Loading...
2016-08-23 City Council - Full Agenda-17391. 2. 3. 4. 5 6 7. 8. 9. 10. 11. 12. o Agenda Edmonds City Council snl. ynyo COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 AUGUST 23, 2016, 7:00 PM CALL TO ORDER/FLAG SALUTE ROLL CALL APPROVAL OF THE AGENDA APPROVAL OF THE CONSENT AGENDA 1. Approval of Council Special Meeting Minutes of August 16, 2016 2. Approval of Council Meeting Minutes of August 16, 2016 3. Acknowledge receipt of a Claim for Damages from Anne Johnson ($500,000.00), and Frontier (amount undetermined). 4. Approval of claim, payroll and benefit direct deposit, checks and wire payments. PRESENTATIONS/REPORTS 1. Economic Development Commission Presentation (20 min.) 2. Edmonds School District Foundation Presentation on Youth Homelessness (15 min.) AUDIENCE COMMENTS (3-MINUTE LIMIT PER PERSON) - REGARDING MATTERS NOT LISTED ON THE AGENDA AS CLOSED RECORD REVIEW OR AS PUBLIC HEARINGS STUDY ITEMS 1. Sunset Ave Walkway Design Proposals (60 min.) 2. Presentation of the 2017-2022 Six -Year Transportation Improvement Program (15 min.) 3. Stormwater Management Code Update, Edmonds Community Development Code Chapter 18.30 (20 min.) 4. Authorization to contract with James G. Murphy to sell surplus city equipment (5 min.) ACTION ITEMS 1. Authorization to modify an Agreement with the Cold Spring Granite Company for the Veteran's Plaza (10 min.) 2. Presentation of Bids and Award for Downtown Restroom (5 min.) REPORTS ON OUTSIDE BOARD AND COMMITTEE MEETINGS MAYOR'S COMMENTS COUNCIL COMMENTS CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(1) Edmonds City Council Agenda August 23, 2016 Page 1 13. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION. ADJOURN Edmonds City Council Agenda August 23, 2016 Page 2 4.1 City Council Agenda Item Meeting Date: 08/23/2016 Approval of Council Special Meeting Minutes of August 16, 2016 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 08-16-2016 Draft Council Special Meeting Minutes Packet Pg. 3 4.1.a EDMONDS CITY COUNCIL SPECIAL MEETING DRAFT MINUTES AUGUST 16, 2016 The City Council Special Meeting was called to order at 6:30 p.m. by Mayor Earling in the Council Chambers, 250 5th Avenue North, Edmonds. The Council then convened in the Jury Meeting Room. Elected Officials Present Kristiana Johnson, Council President Mike Nelson, Councilmember Diane Buckshnis, Councilmember Tom Mesaros, Councilmember Dave Teitzel, Councilmember Neil Tibbott, Councilmember Adrienne Fraley-Monillas, Councilmember Mayor Earling Others Present Mary Ann Hardie, HR Manager Jeff Taraday, City Attorney 1. CONVENE IN EXECUTIVE SESSION TO DISCUSS COLLECTIVE BARGAINING PER RCW 42.30.140(4)(A). The City Council adjourned to the Jury Meeting Room to discuss collective bargaining per RCW 42.30.140(4)(a). I\ 13Lei 0-,,] O The meeting was adjourned at 6:54 p.m. Edmonds City Council Draft Minutes August 16, 2016 Page 1 Packet Pg. 4 4.2 City Council Agenda Item Meeting Date: 08/23/2016 Approval of Council Meeting Minutes of August 16, 2016 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 08-16-2016 Draft Council Meeting Minutes Packet Pg. 5 4.2.a EDMONDS CITY COUNCIL DRAFT MINUTES August 16, 2016 ELECTED OFFICIALS PRESENT Dave Earling, Mayor Kristiana Johnson, Council President Michael Nelson, Councilmember Adrienne Fraley-Monillas, Councilmember Diane Buckshnis, Councilmember Dave Teitzel, Councilmember Thomas Mesaros, Councilmember Neil Tibbott, Councilmember 1. CALL TO ORDER/FLAG SALUTE STAFF PRESENT Phil Williams, Public Works Director Patrick Doherty, Econ. Dev & Comm. Serv. Dir Shane Hope, Development Services Director Scott James, Finance Director Rob English, City Engineer Kernen Lien, Senior Planner Jeff Taraday, City Attorney Scott Passey, City Clerk Andrew Pierce, Legislative/Council Assistant Jerrie Bevington, Camera Operator Jeannie Dines, Recorder The Edmonds City Council meeting was called to order at 7:01 p.m. by Mayor Earling in the Council Chambers, 250 5"' Avenue North, Edmonds. The meeting was opened with the flag salute. 2. ROLL CALL City Clerk Scott Passey called the roll. All elected officials were present. 3. APPROVAL OF AGENDA Council President Johnson advised the presenter for Item 5.1 will arrive at approximately 8:00 p.m. COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO APPROVE THE AGENDA IN CONTENT AND ORDER, MOVING ITEM 5.1 TO ITEM 8.1. MOTION CARRIED UNANIMOUSLY. 4. APPROVAL OF CONSENT AGENDA ITEMS COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: APPROVAL OF COUNCIL MEETING MINUTES OF AUGUST 2, 2016 2. APPROVAL OF COUNCIL SPECIAL MEETING MINUTES OF AUGUST 9, 2016 3. APPROVAL OF COUNCIL MEETING MINUTES OF AUGUST 9, 2016 4. ACKNOWLEDGE RECEIPT OF A CLAIM FOR DAMAGES FROM BRUCE WHITE (AMOUNT UNDETERMINED) Edmonds City Council Draft Minutes August 16, 2016 Page 1 Packet Pg. 6 4.2.a 5. APPROVAL OF CLAIM CHECKS 6. JUNE 2016 QUARTERLY FINANCIAL REPORT 7. SENIOR CENTER LEASE AGREEMENT AMENDMENT 5. PRESENTATIONS/REPORTS 2. PRESENTATION OF NATIONAL CITIZEN SURVEY RESULTS Economic Development/Community Services Director Patrick Doherty provided background: • Pursuant City Council approval and funding, the National Citizen Survey, administered by the National Research Center (NRC), was conducted between 6/3/16 and 7/17/16 in Edmonds • Survey is conducted in a scientifically valid, statistically significant fashion • Surveys were sent to 2,200 randomly selected households • Online, opt -in survey was open from 7/1/16 to 7/17/16 • Responses to the randomized survey totaled 586, or 28%, within 20-40% national average. • Constitutes statistically significant survey response. • 320 online responses were received • 906 total responses • Results were combined since both samples were most similar in NRC's national experience • Increased confidence level to only 3% margin of error Mr. Doherty described the Community Livability Report: • NRC conducts detailed analysis and draws conclusions in so-called "Community Livability Report" • 3 pillars of community: o Community characteristics o Governance o Participation • Across eight central facets of community: o Safety o Mobility o Natural Environment o Built Environment o Economy o Recreation and Wellness o Education and Enrichment o Community Engagement • Benchmarking o Comparison against nationwide averages o Comparison against 25 Pacific NW cities 20,000 to 60,000 population o Compare/contrast across 5 demographic cohorts: ■ Length of residency in Edmonds ■ Annual household income ■ Rent or own dwelling unit ■ Age ■ Gender He provided summary conclusions: Edmonds City Council Draft Minutes August 16, 2016 Page 2 Packet Pg. 7 4.2.a • Overwhelming majority of residents gave Edmonds a resounding thumbs -up! • Indicators of Quality of Life 0 93% - Overall image 0 86% - Neighborhood 0 92% - Place to raise children 0 87% - Place to retire 0 96% - Overall appearance • Edmonds is a great place to live, with 9 in 10 residents positively rating overall image, overall appearance and Edmonds as a great place to raise children, among other attributes. Ninety-six percent of respondents rated Edmonds as an excellent or good place to live, much higher than responses in nationwide surveys and those from throughout the Pacific Northwest. • Safety is an asset and a priority, with 9 in 10 residents stating they feel safe in Edmonds and also identifying safety as a priority to focus on in coming years. • The economy is important to residents and highly rated in Edmonds. About 8 in 10 residents rated the City's economic health as positive, although it is recognized that more jobs in Edmonds for Edmonds residents would be desirable as only 3 in 10 work in the city. • The City supports a culture of diversity and opportunities for citizen engagement. At least three- quarters of residents gave excellent/good ratings to opportunities for cultural/arts/events engagement. Also, up to 6 in 10 felt that the City has high levels of community engagement and is open to people of diverse backgrounds. • Respondents rated the following well above national averages: o Ease of walking o Overall natural environment o Air quality o Vibrant downtown area o Mental health care o Healthcare o Adult education o Traffic flow o Cleanliness o Public places o Places to visit o Preventative health services o Cultural/arts/music activities o Social events and activities • Only one category ranked lower than national averages: o Affordable quality housing Mr. Doherty reviewed responses to five customized questions, unique to Edmonds: • How likely or unlikely would you be to support increased local public funding for the following transportation -related services in Edmonds? o Repair/replacement of existing sidewalks — 86% favorable o Repair and/or maintenance of City streets — 88% favorable o Construction of new sidewalks — 84% favorable o Expansion of bicycle facilities — 59% favorable • How likely or unlikely would you be to support increased local public funding for the following parks and recreation -related services in Edmonds? o Acquisition of parkland, beachfront — 77% favorable o Capital projects such as Civic Field, Marina Beach Park, etc. — 83% favorable o Upgrading Frances Anderson Center — 79% favorable o Upgrading maintenance levels of existing parks — 85% favorable Edmonds City Council Draft Minutes August 16, 2016 Page 3 Packet Pg. 8 4.2.a • Please indicate whether or not you currently experience discrimination in Edmonds based on your: o Sexual orientation or gender identity — 2% o Disability — 3% o Religion — 3% o National origin — 3% o Race — 4% o Gender — 3% o Age — 5% How likely or unlikely would you be to support increased funding to enhance the following Edmonds Police -related services? o Domestic violence services — 89% favorable o Increased patrol presence for crime deterrence, detection and apprehension — 89% favorable o Crime prevention services — 89% favorable o Youth Services programs (High School Resource Officer, DARE, GREAT, etc.) — 74% favorable o Crime analysis — 82% favorable o Traffic enforcement — 65% favorable Rate how various media are regular source of information for you about City functions, activities, programs and events through the following channels o Word of mouth — 36% o Posters, banners or other signage — 32% o Online media — 46% o Printed media — 43% o City website or Facebook page — 26% He described survey responses related to community focus moving forward: • Residents believe the following should be areas of focus over the next two years: o Overall quality of natural environment — 83% o Overall quality of built environment — 79% o Health and wellness opportunities — 65% o Sense of community — 84% Mr. Doherty advised survey information will be placed on the City's website and a press release issued tomorrow. Councilmember Tibbott asked whether the location of the responses was known. Mr. Doherty referred to a map that identified the households that received surveys; location information is not available for the online respondents. Councilmember Buckshnis said she took the survey and forwarded it to her friends. She relayed a concern she heard that there were no dollar amounts associated with any of the questions. In utopia all the projects would be great but in reality the estimates are $5+ million for Marina Beach, $8+ million for Civic Field, etc. She asked how the survey data would be used. Mr. Doherty said the questions asked whether the respondent supported increased funding; there was some debate among staff about whether to included numbers but there was concern it began to sound like a referendum and the amounts are unknown. This survey provides one piece of information for the Council when debating priorities during the budget process. For example, if the Council is debating improving Marina Beach Park versus another park, this may be one piece of information showing the public's support for Marina Beach. Edmonds City Council Draft Minutes August 16, 2016 Page 4 Packet Pg. 9 4.2.a Councilmember Buckshnis recalled when the Council originally reviewed the questions there was reference to a levy and the recommendation was to remove that. She commented people may indicate support for a concept but will not support it when the actual cost is presented She asked how the survey results would be integrated with the Strategic Action Plan (SAP). Mr. Doherty said following the presentation to Council and posting information on the