - Concept
c453
E4DA
STR
Transportation Plan Update
c391
E2AA
SWR
2013 Sewerline Replacement Project
c398
E3GA
SWR
2015 Sewerline Overlays
i007
E5CC
SWR
2015 Sewerline Replacement Project
c441
E4GA
SWR
2016 Sewerline Overlays
i010
E6CC
SWR
2016-17 Sanitary Sewer Replacement Projects
c469
E5GA
SWR
Citywide CIPP Sewer Rehab Phase I
c456
E4GB
SWR
Lake Ballinger Trunk Sewer Study
sol l
E5GB
SWR
Lift Station #1 Basin & Flow Study
c461
E4GC
UTILITIES
Standard Details Updates
solo
E5NA
UTILITIES
Utility Rate Update
s013
E6JA
WTR
2014 Waterline Overlays
c452
E4CC
WTR
2015 Waterline Overlays
c475
E5CB
WTR
2015 Waterline Replacement Program
c440
E4JB
WTR
2016 Water Comp Plan Update
c460
E4JC
WTR
2016 Waterline Overlays
i009
E6CB
WTR
2016-17 Waterline Replacement Projects
c468
E5JA
WTR
224th Waterline Relocation (2013)
c418
E3JB
WTR
Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)
c482
E5J13
WTR
Five Corners Reservoir Re -coating
c473
E5KA
WWTP
Sewer Outfall Groundwater Monitoring
c446
E4HA
WWTP
WWTP Outfall Pipe Modifications
c481
E5HA
ui
U
m
t
v
E
2
U
0
0
L
Q
a
a
N
6�
r
Revised 4/28/2016 Packet Pg. 78
3.3
City Council Agenda Item
Meeting Date: 05/3/2016
Resolution in Support of Sustainable Cities Partnership
Staff Lead: Rob Chave
Department: Planning Division
Preparer: Rob Chave
Background/History
A presentation on the Partnership was presented to the Council on April 12, 2016, with a follow-up
discussion on April 26, 2016. Council moved the proposed resolution to the May 3, 2016, Consent
agenda for action.
Staff Recommendation
Council to approve the proposed resolution in support of the Partnership (Exhibit 1).
Narrative
Exhibit 1 contains a draft Resolution in support of the Partnership. This has been placed on the Consent
agenda for approval in response to the Council discussion on April 26th. The resolution will authorize
staff to finalize and submit the application to the program, and will also commit the Council to supply
funding for the program in the FY2017 budget (no funds need to be expended this year).
As discussed with Council during the April 12 and April 26 meetings, the Sustainable Cities Partnership
(SCP) is a yearlong partnership between Western Washington University's Office of Sustainability, AWC,
and one partner city chosen through a competitive application process. The program engages Western's
students and faculty on sustainability and livability projects chosen in collaboration with the partner city.
The SCP faculty and students work through a variety of studio and service learning courses, thus
providing students with experience tackling the city's real -world projects.
Exhibit 2 contains the most recent list of projects being considered for partnering; this is the same list
presented on April 26th. However, as a result of the Council's April 26th discussion, we are also including
the City's Cemetery Mapping Project in the proposed project list:
Project Description: Edmonds Memorial Cemetery was deeded to the City in 1982. The City has
been operating the cemetery with no markings, rows, aisles, or surveyed mapping. It is essential
that the City survey/map/and mark the cemetery so as to effectively manage the plots.
As before, information on the program is attached in Exhibits 3 and 4
If selected for the program, a contract would be entered into between the City and WWU. Because a
final set of projects would not be agreed to until that point in time, there will be an opportunity for staff
to update the Council on selected projects and final details before the contract is signed.
Packet Pg. 79
3.3
Attachments:
Exhibit 1: Draft resolution supporting Sustainable Cities Partnership
Exhibit 2: Current listing of Sustainable Cities Partnership projects for consideration
Exhibit 3: Sustainable Cities Partnership FAQ
Exhibit 4: SCP program RFP
Packet Pg. 80
3.3.a
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS,
WASHINGTON, DIRECTING STAFF TO SUBMIT AN APPLICATION FOR
THE SUSTAINABLE CITIES PARTNERSHIP.
WHEREAS, the Sustainable Cities Partnership (SCP) is a yearlong partnership between Western
Washington University's Office of Sustainability, AWC, and one partner city chosen through a
competitive application process; and
WHEREAS, the program engages Western's students and faculty on sustainability and livability
projects chosen in collaboration with the partner city; and
WHEREAS, the SCP faculty and students work through a variety of studio and service learning
courses, thus providing students with experience tackling the city's real -world projects; and
WHEREAS, SCP's primary value derives from collaborations resulting in on -the -ground impact and
forward movement for a community ready to transition to a more sustainable and livable future; and
WHEREAS, applications for the SCP are due at the end of April; and
WHEREAS, if selected, Edmonds would need to enter into a contract for services (within the
Mayor's contracting authority) and would need to allocate funds through a 2016 budget amendment,
which could be carried forward for an actual expenditure in 2017; and
WHEREAS, the allocation would likely be in the range of $65,000-$85,000, depending on how
many projects were included in the contract; now therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY
RESOLVES AS FOLLOWS:
Section 1. Staff should prepare and submit an application for participation in the Sustainable Cities
Partnersihp.
RESOLVED this day of April, 2016.
CITY OF EDMONDS
MAYOR, DAVE EARLING
ATTEST:
Packet Pg. 81
3.3.a
CITY CLERK, SCOTT PASSEY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
RESOLUTION NO.
4851-5533-3898, v. 1
Packet Pg. 82
3.3.b
Sustainable Cities Partnership
Range of possible projects in Edmonds
The following are projects with expressed interest from Western Washington University,
organized by faculty/course program area.
Also included are some references to the City's Comprehensive Plan (CP) or Strategic Action
Plan (SAP) as they relate to each project.
Disaster reduction planning:
• Sea level rise mitigation/action plan
Study the potential impacts of sea level rise in Edmonds. Could include scenarios and
risk analysis, impacts on private property & development, public works & transportation
facilities, parks, public safety, other infrastructure. Could provide valuable input to other
planning activities. Related City Departments: Development Services; Parks & Rec;
Public Works; Police & Fire; Finance/IS Waterfront master plan
(CP Sustainability Implementation Action by 2017; CP Sustainability Climate Change
Goal C; CP Sustainability Community Health Goal F)
Web applications:
• Art/History/Environment mobile application
Creating an application to guide public in finding: public art installations, community
history sites, and interpretive information for environmentally sensitive sites and certain
City facilities (such as the wastewater treatment facility)
(SAP #1b.7; 1d.1; 1e.1; 1e.5)
Downtown business and way -finding application
(Expandable to other parts of the city?) Mobile ap (possibly with companion website)
identifying & promoting Edmonds businesses. Could identify, search for, help locate
different businesses in the district. Should also have a 'browse' or 'discover' component.
This could take the place of or be a supplement to signage or other ways of helping
people find and explore downtown businesses. Should be able to be managed by the
BID. Could also include arts & cultural locations.
(SAP #1a.4; 1b.7)
Tourism website or mobile application for all visitor information (restaurants, activities,
etc.) (SAP references are as above)
Environmental education:
• Green Resource Room displays
Ideas for and perhaps preparation of displays that could be used at the City Hall
permitting center to demonstrate energy conservation, use of solar panels, use of other
green building techniques, "low impact" stormwater management techniques, and
showcasing of any other eco-friendly development ideas (whether through 3-D displays,
videos, or other materials)
(SAP #2a.9; 2a.10)
1 I Page
Packet Pg. 83
3.3.b
• New brochure for wastewater treatment process about what's been done to improve
plant & what might be next for energy efficiency
(CP Sustainability Community Health Goal E)
PR campaign:
• 4th Avenue Arts/Culture Corridor Plan
City wants to promote an arts/culture corridor, just off the main downtown streets,
linking to the performing arts center
(SAP #1e.3; 1e.5)
Energy studies:
• Greenhouse Gas Inventory/Monitoring.
Develop an updatable greenhouse gas inventory template for city operations. We've
done one in the past, but used ICLEI model & input system which was very difficult to
use. Would involve researching & developing a simple computer -based model, either
internet-based or Excel or whatever. Inputs would be identified & factored.
(SAP #5b.2; CP Sustainability Implementation Goal A)
Sustainability planning studio:
• Zero waste program
Focus on materials management, esp. construction materials waste
• Food waste policies, programs
• Identify opportunities for "Smart City" approaches (e.g. sensors in garbage cans, auto
locks for off -site locations)
(For each of the above reference SAP #2a.1; CP Sustainability Community Health Goal E;
CP Solid Waste Goal D for a Zero Waste Strategy; Council Resolution #1357 on "Zero
Waste and Beyond Waste")
Marketing analytics:
• Green Business Program.
City has established a 'pledge' and has initial businesses who have signed on, but limited
staff time means little 'meat' to the program. The program needs to be fleshed out and
marketed. What are the benefits to businesses? Information sharing? "Buy Local"
program? Branding? What else? Related City Departments: Economic Development;
Development Services.
(SAP #1f.1)
• Sustainability Metrics Management System.
The 2015 Comprehensive Plan calls for and started to indicate various 'metrics' for
measuring achievement city goals. These could be expanded and elaborated on, but
need to be done thoughtfully and in a way that is easy to measure and update/track.
Could be keyed to City sustainability.
2 1 P a g e
Packet Pg. 84
3.3.b
(SAP #5b.2; CP Sustainability Climate Change Goals A and B; CP Sustainability
Implementation Goal A)
The following projects might also be possible, but have less expressed interest at
this point in time:
[aI_l
• Phase 1 environmental assessment for restoration of Stella's Landing area
Project relates to private property adjacent to the Marsh, east of SR 104, which may
soon be donated to the City. Need to identify restoration options and complete a Phase
1 environmental assessment. Public participation & ongoing community stewardship
would be key aspects.
Environmental restoration:
• Marsh environmental enhancement
The estuarine marsh ("Edmonds Marsh"), which is greatly loved but impacted by past &
present urban uses, including adjacent development and stormwater runoff, could
benefit from creation of "buffer" areas that feature new low impact stormwater
management (raingardens or other techniques) while still allowing adjacent
development. What conceptual designs should be considered? How would we know
the approach would work? This project needs to be coordinated with environmental
and business interests.
Environmental education:
• Public education training video about City's wastewater treatment plant to show how
the plant works
Computer science:
• Paperless court records system:
The court would like to go digital, which some courts are calling paperless. Each court
case would have a digital file that contains all documents (Charges, pleadings, filings and
orders). These files can be accessed by a clickable link allowing attorneys, judges, law
enforcement, court staff and the public to access court records online from their own
personal devices. The user will be able to file documents online, see upcoming court
dates, fines, sentencing conditions and public records request. The system will need to
interact with the Washington State judicial information system (JIS). In addition, the
court will need to develop an efficient and cost effective way to scan in the current
estimated 10,000 open criminal and infraction files.
3 1 P a g e
Packet Pg. 85
3.3.c
WESTERN
WASHINGTON UNIVERSITY
What is SCP?
Sustainable Cities
Partnership
Frequently Asked Questions
The Sustainable Cities Partnership (SCP) is a one-year partnership between Western Washington
University, the Association of Washington Cities, and a city in Washington State. The city provides a
list of challenging sustainability projects/issues, which are tackled by creative, passionate students and
faculty across multiple disciplines. While SCP is a new program at Western, it is based upon a
successful model used for years at the University of Oregon.
What happens during the year -long partnership?
We expect that SCP will address 9-12 projects through 9-15 courses with 250+ students across
several academic departments dedicating thousands of hours of student work. This work will focus
on projects related to Urban Planning, Economics, Energy, Environmental Sciences, Environmental
Studies, Design, Communications, Journalism, Management, Entrepreneurship, Computer Science,
Marketing, Operations Management, Recreation, and Sociology, among others.
Who can submit a proposal?
SCP will be focused on cities within —2 hours driving time of Bellingham. Generally, one city is the
lead applicant, enlisting co -applicants depending upon the nature of specific projects and upon the
finances of the applicants. We highly encourage such partnerships as they help ensure that ideas
generated from the university -community engagement get put into action.
What types of projects can SCP address?
Cities are encouraged to propose a wide range of projects and think of "sustainability" very broadly.
Past projects at similar programs have included designs for open spaces, redevelopment planning and
visioning, waste and stormwater management schemes, transportation connectivity analyses, civic
engagement techniques, strategic communications strategies, bicycle transportation analysis and design,
public art planning, transit -oriented development, industrial byproduct re -use, and master plan designs,
among others. Projects can emanate from a wide variety of city departments, including planning and
development, public works, economic development, parks and recreation, transportation, and public
safety, among others. Examples of projects completed by Oregon's SCYP program can be seen at
https://sci.uoregon.edu/sustainable-city-year-project-portfolio
What are the community/agency benefits of SCP?
New Ideas: Dozens of implementable ideas are generated over the course of the year by students who
draw on a combination of their training, community expertise, and examples of excellence from around
the globe. At the conclusion of each project, students can publicly present their recommendations to the
city and community, and SCP compiles their ideas into a professional report that can be a resource for
community decision making.
Packet Pg. 86
3.3.c
Expanded Conversations & Public Outreach: Students are able to put ideas into the public domain in
politically neutral ways that help advance community conversations and spur the imagination of staff
and the broader community. Because 250+ students are intimately involved in the community over an
academic year, many private, neighborhood, and nonprofit stakeholders become engaged in projects
alongside city and agency staff. Students are able to help `till the soil' and catalyze future sustainability-
oriented projects, policies, and plans.
How much does SCP cost?
The cost of SCP will vary based on the number of city projects and the number of courses working on
each project. At other similar programs, the average cost of a single academic -quarter course targeted at
a single project has been about $7,000. With that as a guideline, expect to incur a total cost of $65,000
to $85,000 to support a yearlong program that includes 9-12 courses, 250+ students, and 16,000+ hours
of effort. In programs elsewhere, cities have funded SCP through their general fund, urban renewal
fund, utility funds, and state and federal grants, as well as with partnerships involving school districts,
utility districts, and private businesses.
How much staff time does SCP involve?
The success of the SCP partnership relies in part on the engagement of the partner city. The city will
need to provide a lead coordinator (typically 0.25 FTE for 15 months), as well as a city contact for each
course, who typically would spend one day each two weeks (i.e., 0.1FTE) for the duration of the
quarter -long course. SCP employs a dedicated project manager to coordinate among all the faculty and
students and to act as a main point of contact for the city.
What do people say about similar programs in other cities?
"That project would not have happened without the students,' says Linda Norris, Salem's
city manager.... `I was concerned about how we were going to achieve a number of goals we
had set with the limited resources we had.' The students propelled them forward more
than three years, she says, helping design new energy -efficient street lights, bicycle lanes, park
signage and new uses for the wastewater treatment plant that saved the city $400,000. —
Financial Times 09.12.2012
" `Students can stretch, be creative and generate ideas we might not think of to get the
discussion going,' said Brian Martin, an associate planner for the City of Gresham. We want
to take advantage of that brainpower.' " — Oregon Daily Emerald, 11.05.2009
SCYP is "perhaps the most comprehensive effort by a U.S. university to infuse
sustainability into its curricula and community outreach." — New York Times 08.23.2010
How do we get started with our application?
Let us know that you are interested! Contact the Sustainable Cities Partnership at 360-650-3824 or
SCP@wwu.edu and we'll send application materials. Visit the website at www.wwu.edu/scp
2. Complete an application for the 2016-2017 SCP cycle. We'll work with you as you develop it.
SCP staff can help describe the program to proposal teams, city decision makers, and co -applicants.
We are available to help brainstorm interdisciplinary project ideas and answer questions about the
program. SCP is about developing strong partnerships between universities and communities and
the more we work together during the application process, the better the projects will be
3. Submit the completed application via email to SCP(a,wwu.edu by April 29, 2016. SCP will review
applications and select the `16-` 17 partner by May 15, 2016.
Packet Pg. 87
3.3.d
Sustainable Cities
AWC Partnership
WESTERNIALAII!1i,�
WASHINGTON UNIVERSITY Application Instructions for
2016-17 Academic Year
Summary
The Sustainable Cities Partnership (SCP) at Western Washington University (Western) is now
accepting applications from cities to be the partner for the academic year beginning September
2016, the inaugural year for SCP. The selected partner will benefit from thousands of hours of
effort by Western students and faculty members, from a variety of disciplines, working to
advance the city's sustainability projects. Additional benefits will be derived from the
involvement of the Association of Washington Cities (AWC), Western's partner in the launch
of the SCP program. While new at Western, our SCP program is based upon proven models at
the University of Oregon, University of Michigan, and San Diego State, and is built on the
academic strengths of Western, as well as the relationship with and involvement of AWC. The
partner city must support the effort through staff time and the payment of a fee. The selection
process is competitive, and the deadline for applications is April 29, 2016.
Overview of Program
SCP is a yearlong partnership between Western's Office of Sustainability, AWC, and one partner
city in Washington. The program engages Western's students and faculty on sustainability and
livability projects chosen in collaboration with the partner. The SCP faculty and students work
through a variety of studio and service learning courses, thus providing students with experience
tackling the city's real -world projects. Many courses/projects will involve fieldwork, so a partner
city will typically be within a two-hour drive of Western. Students bring energy, enthusiasm, and
innovative approaches to difficult, persistent problems. SCP's primary value derives from
collaborations resulting in on -the -ground impact and forward movement for a community ready
to transition to a more sustainable and livable future. AWC will be an active partner in the launch
of SCP, helping to solicit partner cities and to communicate the value of this effort to other
elected and appointed municipal officials throughout the state. AWC will also help with the
ongoing communication needs of the partner city and can help draw upon resources and skills of
other entities in the region.
Potential SCP Projects
The concept of sustainability applies not only to municipalities of all sizes, but also to a broad
spectrum of disciplines. Urban planning is a discipline with a clear relationship to sustainability,
and Western has years of experience collaborating with the City of Bellingham on urban
projects. Our Urban Transitions Studio course has developed concepts for Bellingham since
2010 in the areas of planning and transportation. But many other disciplines taught at Western
also relate to sustainability, as seen in the list below
• Urban Planning Studios (4). Land use planning for neighborhood/district. Redevelopment
planning. Transit -oriented planning. Open space planning. Transportation modal
connectivity. Incorporation of principles of sustainability into land use plans. Incorporation
of methods of disaster reduction into long range plans.
• Spatial Analysis. Development of GIS datasets either from existing datasets or from GPS-
based field data. Analysis of datasets (land cover, land use, critical areas buffers, etc.)
Facility inventory (e.g., stormwater system) and mapping.
• Environmental Policy. Investigation of issues related to environmental justice (e.g., noise
or air pollution impacts correlated to social and economic class), food justice.
Packet Pg. 88
3.3.d
• CommunicationslJournalism. Development of materials for a public relations campaign
(including survey research that underpins a campaign). Development of a video/film
promoting a topic/program.
• Computer science. Development of both user- and server -side portions of web -based
database application that handles a specific need (e.g., compilation of public comments
related to a proposal). Development of a mobile app (e.g., routes and times for a transit
system).
• Marketing. Use of analytics for program analysis or development (e.g., Is there a market
for a swimming pool? Where should a new park be built?). Can include focus
groups/surveys/ethnographic studies, in addition to analysis of existing data.
• Sociology /Anthropology. Exploration of cultural issues via surveys, interviews, other
methods. What are a community's attitudes regarding sustainability? Why does a given
ethnic group not take advantage of a particular program? What are the needs of a subset of
the city's population?
• Community Health/Recreation. Analyze health of a population; gain an understanding of
health dynamics. Promote health equity through advocacy. Analyze community
assets/opportunities/barriers to improve recreation service provision to marginalized
communities.
• Environmental Science. Ecosystem restoration planning. Environmental impact
assessment.
• Design. Wayfinding signage. Interpretive signage.
• Energy. Analysis of carbon footprint of an operation center or a geographic region.
Analysis of building retrofit opportunities. Lifecycle net energy analysis.
We've provided examples of projects possible within each discipline, but applicants should
generalize from those examples, thinking first of the issues/problems facing the city, and then
imagining how a given discipline/course could be brought to bear. Also, multiple disciplines/
courses can focus upon a single issue—e.g., a spatial analysis course can interact with a land
use planning course; a sociology course that conducts a community survey can interact with a
journalism course that designs a public relations campaign.
In an appendix, please find a list of many projects completed by the University of Oregon's
program of a type that could be undertaken by Western's SCP. The list shows the diverse ways
in which a university can assist a city in the achievement of its goals, and it might help you
develop project concepts that could be included in your application.
Proposing Projects
Partners are strongly encouraged to discuss their proposed projects with SCP during
preparation of the application —this interaction helps produce a project list that best matches
Western's capacity with the partner's goals. Successful development of a project list is a
dialogue that includes: (1) the partner proposes a list of projects; (2) SCP and the partner
discuss modifications to the proposed projects to match the projects' scope and scale with
availability and interest of Western courses and faculty; and (3) SCP suggests additional
projects, based on the university's capacity, that could meet the partner's sustainability and
livability goals. We suspect that you are unfamiliar with the wide range of university faculty
expertise available, so we encourage you to think creatively when developing project ideas.
During development of your application, SCP staff can be reached by email at
SCP(a,wwu.edu or at 360-650-3824 (Office Hours: 8:00—11:30, Mon — Fri)
Packet Pg. 89
An SCP partner should have the staff and funding capacity to support at least nine selected
projects, but an application should include a list of 15 to 20 proposed projects, since not all
projects will be suitable for matching with university courses. An individual project's timeline
must not exceed nine months and should ideally be compatible with Western's three 11-week
academic terms: fall (September- December), winter (January -March), and spring (April -June).
NOTE: Partners may collaborate with neighboring entities (e.g. cities, counties, special
purpose districts, NGOs, business or professional organizations, private funders, or research or
educational institutions) to formulate projects and share costs.
Upon selection of the partner, SCP and the city will develop a scope of work for each project,
detailing the problem statement, potential directions for student exploration, expected
outcomes, deliverables, activities, and the corresponding financial obligation.
Benefits of SCP to the City Partner:
SCP provides numerous benefits for the partner. The partner can expect:
• Concept plans and designs that can energize staff and community members around projects
tied to partner goals. Students can explore and innovate in directions that are sometimes
unavailable to partner staff or consultants due to constrained project budgets or political
conditions.
• A high rate of return on investment, with thousands of hours of student work on projects.
• Increased energy and enthusiasm among residents and partner staff, and greater support
from residents for proposed solutions, through student outreach in your area.
• Robust proposals that can spark community and staff discussions, increase the breadth of
conversations around projects, as well as help to get "stuck" projects moving.
• Increased publicity and an improved reputation as a forward- thinking, sustainable
organization. SCP project results can help you clarify, understand, and apply sustainability
and livability principles.
• An interdisciplinary group of faculty experts with first-hand knowledge of innovative
research and practices.
• Interested students, with on -the -ground knowledge of your area, who may serve as
candidates for future internships and staff positions.
• Students often turn out to be informal ambassadors for the partner, describing their
successful collaborations with the partner in presentations, community meetings, future
academic courses, and job interviews.
• A student journalist who will generate press releases, project reports, human -interest
stories, and related content on a bi-weekly basis for your local media and our news outlets.
The regular, positive press coverage will help to frame your organization to your
constituents as progressive and forward thinking.
Expected Cost to a Partner City: Fee, Staff Involvement
The fee for participation in SCP is designed to recover direct program costs —no indirect
charges or overhead are included. The cost therefore varies based on the number of projects,
number of academic courses, and level of student activity in each course. At other
universities, the average cost of a single course working on a single project has been about
$7,000. With that as a guideline, the partner should expect to pay roughly $65,000 to support
a yearlong program including 9 projects, $85,000 to support a program of 12 projects, etc. We
recognize that budgets are tight; at programs elsewhere in the U.S., cities have collaborated
with other groups, including special purpose districts, private developers, business partners,
and chambers of commerce, in order to defray costs.
Packet Pg. 90
3.3.d
Services covered by the fee include coordination support from SCP staff; student and faculty
site visits to the city; compilation, printing, and distribution of high -quality final reports;
publicity and hosting of events; student -created materials for display; coordination of contact
with media (utilizing Western's Office of Communications); and electronic versions of reports
produced by students (which will also be permanently availed via Western's Libraries).
A key element of a successful SCP program is partner involvement—SCP projects will be
successful only with city staff participation. Such participation falls into three categories:
• The partner must have a program champion, preferably a person with sufficient seniority
to direct and motivate city staff to actively engage in the partnership.
For each chosen project, the partner must identify a specific person to serve as the Point of
Contact (POC) for SCP faculty and students. Research from other universities' programs
shows that during each academic quarter in which a project is ongoing, the POC spends
about one full day every two weeks (about 0.1 FTE) preparing background materials,
accompanying students on site visits, and participating in reviews and presentations of
student work. Also, before the start of the academic year, the POC needs to compile and
provide relevant documents, including but not limited to, prior concept plans, vision
documents, architectural renderings, computer -aided drawings, GIS maps and layers,
community datasets, and aerial photographs.
The partner must also identify a staff person who will be its program coordinator, serving
as main liaison between the city and SCP. The coordinator should be involved enough in
each project to know the staff and faculty involved and to understand the project's scope
and current status. The coordinator's time commitment will vary based upon the number
of projects --data collected from Oregon's program in 2010-2011 showed that Salem's
coordinator averaged 15-20 hours per week for about 15 months to coordinate 28 courses
working on 16 projects. A smaller number of courses and projects would entail a smaller
burden on a coordinator.
Application Components
Your SCP application should be emailed to SCP ,wwu.edu and should include the following:
Organization Information. Provide the city's name and the name and contact information
(e-mail, phone, mailing address, department, and staff role) of the primary contact person
for your application. Please include a list of co -applicant organizations (if any) and briefly
describe their roles in the partnership.
Project Summary List. Provide a list of your proposed projects. This summary should
briefly describe each project in a paragraph, including the project's sustainability impacts
and the designated staff POC for the project.
Example project summary: Plan and design environmentally friendly
re -use and redevelopment of a public housing site in a way that
integrates an adjacent affordable housing complex, a sustainable
stormwater management system, infill development, and the
community at large. Sustainability impact: economic development,
active transportation, and water quality. Staff contact: Jane Doe,
Economic Development Department.
Letters of Support. Include letters of support from the city mayor / manager, the city
council, the council and mayor / manager of co -applicant organizations (if any), and other
funding partners, where applicable. If you have a sustainability action plan, strategic plan,
or other adopted document showing the partner's commitment to sustainability, you
should include or reference this document in your application.
4
Packet Pg. 91
3.3.d
Appendix with Project Details. Provide details for each project in an appendix. We
suggest including a map showing the project site (if applicable), a narrative description of
the project's goals, sustainability issues addressed by the project, specific problems that
students may be able to address, and suggested deliverables from the SCP courses. Also
include information about the staff involved in the project, potential funding sources, and
the role of partner organizations (if any).
Application Evaluation Criteria
SCP will evaluate applications based on the following criteria:
• Top -Level Support: City Mayor / Manager and elected officials indicate willingness to
direct staff to provide resources, devote time, and participate in SCP projects.
• Sustainability: Projects include specific sustainability goals, such as (but not limited to)
reducing greenhouse gas emissions, fostering active transportation, improving social
equity, increasing housing density/mix, improving urban form, reducing energy use, or
redeveloping existing structures or sites.
• Financial Support: The partner's cost for SCP will range from $65,000 to $85,000 to
support 9 to 12 projects. While we do not ask for a formal commitment of funds at this
time, it would be helpful to include a statement in your application indicating expected
sources of funding.
• Real Impact: Projects directly relate to your goals and will have a measurable positive
impact on the community. Describe how you will measure the success of SCP projects and
monitor progress after the year is over.
• Academic Calendar and Logistics: Projects are compatible with the Western academic
calendar of three 11-week terms. Some projects may be complex enough to involve
multiple courses over two or three terms. For partners more than two hours' travel time
from Bellingham, describe any special arrangements to address issues of collaboration and
coordination.
• Faculty Match: Projects must be within the capability of SCP faculty and students. SCP
will identify faculty who are able and willing to carry out projects based on curricular and
research needs and interests. Coordinating with SCP as you develop your project list will
help ensure a strong faculty match.
• External Organization Support: Projects that involve other organizations, such as
transportation districts, school districts, nonprofit organizations, business or professional
organizations, or research or educational institutions, should indicate how these
partnerships would function.
Contact Information for Springfield, Salem, and Medford
The coordinators for Oregon's SCYP partnerships with Springfield, Salem and Medford have
generously offered to answer questions about their experience with SCYP, which is the model
for Western's new SCP program.
City of Springfield: Courtney Griesel, Senior Management Analyst.
541-736-7132, c rig iesel(a�springfield-or.gov
• City of Salem: Courtney Knox Busch, Strategic Initiatives Manager.
503-540-2426, cknox(acityofsalem.net
• City of Medford: Jim Huber, Planning Director.
541-774-2381, jim.huber(acityofinedford.org
Packet Pg. 92
3.3.d
Timeline: Application Process
February 16, 2016: Application packet available. SCP opens the application process that
will lead to selection of a partner for the 2016 — 2017 academic year. Read the packet and
develop initial questions/thoughts to bring to an information session.
March 2 and 3, 2016: SCP hosts information sessions to provide a general description of
the program, field initial questions, and begin discussions of possible city projects. North
session is on the Western campus in Bellingham at 10:00 a.m. on March 2. South session
is in Everett at 1:30 p.m. on March 3. See our website for details of location/parking.
March 1 to April 29, 2016: SCP staff available by phone, by email, and in person to
discuss potential projects with applicants. SCP office hours are 8:00 to 11:30, Monday
through Friday. Applicants are strongly encouraged to interact with SCP during the
development of an application. SCP staff are also available for presentations to
stakeholders at the city (e.g., city council, potential co -applicant entities).
April 29, 2016: Applications due to SCP. An electronic version should be emailed to
SCP(-,wwu.edu
Timeline: SCP'16-'17 Program
May 16, 2016: Partner chosen. SCP and the partner will coordinate media to announce
the selection.
May -June 2016: SCP and the partner match proposed projects with academic courses and
faculty. SCP and partner develop and sign master contract.
Summer 2016: SCP and partner develop scope of work documents (which become
appendices to the master contract) for each project and course. SCP staff and faculty meet
with partner staff and local professionals. City staff provide background information and
documents for projects.
Fall 2016: SCP kick-off event. Fall term classes work on SCP projects.
Winter 2017: Winter term classes work on SCP projects. Fall term written reports
delivered to the partner.
Spring 2017: Spring term classes work on SCP projects. Winter term written reports
delivered to the partner.
May 2017: SCP 2016-17 wrap-up celebration, hand-off to the 2017-18 partner.
Summer 2017: Spring term written reports delivered to the partner
Additional Information
For additional information about SCP and this application process, please refer to SCP's web
site, www.wwu.edu/scp
6
Packet Pg. 93
3.4
City Council Agenda Item
Meeting Date: 05/3/2016
Award of Tourism Grants to Edmonds Center for the Arts and Edmonds Waterfront Festival
Staff Lead: Patrick Doherty
Department: Economic Development
Preparer: Patrick Doherty
Background/History
The Council -approved 2016 budget and work plan for use of the General Tourism Promotion funds
(Fund 120), as originally recommended by the Lodging Tax Advisory Committee (LTAC), includes
disbursement of funds to several organizations involved in events, programs or venues that bring
visitors or promote visits to Edmonds. (See attached 2016 LTAC Budget Detail for reference.) City
Council considered this item at its 4/26/16 regular meeting and forwarded it for approval as a Consent
Agenda item on the 5/3/16 meeting.
Staff Recommendation
Approve grant of $2,500 to Edmonds Center for the Arts for promotion of the 10th Anniversary
"Birthday Bash" and $1,000 to the Edmonds Noon Rotary Club for an advertising "bus wrap" to promote
the 2016 Edmonds Waterfront Festival on Consent Agenda.
Narrative
In addition to the Council -approved budget and work plan cited above, this year two organizations
submitted applications to the LTAC for smaller grants to help promote two specific events: the Edmonds
Center for the Arts and the Edmonds Noon Rotary Club.
The Edmonds Center for the Arts requests $2,500 to help fund marketing and advertising for their
upcoming 10th Anniversary "Birthday Bash" on Saturday, July 30th.
The Edmonds Noon Rotary Club requests $1,000 to help fund a CT advertising "bus wrap" to help
promote the Edmonds Waterfront Festival, scheduled this year from Friday June 3rd through Sunday
June 5th.
After review and deliberation, the LTAC members voted to recommend to Council approval of the two
grant requests, citing as justification the potential that enhanced advertising for both events would
attract a greater number of visitors to Edmonds. Funds to cover these two expenditures, totaling
$3,500, would come from a reappropriation of the $3,000 earmarked for support for the RevitalizeWA
Conference (which was not awarded to Edmonds this year), plus an additional $500 from the ending
fund balance, which is projected to total over $74,000 by the end of 2016.
The full applications from both organizations, as well as the Council -approved 2016 Tourism Budget, are
attached for your reference.
Packet Pg. 94
3.4
Attachments:
2016 Tourism Grant Applications
LTAC_ B u d get_Deta i I_2016_
Packet Pg. 95
3.4.a
1
I ff S/4f , i
L'
e(:a
edmonds center for the arts
March 4, 2016
Cindi Cruz - Lodging Tax Advisory Committee
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020
Request for support — Edmonds Center for the Arts Birthday Bash!
Dear Cindi,
Edmonds Center for the Arts will launch our 2016-17 Season in September, 2016. The season represents
our 10-year Anniversary: 10 years of celebrating the performing arts, ensuring access to the arts, and
strengthening and inspiring our community both locally and regionally.
Birthday Bash: Saturday, July 30, 2016, 3 — 9 pm
ECA is planning an event to thank all those who have made our first 10 years so successful. The Birthday
Bash will be a free, 6-hour event featuring performances, workshops, food, and fun for theater
enthusiasts and supporters of all ages. Modeled after our proven KidStock! event which drew 3,000
children and family visitors this past January, we expect to welcome several thousand guests from
Edmonds and beyond. Experience tells us that Edmonds Center for the Arts is a regional destination.
We are confident that this birthday party will provide a strong draw for our many patrons and
supporters as well as summer fun -seekers across the area.
The event will be promoted through media, the ECA website and at the Edmonds July 4 Parade.
We are requesting support from the lodging excise tax fund in the amount of $2500 for this event.
As a reminder, the ECA Audience Profile is broad in scope and reach:
• More than 65,000 people attend events at ECA annually.
• ECA events draw 58% of attendees from outside the Greater Edmonds area; 17% are from the city of
Seattle alone.
• Our core audience is aged 35 and older.
• Our Education and Outreach programs increase ECA's accessibility to individuals of diverse ages,
abilities, and cultural and socioeconomic backgrounds.
• ECA audiences and supporters include prominent business and community leaders, theater
enthusiasts, subscribers, donors and active community volunteers.
The required Lodging Tax Expenditure Appli � a-PemH- ; attached. We appreciate your consideration
of this request and are happy t i e additional information if needed.
I ly,
DevWoment Director
Edmonds Center for the Arts
Direct: 425-275-9485 / Karen@ec4arts.org
Edmonds Center for the Arts
410 Fourth Avenue North I Edmonds, WA 98020
tel 425.275.4485 1 fax 425.275.4487
edmondscenterforthearts.org
Packet Pg. 96
3.4.a
Lodging Tax Expenditure Application Form
City of Edmonds Lodging Tax Advisory Committee (LTAC)
Estimated Event or Tourism Activity
NOTE It is very important that you fill this application out as completely as possible to ensure you are eligible to receive Tourism
Promotion Funds supported through Lodging Tax now and in the future! The City of Edmonds is required to provide the
information below from your Final Report to the State. Please plan now how you will collect this information. Questions? Call 425-
775-7724
1, Organization: Edmonds Center for the Arts
2. ActivitylEvent Name: 10' Anniversary Birthday Bash
3. Activity Type(check one): Event/Festival x Marketing or Facility(acquisition, upkeep, renovation)
4, Start Date: July 30, 2016 End Date: July 30, 2016
S. Total Lodging Tax Funds Requested: $ 2,500
6. Total Activity/Event Estimated Cost: $15,000
Estimated Attendance Information
7. Overall Attendance: Enter the total number of people predicted to attend this activity and select the method used to determine the
attendance.
Predicted: 3500
Method: direct count____-, indirect count_ representative survey_____, informal survey-----, structured
estimate xx, other______, N/A . Please explain:
8. Attendance, 50+ miles: Enter the number of people who travel greater than 50 miles predicted to attend this activity and select the
method used to determine the attendance.
Predicted: 700 (20%)
Method: direct count___---, indirect count_ , representative survey______, informal survey------, structured
estimate xx, other_ N/A . Please explain:
9. Attendance, Out of State, Out of Country: Enter the number of people from outside the state and country predicted to attend
this activity and select the method used to determine the attendance.
Predicted: 3S (1 %)
Method: direct count-----, indirect count--, representative survey____, informal survey structured
estimate xx, other—____, N/A . Please explain:
10. Attendance, Paid for Overnight Lodging: Enter the estimated number predicted to attend this activity and pay for overnight
lodging and select the method used to determine the attendance.
Predicted: 10 - IS
Method: direct count . indirect count_ , representative survey____, informal survey----, structured
estimate xx, other N/A . Please explain:
11. Attendance, Did not pay for overnight lodging: Enter the number predicted to attend this activity without paying for overnight
lodging and select the method used to determine the attendance.
Predicted: 3485
Packet Pg. 97
3.4.a
Method: direct count , indirect count__, representative survey----, informal survey-----, structured
estimate roc, other_ , N/A . Please explain:
12. Paid Lodging Nights: Total estimated number of paid lodging nights. One lodging night = one or more persons occupying one room
for one night.
Predicted: 5-7
Method: direct count . indirect count , representative survey______, informal survey__----, structured
estimate roc, other_______, N/A . Please explain:
Additional Notes: Please provide any additional information regarding the impact of the festival, events, or tourism -related facility
using lodging tax funds:
Please see attached letter for additional detail about this event and request.
Submitted by: Karen Crowley, Development Director
Date: March 4, 2015
E-mail: Karen@ec4arts.org
Phone M 425-275-9485
Packet Pg. 98
3.4.a
March 8, 2016
City of Edmonds
Lodging Tax Advisory Committee
RE: Edmonds Noon Rotary Club Grant Application
Dear Committee,
We represent the Edmonds Noon Rotary Club and are submitting the attached grant application
requesting $1,000 to help purchase a "bus wrap" for one Community Transit bus for two weeks.
The bus wrap would be used as a promotional tourism tool to attract tourist to the annual
Edmonds Waterfront Festival.
To give you an idea what a "bus wrap" is; the bus wrap is the advertising banner that Community
Transit buses use for advertising and promoting locals events in the Puget Sound region.
The Edmonds Noon Rotary Club promotes, produces and hosts the Waterfront Festival each year
with the help of approximately 250 volunteers.
The 29t" Annual Edmonds Waterfront Festival will run the weekend of June 3rd through June 5tn
and is open to guests starting Friday the 3rd at 3:00 pm to 10:00 pm, Saturday 11:00 am — 10:00
pm and Sunday from 11:00 am to 7:00 pm. The Waterfront Festival attracts over 20,000 visitors
to Edmonds each year. During last year's festival, we conducted an informal poll of arriving
guest, and found that approximately 75% of the guests live outside the City of Edmonds.
Additionally, the Festival is served by 175 vendors, of which 155 of them came from outside the
City of Edmonds. Of the 155 vendors traveling to Edmonds, 70 came from over 50 miles away
from Edmonds, and of these some vendors came from as far away as eastern Washington
Oregon, Montana and Arizona.
Lastly, the Waterfront festival benefits the Edmonds Noon Rotary Club by providing our clubs
major source of income that help us fund several of our programs. Examples include College
Scholarships, Edmonds Food Bank donations, and transitional housing that provides a safe home
for women and children who are transitioning from a crisis situation.
We appreciate your consideration.
r
Sincerely,
Valerie Claypool
Director of Waterfront Festival
Packet Pg. 99
3.4.a
Lodging Tax Expenditure Application Form
City of Edmonds Lodging Tax Advisory Committee (LTAC)
Estimated Event or Tourism Activity
NOTE: It is very important that you fill this application out as completely as possible to ensure you are eligible to receive Tourism
Promotion Funds supported through Lodging Tax now and in the future! The City of Edmonds is required to provide the
information below from your Final Report to the State. Please plan now how you will collect this information. Questions? Call 425-
775-7724
2.
3.
Activity Type(check one): Event/Festival_,�Q--Marketing or Facility(acquisition, upkeep, renovation)
4.
Start Date:��.. ZC��, la End Date:A
S.
Total Lodging Tax Funds Requested: $ t' 1 n - r(� -
_
6.
Total Activity/Event Estimated Cost:
Q
Estimated Attendance Information
7.
Overall Attendance: Enter the total number of people predicted to attend this activity and select the method used to determine the
attendance.
E
Predicted:
o
Method: direct count , indirect count ���, representative survey informal survey structured
t—
estimateother N/A Please explain:
J
N
l
8.
Attendance, 50+ miles: Enter the number of people who travel greater than 50 miles predicted to attend this activity and select the
c
method used to determine the attendance.
r
Predicted: 5 �!
Q
Q
Method: direct count , indirect count representative survey informal survey ,structured
c
estimate , other NIA Please explain: J
t,
C+jMA
L
9.
Attendance, Out of State, Out of Country: Enter the number of people from outside the state and country predicted to attend
c
this activity and select the method used to determine the attendance.
H
co
Predicted:
r
Method: direct count , indirect count,, representative survey____, informal survey____, structured
estimate other ,-, N/A Please explain: �\ t tJ��` J Q �\� W u
r
Q
10.
Attendance, Paid for Overnight Lodging: Enter the estimated number predicted to attend this activity and pay for overnight
lodging and select the method used to determine the attendance. S
Predicted: j
Method: direct countindirect count representative survey informal survey____, structured
estimate , other N/A Please explain:
11. Attendance, Did not pay for overnight lodging: Enter the number predicted to attend this activity without paying for overnight
lodging and select the method used to determine the attendance.
Predicted:.: 7C5
Packet Pg. 100
3.4.a
Method: direct count______, indirect count_ representative survey , informal survey , structured
estimate , other N/A Please explain:
12. Paid Lodging Nights: Total estimated number of paid lodging nights. One lodging night = one or more persons occupying one room
for one night
Predicted: r cry--
Method: direct count , indirect coum CC representative survey____, informal survey_____, structured
estimate , other , N/A . Please explain:
Additional Notes: Please provide any additional information regarding the impact of the festival, events, or tourism -related facility
using lodging tax funds:
1 r l
Submitted by: ; ' 0,�
Date: Y\V 1 C7,<Q—V-" U
E-mail: 1 V 1JU , l . �_',p YY
Phone
Packet Pg. 101
3.4.b
Approved 2014
Budget
Approved 2015
Budget
Year -to -Date 2015
Approved 2016
Budget
Year -to -Date 2016
Revenue
75% Fund 120 - General Tourism Promotion $54,000 $67,500 $80,161 $81,750 $81,750
25% Fund 123 - Arts/Culture Tourism Promotion $18,000
Total Lodging Tax Reven
120 Fund
Beginning Fund Balance $106,736
$22,500 $26,720 $27,2501
$106,881 $109,000
$27,250
$109,000
$112,841 $133,991
$142,461
$142,461
75% Fund 120 - General Tourism Promotion Revenue $54,000
$67.500 $80,161
$81,750
Interest $140
Total: $160,87
$175 $1, 090
$180,516 $215,242
$400
1 $224,611
1 $142,461
ON -GOING EXPENDITURES
Contingency**
$2,575
General Tourism Promotion (Fund 120):
Printing/distribution of rack card
$6,000
$6,000
$4,240
$7,500
$3,121
Promotion/support of Bird Fest
$1,500
$2,500
$1,871
$1,500
Sno Co Tourism Bureau
$6,000
$6,000
$6,000
$6,000
Edmonds Visitor's Center
$2,500
$2,500
$2,500
$2,500
General Advertising
$21,000
$21,000
$16,610
$25,000
Edmonds Center for the Arts Season Brochure Ad
$12,500
$12,500
$12,500
$12,500
Miscellaneous - Design, photography, emerging opportunities
$500
$500
$1,638
$2,575
Transfer to Fund 117 for arts promotion CRAZE etc.
$4,000
$4,000
$4,000
$4,000
Tourism Promotion/Website/Calendar Support
Subtotal:
Fund 120 Subtotal
$12,000
$54,000 $67,000
$106,876 $113,516
$12,000 $18,000
$61,358 $82,150
$153,885 _d= $142,46
$3,000
$6,121
$136,340
ONE-TIME EXPENDITURES
Support for Restroom Construction
$60,000
Support for RevitalizeWA Conference
$3,000
$3,000
Log Cabin Maintenance (2016)
$4,500
**Note: To Account for less than projected revenue and/or minor additional expenditures in approved line items
61
$136, 340
0
0
N
m
E
s
a
Packet Pg. 102
3.4.b
Approved 2014
Budget
Approved 2015
Budget
Year -to -Date 2015
Approved 2016
Budget
Year -to -Date 2016
123 Fund
Beginning Fund Balance $70,429 $75,297 $77,645 $80,760 $80,760
25% Fund 123 - Arts/Culture Tourism Promotion
$18,000
$22,500
$4,707
$27,250
Sale Maps/Books
$100
$150
$14
$30
Interest
$100
$250
$227
$250
Total:
$88,629
$98,197
$82,593
$108,290
$80,760
On -going Expenditures:
Art/Culture Tourism Promotion Grants:
Cascade Symphony
$1,700
$2,000
2000
$2,000
EAF for Art Studio Tour
$800
$1,000
1000
$1,000
Edmonds Arts Festival
$1,000
Sno-King Chorale
$1,000
$1,500
1500
$1,500
DeMiero Jazz Festival
$2,000
$2,000
$2,000
$2,000
Olympic Ballet Theater
$2,000
$2,000
2000
$2,000
Driftwood Theater
$2,000
$2,000
2000
$2,000
Phoenix Theater
$1,500
1500
$1,500
Art Walk
$750
Cascadia Art Museum
$750
Write on the Sound
$5,000
$7,200
$1,715
$8,000
Cascade Symphony
$1,500
Edmonds Historical Museum
$1,500
Jazz Connection
$2,000
Promotion of public art/brochure
$2,000
$2,000
Concerts in the Park (new banner)
$1,000
Subtotal tourism promotion grants:
$14,500
$21,200
$13,715
$30,500
$0
Miscellaneous Ad's
$250
1000
Subtotal: Expenditures
$14,500
$21,200
$13,965
$31,500
$0
Fund 123 subtotal
ONE-TIME EXPENDITURES
***Supplement of potental future events
$4,250
0
0
N
m
E
s
a
Packet Pg. 103
3.4.b
Approved 2014
Budget
Approved 2015 Approved 2016
Year -to -Date 2016
Budget Year -to -Date 2015 Budget
0
0
N
a
Packet Pg. 104
3.5
City Council Agenda Item
Meeting Date: 05/3/2016
2016 1st Quarter Budget Amendment
Staff Lead:
Department: Administrative Services
Preparer: Debra Sharp
Narrative
There are a total of 19 budget amendments.
Three of the amendments are carryforward requests from unexpended 2015 budgets. The carryforward
budget amendments include the Highway 99 Subarea Plan, Critical Area Regulation Update and the
Development Code Rewrite.
There are three items that have previously been discussed by Council. They include the public defense
contract, the Veterans Plaza and a canopy for the propane dispenser.
There are eleven new budget amendments. There are five General Fund budget amendments. Four of
the five amendments reduce the General Fund ending fund balance by $62,445. They include a decision
package for the SAW reimbursement, the Planning Board videotaping services, back -fill for a planner's
extended leave, and the Marina Beach Park environmental testing. The 5th decision package is an
increase to the Economic Development professional services line item. This decision package is offset by
contributions and fees received to cover the expenses. There are two park projects requesting
additional dollars from REET in the amount of $91,933. There are three street construction projects that
are offset by additional grant revenue and one request for the Sewer Fund.
Two additional budget amendments have been added since the 1st Quarter Budget Amendment was
submitted to Council. The first one is for additional funding for the Downtown Restroom and the
second is for additional funding for the Asset Management Mobile Field Conversion.
Staff recommends that Council adopt Ordinance No. XXXX approving the 2016 First Quarter Budget
Amendment.
Attachments:
1st Quarter Budget Amendment Ordinance
Packet Pg. 105
3.5.a
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON,
AMENDING ORDINANCE NO. 4019 AS A RESULT OF UNANTICIPATED
TRANSFERS AND EXPENDITURES OF VARIOUS FUNDS, AND FIXING A
TIME WHEN THE SAME SHALL BECOME EFFECTIVE.
WHEREAS, previous actions taken by the City Council require Interfund
Transfers and increases in appropriations; and
WHEREAS, state law requires an ordinance be adopted whenever money is
transferred from one fund to another; and
WHEREAS, the City Council has reviewed the amended budget appropriations
and information which was made available; and approves the appropriation of local, state, and
federal funds and the increase or decrease from previously approved programs within the 2016
Budget; and
THEREFORE,
WHEREAS, the applications of funds have been identified;
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO
ORDAIN AS FOLLOWS:
Section 1. Section 1. of Ordinance No. 4019 adopting the final budget for the
fiscal year 2016 is hereby amended to reflect the changes shown in Exhibits A, B, C, D, E, and F
adopted herein by reference.
Section 2. Effective Date. This ordinance, being an exercise of a power
specifically delegated to the City legislative body, is not subject to referendum, and shall take
I
Packet Pg. 106
3.5.a
effect five (5) days after passage and publication of an approved summary thereof consisting of
the title.
ATTEST/AUTHENTICATE:
CITY CLERK, SCOTT PASSEY
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
M.
JEFF TARADAY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
PUBLISHED:
EFFECTIVE DATE:
ORDINANCE NO.
APPROVED:
MAYOR, DAVE EARLING
2
Packet Pg. 107
3.5.a
SUMMARY OF ORDINANCE NO.
of the City of Edmonds, Washington
On the day of , 2016, the City Council of the City of Edmonds,
passed Ordinance No. A summary of the content of said ordinance, consisting
of the title, provides as follows:
AN ORDINANCE OF THE CITY OF
ORDINANCE NO. 4019 AS A RESULT
EXPENDITURES OF VARIOUS FUNDS,
SHALL BECOME EFFECTIVE.
EDMONDS, WASHINGTON, AMENDING
OF UNANTICIPATED TRANSFERS AND
AND FIXING A TIME WHEN THE SAME
The full text of this Ordinance will be mailed upon request.
DATED this day of ,2016.
CITY CLERK, SCOTT PASSEY
3
Packet Pg. 108
EXHIBIT "A": Budget Amendment Summary (April 2016)
3.5.a
FUND
NO.
FUND
DESCRIPTION
2016
BEGINNING
FUND BALANCE
REVENUE
EXPENDITURES
2016
ENDING
FUND BALANCE
001
GENERAL FUND
6,601,702
39,276,670
40,929,107
4,949,265
009
LEOFF-MEDI CAL INS. RESERVE
538,960
278,770
279,480
538,250
011
RISK MANAGEMENT RESERVE FUND
951,820
6,660
-
958,480
012
CONTINGENCY RESERVE FUND
4,680,340
28,110
800,000
3,908,450
013
MULTI MODAL TRANSPORTATION FD.
56,020
-
-
56,020
014
HISTORIC PRESERVATION GIFT FUND
970
5,000
5,400
570
016
BUILDING MAINTENANCE
229,850
2,005,000
2,175,000
59,850
104
DRUG ENFORCEMENT FUND
27,530
153,000
76,030
104,500
111
STREET FUND
516,350
1,760,500
1,716,120
560,730
112
COMBINED STREET CONST/I MP ROVE
242,450
8,314,697
8,327,792
229,355
117
MUNICIPAL ARTS ACQUIS. FUND
438,050
102,410
181,380
359,080
118
MEMORIAL STREETTREE
17,900
110
-
18,010
120
HOTEL/MOTEL TAX REVENUE FUND
131,670
82,150
149,650
64,170
121
EMPLOYEE PARKING PERMIT FUND
59,430
21,390
26,880
53,940
122
YOUTH SCHOLARSHIP FUND
16,000
5,550
3,000
18,550
123
TOURISM PROMOTIONAL FUND/ARTS
82,780
27,530
31,500
78,810
125
PARK ACQ/IMPROVEMENT
1,174,702
1,108,000
2,100,565
182,137
126
SPECIAL CAPITAL FUND
1,978,970
1,102,000
2,595,320
485,650
127
GIFTS CATALOG FUND
255,550
46,900
44,950
257,500
129
SPECIAL PROJECTS FUND
38,360
280
-
38,640
130
CEMETERY MAINTENANCE/IMPROV
121,770
177,260
210,370
88,660
132
PARKS CONSTRUCTION
1,286,050
2,552,240
2,775,770
1,062,520
136
PARKSTRUSTFUND
151,640
630
-
152,270
137
CEMETERY MAINTENANCE TRUSTFD
882,510
19,880
-
902,390
138
SISTER CITY COMMISSION
1,510
12,010
12,500
1,020
139
TRANSPORTATION BENEFIT DISTRICT
-
682,500
682,500
-
211
LID FUND CONTROL
-
14,400
14,400
-
213
LI D GUARANTY FUND
101,810
14,400
-
116,210
231
2012 LTGO DEBT SERVICE FUND
-
677,380
677,380
-
232
2014 DEBT SERVICE FUND
-
949,540
949,540
-
421
WATER
20,256,697
8,443,460
12,717,507
15,982,650
422
STORM
13,624,010
4,131,780
7,613,450
10,142,340
423
SEWER/TREATMENT PLANT
50,898,580
12,645,240
17,921,050
45,622,770
424
BOND RESERVE FUND
842,940
1,989,900
1,990,920
841,920
511
EQUIPMENT RENTAL FUND
7,099,240
1,579,570
1,971,820
6,706,990
617
FIREMEN'S PENSION FUND
196,490
64,840
59,610
201,720
Tota Is
113,502,651
88,279,757
107,038,991
94,743,417
It
O
N
v
C
M
C
L
O
C
N
E
C
N
E
Q
N
i�
3
m
L
CD
3
cy
2
N
r
C
N
E
t
v
cC
Q
Packet Pg. 109
EXHIBIT "B": Budget Amendments by Revenue (April 2016)
3.5.a
FUND
NO.
FUND
DESCRIPTION
ORD. NO.
4014
12/18/2015
ORD. NO.
4019
2/19/2016
ORD. NO.
April 2016
2016
Amended
Budget
001
General Fund
$ 39,266,670
$
$ 10,000
$ 39,276,670
009
Leoff-Medical Ins. Reserve
278,770
-
278,770
011
Risk Management Reserve Fund
6,660
6,660
012
Contingency Reserve Fund
28,110
28,110
014
Historic Preservation Gift Fund
5,000
5,000
016
Building Maintenance
1,680,000
325,000
2,005,000
104
Drug Enforcement Fund
153,000
-
153,000
111
Street Fund
1,760,500
-
-
1,760,500
112
Combined Street Const/Improve
5,290,850
2,735,647
288,200
8,314,697
117
Municipal Arts Acquis. Fund
102,410
-
-
102,410
118
Memorial Street Tree
110
110
120
Hotel/Motel Tax Revenue Fund
82,150
82,150
121
Employee Parking Permit Fund
21,390
21,390
122
Youth Scholarship Fund
5,550
5,550
123
Tourism Promotional Fund/Arts
27,530
27,530
125
ParkAcq/Improvement
1,108,000
1,108,000
126
Special Capital Fund
1,102,000
1,102,000
127
Gifts Catalog Fund
46,900
46,900
129
Special Projects Fund
280
280
130
Cemetery Maintenance/Improv
177,260
-
-
177,260
132
Parks Construction
2,037,240
500,000
15,000
2,552,240
136
Parks Trust Fund
630
-
-
630
137
Cemetery Maintenance Trust I'd
19,880
19,880
138
Sister City Commission
12,010
12,010
139
Transportation Benefit District
682,500
682,500
211
Lid Fund Control
14,400
14,400
213
Lid Guaranty Fund
14,400
14,400
231
2012 LTGO Debt Service fund
677,380
677,380
232
2014 Debt Service Fund
949,540
-
949,540
421
Water
8,429,970
13,490
8,443,460
422
Storm
4,131,780
-
4,131,780
423
Sewer/Treatment Plant
12,414,120
231,120
12,645,240
424
Bond Reserve Fund
1,989,900
-
1,989,900
511
Equipment Rental Fund
1,579,570
1,579,570
617
Firemen's Pension Fund
64,840
64,840
Totals
$ 84,161,300
1 $ 3,805,257
1 $ 313,200
1 $ 88,279,757
It
00
N
v
C
M
C
O
C
N
E
C
N
E
Q
N
i�
3
m
N
3
CY
r�
to
r
C
N
E
t
V
fC
a+
Q
Packet Pg. 110
EXHIBIT "C": Budget Amendments by Expenditure (April 2016)
3.5.a
FUND
NO.
FUND
DESCRIPTION
ORD. NO.
4014
12/18/2015
ORD. NO.
4019
2/19/2016
ORD. NO.
0
April 2016
2016
Amended
Budget
001
General Fund
$ 39,733,780
$ 957,500
$ 237,827
$ 40,929,107
009
Leoff-Medical Ins. Reserve
279,480
-
-
279,480
012
Contingency Reserve Fund
800,000
800,000
014
Historic Preservation Gift Fund
5,400
-
5,400
016
Building Maintenance
1,754,000
421,000
2,175,000
104
Drug Enforcement Fund
76,030
-
76,030
111
Street Fund
1,712,370
-
3,750
1,716,120
112
Combined Street Const/Improve
5,311,460
2,728,132
288,200
8,327,792
117
Municipal Arts Acquis. Fund
181,380
-
-
181,380
120
Hotel/Motel Tax Revenue Fund
149,650
149,650
121
Employee Parking Permit Fund
26,880
26,880
122
Youth Scholarship Fund
3,000
3,000
123
Tourism Promotional Fund/Arts
31,500
-
-
31,500
125
ParkAcq/Improvement
1,523,650
484,982
91,933
2,100,565
126
Special Capital Fund
1,934,390
545,930
115,000
2,595,320
127
Gifts Catalog Fund
44,950
-
-
44,950
130
Cemetery Maintenance/Improv
210,370
-
-
210,370
132
Parks Construction
2,100,000
660,770
15,000
2,775,770
138
Sister City Commission
12,500
-
-
12,500
139
Transportation Benefit District
682,500
682,500
211
Lid Fund Control
14,400
14,400
231
2012LTGO Debt Service Fund
677,380
677,380
232
2014 Debt Service Fund
949,540
-
-
949,540
421
Water
12,323,960
389,797
3,750
12,717,507
422
Storm
6,612,170
997,530
3,750
7,613,450
423
Sewer/Treatment Plant
17,172,110
569,190
179,750
17,921,050
424
Bond Reserve Fund
1,990,920
-
-
1,990,920
511
Equipment Rental Fund
1,955,820
16,000
1,971,820
617
Firemen's Pension Fund
59,610
-
59,610
Totals
$98,329,200
$ 7,754,831
$ 954,960
$ 107,038,991
It
00
N
v
C
M
C
L
O
C
N
E
C
N
E
Q
N
i�
3
m
L
CD
V
Y
r
C
N
E
t
V
fC
a+
Q
Packet Pg. 111
EXHIBIT "D": Budget Amendments (April 2016)
3.5.a
Fund Number
Change in
Beginning Fund
Balance
Revenue
Expense
Change in Ending
Fund Balance
001
165,382
10,000
237,827
(62,445)
111
-
-
3,750
(3,750)
112
288,200
288,200
125
-
91,933
(91,933)
126
-
115,000
(115,000)
132
15,000
15,000
421
-
3,750
(3,750)
422
3,750
(3,750)
423
179,750
(179,750)
511
16,000
(16,000)
Total Change
165,382
313,200
954,960
(476,378)
It
00
N
V
C
M
C
L
0
E
E
Q
tM
m
L
CD
V
Y
r
C
N
E
t
V
fC
a+
Q
Packet Pg. 112
3.5.a
EXHIBIT "E": Budget Amendment Summary (April 2016)
Fund BARS Category Debit Credit Pg# Description
Carryforwards
General Fund
001
000
62
558
60
41
00
Professional Services
100,000
9
Hwy 99Subarea Plan
General Fund
001
0001
62
1 558
60
41
00
Professional Services
11,183
10
Critical Area Update
General Fund
001
0001
62
1 524
10
41
00
Professional Services
54,199
�11
Code Rewrite
General Fund
001
0001
1 308
00
0001
00
Beginning Fund Balance
165,382
Previously Discussed by Council
General Fund
001
1 000
39
512
52
41
00
Professional Services
16,500
12
Public Defense
General Fund
001
000
39
508
00
00
00
Endingfund Balance
16,500
Parks Construction
132
000
64
594
76
65
00
Construction
30,000
13
Veterans Plaza
Parks Construction
132
000
64
594
76
65
91
Constr from other fund
30,000
REET 2
125
000
64
594
75
65
90
Const to other fund
30,000
REET2
125
000
64
508
30
00
00
Endingfund Balance
30,000
Equipment Rental
511
000
77
594
48
64
00
Equipment
16,000
14
Canopyfor propane
dispenser
Equipment Rental
5111
000
77
508
00
00
00
Endingfund Balance
16,000
Parks Construction
1321
000
64
594
76
65
00
Construction
130,000
15
Downtown Restroom
Parks Construction
132
000
64
594
76
65
91
Constr from other fund
115,000
Parks Construction
132
000
367
00
000
00
Contributions
15,000
REET 1
126
000
68
595
33
65
90
Const to other fund
115,000
REET1
126
000
39
508
30
00
00
Endingfund Balance
115,000
New Items for Council
General Fund
0011
000
22
518
10
49
00
Miscellaneous
16,254
16
SAW Reimbursement
General Fund
001
000
62
524
10
41
00
Professional Services
2,100
17
Planning Board
Videotaping
General Fund
001
000
62
558
60
11
00
Salaries
10,800
18
Planning Staff Back -fill
General Fund
001
000
62
558
60
23
00
Benefits
4,400
General Fund
001
000
64
571
21
41
00
Professional Services
12,391
19
Marina Beach
General Fund
001
000
39
508
00
00
00
Ending Fund Balance
45,945
General Fund
001
000
61
558
70
41
00
Professional Services
10,000
20
Economic Dev.
Professional Services
General Fund
001
000
367
00
00
00
Bird Fest Contributions
5,000
General Fund
001
000
347
93
00
00
Winter Market Reg Fees
5,000
REET2
125
000
64
594
75
65
00
Construction
30,000
21
Bandshell for Frances
Anderson Center
REET2
125
000
64
508
30
00
00
Ending Fund Balance
30,000
Parks Construction
132
000
64
594
76
65
00
Construction
31,933
22
City Park Spray & Play
Parks Construction
132
000
64
594
76
65
91
Constr from other fund
31,933
REET 2
1251
000
64
594
75
65
90
Const to other fund
31,933
REET2
125
000
64
508
30
00
00
Ending Fund Balance
31,933
Street Construction
112
000
68
595
33
41
00
Professional Services
33,520
23
15th STSW Walkway
Street Construction
112
000
68
595
33
41
10
InterfundServices
10,000
Street Construction
112
000
334
03
600
05
Grant
43,520
Street Construction
112
000
68
595
33
41
00
Professional Services
75,000
24
238thStSW Walkway
Street Construction
112
000
68
595
33
41
10
InterfundServices
15,000
Street Construction
112
Grant
90,000
Street Construction
112
000
68
595
33
41
00
Professional Services
80,360
25
236th STSW Walkway
Street Construction
112
000
68
595
33
41
10
InterfundServices
22,150
Street Construction
112
000
68
595
33
65
00
Construction
52,170
Street Construction
112
000
333
20
205
16
Grant
154,680
Sewer Fund
423
200
75
594
35
41
00
Professional Services
20,000
26
Citywide CIPP Sewer
Rehab
Sewer Fund
423
200
75
594
35
65
00
Construction
156,000
Sewer Fund
423
200
75
508
30
00
00
Ending Fund Balance
176,000
Street Fund
111
000
68
542
31
49
00
Miscellaneous
3,750
27
Asset Management
MobileField
Conversion
Street Fund
111
000
68
508
30
00
00
Endingfund Balance
3,750
Water Fund
421
000
74
534
80
49
00
Miscellaneous
3,750
Water Fund
421
000
74
508
00
00
00
Endingfund Balance
3,750
Storm Fund
422
000
72
531
10
49
00
Miscellaneous
3,750
Storm Fund
422
000
72
508
00
00
00
Endingfund Balance
3,750
Sewer Fund
423
000
75
535
80
49
00
Miscellaneous
3,750
Sewer Fund
423
0001
75
1 5081
00
1 00
1 00
jEndingfund Balance
1
1 3,750
It
O
N
v
C
M
C
L
O
C
N
E
C
N
E
Q
N
3
m
L
N
7
CY
r�
N
r
C
N
E
t
V
cC
r�
Q
Packet Pg. 113
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: Carryforward Item
Item Description:
In 2015, the City Council budgeted $100,000 to start the Highway 99 Subarea Plan.
In 2016, Council budgeted an additional $75,000 for additional work to complete
the project. While the process began in late 2015 and consultants were selected,
no 2015 funds were spent. The purpose of the budget amendment is to carry
forward the unexpeneded funds from 2015 ($100,000). This will be added to the
$75,000 approved for 2016.
Department:
Development Services
Fund
GENERAL
Division:
Administration
Title:
Highway 99 Subarea Plan and Planned Action
Name:
Preparer:
Shane Hope
Department Account Number:
621
Strategic Plan Task Action Item:
1a.7,1b.6, 3a.10, 4a7, 4a.14
Budget Amendment Type? I Carryforward
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
Plannin Pro . Svc. 62.558.60.41.00
75,000
100,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$75,000
$100,000
$0
$0
$0
$0
Total Expenses I $175,000 I $0 I $0 I $0 I $0
Revenue and Endin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Carryforward
001.000.308.00
100,000
0
0
0
0
Ending Cash: Carryforward
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$100,000
$0
$0
$0
$0
PJ
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 114
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: Carryforward Item
Item Description:
The Council budgeted $40,000 in 2014 and another $40,000 in 2015 for the Critical
Area Ordinance (CAO) Update. The purpose of this budget amendment is to
carryforward the unexpended funds ($11,183.41) in order to cover 2016 consultant
costs to complete the CAO update and associated work in 2016.
Department:
Development Services
Fund
Name:
GENERAL
Division:
Planning Division
Title:
Critical Area Regulation Update
Preparer:
Kernen Lien
Department Account Number:
620
Strategic Plan Task Action Item:
Budget Amendment Type? I Carryforward
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
Plannin Pro . Svc. 62.558.60.41.00
0
11,183
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$11,183
$0
$0
$0
$0
Total Expenses 1 $11,183 1 $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Carryforward
001.000.308.00
11,183
0
0
0
0
Ending Cash: Carryforward
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$11,183
$0
$0
$0
$0
10
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
O
a�
E
c
w
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 115
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: Carryforward Item
Item Description:
The Council budgeted $110,000 in professional services funds in 2015 to move
forward on the Development Code Update. The purpose of this budget amendment
is to carry forward the unexpended funds budgeted in 2015 ($39,199) and
supplement the project budget with an additional $15,000 in unanticipated savings
from professional services that occurred in 2015 (savings from the Hearings
Examiner professional services budget, not reflected in the year-end estimates).
Department:
Development Services
Fund
GENERAL
Division:
Development Services
Title:
Development Code Rewrite
Name:
Preparer:
Shane Hope
Department Account Number:
62
Strategic Plan Task Action Item:
5a.2, 2a.5-6
Budget Amendment Type? I Carryforward
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
DSAdmin 62.524.10.41.00 (Pro Services)
0
54,199
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$54,199
$0
$0
$0
$0
Total Expenses 1 $54,199 1 $0 I $0 I $0 I $0
Revenue and Endin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Carryforward
001.000.308.00
54,199
0
0
0
0
Ending Cash: Carryforward
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$54,199
$0
$0
$0
$0
11
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 116
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
This budget adjustment is for the amendment to the Public Defense Professional
Services contract with the Snohomish County Public Defense Association.
Additional services were required due to a change in case load requirements and
to transition from previous provider.
Department:
Human Resources
Fund
Name:
GFNII2AL
Division:
Human Resources
Title:
Public Defense
Preparer:
Carrie Hite
Department Account Number:
001.00.39.512.52.41.00
Strategic Plan Task Action Item:
Budget Amendment Type? I Previously Discussed By Council
If previously discussed, date(s) of discussion: Feb 16 2016
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description IsI
Baseline
Budget
2016
2017
2018
2019
2020
Public Defense legal services
296,080
16,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$296,080
$16,500
$0
$0
$0
$0
Total Expenses I $312,580 I $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
001.000.39.508.
16,500
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$16,500
$0
$0
$0
$0
12
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
O
a�
E
c
w
E
Q
a�
aM
00
L
3
CY
r
a-:
c
a�
E
t
v
c�
Q
Packet Pg. 117
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
An additional $30,000 spending allocation for Veterans Plaza was given by Council
on 2/2/16. These fund are for plaza area development to include planter
beds/benches and a seating area. This will be paid out of 132, but reimbursed
REST.
Department:
Parks, Recreation & Cultural Services
Fund
Name:
PARKS
CONSTRUCTION
Division:
Parks
Title:
Veterans Plaza
Preparer:
CCruz for Carrie Hite
Department Account Number:
132.000.64.594.76.65.00
Strategic Plan Task Action Item:
Action 3a.4 (35): Greenways and Parks
Budget Amendment Type? I Previously Discussed By Council
If previously discussed, date(s) of discussion: Feb 2016
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
132.000.64.594.76.65.00 (Construction)
475,000
30,000
0
0
0
0
132.000.64.594.76.65.91 (Constfirom otherfind)
0
(30,000)
0
0
0
0
125.000.64.594.75.65.90 Const to other and
0
30,000
0
1 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$475,000
$30,000
$0
$0
$0
$0
Total Expenses I $505,000 I $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
125.000.64.508.30
30,000
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
Total Revenue and Ending Cash
$30,000
$0
$0
$0
$0
13
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
O
a�
E
c
w
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 118
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
In the 2016 budget $22,000 was approved to have a canopy built to cover the
propane dispenser. After some thought, we would like to move the dispencer
closer to the existing gas/diesel island and make the canopy larger (12'x24'x17')
for better coverage. We will need $16,000 more to achieve this.
Department:
Public Works
Fund
Name:
EQUIPMENT RENTAL
Division:
Fleet Maintenance
Title:
Canopy for propane dispencer
Preparer:
NEke Adams
Department Account Number:
511.000.77.594.48.64.00
Strategic Plan Task Action Item:
Budget Amendment Type? I Previously Discussed By Council
If previously discussed, date(s) of discussion: Dec 12015
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
Propane dis encer canopy
52,000
16,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$52,000
$16,000
$0
$0
$0
$0
Total Expenses 1 $68,000 1 $0 I $0 I $0 1 $0
Revenue andEnding Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
511.000.77.508.
16,000
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$16,000
$0
$0
$0
$0
14
r
c
m
E
c
m
E
Q
m
a�
00
L
a�
L
CI
co
0
N
00
a�
U
a
M
c
�a
L
0
c
a�
E
c
M
E
Q
a�
a�
00
L
d
3
CY
r
c
M
E
t
c�
Q
Packet Pg. 119
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
Supplemental appropriation for Downtown Restroom - up to $115,000 from 2015
ending balance of REET 1 (Fund 126) plus expenditure of $15,000 from
contributions from Edmonds Downtown Alliance ($10,000) and Edmonds Noon
Rotary ($5,000). Council -approved $260,000 for this project as part of the 2016
Budget. With this supplemental appropriation, the total project budget will be
$390,000.
Department:
Economic Development/Community Services
Fund
GENERAL
Division:
Economic Development
Title:
Downtown Restroom
Name:
Preparer:
Patrick Doherty
Department Account Number:
132.000.64.594.76.65.00
Strategic Plan Task Action Item:
3a.2
Budget Amendment Type? I Previously Discussed By Council
If previously discussed, date(s) of discussion: I Apr 19 2016
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
132.000.64.594.76.65.00
260,000
130,000
0
0
0
0
132.000.64.594.76.65.91 Contribution om REET
0
(115,000)
0
0
0
0
126.000.68.595.33.65.90 REET contribution
0
115,000
0
1 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$260,000
$130,000
$0
$0
$0
$0
Total Expenses I $390,000 I $0 I $0 I $0 I $0
Revenue and Endin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
126.000.39.508.30.00.00
115,000
0
0
0
0
Ending Cash: Carryforward
0
0
0
0
0
Grants/Contributions
132.000.367.00.000.00
15,000
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$130,000
$0
$0
$0
$0
15
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 120
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
There was an an additional $16,254 of revenues received in the department at the
end of last year from the L & I SAW program which is needed for the 2016 City
safety program and safety compliance. This money was received in 2015, but not
spent. This money will be used for accident prevention including mandatory,
necessary training programs and compliance initiatives for the City's Acccident
Prevention Program that are not yet funded as well as a Safety consultant.
Department:
Human Resources
Fund
GFNII2AL
Division:
Human Resources
Title:
SAW Reimbursements
Name:
Preparer:
Mary Ann Hardie
Department Account Number:
001.000.22.518.10.49.00
Strategic Plan Task Action Item:
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
SAWReimbursements
0
16,254
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$16,254
$0
$0
$0
$0
Total Expenses 1 $16,254 1 $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
001.000.39.508.
16,254
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$16,254
$0
$0
$0
$0
16
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 121
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
Planning Board meetings were videotaped in 2015 by a one-time City Council
budget allocation of $2,000 included in the 2015 budget. Funding for this item
needs to be reauthorized as an ongoing budget expense.
Department:
Development Services
Fund
Name:
GFNII2AL
Division:
Administration
Title:
Planning Board videotaping
Preparer:
Shane Hope
Department Account Number:
62.524
Strategic Plan Task Action Item:
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I On -Going
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
Dev. Services Prof Svc. 62.524.10.41.00
0
2,100
2,100
2,100
2,100
2,100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$2,100
$2,100
$2,100
$2,100
$2,100
Total Expenses 1 $2,100 1 $2,100 1 $2,100 1 $2,100 1 $2,100
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
001.000.39.00
2,100
2,100
2,100
2,100
2,100
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$2,100
$2,100
$2,100
$2,100
$2,100
17
r
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 122
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
A member of the Planning Division staff will be on leave for an extended period of
time during 2016. Given the elevated level of development activity being
experienced and the significant planning and code work being done, it is important
to make sure that staffing is maintained during this year. This proposal will fund
additional hours of work for an existing part-time planner to provide coverage
during this period.
Department:
Development Services
Fund
GENERAL
Division:
Planning
Title:
Planning Staff Back -fill
Name:
Preparer:
Shane Hope
Department Account Number:
62.558
Strategic Plan Task Action Item:
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
Planning Salaries 62.558.60.11.00
565,910
10,800
0
0
0
0
Planning Benefits 62.558.60.23.00
218,570
4,400
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$784,480
$15,200
$0
$0
$0
$0
Total Expenses I $799,680 I $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
001.000.39.508
15,200
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$15,200
$0
$0
$0
$0
1M.
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 123
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
Phase II Environmental at Marina Beach Park. Landau Associates performed
some soil and water sampling testing at Marina Beach Park. This was not
originally in the 2016 budget. This request is for additional authorization for the
Parks administrative professional services line item.
Department:
Parks, Recreation & Cultural Services
Fund
Name:
GFNII2AL
Division:
Parks
Title:
Marina Beach Park Environmental Testing
Preparer:
CCruz for Carrie Hite
Department Account Number:
001.000.64.571.21.41.00
Strategic Plan Task Action Item:
Action 3a.4 (35): Greenways and Parks
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
Professional Services
38,600
12,391
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$38,600
$12,391
$0
$0
$0
$0
Total Expenses 1 $50,9911 $0 I $0 I $0 1 $0
Revenue and Ending Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
001.000.39.508.
12,391
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$12,391
$0
$0
$0
$0
19
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
W
E
Q
a�
a�
00
L
3
CY
r
a-:
c
a�
E
t
v
c�
Q
Packet Pg. 124
3.5.a
EXHIBIT "P: Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
Authorization request to expend funds received in association with the Holiday Market and
Bird Fest.
Holiday Market. Funds received derive principally from vendor booth fees, which with an
enhanced holiday market for 2016, could run up to $5000. This authorization would allow for
expenditure of up to the total funds received (maximum $5000) to pay for expenses related to
producing, managing and promoting the holiday market.
Bird Fest. Funds received derive principally from sponsorships and donations, which could
run up to $5000. This authorization would allow for expenditure of up to the total funds
received (maximum $5000) to pay for expenses related to producing, managing and promoting
Bird Fest.
Department:
Community Svcs/Eton Development
Fund
GENERAL
Division:
Economic Development (61)
Title:
Professional Services
Name:
Preparer:
Patrick Doherty
Department Account Number:
001.000.61.558.70.41
Strategic Plan Task Action Item:
I Year round Farmer's Market - 2a.2
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I On -Going
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description[s]
Baseline
Budge
2016
2017
2018
2019
2020
Professional Services -
21,000
10,000
10,000
10,000
10,000
10,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$21,000
$10,000
$10,000
$10,000
$10,000
$10,000
Total Expenses 1 $31,000 1 $31,000 1 $31,000 1 $31,000 1 $31,000
Revenue and Ending Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
0
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
001.000.367.00.200.00
5,000
5,000
5,000
5,000
5,000
General Fund Subsidy
0
0
0
0
0
New Revenue
001. 000.34 7.93.000.00
5,000
5,000
5,000
5,000
5,000
Other
0
0
0
0
0
Total Revenue and Ending Cash
$10,000
$10,000
$10,000
$10,000
$10,000
20
Q
Packet Pg. 125
3.5.a
EXHIBIT "P: Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
The replacement of the Bandshell at the Frances Anderson Center is scheduled
for 2016. $81,870 was carriedforward from 2015 and an additional budget
authority was requested at that time. Another $30,000 is now requested to cover
costs for demolition. This was a " by owner" item, but we just don't have the
capacity to perform this work.
Department:
Parks, Recreation & Cultural Services
Fund
Name:
PARKACQ/
1WROVFIVIENT
Division:
Parks
Title:
Bands hell at Frances Anderson
Preparer:
CCruz for Carrie Hite
Department Account Number:
125.000.64.594.75.65.00
Strategic Plan Task Action Item:
Action 3a.4 (35): Greenways and Parks
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description IsI
Baseline
Budget
2016
2017
2018
2019
2020
Construction Projects
161,870
30,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$161,870
$30,000
$0
$0
$0
$0
Total Expenses I $191,870 I $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
125.000.64.508.30
30,000
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
Total Revenue and Ending Cash
$30,000
$0
$0
$0
$0
21
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
a�
E
t
v
c�
Q
Packet Pg. 126
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
An additional $31,933 spending allocation is needed to pay for the water
connection to the spray park. Water Meter Fee $6,390, Water Connection Fee
$25,248, Permit Surcharge fee $25 and Sewer Permit fee $270. This is an
interfund charge that wasn't orginally identified in the project budget.
Department:
Parks, Recreation & Cultural Services
Fund
Name:
PARKS
CONSTRUCTION
Division:
Parks
Title:
City Park Spray & Play
Preparer:
CCruz for Carrie Hite
Department Account Number:
132.000.64.594.76.65.00
Strategic Plan Task Action Item:
Action 3a.4 (35): Greenways and Parks
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
132.000.64.594.76.65.00 (Construction)
160,872
31,933
0
0
0
0
132.000.64.594.76.65.91 (Constfirom otherfind)
0
(31,933)
0
0
0
0
125.000.64.594.75.65.90 Const to other and
0
31,933
0
1 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$160,872
$31,933
$0
$0
$0
$0
Total Expenses I $192,805 I $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
125.000.64.508.30
31,933
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
Total Revenue and Ending Cash
$31,933
$0
$0
$0
$0
22
Q
Packet Pg. 127
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
Construction is complete but education and enforcement are ongoing and are
expected to be complete by Summer, 2016. Education and enforcement funds
were part of the original Safe Routes to School Grant awarded for this project.
Department:
Public Works
Fund
Name:
STREET
CONSTRUCTION
Division:
Engineering
Title:
E3DC-15th St SW Walkway (Edmonds Way to 8th Ave)
Preparer:
Ryan Hague
Department Account Number:
Strategic Plan Task Action Item:
4a.3 Walkways
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
112.000.68.595.33.41.00 Professional Services
0
33,520
0
0
0
0
112.000.68.595.33.41.10 Interfund Services
0
10,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$43,520
$0
$0
$0
$0
Total Expenses 1 $43,520 1 $0 I $0 I $0 I $0
Revenue and Endin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
0
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
112.000.334.03.600.05
43,520
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$43,520
$0
$0
$0
$0
23
r
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 128
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
The City was successful in securing a transportation grant for the 238th St.
Walkway (Hwy 99 to SR104) from the Transportation Improvement Board (TIB)
in late Fall, 2015. The TIB grant agreement was approved by the City Council in
early 2016. Design development is expected to begin Spring, 2016
Department:
Public Works
Fund
Name:
STREET
CONSTRUCTION
Division:
Engineering
Title:
E6DA-238th St SW Walkway (Edmonds Way to Hwy 99
Preparer:
Ryan Hague
Department Account Number:
Strategic Plan Task Action Item:
4a.3 Walkways
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
112.000.68.595.33.41.00 Professional Services
0
75,000
0
0
0
0
112.000.68.595.33.41.10 Interfund Services
0
15,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$90,000
$0
$0
$0
$0
Total Expenses 1 $90,000 1 $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
0
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
TIB Fuel Tax Grant
90,000
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$90,000
$0
$0
$0
$0
24
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 129
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
Additional funds from the 2016 pavement preservation program are being
programmed into the 236th St. Walkway project to fund an overlay of 236th
within the project limits. Construction is expected to begin Summer, 2016.
Department:
Public Works
Fund
Name:
STREET
CONSTRUCTION
Division:
Engineering
Title:
236th St SW Walkway (Edmonds Way to Madrona Scho
Preparer:
Ryan Hague
Department Account Number:
Strategic Plan Task Action Item:
4a.3 Walkways
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
112.000.68.595.33.41.00 Professional Services
74,337
80,360
0
0
0
0
112.000.68.595.33.41.10 Interfund Services
21,856
22,150
0
0
0
0
112.000.68.595.33.65.00 Construction
497,272
52,170
0
1 0
0
0
126.000.68.595.33.41.90 REST I Pro Sery to Other
0
0
0
0
0
0
126.000.68.595.33.41.19 REST I Inter and Sery to Od
0
0
0
0
0
0
126.000.68.595.33.65.90 REST I Const Pro ' to Other
0
0
0
0
0
0
Sub -Total
$593,465
$154,680
$0
$0
$0
$0
Total Expenses I $748,145 I $0 I $0 I $0 I $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
0
0
0
0
Ending Cash: Decrease Increase
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
112.000.333.20.205.16
154,680
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$154,680
$0
$0
$0
$0
25
r
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
M
E
Q
a�
aM
00
L
3
CY
N
r
a-:
c
M
E
t
v
c�
Q
Packet Pg. 130
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
An additional site was added near the end of the design project, which requires the
need of additional funding to allow for construction of the entire project. The
additional funding is coming from: $75,000 from the 423 Sewer Utility Fund
balance (2015 Sewer replacement project was under budget); $60,000 from the
2016 Sewer Replacement project (Estimated surplus of funds in 2016); and
$41,000 from the 423 Sewer Utility Fund balance (2015 CIPP did not go to
Department:
Public Works
Fund
Name:
SEWER/TREATMENT
PLANT
Division:
Engineering
Title:
Citywide CIPP Sewer Rehab
Preparer:
Michele (Nlike) De Lilla
Department Account Number:
Strategic Plan Task Action Item:
N/A
Budget Amendment Type? I New Item For Council To Consider
If previously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Capital
Fill In Item Description[s]
Baseline
Budget
2016
2017
2018
2019
2020
0
0
0
0
0
0
Professional Services 423.200.75.594.35.41.00
0
20,000
0
0
0
0
Interfund Services 423.200.75.535.35.41.10
0
0
0
0
1 0
0
Construction 423.200.75.594.35.65.00
0
156,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$0
$176,000
$0
$0
$0
$0
Total Expenses I $176,000 I $0 I $0 I $0 I $0
Revenue and Endin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
0
0
0
0
Ending Cash: Decrease Increase
423.200.75.508.30.00.00
176,000
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue and Ending Cash
$176,000
$0
$0
$0
$0
26
c
m
E
c
m
Q
m
a�
00
L
L
CI
co
0
N
0
a�
U
a
M
c
�a
L
0
a�
E
c
W
E
Q
a�
a�
00
L
3
CY
r
c
a�
E
t
c�
Q
Packet Pg. 131
3.5.a
EXHIBIT "F": Budget Amendments (April 2016)
Budget Amendment for: First Quarter
Item Description:
During the 2016 Budget development, staff submitted a budget request for $50,000
for the transition to a web based operations management system that will allow
staff to use mobile devices to assign, track, record and retrieve information while
in the field. Further research led to a decision to purchase a different software
system entirely which will savesignificantly on annual software license costs in
2017 and beyond but will be $15,000 higher in 2016. The additional $15,000 will be
split evenly between the four funds listed below.
Department:
Public Works
Pond
Name:
Street, water,
Storm & Sewer
Division:
Street, Storm, Water & Sewer
Title:
Asset Management Mobile Field Conversion
Preparer:
Phil Williams
Department Account Number:
Funds 111, 421, 422, & 423
Strategic Plan Task Action Item:
Budget Amendment Type? I New Item For Council To Consider
Ifpreviously discussed, date(s) of discussion:
What is the nature of the expenditure? I One -Time
Is the Expenditure Operating or Capital? I Operating
Fill In Item Description [s I
Baseline
Budget
2016
2017
2018
2019
2020
111.000.68.542.31.49.00
12,500
3,750
0
0
0
0
421.000.74.534.80.49.00
12,500
3,750
0
0
0
0
422.000.72.531.10.49.00
12,500
3,750
0
0
0
0
423.000.75.535.80.49.00
12,500
3,750
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sub -Total
$50,000
$15,000
$0
$0
$0
$0
Total Expenses 1 $65,000 1 $0 I $0 1 $0 $0
Revenue and Fndin Cash
Comments
2016
2017
2018
2019
2020
Ending Cash: Decrease Increase
Funds 111, 421, 422, 423
15,000
0
0
0
0
Ending Cash: Carr forward
0
0
0
0
0
Grants/Contributions
0
0
0
0
0
General Fund Subsidy
0
0
0
0
0
New Revenue
0
0
0
0
0
Other
0
0
0
0
0
Total Revenue andFndin Cash
$15,000
$0
$0
$0
$0
27
Q
Packet Pg. 132
3.6
City Council Agenda Item
Meeting Date: 05/3/2016
Authorization to award a construction contract for the 2016 Waterline Replacement Program to D&G
Backhoe
Staff Lead: Rob English
Department: Engineering
Preparer: Megan Luttrell
Background/History
On April 26, 2016, staff presented this item to the City Council and it was forwarded to the May 3, 2016
consent agenda for approval.
Staff Recommendation
Award the construction contract to D&G Backhoe in the amount of $1,147,401.86 and authorize a
$120,000 management reserve for changes and unforeseen conditions during construction.
Narrative
On April 21, 2016, the City received four bids for the 2016 Waterline Replacement Project. The bids
ranged from a low of $1,147,401.86 to a high of $1,575,310.48. A summary of bid results is attached as
Exhibit A. D&G Backhoe submitted the low responsive bid in the amount of $1,147,401.86. The
engineer's estimate was $1,470,000. A review of the low bidder's record has been completed, and
responses are positive.
This project is part of the City's program to replace and upgrade existing waterlines at various locations
around the City that are reaching the end of their useful service life, is undersized and unable to meet
current requirements, or has some other existing system deficiency. The project will replace at various
locations around the City approximately 4,850 linear feet of waterline piping with associated meters,
and fire hydrants.
The proposed construction budget and funding are shown on Exhibit B. The project costs are
being funded by the 421 Water Fund and the General Funds available for fire protection costs.
A 10% management reserve is proposed for the project.
Attachments:
Exhibit A - Bid Summary
Exhibit B - Proposed Budget
Vicinity Map
Packet Pg. 133
3.6.a
City of Edmonds
2016 Waterline Replacement Project
Bid Summary
April 2016
Site
Engineer's Estimate
D&G
Laser Underground
SRV Construction
Kar-Vel
Schedule A: 217th Street SW STA AO+00 to STA A7+80
$ 230,000.00
$ 177,204.90
$ 221,312.88
$ 236,133.68
$ 195,910.65
Schedule B: 12th Ave N, Sierra St
$ 20,000.00
$ 9,827.10
$ 38,979.00
$ 30,485.97
$ 18,204.84
Schedule C: 87th Avenue W STA CO+00 to STA C5+30
$ 160,000.00
$ 121,944.21
$ 166,950.90
$ 150,978.29
$ 142,059.24
Schedule D: Northstream Lane STA DO+00 to STA D8+60)
$ 250,000.00
$ 193,789.53
$ 251,991.00
$ 288,390.80
$ 225,100.98
Schedule E
$ 150,000.00
$ 109,996.32
$ 163,958.85
$ 158,915.74
$ 132,070.19
Schedule F: Sierra Drive, 80th PI W, 81st PI W, STA FO+00 to STA F5+80
$ 510,000.00
$ 424,368.98
$ 537,481.98
$ 551,228.94
$ 450,687.83
Schedule G: 182nd Place SW STA GO+00 to STA G4+20
$ 150,000.00
$ 110,270.82
$ 149,778.18
$ 159,177.06
$ 132,934.86
Total
$ 1,470,000.00
$ 1,147,401.86
$ 1,530,452.79
$ 1,575,310.48
$ 1,296,968.59
E
3
a
ti
00
r
f0
E
E
7
E
t
K
W
C
d
E
t
V
IC
a+
Q
Packet Pg. 134
3.6.b
2016 Waterline Replacement Project
Proposed Construction Budget
Description Amount
Contract Award
$1,147,402
Construction Management, Inspection & Testing
$140,000
Management Reserve
$120,000
Total = $1,407,402
Construction Funding
Funding Amount
Fire Protection $45,677
421 funds available for 2016 Water Replacement Project $1,900,000
Total = $1,945,677
Packet Pg. 135
3.6.c
City of Edmonds
Vicinity Map 2016 Waterline Replacement
s n Project
Site Locations:
1. 21711 St SW west of 88t1i Ave W
2. Easement From 520 12th Ave W, heading east to
9221 Sierra St.
3. 87th Ave W south of 202"d St SW.
4. Northstream Lane west of 9th Ave W.
5. 192"d St West east of 94th Ave W.
6. 80th Place West north of Sierra Drive, Sierra Drive
Ibetween 80th Ave W and 815Y PI W and 815t Place
W south of Sierra Dr.
7. 182"d Place east of 7211 Ave W.
HWERq>
44
d
_z
Y
II61H�i
160TH 5T S%%-
qr
1 0 i.
C
t?PTH 4T SW
S
196TH Sl SW
qA
K -•H 1 `T'-Jh
2 .?041 H %r •,W
�C6iHS1 �
h�
�t
�1M 4sr Win'
244TH STFW -N
r
24411a
a
Packet Pg. 136
3.7
City Council Agenda Item
Meeting Date: 05/3/2016
Authorization to award a construction contract for the 2016 Sanitary Sewerline Replacement Program to
Kar-Vel Construction
Staff Lead: Rob English
Department: Engineering
Preparer: Megan Luttrell
Background/History
On April 26, 2016, staff presented this item to the City Council and it was forwarded to the May 3, 2016
consent agenda for approval.
Staff Recommendation
Award the construction contract to Kar-Vel Construction in the amount of $1,543,752.59 and authorize a
$155,000 management reserve for changes and unforeseen conditions during construction.
Narrative
On April 26, 2016, the City received five bids for the 2016 Sanitary Sewer and Storm Replacement
Project. The bids ranged from a low of $1,543,752.59 to a high of $2,342,399.63. Kar-Vel Construction
submitted the low responsive bid in the amount of $1,543,752.59. The engineer's estimate was
$1,454,145. A review of the low bidder's record has been completed, and responses are positive.
This project is part of the City's program to replace/repair and upgrade existing sewerlines at various
locations around the City that are reaching the end of their useful service life, are undersized and unable
to meet current requirements, or has some other existing system deficiency. The project will replace at
seven locations in the City approximately 2,000 linear feet of sewerline, associated manholes and
services. In addition, the project will install approximately 750 linear feet of new stormwater piping and
associated manholes. This portion of the project will construct a bypass to alleviate drainage issues
downstream of 12th Ave and Sierra Place.
The proposed construction budget and funding are shown in Exhibit B. The project costs are being
funded by the 423 (Sewer) and 422 (Storm) Utility Funds. A $440,000 budget amendment is needed for
the Stormwater portion of the project and it will be included in the second quarter budget amendments.
A 10% management reserve is proposed for changes and unforeseen conditions during construction.
Attachments:
Exhibit A - Bid Summary
Exhibit B - Proposed Budget
Vicinity Map
Packet Pg. 137
3.7.a
City of Edmonds
2016 Sanitary and Storm Replacement Projects
Bid Summary
April 2016
Engineer's Estimate
Shoreline
Construction Co
A-1 Landscaping and
Laser Underground &
Kar-Vel Construction
Rodarte Construction
Inc
Construction
Earthworks, Inc.,
SCHEDULE 1 - 75TH PL W and 162ND ST W SANITARY SEWER
REPLACEMENT
$ 125,448.70
$
126,840.96
$ 223,359.55
$ 158,700.53
$ 116,054.21
$
109,666.04
SCHEDULE 2 - 75TH PL W and 164TH ST W SANITARY SEWER
REPLACEMENT
$ 106,556.51
$
98,092.03
$ 177,273.20
$ 149,638.73
$ 113,377.01
$
99,258.10
SCHEDULE 3 - 76TH AVE W and BERTOLA RD SANITARY SEWER
REPLACEMENT
$ 203,669.12
$
225,914.60
$ 326,626.45
$ 276,118.45
$ 220,552.24
$
456,647.22
SCHEDULE 4 - 88TH AVE W and 196TH ST SW SANITARY SEWER
REPLACEMENT
$ 193,466.50
$
243,508.95
$ 312,222.89
$ 258,171.64
$ 240,155.93
$
240,234.71
SCHEDULE 5 - 6th AVE S and MAPLE ST SANITARY SEWER
REPLACEMENT
$ 243,707.69
$
273,162.64
$ 434,206.30
$ 326,747.23
$ 265,999.83
$
306,822.92
SCHEDULE 6 - BOWDOIN WAY and 92ND AVE W SANITARY SEWER
REPLACEMENT
$ 87,196.57
$
87,446.92
$ 178,060.46
$ 118,652.08
$ 91,556.18
$
106,837.60
SCHEDULE 7SS - SIERRA PLACE SANITARY SEWER REPLACEMENT
$ 148,688.96
$
188,673.73
$ 164,225.66
$ 222,841.30
$ 136,305.17
$
136,863.50
IMPROVEMENTS
$ 345,411.04
$
460,015.88
$ 510,723.72
$ 375,937.63
$ 359,752.01
$
359,496.18
TOTAL
$ 1,454,145.08
$
1,703,655.70
$ 2,326,698.23
$ 1,886,807.59
$ 1,543,752.59
$
1,815,826.28
Packet Pg. 138
3.7.b
2016 Sewer and Storm Replacement Project
Proposed Construction Budget Total
Descriotion
Amount
Contract Award
$1,543,753
Construction Management, Inspection & Testing
$170,000
1% for the arts
$3,598
Management Reserve
$155,000
Total = $1,872,351
Construction Funding
funding Amount
422 Stormwater Utility Funding $460,000
423 funds available for 2016 Sewer Replacement Project $1,800,000
Total = $2,260,000
Packet Pg. 139
3.7.c
City of Edmonds
Vicinity Map
, Q 00
Site Locations:
1. 75th PI W near the intersection of 162nd
2. 75th PI W near the intersection of 164th
3. 76th Ave W near the intersection of Bertola Rd.
4. 88th Ave W north of the intersection of 196th St.
5. 6th Ave S and Maple St.
6. Bowdoin Way near the intersection of 92nd Ave
West.
7. 12th Ave N south of the intersection with Vista
Way and also Sierra Place east of Olympic Ave.
lz�-
pK
O NvpYI%AAI
O
Q
—
�4
4n
a+ • r; - r
u, 5
O
d
+h
K
Y-
z
+
I_
¢
t
2016 Sanitary and Storm
Replacement Project
ISOTHST S)bv
r'
Q 1
T }
►,per
146TH }T SW
A
01�
I
r
a "-
2.7Gi1�
x 7
3
f it, 04bs war
} Il
4 }
w
a
lil•f1'ST5;w r
244TH STIW -� 1-141
Packet Pg. 140
3.8
City Council Agenda Item
Meeting Date: 05/3/2016
Public Works Engineering Job Description Update & Reclassification
Staff Lead: Rob English
Department: Engineering
Preparer: Megan Luttrell
Background/History
On April 26, 2016, staff presented this item to Council and it was forwarded to the May 3rd consent
agenda for approval.
Staff Recommendation
Approve the revised job descriptions for the Senior Utilities Engineer, Stormwater Engineer and
Engineering Program Manger 2.
Narrative
This agenda item addresses a promotion and proposal to reclassify three job descriptions within the
Engineering Division. Two of the proposed job reclassifications (Senior Utilities Engineer and
Stormwater Engineer) are in response to the vacancy created when Mr. Jerry Shuster accepted a
position with the City of Bellevue. This change will improve the coordination and planning of capital
utility projects for all three utilities, since one position will oversee this effort. In addition, the Senior
Utilities Engineer position is being revised to add supervisor responsibilities and will supervise two
positions.
The Engineering Program Manager 2 reclassification and Engineering Technician III promotion are both
opportunities for current staff to advance in their career path according to a previously established
career progression plan. The Engineering Technician III promotion will provide more flexibility within
the Engineering Division, since an Engineering Technician III can work on more complex projects and can
independently review larger private development projects such as commercial, multi -family and short
plats.
The Engineering Program Manager 2 reclassification also revises the job description to eliminate capital
construction job duties that are no longer appropriate for this positon. The Engineering Program
Manager 2 position will supervise three employees who work together as a team to focus on the review
and inspection of private development projects. Designating a supervisor for this team will provide
workflow efficiency and improve communication and coordination within the group.
Packet Pg. 141
3.8
The proposed reclassifications will also reduce the number of employees supervised by the City Engineer
from 13 to 9. Refer to the organization chart, Attachment 5. This is a more appropriate span of control
given the technical complexity and financial workload managed by the Division.
Senior Utilities Engineer & Stormwater Engineer (Reclassifications):
In January of this year, the Stormwater Engineer position became vacant after Mr. Jerry Shuster
accepted a position with the City of Bellevue. The vacancy created an opportunity to evaluate job duties
and the skill set of existing staff. Based on this review, staff is recommending the following changes and
reclassification of the Senior Utilities Engineer and Stormwater Engineer positions:
The supervisor responsibilities and long range planning of stormwater capital
improvements would be eliminated from the Stormwater Engineer job description. The
salary range would drop from 14 to 13.
Shift the long range planning and programming of Stormwater capital improvements
from the Stormwater Engineer position to the Senior Utilities Engineer positon. Prior to
the vacancy, the planning and programming of capital improvements for utility projects
was split between the Senior Utilities Engineer and the Stormwater Engineer. The
Senior Utilities Engineer was responsible for water and sewer improvements and the
Stormwater Engineer managed stormwater improvements. The coordination, planning
and programming of all three utilities could be simplified and improved by moving this
responsibility under the Senior Utilities Engineer position.
Add supervisor duties to the Senior Utilities Engineer position and increase the salary
range from 14 to 16. The Senior Utilities Engineer would supervise two employees, the
Stormwater Engineer and the Stormwater Technician positions.
Engineering Technician III Promotion:
The City previously established three career progression positions for the Engineering Technician and
Engineering Program Manager positions. One of the main goals of the career progression plan is to
provide a career path for employees to gain increasing experience over time and become more
productive and efficient in the service they provide. The progression plan helps to retain employees,
expand the employee's qualifications and experience and provide flexibility to distribute private
development reviews and inspections between multiple staff.
To be eligible for promotion in the Engineering Technician series, an employee must complete the
experience requirements in a qualifications checklist. A qualifications checklist is used to promote an
Engineering Technician I to Engineering Technician II and an Engineering Technician II to Engineering
Technician III. The employee must also receive an overall employee rating of "Commendable" on their
performance evaluation.
The Engineering Division currently has an employee who is an Engineering Technician II that has
successfully completed the qualifications checklist and is now eligible for promotion. The employee, Ms.
Jennifer Lambert, is responsible for completing reviews and inspections on private residential and minor
Packet Pg. 142
3.8
commercial projects. She also reviews and approves right of way permits for utility improvements
proposed by Puget Sound Energy, Snohomish County PUD, Comcast, Frontier and other utility providers.
Staff is recommending the addition of an Engineering Technician III position to the 2016 budget to
provide a promotion opportunity for Ms. Lambert. Once the Engineering Technician III position is filled,
one of the two existing Engineering Technician II positions would be eliminated from the budget.