website, there are plans for an open house in September to share this information with the public The SAP items could be displayed on boards in the room while the survey information is shared to determine whether the SAP items are still important. Councilmember Buckshnis agreed, noting over time the SAP items should be whittled down to what is reality. Councilmember Nelson commented it was great to see that the natural environment scored the highest. He observed only the question related to discrimination included a note from the survey: NOTE: While low absolute figures, it is important to recognize that for some of these categories (sexual orientation, disability, national origin, and race) the portion of the Edmonds population who fall within those cohorts is mostly under 10016, making these response rates more significant within each cohort (e.g., 2% of the population stating they experience discrimination based on sexual orientation, when approximately 5- 10% of the population may be a member of this cohort, meaning that 20% to 45% of that cohort may be experiencing discrimination). Councilmember Nelson said if a certain segment of a population is being discriminated against, that needs to be considered. Mr. Doherty commented that is the reason for the Diversity Commission, their programs and outreach; in forums the Diversity Commission has had, some people still feel they are experiencing discrimination. Councilmember Nelson asked what was learned from the survey that was not known before. Mr. Doherty answered the age discrimination was the youngest cohort and that 42% get information via print media. Generally speaking in reviewing the questions, he expected Edmonds to score high and that happened. Councilmember Nelson remarked he likes both forms of media. Councilmember Teitzel referred to the way the questions were framed; many begin with the phrase, "Would you support increased local public funding for..." He questioned whether the response rate would have been as favorable if the question stated, "Would you be willing pay an increased local tax rate for improved streets and sidewalks in Edmonds." Mr. Doherty recalled the Council debated that language before approving the survey; an earlier version included more directed language related to a levy or increased property taxes and the decision at the time was it was too directive and sounded too much like a poll. He agreed the way the question was worded lost a little precision but the problem with specifying a funding source is that funding source may not make the most sense in the future which increases the complexity of the question. He was counseled by NRC to make the question more generic, recognizing it does not provide precision but provides one point of information. Councilmember Teitzel asked whether most respondents knew that when reading the question. Mr. Doherty answered the language was not very complicated so he assumed they would understand it meant more funds although they would not know whether it was a tax, a fee or a re -appropriation of existing funds. Councilmember Fraley-Monillas commented the survey tells the City what is being done right and what could be done better. She supported providing information to the Diversity Commission and potentially to other commissions. She noted although respondents indicate a willingness to spend more money on public safety, roads, and parks, voters recently did not support a $0.02 sales tax increase for public safety. She recognized the reasons for not including a dollar amount in the survey but questioned whether the results would be the same if an amount were included. Mr. Doherty responded the percentages in the 80s and 90s indicate there is a lot support for some kind of funding increases. As those issues arise during this and subsequent budget cycles, this survey can be used as a piece of information indicating support for those subject matters. Councilmember Fraley-Monillas agreed, noting countywide funding is different than in funding in our own backyard. She agreed the survey results will be of value to the City. Mr. Edmonds City Council Draft Minutes August 16, 2016 Page 5 Packet Pg. 10 4.2.a Doherty said he likely will return to Council in three years asking whether to do the survey again; those results would illustrate how the City is doing then compared to 2016 as well as compared to other cities. Mayor Earling said the survey results indicate the community's level of satisfaction community as well as information regarding where improvements are needed/wanted. 3 to 0104001 B[K1]0T lu I oleo V Roger Hertrich, Edmonds, said when driving along 71h Avenue tonight and looking at Civic Field, he recognized that great open space accommodates events and sports on the same field. He encouraged the City to maintain the space without too many impediments. Next, he said the National Citizens Survey was a waste of time and money and should not be given much credit, commenting he would not take the time to answer the questions. He referred to the Council's 4-3 decision to remove themselves from quasi- judicial hearings, deciding that the Council was not smart enough to handle court -type proceeding that are important to the public. He recalled the hard work he did on quasi-judicial matters when he was on the Council. When Councilmembers participate in quasi-judicial hearings, they look harder at the code and realize changes need to be made. He pointed out land use is always changing and there is not enough public participation in land use decisions, leaving it up to staff where sometimes things get out of hand. The Council has ability to assist citizens and ensure things are done correctly. He concluded the Council made the wrong decision. Dorothy Trennen, Edmonds, a member of the Edmonds Housing Task Force, a citizen group advocating for housing for those in need, urged the Council to focus on the affordable housing that may be going in as part of Westgate redevelopment. Mayor Earling suggested she provide comments regarding Westgate during the public hearing. 7. PUBLIC HEARINGS 1. PUBLIC HEARING AND RESOLUTION TO DESIGNATE WESTGATE MIXED -USE ZONE DISTRICT AS RESIDENTIAL TARGETED AREA Economic Development/Community Services Director Patrick Doherty explained on July 26, 2016 the Council passed a resolution of intent, a step required by State law to consider the Westgate Mixed Use (WMU) Zone as a residential targeted area for the potential implementation of the Multifamily Tax Exemption Program and set a public hearing for tonight. The reason the Council chose the WMU Zone was the implementation of a plan for zoning for that mixed use center 11/2 years ago. There has been little development activity in that area and he learned most neighboring jurisdictions have this provision. Following the public hearing, the Council has the opportunity to designate the Westgate area as a residential targeted area. That action does not institute the program; it simply designates Westgate as an area where the program may be instituted. Staff will come back to Council in the next couple months with the code provisions, ordinance, public hearing, etc. and the Council can debate the particulars of the program at that time. The proposed action tonight is to pass the resolution to designate the WMU zone as a residential target area. Councilmember Teitzel referred to language in Section 1 of the resolution that states the WMU Zone lacks sufficient affordable housing. If the resolution and subsequent processes are approved and Westgate is redeveloped to include affordable housing, he asked what mechanism ensures those units are rented to people who meet that demographic. Mr. Doherty referred to Section Lb that states the district lacks sufficient available, desirable and convenient residential housing including affordable housing, noting that section does not refer only to affordable housing. Statutory provisions at the State level provide two incentives options, 1) 8-year tax exemption for projects that do not include affordable housing, and 2) a 50% bonus, 12-year exemption for projects if 20% of the units are affordable. He noted in any Edmonds City Council Draft Minutes August 16, 2016 Page 6 Packet Pg. 11 4.2.a development, some units are more affordable than others such as smaller units or units that face another building. There is a multistep process; applicants seeking this provision apply to the City, the City Council approves the preliminary contract; once the project is complete, the applicant returns to execute contract. The contract states they recognize the duty to provide those housing units in accordance with a formula for affordable for the entirety of the exemption period as well as provide an annual report to the City regarding compliance. If the applicant does not comply, they lose the exemption. Mayor Earling opened the public hearing. George Keefe, Edmonds, urged the Council to adopt a development plan that provides for a 20% affordable housing mandate with a 12-year tax incentive. The report card on child homelessness for the 2012-2013 school year ranks the State of Washington 40`h in the United States. There were 61,000 homeless children in Washington; Washington ranked lower than Arkansas, Georgia, Louisiana, Mississippi, South Carolina and Texas. The Washington statewide homeless student report by district for the school year 2014-2015 reports the Edmonds School District had 600 homeless students, 40-60 homeless students in each of 10 grades; two-thirds were doubled up sharing housing due to loss of housing or income hardship, more than 100 were in shelters, more than 50 were in hotels/motels and 11 were unsheltered. Such statistics about children are shameful; he commented on the difficult to do homework in the backseat of a car or in tent city. All children deserve a home in which to study, learn and thrive. He urged the Council to begin to address the need for affordable housing in Edmonds. Carolyn Harris, Edmonds, a member of the Edmonds Housing Task Force, agreed with Mr. Keefe, regarding the need for affordable housing. She explained a family is supposed to pay 30% of their income in rent; a family she put in affordable housing recently pays 75% of their income in rent. The poverty level in 1995 was $25,000/year; the poverty level now for a family of 4 is $24,000, yet the same housing she put refugees in in 1995 that rented for $500/month now rents for $1500/month. There is no place for people to live and there is a great deal of discrimination against the poor. Edmonds needs affordable housing and needs to do something significant. She encouraged the Mayor to be the spirit of Edmonds and for homeless children. There is a very diverse student population in Edmonds; 30 different countries are represented in the children bused into Westgate, Chase Lake, and College Place. Thirty-nine children who are residents of Edmonds are homeless. She noted there is little assistance for homeless children as there is no welfare and HUD has stopped taking applications and has not increased their housing for 15 years. She urged Edmonds to take actions like Bellingham, Everett, and Seattle have done. Roger Hertrich, Edmonds, said Westgate is crowded now and difficult to negotiate. He recognized Westgate could be developed to some degree including residential against the hillside but did not think there was enough room at Westgate to make it a district for this purpose and felt it was premature to put Westgate in a new category. He recognized there were problems with housing but did not think this program was appropriate for this area. He questioned the financial benefit of this program to the City. Mayor Earling closed the public hearing. COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO APPROVE RESOLUTION 1368, A RESOLUTION OF THE CITY OF EDMONDS, WASHINGTON, TO DESIGNATE THE WESTGATE MIXED -USE ZONE DISTRICT AS A RESIDENTIAL TARGETED AREA FOR THE PURPOSE OF ESTABLISHING A MULTIFAMILY TAX EXEMPTION PROGRAM. MOTION CARRIED UNANIMOUSLY. 