Engineering Program Manager (Reclassification):
A similar career progression is in place for the Engineering Program Manager series with an Engineering
Program Manager 1, 2 and 3. The Engineering Program Manager is responsible for managing the private
development reviews and inspections for the Division. The position also provides guidance to the
Engineering Technicians who work on private development projects. Staff is recommending the
reclassification of the Engineering Program Manager 1 to the Engineering Program Manager 2 position.
The Engineering Program Manager 1 position is currently held by Ms. Jeanie McConnell, who has been
employed with the City of Edmonds since 1994 and was hired into the Engineering Program Manager 1
position in 2007. The reclassification will increase Ms. McConnell's job duties by adding supervisor
responsibilities and managing three engineering employees who work on private development reviews
and inspections.
In addition to the reclassification, staff is recommending the job description be updated and revised to
reflect the job duties this position will be performing. The previous Engineering Program Manager 2 job
description was created in 2001 and included job duties related to capital construction that is no longer
required or appropriate for this position.
The revised job descriptions for each position are attached for reference.
Budget Impacts:
The proposed reclassifications and promotion will result in an estimated decrease of approximately
($36,000) to salaries and benefits in 2016 due to the salary savings from the Stormwater Engineer
vacancy. A four year estimate, from 2017 to 2020, shows an annual increase in salaries and benefits
that ranges from $12,600 to $30,000. The calculations are based in today's dollars and extend to when
all positions would be at the top step in the salary range. The Utility Funds will pay for approximately
55% of the increase and the remaining amount will be largely offset by permit revenue with some
contribution by the General Fund. Refer to Attachment 4.
Attachments:
Attachment 1
- Engineering Program Manager Job Description
Attachment 2
- Senior Utilities Engineer Job Description
Attachment 3
- Stormwater Engineer Job Description
Attachment 4
- Salary Table
Attachment 5
- Engineering Organizational Chart
Packet Pg. 143
3.8.a
City of
EDMONDS
Washington
ENGINEERING PROGRAM MANAGER 2
' Formatted: Heading 3, Left, Space Aft
Department:
Public Works - Engineering
Pay Grade:
NR-12
Bargaining Unit:
Non -Represented
FLSA Status:
Exempt
Revised Date:
November 201 April 2016
Reports To:
City Engineer
POSITION PURPOSE: Under administrative direction, manages private development and inspection
responsibilities for the Engineering Division; manages staff including training and evaluation of assigned
personnel; serves as the liaison between City staff, the general public, engineering consultants and other land
development professionals to provide information regarding City codes and standards and permit requirements;
reviews processes and inspection requirements; performs plan reviews and field inspections on private
development projects to ensure code and permit compliance; reviews and recommends updates City codes,
standards, policies and procedures as needed and to provide efficiency in the development process.
ESSENTIAL FUNCTIONS AND RESPONSIBILITIES:
The following duties ARE NOT intended to serve as a comprehensive list of all duties performed by all
employees in this classification, only a representative summary of the primary duties and responsibilities.
Incumbent(s) may not be required to perform all duties listed and may be required to perform additional,
position -specific duties.
Private Development Services
• Manages the Engineering Division responsibilities for private development reviews and inspections;
coordinates and maintains an orderly review process for land development proposals submitted to the
City and ensures compliance with the ECDC.
• Supervises, coaches, trains and motivates staff and coordinates and/or provides staff training.
• Manages the employment and hiring process and employee relations for assigned area.
• Manages the workflow and prioritization of assigned projects,
,..hen necessary pre..iron adyine and nounspi to staff
• Develops or assists with developmental work plans for staff and makes recommendations and/or
implements corrective actions, discipline and termination procedures as appropriate/necessary or as
directed.
• Prepares and maintains a variety of records and�,�, ews related to assigned activities.
• Reviews and makes recommendations to City codes or policy changes as appropriate and based on
experience with daily operations and planning.
• Develops, documents and publicizes Engineering Division processes and procedures; establishes
documents; publicizes City design and construction standards.
• Determines engineering requirements for subdivisions, commercial, multi -family and single family
private development projects.
• Reviews plats and designs for streets and utilities to be installed.
• Reviews and approves permits for commercial, multi -family, single family and other private development
projects for code compliance.
• Conducts preconstruction conferences and explains permit conditions to applicants.
• Reviews final subdivision records, verifying accuracy of legal descriptions and maps for conformance to
ECDC and coordinates reviews with other divisions.
Engineering Program Manager 2
April 2016NAvP" ~ 2012^'
otf
N pt
N
c
c
W
U)
Y
L
0
7
3
a
co
00
r
Packet Pg. 144
3.8.a
JOB DESCRIPTION
Engineering Program Manager 2
• Calculates permit fees including performance bond amount and inspection fees;, prepares Engineering
requirements for development. and submits to the City ERgiR88F for autheFized sigRa ,,.e
• Conducts reviews and inspections and approves construction of subdivisions, commercial and multi-
family building projects; provides guidance, training and oversight for other staff members on
development reviews and inspection.
• Monitors assigned staff performance and implements corrective action as appropriate.
• Serves as liaison between City staff, the public, engineering consultants and other land development
professionals.
• Responds to engineering questions and provides information regarding engineering permits and land
development to the public.
• Communicates with internal and external contacts regarding project management, project coordination
and general inquiries.
• Attends hearings on subdivision and land developments and presents project requirements.
• Provides information to public regarding permits and related engineering questions.
•_Prepares and presents materials for City Council, Hearing Examiner, Planning Commission,
Architectural Design Board and public meetings; prepares and maintains a variety of files, records and
reports related to assigned activities.
• Performs website design and maintenance for the Public Works Department and prepares and
maintains a variety of files, records and reports related to assigned activities.
Engineering Program Manager 2
April 2016November 2812
Packet Pg. 145
3.8.a
JOB DESCRIPTION
Engineering Program Manager 2
Required Knowledge of:
• Civil engineering principles, practices and standards.
• City standards, codes, regulations, local, state and federal laws including the Edmonds Community
Development Code.
• Review, inspection and approval processes and procedures related to subdivisions and commercial,
multi -family and single family private developments.
• WSDOT and APWA specifications and procedures.
• Building, eleGtrinnl and plumbing , Gd4s ^Construction methods, materials, processes and procedures.
• Field inspection practices, including surveying and material testing.
• Property owners' rights and privileges.
• Laws, regulations, ordinances and codes related to assigned activities.
• Health and safety regulations.
• Technical aspects of field of specialty.
• Interpersonal skills using tact, patience and courtesy.
• Structure, organization and interrelationships of city departments, agencies and related governmental
agencies and offices affecting assigned functions.
• Effective oral and written communication principles and practices to include public relations and public
speaking.
• Research methods and report preparation and presentation.
• Modern office procedures, methods, and equipment including computers and computer applications
such as: word processing, spreadsheets, and statistical databases.
• English usage, spelling, grammar and punctuation.
• Principles of business letter writing.
• Oversight, technical review and advisement techniques, lead work principles, methods and techniques.
Required Skill in:
• Planning, designing, directing, coordinating and implementing construction of public facilities primarily
related to streets and utilities.
Providing project oversight for the develepment, bidding and GenstrUGtien management of City prejeGt-_.
• Performing engineering and land survey calculations.
• Reading, interpreting and understanding specifications, drawings and field surveys.
• Reviewing and editing project plans and specifications.
• Planning workload and prioritizing and scheduling work.
• Representing the City effectively at public meetings and work with the public.
• Interpreting, applying and explaining rules, regulations, policies and procedures.
• Utilizing personal computer software programs and other relevant software affecting assigned work and
in compiling and preparing spreadsheets.
• Establishing and maintaining effective working relationships with staff, management, vendors, outside
agencies, community groups and the general public.
• Applying program/projeGt management techniques and prinG nlnc
• Directing the maintenance of a variety of reports and files; preparing, maintaining and reviewing
narratives and statistical reports.
Engineering Program Manager 2
April 2016November —2812
Packet Pg. 146
3.8.a
JOB DESCRIPTION
Engineering Program Manager 2
• Determining or assisting with project budgets, resources and timelines to complete projects from
conceptualization to finish.
• Communicating effectively verbally and in writing, including public relations and public speaking.
• Oversight, trainingand t8Ghn Gal review of ether's tasks
• Supervising, leading, coaching and using best management practices to improve staff performance;
delegating tasks and workload assignments.
MINIMUM QUALIFICATIONS:
Education and Experience:
Bachelor's Degree in Civil Engineering, Construction Management or related field and four years of municipal
engineering experience including review, inspection and approval of subdivisions and commercial, multi -family
and single family private developments or ,--qRd—management and design evefsight of capital construction
projects a.Rd G.fraGtr that in .Iud s eversigmf f .Bann, GGI;eduler Rd GE46; OR an equivalent
combination of education, training and experience.
Required Licenses or Certifications:
Valid State of Washington Driver's License.
Must be able to successfully complete and pass a background check.
WORKING CONDITIONS:
Environment:
• Indoor and outdoor work environment.
• Driving a vehicle to conduct work.
Physical Abilities:
• Hearing, speaking or otherwise communicating to exchange information in person or on the telephone.
• Operating a computer keyboard and drafting materials.
• Reading and understanding a variety of materials.
• Sitting, standing or otherwise remaining in a stationary position for extended periods of time.
• Ascending/descending from ladders and working from heights or depths.
• Bending at the waist, kneeling or crouching reaching above shoulders and horizontally or otherwise
positioning oneself to accomplish tasks.
• Lifting/carrying or otherwise moving or transporting moderately heavy objects up to 40 lbs.
• Ability to wear appropriate personal protective equipment based on required City Policy.
Hazards:
• Contact with angry and/or dissatisfied customers.
• Working in and around moving traffic.
• Occasional exposure to dangerous machinery.
• Occasional extreme weather conditions.
• Potential physical harm and hazardous chemicals when working in the field, conducting inspections and
working around construction equipment and worksites.
Incumbent Signature:
Department Head:
Engineering Program Manager 2
Date:
Date:
April 2016November '^"
Packet Pg. 147
3.8.b
City of
EDMONDS
Washington
SENIOR UTILITIES ENGINEER
Department:
Public Works - Engineering
Pay Grade:
NR-16
Bargaining Unit:
Non Represented
FLSA Status:
Exempt
Revised Date:
^1nvPrnbP :2n12April 2016
Reports To:
City Engineer
POSITION PURPOSE: Under administrative direction, plans and manages the City's engineering programs for
water, stormwater and sewer utilities; develops and manages water, sewer and storm drainage capital
projects; plans, develops and prepares design drawings, specifications and cost estimates; designs contract
drawings to ensure quality and cost effective construction; manages consultant and contractor contracts;
performs reviews and inspections of utilities on private development projects and performs oversight and
technical review on design drawings and specifications prepared by other City staff.
ESSENTIAL FUNCTIONS AND RESPONSIBILITIES:
The following duties ARE NOT intended to serve as a comprehensive list of all duties performed by all
employees in this classification, only a representative summary of the primary duties and responsibilities.
Incumbent(s) may not be required to perform all duties listed and may be required to perform additional,
position -specific duties.
• Manages the City's engineering programs for water, stormwater and sewer utilities engineering
programs; prepares technical studies and performs hydraulic analysis to size new systems with
appropriate capacity.
• Performs oversight and technical supervision of utilityies engineering/design work performed by other
staff members; reviews, approves, stamps and signs utilityies engineering/design drawings prepared by
other staff members.
• Prepares and implements new City code, standards and specifications for utility improvement and
conducts plan reviews and inspections on utility improvements for private development applications.
• Prepares the annual water, stormwater and sewer capital improvement programs and updates the water
and sewer elements of the Comprehensive Plan.
• Manages assigned capital improvement projects and independently plans, develops and prepares
water, sewer and storm drainage utility design drawings, contract specifications and cost estimates.
• Uses AutoCAD and related engineering and graphics software to prepare detailed design drawings.
• Coordinates project improvements with City Departments, private utilities, other public agencies and
citizens; prepares and secures necessary easements for project construction.
• Manages the advertisement, bid and award of water, sewer and storm drainage capital improvement
projects; prepares advertisement notice and responses to bidder questions.
• Reviews and analyzes bid documents for compliance with City, state and federal requirements;
prepares award recommendation for City Council; oversees the execution and processing of
construction contract documents.
• Performs the construction management of assigned projects; implements the contract and maintains a
project filing system.
• Follows related City, state and federal standards, policies, guidelines and laws; processes, reviews and
approves contractor submittals; processes, reviews and responds to requests for information.
• Performs field inspection and documentation of construction activities; prepares and calculates progress
pay estimates and negotiates and prepares change orders and field change directives.
Senior Utilities Engineer
April 2016Neve^ 'n 2
Style Definition: List Bullet 2: Font: P
Indent: Left: 0.25"
T,
a
to
00
Packet Pg. 148
3.8.b
JOB DESCRIPTION
Senior Utilities Engineer
• Prepares daily inspection reports; calculates and prepares field notes records of contractor quantities
and materials installed in the field; takes and files daily photos of assigned projects and monitors
contractor operations and traffic control to ensure a safe work area.
• Responds promptly to public questions and concerns; attends, runs or coordinates associated meetings
and interacts with other public agencies; manages and tracks the close-out phase of construction
contracts and the documentation required for final project approval.
• Prepares and manages consultant contracts; develops and prepares Request for Qualifications (RFQ's).
• Reviews and evaluates statement of qualifications; reviews and approves fee sheets, scopes,
schedules and invoices; reviews and checks consultant drawings, specifications and estimates for
accuracy and quality; monitors consultant progress and invoices to approved schedules.
• Develops, prepares and monitors project budget; reviews and tracks project expenditures; prepares
reports on cost overruns or budget amendments; prepares City, state and federal documents for
administration of grants and loans and proposes alternate construction methods or materials to reduce
project costs.
• Assists with the development and issuance of utility revenue bonds to fund capital improvement
projects.
•_Prepares City Council agenda packets; attends City Council meetings and public hearings; makes
presentations and responds to questions on issues as needed.
• Manages, coordinates and reviews the work of assigned staff.
• Assigns work activities; coordinates schedules, project and programs; provides constructive feedback;
reviews and evaluates work and makes effective suggestions and recommendations.
• Supervises, coaches, trains and motivates staff and coordinates and/or provides staff training.
• Manages the employment and hiring process and employee relations for assigned area.
• Manages the workflow and prioritization of assigned projects.
• Develops or assists with developmental work plans for staff and makes recommendations and/or
implements corrective actions including discipline and termination procedures as appropriate/necessary
or as directed.
Required Knowledge of:
• Design and construction principles.
• Construction field measurement and inspection methods and procedures.
• City and industry (water, sewer and storm drainage) standard codes and regulations as well as local,
state and federal laws relating to assigned work.
• Surveying principles and use of survey equipment.
• Engineering mathematics, standards, practices and principles.
• Engineering calculators and modeling programs.
• Drafting practices and standards, including operating AutoCAD to develop project drawings.
• Technical aspects of field of specialty.
• Interpersonal skills using tact, patience and courtesy.
• Structure, organization and inter -relationships of city departments, agencies, and related governmental
agencies and offices affecting assigned functions.
• Effective oral and written communication principles and practices to include public relations and public
speaking.
• Program/project management techniques and principles.
• Research methods and report preparation and presentation.
• Modern office procedures, methods, and equipment including computers and computer applications
such as: word processing, spreadsheets, and statistical databases.
• English usage, spelling, grammar and punctuation.
• Principles of business letter writing.
Senior Utilities Engineer
April 2016niPyAFnbAF 2012
Packet Pg. 149
3.8.b
JOB DESCRIPTION
Senior Utilities Engineer
• Principles and practices of governmental budget preparation and administration related to capital
projects budgets.
• Supervisory and training principles, methods, best management practices and techniques.
Required Skill in:
• Planning, developing and prepares design drawings and specifications for water, sewer and storm' Formatted: Indent: Left: 0"
drainage utilities projects.
• Managing projects, resources, schedules and timelines.
• Performing topographic and construction surveys.
• Reading and understanding engineering drawings.
• Understanding codes and specifications.
• Prioritizing and scheduling work.
• Representing the City effectively at public meetings and working with the public.
• Interpreting, applying and explaining rules, regulations, policies and procedures.
• Utilizing personal computer software programs and other relevant software affecting assigned work and
in compiling and preparing spreadsheets including AutoCAD to develop project drawings.
• Establishing and maintaining effective working relationships with staff, management, vendors, outside
agencies, community groups and the general public.
• Analyzing situations accurately and adopting an effective course of action.
• Applying program/project management techniques and principles.
• Directing the maintenance of a variety of reports and files; preparing, maintaining and reviewing
narratives and statistical reports.
• Determining project budgets, resources and timelines to complete projects from conceptualization to
finish.
• Communicating effectively verbally and in writing including public relations and public speaking.
• Supe .i..iRg -RRd fnr-.h Rinnl rRviewing of other's }asks
• Supervising, leading, coaching and using best management practices to improve staff performance: • - Formatted: List Bullet 2, Space After:
delegating tasks and workload assignments.
' Formatted: List Bullet 2, Indent: Left:
MINIMUM QUALIFICATIONS: Space After: 0 pt
Education and Experience:
Bachelor's Degree in Civil Engineering or related field and four years of public works or construction related
experience that includes project management experience in designing, managing or inspecting the construction
of utilities projects; OR an equivalent combination of education, training and experience.
Required Licenses or Certifications:
Valid State of Washington Driver's License.
Washington State Professional Civil Engineer (PE) license.
Must be able to successfully complete and pass a background check.
WORKING CONDITIONS:
Environment:
• Indoor and outdoor work environment.
• Driving a vehicle to conduct work.
Senior Utilities Engineer
April 20161SIevernber 'n"
Packet Pg. 150
3.8.b
JOB DESCRIPTION
Senior Utilities Engineer
Physical Abilities:
• Hearing, speaking or otherwise communicating to exchange information in person or on the telephone.
• Operating a computer keyboard and drafting materials.
• Reading and understanding a variety of materials.
• Sitting, standing or otherwise remaining in a stationary position for extended periods of time.
• Ascending/descending from ladders and working from heights or depths.
• Bending at the waist, kneeling or crouching reaching above shoulders and horizontally or otherwise
positioning oneself to accomplish tasks.
• Lifting/carrying or otherwise moving or transporting moderately heavy objects up to 40 lbs.
• Ability to wear appropriate personal protective equipment based on required City Policy.
Hazards:
• Contact with angry and/or dissatisfied customers.
• Occasional exposure to dangerous machinery.
• Occasional extreme weather conditions.
• Potential physical harm and hazardous chemicals when working in the field, conducting inspections and
working around construction equipment and worksites.
Incumbent Signature: Date:
Department Head: Date:
Senior Utilities Engineer
April 2016Nevernber 20"
Packet Pg. 151
3.8.b
JOB DESCRIPTION
Senior Utilities Engineer
Senior Utilities Engineer
April 2016Ne rnber'^"
Packet Pg. 152
3.8.c
City of
EDMONDS
Washington
STORMWATER ENGINEER
Department: Public Works - Engineering Pay Grade: NR-13
Bargaining Unit: Non- Represented FLSA Status: Exempt
Revised Date: November 201-2 ril 2016 Reports To: Senior Utilities Engineer
POSITION PURPOSE: Under administrative direction, manages stormwater engineering and compliance
program; prepares City stormwater code, standards and reports; prepares stormwater compliance reviews on
private development projects and capital improvements projects; plats, develops and implements the
stormwater capital improvement plan; manages assigned capital improvement projects and contracts; prepares
stormwater design drawings, specifications and cost estimates; provides technical recommendations to
stormwater maintenance personnel; and updates the Storm and Surface Water element of the City's
Comprehensive Plan.
ESSENTIAL FUNCTIONS AND RESPONSIBILITIES:
The following duties ARE NOT intended to serve as a comprehensive list of all duties performed by all
employees in this classification, only a representative summary of the primary duties and responsibilities.
Incumbent(s) may not be required to perform all duties listed and may be required to perform additional,
position -specific duties.
• Manages the City's stormwater engineering program; coordinates and oversees the City's compliance
with the Western Washington Phase II Municipal Stormwater Permit (Phase II NPDES permit).
• Prepares the City's annual report on the Phase II NPDES permit to the Department of Ecology and
coordinates and conducts public education and outreach activities.
• Prepares and implements the City's stormwater code for private development and permit applications;
performs stormwater development review on larger sites and manages the inspection program to
ensure all private stormwater facilities are properly maintained and operate as designed.
• Directs the implementation of the entire program for controlling runoff for new development and
redevelopment; applies all applicable City code and regulations to development submittals; performs
development review of the more complex and larger sites for compliance; manages the inspection
program to ensure all private stormwater facilities are properly maintained and operate as designed.
• Manages basin plans and other documentation to identify and define priorities for repair and
replacement of surface water infrastructure.
• Manages coordinates and reviews the work of assignors staff
• SupervisGS, GeaGhes, trains and metivates staff and GOOrdiRates and/Gr provides staff traiRiRg.
reviews and evaluates work and makes effective suggestions and recommendations. Manages the workflow and prioritization of assigned projects and takes appropriate corrective action
when nyi.ding a.dVir.e anrs r. el to staff
• Develops or assists with developmental work plans for staff and makes recornmendations an
or as d0rer.ted
Stormwater Engineer AML2016NGfPacket Pg. 153
3.8.c
JOB DESCRIPTION
Stormwater Engineer
• Develops and implo,,,othe Stormwater Capital Improvement Program plan to address flooding, water
quality and aquatic habitat concerns throughout the City; performs hydraulic analysis and determines
size of new systems to meet design flow requirements; performs field inspections of hydraulic and
hydrology related work and develops and updates the City's stormwater standards, code and standard
details including; project objects, cost estimates and Council briefings.
• Manages assigned capital improvement projects; plans, develops and prepares stormwater design
drawings, contract specifications and cost estimates.
• Uses AutoCAD and related engineering and graphics software to prepare detailed design drawings.
• Coordinates project improvements with City Departments, private utilities other public agencies and
citizens.
• Prepares and secures necessary easements for project construction.
• Manages the advertisement, bid and award of stormwater capital improvement projects; prepares
advertisement notices and responses to bidder questions; reviews and analyzes bid documents for
compliance with city, state and federal requirements; prepares award recommendations for City Council
and oversees the execution and processing of construction contract documents.
• Performs the construction management of assigned stormwater projects; implements the contract and
maintains project filing system.
• Follows related city, state and federal standards, policies, guidelines, laws and processes.
• Reviews and approves contractor submittals and reviews and responds to requests for information.
• Performs field inspection and prepares daily inspection reports; calculates and prepares field note
records of contractor quantities and materials installed in the field; takes and files daily photos of
assigned projects and monitors contractor operations and traffic control to ensure a safe work area.
• Prepares and calculates progress pay estimates for Contractor payments.
• Negotiates and prepares change orders and field change directives.
• Manages and tracks the close-out phase of construction contracts and the documentation required for
final project approval.
• Attends, runs or coordinates associated meetings and; interacts with other public agencies,
• Prepares and manages consultant contracts; develops and prepares Request for Qualifications (RFQ's)
and reviews and evaluates statement of qualifications.
• Reviews and approves fee sheets, scopes, schedules and invoices; reviews and checks consultant
drawings, specifications and estimates for accuracy and quality; monitors consultant progress and
invoices to approved schedules;
• Develops, prepares and monitors project budget; reviews and tracks project expenditures and prepares
reports on cost overruns or budget amendments.
• Prepares City, state and federal documents for administration of grants and loans.
• Prepares City Council agenda packets for stormwater issues; attends City Council meetings and public
hearings; makes presentations and responds to questions on issues as needed and responds to public
concerns and complaints regarding stormwater management issues.
Required Knowledge of:
• Engineering principles related to stormwater collection, conveyance, best management practices cost
estimating and construction.
• Environmental regulations related to stormwater management, wetlands, fisheries and aquatic systems.
• Hydrologic and hydraulic analysis.
• -&Stormwater computer software applications and computer aided design.
• City's Storm Water Management Ordinance and the Washington State Storm Water Management
Manual.
• Federal, state and local laws and regulations regarding drainage systems.
• Technical aspects of field of speci-alty.
• Interpersonal skills using tact, patience and courtesy.
• Structure, organization and inter -relationships of city departments, agencies and related governmental
agencies and offices affecting assigned functions.
Stormwater Engineer Neaemb
Packet Pg. 154
3.8.c
JOB DESCRIPTION
Stormwater Engineer
• Effective oral and written communication principles and practices to include public relations and public
speaking.
• Program/project management techniques and principles.
• Research methods and report preparation and presentation.
• Modern office procedures, methods, and equipment including computers and computer applications
such as: word processing, spreadsheets, and statistical databases.
• English usage, spelling, grammar and punctuation.
• Principles of business letter writing.
• Principles and practices of governmental budget preparation and administration.
Required Skill in:
• Performing technical studies, designs and field inspections of hydraulic and hydrology -related work.
• Performing hydraulic analysis of storm systems.
• Interpretation of laws and regulations related to stormwater quality and quality and their effects on the
environment.
• Developing long term plans based on analysis developed.
• Prioritizing projects based on cost and social benefit analysis.
• Reviewing a variety of plans and providing guidance on deficiencies.
• Represent the City effectively at public meetings and work with the public.
• Meeting schedules and timelines.
• Interpreting, applying and explaining rules, regulations, policies and procedures.
• Utilizing personal computer software programs and other relevant software affecting assigned work and
in compiling and preparing spreadsheets.
• Establishing and maintaining effective working relationships with staff, management, vendors, outside
agencies, community groups and the general public.
• Analyzing situations accurately and adopting an effective course of action.
• Applying program/project management techniques and principles.
• Directing the maintenance of a variety of reports and files; preparing, maintaining and reviewing
narrative and statistical reports.
• Communicating effectively verbally and in writing including public relations and public speaking.
'' delegating tacks anworkload assignments rl
MINIMUM QUALIFICATIONS:
Education and Experience:
Bachelor's Degree in Civil Engineering, Environmental Engineering or related field and four years of municipal
engineering experience; preferably in stormwater design and environmental permitting in a public sector
environment; OR an equivalent combination of education, training and experience.
Required Licenses or Certifications:
Valid State of Washington Driver's License.
Current Washington State Professional Civil Engineer (PE) license.
Must be able to successfully complete and pass a background check.
WORKING CONDITIONS:
Stormwater Engineer Nevemb
Packet Pg. 155
3.8.c
JOB DESCRIPTION
Stormwater Engineer
Environment:
• Indoor and outdoor work environment.
• Driving a vehicle to conduct work.
Physical Abilities:
• Hearing, speaking or otherwise communicating to exchange information in person or on the telephone
• Operating a computer keyboard and drafting materials.
• Reading and understanding a variety of materials.
• Sitting, standing or otherwise remaining in a stationary position for extended periods of time.
• Ascending/descending from ladders and working from heights or depths.
• Bending at the waist, kneeling or crouching reaching above shoulders and horizontally or otherwise
positioning oneself to accomplish tasks.
• Lifting/carrying or otherwise moving or transporting moderately heavy objects up to 40 lbs.
• Ability to wear appropriate personal protective equipment based on required City Policy.
Hazards:
• Contact with angry and/or dissatisfied customers.
• Occasional exposure to dangerous machinery.
• Occasional extreme weather conditions.
• Potential physical harm and hazardous chemicals when working in the field, conducting inspections and
working around construction equipment and worksites.
Incumbent Signature:
Department Head:
Date:
Date:
Stormwater Engineer
Neaemb
Packet Pg. 156
Estimated Salary/Benefits
Position 2016 2017 2018
2019 2020
Senior Utilities Engineer
$4,354
$13,386
$13,386
$13,386
$13,386
Stormwater Engineer
($50,725)
($23,155)
($17,782)
($12,141)
($6,218)
Engineering Prgm Mgr 2
$3,582
$11,014
$11,014
$11,014
$11,014
Engineering Tech 3
$6,673
$11,351
$11,351
$11,351
$11,351
($36 1 1r` $12,596 $17,969 $23,610 $29,533
W
PO
Q
Attachment: Attachment 4 - Salary Table (1186 : Public Works Engineering Job Description Update & Reclassification)
3.8.e
EXISTING
Administrative
Assistant
Engineering
Program
Manager
RECOMMENDED
Administrative
Assistant
Engineering
Technician
(3)
Engineering
Program
Manager
Engineering
Technician
(3)
City
Engineer
Traffic
Engineer
Traffic
Engineer
Senior
Utility
Engineer
City
Engineer
Stormwater
Engineer
Senior
Utility
Engineer
Stormwater
Engineer
Stormwater
Technician
Capital
Project
Manager
(4)
Stormwater
Technician
Y
L
0
ci
Capital Senior a
Project Construction
co
Manager Inspector
(4) 1
Senior
Construction
Inspector
Packet Pg. 158
3.9
City Council Agenda Item
Meeting Date: 05/3/2016
Removal of residence located at 820 Maple Street from the Edmonds Register of Historic Places
Staff Lead: Kernen Lien
Department: Planning Division
Preparer: Kernen Lien
Background/History
The residence known as the Dr. Palmer House located at 820 Maple Street was placed on the Edmonds
Register of Historic Places in 2010 under Ordinance No. 3811 (Exhibit 2). The property has since
changed ownership and the new owners have submitted for building permits for alterations to the
residence. Prior to the commencement of any work on a register property, the owner must receive a
Certificate of Appropriateness from the Edmonds Historic Preservation Commission. The Historic
Preservation Commission found some of the proposed work on the residence did not meet the criteria
for a Certificate of Appropriateness.
Staff Recommendation
Adopt the ordinance included as Exhibit 1 to remove the residence from the Edmonds Register of
Historic Places and remove the "HR" designation from the official zoning map.
Narrative
The property owner has recently submitted building permits for a new porch addition, detached garage,
siding restoration and replacement of four windows on the third floor of the residence (BLD20160420 &
BLD20160421). The Historic Preservation Commission (HPC) reviewed the proposed changes at their
April 14, 2016 meeting to consider the eligibility of the proposed work for a Certificate of
Appropriateness (Exhibit 3). While the HPC found the porch addition, detached garage, and siding
restoration work met the criteria for an issuance of a Certificate of Appropriateness; the HPC found the
proposed window replacements do not meet the criteria for the issuance of a Certificate of
Appropriateness. Upon considering the HPC findings and reviewing potential alternatives to the window
replacement, the property owners have requested the property be removed from the register. Chapter
20.45 ECDC, the code section governing Edmonds Register of Historic Places, is premised upon
participation through owner consent.
Given the building official cannot issue a building permit for a Register property without a Certificate of
Appropriateness, the HPC findings that the proposed window replacement does not meet the criteria
for a Certificate of Appropriateness and, the owner's request that the property be removed from the
Register, the draft ordinance included as Exhibit 1 has been prepared for the Council's consideration to
remove the property from the Edmonds Register of Historic Places.
Attachments:
Exhibit 1 - Proposed Ordiance to Remove 820 Maple Street from Historic Register
Packet Pg. 159
3.9
Exhibit 2 - Ordinance No. 3811
Exhibit 3 - April 14, 2016 Historic Preservation Commission Draft Minutes Excerpt
Packet Pg. 160
3.9.a
ORDINANCE NO.
AN ORDINANCE REMOVING THE RESIDENCE KNOWN AS
THE DR. PALMER HOUSE LOCATED AT 820 MAPLE
STREET, EDMONDS, WASHINGTON FROM THE EDMONDS
REGISTER OF HISTORIC PLACES, AND DIRECTING THE
DEVELOPMENT SERVICES DIRECTOR OR HIS DESIGNEE
TO REMOVE THE "HR" DESIGNATION FOR SITE FROM
THE OFFICIAL ZONING MAP WITH, AND FIXING A TIME
WHEN THE SAME SHALL BECOME EFFECTIVE.
WHEREAS, the residence known as the Dr. Palmer House located at 820 Maple
Street, Edmonds, Washington, was placed on the Edmonds Register of Historic Places in 2010
under Ordinance No. 3 811; and
WHEREAS, prior to the commencement of any work on a register property, the
owner must request and receive a Certificate of Appropriateness from the Historic Preservation
Commission; and
WHEREAS, for properties that are on the Edmonds Register of Historic Places,
the City of Edmonds building official cannot issue a building permit without a Register property
first receiving a Certificate of Appropriateness from the Historic Preservation Commission; and
WHEREAS, the property owner of the Dr. Palmer House located at 820 Maple
Street, Edmonds, Washington has proposed to add a new 44 square foot covered porch, a new
568 square foot detached garage, restore original siding, and replace four third -story windows to
the Register property, and
a
-1-
Packet Pg. 161
3.9.a
WHEREAS, the Edmonds Historic Preservation Commission held a public
meeting on April 14, 2016, to consider the eligibility of the proposed work for a Certificate of
Appropriateness, and
WHEREAS, the Historic Preservation Commission found the porch addition,
detached garage, and siding restoration work meets the criteria for an issuance of a Certificate of
Appropriateness, and
WHEREAS, the Historic Preservation Commission found the proposed window
replacements do not meet the criteria for the issuance of a Certificate of Appropriateness, and
WHEREAS, the Historic Preservation Commission found the proposed window
replacements would alter the Dr. Palmer residence at 820 Maple Street to such an extent that the
property would no longer be eligible for listing on the Register of Historic Places, and
WHEREAS, the owners have expressed their desire for the property be removed
from the Edmonds Register of Historic Places; and
WHEREAS, the chapter 20.45 ECDC, the chapter governing the Edmonds
Register of Historic Places, is premised upon participation through owner consent, NOW,
THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO
ORDAIN AS FOLLOWS:
Section 1. The residence known at the Dr. Palmer House located at 820 Maple
Street Edmonds, Washington 98020, is hereby removed from the Edmonds Register of Historic
Places.
Section 2. The Development Services Director, or his designee, is hereby x
w
authorized to remove the "HR" designation for the site from the Edmonds zoning map. This
E
a
-2-
Packet Pg. 162
3.9.a
removal of the designation does not change or modify the underlying zone classification.
Section 3. Effective Date. This ordinance, being an exercise of a power specifi-
cally delegated to the City legislative body, is not subject to referendum, and shall take effect
five (5) days after passage and publication of an approved summary thereof consisting of the
title.
APPROVED:
MAYOR DAVID O. EARLING
ATTEST/AUTHENTICATED:
CITY CLERK, SCOTT PASSEY
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
JEFFREY B. TARADAY, CITY ATTORNEY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
PUBLISHED:
EFFECTIVE DATE:
ORDINANCE NO.
a
-3-
Packet Pg. 163
3.9.a
SUMMARY OF ORDINANCE NO.
of the City of Edmonds, Washington
On the 3rd day of May, 2016, the City Council of the City of Edmonds, passed
Ordinance No. A summary of the content of said ordinance, consisting of the title,
provides as follows:
AN ORDINANCE REMOVING THE RESIDENCE KNOWN AS
THE DR. PALMER HOUSE LOCATED AT 820 MAPLE
STREET, EDMONDS, WASHINGTON FROM THE EDMONDS
REGISTER OF HISTORIC PLACES, AND DIRECTING THE
DEVELOPMENT SERVICES DIRECTOR OR HIS DESIGNEE
TO REMOVE THE "HR" DESIGNATION FOR SITE FROM
THE OFFICIAL ZONING MAP WITH, AND FIXING A TIME
WHEN THE SAME SHALL BECOME EFFECTIVE.
The full text of this Ordinance will be mailed upon request.
DATED this day of May, 2016.
CITY CLERK, SCOTT PASSEY
a
jrwci00006.900000i}
Packet Pg. 164
3.9.b
0006.90000
kpl
09/20/2010
ORDINANCE NO.3811
AN ORDINANCE DESIGNATING THE EXTERIOR OF THE
RESIDENCE KNOWN AS THE DR. PALMER HOUSE
LOCATED AT 820 MAPLE STREET, EDMONDS,
WASHINGTON FOR INCLUSION ON THE EDMONDS
REGISTER OF HISTORIC PLACES, AND DIRECTING THE
COMMUNITY SERVICES DIRECTOR OR HIS DESIGNEE TO
DESIGNATE THE SITE ON THE OFFICIAL ZONING MAP
WITH AN "HR" DESIGNATION., AND FIXING A TIME
WHEN THE SAME SHALL BECOME EFFECTIVE.
WHEREAS, the residence known as the Dr. Palmer House located at 820 Maple
Street, Edmonds, Washington, is included on the Historic Survey of Downtown Edmonds
prepared by BOLA Architecture in conjunction with the Washington State Office of
Archaeology and Historic Preservation in October, 2004, as a property that is potentially eligible
for listing on the Edmonds Register of Historic Places; and
WHEREAS, the Edmonds Historic Preservation Commission held a public
hearing on August 12, 2010, to consider the eligibility of the residence for listing on the
Edmonds Register of Historic Places; and
WHEREAS, after consideration of the staff recommendation the Commission
unanimously voted to recommend to the City Council that the residence be listed on the
Edmonds Register of Historic Places; and
and
WHEREAS, the owner(s) have given their written consent for such designation;
-1-
Packet Pg. 165
3.9.b
WHEREAS, the City Council has received the recommendation of the Historic
Preservation Commission regarding the features of the site which contribute to its designation
and finds that the application meets the criteria of the ordinance as contained in Chapter 20.45 of
the ECDC, NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO
Section 1. The residence known as the Dr. Palmer House located at 820 Maple
Street, Edmonds, Washington 98020, is hereby approved for designation to the Edmonds
Historic Register. The exterior of the building is hereby designated as significant.
Section 2. The Community Services Director, or his designee, is hereby
authorized to designate the listed site on the Edmonds zoning map with an "HR" designation.
This designation does not change or modify the underlying zone classification.
Section 3. Effective Date. This ordinance, being an exercise of a power specifi-
cally delegated to the City legislative body, is not subject to referendum, and shall take effect
five (5) days after passage and publication of an approved summary thereof consisting of the
title.
ATTEST/AUTHENTICATED:
� d �
CITY CLERK, SANDRA S. CHASE
APPROVED AST ORM:
OFFICE OF W TY A O EY-
BY
W. SCOTT SNYDER
APPROV D: %
lam_.
MAYOR MIKE COOP R
-2-
Packet Pg. 166
3.9.b
FILED WITH THE CITY CLERK: 10-01-2010
PASSED BY THE CITY COUNCIL: 10-05-2010
PUBLISHED: 10-10-2010
EFFECTIVE DATE: 10-15-2010
ORDINANCE NO. 3811
-3-
Packet Pg. 167
3.9.b
SUMMARY OF ORDINANCE NO.3811
of the City of Edmonds, Washington
On the 5`" day of October, 2010, the City Council of the City of Edmonds, passed
Ordinance No. 3811. A summary of the content of said ordinance, consisting of the title,
provides as follows:
AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, DESIGNATING THE
EXTERIOR OF THE RESIDENCE KNOWN AS THE DR. PALMER HOUSE LOCATED AT
820 MAPLE STREET, EDMONDS, WASHINGTON FOR INCLUSION ON THE EDMONDS
REGISTER OF HISTORIC PLACES, DIRECTING THE COMMUNITY SERVICES
DIRECTOR OR HIS DESIGNEE TO DESIGNATE THE SITE ON THE OFFICIAL ZONING
MAP WITH AN "HR" DESIGNATION, AND FIXING A TIME WHEN THE SAME SHALL
BECOME EFFECTIVE.
The full text of this Ordinance will be mailed upon request.
DATED this 6th day of October, 2010.
ITY CLERK, SANDRA S. CHASE
{rwc/00006.900000/} - 4 -
Packet Pg. 168
3.9.b
Affidavit of Publication
STATE OF WASHINGTON'
COUNTY OF SNOHOMISH
} S.S.
µ
The undersigned, being first duly sworn on oath deposes and says that she is Principal Clerk of
THE HERALD, a daily newspaper printed and published in the City of Everett, County of
Snohomish, and State of Washington; that said newspaper is a newspaper of general
ono. 1 ae�
circulation in said County and State; that said newspaper has been approved as a legal
SUMMARY OF ORDINANCE NO. 3811
o the dyo'E mon s, ashington
newspaper by order of the Superior Courtof Snohomish County and that the notice
On the Sth day of October, 2010, the City Council of the City of
Edmonds, passed Ordinance No. 3811. A summary of the content
of said ordinance, consisting of the title, provides as follows:
AN ORDINANCE. OF THE CITY OF EDMONDS, WASHINGTON,
DESIGNATING THE EXTERIOR OF THE RESIDENCE KNOWN
Summary of Ordinance NO. 3811
AS6THE DR. PALMER HOUSE LOCATED AT 820 MAPLE
STREET, EDMONDS, WASHINGTON FOR INCLUSION ON THE
EDMONDS REGISTER OF HISTORIC PLACES, DIRECTING
THE COMMUNITY SERVICES DIRECTOR OR HIS DESIGNEE
Designating the Expterior of the Residence
TO DESIGNATE..THE SITE ON THE OFFICIAL ZONING MAP
WITH AN'HR" DESIGNATION, AND FIXING A TIME WHEN THE
SAME SHALL BECOME EFFECTIVE.
The full teittof this Ordinance -will be mailed upon request.
DATED this 6th day of October, 2010.
Published: October 10, 2010. CITY CLERK, SANDRA S. CHASE
a printed copy of which is hereunto attached, was published in said newspaper proper and not in
supplement form, in the regular and entire edition of said paper on the following days and
times, namely:
October 10, 2010
,OCT 19 2010
s t s =r�
^✓i.;�_
Account Name: City of Edmonds
and that said newser was regularly distributed to its -subscribers during all of said period.
Subscribed and sworn to before me this
day of October, 2010i-1
Notary Public in and for a totoi-!ah)fi'�foir,res.
County. Z
D
..y
Account Number. 101 �6 rz f ? . ,4 `
11th
Snohomish
Number: 0001713760
Packet Pg. 169
3.9.c
CITY OF EDMONDS
HISTORIC PRESERVATION COMMISSION
Summary Minutes of Regular Meeting
April 14, 2016
CALL TO ORDER AND ROLL CALL
Chair Scott called the meeting of the Edmonds Historic Preservation Commission to order at 5:37 p.m. in the 3rd Floor
Conference Room of City Hall, 121 — 5d' Avenue North.
COMMISSIONERS PRESENT
Emily Scott, Chair
Larry Vogel, Vice Chair (arrived at 5:35 p.m.)
Sandra Allbery
Chris Definer -Karr
Tim Raetzloff
Steve Waite
Dave Teitzel, City Council Member
COMMISSIONERS ABSENT
Eric Livingston
AGENDA ADDITIONS/CHANGES
STAFF PRESENT
Kernen Lien, Senior Planner
Diane Cunningham, Administrative Assistant
OTHERS PRESENT
David Peterson
Margaret Peterson
The agenda was modified to place the Action Item (820 Maple Street) first on the agenda.
ACTION ITEMS
Certificate of Appropriateness or Removal from Historic Register for Dr. Palmer House at 820 Maple Street
Mr. Lien advised that 820 Maple Street was placed on the Edmonds Register of Historic Places in 2010, and is one of the few
properties the BOLA Report listed as qualifying for the National Register. The current owners have applied for a building
permit for a garage addition, a porch addition, and replacement of four windows on the third floor.
David and Margaret Peterson provided an overview of the proposed changes to both the inside and outside of the structure.
Mr. Peterson explained that, in addition to replacing four windows on the third floor, they are proposing to remove the
asbestos siding to reveal the home's original wood siding. The proposed garage will have a similar architectural detail as the
home.
Mr. Lien reminded the Board that the proposed modifications will require a Certificate of Appropriateness from the
Commission. He referred to the Secretary of the Interior's Standards for Rehabilitation of Historic Structures. He
summarized that both the garage and porch additions appear to be consistent with the standards, but he has concerns about
the windows. He specifically pointed out that:
Packet Pg. 170
3.9.c
Windows comprise a considerable amount of the historic fabric and wall plain, and thus, deserve special
consideration in a rehabilitation project. The windows were identified in the BOLA Report as part of the
defining historic character of the house.
The standards do not allow property owners to remove or radically alter the windows, which are important in
defining the historic character of the building, in such a way that diminishes the character. That is the big
question the Commission must answer. The applicant is proposing to change both the size of the window openings
and the style of the windows. Based on precedence set by the Schumacher Building, the Commission could approve
the Certificate of Appropriateness as long as the size of the openings is not changed.
The standards also recommend against adding false historic character to the building. In addition to changing the
size and style of the window, the applicant is proposing to add a design element to the top of the windows.
Mr. Lien advised that small additions that do not change the defining character of the building can be allowed. The porch
addition will be located at the back corner of the building under the existing eaves, and the shed type roof will differentiate
the addition from the sweeping eaves.
The Commissioners all voiced support for the applicant's proposal to remove the asbestos siding and restore the original
siding and shingles that lie underneath. They also voiced general support for the proposed changes to the south side of the
structure (porch and garage), which will not be visible from the street. However, Commissioner Waite voiced concern that
the proposed garage design is too much like the historic structure. He explained that the design is supposed to be influenced
by the historic structure, but not replicated. Regarding the windows, the Commission discussed the following:
Are the Secretary of the Interior's Standards recommendations or mandates? Some Commissioners felt that if the
structure was being considered for the State or National Registers, the criteria should be interpreted strictly.
However, there is more flexibility for local registers. On the other hand, Commissioner Waite pointed out that the
Department of the Interior's Standards are clear and have been in place for a number of years. Disregarding the
standards could raise questions about the credibility of the Edmonds Register of Historic Places. While he
applauded the Petersons for restoring the original siding, which is an important characteristic of the building, he
questioned if that should warrant the Commission's decision to disregard the criteria relative to windows.
It was discussed that, although the proposed window alterations are inconsistent with some of the criteria, they
would not prevent a future owner from changing the size and style back to the original design at some point in the
future. Some felt that the proposed change would not irreparably change the structure and character of the building.
The Petersons pointed out that the larger windows are needed to improve the lighting for the living space and to take
advantage of the fabulous views. Commissioner Waite explained that the idea of reversibility is generally related to
repair, and it is not likely that the original window style and size will be replaced at a future time. He suggested that
a skylight could be an alternative to provide additional light.
The Commissioners agreed that the structure is very important to the Edmonds Register and it is currently eligible to
be included on the National Register, as well. Chair Scott suggested that the Commission consider whether or not
the building would have still been added to the Register if the window modifications had occurred prior to listing it
on the Register. It was discussed that retaining the structure on the Register would allow the Commission to work
with the property owners to maintain the integrity of the building going forward. Commissioner Raetzloff said he
believes the Commission would have approved the structure for the Register if the windows had already been
changed, but he is still hesitant to support the application as proposed.
Some Commissioners felt the preponderance of historic characteristics and attributes for keeping the structure on the
Register far outweigh the windows. Commissioner Deiner-Karr said she does not believe that changing just four
windows would have a significant impact on the historic integrity of the building, particularly in light of the
applicant's proposal to restore the original siding. Commissioner Waite commented that although the window
alterations may not be noticeable to those walking by, the Commission's responsibility is to maintain the historic
integrity of structures.
Historic Preservation Commission Minutes
April 14, 2016 Page 2
Packet Pg. 171
3.9.c
• The Commissioners referred to their earlier action relative to the Schumacher Building. It was pointed out that the
current proposal is different in that it would replace iconic windows and the Schumacher Building windows were
not original. It was also pointed out that the window openings on the Schumacher Building were not altered.
• There was concern expressed that the proposed window design provides too much detail that does not match the
windows below. If the details were eliminated, the windows would look more authentic.
• The Commission discussed that fire safety requirements may need to be addressed if the upper story is used as
bedroom space. It was noted that the windows would need to open, and they can be no higher than 48 inches from
the floor.
• Chair Scott pointed out that if the applicant replaces the four windows on the upper story as proposed, it is likely the
home would no longer be eligible for the State and National Registers. It was explained that because the City is a
Certified Local Government, it must follow the State's standards, which are based on the Department of the
Interior's Standards. Again, it was suggested that the Department of the Interior's Standards could be interpreted to
be recommendations and not mandates.
VICE CHAIR VOGEL MOVED THAT THE COMMISSION ISSUE A CERTIFICATE OF APPROPRIATENESS
FOR REMOVAL OF THE ASBESTOS SIDING TO REVEAL AND RESTORE THE ORIGINAL FIR SIDING AND
CEDAR SHINGLES. COMMISSIONER ALLBERY SECONDED THE MOTION, WHICH CARRIED
UNANIMOUSLY.
VICE CHAIR VOGEL MOVED THAT THE COMMISSION ISSUE A CERTIFICATE OF APPROPRIATENESS
FOR THE PORCH ADDITION. COMMISSIONER ALLBERY SECONDED THE MOTION.
Commissioner Waite pointed out that no design has been proposed for the porch addition. Mr. Lien said the porch will have
a shed roof, which is different than the existing roof. The porch will be located under the eaves, and will not alter any of the
significant features of the home.
VICE CHAIR VOGEL MOVED TO AMEND HIS MOTION TO CLARIFY THAT THE PORCH ADDITION
WOULD BE LOCATED ON THE SOUTHEAST CORNER OF THE STRUCTURE AND THE DESIGN WOULD
BE CONSISTENT WITH STAFF'S DESCRIPTION. COMMISSIONER DEINER-KARR SECONDED THE
AMENDMENT. THE MOTION TO AMEND WAS UNANIMOUSLY APPROVED.
THE MAIN MOTION, AS AMENDED, WAS UNANIMOUSLY APPROVED.
VICE CHAIR VOGEL MOVED THAT THE COMMISSION ISSUE A CERTIFICATE OF APPROPRIATENESS
FOR THE GARAGE ADDITION AS DESCRIBED IN THE DRAWINGS. COMMISSIONER WAITE SECONDED
THE MOTION, WHICH CARRIED UNANIMOUSLY.
Commissioner Deiner-Karr pointed out that the applicant has not finalized the window design. She suggested that the
Commission could approve the window modifications based on specific recommendations. For example, the upper windows
could be redesigned to remove the embellishments and reflect the design of the existing first and second floor windows.
VICE CHAIR VOGEL MOVED THAT THE COMMISSION ISSUE A CERTIFICATE OF APPROPRIATENESS
FOR THE PROPOSED MODIFICATIONS TO THE THIRD FLOOR WINDOWS, WITH THE PROVISO THAT
EVERY EFFORT BE MADE FOR THE WINDOWS TO REFLECT THE DESIGN AND CHARACTER OF THE
EXISTING WINDOWS ON THE FIRST AND SECOND FLOORS. COMMISSIONER DEINER-KARR
SECONDED THE MOTION. THE MOTION FAILED 4-2, WITH COMMISSIONERS VOGEL AND DEINER-
KARR VOTING IN FAVOR AND COMMISSIONERS RAETZLOFF, ALLBERY, SCOTT AND WAITE VOTING
IN OPPOSITION.
Historic Preservation Commission Minutes
April 14, 2016 Page 3
Packet Pg. 172
3.9.c
Mr. Lien agreed to notify the Peterson's of the Commission's decision and offer direction for how they can modify the
proposed window alterations or request that the property be taken off the Register. After speaking with the Petersons, Mr.
Lien would send an update to the Commissioners.
Commissioner Raetzloff inquired if allowances could be made to accommodate the changing uses of a structure. Mr. Lien
answered affirmatively and reviewed the Department of the Interior's Standards that apply to "Alterations and Additions for
the New Use." The installation of additional windows on rear or other non -character -defining elevations would be allowed if
required by the new use. While the design should be compatible with the overall design of the building, it should not
duplicate the fenestration, pattern, detail or character of the defining elevation.
READING/APPROVAL OF MINUTES
COMMISSIONER RAETZLOFF MOVED TO APPROVE THE MINUTES OF FEBRUARY 11, 2016 AS
SUBMITTED. COMMISSIONER DEINER-KARR SECONDED THE MOTION, WHICH CARRIED
UNANIMOUSLY.
REOUESTS FROM THE AUDIENCE
There were no audience comments.
NEW BUSINESS
Discussion and Recommendation on New HPC Schedule
Ms. Cunningham suggested that this item be postponed until the Commission's May meeting. She explained that because the
City must pay overtime for a staff person to monitor the door during Commission meetings, the City Council has proposed
that the Commission change its meeting location and/or time. Staff is still working out the details and will report back to the
Commission. Vice Chair Vogel voiced opposition to changing the meeting date to the third Thursday of each month, since
that is the day the Arts Commission conducts the monthly Art Walk, which is a major event in Edmonds.
Discussion on 2017 Calendar
This item was postponed to the next meeting.
Preservationist Uudate
Chair Scott reported that Commissioner Raetzloff wrote some great copy that features the First Baptist Church, and she is
working to get some different photographs.
Civic Playfield
Council Member Teitzel reported that the City recently purchased the Civic Playfield and the master plan process will start
soon. There has been a lot of discussion about potentially demolishing the grandstands, which are not currently listed on the
Register. Chair Scott clarified that the grandstands have been infested with worms, and restoration may no longer be
possible. The Commission agreed to recommend that a structural assessment of the structure be done before a final decision
is made.
Prouerty at 232 Sunset Avenue
Commissioner Allbery reported that the home at 232 Sunset Avenue has been sold. She agreed to contact the new owner to
discuss adding the property to the Register.
Changes to the Library
Commissioners Waite and Allbery agreed to review the assessment of repairs and alterations that need to be done at the
Library facility. The consultant who completed the assessment is interested in ensuring that the modifications are done in a
way that preserves the historic quality and character of the building. Because the City owns the building, the Commission
agreed that the City has a responsibility to take care of many of the items. Commissioner Waite suggested that the
Commission should advise the City relative to the proposed changes to make sure the work is done correctly. The
Commission concurred and agreed to review the list in more detail at their next meeting.
Historic Preservation Commission Minutes
April 14, 2016 Page 4
Packet Pg. 173
4.1
City Council Agenda Item
Meeting Date: 05/3/2016
Puget Sound Starts Here Proclamation (5 min.)
Staff Lead: Carolyn LaFave
Department: Mayor's Office
Preparer: Carolyn LaFave
Background/History
Staff Recommendation
Narrative
Puget Sound Starts Here (PSSH) campaign seeks to increase awareness of the magnitude of Puget
Sound's pollution problem and to motivate residents to adopt new behaviors that will decrease the
amount of pollution entering the Sound through stormwater runoff and other sources of pollution. The
tools developed to achieve these goals include a recognizable brand, television advertisements, a
website designed to foster behavior change, and public outreach tools for use by PSSH partners at a
local, grassroots level. For more information visit the website at www.pugetsoundstartshere.org
<http://www.pugetsoundstartshere.org>.
Attachments:
PSSH_2016
Packet Pg. 174
O
Abr
Priarfamatijan
C'i of Edmonds • Office of the Mayor
PugetScund "Pu et Sound Starts Isere Monthg
starts May 2016
WHEREAS, Puget Sound contributes in numerous ways to the City of Edmonds' economic
infrastructure and to our unparalleled natural resource base; and
WHEREAS, Puget Sound is an important part of the identity and character of the City; and
WHEREAS, the water quality of Puget Sound and its tributaries is a priority for the safety, health,
and welfare of the citizens of Edmonds; and
WHEREAS, millions of pounds of pollutants enter Puget Sound every year as a result of rain
washing yard chemicals, pet waste, oil, soaps, and other substances into storm drains
and streams connected to Puget Sound; and
WHEREAS, educational initiatives such as the regional "Puget Sound Starts Here" campaign serve ,Q
to protect and improve local water quality; and r
WHEREAS, "Puget Sound Starts Here Month" will bring attention and focus to the issue of local to
and regional water quality and provide educational opportunities for the public to cm
learn how they can help clean-up and protect Puget Sound and our local waterways; x
and N
a
WHEREAS, all Puget Sound residents have the ability to take action to reduce their individual and
CD
cumulative impact on the water quality of Puget Sound and local waterways; E
E
z
U
NOW, THEREFORE, I, Dave Earling, Mayor, do hereby proclaim May 2016 as:
Q
"Puget Sound Starts Here Month "in Edmonds
and encourage all citizens to take action by attending local and regional events and to adopt behaviors
in their daily lives to help to protect and clean up Puget Sound and our local waterways.
,Z,), - � Z., 5;: 7 ,, -. - 0, ,
Nave- Earling, Mayor
April 28, 2016
Packet Pg. 175
4.2
City Council Agenda Item
Meeting Date: 05/3/2016
Edmonds Cemetery Board Presentation (5 min.)
Staff Lead: Carrie Hite
Department: Parks, Recreation & Cultural Services
Preparer: Carrie Hite
Background/History
Each year the Cemetery board hosts an annual Memorial Day program at the Edmonds Memorial
Cemetery and Columbarium.
Staff Recommendation
Presentation only.
Narrative
A Cemetery Board representative will be inviting the Council and general public to attend the annual
Memorial Day program.
Packet Pg. 176
4.3
City Council Agenda Item
Meeting Date: 05/3/2016
Alliance for Housing Affordability Presentation (20 min.)
Staff Lead: Shane Hope
Department: Development Services
Preparer: Shane Hope
Background/History
The Alliance for Housing Affordability ("AHA") is a venue for Snohomish County jurisdictions to work
together to understand local housing challenges and share resources to address these challenges. It is a
membership organization, consisting of 13 cities (including Edmonds), Snohomish County, and the
Housing Authority of Snohomish County. It was established in 2013 through an interlocal agreement.
One full-time housing policy analyst serves as staff.
AHA's work is guided by its Joint Board, which has representation from each member. Councilmember
Diane Buckshnis was Edmonds' original City Council representative on the Joint Board; Councilmember
Neil Tibbott is the current Edmonds City Council representative.
Staff Recommendation
Consider the information and provide any questions/comments.
Narrative
"Affordable housing" is a term that means different things to different people. AHA has always
considered affordability to be a broad issue that includes meeting needs for people with a range of
incomes and circumstances.
In the Edmonds Comprehensive Plan, a chapter focuses on Housing. It includes information gleaned
from a Housing Profile that AHA put together for Edmonds. One future "action item" identified in our
Comprehensive Plan is to develop a Housing Strategy by 2019. AHA will probably be able to help with
this effort.
At the May 3 City Council meeting, AHA's policy analyst (Kristina Gallant) will make a presentation. She
will address general housing affordability issues, along with AHA's role.
Packet Pg. 177
4.4
City Council Agenda Item
Meeting Date: 05/3/2016
March 2016 Quarterly Financial Report (10 min.)
Staff Lead: Scott James
Department: Administrative Services
Preparer: Sarah Mager
No action needed; informational only.
Attachments:
Complete March 2016 Quarterly Financial Report
1st Qtr 2016 Financial Management Report PPT
Packet Pg. 178
4.4.a
bAt
vX, OF E� O,�
d
u
"J7 1 Rao
AT A GLANCE:
General Fund operating
revenues are ahead of last
year's revenues. 2016 sales
tax revenue out performs
2015 (see page 18)
2016 Interest Earnings are
higher than 2015.. (see page
32)
INSIDE THIS
ISSUE:
Revenues By Fund
Summary
Expenditures By Fund
Summary 2
General Fund
Revenues
W
0
0.
d
SummaryOperating of All Funds: Revenue
c�
The Financial Management Report is a summary report of the City's
c
U.
1 st Quarter 2016 financial results with a comparison to 1 st Quarter 2015L.
21
• Notable Revenue Highlights: Additional Special Revenue Fund
CY
=> 2016 Investment earnings are Highlights:
co
$8,058 Higher than 2015
0
=> 2016 tax revenues are $388,747 Street Fund 111 2016 Annual Vehicle
higher than 2015 . These increases Fees (TBD) revenues are $5,881 high -
are led by: er than 2015.
*Property Taxes $47,29100
*Sales Taxes $88,186 Municipal Arts Acquisition Fund
r
*Real Estate Excise Tax $100,235 117 received an additional $2,182 in
donations and contributions over 2015.
°
Expenditures By Fund Specific Revenue Highlights by Fund:
Details 6
• General Fund first quarter 2016
General Fund
4 operating revenue is $562,589 or
Expenditure Detail
9.0 percent over last year, largely
due to increased property tax and
sales tax revenues. A detailed anal -
Investment Portfolio
32 ysis of General Fund revenues can
be found on page 4, with sales tax
Fund Balance
33 performance discussed on page 18.
Overview
• Special Revenue Funds 2016 rev-
enues are $3,766,395 or 224.5 per -
Five Comers
cent higher than 2015. The 2016
revenue increase is primarily due
to:
• During 2016 the Street Construc-
tion Fund 112 billed grant agen-
cies for $2.8 million more than in
2015.
• Hotel/Motel Lodging tax revenues
grew 4.9% over 2015.
• Real Estate Excise Tax revenues in-
creased $100,235 or 24.5% over
2015.
• Park Construction Fund 132 Park
grant revenues increased $490,935
over 2015.
• Utility Funds:
=> Water sales increased by $157,312 or
11.5 percent over 2015.
=> Stormwater sales increased by
$46,259 or 4.9 percent over 2015
=> Sewer sales increased by $159,203 or
11.0 percent over 2015.
Financial Management Report as of March 31, 2016
Packet Pg. 179
— — — — — — — — — — — — — — — — — —
�ummary of All Operating Funds: Expenditures
City of Edmonds
Purchase of Civic
Field completed
with help of $1.4
I
Driftwood Players
"A Funny Thing
Happened on the
Way to the Forum"
Olympic Ballet
• General Fund expenditures ended
the quarter with 25% of the budget
expended. Operating expenditures
increased $1,283,713 or 14.2%
over 2015. The majority of this -
increase is due to paying $936,429
for the last payment to retire the
Public Safety Bond debt.
General Fund expense by catego-
ries are on page 6 and departmental
expenses are on pages 1316
Additional General Fund expendi-
tures information can be found on
pages 23-31.
Special Revenue Fund expendi-
tures increased $1,886,504 in 2016
over 2015. The majority of this
increase comes from increased con-
struction outlays, with street con-
struction expenses being $929,680
higher than 2015. Additional Spe-
cial Revenue Fund expenditure in-
formation can be found on pages
68.
• Utility Funds 2016 expenses in-
creased $176,465 over 2015, pri-
marily due to increase capital ex-
penses for water line replacements
Additional Utility Fund expense
information can be found on pages
9 —10.
The Water Fund expenditures for
were $273,374 higher than 2015
mainly due to increased capital ex-
penditures. (see page 11 for ex-
penditure details.)
Investment Portfolio
• The City's investment earnings in-
creased over 9.6% over 2015 earn-
ings primarily due to diversifying
the portfolio. (see page 32 for addition-
al investment details)
i
I
I
Fund Balances
• During the first quarters of 2016, the 1
General Fund balance decreased
$3,40,446. The 2016 fund balance de-
crease is primarily due to the timing of
when the City receives its bi-annual
property tax payments.
• Additional fund balance information can 1
be found on pages 33-38.
Other Notable Highlights
I
• In 2014, the City received a $1.67 mil-
lion retroactive invoice from Fire Dis-
trict 1 as the result of their settled labor
agreement. Subsequently to receiving
this invoice, the City negotiated a small 1
reduction and were able to pay the re-
maining $1,603,000 over eight quarterly 1
payments. To date, the City has paid 1
$1,002,540 towards this settlement. 1
• During the Week of January 18th 2016,
the City invested in another $5,000,000
of bonds.
• City closed on purchase of Civic Field
on February 9, 2016.
• On February 12, 2016, the City made its 1
last Public Safety Bond payment early,
saving the City approximately $13,000
in interest expense.
I
Sunset in Edmonds
By Deb Sharp 1
Financial Management Report as of March 31, 2016
Packet Pg. 180
I 4.4.a I
Page 1 of 1
C ITY O F EDMO NDS
REVENUES BY FUND - SUMMARY
Fund
2016 Adopted
3/31/2015
3/31/2016
Amount
No. Title
Budget
Revenues
Revenues
Remaining
%Received
001 GENERAL FUND
$ 39,266,670
$ 6,234,620 $
6,797,209
$ 32,469,461
170
009 LEOFF-MEDICAL INS. RESERVE
278,770
1,270
924
277,846
00,
011 RISK MANAGEMENT FUND 6,660 2,684 1,828 4,832 27' -r
012
CONTINGENCY RESERVE FUND
28,110
14,247
3,164
24,946
110 Q.
013
MULTIMODAL TRANSPORTATION FUND
-
147
107
(107)
d
00 Q'
014
HISTORIC PRESERVATION GIFT FUND
5,000
3
17
4,983
00 •V
016
BUILDING MAINTENANCE
2,005,000
45,235
33,918
1,971,082
20
C
104
DRUG ENFORCEMENT FUND
153,000
11,205
68,542
84,459
450 j,L
111
STREET FUND
1,760,500
324,473
358,400
1,402,100
20° i
112
COMBINED STREET CONST/IMPROVE t
8,026,497
573,506
3,398,849
4,627,648
420
IC
117
MUNICIPAL ARTS ACQUIS. FUND
102,410
10,664
17,826
84,584
170
CY
118
MEMORIAL STREET TREE
110
47
34
76
310, co
120
HOTEL/MOTEL TAX REVENUE FUND
82,150
16,034
16,745
65,405
200 N
121
EMPLOYEE PARKING PERMIT FUND
21,390
7,135
7,284
14,106
340 v
122
YOUTH SCHOLARSHIP FUND
5,550
157
32
5,518
L
1°
123
TOURISM PROMOTIONAL FUND/ARTS
27,530
5,443
5,656
21,874
210
00
125
REAL ESTATE EXCISE TAX 2 2
1,108,000
229,844
280,037
827,963
250
126
REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 2
1,102,000
228,977
279,885
822,115
250
127
GIFTSCATALOGFUND
46,900
27,899
25,243
21,657
540 Q
129
SPECIAL PROJECTS FUND
280
100
73
207
260 0
130 CEMETERY MAINTENANCE/IMPROVEMT 177,260 46,478 39,130 138,130 220
132 PARKS CONSTRUCTION FUND 3 2,537,240 30,076 776,311 1,760,929 310, C
136
PARKS TRUST FUND
630
396
289
341
460
137
CEMETERY MAINTENANCE TRUST FD
19,880
7,393
6,001
13,879
300
138
SISTER CITY COMMISSION
12,010
4
7
12,003
00
139
TRANSPORTATION BENEFIT DISTRICT
682,500
157,885
163,766
518,734
240
140
BUSINESS IMPROVEMENT DISTRICT
-
32,976
35,858
(35,858)
00
211
L.I.D. FUND CONTROL
14,400
9,718
773
13,627
50,
213
L.I.D. GUARANTY FUND
14,400
-
-
14,400
00
231
2012 LT GO DEBT SERVICE FUND
677,380
-
-
677,380
09
232
2014 DEBT SERVICE FUND
949,540
-
936,429
13,111
990
411
COMBINED UTILITY OPERATION
-
83,625
47,129
(47,129)
00
421
WATER UTILITY FUND 4
8,443,460
1,704,798
2,170,332
6,273,128
260
422
STORM UTILITY FUND
4,131,780
1,329,403
1,140,955
2,990,825
280,
423 SEWER/WWTP UTILITY FUND 5 12,645,240 2,054,065 2,617,857 10,027,383 210,
424 BOND RESERVE FUND 1,989,900 2 3 1,989,897 00
511 EQUIPMENT RENTAL FUND 1,579,570 407,182 394,332 1,185,238 250
617 FIREMEN'S PENSION FUND 64,840 469 375 64,465 10,
$ 87,966,557 $13,598,157 $ 19,625,321 $ 68,341,236 220,
Difference between 2015 and 2016 is due to grant invoicing for various projects in 2016.
2 Real Estate Excise Tax revenues for both funds 125 and 126 is up a total of $100,235 from 2015.
3 Differences between 2015 and 2016 are due to a SnoCo grant, parks donations, and park impact fees
4 Difference between 2015 and 2016 islargely due to a substantial water connection fee and the 9%increase to water base rates
5 Difference between 2015 and 2016 is largely due to timing difference for invoicing in 2016 and 9.5%increase to sewer base rates
1
11__I__ .,_ 181
rac,ecei Pg. io i
4.4.a
Page 1 of 1
C PTY O F IDMO NDS
EXPENDITURES BY FUND - SUMMARY
Fund 2016 Adopted
3/31/2015
3/31/2016
Amount
No. Title Budget
Expenditures
Expenditures
Remaining %Spent
001 GENERAL FUND 6 $ 40,691,280
$ 8,883,278
$ 10,217,655
$ 30,473,625 250/(
009 LEOFF-MEDICAL INS. RESERVE 279,480
83,216
66,573
212,907 240/(
011 RISK MANAGEMENT RESERVE FUND - - - 0°/
012 CONTINGENCY RESERVE FUND 800,000 - 800,000 00/, Q.
014
HISTORIC PRESERVATION GIFT FUND
5,400
-
-
5,400
00/(
016
BUILDING MAINT ENANCE
2,175,000
52,764
18,743
2,156,257
1%
t)
104
DRUG ENFORCEMENT FUND
76,030
910
16,742
59,288
220/(
III
STREET FUND
1,712,370
408,019
445,917
1,266,453
260/(
LL
112
COMBINED STREET CONST/IMPROVE 7
8,039,592
159,883
1,089,563
6,950,029
140/( 2'
117
MUNICIPAL ARTS ACQUIS. FUND
181,380
13,771
4,212
177,168
L
20/(
118
MEMORIAL STREET TREE
-
-
-
-
O
00/( 3
C'1
120
HOTEL/MOTEL TAX REVENUE FUND
149,650
3,552
6,121
143,529
4% �p
121
EMPLOYEE PARKING PERMIT FUND
26,880
-
-
26,880
00/( N
122
YOUTH SCHOLARSHIP FUND
3,000
890
327
2,673
11% v
123
TOURISM PROMOTIONAL FUND/ARTS
31,500
1,715
3,737
27,763
L
120/,
125
REAL ESTATE EXCISE TAX 2
2,008,632
50,695
35,314
1,973,318
20/(
126
REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 8
2,480,320
-
476,669
2,003,651
00
19% 17,
127
GIFTS CATALOG FUND
44,950
1,178
6,553
38,397
1501(
129
SPECIAL PROJECTS FUND
-
-
-
-
00/( p
130
CEMETERY MAINTENANCE/IMPROVEMT
210,370
38,394
34,217
176,153
160/(
132
PARKS CONSTRUCTION FUND 8
2,760,770
92,860
513,120
2,247,650
19%
136
PARKS TRUST FUND
-
-
-
-
00/( v
C
O
138
SISTER CITY COMMISSION
12,500
-
-
12,500
00/( ,S
LL
139
TRANSPORTATION BENEFIT DISTRICT
682,500
157,885
163,766
518,734
24%
140
BUSINESS IMPROVEMENT DISTRICT
-
1,175
2,525
(2,525)
L
00/(
211
L.I.D. FUND CONTROL
14,400
-
14,400
0%
213
L.I.D. GUARANTY FUND
-
-
00/( CY
231
2012 LT GO DEBT SERVICE FUND
677,380
54
677,380
0% p
232
2014 DEBT SERVICE FUND 6
949,540
-
936,429
13,111
cm
990/c t
c�
421
WATER UTILITYFUND
12,713,757
1,384,585
1,657,959
11,055,798
130/, LLp
422
STORM UTILITY FUND
7,609,700
566,110
601,062
7,008,639
80/( d
423
SEWER/WWTP UTILITY FUND
17,741,300
1,926,894
1,795,089
15,946,211
100/(
M
424
BOND RESERVE FUND
1,990,920
54
1,990,920
00/( E
O
511
EQUIPMENT RENTAL FUND
1,955,820
226,996
287,269
1,668,551
1501( U
617
FIREMEN'S PENSION FUND
59,610
15,392
11,641
47,969
200/( C
O
S 106,084,031
$14,070,271
$ 18,391,200
$ 87,692,831
17% E
6 Differences between 2015 and 2016 are primarily due to final payment of 2014 debt.
7 Differences between 2015 and 2016 are due to invoices for construction projects in 2016.
8 Differences between 2015 and 2016 are due to purchase of Civic Field in 2016.
2
Packet Pg. 182 1
4.4.a
Page 1 of 3
C ITY O F IDMO NDS
REVENUES - GENERAL FUND
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Revenues
Revenues
Remaining
%Received
TAXES:
REAL PERSONAL / PROPERTY TAX
$ 10,068,020
$ 476,099
$ 499,287
$ 9,568,733
5%
EMS PROPERTY TAX
3,688,090
160,514
181,856
3,506,234
5%
VOTED PROPERTY TAX
949,540
44,285
47,046
902,494
5%
LOCAL RETAIL SALES/USE TAX 9
6,144,400
1,605,365
1,693,551
4,450,849
28%
NATURAL GAS USE TAX
9,800
2,332
2,095
7,705
21% ^
1/10 SALES TAX LOCAL CRIM JUST
626,700
158,479
167,103
459,597
27% p
ELECTRIC UTILITY TAX10
1,451,800
466,770
509,702
942,098
35% d
GASUTILITYTAX
647,900
252,457
249,556
398,344
39%
SOLID WASTE UTILITY TAX
306,500
84,461
88,341
218,159
29% io
WAT ER UT ILIT Y T AX
1,229,110
256,539
285,967
943,143
23%
SEWER UTILITYTAX
629,140
144,720
160,667
468,473
26% 03
ST ORMWAT ER UT ILIT Y T AX
330,430
94,185
98,791
231,639
30% C
T.V. CABLE UTILITY TAX
846,000
209,946
214,403
631,597
25% L+
TELEPHONE UTILITY TAX
1,349,100
358,530
328,246
1,020,854
24% i
PULLTABSTAX
60,600
14,128
12,510
48,090
21%
AMUSEMENT GAMES
40
-
141
(101)
351% M
LEASEHOLD EXCISE TAX
242,200
58,414
59,768
182,432
25% �
28,579,370
4,387,224
4,599,031
23,980,339
16%
LICENSES AND PERNUTS:
FIRE PERMITS -SPECIAL USE
250
145
120
130
48% N
POLICE - FINGERPRINTING
300
-
45
255
15% t
PROF AND OCC LICENSE -TAXI
630
-
-
630
0% i
AMUSEMENTS
4,740
4,325
-
4,740
0%
FRANCHISE AGREEMENT -COMCAST
710,600
178,240
180,648
529,952
25% ..
FRANCHISE FEE-EDUCATION/GOVERNMENT
44,900
11,899
10,613
34,287
24% 00
FRANCHISE AGREEMENT -VERIZON/FRONT IER
100,900
24,811
25,106
75,794
25% CY)
FRANCHISE AGREEMENT -BLACKROCK
18,400
5,227
4,107
14,293
22%
FRANCHISE AGREMENT-ZAYO
-
-
-
-
0%
OLYMPIC VIEW WATER DISTRICT FRANCHISE
268,000
57,968
60,666
207,334
23% O
GENERAL BUSINESS LICENSE
116,000
77,079
63,785
52,215
55%
DEV SERV PERMIT SURCHARGE
42,000
10,965
12,765
29,235
30% W
NON-RESIDENT BUS LICENSE
70,400
19,550
34,250
36,150
49%
RIGHT OF WAY FRANCHISE FEE
15,000
5,388
-
15,000
0%
BUILDING STRUCTURE PERMITS 11
525,000
121,008
178,390
346,610
34%
ANIMAL LICENSES
38,800
9,925
6,193
32,607
C
16% li
STREET AND CURB PERMIT
42,100
3,613
12,112
29,988
29%
OTRNON-BUSLIC/PERMITS
13,100
3,067
3,962
9,138
30%
2,011,120
533,210
592,763
1,418,357
29%
INTERGOVERNMENTAL:
c0
FEDERAL GRANT S-BUDGET ONLY
-
-
-
-
0% CY
DOJ 15-0404-0-1-754 - BULLET PROOF VEST
11,970
-
-
11,970
0% �p
USDA FOREST SERVICE
-
-
-
-
0% C
ROOFTOP SOLAR CHALLENGE GRANT
-
-
-
0% N
ROOFTOP SOLAR CHALLENGE II
6,000
5,250
-
6,000
0% V
TARGET ZERO TEAMS GRANT
7,500
1,084
-
7,500
0%
HIGH VISIBILITY ENFORCEMENT
3,000
-
1,139
1,861
38% 2
DOCKSIDE DRILLS GRANT REIMBURSE
-
-
-
-
0% y
WA STATE ADMIN OFFICE COURTS GRANT
300
300
-
300
0% y
2014 COMMUNITY FORESTRY GRANT
-
-
-
-
0% Q.
WATERFRONT ANALYSIS GRANT
-
-
89,893
(89,893)
0% E
PUD PRIVILEDGE TAX
192,500
-
-
192,500
0% V
MVET/SPECIAL DISTRIBUTION
10,000
2,608
2,725
7,275
27% ..
JUDICIAL SALARY CONTRIBUTION -SPATE
13,000
4,074
4,575
8,425
35% C
CRIMINAL JUSTICE -SPECIAL PROGRAMS
36,980
9,581
9,961
27,019
27% 4)
DUI - CITIES
7,240
1,756
1,593
5,647
22% t
LIQUOR EXCISE TAX
65,200
19,873
42,903
22,297
66%
LIQUOR BOARD PROFITS
357,800
87,538
87,409
270,392
24%
MISCELLANEOUS INTERLOCAL REVENUE 12
-
-
75,707
(75,707)
0% Q
INTERLOCAL GRANTS
383,330
-
-
383,330
0%
VERDANT INTERLOCAL GRANTS
-
-
-
0%
1,094,820
132,064
315,905
778,915
29%
9 2016 Local Retail Sales/Use Tax revenues are $70,070 higher than 2015 revenues. Please also see pages 18
& 19.
10 2016 Electric Utility Taxes are $42,932 higher than 2015 revenues.
11 2016 Building Structure Permit revenues are $57,382 higher than 2015 revenues.
12 Difference between 2015 and 2016 revenues is due to funds received for closure of ESCA in 2016.
3
Packet Pg. 183
I 4.4.a I
Title
CHARGES FOR GOODS AND SERVICES:
RECORD/LEGAL INSTRUMTS
ATM SURCHARGE FEES
COURT RECORD SERVICES
D/M COURT REC SER
SHARED COURT COSTS
MUNIC.-DIST. COURT CURREXPEN
SALE MAPS & BOOKS
CLERKS TIME FOR SALE OF PARKING PERMITS
BID SUPPLIES REIMBURSEMENT
PHOTOCOPIES
POLICE DISCLOSURE REQUESTS
ENGINEERING FEES AND CHARGES 13
ELECTION CANDIDATE FILING FEES
SNO-ISLE
PASSPORTS AND NATURALIZATION FEES
POLICE SERVICES SPECIAL EVENTS
OCDETF OVERTIME
CAMPUS SAFETY-EDM. SCH. DIST.
WOODWAY-LAW PROTECTION
MISCELLANEOUS POLICE SERVICES
DUI EMERGENCY FIRE SERVICES
FIRE PROTECTION & EMS FORDUI
FIRE DISTRICT #1 STATION BILLINGS
ADULT PROBATION SERVICE CHARGE
BOOKING FEES
FIRE CONSTRUCTION INSPECTION FEES
EMERGENCY SERVICE FEES
EMS TRANSPORT USER FEE 14
CRIM CONV FEE CT
CRIM CONV FEE CN
FIBER SERVICES
INTERGOVERNMENTAL FIBER SERVICES
FLEX FUEL PAYMENTS FROM STATIONS
ANIMAL CONTROL SHELTER
ZONING/SUBDIVISION FEE
PLAN CHECKING FEES
FIRE PLAN CHECK FEES
PLANNING 1% INSPECTION FEE
S.E.P.A. REVIEW
CRITICAL AREA STUDY
DV COORDINATOR SERVICES
SWIM POOL ENTRANCE FEES
GYM AND WEIGHT ROOM FEES
LOCKER FEES
SWIM CLASS FEES
PROGRAM FEES
TAXABLE RECREATION ACTIVITIES
SWIM TEAM/DIVE TEAM
WINTER MARKET REGISTRATION FEES
BIRD FEST REGISTRATION FEES
INTERFUND REIMBURSEMENT -CONTRACT SVCS
Page 2 of 3
CITY OF EDMO NDS
REVENUES - GENERAL FUND
2016 Adopted 3/31/2015 3/31/2016 Amount
Budget Revenues Revenues Remaining %Received
2,000
162
421
1,579
21%
250
-
13
237
5%
-
-
-
0%
50
7
3
47
7%
-
-
-
-
0%
.-.
400
173
202
198
50%
G
100
-
-
100
0%
O.
25,100
25,100
0%
600
-
-
600
0%
2,000
549
298
1,702
15%
•v
4,000
1,323
911
3,089
23%
O
180,350
23,666
56,787
123,563
31%
M
C
-
-
-
-
0%
LL
58,000
14,361
16,084
41,916
28%
2'
15,000
6,410
6,075
8,925
41%
G1
26,000
-
-
26,000
0%
0%
3
12,300
605
-
12,300
0%
39,500
10,650
10,180
29,320
26%
1,500
-
-
1,500
0%
N
300
135
-
300
0%
-
-
16
(16)
0%
45,000
12,095
13,635
31,365
30%
60,000
16,083
18,850
41,150
31%
6,000
1,956
1,104
4,896
18%
co
8,000
5,235
7,216
784
90%
CY)
15,000
2,760
2,579
12,421
17%
822,100
197,671
231,033
591,067
28%
-
-
-
-
0%
O
-
-
-
-
0%
0
9,200
2,295
2,295
6,905
25%
7,200
1,800
1,800
5,400
25%
R
1,800
126
310
1,490
17%
C1
6,000
759
55
5,945
1%
75,000
23,809
17,798
57,202
24%
•S
425,000
168,223
74,671
350,329
18%
u_
3,000
3,060
3,375
(375)
113%
L
1,250
-
1,588
(338)
127%
7,000
1,220
-
7,000
0%
R
15,000
3,720
5,115
9,885
34%
O
CY
10,000
2,373
2,780
7,220
28%
-
-
-
-
0%
r
7,800
2,417
3,639
4,161
47%
N
-
-
-
-
0%
_
0%
s'
861,700
212,377
322,426
539,274
37%
M
19,130
35,629
581
18,549
3%
-
0%
-
25
(25)
0%
950
20
950
0%
E
2,964,600
209,431
236,439
2,728,161
8%
O
5,738,180
961,099
1,038,305
4,699,875
18%
V
13 2016 Engineering Fees and Charges are $33,122 higher than 2015 revenues.
14 2016 EMS Transport User Fees are $33,362 higher than 2015 revenues.
4
Packet Pg. 184 1
4.4.a
Page 3 of 3
C TTY O F EDMO NDS
REVENUES - GENERAL FUND
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Revenues
Revenues
Remaining
% Received
FINES AND FO RFEITURES :
PROOF OF VEHICLE INS PENALTY
8,000
1,565
1,680
6,320
21%
TRAFFIC INFRACTION PENALTIES
25,000
6,574
46,757
(21,757)
187%
NC TRAFFIC INFRACTION
260,000
67,692
16,200
243,800
6%
CRT COST FEE CODE LEG ASSESSMENT (LGA)
24,600
5,139
4,889
19,711
20%
SPEEDING DOUBLE
-
-
-
-
0%
NON -TRAFFIC INFRACTION PENALTIES
1,300
(8,198)
38,250
(36,950)
2942%
OTHERINFRACTIONS'04
1,000
232
276
724
28%
P ARKING INFRACT ION P ENALT IES
43,000
10,845
8,040
34,960
19%
PR -HANDICAPPED
-
-
-
-
0%
PARK/INDDISZONE
1,300
1,064
908
392
70%
DWI PENALTIES
6,000
1,214
12,615
(6,615)
210%
DUI - DP ACCT
2,500
504
720
1,780
29%
CRIM CNV FEE DUI
300
146
153
147
51%
OTHER CRIMINAL TRAF MISDEM PEN
-
-
-
-
0%
CRIMINAL TRAFFIC MISDEMEANOR 8/03
33,000
7,879
8,020
24,980
24%
CRIMINAL CONVICTION FEE CT
1,900
529
589
1,311
31%
CRIM CONV FEE CT
2,300
656
510
1,790
22%
OT HER NON-T RAF MISDEMEANOR P EN
130
88
-
130
0%
OTHER NON TRAFFIC MISD. 8/03
9,000
4,397
1,515
7,485
17%
COURT DV PENALTY ASSESSMENT
900
370
52
848
6%
CRIMINAL CONVICTION FEE CN
1,900
458
406
1,494
21%
CRIM CONV FEE CN
900
149
176
724
20%
CRIMINAL COST S-RECOUPMENTS
60,000
17,586
8,246
51,754
14%
PUBLIC DEFENSE RECOUPMENT
33,000
7,139
6,710
26,290
20%
BANK CHARGE FOR CONV. DEFENDANT
-
-
776
(776)
0%
COURT INTERPRETER COSTS
100
186
60
40
60%
BUS. LICENSE PERMIT PENALTY
5,000
8,780
6,550
(1,550)
131%
MISC FINES AND PENALTIES
1,000
-
-
1,000
0%
522,130
134,994
164,100
358,030
31%
MISCELLANEOUS :
INVESTMENT INTEREST
38,600
7,506
7,850
30,750
20%
INTEREST ON COUNTY TAXES
5,700
429
674
5,026
12%
INTEREST - COURT COLLECTIONS
5,000
1,623
1,508
3,492
30%
PARKING
14,000
3,611
3,498
10,502
25%
SPACE/FACILITIES RENTALS
128,000
10,775
14,352
113,648
11 %
BRACKET ROOM RENTAL
5,000
1,440
640
4,360
13%
LEASESLONG-TERM
218,100
43,137
45,408
172,692
21%
VENDING MACHINE/CONCESS'ION
50,000
883
784
49,216
2%
OTHER RENTS& USE CHARGES
4,500
1,500
-
4,500
0%
PARKSDONATIONS
9,500
6,277
3,750
5,750
39%
BIRD FEST CONTRIBUTIONS
950
200
-
950
0%
125TH ANNIVERSARY CONTRIBUTIONS
-
-
-
-
0%
VOLUNTEER PICNIC CONTRIBUTIONS
-
-
-
-
0%
POLICE CONT RIBUT IONS FROM PRIV SOURCES
1,000
-
-
1,000
0%
PARKS GRANTS- PRIVATE SOURCES
-
-
-
-
0%
SALE OF JUNK/SALVAGE
150
-
-
150
0%
SALES OF UNCLAIM PROPERTY
2,000
4
2,481
(481)
124%
CONFISCATED AND FORFEITED PROPERTY
2,000
-
-
2,000
0%
OT HER JUDGEMENT /SET T LEMENT
2,000
18
50
1,950
3%
POLICE JUDGMENT S✓RESTITUTION
200
10
-
200
0%
CASHIER'S OVERAGES/SHORTAGES
-
(0)
163
(163)
0%
OTHER MISC REVENUES
1,000
8,375
4,368
(3,368)
437%
SMALL OVERPAYMENT
50
1
11
39
23%
NSF FEES - PARKS & REC
120
-
-
120
0%
NSF FEES - MUNICIPAL COURT
330
87
66
264
20%
FLEX -PLAN SERVICES FORFEITURES
1,010
-
-
1,010
0%
US BANK REBATE
6,000
155
1,500
4,500
25%
495,210
86,030
87,105
408,105
18%
TRANSFERS -IN:
PROCEEDS OF REFUNDING DEBT
-
-
-
-
0%
TRANSFER FROM FUND 012
800,000
-
-
800,000
0%
TRANSFER FROM FUND 127
25,840
-
-
25,840
0%
825,840
-
-
825,840
007a
TOTAL GENERAL FUND REVENUE
$ 39,266,670
$ 6,234,620
$ 6,797,209
$ 32,469,461
17%
5
Packet Pg. 185
I 4.4.a I
Page 1 of 6
C ITY O F EDMO NDS
EXPENDITURES BY FUND - DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
GENERAL FUND EXPENDITURES (001)
SALARIES AND WAGES
$ 13,999,790
$ 3,185,665
$ 3,342,640
$ 10,657,150
24%
OVERTIME
423,510
114,838
116,120
307,390
27%
HOLIDAY BUY BACK
217,790
1,543
674
217,116
0%
BENEFITS
5,352,060
1,179,663
1,265,354
4,086,706
24%
UNIFORMS
89,290
20,952
23,281
66,009
26%
SUPPLIES
393,950
83,197
67,109
326,841
17%
SMALL EQUIPMENT
155,480
52,415
34,550
120,930
22%
PROFESSIONAL SERVICES
3,394,030
420,901
534,961
2,859,069
16%
COMMUNICATIONS
211,890
31,088
27,222
184,668
13%
TRAVEL
46,210
4,403
4,522
41,688
10%
EXCISE TAXES
6,500
-
630
5,870
10%
ADVERTISING
-
634
-
-
0%
RENTAL/LEASE
916,390
224,703
232,240
684,150
25%
INSURANCE
534,440
418,367
538,732
(4,292)
101%
UTILITIES
457,800
104,689
109,037
348,763
24%
REPAIRS & MAINTENANCE
425,530
166,969
65,848
359,682
15%
MISCELLANEOUS
383,840
148,976
145,454
238,386
38%
INTERGOVERNMENTAL SERVICES
10,384,010
2,709,466
2,772,851
7,611,159
27%
INTERGOVERNMENTAL PAYMENTS
135,000
-
-
135,000
0%
INTERFUND SUBSIDIES
2,909,320
-
936,429
1,972,891
32%
MACHINERY/EQUIPMENT
40,000
14,777
-
40,000
0%
GENERAL OBLIGATION BOND PRINCIPAL
168,300
-
168,300
0%
CAPITAL LEASES AND INSTALLMENT PURCHASES
-
-
-
0%
OTHER DEBT
-
33
-
0%
INTEREST ON LONG-TERM EXTERNAL DEBT
46,150
-
46,150
0%
DEBT ISSUE COSTS
-
-
-
0%
INTERFUND SERVICES
-
-
-
-
0%
40,691,280
8,883,278
10,217,655
30,473,625
25%
LEOFF-MEDICAL INS. RESERVE(009)
BENEFITS
IN HOME LTC CLAIMS
PROFESSIONAL SERVICES
MISCELLANEOUS
RISK MANAGEMENT RESERVE FUND (011)
MISCELLANEOUS
CONTINGENCY RESERVEFUND (012)
INTERFUND LOAN
INTERFUND SUBSIDIES
HISTORIC PRESERVATION GIFT FUND (014)
SUPPLIES
PROFESSIONAL SERVICES
MISCELLANEOUS
BUILDING MAINTENANCE SUBFUND (016)
SUPPLIES
PROFESSIONAL SERVICES
REPAIRS & MAINTENANENCE
MISCELLANEOUS
MACHINERY/EQUIPMENT
DRUG INFO RCEM NTFUND (104)
FUEL CONSUMED
SMALL EQUIPMENT
COMMUNICATIONS
REPAIR/MAINT
MISCELLANEOUS
INTERGOVERNMENTAL SERVICES
$ 178,720 $
58,879 $
49,815 $
128,905
28%
100,480
24,062
16,407
84,073
16%
-
-
-
-
0%
280
275
350
(70)
125%
279,480
83,216 $
66,573
212,907
24%
0%
$ - $ $ $ - 0%
800,000 $ 800,000 0%
800,000 - 800,000 0%
$ 100 $ - $ $ 100 0%
200 - 200 0%
5,100 - 5,100 0%
5,400 - 5,400 0%
$ - $
1,834 $ -
$ -
0%
80,000
50,929 17,912
62,088
22%
2,062,000
- -
2,062,000
0%
-
- 546
(546)
0%
33,000
- 286
32,714
1%
2,175,000
52,764 18,743
2,156,257
1%
$ 3,000 $
344 $ 269 $
2,731
9%
5,000
- -
5,000
0%
2,230
567 438
1,792
20%
800
- -
800
0%
20,000
5,000
15,000
25%
45,000
11,035
33,965
25%
76,030 S
910 16,742 S
59,288
22%
6
Packet Pg. 186
I 4.4.a I
Page 2 of 6
C ITY O F EDMO NDS
EXPENDITURES BY FUND - DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
STREEI'FUND (111)
SALARIES AND WAGES
$ 515,160
$ 125,308
$ 127,495
$ 387,665
25%
OVERTIME
18,400
3,374
4,926
13,475
27%
BENEFITS
265,870
60,051
67,331
198,539
25%
UNIFORMS
6,000
4,615
3,629
2,372
60%
SUPPLIES
240,000
17,144
42,074
197,926
18%
SMALL EQUIPMENT
26,000
-
545
25,455
2%
PROFESSIONAL SERVICES
14,050
4,539
3,927
10,123
28%
COMMUNICATIONS
3,500
752
824
2,676
24%
TRAVEL
1,000
300
-
1,000
0%
RENTAL/LEASE
190,950
47,363
47,290
143,660
25%
INSURANCE
87,620
81,386
97,912
(10,292)
112%
UTILITIES
270,170
60,694
47,218
222,952
17%
REPAIRS& MAINTENANCE
45,000
2,493
1,643
43,358
4%
MISCELLANEOUS
20,500
-
350
20,150
2%
INTERGOVERNMENTAL SERVICES
3,000
-
754
2,246
25%
INTERFUND SUBSIDIES
-
-
-
-
0%
MACHINERY/EQUIPMENT
-
-
-
0%
GENERAL OBLIGATION BOND PRINCIPAL
3,420
-
3,420
0%
OTHER INTEREST & DEBT SERIVCE COSTS
-
-
-
0%
INTEREST ON LONG-TERM EXTERNAL DEBT
1,730
-
1,730
0%
COMBINED STREETCONST/IMPROVE(112)
PROFESSIONAL SERVICES
INTERFUND SUBSIDIES
LAND
CONSTRUCTION PROJECTS
INTERGOVERNMENTAL LOANS
INTEREST
INTERGOVERNMENTAL SERVICES
MUNIC IPAL ARTS AC Q UIS. FUND (1 l 7)
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
TRAVEL
ADVERTISING
RENT AL/LEASE
REPAIRS & MAINTENANCE
MISCELLANEOUS
HO TEL/MO TEL TAX REVENUE FUND (120)
PROFESSIONAL SERVICES
ADVERTISING
MISCELLANEOUS
INTERFUND SUBSIDIES
CONSTRUCTION PROJECTS
EMPLOYEE PARKING PERMIT FUND (121)
SUPPLIES
PROFESSIONAL SERVICES
YOUTH SCHOLARSHIP FUND (122)
MISCELLANEOUS
TOURISM PROMOTIONAL FUND/ARTS (123)
PROFESSIONAL SERVICES
ADVERTISING
MISCELLANEOUS
$ 1,712,370 $
408,019
$ 445,917
$ 1,266,453
26%
$ 1,614,390 $
100,550
$ 164,089
$ 1,450,301
10%
358,240
-
-
358,240
0%
438,000
5,628
23,189
414,811
5%
5,553,332
53,705
902,285
4,651,047
16%
72,220
-
-
72,220
0%
3,410
3,410
0%
-
-
-
-
0%
$ 8,039,592 $
159,883
$ 1,089,563
$ 6,950,029
14%
$ 4,400 $
432 $
18 $
4,382
0%
1,500
-
-
1,500
0%
166,500
12,560
3,178
163,322
2%
80
-
11
70
13%
-
-
-
0%
2,000
2,000
0%
300
-
-
300
0%
6,600
779
1,005
5,595
15%
$ 181,380 $
13,771 $
4,212 $
177,168
2%
$ 77,500 $ 3,470 $ 6,121 $ 71,379 8%
- - - - 0%
8,150 82 8,150 0%
4,000 - 4,000 0%
60,000 - - 60,000 0%
$ 149,650 $ 3,552 $ 6,121 $ 143,529 4%
$ 1,790 $ - $ $ 1,790 0%
25,090 - 25,090 0%
$ 26,880 $ - $ $ 26,880 0%
$ 3,000 $ 890 $ 327 $ 2,673 11%
$ 3,000 $ 890 $ 327 $ 2,673 11%
$ 28,300 $ 1,715 $ 3,737 $ 24,563 13%
- - - - 0%
3,200 - - 3,200 0%
$ 31,500 $ 1,715 $ 3,737 $ 27,763 12%
7
Packet Pg. 187
I 4.4.a I
Page 3 of 6
C ITY O F EDMO NDS
EXPENDITURES BY FUND - DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
REAL ES TATE EXC IS E TAX 2 (125)
SUPPLIES
$ 21,000
$ 20,955
$ 14,821
$ 6,179
71%
PROFESSIONAL SERVICES
186,788
27,543
18,090
168,698
10%
RENTAL/LEASE
-
2,196
966
(966)
0%
UTILITIES
-
-
-
-
0%
REPAIRS & MAINTENANCE
140,000
-
-
140,000
0% t^,
CONSTRUCTION PROJECTS
1,660,844
-
1,437
1,659,407
0% p
REAL ESTATE EXCISE TAX 1, PARKS AC Q (126)
PROFESSIONAL SERVICES
MISCELLANEOUS
INTERFUND SUBSIDIES
LAND
CONSTRUCTION PROJECTS
GENERAL OBLIGATION BONDS
OTHER DEBT & DEBT SERVICE COST S
INTEREST
GIFTS CATALOG FUND (127)
SUPPLIES
PROFESSIONAL SERVICES
INTERFUND SUBSIDIES
SPECIAL PROJECTS FUND (129)
CONSTRUCTION PROJECTS
CEMETERY MAINTENANCEIIIVIPRO VEMENT (130)
SALARIES AND WAGES
OVERTIME
BENEFITS
UNIFORMS
SUPPLIES
SUPPLIES PURCHASED FOR INVENTORY/RESALE
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
ADVERTISING
RENT AL/LEASE
UTILITIES
REPAIRS & MAINTENANCE
MISCELLANEOUS
PARKS CONSTRUCTION FUND (132)
SUPPLIES
PROFESSIONAL SERVICES
LAND
CONSTRUCTION PROJECTS
INTERFUND SUBSIDIES
SISTER CITY COMMISSION (138)
SUPPLIES
TRAVEL
MISCELLANEOUS
TRANSPORTATION BENEFIT DISTRICT (139)
PROFESSIONAL SERVICES
INSURANCE
INTERGOVERNMENTAL SERVICES
$
2,008,632
$
50,695
$
35,314
$
1,973,318
2%
0.
$
212,050
$
-
$
-
$
212,050
0%
-
-
-
0%
C1
139,430
-
-
139,430
0%
CM
692,180
-
476,669
215,511
69%
S
1,406,700
-
-
1,406,700
0%
LL
19,890
-
19,890
0%
i
-
-
-
0%
G1
10,070
-
-
10,070
0%
$
2,480,320
$
-
$
476,669
$
2,003,651
19%
Ci
$
13,110
$
905
$
253
$
12,857
2%
6,000
273
6,300
(300)
105%
N
25,840
-
-
25,840
0%
s
$
44,950
$
1,178
$
6,553
$
38,397
15%
i
t0
$
-
$
-
$
-
$
-
0%�2.
$
-
$
-
$
-
$
-
00/.
00
C1
T"
$
108,410
$
19,545
$
18,401
$
90,009
17%
3,500
176
26
3,474
1%
44,500
8,179
8,341
36,159
19%
p
1,000
197
-
1,000
0%
d
7,000
306
-
7,000
0%
w
20,000
5,101
3,342
16,658
17%
is
4,200
190
218
3,982
5%
Ct
1,410
441
250
1,160
18%
500
-
-
500
0%
-
-
-
-
0%
11,550
2,496
2,888
8,663
25%
>'
3,800
139
150
3,650
4%
G�
500
-
-
500
0%
Ca
4,000
1,624
601
3,399
15%
=
$
210,370
S
38,394
$
34,217
$
176,153
16%
Cy
m
$ - $
- $ -
$ -
0%
225,000
16,960 10,901
214,099
5%
500,000
- 475,710
24,291
95%
2,035,770
75,900 26,510
2,009,260
1%
-
- -
-
0%
$ 2,760,770 $
92,860 $ 513,120
$ 2,247,650
19%
$ 2,000 $ $ $ 2,000 0%
4,500 4,500 0%
6,000 6,000 0%
$ 12,500 $ - $ $ 12,500 0%
$ - $ - $ - $ - 0%
2,500 2,500 2,500 - 100%
680,000 155,385 161,266 518,734 24%
$ 682,500 $ 157,885 $ 163,766 $ 518,734 24%
Packet Pg. 188
I 4.4.a I
Page 4 of 6
C ITY O F EDMO NDS
EXPENDITURES BY FUND - DETAIL
2016 Adopted 3/31/2015
3/31/2016
Amount
Title
Budget Expenditures
Expenditures
Remaining
%Spent
BUSINESS EMPROVFNMI ;T DISTRICT FUND (140)
SUPPLIES
$ $ 1,175
$ 39
$ (39)
0%
PROFESSIONAL SERVICES
-
2,291
(2,291)
0%
MISCELLANEOUS
- -
195
(195)
0%
- 1,175
2,525
2,525
0%
LID FUND CONTROL (211)
INTERFUND SUBSIDIES
2012 LTGO DEBT SERVIC FUND (231)
GENERAL OBLIGATION BOND
INTEREST
OTHER INTEREST & DEBT SERVICE COSTS
2014 DEBTSERVICEFUND (232)
GENERAL OBLIGATION BOND
INTEREST
WATER FUND (421)
SALARIES AND WAGES
OVERTIME
BENEFITS
UNIFORMS
SUPPLIES
WATER PURCHASED FOR RESALE
SUPPLIES PURCHASED FOR INVENTORY/RESALE
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
EXCISE TAXES
RENT AL/LEASE
INSURANCE
UTILITIES
REPAIRS & MAINTENANCE
MISCELLANEOUS
INTERGOVERNMENTAL SERVICES
INTERFUND TAXES
INTERFUND SUBSIDIES
MACHINERY/EQUIPMENT
CONSTRUCTION PROJECTS
GENERAL OBLIGATION BONDS
REVENUE BONDS
INTERGOVERNMENTAL LOANS
INTEREST
DEBT ISSUE COSTS
OTHER INTEREST & DEBT SERVICE COSTS
INTERGOVERNMENTAL SERVICES
$ 14,400 $ - $ $ 14,400 0%
$ 14,400 $ - $ $ 14,400 0%
$ 536,270 $ - $ $ 536,270 0%
140,610 - 140,610 0%
500 54 500 0%
$ 677,380 S 54 $ $ 677,380 0%
$ 933,210 $ - $ 933,208 $ 2 100%
16,330 - 3,221 13,109 20%
$ 949,540 $ - $ 936,429 $ 13,111 99%
$ 795,220 $
183,543
$ 191,718
$ 603,502
24%
24,000
5,380
6,167
17,833
26%
372,550
82,519
88,674
283,876
24%
4,000
1,241
914
3,086
23%
151,000
26,484
16,679
134,321
11%
1,600,000
283,734
323,157
1,276,843
20%
143,000
29,976
22,544
120,456
16%
11,000
7,491
-
11,000
0%
1,793,286
114,498
215,782
1,577,504
12%
30,000
7,896
5,826
24,174
19%
200
-
-
200
0%
340,000
73,018
89,451
250,549
26%
100,750
24,098
24,825
75,925
25%
58,920
70,904
52,335
6,585
89%
40,000
5,966
6,591
33,409
16%
17,000
8,214
1,038
15,962
6%
66,700
25,383
24,089
42,611
36%
30,000
10,782
11,110
18,890
37%
1,229,110
256,539
285,967
943,143
23%
731,220
-
-
731,220
0%
15,000
-
-
15,000
0%
4,551,921
166,886
291,092
4,260,829
6%
2,300
-
-
2,300
0%
323,870
-
323,870
0%
25,840
-
25,840
0%
256,870
-
256,870
0%
-
-
-
0%
-
31
-
0%
-
-
-
-
0%
$ 12,713,757 S
1,384,585
$ 1,657,959
$ 11,055,798
13%
9
Packet Pg. 189
I 4.4.a I
Page 5 of 6
CITY OF EDMO NDS
EXPENDITURES BY FUND - DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
S TO RM FUND (422)
SALARIES AND WAGES
$ 640,470
$ 126,111
$ 139,144
$ 501,326
22%
OVERTIME
6,000
3,846
3,475
2,525
58%
BENEFITS
313,950
61,766
69,210
244,740
22%
UNIFORMS
6,500
4,154
4,190
2,310
64%
SUPPLIES
46,500
9,282
3,428
43,072
7%
SMALL EQUIPMENT
4,000
787
-
4,000
0%
PROFESSIONAL SERVICES
2,638,530
110,793
83,484
2,555,046
3%
COMMUNICATIONS
3,200
603
537
2,663
17%
TRAVEL
4,300
-
200
4,100
5%
EXCISE TAXES
55,000
14,925
15,787
39,213
29%
RENTAL/LEASE
252,990
53,333
62,249
190,741
25%
INSURANCE
64,120
39,269
63,187
933
99%
UTILITES
10,500
2,407
2,668
7,832
25%
REPAIR & MAINTENANCE
13,000
7,846
-
13,000
0%
MISCELLANEOUS
91,200
15,467
8,951
82,249
10%
INTERGOVERNMENTAL SERVICES
85,000
21,322
40,837
44,163
48%
INTERFUND TAXES AND OPERATING ASSESSMENT
330,430
94,185
98,791
231,639
30%
INTERFUND SUBSIDIES
410,080
-
4,923
405,157
1%
LAND
25,000
-
-
25,000
0%
MACHINERY/EQUIPMENT
-
-
-
0%
CONSTRUCTION PROJECTS
2,168,330
-
2,168,330
0%
GENERAL OBLIGATION BONDS
83,800
-
83,800
0%
REVENUE BONDS
158,300
-
158,300
0%
INTERGOVERNMENTAL LOANS
32,070
-
32,070
0%
INTEREST
166,430
166,430
0%
DEBT ISSUE COSTS
-
-
0%
OTHER INTEREST & DEBT SERVICE COSTS
-
15
0%
INTERGOVERNMENTAL SERVICES
-
-
-
-
0%
$ 7,609,700
$ 566,110
$ 601,062
$ 7,008,639
8%
SEWER FUND (423)
SALARIES AND WAGES
OVERTIME
BENEFITS
UNIFORMS
SUPPLIES
FUEL CONSUMED
SUPPLIES PURCHASED FOR INV OR RESALE
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
EXCISE TAXES
RENT AL/LEASE
INSURANCE
UTILITIES
REPAIR & MAINTENANCE
MISCELLANEOUS
INTERGOVERNMENTAL SERVICES
INTERFUND TAXES AND OPERATING ASSESSMENT
INTERFUND SUBSIDIES
MACHINERY/EQUIPMENT
CONSTRUCTION PROJECTS
GENERAL OBLIGATION BONDS
REVENUE BONDS
INTERGOVERNMENTAL LOANS
INTEREST
DEBT ISSUE COSTS
OTHER INTEREST & DEBT SERVICE COSTS
INTERGOVERNMENTAL SERVICES
BOND RESERVEFUND (424)
REVENUE BONDS
DEBT ISSUE COSTS
INTEREST
OTHER INTEREST & DEBT SERVICE COSTS
$ 1,721,530 $
410,626
$ 432,417
$ 1,289,113
25%
100,000
20,186
19,910
80,090
20%
771,920
178,128
194,349
577,571
25%
9,500
4,892
3,102
6,398
33%
420,200
57,234
67,374
352,826
16%
90,000
11,762
6,675
83,325
7%
4,000
-
-
4,000
0%
46,000
8,524
18,584
27,416
40%
1,934,696
259,690
248,223
1,686,473
13%
43,000
9,055
9,806
33,194
23%
5,000
-
-
5,000
0%
150,000
40,836
52,111
97,889
35%
182,670
49,082
44,371
138,299
24%
96,630
139,648
105,637
(9,007)
109%
1,05 6,660
189,581
193,391
863,269
18%
325,000
143,744
79,130
245,870
24%
101,700
17,430
13,473
88,227
13%
150,000
67,206
71,403
78,597
48%
629,140
144,720
160,667
468,473
26%
2,563,949
-
-
2,563,949
0%
-
-
-
-
0%
6,843,825
154,257
54,182
6,789,643
1%
130,140
-
-
130,140
0%
72,840
-
-
72,840
0%
170,620
13,109
13,414
157,206
8%
122,280
4,090
3,917
118,363
3%
-
-
-
-
0%
-
3,093
2,955
(2,955)
0%
-
-
-
-
0%
$ 17,741,300 $
1,926,894
$ 1,795,089
$ 15,946,211
10%
$ 655,010 $ - $ $ 655,010 0%
- - - 0%
1,334,910 - 1,334,910 0%
1,000 54 1,000 0%
$ 1,990,920 $ 54 $ $ 1,990,920 0%
10
Packet Pg. 190
I 4.4.a I
Page 6 of 6
CITY OF EDMO NDS
EXPENDITURES BY FUND - DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
EQUIPMENT RENTAL FUND (511)
SALARIES AND WAGES
$ 224,880
$ 52,255
$ 56,302
$ 168,578
25%
OVERTIME
2,000
61
-
2,000
0%
BENEFITS
105,050
23,730
24,285
80,765
23%
UNIFORMS
1,000
426
512
488
51%
SUPPLIES
110,000
21,860
18,396
91,604
17%
FUEL CONSUMED
1,000
-
-
1,000
0%
SUPPLIES PURCHASED FOR INVENTORY/RESALE
308,200
17,260
24,424
283,776
8%
SMALL EQUIPMENT
58,000
13,273
693
57,307
1%
PROFESSIONAL SERVICES
44,000
314
423
43,577
1%
COMMUNICATIONS
3,000
472
618
2,382
21%
TRAVEL
1,000
1,196
10
990
1%
RENTAL/LEASE
19,440
3,603
4,611
14,829
24%
INSURANCE
29,560
40,605
29,967
(407)
101%
UTILITIES
14,000
3,214
3,752
10,248
27%
REPAIRS & MAINTENANCE
60,000
8,656
16,630
43,370
28%
MISCELLANEOUS
7,190
120
140
7,050
2%
INTERGOVERNMENTAL SERVICES
2,500
-
-
2,500
0%
MACHINERY/EQUIPMENT
965,000
39,949
106,506
858,494
11%
INTERFUND RENTAL
-
-
-
-
0%
$
1,955,820
$
226,996
$ 287,269
$ 1,668,551
15%
FIREMEN'S PENSION FUND (617)
BENEFITS
$
30,940
$
8,590
$ 5,188
$ 25,752
17%
PENSION AND DISABILITY PAYMENTS
27,470
6,803
6,453
21,017
23%
PROFESSIONAL SERVICES
1,200
-
-
1,200
0%
$
59,610
$
15,392
$ 11,641
$ 47,969
20%
TOTAL EXPENDITURE ALL FUNDS
$
106,084,031
$
14,070,271
$ 18,391,200
$ 87,692,831
17%
11
Packet Pg. 191
4.4.a
Page 1 of 1
CITY
OF EDMO NDS
EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN SUMMARY
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
CITY COUNCIL $
295,500 $
54,262 $
44,120
$ 251,380
150/c
OFFICE OF MAYOR
260,250
62,160
64,319
195,931
250/c
.-.
HUMAN RESOURCES
445,790
97,488
90,412
355,378
200/c 0
MUNICIPAL COURT
909,270
199,177
219,191
690,079
240/c
CITY CLERK
585,310
151,490
142,107
443,203
240/c .�
c�
ADMINISTRATIVE SERVICES
1,839,930
496,123
403,231
1,436,699
220/c
C
CITY ATTORNEY
741,560
164,833
162,968
578,592
220/c LL
NON -DEPARTMENTAL
14,939,500
3,261,415
4,389,675
10,549,825
290/c
POLICE SERVICES
9,628,550
2,171,600
2,295,467
7,333,083
240/, 3
COMMUNITY SERVICES✓ECONOMIC DEV.
483,580
90,926
101,724
381,856
210/c
DEVELOPMENT SERVICES
2,473,970
538,490
565,548
1,908,422
230/c o
N
PARKS& RECREATION
3,762,150
729,804
770,996
2,991,154
200/c v
L
PUBLIC WORKS
2,842,120
520,651
610,297
2,231,823
21%
FACILITIES MAINTENANCE
1,483,800
344,860
357,601
1,126,199
240/c 00
$
40,691,280 $
8,883,278 $
10,217,655
$ 30,473,625
250/,
C ITY O F EDMO NDS
EXPENDITURES - UTILITY- BY FUND IN SUMMARY
Title
2016 Adopted
Budget
3/31/2015
Expenditures
3/31/2016
Expenditures
Amount
Remaining
%Spent
WATER UTILITY FUND $
12,713,757
$ 1,384,585 $
1,657,959
$ 11,055,798
130/
STORM UTILITY FUND
7,609,700
566,110
601,062
7,008,639
80/
SEWER/WWTP UTILITY FUND
17,741,300
1,926,894
1,795,089
15,946,211
100/
BOND RESERVE FUND
1,990,920
54
-
1,990,920
0%
$
40,055,677
$ 3,877,644 $
4,054,109
$ 36,001,568
100/(
12
Packet Pg. 192
Page 1 of 4
CITY OF EDMO NDS
EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DEIAAIL
2016 Adopted 3/31/2015 3/31/2016 Amount
Title Budget Expenditures Expenditures Remaining %Spent
CITY COUNCIL
SALARIES
OVERTIME
BENEFITS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
RENT AL/LEASE
REPAIRS/MAINTENANCE
MISCELLANEOUS
OFFICEOFMAYOR
SALARIES
BENEFITS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATION
TRAVEL
RENT AL/LEASE
REPAIR/MAINTENANCE
MISCELLANEOUS
HUMAN RESOURCES
SALARIES
OVERTIME
BENEFITS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
ADVERTISING
RENT AL/LEASE
REPAIR/MAINTENANCE
MISCELLANEOUS
MUNIC IPAL C O URT
SALARIES
OVERTIME
BENEFITS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
RENT AL/LEASE
REPAIR/MAINTENANCE
MISCELLANEOUS
$ 119,100 $ 30,712 $ 22,896 $ 96,204 19%
1,000 - - 1,000 0%
88,550 17,317 17,377 71,173 20%
2,000
217
617
1,383
31%
.-.
-
-
-
-
0%
p
47,160
4,300
1,432
45,728
3%
3,000
1,432
600
2,400
20%
Q'
6,700
70
1,073
5,627
16%
490
160
125
365
25%
'C1
500
-
-
500
0%
27,000
54
27,000
0%
C
$ 295,500 $
54,262 $
44,120 $
251380
15%
LL
$ 197,160 $
48,969 $
49,371 $
147,789
25%
L
48,190
11,112
12,012
36,178
25%
M
1,500
210
317
1,183
21%
C'1
-
-
-
-
0%
�p
2,000
764
848
1,152
42%
1,400
80
191
1,209
14%
N
3,000
143
514
2,486
17%
V
2,400
605
430
1,970
18%
-
-
-
-
0%
a
4,600
277
636
3,964
14%
''
$ 260,250 $
62,160 $
64,319 $
195,931
25%
00
C)
$ 226,880 $
51,939 $
54,965 $
171,915
24%
-
-
43
(43)
0%
73,380
16,985
18,258
55,122
25%
d
2,300
405
1,339
961
58%
300
-
-
300
0%
114,000
17,395
12,523
101,477
11%
'C1
700
190
191
509
27%
CM
1,000
-
-
1,000
0%
,r-
_
-
-
-
-
0%
LL
2,200
605
430
1,770
20%
i
7,850
7,793
-
7,850
0%
17,180
2,175
2,663
14,517
16%
cp
$ 445,790 $
97,488 $
90,412 $
355,378
20%
$ 566,190 $
128,070 $
141,118 $
425,072
25%
600
213
-
600
0%
222,750
43,306
51,834
170,916
23%
9,930
3,714
2,126
7,804
21%
2,800
1,234
132
2,668
5%
64,000
16,200
19,111
44,889
30%
1,800
424
671
1,129
37%
2,500
966
139
2,361
6%
800
155
130
670
16%
1,700
117
242
1,458
14%
36,200
4,778
3,689
32,511
10%
$ 909,270 $
199,177 $
219,191 $
690,079
24%
13
Packet Pg. 193
Page 2 of 4
C ITY O F EDMO NDS
EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
CITY CLERK
SALARIES AND WAGES
$ 324,480
$ 96,115
$ 93,318
$ 231,162
29%
OVERTIME
-
312
1,509
(1,509)
0%
BENEFITS
129,300
30,569
33,432
95,868
26%
SUPPLIES
10,240
2,184
1,429
8,811
14%
SMALL EQUIPMENT
-
140
500
(500)
0%
PROFESSIONAL SERVICES
28,310
3,666
4,435
23,875
16%
COMMUNICATIONS
50,000
8,112
112
49,888
0%
TRAVEL
1,000
-
-
1,000
0%
ADVERTISING
-
-
-
-
0%
RENTAL/LEASE
20,000
3,935
5,130
14,870
26%
REPAIRS&MAINTENANCE
17,980
5,624
1,350
16,630
8%
MISCELLANEOUS
4,000
834
891
3,109
22%
$ 585,310
$ 151,490
$ 142,107
$ 443,203
24%
ADMINISTRATIVE SERVICES
SALARIES
$ 892,390 $
193,520 $
207,819 $
684,571
23%
OVERTIME
6,670
235
200
6,470
3%
BENEFITS
305,800
66,112
70,390
235,410
23%
SUPPLIES
43,050
2,104
1,459
41,591
3%
SMALL EQUIPMENT
110,650
37,314
22,212
88,438
20%
PROFESSIONAL SERVICES
111,400
26,168
6,201
105,199
6%
COMMUNICATIONS
61,500
8,613
12,575
48,925
20%
TRAVEL
2,900
-
14
2,886
0%
RENTAL/LEASE
8,200
2,090
1,865
6,335
23%
REPAIR/MAINTENANCE
242,680
121,787
32,536
210,144
13%
MISCELLANEOUS 15
14,690
23,402
47,960
(33,270)
326%
MACHINERY/EQUIPMENT
40,000
14,777
-
40,000
0%
$ 1,839,930 $
496,123 $
403,231 $
1,436,699
22%
CITY ATTO RNEY
PROFESSIONAL SERVICES
$ 741,560 $
164,833 $
162,968 $
578,592
22%
MISCELLANEOUS
-
-
-
-
0%
$ 741,560 $
164, 333 $
162,968 $
578,592
22%
NON -DEPARTMENTAL
SALARIES
$ 100,000 $
- $
- $
100,000
0%
BENEFITS -UNEMPLOYMENT
34,500
257
471
34,029
1%
SUPPLIES
3,000
56
609
2,391
20%
PROFESSIONAL SERVICES
626,920
92,527
106,355
520,565
17%
EXCISE TAXES
6,500
634
630
5,870
10%
RENTAL/LEASE
3,600
3,600
3,600
-
100%
INSURANCE
534,440
418,367
538,732
(4,292)
101%
REPAIR & MAINTENANCE
-
-
-
-
0%
MISCELLANEOUS
69,010
46,746
40,272
28,738
58%
INTERGOVT SERVICES
10,302,760
2,699,194
2,762,577
7,540,183
27%
ECA LOAN PAYMENT
135,000
-
-
135,000
0%
INTERFUND SUBSIDIES
2,909,320
936,429
1,972,891
32%
GENERAL OBLIGATION BOND
168,300
-
168,300
0%
INSTALLMENT PURCHASES
-
-
-
0%
OTHER DEBT
-
-
-
0%
INTEREST ON LONG-TERM DEBT
46,150
-
46,150
0%
DEBT ISSUANCE COSTS
-
-
-
0%
FISCAL AGENT FEES
33
-
-
0%
INTERFUND SERVICES
-
0%
$ 14,939,500 $
3,261,415 $
4,389,675 $
10,549,825
29%
15 Difference between 2015 and 2016 is due to Microsoft Office Windows Software Renewal in 2016.
14 r-
Packet Pg. 194 1
1 4.4.a I
Page 3 of 4
CITY OF EDMO NDS
EXPENDITURES - GENERAL FUND - BY DEPARTMENTIN DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
PO LIC E S ERVIC ES
SALARIES
$ 5,778,330
$ 1,316,006
$ 1,408,786
$ 4,369,544
24%
OVERTIME
396,240
110,325
105,596
290,644
27%
HOLIDAY BUYBACK
217,790
1,543
674
217,116
0%
BENEFITS
2,220,940
507,479
549,159
1,671,781
25%
UNIFORMS
80,310
17,764
22,222
58,088
28%
p
SUPPLIES
86,730
24,930
13,288
73,442
15%
Q-
SMALL EQUIPMENT
20,400
1,363
3,694
16,706
18%
PROFESSIONAL SERVICES
117,170
22,671
21,037
96,133
18%
COMMUNICATIONS
26,210
4,941
5,199
21,011
20%
C1
TRAVEL
17,310
3,045
1,278
16,032
7%
ADVERTISING
-
-
-
-
0%
S
RENTAL/LEASE
595,100
142,989
147,715
447,385
25%
LL
REPAIR/MAINTENANCE
14,620
1,089
1,238
13,382
8%
L
MISCELLANEOUS
46,850
12,183
10,308
36,542
22%
INTERGOVTL SERVICES
10 550
5 272
5 274
5 276
50%
M
COMMUNITY SERVIC ES/EC 0 N DEV.
SALARIES
BENEFITS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
ADVERTISING
RENT AL/LEASE
REPAIR/MAINTENANCE
MISCELLANEOUS
DEVELOPMENT SERVICES /PLANNING
SALARIES
OVERTIME
BENEFITS
UNIFORMS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
ADVERTISING
RENT AL/LEASE
REPAIRS & MAINTENANCE
MISCELLANEOUS
ENGINEERING
SALARIES
OVERTIME
BENEFITS
UNIFORMS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
RENT AL/LEASE
REPAIR/MAINTENANCE
MISCELLANEOUS
$ 9,628,550 $
2,171,600 $
2,295,467 $
7,333,083
24%
$ 224,960 $
54,297 $
56,435 $
168,525
25%
67,430
15,604
17,199
50,231
26%
N
7,000
41
23
6,977
0%
v
800
-
125
676
16%
170,400
16,577
26,476
143,924
16%
1,490
189
202
1,288
14%
2,000
179
-
2,000
0%
00
w
-
-
-
-
0%
2,000
605
431
1,569
22%
.�
500
-
-
500
0%
7,000
3,434
834
6,166
12%
C.
$ 483,580 $
W926 $
101,724 $
381,856
21%
W
$ 1,433,430 $
339,709 $
355,435 $
1,077,995
25%
1,300
-
3,289
(1,989)
253%
530,270
119,763
128,803
401,467
24%
500
-
-
500
0%
16,100
2,563
3,284
12,816
20%
5,250
4,338
453
4,797
9%
403,960
27,029
52,445
351,515
13%
8,500
838
998
7,502
12%
4,250
-
1,484
2,766
35%
-
-
-
-
0%
24,750
8,637
4,861
19,889
20%
6,800
2,529
274
6,526
4%
38,860
33,084
14,222
24,638
37%
$ 2,473,970 $
538,490 $
565,548 $
1,908,422
23%
$ 1,373,500 $
305,088 $
308,514 $
1,064,986
22%
5,000
774
439
4,561
9%
561,900
119,962
123,167
438,733
22%
360
-
-
360
0%
-
-
-
0%
2,200
1,033
1,167
47%
465,000
-
75,851
389,149
16%
11,800
1,523
1,861
9,939
16%
600
-
20
580
3%
26,370
3,720
6,109
20,261
23%
2,600
-
-
2,600
0%
21,000
2,178
4,256
16,744
20%
$ 2,470,330 $
433,246 $
521,251 $
1,949,079
21%
15
Packet Pg. 195
Page 4 of 4
C ITY O F EDMO NDS
EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL
2016 Adopted
3/31/2015
3/31/2016
Amount
Title
Budget
Expenditures
Expenditures
Remaining
%Spent
PARKS & REC REATIO N
SALARIES
$ 1,830,090
$ 401,653
$ 415,996
$ 1,414,094
23%
OVERTIME
10,000
2,202
1,836
8,164
18%
BENEFITS
695,310
149,936
158,503
536,807
23%
UNIFORMS
5,370
2,634
603
4,767
11%
SUPPLIES
117,500
19,848
25,474
92,026
22%
SMALL EQUIPMENT
9,080
6,252
6,205
2,875
68%
PROFESSIONAL SERVICES
501,950
28,763
45,261
456,689
9%
COMMUNICATIONS
30,140
1,275
1,109
29,031
4%
TRAVEL
4,450
-
-
4,450
0%
ADVERTISING
-
-
-
-
0%
RENTAL/LEASE
170,310
42,801
46,009
124,301
27%
PUBLIC UTILITY
175,000
36,008
34,232
140,768
20%
REPAIR/MAINTENANCE
50,800
14,877
14,248
36,552
28%
MISCELLANEOUS
91,450
18,557
16,520
74,930
18%
MACHINERY/EQUIPMENT
-
-
-
-
0%
INTERGOVTL SERVICES
70,700
5,000
5,000
65,700
7%
$ 3,762,150
$ 729,804
$ 770,996
$ 2,991,154
20%
PUBLIC WORKS
SALARIES
OVERTIME
BENEFITS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
RENT AL/LEASE
PUBLIC UTILITY
REPAIR/MAINTENANCE
MISCELLANEOUS
FACILITIES MAINTENANCE
SALARIES
OVERTIME
BENEFITS
UNIFORMS
SUPPLIES
SMALL EQUIPMENT
PROFESSIONAL SERVICES
COMMUNICATIONS
TRAVEL
RENT AL/LEASE
PUBLIC UTILITY
REPAIR/MAINTENANCE
MISCELLANEOUS
TOTAL GENERAL FUND EXPENDITURES
$ 263,850 $
63,617 $
65,440 $
198,410
25%
200
-
-
200
0%
81,750
18,943
20,728
61,022
25%
7,600
1,118
471
7,129
6%
1,000
1,479
-
1,000
0%
200
8
20
180
10%
1,350
131
150
1,200
11%
500
-
-
500
0%
7,640
1,476
1,536
6,104
20%
2,800
633
702
2,098
25%
1,000
-
-
1,000
0%
3,900
3,900
0%
$ 371,790 $
87,405 $
89,046 $
282,744
24%
669,430
155,972
162,548
506,882
24%
2,500
777
3,209
(709)
128%
291,990
62,317
64,020
227,970
22%
2,750
554
455
2,295
17%
87,000
25,809
16,674
70,326
19%
3,000
295
197
2,803
7%
-
-
-
-
0%
14,000
3,337
3,362
10,638
24%
-
-
-
-
0%
52,530
13,324
13,870
38,660
26%
280,000
68,047
74,103
205,897
26%
78,500
13,154
15,961
62,539
20%
2,100
1,274
3,203
(1,103)
153%
$ 1,483,800 $
344,860 $
357,601 $
1,126,199
24%
S 40,691,280 S 8,883,278 S 10,217,655 $ 30,473,625 25%
16
Packet Pg. 196
I 4.4.a I
City of Edmonds, WA
Monthly Revenue Summary -General Fund
2016
General Fund
Cumulative Monthly YTD Variance
Budget Forecast Budget Forecast Actuals
January $ 1,918,337 $
February 4,634,891
March 6,893,920
April 10,554,422
May 18,443,843
June 20,419,802
July 22,540,807
August 24,729,200
September 26,735,162
October 29,955,787
November 37,295,545
December 39,266,670
Real Estate Excise Tax 1 & 2
1,918,337 $ 2,112,632 10.13%
2,716,554 4,307,339 -7.07%
2,259,028 6,797,209 -1.40%
3,660,503
7,889,420
1,975,960
2,121,005
2,188,392
2,005,962
3,220,626
7,339,758
1,971,125
City of Edmonds, WA
Monthly Revenue Summary -Real Estate Excise Tax
2016
Cumulative Monthly YTD Variance
Budget Forecast Budget Forecast Actuals
January $
189,874 $
February
316,058
March
479,194
April
640,872
May
800,918
June
986,094
July
1,276,157
August
1,480,830
September
1,690,614
October
1,875,616
November
2,069,074
December
2,200,000
189,874 $ 216,395 13.97%
126,183 447,070 41.45%
163,136 551,728 15.14%
161,679
160,046
185,176
290,062
204,673
209,784
185,002
193,458
130,926
*The monthly budget forecast columns are based on a five-year average.
17
Packet Pg. 197 1
4.4.a
Contractors 273,625
Health & Personal Care
27,401
Retail Eating & Drinking
204,358
Gasoline Stations 7,957
Automotive Repair 42,350
Retail Automotive 418,635
Total
Retail Automotive
Misc Retail Trade
Business Services
Retail Eating & Drinking
Retail Food Stores
Wholesale Trade
Others
Accommodation
Health & Personal Care
Gasoline Stations
Clothing and Accessories
Automotive Repair
Amusement & Recreation
Communications
Contractors
($40,000)
Sales Tax Analysis By Category
Current Period: March 2016
Year -to -Date
Total $1,693,551
Wholesale Trade 69,581
Clothing and Accessories
62,793
Change in Sales Tax Revenue:
March 2016 compared to
March 2015
ns 55,052
0
Misc Retail Trade 229,182
N
C
t0
Accommodation 9,203
�
LL
Business Services 126,081
L
3
C'1
Amusement & Recreation
15,527
r
0
N
Retail Food Stores 67,153
t
Others 84,656
0
CD
-
V77
($20,000) $0 $20,000 $40,000 $60,000 $80,000
18
Packet Pg. 198
I 4.4.a I
City of Edmonds, WA
Monthly Revenue Summary -Sales and Use Tax
2016
Sales and Use Tax
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 471,315 $
471,315
$ 539,867
14.54%
February
1,055,135
583,820
1,204,754
14.18%
March
1,506,759
451,624
1,693,551
12.40%
April
1,936,463
429,704
May
2,478,856
542,394
June
2,960,731
481,875
July
3,457,813
497,082
August
3,998,806
540,993
September
4,517,576
518,770
October
5,055,818
538,242
November
5,626,862
571,044
December
6,144,400
517,538
Sales and Use Tax
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000 too
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Year Budget mar Prior Year
City of Edmonds, WA
Monthly Revenue Summary -Gas Utility Tax
2016
Gas Utility Tax
Cumulative Monthly YTD Variance
Budget Forecast Budget Forecast Actuals %
January $
90,678 $
90,678 $ 85,977 -5.18%
February
190,868
100,190 176,574 -7.49%
March
272,706
81,838 249,556 -8.49%
April
346,987
74,281
May
405,847
58,860
June
445,893
40,046
July
477,342
31,449
August
501,633
24,291
September
523,862
22,229
October
548,406
24,545
November
586,112
37,705
December
647,900
61,788
Gas Utility Tax
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year -Budget -0-- Prior Yeaz
*The monthly budget forecast columns are based on a five-year average.
19
Packet Pg. 199 1
I 4.4.a I
City of Edmonds, WA
Monthly Revenue Summary -Telephone Utility Tax
2016
Telephone Utility Tax
Cumulative Monthly
Budget Forecast Budget Forecast
TrD
Actuals
Variance
January
$ 125,356 $
125,356
$ 91,384
-27.10%
February
226,461
101,105
230,098
1.61%
March
344,917
118,456
328,246
-4.83%
April
457,974
113,057
May
577,752
119,778
June
685,900
108,148
July
794,692
108,792
August
904,737
110,045
September
1,019,063
114,326
October
1,131,491
112,428
November
1,235,975
104,484
December
1,349,100
113,125
Telephone Utility Tax
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Yeaz Budget --dr- Prior Year
City of Edmonds, WA
Monthly Revenue Summary -Electric Utility Tax
2016
1lectric Utility Tax
Cumulative Monthly TrD Variance
Budget Forecast Budget Forecast Actuals
January $
155,396 $
155,396 $ 177,383 14.15%
February
311,244
155,848 348,280 11.90%
March
463,906
152,662 509,702 9.87%
April
612,759
148,854
May
749,676
136,917
June
854,497
104,821
July
956,312
101,815
August
1,049,934
93,622
September
1,145,581
95,647
October
1,239,871
94,290
November
1,346,584
106,712
December
1,451,800
105,216
Electric Utility Tax
1,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year -Budget --O-Prior Year
*The monthly budget forecast columns are based on a five-year average.
20
Packet Pg. 200 1
I 4.4.a I
City of Edmonds, WA
Monthly Revenue Summary -Meter Water Sales
2016
Meter Water Sales
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
January
$ 573,717 $
573,717
$ 553,882
-3.46%
February
969,279
395,562
943,114
-2.70%
March
1,534,923
565,644
1,529,160
-0.38%
April
1,915,226
380,303
May
2,481,868
566,642
June
2,912,390
430,522
July
3,586,469
674,079
August
4,157,711
571,242
September
4,946,125
788,414
October
5,503,014
556,889
November
6,162,012
658,998
December
6,572,750
410,738
City of Edmonds, WA
Monthly Revenue Summary -Storm Water Sales
2016
Storm Water Sales
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
January
$ 238,091 $
238,091
$ 238,442
14.15%
February
750,139
512,049
750,909
11.90%
March
988,469
238,330
988,089
9.87%
April
1,200,403
211,933
May
1,439,120
238,718
June
1,651,173
212,053
July
1,891,010
239,837
August
2,403,804
512,795
September
2,641,727
237,923
October
2,853,622
211,895
November
3,092,120
238,497
December
3,304,340
212,220
Storm Water Sales
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year Budget -dr,- Prior Year
O
N
C
C
LL
L
d
7
CY
tD
r
O
N
t
V
i
fC
00
CD
*The monthly budget forecast columns are based on a five-year average.
21
Packet Pg. 201 1
I 4.4.a I
City of Edmonds, WA
Monthly Revenue Summary-Unmeter Sewer Sales
2016
Unmeter Sewer Sales
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
January
$ 571,975
$ 571,975
$ 566,825
-0.90%
February
1,033,695
461,721
1,035,133
0.14%
March
1,603,598
569,903
1,607,616
0.25%
April
2,066,627
463,029
May
2,641,462
574,835
June
3,110,919
469,457
July
3,697,613
586,694
August
4,168,968
471,356
September
4,762,598
593,630
October
5,236,709
474,111
November
5,819,454
582,746
December
6,291,410
471,956
F
O
Q
N
fC
C
R
C
iL
L
N
to
3
to
O
tl
t
U
L
C�
G
00
CD
r
r
*The monthly budget forecast columns are based on a five-year average.
22
Packet Pg. 202 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -General Fund
2016
General Fund
Cumulative Monthly YTD Variance
Budget Forecast Budget Forecast Actuals %
January
$ 4,534,064 $
4,534,064 $ 4,953,956 9.26%
February
7,039,425
2,505,361 7,893,221 12.13%
March
10,195,267
3,155,842 10,217,655 0.22%
April
14,199,472
4,004,205
May
16,374,414
2,174,942
June
20,134,963
3,760,549
July
23,368,286
3,233,323
August
26,955,976
3,587,690
September
30,559,040
3,603,064
October
33,147,709
2,588,669
November
36,747,228
3,599,518
December
40,691,280
3,944,052
City of Edmonds, WA
Monthly Expenditure Report -Non -Departmental
2016
Non -Departmental
Cumulative Monthly
Budget Forecast Budget Forecast
YTD Variance
Actuals %
January
$ 2,637,164 $
2,637,164
$ 3,074,199 16.57%
February
3,090,761
453,597
4,065,136 31.53%
March
4,177,637
1,086,876
4,389,675 5.08%
April
6,115,913
1,938,276
May
6,276,776
160,863
June
7,917,237
1,640,461
July
8,983,200
1,065,963
August
10,280,111
1,296,911
September
11,804,336
1,524,225
October
12,235,538
431,202
November
13,396,879
1,161,341
December
14,939,500
1,542,621
Non -Departmental
16,000,000
14,000,000
12,000,000
10,000,000
8,000,000
6,000,000 001,
4,000,000
2,000,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year —Budget —dm- Prior Year
O
d
C
C
LL
L
d
O
7
CY
tD
O
N
t
V
i
fC
O
CD
*The monthly budget forecast columns are based on a five-year average.
23
Packet Pg. 203 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -City Council
2016
City Council
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 19,588 $
19,588
$ 13,340
-31.90%
February
43,238
23,650
27,668
-36.01%
March
68,617
25,379
44,120
-35.70%
April
91,002
22,385
May
115,388
24,386
June
142,957
27,568
July
169,613
26,656
August
194,018
24,404
September
218,163
24,145
October
242,646
24,484
November
268,263
25,616
December
295,500
27,237
City of Edmonds, WA
Monthly Expenditure Report -Office of Mayor
2016
Office of Mayor
Cumulative Monthly YTD Variance
Budget Forecast Budget Forecast Actuals %
January $
22,161 $
22,161 $ 21,296 -3.90%
February
44,020
21,859 43,294 -1.65%
March
65,603
21,583 64,319 -1.96%
April
86,693
21,090
May
108,016
21,323
June
129,368
21,352
July
151,400
22,032
August
172,781
21,380
September
193,702
20,921
October
217,172
23,470
November
239,237
22,065
December
260,250
21,013
Office of Mayor
300,000.00
250,000.00
200,000.00
150,000.00
100,000.00
50,000.00
0.00
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year Budget -dr,- Prior Year
O
d
C
M
C_
LL
L
d
O
7
CY
O
O
N
t
V
i
fC
O
CD
*The monthly budget forecast columns are based on a five-year average.
24
Packet Pg. 204 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -Community Services/Economic Development
2016
Community Services/Economic Development
Cumulative
Monthly
YTD
Variance
Budget Forecast Budget Forecast
Actuals
%
January
$ 28,028 $
28,028
$ 25,054
-10.61%
February
65,193
37,165
61,145
-6.21%
March
101,769
36,576
101,724
-0.04%
April
152,174
50,405
May
189,175
37,001
June
223,124
33,949
July
264,279
41,155
August
303,281
39,002
September
346,067
42,786
October
388,176
42,108
November
429,367
41,192
December
483,580
54,213
City Clerk
Community Services/Economic Development
600,000
500,000
400,000
300,000
200,000
100,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year Budget -dp- Prior Year
City of Edmonds, WA
Monthly Expenditure Report -City Clerk
2016
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 50,489 $
50,489
$ 44,524
-11.81%
February
96,125
45,635
87,838
-8.62%
March
145,204
49,079
142,107
-2.13%
April
189,944
44,740
May
234,027
44,083
June
281,576
47,549
July
329,270
47,695
August
379,179
49,909
September
428,220
49,041
October
485,933
57,714
November
535,319
49,385
December
585,310
49,991
700,000
City Clerk
600,000
500,000
400,000
300,000
200,000
100,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Year Budget -dr- Prior Year
O
d
C
co
C
LL
L
d
O
7
CY
O
O
N
t
V
i
fC
O
CD
*The monthly budget forecast columns are based on a five-year average.
25
Packet Pg. 205 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -Human Resources
2016
Human Resources
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 33,067 $
33,067
$ 28,007
-15.30%
February
68,688
35,621
58,708
-14.53%
March
111,242
42,553
90,412
-18.73%
April
145,138
33,896
May
182,888
37,750
June
219,759
36,871
July
256,747
36,988
August
291,944
35,197
September
332,154
40,210
October
368,111
35,957
November
400,133
32,022
December
445,790
45,657
Human Resources
500,000
450,000
400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Year Budget t Prior Year
City of Edmonds, WA
Monthly Expenditure Report -Municipal Court
2016
Municipal Court
Cumulative Monthly YTD Variance
Budget Forecast Budget Forecast Actuals %
January $
67,768 $
67,768 $ 67,346 -0.62%
February
140,999
73,231 145,300 3.05%
March
219,268
78,269 219,191 -0.04%
April
293,243
73,975
May
365,511
72,268
June
440,872
75,361
July
515,865
74,993
August
594,541
78,676
September
669,574
75,033
October
750,559
80,985
November
828,307
77,748
December
909,270
80,963
Municipal Court
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year Budget -0-- Prior Year
*The monthly budget forecast columns are based on a five-year average.
26
Packet Pg. 206
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -Information Services
2016
Information Services
Cumulative Monthly
Budget Forecast Budget Forecast
TrD
Actuals
Variance
%
January
$ 87,065 $
87,065
$ 55,507
-36.25%
February
163,617
76,552
158,620
-3.05%
March
224,796
61,179
205,381
-8.64%
April
281,617
56,821
May
331,746
50,129
June
381,470
49,725
July
448,514
67,044
August
521,686
73,171
September
590,807
69,121
October
648,167
57,360
November
735,478
87,311
December
900,110
164,632
Finance
Information Services
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
0. !77 1
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Year - Budget -90-- Prior Year
City of Edmonds, WA
Monthly Expenditure Report -Finance
2016
Cumulative Monthly
Budget Forecast Budget Forecast
TrD
Actuals
Variance
%
January
$ 97,947
$ 97,947
$ 62,994
-35.69%
February
174,402
76,455
130,335
-25.27%
March
249,528
75,126
197,850
-20.71%
April
330,097
80,569
May
403,825
73,728
June
478,183
74,359
July
551,010
72,826
August
624,240
73,230
September
699,491
75,251
October
782,345
82,854
November
857,044
74,699
December
939,820
82,776
Finance
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
+Current Year - Budget -dP-- Prior Year
*The monthly budget forecast columns are based on a five-year average.
27
Packet Pg. 207 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -City Attorney
2016
City Attorney
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 61,797
$ 61,797
$ 60,070
-2.79%
February
123,593
61,797
120,220
-2.73%
March
185,390
61,797
162,968
-12.09%
April
247,187
61,797
May
308,983
61,797
June
370,780
61,797
July
432,576
61,797
August
494,373
61,797
September
556,170
61,797
October
617,966
61,797
November
679,763
61,797
December
741,560
61,797
Police
800,000
City Attorney
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
JAN
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
+Current Year - Budget -dr- Prior Year
City of Edmonds, WA
Monthly Expenditure Report -Police
2016
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 742,439 $
742,439
$ 771,955
3.98%
February
1,500,827
758,388
1,527,193
1.76%
March
2,270,564
769,738
2,295,467
1.10%
April
3,024,634
754,070
May
3,778,474
753,839
June
4,596,174
817,700
July
5,361,301
765,126
August
6,134,061
772,761
September
6,899,091
765,029
October
7,695,105
796,015
November
8,764,862
1,069,757
December
9,628,550
863,688
Police
10,000,000
9,000,000
8,000,000
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
-*--Current Year - Budget -*I,- Prior Year
*The monthly budget forecast columns are based on a five-year average.
28
Packet Pg. 208
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -Development Services
2016
Development Services
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 187,956 $
187,956
$ 170,060
-9.52%
February
382,755
194,799
361,353
-5.59%
March
596,922
214,167
565,548
-5.26%
April
791,247
194,325
May
991,993
200,746
June
1,183,614
191,621
July
1,388,451
204,836
August
1,596,781
208,330
September
1,803,127
206,345
October
2,032,106
228,979
November
2,241,805
209,699
December
2,473,970
232,165
Parks & Recreation
Development Services
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Year Budget t Prior Year
City of Edmonds, WA
Monthly Expenditure Report -Parks & Recreation
2016
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 242,792 $
242,792
$ 252,899
4.16%
February
503,727
260,935
502,972
-0.15%
March
778,531
274,804
770,996
-0.97%
April
1,055,428
276,898
May
1,355,118
299,690
June
1,671,726
316,608
July
2,101,457
429,730
August
2,558,858
457,401
September
2,879,622
320,763
October
3,172,797
293,176
November
3,426,737
253,939
December
3,762,150
335,413
Parks & Recreation
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Yeaz Budget -dm- Prior Year
*The monthly budget forecast columns are based on a five-year average.
29
Packet Pg. 209 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -Public Works
2016
Public Works
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 31,230 $
31,230
$ 29,570
-5.31%
February
62,130
30,900
59,034
-4.98%
March
92,810
30,680
89,046
-4.05%
April
123,243
30,434
May
154,320
31,076
June
185,380
31,060
July
216,622
31,243
August
246,986
30,363
September
276,279
29,293
October
308,266
31,987
November
337,169
28,904
December
371,790
34,621
Facilities Maintenance
Public Works
400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Current Year Budget --AP- Prior Year
City of Edmonds, WA
Monthly Expenditure Report -Facilities Maintenance
2016
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 115,588 $
115,588
$ 116,661
0.93%
February
236,621
121,033
240,595
1.68%
March
365,554
128,934
357,601
-2.18%
April
487,500
121,946
May
604,005
116,504
June
723,757
119,752
July
857,071
133,314
August
967,719
110,648
September
1,099,287
131,567
October
1,211,418
112,132
November
1,335,849
124,431
December
1,483,800
147,951
Facilities Maintenance
1,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
--#- Current Year -Budget --O-Prior Year
*The monthly budget forecast columns are based on a five-year average.
30
Packet Pg. 210 1
I 4.4.a I
City of Edmonds, WA
Monthly Expenditure Report -Engineering
2016
Engineering
Cumulative Monthly
Budget Forecast Budget Forecast
YTD
Actuals
Variance
%
January
$ 198,055 $
198,055
$ 160,475
-18.97%
February
396,423
198,368
303,810
-23.36%
March
597,281
200,858
521,251
-12.73%
April
796,160
198,879
May
1,001,003
204,843
June
1,201,964
200,961
July
1,401,670
199,706
August
1,603,612
201,942
September
1,807,951
204,339
October
2,023,470
215,519
November
2,232,307
208,838
December
2,470,330
238,023
Engine a ring
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
t Current Year Budget —dp-- Prior Year
*The monthly budget forecast columns are based on a five-year average.
31
Packet Pg. 211
INVESTMENT PORTFOLIO SUMMARY
I 4.4.a I
City of Edmonds
Investment Portfolio Summary
As of March 31, 2016
(a)
Term Purchase Purchase
Maturity
Agency/Issuer Investment Type
(months) Date Price
Date
Washington State Local Investment Pool
Various $13,413,047
Various
Government Investment Pool
Snohomish County Investment Pool
Various $35,453,364
Various
Investment Pool
FICO
Bonds
33
9/19/2014
1,027,000
6/6/2017
FHLMC
Bonds
54
12/27/2012
1,000,000
6/27/2017
FHLMC
Bonds
60
12/28/2012
1,000,000
12/28/2017
FHLMC
Bonds
33
2/19/2016
1,000,000
11/19/2018
FFCB
Bonds
36
1/25/2016
2,000,000
12/28/2018
FFCB
Bonds
37
1/25/2016
2,000,000
1/25/2019
FNMA
Bonds
60
9/19/2014
1,000,000
9/19/2019
TOTAL
F
O
O_
Yield to
Weighted
Maturity
Average
0.45%
0.10%
c
ii
0.79%
0.48%
L
m
0.96%
0.02%
CY
0.75%
0.01 %
co
0
0.90%
0.02%
cV
t
U
L
1.25%
0.02%
1.42%
0.05%
rn
1 .23% 0.04%
1.87% 0.03% Q'
0.78% 0.78%
Investment Mix % of Total Rate Comparison
State Investment Pool 23.17% Current 6-month treasury rate 0.39%
Bonds 15.59% Current State Pool rate 0.45%
Snohomish County
Investment Pool 61.24% Blended Edmonds rate 0.78%
100.0%
(a) To maturity.
Investment interest through March of 2016 is$91,770, whereas interest through March of 2015 was$83,712; difference of $8,058.
32
Packet Pg. 212
4.4.a
GENERAL FUND OVERVIEW
FUND BALANCES
CHANGE IN FUND BALANCES o
GENERAL FUND
& SUBFUNDS
---- ACTUAL ----
---- ACTUAL ----
12/31 /2015 2/28/2016 3/31 /2016
Q1
YTD i
001-General Fund
$ 9,196,139 $ 4,716,874 $ 5,775,692
$ (3,420,446)
$ (3,420,44f
009-Leoff-Medical Ins. Reserve
519,409 477,074 453,760
(65,648)
(65,64t
u_
011-Risk Management Fund
961,512 962,390 963,340
1,828
1,82t ',
012-Contingency Reserve Fund
1,664,488 1,672,096 1,667,653
3,164
L
3,16, �
013-Mulitmodal Transportation FD
56,487 56,538 56,594
107
10- M=
014-Historic Preservation Gift Fund
9,026 9,034 9,043
17
1' CY
016-Building Maintenance
118,085 133,427 133,260
15,175
15,17! c
N
Total General Fund & Subfunds
$ 12,525,146 $ 8,027,434 $ 9,059,344
$ (3,465,802) $ (3,465,80: t
v
L
C�
G
00
CD
r
r.+
L
0
Q
-
General Fund & Subfunds
2
18
U
16
ii
14 $12.53
�'
L
12
1`
10 $9.06
$8.03
CY
0 8
-
-
m
r
6
N
4
L
L
2 —
d
Dec 2015 Feb 2016 Mar 2016
Q-
E
0
U
c
a�
E
c�
*Please note that these revenues and expenses occur within annual cycles.
a
This Interim Report is not adjusted for accruals or those annual cycles.
The beginning fund balances for 2016 are preliminary, these will be updated
after the completion of the 2015 Financial Statements.
33
Packet Pg. 213
4.4.a
GOVERNMENTAL
FUNDS OVERVIEW
CHANGE IN FUND
FUND BALANCES
BALANCES
GOVERNMENTAL
---- ACTUAL ----
FUNDS
---- ACTUAL ----
12/31 /2015
2/28/2016
3/31 /2016
Q1 YTD
—
o
a
General Fund & Subfunds
$ 12,525,146
$ 8,027,434 $
9,059,344
$
(3,465,802) $ (3,465,80
Special Revenue
9,206,543
9,937,132
11,887,729
2,681,185 2,681,18
�a
Debt Service
114,790
115,564
115,564
773 77
.5
ca
Total Governmental Funds
$ 21,846,480
$ 18,080,129 $
21,062,636
$
(783,843) $ (783,84LL
c
L
V
to
Governmental Fund Balances
-By Fund GrouP
Governmental Fund
r
N
t
16
14
12
10
c
0
8
6
4
2
Balances - Combined U
ao
CD
24 — ..
- General
Fund &
Subfunds 18
f Special o
Revenue
12
Debt
Service
$0.11 $0.12 $0.12
Dec 2015 Feb 2016 Ma r 2016
6
Dec 2015 Feb 2016 Mar 2016
*Please note that these revenues and expenses occur within annual cycles.
This Interim Report is not adjusted for accruals or those annual cycles.
The beginning balances for 2016 are preliminary, these will be updated
after the completion of the 2015 Financial Statements.
34
Packet Pg. 214 1
SPECIAL REVENUE FUNDS OVERVIEW
1 4.4.a I
FUND
BALANCES
GOVERNMENTAL
---- ACTUAL ----
SPECIAL REVENUE
12/31 /2015
2/28/2016
3/31 /2016
104 - Drug Enforcement Fund
$ 68,732
$ 71,138
$ 120,531
111 - Street Fund
514,447
411,912
426,929
112 - Combined Street Const/Improve
1,504,539
2,714,817
3,813,826
117 - Municipal Arts Acquis. Fund
468,470
465,260
482,084
118 - Memorial Street Tree
17,919
17,935
17,953
120 - Hotel/Motel Tax Revenue Fund
153,885
158,871
164,509
121 - Employee Parking Permit Fund
64,481
71,294
71,765
122 - Youth Scholarship Fund
15,469
15,296
15,173
123 - Tourism Promotional Fund/Arts
84,568
84,575
86,486
125 - Real Estate Tax 2
1,629,534
1,819,277
1,874,258
126 - Real Estate Excise Tax 1
2,239,005
1,967,598
2,042,221
127 - Gifts Catalog Fund
265,924
277,668
284,615
129 - Special Projects Fund
38,393
38,428
38,466
130 - Cemetery Maintenance/Improvement
137,256
138,476
142,169
132 - Parks Construction Fund
897,415
541,055
1,160,606
136 - Parks Trust Fund
152,249
152,388
152,538
137 - Cemetery Maintenance Trust Fund
883,730
887,183
889,731
138 - Sister City Commission
3,785
3,789
3,792
139 - Transportation Benefit District
0
0
0
140 - Business Improvement Disrict
66,743
100,170
100,076
Total Special Revenue
$ 9,206,543
$ 9,937,132
$ 11,887,729
15
12
c
9
0
6
3
Special Revenue Funds
$9.94
CHANGE IN FUND
BALANCE;
---- ACTUAL ----
Q1 YTD
$ 51,800 $
51,80(
(87,517)
(87,511
Q
2,309,287
2,309,281
13,614
13,61
Fa
34
3z
10,624
10,62z
c
7,284
7,28z
ii
(295)
(29`.
1,918
1,91E
244,723
244,7Z
(196,784)
(196,78:
CY
18,690
18,69(
c
73
7;
N
4,913
4,91;
z
U
263,191
263,19'
289
28�
6,001
6,00'
rn
7
33,333
33, 33,
Q.
$ 2,681,185 $
2, 681,18:
$11.89
Special
Revenue
Dec 2015
Feb 2016
Mar2016
*Please note that these revenues and expenses occur within annual cycles.
This Interim Report is not adjusted for accruals or those annual cycles.
The beginning fund balances for 2016 are preliminary, these will be updated
after the completion of the 2015 Financial Statements.
35
Packet Pg. 215
ENTERPRISE FUNDS OVERVIEW
I 4.4.a I
ENTERPRISE
FUNDS
421 - Water Utility Fund
422 - Storm Utility Fund
423 - Sewer/WWTP Utility Fund
424 - Bond Reserve Fund
411 - Combined Utility Operation
Total Enterprise Funds
$70,000,000
$60,000,000
$50,000,000
$40, 000,000
$30,000,000
$20,000,000
$10, 000,000
FUND BALANCES
---- ACTUAL ----
$ 15, 000, 775 $ 20, 440, 890 $ 15, 513,148 $
10, 032, 988 14,188, 251 10, 572, 881
43,129, 479 51, 909,129 43, 952, 248
843,961 843,913 843,964
- 25,583 47,129
$ 69, 007, 203 $ 87, 407, 767 $ 70.929, 369 $
Enterprise Fund Balances as of March 31, 2016
Combined Utility Water
10,572,881
E
L
O
CL
CHANGE IN FUND
---- ACTUAL ---- —
512,373 $
539,894
822,769
3
47,129
1.922,167 $
YID
512, 37,
c
539, 89z
822, 76t
r
47,12t a
1,922,161 c
N
t
V
L
C�
C
00
Cn
r
$843,964
Storm Sewer/WWTP Bond Reserve
*Please note that these revenues and expenses occur within annual cycles.
This Interim Report is not adjusted for accruals or those annual cycles.
The beginning fund balances for 2016 are preliminary, these will be updated
after the completion of the 2015 Financial Statements.
36
Packet Pg. 216
SUMMARY OVERVIEW
4.4.a I
CITY-WIDE
Governmental Funds
Enterprise Funds
Internal Services Fund
Agency Funds
Total City-wide Total
FUND BALANCES
ACTUAL
CHANGE IN FUND
BALANCES
---- ACTUAL ----
$ 21,846,480
$ 18,080,129
$ 21,062,636
$
(783,843) $
69,007,203
87,407,767
70,929,369
1,922,167
8,166,494
7,543,590
8,273,556
107,063
203,101
194,925
191,835
(11,265)
$ 99,223,277
$113,226,412
$100,457,398
$
1,234,121 $
Governmental Fund Balances as of March 31, 2016
General Fund & Subfunds
Drug Enforcement Fund
Street Fund
Combined Street Const/Improve Fund
Municipal Arts Acquis. Fund
Memorial Street Fund
Hotel/Motel Tax Revenue Fund
Employee Parking Permit Fund
Youth Scholarship Fund
Tourism Promotional Fund/Arts
Real Estate Excise Tax 2
Real Estate Excise Tax 1, Parks Acq
Gifts Catalog Fund
Special Projects Fund
Cemetery Maintenance/Improvement
Parks Construction Fund
Parks Trust Fund
Cemetery Maintenance Trust Fund
Sister City Commission
Transportation Benefit District $ (0)
Business Improvement District
L.I.D. Fund Control
L.I.D. Guaranty Fund
2012 LTGO Debt Service Fund $ (0)
Equipment Rental Fund
Firemen's Pension Fund
$1
$3,792
YTD E
(783,84: Q
m
1,922,16-1 W
107,06:
(11,26f
1,234,12' ii
L
CY
to
$9,059,34, N
$120,531 v
$426,929
$3,81 ,826
$482,084 co
$17,953
$164,509
$71,765 r-
$15,173
$86,486
$1,874,2 8
$2,042,2 1
$284,615
$38,466
— $142,169
� $1,160,606
� $152,538
$889,731
� $100,076
$10,429
$105,135
$191,835
*Please note that these revenues and expenses occur within annual cycles.
This Interim Report is not adjusted for accruals or those annual cycles.
The beginning fund balances for 2016 are preliminary, these will be updated
after the completion of the 2015 Financial Statements.
$8,273,55E
$20,000,000
37
Packet Pg. 217
INTERNAL SERVICE FUNDS OVERVIEW
I 4.4.a I
INTERNAL SERVICE
FUNDS
511 - Equipment Rental Fund
Total Internal Service Funds
10
8
6
0
4
2
FUND BALANCES
---- ACTUAL ----
12/31 /2015 2/28/2016 3/31 /2016
$ 8,166, 494 $ 7,543,590 $ 8,273,556 $
$ 8,166, 494 $ 7,543,590 $ 8,273,556 1 $
Internal Service Fund Balances
0 17 $8.27
Dec 2015 Feb 2016 Mar 2016
CHANGE IN FUND 00.
BALANCES
---- ACTUAL ----
iU_
01 YTD �
c
107,063 $ 107, 06< ii
107,063 $ 107, 06'
�a
Ci
r
O
N
t
V
i
fC
511- Equipment Rental Fund
*Please note that these revenues and expenses occur within annual cycles.
This Interim Report is not adjusted for accruals or those annual cycles.
The beginning fund balances for 2016 are preliminary, these will be updated
after the completion of the 2015 Financial Statements.
38
co
CD
Packet Pg. 218 1
4.4.b
Is' Quarter 2016 Financial T
d
Management Repord,
➢ 1 St Quarter Financial Highlights
➢ Financial Quiz
➢ Q &A
r
0
N
U
L
C�
C
00
a
a
r-
O
U-
CD
N
L
V
F
N
r
C
N
t
V
r
Q
Packet Pg. 219
4.4.b
QIU- z
21
L
➢ Question
1. The Chart Below represents?
0
N
L
12.0
10.0 I ICO
COE
=E■w■—�� WWW �I/■�MEEF-�
4.0 TL
2.0 E
as
0.0 c
c�
ti,�� 1°)�� ti��� �°��� 1°��� ti��� ti��� ti��� ti��� ti��� ti��� 1�01 ti���
c
c
ii
co
N
a) Sales Tax Revenues(in Millions) & Recessions L
b) Number of Housing Unit Permits Issued(in Tens) & Periods of Economic r
Recovery E
c) Greater Seattle Unemployment Rate (in percent) & Recessionary PeriodL
Packet Pg. 220
(lneetinn
4.4.b
QIU- z
L
1. The Chart Below represents? 3
Cy
250 - co
12 0
N
'f1C. l Q
200 10 c`o
AVX\
6
a
r-
100
A
4
Q.
50 OFv
2 E
m
0 0 c
1p'O 10011 yp0� 106^ If" 11p 11 tiffs\"
a) Sales Tax Revenues(in Thousands), Commercial Building Permits &
Recessions
N
b) Number of Housing Unit Permits Issued, Unemployment Rate & Periods a
of Recession
d
c) Street Lane Improvements(1,000's of feet), Addition of New Residents
to City(ten's) & Periods of Economic Recovery
Packet Pg. 221
4.4.b
General Fund - Funds
Revenue Comparison
"a C. 100 9 V
1st QUARTER 2016 REVENUE SUMMARY - GENERAL FUND TYPES
Fund
NO.
Fund Name
YTD 2015
Receipts
YTD 2016
Receipts
$ Change
116 -'15
% Chang
'16 -'15
001
GENERAL FUND
692349620
697979209
5629589
9.0
009
LEOFF-MEDICAL INS. RESERVE
19270
924
(346)
-27.2
011
RISK MANAGEMENT FUND
21684
1,828
(856)
-31.9
012
CONTINGENCY RESERVE FUND
14,247
3,164
(11,082)
-77.8
013
MULTIMODAL TRANSPORTATION FUND
147
107
(39)
-26.8
014
HISTORIC PRESERVATION GIFT FUND
3
17
14
515.4
UILDING MAINTENANCE
45,235
33,918
(11,316)
-25.0
notals
r 692989206
69837,169
5389963
8.6
21
CD
d
r
N
U
L
C�
C
00
r
r
a
a
0
a
m
r
0
N
L
V
F
N
r
C
N
t
V
r
Q
Packet Pg. 222
General Fund Revenue Budget to Actual
General Fund
Year -to -Date Actual
Budget
% of
Budget
Resource Category
21
3/31/2015
3/31/2016
%
2015
2016
2015
2016
Taxes
m
Property Taxes
680,898
728,189
6.9%
14,320,535
14,705,650
2.7%
4.8%
5.0%
Sales Tax
1,605,365
1,693,551
5.5%
5,627,000
6,144,400
9.2%
28.5%
27.6%
CY
0
Utility Taxes
1,867,607
1,935,674
3.6%
6,732,519
6,789,980
0.9%
27.7%
28.5%
c
Other Taxes
233,353
241,616
3.5%
872,750
939,340
7.6%
26.7%
25.7%
N
t
Total Taxes
4,387,224
4,599,031
4.8%
27,552,804
28,579,370
3.7%
15.9%
16.1%
2
Licenses & Permits
Business Licenses & Misc. Permits
114,091
108,355
-5.0%
236,680
244,220
3.2%
48.2%
44.4%
Franchise Fees
278,145
281,141
1.1%
1,093,490
1,142,800
4.5%
25.4%
24.6%
CD
Develo ment Related Permits
140,974
203,267
44.2%
567,370
624,100
10.0%
24.8%
32.6%
Total Licenses & Permits
533,210
592,763
11.2%
1,897,540
2,011,120
6.0%
28.1%
29.5%
a
Intergovernmental Revenues
d
Liquor Board Profits
87,538
87,409
-0.1%
356,890
357,800
0.3%
24.5%
24.4%
r-
0
Liquor Excise Tax
19,873
42,903
115.9%
65,000
65,200
0.3%
30.6%
65.8%
y
Grants
6,634
91,032
1272.2%
40,470
412,100
918.3%
16.4%
22.1%
Other Intergovernmental
18,019
94,561
424.8%
254,190
259,720
2.2%
7.1 %
36.4%
r
Total Intergovernmental Revenues
132,064
315,905
139.2%
716,550
1,094,820
52.8%
18.4%
28.9%
E
Fees For Service
m
Interfund Reimbursement
209,431
236,439
12.9%
1,969,500
2,964,600
50.5%
10.6%
8.0%
Engineering Services
23,666
56,787
140.0%
267,630
180,350
-32.6%
8.8%
31.5%
Plan Check & Inspection Fees
181,458
91,965
-49.3%
323,060
459,250
42.2%
56.2%
20.0%
70
Zoning & Subdivision Fees
23,809
17,798
-25.2%
95,950
75,000
-21.8%
24.8%
23.7%
EMS Transport Fees
200,431
233,613
16.6%
824,575
837,100
1.5%
24.3%
27.9%
Parks & Recreational Fees
250,441
326,671
30.4%
1,066,360
889,580
-16.6%
23.5%
36.7%
u_
co
Other Charges for Services
71,864
75,031
4.4%
305,411
332,300
8.8%
23.5%
22.6%
c
Total Fees For Service
961,099
1,038,305
8.0%
4,852,486
5,738,180
18.3%
19.8%
18.1%
cL
Fines & Forfeitures
Ci
Fines & Forfeitures
134,994
164,100
21.6%
602,450
522,130
-13.3%
22.4%
31.4%
n
Total Fines & Forfeitures
134,994
164,100
21.6%
602,450
522,130
-13.3%
22.4%
31.4%
T
Miscellaneous Revenues
m
Interest Earnings & Misc.
86,030
87,105
1.3%
362,012
495,210
36.8%
23.8%
17.6%
E
t
Total Miscellaneous Revenues
86,030
87,105
1.3%
362,012
495,210
36.8%
23.8%
Financing SourcesInterfund
Transfers
0
0
0.0%
822,175
825,840
0.4%
0.0%
LIT%Other
%Total
Other Financing Sources
0
0
0.0%
822,175
825,840
0.4%
0.0%11
Total Revenues
6,234,620
6,797,209
9.0%
36,806,017
39,266,670
6.7%
16.9%
ket Pg. 223
General Fund Revenue Budget to Actual
Year -to -Date Actual
%
General Fund
Resource Category
3/31/2015
3/31/2016
Change
Taxes
Property Taxes
6801898
7281189
6.9%
Sales Tax
116051365
L6931551
5.5%
Utility Taxes
1186707
L935,674
3.6%
Other Taxes
2331353
2411616
3.5%
Total Taxes
4,387,224
4,5999031
4.8%
Licenses & Permits
Business Licenses & Misc. Permits
1141091
1081355
-5.0%
Franchise Fees
2781145
2811141
1.1 %
Development Related Permits
1401974
2031267
44.2%
Total Lice ns e s & Pe rmits
5339210
-� —r
5929763
11.2
c�
0
N
L
2
00
CD
a
O
a -
CD
U-
0
N
L
cY
F
U)
r
C
N
E
t
V
r
Q
Packet Pg. 224
4.4.b
Contractors 273.625
Health & Persc
27,401
Retail Eating & Drinkin,
204,358
Gasoline Stations 7,957
Automotive Repair 42,3;
Sales Tax Analysis By Category
Current Period: March 2016
Year -to -Date
Total $1,693,551
Wholesale Trade 69,5811
1
(Communications 55,052
Clothing and Accessories
62,793
0
0.
as
r
c
dation 9,203 E
as
c
c�
ervices 126,08 2
0
c
& Recreation E
LL
,527
0
.ores 67,153
Cl
T
E
c�
a
Packet Pg. 225
4.4.b
Change in Sales Tax Revenue:
March 2016 compared to
March 2015
Total
Retail Automotive
Misc Retail Trade
Business Services
Retail Eating & Drinking
Retail Food Stores
Wholesale Trade
Others
Accommodation
Health & Personal Care
Gasoline Stations
Clothing and Accessories
Automotive Repair
Amusement & Recreation
Communications
Contractors
($40,000) ($20,000) $0 $20,000 $40,000 $60,000 $80 000
Packet Pg. 226
General Fund - Fun"""
Expenditure Comparison
rnc. 1$y"
1st QUARTER 2016 EXPENSE SUMMARY - GENERAL FUND TYPES
Fund
NO.
Fund Name
YTD 2015
Expenses
YTD 2016
Expenses
$ Change
'16 -'15
% Chant
16 -'15
001
GENERAL FUND
$8,883,278
1092179655
193349376
15.0'
009
LEOFF-MEDICAL INS. RESERVE
83,216
66,573
(169643)
-20.0'
O11
RISK MANAGEMENT FUND
-
-
-
0.0'
012
CONTINGENCY RESERVE FUND
-
-
-
0.0'
014
HISTORIC PRESERVATION GIFT FUND
-
-
-
0.0'
016
BUILDING MAINTENANCE
529764
18,743
(34,020)
-64.5'
Totals
990199258
10,302,971
1,283,713
14.2'
21
r
0
N
M
U
L
C�
C
00
CD
r
r
a
a
r-
O
a-
E
2
U-
0
N
c�
r
C
N
E
t
V
M
r
Q
Packet Pg. 227
'Ile. 1
009V
Title
General Fund Departm
L ExpenseSumma
r
y�
a
to
r
0
N
L
CM
C
2016 Adopted 3/31/2015 3/31/2016 Amount co
Budget &penditures &penditures Remaining % Spent °'
CITY COUNCIL $
295,500 $
54,262 $
44,120 $
251,380
15%
a
a
OFFICE OF MAYOR
260,250
62,160
64,319
195,931
25%
L
HUMAN RESOURCES
445,790
97,488
90,412
355,378
20%
0
MUNICIPAL COURT
909,270
199,177
219,191
690,079
24%
E
CITY CLERK
585,310
151,490
142,107
443,203
24%
0�
ADMINISTRATIVE SERVICES
1,839,930
496,123
403,231
1,436,699
22%
0
CITY ATTORNEY
741,560
164,833
162,968
578,592
22%
c
NON -DEPARTMENTAL
14,939,500
3,261,415
4,389,675
10,549,825
29%
ii
POLICE SERVICES
9,628,550
2,171,600
2,295,467
7,333,083
24%
co
COMMUNITY SERVICESECONOMIC DEV.
483,580
90,926
101,724
381,856
21%
0
ci
CY
DEVELOPMENT SERVICES
2,473,970
538,490
565,548
1,908,422
23%
N
PARKS & RECREATION
3,762,150
729,804
770,996
2,991,154
20%
a�
PUBLIC WORKS
2,842,120
520,651
610,297
2,231,823
21%
E
FACILITIES MAINTENANCE
1,483,800
344,860
357,601
1,126,199
24%
a
$ 40,691,280 $ 8,883,278 $ 10,217,655 $ 30,473,625 25% in
Packet Pg. 228
4.4.b
Special Revenue Funds Revenue Comparison
1st QUARTER 2016 REVENUE SUMMARY - SPECIAL REVENUE FUNDS
Fund
NO.
Fund Name
YTD 2015
Receipts
YTD 2016
Receipts
$ Change
'16 -'15
% Chang
'16 -'15
104
DRUG ENFORCEMENT FUND
11,205
68,542
57,337
511.7
111
STREET FUND
324,473
358,400
33,927
10.5
112
COMBINED STREET CONST/IMPROVE
573,506
3,398,849
2,825,344
492.6
117
1 MUNICIPAL ARTS ACQUIS. FUND
10,664
17,826
7,162
67.2
118
MEMORIAL STREET TREE
47
34
(12)
-26.8
120
HOTEL/MOTEL TAX REVENUE FUND
169034
16,745
710
4.4
121
EMPLOYEE PARKING PERMIT FUND
7,135
7,284
150
2.1
122
YOUTH SCHOLARSHIP FUND
157
32
(125)
-79.9
123
1 TOURISM PROMOTIONAL FUND/ARTS
5,443
5,656
213
3.9
125
REAL ESTATE EXCISE TAX 2
229,844
280,037
50,193
21.8
126
REAL ESTATE EXCISE TAX 1
228,977
279,885
50,908
22.2
127
GIFTS CATALOG FUND
27,899
25,243
(2,656)
-9.5
129
SPECIAL PROJECTS FUND
100
73
(27)
-26.8
130
CEMETERY MAINTENANCE/IMPROVEMT
46,478
39,130
(7,348)
-15.8
132
PARKS CONSTRUCTION FUND
30,076
776,311
746,235
2481.2
136
PARKS TRUST FUND
396
289
(106)
-26.8
137
CEMETERY MAINTENANCE TRUST FD
79393
6,001
(19392)
-18.8
138
SISTER CITY COMMISSION
4
7
3
70.2
139
TRANSPORTATION BENEFIT DISTRICT
157,885
163,766
5,881
1 3.7
Totals
1,677,714
5,444,109
3,766,395 1
224.5
a
11
Packet Pg. 229
p ED pAfO �
Motor Vehicle Fuel Tax
'IC. 1 g9
$300,000
$250,000
$200,000
$150,000
$100,000
$50,000
$0
4.4.b
Revenues
>,
�d+
L
1 st Quarter 2016 Motor Vehicle Fuel Tax Revenues
$196,961 $194,118
188 794 $192 586 $208,373
Lai
l
C
00
T
IL
a
r-
0
0.
as
c
a�
E
a�
c
c�
2012 2013 2014 2015 2016
c
LL
T
0
N
The City receipts 82% of its Motor Vehicle Fuel Excise Tax (gas tax) into
the Street Fund. This fund is used for costs related to street maintenance. N
T
The remaining 18% of the gas tax is used for street construction and
improvement projects. E
a
19
Packet Pg. 230
'11C. 1009V
$25,000
$20,000
$15,000
$10,000
$5,000
$0
Hotel/Motel Lodging Tax
4.4.b
Revenues
>,
�d+
L
Lai
l
C
1 st Quarter 2016 Hotel/Motel Lodging Tax Revenues
rVO
$145124 12 651 $14,801
2010 2011
$16,75
$201926
E
7.632
2
U-
0
N
L
V
N
2015 r
The City receipts 75% of its Lodging Tax into the Hotel/Motel Tax Fund, which uses the funds for E
the purpose of promoting tourism and visitors to Edmonds. The remaining 25% of the Lodging Tax
2012 2013
2014
is receipted into the Fund 123 Tourism Promotion/Arts Fund, which uses the funds to promote a
tourism through support arts and culture events.
Packet Pg. 231 1
'Ile. 1009V
$600,000
$500,000
$400,000
$300,000
$200,000
$100,000
$0
Real Estate Excise
.. N
4.b
Tax Revemij
1 st Quarter 2016 Real Estate Excise Tax Revenues
2012
2013
2014
2015
2016
114
Packet Pg. 232
4.4.b
Special Revenue Funds Expenditure Comparison
T
1st QUARTER 2016 EXPENSE SUNMARY -SPECIAL REVENUE FUNDS
Fund
NO.
Fund Name
YTD 2015
Expenses
YTD 2016
Expenses
$ Change
'16 -'15
% Changi
16 -'15
104
DRUG ENFORCEMENT FUND
910
161,742
159832
1738.90r
III
STREET FUND
408,019
445,917
379898
9.30r
112
COMBINED STREET CONST/IMPROVE
1599883
190899563
9299680
581.50r
117
MUNICIPAL ARTS ACQUIS. FUND
13,771
4412
(91559)
-69.40r
118
MEMORIAL STREET TREE
-
-
-
0.00/ c
120
HOTEL/MOTEL TAX REVENUE FUND
31552
69121
21569
72.3°r j
121
EMPLOYEE PARKING PERMIT FUND
-
-
-
0.0 °i c
122
YOUTH SCHOLARSHIP FUND
890
327
(563)
-63.3 °r
123
TOURISM PROMOTIONAL FUND/ARTS
1,715
39737
2,022
117.90r
125
REAL ESTATE EXCISE TAX 2
50,695
359314
(159381)
-30.30r
126
REAL ESTATE EXCISE TAX 1
-
4769669
476,669
100.00r
127
GIFTS CATALOG FUND
19178
69553
59374
456.20r
129
SPECIAL PROJECTS FUND
-
-
-
0.00r
130
CEMETERY MAINTENANCE/IMPROVEMT
389394
349217
(49178)
-10.90r
132
PARKS CONSTRUCTION FUND
929860
513,120
4209260
452.60r
136
PARKS TRUST FUND
-
-
-
0.00r
138
SISTER CITY COMMISSION
-
-
-
0.00r
139
TRANSPORTATION BENEFIT DISTRICT
157,885
163,766
51881
3.70r
Totals
9299753
29796,257
118669504
200.80r
Vi
Packet Pg. 233
'Ile. ] 009V
Utility Fur�dP
Revenue Comparison
1st QUARTER 2016 REVENUE SUMMARY - UTILITY FUNDS
Fund
NO.
Fund Name
YTD 2015
Receipts
YTD 2016
Receipts
$ Change
'16 -'15
% Chang
'16 -'15
411
COMBINED UTILITY OPERATION
839625
479129
(369496)
-43.6
421
WATER UTILITY FUND
197049798
291709332
4659533
27.3
422
STORM UTILITY FUND
193299403
191409955
(1889448)
-14.2
423
SEWER/WWTP UTILITY FUND
290549065
296179857
5639792
27.4
424
BOND RESERVE FUND
2
3
1
80.1
Totals
591719892
599769276
8049384
15.6
21
CD
N
M
U
L
C�
C
00
r
r
a
a
r-
O
a -
CD
-
0
N
L
V
N
r
C
N
E
t
V
r
Q
ig
Packet Pg. 234
Utility Fur�dP
Expense Comparison
'nc. 1$y"
1st QUARTER 2016 EXPENSE SUMMARY - UTILITY FUNDS
Fund
NO.
Fund Name
YTD 2015
Expenses
YTD 2016
Expenses
$ Change
'16 -'15
% Chant
16 -'15
421
WATER UTILITY FUND
11384,585
196579959
2739374
19.7'
422
STORM UTILITY FUND
566,110
6019062
349951
6.24
423
SEWER/WWTP UTILITY FUND
11926,894
197959089
(1319806)
-6.8'
424
BOND RESERVE FUND
1 54
-
1 (54)
-100.0'
Totals
3,877,644
4,054,109
176,465
4.6'
21
r
N
U
L
C�
C
00
CD
r
r
a
a
O
a -
CD
A2
U-
r
0
N
L
V
F
N
r
C
N
E
t
V
r
Q
17
Packet Pg. 235
Quiz Answers to Be Shared Dur
Council
'`re. l sy"
Meeting'"
0
N
U
L
C
00
r
r
Packet Pg. 236
4.4.b
•
Questions?Zl
CD
N
u
L
C
a
a
Packet Pg. 237
6.1
City Council Agenda Item
Meeting Date: 05/3/2016
Critical Area Ordinance Update (30 min.)
Staff Lead: Kernen Lien
Department: Planning Division
Preparer: Kernen Lien
Background/History
All cities and counties in Washington State are required to adopt and periodically update critical areas
regulations by the Growth Management Act (GMA). As defined by the GMA, "Critical areas" include the
following areas and ecosystems: (a) wetlands; (b) areas with a critical recharging effect on aquifers used
for potable water; (c) fish and wildlife habitat conservation areas; (d) frequently flooded areas; and (e)
geologically hazardous areas." [RCW 36.70A.030(5)]
In 2015, the City worked with an environmental consulting firm, ESA, on updating the City's critical area
regulations as required by the GMA. The update began with a review of the City's 2004 Best Available
Science (BAS) report for which ESA prepared the 2015 BAS Addendum. This information, along with staff
experiences implementing the critical area regulations over the last 10 years, was used to propose an
update to the City's critical area regulations contained in the Edmonds Community Development Code
(ECDC) 23.40 - 23.90, as well as the portion of the building code that addresses frequently flooded areas
(a typed of critical area) for likely sea rise. The Best Available Science and Gap Analysis Matrix
summarize proposed changes to the code. ESA also prepared a memorandum that addressed some
flexibility that is being proposed in the updated critical area regulations following the format of WAC
365-195-915. Staff also prepared a Q & A memorandum that addressed some general concepts and
specific questions that arose during review of the critical area regulations. On October 29, 2015,
Washington State Department of Ecology submitted a letter of support for the draft critical area
regulations.
The Planning Board reviewed the proposed changes to the critical area regulations over the course of
five meetings and forwarded a recommendation to the City Council in July 2015. The City Council began
review of the critical area regulations in September 2015 and reviewed the updated critical area
regulations over five Council meetings in 2015. At the last Council meeting of 2015, the City Council
proposed a number of amendments to the draft critical area regulations which were adopted in
Ordinance No. 4017 and subsequently vetoed by the Mayor. Following reconsideration of the Mayor's
veto, the Council discussed returning to review the version of the critical area regulations that were
considered at the December 15, 2015 meeting.
Staff Recommendation
Adopt the ordinance included as Exhibit 1.
Narrative
Packet Pg. 238
6.1
At the February 2, 2016, the Council discussed returning to the December 15, 2015 version of the critical
area regulations. An initial set of proposed Council amendments was discussed at the February 23, 2016
Council meeting. The Council decided to hold another public hearing on the "universe" of potential
amendments to the draft critical area regulations. A second public hearing on the critical area
regulations and potential amendments was held on March 15, 2016.
Following the public hearing on March 15, 2016, the Council began taking action on the various
proposed amendments. Review and action on potential amendments continued at the April 5, April 12,
and April 19 Council meetings. At the April 19, 2016 Council meeting, the Council directed the City
Attorney to prepare an ordinance to present to the City Council. The City Attorney has prepared a draft
ordinance included as Exhibit 1. The ordinance in Exhibit 1 contains all of the changes to the critical area
regulations in Chapters 23.40 through 23.90 ECDC in a strike -thro gl /underline format, as well as
related amendments to ECDC 19.00.025 (building code frequently flooded areas amendment), ECDC
21.40.030 (definition of height frequently flooded amendment), ECDC 20.01.003 (permit process
amendment related to new critical area contingent review process), and ECDC 20.03.002 (notice of
application requirements related to new critical area contingent review process). Exhibit 2 is a table
that summarizes all of the Council actions on the proposed Council amendments taken at the March 15,
April 5, April 12, and April 19 Council meetings as well as where the amendments can be located in the
ordinance in Exhibit 1.
As requested by the Council, Exhibit 3 is a clean version of the critical area regulations for just those
portions that are in ECDC 23.40 through 23.90.
Attachments:
Exhibit 1- Draft Ordinance
Exhibit 2 - Council Amendment Actions Summary Table
Exhibit 3 - Clean version of ECDC 23.40 through 23.90
Exhibit 4 - March 15, 2016 Council Minutes Excerpt
Exhibit 5 - April 5, 2016 Council Minutes Excerpt
Exhibit 6 - April 12, 2016 Council Minutes Excerpt
Exhibit 7 - April 19, 2016 Council Minutes Excerpt
Packet Pg. 239
6.1.a
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF EDMONDS,
WASHINGTON, AMENDING THE CRITICAL AREAS
REGULATIONS CONTAINED IN EDMONDS COMMUNITY
DEVELOPMENT CODE CHAPTERS 23.40
ENVIRONMENTALLY CRITICAL AREAS GENERAL
PROVISIONS, 23.50 WETLANDS, 23.60 CRITICAL AQUIFER
RECHARGE AREAS, 23.70 FREQUENTLY FLOODED
AREAS, 23.80 GEOLOGICALLY HAZARDOUS AREAS, AND
23.90 FISH AND WILDLIFE HABITAT CONSERVATION
AREAS, AMENDING ECDC SECTION 19.00.025, A
PROVISION OF THE BUILDING CODE RELATED TO
FREQUENTLY FLOODED AREAS, AMENDING ECDC
SECTION 21.40.030, TO ADD A NEW EXCEPTION TO THE
DEFINITION OF "HEIGHT" FOR USE IN COASTAL HIGH
HAZARD AREAS AND COASTAL "A" FLOOD ZONES;
AMENDING CERTAIN PERMIT REVIEW PROCESSES
RELATED TO CRITICAL AREAS IN ECDC SECTIONS
20.01.003 AND 20.03.002.
WHEREAS, the City of Edmonds is required to plan under RCW 36.70A.040; and
WHEREAS, RCW 36.70A.130(1) requires City of Edmonds to take legislative action to
review and, if needed, revise its comprehensive plan and development regulations, including its
policies and regulations designating and conserving natural resource lands and designating and
protecting critical areas to comply with the requirements in chapter 36.70A RCW (the Growth
Management Act or GMA); and
WHEREAS, on June 16, 2015, the city council of the City of Edmonds reviewed its
comprehensive plan and conducted a public hearing on the 2015 update to the City of Edmonds
comprehensive plan; and
WHEREAS, the City of Edmonds adopted the 2015 update to the City of Edmonds
comprehensive plan with Ordinance 4003; and
WHEREAS, based on early direction from the City Council, the 2015 update did not
involve a major policy shift, but instead focused on consistency and streamlining, including the
latest data, as well as the addition of several performance measures; and
Packet Pg. 240
6.1.a
WHEREAS, it was determined during this review process that, with the exception of the
critical areas regulations, the City of Edmonds' development regulations remained consistent
with and would continue to implement the comprehensive plan and the proposed update to it so
that no other development regulations would need to be revised at this time; and
WHEREAS, the Growth Management Act (GMA) defines "critical areas" to include the
following areas and ecosystems: (a) wetlands; (b) areas with a critical recharging effect on
aquifers used for potable water; (c) fish and wildlife habitat conservation areas; (d) frequently
flooded areas; and (e) geologically hazardous areas; and
WHEREAS, the GMA requires that each city adopt development regulations that protect
critical areas; and
WHEREAS, cities in Snohomish County are expected to take action to review and, if
needed, revise their comprehensive plans and development regulations to ensure the plan and
regulations comply with the requirements of the GMA on or before June 30, 2015, and every
eight years thereafter; and
WHEREAS, cities must include the best available science in developing policies and
development regulations to protect the functions and values of critical areas; and
WHEREAS, cities must give special consideration to conservation or protection
measures necessary to preserve or enhance anadromous fisheries; and
WHEREAS, the City has not comprehensively reviewed its critical areas ordinance and
best available science since 2005 when the current version of the critical area regulations became
effective; and
WHEREAS, the City selected environmental consultants ESA to assist the City in
updating the 2004 City's Best Available Science Report (Exhibit 1 to September 8, 2015 agenda
memo 7969) and to evaluate the City's critical area regulations given the changes in science; and
WHEREAS, the Best Available Science addendum prepared by ESA reviewed the
current science related to critical areas as it has changed since 2004 (see Exhibit 2 to September
8, 2015 agenda memo 7969); and
Packet Pg. 241
6.1.a
WHEREAS, ESA also prepared a memo for the City's review that outlines certain
provisions that may deviate from Best Available Science, as required by WAC 365-195-915; and
WHEREAS, the Planning Board reviewed proposed changes to the critical area
regulations over the course of five Planning Board meetings between March 25 and July 22,
2015; and
WHEREAS, the Board's review included a July 8, 2015 public hearing; and
WHEREAS, the Planning Board forwarded its recommended changes to the City's
critical area regulations to the City Council; and
WHEREAS, the Planning Board also forwarded a recommendation for some
modifications to the building code Title 19 ECDC and definitions in Title 21 ECDC, in
conjunction with its recommendations on critical areas and frequently flooded area regulations;
and
WHEREAS, the City Council reviewed the draft updated critical area regulation as
recommended by the Planning Board at the September 8, 2015 Council meeting and continued
that review at the September 22, 2015 Council meeting; and
WHEREAS, the City Council held a public hearing at the October 6, 2015 City Council
meeting and continued to review the critical area regulations at the November 2, 2015 City
Council meeting; and
WHEREAS, the City Council directed the City Attorney to prepare an ordinance to adopt
the updated critical areas regulations as amended by the City Council during the December 15,
2015 City Council meeting; and
WHEREAS, the Mayor asked the City Council to reconsider the amendments that were
approved during the December 15, 2015 City Council meeting; and
WHEREAS, the Mayor forwarded to the City Council a December 22, 2015 memo that
addresses the implications of the December 15, 2015 amendments; and
WHEREAS, on January 26, 2016, the City Council adopted a critical areas ordinance in
the form of Ordinance 4017, which included the eight amendments made at the December 15,
2015 City Council meeting; and
Packet Pg. 242
6.1.a
WHEREAS, Ordinance 4017 was vetoed by Mayor Earling on January 28, 2016; and
WHEREAS, at the February 2, 2016 City Council meeting, rather than voting on whether
to override the veto, the City Council discussed returning to the December 15, 2015 (pre -
amendments) version of the critical area regulations and providing staff a new set of proposed
amendments, using that version as a baseline, for discussion at future City Council meetings; and
WHEREAS, an initial set of proposed amendments were discussed at the February 23,
2016 City Council meeting; and
WHEREAS, the City Council adopted Resolution 1351 on March 1, 2016, which
expressed a goal date of April 30, 2016 for adoption of another critical areas ordinance and made
a finding that, except for the critical areas ordinance, the required 2015 review of the City's
comprehensive plan and development regulations had been completed and found to be consistent
with the GMA; and
WHEREAS, the City Council decided to hold another public hearing on potential
amendments to the draft critical area regulations on March 15, 2016; and
WHEREAS, the City Council took preliminary action on the proposed amendments on
March 15, 2016, April 5, 2016, April 12, 2016 and April 19, 2016; and
WHEREAS, this ordinance serves as the final legislative action required by the City
under RCW 36.70A.130 for the 2015 review and update;
NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN
AS FOLLOWS:
Section 1. The following chapters of the Edmonds Community Development Code are
hereby amended to read as set forth in Attachment A hereto, which is incorporated herein by
this reference as if set forth in full (new text is shown in underline; deleted text is shown in
stfikethr-eu& text moved from one location to another is shown in double underline where it
was moved to and shown in where it was moved from; new graphics have
an underline under the graphic; deleted graphics have been crossed -out with an X): chapter
23.40, entitled "Environmentally Critical Areas General Provisions;" chapter 23.50, entitled
Packet Pg. 243
6.1.a
"Wetlands;" chapter 23.60, entitled "Critical Aquifer Recharge Areas;" chapter 23.70, entitled
"Frequently Flooded Areas;" chapter 23.80, "Geologically Hazardous Areas;" and chapter 23.90
entitled, "Fish and Wildlife Habitat Conservation Areas."
Section 2. Section 19.00.025 of the Edmonds Community Development Code, entitled
"International Building Code section amendments," is hereby amended to read as set forth in
Attachment B hereto, which is incorporated herein by this reference as if set forth in full (new
text is shown in underline; deleted text is shown in s#ike dffetigh) to require the elevation of the
lowest floor of all structures located in the Coastal High Hazard Areas and Coast A Flood Zones
to be a minimum of two feet above the base flood elevation.
Section 3. Section 21.40.030 of the Edmonds Community Development Code, entitled
"Height," is hereby amended to read as follows (new text is shown in underline; deleted text is
shown in strike through):
21.40.030 Height.
A. Height means the average vertical distance from the
average level of the undisturbed soil of the site covered by a
structure to the highest point of the structure. (See subsection (D)
of this section for exceptions to this rule.)
B. "Average level" shall be determined by averaging
elevations of the downward projections of the four corners of the
smallest rectangle which will enclose all of the building, excluding
a maximum of 30 inches of eaves. If a corner falls off the site, its
elevation shall be the average elevation of the two points projected
downward where the two sides of the rectangle cross the property
line. (See subsection (D) of this section for exceptions to this rule.)
C. Accessory buildings that are attached to the main
building by a breezeway, hallway, or other similar connection so
that the accessory building is separated by 10 feet or less from the
main building shall be considered to be part of the main building
for purposes of determining the average level. For the purposes of
this section, in order for an accessory building to be considered to
be attached to and a part of the main building, the connecting
structure must have a roof and be constructed of similar materials
to both the main building and the accessory building so that it
appears to be a unified and consistently designed building.
D. Height Exceptions.
Packet Pg. 244
6.1.a
1. (Rem For all properties located within the Coastal
High Hazard Areas and Coastal A Flood Zones, height is measured
from the elevation that is two feet above base flood elevation as
identified from the applicable FEMA flood hazard map;
2. Church steeples;
3. Elevator penthouses, not to exceed 72 square feet in
horizontal section, or three feet in height, for that portion above the
height limit;
4. Chimneys, not to exceed nine square feet in horizontal
section or more than three feet in height, for that portion above the
height limit. In RM districts, chimneys shall be clustered. No
multiple -flue chimney shall exceed 39 square feet in horizontal
section. The first chimney shall not exceed nine square feet in
horizontal section, and other chimneys shall not exceed six square
feet in horizontal section;
5. Vent pipes not to exceed 18 inches in height above the
height limit;
6. Standpipes not to exceed 30 inches in height above the
height limit;
7. Solar energy installations not to exceed 36 inches in
height above the height limit. Such an installation may be
approved as a Type II staff decision if it is designed and located in
such a way as to provide reasonable solar access while limiting
visual impacts on surrounding properties; and a
8. Replacement of existing rooftop HVAC equipment
which exceeds the existing height limit, so long as the replacement
equipment does not exceed the height of the existing equipment by
more than 12 inches. The replacement equipment must have earned
the Energy Star label.
Section 4. Section 20.01.003 of the Edmonds Community Development Code, entitled
"Permit type and decision framework," is hereby amended to read as follows (new text is shown
in underline; deleted text is shown in strike -through):
20.01.003 Permit type and decision framework.
A. Permit Types.
TYPE I
TYPE II -A
TYPE II-B
TYPE III -A
TYPE III-B
TYPE IV -A
TYPE IV-B
TYPE V
Zoning
Accessory
Contingent
Outdoor dining
Essential public
Final formal
Site specific
Development
Critical
compliance letter
dwelling unit
facilities
plats
rezone
agreements
Area
Review
Packet Pg. 245
TYPE I
TYPE II -A
TYPE II-B
TYPE III -A
TYPE III-B
TYPE IV -A
TYPE IV-B
TYPE V
Lot line
Formal
Technological
Design review
Final planned
Zoning text
adjustment
interpretation of
impracticality
(where public
residential
amendment; area -
the text of the
waiver for
hearing by
development
wide zoning map
ECDC by the
amateur radio
architectural
amendments
director
antennas
design board is
required)
Critical area
SEPA
Critical Area
Shoreline
Comprehensive
determinations
determinations
Variance
substantial
plan amendments
development,
shoreline
conditional use,
shoreline
variance
Shoreline
Preliminary short
Contingent
Conditional use
Annexations
Exemptions
plat
Critical Area
permits (where
Review if public
public hearing
hearing requested
by hearing
examiner is
required)
Minor
Land
Variances
Development
amendments to
clearing/grading
regulations
planned
residential
development
Minor
Revisions to
Home
preliminary plat
shoreline
occupation
amendment
management
permit (where
permits
public hearing
by hearing
examiner is
required)
Staff design
Administrative
Preliminary
review, including
variances
formal plat
signs
Final short plat
Land use permit
Preliminary
extension requests
planned
residential
development
Sales
Guest house
office/model
(ECDC
17.70.005)
Innocent
purchaser
determination
B. Decision Table.
PROCEDURE FOR DEVELOPMENT PROJECT PERNHT APPLICATIONS
LEGISLATIVE
(TYPE I - IV)
TYPE I
TYPE II -A
TYPE II-B
TYPE III -A
TYPE III-B
TYPE IV -A
TYPE IV-B
TYPE V
Recommendation
N/A
N/A
N/A
N/A
N/A
N/A
Planning board
Planning board
by:
Final decision by:
Director
Director
Director
Hearing
Hearing
City council
City council
City council
examiner
examiner/ADB
Notice of
No
Yes
Yes
Yes
Yes
Yes
Yes
No
application:
T
r�
t
K
W
r.+
C
N
E
s
M
Q
Packet Pg. 246
PROCEDURE FOR DEVELOPMENT PROJECT PERMIT APPLICATIONS
(TYPE I — IV)
LEGISLATIVE
TYPE I
TYPE II -A
TYPE II-B
TYPE III -A
TYPE III-B
TYPE IV -A
TYPE IV-B
TYPE V
Open record
No
Only if
1)i
Yes, before
Yes, before
No
Yes, before
Yes, before
public hearing or
appealed,
Director
hearing
hearing
planning board
planning board
open record
open record
decision is
examiner to
examiner or
which makes
which makes
appeal of a final
hearing
appealed,
render final
board to render
recommendation
recommendation
decision:
before
open record
decision
final decision
to council
to council or
hearing
hearing
council could
examiner
before
hold its own
hearing
hearing
examiner
converted to
Type III -
process
Closed record
No
No
No
No
Yes, before the
No
Yes, before the
review:
council
council
Judicial appeal:
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
C. Any reference to "Type II" in the Edmonds Community Development Code without expressly
being modified as "Type II-B" shall be construed to mean Type II -A for the purposes of this
section unless the context clearly suggests otherwise.
Section 5. Section 20.03.002 of the Edmonds Community Development Code, entitled
"Notice of application," is hereby amended to read as follows (new text is shown in underline;
deleted text is shown in strike thr-o g ):
20.03.002 Notice of application.
A. Generally. A notice of application shall be provided by the director to the public, all
city departments and agencies with jurisdiction of all Type II, III and IV development project
permit applications in accordance with this chapter. The notice of application for these permits
shall also be provided to the public by posting, publishing and mailing.
B. Issuance of Notice of Application.
1. A notice of application shall be issued within 14 days after the city has made a
determination of completeness pursuant to ECDC 20.02.003.
Packet Pg. 247
6.1.a
2. If any open record predecision hearing is required for the requested development
project permit(s), the notice of application shall be provided at least 15 days prior to the open
record hearing.
C. Contents. The notice of application shall include the following information in a format
determined by the director:
1. The date of submission of the initial application, the date of the notice of completion
and acceptance of the application, and the date of the notice of application;
2. A description of the proposed project and a list of the development project permits
requested in the application and, if applicable, a list of any studies requested under Chapter
36.7013 RCW;
3. A description of other required permits not included in the application, to the extent
known by the city at that time;
4. A description of existing environmental documents that evaluate the proposed project,
and, if not otherwise stated on the document providing notice of application, the location where
the application and any studies can be reviewed;
5. A statement setting forth: (a) the time for the public comment period, which shall be
not less than 15 days following the date of notice of application; (b) the right of any person to
comment on the application, receive notice of and participate in any hearings, and request a copy
of the decision on the application; and (c) any appeal rights;
6. The date, time, place and type of hearing, if a hearing has been scheduled when the
date of notice of application is issued;. For Type II-B processes, the notice shall provide
information regarding _ the process for requesting, a public hearing in accordance with the
applicable Type II-B permit application.
7. Any other information determined appropriate by the director such as the director's
threshold determination, if complete at the time of issuance of the notice of application.
D. Mailed Notice. Notice of application shall be mailed to:
1. The owners of the property involved if different from applicant; and
Packet Pg. 248
6.1.a
2. The owners of real property within 300 feet of the boundaries of the property(ies)
involved in the application. Addresses for a mailed notice required by this code shall be obtained
from the applicable county's real property tax records. The adjacent property owners list must be
current to within six months of the date of initial application.
3. Type III Preliminary Plat Actions. In addition to the above, requirements for mailed
notice of filing for preliminary plats and proposed subdivisions shall also include the following:
a. Notice of the filing of a preliminary plat adjacent to or within one mile of the
municipal boundaries of any city or town, or which contemplates the use of any city or town
utilities shall be given to the appropriate city or town authorities;
b. Notice of the filing of a preliminary plat of a proposed subdivision adjoining the
boundaries of Snohomish County shall be given to the appropriate county officials;
c. Notice of the filing of a preliminary plat of a proposed subdivision located adjacent to
the right-of-way of a state highway shall be given to the Secretary of Transportation;
4. For a plat alteration or a plat vacation, notice shall be as provided in RCW 58.17.080
and 58.17.090.
All mailed public notices shall be deemed to have been received on the next business day
following the day that the notice is deposited in the mail.
E. Published Notice. Notice of application shall be published in the city's official
newspaper (The Everett Herald, as identified in Chapter 1.03 ECC). The format shall be
determined by the director and the notice must contain the information listed in ECDC
20.03.002(C).
F. Posting. Posting of the property for site specific proposals shall consist of one or more
notice boards as follows:
1. A single notice board shall be placed:
a. At the midpoint of the street fronting the site or as otherwise directed by the director
for maximum visibility;
Packet Pg. 249
6.1.a
b. Five feet inside the street property line, except when the board is structurally attached
to an existing building; provided, that no notice board shall be placed more than five feet from
the street without approval of the director;
c. So that the bottom of the notice board is between two and four feet above grade; and
d. Where it is completely visible to pedestrians.
e. The size of the notice board shall be determined by the director.
2. Additional notice boards may be required when:
a. The site does not abut a public road;
b. A large site abuts more than one public road; or
c. The director determines that additional notice boards are necessary to provide adequate
public notice.
3. Notice boards shall be:
a. Maintained in good condition during the notice period;
b. In place at least 14 days prior to the date of any hearing, and at least 14 days prior to
the end of any required comment period;
c. Removed within 30 days of the date of the project decision, unless the decision is
appealed. If the project decision is appealed, the sign must be removed 30 days after the appeal
decision is issued.
4. Removal of the notice board prior to the end of the notice period shall be cause for
discontinuance of the department review until the notice board is replaced and remains in place
for the specified time period.
G. Public Comment on the Notice of Application. All public comments in response to the
notice of application must be received by the city's development services department by 4:30
p.m. on the last day of the comment period. Comments in response to the notice of application
received after the comment period has expired will not be accepted no matter when they were
mailed or postmarked. Comments shall be mailed or personally delivered. Comments should be
as specific as possible.
Packet Pg. 250
6.1.a
Section 6. Severability. If any section, subsection, clause, sentence, or phrase of this
ordinance should be held invalid or unconstitutional, such decision shall not affect the validity of
the remaining portions of this ordinance.
Section 7. Effective Date. This ordinance, being an exercise of a power specifically
delegated to the City legislative body, is not subject to referendum and shall take effect five (5)
days after passage and publication of an approved summary thereof consisting of the title.
APPROVED:
MAYOR DAVE EARLING
ATTEST/AUTHENTICATED:
CITY CLERK, SCOTT PASSEY
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
IM
JEFF TARADAY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
PUBLISHED:
EFFECTIVE DATE:
ORDINANCE NO.
Packet Pg. 251
6.1.a
SUMMARY OF ORDINANCE NO.
of the City of Edmonds, Washington
On the day of , 2016, the City Council of the City of Edmonds, passed
Ordinance No. A summary of the content of said ordinance, consisting
of the title, provides as follows:
AN ORDINANCE OF THE CITY OF EDMONDS,
WASHINGTON, AMENDING THE CRITICAL AREAS
REGULATIONS CONTAINED IN EDMONDS
COMMUNITY DEVELOPMENT CODE CHAPTERS
23.40 ENVIRONMENTALLY CRITICAL AREAS
GENERAL PROVISIONS, 23.50 WETLANDS, 23.60
CRITICAL AQUIFER RECHARGE AREAS, 23.70
FREQUENTLY FLOODED AREAS, 23.80
GEOLOGICALLY HAZARDOUS AREAS, AND 23.90
FISH AND WILDLIFE HABITAT CONSERVATION
AREAS, AMENDING ECDC SECTION 19.00.025, A
PROVISION OF THE BUILDING CODE RELATED TO
FREQUENTLY FLOODED AREAS, AMENDING ECDC
SECTION 21.40.030, TO ADD A NEW EXCEPTION TO
THE DEFINITION OF "HEIGHT" FOR USE IN
COASTAL HIGH HAZARD AREAS AND COASTAL
"A" FLOOD ZONES; AMENDING CERTAIN PERMIT
REVIEW PROCESSES RELATED TO CRITICAL
AREAS IN ECDC SECTIONS 20.01.003 AND 20.03.002.
The full text of this Ordinance will be mailed upon request.
DATED this day of , 2016.
4840-7251-8158,v. 1
13
CITY CLERK, SCOTT PASSEY
Packet Pg. 252
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
EDMONDS CITY CODE AND COMMUNITY DEVELOPMENT CODE
Chapter 23.40
ENVIRONMENTALLY CRITICAL AREAS GENERAL PROVISIONS
Sections:
Part I. Purpose and General Provisions
23.40.000 Purpose.
23.40.3-29005 Definitions pertaining to critical areas.
23.40.010 Authority.
23.40.020 Relationship to other regulations.
23.40.030 Severability.
23.40.040 Jurisdiction — Critical areas.
23.40.050 Protection of critical areas.
23.40.055 City Council Reports
Part II. Critical Areas Review Process
23.40.060 General requirements.
23.40.070 Critical areas preapplication consultation.
23.40.080 Notice of initial determination.
23.40.090 Critical areas report — Requirements.
23.40.100 Critical areas report— Modifications to requirements.
23.40.110 Mitigation requirements.
23.40.120 Mitigation sequencing.
23.40.130 Mitigation plan requirements.
23.40.140 Innovative mitigation.
23.40.150 Critical areas decision.
Page 1 of 100
a
Packet Pg. 253
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40.160 Review criteria.