8. ACTION ITEMS Edmonds City Council Draft Minutes August 16, 2016 Page 7 Packet Pg. 12 4.2.a PRESENTATION AND AUTHORIZATION FOR MAYOR TO SIGN SUPPLEMENTAL AGREEMENT WITH HWA GEOSCIENCES FOR THE FISHING PIER REHABILITATION PROJECT City Engineer Rob English explained this is a supplemental agreement for additional inspection services on the fishing pier project. The original contract, executed in March 2016, for $61,000 was followed by the first supplemental agreement executed earlier this summer for additional testing and inspection. The services included in this supplemental agreement total $13,891. As the concrete repairs are ongoing; this is an estimated amount. Staff is working with the contractor on testing issues and may need to return to Council depending on how that is resolved. He recommended approval of the supplemental agreement so funds are available to continue inspection and testing. There were plans for a soft opening of the pier by the end of this week; however, recent developments have moved the soft opening to September 2 due to issues with the rail and rail supports as well as the waterline and the materials needed to correct it. There was also a change from a clear concrete deck surface sealant to an opaque sealer. COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO AUTHORIZE THE MAYOR TO SIGN THE SUPPLEMENTAL AGREEMENT. Council President Johnson inquired about the funding source. Mr. English answered it is paid from the management reserve which is comprised of grant funds. MOTION CARRIED UNANIMOUSLY. 2. AUTHORIZATION TO JOIN THE KING COUNTY LAWSUIT REGARDING RONALD WASTEWATER DISTRICT SERVICE AREA Public Works Director Phil Williams explained industrial land in southwest Snohomish County, Pt. Wells, has been proposed for significant residential development, potentially 3,000 residential units. Shoreline has been working with the property owner/developer to put the project together. The proposal went to the Snohomish County Boundary Review Board who issued decisions related to service providers that were contrary to King County and Shoreline's interests. Those decisions were appealed and without any action by Snohomish County were subsequently abandoned. The parties are asking King County to opine regarding whose stormwater service area Pt. Wells is in. Olympic View Water & Sewer District (OVWSD), based largely in Snohomish County, feel Pt. Wells is in their service area and Edmonds supports OVWSD's position. He requested the Council authorize the City Attorney to take the necessary actions to have Edmonds added to the action in King County. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO DIRECT THE CITY ATTORNEY TO INTERVENE AS A DEFENDANT IN KING COUNTY SUPERIOR COURT CAUSE NUMBER 16-2-15331-3 SEA, CAPTIONED AS RONALD WASTEWATER DISTRICT, PLAINTIFF VS. OLYMPIC VIEW WATER AND SEWER DISTRICT ET AL., DEFENDANTS, TO PROTECT THE CITY OF EDMONDS' INTEREST IN RECEIVING WASTEWATER FLOWS FROM FUTURE DEVELOPMENT IN THE POINT WELLS AREA OF SNOHOMISH COUNTY. MOTION CARRIED UNANIMOUSLY. Mayor Earling declared a brief recess. 3. SHORELINE MASTER PROGRAM UPDATE Senior Planner Kernen Lien explained: • Pursuant to RCW 90.58.090(2)(e), the City of Edmonds has two options for responding to Ecology's conditional approval: 1. Agree to the proposed changes, or Edmonds City Council Draft Minutes August 16, 2016 Page 8 Packet Pg. 13 4.2.a 2. Submit an alternative proposal. Ecology will then review the alternative(s) submitted for consistency with the purpose and intent of the changes originally submitted by Ecology with the Shoreline Management Act. Ecology's reply to the City's initial response — October 31 st Mr. Lien reviewed Ecology's required changes and Council action to date: Ecology Required Change 1Update Critical Area Ordinance reference • Required change to reference Ord. 4026 dated May 3, 2016 • August 2nd — Council voted to accept change Ecology Required Change 2 — Replace Appendix B • Required change is to replace Appendix B under Ord. 4026 (minus exceptions) • August 2nd — Council voted to accept change with the critical area regulations adopted in 2016 Ecology Required Change 3 - Critical Area Provisions Requiring Shoreline Variance • Required change would eliminate SMP 24.40.020.0 • August 2nd — Council voted to accept change Ecology Required Change 4 — Critical Area Exceptions • Required change would modify list to only except critical area variance (ECDC 23.40.210) and geologically hazardous areas allowed activities (ECDC 23.80.040.13) • August 2nd — Council voted to accept change Ecology Required Change 5 — SMP Wetland Section • SMP 24.40.0201 contains wetland regulations for shoreline jurisdiction based on Ecology's Guidance for Small Cities • Required change would remove SMP 24.40.020.F • Since the City adopted the CAO, Ecology published Guidance for Critical Area Ordinances o Council requested information regarding the difference between Guidance for Small Cities and Guidance for Critical Area Ordinances ■ Council packet contains a comparison done by Paul Anderson, Ecology (Exhibit 4) • Updated critical area regulations wetland section is based on Ecology's Guidance for Small Cities • Physically Separated/Functionally Isolated Buffer Councilmember Teitzel referred to the statement in Exhibit 4 (packet page 486), "For water quality improvement, the benefit of buffers is achieved within the first 60-75 feet and wider buffer are providing primarily habitat value." In the UMU IV the buffer was set at 50 feet, less than 60-75 feet. He asked how Mr. Anderson's recommendation regarding a 50-foot buffer width squared with his comments in Exhibit 4. Paul Anderson, Wetland Specialist, Washington State Department of Ecology, responded the statement was related to buffers that are primarily intact, well vegetated to start with, and was a general statement about buffer function. The 50-feet proposed for the Harbor Square area would be restored buffer via mitigation to compensate for increased land use intensity. There would be some water quality benefit but redevelopment would also occur consistent with current stormwater standards. That statement was not that a 60-75-foot buffer would apply; it was a general statement about the functions that buffers provide. Recognizing the buffer is measured from ordinary high water mark (OHWM), Councilmember Tibbott asked if there was any estimate/guess regarding how the OHWM could change with daylighting of Willow Creek and a more natural tidal flow into the marsh and how that would affect where the buffer is measured from. Mr. Anderson referred to a graphic Mr. Lien displayed two meetings ago that illustrated Edmonds City Council Draft Minutes August 16, 2016 Page 9 Packet Pg. 14 4.2.a the estimated shift of ordinary high water as a result of daylighting Willow Creek. The graphics that have been displayed are planning level estimates; the OHWM and the wetland edge would not be precisely determined until a development proposal is submitted. Mr. Lien displayed a 2008 WSDOT survey of the marsh that identified the salt tolerant vegetation that existed at that time. He identified an additional area on the aerial image that was likely to become salt marsh if Willow Creek is daylighted and there is free flow tidal influence into the marsh. He clarified the boundaries of marsh would not change but the ecological makeup of a certain portion would change. Councilmember Tibbott relayed his understanding the OHWM currently extends roughly to the base of the dike and would expand somewhat to the east with additional flows. Mr. Lien agreed. Councilmember Buckshnis said in Mr. Anderson's comparison, the changes are not that significant and she questioned why not update the CAO based on the most recent BAS. Mr. Anderson answered that could be done, it was a Council decision; they were not recommending one way or another. They were okay with leaving the the reference to Guidance to Small Cities in the CAO especially since the new guidance came out after the Council's recent adoption of the CAO. Councilmember Buckshnis said although she had not done a comparison of the tables, it appeared the basis for the 10-year update was revising buffers widths and discussing the difference between Category I and II wetlands. Mr. Anderson commented it wasn't a 10-year update, it just happened to be that the BAS was published in 2005 and all the documents that have come out since then have been based on the 2005 guidance. The update in June provided clarification; some people were misinterpreting the buffer table in the Guidance for Small Cities. He was unsure why Category II estuarine wetland were not included in the Small Cities Guidance but it is now included. All the tables arise from Volume 2 of the BAS document; Appendix 8C is the origin of the tables. The guidance in June was to clean up and clarify. Councilmember Buckshnis commented if the SMP is based on 2005 the marsh is still Category I. Mr. Anderson disagreed, that is not the not rating system, it is the BAS; the state rating system is a separate document. Councilmember Buckshnis said if the City utilizes this data, it clearly identifies the marsh as a Category II. Mr. Anderson answered it is based on the current rating system which is not in these documents. Councilmember Buckshnis agreed, stating that is why the current documents should be updated with these new rulings. Councilmember Tibbott referred to the buffers for Category II wetlands in the 2016 Guidance. Mr. Anderson referring to Table XX.1 (packet page 495) explaining these were separated out due to the belief that estuarine and interdunal wetland had special enough characteristics that the buffer widths should not be based solely on wetland ratings score. The current wetland rating system only goes into detail for freshwater wetlands. Estuarine wetlands are identified separately because there is not a system for rating them, the habitat functions are not as well understood and interdunal wetlands are a unique system. For the salt marsh portion of Edmonds Marsh, only the estuarine buffer widths would be used and the habitat score would not be considered in establishing the buffer. Councilmember Tibbott concluded from the table that BAS suggests there should be a 110 buffer in that area. Mr. Anderson said Table XX.1 would be 150 feet; Table XX.3 would be 110 feet on a Category II wetland. The minimization measures in XX.2 need to be included or a wildlife corridor established that is 100 feet wide. If either can be done, it qualifies for the reduced buffer width of 110 feet. If a wildlife corridor cannot be established or the minimization measures included, the buffer is 150 feet in Table XX.3. Mr. Lien added this assumes a vegetated buffer exists and there is not already existing development. If development occurred in an area where there was an existing buffer, this guidance would apply in that area. Mr. Anderson agreed, pointing out the 50-foot buffer with setback in the required changes is a restored buffer which is not what these tables are referencing. These tables apply to a well vegetated or any remaining portion of a well vegetated buffer. Edmonds City Council Draft Minutes August 16, 2016 Page 10 Packet Pg. 15 4.2.a Councilmember Tibbott concluded from the explanation that these tables have nothing to do with the Edmonds Marsh. Mr. Anderson they have nothing to do with the marsh along the west, north and east side; there is still some intact buffer on the south side and there may be 150 feet of forest in the southeast corner. When the buffer along Harbor Square was measured, the only effective buffer that exists is 13 feet to the top of the berm. Mr. Lien displayed an aerial view of the impacted buffer, explaining Ecology Required Change 5 is related to the wetland section of the SMP and making it consistency with the CAO. While related, is a separate issue from Ecology Required Change 7 which is related to the appropriate setback and buffer for the area next to the marsh. The SMP establishes specific setbacks and buffer for the marsh based on site specific characteristics; this is more general guidance. Councilmember Nelson said given that this would apply to a portion of the Edmonds Marsh, the June 2016 Guidance should apply to the CAO. COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS. TO USE THE JUNE 2016 GUIDANCE FOR CAO UPDATES FOR WESTERN WASHINGTON TO UPDATE THE CRITICAL AREAS ORDINANCE. Development Services Director Shane Hope said a new CAO cannot be adopted on the spot; this is direction to use this as guidance in future discussions. Mr. Lien said the Ecology required change is whether the wetland section in the SMP are consistent with the CAO. If the Council accepts this change, it utilizes the current CAO. If the Council wants to use the 2016 update