23.40.170 Favorable critical areas decision.
23.40.180 Unfavorable critical areas decision.
23.40.190 Completion of the critical areas review.
23.40.195 Contingent review procedure for certain types of development
23.40.200 Appeals.
23.40.210 Variances.
23.40.215 Critical Area Restoration Projects
Part III. Allowed Activities, Exemptions and Noncompliance Penalties
23.40.220 Allowed activities.
23.40.230 Exemptions.
23.40.240 Unauthorized critical areas alterations and enforcement.
Part IV. General Critical Areas Protective Measures
23.40.250 Critical areas markers and signs.
23.40.270 Critical areas tracts.
23.40.280 Building setbacks.
23.40.290 Bonds to ensure mitigation, maintenance, and monitoring.
23.40.300 Critical areas inspections.
Part V. Incorporation of Best Available Science
23.40.310 Best available science.
Part I. Purpose and General Provisions
Page 2 of 100
Q
Packet Pg. 254
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40.000 Purpose.
A. The purpose of this title is to designate and classify ecologically sensitive and hazardous areas and to
protect these areas and their functions and values, while also allowing for reasonable use of private
property.
B. This title is to implement the goals, policies, guidelines, and requirements of the comprehensive plan
and the Washington State Growth Management Act.
C. The city of Edmonds finds that critical areas provide a variety of valuable and beneficial biological
and physical functions that benefit Edmonds and its residents, and/or may pose a threat to human safety
or to public and private property. The beneficial functions and values provided by critical areas include,
but are not limited to, water quality protection and enhancement, fish and wildlife habitat, food chain
support, flood storage, conveyance and attenuation of flood waters, ground water recharge and
discharge, erosion control, wave attenuation, protection from hazards, historical, archaeological, and
aesthetic value protection, and recreation. These beneficial functions are not listed in order of priority.
D. Goals. By limiting development and alteration of critical areas, this title seeks to:
1. Protect members of the public and public resources and facilities from injury, loss of life, or property
damage due to landslides and steep slope failures, erosion, seismic events, or flooding;
o�
2. Maintain healthy, functioning ecosystems through the protection of unique, fragile, and valuable
elements of the environment, including ground and surface waters, wetlands, and fish and wildlife and
their habitats, and to conserve the biodiversity of plant and animal species;
3. Direct activities not dependent on critical areas resources to less ecologically sensitive sites and
mitigate unavoidable impacts to critical areas by regulating alterations in and adjacent to critical areas;
and
4. Prevent cumulative adverse environmental impacts to water quality, wetlands, and fish and wildlife
habitat, and the overall net loss of wetlands, frequently flooded areas, and fish and wildlife habitat
conservation areas.
E. The regulations of this title are intended to protect critical areas in accordance with the Growth
Management Act and through the application of the best available science, as determined according to
WAC 365-195-900 through 365-195-925 and RCW 36.70A.172, and in consultation with state and
federal agencies and other qualified professionals.
F. This title is to be administered with flexibility and attention to site -specific characteristics. It is not the
intent of this title to make a parcel of property unusable by denying its owner reasonable economic use
of the property nor to prevent the provision of public facilities and services necessary to support existing
development.
G. The city of Edmonds' enactment or enforcement of this title shall not be construed to benefit any
individual person or group of persons other than the general public. [Ord. 3527 § 2, 2004].
Page 3 of 100
Packet Pg. 255
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40. 0005 Definitions pertaining to critical areasjc SHRRE
For the puraoses of this chapter and the chanters on the five specific critical area tunes (Chapters 23.50
23.60, 23.70, 23.80 and 23.90 ECDC) the following definitions shall apply:
"Adjacent" means those afeas activities located on -site immediately adjoining a critical area; or distance
equal to or less than two hundred and twenty five (225) 2Wfeet of a development proposal or subject
parcel. ,,,,a 4hese areas l,,eatea within 800 feet f a a,,,.,,,.. entea ba4 a
"Alteration" means anv human -induced action which changes the existing condition of a critical area or
its buffer. Alterations include; but are not limited to: grading; filling; dredging; draining; channelizing;
cutting, pruning, limbing or topping, clearing, relocating or removing vegetation; applying herbicides or a
pesticides or any hazardous or toxic substance; discharging pollutants; paving, construction, application
of gravel; modifying for surface water management pumoses; or any other human activity that changes
the existing landforms, vegetation, hydrology, wildlife or wildlife habitat value of critical areas.
L
0
"Best Available Science." See ECDC 23.40.310 M
L
a
"Best management practices" means a system of practices and management measures that:
r
L
1. Control soil loss and reduce water quality degradation caused by nutrients, animal waste, and toxics• �?
o�
2. Control the movement of sediment and erosion caused by land alteration activities•
a�
3. Minimize adverse impacts to surface and ground water quality, flow, and circulation patterns; and
c
4. Minimize adverse impacts to the chemical, physical, and biological characteristics of critical areas. 0`
"Buffer" means the designated area immediately next to and a part of a steep slope or landslide hazard a
area and which protects slope stability, attenuation of surface water flows and landslide hazards r
reasonably necessary to minimize risks to persons or property: or a designated area immediately next to
and part of a stream or wetland that is an integral part of the stream or wetland ecosystem.
x
w
"Chapter" means those sections of this title sharing the same third and fourth digits.
E
s
"City" means the city of Edmonds. M
a
"Class" or "wetland class" means descriptive categories of wetland vegetation communities within the
wetlands taxonomic classification system of the U.S. Fish and Wildlife Service (Cowardin, et al., 19791.
"Clearing" means the act of cutting and/or removing vegetation. This definition shall include grubbing
vegetation and the use or application of herbicide.
"Compensation project" means an action(s) specifically designed to replace project -induced critical area
or buffer losses. Compensation project design elements may include, but are not limited to: land
Page 4 of 100
Packet Pg. 256
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
acquisition procedures and detailed plans including functional value assessments, detailed landscaping
designs, construction drawings, and monitoring and contingency plans.
"Compensatory mitigation" means replacing project -induced losses or impacts to a critical areaand
includes, but is not limited to, the following:
21. "Creation" means actions performed to intentionally establish a wetland at a site where it did not
formerly exist.
2. "Re-establishment" means actions performed to restore processes and functions to an area that was
formerly a critical area, where the former critical area was lost by past alterations and activities.
3. "Rehabilitation" means improving or repairingprocessesand functions to an area that is an existing
critical area that is highly degraded because one or more environmental processes supporting the critical
area have been disrupted.
-34. "Enhancement" means actions performed to improve the condition of existing degraded wetlands so
that the functions they provide are of a higher quality.
45. "Preservation" means actions taken to ensure the permanent protection of existing high -quality
wetlands.
Council" or "Council." See ECDC 21.15.030.
"Creation" means a compensation project performed to intentionally establish a wetland or stream at a
site where one did not formerly exist.
"Critical areas" for the city of Edmonds means wetlands, critical aquifer recharge areas, frequently
flooded areas, geologically hazardous areas, and fish and wildlife habitat conservation areas as defined
in Chapters 23.50, 23.600 23.70, 23.80 and 23.90 ECDC, respectively.
"Development proposal" means any activity relating to the use and/or development of land requiring -a
permit or approval from the city, including, but not limited to: commercial or residential building
permit; binding site plan; conditional use permit; franchise; right-of-way permit; grading and clearing
permit; mixed use approval; planned residential development; shoreline conditional use permit;
shoreline substantial development permit; shoreline variance; short subdivision; special use permit;
subdivision; flood hazard permit; unclassified use permit; utility and other use permit; variance; rezone -
or any required permit or approval not expressly exempted by this title.
"Director" means the city of Edmonds development services director or his/her designee.
"Division" means the planning division of the city of Edmonds development services department.
Page 5 of 100
T
t
x
w
c
as
E
s
M
Q
Packet Pg. 257
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
"Enhancement" means an action taken to improve the condition and function of a critical area. In the
case of wetland or stream, the term includes a compensation project performed to improve the
conditions of an existing degraded wetland or stream to increase its functional value.
"Erosion" means the process in which soil particles are mobilized and transported by natural agents such
as wind, rain, frost action, or stream flow.
Erosion Hazard Areas. See ECDC 23.80.020(Al.
Fish and Wildlife Habitat Conservation Areas. See Chanter 23.90 ECDC.
as
"Floodplain" means the total area subject to inundation by a "100-year flood." "100-year flood" means a
r
�.
flood having a one percent chance of being equaled or exceeded in any given year.
a�
c
"Footprint of Existing Development" or "Footprint of Development" means the area of a asite that
contains legally established: buildings; roads, driveways, parking lots, storage areas, walkways or other
areas paved with concrete, asphalt or compacted gravel; outdoor swimming pools; patios.
0
0
L
a
"Frequently Flooded Areas." See Chapter 23.70 ECDC.
r
"Functions" means the roles served by critical areas including, but not limited to: water a_uality
L
v
protection and enhancement: fish and wildlife habitat; food chain support; flood storage, conveyance
and attenuation: ground water recharge and discharge: erosion control: wave attenuation: aesthetic value
protection; and recreation. These roles are not listed in order of priority.
c
"Geologically Hazardous Areas." See Chapter 23.80 ECDC.
L
0
"Geologist" means a person licensed as a geologist, engineering geologist, or hydrologist in the state of
Washington
c`
ra 4 least t� 0 0 00 o
,� l gist few f
two .eas n foxrovienee
etieine of vexBe..;enc-e
r
++
Iry i ioa n .it nli fie n4i niv. .
.ajugie i
landslidewith
n
o eeeleey anda elese atio a
K
eeeleesta d eeeteehnieal/ei-,M neer3. For geologically hazardous areas, an applicant may choose
W
a geologist or engineering_geologist licensed in the State of Washington to assess the potential hazard.
E
"Geotechnical engineer" means a practicing geotechnical/civil engineer licensed as a professional civil
engineer in the state of Washington who has at least fewfive years of professional employment as a
Q
geotechnical engineer in responsible charge including experience with landslide evaluation.
"Grading" means any one or a combination of excavating, filling, or disturbance of that portion of the
soil profile which contains decaying organic matter.
"Habitats of local importance" means areas that include a seasonal range or habitat element with which a
given species has a primary association, and which, if altered may reduce the likelihood that the species
will maintain and reproduce over the long-term. These might include areas of high relative density or
Page 6 of 100
Packet Pg. 258
6.1.a
Attachment A
City of Edmonds - City Code and Community Development Code
Environmentally Critical Areas - April 26, 2016
species richness, breeding habitat, winter range, and movement corridors. These might also include
habitats that are of limited availability or high vulnerability to alterations such as cliffs, talus, and
wetlands. In urban areas like the city of Edmonds, habitats of local importance include biodiversjty
areas and corriodrs, which as characterized by a framework of ecological components which provides
the physical conditions necessary for ecosystems and species populations to survive in a human -
dominated landscape. inelude a seasonal r-angt r- habita4 elemei * with w-hieh a given 0 es has
a-nd whigh. if alter-ed. mayff:Q(Wee the likelihood that the will maintain and
0oN,er-areasr-elatiyeor-0 0 r4ehaess.
habitat. , er-o and mevementeeffider-s.0 ef
n+udfiats. eel .beds. and weflands=,(:See ECDC 23 . °�010(^
"In lieu fee program" means a program which sells compensatory mitigation credits to permittees whose
obligation to provide compensatory mitigation is then transferred to the in lieu pro_r�ponsor, a
governmental or non-profit natural resource management entity
"Landslide Hazard Areas." (See ECDC 23.80.020(BA_}
"Mitigation" means the use of any or all of the following actions, which are listed in descending order of
preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action:
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by
using appropriate technology or by taking affirmative steps such as project redesign, relocation, or
timing to avoid or reduce impacts:
3. Rectifying the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and habitat
conservation areas by repairing, rehabilitating, or restoring the affected environment to the historical
conditions or the conditions existing at the time of the initiation of the project;
4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineered or
other methods:
5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations
during the life of the action•
6. Compensating for the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and
habitat conservation areas by replacing, enhancing, or providing substitute resources or environments;
and
7. Monitoring the hazard or other required mitigation and taking remedial action when necessary.
Page 7 of 100
T
x
w
c
as
E
s
M
a
Packet Pg. 259
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
"Native vegetation" means vegetation comprised of plant species which are indigenous to the Puget
Sound region and which reasonably could have been expected to naturally occur on the site. "Native
vegetation" does not include noxious weeds as defined by the state of Washington or federal agencies.
"Normal maintenance of vegetation" means removal of shrubs/non-woody vegetation and trees (less
than 4-inch diameter at breast height) that occurs at least every other year. Maintenance also maX
include tree topping that has been previousl approved by the City in the past 5 years.
"Noxious weeds" means any plant ,.,hie . when esta.lishe,a, that is highly destructive. competitive or
difficult to control by cultural or chemical practices, limited to those plants on the state noxious week
•f*'i
list contained as fef- listen in Cha ter 16-750 WAC.
°�
"Planning staff' means those employed in the planning division of the city of Edmonds development
Q.
M
services department.
c
c
"Qualified critical areas consultant" or "qualified professional" means a person who has the
o
qualifications specified below to conduct critical areas studies pursuant to this title, and to make
recommendations for critical areas mitigation. For geologically hazardous areasFef afeas of petenfiga
L
ge ' g;,.:,,sWb4ity, the qualified critical areas consultant shall be a geologist or geeteehnieal engine
engineering geologist licensed in the State of Washington to assess the potential hazard. If development
is to take place within a geologically hazardous area, the qualified critical areas consultant developer
L
v
_
mitigation plans and design shall be a Professional Engineer licensed in the State of Washington and
familiar with landslide and slope stability mitigation. For wetlands and streams, the qualified critical
areas consultant shall be a specialist in botany, fisheries, wetland biology, and/or hydrology with a
minimum of twefive years' field experience with wetlands and/or streams in the Pacific Northwest.
c
Requirements defining a qualified critical areas consultant or qualified professional are contained within
the chapter on each critical area type.
O
"Reasonable economic use(s)" means the minimum use to which a property owner is entitled under
c
applicable state and federal constitutional provisions in order to avoid a taking and/or violation of
'
substantive due process.
T
"Redeveloped land(s)" means those lands on which existing structures are demolished in their entirety to
w
allow for new development. The director shall maintain discretion to determine if the demolition of a
c
majority of existing structures or portions thereof constitute the re -development of a property or subject
E
a
Q
"Restoration" means the actions necessary to return a stream, wetland or other critical area to a state in
which its stability. functions and values approach its unaltered state as closely as possible. For wetlands,
restoration as compensatory mitigation may include re-establishment or rehabilitation.
"Seismic Hazard Areas." See ECDC 23.80.020(CU
"Species of local importance" means those species that are of local concern due to their population
status, their sensitivity to habitat manipulation, or that are game (hunted) species. (See ECDC
23.90.010(A)(4).)
Page 8 of 100
Packet Pg. 260
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
"Storm Water Management Manual" means the Stef,v. W er- �a,,,,,,,.enwnt M rua o r the PUeet c,,,,,,a
stormwater manualspecified in in
Chanter 18.30 ECDC).
"Streams" means any area where surface waters produce a defined channel or bed which demonstrates
clear evidence, such as the sorting of sediments, of the passage of water. The channel or bed need not
contain water year-round. This definition is not meant to include irrigation ditches, canals, storm or
surface water runoff devices (drainage ditches) or other entirely artificial watercourses unless they are
used by salmonids or used to convey streams naturally occurring prior to construction of such
watercourse. Streams are further classified into Categories SFNn and Ns and fishbearing or
nonfishbearing 1, 2 and 3. (See ECDC 23.90.010(A)(1).)
"Title" means all chapters of the city of Edmonds Development Code beginning with the digits 23.
"Undeveloped land(s)" means land(s) on which manmade structures or land modifications (clearing.
grading, etc.) do not exist. The director retains discretion to identify undeveloped land(s) in those
instances where historical modifications and structures may have existed on a property or subject parcel
in the past.
"Wetland functions" means those natural processes performed by wetlands, such as facilitating food
chain production; providing habitat for nesting, rearing and resting sites for aquatic, terrestrial or avian
species; maintaining the availability and quality of water; acting as recharge and/or discharge areas for
ground water aquifers; and moderating surface water and storm water flows.
"Wetland mitigation bank" means a site where wetlands are restored, created, enhanced, or in
exceptional circumstances, preserved expressly for the purpose of providing compensatory mitigation in
advance of authorized impacts to similar resources.
"Wetlands" means those areas that are inundated or saturated by ground or surface water at a frequency
and duration sufficient to support, and that under normal circumstances do support, a prevalence of
vegetation typically adapted for life in saturated soil conditions. Wetlands do not include those artificial
wetlands intentionally created from nonwetland sites, including, but not limitedrgion and
drainage ditches, grass -lined swales, canals, detention facilities, wastewater treatment facilities, farm
ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally
created as a result of the construction of a road, street or highway. However, wetlands may include those
artificial wetlands intentionally created from nonwetland areas created to mitigate conversion of
wetlands if permitted by the city (WAC 365-190-030(22)). Wetlands are further classified into
Categories 1, 2, 3 and 4. (See ECDC 23.50.010(B).) [Ord. 3952 & 1, 2013; Ord. 3931 & 2, 2013; Ord.
3527 & 2, 20041.
23.40.010 Authority.
A. As provided herein, the Edmonds development services director or his/her designee (hereafter
referred to as "the director") is given the authority to interpret and apply, and the responsibility to
enforce, this title to accomplish the stated purpose.
Page 9 of 100
o�
a�
c
M
c
�a
0L
r-
M
c`
T
x
w
c
as
E
s
M
Q
Packet Pg. 261
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. The director may withhold, condition, or deny development permits or activity approvals to ensure
that the proposed action is consistent with this title. [Ord. 3527 § 2, 2004].
23.40.020 Relationship to other regulations.
A. These critical areas regulations shall apply as an overlay and in addition to zoning, site development,
stormwater management, building and other regulations adopted by the city of Edmonds.
B. Any individual critical area adjoined or overlain by another type of critical area shall have the buffer
and meet the requirements that provide the most protection to the critical areas involved. When any
provision of this title or any existing land use regulation conflicts with this title, that which provides
more protection to the critical area shall apply.
C. These critical areas regulations shall be coordinated with review conducted under the State
Environmental Policy Act (SEPA), as necessary and locally adopted.
D. Compliance with the provisions of this title does not constitute compliance with other federal, state, a
and local regulations and permit requirements that may be required (for example, shoreline substantial a
development permits, Hydraulic Permit Act (HPA) permits, Section 106 of the National Historic
Preservation Act, U.S. Army Corps of Engineers Section 404 permits, and National Pollution Discharge L
Elimination System permits). The applicant is responsible for complying with these requirements, apart �?
from the process established in this title. [Ord. 3527 § 2, 2004].
23.40.030 Severability.
If any clause, sentence, paragraph, section, or part of this title or the application thereof to any person or
circumstances shall be judged by any court of competent jurisdiction to be invalid, such order or
judgment shall be confined in its operation to the controversy in which it was rendered. The decision
shall not affect or invalidate the remainder of any part thereof and to this end the provisions of each
clause, sentence, paragraph, section, or part of this law are hereby declared to be severable. [Ord. 3527
§ 2, 2004].
23.40.040 Jurisdiction — Critical areas.
A. The director shall regulate all uses, activities, and developments within, adjacent to, or likely to affect
one or more critical areas, consistent with the best available science and the provisions herein.
B. Critical areas regulated by this title include:
1. Wetlands as designated in Chapter 23.50 ECDC, Wetlands;
2. Critical aquifer recharge areas as designated in Chapter 23.60 ECDC, Critical Aquifer Recharge
Areas;
3. Frequently flooded areas as designated in Chapter 23.70 ECDC, Frequently Flooded Areas;
Page 10 of 100
Packet Pg. 262
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
4. Geologically hazardous areas as designated in Chapter 23.80 ECDC, Geologically Hazardous Areas;
and
5. Fish and wildlife habitat conservation areas as designated in Chapter 23.90 ECDC, Fish and Wildlife
Habitat Conservation Areas.
C. All areas within the city of Edmonds meeting the definition of one or more critical areas, regardless
of any formal identification, are hereby designated critical areas and are subject to the provisions of this
title.
D. Areas Adjacent to Critical Areas Subject to Regulation. Areas adjacent to critical areas shall be
considered to be within the jurisdiction of these requirements and regulations to support the intent of this
title and ensure protection of the functions and values of critical areas. " " shall mean a*y
.twity l,.eatea.
air_sr.�r:�sr.�:ea:ss:ee�.riT.��ss��reef:ersss�e� _ .rrs:re��asrtrs��r.�:r�ziy�
23.40.050 Protection of critical areas.13 SHARE
Any action taken pursuant to this title shall result in equivalent or greater functions and values of the
critical areas associated with the proposed action, as determined by the best available science. All
actions and developments shall be designed and constructed in accordance with ECDC 23.40.120,
Mitigation sequencing, to avoid, minimize, and restore all adverse impacts. Applicants must first
demonstrate an inability to avoid or reduce impacts before the use of actions to mitigate potential
0`
impacts will be allowed. No activity or use shall be allowed that results in a net loss of the functions or
values of critical areas. [Ord. 3527 § 2, 2004].
c`
23.40.055 City Council Reports
The Director will provide a report to the Citv Council during the 1 st and 3rd auarter each vear
summarizing critical area decisions that have been made since the previous report. The report will
include information such as, the number and type of critical area decisions that have been made,
including information on buffers and enhancements approved for each applicable decision, a description
of each approved restoration proiect. and other information specifically reauested by the Council
following the previous report.
Part Il. Critical Areas Review Process
23.40.060 General requirements.3 SHARE
A. As part of this review, the director shall:
1. Verify the information submitted by the applicant;
Page 11 of 100
Packet Pg. 263
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
2. Evaluate the project area and vicinity for critical areas;
3. Determine whether the proposed project is likely to impact the functions or values of critical areas;
and
4. Determine if the proposed project adequately assesses all impacts, avoids impacts, and/or mitigates
impacts to the critical area associated with the project.
B. If the proposed project is within, adjacent to, or is likely to impact a critical area, the director shall:
1. Require a critical areas report from the applicant that has been prepared by a qualified professional;
2. Review and evaluate the critical areas report;
3. Determine whether the development proposal conforms to the purposes and performance standards of
this title, including the criteria in ECDC 23.40.160, Review criteria•,
4. Assess the potential impacts to the critical area and determine if they can be avoided or minimized;
and
5. Determine if any mitigation proposed by the applicant is sufficient to protect the functions and values �?
of the critical area and public health, safety, and welfare concerns consistent with the goals, purposes,
objectives, and requirements of this title. [Ord. 3527 § 2, 2004].
23.40.070 Critical areas preapplication consultation.0 SHARE
Any person preparing to submit an application for development or use of land that may be regulated by
the provisions of this title may request a preapplication meeting with the director prior to submitting an
application for development or other approval. At this meeting, the director shall discuss the
requirements of this title; provide critical areas maps, scientific information, and other source materials;
outline the review process; and work with the activity proponent to identify any potential concerns that
might arise during the review process, in addition to discussing other permit procedures and
requirements. All applicants, regardless of participation in a preapplication meeting, are held fully
responsible for knowledge and disclosure of critical areas on, adjacent to, or associated with a subject
parcel and full compliance with the specific provisions and goals, purposes, objectives, and requirements
of this title. [Ord. 3527 § 2, 2004].
23.40.080 Notice of initial determination.13 SHARE
A. If the director determines that no critical areas report is necessary, the director shall state this in the
notice of application issued for the proposal.
B. If the director determines that there are critical areas on the site that the proposed project is unlikely
to impact and the project meets the requirements for and has been granted a waiver from the requirement
Page 12 of 100
Packet Pg. 264
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
to complete a critical areas report, this shall be stated in the notice of application for the proposal. A
waiver maygranted if the director determines that all of the following requirements will be met:
1. There will be no alteration of the critical area or buffer;
2. The development proposal will not affect the critical area in a manner contrary to the purpose, intent,
and requirements of this Title.
C. If the director determines that critical areas may be affected by the proposal and a critical areas report
is required, public notice of the application shall include a description of the critical area that might be
affected and state that a critical areas report(s) is required.
D. Critical areas determinations shall be considered valid for five years from the date in which the
determination was made; after such date the city shall require a new determination, or at minimum
documentation of a new assessment verifying the accuracy of the previous determination [Ord. 3527
§ 2, 2004].
23.40.090 Critical areas report — Requirements.0 SHARE
A. Preparation by Qualified Professional. The applicant shall submit a critical areas report prepared by a
qualified professional as defined herein. For wetlands, frequently flooded areas and fish and wildlife v
habitat conservation areas, an applicant may choose one of the qualified technical consultants on the
city's approved list to prepare critical areas reports per the requirements of this title or may apply to o�
utilize an alternative consultant. Critical areas studies and reports developed by an alternative consultant
shaU-nLaLbe subject to independent review pursuant to subsection B of this section.
the sefviees of a qualified teehnieal eensultant f�om the eity's approved list shall enter- into a three pfR4y
,i*«.,et between the applicant, the consultant and th ty-. All costs associated with the critical areas
study shall be borne by the applicant. 0`
B. Independent Review of Critical Areas Reports. Critical areas studies and reports on geologically
hazardous areas and those developed by an applicant representative or consultant not as part of a three -
party contract may, at the discretion of the director, be subject to independent review. This independent
review shall be performed by a qualified technical consultant selected by the city with all costs borne by
the applicant. The purpose of such independent review is to provide the city with objective technical
assistance in evaluating the accuracy of submitted reports and/or the effects on critical areas which may
be caused by a development proposal and to facilitate the decision -making process. The director may
also have technical assistance provided by appropriate resource agency staff if such assistance is
available in a timely manner.
C. Best Available Science. The critical areas report shall use scientifically valid methods and studies in
the analysis of critical areas data and field reconnaissance and reference the source of science used. The
critical areas report shall evaluate the proposal and all probable impacts to critical areas in accordance
with the provisions of this title.
D. Minimum Report Contents. At a minimum, the report shall contain the following:
Page 13 of 100
Packet Pg. 265
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
1. The name and contact information of the applicant, a description of the proposal, and identification of
the permit requested;
2. A copy of the site plan for the development proposal including:
a. A map to scale depicting critical areas, buffers, the development proposal, and any areas to be cleared;
and
b. A description of the proposed storm water management plan for the development and consideration of
impacts to drainage alterations;
c. The site plan shall identify the location of all native and non-native vegetation of 6 inches dbh or
larger.
3. The dates, names, and qualifications of the persons preparing the report and documentation of any
fieldwork performed on the site;
4. Identification and characterization of all critical areas, wetlands, water bodies, shorelines, and buffers
adjacent to the proposed project area;
5. A description of reasonable efforts made to apply mitigation sequencing pursuant to ECDC �?
23.40.120, Mitigation sequencing, to avoid, minimize, and mitigate impacts to critical areas; and
6. Report requirements specific to each critical area type as indicated in the corresponding chapters of
this title. c
7. A statement specifying the accuracy of the report and all assumptions made and relied upon;
8. A description of the methodologies used to conduct the critical areas study, including references; and
9. Plans for adequate mitigation, as needed to offset any critical areas impacts, in accordance with the
Mitigation Plan Requirements in Section 23.40.130.
E. Unless otherwise provided, a critical areas report may incorporate, be supplemented by or composed,
in whole or in part, of any reports or studies required by other laws and regulations or previously
prepared for and applicable to the development proposal site, as approved by the director. At the
discretion of the director, reports previously compiled or submitted as part of a proposal for
development may be used as a critical areas report to the extent that the requirements of this section and
the report requirements for each specific critical area type are met.
F. Critical areas reports shall be considered valid for five years; after such date the city shall determine
whether a revision or additional assessment is necessary.[Ord. 3527 § 2, 2004].
23.40.100 Critical areas report —Modifications to requirements.C3 SHARE
Page 14 of 100
Packet Pg. 266
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
A. Limitations to Study Area. The director may limit the required geographic area of the critical areas
report as appropriate if:
1. The applicant, with assistance from the city of Edmonds, cannot obtain permission to access
properties adjacent to the project area; or
2. The proposed activity will affect only a limited part of the subject site.
B. Modifications to Required Contents. The applicant may consult with the director prior to or during
preparation of the critical areas report to obtain approval of modifications to the required contents of the
report where, in the judgment of a qualified professional, more or less information is required to
adequately address the potential critical area impacts and required mitigation.
C. Additional Information Requirements. The director may require additional information to be included
in the critical areas report when determined to be necessary to the review of the proposed activity in
accordance with this title. Additional information that may be required includes, but is not limited to:
1. Historical data, including original and subsequent mapping, aerial photographs, data compilations and
summaries, and available reports and records relating to the site or past operations at the site;
2. Grading and drainage plans; and
o�
3. Information specific to the type, location, and nature of the critical area. [Ord. 3527 § 2, 2004].
23.40.110 Mitigation requirements.13 SHARE
A. The applicant shall avoid all impacts that degrade the functions and values of critical areas. Unless
otherwise provided in this title, if alteration to the critical area is unavoidable, all adverse impacts to or
from critical areas and buffers resulting from a development proposal or alteration shall be mitigated
using the best available science in accordance with an approved critical areas report and SEPA
documents, so as to result in no net loss of critical area functions and values.
B._ Mitigation shall be in sufficient to maintain or compensate for
the functions and values of the impacted critical area and to prevent risk from a hazard posed by a
critical area.
C. Mitigation shall not be implemented until after the director has provided approval of a critical areas
report that includes a mitigation plan. Mitigation shall be implemented in accordance with the provisions
of the approved critical areas report. [Ord. 3527 § 2, 2004].
23.40.120 Mitigation sequencing.0 SHARE
A. Applicants shall demonstrate that all reasonable efforts have been examined with the intent to avoid
and minimize impacts to critical areas.
Page 15 of 100
Packet Pg. 267
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. When an alteration to a critical area is proposed, such alteration shall be avoided, minimized, or
compensated for in the following sequential order of preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action;
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by
using appropriate technology or by taking affirmative steps, such as project redesign, relocation, or
timing, to avoid or reduce impacts;
3. Rectifying the impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation
areas by repairing, rehabilitating, or restoring the affected environment to the historical conditions or the
conditions existing at the time of the initiation of the project;
4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineering
or other methods;
5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations
during the life of the action;
6. Compensating for the impact to wetlands, frequently flooded areas, and fish and wildlife habitat
conservation areas by replacing, enhancing, or providing substitute resources or environments; and/or
o�
7. Monitoring the hazard or other required mitigation and taking remedial action when necessary.
C. Mitigation for individual actions may include a combination of the above measures. [Ord. 3527 § 2,
2004] .
23.40.130 Mitigation plan requirements.0 SHARE
When mitigation is required, the applicant shall submit for approval by the director a mitigation plan as
part of the critical areas report. The mitigation plan shall include:
A. Environmental Goals and Objectives. The mitigation plan shall include a written report identifying
environmental goals and objectives of the compensation proposed and including:
1. A description of the anticipated impacts to the critical areas and the mitigating actions proposed and
the purposes of the compensation measures, including the site selection criteria; identification of
compensation goals; identification of resource functions; and dates for beginning and completion of site
compensation construction activities. The goals and objectives shall be related to the functions and
values of the impacted critical area;
2. A review of the best available science supporting the proposed mitigation;
3. An analysis of the likelihood of success of the compensation project; and
4. Specific mitigation plan and report requirements for each critical area type as indicated in this title.
Page 16 of 100
Packet Pg. 268
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. Performance Standards. The mitigation plan shall include measurable specific criteria for evaluating
whether or not the goals and objectives of the mitigation project have been successfully attained and
whether or not the requirements of this title have been met.
C. Detailed Construction Plans. The mitigation plan shall include written specifications and descriptions
of the mitigation proposed, such as:
1. The proposed construction sequence, timing, and duration;
2. Areas of proposed impacts on critical areas or buffers;
3. Grading and excavation details;
-34. Erosion and sediment control features;
45. A planting plan specifying plant species, quantities, locations, size, spacing, and density; and
56. Measures to protect and maintain plants until established.
These written specifications shall be accompanied by detailed site diagrams, scaled cross -sectional L
drawings, topographic maps showing slope percentage and final grade elevations, and any other �?
drawings appropriate to show construction techniques or anticipated final outcome.
D. Monitoring Program. The mitigation plan shall include a program for monitoring construction and for
assessing a completed project. A protocol shall be included outlining the schedule for site monitoring
M
(for example, monitoring shall occur in years one, three, and five after site construction), and how the
�a
monitoring data will be evaluated to determine if the performance standards are being met. A monitoring
0
report shall be submitted as needed to document milestones, successes, problems, and contingency
actions of the compensation project. The compensation project shall be monitored for a period necessary
a
to establish that performance standards have been met, but not for a period less than tie -five 5 years
r
without approval from the director.
E. Contingency Plan. The mitigation plan shall include identification of potential courses of action and
any corrective measures to be taken if monitoring or evaluation indicates project performance standards
are not being met.
F. Financial Guarantees. The mitigation plan shall include financial guarantees, as necessary, to ensure
that the mitigation plan is fully implemented. Financial guarantees ensuring fulfillment of the
compensation project, monitoring program, and any contingency measures shall be posted in accordance
with ECDC 23.40.290, Bonds to ensure mitigation, maintenance, and monitoring. [Ord. 3527 § 2, 2004].
23.40.140 Innovative mitigation.0 SHARE
A. The city of Edmonds may encourage, facilitate, and approve innovative mitigation projects that are
based on the best available science. Advance mitigation, in lieu fee programs, or mitigation banking are
examples of alternative mitigation prejeet-, pI oaches allowed under the provisions of this section
Page 17 of 100
Packet Pg. 269
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
wherein one or- more applieants, or- an or-gamza4ion with demonstr-ated eapability, may undet4ake-a
mitigation pFoject toget if it is demonstrated that all of the following circumstances exist:
1. There are no reasonable onnortunities on --site or within the same sub -drainage basin. or onnortunities
on -site or within the sub -drainage basin do not have a high likelihood of success based on a
determination of the capacity of the site to compensate for the impacts. Considerations should include:
anticipated replacement ratios for wetland mitigation, buffer conditions and proposed widths, available
water to maintain anticipated hydro _ eg omorphic classes of wetlands when restored, proposed flood
storage capacity, and potential to mitigate fish and wildlife impacts (such as connectivity);
4-2. The off -site mitigation has a greater likelihood of providing equal or improved critical areas
functions than the altered critical area, and there is a clear potential for success of the proposed
mitigation at the identified mitigation site.
3. Off -site locations shall be in the same basin and within the City unless:
a. Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland
functions have been established by the City and strongly justify location of mitigation at another site; or
b. Credits from an approved (State -certified) wetland mitigation bank are used as compensation, and the
use of credits is consistent with the terms of the approved bank instrument;
c. Fees are paid to an approved in -lieu fee program to compensate for the impacts.
B. Development nr000sals impacting critical areas and/or associated buffers may contribute oavment
towards an identified City of Edmonds mitigation with approval from the director, provided that
the mitigation approach meets all state and federal permit requirements, where required. Such miti ag tion
actions shall be consistent with ECDC 23.40.140.A.1. and ECDC 23.40.140.A.2., and with all other
applicable provisions of ECDC Chapters 23.50 and 23.90.
1BC. Conducting mitigation as part of a cooperative process provides for retention or an increase in the
beneficial functions and values of critical areas within the Edmonds jurisdiction. [Ord. 3527 § 2, 2004].
23.40.150 Critical areas decision.0 SHARE
The city of Edmonds development services director shall make a decision as to whether the proposed
activity and mitigation, if any, is consistent with the provisions of this title. The decision shall be based
on the criteria of ECDC 23.40.160, Review criteria, and shall affect and be incorporated within the
larger project decision. [Ord. 3527 § 2, 2004].
Page 18 of 100
Packet Pg. 270
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40.160 Review criteria.0 SHARE
A. Any alteration to a critical area, unless otherwise provided for in this title, shall be reviewed and
approved, approved with conditions, or denied based on the proposal's ability to comply with all of the
following criteria:
1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation
sequencing;
2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
3. The proposal is consistent with the general purposes of this title and the public interest;
4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110,
Mitigation requirements;
5. The proposal protects the critical area functions and values consistent with the best available science
and results in no net loss of critical area functions and values; and
6. The proposal is consistent with other applicable regulations and standards.
o�
B. The director may condition the proposed activity as necessary to mitigate impacts to critical areas and
to conform to the standards required by this title. Except as provided for by this title, any project that
cannot adequately mitigate its impacts to critical areas in the sequencing order of preferences in ECDC
23.40.120 shall be denied. [Ord. 3527 § 2, 2004].
23.40.170 Favorable critical areas decision.0 SHARE
If the director determines that the proposed activity meets or is exempt from the criteria in ECDC
23.40.160, Review criteria, and complies with the applicable provisions of this title, the development
services director shall prepare a written notice of decision for the applicant and identify any required
conditions of approval as part of the larger project decision. The notice of decision and conditions of
approval shall be included in the project file and be considered in the next phase of the city's review of
the proposed activity in accordance with any other applicable codes or regulations.
Any conditions of approval included in a notice of decision shall be attached to the underlying permit or
approval. Any subsequent changes to the conditions of approval shall void the previous decision
pending re -review of the proposal and conditions of approval previously set by the director.
A favorable decision should not be construed as endorsement or approval of any underlying permit or
approval. [Ord. 3527 § 2, 2004].
23.40.180 Unfavorable critical areas decision.0 SHARE
Page 19 of 100
Packet Pg. 271
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
If the director determines that a proposed activity is not exempt or does not adequately mitigate its
impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160, Review criteria,
and the provisions of this title, the director shall prepare a written decision for the applicant that includes
findings of noncompliance.
No proposed activity or permit shall be approved or issued if it is determined that the proposed activity
does not adequately mitigate its impacts on the critical areas and/or does not comply with the provisions
of this title.
Following notice of decision that the proposed activity does not meet the review criteria and/or does not
comply with the applicable provisions of this title, the applicant may request consideration of a revised
critical area report. If the revision is found to be substantial and relevant to the critical area review, the
director may reopen the critical area review and make a new decision based on the revised report. [Ord.
3527 § 2, 2004].
23.40.190 Completion of the critical areas review.0 SHARE
The director's decision regarding critical areas pursuant to this title shall be final concurrent with the
final project decision to approve, condition, or deny the development proposal or other activity involved.
[Ord. 3527 § 2, 2004].
23.40.195 Contingent review procedure for certain types of development.
A. Scope. The procedures set forth in this section shall apply to the following types of critical area
restoration projects as allowed by ECDC 23.40.215:
1. Restoration projects involving anadromous fish streams
2. Restoration projects involving Category I or Category II wetlands
3. Restoration projects involving Category I or Category II estuarine wetlands
B. Notice of application. Development activity within the scope of subsection A, above, shall be
processed as a Type II application, unless the process is altered according to subsection D, below. In
addition to the notice provided pursuant to Title 20, notice of application for all such development shall
also be sent to the city council by email.
C. Contingent review process. Development activity within the scope of subsection A, above, shall be
escalated to a Type III -A process when:
1. The city receives a request from any person for a public hearing within 14 days of the date of the
notice of application; and
2. The public hearing request is accompanied by a hearing fee in the amount of 50% of the difference
between the Type II and Type III -A application fee.
Page 20 of 100
Packet Pg. 272
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
D. Effect of contingent review. When the contingent review process is triggered pursuant to subsection
C above, the project applicant shall pay the other 50% of the difference between the Type II and Type
III -A application fee, on top of the previously paid Type II application fee. The applicant shall pay this
fee within 30 days of notice from the city that the fee is due. If the applicant fails to pay the additional
fee within the required 30-dayperiod, the application for the project shall be deemed withdrawn. The
city shall not schedule the public hearing until the additional fee has been paid. For these public
hearings, the cost of the hearing examiner shall be borne by the city_
E. Notice of decision. Whether development activity within the scope of subsection A, above, is
processed as a Type II application or escalated to a Type III -A application, notice of decision shall be
sent by email to the city council in addition to any other notice that ma,, b�quired by Title 20.
23.40.200 Appeals.0 SHARE
Any decision to approve, condition, or deny a development proposal or other activity based on the
requirements of this title may be appealed according to, and as part of, the appeal procedure, if any, for
the permit or approval involved. [Ord. 3736 § 71, 2009; Ord. 3527 § 2, 2004].
23.40.210 Variances.13 SHARE
A. Variances from the standards of this title may be authorized through the process of hearing examiner
review in accordance with the procedures set forth in Chapter 20.85 ECDC only if an applicant o,
demonstrates that one or more of the following two conditions exist:
1. The application of this title would prohibit a development proposal by a public agency or public
utility. A public agency and utility exception may be granted as a variance if:
a. There is no other practical alternative to the proposed development with less impact on the critical
areas;
b. The application of this title would unreasonably restrict the ability to provide utility services to the
public;
c. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
d. The proposal attempts to protect and mitigate impacts to the critical area functions and values
consistent with the best available science; and
e. The proposal is consistent with other applicable regulations and standards.
2. The application of this title would deny all reasonable economic use (see the definition of "reasonable
economic use(s)" in ECDC 23.40.320) of the subject property. A reasonable use exception may be
authorized as a variance only if an applicant demonstrates that:
a. The application of this title would deny all reasonable economic use of a property or subject parcel;
Page 21 of 100
Packet Pg. 273
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
b. No other reasonable economic use of the property consistent with the underlying zoning and the city
comprehensive plan has less impact on the critical area;
c. The proposed impact to the critical area is the minimum necessary to allow for reasonable economic
use of the property;
d. The inability of the applicant to derive reasonable economic use of the property is not the result of
actions by the applicant after the effective date of the ordinance codified in this title or its predecessor;
e. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
f. The proposal minimizes net loss of critical area functions and values consistent with the best available
science; and
g. The proposal is consistent with other applicable regulations and standards.
B. Specific Variance Criteria. A variance may be granted if the applicant demonstrates that the requested
action conforms to all of the following specific criteria:
1. Special conditions and circumstances exist that are peculiar to the land, the lot, or something inherent �?
in the land, and that are not applicable to other lands in the same district;
2. The special conditions and circumstances do not result from the actions of the applicant;
3. A literal interpretation of the provisions of this title would deprive the applicant of all reasonable
economic uses and privileges permitted to other properties in the vicinity and zone of the subject
property under the terms of this title, and the variance requested is the minimum necessary to provide
the applicant with such rights;
4. Granting the variance requested will not confer on the applicant any special privilege that is denied by
this title to other lands, structures, or buildings under similar circumstances;
5. The granting of the variance is consistent with the general purpose and intent of this title, and will not
further degrade the functions or values of the associated critical areas or otherwise be materially
detrimental to the public welfare or injurious to the property or improvements in the vicinity of the
subject property; and
6. The decision to grant the variance is based upon the best available science and gives special
consideration to conservation or protection measures necessary to preserve or enhance anadromous fish
habitat.
C. Hearing Examiner Review. The city hearing examiner shall, as a Type III -A decision (see Chapter
20.01 ECDC), review variance applications and conduct a public hearing. The hearing examiner shall
approve, approve with conditions, or deny variance applications based on a proposal's ability to comply
with general and specific variance criteria provided in subsections (A) and (B) of this section.
Page 22 of 100
Packet Pg. 274
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
D. Conditions May Be Required. The director retains the right to prescribe such conditions and
safeguards as are necessary to secure adequate protection of critical areas from adverse impacts, and to
ensure conformity with this title for variances granted through hearing examiner review.
E. Time Limit. The director shall prescribe a time limit within which the action for which the variance is
required shall be begun, completed, or both. Failure to begin or complete such action within the
established time limit shall void the variance, unless the applicant files an application for an extension of
time before the expiration. An application for an extension of time shall be reviewed by the director as a
Type II decision (see Chapter 20.01 ECDC).
F. Burden of Proof. The burden of proof shall be on the applicant to bring forth evidence in support of a
variance application and upon which any decision has to be made on the application. [Ord. 3783 § 15,
2010; Ord. 3775 § 15, 2010; Ord. 3736 §§ 72, 73, 2009; Ord. 3527 § 2, 2004].
23.40.215 Critical Area Restoration Proiects
A. When a critical area restoration project is proposed that is not required as mitigation for a
development proposal, the Director or Hearing Examiner (as applicable)may grant relief from standard
critical area buffer requirements if the restoration project involves:
1. The daylighting of a stream or tidal channel, or
o�
2. Expansion of a wetland that would cause a landward expansion of the wetland buffer.
B. The restoration project proposal will include a proposed buffer width for the project that is developed
from an assessment by a qualified Critical Area Consultant on the buffer width necessary to ensure that
the restoration project is successful and the ecological functions of the areas adjacent to the stream or
wetland will be enhanced.
C. The Director or Hearing Examiner (as applicable) will consider the proposed buffer width along with
hydrologic, geologic, and other habitat data for the site to determine if the project warrants a buffer
width that deviates from the standard critical area buffer widths.
D. If the Director or Hearing Examiner (as applicable) determines that a reduced buffer width is
appropriate for the proposed restoration project, the Director may approve the reduced buffer width for
the proposed restoration site.
Part III. Allowed Activities, Exemptions and Noncompliance Penalties
23.40.220 Allowed activities. FC3 s"RRI 1
A. Critical Area Report. Activities allowed under this title shall have been reviewed and permitted or
approved by the city of Edmonds or other agency with jurisdiction, but do not require submittal of a
critical area report, unless such submittal was required previously for the underlying permit. The director
Page 23 of 100
Packet Pg. 275
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
may apply conditions to the underlying permit or approval to ensure that the allowed activity is
consistent with the provisions of this title to protect critical areas.
B. Required Use of Best Management Practices. All allowed activities shall be conducted using the best
management practices that result in the least amount of impact to the critical areas. Best management
practices shall be used for tree and vegetation protection, construction management, erosion and
sedimentation control, water quality protection, and regulation of chemical applications. The city may
observe or require independent inspection of the use of best management practices to ensure that the
activity does not result in degradation to the critical area. Any incidental damage to, or alteration of, a
critical area shall be restored, rehabilitated, or replaced at the responsible party's expense.
C. Allowed Activities. The following activities are allowed:
1. Permit Requests Subsequent to Previous Critical Areas Review. Development permits and approvals
that involve both discretionary land use approvals (such as subdivisions, rezones, or conditional use
permits) and construction approvals (such as building permits) if all of the following conditions have
been met:
a. The provisions of this title have been previously addressed as part of another approval;
b. There have been no material changes in the potential impact to the critical area or buffer since the v
prior review;
o�
c. The permit or approval has not expired or, if no expiration date, no more than five years have elapsed
since the issuance of that permit or approval; c
d. There is no new information available that is applicable to any critical area review of the site or
particular critical area; and
de. Compliance with any standards or conditions placed upon the prior permit or approval has been
achieved or secured.;
2. Modification to Structures Existing Outside of Critical Areas and/or Buffers. Structural modification
of, addition to, or replacement of a legally constructed structure existing outside of a critical area or its
buffer that does not further alter or increase the impact to the critical area or buffer and there is no
increased risk to life or property as a result of the proposed modification or replacement;
3. Perr hied Altefatio Modifications to Existing Structures Existing within Critical Areas and/or
Buffers. Permitted altef tior Modification to a legally constructed structure existing within a critical area
or buffer shall be allowed when the a' atmodification:does no
a. Does not increase the footprint of the structuredevelopment; and
b. Does not increase the impact to the critical area or buffer; and
Page 24 of 100
Packet Pg. 276
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
c. Does not increasether-e ;s no iner-e se risk to life or property as a result of the proposed modification
or replacement_ (
Aadditions to legally constructed structures existing within a critical area or buffer that do increase the
existing footprint of development shall be subject to and permitted in accordance with the development
standards of the associated critical area type (see ECDC 23.50.040 and 23.90.040)). This provision shall
be interpreted to supplement the provisions of the Edmonds Community Development Code relating to
nonconforming structures in order to permit the full reconstruction of a legal nonconforming building
within its footprint;
4. Development Proposals within Interrupted Stream or Wetland Buffers. Adjacent areas that may be
physically separated from a stream or wetland due to existing„ legally established structures or paved
areas may be exempted from the prescribed buffer widths if proven scientifically to be functionally
isolated from the stream or wetland. The Director will require the applicant to provide a site assessment
and functional analysis documentation report by a qualified Critical Area Consultant that demonstrates
the interrupted buffer area is functionally isolated. The Director shall consider the hydrologic, geologic,
and/or biological habitat connection potential and the extent and permanence of the physical separation.
45. Activities within the Improved Right -of -Way. Replacement, modification, installation, or
construction of utility facilities, lines, pipes, mains, equipment, or appurtenances, when such facilities r
L
are located within the improved portion of the public right-of-way or a city -authorized private roadway., v
except those activities that alter a wetland or watercourse, such as culverts or bridges, or result in the
transport of sediment or increased stormwater.
-56. Minor Utility Projects. Utility projects that have minor or short -duration impacts to critical areas, as
determined by the director in accordance with the criteria below, and which do not significantly impact
the function or values of a critical area(s); provided, that such projects are constructed with best
management practices and additional restoration measures are provided. Minor activities shall not result
in the transport of sediment or increased storm water. Such allowed minor utility projects shall meet the
following criteria:
a. There is no practical alternative to the proposed activity with less impact on critical areas;
b. The activity involves the placement of utility pole(s), street sign(s), anchor(s), or vault(s) or other
small component(s) of a utility facility; and
c. The activity involves disturbance of an area less than 75 square feet;
6. Public and Private Pedestrian Trails. New public and private pedestrian trails subject to the following:
a. The trail surface shall be limited to pervious surfaces and meet all other requirements, including water
quality standards set forth in the current editions of the International Residential Code and International
Building Code, as adopted in ECDC Title 19;
b. Critical area and/or buffer widths shall be increased, where possible, equal to the width of the trail
corridor, including disturbed areas; and
Page 25 of 100
Packet Pg. 277
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
c. Trails proposed to be located in landslide or erosion hazard areas shall be constructed in a manner that
does not increase the risk of landslide or erosion and in accordance with an approved geotechnical
report; and
d. Trails located only in the outer twenty percent (25%) of critical areas buffers, and located to
avoid removal of significant trees. Where existing legally established development has reduced the
width of the critical areas buffer, trails may be placed in the outer twenty percent (25%, of the
remaining critical area buffer. The trail shall be no more than five (5) feet in width and for pedestrian
use only. Raised boardwalks utilizing nontreated pilings may be acceptable.
Allowances for trails within the inner seventy percent (75%) of critical areas buffers are provided
within applicable sections of ECDC Chapters 23.50 — 23.90.
7. Select Vegetation Removal Activities. The following vegetation removal activities:
a. The removal of the following vegetation with hand labor and Et -hand-held equipment when the area
of work is under one thousand five hundred (1,500)square feet in area as calculated cumulatively
three (3) years:
i. Invasive and noxious weeds;
ii. English ivy (Hedera helix);
o�
iii. Himalayan blackberry (Rubus discolor, R. procerus);
iv. Evergreen blackberry (Rubus laciniatus);
v. Scot's broom (Cytisus scoparius); and
vi. Hedge and field bindweed (Convolvulus sepium and C. arvensis);
Removal of these invasive and noxious plant species shall be restricted to hand removal unless permits
or approval from the appropriate regulatory _ agencies have been obtained for approved biological _ or
chemical treatments or other removal techniques. All removed plant material shall be taken away from
the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed
Control Board list of noxious weeds must be handled and disposed of according to a noxious weed
control plan appropriate to that species.
b. The removal of trees from critical areas and buffers that are hazardous, posing a threat to public
safety, or posing an imminent risk of damage to private property; provided, that:
i. The applicant submits a report from an ISA- or ASCA-certified arborist or registered landscape
architect that documents the hazard and provides a replanting schedule for the replacement trees;
Page 26 of 100
Packet Pg. 278
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
ii. Tree cutting shall be limited to pruning and crown thinning, unless otherwise justified by a qualified
professional. Where pruning or crown thinning is not sufficient to address the hazard, trees should be
removed or converted to wildlife snags;
iii. All vegetation cut (tree stems, branches, etc.) shall be left within the critical area or buffer unless
removal is warranted due to the potential for disease or pest transmittal to other healthy vegetation or
unless removal is warranted to improve slope stability;
iv. The land owner shall replace any trees that are removed with new trees at a ratio of two replacement
trees for each tree removed (two ene2:1) within one year in accordance with an approved restoration
plan. Replacement trees may be planted at a different, nearby location if it can be determined that
planting in the same location would create a new hazard or potentially damage the critical area.
Replacement trees shall be species that are native and indigenous to the site and a minimum of one to
two inches in diameter at breast height (dbh) for deciduous trees and a minimum of six feet in height for
evergreen trees as measured from the top of the root ball;
v. If a tree to be removed provides critical habitat, such as an eagle perch, a qualified wildlife biologist
shall be consulted to determine timing and methods of removal that will minimize impacts; and
vi. Hazard trees determined to pose an imminent threat or danger to public health or safety, to public or r
L
private property, or of serious environmental degradation may be removed or pruned by the land owner v
prior to receiving written approval from the city; provided, that within 14 days following such action,
the land owner shall submit a restoration plan that demonstrates compliance with the provisions of this
title;
c. Measures to control a fire or halt the spread of disease or damaging insects consistent with the State
Forest Practices Act, Chapter 76.09 RCW; provided, that the removed vegetation shall be replaced in
kind or with similar native species within one year in accordance with an approved restoration plan;
d. Chemical Annlications. The aaalication of herbicides. pesticides. organic or mineral -derived
fertilizers, or other hazardous substances, if necessary, as approved by the City, provided that their use
shall be restricted in accordance with state Department of Fish and Wildlife Management
Recommendations and the regulations of the state Department of Agriculture, the U.S. Environmental
Protection Agency, and Department of Ecology; and
de. Unless otherwise provided, or as a necessary part of an approved alteration, removal of any
vegetation or woody debris from a fish and wildlife habitat conservation area or wetland shall be
prohibited;
8. Minor Site Investigative Work. Work necessary for land use submittals, such as surveys, soil logs,
percolation tests, and other related activities, where such activities do not require construction of new
roads or significant amounts of excavation. In every case, impacts to the critical area shall be minimized
and disturbed areas shall be immediately restored; and
9. Navigational Aids and Boundary Markers. Construction or modification of navigational aids and
boundary markers. [Ord. 3527 § 2, 2004].
Page 27 of 100
Packet Pg. 279
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40.230 Exemptions.P SHARE
A. Exemption Request and Review Process. The proponent of the activity may submit a written request
for exemption to the director that describes the activity and states the exemption listed in this section
that applies.
The director shall review the exemption request to verify that it complies with this title and approve or
deny the exemption. If the exemption is approved, it shall be placed on file with the city of Edmonds. If
the exemption is denied, the proponent may continue in the review process and shall be subject to the
requirements of this title.
B. Exempt Activities and Impacts to Critical Areas. All exempted activities shall use reasonable
methods to avoid potential impacts to critical areas. To be exempt from this title does not give
permission to degrade a critical area or ignore risk from natural hazards. Any incidental damage to, or
alteration of, a critical area that is not a necessary outcome of the exempted activity shall be restored,
rehabilitated, or replaced at the responsible party's expense.
C. Exempt Activities. The following developments, activities, and associated uses shall be exempt from
the provisions of this title; provided, that they are otherwise consistent with the provisions of other local,
state, and federal laws and requirements:
1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or
welfare, or that pose an immediate risk of damage to private property and that require remedial or
preventative action in a time frame too short to allow for compliance with the requirements of this title. as
Emergency actions that create an impact to a critical area or its buffer shall use reasonable methods to
address the emergency; in addition, they must have the least possible impact to the critical area or its
buffer. The person or agency undertaking such action shall notify the director within one working day
following commencement of the emergency activity. Within 30 days, the director shall determine if the
action taken was within the scope of the emergency actions allowed in this subsection. If the director
determines that the action taken, or any part of the action taken, was beyond the scope of an allowed
emergency action, then enforcement provisions of ECDC 23.40.240, Unauthorized critical area
alterations and enforcement, shall apply.
After the emergency, the person or agency undertaking the action shall fully fund and conduct necessary
restoration and/or mitigation for any impacts to the critical area and buffers resulting from the
emergency action in accordance with an approved critical areas report and mitigation plan. The person
or agency undertaking the action shall apply for review, and the alteration, critical area report, and
mitigation plan shall be reviewed by the director in accordance with the review procedures contained
herein. Restoration and/or mitigation activities must be initiated within one year of the date of the
emergency and completed in a timely manner;
2. Operation, Maintenance, or Repair. Operation, maintenance, or repair of existing structures,
infrastructure improvements, utilities, public or private roads, dikes, levees, or drainage systems that do
not require construction permits, if the activity does not further alter or increase the impact to, or
encroach further within, the critical area or buffer and there is no increased risk to life or property as a
Page 28 of 100
Packet Pg. 280
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
result of the proposed operation, maintenance, or repair. Operation and maintenance also includes
normal maintenance of vegetation performed in accordance with best management practices, provided
that such management actions are part of regular and ongoing maintenance, do not expand further into
the critical area, are not the result of an expansion of the structure or utility, and do not directly impact
an endangered or threatened species; and
3. Passive Outdoor Activities. Recreation, education, and scientific research activities that do not
degrade the critical area, including fishing, hiking, and bird watching. Trails must be constructed
pursuant to ECDC 23.40.220(C)(6), Public and Private Pedestrian Trails. [Ord. 3527 § 2, 2004].
23.40.240 Unauthorized critical area alterations and enforcement. o SHARE
A. When a critical area or its buffer has been altered in violation of this title or the provisions of Chapter
7.200 ECC, all ongoing development work shall stop and the critical area shall be restored. The director
shall have the authority to issue a stop work order to cease all ongoing development work, and order
restoration, rehabilitation, or replacement measures at the owner's or other responsible party's expense
to compensate for violation of the provisions of this title. The director may also require an applicant or
property owner to take immediate action to ensure site stabilization and/or erosion control as needed.
B. Requirement for Restoration Plan. All development work shall remain stopped until a restoration plan
L
is prepared and approved by the director. Such a plan shall be prepared by a qualified professional using
�?
the best available science and shall describe how the actions proposed meet the minimum requirements
described in subsection C of this section. The director shall, at the violator's expense, seek expert advice
in determining the adequacy of the plan. Inadequate plans shall be returned to the applicant or violator
for revision and resubmittal.
5
C. Minimum Performance Standards for Restoration.
1. For alterations to frequently flooded areas, wetlands, and fish and wildlife habitat conservation areas,
the following minimum performance standards shall be met for the restoration of a critical area;
provided, that if the violator can demonstrate that greater functional and habitat values can be obtained,
these standards may be modified:
a. The historic structural and functional values shall be restored, including water quality and habitat
functions;
b. The historic soil types and configuration shall be replicated;
c. The critical area and buffers shall be replanted with native vegetation that replicates the vegetation
historically found on the site in species types, sizes, and densities. The historic functions and values
should be replicated at the location of the alteration; and
d. Information demonstrating compliance with the requirements in ECDC 23.40.130, Mitigation plan
requirements, shall be submitted to the city planning division.
Page 29 of 100
Packet Pg. 281
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
2. For alterations to flood and geological hazards, the following minimum performance standards shall
be met for the restoration of a critical area; provided, that if the violator can demonstrate that greater
safety can be obtained, these standards may be modified:
a. The hazard shall be reduced to a level equal to, or less than, the predevelopment hazard;
b. Any risk of personal injury resulting from the alteration shall be eliminated or minimized; and
c. The hazard area and buffers shall be replanted with native vegetation sufficient to minimize the
hazard.
D. Site Investigations. The director is authorized to make site inspections and take such actions as are
necessary to enforce this title. The director shall present proper credentials and make a reasonable effort
to contact any property owner before entering onto private property.
E. Penalties. Any person, party, firm, corporation, or other legal entity convicted of violating any of the o
provisions of this title shall be guilty of a misdemeanor and subject to penalties not to exceed a square a
footage cost of three dollars ($3.00) er square foot of impacted critical area and critical area buffer a
and/or a per tree penalty consistent with ECDC 18.45.070B. and C. _set fort i ECDC 18.45.070 U
r
L
shall ,.onstit to a sepafa4e offense. Any development carried out contrary to the provisions of this title v
shall constitute a public nuisance and may be enjoined as provided by the statutes of the state of
Washington. The city of Edmonds may levy civil penalties against any person, party, firm, corporation,
or other legal entity for violation of any of the provisions of this title. The civil penalty shall be assessed
as proscribed in ECDC 18.45.070 and 18.45.075.[Ord. 3828 § 2, 2010; Ord. 3527 § 2, 2004]. c
Part IV. General Critical Areas Protective Measures
23.40.250 Critical areas markers and signs.0 SHARE
A. The boundary at the outer edge of a critical area, critical area buffer or critical area tract may, at the
discretion of the director, be required to be delineated with wood fencing.
B. The boundary at the outer edge of the critical area or buffer may be identified with temporary signs
prior to any site alteration. Such temporary signs may be replaced with permanent signs prior to
occupancy or use of the site.
C. These provisions may be modified by the director as necessary to ensure protection of sensitive
features or wildlife needs. [Ord. 3527 § 2, 2004].
23.40.270 Critical areas tracts and easements.0 sHRRE ]
A. At the discretion of the director, critical areas tracts and/or easements may be required in
development proposals for subdivisions, shoi4 subdivisions, Na „lamed unit.
deve opmep.developments that include critical areas. These critical areas tracts and/or easements shall
delineate and protect those contiguous critical areas and buffers greater than 5,000 square feet including:
Page 30 of 100
Packet Pg. 282
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
1. Landslide hazard areas and buffers;
2. Wetlands and buffers;
3. Fish and wildlife habitat conservation areas; and
4. Other lands to be protected from alterations as conditioned by project approval.
B. Notice on Title. The owner of any property with field -verified presence of critical areas and/or critical
areas buffers, except critical aquifer recharge areas, for which a permit application is submitted shall, as
a condition of permit issuance, record a notice of the existence of such critical area and/or critical area
buffer against the property with the Snohomish County Auditor's office. The notice shall be approved
by the director and the city attorney for compliance with this provision. The titleholder will have the
right to challenge this notice and to have it released if the critical area designation no longer applies;
however, the titleholder shall be responsible for completing a critical areas report, subject to approval by
the director. before the notice on title can be released. Gr-it ea ,,real 4aets shall be r-eeer-ded on all
C. Critical areas tracts or easements shall be designated on the face of the plat or recorded drawing in a
format approved by the director. The designation shall include the following restrictions:
1. An assurance that native vegetation will be preserved for the purpose of preventing harm to property
and the environment, including, but not limited to, controlling surface water runoff and erosion,
maintaining slope stability, buffering, and protecting plants, fish, and animal habitat; and
2. The right of the director to enforce the terms of the restriction.
D. The director may require that critical areas tracts be dedicated to the city, to be held in an undivided
interest by each owner of a building lot within the development with the ownership interest passing with
the ownership of the lot, or held by an incorporated homeowner's association or other legal entity (such
as a land trust), which ensures the ownership, maintenance, and protection of the tract and contains a
process to assess costs associated therewith.
E. The use of herbicides within critical areas tracts or easements is prohibited except use of aquatic
gpproved herbicides where recommended by the Noxious Weed Control Board and where otherwise
consistent with the provisions of ECDC Title 23. [Ord. 3527 § 2, 2004].
23.40.280 Building setbacks.0 sHa_R
Unless ethefwise Except for geologically hazardous areas where setbacks are determined by a
geotechnical report, buildings and other structures shall be set back a distance of 15 feet from the edges
of all critical area buffers or from the edges of all critical areas, if no buffers are required. T4+,—In
addition to other allowances provided by this Title, the following may be allowed in the building setback
area:
A. Landscaping;
Page 31 of 100
Packet Pg. 283
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
B. Uncovered decks;
C. Building overhangs, if such overhangs do not extend more than 30 inches into the setback area; and
D. Impervious ground surfaces, such as driveways and patios; provided, that such improvements may be
subject to water quality regulations as adopted in the current editions of the International Residential
Code and International Building Code, as adopted in ECDC Title 19. [Ord. 3527 § 2, 2004].
23.40.290 Bonds to ensure mitigation, maintenance, and monitoring.0 SHARE
A. When mitigation required pursuant to a development proposal is not completed prior to final permit
approval, such as final plat approval or final building inspection, the applicant shall be required to post a
performance bond or other security in a form and amount deemed acceptable by the director. If the
development proposal is subject to mitigation, the applicant shall post a mitigation bond or other
security in a form and amount deemed acceptable by the city to ensure mitigation is fully functional.
B. The bond shall be in the amount of 120 percent of the estimated cost of the uncompleted actions or
the estimated cost of restoring the functions and values of the critical area that are at risk, whichever is
greater. The amount of the performance bond shall include a reasonable allocation for inflation based on
the length of anticipated delay and the provisions of subsection D of this section.
C. The bond shall be in the form of a surety bond, performance bond, and/or maintenance bond from an V-,
acceptable financial institution, with terms and conditions acceptable to the city of Edmonds' attorney.
D. Bonds or other security authorized by this section shall remain in effect until the director determines,
in writing, that the standards bonded for have been met. Bonds or other security shall be held by the city
for a minimum of twee -five 5 years to ensure that the required mitigation has been fully implemented
and demonstrated to function, and may be held for longer periods when necessary to achieve these goals
E. Depletion, failure, or collection of bond funds shall not discharge the obligation of an applicant or
violator to complete required mitigation, maintenance, monitoring, or restoration.
F. Public development proposals shall be relieved from having to comply with the bonding requirements
of this section if public funds have previously been committed for mitigation, maintenance, monitoring,
or restoration.
G. Any failure to satisfy critical area requirements established by law or condition including, but not
limited to, the failure to provide a monitoring report within thirty k30) days after it is due or comply with
other provisions of an approved mitigation plan shall constitute a default, and the city may demand
payment of any financial guarantees or require other action authorized under this title or any other law.
H. Any funds recovered pursuant to this section shall be used to complete the required mitigation. [Ord.
3527 § 2, 2004].
23.40.300 Critical area inspections. SHARE
Page 32 of 100
Packet Pg. 284
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
Reasonable access to the site shall be provided to the city, state, and/or federal agency review staff for
the purpose of inspections during any proposal review, restoration, emergency action, or monitoring
period. Failure to provide access shall constitute grounds for issuance of a stop work order. [Ord. 3527
§ 2, 2004].
Part V. Incorporation of Best Available Science
23.40.310 Best available science.0 SHARE
A. Protect Functions and Values of Critical Areas with Special Consideration to Anadromous Fish.
Critical areas reports and decisions to alter critical areas shall rely on the best available science to
protect the functions and values of critical areas and must give special consideration to conservation or
protection measures necessary to preserve or enhance anadromous fish, such as salmon and bull trout,
and their habitat, where applicable.
B. Best Available Science to Be Consistent with Criteria. The best available science is that scientific
information applicable to the critical area prepared by local, state, or federal natural resource agencies, a
qualified scientific professional, or a team of qualified scientific professionals that is consistent with
criteria established in WAC 365-195-900 through 365-195-925 and RCW 36.70A.172.
C. Characteristics of a Valid Scientific Process. In the context of critical areas protection, a valid
�?
scientific process is one that produces reliable information useful in understanding the consequences of a
local government's regulatory decisions, and in developing critical areas policies and development
regulations that will be effective in protecting the functions and values of critical areas. To determine
whether information received during the permit review process is reliable scientific information, the
director shall determine whether the source of the information displays the characteristics of a valid
scientific process. Such characteristics are as follows:
0`
1. Peer Review. The information has been critically reviewed by other persons who are qualified
scientific experts in that scientific discipline. The proponents of the information have addressed the
criticism of the peer reviewers. Publication in a refereed scientific journal usually indicates that the
information has been appropriately peer -reviewed;
2. Methods. The methods used to obtain the information are clearly stated and reproducible. The
methods are standardized in the pertinent scientific discipline or, if not, the methods have been
appropriately peer -reviewed to ensure their reliability and validity;
3. Logical Conclusions and Reasonable Inferences. The conclusions presented are based on reasonable
assumptions supported by other studies and consistent with the general theory underlying the
assumptions. The conclusions are logically and reasonably derived from the assumptions and supported
by the data presented. Any gaps in information and inconsistencies with other pertinent scientific
information are adequately explained;
4. Quantitative Analysis. The data have been analyzed using appropriate statistical or quantitative
methods;
Page 33 of 100
Packet Pg. 285
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
5. Context. The information is placed in proper context. The assumptions, analytical techniques, data,
and conclusions are appropriately framed with respect to the prevailing body of pertinent scientific
knowledge; and
6. References. The assumptions, analytical techniques, and conclusions are well referenced with
citations to relevant, credible literature and other pertinent existing information.
D. Nonscientific Information. Nonscientific information, such as anecdotal observations, non -expert
opinion, and hearsay, may supplement scientific information, but it is not an adequate substitute for
valid and available scientific information.
E. Absence of Valid Scientific Information. Where there is an absence of valid scientific information or
incomplete scientific information relating to a critical area leading to uncertainty about the risk to
critical area function of permitting an alteration of or impact to the critical area, the director shall:
1. Take a "precautionary or a no -risk approach" that strictly limits development and land use activities
until the uncertainty is sufficiently resolved; and
2. Require application of an effective adaptive management program that relies on scientific methods to
evaluate how well regulatory and nonregulatory actions protect the critical area. An adaptive r
L
management program is a formal and deliberate scientific approach to taking action and obtaining v
information in the face of uncertainty. An adaptive management program shall:
a. Address funding for the research component of the adaptive management program; a)
b. Change course based on the results and interpretation of new information that resolves uncertainties;
and
c. Commit to the appropriate time frame and scale necessary to reliably evaluate regulatory and
nonregulatory actions affecting protection of critical areas and anadromous fisheries. [Ord. 3527 § 2,
2004] .
SHARE
0,
•- -- - --- ---
A ltgvp»
,
>
>filling;
>
>
>PMRi0g,
OF
>
>Pesticide's
>
OF
>
>
>
>
Page 34 of 100
Packet Pg. 286
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
>1 waste, and tw;
.-.
>
d
r
c�
m
GG
�
c
c
�a
L
7
O
!C
L
a
GG
,�
�L
GG �)
GG
f)
cG
f)
T
T
ii
GG
f)
O
GG
f)
L
jud—
1
,
T
++
f
de'signs
and fflomitor-i"g
and
t
7
7
x
W
�
GG
Mitigation"44044&8
7
�
s
'
M
GG
a
.
b
>IEFEU5,
Of
GG »
GGFF— »
jr
Page 35 of 100
Packet Pg. 287
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
MONISM
111
_ •
�._.___e.=__=_-_
_
•____.____—__!!�ll�;�lSA:!!�1!P��:IPI�:P.l�lrfrlR�l�:!l�l�i!!!!
f- --- El------
7__`�V_
S7_
-------------
ill
low.
Page 36 of 100
T
t
x
W
C
N
E
s
M
Q
Packet Pg. 288
6.1.a
Attachment A
City of Edmonds - City Code and Community Development Code
Environmentally Critical Areas - April 26, 2016
geologist,
>
appliA
eflgifwor- in the 4-W
who
Four-
y@RFS
of
.-.
d
r
c�
>
Q.
c
«
»•
c
association,
p
;breeding habitat, wiwer-
range,,
and
fflow'Ment
L
a
vAil ability
of; high
N,Ulmer-ability
to
alter-a4i-n, S"@h
as
,Mudflats,
•L
>
U
T
o�
T
•
T
«
v
c
:a
L
0
L
1
T
++
f
f
tifflifig to
x
W
yr
•
7
f
7
a"d ha
7
I OF w8toFing
Ow
ewixiE
s
Page 37 of 100
Q
Packet Pg. 289
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
:
I
M�M�
OPINION
I
M...
new.1 .
GG
jr
.-.
d
at
r
Q.
GGQualified
GG
efitie-Al
m
c
�a
L
O
7 )
,
L
a
�L
U
T
7
x
W
d
E
GG
ff �
tea_ .Tsr.a�r�rrcreazrxssr�.r.•_ __ _ _ _ _ _ _
cc »
>
> •
>
>
Page 38 of 100
Packet Pg. 290
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
IMMIN, INS
------------
«
»
------------------
--- ------------
-------- - ------
...
Page 39 of 100
T
t
x
W
d
E
s
M
Q
Packet Pg. 291
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.50
WETLANDS
Sections:
Part I. Designation, Rating and Mapping
23.50.000 Wetlands compliance requirements flowchart.
23.50.010 Designation, rating and mapping —Wetlands.
Part Il. Allowed Activities — Wetlands
23.50.020 Allowed activities — Wetlands.
Part III. Additional Report Requirements — Wetlands
23.50.030 Special study and report requirements — Wetlands.
Part IV. Development Standards — Wetlands �?
o�
23.50.040 Development standards — Wetlands.
23.50.050 Mitigation requirements — Wetlands.
23.50.060 Performance standards — Subdivisions.
Part V. City of Edmonds Wetland Field Data Form
23.50.070 Wetland field data form.
Part I. Designation, Rating and Mapping
23.50.000 Wetlands compliance requirements flowchart.0 SHARE
See Figure 23.50.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.50.010 Designation, rating and mapping — Wetlands.D SHARE
A. Designating Wetlands. Wetlands are those areas, designated in accordance with the approved federal
wetland delineation manual and analicable reizional suoblements as set forth in WAC 173-22-035
Washington State Wetland 1dent f;,.ation and Deiineatio,, Manual (1997), that are inundated or saturated
by surface or ground water at a frequency and duration sufficient to support, and that under normal
circumstances do support, a prevalence of vegetation adapted for life in saturated soil conditions. All
areas within the city of Edmonds meeting the wetland designation criteria i the ideat f:, atier ara
Page 40 of 100
Packet Pg. 292
6.1.a
Attachment A
City of Edmonds - City Code and Community Development Code
Environmentally Critical Areas -April 26, 2016
Deli,ea4i .,, Manual, regardless of any formal identification, are hereby designated critical areas and are
subject to the provisions of this title.
B. Wetland Ratings. Wetlands shall be rated according to the Washington State Department of Ecology
wetland rating system found in the 2014 Washington State Wetland Rating System for Western
Washington doetimen4s O)Upgfp� AlLaS ingto„, Ecology Publications Nos. 14-06-02993 74 and nn 06
OM). Thiese doeuments eontains-
defining the following wetland rating e-atego.v:os.• Consistent with the wetland rating system criteria and
parameters within this document, wetlands that are rated for ecological functions with highest point
totals 23 points or higher) perform ecological functions associated with water flow, water quality an
habitat at highest levels, whereas wetlands that are rated with lowest point totals (15 points or lower)
perform ecological functions at lowest levels. Wetlands that are rated with points between 16 and 22
points perform ecological functions at moderate to high levels.
The City of Edmonds Wetland Rating Categories:
a. Category 4-I Wetlands. Category 4-I wetlands are those that represent a unique or rare wetland type;
are more sensitive to disturbance than most wetlands; are relatively undisturbed and contain ecological
attributes that are impossible to replace within a human lifetime; or provide a high level of function. The
following types of wetlands are Category Lr eetoneor- more of the followinger-i
i. Relatively undisturbed estuarine wetlands larger than ones acre;
ii. Wetlands of high conservation value that are identified by scientists of the Washington Natural a)
Heritage Program/MR; r_
Pr-egr-am�DNR as high quality wedapids; c
iii. Bogs larger than e half acre--,
iv. Wetlands with mature and old growth forests M.,tufe and old growth r^r-este 'v,o*'larger than
one (1) acre;
v. Wetlands in coastal lagoons;
vi. Wetlands that perform functions at high levels Wetlands ds that perform many functions well as
indicated by a score of twenty-three (23�points or more based on functions on the city of Edmonds
wetland field data rn.,,,
b. Category -2-Il Wetlands. Category lI wetlands are those that are difficult, though not impossible, to
replace, and provide high levels of some functions. The following types of wetlands are Category 2II
wetlands
are-
i. Estuarine wetlands smaller than one acre, or disturbed estuarine wetlands larger than one acre;
Page 41 of 100
Packet Pg. 293
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
iv. Wetlands with a moderately high level of functions as indicated by a score of 51 te-6920 to 22 points
based on functions o the eity o4'Edmonds . ,edan f:^'a data fefm.
c. Category - -III Wetlands. Category 3-III wetlands are wetlands with a moderate level of functions as
indicated by a score of 3&16 to 5G-19 points based on
functions.
d. Category 4-IV Wetlands. Category 4-IV wetlands are those with the lowest levels of functions as
indicated by scores below 3-0-16 points based on functions
fem.
All wetlands should be rated consistent with the 2014 Washington State Wetland Rating System for
Western Washinjzton using the 2014 Western Washington Rating Form.
C. Date of Wetland Rating. Wetland rating categories shall be applied as the wetland exists on the date
of adoption of the rating system by the local government, as the wetland naturally changes thereafter, or
as the wetland changes in accordance with permitted activities. Wetland rating categories shall not
change due to illegal modifications.
o�
D. Mapping. The approximate location and extent of wetlands are shown on the city of Edmonds critical
areas inventory. In addition, the National Wetlands Inventory and Soil Maps produced by the U.S.
Department of Agriculture, National Resources Conservation Service may be useful in helping to
identify potential wetland areas. The inventory and cited resources are to be used as a guide for the city
of Edmonds project applicants, and/or property owners and may be continuous) updated as new
�p J pp p p Y Y Y p
0`
critical areas are identified. They are a reference and do not provide a final critical area designation.
E. Delineation. The exact location of a wetland's boundary shall be determined through the performance
of a field investigation by a qualified professional wetland scientist applying the approved federal
wetland delineation manual and annlicable reizional sunnlementsWashi ete State Wetlara�
449-7). Wetland delineations are valid for five years; after such date the city shall determine whether a
revision or additional assessment is necessary.
F. Lake Ballinger. Lake Ballinger is designated on the U.S. National Wetlands Inventory as a lacustrine
(lake) environment and should not be delineated as a wetland in its entirety. Lake fringe wetlands
existing along the periphery of Lake Ballinger shall be identified according to specific criteria provided
in 23.50.010. -the Washington State Wetlands 1dentifieation and Delineation Ma+mal (Eeolog
-Pttblieatien No. 96 94, 1997) and updated guidanee provided in Washington State Wetlands Rating
System for- West€m Washington Revised (E E6logy Pzublieu4io„ No. nn 06 025, 2�004) Consistent with
guidance for delineating lake fringe wetlands provided in these resources, the existence of jurisdictional
wetlands along Lake Ballinger shorelines shall be largely based upon the presence of persistent
emergent vegetation in shoreline areas less than 6.6 feet in depth. Provisions for protection of Lake
Page 42 of 100
Packet Pg. 294
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
Ballinger shorelines not meeting criteria for jurisdictional wetlands are provided in the city of Edmonds
shoreline master program. [Ord. 3527 § 2, 2004].
Part II. Allowed Activities — Wetlands
23.50.020 Allowed activities — Wetlands.0 SHARE
The activities listed below are allowed in wetlands in addition to those activities listed in, and consistent
with, the provisions established in ECDC 23.40.220, and do not require submission of a critical areas
report, except where such activities result in a loss to the functions and values of a wetland or wetland
buffer. These activities include:
A. Conservation or preservation of soil, water, vegetation, fish, shellfish, and other wildlife that does not
entail changing the structure or functions of the existing wetland.
B. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops
and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or
alteration of the wetland by changing existing topography, water conditions, or water sources.
C. Drilling for utilities under a wetland; provided, that the drilling does not interrupt the ground water L
connection to the wetland or percolation of surface water down through the soil column. Specific studies v
by a hydrologist are necessary to determine whether the ground water connection to the wetland or
percolation of surface water down through the soil column could be disturbed.
D. Enhancement of a wetland through the removal of nonnative invasive species. Weeding shall be
restricted to hand removal and weed material shall be removed from the site. Bare areas that remain after
weed removal shall be revegetated with native shrubs and trees at natural densities. Some hand seeding
may also be done over the bare areas with native herbs. Noxious weeds listed on the Washington State
Noxious Weed Control Board list must be handled and disposed of according to a noxious weed control
Ian appropriate to that species.
E. Permitted alteration to a legally constructed structure existing within a wetland or wetland buffer that
does not increase the footprint of development or impervious surfacing or increase the impact to a
wetland or wetland buffer. [Ord. 3527 § 2, 2004].
Part III. Additional Report Requirements — Wetlands
23.50.030 Special study and report requirements — Wetlands.0 SHARE
A. Additional Requirements for Wetlands. In addition to the general critical areas report requirements of
ECDC 23.40.090, critical areas reports for wetlands must meet the requirements of this section. Critical
areas reports for two or more types of critical areas must meet the report requirements for each relevant
type of critical area.
Page 43 of 100
Packet Pg. 295
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. Critical areas report requirements for wetlands may be met in "stages" or through multiple reports.
The typical sequence of potentially required reports that may in part or in combination fulfill the
requirements of this section include:
1. Wetland reconnaissance report documenting the existence and general location of wetlands in the
vicinity of a project area;
2. Wetland delineation report documenting the extent and boundary of a jurisdictional wetland per RCW
36.70A.175; and
3. Wetland mitigation report documenting potential wetland impacts and mitigation measures designed
to retain or increase the functions and values of a wetland in accordance with ECDC 23.50.050 and the
general provisions of this title.
C. A wetland critical areas report may include one or more of the above three report types, depending on
the information required by the director and the extent of potential wetland impacts. The Edmonds
development services director maintains the authority and discretion to determine which report(s) alone
or combined are sufficient to meet the requirements outlined below and to waive report requirements
based upon site conditions and the potential for project impacts.
D. Preparation by a Qualified Professional. A critical area report for wetlands shall be prepared by a v
qualified professional who is a certified professional wetland scientist or a noncertified professional
wetland scientist with a minimum of five years of experience in the field of wetland science and with
experience preparing wetland reports. Pursuant to ECDC 23.40.090(A), applicants may choose one of a)
the qualified technical consultants on the city's approved list in preparing critical areas reports for
wetlands, or may utilize an alternative consultant. Critical areas studies and reports developed by an
alternative consultant shall be subject to independent review pursuant to ECDC 23.40.090(B).
n`
E. Area Addressed in Critical Area Report. The following areas shall be addressed in a critical area
report for wetlands:
1. The project area of the proposed activity;
2. All wetlands and recommended buffers within 200 feet of the project area; and
3. All shoreline areas, water features, floodplains, and other critical areas, and related buffers within 200
feet of the project area. The location and extent of wetlands and other critical areas existing outside of
the project area or subject parcel boundary may be shown in approximation as practical and necessary to
provide an assessment of potential project effects.
F. Wetland Analysis. In addition to the minimum required contents of ECDC 23.40.090, Critical areas
reports — Requirements, a critical areas report for wetlands shall contain an analysis of the wetlands,
including the following site- and proposal -related information at a minimum:
1. A written assessment and accompanying maps of the wetlands and buffers within 200 feet of the
project area, including the following information at a minimum:
Page 44 of 100
Packet Pg. 296
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
a. Wetland delineation and required buffers;
b. Existing wetland acreage;
c. Wetland category;
d. Vegetative, faunal, and hydrologic characteristics;
e. Soil and substrate conditions;
f. Topographic elevations, at two -foot contours; and
g. A discussion of the water sources supplying the wetland and documentation of hydrologic regime
(locations of inlet and outlet features, water depths throughout the wetland, and evidence of recharge or
discharge, evidence of water depths throughout the year: drift lines, algal layers, moss lines, and
sediment deposits).
The location, extent and analyses of wetlands not contiguous with the subject parcel existing outside of
the immediate project area may be described in approximation as practical and necessary to provide an
assessment of potential project effects and hydrologic/ecological connectivity to on -site wetlands and
other critical areas.
o�
2. A discussion of measures, including avoidance, minimization, and mitigation, proposed to preserve
existing wetlands and restore any wetlands that were degraded prior to the current proposed land use
activity. c
3. A habitat and native vegetation conservation strategy that addresses methods to protect and enhance
on -site habitat and wetland functions.
4. Functional evaluation for the wetland and adjacent buffer using a local or state agency staff -
recognized method and including the reference of the method and all data sheets.
5. Proposed mitigation, if needed, including a written assessment and accompanying maps of the
mitigation area, including the following information at a minimum:
a. Existing and proposed wetland acreage;
b. Vegetative and faunal conditions;
c. Surface and subsurface hydrologic conditions including an analysis of existing and future hydrologic
regime and proposed hydrologic regime for enhanced, created, or restored mitigation areas;
d. Relationship to the watershed and existing waterbodies;
e. Soil and substrate conditions, topographic elevations;
Page 45 of 100
Packet Pg. 297
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
f. Existing and proposed adjacent site conditions;
g. Required wetland buffers; and
h. Property ownership.
6. A scale map of the development proposal site and adjacent area. A discussion of ongoing
management practices that will protect wetlands after the project site has been developed, including
proposed monitoring and maintenance programs.
7. A bond estimate for the installation (including site preparation, plant materials and installation,
fertilizers, mulch, and stakes) and the proposed monitoring and maintenance work for the required
number of years. [Ord. 3527 § 2, 2004].
Part IV. Development Standards — Wetlands
23.50.040 Development standards — Wetlands.0 SHARE
A. Activities may only be permitted in a wetland buffer if the applicant can show that the proposed
activity will not degrade the functions and functional performance of the wetland and other critical
areas.
o�
B. Activities and uses shall be prohibited in wetlands and wetland buffers, except as provided for in this
title. as
C. Category 4-I Wetlands. Activities and uses shall be prohibited from Category 47I wetlands, except as
provided for in the public agency and utility exception, reasonable use exception, and variance sections
of this title.
D. Category III Wetlands. With respect to activities proposed in Category III wetlands, the following
standards shall apply:
1. Water -dependent activities may be allowed where there are no practicable alternatives that would
have a less adverse impact on the wetland, its buffers and other critical areas.
2. Where non -water -dependent activities are proposed, it shall be presumed that alternative locations are
available, and activities and uses shall be prohibited, unless the applicant demonstrates that:
a. The basic project purpose cannot be accomplished as proposed and successfully avoid, or result in less
adverse impact on, a wetland on another site or sites in the general region; and
b. All alternative designs of the project as proposed, such as a reduction in the size, scope, configuration,
or density of the project, would not avoid or result in less of an adverse impact on a wetland or its
buffer.
Page 46 of 100
Packet Pg. 298
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
E. Category 3411 and 44V Wetlands. Activities and uses that result in unavoidable and necessary
impacts may be permitted in Category 3-III and 4IV wetlands and associated buffers in accordance with
an approved critical areas report and mitigation plan.
F. Wetland Buffers.
1. Standard Buffer Widths. The standard buffer widths in ECDC 23.50.040.F.1.d below have been
established in accordance with best available science. The buffers are based on the category of wetland
and the habitat score as determined byqualified wetland professional using the Washington State
Wetland Rating System for Western Washington.
a. The use of the standard buffer widths requires the implementation of the measures in ECDC
23.50.040.F.2, where applicable, to minimize the impacts of the adjacent land uses.
b. If an applicant chooses not to apply the mitigation measures in ECDC 23.50.040.F.2, than a thirty
three (33%) increase in the width of all buffers is required.
c_The standard buffer widths presume the existence of a relatively intact native vegetation community a
in the buffer zone adequate to protect the wetland functions and values at the time of the proposed
activity. If the buffer is composed of nonnative vegetation, lawn, or bare ground, vegetation is r
L
inadequate, then, at the discretion of the director, the buffer width may be increased or an applicant may v
be required to either develop and implement a wetland buffer enhancement plan to maintain the standard
Cn
width or widen the standard width to ensure that adequate functions of the buffer are provided.-(s-ee
subseetion (F)(3) of this seetion). R.elluife-d standard wetiand bti�r-s, based on wetland eategofy, are as
as
max F-919MMUMAMFORIM
�rMITNTMAMMIEVm
d. Standard Wetland Buffer Widths Table.
Minimum
Buffer
Buffer
Buffer
Width
Width
Buffer Width
Width
Wetland
Wetland
(Wetland scores
(Wetland
Wetland Category
scores 3-4
scores 5
scores 6-7
8-9 habitat
habitat
habitatpoints)
habitat
points)
oints
points)
Page 47 of 100
c
Packet Pg. 299
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Category i.
75 ft
105 ft
165 ft
225 ft
Based on total score
Category I:
Bogs and
190 ft
190 ft
190 ft
225 ft
Wetlands of Hiah
Conservation Value
Category I:
75 ft
105 ft
165 ft
225 ft
Forested
Camay I.
150 ft
150 ft
150 ft
150 ft
Estuarine
Category
75 ft
105 ft
165 ft
225 ft
Based on score
Category III (allj
60 ft
105 ft
165 ft
165 ft
Category V (all)
40 ft
40 ft
40 ft
40 ft
2. Required Measures to Minimize Impacts to Wetlands. The standard wetland buffer widths in ECDC v
23.50.040.F. Le assumes implementation of the following measures, where applicable to a specific
proposal
Disturbance
Required Measures to Minimize Impacts
Lights
Direct lights away from wetland
Noise
Locate activity that generates noise away from wetland
• If warranted, enhance existing buffer with native vegetation
plantings adjacent to noise source
• immediately adjacent to the out wetland buffer
Toxic runoff
Route all new, untreated runoff away from wetland while
Page 48 of 100
Packet Pg. 300
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Disturbance
Required Measures to Minimize Impacts
ensuring wetland is not dewatered
• Establish covenants limiting use of pesticides within 150 feet of
wetlands
• Apply integrated pest management
Stormwater runoff
• Retrofit stormwater detention and treatment for roads and
existing adjacent development
• Prevent channelized flow from lawns that directly enters the
buffer
• Use Low Impact Development techniques (per Puget Sound
Action Team publication on LID techniques)
Change in water
regime
• Infiltrate or treat, detain, and disperse into buffer new runoff
from impervious surfaces and new lawns
Pets and human
disturbance
• Use privacy fencing OR plant dense vegetation to delineate
buffer edge and to discourage disturbance using vegetation
appropriate for the ecoregion
Place wetland and its buffer in a separate tract or protect with a
conservation easement
Dust
• Use best management practices to control dust
Disruption of
corridors or
• Maintain connections to offsite areas that are undisturbed
Restore corridors or connections to offsite habitats by replanting
Page 49 of 100
Packet Pg. 301
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Disturbance Required Measures to Minimize Impacts
connections
2. Increased Wetland Buffer Widths. The director shall require increased buffer widths in accordance
with the recommendations of an experienced, qualified professional wetland scientist and the best
available science on a case -by -case basis when a larger buffer is necessary to protect wetland functions
and values based on site -specific characteristics. This determination shall be based on one or more of the
following criteria:
a. A larger buffer is needed to protect other critical areas;
b. The buffer or adjacent uplands has a slope greater than 15 percent or is susceptible to erosion and
standard erosion control measures will not prevent adverse impacts to the wetland; or
c. The buffer area has minimal vegetative cover. In lieu of increasing the buffer width where existing r
L
buffer vegetation is inadequate to protect the wetland functions and values, development and v
implementation of a wetland buffer enhancement plan in accordance with subsection (F)(3) of this
section may substitute.
d. The wetland and/or buffer is occupied by a federally listed threatened or endangered species, a bald
eagle nest, a ,great blue heron rookery, or a species of local importance; and it is determined by the
director that an increased buffer width is necessary to protect the species.
-53. Measurement of Wetland Buffers. All buffers shall be measured from the wetland boundary as
surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for
approved wetland alterations shall be the same as the buffer required for the category of the created,
restored, or enhanced wetland.
64. Buffer Consistency. All mitigation sites shall have buffers consistent with the buffer requirements of
this chapter.
-5. Buffer Maintenance. Except as otherwise specified or allowed in accordance with this title. wetland
buffers shall be retained in an undisturbed or enhanced condition. Removal of invasive nonnative weeds
is required for the duration of the mitigation bond.
G. Wetland Buffer Modifications and Uses
1. Where wetland or buffer alterations are permitted by the City of Edmonds, the applicant shall miti _ ante
impacts to achieve no not loss of wetland acreage and functions consistent with ECDC 23.50.050 and
other applicable provisions of this Title.
Page 50 of 100
Packet Pg. 302
Attachment A
City of Edmonds - City Code and Community Development Code
Environmentally Critical Areas - April 26, 2016
2. At the discretion of the Director, standard wetland buffers may be averaged or reduced when
consistent with all criteria in ECDC 23.50.040.G. Wetland buffer averaging with enhancement shall be
preferred over wetland buffer reduction with enhancement. Wetland buffer reduction shall only be
approved by the director when buffer averaging cannot be accomplished on -site.
43. Wetland Buffer Width Averaging with Buffer Enhancement. The director may allow modification of
a standard or r wetland buffer width in accordance with an approved critical areas report and the
best available science on a case -by -case basis by averaging buffer widths. Any allowance for averaging
buffer widths shall only be granted concomitant to the development and implementation of a wetland
buffer enhancement plan for areas of buffer degradation. Only those portions of a wetland buffer
existing within the project area or subject parcel shall be considered the total standard er -buffer
for buffer averaging. Averaging of buffer widths may only be allowed where a qualified professional
wetland scientist demonstrates that:
a. The buffer averaging and enhancement plan provides evidence that wetland functions and values will
be:
i. Increased or retained through plan implementation for those wetlands where existing buffer vegetation _
is generally intact; or
ii. Increased throuizh elan implantation for those wetlands where existing buffer vegetation is inadeauate v
to protect the functions and values of the wetland;
a. It will not reduee the function and value of wetlands or associated buff-ers;
a�
b. The wetland contains variations in sensitivity due to existing physical characteristics or the character
of the buffer varies in slope, soils, or vegetation, and the wetland would benefit from a wider buffer in
places and would not be adversely impacted by a narrower buffer in other places;
c. The total area contained in the buffer area, or the total buffer area existing on a subject parcel for
wetlands extending off -site, after averaging is no less than that which would be contained within a
standard ,-edu e buff r; and
d. The buffer width at any single location is not reduced to4e&s4hanby more than twenty-five percent
25% 50-percent of the standard er - buffer width.
34. Buffer Width Reductions Thfeughthrouh Buffer Enhancement. At the discretion of the Edmonds
development set-viees director, and only when buffer averaging cannot be accomplished on site, wetland
buffer width reductions (or approval of standard buffer widths for wetlands where existing buffer
conditions require increased buffer widths) may be granted concomitant to the development and
implementation of a wetland buffer enhancement plan for Category 3-III and 4-IV wetlands only.
Approval of a wetland buffer enhancement plan shall, at the discretion of the director, allow for wetland
buffer width reductions by no more than twenty-fivepercent 25% to no loss 50 per-eent of the
standard width; provided, that:
a. The plan provides evidence that wetland functions and values will be:
Page 51 of 100
Packet Pg. 303
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
i. Inncreased or retained through plan implementation to at least the level ^.idea by ^ standard buffer-
or- through additional
for those wetlands where existing buffer vegetation is generally intact;
or
ii. Increased through plan implementation for those wetlands where existing buffer vegetation is
inadequate to protect the functions and values of the wetland;
b. The plan documents existing native plant densities and provides for increases in buffer native plant
densities to no less than three feet on center for shrubs and eight feet on center for trees;
c. The plan requires monitoring and maintenance to ensure success in accordance with ECDC
23.40.130(D); and
d. The plan specifically documents methodology and provides performance standards for assessing
iner-eases in wetland btt r- ftmetioni g as relate including but not limited to:
i. Water- quality „roteet o Percent vegetative cover;
ii. Provision ofwildlife h.,b; ercent invasive species cover;
iii. Maintenance of wetiand h.,arolen.,Species richness; and �?
o�
iv. Restr4eting wetland ifitndsion and distwbaneeAmount of large woody debris.
- - - - - -- - - - - - - - - -
NO
8. Buffer Uses. The following uses may be permitted within a wetland buffer in accordance with the
review procedures of this title; provided, they are not prohibited by any other applicable law and they
are conducted in a manner so as to minimize impacts to the buffer and adjacent wetland:
a. All activities allowed by ECDC 23.50.020 (Allowed activities — wetlands).
b. Conservation and Restoration Activities. Conservation or restoration activities aimed at protecting the
soil, water, vegetation, or wildlife.
Page 52 of 100
Packet Pg. 304
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
bc. Passive Recreation. Passive recreation facilities designed and in accordance with an approved critical
area report, including:
i. Walkways and trails; provided, that those pathways are generally constructed with a surface that does
not interfere with substrate permeability-, are generally located only in the outer twenty-fivepercent
(25%) of wetland buffers, and are located to avoid removal of significant trees. Where existing lega11X
established development has reduced the width of the wetland buffer, trails may be placed in the outer
twenty-fivepercent (25%) of the remaining wetland buffer. The trail shall be no more than five (5 feet
in width and for pedestrian use only.Raised boardwalks utilizing nontreated pilings may be acceptable_
The director may allow trails within the inner twenty-five percent (25%) of wetland buffers when
required to provide access to wildlife viewing structures, fishing access areas, or connections to other
trail facilities;
ii. Wildlife viewing structures; and
iii. Fishing access areas down to the water's edge that shall be no larger than six feet.
c. Storm Water Management Facilities. Storm water management facilities, limited to outfalls, pipes and
conveyance systems, storm water dispersion outfalls and bioswales, may be allowed within the outer 25
percent of a standard or modified buffer for Category 3 or 4 wetlands only; provided, that:
i. No other location is feasible; and
ii. The location and function of such facilities will not degrade the functions or values of the wetland. a)
iii. Storm water management facilities are not allowed in buffers of Category 1 or 2 wetlands.
iv. Projects shall also comply with all applicable requirements in Chapter 18.30 ECDC, Stormwater
Management, including Minimum Requirement #8, Wetland Protection.
4 H. Signs and Fencing of Wetlands.
1. Temporary Markers. The outer perimeter of the wetland or buffer and the limits of those areas to be
disturbed pursuant to an approved permit or authorization shall be marked in the field in such a way as
to ensure that no unauthorized intrusion will occur and is subject to inspection by the director prior to
the commencement of permitted activities. The director may require the use of fencing to protect
wetlands from disturbance and intrusion. Temporary marking shall be maintained throughout
construction and shall not be removed until permanent signs, if required, are in place.
2. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the
director may require the applicant to install permanent signs along the boundary of a wetland or buffer.
a. Permanent signs shall be made of an enamel -coated metal face and attached to a metal post or another
nontreated material of equal durability. Signs must be posted at an interval of one per lot or every 50
feet, whichever is less, and must be maintained by the property owner in perpetuity. The sign shall be
worded as follows or with alternative language approved by the director:
Page 53 of 100
Packet Pg. 305
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Protected Wetland Area
Do Not Disturb
Contact the City of Edmonds
Regarding Uses and Restrictions
b. The provisions of subsection (G)(2)(a) of this section may be modified as necessary to assure
protection of sensitive features or wildlife.
3. Permanent Fencing. Permanent fencing shall be required at the outer edge of the critical area buffer
under the following circumstances, provided that the director may waive this requirement:
a. As part of any development proposal for single-family plats, single-family. s�plats, multifamily,
mixed use, and commercial development where the director determines that such fencing is necessary to
protect the functions of the critical area, provided that breaks in permanent fencing may be allowed for
access to permitted buffer uses (ECDC 23.50.040.G.8);
b. As part of development proposals for parks where the adjacent proposed use is active recreation and r
L
the director determines that such fencing is necessary to protect the functions of the critical area; �?
o�
c. When buffer averagingis s employ e�part of a development proposal;
d. When buffer reductions are employed as part of a development proposal; or
e. At the director's discretion to protect the values and functions of a critical area.
FIL Additions to Structures Existing Within Wetlands and/or Wetland Buffers.
1_Additions to legally constructed structures existing within wetlands or wetland buffers that increase
the footprint of development or impervious surfacing shall be permitted consistent with the development
standards of this section. provided that a wetland and/or buffer enhancement elan is provided to mitigate
for impacts consistent with this Title, and provided that all.. impacts from temporary disturbances within
the critical area buffer shall be addressed through use of best management plans and buffer enhancement
plantings during and following construction of the allowed alteration. Provisions for standard wetland
buffers, buffer- r-eduetienthrough enhaneemen wetland buffer averaging with enhancement, and
buffer reductions with enhancement require applicants to locate such additions in accordance with the
following sequencing:
-Ia. Outside of the standard wetland buffer;
-3b. Outside of a wetland buffer averaged (with enhancement)ing per subsection
(FG)(43) of this section;
Page 54 of 100
Packet Pg. 306
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
-2c. Outside of a wetland buffer reduced wither enhancement) per subsection (EG)(34) of this
section;
4d. Outside of the inner twenty fiv 2-5 percent 25% of the standard wetland buffer width thr-ough the
use of both buffer- r-eduetien a -ad bti�r- with no more than three hundred (300)square feet of
structure addition footprint within the inner fifty percent (50%) of the standard wetland buffer width,
provided that enhancement is provided at a minimum three -to -one (3:1, ratio (enhancement -to -impact),
e. Outside of the inner twentv five percent (25%) of the standard wetland buffer width with no more
than five hundred (500)square feet of new footprint within the inner fifty percent(50%) of the standard
wetland buffer width, provided that enhancement is provided at a minimum five -to -one (5:1,) ratio
(enhancement -to -impact), and that stormwater low impact development (LID) techniques and other
measures are included as part of the wetland / buffer enhancement plan.
2. Where meeting wetland buffer enhancement reauirements reauired by H.1. of this section would
result in enhancement that is separated from the critical area due to uncommon property ownership,
alternative enhancement approaches may be approved by the director. Alternative approaches could
include a vegetated rain garden that receives storm runoff, replacement of existing impervious surfaces
with pervious materials, or other approaches that provide ecological benefits to the adjacent critical area.
o�
3. Additions to legally constructed structures existing within wetlands or wetland buffers that cannot be
accommodated in accordance with the above sequencing in H.1. of this section (i.e., additions proposed 4)
within a wetland or the inner 25 percent of a standard buffer width) may be permitted at the director's r_
discretion as a variance subject to review by the city hearing examiner and the provisions of ECDC
23.40.210.
J. Development Proposals within the Footprint of Existing Development. New development shall be
allowed within the footprint of existingdevelopment evelopment occurring within a wetland buffer, provided that
the following conditions are met:
1. The footprint of existingdevelopment evelopment was legally established, and is consistent with the definition
provided in ECDC 23.40.320;
2. The proposed development within the footprint of existing development is sited as far away from the
wetland edge as is feasible;
3. As part of the development proposal, opportunities to reduce the footprint of existing development evelopment are
implemented where such reduction would increase the buffer width adjacent to the wetland and not
represent an undue burden given the scale of the proposed development.
4. The proposed development includes enhancement to the adjacent wetland and associated buffer in
order to improve functions degraded by previous development;
Page 55 of 100
Packet Pg. 307
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
5. Enhancement is provided as wetland or buffer enhancement for an equivalent area of the footprint of
the newly proposed development within the footprint of existingdevelopment evelopment occurring in a wetland
buffer, or through an alternative approach approved by the director that restores degraded functions of
the wetland and remaining buffer; and
6. Impacts from temporary disturbances within the wetland buffer shall be addressed through use of best
management plans and buffer enhancement plantings during and following construction of the allowed
alteration.
IK. Small, hydrologically _ isolated wetlandsE�s. The director may allow small, hydrolo _ ig ca11X
isolated Category 3-III or IV4 wetlands under 588one thousand- 1 000 square feet in area to be exempt
from the avoidance sequencing, provisions of ECDC 23.40.120 and the wetland development standards
provisions of ECDC 23.50.040.F. At the discretion of the director such wetlands may be altered,
provided that pp-feevWens of this title. A wetland exemption shall granted i a submitted critical
areas report and miti atg ion plan, �r *"� �� �r�*���' of delineation, provides
evidence that all of the following conditions are met:
1. The wetland is unless than done thousand (1,000) square feet in area;
-32. The wetland does not provide significant habitat value for wildlife; aftd
3. The wetland is not adjacent to a riparian area;
4. The wetland has a score of three (3) — four (4) points for habitat in the adopted Western Washing
rating system; and
5. A mitigation plan to replace lost wetland functions and values is developed, approved and
implemented consistent with ECDC 23.50.050.
rre!rr.��Tsssrssee!*: �!�rzt�:�stre�r�as�
•2004]._ -
23.50.050 Mitigation requirements — Wetlands.P SHARE
Compensatory mitigation for alterations to wetlands shall achieve equivalent or greater biologic
functions. Wetland mitigation plans shall be consistent with the state Depaftment of Eeeleg
Gguidelines fef-in Wetland Mitigation in Washington State —Part 2: Developing Mitigation Plans
(Ecologyy, 2006) and Selecting Wetland Mitigation Sites Using a Watershed Approach (Ecology,
2009)Devele„ing Freshwater- Wetlands Mitigation Plans and sals, 1994, as revised.
Page 56 of 100
Packet Pg. 308
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
............
E A. Mitigation for Lost or Affected Functions. Compensatory mitigation actions shall address functions
affected by the alteration to achieve functional equivalency or improvement and shall provide similar
wetland functions as those lost, except when:
1. The lost wetland provides minimal functions as determined by a site -specific function assessment, and
the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide
functions shown to be limiting within a watershed through a formal Washington State watershed
assessment plan or protocol; or
2. Out -of -kind replacement will best meet formally identified watershed goals, such as replacement of
historically diminished wetland types.
o�
GB. Preference of Mitigation Actions. Mitigation actions that require compensation by replacing,
enhancing, or substitution shall occur in the following order of preference:
1. Implementing compensatory restoration through purchase of credits at an approved mitigation bank or
through payment into an approved in lieu fee program.
-12. Restoring (re-establishing) wetlands on upland sites that were formerly wetlands.
-23. Creating wetlands on disturbed upland sites such as those with vegetative cover consisting primarily
of nonnative, introduced species. This should only be attempted when there is a consistent source of
hydrology and it can be shown that the surface and subsurface hydrologic regime is conducive for the
wetland community that is being designed.
4. Enhancing significantly degraded wetlands in combination with restoration or creation. Such
enhancement should be part of a mitigation package that includes replacing the impacted area meeting
appropriate ratio requirements.
D�C. Type and Location of Mitigation. Unless it is demonstrated that a higher level of ecological
functioning would result from an alternate approach, compensatory mitigation for ecological functions
shall be in -kind and conducted on the site or in the vicinity of the alteration except when all of the
following apply:
1. On -site opportunities do not have a high likelihood of success, after a determination of the natural
capacity of the site to mitigate for the impacts. Consideration should include: anticipated wetland
Page 57 of 100
Packet Pg. 309
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
mitigation replacement ratios, buffer conditions and proposed widths, hydrogeomorphic classes of on -
site wetlands when restored, proposed flood storage capacity, and potential to mitigate riparian fish and
wildlife impacts (such as connectivity);
2. Off -site mitigation has a greater likelihood of providing equal or improved wetland functions than the
impacted wetland; -and
3. Off -site mitigation incorporates guidance from Calculating Credits and Debits for Compensatory
Mitigation in Wetlands of Western Washington (Ecology Publication #10-06-011, Hruby. 2012), and
-34. Off -site locations for compensatory mitigation are consistent with city of Edmonds goals for
rimwatershed-wide ecological restoration. Off -site locations are selected with a preference for
sites within the same basin as the impact, followed by other sites within the city. -Specific areas targeted
for restoration efforts include:
a. Lake -fringe wetlands and habitat areas associated with Lake Ballinger;
b. Edmonds marsh;
c. Yost Park wetlands;
d. Good Hope wetlands; and
e. Wetlands and habitat areas peripheral to anadromous fish -bearing streams:; and
f. Sites available through an approved mitigation bank or in --lieu fee program.
m.
This list is not comprehensive and may change as the city of Edmonds identifies areas suitable for
restoration and capital improvement projects consistent with goals for jurisdiction -wide habitat retention
and enhancement provided in the city's comprehensive plan.
ED. Mitigation Timing. Mitigation projects shall be completed with an approved monitoring plan prior
to activities that will disturb wetlands. In all other cases, mitigation shall be completed immediately
following disturbance and prior to use or occupancy of the activity or development. Construction of
mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora.
EE. Mitigation Ratios.
1. Acreage Replacement Ratios. The fellewing ratios in the table below shall apply to ere
r-estor-atie or re-establishment, rehabilitation, or enhancement that is in -kind, is on -site, is the
same eategor-y, is timed prior to or concurrent with alteration, and has a high probability of success.
These ratios do not apply to remedial actions resulting from unauthorized alterations; greater ratios shall
apply in those cases. The first number specifies the acreage of replacement wetlands and the second
specifies the acreage of wetlands altered. Ratios for rehabilitation and enhancement may be reduced
when combined with 1:1 replacement through creation or re-establishment pursuant to Table la,
Wetland Mitigation in Washington State — Part 1: Agency Policies and Guidance —Version 1, (Ecologyy
Page 58 of 100
Packet Pg. 310
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Publication #06-06-1 la, or as revised). Creation, re-establishment, rehabilitation, and enhancement
definitions are provided in ECDC 23.40.320 (see definition for "compensatory mitigation", and shall be
additionally consistent with intent pursuant to Ecology Publication #06-06-1 la.:
e. Category 3: two to one-,
Category and
Tyne of Wet/and
Creation or
Re -
establishment
Rehabilitation
Enhancement
only
only
Category IV
1.5:1
3:1
6:1
Category III
2:1
4:1
81
Category II
3:1
6:1
12:1
Category I:
Based on functions
4:1
8:1
16:1
Category I:
Mature and old
growth forest
6:1
12:1
24:1
Category I:
High conservation
Not considered
Not considered
Not considered
possible
possible
possible
value / Boq
Mitigation requirements may also be determined using the credit/debit tool described in Calculating
Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington: Final Report
(Ecology Publication #10-06-011, Olympia, WA, March 2012, or as revised) if gpproved by the director.
2. Off -site Mitigation. - These ratios provided in ECDC 23.50.050.F.1. do not apply to off -site mitigation, _
including4he use of credits from a state -certified wetland mitigation bank or payment to a certified in -
lieu fee program. When off -site mitigation is proposed, or when ^redits from armed mitigation bank
Page 59 of 100
Packet Pg. 311
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
or in lieu fee program isafe used, replacement ratios mayshou-M incorporate guidance from Calculating
Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington (Ecology
Publication #10-06-011, Hruby. 2012), and for mitigation banks or in lieu fee program should be
consistent with the certification requirements ef the bmk's eet4i fie fie . Use of mitigation banks shall
meet all requirements of ECDC 23.50.050.H.The firs* number- oeifies the ae of r-eplaeemen
-23. Increased Replacement Ratio. The director may require increased compensatory mitigation ratios
under the following circumstances:
a. Uncertainty exists as to the probable success of the proposed restoration or creation;
b. A significant period of time will elapse between impact and replication of wetland functions;
c. Proposed mitigation will result in a lower -category wetland or reduced functions relative to the
wetland being impacted; or
d. The impact was an unauthorized impact.
G. Wetlands Enhancement as Mitigation.
1. Impacts to wetland functions may be mitigated by enhancement of existing significantly degraded
wetlands, but may, at the discretion of the director, be used in conjunction with restoration and/or
creation. Applicants proposing to enhance wetlands must produce a critical areas report that identifies
how enhancement will increase the functions of the degraded wetland and how this increase will
adequately mitigate for the loss of wetland area and function at the impact site. An enhancement
must also show whether existing wetland functions will be reduced b the enhancement
proposal g Y
0
o
actions.
2. At a minimum, enhancement acreage shall be double the acreage required for creation or restoration
under subsection F of this section. The ratios shall be greater than double the required acreage where the
enhancement proposal would result in minimal gain in the performance of wetland functions and/or
result in the reduction of other wetland functions currently being provided in the wetland.
3. Mitigation ratios for enhancement in combination with other forms of mitigation shall range from six -
to -one to three -to -one and be limited to Class 3 and 4 wetlands.
H. Wetland Mitigation Banks and In --Lieu Fee Programs.
1. Wetland Mitigation Banks. Credits from a wetland mitigation bank may be approved for use as
compensation for unavoidable impacts to wetlands when:
a. The bank is certified under state rules;
b. The director determines that the wetland mitigation bank provides appropriate compensation for the
authorized impacts; and
Page 60 of 100
Packet Pg. 312
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
c. The proposed use of credits is consistent with the terms and conditions of the bank's certification
instrument.
d. Replacement ratios for projects using bank credits mare consistent with replacement ratios
specified in the bank's certification.
e. Credits from a certified wetland mitigation bank are used to compensate for impacts located within
the service area specified in the certified bank instrument. In some cases, the service area of the bank
may include portions of more than one adjacent drainage basin for specific wetland functions.
32. In --Lieu Fee Programs. As an alternative to on -site or other
off -site mitigation pproaches, the director may previ 1egpprove purchase of credit for compensatory �.
mitigation from an in lieu fee program. An.. such used to compensate for direct wetland
impacts shall be developed and approved throu_hg_a public process and be consistent with federal rules, c
state policy on in lieu fee mitigation and state water quality regulations, Determiningcredit redit purchase
necessary to compensate for wetland impacts shall incorporate guidance from Calculating Credits and
Debits for Compensatory Mitigation in Wetlands of Western Washington (Ecology Publication #10-06-
011, Hruby. 2012). Development proposals impacting critical areas and/or associated buffers maX a
contribute payment towards an identified City of Edmonds mitigation project with approval from the
director, provided that the mitigation meets all state and federal permit requirements, where r
L
required. vwhieh shall be, at a fiiiniffr&m, equal to the eest of designing, developing, implemeating and menitofing
in kind ^ ^ ator-y mitigation on to ^ in the „ eet viei„ t* -.-Applicant provision of funds for
compensatory mitigation shall only be approved if: c
a. The director determines that it would provide environmentally ppropriate compensation for the
proposed wetland impacts;
effo14S;
b. The mitigation will occur on a site identified using the site selection and prioritization process in the
approved in --lieu fee program instrument or at a City -identified restoration site consistent with
ECDC23.40.140
with the pr-evisions and faties of this title;
c. A restoration area and plan have been identified and shall be implemented within three years of
project development;
d. Restoration efforts are focused in those areas identified in subsection (T"«` of this section and areas
identified as suitable for restoration by the director; and
e. Credits from an approved in --lieu fee program may be used to compensate for impacts located within
the service area specified in the approved in --lieu fee instrument.
[Ord. 3527 § 2, 2004].
Page 61 of 100
Packet Pg. 313
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
23.50.060 Performance standards — Subdivisions.13 SHARE
The subdivision and short subdivision of land in wetlands and associated buffers is subject to the
following:
A. Land that is located wholly within a wetland or its buffer may not be subdivided.
B. Land that is located partially within a wetland or its buffer may be subdivided; provided, that an
accessible and buildable contiguous portion of each new lot is located outside of the wetland and its
buffer.
C. Access roads and utilities serving the proposed subdivision may be permitted within the wetland and
associated buffers only at the discretion of the director. [Ord. 3527 § 2, 2004].
Part V. City of Edmonds Wetland Field Data Form
23.50.070 Wetland field data form.0 SHARE
The eity ofEdmonds-wetland field data used for completion of wetland ratings shall be consistent with
the Washington State Wetland Rating System for Western Washington: 2014 Update (Ecology v
Publication # 14-06-029: Hrubv 2014).E fm is available in the eity of Edmonds de ve ^3m ent sepviees
Figure 23.50.000
- [Ord. 3527 § 2, 2004]. o�
Page 62 of 100
Packet Pg. 314
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements*
Wetlands
wetland nr?v
Wetland Reconnais•
Reconnaissance
Wetland belineatiun
giff"
Impacts cannot NffurAmai�mr
uffer —
belccated
sanceREQuIRED ta
detemInes that
REQilIREStoidentify
annar+.ntiand
be avoided
on or near
determine ifpotential
jurisdictional
wetland bound atic
�nt
throughSubject
Plan
wetland rneets ju risdic-
wetland exist
andclassify wetland
standard buffer
o prove
parcel-
LlonaI criteria and is
within 22.5 ft of
per updated
Increase
located within 2254of
subject parcel.
categories.
nctions
subject parcel.
es.
Butter wiEih rMuciien
th rpu��n hor.�mc�t
[:a agury3a�4+
Wetland Buller
Recon n ai5sa nce identifies
Wetland impacts are
p;,�ni.�gaaarwap
ihattcemcrrc Plan
well an d is not j urisd fiction a l
avendPd thfougn
EQIHREh top rove
(and ju rlsd lttlon a l determl-
standard buffer
Mention or Inc rease
nation is confirmed by the
widths for wetiand
in wetland functions;
U,& Army Gor ps of
category.
a nd va lues.
Engineers); or reconnais-
sance identifies th at
wetland Is located � 225It
P Wetland Buffer
from subjectparcel .
No additional
woe V m f"''
Mitigation Plan
maaaron
Qv
RE IRED Per
compliance
J
u pd a led ccd a req ui re-
requ iremen ts,
ment5 to prove
'ten lion or increase
No additlonaI
of wetland functions
compliance
:aod imlu�,
l requirements.
Nearing Examiner
imi—tscar rot to
EQUOR Ea on ly for va ri a nees
nie®�ue
projects for wh[chimpacis
n not be miligat�d to retain
well and functions and
values.
WPM -1ii hemen[s may hP rent thmueh subMIM1011 nl a slnele nd[ral area rP. n rrt or midtlplo roparts In fnm6lnatlnn.
Page 63 of 100
No additional
compliance
required.
No additional
compliance
required.
No additional
compliance
required.
Packet Pg. 315
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements*
Wetlands
�. il•r I �: Hed+nJ Hrwnn.nwxr Rr.,•nnar..J n.r ► pdino.eien i�nlvy.,n�,,,,,, iJJmonJ r_riliuf
••..I...I. y "t;IHEIsn..trrrnnlnr ,kemnmrath.! � RWIAW P y n.ok'C11 :. iiwNpsirt
I'•• ' I.� •• i!I'r'rrnti+! r+},.ewwi-CCla J itlmlilywolurJ 0r'.1 r.I 1' REQ IRDIENT to 1•Lr+.1Jnr;m+!
"Ut,J nlrtle nn •irhm :Un rt •.r bvurwluler and I.rurr rerntk. of wor�li+rrcr
lunw awri+!cntene �yj sul•i. •+r.Yl. dwity-VIIm.J it• fun:ann-40 r400; tnluirrmrrots.
is;ucmed a Ili,In NO It of nldrt.d Ihr..0+, mw kl,,
wt,lhl {�arcri. i.,rne• �r In
Wrdurd lrRer
k'aArrrcemrwd Play No +Jdrt.•,,.I
1![.'onFWAU CJrrann nlrt IYEQLRATUr., pw"..
wrtlrnd is not nu+sJKa wl rrrrntkr �K must' cwnptinwe
M n I timed r 'QD It fmm In wct4nd lummom eryuieemmn.
+nd taiuet.
wMtre rynrl. .. �.trl. _.
wa4"d Mil#w lair
�n�f.hrmnal r' MisREQUIKEU Tiu+Sdriiunal
wm lian:e prr tr�Aasrd.,rJe .. .14...
rrymrcmni^. ,r n I n rryuirrmrnit.
� p r+ cr !v„re Menskm a
rr yaarrneola m�rrax o1 w,relanJ
Mq•r. n .+nnw !.
requirements may be met through submission of a single critical area report or multiple reports in combi
Page 64 of 100
Packet Pg. 316
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.60
CRITICAL AQUIFER RECHARGE AREAS
Sections:
Part I. Designation, Rating and Mapping
23.60.010 Critical aquifer recharge areas designation.
Part I. Designation, Rating and Mapping
23.60.010 Critical aquifer recharge areas designation.0 SHARE
Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect on aquifers used
for potable water as defined by WAC 365-190-030(2). CARAs have prevailing geologic conditions
associated with infiltration rates that create a high potential for contamination of ground water resources
or contribute significantly to the replenishment of ground water. CARAs are protected as critical areas
under the Washington State Growth Management Act. However, no areas meeting criteria for CARAs
exist in the vicinity of the city of Edmonds. Thus, additional specific provisions for protection of this
critical area type are not provided within this title. [Ord. 3527 § 2, 2004].
Page 65 of 100
Packet Pg. 317
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.70
FREQUENTLY FLOODED AREAS
Sections:
Part I. Designation, Rating and Mapping
23.70.010 Designation, rating and mapping —Frequently flooded areas.
Part IL Additional Report Requirements — Frequently Flooded Areas
23.70.020 Special study and report requirements — Frequently flooded areas.
23.70.030 Warning and disclaimer of liability.
Part III. Development Standards — Frequently Flooded Areas
23.70.040 Development standards — Frequently flooded areas.
Part I. Designation, Rating and Mapping �?
o�
23.70.010 Designation, rating and mapping — Frequently flooded areas. SHARE
A. Frequently Flooded Areas. Frequently flooded areas shall include:
1. Those areas identified on FEMA flood insurance maps as areas of special flood hazard, which include
those lands in the floodplain subject to a one percent or greater chance of flooding in any given year. For
the purposes of this title, areas of special flood hazard for the city of Edmonds are hereby declared
generally to be those areas shown as Zone A (including Zones A, AE, Al—A30, AH, AO, AR and A99)
and Zone V (including Zones V and YE
Ion the following FEMA maps or panels: 53061C00;
5306IC1292 E, Panel 1292; 53061C1285 E, Panel 1285; 5306IC1315 E, Panel 1315; and 5306IC1305
E, Panel 1305. The following maps and panels were revised and effeetive on jafmafy 30,
1999, and such inaps and panels are adepted by this referenee as a part of this ehapter as if ful1y-s-e4
f i*' n.The city will use the most currently adopted FEMA maps in determining whether a propertX
is located within a frequently flooded area. Base flood elevations and flood hazard factors for those
areas shown as Zone A on the map have not been determined and the local flood management
administrator shall utilize such other data as may be reasonably available from federal, state or other
sources in administering this chapter as provided in the current editions of the International Residential
Code and International Building Code, as adopted in ECDC Title 19.
2. Those areas identified as frequently flooded areas on the city of Edmonds critical areas inventory.
Identified frequently flooded areas are consistent with and based upon designation of areas of special
flood hazard on FEMA flood insurance maps as indicated above.
Page 66 of 100
Packet Pg. 318
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. City Discretion and Designation. Flood insurance maps and the city's critical areas inventory are to
be used as a guide for the city of Edmonds development services department, project applicants and/or
property owners, and the public and should be considered a minimum designation of frequently flooded
areas. As flood insurance maps may be continuously updated as areas are reexamined or new areas are
identified, newer and more restrictive information for flood hazard area identification shall be the basis
for regulation. The city of Edmonds shall retain the right to designate and identify areas known to be
prone to flooding outside of the 100-year floodplain and subject them to the provisions and protections
of this title and the current editions of the International Residential Code and International Building
Code, as adopted in ECDC Title 19. [Ord. 3527 § 2, 2004].
Part II. Additional Report Requirements — Frequently Flooded Areas
23.70.020 Special study and report requirements — Frequently flooded areas. s"pE
In addition to the general critical areas report requirements of ECDC 23.40.090, critical areas reports for
frequently flooded areas must meet the requirements of this section and the current editions of the
International Residential Code and International Building Code, as adopted in ECDC Title 19. Critical
areas reports for two or more types of critical areas must meet the report requirements for each relevant
type of critical area.
A. Preparation by a Qualified Professional. A frequently flooded areas report shall be prepared by a �?
qualified professional who is a hydrologist or engineer, licensed in the state of Washington, with
experience in preparing flood hazard assessments. Pursuant to ECDC 23.40.090(A), applicants may
choose one of the qualified technical consultants on the city's approved list in preparing critical areas
reports for frequently flooded areas, or may utilize an alternative consultant. Critical areas studies and
reports developed by an alternative consultant shall be subject to independent review pursuant to ECDC E
23.40.090(B). p`
B. Areas to Be Addressed. The following areas shall be addressed in a critical areas report for frequently
flooded areas:
1. The site area of the proposed activity;
2. All areas of a special flood hazard area, as indicated on the flood insurance map(s), within 200 feet of
the project area; and
3. All other flood areas indicated on the flood insurance map(s) within 200 feet of the project area.
C. Flood Hazard Assessment. A critical area report for a proposed activity within a frequently flooded
area shall contain a flood hazard assessment including the following site- and proposal -related
information at a minimum:
1. Site and Construction Plans. A copy of the site and construction plans for the development proposal
showing:
Page 67 of 100
Packet Pg. 319
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
a. Floodplain (100-year flood elevation), 10- and 50-year flood elevations, floodway, other critical areas,
buffers, and shoreline areas;
b. Proposed development, including the location of existing and proposed structures, fill, storage of
materials, and drainage facilities, with dimensions indicating distances to the floodplain;
c. Clearing limits; and
d. Elevation of the lowest floor (including basement) of all structures, and the level to which any
nonresidential structure has been floodproofed.
2. Watercourse Alteration. Alteration of natural watercourses shall be avoided, if feasible. If
unavoidable, a critical areas report shall include:
a. Extent of Watercourse Alteration. A description of and plan showing the extent to which a
watercourse will be altered or relocated as a result of a proposal;
b. Maintenance Program Required for Watercourse Alterations. A maintenance program that provides
maintenance practices for the altered or relocated portion of the watercourse to ensure that the flood -
carrying capacity is not diminished.
D. Information Regarding Other Critical Areas. Potential impacts to wetlands, fish and wildlife habitat,
and other critical areas shall be addressed in accordance with the applicable sections of this title. [Ord.
3527 § 2, 2004].
23.70.030 Warning and disclaimer of liability.0 SHARE
The degree of flood protection required by this chapter and the current editions of the International
Residential Code and International Building Code, as adopted in ECDC Title 19, is considered
reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger
floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural
causes. This chapter does not imply that land outside frequently flooded areas or uses permitted within
such areas will be free from flooding or flood damages. This chapter shall not create liability on the part
of the city of Edmonds, any officer or employee thereof, or the Federal Insurance Administration for any
flood damages that result from reliance on this chapter or any administrative decision lawfully made
hereunder. [Ord. 3527 § 2, 2004].
Part III. Development Standards — Frequently Flooded Areas
23.70.040 Development standards — Frequently flooded areas-0 SHARE
Development standards and provisions for protection of frequently flooded areas are provided as
applicable to areas of special flood hazard in the current editions of the International Residential Code
and International Building Code, as adopted in ECDC Title 19. Conformance with the provisions for
flood hazard reduction of the current editions of the International Residential Code and International
Building Code, as adopted in ECDC Title 19, shall constitute conformance with ECDC 23.40.050,
Page 68 of 100
Packet Pg. 320
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
Protection of critical areas, per the mandates of the Washington Growth Management Act and the
purposes and objectives of this title. [Ord. 3527 § 2, 2004].
Chapter 23.80
GEOLOGICALLY HAZARDOUS AREAS
Sections:
Part I. Designation, Rating and Mapping
23.80.000 Geologically hazardous areas compliance requirements flowchart.
23.80.010 Designation, rating and mapping —Geologically hazardous areas.
23.80.020 Designation of specific hazard areas.
23.80.030 Mapping of geologically hazardous areas.
Part II. Allowed Activities — Geologically Hazardous Areas
23.80.040 Allowed activities — Geologically hazardous areas. u;
Part III. Additional Report Requirements — Geologically Hazardous Areas
23.80.050 Special study and report requirements — Geologically hazardous areas.
Part IV. Development Standards — Geologically Hazardous Areas
23.80.060 Development standards — General requirements.
23.80.070 Development standards — Specific hazards.
Part I. Designation, Rating and Mapping
23.80.000 Geologically hazardous areas compliance requirements flowchartA SHARE
See Figure 23.80.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.80.010 Designation, rating and mapping — Geologically hazardous areas.0 SHARE
Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other
geological events. They pose a threat to the health and safety of citizens when incompatible
Page 69 of 100
Packet Pg. 321
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
development is sited in areas of significant hazard. Such incompatible development may not only place
itself at risk, but also may increase the hazard to surrounding development and use. Areas susceptible to
one or more of the following types of hazards shall be designated as a geologically hazardous area:
A. Erosion hazard;
B. Landslide hazard; and
C. Seismic hazard. [Ord. 3527 § 2, 2004].
23.80.020 Designation of specific hazard areas. SHRRE
A. Erosion Hazard Areas. Erosion hazard areas are at least those areas identified by the U.S. Department
of Agriculture's Natural Resources Conservation Service as having a "moderate to severe," "severe," or
"very severe" rill and inter -rill erosion hazard. Erosion hazard areas are also those areas impacted by
shoreland and/or stream bank erosion. Within the city of Edmonds erosion hazard areas include:
1. Those areas of the city of Edmonds containing soils that may experience severe to very severe erosion
hazard. This group of soils includes, but is not limited to, the following when they occur on slopes of 15
percent or greater:
a. Alderwood soils (15 to 25 percent slopes);
b. Alderwood/Everett series (25 to 70 percent slopes); as
c. Everett series (15 to 25 percent slopes);
2. Coastal and stream erosion areas which are subject to the impacts from lateral erosion related to
moving water such as stream channel migration and shoreline retreat.
3-2. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils
and springs or ground water seepage; and
4-3. Areas with significant visible evidence of ground water seepage, and which also include existing
landslide deposits regardless of slope.
B. Landslide Hazard Areas. Landslide hazard areas are areas potentially subject to landslides based on a
combination of geologic, topographic, and hydrologic factors. They include areas susceptible because of
any combination of b soil, slope (gradient), slope aspect, structure, hydrology, or other factors.
Within the city of Edmonds potential landslide hazard areas speeifieally include:
1. Areas of ancient or historic failures in Edmonds which include all areas within the earth subsidence
and landslide hazard area as identified in the 1979 report of Robert Lowe Associates and amended by
the 1985 report of GeoEngineers, Inc. and further discussed in the 2007 report by Landau Associates;
Page 70 of 100
Packet Pg. 322
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
2. Coastal areas mapped as class a (unstable), ups (unstable old slides), and urs (unstable recent slides)
in the Department of Ecology Washington coastal atlas;
3. Areas designated as quaternary, steps, earthflows, mudflows, or landslides on maps published by the
United States Geological Survey or Washington State Department of Natural Resources;
Figure 1
Simple Slope Calculation
The slope calculation guidance shall be used to determine the toe and top of% slope for slopes that
are potentially landslide hazard areas or potentially erasion hazard areas.
Toe and top of landslide hazard areas (generally slopes of 40%
or greater) delineated where incline reverses or diminishes to
<40Vo over at least 10 feet of horizontal distance.
Toe and top of erosion hazard areas (generally slopes 15.40 %)
delineated where incline reverses or diminishes to <15%over
at Ipast 10 fppt of hnri7nntal rlidanrp
WO% slop,
hazard are
slope (era!
a reaj over rri n 10 ft.
101
Top of Slope
r
V (Vertical Rise)
% Slope = x 100%
H QiorizontalRun)
Note: Steps, grad! entchanges, and incline reversals o r brea ks b e low percent slopes dellning landslide
hazard areas (40%) and erasion hazard areas (15%) shall he included as part of the larger slope.
Page 71 of 100
Packet Pg. 323
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Simple Slope Calculation
Toe and top a ndsllde hazard areas (slopes of 40% or
greater) delineate where incline reverses or diminishes
to <40% over at leasNO feet of horizontal distance.
Toe and top of erosion ha areas (slopes 15-40%)
delineated where incline revertals,or diminishes to <15%
over at least 10 feet of horizontal N Canoe.
M
Toe of Slope #*
{pol to
of Slope
<40%dDpe (Iand sllde
1i�m�dam) or "5%
1---401 awe(Gmk>n hazard
OM) Owr MPO. 1 oft.
AV
H
IL
landa'de %, slope f tFtor�ua�n awl Run) x 10096
or el 10,
hazard
in. 10
lepa, grsdfenl changes and incline reversals or bnaaks be6ow percent siopcs Jelin n9 iandsirde0%) and erasion hazard areas (15%) snalI be Inpudad as part of a larger slope unless trray aretoal foot or longer
24. Any slope of forty percent (40%) or steeper that exceeds a vertical height of ten (10) feet over a
twenty-five (25) foot horizontal run. Except for rockeries that have been engineered and approved b, the
engineer as having been built according to the engineered design, all other modified slopes (including
slopes where there are breaks in slopes) meeting overall average steepness and height criteria should be
considered potential landslide hazard areas);
5. Any slope with all three of the following characteristics:
a. Slopes steeper than fifteen percent (15%),
b. Hillsides intersecting aeoloaic contacts with a relativelv permeable sediment overlvina a relativelv
impermeable sediment; and
Springsc. groundwater seepage;.0 per-eent or- steeper- and with a VeI4
relief of 10 or- more feet exeept areas eemposed of eonselidated r-eek. A slope is delineated b
establishing its tee and top (as defined in Figufe 1 in subseetion (B)(1) of this seefien) and is measii
by averaging
the inelination over- at least 10 feet of vet4ieal r-ekef or- 25 feet of her-izental distanee.
Benehes, steps and vafiations in gfadient shall be ineefpef4ed inte a lafger- slope if they do not mee
Page 72 of 100
Packet Pg. 324
6.1.a
Attachment A
City of Edmonds - City Code and Community Development Code
Environmentally Critical Areas - April 26, 2016
5lvpes Extending Q!f Lots
ral Top
If the toe or top a slope is located off of a
subject property, th it shall be delineated 200
horizontal feet from the roperty boundary or at
its natural location, whiche r is closer to the
subject parcel.
Top Defined Here
Parcel
Toe Defined Here
Natural T 200 ft.
200 fL-1 \ r'
36. Any area potentially unstable as a result of rapid stream incision or stream bank erosion; -ate
47. Any area located on an alluvial fan, presently subject to, or potentially subject to, inundation by
debris flow or deposition of stream -transported sediments, and
8. Any slopes that have been modified by past development activity that still meet the slope triter -
C. Seismic Hazard Areas. Seismic hazard areas are areas subject to severe risk of damage as a result of
earthquake -induced ground shaking, slope failure, settlement, soil liquefaction, lateral spreading, or
surface faulting. These areas are designated as having a "high" and "moderate to high" risk of
liquefaction as manned on the Liauefaction Susceatibility Man of Snohomish Countv by the
Washington State Department of Natural Resources or areas located within er4ear-landslide hazard
areas.
satwated soils of low density, typieally in assoeiation with a shallow gr-ound water- ta [Ord. 3527 § 2,
2004] .
23.80.030 Mapping of geologically hazardous areas.1-3
A. The approximate location and extent of geologically hazardous areas are shown on the city of
Edmonds critical areas inventory. In addition, resources providing information on the location and
extent of geologically hazardous areas in Edmonds include:
Page 73 of 100
Packet Pg. 325
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
1. Washington Department of Ecology coastal zone atlas (for marine bluffs);
2. U.S. Geological Survey geologic maps, landslide hazard maps, and seismic hazard maps;
3. Washington State Department of Natural Resources seismic hazard maps for Western Washington;
4. Washington State Department of Natural Resources slope stability maps;
5. National Oceanic and Atmospheric Administration tsunami hazard maps; and
6. Federal Emergency Management Administration flood insurance maps.
B. The critical areas inventory and the resources cited above are to be used as a guide for the city of
Edmonds development services department, project applicants and/or property owners and may be
continuously updated as new critical areas are identified. They are a reference and do not provide a final
critical area designation. [Ord. 3527 § 2, 2004].
Part II. Allowed Activities — Geologically Hazardous Areas
23.80.040 Allowed activities — Geologically hazardous areas.0 SHARE
The following activities are allowed in geologically hazardous areas as consistent with ECDC V_,
23.40.220, Allowed activities, Chapter 19.10 ECDC, Building Permits — Earth Subsidence and 77
Landslide Hazard Areas, and Chapter 18.30 ECDC, Storm Water Management, and do not require
submission of a critical area report:
A. Erosion and Landslide Hazard Areas. Except for installation of fences and as otherwise provided for
in this title, only those activities approved and permitted consistent with an approved critical areas report
in accordance with this title shall be allowed in erosion or landslide hazard areas.
B. Seismic Hazard Areas. The following activities are allowed within seismic hazard areas:
1. Construction of new buildings with less than 2,500 square feet of floor area or roof area, whichever is
greater, and which are not residential structures or used as places of employment or public assembly;
2. Additions to existing single -story residences that are 250 square feet or less; and
3. Installation of fences. [Ord. 3527 § 2, 2004].
Part III. Additional Report Requirements — Geologically Hazardous Areas
23.80.050 Special study and report requirements — Geologically hazardous areas.
SHARE
Critical area report requirements for geologically hazardous areas are generally met through submission
to the director of one or more geotechnical ngreports. In addition to the general critical areas
Page 74 of 100
Packet Pg. 326
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
report requirements of ECDC 23.40.090, critical areas reports for geologically hazardous areas must
meet the requirements of this section and Chapters 18.30 and 19.10 ECDC as applicable. Critical areas
reports for two or more types of critical areas must meet the report requirements for each relevant type
of critical area. Geotechnical report(s) submitted for the purpose of critical areas review are required as
necessary in addition to reports, data and other information mandated per ECDC Titles 18 and 19.
Geotechnical report(s) shall be required: whenever a potential erosion hazard area or potential landslide
hazard area, as mapped by Edmonds critical areas inventory or shown on other information consistent
with ECDC 23.80.030, is located within 50 feet of the proposed development site; whenever a
development site is located within a seismic hazard area; or when otherwise determined warranted by
the director (e.g. a distance equal to the height of the slope).
A. Preparation by a Qualified Professional. A critical areas report for assessing a potential geologically
hazardous area shall be prepared by a geologist licensed in the state of Washington, with
experience analyzing geologic, hydrologic, and ground water flow systems, and who has experience
preparing reports for the relevant type of hazard. If mitigation measures are necessary, the report
detailing the mitigation measures and design of the mitigation shall be prepared by an engineer licensed
in the State of Washington, with experience stabilizing slopes with similar geotechnical properties.
Critical areas studies and reports on geologically hazardous areas shall be subject to independent review
pursuant to ECDC 23.40.090(B).
B. Area Addressed in Critical Areas Report. The following areas shall be addressed in a critical areas v
report for geologically hazardous areas:
1. The project area of the proposed activity; and a)
2. All geologically hazardous areas within 200 feet of the project area or that have the potential to be
affected by the proposal.
C. Geological Hazards Assessment. A geology hazard assessment ^r-itie ' area report for a geologically
hazardous area shall include a field investigation and contain an assessment of whether or not each type
of LyeoloLyic hazard identified in ECDC 20.80.020 is present or not present and if development of the site
will increase the risk of landslides or erosion on or off the site. Geotechnical reports shall be prepared,
stamped and signed _byqualified professional. These reports must:
1. Be appropriate for the scale and scope of the project;
2. Include a discussion of all geologically hazardous areas on the site and any geologically hazardous
areas off site potentially impacted by the proposed project. If the affected area extends beyond the
subject property, the geology hazard assessment may utilize existing data sources pertaining to that area;
3. Clearly state that the proposed project will not decrease slope stability or pose an unreasonable threat
to persons or property either on or off site and provide a rationale as to those conclusions based on
geologic conditions and interpretations specific to the project,
4. Provide adequate information to determine compliance with the requirements of ECDC Chapter
23.80;
Page 75 of 100
Packet Pg. 327
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
5. Generally follow the guidelines set forth in the Washington State Department of Licensing Guidelines
for Preparing Engineering Geology Reports in Washington (2006). In some cases, such as when it is
determined that no landslide or erosion risk is present, a full report may not be necessary to determine
compliance with the ECDC Chapter 23.80. and in those cases a letter or abbreviated report may be
provided.
6. If a landslide or erosion hazard is identified, provide minimum setback recommendations for avoiding
the landslide or erosion hazard, other recommendations for site development so that the frequency or
magnitude of landsliding or erosion on or off the site is not altered, and recommendations consistent
with ECDC 23.80.060 and 23.80.070.
I 11. 11111
MINOR
!�.�rsz�r�:�:�srsss�rsss����irs�
!�Ers�:�esz��ers�sa�.s:�sz�r��:eTs
Page 76 of 100
T
t
x
W
yr
d
E
s
M
Q
Packet Pg. 328
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
D. Incorporation of Previous Study. Where a valid critical areas report has been prepared within the last
five years for a specific site, and where the proposed land use activity and surrounding site conditions
are unchanged, said report may be incorporated into the required critical areas report. The applicant shall
submit a hazards assessment detailing any changed environmental conditions associated with the site.
E. Mitigation of Long -Term Impacts. When hazard mitigation is required, the mitigation plan shall
specifically address how the activity maintains or reduces the preexisting level of risk to the site and all
other adjaeent-properties potentially pacted on a long-term basis (equal to or exceeding the projected
lifespan of the activity or occupation). Proposed mitigation techniques shall be considered to provide
long-term hazard reduction only if they do not require regular maintenance or other actions to maintain
their function. Mitigation may also be required to avoid any increase in risk above the preexisting
conditions following abandonment of the activity.
F. Additional Technical Information Requirements for Projects within Erosion and Landslide Hazard a
Areas. In addition to the basic critical areas report requirements for geologically hazardous areas
provided in subsections A through E of this section, technical information for any development within r
L
earth subsidence and landslide hazard areas shall meet the requirements of Chapter 19.10 v
ECDC and include the following information at a minimum:
1. Site Plan. The critical areas report shall include a copy of the site plan for the proposal showing: a)
a. The height of slope, slope gradient, and cross-section of the project area;
b. The location of springs, seeps, or other surface expressions of ground water on or within 200 feet of
the project area or that have the potential to be affected by the proposal; and
c. The location and description of surface water runoff features;
2. Hazards Analysis. The hazards analysis component of the critical areas report shall specifically
include:
a. A description of the extent and type of vegetative cover;
b. A description of subsurface conditions based on data from site -specific explorations;
c. Descriptions of surface and ground water conditions, public and private sewage disposal systems, fills
and excavations, and all structural improvements;
d. An estimate of slope stability and the effect construction and placement of structures will have on the
slope over the estimated life of the structure;
Page 77 of 100
Packet Pg. 329
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
e. An estimate of the bluff retreat rate or an estimate of the percent risk of landslide area expansion that
recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event;
f. Consideration of the run -out hazard of landslide debris and/or the impacts of landslide run -out on
down -slope properties;
g. A study of slope stability including an analysis of proposed cuts, fills, and other site grading;
h. Recommendations for building siting limitations; and
i. An analysis of proposed surface and subsurface drainage, and the vulnerability of the site to erosion;
3. Geotechnical Engineering Report. The technical information for a project within a landslide hazard
area shall include a geotechnical engineering report prepared by a licensed engineer that presents
engineering recommendations for the following:
a. Parameters for design of site improvements including appropriate foundations and retaining
structures. These should include allowable load and resistance capacities for bearing and lateral loads,
installation considerations, and estimates of settlement performance;
b. Recommendations for drainage and subdrainage improvements;
o�
c. Earthwork recommendations including clearing and site preparation criteria, fill placement and
compaction criteria, temporary and permanent slope inclinations and protection, and temporary
excavation support, if necessary; and c
d. Mitigation of adverse site conditions including slope stabilization measures and seismically unstable
soils, if appropriate;
4. Erosion and Sediment Control Plan. For any development proposal on a site containing an erosion
hazard area, an erosion and sediment control plan shall be required. The erosion and sediment control
plan shall be prepared in compliance with requirements set forth in Chapter 18.30 ECDC.
G. Limited Report Requirements for Stable Erosion Hazard Areas. At the director's discretion, detailed
critical areas report requirements may be waived for erosion hazard areas with suitable slope stability.
Report requirements for stable erosion hazard areas may be met through construction documents that
shall include at a minimum an erosion and sediment control plan prepared in compliance with
requirements set forth in Chapter 18.30 ECDC.
H. Seismic Hazard Areas. In addition to the basic critical areas report requirements for geologically
hazardous areas provided in subsections A through E of this section, a critical areas report for a seismic
hazard area shall also meet the following requirements:
Page 78 of 100
Packet Pg. 330
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
-21. The hazards analysis shall include a complete discussion of the potential impacts of seismic activity
on the site (for example, forces generated and fault displacement).
32. A geotechnical engineering report shall evaluate the physical properties of the subsurface soils,
especially the thickness of unconsolidated deposits and their liquefaction potential. If it is determined
that the site is subject to liquefaction, mitigation measures appropriate to the scale of the development
shall be recommended and implemented. [Ord. 3527 § 2, 2004].
Part IV. Development Standards — Geologically Hazardous Areas
23.80.060 Development standards — General requirements.0 SHARE
A. Alterations of geologically hazardous areas or associated buffers may only occur for activities that:
1. Will not increase the threat of the geological hazard to adjacent properties beyond predevelopment
conditions;
2. Will not adversely impact other critical areas;
3. Are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than
predevelopment conditions; and
o�
4. Are certified as safe as designed and under anticipated conditions by a qualified engineer or geologist,
licensed in the state of Washington. as
B. Critical Facilities Prohibited. Critical facilities shall not be sited within geologically hazardous areas
unless there is no other practical alternative. [Ord. 3527 § 2, 2004].
23.80.070 Development standards — Specific hazards.0 SHARE
A. Erosion and Landslide Hazard Areas. Activities on sites containing erosion or landslide hazards shall
meet the requirements of ECDC 23.80.060, Development Standards — General Requirements, and the
specific following requirements:
1. Minimum Building Setback. The minimum setback shall be the distance required to ensure the
proposed structure will not be at risk from landslides for the life of the structure, considered to be one
hundred and twenty (120) years and will not cause an increased risk of landslides takingplaceon or off
the site. Buffer "e,,uirenwnt. A setback buff-ershall be established from all edges of landslide hazard
areas. The size of the setbackbuffer shall be determined by the director consistent with recommendations
provided in the geotechnical report to eliminate or minimize the risk of property damage, death, or
injury resulting from landslides caused in whole or part by the development, based upon review of and
concurrence with a critical areas report prepared by a qualified professional.
2. Buffer Requirements. A buffer may be established with specific requirements and limitations,
including but not limited to, drainage, rgradinding, irrigation, and vegetation. Buffer requirements shall be
determined by the director consistent with recommendations provided in the geotechnical report to
Page 79 of 100
Packet Pg. 331
Attachment A
City of Edmonds - City Code and Community Development Code
Environmentally Critical Areas - April 26, 2016
eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in
whole or part by activities within the buffer area, based upon review of and concurrence with a critical
areas report prepared by a qualified professional.
LT,erperp.MMU •
- -
e�sa,;
I M-1061M
-23. Alterations. Alterations of an erosion or landslide hazard area, minimum building setback and/or
buffer may only occur for activities for which a hazards analysis is submitted and certifies that:
a. The alteration deve rmen will not increase surface water discharge or sedimentation to adjacent
properties beyond predevelopment conditions;
b. The alterationdeve ormer* will not decrease slope stability on adjacent properties; and
c. Such alterations will not adversely impact other critical areas;
3. Design Standards within erosion and landslide hazard areas. Development within an erosion or
landslide hazard area and/or buffer shall be designed to meet the following basic requirements unless it
can be demonstrated that an alternative design that deviates from one or more of these standards
provides greater long-term slope stability while meeting all other provisions of this title. The
requirement for long-term slope stability shall exclude designs that require regular and periodic
maintenance to maintain their level of function. The basic development design standards are:
a. The proposed development shall not decrease the factor of safety for landslide occurrences below the
limits of 1.5 for static conditions and 1.2 for dynamic conditions. If stability at the proposed
development site is below these limits, the proposed development shall provide practicable approaches
to reduce risk to human safety and improve the factor of safety for landsliding. In no case shall the
existing factor of safety be reduced for the subject property or adjacent properties;
b. Structures and improvements shall be clustered to avoid geologically hazardous areas and other
critical areas;
c. Structures and improvements shall minimize alterations to the natural contour of the slope, and
foundations shall be tiered where possible to conform to existing topography;
d. Structures and improvements shall be located to preserve the most critical portion of the site and its
natural landforms and vegetation;
Page 80 of 100
Packet Pg. 332
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
e. The proposed development shall not result in greater risk or a need for increased buffers on
neighboring properties;
f. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over
graded artificial slopes; and
g. Development shall be designed to minimize impervious lot coverage;
4. Vegetation Retention. Unless otherwise provided or as part of an approved alteration, removal of
vegetation from an erosion or landslide hazard area or related buffer shall be prohibited;
5. Seasonal Restriction. Clearing shall be allowed only from May 1 st to October 1 st of each year;
provided, that the director may extend or shorten the dry season on a case -by -case basis depending on
actual weather conditions, except that timber harvest, not including brush clearing or stump removal,
may be allowed pursuant to an approved forest practice permit issued by the city of Edmonds or the
Washington State Department of Natural Resources;
6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from
an erosion or landslide hazard area shall be prohibited except as follows:
a. Conveyed via continuous storm pipe downslope to a point where there are no erosion hazard areas �?
downstream from the discharge;
o�
b. Discharged at flow durations matching predeveloped conditions, with adequate energy dissipation,
into existing channels that previously conveyed storm water runoff in the predeveloped state; or
c. Dispersed discharge upslope of the steep slope onto a low -gradient, undisturbed buffer demonstrated
to be adequate to infiltrate all surface and storm water runoff, and where it can be demonstrated that
such discharge will not increase the saturation of the slope; and
7. Prohibited Development. On -site sewage disposal systems, including drain fields, shall be prohibited
within erosion and landslide hazard areas and related buffers.
B. Earth Subsidence and Landslide Hazard Area. In addition to the requirements of this chapter,
development proposals for lands located within the earth subsidence and landslide hazard area as
indicated on the critical areas inventory shall be subject to the provisions of Chapter 19.10 ECDC
C. Seismic Hazard Areas. Activities proposed to be located in seismic hazard areas shall meet the
standards of ECDC 23.80.060, Development Standards — General Requirements. [Ord. 3527 § 2, 2004].
Page 81 of 100
Packet Pg. 333
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Figure 23.80.000
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements*
Geologically Hazardous Areas
Geologically
Goo-Haxa Geo-Hazard assess- GeotechnicalReport
Development
hazardousarea
REQUIRE menteoncludes REQUIREMENT to
encroaches within
(geo•hazard) may be
ALntifyclassification and jurisdictional delineate boundaries
delineated
located on or near
location of geohazard. geo-hazard area and extent of
geo-hazard area
subject parcel.
located with in200ft geo-hazard area-
andlorminimum
of subject parcel.
bu ild i n g setback,
.to
Geo-Hazard assessment
concludes n o ju risd ic- Development avoids
G e otec h n ical Re port
�
tionalgeo•hazard geo-hazard area and
REQUI REMENT to identify
located -200Rfrom required minimum
design modifications and
subject parcel, buildingsetbo(*
mitigation sufficient to
'a
buffer.
avoid additional potential
O
risk associated with
development in and
i
around geo-hazard areas.
N o additiona I
Q
compliance
requirements. No ad ditiona l
V
compliance
required.
No additional
V
compliance requirements
upon implementation of
geotechnical
recommendations
-Report requirements may be met through submission of a single critical area report or multiple reports in corn binawn.
Page 82 of 100
Packet Pg. 334
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.90
FISH AND WILDLIFE HABITAT CONSERVATION AREAS
Sections:
Part I. Designation, Rating and Mapping
23.90.000 Fish and wildlife habitat conservation areas compliance requirements flowchart.
23.90.010 Designation, rating and mapping —Fish and wildlife habitat conservation areas.
Part IL Additional Report Requirements — Fish and Wildlife Habitat Conservation Areas
23.90.020 Special study and report requirements — Fish and wildlife habitat conservation areas.
Part III. Development Standards — Fish and Wildlife Habitat Conservation Areas
23.90.030 Development standards — General requirements.
23.90.040 Development standards — Specific habitats. �?
o�
Part I. Designation, Rating and Mapping
23.90.000 Fish and wildlife habitat conservation areas compliance requirements
flowchart.. SHARE _
See Figure 23.90.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.90.010 Designation, rating and mapping — Fish and wildlife habitat conservation
areas. SHARE
A. Fish and wildlife habitat conservation areas in the city of Edmonds include:
1. Streams. Within the city of Edmonds streams shall include those areas where surface waters produce a
defined channel or bed which demonstrates clear evidence, such as the sorting of sediments, of the
passage of water. The channel or bed need not contain water year-round. Streams shall be classified in
accordance with the Washington Department of Natural Resources water typing system (WAC 222-16-
030) hereby adopted in its entirety by reference and summarized as follows:
a. Type S: streams inventoried as "shorelines of the state" under Chapter 90.58 RCW and the rules
promulgated pursuant to Chapter 90.58 RCW;
b. Type F: streams which contain fish habitat;
Page 83 of 100
Packet Pg. 335
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
c. Type Np: perennial nonfish habitat streams; and
d. Type Ns: seasonal nonfish habitat streams.
All streams included on the inventory that are known to exist within the city of Edmonds do not meet
criteria for "shorelines of the state" but contain fish habitat and, thus, meet designation criteria for Type
F waters pursuant to WAC 222-16-030. However, not all Edmonds streams support anadromous fish
populations or have the potential for anadromous fish occurrence because of obstructions, blockages or
access restrictions resulting from existing conditions. Therefore, in order to provide special
consideration of and increased protection for anadromous fish in the application of development
standards, Edmonds streams shall be further classified as follows:
Anadromous fishbearing streams: streams existing in whole or in part within the city of Edmonds in
which anadromous fish are known to occur. As of 2004, Edmonds fishbearing streams are known to
include Willow Creek, Shellabarger Creek, Shell Creek, Hindley Creek, Perrinville Creek, and Lunds
Creek; and
Nonanadromous fishbearing streams: streams existing in whole or in part within the city of Edmonds
which do not support fish populations and do not have the potential for fish occurrence because of
barriers to fish passage or lack of suitable habitat.
Streams with anadromous fish occurrence were identified in the Edmonds Stream Inventory and
Assessment, a 2002 report of Pentec Environmental which is incorporated by this reference as if herein
set forth. The city of Edmonds advocates and encourages the removal of barriers to anadromous fish a)
passage consistent with the purposes and objectives of this title. The director may provide updated r_
information on the occurrence of anadromous fish in Edmonds streams consistent with changes in
existing environmental conditions.
L
2. Areas with VA+ieh-which State or Federally Designated Endangered, Threatened, and Sensitive
Species Have a Primary Association, or offer important fish and wildlife habitat within the urban
environment_
a. Federally designated endangered and threatened species are those fish and wildlife species identified
by the U.S. Fish and Wildlife Service and the NOAA Fisheries that are in danger of extinction or
threatened to become endangered. The U.S. Fish and Wildlife Service and the National Marine Fisheries
Service should be consulted for current listing status.
b. State -designated endangered, threatened, and sensitive species are those fish and wildlife species
native to the state of Washington identified by the Washington Department of Fish and Wildlife, that are
in danger of extinction, threatened to become endangered, vulnerable, or declining and are likely to
become endangered or threatened in a significant portion of their range within the state without
cooperative management or removal of threats. State -designated endangered, threatened, and sensitive
species are periodically recorded in WAC 232-12-014 (state endangered species) and WAC 232-12-011
(state threatened and sensitive species). The state Department of Fish and Wildlife maintains the most
current listing and should be consulted for current listing status.
Page 84 of 100
Packet Pg. 336
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
3. State Priority Habitats and Areas Associated with State Priority Species. Priority habitats and species
are considered to be priorities for conservation and management. Priority species require protective
measures for their perpetuation due to their population status, sensitivity to habitat alteration, and/or
recreational, commercial, or tribal importance. Priority habitats are those habitat types or elements with
unique or significant value to a diverse assemblage of species. A priority habitat may consist of a unique
vegetation type or dominant plant species, a described successional stage, or a specific structural
element. Priority habitats and species are identified by the state Department of Fish and Wildlife.
4. Habitats and Species of Local Importance. Habitats and species of local importance are those
identified by the city of Edmonds, including but not limited to those habitats and species that, due to
their population status or sensitivity to habitat manipulation, warrant protection. Habitats may include a
seasonal range or habitat element with which a species has a primary association, and which, if altered,
may reduce the likelihood that the species will maintain and reproduce over the long term.
4-5. Commercial and Recreational Shellfish Areas. These areas include all public and private tidelands or
bedlands suitable for shellfish harvest, including shellfish protection districts established pursuant to
Chapter 90.72 RCW.
56. Kelp and eelgrass beds and herring and smelt spawning areas.
6-7. Naturally Occurring Ponds Under 20 Acres. Naturally occurring ponds are those ponds under 20
v
acres and their submerged aquatic beds that provide fish or wildlife habitat, including those artificial
ponds intentionally created from dry areas in order to mitigate impacts to ponds. Naturally occurring
ponds do not include ponds deliberately designed and created from dry sites, such as canals, detention
facilities, wastewater treatment facilities, farm ponds, temporary construction ponds, and landscape
amenities, unless such artificial ponds were intentionally created for mitigation.
E
79. Waters of the State. Waters of the state include lakes, rivers, ponds, streams, inland waters,
underground waters, salt waters, and all other surface waters and watercourses within the jurisdiction of
the state of Washington, as classified in WAC 222-16-031 (or WAC 222-16-030, depending on
classification used).
B. All areas within the city of Edmonds meeting one or more of these criteria, regardless of any formal
identification, are hereby designated critical areas and are subject to the provisions of this title and shall
be managed consistent with the best available science, such as the Washington Department of Fish and
Wildlife's Management Recommendations for Priority Habitat and Species.
Page 85 of 100
Packet Pg. 337
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
C. Mapping. The approximate location and extent of fish and wildlife habitat conservation areas are
shown on the city of Edmonds critical areas inventory. Resources providing information on the location
and extent of fish and wildlife habitat conservation areas incorporated into the inventory include:
1. Washington Department of Fish and Wildlife priority habitat and species maps;
2. Washington State Department of Natural Resources official water type reference maps, as amended;
3. Washington State Department of Natural Resources Puget Sound intertidal habitat inventory maps;
4. Washington State Department of Natural Resources shorezone inventory;
5. Washington State Department of Natural Resources Natural Heritage Program mapping data;
6. Washington State Department of Health annual inventory of shellfish harvest areas;
7. Anadromous and resident salmonid distribution maps contained in the habitat limiting factors reports
published by the Washington Conservation Commission; and
8. Washington State Department of Natural Resources state natural area preserves and natural resource
conservation area maps.
o�
The critical areas inventory and the resources cited above are to be used as a guide for the city of
Edmonds development services department, project applicants, and/or property owners and should be
continuously updated as new critical areas are identified. They are a reference and do not provide a final
critical areas designation. [Ord. 3527 § 2, 2004].
Part II. Additional Report Requirements — Fish and Wildlife Habitat Conservation Areas
23.90.020 Special study and report requirements — Fish and wildlife habitat
conservation areas. -3StL
In addition to the general critical areas report requirements of ECDC 23.40.090, critical area reports for
fish and wildlife habitat conservation areas must meet the requirements of this section. Critical areas
reports for two or more types of critical areas must meet the report requirements for each relevant type
of critical area.
A. Preparation by a Qualified Professional. A critical areas report for a fish and wildlife habitat
conservation area shall be prepared by a qualified professional who is a biologist with experience
preparing reports for the relevant type of habitat. Pursuant to ECDC 23.40.090(A), applicants may
choose one of the qualified technical consultants on the city's approved list in preparing critical areas
reports for fish and wildlife habitat conservation areas, or may utilize an alternative consultant. Critical
areas studies and reports developed by an alternative consultant shall be subject to independent review
pursuant to ECDC 23.40.090(B).
Page 86 of 100
Packet Pg. 338
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. Areas Addressed in Critical Areas Report. The following areas shall be addressed in a critical areas
report for fish and wildlife habitat conservation areas:
1. The project area of the proposed activity;
2. All fish and wildlife habitat conservation areas and recommended buffers within 200 feet of the
project area;
3. All shoreline areas, floodplains, other critical areas, and related buffers within 200 feet of the project
area; and-
4. A discussion of the efforts to avoid and minimize potential effects to these resources and the
implementation of mitigation/enhancement measures as required.
C. Habitat Assessment. A habitat assessment is an investigation of the project area to evaluate the
potential presence or absence of designated critical fish or wildlife species or habitat. A critical areas
report for a fish and wildlife habitat conservation area shall contain an assessment of habitats, including
the following site- and proposal -related information at a minimum:
1. Detailed description of vegetation on and adjacent to the project area and its associated buffer;
2. Identification of any species of local importance, priority species, or endangered, threatened,
sensitive, or candidate species that have a primary association with habitat on or adjacent to the project
area, and assessment of potential project impacts to the use of the site by the species;
3. A discussion of any federal, state, or local special management recommendations, including
Washington Department of Fish and Wildlife habitat management recommendations, that have been
developed for species or habitats located on or adjacent to the project area.
D. Additional Technical Information Requirements for Streams. Consistent with specific development
standards for Edmonds streams (ECDC 23.90.040(D)), critical areas report requirements for streams
may be met, at the discretion of the director, through submission of one or more specific report types. If
stream buffer enhancement is proposed to reduce a standard stream buffer width or as part of project
mitigation required by the director, a stream buffer enhancement plan may be submitted to fulfill the
requirements of this section. If no project impacts are anticipated and standard stream buffer widths are
retained, a stream survey report, general critical areas report or other reports alone or in combination
may be submitted as consistent with the specific requirements of this section. In addition to the basic
critical areas report requirements for fish and wildlife habitat conservation areas provided in subsections
(A) through (C) of this section, technical information on streams shall include the following information
at a minimum:
1. A written assessment and accompanying maps of the stream and associated hydrologic features within
200 feet of the project area, including the following information at a minimum:
a. Stream survey showing the ordinary high water mark(s);
Page 87 of 100
Packet Pg. 339
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
b. Standard stream buffer boundary;
c. Boundary for proposed reduced stream buffers;
d. Vegetative, faunal, and hydrologic characteristics;
e. Soil and substrate conditions; and
f. Topographic elevations, at two -foot contours;
2. A detailed description and functional assessment of the stream buffer under existing conditions
pertaining to the protection of stream functions, fish habitat and, in particular, potential anadromous
fisheries;
3. A habitat and native vegetation conservation strategy that addresses methods to protect and enhance
on -site habitat and stream functions;
4. Proposed buffer enhancement, if needed, including a written assessment and accompanying maps and
planting plans for buffer areas to be enhanced, including the following information at a minimum:
a. A description of existing buffer conditions;
o�
b. A description of proposed buffer conditions and how proposed conditions will increase buffer
functioning in terms of stream and fish habitat protection;
c. Performance standards for measuring enhancement success through a monitoring period of at least
three years; and
d. Provisions for monitoring and submission of monitoring reports documenting buffer conditions as
compared to performance standards for enhancement success;
5. A discussion of ongoing management practices that will protect stream functions and habitat value
through maintenance of vegetation density within the stream buffer. [Ord. 3527 § 2, 2004].
Part III. Development Standards — Fish and Wildlife Habitat Conservation Areas
23.90.030 Development standards — General requirements.0 SHARE
A. Alterations. A fish and wildlife habitat conservation area may be altered only if the proposed
alteration of the habitat or the mitigation proposed does not degrade the quantitative and qualitative
functions and values of the habitat. There are no specific development standards for upland habitats of
local importance unless these areas include another critical area (streams, heron rookeries, steep slopes,
etc.). City staff will review the critical areas report (ECDC 23.90.020) and work with the applicant to
minimize effects or improve conditions to upland habitat.
Page 88 of 100
Packet Pg. 340
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
B. Approvals of Activities. The director shall condition approvals of activities allowed within or
adjacent to a habitat conservation area or its buffers as necessary to minimize or mitigate any potential
adverse impacts. Conditions shall be based on the best available science and may include, but are not
limited to, the following:
1. Establishment of buffer zones;
2. Preservation of critically important vegetation and/or habitat features such as snags and downed
wood;
3. Limitation of access to the habitat area, including fencing to deter unauthorized access;
4. Seasonal restriction of construction activities;
5. Establishment of a duration and timetable for periodic review of mitigation activities; and
6. Requirement of a performance bond, when necessary, to ensure completion and success of proposed
mitigation.
C. Mitigation and Equivalent or Greater Biological Functions. Mitigation of alterations to fish and r
L
wildlife habitat conservation areas shall achieve equivalent or greater biologic and hydrologic functions �?
and shall include mitigation for adverse impacts upstream or downstream of the development proposal
site. Mitigation shall address each function affected by the alteration to achieve functional equivalency
or improvement on a per function basis. Mitigation shall be located on -site except when demonstrated
that a higher level of ecological functioning would result from an off -site location. Mitigation shall be
detailed in a fish and wildlife habitat conservation area mitigation plan, which may include the following c
as necessary:
1. A native vegetation planting plan;
2. Plans for retention, enhancement or restoration of specific habitat features;
3. Plans for control of nonnative invasive plant or wildlife species; and
4. Stipulations for use of innovative, sustainable building practices.
D. Approvals and the Best Available Science. Any approval of alterations or impacts to a fish and
wildlife habitat conservation area shall be supported by the best available science.
E. Buffers.
1. Establishment of Buffers. The director shall require the establishment of temporary or permanent
buffer areas for permitted activities adjacent to fish and wildlife habitat conservation areas which may
result in fish or wildlife disturbance (e.g., construction, grading, etc.) when needed to protect fish and
wildlife habitat conservation areas. Establishment of buffers shall follow recommendations set forth by a
qualified biologist in the project critical areas report. Required buffer widths shall reflect the sensitivity
Page 89 of 100
Packet Pg. 341
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
of the habitat and the type and intensity of human activity proposed to be conducted nearby and shall be
consistent with the management recommendations issued by the Washington Department of Fish and
Wildlife.
2. Seasonal and Daily Timing Restrictions. When a species is more susceptible to adverse impacts
during specific periods of the year or day, seasonal restrictions on permitted activities within or adjacent
to fish and wildlife habitat conservation areas may be required at the discretion of the director pursuant
to recommendations set forth in a critical areas report.
F. Signs and Fencing of Fish and Wildlife Habitat Conservation Areas.
1. Temporary Markers. The outer perimeter of the fish and wildlife habitat conservation area or buffer
and the limits of those areas to be disturbed pursuant to an approved permit or authorization shall be
marked in the field as required by the director in such a way as to ensure that no unauthorized intrusion
will occur. This temporary marking shall be maintained throughout construction and shall not be
removed until permanent signs, if required, are in place.
2. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the
director may require the applicant to install permanent signs along the boundary of a fish and wildlife
habitat conservation area or buffer.
a. Permanent signs shall be made of a metal face and attached to a metal post or another material of
equal durability. Signs must be posted at an interval of one per lot or every 50 feet, whichever is less,
and must be maintained by the property owner in perpetuity. The sign shall be worded as follows or with
alternative language approved by the director: c
Fish and Wildlife Habitat
Conservation Area
Do Not Disturb
Contact the City of Edmonds
Regarding Uses and Restriction
b. The provisions of subsection (F)(2)(a) of this section may be modified by the director as necessary to
assure protection of sensitive features or wildlife.
3. Fencing.
a. The director shall determine if fencing is necessary to protect the functions and values of the critical
area. If found to be necessary, the director shall condition any permit or authorization issued pursuant to
this chapter to require the applicant to install a permanent fence at the edge of the fish and wildlife
habitat conservation area or buffer, when fencing will prevent future impacts to the fish and wildlife
habitat conservation area.
Page 90 of 100
Packet Pg. 342
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
b. The applicant shall be required to install a permanent fence around the fish and wildlife habitat
conservation area or buffer when domestic grazing animals are present or may be introduced on -site.
c. Fencing installed as part of a proposed activity or as required in this subsection shall be designed so as
to not interfere with species migration, including fish runs, and shall be constructed in a manner that
minimizes habitat impacts. [Ord. 3527 § 2, 2004].
23.90.040 Development standards — Specific habitats.0 SHARE
A. Endangered, Threatened, and Sensitive Species.
1. No development shall be allowed within a fish and wildlife habitat conservation area or buffer with
which state or federally endangered, threatened, or sensitive species have a primary association, except
that which is provided for by a management plan established by the Washington Department of Fish and
Wildlife or applicable state or federal agency.
2. Whenever activities are proposed adjacent to a fish and wildlife habitat conservation area with which
a
state or federally endangered, threatened, or sensitive species have a primary association, such area shall
a
be protected through the application of protection measures in accordance with a critical areas report
prepared by a qualified professional and approved by the director. Approval for alteration of land
L
adjacent to the fish and wildlife habitat conservation area or its buffer shall not occur prior to
�?
consultation with the Washington Department of Fish and Wildlife for animal species, the Washington
State Department of Natural Resources for plant species, and other appropriate federal or state agencies.
3. Bald eagle habitat is subject to the Federal Bald and Golden Eagle Protection Act. Washington State
bald eagle protection rules (WAC 232-12-292) shall not be required as long as bald eagles are not listed
as a State Endangered or Threatened species. Bald eagle habitat shall be pr-oteete " nt t
within 800 feet of a verified nest teffitery or- eemmunal r-eest, a habitat management plan shall be
developed by a Valified-ffefessional. The dir-eeter- shall verify the leeation of eagle management afeas
for- eaeb proposed aetivity. Appr-oval of the aetivity shall not 3 approval of the habitat
management plan by the Washington Department of Fist, and Wfldi;f.
B. Anadromous Fish.
1. All activities, uses, and alterations proposed to be located in water bodies used by anadromous fish or
in areas that affect such water bodies shall give special consideration to the preservation and
enhancement of anadromous fish habitat, including, but not limited to, adhering to the following
standards:
a. Activities shall be timed to occur only during the allowable work window as designated by the
Washington Department of Fish and Wildlife for the applicable species;
b. An alternative alignment or location for the activity is not feasible;
Page 91 of 100
Packet Pg. 343
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
c. The activity is designed so that it will not degrade the functions or values of the fish habitat or other
critical areas;
d. Shoreline erosion control measures shall be designed to use bioengineering methods or soft armoring
techniques, according to an approved critical areas report; and
e. Any impacts to the functions or values of the fish and wildlife habitat conservation area are mitigated
in accordance with an approved critical areas report.
2. Structures that prevent the migration of salmonids shall not be allowed in the portion of water bodies
currently or historically used by anadromous fish. Fish bypass facilities shall be provided that allow the
upstream migration of adult fish and shall prevent fry and juveniles migrating downstream from being
trapped or harmed.
3. Fills, when authorized, shall not adversely impact anadromous fish or their habitat or shall mitigate
any unavoidable impacts and shall only be allowed for a water -dependent use.
C. Retention of Vegetation on Subdividable, Undeveloped Parcels. As a provision of this title, the a
director shall require retention of a minimum of 30 percent of native vegetation on undeveloped (or M
redeveloped), subdividable lands zoned as RS-12 or RS-20 per Chapter 16.10 ECDC. This standard for r
L
development shall apply to all undeveloped (or redeveloped), subdividable lands zoned RS-12 or RS-20regardless of the petei4ial for- designatien as a fish and wildlife habitat eensefvafien area or- other- er-itieal.
v
on
areathat contain a landslide hazard area as defined by ECDC 23.80.020.B; a stream or stream buffer; or
a wetland or wetland buffer, except for as provided in ECDC 23.90.040.C.4._This provision for native
vegetation retention will provide increased protection of fish and wildlife habitat throughout the
Edmonds jurisdiction, and shall be applied consistent with the following criteria: c
1. Achieving the minimum 30 percent retention reauirement for native vegetation shall be determined b
assessing the existing site area that supports native vegetation. For purposes of this provision, areas that
support native vegetation shall include areas dominated by plant species which are indigenous to the
Puget Sound region, which reasonably could have been expected to naturally occur on the site, and
within which native trees over 6 inches in diameter at breast height (DBH) make ua more than 40
ercent of the canopy cover.
2. The goal of 30 percent native vegetation can be met through maintaining existing native vegetation,
establishing native vegetation, or a combination of both.
3. A vegetation management plan, subject to the approval of the director, is required for approval of the
proposed development.
4. For undeveloped (or redeveloped), subdividable lands zoned as RS-12 or RS-20 that currently do not
support any native vegetation areas meeting minimum requirements in ECDC 23.90.040.C.1, the
director may waive the requirements of this provision.
D. Streams. No alteration to a stream or stream buffer shall be permitted unless consistent with the
provisions of this title and the specific standards for development outlined below.
Page 92 of 100
Packet Pg. 344
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
1. Standard Stream Buffer Widths. Buffers for streams shall be measured on each side of the stream,
from the ordinary high water mark. The following shall be the standard buffer widths for streams based
upon the Washington State Department of Natural Resources water typing system and further
classification based upon fish presence (fishbearing vs. nonfishbearing) for the Type F streams existing
in the city of Edmonds:
a. Type S: 150 feet;
b. Type F anadromous fishbearing stream adjacent to reaches with anadromous fish access: 100 feet;
c. Type F anadromous fishbearing stream adjacent to reaches without anadromous fish access: 75 feet;
d. Type F nonanadromous fishbearing stream: 75 feet;
e. Type Np: 50 feet;
f. Type Ns: 2-540 feet.
General areas and stream reaches with access for anadromous fish are indicated on the city of Edmonds
critical areas inventory. The potential for anadromous fish access shall be confirmed in the field by a
qualified biologist as part of critical areas review and determination of standard stream buffer widths.
o�
2. Reduced Stream Buffer Widths. Standard stream buffer widths may be reduced by no more than -58
twenty. f�percent 25%) of the standard stream buffer width concomitant to development and
implementation of a stream buffer enhancement plan approved by the director. Reduced stream buffer
widths shall only be approved by the director if a stream buffer enhancement plan conclusively
demonstrates that enhancement of the reduced buffer area will not degrade the quantitative and o
L
qualitative functions and values of the buffer area in terms of fish and stream protection and the
provision of wildlife habitat. Stream buffer enhancement plans must meet the specific requirements of a
ECDC 23.40.110, 23.40.120 and 23.40.130 and:
a. ,
will pr-ovide equivalent to or- gr-ea
than a star .,,.a b„ff r w itho„* o„h,,,,,.o.,..o„*The buffer enhancement plan proposed as part of buffer
reduction provides evidence that functions and values in terms of stream and wildlife protections will
bea,,,,ivale„t t o eater than a standard buffer without enha,,,o, en :
i. Increased or retained through plan implementation for those streams where existing buffer vegetation _
is generally intact; or
ii. Increased through plan implementation for those streams where existing buffer vegetation is
inadequate to protect the functions and values of the stream;
b. The plan documents existing native plant densities and provides for increases in buffer native plant
densities to no less than three feet on center for shrubs and eight feet on center for trees;
Page 93 of 100
Packet Pg. 345
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
c. The plan requires monitoring and maintenance to ensure success for a minimum of tie -five 5 years
in accordance with ECDC 23.40.130(D) and (E); and
d. The plan specifically documents methodology and provides performance standards for assessing
increases in stream buffer functioning as related to:
i. Water quality protection;
ii. Provision of wildlife habitat;
iii. Protection of anadromous fisheries;
iv. Enhancement of fish habitat; and
v. Restricting intrusion and disturbance.
3. Stream Buffer Width Averaging with Enhancement. The director may allow modification of a a
standards stream buffer width in accordance with an approved critical areas report and the best a
available science on a case -by -case basis by averaging buffer widths. Any allowance for averaging
buffer widths shall only be granted concomitant to the development and implementation of a buffer r
L
enhancement plan for areas of buffer degradation. Only those portions of a stream buffer existing within �?
the project area or subject parcel shall be considered in the total buffer area for buffer averaging.
Averaging of buffer widths may only be allowed where a qualified professional demonstrates that: 77
a. The buffer enhancement plan proposed as part of buffer averaging provides evidence that functions
and values in terms of stream and wildlife protections will be:
i. Increased or retained through plan implementation for those streams where existing buffer vegetation
is generally intact; or
ii. Increased through plan implementation for those streams where existing buffer vegetation is
inadequate to protect the functions and values of the stream;
b. The total area contained in the buffer area, or the total buffer area existing on a subject parcel for a
stream extending off -site, after averaging is no less than that which would be contained within the
standard buffer;
bc. The buffer width at any single location is not reduced t loss than Wby more the twenty-five (25%)
percent of the r-e"eed of standard width; and
4. Additions to Structures Existing within Stream Buffers.
Page 94 of 100
Packet Pg. 346
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
a. Additions to legally constructed structures existing within stream buffers that increase the footprint of
development or impervious surfacing shall be permitted consistent with the development standards of
this chapter (ECDC 23.90.030 and this section) -,provided that a buffer enhancement plan is provided to
mitigate for impacts consistent with this Title, and provided that all impacts from temporary
disturbances within the critical area buffer shall be addressed through use of best management plans and
buffer enhancement plantings during and following construction of the allowed alteration. Provisions for
standard stream buffers, buffer- r-eduetiendffoRgh enhaneement, and stream buffer averaging with
enhancement, and buffer reductions through enhancement require applicants to locate such additions in
accordance with the following sequencing:
ai. Outside of the standard stream buffer;
bii. Outside of a stream buffer averaged (with enhancement) per
subsection (D)(�3) of this section;
eiii. Outside of a stream buffer reduced (with enhancement) *h,.,,,,,,h, b r ,..o, , ,;,, . per subsection
(D)(�2) of this section; or
div. Outside of the inner twenty five percent (25to) pereen4 of the standard stream buffer width through
the ttse of both buff reduction eductio andb„ff �� � e ith no more than three hundred (300) square feet r
L
of structure addition footprint within the inner fifty percent (50%) of the standard stream buffer width, v
provided that enhancement is provided at a minimum three -to -one (3:1, ratio (enhancement -to -impact).
v. Outside of the inner 25 percent of the standard stream buffer width with no more than five hundred
(500)square feet of new footprint within the inner fifty percent (50%) of the standard stream buffer
width, provided that enhancement is provided at a minimum five -to -one (5:1,) ratio (enhancement -to -
impact), and that stormwater low impact development (LID)techniques or other measures that enhance 0
o`
existing buffer condition are included as part of the stream buffer enhancement plan. $
b. Where meeting stream buffer enhancement reauirements reauired by H.1. of this section would result
in enhancement that is separated from the critical area due to uncommon property ownership, alternative
enhancement approaches may be gpproved by the director. Alternative approaches could include a
vegetated rain garden that receives storm runoff, replacement of existing impervious surfaces with
pervious materials, or other approaches that provide ecological benefits to the adjacent critical area.
c_Additions to legally constructed structures existing within stream buffers that cannot be
accommodated in accordance with the above sequencing (i.e., additions proposed within the inner 25
percent of a standard buffer width) may be permitted at the director's discretion as a variance subject to
review by the city hearing examiner and the provisions of ECDC 23.40.210.
5. Development Proposals within the Footprint of Existing Development. New development shall be
allowed within the footprint of existing development occurring within a stream buffer, provided that the
following conditions are met:
a. The footprint of existing development was legally established, and is consistent with the definition
provided in ECDC 23.40.320;
Page 95 of 100
Packet Pg. 347
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. The proposed development within the footprint of existing development is sited as far away from the
stream edge as is feasible;
c. As part of the development proposal, opportunities to reduce the footprint of existing development evelopment are
implemented where such reduction would increase the buffer width adjacent to the stream and not
represent an undue burden given the scale of the proposed development.
d. The proposed development includes enhancement to the adjacent remaining stream buffer in order to
improve functions degraded ded by previous development;
e. Enhancement is provided as buffer enhancement for an equivalent area of the footprint of the newly
proposed development within the footprint of existing development occurring in stream buffer, or
through an alternative approach approved by the director that restores degraded functions of the wetland
and remaining buffer; and
f. Impacts from temporary disturbances within the stream buffer shall be addressed through use of best
management plans and buffer enhancement plantings during and following construction of the allowed
alteration.
-56. Stream Crossings. Stream crossings may be allowed only if all reasonable construction techniques
L
and best management practices are used to avoid disturbance to the stream bed or bank. Upon v
completion of construction, the area affected shall be restored to an appropriate grade, replanted with
native species and/or otherwise protected according to a stream mitigation and buffer enhancement plan
approved by the director, and maintained and monitored per the requirements of ECDC 23.40.110, a)
23.40.120 and 23.40.130 and providing for buffer enhancement in accordance with the requirements of r_
subsection (D)(2) of this section. In addition, the applicant must demonstrate that best management
practices will be used during construction to provide the following:
L
a. Fisheries protection, including no interference with fish migration or spawning;
b. All crossings shall be constructed during summer low flow periods and shall be timed to avoid stream
disturbance during periods when stream use is critical to salmonids;
c. Crossings shall not occur over salmonid spawning areas unless no other possible crossing site exists;
d. Crossings and culverted portions of the stream shall be minimized to the extent feasible and serve
multiple purposes and multiple lots whenever possible;
e. Roads may cross streams only on previously approved rights -of -way, provided no practical alternative
exists and adequate provision is made to protect and/or enhance the stream through appropriate
mitigation. Roads shall be designed and located to conform to topography, and maintained to prevent
erosion and restriction of the natural movement of ground water as it affects the stream;
f. Roads and utilities shall be designed in conjunction to minimize the area of disturbance to the stream;
and
Page 96 of 100
Packet Pg. 348
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
g. Roads shall be constructed so as to minimize adverse impacts on the hydrologic quality of the stream
or associated habitat to a degree acceptable to the city2
h. An alternative alignment or location with less impact is not feasible; and
i. The crossing will be designed as near as perpendicular with the water body as possible..
67. Trails. After reviewing the proposed development and technical reports, the director may determine
that a pedestrian -only trail may be allowed in a stream buffer; provided, nonimpervioussttr€aee
materials are used, all appropriate provision is made to protect water quality, and all applicable permit
requirements have been met. No motorized vehicles shall be allowed within a stream or its buffer except
as required for necessary maintenance or security. Vegetative edges, structural barriers, signs or other
measures must be provided wherever necessary to protect streams by limiting vehicular access to
designated public use or interpretive areas.
-8. Storm Water Management Facilities. Storm water management facilities, limited to outfalls, pipes
and conveyance systems, storm water dispersion outfalls and bioswales, may be allowed within stream
buffers; provided, that:
a. No other location is feasible;
b. Pipes and conveyance facilities will be in the outer twenty five percent (25%) of the buffer;
c. Stormwater dispersion outfalls, bioswales, and bioretention facilities may be allowed anywhere within
stream buffers: c
d. Such facilities are designed consistent with requirements of ECDC Chapter 18.30; and
be. The location and function of such facilities will not degrade the functions or values of the stream or
stream buffer.
-99. City Discretion in Protection, Enhancement and Preservation of Streams. The city of Edmonds is
unique within the state of Washington as a built -out community with streams that have been
incorporated within, and often located immediately adjacent to, residential development. This title
allows the director full discretion to condition proposals for development on parcels containing, adjacent
to, or potentially impacting streams to enhance conditions consistent with ECDC 23.40.050 and the
purposes and objectives of this title. Conditions on development shall be required to enhance streams
and stream buffers as fish and wildlife habitat conservation areas to provide increased protection of
anadromous fisheries and potential fish habitat in accordance with best available science and the
recommendations of an approved critical areas report and may include:
a. Removal of stream bank armoring;
b. In -stream habitat modification;
c. Native planting;
Page 97 of 100
Packet Pg. 349
6.1.a
Attachment A
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas —April 26, 2016
d. Relocation of stream channel portions to create contiguous riparian corridors or wildlife habitat;
e. Planting of stream bank native vegetation to increase stream shading;
f. Removal and control of nonnative, invasive weed species;
g. Requiring additional building setbacks or modified buffers; and
h. Limiting or reducing the types or densities of particular uses.
The right of discretion in provisioning development in regard to streams is maintained in order to
provide for the creation of enhanced conditions over those currently existing around streams in the city
of Edmonds. In all instances where an applicant cannot demonstrate that standard stream buffer widths
as provided in subsection (D)(1) of this section can be accommodated by project development, the
applicant shall be required to submit a stream buffer enhancement plan or a stream mitigation and buffer
enhancement plan as part of a critical areas report indicating that post -project site conditions will
provide equivalent or greater protection of stream functions and fish habitat over a standard stream
buffer and existing site conditions. [Ord. 3527 § 2, 2004].
Figure 23.90.000
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements`
Fish and Wildlife Habitat Conservation Areas ■
Fish and 4YddUile Cririul Areu R�Iran Cnt;cal AU Report 11, l I! •. Eririnl Area Reporl CriRk'JArrd Mirigrion R
Eiahirdr Conorrvatioa RE4U]RL•51LN71u identihea jurisdicriooal IS4'�� DSquIREMEN7 Ln Rrporin Chides _ .1 11 11-I
Arta 4LWkCA) hray rdenriep pre unrrrn dtea Wilfim2D) fi of I-M& „�,: dsar idowrald KkrnrLlr ucNnna
bebmi.d on or near juriwlicLinna] E1191[h. luhjat panel. of h.11 ital sad idnnLf. FWJiC:A will liPal}• retain nr,tfir-
tabjeer WA wiehin 11ir nF rnlamliil nnpw, .suliing xsulr from proien and ralucv
sul,icn pun;l., Iron. pr.geri devclnpn L dnrrlopnimr. ul wildtifr hAbAaL.
C.ritiwl Aeea Report repast oncIWc<
conclkKW Ilo that habitat nlivna No xlsiilinn�l
juridictiorml errns fr: and valets will ll not ht rnnspliancr
hKotud within X0 R 4 days-d through proiocl Tequirrnunrs.
sut%lm pawl. de+xlupmrnr.
vn ui�itinmat
No oddioianel snmpli,r,
camplunen r �uirementx.
requiremanlR
9Lxaam�uforEdmkiatal
9r,eem Survey REQUIRED lyen ftEQUipEII w
In dnvu,l�.u�um arid 3Toi"r will nsnll dtmomtrow rtoendon of
JYofrxr a•ruld, sir or in sjwnDor bllfkr anNln and buffer fuikrwns Imlwi,io strenrn
wsl.TiMin uad buffer Winter "P.led L, � impacts s.ilh'rand�m --b.-aad ti'al,lesxirh reduced � huffer moirhd ihmugh
wtIm-d-dlo.ffur L—JMI1111J 3-Ilawsli ills bufhrwidilm bttffcrwidrhiw5U%). bufirrwduction.
wudihs. %U1HUrd.31uffr7 width.
1
Nkruldarn.nuI Noaddiliona! %tream bufferrvroging Further hurler No additlunal
mimpbar— wnq&nm — allawad with odirianal d.di . ..dad 1. r,umpllanuc
reyuirc lc TlrluiMmallts. buffer mhancemenl. mid huller in,lrcicm relrLJMHenrs.
'Report requirements may be met through submission of a single rri6cal area report or multiple reports in combination.
Page 98 of 100
Packet Pg. 350
6.1.a
Attachment B
19.00.025 International Building Code section amendments.
The following sections of the IBC are hereby amended as follows:
A. Section 104.3, Notices and Orders, is amended to read:
The building official shall issue all necessary notices or orders to ensure compliance with this
code. The building official is also authorized to use Chapter 20.110 ECDC for code compliance
in addition to the remedies provided for in this code.
B. Section 105.1.1, Annual Permit, is deleted.
C. Section 105.1.1, Demolition Permits, is added and shall read:
Before the partial or complete demolition of any building or structure (interior or exterior), a
demolition permit shall be obtained from the building official. The permit fee is established
pursuant to Chapter 19.70 ECDC. The applicant shall also post with the city, prior to permit
issuance, a performance bond, or frozen fund, conforming to Chapter 17.10 ECDC herein, in an
amount to be determined by the building official to satisfy all city requirements no later than
180 days after the issuance of the permit. The demolition performance bond or frozen fund shall
not be released until the building official determines the following requirements have been
completed:
1 Cap Abandoned Sanitary Sewers. Septic tanks shall be pumped, collapsed and removed
and/or filled with earth, sand, concrete, CDF or hard slurry.
2 Knock Down of Concrete Foundation Walls, Porches, Chimneys and Similar Structures. V
Concrete, bricks, cobbles and boulders shall be broken to less than 12-inch diameter. Debris left
V-
on site shall conform to IBC Section 1804.2 for clean fill. on
3 Construction debris, vegetation, and garbage attributable to the demolition shall be removed
v
from the site and from unopened street right-of-way within 30 days of written notice. No debris
of any kind may be placed or maintained on street right-of-way (including alleys) without a
c
permit issued pursuant to Chapter 18.60 or 18.70 of the Edmonds Community Development
E
Code. A
4 Repair of any damage to, and restoration of, any public property to substantially original
conditions, i.e., alley, street, sidewalk, landscaping, water meter, utilities, rockeries, retaining
walls, etc, in accordance with this code and the City's engineering requirements.
5 Grading of Site Back to Original Topography Grades. Basements shall be filled and
compacted to 90 percent as verified by a special inspector. "Structural fill" is defined as any fill
placed below structures, including slabs, where the fill soils need to support loads without
unacceptable deflections or shearing. Structural fill shall be clean and free draining, placed
above unyielding native site soils and compacted to a minimum of 90 percent modified proctor,
per ASTM D1557.
6 Temporary erosion control shall be installed and maintained per Chapter 18.30 ECDC.
D. Section 105.1.2, Annual permit records, is deleted.
E. Section 105.2, Work exempt from permit, is replaced as follows:
Exemptions from permit requirements of this code shall not be deemed to grant authorization
for any work to be done in any manner in violation of the provisions of this code or any other
laws or ordinances of this jurisdiction. It is the applicant's responsibility to comply with bulk
zoning code standards per ECDC Title 16 and storm water management provisions per Chapter
18.30 ECDC. Permits shall not be required for the following unless required by the provisions
of ECDC Title 23 or limited or prohibited by the provisions of Chapter 19.10 ECDC:
Page 1 of 9
Packet Pg. 351
Attachment B
1. Building (general):
(a) One (1) story detached accessory structures used as tool and storage sheds, playhouses and
similar uses; provided the floor area (measured to the exterior wall or post) does not exceed 120
square feet, with a maximum eave of thirty (30) inches.
(b) Fences not over six (6) feet high; provided a permit is not required by Chapter 17.30 ECDC.
(c) Movable cases, counters and partitions not over five (5) feet nine (9) inches high.
(d) Retaining walls 4 feet (1,219 nun) in height or less measured vertically from the finished
grade at the exposed toe of the retaining wall to the highest point in the wall, unless:
I Supporting a surcharge; or
4)
II Impounding Class I, II, III -A liquids; or
Q-
III Subject to the provisions of Chapter 23.50 ECDC or Chapter 23.80 ECDC.
m
c
(e) Rockeries.
L
O
(f) Water tanks supported directly upon grade if the capacity does not exceed 5,000 gallons and
m
the ratio of height to diameter or width does not exceed two (2) to one (1).
Q
(g) Sidewalks and driveways not more than 30 inches above adjacent grade, and not over any
basement or story below and are not part of an accessible route, provided a permit is not
L
required by Chapter 18.60 ECDC.
�?
h Painting, tilin carpeting,cabinets countertops and similar finish work.
() g, g, P
(i) Temporary motion picture, television and theater stage sets and scenery.
c
0) Shade cloth structures constructed for nursery or agricultural purposes.
c
(k) Prefabricated swimming pools accessory to an occupancy in which the pool walls are
L
O
entirely above the adjacent grade and the capacity does not exceed 5,000 gallons. Hot tubs and
spas less than 5,000 gallons, completely supported by the ground.
(1) Grading less than fifty (50) cubic yards (placed, removed or moved within any 365-day
period) unless subject to the provisions of Chapter 23.50 ECDC or Chapter 23.80 ECDC.
(in) Repair of appliances which do not alter original approval, certification, listing or code.
t
w
(n) Replacement or adding new insulation with no drywall removal or placement.
(o) Replacement or repair of existing gutters or downspouts.
s
(p) The following types of signs are exempt from permit requirements except that dimensional
Q
size and placement standards shall comply with Chapter 20.60 ECDC:
I. Replacing the panel on a previously permitted existing wall cabinet or pole sign,
II. Repainting an existing previously permitted wood sign,
III. Painted or vinyl lettering on storefront windows,
IV. Governmental signs, campaign signs, official public notices, and signs required by
provision of local, state, or federal law,
Page 2 of 9
Packet Pg. 352
6.1.a
Attachment B
V. Temporary signs announcing the sale or rent of property and other temporary signs as
described in ECDC 20.60.080,
VI. Signs erected by the transportation authorities, and temporary seasonal and holiday
displays.
2. Mechanical:
(a) Portable heating, ventilation, cooling, cooking or clothes drying appliances.
(b) Replacement of any part that does not alter approval of equipment or make such equipment
unsafe.
(c) Portable fuel cell appliances that are not connected to a fixed piping system and are not
interconnected to a power grid.
Q.
(d) Steam, hot or chilled water piping within any heating or cooling equipment regulated by this
code.
c
c
(d) Portable evaporative cooler.
=a
O
(f) Self-contained refrigeration systems containing ten (10) pounds or less of refrigerant or that
m
are actuated by motor of one (1) horsepower or less.
Q
3. Plumbing:
r
(a) The stopping of leaks in drains, water, soil, waste or vent pipe, provided that the
L
�?
replacement of defective material shall be done with new material and a permit obtained and
inspection made.
(b) Reinstallation or replacement of approved prefabricated plumbing fixtures that do not
involve or require the replacement or rearrangement of valves or pipes.
4. Residential permit exemptions:
In addition the following exemptions apply for single family dwellings:
(a) One (1) story detached accessory structures used as tool and storage sheds, playhouses and
similar uses; provided the floor area (measured to the exterior wall or post) does not exceed 200
square feet, with a maximum eave of twelve (12) inches and maximum height of fifteen (15)
feet. Vehicle storage structures, such as garages and carports, are not exempted.
(b) Window awnings supported by an exterior wall and do not project more than fifty-four (54)
inches from the exterior wall and do not require additional support. ECDC Title 23 provisions
shall not apply to such awnings.
(c) Sport courts less than 2,000 square feet.
(d) Dock repair of individual decking members. ECDC Title 23 provisions shall not apply.
(e) Replacement or repair of existing exterior siding. ECDC Title 23 provisions shall not apply.
(f) Replacement or repair of existing windows or doors provided; no alteration of structural
members is required, the replacement would not require installation of safety glazing, the
installation does not involve required egress windows. ECDC Title 23 provisions shall not
apply-
(g) Minor like -for -like drywall repairs not involving fire -rated assemblies.
Page 3 of 9
Packet Pg. 353
Attachment B
(h) Replacement or repair of individual decking, joists, stair treads, or intermediate rails. ECDC
Title 23 provisions do not apply.
(i) Uncovered platforms, decks, patios, not exceeding 200 square feet in area, that are not more
than thirty (30) inches above grade at any point and do not serve the exit door required by IRC
Section R311.4.
0) Canopies, as defined in ECDC 17.70.035, accessory to a single family dwelling, with a floor
area measured to the exterior wall or post not to exceed 200 square feet, for covered storage,
carport or similar use.
(k) Reroof overlays, except that all existing layers of roofing must first be removed if the
existing material is wood shake, slate, clay, cement or asbestos tile, or where the existing roof
has two or more applications of any type of roofing.
F. Section 105.3.2, Time limitation of permit application, is amended to read:
1. Applications, for which no permit is issued within 180 days following the date of application,
shall expire by limitation, and plans and other data submitted for review may thereafter be
returned to the applicant or destroyed by the building official.
2. The building official may extend the time for action by the applicant for a period not
exceeding 180 days prior to such expiration date.
3. No application shall be extended more than once for a total application life of 360 days r
except as allowed within this section. In order to renew action on an expired application, the V
applicant shall submit a new application, revised plans based on any applicable code or
ordinance change, and pay new plan review fees.
4. The Building Official may extend the life of an application if any of the following conditions
exist: 0
(a) Compliance with the State Environmental Policy Act is in progress; or
(b) Any other City review is in progress; provided, the applicant has submitted a complete
response to City requests or the Building Official determines that unique or unusual
circumstances exist that warrant additional time for such response and the Building Official
determines that the review is proceeding in a timely manner toward final City decision; or
(c) Litigation against the City or applicant is in progress, the outcome of which may affect the
validity or the provisions of any permit issued pursuant to such application.
G. Section 105.3.3, Fully complete application, is added and reads:
In accordance with the provisions of RCW 19.27.031 and 19.27.074, an applicant's rights shall
vest when a fully complete building permit application is filed. A fully complete building
permit application is an application executed by the owners of the property for which the
application is submitted or the duly authorized agent(s) for such owners, containing each and
every document required under the terms of these ordinances and the IBC and is substantially
complete in all respects. It is anticipated that minor changes or revisions may be required and
are frequently made in the course of any building application review process, and such minor
revisions or changes shall not keep an application from being deemed complete if a good faith
attempt has been made to submit a substantially complete application containing all required
components. Where required, the application and supporting documents shall be stamped
and/or certified by the appropriate engineering, surveying or other professional consultants. A
fully complete building permit application shall be accompanied by all required intake fees,
including but not limited to plan review fees required under the provisions of this chapter and
code.
Page 4 of 9
Packet Pg. 354
6.1.a
Attachment B
H. Section 105.3.4, Concurrent review, is added and reads:
An applicant may submit an application for building permit approval and request plan review
services concurrently with, or at any time following, the submittal of a complete application for
any necessary or required discretionary permit approval or discretionary hearing; provided, that
any building permit application submitted concurrently with an application for discretionary
permit or approvals shall not be considered complete unless the applicant submits a signed
statement, on a form approved by the director, which acknowledges that the building permit
application is subject to any conditions or requirements imposed pursuant to the review and
approval of any necessary or required discretionary permit or approvals. The applicant shall
solely bear the risk of building permit submittal with discretionary permit approval. If, after
discretionary approval, the building permit plans are modified or amended to comply with
conditions or restrictions required by any discretionary permit or approval, the applicant shall
be solely responsible for any and all costs which result therefrom, including but not limited to
additional full plan review fees; provided further, that any applicant -initiated changes made
after the original plan review is complete shall also require payment of full plan review fees.
I. Section 105.5, Permit expiration and extension, is amended to read:
1. Every permit issued under ECDC Title 19 shall expire by limitation 360 days after issuance, O
except as provided in ECDC 19.00.025I(2). M
m
L
2. The following permits shall expire by limitation, 180 days after issuance and may not be Q
extended, unless they are associated with a primary building permit for a larger construction
project, in which case they may run with the life of the primary permit: L
U
Demolition permits;
o�
Permits for Moving Buildings required by Chapter 19.60 ECDC;
m
Mechanical permits; 0
c
M
Tank removal, tank fill, or tank placement permits; E
L
Grading, excavation and fill permits;
M
L
Water service line permits;
T
Plumbing permits;
Gas piping permits;
Deck and dock permits;
Fence permits;
Re -roof permits;
Retaining wall permits;
Swimming pool, hot tub and spa permits;
Sign permits;
Shoring permits;
Foundation permits.
Page 5 of 9
Packet Pg. 355
6.1.a
Attachment B
3. Prior to expiration of an active permit the applicant may request in writing an extension for
an additional year. Provided there has been at least one (1) required progress inspection
conducted by the city building inspector prior to the extension, the permit shall be extended.
Permit fees shall be charged at a rate of one quarter the original building permit fee to extend
the permit.
4. If the applicant cannot complete work issued under an extended permit within a total period
of two (2) years, the applicant may request in writing, prior to the second year expiration, an
extension for a third and final year. Provided there has been at least one (1) required progress
inspection conducted by the city building inspector prior to the extension, the permit shall be
extended. Permit fees shall be charged at a rate of one quarter the original building permit fee to
extend the permit.
5. The maximum amount of time any building permit may be extended shall be a total of three
(3) years. At the end of any three (3) year period starting from the original date of permit
issuance, the permit shall become null and void and a new building permit shall be required,
with full permit fees, in order for the applicant to complete work. The voiding of the prior
permit shall negate all previous vesting of zoning or Building codes. Whenever an appeal is
filed and a necessary development approval is stayed in accordance with ECDC 20.07.004 the
time limit periods imposed under this section shall also be stayed until final decision.
6. The building official may reject requests for permit extension where he determines that
Q
modifications or amendments to the applicable zoning and Building codes have occurred since
the original issuance of the permit and/or modifications or amendments would significantly
promote public health and safety if applied to the project through the issuance of a new permit.
L
U
J. Repealed by Ord. 3926.
o�
K. Section 107.3.3, Phased approval, is amended to read:
v
1. The building official may issue partial permits for phased construction as part of a
m
development before the entire plans and specifications for the whole building or structure have
c
been approved provided architectural design board approval has been granted and a fully
=a
complete permit application for the entire building or structure has been submitted for review.
O
2. Phased approval means permits for grading, shoring, and foundation may be issued
separately, provided concurrent approval is granted by the planning manager, city engineer and
fire marshal, when applicable. No phased approval permit shall be issued unless approved civil
plans detailing the construction of all site improvements including, but not limited to: curbs,
gutters, sidewalks, paved streets, water lines, sewer lines, and storm drainage have been signed
as approved by the city engineer.
3. With such phased approval, a performance bond shall be posted with the city pursuant to
Chapter 17.10 ECDC, to cover the estimated cost of construction to city standards for the
improvements.
L. Section 108, Temporary Structures and Uses, is deleted.
M. Section 110.3.3, Lowest floor elevation, is amended to read:
In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to
further vertical construction, the elevation certification required in Section 1612.5 shall be
submitted to the building official. Prior to final inspection approval, the building official shall
require an elevation certificate based on finished construction prepared and sealed by a State
licensed land surveyor.
N. Section 113, Board of Appeals, is deleted and replaced by Chapter 19.80 ECDC.
Page 6 of 9
Packet Pg. 356
6.1.a
Attachment B
O. Section 501.2, Address Identification, is amended to read:
Approved numbers or addresses shall be installed by the property owner for new and existing
buildings in such a position as to be clearly visible and legible from the street or roadway
fronting the property. Letters or numbers on the building shall be a minimum six (6) inches in
height and stroke a minimum of .75 inch of a contrasting color to the building base color. Where
public or private access is provided and the building address cannot be viewed from the public
way, a monument, pole or other approved sign or means shall be used to identify the structure.
This means of premises identification does not preclude approved identification also affixed to
structure.
P. Section 1612.1.1, Residential Structures, is added and reads:
Construction or reconstruction of residential structures is prohibited within designated
floodways, except for (i) repairs, reconstruction, or improvements to a structure which do not
increase the ground floor area; and (ii) repairs, reconstruction or improvements to a structure,
the cost of which does not exceed 50 percent of the market value of the structure either, (A)
before the repair, or reconstruction is started, or (B) if the structure has been damaged, and is
being restored, before the damage occurred. Any project for improvement of a structure to
correct existing violations of State or local health, sanitary, or safety code specifications which
have been identified by the local code enforcement official and which are the minimum
necessary to assure safe living conditions, or to structures identified as historic places, may be
excluded from the 50 percent calculation.
Q. IBC section 1612.4.1, Lowest Flood Elevation, is added and reads:
For buildings in all structure cateeories located in the Coastal Hieh Hazard Areas and Coastal A Flood Zones. the
elevation of the lowest floor shall be a minimum of two feet above the base flood elevation, as determined from w
the applicable FEMA flood hazard map_
QR. Section 3103, Temporary Structures, is deleted.
RS. Section 3108.1.1, Radio, television and cellular communication related equipment and devices, is added and
reads:
A permit shall be required for the installation or relocation of commercial radio, television or
cellular tower support structures including monopoles, whip antennas, panel antennas,
parabolic antennas and related accessory equipment, and accessory equipment shelters
(regardless of size) including roof mounted equipment shelters.