in the SMP, that alternative would need to be proposed to Ecology. If that is the Council's direction, he will need to review the wetland section to determine what should be removed such as the physical separated/functionally isolated provision. It may be that the table is retained because the rest is consistent with the CAO. Councilmember Nelson said if staff needs more time, that is his intent. Mr. Lien suggested the Council vote on that and he will take a closer look and bring it back to Council. Council President Johnson asked staff to explain what this would mean to the adopted CAO and the process that would be followed to make changes to the adopted CAO. Ms. Hope said her understanding is the Council is providing an alternative to Ecology's required change on the wetland section and referencing the newer guidance. While it could create a need to revise the CAO, that would not happen now but as part of a future process and Mr. Lien could return with the details at a future meeting. She suggested the Council indicate their preference related to the SMP response. Councilmember Teitzel pointed out the CAO was considered and adopted before the June 16, 2016 report. There will be timing issues in the future as new science continually emerges and he did not want the Council reopening the CAO and SMP to integrate new information. This may be a unique circumstance as the report impacts both the CAO and SMP. Mr. Lien pointed out there are periodic updates of the CAO and SMP and agreed this was a unique situation. Ms. Hope said cities typically do not amend the CAO within 1-2 years of adoption. However, that decision is still ahead regardless of tonight's decision. Councilmember Buckshnis asked whether physically separated/functionally isolated was changed to interrupted buffer in the CAO. Mr. Lien explained in the section of the SMP that Ecology recommends be removed, 24.40.020.17, there is a physically separated/functionally isolated buffer. If the Council wants to include the 2016 guidance from Ecology in the SMP, he would need to review 24.40.020.F to see what needs to be retained to include the 2016 update; it was likely only the buffer table needed to included. Councilmember Buckshnis said Mr. Anderson's summary indicates it cleans things up and provides better guidance; therefore, she feels it may be advantageous to do this as an alternative. Mr. Lien said one of the reasons for the CAO integration was to have the same regulation apply within shoreline jurisdiction that apply outside shoreline jurisdiction. Different guidance in the SMP defeats that purpose. Updating the Edmonds City Council Draft Minutes August 16, 2016 Page 11 Packet Pg. 16 4.2.a CAO would be a separate action and follow a different timeline. Ms. Hope pointed out it would require a full public process and may take a few months. Councilmember Buckshnis asked how it would affect the October 31, 2016 deadline. Ms. Hope said staff will research what could be done that would have the least disruption. Councilmember Buckshnis preferred to get done before October 3, 2016. David Pater, Regional Shoreline Planner, Washington State Department of Ecology, clarified it would not delay the SMP process, it cleans up Ecology's Required Change 5 and the changes would be reflected in the table. There would be some deviation until the CAO is updated. Mr. Lien clarified the motion as follows: WITH REGARD TO ECOLOGY REQUIRED CHANGE 5, USE 2016 ECOLOGY GUIDANCE ON WETLANDS IN THE SMP. MOTION CARRIED UNANIMOUSLY. Mr. Lien said he will return at future meeting with information regarding how it is integrated. Ecology Required Change 6 — UMU IV Interim Desi ig a� tion • UMU IV shoreline environment established as an interim designation • Required change would eliminate the interim designation • Changing interim designation would require an SMP amendment • If Council proposes to keep interim designation, a clear purpose and specific timeline should be developed with stakeholders Councilmember Buckshnis said if Ecology has already not agreed to an interim, there is no reason to use an interim. Even though she believed all the logic and past discussions on the interim, she did not support this because she did not want to waste time. Council President Johnson said she was tasked with reaching out to stakeholders to determine whether they were interested in participation in an interim designation. She reported the Port was not interested in an interim designation so there was not agreement amongst the stakeholders. Without the Port's interest in an interim designation, it does not make sense for the City to pursue it. COUNCILMEMBER TIBBOTT MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO REMOVE THE INTERIM DESIGNATION OF UMU IV FOR THE PURPOSES OF ESTABLISHING A BUFFER FOR THE SHORELINE MASTER PROGRAM. UPON ROLL CALL, MOTION CARRIED (4-3), COUNCIL PRESIDENT JOHNSON AND COUNCILMEMBERS MESAROS, TEITZEL AND TIBBOTT VOTING YES; AND COUNCILMEMBERS NELSON, FRALEY-MONILLAS AND BUCKSHNIS VOTING NO. Ecology required Change 7 — UMU IV Setback/Buffer • Council approved SMP established a 100-foot setback with the requirement to establish a 50-foot vegetative buffer within the setback with redevelopment in the UMU IV environment • Required change would establish a 65-foot setback with the requirement to establish a 50-foot vegetative buffer within the setback with redevelopment in the UMU IV environment • Larger setback/buffer vs. Smaller setback/buffer o Large setback/buffer may perpetuate status quo o Smaller setback/buffer may provide incentive for redevelopment and buffer restoration Mr. Lien displayed an aerial image of the original UMU III, explaining when it was first determined that the Edmonds Marsh was a shoreline of the state instead of an associated wetland and the shoreline Edmonds City Council Draft Minutes August 16, 2016 Page 12 Packet Pg. 17 jurisdiction was extended, a new environment for the Harbor Square and the property on the south side of the marsh (Chevron property) was established. When originally established, it was an Urban Mixed Use III environment which also included residential development. The initial proposal developed by staff included only a 25-foot setback which was based on the contract rezone for the Harbor Square property which has as 25-foot open space area adjacent to the marsh. At the Planning Board, the SMP was slowed to coincide with the Port of Edmonds Harbor Square Master Plan process so they could be discussed concurrently. The Planning Board recommended a 50-foot setback as measured from OHWM; implicit in that 50-foot setback, although not described in detail in the SMP, was with redevelopment of Harbor Square there would be enhancement of the buffer around the marsh although the amount to be revegetated was not specified. Mr. Lien continued, the Council discussed options related to the buffer and setback, including a 150-foot setback as measured from the edge of the marsh with a 50-foot vegetated buffer. This option arose from some confusion of the buffer setback issue and where it was measured from. A lot of Council discussions regarding buffers and setbacks revolved around Appendix L of a grant guidance document on three specific water quality grants. The Council wanted a 50-foot vegetated buffer and it as thought at the time that according to Appendix L a 100-foot buffer applied which was added to the 50-foot buffer for a total of 150 feet. During discussions about where buffer and setback are measured from, the Council ultimately adopted the 100-foot setback as measured from the OHWM and within the 100-foot setback a requirement to establish a 50-foot vegetated buffer with redevelopment of Harbor Square. Mr. Lien explained Ecology's required change is a 65-foot setback from the edge of the marsh with a 50- foot vegetated buffer within it. His understanding of Ecology's buffer and setback requirements consider existing conditions. Buffers provide two functions, water quality and habitat. The habitat value landward of the marsh is diminished. Water quality could be provided with a vegetated buffer and water quality can be met with a small buffer than habitat. Ecology recommended 65 feet because the CAO requires a 15- foot building setback in addition to the buffer. One of the main criteria of the SMP is meeting the no net loss requirement. He read from the SMP handbook regarding buffers and setback, "Some local governments with intensely developed shorelines have established only setbacks from the OHWM. Vegetation conservation is required and planting new vegetation and replacing noxious weeks and invasive plants with native plants and other habitat improvements are required for new or expanded development." That was implicit in the Planning Board's recommendations and somewhat more explicit in the Council's adopted 100-foot setback and 50-foot vegetated buffer as well as in Ecology's required change. hi response to questions regarding why this is different than BAS, he explained the primary reason is looking at existing conditions on the ground. As there basically is no buffer or severely impacted buffer particularly on the Harbor Square side, consideration is given to what can be done to improve exiting conditions. He suggested a smaller setback buffer may provide incentive for improvements; a larger buffer is just a line on ground when no buffer exists. Councilmember Teitzel said buffers, setbacks, shoreline setbacks and structure buffers are confusing and complicated and only apply to to UMU IV. He referred to a statement in Ecology's findings and conclusions (Attachment A, packet page 262), "SMP-required change number three requires a 50-foot buffer with a minimum 15-foot structural buffer setback." Councilmember Teitzel agreed with that logic, finding it consistent with the CAO. In order to simplify, he suggested using Ecology's language throughout the SMP related to a buffer and a structural setback. He recognized that would require changing the shoreline bulk and dimensional standards but could be done by removing the quantification footnote and stating in the UMU IV there is a 50-foot buffer and 15-foot structural setback. Councilmember Tibbott agreed with Councilmember Teitzel's suggestion for consistency in the way buffers and setbacks are described. He observed there is currently a 25-foot setback or buffer. Mr. Lien said the 1980s contract rezone for Harbor Square established General Commercial zoning with certain restrictions. The contract rezone established a 25-feet open space zone from the edge of the marsh to Edmonds City Council Draft Minutes August 16, 2016 Page 13 Packet Pg. 18 provide an ecological separation for the marsh; it is not specifically identified in the contract rezone as a buffer or setback. Councilmember Tibbott asked the difference between an open space and a vegetated buffer. Mr. Lien answered open space is a zoning term. There is a chapter in the ECDC regarding open space and allowed uses. A vegetated buffer is intended to provide some ecological benefit to an adjacent critical area, stream, wetland, etc. Two primary functions of a buffer are water quality and habitat. Generally wider buffers are driven by habitat need; water quality standards can be met with smaller buffers. If the Council adopted a 50-foot vegetated buffer, Councilmember Tibbott assumed the area north and south of the marsh would look significant different than it does today with just open space. Mr. Lien answered not immediately. The 50-foot vegetated buffer is established with redevelopment within the shoreline jurisdiction. Currently the 50-foot area is not vegetated all the way around the marsh; that buffer would be established as mitigation for development. With regard to a 15-foot setback landward of the 50- foot buffer, Councilmember Tibbott asked if impervious surfaces would be allowed in that building setback. Mr. Lien referred to page 54 of the SMP, Shoreline Bulk and Dimensional Standards; the left side of column has the different uses that could occur within shoreline jurisdiction; across the top are the shoreline environments. He referred to shore setback for commercial development in UMU IV, 150150. Footnote 18 states setback from new development with UMU IV is 100 feet; new development activities within the UMU IV environment require the establishment of a 50-foot vegetated buffer. The 100150 applies to other uses, not just