8T. Section 3109.1, Applicability and maintenance, is amended to read:
1. Swimming pools, hot tubs and spas of all occupancies shall comply with the requirements of
this section and other applicable sections of this code.
2. It is the responsibility of the owner to maintain a swimming pool, hot tub or spa in a clean and
sanitary condition and all equipment shall be maintained in a satisfactory operating condition
when the swimming pool, hot tub or spa is in use. A swimming pool, hot tub or spa that is
neglected, not secured from public entry and/or not maintained in a clean and sanitary condition
or its equipment in accord with manufacturers recommendations shall be determined to be a
hazard to health and safety and shall be properly mitigated to the satisfaction of the building
official.
-TU. Section 3109.3, Public Swimming Pools, is deleted.
UV. Section 3109.4, Residential Swimming Pools, is deleted.
VW. Section 3109.6, Location and Setbacks, is added and reads:
Page 7 of 9
Packet Pg. 357
Attachment B
6.1.a
Swimming pools, hot tubs and spas shall meet requirements of the zoning code of the city of
Edmonds.
1. Minimum setbacks are measured from property lines to the inside face of the pool, hot tub or
spa as required by the zoning code for accessory structures.
2. All other accessory buildings and equipment shall meet the normally required setbacks for
accessory structures in the zone in which they are located.
WX. Section 3109.7, Tests and cross -connection devices, is added and reads:
1. All swimming pool, hot tub and spa piping shall be inspected and approved before being
covered or concealed.
2. Washington State Department of Health approved cross connection devices are required to
be provided on potable water systems when used to fill any swimming pool, hot tub or spa.
XY. Section 3109.8, Wastewater disposal, is added and reads:
A means of disposal of the total contents of the swimming pool, hot tub or spa (including partial
or periodic emptying) shall be reviewed and approved by the public works director.
1. No direct connection shall be made between any swimming pool, hot tub or spa to any storm
drain, city sewer main, drainage system, seepage pit, underground leaching pit, or sub -soil
drain.
2. A sanitary tee (outside cleanout installed on the main building side sewer line) shall be
provided for draining of treated water into the city sanitary sewer system.
YZ. Section 3109.9, Inspection requirements, is added and reads:
The appropriate city inspector shall be notified for the following applicable inspections:
1. Footing, wall, pre -form, pre-gunite, erosion control, underground plumbing, sanitary
extension and cleanout, mechanical pool equipment, gas piping, mechanical enclosure location,
cross connection and final inspection.
2. An initial cross connection control installation inspection is required by the city cross
connection control specialist prior to final installation approval.
3. All backflow assemblies shall be tested by state certified backflow assembly testers upon
initial installation and then annually thereafter. Copies of all test reports shall be submitted to
the city water division for review and approval.
ZAA. Section 3403.2.1, Residential Structures, is added and reads:
Construction or reconstruction of residential structures is prohibited within designated
floodways, except for (i) repairs, reconstruction, or improvements to a structure which do not
increase the ground floor areas; and (ii) repairs, reconstruction or improvements to a structure,
the cost of which does not exceed 50 percent of the market value of the structure either, (A)
before the repair, or reconstruction is started, or (B) if the structure has been damaged, and is
being restored, before the damage occurred. Any project for improvement of a structure to
correct existing violations of State or local health, sanitary, or safety code specifications which
have been identified by the local code enforcement official and which are the minimum
necessary to assure safe living conditions, or to structures identified as historic places, may be
excluded in the 50 percent.
AABB. Appendix E, Accessibility Requirements, is amended by deleting Sections E107, E108, El 10 and El 11.
Page 8 of 9
Packet Pg. 358
6.1.a
Attachment B
13HCC. Appendix G, Flood -Resistant Construction, is amended by addition of new section:
Section G301.1(4) Where base flood elevation data has not been provided or is not available
from another authoritative source, it shall be generated for subdivision proposals and other
proposed developments which contain at least 50 lots or 5 acres, whichever is less.
CODD. Appendix H, Signs, is amended as follows:
1. Section H101.2, Signs exempt from permits, is replaced by subsection (E)(1)(p) of this section.
2. Section H101.2.1, Prohibited signs, is added and reads as follows:
a. It is unlawful for any person to advertise or display any visually communicated message, by
letter or pictorially, of any kind on any seating bench, or in direct connection with any bench.
d
M
b. All signs not expressly permitted by Chapter 20.60 ECDC.
c. Signs which the city engineer determines to be a hazard to vehicle or pedestrian traffic
m
because they resemble or obscure a traffic control device, or pose a hazard to a pedestrian
c
walkway or because they obscure visibility needed for safe traffic passage. Such signs shall be
'a
immediately removed at the request of the city engineer.
O
d. All signs which are located within a public right-of-way and that have been improperly
M
m
Q
posted or displayed are hereby declared to be a public nuisance and shall be subject to
immediate removal and confiscation per ECDC 20.60.090.
r
3. Sections H104, Identification, H106.1.1, Internally illuminated signs, H107, Combustible materials, H108,
L
V
Animated devices, H109.1, Height restrictions, and H110, Roof signs, are deleted. [Ord. 3926 § 1 (Exh. A), 2013;
Ord. 3845 § 6, 2011; Ord. 3796 § 1, 2010].
Page 9 of 9
Packet Pg. 359
6.1.b
This table summarizes all of the actions on the proposed Council amendments. The first column lists the proposed amendments. The second column list the date of the Council
action and the action taken on the proposed amendment. The third column lists where the amendment is located in the draft ordinance included in Exhibit 1 as well as any
clarifying notes on changes made by staff in order to incorporate the Council amendments into the code. Finally at the end of the table, staff summarizes some cleanup items
undertaken to prepare the code for Council adoption.
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
1. ECDC 23.40.220.C.4 Physically Separated/Functionally Isolated Buffers - Two
potential Council amendments were proposed. Amendment LA was language that
would replace the draft language. Amendment 1.13 (which is also included in
Amendment LA) relates to renaming the provision.
A. Replace draft language with:
April 5, 2016 Council Meeting
Ordinance Attachment A, Pg. 25.
Development Proposals within Physically Separated and Potentially Isolated
Council voted to replace the draft
Staff made minor revisions to the Council
Stream or Wetland Buffers. Adjacent areas that maybe physically separated and
physically separated/functionally
proposed language due to renaming the
potentially functionally isolated from a stream or wetland due to existing, legally
isolated language with the Council
provision to interrupted buffer.
established structures or paved areas may be exempted from the prescribed
proposed language minus the language
buffer widths if proven scientifically to be functionally isolated from the stream
regarding Council review given the
or wetland. The Director will require the applicant to provide a site assessment
decision on Amendment 2.
and functional analysis documentation report by a qualified Critical Area
Consultant that demonstrates the separated buffer area is functionally
isolated. The Director shall consider the hydrologic, geologic, and/or biological
habitat connection potential and the extent and permanence of the physical
separation. If the Director determines, based on the report and other available
information, that the physically separated stream or wetland buffer area may be
functionally isolated, the Director will provide the background information and a
recommendation to the Council that an exemption be approved.
B. Rename provision to physically separated/potentially isolated or "interrupted
March 15, 2016 Council Meeting
Ordinance Attachment A, Pg. 25.
buffer."
Council voted to rename provision
"interrupted buffer."
Page 1 of 10
Packet Pg. 360
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
2. Council Review/Critical Area Decision Process — Three potential amendments were
considered for Council review of critical area decisions.
A. Include the City Council in the decision making process for certain critical area
April 5, 2016 Council Meeting
decisions such as physically separated/functionally isolated buffers, restoration
projects, and exemptions.
Council voted to adopt the new
contingent critical area review process
discussed in Amendment 2.0 below.
B. Consider adding a decision matrix or some threshold for which projects would
April 5, 2016 Council Meeting
include the City Council in the decision making process.
Council voted to adopt the new
contingent critical area review process
discussed in Amendment 2.0 below.
Page 2 of 10
a�
as
M
E
E
c
0
Q
c
m
E
c
m
E
a
0
U
N
t
K
W
r-�
C
N
E
t
c�
R
r
Q
Packet Pg. 361
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
C. Consider amending the decision process for certain types of critical area decision
April 5, 2016 Council Meeting
Ordinance Attachment A, pgs. 20 — 21. New
(i.e. Type I, Type II, Type III or other new process type).
section ECDC 23.40.195.
The City Attorney drafted a new
critical area contingent review process
There are related amendments to ECDC
where certain proposals would start at
20.01.003 Permit type and decision framework
as a Type II decision with notice
(Ordinance Section 4) and ECDC 20.03.002
(including Council notice) with an
Notice of Application (Ordinance Section 5).
opportunity for interested parties to
request a public hearing, thus bumping
up the project review to a Type III
decision.
The Council voted to have this new
contingent review process apply to
restoration projects (the new ECDC
23.40.215 in Amendment 9 below)
that involve anadromous fish streams,
Category I and II wetlands, and
Category I and II estuarine wetlands.
3. ECDC 23.40.220.C.7.b.iv — Hazard Tree Replacement
March 15, 2016 Council Meeting
Ordinance Attachment A, pg. 27.
The proposed Council amendment is to change the required diameter of deciduous
Council voted to make the change as
replacement trees from one inch dbh to one to two inches dbh.
proposed.
4. Definitions - Four separate amendments related to the critical area definitions were
proposed. Amendment 4.A relates to the "normal maintenance of vegetation";
Amendments 4.13 and 4.0 would be new definitions; and Amendment 4.D would
change where the definitions are located within the critical area regulations.
Page 3 of 10
Q
Packet Pg. 362
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
A. ECDC 23.40.320 — Normal Maintenance of Vegetation Definition
March 15, 2016 Council Meeting
Ordinance Attachment A, pg. 8.
"Normal maintenance of vegetation" means removal of shrubs/non-woody
Council voted to make the change as
vegetation and trees (less than 4-inch diameter at breast height) that occurs at
proposed.
least every other year. Maintenance also may include tree topping that has been
previously approved by the City in the past 5 years.
B. Add definition for "Council" to reflect "Edmonds City Council."
April 5, 2016 Council Meeting
Ordinance Attachment A, pg. 5.
Council voted to add a reference to
ECDC 21.15.030 which contains a
definition for "City Council" and
"Council."
C. Add definition for Best Available Science.
March 15, 2016 Council Meeting
Ordinance Attachment A, pg. 4.
Council voted to add a reference to
ECDC 23.40.310 which is the code
section that describes "Best Available
Science."
D. Move definitions from Part VI to ECDC 23.40.010 after Purpose section.
March 15, 2016 Council Meeting
Ordinance Attachment A, pgs. 4 — 9.
Council voted to move the definitions
The definitions were moved to following the
after the Purpose section as proposed.
Purpose section in a new section ECDC
23.40.005. Creating the new ECDC 23.40.005
eliminated the need to renumber the rest of
ECDC 23.40 which would have been required
if the definitions replaced ECDC 23.40.010.
Page 4 of 10
Q
Packet Pg. 363
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
5. ECDC 23.90.040.0 — Retention of Vegetation on Subdividable and Undeveloped
Parcels. The Councilmembers offered up three potential amendments to ECDC
23.90.040.0 as follows:
A. Include RS-8 and RS-10 in addition to RS-12 and RS-20 zones to where this
April 19, 2016 Council Meeting
provision would apply.
Council did not make this proposed
amendment.
B. Consider requiring a different percentage of coverage for the RS-8 and RS-10,
April 19, 2016 Council Meeting
such as 20% percent as opposed to the 30% requirement for RS-12 and RS-20
zones.
Council did not make this proposed
amendment.
C. Change "...native trees over 10 inches in dbh make up more than 70 percent of
April 19, 2016 Council Meeting
Ordinance Attachment A, pg. 92.
the canopy cover" to "...native trees over 6 inches in dbh make up more than 40
percent of the canopy cover."
Council voted to make the amendment
as proposed.
6. Frequently Flood Area Amendments in ECDC 19.00.025 and ECDC 21.40.030
April 19, 2016 Council Meeting
Ordinance Attachment B, pg. 7.
This proposed amendment was to not include the amendments related to frequently
Council voted to make the
The related amendment to the definition of
flooded areas contained in in ECDC 19.00.025 and 21.40.030. The comment behind
amendments as recommended by the
height in ECDC 21.40.030 is in Section 3 of
this is that the proposed amendments for 19.00.025 and 21.40.030 are not technically
planning board.
the Ordinance.
part of the Critical Areas Ordinance. Additionally, it was noted the proposed
changes are in anticipation of FEMA flood hazard maps which have not been issued
by the Federal government.
Page 5 of 10
a�
T
r
as
M
E
E
c
Q
c
as
E
c
as
E
a
c
0
0
N
Z
t
K
W
r-�
C
N
E
t
c�
R
r
Q
Packet Pg. 364
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
7. Council Status Reports
April 5, 2016 Council Meeting
Ordinance Attachment A, pg. 11.
The following language was proposed for requiring regular status reports on critical
Staff proposed some alternate
The Council report requirement was inserted
area regulations implementation.
language for Council reports, which
into new section ECDC 23.40.055 City
the Council adopted with removing
Council Reports.
The Director shall prepare regular status reports on current critical area permits to
the language regarding "example
assist with the monitoring of the objective to protecting and enhance critical areas as
projects."
described in ECDC 23.40.060. The reports shall be presented biannually to the
Council and will be derived from data collected from individual critical area reports
and monitoring required in this title. The report will include data from ECDC
23.40.100 Critical Area Requirements, ECDC 23.40.140 Mitigation Plans, ECDC
23.50.030 Wetland Reporting Requirements, and ECDC 23.90.020 Fish and
Wildlife Habitat Conservation Reporting Requirements, as well as any other
provisions deemed necessary by the Council for the status reports.
Each biannual status report shall include the following for the period reported: how
much mitigation was required, types of mitigation granted, how many buffer
reductions were granted, how many projects included buffer increases, how many
required off -site mitigation, anticipated mitigation success in replacing wetland
acreage and function, how many buffer averaging with buffer enhancements were
granted, how many buffer reductions with buffer enhancements were granted, the
types of enhancements, anticipated increased buffer functioning from enhancements
in terms of stream and fish habitat protection where appropriate, number of
developments within footprint of existing development, number of in -Lieu Fee
programs that were granted, number of credits used, number of variances issued,
number of any exemptions granted, number of violations that occurred, and how
much non -compensatory restoration is being done.
Page 6 of 10
Q
Packet Pg. 365
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
8. Appendices - Two amendments were proposed regarding adopting critical area maps
and an inventory of all critical areas within the City of Edmonds as new appendices
in the critical area regulations.
A. Make new Appendix A formally adopting critical areas maps.
April 12, 2016 Council Meeting
The City critical area information has been
made publicly available on the City's web
Instead of formally adopting critical
mapping program located at
area maps and a critical area inventory
maps.edmondswa.gov.
(proposed Amendment 8.13), Council
voted to make the City's critical area
information available on the City web
mapping program.
B. Make new Appendix B with an inventory of all critical areas within the City of
April 12, 2016 Council Meeting
Edmonds including buffer widths.
See note on amendment 8.A above.
Page 7 of 10
a�
as
M
E
E
c
0
Q
c
m
E
c
m
E
a
0
U
N
t
K
W
r-�
C
N
E
t
c�
R
r
Q
Packet Pg. 366
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
9. ECDC 23.40.215 — Restoration Projects — The proposed amendment was to replace
April 5, 2016 Council Meeting
Ordinance Attachment A, pg. 23.
the draft language in ECDC 23.40.215 with the following:
Council voted to adopted the Council
Given the contingent review process in
A. Restoration of historic ecological functions of critical areas under this title is
proposed language with minor
Amendment 2, there could be two possible
encouraged. When a critical area restoration project is proposed that is not
amendments including removing the
decision makers for a restoration project, the
required as mitigation for a development proposal, the Director may recommend
first sentence in subsection A
Director or Hearing Examiner. As such, the
relief from standard critical area buffer requirements if the restoration project
regarding "historic ecological
"Director or Hearing Examiner (as
involves:
functions", changing the "are
applicable)" was inserted into the code where
1. The daylighting of a stream or tidal channel, or
preserved" in subsection B to "will be
it previously just referenced the director.
2. Expansion of a wetland that would cause a landward expansion of the
enhanced", and removing the Council
wetland buffer.
review in subsection D given the
critical area contingent review process
B. The restoration project proposal will include a proposed buffer width for the
discussed in Amendment 2 above.
project that is developed from an assessment by a qualified Critical Area
Consultant on the buffer width necessary to ensure that the restoration project is
successful and the ecological functions of the areas adjacent to the stream or
wetland are preserved.
C. The Director will consider the proposed buffer width along with hydrologic,
geologic, and other habitat data for the site to determine if the project warrants a
buffer width that deviates from the standard critical area buffer widths.
D. If the Director determines that a reduced buffer width may be appropriate for the
proposed restoration project, the Director will recommend to the Council that
Appendix B of this title be amended to allow the reduced buffer width for the
proposed restoration site.
Page 8of10
as
T
r
as
0
0
E
E
c
0
Q
c
as
E
c
as
E
a
c
0
0
c�
N
t
K
W
r-�
C
N
E
t
U
R
r
Q
Packet Pg. 367
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
10. ECDC 23.40.040.0 — Areas subject to the provision of the CAO
April 12, 2016 Council Meeting
The proposed amendment was to replace this section to refer to new appendices
With the decision to make the critical
discussed in proposed Amendment 8 above if they are adopted.
area information available on the
City's web mapping program in
Amendment 8, this proposed
amendment was no longer applicable.
11. ECDC 23.40.040.D — Areas Adjacent to Critical Areas
March 15, 2016 Council Meeting
Ordinance Attachment A, pg. 11.
The proposed amendment was keep only first sentence and delete the remainder of
Council voted to make the amendment
the section, so ECDC 23.40.040.D would read as follows:
as proposed.
Areas Adjacent to Critical Areas Subject to Regulation. Areas adjacent to critical
areas shall be considered to be within the jurisdiction of these requirements and
regulations to support the intent of this title and ensure protection of the functions
and values of critical areas.
12. ECDC 23.40.090.D — Minimum Report Contents
April 5, 2016 Council Meeting
Ordinance Attachment A, pg. 14.
The proposed amendment was add a new subsection to ECDC 23.40.090.D requiring
Council voted to make the
A new subsection ECDC 23.40.090.D.2.c was
critical area reports to identify the location of all native and non-native vegetation of
amendment.
added to incorporate the Council amendment.
6 inch dbh or larger.
CLEAN UP ITEM — Buffer Reduction Language
Ordinance Attachment A, pg. 51.
The buffer reduction language in ECDC 23.50.040.G.4 (Wetlands) and ECDC
23.90.040.D.2 (Streams) were not consistent. The wetland section noted a buffer could
not be reduced less than 75% of the standard buffer, and the stream section noted a
buffer could be reduced by no more than 25%. The code in the wetland section was
changed to match the code in the stream section.
Page 9of10
as
0
0
E
E
c
0
Q
c
as
E
c
as
E
a
c
0
0
U
N
x
w
c
d
E
U
0
Q
Packet Pg. 368
6.1.b
Proposed Council Amendment
Council Action
Location in Ordinance and Revision Notes
CLEAN UP ITEM — ECDC 23.50.040.G.2
Ordinance Attachment A, pg. 51.
One of the changes with the CAO update is that buffer averaging is preferred over
buffer reduction. There was an error in language of ECDC 23.50.040.G.2, which said
that "wetland buffer averaging with enhancement shall be preferred over wetland buffer
averaging with enhancement." This was corrected to say the "buffer averaging with
enhancement shall be preferred over wetland buffer reduction with enhancement."
CLEAN UP ITEM — Spelling and typos
Throughout Ordinance Attachment A.
Various spelling and typos throughout ECDC 23.40 — 23.90 where correct.
Page 10 of 10
as
M
E
E
c
0
Q
c
m
E
c
m
E
a
0
c�
N
t
K
W
r-�
C
N
E
t
c�
R
r
Q
Packet Pg. 369
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
6.1.c
EDMONDS CITY CODE AND COMMUNITY DEVELOPMENT CODE
Chapter 23.40
ENVIRONMENTALLY CRITICAL AREAS GENERAL PROVISIONS
Sections:
Part I. Purpose and General Provisions
23.40.000 Purpose.
23.40.005 Definitions pertaining to critical areas.
23.40.010 Authority.
23.40.020 Relationship to other regulations.
23.40.030 Severability.
23.40.040 Jurisdiction — Critical areas.
23.40.050 Protection of critical areas.
23.40.055 City Council Reports
Part II. Critical Areas Review Process
23.40.060 General requirements.
23.40.070 Critical areas preapplication consultation.
23.40.080 Notice of initial determination.
23.40.090 Critical areas report — Requirements.
23.40.100 Critical areas report— Modifications to requirements.
23.40.110 Mitigation requirements.
23.40.120 Mitigation sequencing.
23.40.130 Mitigation plan requirements.
23.40.140 Innovative mitigation.
23.40.150 Critical areas decision.
Page 1 of 87
Packet Pg. 370
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
6.1.c
23.40.160 Review criteria.
23.40.170 Favorable critical areas decision.
23.40.180 Unfavorable critical areas decision.
23.40.190 Completion of the critical areas review.
23.40.195 Contingent review procedure for certain types of development
23.40.200 Appeals.
23.40.210 Variances.
23.40.215 Critical Area Restoration Projects
Part III. Allowed Activities, Exemptions and Noncompliance Penalties
23.40.220 Allowed activities.
23.40.230 Exemptions.
23.40.240 Unauthorized critical areas alterations and enforcement.
Part IV. General Critical Areas Protective Measures
23.40.250 Critical areas markers and signs.
23.40.270 Critical areas tracts.
23.40.280 Building setbacks.
23.40.290 Bonds to ensure mitigation, maintenance, and monitoring.
23.40.300 Critical areas inspections.
Part V. Incorporation of Best Available Science
23.40.310 Best available science.
Part I. Purpose and General Provisions
23.40.000 Purpose.
Page 2 of 87
Packet Pg. 371
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
A. The purpose of this title is to designate and classify ecologically sensitive and hazardous areas and to
protect these areas and their functions and values, while also allowing for reasonable use of private
property.
B. This title is to implement the goals, policies, guidelines, and requirements of the comprehensive plan
and the Washington State Growth Management Act.
C. The city of Edmonds finds that critical areas provide a variety of valuable and beneficial biological
and physical functions that benefit Edmonds and its residents, and/or may pose a threat to human safety
or to public and private property. The beneficial functions and values provided by critical areas include,
but are not limited to, water quality protection and enhancement, fish and wildlife habitat, food chain
support, flood storage, conveyance and attenuation of flood waters, ground water recharge and
discharge, erosion control, wave attenuation, protection from hazards, historical, archaeological, and
aesthetic value protection, and recreation. These beneficial functions are not listed in order of priority.
D. Goals. By limiting development and alteration of critical areas, this title seeks to:
1. Protect members of the public and public resources and facilities from injury, loss of life, or property
damage due to landslides and steep slope failures, erosion, seismic events, or flooding;
2. Maintain healthy, functioning ecosystems through the protection of unique, fragile, and valuable
elements of the environment, including ground and surface waters, wetlands, and fish and wildlife and
their habitats, and to conserve the biodiversity of plant and animal species;
3. Direct activities not dependent on critical areas resources to less ecologically sensitive sites and
mitigate unavoidable impacts to critical areas by regulating alterations in and adjacent to critical areas;
and
4. Prevent cumulative adverse environmental impacts to water quality, wetlands, and fish and wildlife
habitat, and the overall net loss of wetlands, frequently flooded areas, and fish and wildlife habitat
conservation areas.
E. The regulations of this title are intended to protect critical areas in accordance with the Growth
Management Act and through the application of the best available science, as determined according to
WAC 365-195-900 through 365-195-925 and RCW 36.70A.172, and in consultation with state and
federal agencies and other qualified professionals.
F. This title is to be administered with flexibility and attention to site -specific characteristics. It is not the
intent of this title to make a parcel of property unusable by denying its owner reasonable economic use
of the property nor to prevent the provision of public facilities and services necessary to support existing
development.
G. The city of Edmonds' enactment or enforcement of this title shall not be construed to benefit any
individual person or group of persons other than the general public. [Ord. 3527 § 2, 2004].
23.40.005 Definitions pertaining to critical areas.0 SHARE
Page 3 of 87
Packet Pg. 372
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
For the purposes of this chapter and the chapters on the five specific critical area types (Chapters 23.50,
23.60, 23.70, 23.80 and 23.90 ECDC) the following definitions shall apply:
"Adjacent" means those activities located on -site immediately adjoining a critical area; or distance
equal to or less than two hundred and twenty five (225) feet of a development proposal or subject
parcel.
"Alteration" means any human -induced action which changes the existing condition of a critical area or
its buffer. Alterations include, but are not limited to: grading; filling; dredging; draining; channelizing;
cutting, pruning, limbing or topping, clearing, relocating or removing vegetation; applying herbicides or
pesticides or any hazardous or toxic substance; discharging pollutants; paving, construction, application
of gravel; modifying for surface water management purposes; or any other human activity that changes
the existing landforms, vegetation, hydrology, wildlife or wildlife habitat value of critical areas.
"Best Available Science." See ECDC 23.40.310
"Best management practices" means a system of practices and management measures that:
1. Control soil loss and reduce water quality degradation caused by nutrients, animal waste, and toxics;
2. Control the movement of sediment and erosion caused by land alteration activities;
3. Minimize adverse impacts to surface and ground water quality, flow, and circulation patterns; and
4. Minimize adverse impacts to the chemical, physical, and biological characteristics of critical areas
"Buffer" means the designated area immediately next to and a part of a steep slope or landslide hazard
area and which protects slope stability, attenuation of surface water flows and landslide hazards
reasonably necessary to minimize risks to persons or property; or a designated area immediately next to
and part of a stream or wetland that is an integral part of the stream or wetland ecosystem.
"Chapter" means those sections of this title sharing the same third and fourth digits.
"City" means the city of Edmonds.
"Class" or "wetland class" means descriptive categories of wetland vegetation communities within the
wetlands taxonomic classification system of the U.S. Fish and Wildlife Service (Cowardin, et al., 1979).
"Clearing" means the act of cutting and/or removing vegetation. This definition shall include grubbing
vegetation and the use or application of herbicide.
"Compensation project" means an action(s) specifically designed to replace project -induced critical area
or buffer losses. Compensation project design elements may include, but are not limited to: land
acquisition procedures and detailed plans including functional value assessments, detailed landscaping
designs, construction drawings, and monitoring and contingency plans.
Page 4 of 87
Packet Pg. 373
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
"Compensatory mitigation" means replacing project -induced losses or impacts to a critical area, and
includes, but is not limited to, the following:
1. "Creation" means actions performed to intentionally establish a wetland at a site where it did not
formerly exist.
2. "Re-establishment" means actions performed to restore processes and functions to an area that was
formerly a critical area, where the former critical area was lost by past alterations and activities.
3. "Rehabilitation" means improving or repairing processes and functions to an area that is an existing
critical area that is highly degraded because one or more environmental processes supporting the critical
area have been disrupted.
4. "Enhancement" means actions performed to improve the condition of existing degraded wetlands so
that the functions they provide are of a higher quality.
5. "Preservation" means actions taken to ensure the permanent protection of existing high -quality
wetlands.
"City Council" or "Council." See ECDC 21.15.030.
"Creation" means a compensation project performed to intentionally establish a wetland or stream at a
site where one did not formerly exist.
"Critical areas" for the city of Edmonds means wetlands, critical aquifer recharge areas, frequently
flooded areas, geologically hazardous areas, and fish and wildlife habitat conservation areas as defined
in Chapters 23.50, 23.60, 23.70, 23.80 and 23.90 ECDC, respectively.
"Development proposal" means any activity relating to the use and/or development of land requiring a
permit or approval from the city, including, but not limited to: commercial or residential building
permit; binding site plan; conditional use permit; franchise; right-of-way permit; grading and clearing
permit; mixed use approval; planned residential development; shoreline conditional use permit;
shoreline substantial development permit; shoreline variance; short subdivision; special use permit;
subdivision; flood hazard permit; unclassified use permit; utility and other use permit; variance; rezone;
or any required permit or approval not expressly exempted by this title.
"Director" means the city of Edmonds development services director or his/her designee.
"Division" means the planning division of the city of Edmonds development services department.
"Enhancement" means an action taken to improve the condition and function of a critical area. In the
case of wetland or stream, the term includes a compensation project performed to improve the
conditions of an existing degraded wetland or stream to increase its functional value.
"Erosion" means the process in which soil particles are mobilized and transported by natural agents such
as wind, rain, frost action, or stream flow.
Page 5 of 87
Packet Pg. 374
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Erosion Hazard Areas. See ECDC 23.80.020(A).
Fish and Wildlife Habitat Conservation Areas. See Chapter 23.90 ECDC.
"Floodplain" means the total area subject to inundation by a "100-year flood." "100-year flood" means a
flood having a one percent chance of being equaled or exceeded in any given year.
"Footprint of Existing Development" or "Footprint of Development" means the area of a asite that
contains legally established: buildings; roads, driveways, parking lots, storage areas, walkways or other
areas paved with concrete, asphalt or compacted gravel; outdoor swimming pools; patios.
"Frequently Flooded Areas." See Chapter 23.70 ECDC.
"Functions" means the roles served by critical areas including, but not limited to: water quality
protection and enhancement; fish and wildlife habitat; food chain support; flood storage, conveyance
and attenuation; ground water recharge and discharge; erosion control; wave attenuation; aesthetic value
protection; and recreation. These roles are not listed in order of priority.
"Geologically Hazardous Areas." See Chapter 23.80 ECDC.
"Geologist" means a person licensed as a geologist, engineering geologist, or hydrologist in the state of
Washington. For geologically hazardous areas, an applicant may choose a geologist or engineering
geologist licensed in the State of Washington to assess the potential hazard.
"Geotechnical engineer" means a practicing geotechnical/civil engineer licensed as a professional civil
engineer in the state of Washington who has at least five years of professional employment as a
geotechnical engineer in responsible charge including experience with landslide evaluation.
"Grading" means any one or a combination of excavating, filling, or disturbance of that portion of the
soil profile which contains decaying organic matter.
"Habitats of local importance" means areas that include a seasonal range or habitat element with which a
given species has a primary association, and which, if altered may reduce the likelihood that the species
will maintain and reproduce over the long-term. These might include areas of high relative density or
species richness, breeding habitat, winter range, and movement corridors. These might also include
habitats that are of limited availability or high vulnerability to alterations such as cliffs, talus, and
wetlands. In urban areas like the city of Edmonds, habitats of local importance include biodiversity
areas and corriodrs, which as characterized by a framework of ecological components which provides
the physical conditions necessary for ecosystems and species populations to survive in a human -
dominated landscape.
"In lieu fee program" means a program which sells compensatory mitigation credits to permittees whose
obligation to provide compensatory mitigation is then transferred to the in lieu program sponsor, a
governmental or non-profit natural resource management entity.
Page 6 of 87
Packet Pg. 375
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
"Landslide Hazard Areas." See ECDC 23.80.020(B). "Mitigation" means the use of any or all of the
following actions, which are listed in descending order of preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action;
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by
using appropriate technology or by taking affirmative steps such as project redesign, relocation, or
timing to avoid or reduce impacts;
3. Rectifying the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and habitat
conservation areas by repairing, rehabilitating, or restoring the affected environment to the historical
conditions or the conditions existing at the time of the initiation of the project;
4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineered or
other methods;
5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations
during the life of the action;
6. Compensating for the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and
habitat conservation areas by replacing, enhancing, or providing substitute resources or environments;
and
7. Monitoring the hazard or other required mitigation and taking remedial action when necessary.
"Native vegetation" means vegetation comprised of plant species which are indigenous to the Puget
Sound region and which reasonably could have been expected to naturally occur on the site. "Native
vegetation" does not include noxious weeds as defined by the state of Washington or federal agencies.
"Normal maintenance of vegetation" means removal of shrubs/non-woody vegetation and trees (less
than 4-inch diameter at breast height) that occurs at least every other year. Maintenance also may
include tree topping that has been previousl approved by the City in the past 5 years.
"Noxious weeds" means any plant that is highly destructive, competitive or difficult to control by
cultural or chemical practices, limited to those plants on the state noxious week list contained in
Chapter 16-750 WAC.
"Planning staff'means means those employed in the planning division of the city of Edmonds development
services department.
"Qualified critical areas consultant" or "qualified professional" means a person who has the
qualifications specified below to conduct critical areas studies pursuant to this title, and to make
recommendations for critical areas mitigation. For geologically hazardous areas, the qualified critical
areas consultant shall be a geologist or engineering geologist licensed in the State of Washington to
assess the potential hazard. If development is to take place within a geologically hazardous area, the
qualified critical areas consultant developing mitigation plans and design shall be a Professional
Page 7 of 87
Packet Pg. 376
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Engineer licensed in the State of Washington and familiar with landslide and slope stability mitigation.
For wetlands and streams, the qualified critical areas consultant shall be a specialist in botany, fisheries,
wetland biology, and/or hydrology with a minimum of five years' field experience with wetlands and/or
streams in the Pacific Northwest. Requirements defining a qualified critical areas consultant or qualified
professional are contained within the chapter on each critical area type.
"Reasonable economic use(s)" means the minimum use to which a property owner is entitled under
applicable state and federal constitutional provisions in order to avoid a taking and/or violation of
substantive due process.
"Redeveloped land(s)" means those lands on which existing structures are demolished in their entirety to
allow for new development. The director shall maintain discretion to determine if the demolition of a
majority of existing structures or portions thereof constitute the re -development of a property or subject
parcel.
"Restoration" means the actions necessary to return a stream, wetland or other critical area to a state in
which its stability, functions and values approach its unaltered state as closely as possible. For wetlands,
restoration as compensatory mitigation may include re-establishment or rehabilitation.
"Seismic Hazard Areas." See ECDC 23.80.020(C). "Species of local importance" means those species
that are of local concern due to their population status, their sensitivity to habitat manipulation, or that
are game (hunted) species. (See ECDC 23.90.010(A)(4).)
"Storm Water Management Manual" means the stormwater manual specified in in Chapter 18.30
ECDC.
"Streams" means any area where surface waters produce a defined channel or bed which demonstrates
clear evidence, such as the sorting of sediments, of the passage of water. The channel or bed need not
contain water year-round. This definition is not meant to include irrigation ditches, canals, storm or
surface water runoff devices (drainage ditches) or other entirely artificial watercourses unless they are
used by salmonids or used to convey streams naturally occurring prior to construction of such
watercourse. Streams are further classified into Categories S, F, Np and Ns and fishbearing or
nonfishbearing 1, 2 and 3. (See ECDC 23.90.010(A)(1).)
"Title" means all chapters of the city of Edmonds Development Code beginning with the digits 23
"Undeveloped land(s)" means land(s) on which manmade structures or land modifications (clearing,
grading, etc.) do not exist. The director retains discretion to identify undeveloped land(s) in those
instances where historical modifications and structures may have existed on a property or subject parcel
in the past.
"Wetland functions" means those natural processes performed by wetlands, such as facilitating food
chain production; providing habitat for nesting, rearing and resting sites for aquatic, terrestrial or avian
species; maintaining the availability and quality of water; acting as recharge and/or discharge areas for
ground water aquifers; and moderating surface water and storm water flows.
Page 8 of 87
Packet Pg. 377
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
"Wetland mitigation bank" means a site where wetlands are restored, created, enhanced, or in
exceptional circumstances, preserved expressly for the purpose of providing compensatory mitigation in
advance of authorized impacts to similar resources.
"Wetlands" means those areas that are inundated or saturated by ground or surface water at a frequency
and duration sufficient to support, and that under normal circumstances do support, a prevalence of
vegetation typically adapted for life in saturated soil conditions. Wetlands do not include those artificial
wetlands intentionally created from nonwetland sites, including, but not limited to, irrigation and
drainage ditches, grass -lined swales, canals, detention facilities, wastewater treatment facilities, farm
ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally
created as a result of the construction of a road, street or highway. However, wetlands may include those
artificial wetlands intentionally created from nonwetland areas created to mitigate conversion of
wetlands if permitted by the city (WAC 365-190-030(22)). Wetlands are further classified into
Categories 1, 2, 3 and 4. (See ECDC 23.50.010(B).) [Ord. 3952 § 1, 2013; Ord. 3931 § 2, 2013; Ord.
3527 § 2, 2004].
23.40.010 Authority.
A. As provided herein, the Edmonds development services director or his/her designee (hereafter
referred to as "the director") is given the authority to interpret and apply, and the responsibility to
enforce, this title to accomplish the stated purpose.
B. The director may withhold, condition, or deny development permits or activity approvals to ensure
that the proposed action is consistent with this title. [Ord. 3527 § 2, 2004].
23.40.020 Relationship to other regulations.
A. These critical areas regulations shall apply as an overlay and in addition to zoning, site development,
stormwater management, building and other regulations adopted by the city of Edmonds.
B. Any individual critical area adjoined or overlain by another type of critical area shall have the buffer
and meet the requirements that provide the most protection to the critical areas involved. When any
provision of this title or any existing land use regulation conflicts with this title, that which provides
more protection to the critical area shall apply.
C. These critical areas regulations shall be coordinated with review conducted under the State
Environmental Policy Act (SEPA), as necessary and locally adopted.
D. Compliance with the provisions of this title does not constitute compliance with other federal, state,
and local regulations and permit requirements that may be required (for example, shoreline substantial
development permits, Hydraulic Permit Act (HPA) permits, Section 106 of the National Historic
Preservation Act, U.S. Army Corps of Engineers Section 404 permits, and National Pollution Discharge
Elimination System permits). The applicant is responsible for complying with these requirements, apart
from the process established in this title. [Ord. 3527 § 2, 2004].
23.40.030 Severability.
Page 9 of 87
Packet Pg. 378
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
If any clause, sentence, paragraph, section, or part of this title or the application thereof to any person or
circumstances shall be judged by any court of competent jurisdiction to be invalid, such order or
judgment shall be confined in its operation to the controversy in which it was rendered. The decision
shall not affect or invalidate the remainder of any part thereof and to this end the provisions of each
clause, sentence, paragraph, section, or part of this law are hereby declared to be severable. [Ord. 3527
§ 2, 2004].
23.40.040 Jurisdiction — Critical areas.
A. The director shall regulate all uses, activities, and developments within, adjacent to, or likely to affect
one or more critical areas, consistent with the best available science and the provisions herein.
B. Critical areas regulated by this title include:
1. Wetlands as designated in Chapter 23.50 ECDC, Wetlands;
2. Critical aquifer recharge areas as designated in Chapter 23.60 ECDC, Critical Aquifer Recharge
Areas;
3. Frequently flooded areas as designated in Chapter 23.70 ECDC, Frequently Flooded Areas;
4. Geologically hazardous areas as designated in Chapter 23.80 ECDC, Geologically Hazardous Areas;
and
5. Fish and wildlife habitat conservation areas as designated in Chapter 23.90 ECDC, Fish and Wildlife
Habitat Conservation Areas.
C. All areas within the city of Edmonds meeting the definition of one or more critical areas, regardless
of any formal identification, are hereby designated critical areas and are subject to the provisions of this
title.
D. Areas Adjacent to Critical Areas Subject to Regulation. Areas adjacent to critical areas shall be
considered to be within the jurisdiction of these requirements and regulations to support the intent of this
title and ensure protection of the functions and values of critical areas.
23.40.050 Protection of critical areas. 'I SHARE
Any action taken pursuant to this title shall result in equivalent or greater functions and values of the
critical areas associated with the proposed action, as determined by the best available science. All
actions and developments shall be designed and constructed in accordance with ECDC 23.40.120,
Mitigation sequencing, to avoid, minimize, and restore all adverse impacts. Applicants must first
demonstrate an inability to avoid or reduce impacts before the use of actions to mitigate potential
impacts will be allowed. No activity or use shall be allowed that results in a net loss of the functions or
values of critical areas. [Ord. 3527 § 2, 2004].
23.40.055 City Council Reports
Page 10 of 87
Packet Pg. 379
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
The Director will provide a report to the City Council during the 1st and 3rd quarter each year,
summarizing critical area decisions that have been made since the previous report. The report will
include information such as, the number and type of critical area decisions that have been made,
including information on buffers and enhancements approved for each applicable decision, a description
of each approved restoration project, and other information specifically requested by the Council
following the previous report.
Part II. Critical Areas Review Process
23.40.060 General requirements.0 SHARE
A. As part of this review, the director shall:
1. Verify the information submitted by the applicant;
2. Evaluate the project area and vicinity for critical areas;
3. Determine whether the pro posed project is likely to impact the functions or values of critical areas;
and
4. Determine if the proposed project adequately assesses all impacts, avoids impacts, and/or mitigates
impacts to the critical area associated with the project.
B. If the proposed project is within, adjacent to, or is likely to impact a critical area, the director shall
1. Require a critical areas report from the applicant that has been prepared by a qualified professional;
2. Review and evaluate the critical areas report;
3. Determine whether the development proposal conforms to the purposes and performance standards of
this title, including the criteria in ECDC 23.40.160, Review criteria;
4. Assess the potential impacts to the critical area and determine if they can be avoided or minimized;
and
5. Determine if any mitigation proposed by the applicant is sufficient to protect the functions and values
of the critical area and public health, safety, and welfare concerns consistent with the goals, purposes,
objectives, and requirements of this title. [Ord. 3527 § 2, 2004].
23.40.070 Critical areas preapplication consultation.0 SHARE
Any person preparing to submit an application for development or use of land that may be regulated by
the provisions of this title may request a preapplication meeting with the director prior to submitting an
application for development or other approval. At this meeting, the director shall discuss the
requirements of this title; provide critical areas maps, scientific information, and other source materials;
outline the review process; and work with the activity proponent to identify any potential concerns that
Page 11 of 87
Packet Pg. 380
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
might arise during the review process, in addition to discussing other permit procedures and
requirements. All applicants, regardless of participation in a preapplication meeting, are held fully
responsible for knowledge and disclosure of critical areas on, adjacent to, or associated with a subject
parcel and full compliance with the specific provisions and goals, purposes, objectives, and requirements
of this title. [Ord. 3527 § 2, 2004].
23.40.080 Notice of initial determination.0 SHARE
A. If the director determines that no critical areas report is necessary, the director shall state this in the
notice of application issued for the proposal.
B. If the director determines that there are critical areas on the site that the proposed project is unlikely
to impact and the project meets the requirements for and has been granted a waiver from the requirement
to complete a critical areas report, this shall be stated in the notice of application for the proposal. A
waiver may be granted if the director determines that all of the following requirements will be met:
1. There will be no alteration of the critical area or buffer;
2. The development proposal will not affect the critical area in a manner contrary to the purpose, intent,
and requirements of this Title.
C. If the director determines that critical areas may be affected by the proposal and a critical areas report
is required, public notice of the application shall include a description of the critical area that might be
affected and state that a critical areas report(s) is required.
D. Critical areas determinations shall be considered valid for five years from the date in which the
determination was made; after such date the city shall require a new determination, or at minimum
documentation of a new assessment verifying the accuracy of the previous determination [Ord. 3527
§ 2, 2004].
23.40.090 Critical areas report — Requirements. 0 SHARE
A. Preparation by Qualified Professional. The applicant shall submit a critical areas report prepared by a
qualified professional as defined herein. For wetlands, frequently flooded areas and fish and wildlife
habitat conservation areas, an applicant may choose one of the qualified technical consultants on the
city's approved list to prepare critical areas reports per the requirements of this title or may apply to
utilize an alternative consultant. Critical areas studies and reports developed by an alternative consultant
may be subject to independent review pursuant to subsection B of this section. All costs associated with
the critical areas study shall be borne by the applicant.
B. Independent Review of Critical Areas Reports. Critical areas studies and reports on geologically
hazardous areas and those developed by an applicant representative or consultant not as part of a three -
party contract may, at the discretion of the director, be subject to independent review. This independent
review shall be performed by a qualified technical consultant selected by the city with all costs borne by
the applicant. The purpose of such independent review is to provide the city with objective technical
assistance in evaluating the accuracy of submitted reports and/or the effects on critical areas which may
Page 12 of 87
Packet Pg. 381
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
be caused by a development proposal and to facilitate the decision -making process. The director may
also have technical assistance provided by appropriate resource agency staff if such assistance is
available in a timely manner.
C. Best Available Science. The critical areas report shall use scientifically valid methods and studies in
the analysis of critical areas data and field reconnaissance and reference the source of science used. The
critical areas report shall evaluate the proposal and all probable impacts to critical areas in accordance
with the provisions of this title.
D. Minimum Report Contents. At a minimum, the report shall contain the following:
1. The name and contact information of the applicant, a description of the proposal, and identification of
the permit requested;
2. A copy of the site plan for the development proposal including:
a. A map to scale depicting critical areas, buffers, the development proposal, and any areas to be cleared;
and
b. A description of the proposed storm water management plan for the development and consideration of
impacts to drainage alterations;
c. The site plan shall identify the location of all native and non-native vegetation of 6 inches dbh or
larger.
3. The dates, names, and qualifications of the persons preparing the report and documentation of any
fieldwork performed on the site;
4. Identification and characterization of all critical areas, wetlands, water bodies, shorelines, and buffers
adjacent to the proposed project area;
5. A description of reasonable efforts made to apply mitigation sequencing pursuant to ECDC
23.40.120, Mitigation sequencing, to avoid, minimize, and mitigate impacts to critical areas;
6. Report requirements specific to each critical area type as indicated in the corresponding chapters of
this title.
7. A statement specifying the accuracy of the report and all assumptions made and relied upon;
8. A description of the methodologies used to conduct the critical areas study, including references; and
9. Plans for adequate mitigation, as needed to offset any critical areas impacts, in accordance with the
Mitigation Plan Requirements in Section 23.40.130.
E. Unless otherwise provided, a critical areas report may incorporate, be supplemented by or composed,
in whole or in part, of any reports or studies required by other laws and regulations or previously
Page 13 of 87
Packet Pg. 382
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
prepared for and applicable to the development proposal site, as approved by the director. At the
discretion of the director, reports previously compiled or submitted as part of a proposal for
development may be used as a critical areas report to the extent that the requirements of this section and
the report requirements for each specific critical area type are met.
F. Critical areas reports shall be considered valid for five years; after such date the city shall determine
whether a revision or additional assessment is necessary.[Ord. 3527 § 2, 2004].
23.40.100 Critical areas report — Modifications to requirements. sH"RE
A. Limitations to Study Area. The director may limit the required geographic area of the critical areas
report as appropriate if.
1. The applicant, with assistance from the city of Edmonds, cannot obtain permission to access
properties adjacent to the project area; or
2. The proposed activity will affect only a limited part of the subject site.
B. Modifications to Required Contents. The applicant may consult with the director prior to or during
preparation of the critical areas report to obtain approval of modifications to the required contents of the
report where, in the judgment of a qualified professional, more or less information is required to
adequately address the potential critical area impacts and required mitigation.
C. Additional Information Requirements. The director may require additional information to be included
in the critical areas report when determined to be necessary to the review of the proposed activity in
accordance with this title. Additional information that may be required includes, but is not limited to:
1. Historical data, including original and subsequent mapping, aerial photographs, data compilations and
summaries, and available reports and records relating to the site or past operations at the site;
2. Grading and drainage plans; and
3. Information specific to the type, location, and nature of the critical area. [Ord. 3527 § 2, 2004]
23.40.110 Mitigation requirements.0 SHARE
A. The applicant shall avoid all impacts that degrade the functions and values of critical areas. Unless
otherwise provided in this title, if alteration to the critical area is unavoidable, all adverse impacts to or
from critical areas and buffers resulting from a development proposal or alteration shall be mitigated
using the best available science in accordance with an approved critical areas report and SEPA
documents, so as to result in no net loss of critical area functions and values.
B. Mitigation shall be sufficient to maintain or compensate for the functions and values of the impacted
critical area and to prevent risk from a hazard posed by a critical area.
Page 14 of 87
Packet Pg. 383
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
C. Mitigation shall not be implemented until after the director has provided approval of a critical areas
report that includes a mitigation plan. Mitigation shall be implemented in accordance with the provisions
of the approved critical areas report. [Ord. 3527 § 2, 2004].
23.40.120 Mitigation sequencing.0 SHARE
A. Applicants shall demonstrate that all reasonable efforts have been examined with the intent to avoid
and minimize impacts to critical areas.
B. When an alteration to a critical area is proposed, such alteration shall be avoided, minimized, or
compensated for in the following sequential order of preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action;
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by
using appropriate technology or by taking affirmative steps, such as project redesign, relocation, or
timing, to avoid or reduce impacts;
3. Rectifying the impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation
areas by repairing, rehabilitating, or restoring the affected environment to the historical conditions or the
conditions existing at the time of the initiation of the project;
4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineering
or other methods;
5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations
during the life of the action;
6. Compensating for the impact to wetlands, frequently flooded areas, and fish and wildlife habitat
conservation areas by replacing, enhancing, or providing substitute resources or environments; and/or
7. Monitoring the hazard or other required mitigation and taking remedial action when necessary
C. Mitigation for individual actions may include a combination of the above measures. [Ord. 3527 § 2,
2004] .
23.40.130 Mitigation plan requirements.0 SHARE
When mitigation is required, the applicant shall submit for approval by the director a mitigation plan as
part of the critical areas report. The mitigation plan shall include:
A. Environmental Goals and Objectives. The mitigation plan shall include a written report identifying
environmental goals and objectives of the compensation proposed and including:
1. A description of the anticipated impacts to the critical areas and the mitigating actions proposed and
the purposes of the compensation measures, including the site selection criteria; identification of
Page 15 of 87
Packet Pg. 384
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
compensation goals; identification of resource functions; and dates for beginning and completion of site
compensation construction activities. The goals and objectives shall be related to the functions and
values of the impacted critical area;
2. A review of the best available science supporting the proposed mitigation;
3. An analysis of the likelihood of success of the compensation project; and
4. Specific mitigation plan and report requirements for each critical area type as indicated in this title.
B. Performance Standards. The mitigation plan shall include measurable specific criteria for evaluating
whether or not the goals and objectives of the mitigation project have been successfully attained and
whether or not the requirements of this title have been met.
C. Detailed Construction Plans. The mitigation plan shall include written specifications and descriptions
of the mitigation proposed, such as:
1. The proposed construction sequence, timing, and duration;
2. Areas of proposed impacts on critical areas or buffers;
3. Grading and excavation details;
4. Erosion and sediment control features;
5. A planting plan specifying plant species, quantities, locations, size, spacing, and density; and
6. Measures to protect and maintain plants until established.
These written specifications shall be accompanied by detailed site diagrams, scaled cross -sectional
drawings, topographic maps showing slope percentage and final grade elevations, and any other
drawings appropriate to show construction techniques or anticipated final outcome.
D. Monitoring Program. The mitigation plan shall include a program for monitoring construction and for
assessing a completed project. A protocol shall be included outlining the schedule for site monitoring
(for example, monitoring shall occur in years one, three, and five after site construction), and how the
monitoring data will be evaluated to determine if the performance standards are being met. A monitoring
report shall be submitted as needed to document milestones, successes, problems, and contingency
actions of the compensation project. The compensation project shall be monitored for a period necessary
to establish that performance standards have been met, but not for a period less than five (5) years
without approval from the director.
E. Contingency Plan. The mitigation plan shall include identification of potential courses of action and
any corrective measures to be taken if monitoring or evaluation indicates project performance standards
are not being met.
Page 16 of 87
Packet Pg. 385
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
F. Financial Guarantees. The mitigation plan shall include financial guarantees, as necessary, to ensure
that the mitigation plan is fully implemented. Financial guarantees ensuring fulfillment of the
compensation project, monitoring program, and any contingency measures shall be posted in accordance
with ECDC 23.40.290, Bonds to ensure mitigation, maintenance, and monitoring. [Ord. 3527 § 2, 2004].
23.40.140 Innovative mitigation.0 SHARE
A. The city of Edmonds may encourage, facilitate, and approve innovative mitigation projects that are
based on the best available science. Advance mitigation, in lieu fee programs, or mitigation banking are
examples of alternative mitigation approaches allowed under the provisions of this section if it is
demonstrated that all of the following circumstances exist:
1. There are no reasonable opportunities on -site or within the same sub -drainage basin, or opportunities
on -site or within the sub -drainage basin do not have a high likelihood of success based on a
determination of the capacity of the site to compensate for the impacts. Considerations should include:
anticipated replacement ratios for wetland mitigation, buffer conditions and proposed widths, available
water to maintain anticipated hydrogeomorphic classes of wetlands when restored, proposed flood
storage capacity, and potential to mitigate fish and wildlife impacts (such as connectivity);
2. The off -site mitigation has a greater likelihood of providing equal or improved critical areas functions
than the altered critical area, and there is a clear potential for success of the proposed mitigation at the
identified mitigation site.
3. Off -site locations shall be in the same basin and within the City unless:
a. Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland
functions have been established by the City and strongly justify location of mitigation at another site; or
b. Credits from an approved (State -certified) wetland mitigation bank are used as compensation, and the
use of credits is consistent with the terms of the approved bank instrument;
c. Fees are paid to an approved in -lieu fee program to compensate for the impacts.
B. Development proposals impacting critical areas and/or associated buffers may contribute payment
towards an identified City of Edmonds mitigation project with approval from the director, provided that
the mitigation approach meets all state and federal permit requirements, where required. Such mitigation
actions shall be consistent with ECDC 23.40.140.A.1. and ECDC 23.40.140.A.2., and with all other
applicable provisions of ECDC Chapters 23.50 and 23.90.
C. Conducting mitigation as part of a cooperative process provides for retention or an increase in the
beneficial functions and values of critical areas within the Edmonds jurisdiction. [Ord. 3527 § 2, 2004].
23.40.150 Critical areas decision.0 SHARE
The city of Edmonds development services director shall make a decision as to whether the proposed
activity and mitigation, if any, is consistent with the provisions of this title. The decision shall be based
Page 17 of 87
Packet Pg. 386
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
on the criteria of ECDC 23.40.160, Review criteria, and shall affect and be incorporated within the
larger project decision. [Ord. 3527 § 2, 2004].
23.40.160 Review criteria..) SHARE
A. Any alteration to a critical area, unless otherwise provided for in this title, shall be reviewed and
approved, approved with conditions, or denied based on the proposal's ability to comply with all of the
following criteria:
1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation
sequencing;
2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
3. The proposal is consistent with the general purposes of this title and the public interest;
4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110,
Mitigation requirements;
5. The proposal protects the critical area functions and values consistent with the best available science
and results in no net loss of critical area functions and values; and
6. The proposal is consistent with other applicable regulations and standards.
B. The director may condition the proposed activity as necessary to mitigate impacts to critical areas and
to conform to the standards required by this title. Except as provided for by this title, any project that
cannot adequately mitigate its impacts to critical areas in the sequencing order of preferences in ECDC
23.40.120 shall be denied. [Ord. 3527 § 2, 2004].
23.40.170 Favorable critical areas decision.0 SHARE
If the director determines that the proposed activity meets or is exempt from the criteria in ECDC
23.40.160, Review criteria, and complies with the applicable provisions of this title, the development
services director shall prepare a written notice of decision for the applicant and identify any required
conditions of approval as part of the larger project decision. The notice of decision and conditions of
approval shall be included in the project file and be considered in the next phase of the city's review of
the proposed activity in accordance with any other applicable codes or regulations.
Any conditions of approval included in a notice of decision shall be attached to the underlying permit or
approval. Any subsequent changes to the conditions of approval shall void the previous decision
pending re -review of the proposal and conditions of approval previously set by the director.
A favorable decision should not be construed as endorsement or approval of any underlying permit or
approval. [Ord. 3527 § 2, 2004].
Page 18 of 87
Packet Pg. 387
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40.180 Unfavorable critical areas decisionA3 SHARE a
If the director determines that a proposed activity is not exempt or does not adequately mitigate its
impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160, Review criteria,
and the provisions of this title, the director shall prepare a written decision for the applicant that includes
findings of noncompliance.
No proposed activity or permit shall be approved or issued if it is determined that the proposed activity
does not adequately mitigate its impacts on the critical areas and/or does not comply with the provisions
of this title.
Following notice of decision that the proposed activity does not meet the review criteria and/or does not
comply with the applicable provisions of this title, the applicant may request consideration of a revised
critical area report. If the revision is found to be substantial and relevant to the critical area review, the
director may reopen the critical area review and make a new decision based on the revised report. [Ord.
3527 § 2, 2004].
23.40.190 Completion of the critical areas review.0 SHARE
The director's decision regarding critical areas pursuant to this title shall be final concurrent with the
final project decision to approve, condition, or deny the development proposal or other activity involved.
[Ord. 3527 § 2, 2004].
23.40.195 Contingent review procedure for certain types of development.
A. Scope. The procedures set forth in this section shall apply to the following types of critical area
restoration projects as allowed by ECDC 23.40.215:
1. Restoration projects involving anadromous fish streams
2. Restoration projects involving Category I or Category II wetlands
3. Restoration projects involving Category I or Category II estuarine wetlands
B. Notice of application. Development activity within the scope of subsection A, above, shall be
processed as a Type II application, unless the process is altered according to subsection D, below. In
addition to the notice provided pursuant to Title 20, notice of application for all such development shall
also be sent to the city council by email.
C. Contingent review process. Development activity within the scope of subsection A, above, shall be
escalated to a Type III -A process when:
1. The city receives a request from any person for a public hearing within 14 days of the date of the
notice of application; and
Page 19 of 87
Packet Pg. 388
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
2. The public hearing request is accompanied by a hearing fee in the amount of 50% of the difference
between the Type II and Type III -A application fee.
D. Effect of contingent review. When the contingent review process is triggered pursuant to subsection
C above, the project applicant shall pay the other 50% of the difference between the Type II and Type
III -A application fee, on top of the previously paid Type II application fee. The applicant shall pay this
fee within 30 days of notice from the city that the fee is due. If the applicant fails to pay the additional
fee within the required 30-day period, the application for the project shall be deemed withdrawn. The
city shall not schedule the public hearing until the additional fee has been paid. For these public
hearings, the cost of the hearing examiner shall be borne by the city.
E. Notice of decision. Whether development activity within the scope of subsection A, above, is
processed as a Type II application or escalated to a Type III -A application, notice of decision shall be
sent by email to the city council in addition to any other notice that may be required by Title 20.
23.40.200 Appeals.0 SHARE
Any decision to approve, condition, or deny a development proposal or other activity based on the
requirements of this title may be appealed according to, and as part of, the appeal procedure, if any, for
the permit or approval involved. [Ord. 3736 § 71, 2009; Ord. 3527 § 2, 2004].
23.40.210 Variances.0 SHARE
A. Variances from the standards of this title may be authorized through the process of hearing examiner
review in accordance with the procedures set forth in Chapter 20.85 ECDC only if an applicant
demonstrates that one or more of the following two conditions exist:
1. The application of this title would prohibit a development proposal by a public agency or public
utility. A public agency and utility exception may be granted as a variance i£
a. There is no other practical alternative to the proposed development with less impact on the critical
areas;
b. The application of this title would unreasonably restrict the ability to provide utility services to the
public;
c. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
d. The proposal attempts to protect and mitigate impacts to the critical area functions and values
consistent with the best available science; and
e. The proposal is consistent with other applicable regulations and standards.
Page 20 of 87
Packet Pg. 389
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
2. The application of this title would deny all reasonable economic use (see the definition of "reasonable
economic use(s)" in ECDC 23.40.320) of the subject property. A reasonable use exception may be
authorized as a variance only if an applicant demonstrates that:
a. The application of this title would deny all reasonable economic use of a property or subject parcel;
b. No other reasonable economic use of the property consistent with the underlying zoning and the city
comprehensive plan has less impact on the critical area;
c. The proposed impact to the critical area is the minimum necessary to allow for reasonable economic
use of the property;
d. The inability of the applicant to derive reasonable economic use of the property is not the result of
actions by the applicant after the effective date of the ordinance codified in this title or its predecessor;
e. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
f. The proposal minimizes net loss of critical area functions and values consistent with the best available
science; and
g. The proposal is consistent with other applicable regulations and standards.
B. Specific Variance Criteria. A variance may be granted if the applicant demonstrates that the requested
action conforms to all of the following specific criteria:
1. Special conditions and circumstances exist that are peculiar to the land, the lot, or something inherent
in the land, and that are not applicable to other lands in the same district;
2. The special conditions and circumstances do not result from the actions of the applicant;
3. A literal interpretation of the provisions of this title would deprive the applicant of all reasonable
economic uses and privileges permitted to other properties in the vicinity and zone of the subject
property under the terms of this title, and the variance requested is the minimum necessary to provide
the applicant with such rights;
4. Granting the variance requested will not confer on the applicant any special privilege that is denied by
this title to other lands, structures, or buildings under similar circumstances;
5. The granting of the variance is consistent with the general purpose and intent of this title, and will not
further degrade the functions or values of the associated critical areas or otherwise be materially
detrimental to the public welfare or injurious to the property or improvements in the vicinity of the
subject property; and
Page 21 of 87
Packet Pg. 390
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
6. The decision to grant the variance is based upon the best available science and gives special
consideration to conservation or protection measures necessary to preserve or enhance anadromous fish
habitat.
C. Hearing Examiner Review. The city hearing examiner shall, as a Type III -A decision (see Chapter
20.01 ECDC), review variance applications and conduct a public hearing. The hearing examiner shall
approve, approve with conditions, or deny variance applications based on a proposal's ability to comply
with general and specific variance criteria provided in subsections (A) and (B) of this section.
D. Conditions May Be Required. The director retains the right to prescribe such conditions and
safeguards as are necessary to secure adequate protection of critical areas from adverse impacts, and to
ensure conformity with this title for variances granted through hearing examiner review.
E. Time Limit. The director shall prescribe a time limit within which the action for which the variance is
required shall be begun, completed, or both. Failure to begin or complete such action within the
established time limit shall void the variance, unless the applicant files an application for an extension of
time before the expiration. An application for an extension of time shall be reviewed by the director as a
Type II decision (see Chapter 20.01 ECDC).
F. Burden of Proof. The burden of proof shall be on the applicant to bring forth evidence in support of a
variance application and upon which any decision has to be made on the application. [Ord. 3783 § 15,
2010; Ord. 3775 § 15, 2010; Ord. 3736 §§ 72, 73, 2009; Ord. 3527 § 2, 2004].
23.40.215 Critical Area Restoration Projects
A. When a critical area restoration project is proposed that is not required as mitigation for a
development proposal, the Director or Hearing Examiner (as applicable) may grant relief from standard
critical area buffer requirements if the restoration project involves:
1. The daylighting of a stream or tidal channel, or
2. Expansion of a wetland that would cause a landward expansion of the wetland buffer.
B. The restoration project proposal will include a proposed buffer width for the project that is developed
from an assessment by a qualified Critical Area Consultant on the buffer width necessary to ensure that
the restoration project is successful and the ecological functions of the areas adjacent to the stream or
wetland will be enhanced.
C. The Director or Hearing Examiner (as applicable) will consider the proposed buffer width along with
hydrologic, geologic, and other habitat data for the site to determine if the project warrants a buffer
width that deviates from the standard critical area buffer widths.
D. If the Director or Hearing Examiner (as applicable) determines that a reduced buffer width is
appropriate for the proposed restoration project, the Director may approve the reduced buffer width for
the proposed restoration site.
Page 22 of 87
Packet Pg. 391
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Part I1I. Allowed Activities, Exemptions and Noncompliance Penalties
23.40.220 Allowed activities.o SHARE
A. Critical Area Report. Activities allowed under this title shall have been reviewed and permitted or
approved by the city of Edmonds or other agency with jurisdiction, but do not require submittal of a
critical area report, unless such submittal was required previously for the underlying permit. The director
may apply conditions to the underlying permit or approval to ensure that the allowed activity is
consistent with the provisions of this title to protect critical areas.
B. Required Use of Best Management Practices. All allowed activities shall be conducted using the best
management practices that result in the least amount of impact to the critical areas. Best management
practices shall be used for tree and vegetation protection, construction management, erosion and
sedimentation control, water quality protection, and regulation of chemical applications. The city may
observe or require independent inspection of the use of best management practices to ensure that the
activity does not result in degradation to the critical area. Any incidental damage to, or alteration of, a
critical area shall be restored, rehabilitated, or replaced at the responsible party's expense.
C. Allowed Activities. The following activities are allowed:
1. Permit Requests Subsequent to Previous Critical Areas Review. Development permits and approvals
that involve both discretionary land use approvals (such as subdivisions, rezones, or conditional use
permits) and construction approvals (such as building permits) if all of the following conditions have
been met:
a. The provisions of this title have been previously addressed as part of another approval;
b. There have been no material changes in the potential impact to the critical area or buffer since the
prior review;
c. The permit or approval has not expired or, if no expiration date, no more than five years have elapsed
since the issuance of that permit or approval;
d. There is no new information available that is applicable to any critical area review of the site or
particular critical area; and
e. Compliance with any standards or conditions placed upon the prior permit or approval has been
achieved or secured.
2. Modification to Structures Existing Outside of Critical Areas and/or Buffers. Structural modification
of, addition to, or replacement of a legally constructed structure existing outside of a critical area or its
buffer that does not further alter or increase the impact to the critical area or buffer and there is no
increased risk to life or property as a result of the proposed modification or replacement;
3. Modifications to Existing Structures within Critical Areas and/or Buffers. Modification to a legally
constructed structure existing within a critical area or buffer shall be allowed when the modification:
Page 23 of 87
Packet Pg. 392
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
a. Does not increase the footprint of the structure; and
b. Does not increase the impact to the critical area or buffer; and
c. Does not increase risk to life or property as a result of the proposed modification or replacement.
Additions to legally constructed structures existing within a critical area or buffer that do increase the
existing footprint of development shall be subject to and permitted in accordance with the development
standards of the associated critical area type (see ECDC 23.50.040 and 23.90.040). This provision shall
be interpreted to supplement the provisions of the Edmonds Community Development Code relating to
nonconforming structures in order to permit the full reconstruction of a legal nonconforming building
within its footprint;
4. Development Proposals within Interrupted Stream or Wetland Buffers. Adjacent areas that may be
physically separated from a stream or wetland due to existing, legally established structures or paved
areas may be exempted from the prescribed buffer widths if proven scientifically to be functionally
isolated from the stream or wetland. The Director will require the applicant to provide a site assessment
and functional analysis documentation report by a qualified Critical Area Consultant that demonstrates
the interrupted buffer area is functionally isolated. The Director shall consider the hydrologic, geologic,
and/or biological habitat connection potential and the extent and permanence of the physical separation.
5. Activities within the Improved Right -of -Way. Replacement, modification, installation, or construction
of utility facilities, lines, pipes, mains, equipment, or appurtenances, when such facilities are located
within the improved portion of the public right-of-way or a city -authorized private roadway, except
those activities that alter a wetland or watercourse, such as culverts or bridges, or result in the transport
of sediment or increased stormwater.
6. Minor Utility Projects. Utility projects that have minor or short -duration impacts to critical areas, as
determined by the director in accordance with the criteria below, and which do not significantly impact
the function or values of a critical area(s); provided, that such projects are constructed with best
management practices and additional restoration measures are provided. Minor activities shall not result
in the transport of sediment or increased storm water. Such allowed minor utility projects shall meet the
following criteria:
a. There is no practical alternative to the proposed activity with less impact on critical areas;
b. The activity involves the placement of utility pole(s), street sign(s), anchor(s), or vault(s) or other
small component(s) of a utility facility; and
c. The activity involves disturbance of an area less than 75 square feet;
6. Public and Private Pedestrian Trails. New public and private pedestrian trails subject to the following:
a. The trail surface shall be limited to pervious surfaces and meet all other requirements, including water
quality standards set forth in the current editions of the International Residential Code and International
Building Code, as adopted in ECDC Title 19;
Page 24 of 87
Packet Pg. 393
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Critical area and/or buffer widths shall be increased, where possible, equal to the width of the trail
corridor, including disturbed areas;
c. Trails proposed to be located in landslide or erosion hazard areas shall be constructed in a manner that
does not increase the risk of landslide or erosion and in accordance with an approved geotechnical
report; and
d. Trails located only in the outer twenty-five percent (25%) of critical areas buffers, and located to
avoid removal of significant trees. Where existing legally established development has reduced the
width of the critical areas buffer, trails may be placed in the outer twenty-five percent (25%) of the
remaining critical area buffer. The trail shall be no more than five (5) feet in width and for pedestrian
use only. Raised boardwalks utilizing nontreated pilings may be acceptable.
Allowances for trails within the inner seventy-five percent (75%) of critical areas buffers are provided
within applicable sections of ECDC Chapters 23.50 — 23.90.
7. Select Vegetation Removal Activities. The following vegetation removal activities:
a. The removal of the following vegetation with hand labor and hand-held equipment when the area of
work is under one thousand five hundred (1,500) square feet in area as calculated cumulatively over
three (3) years:
i. Invasive and noxious weeds;
ii. English ivy (Hedera helix);
iii. Himalayan blackberry (Rubus discolor, R. procerus);
iv. Evergreen blackberry (Rubus laciniatus);
v. Scot's broom (Cytisus scoparius); and
vi. Hedge and field bindweed (Convolvulus sepium and C. arvensis);
Removal of these invasive and noxious plant species shall be restricted to hand removal unless permits
or approval from the appropriate regulatory agencies have been obtained for approved biological or
chemical treatments or other removal techniques. All removed plant material shall be taken away from
the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed
Control Board list of noxious weeds must be handled and disposed of according to a noxious weed
control plan appropriate to that species.
b. The removal of trees from critical areas and buffers that are hazardous, posing a threat to public
safety, or posing an imminent risk of damage to private property; provided, that:
i. The applicant submits a report from an ISA- or ASCA-certified arborist or registered landscape
architect that documents the hazard and provides a replanting schedule for the replacement trees;
Page 25 of 87
Packet Pg. 394
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
ii. Tree cutting shall be limited to pruning and crown thinning, unless otherwise justified by a qualified
professional. Where pruning or crown thinning is not sufficient to address the hazard, trees should be
removed or converted to wildlife snags;
iii. All vegetation cut (tree stems, branches, etc.) shall be left within the critical area or buffer unless
removal is warranted due to the potential for disease or pest transmittal to other healthy vegetation or
unless removal is warranted to improve slope stability;
iv. The land owner shall replace any trees that are removed with new trees at a ratio of two replacement
trees for each tree removed (2:1) within one year in accordance with an approved restoration plan.
Replacement trees may be planted at a different, nearby location if it can be determined that planting in
the same location would create a new hazard or potentially damage the critical area. Replacement trees
shall be species that are native and indigenous to the site and a minimum of one to two inches in
diameter at breast height (dbh) for deciduous trees and a minimum of six feet in height for evergreen
trees as measured from the top of the root ball;
v. If a tree to be removed provides critical habitat, such as an eagle perch, a qualified wildlife biologist
shall be consulted to determine timing and methods of removal that will minimize impacts; and
vi. Hazard trees determined to pose an imminent threat or danger to public health or safety, to public or
private property, or of serious environmental degradation may be removed or pruned by the land owner
prior to receiving written approval from the city; provided, that within 14 days following such action,
the land owner shall submit a restoration plan that demonstrates compliance with the provisions of this
title;
c. Measures to control a fire or halt the spread of disease or damaging insects consistent with the State
Forest Practices Act, Chapter 76.09 RCW; provided, that the removed vegetation shall be replaced in
kind or with similar native species within one year in accordance with an approved restoration plan;
d. Chemical Applications. The application of herbicides, pesticides, organic or mineral -derived
fertilizers, or other hazardous substances, if necessary, as approved by the City, provided that their use
shall be restricted in accordance with state Department of Fish and Wildlife Management
Recommendations and the regulations of the state Department of Agriculture, the U.S. Environmental
Protection Agency, and Department of Ecology; and
e. Unless otherwise provided, or as a necessary part of an approved alteration, removal of any vegetation
or woody debris from a fish and wildlife habitat conservation area or wetland shall be prohibited;
8. Minor Site Investigative Work. Work necessary for land use submittals, such as surveys, soil logs,
percolation tests, and other related activities, where such activities do not require construction of new
roads or significant amounts of excavation. In every case, impacts to the critical area shall be minimized
and disturbed areas shall be immediately restored; and
9. Navigational Aids and Boundary Markers. Construction or modification of navigational aids and
boundary markers. [Ord. 3527 § 2, 2004].
Page 26 of 87
Packet Pg. 395
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.40.230 Exemptions.P SHARE
A. Exemption Request and Review Process. The proponent of the activity may submit a written request
for exemption to the director that describes the activity and states the exemption listed in this section
that applies.
The director shall review the exemption request to verify that it complies with this title and approve or
deny the exemption. If the exemption is approved, it shall be placed on file with the city of Edmonds. If
the exemption is denied, the proponent may continue in the review process and shall be subject to the
requirements of this title.
B. Exempt Activities and Impacts to Critical Areas. All exempted activities shall use reasonable
methods to avoid potential impacts to critical areas. To be exempt from this title does not give
permission to degrade a critical area or ignore risk from natural hazards. Any incidental damage to, or
alteration of, a critical area that is not a necessary outcome of the exempted activity shall be restored,
rehabilitated, or replaced at the responsible party's expense.
C. Exempt Activities. The following developments, activities, and associated uses shall be exempt from
the provisions of this title; provided, that they are otherwise consistent with the provisions of other local,
state, and federal laws and requirements:
1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or
welfare, or that pose an immediate risk of damage to private property and that require remedial or
preventative action in a time frame too short to allow for compliance with the requirements of this title.
Emergency actions that create an impact to a critical area or its buffer shall use reasonable methods to
address the emergency; in addition, they must have the least possible impact to the critical area or its
buffer. The person or agency undertaking such action shall notify the director within one working day
following commencement of the emergency activity. Within 30 days, the director shall determine if the
action taken was within the scope of the emergency actions allowed in this subsection. If the director
determines that the action taken, or any part of the action taken, was beyond the scope of an allowed
emergency action, then enforcement provisions of ECDC 23.40.240, Unauthorized critical area
alterations and enforcement, shall apply.
After the emergency, the person or agency undertaking the action shall fully fund and conduct necessary
restoration and/or mitigation for any impacts to the critical area and buffers resulting from the
emergency action in accordance with an approved critical areas report and mitigation plan. The person
or agency undertaking the action shall apply for review, and the alteration, critical area report, and
mitigation plan shall be reviewed by the director in accordance with the review procedures contained
herein. Restoration and/or mitigation activities must be initiated within one year of the date of the
emergency and completed in a timely manner;
2. Operation, Maintenance, or Repair. Operation, maintenance, or repair of existing structures,
infrastructure improvements, utilities, public or private roads, dikes, levees, or drainage systems that do
not require construction permits, if the activity does not further alter or increase the impact to, or
encroach further within, the critical area or buffer and there is no increased risk to life or property as a
Page 27 of 87
Packet Pg. 396
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
result of the proposed operation, maintenance, or repair. Operation and maintenance also includes
normal maintenance of vegetation performed in accordance with best management practices, provided
that such management actions are part of regular and ongoing maintenance, do not expand further into
the critical area, are not the result of an expansion of the structure or utility, and do not directly impact
an endangered or threatened species; and
3. Passive Outdoor Activities. Recreation, education, and scientific research activities that do not
degrade the critical area, including fishing, hiking, and bird watching. Trails must be constructed
pursuant to ECDC 23.40.220(C)(6), Public and Private Pedestrian Trails. [Ord. 3527 § 2, 2004].
23.40.240 Unauthorized critical area alterations and enforcement. o SHARE
A. When a critical area or its buffer has been altered in violation of this title or the provisions of Chapter
7.200 ECC, all ongoing development work shall stop and the critical area shall be restored. The director
shall have the authority to issue a stop work order to cease all ongoing development work, and order
restoration, rehabilitation, or replacement measures at the owner's or other responsible party's expense
to compensate for violation of the provisions of this title. The director may also require an applicant or
property owner to take immediate action to ensure site stabilization and/or erosion control as needed.
B. Requirement for Restoration Plan. All development work shall remain stopped until a restoration plan
is prepared and approved by the director. Such a plan shall be prepared by a qualified professional using
the best available science and shall describe how the actions proposed meet the minimum requirements
described in subsection C of this section. The director shall, at the violator's expense, seek expert advice
in determining the adequacy of the plan. Inadequate plans shall be returned to the applicant or violator
for revision and resubmittal.
C. Minimum Performance Standards for Restoration.
1. For alterations to frequently flooded areas, wetlands, and fish and wildlife habitat conservation areas,
the following minimum performance standards shall be met for the restoration of a critical area;
provided, that if the violator can demonstrate that greater functional and habitat values can be obtained,
these standards may be modified:
a. The historic structural and functional values shall be restored, including water quality and habitat
functions;
b. The historic soil types and configuration shall be replicated;
c. The critical area and buffers shall be replanted with native vegetation that replicates the vegetation
historically found on the site in species types, sizes, and densities. The historic functions and values
should be replicated at the location of the alteration; and
d. Information demonstrating compliance with the requirements in ECDC 23.40.130, Mitigation plan
requirements, shall be submitted to the city planning division.
Page 28 of 87
Packet Pg. 397
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
2. For alterations to flood and geological hazards, the following minimum performance standards shall
be met for the restoration of a critical area; provided, that if the violator can demonstrate that greater
safety can be obtained, these standards may be modified:
a. The hazard shall be reduced to a level equal to, or less than, the predevelopment hazard;
b. Any risk of personal injury resulting from the alteration shall be eliminated or minimized; and
c. The hazard area and buffers shall be replanted with native vegetation sufficient to minimize the
hazard.
D. Site Investigations. The director is authorized to make site inspections and take such actions as are
necessary to enforce this title. The director shall present proper credentials and make a reasonable effort
to contact any property owner before entering onto private property.
E. Penalties. Any person, party, firm, corporation, or other legal entity convicted of violating any of the
provisions of this title shall be guilty of a misdemeanor and subject to penalties not to exceed a square
footage cost of three dollars ($3.00) per square foot of impacted critical area and critical area buffer
and/or a per tree penalty consistent with ECDC 18.45.070B. and C. Any development carried out
contrary to the provisions of this title shall constitute a public nuisance and may be enjoined as provided
by the statutes of the state of Washington. The city of Edmonds may levy civil penalties against any
person, party, firm, corporation, or other legal entity for violation of any of the provisions of this title.
The civil penalty shall be assessed as proscribed in ECDC 18.45.070 and 18.45.075.[Ord. 3828 § 2,
2010; Ord. 3527 § 2, 2004].
Part IV. General Critical Areas Protective Measures
23.40.250 Critical areas markers and signs.0 SHARE
A. The boundary at the outer edge of a critical area, critical area buffer or critical area tract may, at the
discretion of the director, be required to be delineated with wood fencing.
B. The boundary at the outer edge of the critical area or buffer may be identified with temporary signs
prior to any site alteration. Such temporary signs may be replaced with permanent signs prior to
occupancy or use of the site.
C. These provisions may be modified by the director as necessary to ensure protection of sensitive
features or wildlife needs. [Ord. 3527 § 2, 2004].
23.40.270 Critical areas tracts and easements.0 SHARE
A. At the discretion of the director, critical areas tracts and/or easements may be required in
development proposals for developments that include critical areas. These critical areas tracts and/or
easements shall delineate and protect those contiguous critical areas and buffers greater than 5,000
square feet including:
Page 29 of 87
Packet Pg. 398
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
1. Landslide hazard areas and buffers;
2. Wetlands and buffers;
3. Fish and wildlife habitat conservation areas; and
4. Other lands to be protected from alterations as conditioned by project approval.
B. Notice on Title. The owner of any property with field -verified presence of critical areas and/or critical
areas buffers, except critical aquifer recharge areas, for which a permit application is submitted shall, as
a condition of permit issuance, record a notice of the existence of such critical area and/or critical area
buffer against the property with the Snohomish County Auditor's office. The notice shall be approved
by the director and the city attorney for compliance with this provision. The titleholder will have the
right to challenge this notice and to have it released if the critical area designation no longer applies;
however, the titleholder shall be responsible for completing a critical areas report, subject to approval by
the director, before the notice on title can be released..
C. Critical areas tracts or easements shall be designated on the face of the plat or recorded drawing in a
format approved by the director. The designation shall include the following restrictions:
1. An assurance that native vegetation will be preserved for the purpose of preventing harm to property
and the environment, including, but not limited to, controlling surface water runoff and erosion,
maintaining slope stability, buffering, and protecting plants, fish, and animal habitat; and
2. The right of the director to enforce the terms of the restriction.
D. The director may require that critical areas tracts be dedicated to the city, to be held in an undivided
interest by each owner of a building lot within the development with the ownership interest passing with
the ownership of the lot, or held by an incorporated homeowner's association or other legal entity (such
as a land trust), which ensures the ownership, maintenance, and protection of the tract and contains a
process to assess costs associated therewith.
E. The use of herbicides within critical areas tracts or easements is prohibited except use of aquatic
approved herbicides where recommended by the Noxious Weed Control Board and where otherwise
consistent with the provisions of ECDC Title 23. [Ord. 3527 § 2, 2004].
23.40.280 Building setbacks.0 SHARE
Except for geologically hazardous areas where setbacks are determined by a geotechnical report,
buildings and other structures shall be set back a distance of 15 feet from the edges of all critical area
buffers or from the edges of all critical areas, if no buffers are required. In addition to other allowances
provided by this Title, the following may be allowed in the building setback area:
A. Landscaping;
B. Uncovered decks;
Page 30 of 87
Packet Pg. 399
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
C. Building overhangs, if such overhangs do not extend more than 30 inches into the setback area; and
D. Impervious ground surfaces, such as driveways and patios; provided, that such improvements may be
subject to water quality regulations as adopted in the current editions of the International Residential
Code and International Building Code, as adopted in ECDC Title 19. [Ord. 3527 § 2, 2004].
23.40.290 Bonds to ensure mitigation, maintenance, and monitoring. SHARE
A. When mitigation required pursuant to a development proposal is not completed prior to final permit
approval, such as final plat approval or final building inspection, the applicant shall be required to post a
performance bond or other security in a form and amount deemed acceptable by the director. If the
development proposal is subject to mitigation, the applicant shall post a mitigation bond or other
security in a form and amount deemed acceptable by the city to ensure mitigation is fully functional.
B. The bond shall be in the amount of 120 percent of the estimated cost of the uncompleted actions or
the estimated cost of restoring the functions and values of the critical area that are at risk, whichever is
greater. The amount of the performance bond shall include a reasonable allocation for inflation based on
the length of anticipated delay and the provisions of subsection D of this section.
C. The bond shall be in the form of a surety bond, performance bond, and/or maintenance bond from an
acceptable financial institution, with terms and conditions acceptable to the city of Edmonds' attorney.
D. Bonds or other security authorized by this section shall remain in effect until the director determines,
in writing, that the standards bonded for have been met. Bonds or other security shall be held by the city
for a minimum of five (5) years to ensure that the required mitigation has been fully implemented and
demonstrated to function, and may be held for longer periods when necessary to achieve these goals.
E. Depletion, failure, or collection of bond funds shall not discharge the obligation of an applicant or
violator to complete required mitigation, maintenance, monitoring, or restoration.
F. Public development proposals shall be relieved from having to comply with the bonding requirements
of this section if public funds have previously been committed for mitigation, maintenance, monitoring,
or restoration.
G. Any failure to satisfy critical area requirements established by law or condition including, but not
limited to, the failure to provide a monitoring report within thirty (30) days after it is due or comply with
other provisions of an approved mitigation plan shall constitute a default, and the city may demand
payment of any financial guarantees or require other action authorized under this title or any other law.
H. Any funds recovered pursuant to this section shall be used to complete the required mitigation. [Ord.
3527 § 2, 2004].
23.40.300 Critical area inspections.0 SHARE
Reasonable access to the site shall be provided to the city, state, and/or federal agency review staff for
the purpose of inspections during any proposal review, restoration, emergency action, or monitoring
Page 31 of 87
Packet Pg. 400
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
period. Failure to provide access shall constitute grounds for issuance of a stop work order. [Ord. 3527
§ 2, 2004].
Part V. Incorporation of Best Available Science
23.40.310 Best available science.0 SHARE
A. Protect Functions and Values of Critical Areas with Special Consideration to Anadromous Fish.
Critical areas reports and decisions to alter critical areas shall rely on the best available science to
protect the functions and values of critical areas and must give special consideration to conservation or
protection measures necessary to preserve or enhance anadromous fish, such as salmon and bull trout,
and their habitat, where applicable.
B. Best Available Science to Be Consistent with Criteria. The best available science is that scientific
information applicable to the critical area prepared by local, state, or federal natural resource agencies, a
qualified scientific professional, or a team of qualified scientific professionals that is consistent with
criteria established in WAC 365-195-900 through 365-195-925 and RCW 36.70A.172.
C. Characteristics of a Valid Scientific Process. In the context of critical areas protection, a valid
scientific process is one that produces reliable information useful in understanding the consequences of a
local government's regulatory decisions, and in developing critical areas policies and development
regulations that will be effective in protecting the functions and values of critical areas. To determine
whether information received during the permit review process is reliable scientific information, the
director shall determine whether the source of the information displays the characteristics of a valid
scientific process. Such characteristics are as follows:
1. Peer Review. The information has been critically reviewed by other persons who are qualified
scientific experts in that scientific discipline. The proponents of the information have addressed the
criticism of the peer reviewers. Publication in a refereed scientific journal usually indicates that the
information has been appropriately peer -reviewed;
2. Methods. The methods used to obtain the information are clearly stated and reproducible. The
methods are standardized in the pertinent scientific discipline or, if not, the methods have been
appropriately peer -reviewed to ensure their reliability and validity;
3. Logical Conclusions and Reasonable Inferences. The conclusions presented are based on reasonable
assumptions supported by other studies and consistent with the general theory underlying the
assumptions. The conclusions are logically and reasonably derived from the assumptions and supported
by the data presented. Any gaps in information and inconsistencies with other pertinent scientific
information are adequately explained;
4. Quantitative Analysis. The data have been analyzed using appropriate statistical or quantitative
methods;
Page 32 of 87
Packet Pg. 401
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
5. Context. The information is placed in proper context. The assumptions, analytical techniques, data,
and conclusions are appropriately framed with respect to the prevailing body of pertinent scientific
knowledge; and
6. References. The assumptions, analytical techniques, and conclusions are well referenced with
citations to relevant, credible literature and other pertinent existing information.
D. Nonscientific Information. Nonscientific information, such as anecdotal observations, non -expert
opinion, and hearsay, may supplement scientific information, but it is not an adequate substitute for
valid and available scientific information.
E. Absence of Valid Scientific Information. Where there is an absence of valid scientific information or
incomplete scientific information relating to a critical area leading to uncertainty about the risk to
critical area function of permitting an alteration of or impact to the critical area, the director shall:
1. Take a "precautionary or a no -risk approach" that strictly limits development and land use activities
until the uncertainty is sufficiently resolved; and
2. Require application of an effective adaptive management program that relies on scientific methods to
evaluate how well regulatory and nonregulatory actions protect the critical area. An adaptive
management program is a formal and deliberate scientific approach to taking action and obtaining
information in the face of uncertainty. An adaptive management program shall:
a. Address funding for the research component of the adaptive management program;
b. Change course based on the results and interpretation of new information that resolves uncertainties;
and
c. Commit to the appropriate time frame and scale necessary to reliably evaluate regulatory and
nonregulatory actions affecting protection of critical areas and anadromous fisheries. [Ord. 3527 § 2,
2004] .
Page 33 of 87
Packet Pg. 402
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.50
WETLANDS
Sections:
Part I. Designation, Rating and Mapping
23.50.000 Wetlands compliance requirements flowchart.
23.50.010 Designation, rating and mapping —Wetlands.
Part II. Allowed Activities — Wetlands
23.50.020 Allowed activities — Wetlands.
Part III. Additional Report Requirements — Wetlands
23.50.030 Special study and report requirements — Wetlands.
Part IV. Development Standards — Wetlands
23.50.040 Development standards — Wetlands.
23.50.050 Mitigation requirements — Wetlands.
23.50.060 Performance standards — Subdivisions.
Part V. City of Edmonds Wetland Field Data Form
23.50.070 Wetland field data form.
Part I. Designation, Rating and Mapping
23.50.000 Wetlands compliance requirements flowchart.0 SHARE
See Figure 23.50.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.50.010 Designation, rating and mapping — Wetlands.0 SHARE
A. Designating Wetlands. Wetlands are those areas, designated in accordance with the approved federal
wetland delineation manual and applicable regional supplements as set forth in WAC 173-22-035, that
are inundated or saturated by surface or ground water at a frequency and duration sufficient to support,
and that under normal circumstances do support, a prevalence of vegetation adapted for life in saturated
soil conditions. All areas within the city of Edmonds meeting the wetland designation criteria, regardless
Page 34 of 87
Packet Pg. 403
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
of any formal identification, are hereby designated critical areas and are subject to the provisions of this
title.
B. Wetland Ratings. Wetlands shall be rated according to the Washington State Department of Ecology
wetland rating system found in the 2014 Washington State Wetland Rating System for Western
Washington (Ecology Publication No. 14-06-029). Consistent with the wetland rating system criteria
and parameters within this document, wetlands that are rated for ecological functions with highest point
totals (23 points or higher) perform ecological functions associated with water flow, water quality and
habitat at highest levels, whereas wetlands that are rated with lowest point totals (15 points or lower)
perform ecological functions at lowest levels. Wetlands that are rated with points between 16 and 22
points perform ecological functions at moderate to high levels.
The City of Edmonds Wetland Rating Categories:
a. Category I Wetlands. Category I wetlands are those that represent a unique or rare wetland type; are
more sensitive to disturbance than most wetlands; are relatively undisturbed and contain ecological
attributes that are impossible to replace within a human lifetime; or provide a high level of function. The
following types of wetlands are Category I::
i. Relatively undisturbed estuarine wetlands larger than one(1) acre;
ii. Wetlands of high conservation value that are identified by scientists of the Washington Natural
Heritage Program/DNR;;
ill. Bogs;
iv. Wetlands with mature and old growth forests larger than one (1) acre;
v. Wetlands in coastal lagoons;
vi. Wetlands that perform functions at high levels as indicated by a score of twenty-three (23) points or
more based on functions.
b. Category II Wetlands. Category II wetlands are those that are difficult, though not impossible, to
replace, and provide high levels of some functions. The following types of wetlands are Category II:
i. Estuarine wetlands smaller than one acre, or disturbed estuarine wetlands larger than one acre;
iv. Wetlands with a moderately high level of functions as indicated by a score of 20 to 22 points based
on functions.
c. Category III Wetlands. Category III wetlands are wetlands with a moderate level of functions as
indicated by a score of 16 to 19 points based on functions.
d. Category IV Wetlands. Category IV wetlands are those with the lowest levels of functions as
indicated by scores below 16 points based on functions.
Page 35 of 87
Packet Pg. 404
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
All wetlands should be rated consistent with the 2014 Washington State Wetland Rating System for
Western Washington using the 2014 Western Washington Rating Form. C. Date of Wetland Rating.
Wetland rating categories shall be applied as the wetland exists on the date of adoption of the rating
system by the local government, as the wetland naturally changes thereafter, or as the wetland changes
in accordance with permitted activities. Wetland rating categories shall not change due to illegal
modifications.
D. Mapping. The approximate location and extent of wetlands are shown on the city of Edmonds critical
areas inventory. In addition, the National Wetlands Inventory and Soil Maps produced by the U.S.
Department of Agriculture, National Resources Conservation Service may be useful in helping to
identify potential wetland areas. The inventory and cited resources are to be used as a guide for the city
of Edmonds, project applicants, and/or property owners, and may be continuously updated as new
critical areas are identified. They are a reference and do not provide a final critical area designation.
E. Delineation. The exact location of a wetland's boundary shall be determined through the performance
of a field investigation by a qualified professional wetland scientist applying the approved federal
wetland delineation manual and applicable regional supplements. Wetland delineations are valid for five
years; after such date the city shall determine whether a revision or additional assessment is necessary.
F. Lake Ballinger. Lake Ballinger is designated on the U.S. National Wetlands Inventory as a lacustrine
(lake) environment and should not be delineated as a wetland in its entirety. Lake fringe wetlands
existing along the periphery of Lake Ballinger shall be identified according to specific criteria provided
in 23.50.010. Consistent with guidance for delineating lake fringe wetlands provided in these resources,
the existence of jurisdictional wetlands along Lake Ballinger shorelines shall be largely based upon the
presence of persistent emergent vegetation in shoreline areas less than 6.6 feet in depth. Provisions for
protection of Lake Ballinger shorelines not meeting criteria for jurisdictional wetlands are provided in
the city of Edmonds shoreline master program. [Ord. 3527 § 2, 2004].
Part II. Allowed Activities — Wetlands
23.50.020 Allowed activities — Wetlands.0 SHARE
The activities listed below are allowed in wetlands in addition to those activities listed in, and consistent
with, the provisions established in ECDC 23.40.220, and do not require submission of a critical areas
report, except where such activities result in a loss to the functions and values of a wetland or wetland
buffer. These activities include:
A. Conservation or preservation of soil, water, vegetation, fish, shellfish, and other wildlife that does not
entail changing the structure or functions of the existing wetland.
B. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops
and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or
alteration of the wetland by changing existing topography, water conditions, or water sources.
C. Drilling for utilities under a wetland; provided, that the drilling does not interrupt the ground water
connection to the wetland or percolation of surface water down through the soil column. Specific studies
Page 36 of 87
Packet Pg. 405
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
by a hydrologist are necessary to determine whether the ground water connection to the wetland or
percolation of surface water down through the soil column could be disturbed.
D. Enhancement of a wetland through the removal of nonnative invasive species. Weeding shall be
restricted to hand removal and weed material shall be removed from the site. Bare areas that remain after
weed removal shall be revegetated with native shrubs and trees at natural densities. Some hand seeding
may also be done over the bare areas with native herbs. Noxious weeds listed on the Washington State
Noxious Weed Control Board list must be handled and disposed of according to a noxious weed control
plan appropriate to that species.
E. Permitted alteration to a legally constructed structure existing within a wetland or wetland buffer that
does not increase the footprint of development or impervious surfacing or increase the impact to a
wetland or wetland buffer. [Ord. 3527 § 2, 2004].
Part III. Additional Report Requirements — Wetlands
23.50.030 Special study and report requirements — Wetlands.0 SHARE
A. Additional Requirements for Wetlands. In addition to the general critical areas report requirements of
ECDC 23.40.090, critical areas reports for wetlands must meet the requirements of this section. Critical
areas reports for two or more types of critical areas must meet the report requirements for each relevant
type of critical area.
B. Critical areas report requirements for wetlands may be met in "stages" or through multiple reports.
The typical sequence of potentially required reports that may in part or in combination fulfill the
requirements of this section include:
1. Wetland reconnaissance report documenting the existence and general location of wetlands in the
vicinity of a project area;
2. Wetland delineation report documenting the extent and boundary of a jurisdictional wetland per RCW
36.70A.175; and
3. Wetland mitigation report documenting potential wetland impacts and mitigation measures designed
to retain or increase the functions and values of a wetland in accordance with ECDC 23.50.050 and the
general provisions of this title.
C. A wetland critical areas report may include one or more of the above three report types, depending on
the information required by the director and the extent of potential wetland impacts. The Edmonds
development services director maintains the authority and discretion to determine which report(s) alone
or combined are sufficient to meet the requirements outlined below and to waive report requirements
based upon site conditions and the potential for project impacts.
D. Preparation by a Qualified Professional. A critical area report for wetlands shall be prepared by a
qualified professional who is a certified professional wetland scientist or a noncertified professional
wetland scientist with a minimum of five years of experience in the field of wetland science and with
Page 37 of 87
Packet Pg. 406
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
experience preparing wetland reports. Pursuant to ECDC 23.40.090(A), applicants may choose one of
the qualified technical consultants on the city's approved list in preparing critical areas reports for
wetlands, or may utilize an alternative consultant. Critical areas studies and reports developed by an
alternative consultant shall be subject to independent review pursuant to ECDC 23.40.090(B).
E. Area Addressed in Critical Area Report. The following areas shall be addressed in a critical area
report for wetlands:
1. The project area of the proposed activity;
2. All wetlands and recommended buffers within 200 feet of the project area; and
3. All shoreline areas, water features, floodplains, and other critical areas, and related buffers within 200
feet of the project area. The location and extent of wetlands and other critical areas existing outside of
the project area or subject parcel boundary may be shown in approximation as practical and necessary to
provide an assessment of potential project effects.
F. Wetland Analysis. In addition to the minimum required contents of ECDC 23.40.090, Critical areas
reports — Requirements, a critical areas report for wetlands shall contain an analysis of the wetlands,
including the following site- and proposal -related information at a minimum:
1. A written assessment and accompanying maps of the wetlands and buffers within 200 feet of the
project area, including the following information at a minimum:
a. Wetland delineation and required buffers;
b. Existing wetland acreage;
c. Wetland category;
d. Vegetative, faunal, and hydrologic characteristics;
e. Soil and substrate conditions;
f. Topographic elevations, at two -foot contours; and
g. A discussion of the water sources supplying the wetland and documentation of hydrologic regime
(locations of inlet and outlet features, water depths throughout the wetland, and evidence of recharge or
discharge, evidence of water depths throughout the year: drift lines, algal layers, moss lines, and
sediment deposits).
The location, extent and analyses of wetlands not contiguous with the subject parcel existing outside of
the immediate project area may be described in approximation as practical and necessary to provide an
assessment of potential project effects and hydrologic/ecological connectivity to on -site wetlands and
other critical areas.
Page 38 of 87
Packet Pg. 407
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
2. A discussion of measures, including avoidance, minimization, and mitigation, proposed to preserve
existing wetlands and restore any wetlands that were degraded prior to the current proposed land use
activity.
3. A habitat and native vegetation conservation strategy that addresses methods to protect and enhance
on -site habitat and wetland functions.
4. Functional evaluation for the wetland and adjacent buffer using a local or state agency staff -
recognized method and including the reference of the method and all data sheets.
5. Proposed mitigation, if needed, including a written assessment and accompanying maps of the
mitigation area, including the following information at a minimum:
a. Existing and proposed wetland acreage;
b. Vegetative and faunal conditions;
c. Surface and subsurface hydrologic conditions including an analysis of existing and future hydrologic
regime and proposed hydrologic regime for enhanced, created, or restored mitigation areas;
d. Relationship to the watershed and existing waterbodies;
e. Soil and substrate conditions, topographic elevations;
f. Existing and proposed adjacent site conditions;
g. Required wetland buffers; and
h. Property ownership.
6. A scale map of the development proposal site and adjacent area. A discussion of ongoing
management practices that will protect wetlands after the project site has been developed, including
proposed monitoring and maintenance programs.
7. A bond estimate for the installation (including site preparation, plant materials and installation,
fertilizers, mulch, and stakes) and the proposed monitoring and maintenance work for the required
number of years. [Ord. 3527 § 2, 2004].
Part IV. Development Standards — Wetlands
23.50.040 Development standards — Wetlands.0 SHARE
A. Activities may only be permitted in a wetland buffer if the applicant can show that the proposed
activity will not degrade the functions and functional performance of the wetland and other critical
areas.
Page 39 of 87
Packet Pg. 408
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
B. Activities and uses shall be prohibited in wetlands and wetland buffers, except as provided for in this
title.
C. Category I Wetlands. Activities and uses shall be prohibited from Category I wetlands, except as
provided for in the public agency and utility exception, reasonable use exception, and variance sections
of this title.
D. Category II Wetlands. With respect to activities proposed in Category II wetlands, the following
standards shall apply:
1. Water -dependent activities may be allowed where there are no practicable alternatives that would
have a less adverse impact on the wetland, its buffers and other critical areas.
2. Where non -water -dependent activities are proposed, it shall be presumed that alternative locations are
available, and activities and uses shall be prohibited, unless the applicant demonstrates that:
a. The basic project purpose cannot be accomplished as proposed and successfully avoid, or result in less
adverse impact on, a wetland on another site or sites in the general region; and
b. All alternative designs of the project as proposed, such as a reduction in the size, scope, configuration,
or density of the project, would not avoid or result in less of an adverse impact on a wetland or its
buffer.
E. Category III and IV Wetlands. Activities and uses that result in unavoidable and necessary impacts
may be permitted in Category III and IV wetlands and associated buffers in accordance with an
approved critical areas report and mitigation plan.
F. Wetland Buffers.
1. Standard Buffer Widths. The standard buffer widths in ECDC 23.50.040.F.1.d below have been
established in accordance with best available science. The buffers are based on the category of wetland
and the habitat score as determined by a qualified wetland professional using the Washington State
Wetland Rating System for Western Washington.
a. The use of the standard buffer widths requires the implementation of the measures in ECDC
23.50.040.F.2, where applicable, to minimize the impacts of the adjacent land uses.
b. If an applicant chooses not to apply the mitigation measures in ECDC 23.5 0.040. F.2, than a thirty-
three (33%) increase in the width of all buffers is required.
c. The standard buffer widths presume the existence of a relatively intact native vegetation community
in the buffer zone adequate to protect the wetland functions and values at the time of the proposed
activity. If the buffer is composed of nonnative vegetation, lawn, or bare ground, then, at the discretion
of the director, the buffer width may be increased or an applicant may be required to either develop and
implement a wetland buffer enhancement plan to maintain the standard width or widen the standard
width to ensure that adequate functions of the buffer are provided..
Page 40 of 87
Packet Pg. 409
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
d. Standard Wetland Buffer Widths Table.
Minimum
Buffer
Buffer
Buffer
Width
Width
Buffer Width
Width
(Wetland
(Wetland
(Wetland scores
(Wetland
Wetland Category
scores 3-4
scores 5
scores 6-7
8-9 habitat
habitat
habitat
points)
habitat
points)
points)
points)
Category L•
75 ft
105 ft
165 ft
225 ft
Based on total score
Category I:
Bogs and
190 ft
190 ft
190 ft
225 ft
Wetlands of High
Conservation Value
Category I:
75 ft
105 ft
165 ft
225 ft
Forested
Category L•
150 ft
150 ft
150 ft
150 ft
Estuarine
Category II:
75 ft
105 ft
165 ft
225 ft
Based on score
Category III (all)
60 ft
105 ft
165 ft
165 ft
Category IV (all)
40 ft
40 ft
40 ft
40 ft
2. Required Measures to Minimize Impacts to Wetlands. The standard wetland buffer widths in ECDC
23.50.040.F.I.e assumes implementation of the following measures, where applicable to a specific
proposal.
Disturbance I Required Measures to Minimize Impacts
Lights I • Direct lights away from wetland
Page 41 of 87
Packet Pg. 410
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Disturbance
Required Measures to Minimize Impacts
Noise
• Locate activity that generates noise away from wetland
If warranted, enhance existing buffer with native vegetation
plantings adjacent to noise source
• immediately adjacent to the out wetland buffer
. Route all new, untreated runoff away from wetland while
Toxic runoff
ensuring wetland is not dewatered
Establish covenants limiting use of pesticides within 150 feet of
wetlands
Apply integrated pest management
Stormwater runoff
. Retrofit stormwater detention and treatment for roads and
existing adjacent development
Prevent channelized flow from lawns that directly enters the
buffer
• Use Low Impact Development techniques (per Puget Sound
Action Team publication on LID techniques)
Change in water
. Infiltrate or treat, detain, and disperse into buffer new runoff
regime
from impervious surfaces and new lawns
Pets and human
• Use privacy fencing OR plant dense vegetation to delineate
buffer edge and to discourage disturbance using vegetation
Page 42 of 87
Packet Pg. 411
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Disturbance
Required Measures to Minimize Impacts
appropriate for the ecoregion
disturbance
• Place wetland and its buffer in a separate tract or protect with a
conservation easement
Dust
• Use best management practices to control dust
Disruption of
• Maintain connections to offsite areas that are undisturbed
corridors or
. Restore corridors or connections to offsite habitats by replanting
connections
2. Increased Wetland Buffer Widths. The director shall require increased buffer widths in accordance
with the recommendations of an experienced, qualified professional wetland scientist and the best
available science on a case -by -case basis when a larger buffer is necessary to protect wetland functions
and values based on site -specific characteristics. This determination shall be based on one or more of the
following criteria:
a. A larger buffer is needed to protect other critical areas;
b. The buffer or adjacent uplands has a slope greater than 15 percent or is susceptible to erosion and
standard erosion control measures will not prevent adverse impacts to the wetland; or
c. The buffer area has minimal vegetative cover. In lieu of increasing the buffer width where existing
buffer vegetation is inadequate to protect the wetland functions and values, development and
implementation of a wetland buffer enhancement plan in accordance with subsection (F)(3) of this
section may substitute.
d. The wetland and/or buffer is occupied by a federally listed threatened or endangered species, a bald
eagle nest, a great blue heron rookery, or a species of local importance; and it is determined by the
director that an increased buffer width is necessary to protect the species.
3. Measurement of Wetland Buffers. All buffers shall be measured from the wetland boundary as
surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for
approved wetland alterations shall be the same as the buffer required for the category of the created,
restored, or enhanced wetland.
4. Buffer Consistency. All mitigation sites shall have buffers consistent with the buffer requirements of
this chapter.
Page 43 of 87
Packet Pg. 412
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
5. Buffer Maintenance. Except as otherwise specified or allowed in accordance with this title, wetland
buffers shall be retained in an undisturbed or enhanced condition. Removal of invasive nonnative weeds
is required for the duration of the mitigation bond.
G. Wetland Buffer Modifications and Uses
1. Where wetland or buffer alterations are permitted by the City of Edmonds, the applicant shall mitigate
impacts to achieve no not loss of wetland acreage and functions consistent with ECDC 23.50.050 and
other applicable provisions of this Title.
2. At the discretion of the Director, standard wetland buffers may be averaged or reduced when
consistent with all criteria in ECDC 23.50.040.G. Wetland buffer averaging with enhancement shall be
preferred over wetland buffer reduction with enhancement. Wetland buffer reduction shall only be
approved by the director when buffer averaging cannot be accomplished on -site.
3. Wetland Buffer Width Averaging with Buffer Enhancement. The director may allow modification of
a standard wetland buffer width in accordance with an approved critical areas report and the best
available science on a case -by -case basis by averaging buffer widths. Any allowance for averaging
buffer widths shall only be granted concomitant to the development and implementation of a wetland
buffer enhancement plan for areas of buffer degradation. Only those portions of a wetland buffer
existing within the project area or subject parcel shall be considered the total standard buffer for buffer
averaging. Averaging of buffer widths may only be allowed where a qualified professional wetland
scientist demonstrates that:
a. The buffer averaging and enhancement plan provides evidence that wetland functions and values will
be:
i. Increased or retained through plan implementation for those wetlands where existing buffer vegetation
is generally intact; or
ii. Increased through plan implantation for those wetlands where existing buffer vegetation is inadequate
to protect the functions and values of the wetland;
b. The wetland contains variations in sensitivity due to existing physical characteristics or the character
of the buffer varies in slope, soils, or vegetation, and the wetland would benefit from a wider buffer in
places and would not be adversely impacted by a narrower buffer in other places;
c. The total area contained in the buffer area, or the total buffer area existing on a subject parcel for
wetlands extending off -site, after averaging is no less than that which would be contained within a
standard; and
d. The buffer width at any single location is not reduced by more than twenty-five percent (25%) percent
of the standard buffer width.
Page 44 of 87
Packet Pg. 413
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
4. Buffer Width Reductions through Buffer Enhancement. At the discretion of the director, and only
when buffer averaging cannot be accomplished on site, wetland buffer width reductions (or approval of
standard buffer widths for wetlands where existing buffer conditions require increased buffer widths)
may be granted concomitant to the development and implementation of a wetland buffer enhancement
plan for Category III and IV wetlands only. Approval of a wetland buffer enhancement plan shall, at the
discretion of the director, allow for wetland buffer width reductions by no more than twenty-five percent
(25%) of the standard width; provided, that:
a. The plan provides evidence that wetland functions and values will be:
i. Increased or retained through plan implementation for those wetlands where existing buffer vegetation
is generally intact; or
ii. Increased through plan implementation for those wetlands where existing buffer vegetation is
inadequate to protect the functions and values of the wetland;
b. The plan documents existing native plant densities and provides for increases in buffer native plant
densities to no less than three feet on center for shrubs and eight feet on center for trees;
c. The plan requires monitoring and maintenance to ensure success in accordance with ECDC
23.40.1300; and
d. The plan specifically documents methodology and provides performance standards including but not
limited to:
i. Percent vegetative cover;
ii. Percent invasive species cover;
iii. Species richness; and
iv. Amount of large woody debris.
8. Buffer Uses. The following uses may be permitted within a wetland buffer in accordance with the
review procedures of this title; provided, they are not prohibited by any other applicable law and they
are conducted in a manner so as to minimize impacts to the buffer and adjacent wetland:
a. All activities allowed by ECDC 23.50.020 (Allowed activities — wetlands).
Page 45 of 87
Packet Pg. 414
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Conservation and Restoration Activities. Conservation or restoration activities aimed at protecting the
soil, water, vegetation, or wildlife.
c. Passive Recreation. Passive recreation facilities designed and in accordance with an approved critical
area report, including:
i. Walkways and trails; provided, that those pathways are generally constructed with a surface that does
not interfere with substrate permeability, are generally located only in the outer twenty-five percent
(25%) of wetland buffers, and are located to avoid removal of significant trees. Where existing legally
established development has reduced the width of the wetland buffer, trails may be placed in the outer
twenty-five percent (25%) of the remaining wetland buffer. The trail shall be no more than five (5) feet
in width and for pedestrian use only. Raised boardwalks utilizing nontreated pilings may be acceptable.
The director may allow trails within the inner twenty-five percent (25%) of wetland buffers when
required to provide access to wildlife viewing structures, fishing access areas, or connections to other
trail facilities;
ii. Wildlife viewing structures; and
iii. Fishing access areas down to the water's edge that shall be no larger than six feet.
c. Storm Water Management Facilities. Storm water management facilities, limited to outfalls, pipes and
conveyance systems, storm water dispersion outfalls and bioswales, may be allowed within the outer 25
percent of a standard or modified buffer for Category 3 or 4 wetlands only; provided, that:
i. No other location is feasible; and
ii. The location and function of such facilities will not degrade the functions or values of the wetland.
iii. Storm water management facilities are not allowed in buffers of Category 1 or 2 wetlands.
iv. Projects shall also comply with all applicable requirements in Chapter 18.30 ECDC, Stormwater
Management, including Minimum Requirement #8, Wetland Protection.
H. Signs and Fencing of Wetlands.
1. Temporary Markers. The outer perimeter of the wetland or buffer and the limits of those areas to be
disturbed pursuant to an approved permit or authorization shall be marked in the field in such a way as
to ensure that no unauthorized intrusion will occur and is subject to inspection by the director prior to
the commencement of permitted activities. The director may require the use of fencing to protect
wetlands from disturbance and intrusion. Temporary marking shall be maintained throughout
construction and shall not be removed until permanent signs, if required, are in place.
2. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the
director may require the applicant to install permanent signs along the boundary of a wetland or buffer.
Page 46 of 87
Packet Pg. 415
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
a. Permanent signs shall be made of an enamel -coated metal face and attached to a metal post or another
nontreated material of equal durability. Signs must be posted at an interval of one per lot or every 50
feet, whichever is less, and must be maintained by the property owner in perpetuity. The sign shall be
worded as follows or with alternative language approved by the director:
Protected Wetland Area
Do Not Disturb
Contact the City of Edmonds
Regarding Uses and Restrictions
b. The provisions of subsection (G)(2)(a) of this section may be modified as necessary to assure
protection of sensitive features or wildlife.
3. Permanent Fencing. Permanent fencing shall be required at the outer edge of the critical area buffer
under the following circumstances, provided that the director may waive this requirement:
a. As part of any development proposal for single-family plats, single-family short plats, multifamily,
mixed use, and commercial development where the director determines that such fencing is necessary to
protect the functions of the critical area, provided that breaks in permanent fencing may be allowed for
access to permitted buffer uses (ECDC 23.50.040.G.8);
b. As part of development proposals for parks where the adjacent proposed use is active recreation and
the director determines that such fencing is necessary to protect the functions of the critical area;
c. When buffer averaging is employed as part of a development proposal;
d. When buffer reductions are employed as part of a development proposal; or
e. At the director's discretion to protect the values and functions of a critical area.
I. Additions to Structures Existing Within Wetlands and/or Wetland Buffers.
1. Additions to legally constructed structures existing within wetlands or wetland buffers that increase
the footprint of development or impervious surfacing shall be permitted consistent with the development
standards of this section, provided that a wetland and/or buffer enhancement plan is provided to mitigate
for impacts consistent with this Title, and provided that all impacts from temporary disturbances within
the critical area buffer shall be addressed through use of best management plans and buffer enhancement
plantings during and following construction of the allowed alteration. Provisions for standard wetland
buffers, wetland buffer averaging with enhancement, and buffer reductions with enhancement require
applicants to locate such additions in accordance with the following sequencing:
a. Outside of the standard wetland buffer;
Page 47 of 87
Packet Pg. 416
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Outside of a wetland buffer averaged (with enhancement) per subsection (G)(3) of this section;
c. Outside of a wetland buffer reduced (with enhancement) per subsection (G)(4) of this section;
d. Outside of the inner twenty five percent (25%) of the standard wetland buffer width with no more
than three hundred (300) square feet of structure addition footprint within the inner fifty percent (50%)
of the standard wetland buffer width, provided that enhancement is provided at a minimum three -to -one
(3:1) ratio (enhancement -to -impact);
e. Outside of the inner twenty five percent (25%) of the standard wetland buffer width with no more
than five hundred (500) square feet of new footprint within the inner fifty percent (50%) of the standard
wetland buffer width, provided that enhancement is provided at a minimum five -to -one (5:1) ratio
(enhancement -to -impact), and that stormwater low impact development (LID) techniques and other
measures are included as part of the wetland / buffer enhancement plan.
2. Where meeting wetland buffer enhancement requirements required by H.1. of this section would
result in enhancement that is separated from the critical area due to uncommon property ownership,
alternative enhancement approaches may be approved by the director. Alternative approaches could
include a vegetated rain garden that receives storm runoff, replacement of existing impervious surfaces
with pervious materials, or other approaches that provide ecological benefits to the adjacent critical area.
3. Additions to legally constructed structures existing within wetlands or wetland buffers that cannot be
accommodated in accordance with the sequencing in H.1. of this section (i.e., additions proposed within
a wetland or the inner 25 percent of a standard buffer width) may be permitted at the director's
discretion as a variance subject to review by the city hearing examiner and the provisions of ECDC
2340210
J. Development Proposals within the Footprint of Existing Development. New development shall be
allowed within the footprint of existing development occurring within a wetland buffer, provided that
the following conditions are met:
1. The footprint of existing development was legally established, and is consistent with the definition
provided in ECDC 23.40.320;
2. The proposed development within the footprint of existing development is sited as far away from the
wetland edge as is feasible;
3. As part of the development proposal, opportunities to reduce the footprint of existing development are
implemented where such reduction would increase the buffer width adjacent to the wetland and not
represent an undue burden given the scale of the proposed development.
4. The proposed development includes enhancement to the adjacent wetland and associated buffer in
order to improve functions degraded by previous development;
5. Enhancement is provided as wetland or buffer enhancement for an equivalent area of the footprint of
the newly proposed development within the footprint of existing development occurring in a wetland
Page 48 of 87
Packet Pg. 417
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
buffer, or through an alternative approach approved by the director that restores degraded functions of
the wetland and remaining buffer; and
6. Impacts from temporary disturbances within the wetland buffer shall be addressed through use of best
management plans and buffer enhancement plantings during and following construction of the allowed
alteration.
K. Small, hydrologically isolated wetlands. The director may allow small, hydrologically isolated
Category III or IV wetlands under one thousand(1,000) square feet in area to be exempt from the
avoidance sequencing provisions of ECDC 23.40.120 and the wetland development standards provisions
of ECDC 23.50.040.F. At the discretion of the director such wetlands may be altered, provided that a
submitted critical areas report and mitigation plan provides evidence that all of the following conditions
are met:
1. The wetland is less than one thousand (1,000) square feet in area;
2. The wetland does not provide significant habitat value for wildlife;
3. The wetland is not adjacent to a riparian area;
4. The wetland has a score of three (3) — four (4) points for habitat in the adopted Western Washington
rating system; and
5. A mitigation plan to replace lost wetland functions and values is developed, approved and
implemented consistent with ECDC 23.50.050. [Ord. 3527 § 2, 2004].
23.50.050 Mitigation requirements — Wetlands.0 SHARE
Compensatory mitigation for alterations to wetlands shall achieve equivalent or greater biologic
functions. Wetland mitigation plans shall be consistent with guidelines in Wetland Mitigation in
Washington State —Part 2: Developing Mitigation Plans (Ecology, 2006) and Selecting Wetland
Mitigation Sites Using a Watershed Approach (Ecology, 2009), as revised.
A. Mitigation for Lost or Affected Functions. Compensatory mitigation actions shall address functions
affected by the alteration to achieve functional equivalency or improvement and shall provide similar
wetland functions as those lost, except when:
1. The lost wetland provides minimal functions as determined by a site -specific function assessment, and
the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide
functions shown to be limiting within a watershed through a formal Washington State watershed
assessment plan or protocol; or
2. Out -of -kind replacement will best meet formally identified watershed goals, such as replacement of
historically diminished wetland types.
Page 49 of 87
Packet Pg. 418
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
B. Preference of Mitigation Actions. Mitigation actions that require compensation by replacing,
enhancing, or substitution shall occur in the following order of preference:
1. Implementing compensatory restoration through purchase of credits at an approved mitigation bank or
through payment into an approved in lieu fee program.
2. Restoring (re-establishing) wetlands on upland sites that were formerly wetlands.
3. Creating wetlands on disturbed upland sites such as those with vegetative cover consisting primarily
of nonnative, introduced species. This should only be attempted when there is a consistent source of
hydrology and it can be shown that the surface and subsurface hydrologic regime is conducive for the
wetland community that is being designed.
4. Enhancing significantly degraded wetlands in combination with restoration or creation. Such
enhancement should be part of a mitigation package that includes replacing the impacted area meeting
appropriate ratio requirements.
C. Type and Location of Mitigation. Unless it is demonstrated that a higher level of ecological
functioning would result from an alternate approach, compensatory mitigation for ecological functions
shall be in -kind and conducted on the site or in the vicinity of the alteration except when all of the
following apply:
1. On -site opportunities do not have a high likelihood of success, after a determination of the natural
capacity of the site to mitigate for the impacts. Consideration should include: anticipated wetland
mitigation replacement ratios, buffer conditions and proposed widths, hydrogeomorphic classes of on -
site wetlands when restored, proposed flood storage capacity, and potential to mitigate riparian fish and
wildlife impacts (such as connectivity);
2. Off -site mitigation has a greater likelihood of providing equal or improved wetland functions than the
impacted wetland;
3. Off -site mitigation incorporates guidance from Calculating Credits and Debits for Compensatory
Mitigation in Wetlands of Western Washington (Ecology Publication #10-06-011, Hruby. 2012); and
4. Off -site locations for compensatory mitigation are consistent with city of Edmonds goals for
watershed -wide ecological restoration. Off -site locations are selected with a preference for sites within
the same basin as the impact, followed by other sites within the city. Specific areas targeted for
restoration efforts include:
a. Lake -fringe wetlands and habitat areas associated with Lake Ballinger;
b. Edmonds marsh;
c. Yost Park wetlands;
d. Good Hope wetlands;
Page 50 of 87
Packet Pg. 419
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
e. Wetlands and habitat areas peripheral to anadromous fish -bearing streams; and
f. Sites available through an approved mitigation bank or in -lieu fee program. This list is not
comprehensive and may change as the city of Edmonds identifies areas suitable for restoration and
capital improvement projects consistent with goals for jurisdiction -wide habitat retention and
enhancement provided in the city's comprehensive plan.
D. Mitigation Timing. Mitigation projects shall be completed with an approved monitoring plan prior to
activities that will disturb wetlands. In all other cases, mitigation shall be completed immediately
following disturbance and prior to use or occupancy of the activity or development. Construction of
mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora.
E. Mitigation Ratios.
1. Acreage Replacement Ratios. The ratios in the table below shall apply to creation or re-establishment,
rehabilitation, or enhancement that is in -kind, is on -site, is timed prior to or concurrent with alteration,
and has a high probability of success. These ratios do not apply to remedial actions resulting from
unauthorized alterations; greater ratios shall apply in those cases. The first number specifies the acreage
of replacement wetlands and the second specifies the acreage of wetlands altered. Ratios for
rehabilitation and enhancement may be reduced when combined with 1:1 replacement through creation
or re-establishment pursuant to Table la, Wetland Mitigation in Washington State — Part 1: Agency
Policies and Guidance —Version 1, (Ecology Publication #06-06-1 la, or as revised). Creation, re-
establishment, rehabilitation, and enhancement definitions are provided in ECDC 23.40.320 (see
definition for "compensatory mitigation", and shall be additionally consistent with intent pursuant to
Ecology Publication #06-06-1 la.
Creation or
Category and
Rehabilitation
Enhancement
Re -
Type of Wet/and
only
only
establishment
Category IV
1.5:1
3:1
6:1
Category III
2:1
4:1
8:1
Category II
3:1
6:1
12:1
Category I:
4:1
8:1
16:1
Based on functions
Category I:
6:1
12:1
24:1
Mature and old
Page 51 of 87
Packet Pg. 420
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
growth forest
Category I:
Not considered
Not considered
Not considered
High conservation
possible
possible
possible
value / Bog
Mitigation requirements may also be determined using the credit/debit tool described in Calculating
Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington: Final Report
(Ecology Publication #10-06-011, Olympia, WA, March 2012, or as revised) if approved by the director
2. Off -site Mitigation. The ratios provided in ECDC 23.50.050.F.1. do not apply to off -site mitigation,
including use of credits from a state -certified wetland mitigation bank or payment to a certified in -lieu
fee program. When off -site mitigation is proposed, or when a mitigation bank or in lieu fee program is
used, replacement ratios may incorporate guidance from Calculating Credits and Debits for
Compensatory Mitigation in Wetlands of Western Washington (Ecology Publication #10-06-011,
Hruby. 2012), and for mitigation banks or in lieu fee program should be consistent with the certification
requirements. Use of mitigation banks shall meet all requirements of ECDC 23.50.050.H.
3. Increased Replacement Ratio. The director may require increased compensatory mitigation ratios
under the following circumstances:
a. Uncertainty exists as to the probable success of the proposed restoration or creation;
b. A significant period of time will elapse between impact and replication of wetland functions;
c. Proposed mitigation will result in a lower -category wetland or reduced functions relative to the
wetland being impacted; or
d. The impact was an unauthorized impact.
G. Wetlands Enhancement as Mitigation.
1. Impacts to wetland functions may be mitigated by enhancement of existing significantly degraded
wetlands, but may, at the discretion of the director, be used in conjunction with restoration and/or
creation. Applicants proposing to enhance wetlands must produce a critical areas report that identifies
how enhancement will increase the functions of the degraded wetland and how this increase will
adequately mitigate for the loss of wetland area and function at the impact site. An enhancement
proposal must also show whether existing wetland functions will be reduced by the enhancement
actions.
2. At a minimum, enhancement acreage shall be double the acreage required for creation or restoration
under subsection F of this section. The ratios shall be greater than double the required acreage where the
enhancement proposal would result in minimal gain in the performance of wetland functions and/or
result in the reduction of other wetland functions currently being provided in the wetland.
Page 52 of 87
Packet Pg. 421
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
3. Mitigation ratios for enhancement in combination with other forms of mitigation shall range from six -
to -one to three -to -one and be limited to Class 3 and 4 wetlands.
H. Wetland Mitigation Banks and In -Lieu Fee Programs.
1. Wetland Mitigation Banks. Credits from a wetland mitigation bank may be approved for use as
compensation for unavoidable impacts to wetlands when:
a. The bank is certified under state rules;
b. The director determines that the wetland mitigation bank provides appropriate compensation for the
authorized impacts; and
c. The proposed use of credits is consistent with the terms and conditions of the bank's certification
instrument.
d. Replacement ratios for projects using bank credits are consistent with replacement ratios specified in
the bank's certification.
e. Credits from a certified wetland mitigation bank are used to compensate for impacts located within
the service area specified in the certified bank instrument. In some cases, the service area of the bank
may include portions of more than one adjacent drainage basin for specific wetland functions.
2. In -Lieu Fee Programs. As an alternative to on -site or other off -site mitigation approaches, the director
may approve purchase of credit for compensatory mitigation from an in lieu fee program. Any such
program used to compensate for direct wetland impacts shall be developed and approved through a
public process and be consistent with federal rules, state policy on in lieu fee mitigation and state water
quality regulations, Determining credit purchase necessary to compensate for wetland impacts shall
incorporate guidance from Calculating Credits and Debits for Compensatory Mitigation in Wetlands of
Western Washington (Ecology Publication #10-06-011, Hruby. 2012). Development proposals
impacting critical areas and/or associated buffers may contribute payment towards an identified City of
Edmonds mitigation project with approval from the director, provided that the mitigation approach
meets all state and federal permit requirements, where required. Applicant provision of funds for
compensatory mitigation shall only be approved if:
a. The director determines that it would provide environmentally appropriate compensation for the
proposed wetland impacts;;
b. The mitigation will occur on a site identified using the site selection and prioritization process in the
approved in -lieu fee program instrument or at a City -identified restoration site consistent with
ECDC23.40.140;
c. A restoration area and plan have been identified and shall be implemented within three years of
project development;
d. Restoration efforts are focused in areas identified as suitable for restoration by the director; and
Page 53 of 87
Packet Pg. 422
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
e. Credits from an approved in -lieu fee program may be used to compensate for impacts located within
the service area specified in the approved in -lieu fee instrument.
[Ord. 3527 § 2, 2004].
23.50.060 Performance standards — Subdivisions.C3 SHARE
The subdivision and short subdivision of land in wetlands and associated buffers is subject to the
following:
A. Land that is located wholly within a wetland or its buffer may not be subdivided.
B. Land that is located partially within a wetland or its buffer may be subdivided; provided, that an
accessible and buildable contiguous portion of each new lot is located outside of the wetland and its
buffer.
C. Access roads and utilities serving the proposed subdivision may be permitted within the wetland and
associated buffers only at the discretion of the director. [Ord. 3527 § 2, 2004].
Part V. City of Edmonds Wetland Field Data Form
23.50.070 Wetland field data form.0 SHARE
The wetland field data used for completion of wetland ratings shall be consistent with the Washington
State Wetland Rating System for Western Washington: 2014 Update (Ecology Publication #14-06-029;
Hruby 2014). [Ord. 3527 § 2, 2004].
Figure 23.50.000
Page 54 of 87
Packet Pg. 423
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements*
Wetlands
Wetlra and nv
Wetland Reconnais•
billet
RetonnaissanWetiand aelineatiw=:-gingwtn y
ce
Impactscannot Nffu
tarot buffer
Q-
belccated
sance REQUIRED to
determ Ines that REQUIRED to identify be avoided-hd^M—j
Averagingand
NDadditional
(D
on or near
dctermi ne if potential
jurisdictional wetland bound atic R through )IF
Enhancement Plan
compliance
V
Subject
wetland meetsjurisdi[-
wetland exist and classify wetland standard buffer
REQiHREO to prove
required.
C
parcel-
Llonal criteria and is
within 22.5 ft of per updated wld NS
ention orincmase
located within 2259of
subject parcel. categoi ies.
in wetland functions
subject pa r[el.
and va I ues.
Butter wiEih tM�ciien
O
th rp,�r:nhor.�mc^t
[: cgury3a^4+
Wetland Buller
Recon n ai5sa ace identifies
Wetland Impacts are
cv ^ning rarwap
iF..hattccmcrrc Plan
No additional
i
Q
well andis not jurisdictienal
avridPA thrnupjn
EQDIRED to prove
compliance
(and jurlsdlctlonaI determl-
standard buffer
etention orInc rease
required-
nation is confirmed by the
widths for wetland
in wetland tunctfons
J,& Army Gor ps of
category.
and va lues.
a+
Engineers); or reconnais-
L
sauce identifies th at
V
wetland Is located � 225It
Wetland Buffer
from su bfect parcel.
No
wota^a im j
Mitigation Plan
additional
mitas=c.
REQII I RED Per
compliance
j
upda led cede require-
No additional
requirements.
mentstoprove
compliance
r
'Lea Idea or increase
required.
No additional
of wetland (uric lions
CD
0)
compliance
:aoda,mlu�
M
l requirements.
N
t
Nearing Examiner
imrr«tsca^^ot to
EQUOR Ell only forvanances
nie®�ue
projects for wh[chi mpacts
0
B
nnot be mitigated to retain
i
w•elland functions and
values.
�
'(span rwry bemen[s may( hP mat thmueh Suh111IM1nn nl a sleele nd[ral area tP. fMrt or mldtlplo roparts In fnmbir atlnn.
M
Page 55 of 87
Packet Pg. 424
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.60
CRITICAL AQUIFER RECHARGE AREAS
Sections:
Part I. Designation, Rating and Mapping
23.60.010 Critical aquifer recharge areas designation.
Part I. Designation, Rating and Mapping
23.60.010 Critical aquifer recharge areas designation.0 SHARE
Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect on aquifers used
for potable water as defined by WAC 365-190-030(2). CARAs have prevailing geologic conditions
associated with infiltration rates that create a high potential for contamination of ground water resources
or contribute significantly to the replenishment of ground water. CARAs are protected as critical areas
under the Washington State Growth Management Act. However, no areas meeting criteria for CARAs
exist in the vicinity of the city of Edmonds. Thus, additional specific provisions for protection of this
critical area type are not provided within this title. [Ord. 3527 § 2, 2004].
Page 56 of 87
Packet Pg. 425
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.70
FREQUENTLY FLOODED AREAS
Sections:
Part I. Designation, Rating and Mapping
23.70.010 Designation, rating and mapping —Frequently flooded areas.
Part IL Additional Report Requirements — Frequently Flooded Areas
23.70.020 Special study and report requirements — Frequently flooded areas.
23.70.030 Warning and disclaimer of liability.
Part III. Development Standards — Frequently Flooded Areas
23.70.040 Development standards — Frequently flooded areas.
Part I. Designation, Rating and Mapping
23.70.010 Designation, rating and mapping — Frequently flooded areas. SHRRE
A. Frequently Flooded Areas. Frequently flooded areas shall include:
1. Those areas identified on FEMA flood insurance maps as areas of special flood hazard, which include
those lands in the floodplain subject to a one percent or greater chance of flooding in any given year. For
the purposes of this title, areas of special flood hazard for the city of Edmonds are hereby declared
generally to be those areas shown as Zone A (including Zones A, AE, Al—A30, AH, AO, AR and A99)
and Zone V (including Zones V and VE) on the following FEMA maps or panels: 53061C00;
53061 C 1292 E, Panel 1292; 53061 C 1285 E, Panel 1285; 53061 C 1315 E, Panel 1315; and 53061 C 1305
E, Panel 1305. The city will use the most currently adopted FEMA maps in determining whether a
property is located within a frequently flooded area. Base flood elevations and flood hazard factors for
those areas shown as Zone A on the map have not been determined and the local flood management
administrator shall utilize such other data as may be reasonably available from federal, state or other
sources in administering this chapter as provided in the current editions of the International Residential
Code and International Building Code, as adopted in ECDC Title 19.
2. Those areas identified as frequently flooded areas on the city of Edmonds critical areas inventory.
Identified frequently flooded areas are consistent with and based upon designation of areas of special
flood hazard on FEMA flood insurance maps as indicated above.
B. City Discretion and Designation. Flood insurance maps and the city's critical areas inventory are to
be used as a guide for the city of Edmonds development services department, project applicants and/or
property owners, and the public and should be considered a minimum designation of frequently flooded
Page 57 of 87
Packet Pg. 426
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
areas. As flood insurance maps may be continuously updated as areas are reexamined or new areas are
identified, newer and more restrictive information for flood hazard area identification shall be the basis
for regulation. The city of Edmonds shall retain the right to designate and identify areas known to be
prone to flooding outside of the 100-year floodplain and subject them to the provisions and protections
of this title and the current editions of the International Residential Code and International Building
Code, as adopted in ECDC Title 19. [Ord. 3527 § 2, 20041.
Part IL Additional Report Requirements — Frequently Flooded Areas
23.70.020 Special study and report requirements — Frequently flooded areas.0 SHARE
In addition to the general critical areas report requirements of ECDC 23.40.090, critical areas reports for
frequently flooded areas must meet the requirements of this section and the current editions of the
International Residential Code and International Building Code, as adopted in ECDC Title 19. Critical
areas reports for two or more types of critical areas must meet the report requirements for each relevant
type of critical area.
A. Preparation by a Qualified Professional. A frequently flooded areas report shall be prepared by a
qualified professional who is a hydrologist or engineer, licensed in the state of Washington, with
experience in preparing flood hazard assessments. Pursuant to ECDC 23.40.090(A), applicants may
choose one of the qualified technical consultants on the city's approved list in preparing critical areas
reports for frequently flooded areas, or may utilize an alternative consultant. Critical areas studies and
reports developed by an alternative consultant shall be subject to independent review pursuant to ECDC
23.40.090(B).
B. Areas to Be Addressed. The following areas shall be addressed in a critical areas report for frequently
flooded areas:
1. The site area of the proposed activity;
2. All areas of a special flood hazard area, as indicated on the flood insurance map(s), within 200 feet of
the project area; and
3. All other flood areas indicated on the flood insurance map(s) within 200 feet of the project area.
C. Flood Hazard Assessment. A critical area report for a proposed activity within a frequently flooded
area shall contain a flood hazard assessment including the following site- and proposal -related
information at a minimum:
1. Site and Construction Plans. A copy of the site and construction plans for the development proposal
showing:
a. Floodplain (100-year flood elevation), 10- and 50-year flood elevations, floodway, other critical areas,
buffers, and shoreline areas;
Page 58 of 87
Packet Pg. 427
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Proposed development, including the location of existing and proposed structures, fill, storage of
materials, and drainage facilities, with dimensions indicating distances to the floodplain;
c. Clearing limits; and
d. Elevation of the lowest floor (including basement) of all structures, and the level to which any
nonresidential structure has been floodproofed.
2. Watercourse Alteration. Alteration of natural watercourses shall be avoided, if feasible. If
unavoidable, a critical areas report shall include:
a. Extent of Watercourse Alteration. A description of and plan showing the extent to which a
watercourse will be altered or relocated as a result of a proposal;
b. Maintenance Program Required for Watercourse Alterations. A maintenance program that provides
maintenance practices for the altered or relocated portion of the watercourse to ensure that the flood -
carrying capacity is not diminished.
D. Information Regarding Other Critical Areas. Potential impacts to wetlands, fish and wildlife habitat,
and other critical areas shall be addressed in accordance with the applicable sections of this title. [Ord.
3527 § 2, 2004].
23.70.030 Warning and disclaimer of liability.0 SHARE
The degree of flood protection required by this chapter and the current editions of the International
Residential Code and International Building Code, as adopted in ECDC Title 19, is considered
reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger
floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural
causes. This chapter does not imply that land outside frequently flooded areas or uses permitted within
such areas will be free from flooding or flood damages. This chapter shall not create liability on the part
of the city of Edmonds, any officer or employee thereof, or the Federal Insurance Administration for any
flood damages that result from reliance on this chapter or any administrative decision lawfully made
hereunder. [Ord. 3527 § 2, 2004].
Part III. Development Standards — Frequently Flooded Areas
23.70.040 Development standards — Frequently flooded areas-0 SHARE
Development standards and provisions for protection of frequently flooded areas are provided as
applicable to areas of special flood hazard in the current editions of the International Residential Code
and International Building Code, as adopted in ECDC Title 19. Conformance with the provisions for
flood hazard reduction of the current editions of the International Residential Code and International
Building Code, as adopted in ECDC Title 19, shall constitute conformance with ECDC 23.40.050,
Protection of critical areas, per the mandates of the Washington Growth Management Act and the
purposes and objectives of this title. [Ord. 3527 § 2, 2004].
Page 59 of 87
Packet Pg. 428
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Chapter 23.80
GEOLOGICALLY HAZARDOUS AREAS
Sections:
Part I. Designation, Rating and Mapping
23.80.000 Geologically hazardous areas compliance requirements flowchart.
23.80.010 Designation, rating and mapping —Geologically hazardous areas.
23.80.020 Designation of specific hazard areas.
23.80.030 Mapping of geologically hazardous areas.
Part II. Allowed Activities — Geologically Hazardous Areas
23.80.040 Allowed activities — Geologically hazardous areas.
Part III. Additional Report Requirements — Geologically Hazardous Areas
23.80.050 Special study and report requirements — Geologically hazardous areas.
Part IV. Development Standards — Geologically Hazardous Areas
23.80.060 Development standards — General requirements.
23.80.070 Development standards — Specific hazards.
Part I. Designation, Rating and Mapping
23.80.000 Geologically hazardous areas compliance requirements flowchart.0 SHARE
See Figure 23.80.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.80.010 Designation, rating and mapping — Geologically hazardous areas.C3 SHARE
Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other
geological events. They pose a threat to the health and safety of citizens when incompatible
development is sited in areas of significant hazard. Such incompatible development may not only place
itself at risk, but also may increase the hazard to surrounding development and use. Areas susceptible to
one or more of the following types of hazards shall be designated as a geologically hazardous area:
Page 60 of 87
Packet Pg. 429
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
A. Erosion hazard;
B. Landslide hazard; and
C. Seismic hazard. [Ord. 3527 § 2, 2004].
23.80.020 Designation of specific hazard areas.O SHARE
A. Erosion Hazard Areas. Erosion hazard areas are at least those areas identified by the U.S. Department
of Agriculture's Natural Resources Conservation Service as having a "moderate to severe," "severe," or
"very severe" rill and inter -rill erosion hazard. Erosion hazard areas are also those areas impacted by
shoreland and/or stream bank erosion. Within the city of Edmonds erosion hazard areas include:
1. Those areas of the city of Edmonds containing soils that may experience severe to very severe erosion
hazard. This group of soils includes, but is not limited to, the following when they occur on slopes of 15
percent or greater:
a. Alderwood soils (15 to 25 percent slopes);
b. Alderwood/Everett series (25 to 70 percent slopes);
c. Everett series (15 to 25 percent slopes);
2. Coastal and stream erosion areas which are subject to the impacts from lateral erosion related to
moving water such as stream channel migration and shoreline retreat.
3. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils
and springs or ground water seepage; and
4. Areas with significant visible evidence of ground water seepage, and which also include existing
landslide deposits regardless of slope.
B. Landslide Hazard Areas. Landslide hazard areas are areas potentially subject to landslides based on a
combination of geologic, topographic, and hydrologic factors. They include areas susceptible because of
any combination of soil, slope (gradient), slope aspect, structure, hydrology, or other factors. Within the
city of Edmonds potential landslide hazard areas include:
1. Areas of ancient or historic failures in Edmonds which include all areas within the earth subsidence
and landslide hazard area as identified in the 1979 report of Robert Lowe Associates and amended by
the 1985 report of GeoEngineers, Inc. and further discussed in the 2007 report by Landau Associates;
2. Coastal areas mapped as class u (unstable), uos (unstable old slides), and urs (unstable recent slides)
in the Department of Ecology Washington coastal atlas;
3. Areas designated as quaternary slumps, earthflows, mudflows, or landslides on maps published by the
United States Geological Survey or Washington State Department of Natural Resources;
Page 61 of 87
Packet Pg. 430
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
Figure 1
Simple Slope Calculation
The slope calculation guidance shall be used to determine the toe and top of % slope for slopes that
are potentially landslide hazard areas or potentiallyerosion hazard areas.
Toe and top of landslide hazard areas (generally slopes of 4Wo
or greater) delineated where incline reverses or diminishes to
<40Vo over at least 10 feet of horizontal distance.
Toe and top of erosion hazard areas (generally slopes 15-40%)
delineated where incline reverses or diminishes to t15%over
at IPAst 10 fppt of hnri7nntal rlidanrp
Toe oft
40%slope (landslide
hazard area) or <1594
slope (erosion ham rd
area) over min 10 ft. 10,
Top of Slope
r
V (Vertical Rise)
% Slope = x 100%
H QHorizontalRun)
Note: Steps, gradientchanges, and incline reversals or breaks below percent slopesdellning landslide
harard areas (40%) and erasion hazard areas (15%) shall be included as part of the larger slope.
4. Any slope of forty percent (40%) or steeper that exceeds a vertical height of ten (10) feet over a
twenty-five (25) foot horizontal run. Except for rockeries that have been engineered and approved by the
engineer as having been built according to the engineered design, all other modified slopes (including
slopes where there are breaks in slopes) meeting overall average steepness and height criteria should be
considered potential landslide hazard areas);
5. Any slope with all three of the following characteristics:
a. Slopes steeper than fifteen percent (15%);
Page 62 of 87
Packet Pg. 431
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively
impermeable sediment; and
c. Springs or groundwater seepage;
6. Any area potentially unstable as a result of rapid stream incision or stream bank erosion;
7. Any area located on an alluvial fan, presently subject to, or potentially subject to, inundation by debris
flow or deposition of stream -transported sediments; and
8. Any slopes that have been modified by past development activity that still meet the slope criter
C. Seismic Hazard Areas. Seismic hazard areas are areas subject to severe risk of damage as a result of
earthquake -induced ground shaking, slope failure, settlement, soil liquefaction, lateral spreading, or
surface faulting. These areas are designated as having a "high" and "moderate to high" risk of
liquefaction as mapped on the Liquefaction Susceptibility Map of Snohomish County by the
Washington State Department of Natural Resources or areas located within landslide hazard areas..
[Ord. 3527 § 2, 2004].
23.80.030 Mapping of geologically hazardous areas.l SHARE
A. The approximate location and extent of geologically hazardous areas are shown on the city of
Edmonds critical areas inventory. In addition, resources providing information on the location and
extent of geologically hazardous areas in Edmonds include:
1. Washington Department of Ecology coastal zone atlas (for marine bluffs);
2. U.S. Geological Survey geologic maps, landslide hazard maps, and seismic hazard maps;
3. Washington State Department of Natural Resources seismic hazard maps for Western Washington;
4. Washington State Department of Natural Resources slope stability maps;
5. National Oceanic and Atmospheric Administration tsunami hazard maps; and
6. Federal Emergency Management Administration flood insurance maps.
B. The critical areas inventory and the resources cited above are to be used as a guide for the city of
Edmonds development services department, project applicants and/or property owners and may be
continuously updated as new critical areas are identified. They are a reference and do not provide a final
critical area designation. [Ord. 3527 § 2, 2004].
Part II. Allowed Activities — Geologically Hazardous Areas
Page 63 of 87
Packet Pg. 432
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
23.80.040 Allowed activities — Geologically hazardous areas.P SHARE
The following activities are allowed in geologically hazardous areas as consistent with ECDC
23.40.220, Allowed activities, Chapter 19.10 ECDC, Building Permits — Earth Subsidence and
Landslide Hazard Areas, and Chapter 18.30 ECDC, Storm Water Management, and do not require
submission of a critical area report:
A. Erosion and Landslide Hazard Areas. Except for installation of fences and as otherwise provided for
in this title, only those activities approved and permitted consistent with an approved critical areas report
in accordance with this title shall be allowed in erosion or landslide hazard areas.
B. Seismic Hazard Areas. The following activities are allowed within seismic hazard areas:
1. Construction of new buildings with less than 2,500 square feet of floor area or roof area, whichever is
greater, and which are not residential structures or used as places of employment or public assembly;
2. Additions to existing single -story residences that are 250 square feet or less; and
3. Installation of fences. [Ord. 3527 § 2, 2004].
Part III. Additional Report Requirements — Geologically Hazardous Areas
23.80.050 Special study and report requirements — Geologically hazardous areas.
SHARE
Critical area report requirements for geologically hazardous areas are generally met through submission
to the director of one or more geotechnical reports. In addition to the general critical areas report
requirements of ECDC 23.40.090, critical areas reports for geologically hazardous areas must meet the
requirements of this section and Chapters 18.30 and 19.10 ECDC as applicable. Critical areas reports for
two or more types of critical areas must meet the report requirements for each relevant type of critical
area. Geotechnical report(s) submitted for the purpose of critical areas review are required as necessary
in addition to reports, data and other information mandated per ECDC Titles 18 and 19. Geotechnical
report(s) shall be required: whenever a potential erosion hazard area or potential landslide hazard area,
as mapped by Edmonds critical areas inventory or shown on other information consistent with ECDC
23.80.030, is located within 50 feet of the proposed development site; whenever a development site is
located within a seismic hazard area; or when otherwise determined warranted by the director (e.g. a
distance equal to the height of the slope).
A. Preparation by a Qualified Professional. A critical areas report for assessing a potential geologically
hazardous area shall be prepared by a geologist licensed in the state of Washington, with experience
analyzing geologic, hydrologic, and ground water flow systems, and who has experience preparing
reports for the relevant type of hazard. If mitigation measures are necessary, the report detailing the
mitigation measures and design of the mitigation shall be prepared by an engineer licensed in the State
of Washington, with experience stabilizing slopes with similar geotechnical properties. Critical areas
studies and reports on geologically hazardous areas shall be subject to independent review pursuant to
ECDC 23.40.090(B).
Page 64 of 87
Packet Pg. 433
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
B. Area Addressed in Critical Areas Report. The following areas shall be addressed in a critical areas
report for geologically hazardous areas:
1. The project area of the proposed activity; and
2. All geologically hazardous areas within 200 feet of the project area or that have the potential to be
affected by the proposal.
C. Geological Hazards Assessment. A geology hazard assessment report for a geologically hazardous
area shall include a field investigation and contain an assessment of whether or not each type of geologic
hazard identified in ECDC 20.80.020 is present or not present and if development of the site will
increase the risk of landslides or erosion on or off the site. Geotechnical reports shall be prepared,
stamped and signed by a qualified professional. These reports must:
1. Be appropriate for the scale and scope of the project;
2. Include a discussion of all geologically hazardous areas on the site and any geologically hazardous
areas off site potentially impacted by the proposed project. If the affected area extends beyond the
subject property, the geology hazard assessment may utilize existing data sources pertaining to that area;
3. Clearly state that the proposed project will not decrease slope stability or pose an unreasonable threat
to persons or property either on or off site and provide a rationale as to those conclusions based on
geologic conditions and interpretations specific to the project;
4. Provide adequate information to determine compliance with the requirements of ECDC Chapter
23.80;
5. Generally follow the guidelines set forth in the Washington State Department of Licensing Guidelines
for Preparing Engineering Geology Reports in Washington (2006). In some cases, such as when it is
determined that no landslide or erosion risk is present, a full report may not be necessary to determine
compliance with the ECDC Chapter 23.80, and in those cases a letter or abbreviated report may be
provided.
6. If a landslide or erosion hazard is identified, provide minimum setback recommendations for avoiding
the landslide or erosion hazard, other recommendations for site development so that the frequency or
magnitude of landsliding or erosion on or off the site is not altered, and recommendations consistent
with ECDC 23.80.060 and 23.80.070.
D. Incorporation of Previous Study. Where a valid critical areas report has been prepared within the last
five years for a specific site, and where the proposed land use activity and surrounding site conditions
are unchanged, said report may be incorporated into the required critical areas report. The applicant shall
submit a hazards assessment detailing any changed environmental conditions associated with the site.
E. Mitigation of Long -Term Impacts. When hazard mitigation is required, the mitigation plan shall
specifically address how the activity maintains or reduces the preexisting level of risk to the site and all
other properties potentially impacted on a long-term basis (equal to or exceeding the projected lifespan
Page 65 of 87
Packet Pg. 434
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
of the activity or occupation). Proposed mitigation techniques shall be considered to provide long-term
hazard reduction only if they do not require regular maintenance or other actions to maintain their
function. Mitigation may also be required to avoid any increase in risk above the preexisting conditions
following abandonment of the activity.
F. Additional Technical Information Requirements for Projects within Erosion and Landslide Hazard
Areas. In addition to the basic critical areas report requirements for geologically hazardous areas
provided in subsections A through E of this section, technical information for any development within
earth subsidence and landslide hazard areas shall meet the requirements of Chapter 19.10 ECDC and
include the following information at a minimum:
1. Site Plan. The critical areas report shall include a copy of the site plan for the proposal showing:
a. The height of slope, slope gradient, and cross-section of the project area;
b. The location of springs, seeps, or other surface expressions of ground water on or within 200 feet of
the project area or that have the potential to be affected by the proposal; and
c. The location and description of surface water runoff features;
2. Hazards Analysis. The hazards analysis component of the critical areas report shall specifically
include:
a. A description of the extent and type of vegetative cover;
b. A description of subsurface conditions based on data from site -specific explorations;
c. Descriptions of surface and ground water conditions, public and private sewage disposal systems, fills
and excavations, and all structural improvements;
d. An estimate of slope stability and the effect construction and placement of structures will have on the
slope over the estimated life of the structure;
e. An estimate of the bluff retreat rate or an estimate of the percent risk of landslide area expansion that
recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event;
f. Consideration of the run -out hazard of landslide debris and/or the impacts of landslide run -out on
down -slope properties;
g. A study of slope stability including an analysis of proposed cuts, fills, and other site grading;
h. Recommendations for building siting limitations; and
i. An analysis of proposed surface and subsurface drainage, and the vulnerability of the site to erosion;
Page 66 of 87
Packet Pg. 435
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
3. Geotechnical Engineering Report. The technical information for a project within a landslide hazard
area shall include a geotechnical engineering report prepared by a licensed engineer that presents
engineering recommendations for the following:
a. Parameters for design of site improvements including appropriate foundations and retaining
structures. These should include allowable load and resistance capacities for bearing and lateral loads,
installation considerations, and estimates of settlement performance;
b. Recommendations for drainage and subdrainage improvements;
c. Earthwork recommendations including clearing and site preparation criteria, fill placement and
compaction criteria, temporary and permanent slope inclinations and protection, and temporary
excavation support, if necessary; and
d. Mitigation of adverse site conditions including slope stabilization measures and seismically unstable
soils, if appropriate;
4. Erosion and Sediment Control Plan. For any development proposal on a site containing an erosion
hazard area, an erosion and sediment control plan shall be required. The erosion and sediment control
plan shall be prepared in compliance with requirements set forth in Chapter 18.30 ECDC.
G. Limited Report Requirements for Stable Erosion Hazard Areas. At the director's discretion, detailed
critical areas report requirements may be waived for erosion hazard areas with suitable slope stability.
Report requirements for stable erosion hazard areas may be met through construction documents that
shall include at a minimum an erosion and sediment control plan prepared in compliance with
requirements set forth in Chapter 18.30 ECDC.
H. Seismic Hazard Areas. In addition to the basic critical areas report requirements for geologically
hazardous areas provided in subsections A through E of this section, a critical areas report for a seismic
hazard area shall also meet the following requirements:
1. The hazards analysis shall include a complete discussion of the potential impacts of seismic activity
on the site (for example, forces generated and fault displacement).
2. A geotechnical engineering report shall evaluate the physical properties of the subsurface soils,
especially the thickness of unconsolidated deposits and their liquefaction potential. If it is determined
that the site is subject to liquefaction, mitigation measures appropriate to the scale of the development
shall be recommended and implemented. [Ord. 3527 § 2, 2004].
Part IV. Development Standards — Geologically Hazardous Areas
23.80.060 Development standards — General requirements.0 SHARE
A. Alterations of geologically hazardous areas or associated buffers may only occur for activities that:
Page 67 of 87
Packet Pg. 436
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
1. Will not increase the threat of the geological hazard to adjacent properties beyond predevelopment
conditions;
2. Will not adversely impact other critical areas;
3. Are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than
predevelopment conditions; and
4. Are certified as safe as designed and under anticipated conditions by a qualified engineer or geologist,
licensed in the state of Washington.
B. Critical Facilities Prohibited. Critical facilities shall not be sited within geologically hazardous areas
unless there is no other practical alternative. [Ord. 3527 § 2, 2004].
23.80.070 Development standards — Specific hazards.O SHIIf
A. Erosion and Landslide Hazard Areas. Activities on sites containing erosion or landslide hazards shall
meet the requirements of ECDC 23.80.060, Development Standards — General Requirements, and the
specific following requirements:
1. Minimum Building Setback. The minimum setback shall be the distance required to ensure the
proposed structure will not be at risk from landslides for the life of the structure, considered to be one
hundred and twenty (120) years and will not cause an increased risk of landslides taking place on or off
the site. A setback shall be established from all edges of landslide hazard areas. The size of the setback
shall be determined by the director consistent with recommendations provided in the geotechnical report
to eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in
whole or part by the development, based upon review of and concurrence with a critical areas report
prepared by a qualified professional.
2. Buffer Requirements. A buffer may be established with specific requirements and limitations,
including but not limited to, drainage, grading, irrigation, and vegetation. Buffer requirements shall be
determined by the director consistent with recommendations provided in the geotechnical report to
eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in
whole or part by activities within the buffer area, based upon review of and concurrence with a critical
areas report prepared by a qualified professional.
3. Alterations. Alterations of an erosion or landslide hazard area, minimum building setback and/or
buffer may only occur for activities for which a hazards analysis is submitted and certifies that:
a. The alteration will not increase surface water discharge or sedimentation to adjacent properties
beyond predevelopment conditions;
b. The alteration will not decrease slope stability on adjacent properties; and
c. Such alterations will not adversely impact other critical areas;
Page 68 of 87
Packet Pg. 437
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
3. Design Standards within erosion and landslide hazard areas. Development within an erosion or
landslide hazard area and/or buffer shall be designed to meet the following basic requirements unless it
can be demonstrated that an alternative design that deviates from one or more of these standards
provides greater long-term slope stability while meeting all other provisions of this title. The
requirement for long-term slope stability shall exclude designs that require regular and periodic
maintenance to maintain their level of function. The basic development design standards are:
a. The proposed development shall not decrease the factor of safety for landslide occurrences below the
limits of 1.5 for static conditions and 1.2 for dynamic conditions. If stability at the proposed
development site is below these limits, the proposed development shall provide practicable approaches
to reduce risk to human safety and improve the factor of safety for landsliding. In no case shall the
existing factor of safety be reduced for the subject property or adjacent properties;
b. Structures and improvements shall be clustered to avoid geologically hazardous areas and other
critical areas;
c. Structures and improvements shall minimize alterations to the natural contour of the slope, and
foundations shall be tiered where possible to conform to existing topography;
d. Structures and improvements shall be located to preserve the most critical portion of the site and its
natural landforms and vegetation;
e. The proposed development shall not result in greater risk or a need for increased buffers on
neighboring properties;
f. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over
graded artificial slopes; and
g. Development shall be designed to minimize impervious lot coverage;
4. Vegetation Retention. Unless otherwise provided or as part of an approved alteration, removal of
vegetation from an erosion or landslide hazard area or related buffer shall be prohibited;
5. Seasonal Restriction. Clearing shall be allowed only from May 1 st to October 1 st of each year;
provided, that the director may extend or shorten the dry season on a case -by -case basis depending on
actual weather conditions, except that timber harvest, not including brush clearing or stump removal,
may be allowed pursuant to an approved forest practice permit issued by the city of Edmonds or the
Washington State Department of Natural Resources;
6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from
an erosion or landslide hazard area shall be prohibited except as follows:
a. Conveyed via continuous storm pipe downslope to a point where there are no erosion hazard areas
downstream from the discharge;
Page 69 of 87
Packet Pg. 438
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Discharged at flow durations matching predeveloped conditions, with adequate energy dissipation,
into existing channels that previously conveyed storm water runoff in the predeveloped state; or
c. Dispersed discharge upslope of the steep slope onto a low -gradient, undisturbed buffer demonstrated
to be adequate to infiltrate all surface and storm water runoff, and where it can be demonstrated that
such discharge will not increase the saturation of the slope; and
7. Prohibited Development. On -site sewage disposal systems, including drain fields, shall be prohibited
within erosion and landslide hazard areas and related buffers.
B. Earth Subsidence and Landslide Hazard Area. In addition to the requirements of this chapter,
development proposals for lands located within the earth subsidence and landslide hazard area as
indicated on the critical areas inventory shall be subject to the provisions of Chapter 19.10 ECDC
C. Seismic Hazard Areas. Activities proposed to be located in seismic hazard areas shall meet the
standards of ECDC 23.80.060, Development Standards — General Requirements. [Ord. 3527 § 2, 2004].
Page 70 of 87
Packet Pg. 439
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
6.1.c
Figure 23.80.000
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements*
Geologically Hazardous Areas
Geologically
Goo-Haxa Geo-Hazard assess- GeotechnicalReport
Development
h azardous area
REQUIRE ment concludes REQUIREMENT to
encroaches within
(geo•hazard) may be
ALnit fyclassification and jurisdictional delineate boundaries
delineated
located on or near
location of geohazard. geo-hazard area and extent of
geo-hazard area
subject parcel.
located with in200R geo-hazard area-
andlorminimum
of subject parcel.
bu ild i n g setback,
Geo-Hazard assessment
concludes n o ju risd ic- Development avoids
G eotech it ical Report
tional geo hazard geo-h atard area and
REQUIREMENT to identify
located -200 Rfrom required minimum
design modifications and
subject parcel, build ingsetbock
mitigation sufficient to
buffer.
avoid additional potential
risk associated with
development in and
around geo-hazard areas.
N o additiona I
compliance
requirements. No ad ditiona l
compliance
required.
No additional
compliance requirements
upon implementation of
geotechnical
remmmendations
-Report requirements may be met through submission of a single critical area report or multiple reports in corn binawn.
Page 71 of 87
Packet Pg. 440
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
6.1.c
Chapter 23.90
FISH AND WILDLIFE HABITAT CONSERVATION AREAS
Sections:
Part I. Designation, Rating and Mapping
23.90.000 Fish and wildlife habitat conservation areas compliance requirements flowchart.
23.90.010 Designation, rating and mapping —Fish and wildlife habitat conservation areas.
Part IL Additional Report Requirements — Fish and Wildlife Habitat Conservation Areas
23.90.020 Special study and report requirements — Fish and wildlife habitat conservation areas
Part III. Development Standards — Fish and Wildlife Habitat Conservation Areas
23.90.030 Development standards — General requirements.
23.90.040 Development standards — Specific habitats.
Part I. Designation, Rating and Mapping
23.90.000 Fish and wildlife habitat conservation areas compliance requirements
flowchart.. SHARE _
See Figure 23.90.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.90.010 Designation, rating and mapping — Fish and wildlife habitat conservation
areas. SHARE
A. Fish and wildlife habitat conservation areas in the city of Edmonds include:
1. Streams. Within the city of Edmonds streams shall include those areas where surface waters produce a
defined channel or bed which demonstrates clear evidence, such as the sorting of sediments, of the
passage of water. The channel or bed need not contain water year-round. Streams shall be classified in
accordance with the Washington Department of Natural Resources water typing system (WAC 222-16-
030) hereby adopted in its entirety by reference and summarized as follows:
a. Type S: streams inventoried as "shorelines of the state" under Chapter 90.58 RCW and the rules
promulgated pursuant to Chapter 90.58 RCW;
b. Type F: streams which contain fish habitat;
Page 72 of 87
Packet Pg. 441
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
c. Type Np: perennial nonfish habitat streams; and
d. Type Ns: seasonal nonfish habitat streams.
All streams included on the inventory that are known to exist within the city of Edmonds do not meet
criteria for "shorelines of the state" but contain fish habitat and, thus, meet designation criteria for Type
F waters pursuant to WAC 222-16-030. However, not all Edmonds streams support anadromous fish
populations or have the potential for anadromous fish occurrence because of obstructions, blockages or
access restrictions resulting from existing conditions. Therefore, in order to provide special
consideration of and increased protection for anadromous fish in the application of development
standards, Edmonds streams shall be further classified as follows:
Anadromous fishbearing streams: streams existing in whole or in part within the city of Edmonds in
which anadromous fish are known to occur. As of 2004, Edmonds fishbearing streams are known to
include Willow Creek, Shellabarger Creek, Shell Creek, Hindley Creek, Perrinville Creek, and Lunds
Creek; and
Nonanadromous fishbearing streams: streams existing in whole or in part within the city of Edmonds
which do not support fish populations and do not have the potential for fish occurrence because of
barriers to fish passage or lack of suitable habitat.
Streams with anadromous fish occurrence were identified in the Edmonds Stream Inventory and
Assessment, a 2002 report of Pentec Environmental which is incorporated by this reference as if herein
set forth. The city of Edmonds advocates and encourages the removal of barriers to anadromous fish
passage consistent with the purposes and objectives of this title. The director may provide updated
information on the occurrence of anadromous fish in Edmonds streams consistent with changes in
existing environmental conditions.
2. Areas with which State or Federally Designated Endangered, Threatened, and Sensitive Species Have
a Primary Association, or offer important fish and wildlife habitat within the urban environment.
a. Federally designated endangered and threatened species are those fish and wildlife species identified
by the U.S. Fish and Wildlife Service and the NOAA Fisheries that are in danger of extinction or
threatened to become endangered. The U.S. Fish and Wildlife Service and the National Marine Fisheries
Service should be consulted for current listing status.
b. State -designated endangered, threatened, and sensitive species are those fish and wildlife species
native to the state of Washington identified by the Washington Department of Fish and Wildlife, that are
in danger of extinction, threatened to become endangered, vulnerable, or declining and are likely to
become endangered or threatened in a significant portion of their range within the state without
cooperative management or removal of threats. State -designated endangered, threatened, and sensitive
species are periodically recorded in WAC 232-12-014 (state endangered species) and WAC 232-12-011
(state threatened and sensitive species). The state Department of Fish and Wildlife maintains the most
current listing and should be consulted for current listing status.
Page 73 of 87
Packet Pg. 442
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
3. State Priority Habitats and Areas Associated with State Priority Species. Priority habitats and species
are considered to be priorities for conservation and management. Priority species require protective
measures for their perpetuation due to their population status, sensitivity to habitat alteration, and/or
recreational, commercial, or tribal importance. Priority habitats are those habitat types or elements with
unique or significant value to a diverse assemblage of species. A priority habitat may consist of a unique
vegetation type or dominant plant species, a described successional stage, or a specific structural
element. Priority habitats and species are identified by the state Department of Fish and Wildlife.
4. Habitats and Species of Local Importance. Habitats and species of local importance are those
identified by the city of Edmonds, including but not limited to those habitats and species that, due to
their population status or sensitivity to habitat manipulation, warrant protection. Habitats may include a
seasonal range or habitat element with which a species has a primary association, and which, if altered,
may reduce the likelihood that the species will maintain and reproduce over the long term.
4. Commercial and Recreational Shellfish Areas. These areas include all public and private tidelands or
bedlands suitable for shellfish harvest, including shellfish protection districts established pursuant to
Chapter 90.72 RCW.
5. Kelp and eelgrass beds and herring and smelt spawning areas.
6. Naturally Occurring Ponds Under 20 Acres. Naturally occurring ponds are those ponds under 20 acres
and their submerged aquatic beds that provide fish or wildlife habitat, including those artificial ponds
intentionally created from dry areas in order to mitigate impacts to ponds. Naturally occurring ponds do
not include ponds deliberately designed and created from dry sites, such as canals, detention facilities,
wastewater treatment facilities, farm ponds, temporary construction ponds, and landscape amenities,
unless such artificial ponds were intentionally created for mitigation.
7. Waters of the State. Waters of the state include lakes, rivers, ponds, streams, inland waters,
underground waters, salt waters, and all other surface waters and watercourses within the jurisdiction of
the state of Washington, as classified in WAC 222-16-031 (or WAC 222-16-030, depending on
classification used).
B. All areas within the city of Edmonds meeting one or more of these criteria, regardless of any formal
identification, are hereby designated critical areas and are subject to the provisions of this title and shall
be managed consistent with the best available science, such as the Washington Department of Fish and
Wildlife's Management Recommendations for Priority Habitat and Species.
C. Mapping. The approximate location and extent of fish and wildlife habitat conservation areas are
shown on the city of Edmonds critical areas inventory. Resources providing information on the location
and extent of fish and wildlife habitat conservation areas incorporated into the inventory include:
1. Washington Department of Fish and Wildlife priority habitat and species maps;
2. Washington State Department of Natural Resources official water type reference maps, as amended;
3. Washington State Department of Natural Resources Puget Sound intertidal habitat inventory maps;
Page 74 of 87
Packet Pg. 443
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
4. Washington State Department of Natural Resources shorezone inventory;
5. Washington State Department of Natural Resources Natural Heritage Program mapping data;
6. Washington State Department of Health annual inventory of shellfish harvest areas;
7. Anadromous and resident salmonid distribution maps contained in the habitat limiting factors reports
published by the Washington Conservation Commission; and
8. Washington State Department of Natural Resources state natural area preserves and natural resource
conservation area maps.
The critical areas inventory and the resources cited above are to be used as a guide for the city of
Edmonds development services department, project applicants, and/or property owners and should be
continuously updated as new critical areas are identified. They are a reference and do not provide a final
critical areas designation. [Ord. 3527 § 2, 2004].
Part II. Additional Report Requirements — Fish and Wildlife Habitat Conservation Areas
23.90.020 Special study and report requirements — Fish and wildlife habitat
conservation areas. SHARE _J
In addition to the general critical areas report requirements of ECDC 23.40.090, critical area reports for
fish and wildlife habitat conservation areas must meet the requirements of this section. Critical areas
reports for two or more types of critical areas must meet the report requirements for each relevant type
of critical area.
A. Preparation by a Qualified Professional. A critical areas report for a fish and wildlife habitat
conservation area shall be prepared by a qualified professional who is a biologist with experience
preparing reports for the relevant type of habitat. Pursuant to ECDC 23.40.090(A), applicants may
choose one of the qualified technical consultants on the city's approved list in preparing critical areas
reports for fish and wildlife habitat conservation areas, or may utilize an alternative consultant. Critical
areas studies and reports developed by an alternative consultant shall be subject to independent review
pursuant to ECDC 23.40.090(B).
B. Areas Addressed in Critical Areas Report. The following areas shall be addressed in a critical areas
report for fish and wildlife habitat conservation areas:
1. The project area of the proposed activity;
2. All fish and wildlife habitat conservation areas and recommended buffers within 200 feet of the
project area;
3. All shoreline areas, floodplains, other critical areas, and related buffers within 200 feet of the project
area; and
Page 75 of 87
Packet Pg. 444
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
4. A discussion of the efforts to avoid and minimize potential effects to these resources and the
implementation of mitigation/enhancement measures as required.
C. Habitat Assessment. A habitat assessment is an investigation of the project area to evaluate the
potential presence or absence of designated critical fish or wildlife species or habitat. A critical areas
report for a fish and wildlife habitat conservation area shall contain an assessment of habitats, including
the following site- and proposal -related information at a minimum:
1. Detailed description of vegetation on and adjacent to the project area and its associated buffer;
2. Identification of any species of local importance, priority species, or endangered, threatened,
sensitive, or candidate species that have a primary association with habitat on or adjacent to the project
area, and assessment of potential project impacts to the use of the site by the species;
3. A discussion of any federal, state, or local special management recommendations, including
Washington Department of Fish and Wildlife habitat management recommendations, that have been
developed for species or habitats located on or adjacent to the project area.
D. Additional Technical Information Requirements for Streams. Consistent with specific development
standards for Edmonds streams (ECDC 23.90.040(D)), critical areas report requirements for streams
may be met, at the discretion of the director, through submission of one or more specific report types. If
stream buffer enhancement is proposed to reduce a standard stream buffer width or as part of project
mitigation required by the director, a stream buffer enhancement plan may be submitted to fulfill the
requirements of this section. If no project impacts are anticipated and standard stream buffer widths are
retained, a stream survey report, general critical areas report or other reports alone or in combination
may be submitted as consistent with the specific requirements of this section. In addition to the basic
critical areas report requirements for fish and wildlife habitat conservation areas provided in subsections
(A) through (C) of this section, technical information on streams shall include the following information
at a minimum:
1. A written assessment and accompanying maps of the stream and associated hydrologic features within
200 feet of the project area, including the following information at a minimum:
a. Stream survey showing the ordinary high water mark(s);
b. Standard stream buffer boundary;
c. Boundary for proposed reduced stream buffers;
d. Vegetative, faunal, and hydrologic characteristics;
e. Soil and substrate conditions; and
f. Topographic elevations, at two -foot contours;
Page 76 of 87
Packet Pg. 445
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
2. A detailed description and functional assessment of the stream buffer under existing conditions
pertaining to the protection of stream functions, fish habitat and, in particular, potential anadromous
fisheries;
3. A habitat and native vegetation conservation strategy that addresses methods to protect and enhance
on -site habitat and stream functions;
4. Proposed buffer enhancement, if needed, including a written assessment and accompanying maps and
planting plans for buffer areas to be enhanced, including the following information at a minimum:
a. A description of existing buffer conditions;
b. A description of proposed buffer conditions and how proposed conditions will increase buffer
functioning in terms of stream and fish habitat protection;
c. Performance standards for measuring enhancement success through a monitoring period of at least
three years; and
d. Provisions for monitoring and submission of monitoring reports documenting buffer conditions as
compared to performance standards for enhancement success;
5. A discussion of ongoing management practices that will protect stream functions and habitat value
through maintenance of vegetation density within the stream buffer. [Ord. 3527 § 2, 2004].
Part III. Development Standards — Fish and Wildlife Habitat Conservation Areas
23.90.030 Development standards — General requirements.0 SHARE
A. Alterations. A fish and wildlife habitat conservation area may be altered only if the proposed
alteration of the habitat or the mitigation proposed does not degrade the quantitative and qualitative
functions and values of the habitat. There are no specific development standards for upland habitats of
local importance unless these areas include another critical area (streams, heron rookeries, steep slopes,
etc.). City staff will review the critical areas report (ECDC 23.90.020) and work with the applicant to
minimize effects or improve conditions to upland habitat.
B. Approvals of Activities. The director shall condition approvals of activities allowed within or
adjacent to a habitat conservation area or its buffers as necessary to minimize or mitigate any potential
adverse impacts. Conditions shall be based on the best available science and may include, but are not
limited to, the following:
1. Establishment of buffer zones;
2. Preservation of critically important vegetation and/or habitat features such as snags and downed
wood;
3. Limitation of access to the habitat area, including fencing to deter unauthorized access;
Page 77 of 87
Packet Pg. 446
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
4. Seasonal restriction of construction activities;
5. Establishment of a duration and timetable for periodic review of mitigation activities; and
6. Requirement of a performance bond, when necessary, to ensure completion and success of proposed
mitigation.
C. Mitigation and Equivalent or Greater Biological Functions. Mitigation of alterations to fish and
wildlife habitat conservation areas shall achieve equivalent or greater biologic and hydrologic functions
and shall include mitigation for adverse impacts upstream or downstream of the development proposal
site. Mitigation shall address each function affected by the alteration to achieve functional equivalency
or improvement on a per function basis. Mitigation shall be located on -site except when demonstrated
that a higher level of ecological functioning would result from an off -site location. Mitigation shall be
detailed in a fish and wildlife habitat conservation area mitigation plan, which may include the following
as necessary:
1. A native vegetation planting plan;
2. Plans for retention, enhancement or restoration of specific habitat features;
3. Plans for control of nonnative invasive plant or wildlife species; and
4. Stipulations for use of innovative, sustainable building practices.
D. Approvals and the Best Available Science. Any approval of alterations or impacts to a fish and
wildlife habitat conservation area shall be supported by the best available science.
E. Buffers.
1. Establishment of Buffers. The director shall require the establishment of temporary or permanent
buffer areas for permitted activities adjacent to fish and wildlife habitat conservation areas which may
result in fish or wildlife disturbance (e.g., construction, grading, etc.) when needed to protect fish and
wildlife habitat conservation areas. Establishment of buffers shall follow recommendations set forth by a
qualified biologist in the project critical areas report. Required buffer widths shall reflect the sensitivity
of the habitat and the type and intensity of human activity proposed to be conducted nearby and shall be
consistent with the management recommendations issued by the Washington Department of Fish and
Wildlife.
2. Seasonal and Daily Timing Restrictions. When a species is more susceptible to adverse impacts
during specific periods of the year or day, seasonal restrictions on permitted activities within or adjacent
to fish and wildlife habitat conservation areas may be required at the discretion of the director pursuant
to recommendations set forth in a critical areas report.
F. Signs and Fencing of Fish and Wildlife Habitat Conservation Areas.
Page 78 of 87
Packet Pg. 447
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
1. Temporary Markers. The outer perimeter of the fish and wildlife habitat conservation area or buffer
and the limits of those areas to be disturbed pursuant to an approved permit or authorization shall be
marked in the field as required by the director in such a way as to ensure that no unauthorized intrusion
will occur. This temporary marking shall be maintained throughout construction and shall not be
removed until permanent signs, if required, are in place.
2. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the
director may require the applicant to install permanent signs along the boundary of a fish and wildlife
habitat conservation area or buffer.
a. Permanent signs shall be made of a metal face and attached to a metal post or another material of
equal durability. Signs must be posted at an interval of one per lot or every 50 feet, whichever is less,
and must be maintained by the property owner in perpetuity. The sign shall be worded as follows or with
alternative language approved by the director:
Fish and Wildlife Habitat
Conservation Area
Do Not Disturb
Contact the City of Edmonds
Regarding Uses and Restriction
b. The provisions of subsection (F)(2)(a) of this section may be modified by the director as necessary to
assure protection of sensitive features or wildlife.
3. Fencing.
a. The director shall determine if fencing is necessary to protect the functions and values of the critical
area. If found to be necessary, the director shall condition any permit or authorization issued pursuant to
this chapter to require the applicant to install a permanent fence at the edge of the fish and wildlife
habitat conservation area or buffer, when fencing will prevent future impacts to the fish and wildlife
habitat conservation area.
b. The applicant shall be required to install a permanent fence around the fish and wildlife habitat
conservation area or buffer when domestic grazing animals are present or may be introduced on -site.
c. Fencing installed as part of a proposed activity or as required in this subsection shall be designed so as
to not interfere with species migration, including fish runs, and shall be constructed in a manner that
minimizes habitat impacts. [Ord. 3527 § 2, 2004].
23.90.040 Development standards — Specific habitats.0 SHARE
A. Endangered, Threatened, and Sensitive Species.
Page 79 of 87
Packet Pg. 448
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
1. No development shall be allowed within a fish and wildlife habitat conservation area or buffer with
which state or federally endangered, threatened, or sensitive species have a primary association, except
that which is provided for by a management plan established by the Washington Department of Fish and
Wildlife or applicable state or federal agency.
2. Whenever activities are proposed adjacent to a fish and wildlife habitat conservation area with which
state or federally endangered, threatened, or sensitive species have a primary association, such area shall
be protected through the application of protection measures in accordance with a critical areas report
prepared by a qualified professional and approved by the director. Approval for alteration of land
adjacent to the fish and wildlife habitat conservation area or its buffer shall not occur prior to
consultation with the Washington Department of Fish and Wildlife for animal species, the Washington
State Department of Natural Resources for plant species, and other appropriate federal or state agencies.
3. Bald eagle habitat is subject to the Federal Bald and Golden Eagle Protection Act. Washington State
bald eagle protection rules (WAC 232-12-292) shall not be required as long as bald eagles are not listed
as a State Endangered or Threatened species. B. Anadromous Fish.
1. All activities, uses, and alterations proposed to be located in water bodies used by anadromous fish or
in areas that affect such water bodies shall give special consideration to the preservation and
enhancement of anadromous fish habitat, including, but not limited to, adhering to the following
standards:
a. Activities shall be timed to occur only during the allowable work window as designated by the
Washington Department of Fish and Wildlife for the applicable species;
b. An alternative alignment or location for the activity is not feasible;
c. The activity is designed so that it will not degrade the functions or values of the fish habitat or other
critical areas;
d. Shoreline erosion control measures shall be designed to use bioengineering methods or soft armoring
techniques, according to an approved critical areas report; and
e. Any impacts to the functions or values of the fish and wildlife habitat conservation area are mitigated
in accordance with an approved critical areas report.
2. Structures that prevent the migration of salmonids shall not be allowed in the portion of water bodies
currently or historically used by anadromous fish. Fish bypass facilities shall be provided that allow the
upstream migration of adult fish and shall prevent fry and juveniles migrating downstream from being
trapped or harmed.
3. Fills, when authorized, shall not adversely impact anadromous fish or their habitat or shall mitigate
any unavoidable impacts and shall only be allowed for a water -dependent use.
C. Retention of Vegetation on Subdividable, Undeveloped Parcels. As a provision of this title, the
director shall require retention of a minimum of 30 percent of native vegetation on undeveloped (or
Page 80 of 87
Packet Pg. 449
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
redeveloped), subdividable lands zoned as RS-12 or RS-20 per Chapter 16.10 ECDC. This standard for
development shall apply to all undeveloped (or redeveloped), subdividable lands zoned RS-12 or RS-20
that contain a landslide hazard area as defined by ECDC 23.80.020.B; a stream or stream buffer; or a
wetland or wetland buffer, except for as provided in ECDC 23.90.040.C.4. This provision for native
vegetation retention will provide increased protection of fish and wildlife habitat throughout the
Edmonds jurisdiction, and shall be applied consistent with the following criteria:
1. Achieving the minimum 30 percent retention requirement for native vegetation shall be determined by
assessing the existing site area that supports native vegetation. For purposes of this provision, areas that
support native vegetation shall include areas dominated by plant species which are indigenous to the
Puget Sound region, which reasonably could have been expected to naturally occur on the site, and
within which native trees over 6 inches in diameter at breast height (DBH) make up more than 40
percent of the canopy cover.
2. The goal of 30 percent native vegetation can be met through maintaining existing native vegetation,
establishing native vegetation, or a combination of both.
3. A vegetation management plan, subject to the approval of the director, is required for approval of the
proposed development.
4. For undeveloped (or redeveloped), subdividable lands zoned as RS-12 or RS-20 that currently do not
support any native vegetation areas meeting minimum requirements in ECDC 23.90.040.C.1, the
director may waive the requirements of this provision.
D. Streams. No alteration to a stream or stream buffer shall be permitted unless consistent with the
provisions of this title and the specific standards for development outlined below.
1. Standard Stream Buffer Widths. Buffers for streams shall be measured on each side of the stream,
from the ordinary high water mark. The following shall be the standard buffer widths for streams based
upon the Washington State Department of Natural Resources water typing system and further
classification based upon fish presence (fishbearing vs. nonfishbearing) for the Type F streams existing
in the city of Edmonds:
a. Type S: 150 feet;
b. Type F anadromous fishbearing stream adjacent to reaches with anadromous fish access: 100 feet;
c. Type F anadromous fishbearing stream adjacent to reaches without anadromous fish access: 75 feet;
d. Type F nonanadromous fishbearing stream: 75 feet;
e. Type Np: 50 feet;
f. Type Ns: 40 feet.
Page 81 of 87
Packet Pg. 450
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
General areas and stream reaches with access for anadromous fish are indicated on the city of Edmonds
critical areas inventory. The potential for anadromous fish access shall be confirmed in the field by a
qualified biologist as part of critical areas review and determination of standard stream buffer widths.
2. Reduced Stream Buffer Widths. Standard stream buffer widths may be reduced by no more than
twenty five percent (25%) of the standard stream buffer width concomitant to development and
implementation of a stream buffer enhancement plan approved by the director. Reduced stream buffer
widths shall only be approved by the director if a stream buffer enhancement plan conclusively
demonstrates that enhancement of the reduced buffer area will not degrade the quantitative and
qualitative functions and values of the buffer area in terms of fish and stream protection and the
provision of wildlife habitat. Stream buffer enhancement plans must meet the specific requirements of
ECDC 23.40.110, 23.40.120 and 23.40.130 and:
a. The buffer enhancement plan proposed as part of buffer reduction provides evidence that functions
and values in terms of stream and wildlife protections will be:
i. Increased or retained through plan implementation for those streams where existing buffer vegetation
is generally intact; or
ii. Increased through plan implementation for those streams where existing buffer vegetation is
inadequate to protect the functions and values of the stream;
b. The plan documents existing native plant densities and provides for increases in buffer native plant
densities to no less than three feet on center for shrubs and eight feet on center for trees;
c. The plan requires monitoring and maintenance to ensure success for a minimum of five (5) years in
accordance with ECDC 23.40.130(D) and (E); and
d. The plan specifically documents methodology and provides performance standards for assessing
increases in stream buffer functioning as related to:
i. Water quality protection;
ii. Provision of wildlife habitat;
iii. Protection of anadromous fisheries;
iv. Enhancement of fish habitat; and
v. Restricting intrusion and disturbance.
3. Stream Buffer Width Averaging with Enhancement. The director may allow modification of a
standard stream buffer width in accordance with an approved critical areas report and the best available
science on a case -by -case basis by averaging buffer widths. Any allowance for averaging buffer widths
shall only be granted concomitant to the development and implementation of a buffer enhancement plan
for areas of buffer degradation. Only those portions of a stream buffer existing within the project area or
Page 82 of 87
Packet Pg. 451
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
subject parcel shall be considered in the total buffer area for buffer averaging. Averaging of buffer
widths may only be allowed where a qualified professional demonstrates that:
a. The buffer enhancement plan proposed as part of buffer averaging provides evidence that functions
and values in terms of stream and wildlife protections will be:
i. Increased or retained through plan implementation for those streams where existing buffer vegetation
is generally intact; or
ii. Increased through plan implementation for those streams where existing buffer vegetation is
inadequate to protect the functions and values of the stream;
b. The total area contained in the buffer area, or the total buffer area existing on a subject parcel for a
stream extending off -site, after averaging is no less than that which would be contained within the
standard buffer;
c. The buffer width at any single location is not reduced by more the twenty-five (25%) percent of
standard width; and
Additions to Structures Existing within Stream Buffers.
a. Additions to legally constructed structures existing within stream buffers that increase the footprint of
development or impervious surfacing shall be permitted consistent with the development standards of
this chapter (ECDC 23.90.030 and this section), provided that a buffer enhancement plan is provided to
mitigate for impacts consistent with this Title, and provided that all impacts from temporary
disturbances within the critical area buffer shall be addressed through use of best management plans and
buffer enhancement plantings during and following construction of the allowed alteration. Provisions for
standard stream buffers, stream buffer averaging with enhancement, and buffer reductions through
enhancement require applicants to locate such additions in accordance with the following sequencing:
i. Outside of the standard stream buffer;
ii. Outside of a stream buffer averaged (with enhancement) per subsection (D)(3) of this section;
iii. Outside of a stream buffer reduced (with enhancement) per subsection (D)(2) of this section; or
iv. Outside of the inner twenty five percent (25%) of the standard stream buffer width with no more than
three hundred (300) square feet of structure addition footprint within the inner fifty percent (50%) of the
standard stream buffer width, provided that enhancement is provided at a minimum three -to -one (3:1)
ratio (enhancement -to -impact).
v. Outside of the inner 25 percent of the standard stream buffer width with no more than five hundred
(500) square feet of new footprint within the inner fifty percent (50%) of the standard stream buffer
width, provided that enhancement is provided at a minimum five -to -one (5:1) ratio (enhancement -to -
impact), and that stormwater low impact development (LID) techniques or other measures that enhance
existing buffer condition are included as part of the stream buffer enhancement plan.
Page 83 of 87
Packet Pg. 452
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
b. Where meeting stream buffer enhancement requirements required by H.1. of this section would result
in enhancement that is separated from the critical area due to uncommon property ownership, alternative
enhancement approaches may be approved by the director. Alternative approaches could include a
vegetated rain garden that receives storm runoff, replacement of existing impervious surfaces with
pervious materials, or other approaches that provide ecological benefits to the adjacent critical area.
c. Additions to legally constructed structures existing within stream buffers that cannot be
accommodated in accordance with the above sequencing (i.e., additions proposed within the inner 25
percent of a standard buffer width) may be permitted at the director's discretion as a variance subject to
review by the city hearing examiner and the provisions of ECDC 23.40.210.
5. Development Proposals within the Footprint of Existing Development. New development shall be
allowed within the footprint of existing development occurring within a stream buffer, provided that the
following conditions are met:
a. The footprint of existing development was legally established, and is consistent with the definition
provided in ECDC 23.40.320;
b. The proposed development within the footprint of existing development is sited as far away from the
stream edge as is feasible;
c. As part of the development proposal, opportunities to reduce the footprint of existing development are
implemented where such reduction would increase the buffer width adjacent to the stream and not
represent an undue burden given the scale of the proposed development.
d. The proposed development includes enhancement to the adjacent remaining stream buffer in order to
improve functions degraded by previous development;
e. Enhancement is provided as buffer enhancement for an equivalent area of the footprint of the newly
proposed development within the footprint of existing development occurring in stream buffer, or
through an alternative approach approved by the director that restores degraded functions of the wetland
and remaining buffer; and
f Impacts from temporary disturbances within the stream buffer shall be addressed through use of best
management plans and buffer enhancement plantings during and following construction of the allowed
alteration.
6. Stream Crossings. Stream crossings may be allowed only if all reasonable construction techniques and
best management practices are used to avoid disturbance to the stream bed or bank. Upon completion of
construction, the area affected shall be restored to an appropriate grade, replanted with native species
and/or otherwise protected according to a stream mitigation and buffer enhancement plan approved by
the director, and maintained and monitored per the requirements of ECDC 23.40.110, 23.40.120 and
23.40.130 and providing for buffer enhancement in accordance with the requirements of subsection
(D)(2) of this section. In addition, the applicant must demonstrate that best management practices will
be used during construction to provide the following:
Page 84 of 87
Packet Pg. 453
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
a. Fisheries protection, including no interference with fish migration or spawning;
b. All crossings shall be constructed during summer low flow periods and shall be timed to avoid stream
disturbance during periods when stream use is critical to salmonids;
c. Crossings shall not occur over salmonid spawning areas unless no other possible crossing site exists;
d. Crossings and culverted portions of the stream shall be minimized to the extent feasible and serve
multiple purposes and multiple lots whenever possible;
e. Roads may cross streams only on previously approved rights -of -way, provided no practical alternative
exists and adequate provision is made to protect and/or enhance the stream through appropriate
mitigation. Roads shall be designed and located to conform to topography, and maintained to prevent
erosion and restriction of the natural movement of ground water as it affects the stream;
f. Roads and utilities shall be designed in conjunction to minimize the area of disturbance to the stream;
g. Roads shall be constructed so as to minimize adverse impacts on the hydrologic quality of the stream
or associated habitat to a degree acceptable to the city;
h. An alternative alignment or location with less impact is not feasible; and
i. The crossing will be designed as near as perpendicular with the water body as possible.
7. Trails. After reviewing the proposed development and technical reports, the director may determine
that a pedestrian -only trail may be allowed in a stream buffer; provided, pervious materials are used, all
appropriate provision is made to protect water quality, and all applicable permit requirements have been
met. No motorized vehicles shall be allowed within a stream or its buffer except as required for
necessary maintenance or security. Vegetative edges, structural barriers, signs or other measures must be
provided wherever necessary to protect streams by limiting vehicular access to designated public use or
interpretive areas.
8. Storm Water Management Facilities. Storm water management facilities, limited to outfalls, pipes and
conveyance systems, storm water dispersion outfalls and bioswales, may be allowed within stream
buffers; provided, that:
a. No other location is feasible;
b. Pipes and conveyance facilities will be in the outer twenty five percent (25%) of the buffer;
c. Stormwater dispersion outfalls, bioswales, and bioretention facilities may be allowed anywhere within
stream buffers;
d. Such facilities are designed consistent with requirements of ECDC Chapter 18.30; and
Page 85 of 87
Packet Pg. 454
6.1.c
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
e. The location and function of such facilities will not degrade the functions or values of the stream or
stream buffer.
9. City Discretion in Protection, Enhancement and Preservation of Streams. The city of Edmonds is
unique within the state of Washington as a built -out community with streams that have been
incorporated within, and often located immediately adjacent to, residential development. This title
allows the director full discretion to condition proposals for development on parcels containing, adjacent
to, or potentially impacting streams to enhance conditions consistent with ECDC 23.40.050 and the
purposes and objectives of this title. Conditions on development shall be required to enhance streams
and stream buffers as fish and wildlife habitat conservation areas to provide increased protection of
anadromous fisheries and potential fish habitat in accordance with best available science and the
recommendations of an approved critical areas report and may include:
a. Removal of stream bank armoring;
b. In -stream habitat modification;
c. Native planting;
d. Relocation of stream channel portions to create contiguous riparian corridors or wildlife habitat;
e. Planting of stream bank native vegetation to increase stream shading;
f. Removal and control of nonnative, invasive weed species;
g. Requiring additional building setbacks or modified buffers; and
h. Limiting or reducing the types or densities of particular uses.
The right of discretion in provisioning development in regard to streams is maintained in order to
provide for the creation of enhanced conditions over those currently existing around streams in the city
of Edmonds. In all instances where an applicant cannot demonstrate that standard stream buffer widths
as provided in subsection (D)(1) of this section can be accommodated by project development, the
applicant shall be required to submit a stream buffer enhancement plan or a stream mitigation and buffer
enhancement plan as part of a critical areas report indicating that post -project site conditions will
provide equivalent or greater protection of stream functions and fish habitat over a standard stream
buffer and existing site conditions. [Ord. 3527 § 2, 2004].
Page 86 of 87
Packet Pg. 455
City of Edmonds — City Code and Community Development Code
Environmentally Critical Areas — April 26, 2016
6.1.c
Figure 23.90.000
CITY OF EDMONDS CRITICAL AREAS
Critical Areas Compliance Requirements*
Fish and Wildlife Habitat Conservation Areas
,dher r
Fish and MUllfe C liul Araa Repea R
on Cridcal Areparr RVFf':A Cririe.l Area Report CrllkrJAM miripbe—Plan
E{abien Corrkatia,l REgfA REM:: i,, idralifka jurisdl.,datuel r4P� REQUIREMENT u, Repnrl or,Ad jdes REOUIRED is
Am IF 611 'A} cur ulun � tiiy E,resei,m W Brea wirhin2R0 frof � p—ulk yi axsussnurnt 111.1 in,pmcex to `* ru-kdy actin., u, U
kbxsrrd Qn or,icni ;.H .Hednnal EV11CA lubjen paNel. of h.,hitat.nd kk3niip fWHCA will ILWV remi. nr,urrK,.� ihu U
e6iee1 purl. within JJI}jt nl pul-jw i,npa ;—.W.V, "all fro., pruist, Innetiuns and valuu
,uhjeci p4-1. fmrn prnieet dr prnrni. dew4lounl. of wild3iir, hahn,u.�
4 t
Critical Area F j+ort kel—, mnclud� O
concludra na thsr h.,bimt Funceianx Na Adciilirmel
and vAlue, will not hr snm inns M
juridirtinml flme ]R N
h,cetA within YQ R nF - dnreamd,hmugh prnim ri�Gpl feine M1ra. L
uIbject parcel. = de+elapmrnr. Q
Nei nddisinnal mrnpliarrre
rxgnirrm h. V
s ucam Buffer Enh r.sml . .
Amiurli'ien REQUIRM Ia
io el—lyItrcam: sid �
3kr+Ieu will �j1j drmortelro[r rroendon of CY)
Jaro 1 avoid, in,pac-I, Jelwn,�no df sl,.-a.n or in rAm,mar hllffer „ MAILI and huff[t tmklrnns Impwi,lo ssreurn V—
wstr{vin and buffrr F bolfer,.;ll he unpxled L irnpacts,rilh stand.o __Im- nod %1,lenrrieh lyduced huffer voided 1hmugh
w,di.iaudarl buffer prujuiinipLo iiiawni wiiR b4t, widths, buffer ridrh i 10 5u%). buffer wduction. ....
walth.. ,tah,6Al3�od�r w�,ltls. C
Further hulls, NC-; 6"Liuiul M
Noaddii—t No Addilio- 5neem htlfkrA+ereging iucNnn needed in unn 1 a N
cmnply, i— mnEiona � od Allowwish aditional m1" ..
rrquiir—ir tequirenlerl,r. huf erenhancrmenl- hoti r in, yet,. rcymre�ntnu. rn
`Report requirements mcy be reset through submission of a single critical area report or muliipie reports in combination.
Page 87 of 87
Packet Pg. 456
6.1.d
COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER TIBBOTT,
AUTHORIZE THE MAYOR TO SIGN THE CONTRACT DOCUMENTS WITH DES FOR
$3,700,416 AND AUTHORIZE WASTEWATER FUNDS TO BE EXPENDED. MOTION
CARRIED UNANIMOUSLY. (Councilmember Fraley-Monillas was not present for the vote.)
Citing the winds this weekend, Councilmember Mesaros asked Mr. Williams to provide a brief update on
how Public Works addressed any issues. Mr. Williams explained staff was very busy all weekend, many
staff members working overtime to address weather -related issues including worked with PUD after
seven major trees fell into power lines. Most of the pump stations were out of power including Lift 1 on
Sunset Avenue; all the generators came on and everything worked perfectly including the transfer
switches. Councilmember Mesaros echoed kudos My Edmonds New gave Public Works staff.
5. PUBLIC HEARING
A. PUBLIC HEARING ON CRITICAL AREAS ORDINANCE UPDATE
Senior Planner Kernen Lien relayed: a
• Update started in fall 2014 with review of existing code and BAS
• Planning Board and City Council Review in 2015
• Council Adoption January 26th and Mayor veto
• December 15, 2015 Code in Exhibit 1
• February 23, 2015 Council scheduled public hearing for tonight to consider potential new CD
amendments to draft regulations in Exhibit 1
o Intent of public hearing was to identify universe of potential amendments to the December 15
code in Exhibit 1
Tonight and next steps
o Tonight
■ Review proposed City Council amendments
■ Take public comments
■ Staff emailed Council comments received after packet prepared
o Next City Council meetings
■ April 5th — Council discuss and decide which proposed amendments to carry forward
■ April 12th — Discuss and refine proposed amendments carried forward on April 5th
■ April 19th — Potential adoption of updated critical area regulations
■ Council previously adopted resolution indicating critical area regulations would be
adopted by April 30.
■ May be time tonight to begin discussion of potential amendments
Mr. Lien reviewed the potential amendments grouped by topic:
ECDC 23.40.220.C.4 — Physically Separated/Functionally Isolated
• LA — Require determination to be made by a qualified critical area consultant
o Maintains flexibility
o Maybe costly for smaller projects
• LB — Rename Provision
o "Potentially isolated"
o Change to "Interrupted Buffer"
■ Defection of buffer: designated area immediately next to and part of a stream or wetland
that is an integral part of the stream or wetland ecosystem
Council Review/Critical Area Decision Process
• 2.A — Include City Council in decision making process for certain critical area decisions
Edmonds City Council Approved Minutes
March 15, 2016
Page 4
Packet Pg. 457
6.1.d
o Could insert public opinion into what is supposed to be opinion based on science
o Could create an appearance of fairness issue
2.B - Decision matrix/threshold for which projects would include City Council in decision
making process
2.0 - Consider amending the decision process for certain types of critical area decisions
Exhibit 2 - Contingent Critical Area Review Procedure (proposed by City Attorney)
o Scope:
■ Development of at least 600 square feet within standard buffer
- Physically separated/functionally isolated buffer
- Restoration project
- Wetland/stream buffer reduction
■ Would include also moving physically separated/functionally isolated out of allowed
activities and into new provisions in the wetland and stream sections
o New Type II-B procedure
■ Public notice (including City Council)
■ Citizen may request public hearing which would escalate the process up to a Type III -A
- Public hearing before Hearing Examiner
- Requestor must pay a fee in the amount of 50% the difference between Type II-B and
Type III -A application fee
- Project proponent shall pay the other 50% difference between Type II-B and Type
III -A application within 30 days T'
o Notice of Final Decision to City Council with opportunity to appeal Hearing Examiner
decision through LUPA appeal a
o Staff will provide an example at April 5 meeting
ECDC 23.40.220.C.7.b.iv - Hazard tree replacement
• 3 - Change the required diameter of deciduous replacement trees from 1-inch dbh to 1 to 2 inches
dbh
o Larger tree not necessarily better for restoration
o Smaller relative root ball for larger tree
o More difficult for tree to become established
Definitinnc
• 4.A - Change "normal maintenance of vegetation" from ...trees less than 3-inch dbh to trees less
than 4-inch dbh...
o Normal maintenance exemption in ECDC 23.40.230.C.2
o Allows the clearing of slightly larger saplings as a critical area exemption
• 4.B - Add definition for "Council"
o Definition exists in ECDC 21.15.030
• 4.0 - Add definition for Best Available Science
o ECDC 23.40.310 -Best Available Science
• 4.13 -Move definitions from Part VI to ECDC 23.40.010 after Purpose section
ECDC 23.90.040.C.I -Native Vegetation
• 5.A -Apply to RS-8 and RS-10 zones
o Would greatly expand the area the provision would apply to
o RS-12 and RS-20 established because the presence of critical areas
o Comprehensive Plan designation
■ Single-family Resource (RS-12, RS-20)
■ Single-family Urban (RS-8, RS-10)
Edmonds City Council Approved Minutes
March 15, 2016
Page 5
Packet Pg. 458
6.1.d
• 5.B — Consider different native vegetation percentage for RS-8 and RS-10 zones
• 5.0 — Change "...native trees over 10 inches in dbh make up more than 70 percent of the canopy
cover" to "...native trees over 6 inches in dbh make up more than 40 percent of the canopy
cover."
o May trigger the requirements of this provision on more properties than the original proposal
o Original proposal based on specific habitat features
o Amendment intended to preserve more canopy coverage
• May be further refined through development of UFMP
Frequently Flooded Areas a
• 6 — Do not consider amendments to ECDC 19.00.025 and 21.40.030 at this time
d
o Frequently flooded areas are critical areas by definition c
o Building code regulates development in the flood plain c
o Proposed amendment to definition height intended to compensate for requirement to build
two feet above base flood elevation 0
c�
o Is appropriate to consider at this time a
■ Language in Comprehensive Plan Sustainability Element: "Focusing on short term
expedient solutions will only make actions necessary to support sustainability more
difficult in the future. For example the areas of environmental issues and climate change, v
deferred action now will only make cumulative effects more difficult to resolve in the
future. The familiar GMA-based 20-year planning timeframe will not be sufficient — a,
planning for sustainability must take an even longer view."
Council Status Reports
• 7 — Require periodic reports to the City Council
o Detailed reports can be time consuming and expensive
o With existing resources could provide periodic reports with basic data, for example:
■ How many buffer reductions were granted and where
■ Number of critical area determinations
■ Number and general type of physically separated/functionally isolated buffer
determinations
■ Provide some sample projects
o Clarify report frequency
Appendices
• 8.A — Insert new Appendix A: Map of Critical Areas in Edmonds
o Not regulatory - used for reference purposes only
o Maps do not show the exact locations of all critical areas
o Subject to change
• 8.13 — Insert new Appendix B: Listing of critical areas in Edmonds with buffer widths and
category/classification designations
o Cost prohibitive
o Would have to visit every property in Edmonds
o Critical areas not fixed in time or place
o Per updated code, critical area determinations and reports only valid for five years (ECDC
23.40.080 and 23.40.090.F)
• Could make existing critical area information available on City of Edmonds web map
o Do not want people making decisions based on information that may be incorrect
Mr. Lien displayed Wetland and Streams; Landslide, Erosion and Seismic Hazards; and Priority Habitat
Areas maps for Edmonds. He continued his review of the proposed amendments:
Edmonds City Council Approved Minutes
March 15, 2016
Page 6
Packet Pg. 459
6.1.d
ECDC 20.15.215 Restoration Projects
• 9 — Replace draft language in Exhibit 1 with Council proposal
o Restoration of historic ecological functions is encouraged
■ Which "historic" period
■ Looking to improve existing conditions
o Project proponent proposes buffer width necessary to ensure success
■ Should have some specific parameters
o Director reviews and forwards recommendation to City Council
■ Same issues with Council administration of the code as previously discussed
ECDC 23.40.040.0 — Areas subject to the provision of the CAO
• 10 — Replace to refer to new appendices if appendices are adopted
o ECDC 23.40.040.0 notes that the critical area regulations apply regardless of any formal
identification
ECDC 23.40.040.D — Areas Adiacent to Critical Areas a
• 11 — Keep only first sentence and delete the remainder of the section
o Amendment would correct discrepancy between ECDC 23.40.040.1) and definition of
adjacent in ECDC 23.40.320 v
CD
Councilmember Buckshnis commended Mr. Lien for all his hard work. She has read four different critical r
area ordinances and will rely on Shoreline's Ordinance 723 which includes a definition for BAS and
others words. She offered to confer with Mr. Lien outside the meeting about definitions.
Councilmember Teitzel read from Department of Ecology's January 12, 2016 letter which states, " In
recognition of the value of restoration in urban landscapes and the limited restoration opportunities, in
2009 the Washington State Legislature amended the Shoreline Management Act (see RCW 90.58.580) to
encourage urban restoration. This amendment allows local jurisdictions to grant relief from shoreline
permitting requirements when a restoration project causes a landward shift of the ordinary high water
mark. Allowing a reduction in the standard buffer is a similar approach to encouraging restoration; not
implementing a restoration project because of inadequate buffers would be an unfortunate loss of
opportunities for environmental improvement." He asked Mr. Lien if he agreed with DOE's conclusion.
Mr. Lien answered yes, the provision in the CAO is based on a SMA provision. The DOE's letter is in
response to one of the December 15, 2015 amendments which would have deleted one of the sections in
the restoration projects. DOE's letter supports the language proposed in Exhibit 1.
Councilmember Teitzel relayed his understanding allowing and encouraging restoration by reducing the
buffer is a win for the environment and for the landowner which should be the City's goal. Mr. Lien
agreed, explaining the language in Exhibit 1 states the restoration project must have a net environmental
benefit. If the land owner were allowed to reduce the buffer, the project overall would be required to have
a net environmental benefit.
Mayor Earling opened the public participation portion of the public hearing.
Mike Echelbarger, Edmonds, a builder in Edmonds, he relayed his experience with a stream and critical
area on an adjacent property and requirement for a study. The study was related to language deleted from
ECDC 23.40.090 and 23.40.310 regarding peer review. He described how peer review works in
Edmonds; they were required do a report, in this case a watershed analysis. They hired a licensed
engineer and paid $10,000 for the report. The report was submitted to the City and the City hired a
consultant to do peer review which cost another $10,000. The consultant identified one addition and it
Edmonds City Council Approved Minutes
March 15, 2016
Page 7
Packet Pg. 460
6.1.d
cost him $1500 to have it included in the report. The bill for peer review from the City was $5,000. He
summarized he did not believe in peer review; the cost was nearly three times what it should have cost
and he did not believe the results were significantly different. Next, he referred to ECDC 23.40.280
building setbacks, questioning why a setback, essentially a buffer for the buffer, was required in addition
to the critical area buffer and how 15-feet was determined. He recommended the City inform its residents;
there was little development potential in Edmonds but many people living next to a stream or wetland do
not know these changes are being proposed.