structures; even parking within the UMU IV would be required to be setback 100 feet from the edge of the marsh. Ecology's required change would change 100150 in the table to 65/50. He clarified it is not just a structural setback; it is a use setback. Councilmember Tibbott asked if there are other significant uses other than buildings and parking. Mr. Lien said recreation has a 15-foot setback. Councilmember Tibbott inquired about a pervious walking trail. Mr. Lien said trails are addressed in the SMP; access to the shoreline is a critical component of the Shoreline Management Act (SMA). There are specific regulations regarding trails in the shoreline area. Councilmember Buckshnis recalled a long discussion she and Mr. Lien had with a citizen regarding comments 17-23 about the buffer and setback starting at the same point of origin which is contrary to what was done previously. She asked Mr. Lien to explain how the 100-foot buffer/setback language occurred and how the 100-foot setback and 50-foot buffer was determined. Mr. Lien referred to Comment 1 and his response (packet page 271) regarding the buffer/setback combination, "Chapter 11 of the SMP Handbook notes, "Shoreline setbacks are the distances separating two features such as a structure and the water, or a structure and the buffer." The SMP handbook also notes, "Some local governments with intensely developed shorelines have established only setbacks from the OHWM. Vegetation conservation is required." With the SMP, buffer is defined as the area adjacent to a critical area and/or shoreline that is required for the continued maintenance, function, and/or structural stability of the critical area and/or shoreline. Buffer widths vary depending on the relative quality and sensitivity of the area being protected. Unlike zoning or shore setbacks, buffer areas are intended to be left undisturbed, or may need to be enhanced to support natural processes, functions and values. Shore setback is also defined in the SMP, the minimum distance between a structure or use and the shoreline ordinary high water mark." Councilmember Buckshnis recalled the citizen saying he hoped Ecology required Edmonds to clear up this confusion and determine if the 50-foot buffer and 100-foot setback from any new development is appropriate for the UMU IV. Councilmember Nelson recalled Ecology's PowerPoint presentation regarding buffers stated the State Supreme Court ruled that under GMA there is no requirement to restore degraded buffers and that that same principle applied to the Edmonds Marsh and Harbor Square. The case, Snohomish Indian Tribal Community versus Western Washington Growth Management Hearings Board was related to the GMA and competing river and agricultural farming land. Mr. Anderson agreed it was the Skagit River and Edmonds City Council Draft Minutes August 16, 2016 Page 14 Packet Pg. 19 4.2.a reestablishing buffers on agricultural land to support salmon. Councilmember Nelson pointed out the SMA was never mentioned in that case. Mr. Anderson agreed. Councilmember Nelson asked whether the requirement not to restore degraded buffers been brought to the State Supreme Court. Mr. Anderson answered he was not aware it had but it has been reviewed as a land use issue, not taking property without due process. Mr. Pater added this is addressed in the State Shoreline Master Program Guidelines in the WAC. In Edmonds the status of the ecology function was established in 2007 with the shoreline inventory and characterization. In the case of the marsh, the inventory and characterization assumed the shoreline jurisdiction at that time went to the edge of the wetland until Mr. Anderson's research in 2010 that determined the jurisdiction extended further. That set the baseline for no net loss of ecological functions. Anything above that is considered restoration unless redevelopment of Harbor Square and Unocal sites increases the intensity of uses and warrants mitigation. Legally the State cannot force a jurisdiction to restore an area; it is purely voluntary. Councilmember Nelson observed if the baseline was established in 2007 and then further research was done in 2010, who knows what happened in those 3 years. Mr. Pater agreed it was always a moving target which was one of problems with prolonged local processes. He agreed things have changed since 2007. Councilmember Nelson said the requirement for no restoration is under WAC 173-26-241 standards which states, "Master programs shall establish a comprehensive program of use regulations for shorelines and shall incorporate provisions for specific uses consistent with the following as necessary to assure consistency with the policy of the act and where relevant within the jurisdiction." That WAC, under Commercial development states, "Master programs shall first give preference to water -dependent commercial uses over nonwater-dependent commercial uses; and second, give preference to water -related and water -enjoyment commercial uses over nonwater-oriented commercial uses" as well as "Master programs should require that public access and ecological restoration be considered as potential mitigation of impacts to shoreline resources and values for all water -related..." and "Master programs shall prohibit nonwater-oriented commercial uses on the shoreline unless they meet the following criteria: he use is part of a mixed -use project that includes water -dependent uses and provides a significant public benefit with respect to the Shoreline Management Act's objectives such as providing public access and ecological restoration." Councilmember Nelson asked how this applies to UMU IV. Mr. Pater pointed out Harbor Square is not a water -dependent use. Mr. Lien said the Edmonds Marsh is different type of shoreline environment than Puget Sound. Puget Sound has navigable waters and is appropriate for water - dependent uses; the Edmonds Marsh is not an environment where there will be water dependent uses. The SMA focuses on navigable waterways. Councilmember Nelson said restoration cannot be required yet the WAC states nonconforming uses can require restoration. Mr. Pater answered that is restoration through mitigation. Mitigation is a requirement when increasing the intensity of development. The SMA is a balancing act between public access and protecting shoreline resources and allowing water -dependent uses. Councilmember Nelson appreciated the balancing act and wanted to ensure there was a balance. He felt there was an imbalance and he wanted to restore the balance. City Attorney Jeff Taraday said there has been some confusion about restoration mitigation because of the way Ecology distinguishes between the two. The buffers the Council is discussing will only apply when redevelopment occurs. He disagreed with Ecology's conclusion that the Council was limited by what currently exists because the buffers the Council will be establishing are only relevant in the context of redevelopment, not what currently exists. COUNCILMEMBER TIBBOTT MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO ADOPT THE 65-FOOT SETBACK/BUFFER AS RECOMMENDED BY ECOLOGY. Councilmember Mesaros appreciated Mr. Taraday's clarification. He acknowledged everyone would like to have a 100-foot buffer to protect the marsh; however, that does not exist. The Council could approve that and many in the City would be happy but it would only be an approval on paper due to the amount of development that exists in that area. He expressed support for the motion, finding the 50 foot plus 15 feet Edmonds City Council Draft Minutes August 16, 2016 Page 15 Packet Pg. 20 4.2.a appropriate and that buffer will be established as redevelopment occurs. He was hopeful with this setback/buffer the Port would do something. Councilmember Fraley-Monillas did not support the motion. She was uncertain the Council was ready to determine the best buffer, whether it is a 50-foot buffer and a 15-foot setback, she was not clear that was enough. She has her own opinion about the buffer but that is irrelevant to this motion. Councilmember Nelson also opposed the motion, commenting not one size fit all. There are parts of the marsh buffer that are vegetated and parts that are not; to establish a blanket setback/buffer for the entire marsh did not make sense using BAS. For example, in the Willow Creek area where there is the intent to bring back juvenile salmon, taking away the existing buffer does not make sense. Mr. Lien clarified Councilmember Nelson's comment, explaining this buffer would only apply within shoreline jurisdiction. The southwest corner of the marsh where a buffer exists is outside outside shoreline jurisdiction and whatever buffer is established in the CAO or the wetland section of the SMP would apply in that area. The 65-foot setback/50-foot buffer would not apply because it is outside the shoreline jurisdiction. Councilmember Nelson said he still has an issue with the Harbor Square area that is much more salvageable and one size does not fit all. He said that setback/buffer was a minimum and the City can do better. Councilmember Teitzel expressed support for the motion. He explained the Council could potentially approve a 100 buffer/setback but that means Harbor Square would remain as it currently exists, dooming the marsh to the existing 12-13 foot open space and providing less opportunity for recovery over time. He wanted to see the marsh recover and the best way to do that was to give deference to Ecology's expertise. He agreed it was a balancing act and this was a compromise to improve the quality of the marsh. Councilmember Buckshnis did not support the motion. She recommended Ecology adhere to its own literature and guidance. The 50-feet was supposedly an agreed -upon amount with some stakeholders that the City was not a part of. She recalled a meeting with Mr. Stockdale at Ecology who talked about mitigation and how the area could be redone as part of redevelopment. With regard to marsh recovery, Councilmember Fraley-Monillas recalled reading that having buildings and people closer to the marsh does not help the marsh's recovery. Mr. Pater said that is not in the findings and conclusions. Mr. Lien referred to the last bullet on the PowerPoint related to Ecology Required Change 7, the buffer around the marsh is disturbed, establishing a large setback and buffer may perpetuate the status quo because there is no incentive for redevelopment. A smaller setback and buffer may provide incentive for redevelopment and establish a buffer, improving existing conditions. He concluded a larger buffer would be nice but he questioned whether that was reality or just a line on the ground. Councilmember Fraley-Monillas asked how development improved the marsh. Mr. Lien answered the buffer is not established unless redevelopment occurs. A large setback discourages redevelopment so the buffer s not established. Development and restoration are not a no sum gain; environmental and economic benefits can be realized with development. Mr. Taraday said the last bullet in the PowerPoint assumes that all other things are equal. There are other tools the Council can use to incentivize redevelopment; buffer width is a major factor but it is not the only way. He agreed in the absence of redevelopment there would not be a vegetated buffer; either redevelopment or a lot of money would be required to create a vegetated buffer. Upon the occurrence of a certain amount of redevelopment, property owners would be required to create a vegetated buffer; the Council is deliberating on how much of a vegetative buffer would be required. Edmonds City Council Draft Minutes August 16, 2016 Page 16 Packet Pg. 21 Councilmember Fraley-Monillas asked who determines the benefit of development via an incentive. Mr. Taraday answered the Council controls what it values as a beneficial development or mitigation via establishing shoreline environments, corresponding zoning, uses, building heights and other factors to incentivize development. Mr. Lien clarified the difference between what the Council adopted and what Ecology is proposing; both require establishing a 50-foot vegetated buffer, the difference is the setback. Where the Council had a 100-foot setback, Ecology is proposing a 65-foot setback, a difference of 35 feet in the setback area. Councilmember Tibbott spoke in favor of the motion. Redevelopment has the potential of establishing a vegetated buffer as well as compliance with new stormwater regulations which would be a significant improvement to the water quality that currently drains directly into marsh. Second, it would meet the no net loss requirement particularly on the southeast side of the marsh where the larger buffer that currently exists could be improved. The Council is currently discussing the setback for the SMP but in the future will be considering zoning for Harbor Square or the south side of marsh which can fine-tune in ways that cannot be done in the SMP. He was supportive of this setbackibuffer as a starting point. COUNCIL PRESIDENT JOHNSON CALLED FOR THE QUESTION. MOTION TO CALL FOR THE QUESTION CARRIED UNANIMOUSLY. UPON ROLL CALL, MAIN MOTION FAILED (3-4) COUNCILMEMBERS MESAROS, TEITZEL, AND TIBBOTT VOTING YES; COUNCIL PRESIDENT JOHNSON AND COUNCILMEMBERS NELSON, FRALEY-MONILLAS, AND BUCKSHNIS VOTING NO. Council President Johnson suggested the Council continue its discussion regarding the SMP after the following presentation. 1. OFFICE OF NEIGHBORHOODS PRESENTATION ON HOMELESS OUTREACH BY SGT. IAN HURI OF THE SNOHOMISH COUNTY SHERIFF'S DEPARTMENT Sgt. Ian Huri, Snohomish County Sheriffs Department, explained a few years ago Snohomish County realized, specifically in the jail, there was a large problem with opioid abuse and the impacts and cost it had on the community. The jail and human services at the County level partnered and determined the needs were with the frequent jail utilizers as well as those in need in the community. The needs of frequent jail utilizers do not necessarily match the needs of low income families in the community as a whole. What a family in need requires from human services and can easily acquire by following the proper channels is not the same for an opioid addict or someone with metal health problems. The issue was how first responders effectively respond to crises they are called to. The jail began a program, Jail Transitional Services, that looked at how to end the cycle of homelessness, drug abuse and provide proper mental health treatment and other post -incarceration options. The business model is broken; the cycle is patrol is called to a nuisance complaint, trespasser, shoplifter, etc., they are arrested for the crime, usually a misdemeanor level offense, booked into Snohomish County Jail, solving the problem for about eight hours. As soon as the person is released, they still do not have housing, they are still addicted and will steal, etc. to get better. When he first started in law enforcement 13 years ago, methamphetamine was a big problem in Snohomish County. Although meth addicts do crazy things under the influence, the long term impacts on their health and the community's health are very different than what is seen now. With opioid addicts, their daily goal is to get enough of the drug to not feel sick (the worst flu multiplied by ten). He described a couple of people he interviewed today, both were using over a gram of heroin/day just to keep from getting sick. One is working full-time under the table and is just getting by, has no place to live, and all the money he earns goes to heroin. Edmonds City Council Draft Minutes August 16, 2016 Page 17 Packet Pg. 22 4.2.a The Sheriff's Office started a unit called the Office of Neighborhoods that began by looking at other agencies and in-house jail studies to determine how to better serve these groups. They visited Santa Monica Police Department to learn about their community's efforts to address homelessness and tried to implement some of their programs. One giant takeaway from Santa Monica was not only did they have a very effective homeless community program that works on the municipal level, human services could be integrated with law enforcement more effectively. In the previously described cycle, people have the co- occurring problems like chemical dependency, homelessness, mental illness, were not connecting with services that were available to them. The Office of Neighborhoods includes a social worker to help law enforcement navigate those services with clients. They quickly realized simply giving someone direction wasn't effective; they were not showing up because so many have lost life skills and they are unable to proceed when encountering minor roadblocks. They realized more handholding would be required such as social workers who drive people to their appointments; very labor intensive but people began realizing they could follow through. Drug treatment is used with most clients as a way to get housing. Housing in Everett has a less than 2% vacancy rate; landlords are more likely to rent to someone with a stable income than someone working through drug treatment and has no income. With drug treatment, they qualify for a county grant problem that provides three months of free housing; their full-time job during that three months is intensive outpatient. The Office of Neighborhoods began to piece together the assets in Snohomish County and throughout the State. He noted if the existing16 detox beds in Snohomish County were doubled or tripled, they could be quickly filled. Opioid addicts go through five days of detox before inpatient. Clients are sent to Spokane, Palm Springs and elsewhere to get help. The goal is not to make them another city's problem; they want them back in Snohomish County where they grew up and where they went to local schools and they want them healthy. When clients return to Snohomish County, they go straight into the three months of free housing and three months of subsidized housing; during the second three months they complete outpatient and 90 meetings in 90 days and start looking for jobs, go back to school, and find other programs while self -managing their issues and begin tapering off the hand holding. Last year's Point in Time count found an increase in unsheltered and homeless individuals. Although below record numbers, it found a higher percentage of the homeless that are opioid addicts. The Office of Neighborhoods' approach is working; approximately 60 people began detox, 55 completed detox and went to an in -patient facility, 35 graduated and 9 are still in treatment which is much better compared to 10% national average success rate. Their program has only been in operation since August 2015 and at full-strength with him, two deputies and two social workers since March 2016. Social liberals love this idea because it is the right thing to do to help people instead of continually incarcerating people. Fiscal conservatives want to know the savings. He provided an example, Edmonds books an opioid addict into the Snohomish County jail who then hurts themselves enough to be taken to the hospital. Two custody deputies accompany the person to the hospital and remain with them, probably on overtime. The person is probably prescribed medication that is dispensed by medical personnel at the jail. The program he described was about 1/4 of that cost. The 211 program, run by Volunteers of America, manages flex funds for law enforcement and is available to any jurisdiction. Officers only need to call and ask for emergency flex funds for a person such as emergency housing for the night. He recommended the City looking for ideas and use Santa Monica as an example. The goal is law enforcement, judges, prosecutors, defense, and human services working together to help transition people from chronic homelessness into housing. Councilmember Fraley-Monillas said in working with Robin Fenton and the Law and Justice Commission, it was important for people to understand this is low barrier housing which does not prevent people from housing due to alcohol or drug addiction. She commented one of the hardest parts of getting a job and moving forward beyond treatment is not having a place to shower, wash clothes or an address. Snohomish County has the highest opioid heroin abuse in the nation. Having these services provided by the Sheriff's Office with Everett has done a lot for Everett. She thanked them for what they are doing. Edmonds City Council Draft Minutes August 16, 2016 Page 18 Packet Pg. 23 4.2.a Councilmember Buckshnis also commended the Office of Neighborhoods for their program. She asked how many clients were veterans. Sgt. Huri answered the population they have helped in Snohomish County has included four veterans who were connected with Veteran Services of Snohomish County. There are other frequent jail utilizers that have served in the military but for some reason do not claim veteran's status. Of the four, two were referred to VA Seattle for drug treatment and housing and the others were helped locally via VA Services of Snohomish County. He said Veterans Services has begun serving veterans effectively and the end result is seen on the street in that homeless veterans and under - housed veterans are not seen as frequently as they were 2-3 years ago. For Councilmember Buckshnis, Sgt. Huri explained some of the material he provided was research done by Robin Fenton and Snohomish County Human Services prior to the implementation of the Office of Neighborhoods, their reference point regarding what they have and what they need. They have a lot of opioid, mental health and homeless issues in the jail and frequent utilizers; what they need is drug treatment, low barrier housing where relapses are not the end of the world. He believes in the housing first model and has seen it work. Of the three clients who have relapsed, two are still housed and the third has been homeless for a week and is getting back into the program. Relapses are shorter and the chance of reoffending can be better managed via housing. Observing the model he described is based in Snohomish County, Council President Johnson asked what 1-2 things Edmonds could do as a city of 40,000 to make a difference. Sgt. Huri recommended getting all the stakeholders together to discuss how to solve the problem as a community. Law enforcement, human services, or fire cannot solve the problem by themselves. He recommended getting human service, police, fire, prosecutor, public defense attorney and possibly a judge together to look at frequent utilizers that hit the legal system or emergency department repeatedly, and determine how to intervene as a group. A connection between law enforcement and human services is vital. Councilmember Nelson commented the region has auto theft and gang task forces, this is obviously a regional problem and the homeless likely go to Mukilteo, Edmonds and Everett. He suggested all Snohomish County cities chip in officers and funding for a regional solution. Sgt. Huri said he was a fan of that approach; they have discussed that with some cities, providing assistance even one day a week. He agreed with a regional approach where budgets allow. 3. SHORELINE MASTER PROGRAM UPDATE - Continued Council President Johnson said this is area where the City Council could benefit from some expert advice. The Council does not have all the answers tonight which is the reason some Councilmembers were reluctant to accept Ecology's proposal. COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO NOT ACCEPT ECOLOGY'S RECOMMENDATION ON THIS SUBJECT AND COME BACK WITH AN ALTERNATIVE TO ECOLOGY. Council President Johnson reiterated neither she nor other Councilmembers have all the information. She wanted to make a decision based on science and in order for the City Council to move forward, she felt more work needed to be done. Mayor Earling asked the nature of the work. Councilmember Mesaros questioned whether a motion was needed. Rather than passing a motion saying more research was needed, he preferred to do the research. He suggested simply requesting more information, reviewing the information and making a decision. Edmonds City Council Draft Minutes August 16, 2016 Page 19 Packet Pg. 24 4.2.a Councilmember Teitzel agreed with Councilmember Mesaros, commenting the Council has received a great deal of information and can always ask for more. Councilmembers have studied the issue for many hour as well as talked to experts and stakeholders. He was frustrated and sad because although he dearly wanted to see the marsh recover and be a host to salmon and be a refuge for birds, he was concerned if the Council continued to debate the issue of setback and buffers and Council decided there should be larger buffer such as 100 feet or 150 feet, it was a hollow victory because it was on paper only and the existing conditions would continue which would not benefit the marsh or the environment. He preferred the Council have positive motion on the issue so the marsh can begin to recover. Councilmember Fraley-Monillas said if movement was desired, she was ready to propose a width tonight. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO AMEND THE MOTION TO CALL FOR A 75-FOOT BUFFER BASED ON THE WETLAND BUFFER REQUIREMENTS FOR WESTERN WASHINGTON PUBLISHED BY THE DEPARTMENT OF ECOLOGY AND A 15-FOOT SETBACK. Mayor Earling ruled the amendment was unrelated to the motion. COUNCILMEMBER BUCKSHNIS WITHDREW THE MOTION WITH THE AGREEMENT OF THE SECONDER. Council President Johnson commented the City has a history of many different setbacks, proposals and scientific tables. She needs independent advice to help her understand what is the most defensible position for the City. Once the information is provided, the Council can make a recommendation. Without sufficient evaluation of all the different requirements as well as what that means for Edmonds, this is the best step to take rather than make a decision based on a table, recommendation or position. She wanted a defensible, rational, scientifically based decision that the City can live with. Mr. Pater said that is the same thing Ecology struggled with when recommending the 50-foot buffer and 15-foot setback. The SMP was adopted in 2014 and public comment was taken in the spring. Ecology listened to everyone involved including the Port, Chevron, Unocal, WSDOT, Councilmembers and staff in an effort to move the process forward. Although he understood Council President Johnson's desire for more information, that information may not be available until the site is redeveloped. It is a complicated site and the City is charting new territory because it is a compromised system, Harbor Square is part of the wetland, there is a dike, etc. Councilmember Fraley-Monillas asked if Council President Johnson was suggesting an outside source help determine the best step. Council President Johnson agreed that was her thinking. UPON ROLL CALL, MOTION CARRIED (4-3), COUNCIL PRESIDENT JOHNSON AND COUNCILMEMBERS NELSON, FRALEY-MONILLAS AND BUCKSHNIS VOTING YES; AND COUNCILMEMBERS MESAROS, TEITZEL AND TIBBOTT VOTING NO. COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO EXTEND THE MEETING UNTIL 10:15 P.M. MOTION CARRIED UNANIMOUSLY. It was agreed the Council would continue discussing the SMP at a future meeting. 9. MAYOR'S COMMENTS Mayor Earling offered congratulations to the community and the Chamber for a successful Taste of Edmonds, with particular thanks to the Chamber for lowering the music volume. He has heard from several citizens that the volume was much better than in recent years. Edmonds City Council Draft Minutes August 16, 2016 Page 20 Packet Pg. 25 Mayor Earling relayed he introduced the concert in the park last week, attended by approximately 400 people. He encouraged citizens to attend the concerts in the park as well as the concerts at Hazel Miller Plaza. 10. COUNCIL COMMENTS Councilmember Fraley-Monillas suggested Councilmembers who attend conferences on behalf of the City provide a report to Council regarding what they learned. Councilmember Buckshnis thanked the citizens who called and emailed her regarding the quasi-judicial process. The reason she amended the motion to not have the issue scheduled on the Consent Agenda and instead take a vote at that meeting was because placing it on the Consent Agenda would simply result in it being pulled and having the same argument and the same vote. She encouraged citizens to contact Councilmembers and/or talk to the media. Council President Johnson thanked everyone who attend the Taste and helped with the Waste Management stations. The stations are a commitment by the City to have zero waste and a wonderful opportunity to educate the public regarding how to recycle everything in the waste stream. She appreciated the attendance at the Old Settlers Picnic, commenting this was the first time she attended and she was glad she did. She expressed thanks to Chris who has taken over this project for the City. Councilmember Teitzel reported in working with the postmaster and the postmaster getting input from citizens regarding the value of a downtown drive -up mailbox at 2nd and Main, the postmaster has agreed to have a box installed in the downtown core area. He, Mr. Williams and the postmaster have been looking for a location and have narrowed it to 2-3 locations. Unfortunately, the postal maintenance crew removed the existing drive -up mailbox today without the postmaster's knowledge. They will attempt to have the process of installing a new mailbox accelerated. Councilmember Mesaros reported the Pacific Little League lost to Bend, Oregon earlier this week, ending their attempt at the Little League World Series. He encouraged the public to wish the players well and was glad they had an opportunity to play in the regional playoffs. 11. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(i) This item was not needed. 12. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION This item was not needed. 13. ADJOURN With no further business, the Council meeting was adjourned at 10:09 p.m. Edmonds City Council Draft Minutes August 16, 2016 Page 21 Packet Pg. 26 4.3 City Council Agenda Item Meeting Date: 08/23/2016 Acknowledge receipt of a Claim for Damages from Anne Johnson ($500,000.00), and Frontier (amount undetermined). Staff Lead: {Type Name of Staff Lead} Department: City Clerk's Office Preparer: Linda Hynd Background/History N/A Staff Recommendation Acknowledge receipt of the Claims for Damages by minute entry. Narrative Anne Johnson ($500,000.00) Frontier Claims Department P.O. Box 60770 Oklahoma City, OK 73146-4066 (amount undetermined) Attachments: Johnson Claim for Damages_Redacted Frontier Claim 8-10-2016 Packet Pg. 27 +'CF'V9 �� CITY OF EllMONDS �U� 1 J M6 P, CLAIM FOR DAMAGES FORM Date Claim Form ' CITYCUW Received by City %1 , who currently resides a mailing address C-- home hone ork phone # f25. iaJ.04V who resided a� at the time of the occurrence and whose date of birth is '/E�1 1 is claiming damages against 1?Ti in the sum of $.5C'V Cr:)0 arising out of the following circumstances listed below. DATE OF OCCURRENCE: ! � TIME: LOCATION OF OCCURRENCE: DESCRIPTION: V i O V p.-+To r)s tF 'KCW (0 0, 1$O (yY ,d ' U 0 ' 1. Describe the conduct and circumstance that brought about the injury or damage. Also describe tlje injury or damage. 1-n ve. lov n r� N t Q C r)n �5 n (-A 1. �7 `f�1 tv r'aCarn A O Gy') L tLL yl 10/1 Q 1 (attach'an extra sheet for additional information, if Vded) 2. Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and pha a numbers. n iCLr,I L f 3. Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair. 4. Have you submitted a claim for damages to your insurance company? Yes -X— No If so, please provide the name of the insurance company: and the policy #: License Plate # _ Type Auto: (year) DRIVER: Address: Phone#: Passengers: Name: Address: * * ADDITIONAL INFORMATION REQUIRED FOR AUTOMOBILE CLAIMS ONLY Driver License # (make) (model) _ OWNER: Address: Phone#: Name: Address: m E L 0 E U N r Form Revised 05/06/14 Page 1 of 2 Packet Pg. 28 4.3.a * * NOTE: THIS FORM MUST BE SIGNED AND NOTARIZED * * I, - ape, 4 . plf+t' smn , being first duly sworn, depose and say that I am the claimant for the above described; that I have read the above claim, know the contents thereof and believe the same to be true. I further acknowledge that any information I provide as part of this claim may be considered a public record and may be subject to disclosure pursuant to RCW 42.56. X dd�� � - LL Signature of Claimant(s) State of Washington County of _ K 10-J I certify that I know or have satisfactory evidence that A-0ht; S • -�*"S,1--is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument and acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the instrument. qmp- Dated: f �Zf t � - .■DO 1# do goTgq�, Sig e� ` N i � `.. • Title J ' C�` My appointment expires: "'l %ny �j� "q ����■ WAVOZo ` Please present the completed claim form to: City Clerk's Office City of Edmonds 121 51h Avenue North Edmonds, WA, 98020 8:00 a.m. to 4:30 p.m. m ts� L �° E U tV to Fenn Revised 05/06/14 Page 2 of 2 Packet Pg. 29 ft,an-her Welcome to the New Frontier *****NOTICE OF CLAIM***** Date: 08-10-2016 CERTIFIED MAIL, RETURN RECEIPT REOUESTED To: CITY OF EDMONDS CITY CLERK CITY HALL 121 5TH AVENUE N EDMONDS, WA 98020 4.3.b CMR CLAIMS DEPARTME P.O. BOX 60770 OKLAHOMA CITY, OK 73146-0770 1-866-887-4066 CERTIFIED MAIL# 9171 9690 0935 0095 9749 31 RE: Damage to FRONTIER Property FRONTIER Claim Num: WAFR16190400 Damage/Discovery Date: 08-02-2016 Damage Location: 8001 SIERRA DR, EDMONDS, WA Damage County: SNOHOMISH Damage Amount: UNDETERMINED Dear Sir/Madam: RECEIVED A ill • r EDMONDS CITY CLERK Please be advised that FRONTIER Facilities sustained damage as a result of the negligent acts or omissions by employees or agents of CITY OF EDMONDS. Investigation has revealed that on or about 08-02-2016 employees or agents of CITY OF EDMONDS, D AND G BACKHOE WAS DOING WORK FOR THE CITY OF EDMONDS AND DAMAGED A FRONTIER BURIED CABLE in the area of 8001 SIERRA DR, EDMONDS, WA. This letter is the written presentment of FRONTIER's claim pursuant to Washington Statute (RCW 4.96.020(2)) . REQUEST FOR GOVERNMENTAL NOTICE FORM If your Governmental Entity requires the completion of its own form to complete proper notice, please forward a copy to the address listed above. Every good faith effort has been made to identify the proper office and address to perfect our notice. Please forward to your attorney, if misdirected, to contact us. Matters herein stated are alleged on information and belief this pleader believes to be true. If there is insurance to cover this matter, kindly advise as to the name of the insurance company, its address and the claim number assigned. If you have any questions, or need additional information, please contact rq�NIV"t11't'�'���.�, 1-800-321-4158 ext 8232. ��•�0CAL F,V, # 15003346 Sincerely, — E(p. 04110/19 Chelsea Dongelewic NOTARY �.F OF...OV(N- >; IIIIF1111111 CMR Claims DEPT Commission Expires N N a� E L 0 E 2 U N t0 r to 0 N 0 r E 2 U a� c 0 U- c a� E t c� Q Packet Pg. 30 4.4 City Council Agenda Item Meeting Date: 08/23/2016 Approval of claim, payroll and benefit direct deposit, checks and wire payments. Staff Lead: Scott James Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim checks #221351 through #221460 dated August 18, 2016 for $634,145.54. Approval of payroll direct deposit and checks #62286 through #62295 for $513,710.39, benefit checks #62296 through #62301 and wire payments of $562,429.15 for the pay period August 1, 2016 through August 15, 2016. Staff Recommendation Approval of claim, payroll and benefit direct deposit, checks and wire payments. Financial Impact Claims $634,145.54 Payroll Employee checks and direct deposit $513,710.39 Payroll Benefit checks and wire payments $562,429.15 Total Payroll $1,076,139.54 Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non -approval of expenditures. Attachments: claim cks 08-18-16 FrequentlyUsedProjNumbers 08-18-16 payroll summary 08-19-16 payroll benefit 08-19-16 Packet Pg. 31 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221351 8/18/2016 069798 A.M. LEONARD INC 221352 8/18/2016 061029 ABSOLUTE GRAPHIX 221353 8/18/2016 000850 ALDERWOOD WATER DISTRICT Voucher List City of Edmonds Invoice PO # Description/Account C116097380 PM: TOOLS AND SUPPLIES PM: TOOLS AND SUPPLIES 001.000.64.576.80.31.00 Tota 816238 ESCC T-SHIRTS ESCC t-shirts 138.100.21.557.21.49.00 9.8% Sales Tax 138.100.21.557.21.49.00 816328 SUMMER SOFTBALL SHIRTS SUMMER SOFTBALL SHIRTS 001.000.64.571.25.31.00 9.8% Sales Tax 001.000.64.571.25.31.00 221354 8/18/2016 060205 ALLIED BUILDING PRODUCTS CORP 14190647-00 221355 8/18/2016 001528 AM TEST INC 221356 8/18/2016 070976 AMERESCO INC 93935 1 Tota MONTHLY WHOLESALE WATER MONTHLY WHOLESALE WATER 421.000.74.534.80.33.00 Tota FAC MAINT - TRUCK SUPPLIES Fac Maint - Truck Supplies 001.000.66.518.30.31.00 9.8% Sales Tax 001.000.66.518.30.31.00 Tota WWTP: ICP SCAN & MERCURY B ICP Scan & Mercury by CVAA- 423.000.76.535.80.41.00 Tota WWTP: 7/3-7/30/16 PHASE 5 ENE 4.4.a Page: 1 c ca lid U a� CF Amoun c 0- m 614.0, 1 : 614.0, 'a 4- w c m 354.4( -a c c� 34.7< o a 1,680.2( E 164.6( u I: 2,233.9� o