Justin Heckt, Edmonds, a Students Saving Salmon volunteer, said for the greater environmental health
W
of Edmonds and surrounding areas, the City needs to be accountable by doing scientific testing and using
a
reliable and unbiased data collected from critical area. Critical areas contain streams and marshes that add
D
to the ecosystem and can potentially support a thriving salmon community. These test provide not only
c
information for health factors such as pH, dissolved oxygen and other factors, they look for potentially
c
dangerous factors such as E.coli and toxins that can leak into neighborhoods or enter streams and the
Marsh. Due to potential threats and the need to defend the environment, the City should look to scientific
O
organizations such as the National Oceanic and Atmospheric Administration and Washington State
i
University Extension to guide reports that will be used to make future guidelines. It is important that BAS
a
be used in conjunction with the data acquired. Not having dependable data could lead to compromised
water sources, increased potential infections from bacteria, exposure to pollutants in stormwater runoff.
L
He suggested focusing attention on the Edmonds Marsh, an estuarine wetland and priority habitat. As the
�?
Marsh feeds into Puget Sound, it impacts the health of upland waters. Using BAS and all available data
CD
can promote a healthy society that will lead to a sustainable future.
r
Alan Merns, Edmonds, referred to written materials he provided, a chart showing, 1) bird population
trends in his Maplewood neighborhood over 13 years, species and how they have appeared/disappeared,
and 2) photos of 20 trees on a property near his home that were marked in late February; he was unsure
this meant they were intended to be removed. He expressed concern with the CAO's inaction on bird and
wildlife corridors across Edmonds. Although not in a critical area, he monitor birds in his yard; the
abundance and biodiversity of bird life has been decreasing since 2005. He has shared his observations
during the past five years with Edmonds citizens via presentations at the Bird Fest, Edmonds Floretum,
Native Plant Demonstration Garden and a recent course at the Edmonds Community College Creative
Retirement Institute. At least 6 of the 75 species are now locally extinct in his area; climate change and
tree and shrub removal are likely factors in the decline. Citizens attending his presentations have been
alarmed and are employing their own monitoring. When his family moved to Edmonds, there was a
corridor of tall trees connecting Yost Park and Maplewood Park where birds including eagles, owls, band -
tailed pigeon could be observed. During that time over 100 trees have been cut and not replaced. During
its deliberations, he encouraged the Council to be inspired by the increased citizen monitoring and
concern.
Phil Lovell, Edmonds, said the Council must incorporate support and implement appropriate language
necessary to address the potential impacts of sea level rise on the Edmonds Puget Sound waterfront. The
new community center currently under design per City Resolution 1313 approved on March 18, 2014, is
based on a full 30-foot tall building with a first floor at elevation 15.0 in NAVD 88 datum. This criteria
compiles with the current building height regulations and engineering based on BAS. He submitted the
briefing document presented to the Council during the senior center's briefing to City Council at its
March 4 retreat. He referred to a New York Times article printed in the March 15, 2016 Seattle Times
regarding a recently published study in the magazine "Nature Climate Change" which states in part,
"rising seas which already endanger coastal communities through tidal floods and storm surges could rise
3 feet and possibly even more." The updated CAO must contain provisions supporting the current design
direction of the new waterfront community center so important to the welfare and benefit of the
community.
Edmonds City Council Approved Minutes
March 15, 2016
Page 8
Packet Pg. 461
6.1.d
Sam Kleven, Edmonds, expressed concern for the City's wildlife including salmon that use streams and
wetlands. He cited the importance of protecting wildlife with the help of buffers. To successful complete
their lifecycle, salmon need wide enough buffers, sized in accordance with BAS. A buffer is a strip of
land that surrounds environmentally fragile streams and wetland; properly sized buffers will help prevent
harmful silt and pollutants such as stormwater runoff from entering streams and wetlands. Providing
native vegetation and shade to nourish salmon will create a safe haven for species in Edmonds. As well
protecting birds, plants, insects and fish native to the City, buffers are also a visual symbol of Edmonds'
land stewardship. Restoring urban streams also includes daylighting wherever possible; for example,
Willow Creek will be daylighted thanks to the City's efforts to secure funding. The Students Saving
Salmon Stream Team at Edmonds-Woodway High School monitors the status of many streams in
Edmonds, including Willow Creek. Bringing back salmon runs will require providing incentives for
daylighting streams and enhancing buffer areas such as tax reductions. Several incentives can be offered
to citizens with regard to buffers via the Puget Sound Urban Resources Partnership, Community Salmon
Fund, private stewardship programs and Five Star Restoration Challenge grants. The City currently
supports the Student Saving Salmon program, a step in the right direction toward conservation
restoration. He encouraged the Council to approve the use of strong language regarding conservation in
Edmonds' CAO.
Joe Scordino, Edmonds, retired fishery biologist, summarized points in an email he provided the
Council. First, he supported including a list of critical areas in Edmonds in the regulations. He questioned
having 90+ pages of regulations but not knowing where they apply. Regulations should be easily readable r
by the public and people should know whether they apply to their property. He suggested simply listing
Shellabarger Creek, Willow Creek, Edmonds Marsh and others and their buffers. Next, he felt it was
important to encourage restoration projects and suggested letting the project proponent dictate the size of
x
the buffer. For a restoration project to be successful it needs an adequate buffer and the buffer should be w
based on the science of the project rather than setting arbitrary buffer widths. With regard to physically
separated/functionally isolated buffers, he recommended modifying the language to ensure what is
functional isolated is scientifically proven not just based on a regulation. He supported the amended 2
language regarding monitoring and reporting so residents can see what is happening to critical areas. He
referred to numerous regulatory structuring comments in his email. With regard to preserving the Marsh,
he agreed there was some overlap with the SMP which has not yet been approved. He feared the intersect �j
of the two may result in a reduction of the Marsh buffer widths or other changes in the Marsh's
protection. He encouraged the Council to look closely at the Marsh when structuring the regulations. N
John Reed, Edmonds, speaking on behalf the Alliance of Citizens for Edmonds (ACE), explained a task
force of ACE members have considered the 12 proposed amendment as well as ideas and main areas
identified for updating in the public hearing notice dated March 1, 2016. The task force also considered
the 8 amendments made by Council on December 15, 2015 and the presentation by staff on the 12
amendments on February 23, 2016. Yesterday ACE submitted written comments to the Council, Mayor
and Mr. Lien, suggesting changes and voicing support for some aspects of the CAO. ACE's comments
are based on the October 19, 2015 redline version of the CAO and in some instances the proposed
amendment in the public hearing memo in tonight's material has been revised and incorporates some of
the recommendations in their submittal. He highlighted ACE's major recommendations.
• Amendment 1: The 2015 Council deleted this new section. ACE recommends the two terms be
carefully and completely defined in the CAO definition section. This provisions needs to be
coordinated with footprint development and the SMP. Note F footprint of development should
include compacted gravel. This was addressed in 2015 Amendment 5 to include legally
established buildings, paved roads, driveways and parking lots. ACE recommends it be limited to
those items.
Edmonds City Council Approved Minutes
March 15, 2016
Page 9
Packet Pg. 462
6.1.d
• Amendment 2: Agree this needs to be limited to major items in physically separated/functionally
isolated restoration exemption areas and recommend adding variances.
• Amendment 5.A: Agree this is unduly burdensome unless selected area such as parcels falling
within a fish a wildlife habitat conservation area can be specifically called out.
• Amendment 9: Recommend remove buffer reduction allowance and allow project proponents to
propose based on need for special projects. Reduction be limited to 25% and eliminate paragraph
B.3 as proposed in 2015
• Note C: Recommend compensatory mitigation be eliminated and actual mitigation be required
• Building code and height exceptions: Stand by position taken on January 25, 2016 letter to
Council....
He requested the Council keep in mind the primary purpose of the ordinance was to protect critical areas
and allow exceptions only when absolutely necessary.
Susan Paine, Edmonds, cited the importance of trees to critical areas and the environmental services O
they provide, more so in critical areas. She supported preserving existing trees and expressed concern M
with allowing the removal of trees smaller than 4 inches or 6 inches as it eliminates much of the a
underbrush and prevents trees from maturing. Trees provide slope stabilization and other environmental
benefits. She recommended restoration projects be limited to non -development projects to prevent M
additional development around sensitive areas which will be important for future generations and salmon v
runs. Regarding physically separated/functionally isolated buffers, she did not support including that
provision, envisioning a sawtooth system of buffers around sensitive areas, wetlands and streams that o,
would be difficult to enforce. With regard to building footprint, she questioned including gravel as part of
a building footprint and recommended retaining the old language and not including loose or compacted a
gravel. She recommended Council review projects where a buffer reduction of 25% or more is proposed. `m
Bob McChesney, Executive Director, Port of Edmonds, said his comments are not related to any
specific project or specific property. The local regulations such as the CAO are already restrictive as they
pertain to future development opportunities and may devalue private property located in or adjacent to
critical areas as well as place new limits on previously accepted private property rights. The Port's
mission endorses both economic development and environmental stewardship as core values. The Port is
committed to the balance between restoration and protection and renewal and economic vitality to serve
future generations. In an ideal world restoration and redevelopment work together; the Port's
responsibility is to find reasonable solutions that create new resources, to invest in restoration and support
environmental stewardship. The Port is opposed to wider buffers around the Marsh as they would be
overly restrictive and counterproductive to Marsh restoration which is a mutual goal. The Port is also
concerned with amendments to frequently flooded areas. A contract rezone for Harbor Square, in
existence since for many years, stipulates maximum building heights to 35 feet which should be reflected
and protected in the new CAO. With regard to how the physically separated/functionally isolated
provision works in the real world, he explained a portion of the footprint for the new Jacobsen Marine
was in a critical area even though the Burlington Northern railroad runs down the middle, preventing any
impacts to the Marsh. Regardless, $11,000 in mitigation was required for impacts that did not exist. He
was hopeful whatever amendments are passed do not overly restrict future development opportunities.
Eric Thuesen, Edmonds, recommended informing residents if their property is located in a critical area.
Many of Edmonds' critical areas are steep slopes, anything over 15%, so it would not be difficult to
delineate those. The information is important for a person to know when purchasing property. He
expressed concern with the Council's level of involvement in critical area decisions, noting the Council
has not been involved in past. Developers spend a considerable amount to hire experts to review projects
using BAS to make determinations. Involving the Council, it becomes a political situation and may result
in five years getting through the process. He acknowledged LUPA was an option but was expensive for
the City as well as the proponent. He recommended the Council not be involved in decisions and instead
Edmonds City Council Approved Minutes
March 15, 2016
Page 10
Packet Pg. 463
rely on experts and the Hearing Examiner. Often the Council does not have the expertise and the net
effect could be an expensive lawsuit. He agreed with the proposal to increase the height of a house in a
wetland.
Rondi Nordal, President, Edmonds-Woodway High School Students Saving Salmon Club, urged the
Council to take to heart her and other young people's comments as they are the future of Edmonds. As a
member of the Stream Team, she places a high value on the environmental health and conscientious
protection and restoration of it. This requires the use of BAS as a means of ensuring these projects have a
net positive benefit for wildlife habitat, critical because if BAS is not applied, restoration projects may not W
focus on key environmental factors or appropriate species. An example of a key factor is embeddedness, a
the extent to which silt surrounds or fills rocks, a key factor to stream health. One way to ensure D
restoration efforts benefit critical habit is continued monitoring with oversight by qualified officials.
a�
c
Continued monitoring ensures a project progresses successfully and also collects information that can be c
used for future updates of the CAO and similar documents. In addition, qualified officials, preferably =a
someone with a specialization in the factors being assessed, adds another level of accountability and O
potential for success. Considering the current BAS, she questioned whether tradeoffs that allow i
development to encroach on critical areas or add impervious surfaces in critical buffer zones should be a
encouraged and whether the width of a buffer established to protect critical habitat should be reduced,
allowing human interests to come before the greater health of the collective environment. She urged the L
Council to consider the best interests of Edmonds when drafting amendments to the CAO. The natural �?
beauty of Edmonds is a core identity and reflects the residents' values. She thanked the Council for their
CD
commitment to drafting the best CAO as it will greatly impact the future. r
Ferrell Fleming, Edmonds, Executive Director, Senior Center, commented Edmonds pride itself on
being a community with a high level of environmental sensitivity and awareness and a commitment to
sustainability. BAS demands the City take account of sea level rise. While the magnitude and timeframe
of that rise if a matter of considerable debate, sea level rise is a fact. Amendment 6 proposes not including
amendments related to frequently flooded areas in the ordinance. Although this amendment may be well-
meaning deal with the belief that this matter should be address elsewhere in the code, frequently flooded
areas are critical areas by definition and with the growing attention paid to the threat of sea level rise, it
would be odd for an environmentally progressive community such as Edmonds with considerable stake in
its waterfront, to leave frequently flooded areas out of the CAO update. He urged the Council to defeat
this amendment and leave frequently flooded areas in the updated CAO. The City's Strategic Action Plan
asked the senior center to build a community center; that can be stopped at any number of points in the
process either by action or inaction; consideration of the CAO is one such point. He urged the Council to
pay specific attention to framing the language of the CAO update in such a way that they can build a
multi -generational center that will serve many generations to come.
David Mellitte, Edmonds, a Woodway High School teacher, agreed with the students' comments
regarding the impact that critical areas have on the environment. Critical areas are often overlooked
unless one steps in it but they are extremely necessary to health and economic benefit. As has been seen
in Louisiana, when critical areas are overlooked, they do not act as sponges to soak up overflows from
natural changes in weather patterns and cannot act as a buffer. If buffers are intentionally reduced and
robust buffers are not required, property owners will face the consequences. He encouraged the Council
to maintain a robust effort with regard to critical areas.
Roger Hertrich, Edmonds, thanked Mayor Earling for his veto which extended discussion regarding the
CAO and the four Councilmembers who voted in favor of holding a public hearing. He appreciated
Councilmember Teitzel's question regarding buffer modification which would apply to stream
restoration. He found that extremely critical and said being overly strict, non -practical would discouraged
stream restoration. He pointed out toxic crumb rubber should be addressed in the CAO, noting there are
Edmonds City Council Approved Minutes
March 15, 2016
Page 11
Packet Pg. 464
6.1.d
no provisions for stormwater with toxic materials that flows into Puget Sound. With regard to
replacement trees, he pointed out a 1-inch tree has a better survival rate. He commented definite critical
area maps are overly expensive and are impractical. As a board member at the senior center, he preferred
to keep the old center to avoid these problems. He did not believe sea level rise would be as high as has
been stated and did not think that belonged in the CAO.
Doug Swartz, Edmonds, referred to Amendment 9 regarding restoration and requested the Council
consider restricting buffer reduction to 25%. Many Edmonds regulations include flexibility; although
flexibility sounds good at the outset, the problem is if staff gives into one developer, every other
developers or special interest will clamor for the same treatment. Buffer reduction up to 75% or allowing
the proponent to recommend the amount of buffer reduction violates the idea of a code. If a project need
more than a 25% reduction, the variance process would be appropriate. He urged the Council not to allow
up to a 75% buffer reduction without a variance because the end result would be a code that was
immaterial and that people could get around.
Sue Little, Edmonds, explained after purchasing her home at 806 Dayton Street in January 2007, she
was told by the City in October 2011 to daylight the stream on the property. Before she daylighted the
a
stream, it was in a pipe except for a waterfall. She hired a biologist and was told to complete a SEPA
checklist for the work in the onsite stream. The biologist reported the stream is a non -fish bearing
L
tributary to Shellabarger Creek. She was also required to obtain hydrologist project approval and even
�?
though her yard has no evidence of a wetland or habitat for endangered, threatened or sensitive species,
CD
she was told to create a berm to hold water in the stream. The work had to be done during low flow
r
during the summer, 10 months from the time the original problem began with the rockery. Her rockery
failed due to the timing. The Fish and Wildlife report stated an annual inspection was required which has
never been done by Fish and Wildlife, the biologist or the Edmonds. After five years of misinformation,
x
lack of communication has created more water problems and expense. She found this very stressful as a
w
property owner as she cannot control the water coming down hill, the rain or the amount of water in her
backyard. After discovering rodents in her crawlspace, 3 feet of water was pumped out, a sump pump and
more drainage installed under her home at a cost of $9.000 She summarized throughout this process she
2
has spent approximately $40,000-$45,000 and still needs to spend more for drainage to address water
issues. She assured she was an environmentalist and liked water and trees but she did not like water
threatening her home.
Hearing no further comment, Mayor Earling closed the public participation portion of the public hearing.
He noted the agenda memo and the agenda mentions only a public hearing. He agreed discussion was
appropriate but questioned whether the Council wanted to take action on the amendments tonight.
Councilmember Mesaros recalled Mr. Lien's slides recommended discussion on April 5 and asked Mr.
Lien to clarify. Mr. Lien agreed the agenda memo identified April 5 to narrow the potential amendments.
As there are no other items on tonight's agenda, he suggested the Council have further discussion tonight.
Councilmember Buckshnis pointed out the agenda memo states potential action and asked if the Council
could begin taking action on the amendments. City Attorney Jeff Taraday responded the agenda memo
limitations are more of a Council protocol issue than a legal issue; there is no legal issue with the Council
narrowing down the amendments tonight.
Councilmember Tibbott commented it may be worthwhile to consider amendments the Council can agree
on and address the remaining amendments at the next meeting.
Council President Johnson thanked everyone who participated in the public hearing particularly the
Students Saving Salmon, noting it was good to hear from young people in the community. She assured
Edmonds City Council Approved Minutes
March 15, 2016
Page 12
Packet Pg. 465
6.1.d
the Council will consider the written comments that have been submitted and citizens are welcome to
make comments regarding the specific amendments. As Mr. Lien mentioned, the Council wanted to
create the universe of potential amendments for the public hearing. The CAO is a very complex,
complicated ordinance and the Council should carefully consider how to move forward. She agreed with
proposed the schedule with adoption by the end of April.
Councilmember Teitzel appreciated Ms. Little's comments about her experience. If a citizen invests
thousands to daylight a stream for the benefit of the environment, it should be a positive experience for
the citizen and the environment. He supported establishing the CAO so that a citizen has reasonable use
of their property at the same time restoring and enhancing the environment to the extent possible and
avoiding Ms. Little's experience whenever possible.
Councilmember Nelson relayed his excitement to begin working on the amendments, preferring to begin
with the amendments that Councilmembers disagree on.
Council President Johnson commented on the importance of the Council considering the comments made
during the public hearing, fearing that taking action tonight would be premature. She preferred to read the
record more thoroughly, consider what has been said tonight and return at a future meeting.
Councilmember Mesaros was not certain which amendments the Council agreed on; he preferred to begin
with Amendment 1.
as
T
T
Councilmember Buckshnis suggested delaying Amendment 2 until the April 5 when the City Attorney
will provide information and Mr. Lien will provide an example. She suggested Amendment 11was an
easy one, simply cleaning up the language. u
Councilmember Teitzel did not advocate for the Council's involvement in the administration's decision -
making process; Councilmembers are legislators and set policy, the administration acts on the policy. If a
decision was made not to have Council take action on exceptions and in 1-2 years the Council found the
legislative intent was not being carried out, he asked if the Council could reopen the CAO to make it more
restrictive and possibly have the Council involved or did the Council have to wait 7 years to make an
amendment Mr. Taraday responded the Council could always clarify ambiguities in the code at a later
date if an ambiguity leads to decisions by the Hearing Examiner that the City Council did not
contemplated when adopting the code.
Councilmember Fraley-Monillas said the Council could also include something in the CAO and if it
didn't work, amend it. Mr. Taraday agreed that could also be done; whatever the Council adopts in 2016,
the Council was not forced to live with the 2016 CAO unchanged for 8 years. The Council can amend and
clarify it as necessary. Councilmember Fraley-Monillas asked if the Council could modify it in 2017. Mr.
Taraday answered yes.
Main Motion #1
COUNCILMEMBER TIBBOTT MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS,
TO APPROVE AMENDMENT 11 AS PROPOSED.
Mr. Taraday clarified Councilmember Tibbott was seeking Council consensus to include Amendment 11
in the CAO. He advised the Council was not adopting anything tonight.
Action on Main Motion #1
MOTION CARRIED (6-1), COUNCIL PRESIDENT JOHNSON VOTING NO.
Main Mntinn ;t2
Edmonds City Council Approved Minutes
March 15, 2016
Page 13
Packet Pg. 466
COUNCILMEMBER TIBBOTT MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO
APPROVE AMENDMENT 3.
Councilmember Mesaros asked if 2 inch dbh replacement trees will be required if the amendment is
approved. Mr. Lien responded if the amendment is approved, the required replacement must be between
1-2 inches; a 1-inch tree would still be allowed. Councilmember Mesaros asked whether 3-inch tree
would be allowed. Mr. Lien answered yes. Councilmember Mesaros clarified the minimum was 1 inch.
Councilmember Teitzel asked what was gained with the amendment as the size of the replacement tree
was at a person's discretion. Mr. Lien said the vast majority of proposals will propose to plant a 1-inch
tree.
Action on Main Motion #2
UPON ROLL CALL, MOTION CARRIED (5-2), COUNCIL PRESIDENT JOHNSON AND
COUNCILMEMBERS NELSON, FRALEY-MONILLAS, BUCKSHNIS AND TIBBOTT VOTING
YES; AND COUNCILMEMBERS MESAROS AND TEITZEL VOTING NO
Councilmember Teitzel proposed changing the title of ECDC 23.40.220.C.4, Amendment LB, Physically
separated/functionally isolated to physically separated/interrupted buffer. Mr. Lien clarified his 2
suggestion was to replace the entire phrase "physically separated/functionally isolated" with "interrupted
buffer."
as
T
Main Motion #3 r
COUNCILMEMBER TEITZEL MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO a
CHANGE THE TITLE OF ECDC 23.40.220.C.4. TO INTERRUPTED BUFFER.
Mr. Lien said changing the entire section to interrupted buffer may require changing other references to
physically separated/functionally isolated throughout the CAO.
Action on Main Motion #3
MOTION CARRIED UNANIMOUSLY.
Main Motion #4
COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
APPROVE THE 4-INCH DBH IN AMENDMENT 4.A.
Council President Johnson referred to comment from Susan Paine regarding the importance of brush and
small young trees. Changing maintenance to allow removal of trees 4-inches dbh or smaller was not
taking into consideration other vegetation that may be useful in stabilizing a slope or providing habitat.
She suggested Ms. Paine's comments were worthy of additional consideration. She interpreted this
change to basically allow clear cutting of any steep slope that had 4 inch or less dbh vegetation.
Councilmember Mesaros responded he did to interpret this to allow clear cutting. He read it to allow
removal of vegetation as part of normal maintenance of vegetation around a critical area. He was certain a
property owner wanted to protect the slope as much as the City did. He recommended approving
Amendment 4.A and allow property owners to take responsibility for their land.
Councilmember Fraley-Monillas asked for clarification. Mr. Lien explained this definition refers to a
specific exemption in 23.40.230 (page 22 of Exhibit 1), an exemption allowed for operation, maintenance
or repair. A statement was added that reads, "Operation and maintenance also includes normal
maintenance of vegetation performed in accordance with best management practices, provided that such
management actions are part of regular and ongoing maintenance, do not expand further into the critical
area, are not the result of an expansion of the structure or utility, and do not directly impact an endangered
Edmonds City Council Approved Minutes
March 15, 2016
Page 14
Packet Pg. 467
6.1.d
or threatened species." A definition of normal maintenance of vegetation was also added, "normal
maintenance of vegetation means removal of shrubs, non -woody vegetation and trees less than 4 inch dbh
that occurs at least every other year. Maintenance also may include tree topping that has been previously
approved by the City in the past five years." Another possible provision would be within the allowed
activity section, 23.40.220.C.7 (page 19 of Exhibit 1) that addresses select vegetation removal activities
and includes a list of evasive and noxious weeds. Amendments to this section would limit the amount of
clearing to an area 1500 square feet over a 3 year period.
Councilmember Fraley-Monillas asked how this would apply to the two incidents on one property where
property owners cut trees on a hillside in a critical area. Mr. Lien answered the most common is alders
that sprout on a property. Alders are a pioneering species and can come up by the thousands on a site. The
exemption would prevent alders from taking over the site. The site Councilmember Fraley-Monillas was
referring to was subject to restoration. Alders can overwhelm a restoration project. The exemption would
allow a property owner to control the alders. Councilmember Fraley-Monillas commented it was not
related only to alders. Mr. Lien agreed, alders were only an example that this would apply to; other trees
sprout in a similar manner.
Councilmember Mesaros relayed his understanding if the amendment were approved, the regulations M
would not allow a clear cut. Mr. Lien agreed the regulations would not allow a clear cut; it was related to L
normal maintenance of vegetation on an ongoing regular basis. �?
CD
Councilmember Buckshnis asked why 4 inches was preferable to 3 inches. Councilmember Mesaros r
recalled a citizen presenting a 3-inch and a 4-inch log to illustrate there was not much difference between
3 inches and 4 inches. Q-
Action on Motion #4
MOTION CARRIED (6-1), COUNCIL PRESIDENT JOHNSON VOTING NO.
Main Motion #5
COUNCILMEMBER NELSON MOVED, SECONDED BY TIBBOTT TO APPROVE
AMENDMENT LA.
Councilmember Nelson explained this amendment provided a balance between allowing some flexibility
while requiring a qualified critical area consultant to make the determination whether it is in fact a
separated and isolated buffer.
Councilmember Mesaros referred to Mr. Echelbarger's comments regarding peer review and asked
whether this amendment would require peer review. Mr. Lien answered that was elsewhere in the
regulations. The amendment would not necessarily require peer review but it could. One of the instances
when the City requires peer review is when there are multiple critical area reports that do not agree. In the
instance referenced by Mr. Echelbarger, staff did not feel they had the expertise to review the critical area
reports so it was sent to a consultant with that expertise. Another area that always requires peer review is
development within the earth subsidence landslide hazard area in North Edmonds. He summarized there
are a few instances where this amendment may require peer review.
Councilmember Mesaros referred to Ms. Little's comments and the investments she has made when
trying to do the right thing that has not turned out well for her. If decisions are made to reduce the buffer,
he supported having good reason to do so and having expertise but did not want the property owner to go
through a series of events that complicates their lives rather than helps them with their property and helps
the City.
Edmonds City Council Approved Minutes
March 15, 2016
Page 15
Packet Pg. 468
6.1.d
Mr. Taraday pointed out a portion of Amendment LA overlaps with Amendment 2; Amendment LA
includes a process involving a recommendation to the City Council and Amendment 2 includes a different
process. An earlier Council comment recommended deferring Amendment 2 to a later date.
Councilmember Buckshnis said if Amendment LA was related to Amendment 2, she preferred to first
hear from the City Attorney on April 5.
Councilmember Tibbott relayed his understanding Amendment LA was an opportunity to agree with
what was already proposed in the CAO and was one of greatest opportunities to allow for development
that would improve environmental effectiveness in the critical area. He was supportive of Amendment
LA and looked forward to a further understanding of Amendment 2.
Action on Main Motion #5
COUNCILMEMBER NELSON WITHDREW AMENDMENT LA WITH AGREEMENT OF THE
SECOND.
Councilmember Teitzel expressed concern with the wording of Amendment LA, which states the director a
will require the applicant to provide a site assessment and functional analysis report by a qualified critical E
area consultant. His concern was this removes staff almost entirely from the decision. He envisioned a
property downslope from a stream and did not support requiring a report when it was absolutely clear t�
there was no impact on the nearby stream or wetland. He found Amendment LA too restrictive and felt it
should be reworded. r'
T
�r
Main Motion #6
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, TO REMOVE AMENDMENT 4.C, ADDING A DEFINITION FOR BEST
AVAILABLE SCIENCE.
Councilmember Buckshnis commented the definition is already contained in ECDC 21.40.310.
Action on Main Motion #6
MOTION CARRIED UNANIMOUSLY.
Main Motion ;t7
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL,
TO APPROVE AMENDMENT 4.1), MOVE DEFINITIONS FROM PART VI TO ECDC 24.40.010
AFTER PURPOSE SECTION.
Councilmember Buckshnis commented the definitions should be at the beginning which is done in other
cities' CAO for readability. Mr. Lien commented moving definitions from Part IV will not move the
section related to BAS which has its own section describing characteristics of BAS, not a definition. He
clarified Section 23.40.310 BAS is not contained in the definitions; the motion is to move the definitions
contained in Part IV, 23.40.320 to 23.40.010, moving the definitions from the end of the general section
to the beginning.
Councilmember Fraley-Monillas asked if Mr. Lien could bring back the amended text next week. Mr.
Lien relayed his understanding the Council was reducing the amendments via changes discussed tonight
so there were fewer to consider on April 5. He did not intend to make any of the changes approved
tonight and would incorporate all the proposed amendments following the April 5 meeting into a new
draft code for the April 12 meeting. Councilmember Fraley-Monillas feared it would be difficult to follow
on April 5 if some changes were approved tonight and not incorporated into the document. Mr. Lien
offered to create a new draft for the April 5 meeting although moving the definitions would require
renumbering everything which would be very confusing. Mr. Taraday suggested when the COA returns to
Edmonds City Council Approved Minutes
March 15, 2016
Page 16
Packet Pg. 469
6.1.d
the Council on April 5, staff categorize the amendments the Council has already acted on and
amendments that have not yet been acted on. Mr. Lien agreed with Mr. Taraday's suggestion.
Councilmember Mesaros asked the intent of Amendment 4.B. Councilmember Buckshnis answered it
relates to Amendment 2.
Councilmember Teitzel agreed it made sense to move the definition to the beginning as it will help the
reader to have the definitions as they read the CAO. With regard to BAS, he suggested referencing in the
list of definitions where BAS is in the document. Mr. Lien commented there was already motion to
a)
remove Amendment 4.C. Councilmember Teitzel clarified his suggestion was to reference the section on a
BAS as the definition of BAS. D
a�
c
Councilmember Buckshnis agreed with Councilmember Teitzel's suggestion. c
L
Councilmember Mesaros clarified Councilmember Teitzel's suggestion; he was not recommending the O
language regarding BAS be included in the definitions, he was recommending including a reference to i
BAS in the definitions. a
Amendment #1 to Main Motion #7 L
COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, V
TO AMEND TO ADD REFERENCE CLARIFYING IN THE DEFINITION LIST WHERE A
READER MIGHT FIND INFORMATION ON BEST AVAILABLE SCIENCE. T-
T
Action on Amendment #1
AMENDMENT CARRIED UNANIMOUSLY.
Action on Main Motion #7 as amended
MAIN MOTION CARRIED UNANIMOUSLY.
It was the consensus of the Council to defer further discussion and action on the amendments to April 5.
7. MAYOR'S COMMENTS
Mayor Earling advised the new Economic Development Commission (EDC) has been formed and
thanked Councilmembers for their appointments. The EDC is a fabulous group of people; their first
meeting is March 30. The Mayors Pedestrian Safety Committee will meet for the first time on April 5.
Mayor Earling reminded of the Snohomish County Cities dinner on Thursday; he is unable to attend.
8. COUNCIL COMMENTS
Councilmember Nelson referred to comments regarding the subject of sea level rise. He was excited there
was so much interest in the topic and Edmonds, as well as other communities along the Washington coast
including Seattle, Olympia, King County, Bellingham and Bremerton and Kitsap Council have looked at
comprehensive ways to address sea level rise. If the City takes on this challenge, which he believed the
City should, we should look at ways to adopt, prepare and fight. The reality is all the modeling is over an
84-year time frame and for the first 34 years of that modeling, the damage is already done. Seas will rise
regardless of whether habits or lifestyles change. Beyond that point, from 2050 to 2100, there are things
the City can do to impact sea level rise and he recommended being proactive not just reactive.
Councilmember Fraley-Monillas apologized for arriving late; she was at Health District's annual retreat
until 6:45. The Health District is struggling with cuts and deciding which programs to cut. One of the
proposals is for the Health District to no longer serve the WIC program and subcontract it instead. There
Edmonds City Council Approved Minutes
March 15, 2016
Page 17
Packet Pg. 470
6.1.e
It was the consensus of the Council to schedule approval of a resolution on next week's Consent Agenda.
Mayor Earling declared a brief recess.
NEW ITEM: CONSIDERATION OF SETTLEMENT AGREEMENT RELATED TO A
CONDEMNATION ACTION AT THE CORNER OF 76TH AVENUE AND 212TH STREET
COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO
APPROVE THE MARCH 29, 2016 SETTLEMENT AGREEMENT BETWEEN THE CITY OF
EDMONDS AND FOUR PROPERTY OWNERS KNOWN AS THREE GRACES #1 LLC, THREE
GRACES #2 LLC, THREE GRACES #3 LLC AND PORTERFIELD DEVELOPMENT LLC IN
WHICH THE PARTIES HAVE AGREED TO SETTLE THE CONDEMNATION ACTION FILED
UNDER SNOHOMISH COUNTY CAUSE NUMBER 15-2-05187-1 FOR A TOTAL JUST
COMPENSATION OF $273,000. MOTION CARRIED UNANIMOUSLY.
B. CRITICAL AREA ORDINANCE UPDATE
Senior Planner Kernen Lien reviewed expectations for tonight's meeting and next steps: @
• Tonight
o Recap Decisions made on March 15, 2016 c i
o Continue Council discussion and decide which proposed amendments to carry forward r
o City Attorney not at next week's meeting so need to make decision regarding contingent r'
critical area review procedure tonight
Next Council Meetings:
o April 12th — Discuss and refine proposed amendments carried forward on April 5th
o April 19th — Potential adoption of updated critical area regulations
Mr. Lien reviewed amendments the Council approved at the March 15 meeting:
• Amendment 1.13: Rename provision to physically separated/potentially isolated or "interrupted
buffer."
o Council voted to rename of the physically separated/functionally isolated buffer provision to
"interrupted buffer."
■ All references to physically separated/functionally isolated buffer in the CAO will be
changed prior to adoption
• Amendment 3: ECDC 23.40.220.C.7.b.iv - Hazard Tree Replacement
o Council voted to change the required diameter of deciduous replacement trees from one inch
dbh to one to two inches dbh
Amendments 4: Definitions
A. ECDC 23.40.320 - Normal Maintenance of Vegetation Definition
o Council voted to Include removal of trees less than 4-inch dbh
C. Add definition for Best Available Science.
o Council voted to insert reference to ECDC 23.40.310 (Best Available Science) in the
definitions section
D. Move definitions from Part VI to ECDC 23.40.010 after Purpose section
o Council voted to move definitions to ECDC 23.40.010
• Amendment 11: ECDC 23.40.040.13 - Areas Adjacent to Critical Areas
o Council voted to keep only the first sentence and delete the remainder of this section
Mr. Lien reviewed potential amendments:
Council Review/Critical Area Decision Process
• 2.A — Include City Council in decision making process for certain critical area decisions
Edmonds City Council Approved Minutes
April 5, 2016
Page 10
Packet Pg. 471
2.B — Decision matrix/threshold for which projects would include City Council in decision
making process
2.0 — Consider amending the decision process for certain types of critical area decisions
Exhibit 2 — Contingent Critical Area Review Procedure
Mr. Lien described the contingent critical area review procedure:
• Scope
o Development of 600 square feet within standard buffer
■ Interrupted Buffer
■ Restoration Project
■ Wetland/Stream Buffer Reduction
• New Type II-B procedure U
o Public Notice (including City Council)
o Citizen may request public hearing which would escalate the process up to a Type III -A
■ Public Hearing before Hearing Examiner O
■ Requestor must pay a fee in the amount of 50% the difference between Type 11-B and
Type III -A application fee Q
■ Project proponent shall pay the other 50% difference between Type II-B and Type III -A
application within 30 days'
L
• Notice of Final Decision to City Council with opportunity to appeal Hearing Examiner decision �?
through LUPA appeal r
rn
Council President Johnson referred to the contingent critical area review procedure, observing a
0.
restoration project such as Willow Creek daylighting may not have 600 square feet of development within
the standard buffer. Mr. Lien explained after the restoration project there will be a buffer to the critical
area; if the restoration project involved more than 600 square feet of disturbance from daylighting the w
stream or expansion of the wetland, it would elevate to this process. Mr. Taraday clarified for this
procedure to apply, both the 600 square foot threshold and at least one of the other three items
(interrupted buffer, restoration project or wetland/stream buffer reduction) needs to occur. It would not 2
apply every time there was development of 600 square feet within a standard buffer. U
Council President Johnson said she will keep this question in mind and will see how the contingent
critical area review procedure would work for a project with restoration but no construction within the
buffer. Mr. Lien said if the desire was to have all restoration projects included, the language could be
changed to restoration projects or interrupted buffer or wetland buffer reduction that include development
of 600 square feet within the standard buffer.
Mr. Lien provided a photograph and described a theoretical contingent review:
• Features of example:
o Stream requiring a 75-foot buffer
0 75-foot buffer
0 25% buffer reduction allowed by CAO
0 600 square foot detached garage on a developed property with stream
o Interrupted buffer or buffer reduction may be applicable
o Initial applications required
• Contingent review process:
o Planning staff reviews critical area application and issues a "Study Required" finding do the
presence of a stream
o Planning staff reviews building permit application
■ Notes 600 square feet of disturbance within standard buffer
■ Notifies applicant of contingent review process
Edmonds City Council Approved Minutes
April 5, 2016
Page 11
Packet Pg. 472
6.1.e
Contingent review process — Type II-B
o Applicant applies for the Type 11-B contingent review and pays $820 application fee
■ 28-day completeness review for Type I1 applications
■ Notice of Application provided
• Properties within 300 ft., posted on site, published in Everett Herald, and notice
provided to Council
■ City received request for public hearing within the 14-day comment period
• Requesting party pay $921
■ Applicant pays $921 to continue with Type III contingent review process within 30 days
Contingent review process — Type III -A
o Notice of Public Hearing provided
■ Properties within 300 ft., posted on site, published in Everett Herald, and notice provided
to Council
o Public hearing held
■ Hearing Examiner has 10 business days to issue decision
o Hearing Examiner decision may be appeal under LUPA (RCW 36.70C)
o No appeal on Hearing Examiner decision
■ Building permit process may be completed
He provided a comparison of the critical area contingent review:
Review Type
Length of Process
Cost
Building permit review
25-30 days
$1,173.50
Building permit review with Type II-B critical area
contingent review
2-3 months
$1,993.50
Building Permit review with Type III -A critical area
contingent review
4-5 months
$2,914.50
Mr. Lien reviewed contingent review process takeaways:
• Adds opportunity for public input into decision process
• Adds cost ad time to project review
Council options
o Adjust threshold for when project is triggered
o Further limit what type of projects are subject to contingent review
o Reserved for special circumstances
o Keep existing review process
o Not apply to buffer reduction
■ Current critical area code includes buffer reduction of 50% of standard buffer and
reduced buffer can also be buffer averaged
■ Draft code only allows reduction of up to 25% of standard buffer and does not allow
combining buffer reduction with buffer averaging
Councilmember Buckshnis said her intent has been to address wetland categories 1 and 2 and estuaries.
She recalled an instance where a massive cutting took place, Council provided input to staff and staff did
not act on Council's input. Her intent was to ensure the Council had knowledge of the threshold and what
is occurring. Her primary concerns were daylighting Willow Creek and any issues related to Lake
Ballinger.
Council President Johnson referred to Mr. Lien's indication that buffer reduction and buffer averaging
could not be combined. She recalled for Willow Creek there was a 25% buffer reduction on the south side
and the Marina Beach Master Plan includes a buffer of less than 75 feet on the north side and there was an
Edmonds City Council Approved Minutes
April 5, 2016
Page 12
Packet Pg. 473
6.1.e
opportunity for buffer averaging. Mr. Lien responded both sides of the creek have 75-foot buffer; buffer
averaging could be done on one side and a buffer reduction could potentially be done on the other side;
they cannot be combined on one side.
Council President Johnson observed the current code allows a 25% buffer reduction and the proposed
code allows a 50% reduction. Mr. Lien said her observation related to several provisions in the CAO.
There is a provision that applies to streams and wetlands that allows buffer reduction. The current code
allows a buffer reduction of 50% of the standard buffer and that 50% buffer could be averaged as well.
The current code does not have a provision for restoration projects. The buffer can only be reduced by
25%, not 50% and buffer reduction and buffer averaging cannot be combined. With regard to the
restoration section of the code, a new section based on the Shoreline Management Act (SMA) only
applies to projects that are not required as mitigation for a development proposal such as daylighting of a
stream or landward expansion of a wetland. If a stream is in a culvert, there is no buffer. Once the stream
is daylighted, it is subject to the critical area regulations. The restoration section was modeled after the
SMA provision that states for a shoreline project that expands shoreline jurisdiction, the SMP does not
apply in that area. The draft critical area provision states a restoration project that expands the critical area
buffer, the buffer could be reduced if certain criteria are met to a maximum of 50% of the standard critical
area buffer. Another amendment will address that issue; he recommended focusing on the contingent
review procedure tonight in order to complete it while Mr. Taraday is present. As currently drafted the
contingent review would apply to restoration projects
T
Council President Johnson commented if the Council were involved, she recalled a ten-day period for the
Council to act after the Hearing Examiner's decision. Mr. Lien explained a LUPA appeal must be made
within 21 days of the Hearing Examiner's decision. Council President Johnson asked if contingent review Q.
example had the same deadline and whether it was considered a LUPA appeal. Mr. Taraday responded
one of the key features of this process is it takes the City Council out of the quasi-judicial decision w
making role for these types of critical area decisions but does not take the Council out of process. That is (n
important because when City Councils act in quasi-judicial decision making roles, they incur the greatest
potential liability for making a decision based not on adopted criteria but on other factors that may not be
permissible. With the contingent review process, the City Council is involved, receives notice of
application, can engage with constituents because the Council is not in the decision making role so the c
Appearance of Fairness Doctrine does not apply. Councilmembers can talk to proponents and opponents, o
testify at the Hearing Examiner, etc. and if a majority of the Council does not like the Hearing Examiner's
decision, the Council can direct the City Attorney to file a LUPA appeal of the Hearing Examiner's o
decision to Superior Court. He summarized the Council was involved, just not as decision makers.
Council President Johnson asked for clarification regarding notification to Council and how quickly the
Council needed to act. Mr. Lien advised there are three potential notices to Council, 1) notice of
application of Type II-B, 2) notice of public hearing if a party requests a public hearing, and 3) notice of
the Hearing Examiner's decision. If a decision is made at the end of the Type 11-B process without a
public hearing, that decision is appealable to the Hearing Examiner.
Councilmember Nelson referred to the comparison of costs. A homeowner constructing a garage would
pay the $1173.50 building permit. If it was discovered the garage met the criteria, the homeowner would
pay an additional $821. He asked what the homeowner would be responsible for in moving forward in a
Type II-B process. Mr. Lien advised the application fees do not include any consultant fees. The property
owner will be required to prepare a critical area report. Once an application is submitted and deemed
complete, there is usually additional discussion with staff. If there is no request for a hearing, that is the
end for the property owner.
Edmonds City Council Approved Minutes
April 5, 2016
Page 13
Packet Pg. 474
6.1.e
Councilmember Nelson clarified if someone requests a public hearing, that person pays a fee. Mr. Lien
explained in an attempt for the requested party to have some buy -in to the process to prevent abuse, the
person requesting the public hearing must pay the half difference between the Type II and III permit
process. Councilmember Nelson asked how the cost for the Type II and III permit fee is determined. Mr.
Lien answered they are in the City's adopted fee schedule. A Type III process is about $1,600 and
anything that goes to the Hearing Examiner, the applicant is required to pay the cost of the Hearing
Examiner and staff takes a deposit at the time of application. Councilmember Nelson observed the person
requesting a public hearing pays 50% of the fee and the homeowner pays 50% of the fee even though they
may not want a Type III process.
Councilmember Fraley-Monillas asked how many applications the City receives a year for property
restoration projects. Mr. Lien did not think the City had ever had an application for a restoration project
and that is not currently included in the code. There has only been one daylighting of stream that he knew
of and it did not start out as a restoration project. Councilmember Fraley-Monillas summarized the
occurrence of restoration projects is very low. Mr. Lien answered it could be but he could foresee a
situation where someone wanted to daylight a stream on their property for a water feature but they may
not want to if daylighting the stream requires a 50-75 foot buffer that takes away the use of their property.
Councilmember Fraley-Monillas asked if a property owner could daylight a stream on their property now.
Mr. Lien answered they could but there is no provision that provides relief from the critical area
regulations; if someone daylighted a stream, they would be stuck with the standard buffer.
T
Councilmember Mesaros pointed out there was no incentive for a property owner to do a restoration
project. Mr. Lien agreed. If the goal was to encourage restoration, Councilmember Mesaros said a system
that provided some relief or incentive was a positive step. He noted the small relief would still cost the Q.
property owner a lot of money, time and effort. Mr. Lien agreed.
x
w
Council President Johnson pointed out there have been no requests for this in the past and before (n
providing an incentive via such a tremendous change, the Council needs to consider how this would
actually be applied. She observed it applies to the Willow Creek daylighting project.
Councilmember Buckshnis supported reserving the contingent review process for special circumstances c
such as Wetland 1 and 2 and Estuary 1 and 2. Many stakeholders are involved in those areas and the o
projects will be very expensive so it is important to have the Council provide oversight and opportunity to 0
involve the City Attorney. If someone wants to daylight a stream in their yard, the Council does not need o
to be involved; however, the Council will want to be involved with the daylighting of Willow Creek and N
if there are any issues with Lake Ballinger Council in the future. Mr. Lien summarized the Council's `"
direction: reserve for special circumstances to apply to restoration projects on anadromous fish bearing 0
streams which include Willow Creek or wetland restoration projects on Category 1 and 2 wetlands and
tweak the language to have it apply to those projects.
Councilmember Teitzel agreed with Councilmember Mesaros' comment. He referred to Mr. Lien's w
indication that there have virtually been no restoration requests because homeowners are cognizant if they
take a stream out of a culvert, they may not be able to expand their home to add bedroom or a deck so it is
not surprising homeowners have not made any requests. That is unfortunate because it is a lost E
z
opportunity to enhance the environment and those type of projects need to be encouraged. He encouraged
the Council to strike the proper balance between respect for the environment and homeowner rights and Q
not create a disincentive to take a stream out of a culvert.
Councilmember Nelson relayed concern with costs for an average homeowner trying to doing a project.
He agreed this process would be rare and infrequent and would only be applicable to a substantial
restoration project. He did not support trying to do a restoration project while fixing something else on a
Edmonds City Council Approved Minutes
April 5, 2016
Page 14
Packet Pg. 475
6.1.e
property. He preferred to make a distinction between an improvement on a property that fell within a
critical area versus restoring a critical area. If the goal was to restore a critical area, that should be the
priority.
Councilmember Mesaros referred to the photo of the contingent review process example. There is a
culverted stream on a property and a homeowner wants to build a garage next to their house. They decide
to daylight the stream as a part of the construction to add value to their property. They may determine
daylighting the stream will not allow construction of the garage. Mr. Lien said if the stream was culverted
and the homeowner daylighted it, there would be a 75-foot buffer which could be reduced via the buffer
width reduction or potentially an interrupted buffer. Daylighting the stream would further restrict the rest
of the property. He summarized with a stream in a culvert there is no buffer, daylighted, there is a buffer.
Councilmember Mesaros wanted to allow a homeowner constructing a garage to be able to daylight the
stream. They likely would not do that because without buffer reduction and daylighting would not allow
them to construct the garage. Mr. Lien agreed that was potentially correct.
Mr. Lien clarified a restoration project is not tied to a development project and not required as mitigation,
it is just something a property owner wants to do to improve the critical area. Councilmember Mesaros
a
asked if a property owner could do both if they wanted to. Mr. Lien said he would discourage a
restoration project to obtain a reduced buffer for a development proposal. Councilmember Mesaros
2
clarified the homeowner may want all the construction to be done at one time. He anticipated the planning
department would inform the homeowner that daylighting the creek would require a 75-foot buffer and
T
describe any additional costs and the homeowner may decide to leave the stream in the culvert. Mr. Lien
said the homeowner would be informed of the consequences. He agreed the City wants to encourage
restoration projects where possible. If the contingent review process only applied to anadromous fish
Q.
bearing streams and Category 1 and 2 wetlands, it would not impact the property in the example because
an anadromous fish bearing stream has a 100-foot buffer.
,L
Councilmember Fraley-Monillas agreed with Councilmember Nelson, finding it difficult to believe
anyone would want to restore a waterway on their property at same time they are increasing the footprint
of their home. She was glad Councilmembers were interested in the environment and restoration, noting
the built -out condition of Edmonds will require more preservation of the environment. She summarized
most homeowners would choose to do one or the other, develop the waterway or their home and she
doubted they would do both at same time.
Councilmember Fraley-Monillas announced the meeting audio is online right now but not on television;
IT staff are working on the AV system.
Councilmember Buckshnis said she also wanted to include Category 1 and 2 estuaries due to DOE's
downgrading the marsh to a Category 2 estuary.
Council President Johnson asked for clarification; originally there were three categories: buffer reduction,
restoration projects and interrupted buffer. She asked if the Council wanted to include all three in the
contingency critical area review procedures. Mr. Lien said he has only heard interest in including
restoration projects. He said a buffer reduction would not be allowed on a Category 1 or 2 wetland, it is
only allowed on Category 3 and 4 wetlands. Council President Johnson asked the Council's interested in
including the interrupted buffer. Mr. Lien relayed what he has heard from the Council: include Category 1
and 2 wetlands, estuary wetlands and anadromous fish bearing streams restoration projects.
For Councilmember Buckshnis, Mr. Lien explained for a restoration project on a Category 1 or 2 wetland,
estuary wetland or anadromous fish bearing streams, the buffer relief associated with the restoration
Edmonds City Council Approved Minutes
April 5, 2016
Page 15
Packet Pg. 476
project is addressed in that review. There are different stream and wetland buffer reduction sections in the
code but a buffer reduction cannot occur on a Category 1 or 2 wetland.
Main Motion #1
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, THAT THE CONTINGENT REVIEW PROCESS APPLY TO CATEGORY 1 AND 2
WETLANDS AND CATEGORY 1 AND 2 ESTUARIES AND ANADROMOUS FISH BEARING
STREAMS FOR BOTH RESTORATION PROJECTS AND WETLAND STREAM BUFFER
REDUCTIONS.
Mr. Lien clarified a wetland buffer reduction cannot be done on a Category 1 or 2 wetland.
Councilmember Buckshnis restated the motion:
THAT THE CONTINGENT REVIEW PROCESS APPLY TO CATEGORY 1 AND 2 WETLANDS
AND CATEGORY 1 AND 2 ESTUARIES AND ANADROMOUS FISH BEARING STREAMS FOR
RESTORATION PROJECTS.
Action on Main Motion #1
MOTION CARRIED UNANIMOUSLY.
Mr. Lien continued his review of potential amendments: j
ECDC 23.40.220.C.4 — Interrupted Buffer
T
• LA — Require determination to be made by a qualified critical area consultant
o Maintains flexibility
o Maybe costly for smaller projects a
Mr. Lien advised the language in LA also originally included Council review but given the previous
discussion, he assumed that would be removed.
Councilmember Mesaros concurred with eliminating City Council review based on the previous
discussion.
Councilmember Teitzel expressed concern this amendment was very restrictive and required a critical
area assessment to be done in all cases. He envisioned some instances where staff may determine analysis
may not be required such as a property that is downslope from stream where there can be no impact from
development. This amendment would require the homeowner to bear the cost in that instance; therefore,
he did not support the amendment.
As the drafter of this amendment, Councilmember Nelson supported it with the modification to remove
Council review. As demonstrated in the text, it maintains flexibility and allows the project/property owner
flexibility that they do not currently have. The determination is important and he wanted a qualified
critical area consultant to make the determination.
Councilmember Mesaros suggested if staff makes a determination a project proposal cannot proceed, why
would a consultant be needed to affirm staff s determination. Councilmember Nelson suggested staff also
could be mistaken and their decision would deny the homeowner the ability to do some development; the
critical areas consultant could find development could occur. This provision allows an expert to make that
determination.
Main Motion #2
COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, TO ADOPT THE AMENDMENT WITHOUT THE COUNCIL REVIEW.
Edmonds City Council Approved Minutes
April 5, 2016
Page 16
Packet Pg. 477
6.1.e
Council President Johnson spoke in favor of motion, commenting it requires a hydrologic, geologic
and/or biological habitat professional. These areas of the City are critical and it would not apply to all
development.
Councilmember Mesaros acknowledged Councilmember Nelson's response, commenting he had not
looked at it that way, staff could be overruled by the consultant's determination.
Action on Main Motion #2
MOTION CARRIED (6-1), COUNCILMEMBER TEITZEL VOTING NO.
Mr. Lien continued his review of potential amendments:
c�
Q-
ECDC 20.15.215 Restoration Projects (not required as mitigation)
• 9 — Replace draft language in Exhibit 1 with Council proposal
o Restoration of historic ecological functions is encouraged
■ Which "historic" period
• Looking to improve existing conditions
o Project proponent proposes buffer width necessary to ensure success
L
a
■ Should have some specific parameters
o Director reviews and forwards recommendation to City Council
■ Same issues with Council administration of the code as previously discussed
v
Mr. Lien explained the draft language is based on the SMA provision and would allow an automatic
a�
reduction of 25% of the buffer and if certain criteria are met, could be reduced to 50% of the expanded
v
buffer area. He referred to revised language in the packet that combines Amendment 9 and the existing
a
code. Another proposal regarding restoration projects was submitted this afternoon.
x
Councilmember Mesaros referred to the language in the PowerPoint, "Director reviews and forwards
w
recommendation to City Council" and asked how many projects this will affect. Mr. Lien answered given
the previous discussion regarding the contingent review process, if this were a restoration project on a
Category 1 or 2 wetland, estuary wetland or anadromous fish bearing streams, this would be the
contingent review process, it would be a staff process and would not be forwarded to City Council. Based
on the Council's previous discussion the last bullet, "Director reviews and forwards recommendation to
0
City Council" would be eliminated.
v
co
Councilmember Nelson advised his modified language no longer references historic. He emphasized the
0
N
importance of a qualified critical area consultant making the determination regarding the buffer. He noted
"_'
people often wrongly assume a qualified professional will require a larger buffer when in fact a qualified
0
consultant may determine a smaller buffer is appropriate such on Willow Creek. This allows the use of
,
science for a specific location rather than a one size fits all buffer.
Mr. Lien reviewed the staffs proposed language in the packet for ECDC 23.40.215, explaining the
x
revised language provides a range for the reduced buffer, up to 50%.
w
c
d
Council President Johnson expressed concern with allowing the director to reduce the buffer by 50%. She
E
understood that may be good for a particular project but she did not like the idea in general and preferred
to use the contingency review process to make that determination. Mr. Lien said given the earlier
Q
amendment, this process would still go through the contingency review process. For a restoration project
on a Category 1 or 2 wetland, estuary wetland or anadromous fish bearing stream, these criteria would
apply but it would still go through the contingency review process.
Council President Johnson asked why it needed to be specified that the buffer could be reduced by 50%.
Mr. Lien responded if 50% was not specified, someone could propose 25%. Council President Johnson
Edmonds City Council Approved Minutes
April 5, 2016
Page 17
Packet Pg. 478
6.1.e
relayed her understanding the State allows a 25% reduction; she felt it best to follow the State's
guidelines rather than the City creating its own. Mr. Lien clarified 75% of the standard buffer would be a
25% reduction. If the code does not at least specify 50% a proposal could be made for 25% of the
standard buffer.
Council President Johnson relayed her understanding that the State wants to encourage restoration
projects and have taken a position of allowing a 25% reduction of the buffer. Mr. Lien responded the
State guidelines are modeled after SMA which states for a shoreline project within shoreline jurisdiction,
the SMP does not have to be applied at all in the expanded shoreline area. This provision was modeled
after that but did not propose not having critical area regulations applied in the expanded area but was
intended to provide some buffer relief. For buffer reduction or buffer averaging for project proposals and
mitigation, the State's recommendation is 25% reduction of the buffer. He clarified that is related to
specific development proposals and not restoration projects; the restoration project would still be required
to have a net environmental benefit. A daylighted stream with a 50% buffer will have a net environmental
benefit over a stream in a culvert.
Council President Johnson said to her knowledge, the City has never had any restoration projects, a
however, a big restoration project is proposed for the daylighting of Willow Creek. The City has
unofficially determined it would have a 25% reduction or averaging and that the current proposal fits
within the guidelines of a 25% reduction. She saw no purpose for going down to 50%, finding it
unnecessary and she preferred to retain the 25% reduction.
T
r
Main Motion #3
COUNCIL PRESIDENT JOHNSON MOVED TO ACCEPT THE LANGUAGE FOR THIS a
AMENDMENT BUT CHANGE STAFF'S RECOMMENDATION OF A 50% BUFFER y
REDUCTION. Y
Action on Main Motion #3
MOTION DIED FOR LACK OF A SECOND.
Council President Johnson clarified she did not want to allow a 50% buffer reduction. Mr. Lien asked for
clarification regarding Council direction regarding the three versions under consideration. Council
President Johnson's proposal was the project proponents may request a reduced buffer up to 75% of the
expanded buffer; that means they can only get a 25% reduction in the buffer. Council President Johnson
preferred the language be more clear and state 25% rather than 75%. Mr. Lien agreed he could revise the
language accordingly.
Councilmember Nelson referred to his proposed language, commenting the percentages in this
amendment make it complicated. The intent is a restoration project could deviate from the standard CAO
requirements by hiring a qualified professional who would recommend a reduction in the buffer of 50%,
75%, etc. or whatever makes sense for the site as long as the ecological functions are maintained and the
site is restored.
Councilmember Buckshnis said a report could be prepared to support a buffer reduction. Mr. Lien agreed
there would need to be a report to allow reduction of the buffer. Councilmember Buckshnis suggested
clarifying the buffers can be reduced based on a report from a qualified consultant. She asked why a
number needed to be included. Mr. Lien answered technically a number did not need to be included; he
suggested a number to establish a lower limit for reducing the buffer.
Council President Johnson preferred not have lower number.
Main Motion #4
Edmonds City Council Approved Minutes
April 5, 2016
Page 18
Packet Pg. 479
6.1.e
COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, TO ACCEPT THE AMENDMENT WITH THE REMOVAL OF THE HISTORICAL
COMPONENT AND NOT REQUIRE COUNCIL REVIEW.
Councilmember Mesaros expressed support for the motion, noting Councilmember Nelson's proposal
will solve the problem and address specific issues and locations.
Mr. Lien explained the intent of a restoration project is to improve a critical area. For example, for a
culverted stream, the goal is not to preserve the existing conditions but to enhance the critical area. He
suggested the language proposed for ECDC 23.40.215.B be revised to read, "The restoration project
proposal will include a proposed buffer width for the project that is developed from an assessment by a
qualified Critical Area Consultant on the buffer width necessary to ensure that the restoration project is
successful and there
will be a net environmental benefit of the restoration project."
Councilmember Nelson responded the intent of restoration is to restore something. He suggested
"ecological functions are enhanced." Mr. Lien clarified the goal is a net environmental benefit from the
restoration project.
Council President Johnson asked whether the motion includes staff s proposal for the amount of buffer v
reduction the applicant can request. Councilmember Nelson clarified his motion was not the redlined
amendment. He restated the motion: a,
TO ACCEPT THE AMENDMENT (REPLACE DRAFT LANGUAGE IN ECDC 23.40.215 WITH
SECTIONS A — D) WITH THE EXCEPTION OF NOT HAVING THE COUNCIL REVIEW +,
PROCESS. Q'
L
Amendment #1
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER MESAROS,
TO AMEND THE MOTION TO CHANGE ITEM B TO READ, "...THE FUNCTION OF THE
AREA ADJACENT TO THE STREAM OR WETLAND ARE PRESEPAIED WILL BE
ENHANCED."
Councilmember Tibbott expressed support for staff redlined version including reference to the allowed
50% reduction which was not included in Councilmember Nelson's amendment. He felt it was important
to identify a percentage and agreed with a 50% reduction. He did not support the amendment.
Vote on Amendment #1
AMENDMENT CARRIED (6-1), COUNCILMEMBER TIBBOTT VOTING NO.
Mr. Lien recalled the original motion also included eliminating restoration of the historic ecologically
functions from Item A. Councilmember Nelson agreed.
Action on Motion #4
MAIN MOTION AS AMENDED CARRIED (6-1), COUNCILMEMBER TIBBOTT VOTING NO.
Following a brief discussion, Council agreed to continue review of the amendments until 10:00 p.m.
Mr. Lien reviewed the remaining amendments:
Definitions
• 4.B - Add definition for Council
o Definition exists in ECDC 21.15.030
Main Mntinn #t5
Edmonds City Council Approved Minutes
April 5, 2016
Page 19
Packet Pg. 480
6.1.e
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL,
TO ADD A DEFINITION OF COUNCIL VIA REFERENCING ECDC 21.15.030.
Action on Main Motion #5
MOTION CARRIED UNANIMOUSLY.
ECDC 20.40.090.D —Minimum Report Contents
• 12 — Add a new subsection to ECDC 23.40.090.D require critical area report to identify the
location of all native and nonnative vegetation of 6 inch dbh and larger
Main Motion #6
COUNCILMEMBER TEITZEL MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO
APPROVE THE COUNCIL AMENDMENT AS WRITTEN.
Councilmember Tibbott asked what is involved in researching 6 inch dbh vegetation on a site such a 2 or
5-acre site. Mr. Lien answered critical areas are unlikely to cover the entire 2 or 5-acre site and there are
few 2-5 acre sites in the City. The critical area report, which focuses on the critical area and buffers,
requires a site visit and description of the site. This information is already included in most critical area
reports so this language does not add additional burden but specifies what is to be included in the critical
area report.
Action on Main Motion #6
MOTION CARRIED UNANIMOUSLY.
Council Status Reports
• 7 — Require periodic reports to the City Council
o Detailed reports can be time consuming and expensive
o With existing resources could provide periodic reports with basic data, for example:
■ How many buffer reductions were granted and where
■ Number of critical area determinations
■ Number and general type of interrupted buffer determinations
■ Provide some sample projects
o Staff proposed language in agenda packet
■ Reports in 1st and 3rd quarter of each year
■ List critical area decisions made since the last report
■ Provide specific examples
■ Provide whatever information the Council requests during the previous report
Councilmember Nelson expressed support for staff s proposal, commenting it simplifies his overly
detailed proposal and provides flexibility for staff and Council.
Main Motion #7
COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO
ADOPT COUNCIL STATUS REPORTS AS STAFF DESCRIBED.
Councilmember Teitzel appreciated staff s efforts to streamline the amendment but expressed concern
with staffs proposal specifically, "staff will provide example projects." He felt that was too broad and
suggested the following alternative language.
Amendment #2
COUNCILMEMBER TEITZEL MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, TO AMEND TO STATE, "THE DIRECTOR SHALL PROVIDE TWO REPORTS
PER YEAR TO COUNCIL, ONE IN THE FIRST QUARTER AND ONE IN THE THIRD
Edmonds City Council Approved Minutes
April 5, 2016
Page 20
Packet Pg. 481
6.1.e
QUARTER, ITEMIZING AND INSTANCES OF BUFFERS REDUCTIONS IN CRITICAL AREAS
OCCURRING SINCE THE PRIOR REPORT THAT WERE ASSOCIATED WITH MITIGATION,
ENHANCEMENT OR RESTORATION. THE REPORT SHALL INCLUDE THE DEGREE OF
BUFFER REDUCTION IN EACH INSTANCE, THE SPECIFIC REMEDIATION ASSOCIATED
WITH EACH BUFFER REDUCTION AS WELL AS OTHER INFORMATION SPECIFICALLY
REQUESTED BY COUNCIL.
Councilmember Teitzel said his amendment appropriately streamlines the language to remove ambiguity
and removes the term "example project." Mr. Lien expressed concern the language was very specific and
tied to buffer reductions during a period of time; the staff proposed language is more broad and would
include information about all critical area decisions, restoration projects, buffer reduction, buffer
averaging. The term "example projects" was used as it would be staffs decision regarding what examples
to include; his intent would be typical project or extraordinary projects. The proposed language would
limit the type of information would provide to Council in the reports. The reference in staff s proposal,
"...other information specifically requested by the Council following the previous report." would allow
the reports to evolve to include information the Council wants to hear.
Councilmember Teitzel agreed staff s proposed language was a substantial improvement from the initial
proposal. He preferred to remove the term example projects.
Action on Amendment #2
COUNCILMEMBER TEITZEL WITHDREW HIS AMENDMENT.
Amendment #3
COUNCILMEMBER TEITZEL MOVED, SECONDED BY COUNCILMEMBER NELSON, TO
AMEND THE MOTION TO REMOVE "EXAMPLE PROJECTS" FROM THE THIRD
PARAGRAPH.
Councilmember Fraley-Monillas asked what example projects are. Mr. Lien said example projects would
include any extraordinary projects done since the previous report and if there were several buffer
reduction or averaging projects, staff would provide an example of one rather than reporting on all the
projects. Councilmember Fraley-Monillas observed that would help pull the report together. Mr. Lien
agreed. Councilmember Fraley-Monillas did not support removing example projects if staff was
interested in providing that information.
Councilmember Buckshnis observed if there had been seven projects during the reporting period, staff
would report on one project but would have information available on all seven projects. Mr. Lien
answered yes. Councilmember Buckshnis did not support the amendment.
Councilmember Tibbott commented if the language were removed, staff could still improve an example
or case study. Mr. Lien said he probably would, noting the intent was to provide the information the
Council was interested in.
Councilmember Tibbott expressed support for the amendment, noting staff could include examples if they
chose.
Councilmember Nelson expressed support for the amendment because in reality staff will provide
information requested by Council following the previous report. After hearing a report, if there were no
examples, Council could request examples.
Councilmember Teitzel commented an ordinance is an important document, this is a confusing ordinance
and he did not support including the term "example projects" as it was subject to interpretation. The
Council can request information from staff as desired.
rn
Edmonds City Council Approved Minutes
April 5, 2016
Page 21
Packet Pg. 482
6.1.e
Action on Amendment #3
UPON ROLL CALL, AMENDMENT CARRIED (4-3), COUNCIL PRESIDENT JOHNSON AND
COUNCILMEMBERS NELSON, TEITZEL, AND TIBBOTT VOTING YES; AND
COUNCILMEMBERS FRALEY-MONILLAS, BUCKSHNIS, AND MESAROS VOTING NO.
Action on Main Motion #7
MAIN MOTION AS AMENDED CARRIED UNANIMOUSLY.
As there were a few more amendments to be considered at the April 12 meeting Mr. Lien advised he will
not make any revisions to the code until all the amendments are adopted. He will return with the revised
code including all the amendments at the April 19 Council meeting.
8. MAYOR'S COMMENTS
Mayor Earling had no report.
9. COUNCIL COMMENTS
Councilmember Teitzel reported he had an opportunity to meet the new WSU President Dr. Kirk Schulz
at Everett Community College. He is very dynamic and friendly and supports branch campuses and the t i
new WSU medical school in Spokane. r
rn
Councilmember Teitzel, a member of the Civic Field Master Plan Advisory Committee, reported three
consultants were interviewed today. All three had great presentations with creative ideas. The master a
planning process will include a great deal of public involvement and there will be great things in the
future at Civic Field. w
Councilmember Fraley-Monillas invited the public to attend tomorrow's Diversity Commission meeting
at the Edmonds Senior Center. She reported the PSRC General Assembly meeting at Husky Stadium
included a report on what Sound Transit's accomplishments during the past year.
Councilmember Buckshnis reported she is participating in WRIA8's grant funding process, commenting
it is fascinating to see what other cities are doing; Seattle is undertaking a daylighting project that will
cost $12 Million. She reported Edmonds was a star in the Citizens Action Training School, an 8-week
environmental school that selects 30 participants who are required to do 50 hours of training. She
recognized two students of that program, Joe Scordino and Val Stewart, who started the Students Saving
Salmon via this project.
Councilmember Nelson thanked Mayor Earling for convening the Pedestrian Safety Task Force who had
their first meeting this morning. He relayed his research in preparation for that meeting, particularly in
light of the recent pedestrian incident last night, shared data compiled by the Washington traffic Safety
Commission over the last 5 years regarding the cause of pedestrian fatalities:
• Most dangerous time for pedestrians is between 3:00 and 9:00 p.m. at an intersection in a city
where the speed limit is 25-35 mph
• Highest percentage of fatalities are between the ages of 46 and 65
• Of the accidents where the driver was main contributor, the #1 contributing factor was the driver
was distracted, #2 was the driver failed to yield the right-of-way, #3 was the driver was impaired
and #4 was speed
• Investigation determined 56% of drivers had not made an error
• Pedestrian's contribution to fatalities were #1 impaired by alcohol drugs, #2 not visible to the
driver, and #3 crossing improperly.
Edmonds City Council Approved Minutes
April 5, 2016
Page 22
Packet Pg. 483
6.1.f
legal description and includes the acreage from the streets and alley into the area that is not restricted. She
requested authorization to schedule approval on next week's Consent Agenda as Snohomish County
needs to expend the funds by April 22.
It was the consensus of Council to schedule this item for approval on next week's Consent Agenda.
H. CRITICAL AREA ORDINANCE UPDATE
Senior Planner Kernen Lien said with the limited amount of time for review of the remaining
amendments, the revised CAO would not be read for adoption next week. He reviewed potential
amendments:
Appendices
• 8.A — Insert new Appendix A: Map of Critical Areas in Edmonds
o Not regulatory - used for reference purposes only
o Maps do not show the exact locations of all critical areas
o Subject to change
■ Many referenced maps in the code are controlled by other agencies
■ Critical area code references that maps should be continuously updated as new critical
areas are discovered (ECDC 23.50.010.1), 23.70.010.B, 23.80.040.B, and 23.90.010)
• 8.B — Insert new Appendix B: Listing of critical areas in Edmonds with buffer widths and
category/classification designations
o Cost prohibitive
o Would have to visit every property in Edmonds
o Critical areas not fixed in time or place
o Per updated code, critical area determinations and reports only valid for five years (ECDC
23.40.080 and 23.40.090.17)
• Suggest making existing critical area information available on City of Edmonds web map with
disclaimer
He displayed the City of Edmonds web maps available at Maps. Edmondswa. gov, explaining he has been
working with the City's GIS Analyst Dave Rohde to add the critical area layers to the map.
Councilmember Nelson thanked Mr. Lien for developing this compromise. This is a great opportunity to
inform citizens of critical areas in their neighborhoods and/or in their backyards. He asked how the public
would access the maps. Mr. Lien said there is a link to the maps on the City's website available by
searching maps. The maps currently include layers for storm water, water and sewer, as-builts, etc.;
critical areas would be a new layer.
Councilmember Nelson asked whether citizens could access the maps from a computer at City Hall. Mr.
Lien answered the plan is to have computers available for citizens' use in the Green Resources Room; any
computer with internet access can access the maps.
COUNCILMEMBER NELSON MOVED, SECONDED COUNCILMEMBER TEITZEL, TO
SUPPORT AMENDMENT 8B.
Councilmember Tibbott commented the maps are a great educational opportunity. He expressed concern
the GIS maps raise an issue of privacy and asked if there had been concerns with displaying critical areas
that exist on private property. Mr. Lien answered any information the City has is a public record. With
regard to privacy related to aerial photographs, he suggested Dave Rohde may be able to answer that. He
noted Google Earth allows anyone to look at basically anything anywhere in the world. He recalled in the
past the State restricted the priority habitat species layer due to concern with identifying the location of
endangered species. That layer is now publicly available on their website. With regard to critical areas, he
Edmonds City Council Approved Minutes
April 12, 2016
Page 16
Packet Pg. 484
did not find a privacy issue as most information can be accessed via public records. Councilmember
Tibbott asked if there was a way to prevent access to map layers that might be considered private
information. Mr. Lien said none of the critical area layers would be considered private.
COUNCILMEMBER NELSON WITHDREW THE MOTION WITH THE AGREEMENT OF THE
SECOND.
COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO
APPROVE AMENDMENT 8A.
Mr. Lien said Amendment 8A was to include the maps as appendices to the CAO which make them static.
His proposal was to make the information publicly available which is neither Amendment A or B.
COUNCILMEMBER NELSON WITHDREW THE MOTION WITH THE AGREEMENT OF THE
SEDOND.
COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, TO APPROVE AMENDMENT 8C, TO HAVE THE DIGITAL MAPS PUBLICLY
ACCESSIBLE AND TO INCLUDE A DISCLAIMER.
Councilmember Buckshnis clarified Amendment 8C was adding the GIS map and asked if it will also
include critical area buffers. Mr. Lien explained determining buffers for critical areas requires a site visit
and a critical areas determination. For example, wetland buffers are based on habitat score. The critical
area layer would show the potential presence of critical areas on or adjacent to a site.
Councilmember Buckshnis suggested using standardized buffer widths because citizens will want to
know what buffer width is required. She referred to the buffer required for an anadromous fish bearing
stream as an example. Mr. Lien advised the buffer width determination is made when a qualified
professional makes a determination regarding the stream category. As an example, he noted the wetland
buffer for a Category 3 wetland ranges from 60 to 165 feet depending on habitat score. Councilmember
Buckshnis suggested including a minimum buffer. Mr. Lien said including the minimum buffer of 60 feet
would be misleading when the buffer could be 165 feet.
Councilmember Fraley-Monillas asked whether consideration had been given to including an address
layer. Mr. Lien demonstrated typing in the address, advising there are many tools and information in the
mapping program including critical areas, stormwater lines, sewers, zoning, easements, deeds, street
maps, and links to the permitting system, the Snohomish County assessor, etc. He said Dave Rhode
developed this program.
Councilmember Teitzel asked how steep slopes were identified on the map. Mr. Lien pointed out areas
identified on the map as potential erosion hazard 15-40% slope, slopes greater than 40% and the
liquefaction hazard zone.
Mr. Lien clarified the motion was to make the City's critical area information available to citizens on the
City's website without a login and to include a disclaimer regarding the accuracy of the information.
MOTION CARRIED UNANIMOUSLY.
Mr. Lien displayed Amendment 10:
ECDC 23.40.040.0 — Areas subject to the provision of the CAO
• 10 — Replace to refer to new appendices if appendices are adopted
Edmonds City Council Approved Minutes
April 12, 2016
Page 17
Packet Pg. 485
6.1.f
■ ECDC 23.40.040.0 notes that the critical area regulations apply regardless of any formal
identification
As Amendment 10 was tied to Amendment 8, he suggested the previous motion takes care of Amendment
10.
i�u EV013MCI] u lu 101eI Ik.
Mayor Earling reminded of the Creative Age Festival of Edmonds (CAFE) on Friday and Saturday, an
opportunity to learn how to become more involved in the community. He invited the Council to attend the
ribbon cutting ceremony on Sunday for the Lutheran Church's new solar panels. He reported tomorrow he
will be attending a cub scout meeting to talk about good government.
8. COUNCIL COMMENTS
Councilmember Tibbott reported over the past several weeks he has meet with citizen in regard to the
CAO. This week he will have the opportunity to do a water quality check with Joe Scordino and students
from Students Saving Salmon. He looked forward to seeing what the students are doing as well as the
implications it has for the City.
Councilmember Mesaros announced the Edmonds Veterans Plaza is fully funded. The next step is linking
information available at the Veterans Plaza to programs at Edmonds Community College which provides
an opportunity for anyone who has not made a donation to do so.
Councilmember Fraley-Monillas reported the World Health Organization declared the Ebola situation in
West Africa no longer constitutes a public health emergency of international concern and the temporary
recommendations adopted in response should be terminated.
Councilmember Fraley-Monillas relayed a Snohomish County Health Districts' report regarding the Zika
virus: The Centers for Disease Control and Prevention has issued a detailed recommendation for
preventing transmission to women who are pregnant or likely to become pregnant in the near future.
Beyond avoiding mosquito bites, the CDC recommends abstaining from sex or practicing safe sex and
delaying conception for at least eight weeks after possible Zika virus illness or exposure. More
information is available at the Snohomish Health District website.
Councilmember Buckshnis announced the K-9 statute at the Veterans Plaza is also fully funded. A
committee will be reviewing designs on Thursday night.
Councilmember Buckshnis commended Keely O'Connell, Carrie Hite and Rob English for their fabulous
presentation to the Salmon Recovery Funding Board regarding final design of Willow Creek daylighting
project.
9. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION
PER RCW 42.30.110(1)(i)
This item was not needed.
10. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN
EXECUTIVE SESSION
This item was not needed.
Edmonds City Council Approved Minutes
April 12, 2016
Page 18
Packet Pg. 486
6.1.g
Senior Planner Kernen Lien displayed the final plat map, explaining Seabrook Estates is a 7-lot plat
located at the corner of Caspers Street and 9th at 860 Caspers Street, next to the United Methodist Church.
The Hearing Examiner held a public hearing on April 9, 2015 and granted approval of the preliminary
plat on April 23, 2015. Final plat approvals are Type IV -A decisions made by the City Council; if the City
Council finds the public use and interest will be served by the proposed subdivision and that all
requirements of the preliminary approval have been met, the final plat shall be approved and the Mayor
and City Clerk shall sign the statement of City Council approval on the final plat.
The applicant has completed all the requirements of the preliminary plat approval or, in the case of some
Engineering and Planning Division requirements, a performance bond has been posted to ensure
completion. Upon completion of required improvements, maintenance bonds will be posted as required.
Since all the conditions and requirements of the preliminary plat have been completed or provided for,
staff recommends the final plat be approved. The packet includes the final plat, signed by the Public
Works Director and Development Services Director.
Councilmember Buckshnis asked if all the Hearing Examiner's conditions have been met. Mr. Lien
answered yes.
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER MESAROS,
TO APPROVE RESOLUTION 1358 IN PREPARATION FOR RECORDING OF THE PLAT
WITH THE SNOHOMISH COUNTY AUDITOR
Councilmember Teitzel noted the soil structure is very dense and drainage is not great. Typically the City
requires all roof runoff to be managed on site; he asked how that would be accomplished if the soil does
not drain well. Mr. Lien answered the stormwater plan calls for detention rather than infiltration.
Councilmember Teitzel observed any overflow from the detention facility would be into the City storm
system. Mr. Lien agreed.
MOTION CARRIED UNANIMOUSLY.
F. CRITICAL AREAS ORDINANCE
Senior Planner Kernen Lien reviewed:
Tonight
o Recap of amendment decision
o Continue Council discussion and decide which proposed amendments to carry forward
Next Council meetings:
o April 24th — present draft copy of code with all amendments
Mr. Lien reviewed potential amendments:
ECDC 23.90.040.C.1 Native Vegetation
• 5.A — Apply to RS-8 and RS-10 zones
o Would greatly expand the area the provision would apply to
o RS-12 and RS-20 established because of the presence of critical areas
o Comprehensive Plan designation
■ Single-family Resource (RS-12, RS-20)
■ Single-family Urban (RS-8, RS-10)
• 5.B — Consider different native vegetation percentage for RS-8 and RS-10 zones
• 5.0 — Change "...native trees over 10 inches in dbh make up more than 70 percent of the canopy
cover" to "...native trees over 6 inches in dbh make up more than 40 percent of the canopy
cover."
Edmonds City Council Approved Minutes
April 19, 2016
Page 10
Packet Pg. 487
6.1.g
o May trigger the requirements of this provision on more properties than the original proposal
o Original proposal based on specific habitat features
o Amendment intended to preserve more canopy coverage
o May be further refined through development of UFMP
Councilmember Tibbott referred to proposed development on undeveloped land zoned RS-8 or RS-10
land and asked how this amendment or low impact development (LID) would instruct the City on the
preservation of native vegetation. Mr. Lien answered that is not really a critical area issue. Updated
subdivision regulations will be presented to the City in the future; if the City wanted to maintain more
canopy coverage, LID could provide flexibility in the way plats are designed to cluster lots to preserve
trees or other features. LID techniques include stormwater infiltration, less impervious surface, etc.
Councilmember Tibbott acknowledged it was not a CAO goal but it was a policy the City could pursue in
the future. Mr. Lien agreed, via the UFMP.
Councilmember Buckshnis said forests and steep slopes are critical areas. Mr. Lien agreed steep slopes,
streams, wetlands are critical areas. Councilmember Buckshnis asked if 5.0 would include R-8, 10, 12
and 20 zones. Mr. Lien explained 5.0 would only apply to the RS-12 and RS-20. Councilmember
Buckshnis asked the timing of the UFMP. Mr. Lien said the Comprehensive Plan anticipates adoption by
the end of 2017.
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER MESAROS,
TO APPROVE AMENDMENT 5C.
Council President Johnson asked how canopy coverage requirements in 5.0 would be managed and
implemented in advance of the UFMP. Mr. Lien explained the canopy coverage requirements in 5.0 are
related to subdividable properties. For example, if a subdivision was proposed in the RS-12 or 20 zone,
staff would consider whether the specific conditions/criteria are met such as is there a stream, wetland or
landslide hazard associated with that potential subdivision. If yes, the makeup of the native vegetation
would be considered. If 5.0 passed, whether 40% of the canopy coverage consist of trees of 6 inch dbh or
larger would be considered. If yes, this provision would apply. He summarized it is site specific.
Council President Johnson asked how the canopy cover would be measured. Mr. Lien referred to
Amendment 12 which requires native trees over 6 inch dbh or larger be identified. He provided an
example of a subdividable property, identifying trees 10 inch or greater dbh and trees 6 inch or greater
dbh. In this example the trees do not make up more than 70% of the canopy coverage so in the draft
proposal this requirement would not be triggered. If 5.0 were adopted, trees greater than 6 inch dbh make
up more than 40% of the canopy coverage so it would be triggered.
Councilmember Fraley-Monillas asked whether a category forest could be considered a critical area. Mr.
Lien answered potentially. The Priority Habitat Species Map maps forested urban corridors. A forest
could be a critical area if it was on the Priority Habitat Map but it may not be if it is just a flat, forested 2-
acre property that is not connected to anything else. Councilmember Fraley-Monillas observed the way a
forest becomes a critical area is if it has habitat. Mr. Lien clarified if it is associated with another critical
area, stream, wetland or slope or identified on the Priority Habitat Species layer.
Council President Johnson recalled a proposal to include other zoning areas. She wanted assurance any
critical area would be evaluated regardless of the zone. Mr. Lien assured the critical area regulations
apply to all properties in the City regardless of the zone.
MOTION CARRIED UNANIMOUSLY.
It was the consensus of the Council that Amendments 5A and B were off the table.
Edmonds City Council Approved Minutes
April 19, 2016
Page 11
Packet Pg. 488
6.1.g
Frequently Flooded Areas
• 6 — Do not consider amendments to ECDC 19.00.025 and 21.40.030 at this time
o Frequently flooded areas are critical areas by definition
o Building code regulates development in the flood plain
o Proposed amendment to definition height intended to compensate for requirement to build
two feet above base flood elevation
o Is appropriate to consider at this time
Council President Johnson asked whether discussion of all the CAO amendments had been concluded.
Mr. Lien explained this is a CAO amendment; frequently flooded areas are critical areas by definition.
The City regulates frequently flooded areas in the building code rather than what is normally thought of
as the CAO, Chapters 23.40 — 23.90. Council President Johnson asked whether there were any other
Council amendments to be considered tonight before the Council directed the City Attorney to bring back
the CAO for Council consideration and final adoption. Mr. Lien answered yes, this is a CAO amendment.
Council President Johnson asked if there were any further amendments for the Council to consider other
than the frequently flooded areas amendment. Mr. Lien answered all the amendments other than
frequently flooded areas have been reviewed. He stressed frequently flooded areas are critical areas and it
is part of the critical area regulations.
COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER FRALEY-
MONILLAS, TO DIRECT THE CITY ATTORNEY TO PREPARE THE CRITICAL AREA
ORDINANCE IN TWO FORMS, THE UNDERLINED/REDLINED VERSION AND A CLEAN
COPY FOR CONSIDERATION BY THE CITY COUNCIL.
Council President Johnson relayed her understanding there were three components the Council was
considering. The first, the CAO which is adopted as part of the GMA and when adopted will be in place
immediately. There are two very important and related pieces of legislation before the Council, changing
the building code and the Edmonds Community Development Code (ECDC). She recognized they are
related to the CAO but were contained in different documents. The City Council's obligation was to
complete the CAO which she felt the Council could do by concluding the amendments. If time remains,
the Council can discuss the other two items.
Councilmember Buckshnis said she looks at things very differently; she looks at it globally; frequently
flooded areas need to be considered as part of the CAO similar to the amendment that included reference
to the definition of City Council. She did not support the motion.
Councilmember Tibbott asked for reference to frequently flooded areas in the CAO. Mr. Lien displayed
Exhibit 1, page 59, Chapter 23.70.010 in the portion of the code that is generally thought of as the critical
area regulations. This chapter specifically states, "... administration shall utilize such other data as may
be reasonably available from the federal state or other sources in administering this chapter as provided in
the current edition of the International Residential Code and International Building Code, as adopted in
ECDC Title 19." He summarized the critical area regulations specifically reference frequently flooded
areas are addressed in the building code. The COA update includes frequently flooded areas and since
they are regulated by the building code, the change in Title 19 of the building code has been proposed.
The proposed definition change is due to the implications the recommendation has for building height.
Councilmember Tibbott relayed his understanding Mr. Lien was suggesting floodplains be identified the
same as identified on FEMA maps. An amendment has been proposed to increase the base by two feet for
any new buildings constructed in the floodplains. Mr. Lien clarified the proposed Council amendment
was not to consider the proposed changes. During Planning Board review, the Planning Board
Edmonds City Council Approved Minutes
April 19, 2016
Page 12
Packet Pg. 489
6.1.g
recommended all structures be required to be at least 2 feet above base elevation and to consider a
potential amendment to the definition of where height is measured, 2 feet above base elevation.
Councilmember Tibbott said if the Council approves the CAO as written without any further
amendments, it contains the 2-foot provision. Development Services Director Shane Hope clarified if the
proposal before Council as recommended by the Planning Board along with the other amendments is
approved by the City Council, it would have the two feet above base elevation provision and it would not
dock the height of new buildings constructed in the floodplain at the new base flood elevation.
City Attorney Jeff Taraday asked for clarification regarding the ordinance he is being directed to draft.
From the discussion it appears a least a couple Councilmembers seem to think the motion contemplates
the original frequently flooded areas language would remain in the ordinance he would be drafting.
Council President Johnson clarified her motion was to direct the City Attorney to prepare the CAO
contained in all of the discussions to date, meaning it only addresses the CAO and does not include any
proposed amendments from December 15, 2015 and does not include the Planning Board
recommendations. Her intent was to recognize there are three separate, legal instruments, 1) the CAO
which is part of the GMA, 2) the building code, and 3) the ECDC. Her motion was directed toward the
CAO as presented by staff. Mr. Taraday relayed his understanding is the Council has already adopted
amendments as part of this process that are contained in Title 21. He asked whether Council President
Johnson's motion was directing him to take out those Title 21 amendments from the ordinance. Council
President Johnson said it was difficult to answer that question but basically yes, she wanted the ordinance
to focus on the CAO first and foremost and the Council can adopt that and then discuss the related
building code and ECDC amendment separately.
Mr. Taraday said it would be more clear if the Council spoke with regard to titles; until now, when
discussing the CAO, there has not been a distinction between the Title 21, Title 23 or Title 19 portions of
the CAO. He suggested the motion may be more clear if it directed him to draft the Title 23 portions of
the CAO.
Mr. Lien relayed his understanding of Council President Johnson's intent, to direct the City Attorney to
draft an ordinance that would include all the proposed amendments, Exhibit 1, pages 1 — 90, but not
include the proposed amendments to 19.025.Q requiring all structures to be built 2 feet above base flood
elevation or the amendment to ECDC 21.40.030.D related to the height exception.
COUNCILMEMBER MESAROS MOVED TO AMEND THE MOTION TO INCLUDE THE
PLANNING BOARD'S RECOMMENDATIONS RELATED TO 19.025.Q AND HEIGHT
EXCEPTIONS.
Councilmember Fraley-Monillas raised a point of order that the amendment changed the intent of the
motion. Mr. Taraday agreed that given how expressly Council President Johnson intended to remove
those portions of the proposal in her motion, the amendment seems to go in the opposite direction which
typically is not allowable for an amendment. He suggested it would be more appropriate to speak against
the motion rather than to make the proposed amendment.
Councilmember Mesaros said this portion of the CAO is important as the City moves forward. He
appreciated that Council President Johnson was trying to put things in silo format. However, issues in the
City are not siloed, they are integrated. He recommended voting down Council President Johnson's
motion.
City Clerk Passey described a process in Roberts Rules of Order for a substitute motion which is used
when a motion presents a radically different solution than the motion on the table. The form would be to
Edmonds City Council Approved Minutes
April 19, 2016
Page 13
Packet Pg. 490
6.1.g
move to substitute for the motion this other solution. If the motion to substitute is seconded, the debate is
taken on the first motion, then debate and conclusion occurs on the second motion, and then Council
votes whether to substitute. Councilmember Mesaros suggested the cleaner version was Mr. Taraday's
suggestion to vote on the first motion.
COUNCILMEMBER MESAROS WITHDREW HIS AMENDMENT.
UPON ROLL CALL, MOTION FAILED (3-4); COUNCIL PRESIDENT JOHNSON AND
COUNCILMEMBERS NELSON AND FRALEY-MONILLAS VOTING YES; AND
COUNCILMEMBERS BUCKSHNIS, MESAROS, TEITZEL, AND TIBBOTT VOTING NO.
COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO
APPROVE THE CRITICAL AREAS ORDINANCE AND ASK THE CITY ATTORNEY TO
DRAFT THE ORDINANCE AND PRESENT IT TO COUNCIL NEXT WEEK TO INCLUDE THE
PLANNING BOARD'S RECOMMENDATIONS ON TITLE 19 AND THE HEIGHT EXCEPTION.
Councilmember Mesaros commented this has been a great process and a long process, the Council has
been reviewing the CAO since September. Mr. Lien added this is the 12th City Council meeting regarding
the CAO update. Councilmember Mesaros referred to an email he received from a citizen regarding how
hasty the Council was being. This has been a thoughtful process and staff has been very interactive. An
ordinance was originally approved by the Council and vetoed by the Mayor. There are others in addition
the senior center awaiting the Council's decision on the CAO.
Councilmember Fraley-Monillas expressed appreciation for all the work that has been done. She pointed
out the Council approved the CAO in December; it was the Mayor's veto that took it back through the
process. She was shocked by the lack of environmental concern demonstrated by several
Councilmembers. Not enough is known about frequently flooded areas, there has been discussion about
climate change, the marsh, waste management, etc. Whether two feet is enough had not been discussed to
her satisfaction; she felt six feet was more appropriate. One of the recommendations related to sea level
rise is to move buildings to the back side of the property which has not been discussed. She recalled being
laughed at when she made that suggestion with regard to the senior center due to dislike for cars between
the building and the water. She has learned a lot during the process but also viewed it as a hurry -up -and -
wait process.
Councilmember Fraley-Monillas said she refused to be held hostage to the senior center saying they will
not construct a new building if they do not get exactly what they want, finding that blackmail at its best.
She expected better than that from the senior center, noting she had the right to say that because she
serves on the Board of Directors and is a frequent volunteer. She wanted to do the right thing for the
waterfront and for all of Edmonds, not the right thing for one area. She assured there would be a better
outcome if the Council looked at the building codes and determined the responsible approach. Stating two
feet is the right thing is a travesty when the floodplains are expected to extend to SR104. She concluded
she did not have enough information to make a decision tonight.
Councilmember Nelson observed all Councilmembers agree sea level rise is a real threat and concern to
the City; where Councilmembers differ is how respond, address and adapt to it. In doing his homework,
he looked at Olympia, one of only a few cities who began looking at this issue over 20 year ago. Olympia
updated their CAO in February 2016. One of the things that struck him was how sea level rise is being
impacted by the current El Nino events, a greater hazard than climate -driven sea level rise. In
November/December tides were 6 inches higher than predicted; on December 11 and 13, tides were 30
inches higher than predicted. This is a problem identified by science, quoting Albert Einstein, "The
significant problems of our time cannot be solved by the same level of thinking that created them." He
urged caution over expediency and did not support motion.
Edmonds City Council Approved Minutes
April 19, 2016
Page 14
Packet Pg. 491
6.1.g
Councilmember Buckshnis suggested taking emotion out of this; everyone agrees sea level rise is going to
happen. After spending a great deal of time working with WRIA 8 and the marsh, she did not like being
told she did not understand the environment. She understood there is never right answer; even if all the
world's scientists were put in a room, there would never be the right answer. This is an issue that either
Councilmembers get or they don't; if they get it and want to do something about it, they either do it or
don't. It has nothing to do with height, there is still a 30-foot height limit at the senior center and the
waterfront and a 35-foot height limit at Harbor Square. The issue is water levels will rise, plain and
simple. The Council can guess at the number but sooner or later a decision needs to be made. She relayed
Lake Washington has been raised and lowered 2 feet every year for years, anticipating a great deal of
discussion was necessary to make that decision. The fact of the matter is something has to be done and
there appears to be enough support for this something.
Council President Johnson estimated the Council had 1 hour and 25 minutes' worth of agenda items left.
This one of the reasons she wanted to simply adopt the CAO because she knew this would require a great
deal of discussion and debate. Based on a review of the Planning Board minutes, there was a lot of
discussion at the Planning Board regarding sea level rise; the City Council has not had any presentations
on sea level rise or been educated on how the two -foot recommendation was made. It was her
understanding that recommendation was made by staff based on their best estimate of all the scientific
estimates. She felt the Council would benefit from a larger, longer discussion regarding sea level rise. She
favored adoption of the CAO and would support on an interim basis the two -foot height adjustment for
the building code but did not support the recommendation made by Phil Lovell at the Planning Board to
define a new base level for evaluating height. She viewed this as three distinct and interrelated decisions.
Councilmember Fraley-Monillas said her hope would have been to pull together groups and information,
have good solid base information regarding sea level rise as well as look at what other cities on Puget
Sound and on open waters have done. In her opinion this was a travesty to the environment and although
she may not be the biggest environmentalist, she understood that going to a few meetings did not make
her an environmentalist; what made her an environmentalist was standing up for the environment.
Councilmember Teitzel relayed he had done a significant amount of research regarding this issue,
studying many difference pieces of research related to sea level rise. The mean level that can be expected
is 2 feet or possibly little bit more over the next 100 years. He noted 100 years is a long time;
governments across the world are making efforts to work together to limit greenhouse gases; he was
hopefully sea level rise could be arrested over time. Based on the available data, the time is right to adjust
the base level elevation and measurement as proposed. There is a great deal of emotion related to this
issue; he agreed with Councilmember Buckshnis' suggestion to take the emotion out of the discussion and
to talk about facts and logic. Logic would say to proceed; not proceeding is not responsible. With regard
to comments about honoring his campaign pledges, he said his predominate campaign pledge was to take
all the input he received, process it properly and make the very best decision he could for the City; he
intended to do that tonight.
Councilmember Tibbott said the complete CAO proposal includes Title 19, the provision related to an
additional 2 feet in the floodplain. When this came to Planning Board, they considering data provided by
the federal government. FEMA does not make recommendations without a great deal study and input
from scientists. FEMA's recommendation is that it would be advisable for cities to use their information
as a basis for establishing a base two feet above the floodplain. In his opinion that recommendation from
the federal government was responsible and allowed cities to look at the reality of sea level rise and plan
for it. It is also equitable; all humans and possibly animals have contributed to the problem of sea level
rise and global warming. As a result, it is only equitable to plan for sea level rise plan and establish a two -
foot base for buildings in those locations. The proposal is simply to establish a new way of measuring the
Edmonds City Council Approved Minutes
April 19, 2016
Page 15
Packet Pg. 492
6.1.g
base in a frequently flooded area. The same option will not be extended to other areas of the City nor will
new standards be created for measuring on a hillside. This simply adjusts the way the base is measured
for new buildings in the floodplain. With regard to a campaign pledge not to increase building heights, he
assured the base is responsible and equitable and buildings will be the same as they have always been. He
summarized this was doing the best possible with the knowledge available and making use of the
information received from FEMA.
Council President Johnson asked when the FEMA map was due to be promulgated. Mr. Lien responded
the draft FEMA map is currently scheduled to be effective June 2017. Council President Johnson asked if
the FEMA states the elevation for building heights. Mr. Lien advised the FEMA map establishes the base
flood elevation; in the waterfront area it is 12 feet.
Council President Johnson said there is no direction from FEMA regarding the base flood elevation. She
recognized that is an important issue but there are many different opinions and she would like to hear
those opinions. For example, the University of Washington plans to convene a conference on this subject
and she was interested in what they said. She relayed there is no requirement for a new way of measuring
building height. It may be an equity issue, for example if a building is constructed two feet above the
current level to accommodate sea level rise, there is no requirement to allow an additional two feet in
building height. This is strictly a policy decision and a political decision; the Council cannot rely on what
the Planning Board said, the decision needs to be made independently and the Council must be
responsible for the decision.
Councilmember Mesaros asked Mr. Lien to review the bar graph related to sea level rise. Mr. Lien
explained the graph relates to the two most recent studies related to sea level rise, NRC 2012 and Mote et
al 2008. The NRC projection is about a two -foot sea level rise in the Puget Sound region; that is one of
the criteria used for establishing two feet above base flood elevation.
Councilmember Fraley-Monillas referred to Councilmember Tibbott's comment that FEMA indicated
buildings needed to be two feet above base flood elevation. Mr. Lien explained FEMA sets the base flood
elevation. The 2-foot recommendation was a result of, 1) most recent information indicates the average
projection are 2 feet at year 2100, and 2) the existing building code requires some structures to be at base
flood elevation and potentially up to 2 feet above base flood elevation. The amendment requires all
structures to be at two feet above base flood elevation. Councilmember Fraley-Monillas asked whether
that was from FEMA. Mr. Lien answered no. Councilmember Fraley-Monillas relayed her understanding
FEMA did not recommend two feet. Mr. Lien said FEMA establishes the base flood elevation and he was
not aware of any specific FEMA recommendation to require structures be above base flood elevation.
Councilmember Buckshnis commented it is a simple question, either you get it or not; either you are
ready to make decision or you won't. She used the example that Edmonds passed a plastic bag ban before
other cities.
COUNCILMEMBER BUCKSHNIS CALLED FOR THE QUESTION. MOTION FAILED (4-3)
COUNCILMEMBER NELSON, COUNCILMEMBER FRALEY-MONILLAS AND COUNCIL
PRESIDENT JOHNSON VOTING NO. [MOTION REQUIRES A SUPER MAJORITY TO PASS.]
UPON ROLL CALL, MAIN MOTION CARRIED (4-3), COUNCILMEMBERS BUCKSHNIS,
MESAROS, TEITZEL AND TIBBOTT VOTING YES; AND COUNCIL PRESIDENT JOHNSON
AND COUNCILMEMBERS NELSON AND FRALEY-MONILLAS VOTING NO.
Mayor Earling declared a brief recess.
B. FIRST QUARTER BUDGET AMENDMENT
Edmonds City Council Approved Minutes
April 19, 2016
Page 16
Packet Pg. 493
6.2
City Council Agenda Item
Meeting Date: 05/3/2016
Dayton Street Plaza Project Budget authorization (10 min.)
Staff Lead: Carrie Hite
Department: Parks, Recreation & Cultural Services
Preparer: Carrie Hite
Background/History
The Dayton Street Plaza has been in the PROS plan and the adopted in the Parks CIP for several years.
We have completed the bid process and awarded the contract to K-A Construction. We are currently
under construction.
Staff Recommendation
Authorize project budget for Dayton Street Plaza.
Narrative
Staff recently went out to bid on the Dayton Street Plaza project. This project has been in the PROS plan
for quite some time, and the plan was adopted in 2011.
The low bid came in at $94,223.87. The Mayor authorized this contract, because it was under the
threshold to bring forth for Council authorization.
We have had several change orders on this project, mainly dealing with increasing the sidewalk width
around the old public works building, and raising curbs from 3" to 6". This has put the project cost over
the $100,000 threshold for Council authorization. According to the purchasing policy, the Mayor has
preliminarily approved these expenditures, pending authorization from Council.
Please see the attached project budget for authorization.
We currently have $168,000 in the approved Council budget for this project, so we are well below what
we have set aside for this project.
As laid out in our purchasing policy, when staff is under construction on a project, and a change order
takes it above the $100,000 threshold, it is suggested that staff alert Council via email, and bring forth a
budget and authorization to Council at the next City Council agenda for review. There is a stipulation in
the policy that allows the Mayor to approve these if a speedier approval process is needed ( i.e. if a
contractor would need to stop work, and add cost delays to a project). After Mayoral approval, then
staff needs to bring this to Council at the next meeting. This is the case with this project, as the
contractor is on site working, and it would add costs to stop work.
Attachments:
Packet Pg. 494
s.2
Dayton Street Project budget April 2016
Packet Pg. 495
6.2.a
2016 Dayton Street Plaza Project Budget
Base bid including tax
$94,223.66
Total
$94,223.66
Change Orders
Date
Brief Description
Change order 1
3/31/2016
Saw Cut & Jack hammer 40 ft sidewalk along building
$1,982.00
Change order 2
3/31/2016
Resetting catch basin elevation
$427.05
Change order 3
3/31/2016
Drop evelvation to create 1/4 foot slope in inner circle area
$930.75
Change order 4
4/5/2016
Cut and remove asphalt and increase sidewalk width from
36" to 48" along north side of building
$5,809.40
Change Order 5
4/21/2016
Raise curb form 3" to 6" plus extra cement. Install dowels in lower
seat wall to patio at 16" on center. This includes rerbar, expoxy
and roto hammer rental. Extra cement and color along building
$2,613.24
Total to 4/21/16
$105,986.10
Additional Management Reserve - 15%
$15,897.00
Total Authorization Request
$121,883.10
Packet Pg. 496