cu CF > 0 a 173,844.8, Q 1 : 173,844.8, r to 59.9( m ao 5.81 ao I : 65.7 , w Y � E ca 75.0( 1 : 75.0( m Ri E R .r r a Page: 1 Packet Pg. 32 vchlist 08/17/2016 9:03:24AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221356 8/18/2016 070976 AMERESCO INC (Continued) 2 221357 8/18/2016 074695 AMERICAN MESSAGING W4101046QH 221358 8/18/2016 001375 AMERICAN PLANNING ASSOCIATION 161846-1673 221359 8/18/2016 075688 ANDOR, JOHNNY 221360 8/18/2016 001634 AQUA QUIP 221361 8/18/2016 069751 ARAMARK UNIFORM SERVICES 180853-1673 080516 1017155-1 1988721342 PO # Description/Account Construction 423.100.76.594.39.65.10 Retainage 423.100.223.400 WWTP: PROF SERVICES FOR PF Professional Services (including sale 423.100.76.594.39.41.10 Tota WATER WATCH PAGER FEES Water Watch Pager Fees 421.000.74.534.80.42.00 Tota APA MEMBERSHIP-JEN MACHUG MEMBERSHIP-JEN MACHUGA 001.000.62.558.60.49.00 APA MEMBERSHIP-KERNAN LIEN MEMBERSHIP-KERNAN LIEN 001.000.62.558.60.49.00 Tota ESCC STUDENT DEL DRIVER Driving services for 2016 ESCC stu 138.200.21.557.21.49.00 Tota WWTP: CHLORINE 3" SILK TABS Chlorine 3" Silt Tabs 423.000.76.535.80.31.53 9.8% Sales Tax 423.000.76.535.80.31.53 Tota FACILITIES DIVISION UNIFORMS 4.4.a Page: 2 c ca U a� Amoun }; 0 a am 82,385.1� a� L -3,751.6( =a 4- aD c 53,008.5� 131,642.1; c� 0 4.5. a 1 : 4.5, % 4- 0 306.0( 0 a 369.0( Q 1 : 675.0( r to de 400.0( 1 : 400.0( r 0 N 499.9: U M 49.0( 6 1 : 548.9'. m E t U R .r r Q Page: 2 Packet Pg. 33 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221361 8/18/2016 069751 ARAMARK UNIFORM SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) FACILITIES DIVISION UNIFORMS 001.000.66.518.30.24.00 9.8% Sales Tax 001.000.66.518.30.24.00 1988731942 WWTP: UNIFORMS, TOWELS & MA wwtp uniforms 423.000.76.535.80.24.00 wwtp mats & towels 423.000.76.535.80.41.00 9.8% Sales Tax 423.000.76.535.80.24.00 9.8% Sales Tax 423.000.76.535.80.41.00 1988731943 PARKS MAINT UNIFORM SERVICE PARKS MAINT UNIFORM SERVICE 001.000.64.576.80.24.00 1988731944 FACILITIES DIVISION UNIFORMS FACILITIES DIVISION UNIFORMS 001.000.66.518.30.24.00 9.8% Sales Tax 001.000.66.518.30.24.00 1988735905 PUBLIC WORKS OMC LOBBY MATE PUBLIC WORKS OMC LOBBY MAT: 001.000.65.518.20.41.00 PUBLIC WORKS OMC LOBBY MATE 111.000.68.542.90.41.00 PUBLIC WORKS OMC LOBBY MATE 421.000.74.534.80.41.00 PUBLIC WORKS OMC LOBBY MATE 422.000.72.531.90.41.00 PUBLIC WORKS OMC LOBBY MATE 423.000.75.535.80.41.00 PUBLIC WORKS OMC LOBBY MATE 511.000.77.548.68.41.00 4.4.a Page: 3 c ca hd U a� Amoun }; 0 a m 24.9( a� L 2.4z =a d c 5.1( 110.9E c�a 0 0.5( c� a 10.8E U w 56.7: 0 0 24.9( a Q 2.4z r 1.6' m r ao 6.1' r 0 0 6.1' Y 6.1' •� 6.1' m 6.0E R .r r Q Page: 3 Packet Pg. 34 4.4.a vchlist Voucher List Page: 4 08/17/2016 9:03:24AM City of Edmonds ca lid Bank code : usbank U W Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221361 8/18/2016 069751 ARAMARK UNIFORM SERVICES (Continued) a 9.8% Sales Tax m 001.000.65.518.20.41.00 0.1( 9.8% Sales Tax a� L 111.000.68.542.90.41.00 0.6( =a 9.8% Sales Tax 421.000.74.534.80.41.00 0.6( 9.8% Sales Tax 422.000.72.531.90.41.00 0.6( 9.8% Sales Tax ca 423.000.75.535.80.41.00 0.6( p 9.8% Sales Tax 511.000.77.548.68.41.00 0.5t o- 1988735906 FLEET DIVISION UNIFORMS & MAT FLEET DIVISION MATS 511.000.77.548.68.41.00 17.3, 9.8% Sales Tax 4- C 511.000.77.548.68.24.00 0.6: 9.8% Sales Tax o 511.000.77.548.68.41.00 1.7( a FLEET DIVISION UNIFORMS Q 511.000.77.548.68.24.00 6.4( r Total: 300.2i 221362 8/18/2016 075721 ARCON TENANT IMPROV CONTRACTOF 080216 HYDRANT METER RENTAL - DEPO: Deposit less rental rate for 4 months,. 421.000.245.110 750.0( r Total: 750.0( o 221363 8/18/2016 072576 ARTACCESS 14119 ARTACCESS N ARTACCESS E 117.100.64.573.20.41.40 88.0( f° Total: 88.0( r c 221364 8/18/2016 064807 ATS AUTOMATION INC S 082097 ALERTON SYSTEM - PREV MAINT f E Alerton System - Prev Maint 8/1-10/3, R .r r Q Page: 4 Packet Pg. 35 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221364 8/18/2016 064807 ATS AUTOMATION INC Voucher List City of Edmonds Invoice (Continued) 221365 8/18/2016 001801 AUTOMATIC WILBERT VAULT CO 44884 221366 8/18/2016 001835 AWARDS SERVICE INC 221367 8/18/2016 069226 BHC CONSULTANTS LLC 221368 8/18/2016 075344 BIRCH, BONNIE 45053 10747 10822 7969 8/9 CONCERT HMP 221369 8/18/2016 075391 BORGNES, PHILIP A 8/9 OUTDOOR MOVIES PO # Description/Account 001.000.66.518.30.48.00 9.8% Sales Tax 001.000.66.518.30.48.00 Tota ROUGH BOX - SEAVER ROUGH BOX - SEAVER 130.000.64.536.20.34.00 ROUGH BOX - HARRISON ROUGH BOX - HARRISON 130.000.64.536.20.34.00 Tota SENIOR SOFTBALL LEAGUE LO SENIOR SOFTBALL LEAGUE LO 001.000.64.571.25.31.00 9.8% Sales Tax 001.000.64.571.25.31.00 SUMMER TENNIS TOURNAMENT SUMMER TENNIS TOURNAMENT 001.000.64.571.25.31.00 9.8% Sales Tax 001.000.64.571.25.31.00 Tota E6GA.SERVICES THRU 7/22/16 E6GA.Services thru 7/22/16 423.200.75.594.35.41.00 Tota 8/9/16 BONNIE BIRCH DUO CONC 8/9/16 BONNIE BIRCH DUO CONC 117.100.64.573.20.41.00 Tota 8/9/16 OUTDOOR MOVIES NITES 4.4.a Page: 5 c ca lid U a� Amoun }; 0 a 2,866.5( -a) 280.9, aa) L 3,147.4, 4- aD c m 460.0( c c� 530.0( 990.0( a WE E W E f° U 12.0( o M 1.1E c TI a TI Q- 167.5( Q 16.4. 1 : 197.1( r ao r ao 2,847.6E w 1: 2,847.6E E E E 250.0( 1 : 250.0( m E 2( R .r r Q Page: 5 Packet Pg. 36 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221369 8/18/2016 075391 BORGNES, PHILIPA Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 4.4.a Page: 6 c ca hd U a� _ Amoun }; 0 a 8/9/16 OUTDOOR MOVIES NITES 2( 001.000.64.571.22.41.00 2,500.0( Total: 2,500.0( i =a 221370 8/18/2016 075342 BORUCHOWITZ, ROBERT 2016-07 JULY PUBLIC DEFENSE COSTS = JULY 2016 PUBLIC DEFENSE COST 4- c 001.000.22.518.10.41.00 770.8: Total : 770.& c 221371 8/18/2016 075723 BOWEN, HOLLY 8/12 REFUND 8/12/16 REFUND CLASS CANCELLE f° 8/12/16 REFUND CLASS CANCELLE 0 L 001.000.239.200 70.0( M Total: 70.0( E 221372 8/18/2016 067391 BRAT WEAR 19502 INV#19502 - EDMONDS PD - HARD\ EMBROIDER NAME TAG ON SHIRT! ,- 001.000.41.521.22.24.00 24.0( c REMOVE/REPLACE NAMETAG-SHIP > 001.000.41.521.22.24.00 20.0( a REMOVE /REPLACE NAMETAG-JUN Q. 001.000.41.521.22.24.00 12.0( Q SEW SGT CHEVRONS ON SHIRTS, 001.000.41.521.22.24.00 20.0( 9.8% Sales Tax 001.000.41.521.22.24.00 7.4E 19503 INV#19503 - EDMONDS PD - HARD\ 00 r METAL NAMETAG - HARDWICK 001.000.41.521.22.24.00 14.9E w 9.8% Sales Tax 001.000.41.521.22.24.00 1.4 1 E Total : 99.81 'ca 221373 8/18/2016 072005 BROCKMANN, KERRY 20938 YOGA 20938 YOGA INSTRUCTION 20938 YOGA INSTRUCTION 001.000.64.571.27.41.00 180.4E t R .r r a Page: 6 Packet Pg. 37 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221373 8/18/2016 072005 BROCKMANN, KERRY 221374 8/18/2016 066578 BROWN AND CALDWELL 221375 8/18/2016 003001 BUILDERS SAND & GRAVEL Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 20944 YOGA 20944 YOGA INSTRUCTION 20944 YOGA INSTRUCTION 001.000.64.571.27.41.00 4.4.a Page: 7 c ca lid U a� Amoun }; U) 0 a m 351.0( L Total : 531.4E 'a 14272889 WWTP: 7/1-7/28/16 EDMONDS SEC a Task Order 1: Ph. 101 & Ph 102.- 423.100.76.594.39.41.10 1,953.0( O&M Professional Services: Task Orc c� 423.000.76.535.80.41.00 116.5( _ Total: 2,069.5( o 316058 PW YARD - ROCK PW Yard - Rock 111.000.68.542.31.31.00 PW Yard - Rock 422.000.72.531.40.31.00 PW Yard - Rock 421.000.74.534.80.31.00 PW Yard - Rock 423.000.75.535.80.31.00 9.8% Sales Tax 111.000.68.542.31.31.00 9.8% Sales Tax 422.000.72.531.40.31.00 9.8% Sales Tax 421.000.74.534.80.31.00 9.8% Sales Tax 423.000.75.535.80.31.00 317258 PW YARD - ROCK PW Yard - Rock 111.000.68.542.31.31.00 PW Yard - Rock 422.000.72.531.40.31.00 PW Yard - Rock c� a E 312.5( 4- 0 312.5( 0 312.5( a Q. Q 312.5E r to 30.6: m 30.6: r r 30.6< c N 30.6: U E .2 966.2' U r c m 966.2' E t U R .r r Q Page: 7 Packet Pg. 38 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221375 8/18/2016 003001 BUILDERS SAND & GRAVEL Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 423.000.75.535.80.31.00 PW Yard - Rock 421.000.74.534.80.31.00 9.8% Sales Tax 111.000.68.542.31.31.00 9.8% Sales Tax 422.000.72.531.40.31.00 9.8% Sales Tax 423.000.75.535.80.31.00 9.8% Sales Tax 421.000.74.534.80.31.00 4.4.a Page: 8 c ca lid U a� Amoun }; 0 a 966.2' -0a 966.2' aUi L =a 94.6E W c 94.6E 94.6E c�a 0 94.6E c� Total: 5,616.31 a 221376 8/18/2016 075278 BURNS, HOUSTON 8/5-8/12 FIELD ATTEN 8/5-8/12/16 SOFTBALL FIELD ATTEI` E 8/5-8/12/16 SOFTBALL FIELD ATTEI` U 001.000.64.571.25.41.00 135.0( o Total: 135.0( 16- 0 221377 8/18/2016 073029 CANON FINANCIAL SERVICES 16286969 CONTRACT CHARGE FOR COPIER a Monthly contract charge for Council Q- Q 001.000.11.511.60.31.00 27.9� 9.8% Sales Tax to 001.000.11.511.60.31.00 2.7E Total: 30.71 m r 221378 8/18/2016 068484 CEMEX LLC 9433752440 ROADWAY - ASPHALT Roadway - Asphalt r 111.000.68.542.31.31.00 105.0( w 9.5% Sales Tax 111.000.68.542.31.31.00 9.9E E 9433752441 ROADWAY - ASPHALT ca Roadway - Asphalt 111.000.68.542.31.31.00 55.0( 9.5% Sales Tax 111.000.68.542.31.31.00 5.Z R .r r Q Page: 8 Packet Pg. 39 4.4.a vchlist Voucher List Page: 9 08/17/2016 9:03:24AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221378 8/18/2016 068484 CEMEX LLC (Continued) a 9433752442 ROADWAY - ASPHALT m Roadway - Asphalt 111.000.68.542.31.31.00 55.0( i 9.5% Sales Tax 111.000.68.542.31.31.00 5.2: 9433768489 ROADWAY - ASPHALT c Roadway - Asphalt 111.000.68.542.31.31.00 55.0( 9.5% Sales Tax ca 111.000.68.542.31.31.00 5.2< o 9433768491 ROADWAY - ASPHALT Roadway - Asphalt a 111.000.68.542.31.31.00 105.0( E 9.5% Sales Tax .@ 111.000.68.542.31.31.00 9.9£ U 9433805673 ROADWAY - ASPHALT o Roadway - Asphalt 111.000.68.542.31.31.00 352.1( o 9.5% Sales Tax a 111.000.68.542.31.31.00 33.4E Q 9433813609 ROADWAY - ASPHALT r Roadway - Asphalt to 111.000.68.542.31.31.00 320.6( 9.5% Sales Tax m 111.000.68.542.31.31.00 r 30.4( 9433820861 STREET -CEMENT r Street - Cement o 111.000.68.542.61.31.00 171.7E Y 9.5% Sales Tax 111.000.68.542.61.31.00 16.3, . Total : 1,335.X 221379 8/18/2016 064291 CENTURY LINK 206-Z02-0478 r WWTP: 8/2/16 TELEMETRY CIRCU m TELEMETRY CIRCUIT LINES- E 423.000.76.535.80.42.00 147.5z R .r r Q Page: 9 Packet Pg. 40 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221379 8/18/2016 064291 064291 CENTURY LINK 221380 8/18/2016 069457 CITY OF EDMONDS Voucher List City of Edmonds Invoice (Continued) PLN20160030 PLN20160031 221381 8/18/2016 019215 CITY OF LYNNWOOD 12408 221382 8/18/2016 065519 CITY OF LYNNWOOD 2016 #2 221383 8/18/2016 075291 CLEARSTREAM RECYCLING 2017 221384 8/18/2016 072848 COPIERS NW 1423581 1423582 PO # Description/Account Tota PLN20160030 RESTROOM LAND PLN20160030 RESTROOM LAND 132.000.64.594.76.65.00 PLN20160031 RESTROOM LAND PLN20160031 RESTROOM LAND 132.000.64.594.76.65.00 Tota E7AC.SIGNAL MAINTENANCE E7AC.Signal Maintenance 112.000.68.595.33.41.00 Tota NARCOTICS BUY FUND - EDMON NARCOTICS BUY FUND - 2016 #2 104.100.41.521.21.49.00 Tota RECYCLE - BAGS / SHIPPING Recycle - Bags / Shipping 421.000.74.537.90.49.00 Tota INV#1423581 ACCT#HMH636 - ED LEASE #IRC5045 7/5 TO 8/4/16 001.000.41.521.10.45.00 9.8% Sales Tax 001.000.41.521.10.45.00 INV#1423582 ACCT#HMH636 - ED 4,425 B/W COPIES 7/5 TO 8/4/16 001.000.41.521.10.45.00 2,954 COLOR COPIES 7/5 TO 8/4/ 001.000.41.521.10.45.00 9.8% Sales Tax 001.000.41.521.10.45.00 4.4.a Page: 10 c ca lid U a� _ Amoun }; 1 : 147.51 0 am m 1,637.0( U: a c 1,662.0( 1 : 3,299.0( c c� 0 L 1,707.7( ca 1,707.7( E D M U w 5,000.0( c I: 5,000.0( > 0 Q L Q. Q 186.3( r 186.3( M m r ao 226.7, r 0 0 22.2, Y M E 35.4( 1 E 138.81 E t 17.0E .r r Q Page: 10 Packet Pg. 41 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221384 8/18/2016 072848 072848 COPIERS NW 221385 8/18/2016 064531 DINES, JEANNIE 221386 8/18/2016 075153 DOPPS, MARIA 221387 8/18/2016 007253 DUNN LUMBER 221388 8/18/2016 008705 EDMONDS WATER DIVISION Voucher List City of Edmonds Invoice PO # Description/Account 4.4.a Page: 11 c lid ca U w U _ Amoun }; (Continued) Total: 440.3' 0 m 16-3684 CITY COUNCIL MINUTES 8/02/2016 08/02/2016 CITY COUNCIL MINUTE: 001.000.25.514.30.41.00 561.0( Total: 561.0( 13397 INTERPRETER FEE INTERPRETER FEE 001.000.23.523.30.41.01 13568 INTERPRETER FEES INTERPRETER FEES 001.000.23.523.30.41.01 Tota 4132194 PM: LUMBER PM: LUMBER 001.000.64.576.80.31.00 9.5% Sales Tax 001.000.64.576.80.31.00 4138667 FAC MAINT - RAIN JACKET - D H Fac Maint - Rain Jacket - D Housler 001.000.66.518.30.24.00 9.5% Sales Tax 001.000.66.518.30.24.00 Tota 1-00655 LIFT STATION #7 71 W DAYTON S LIFT STATION #7 71 W DAYTON S 423.000.75.535.80.47.10 1-00925 LIFT STATION #8 107 RAILROAD LIFT STATION #8 107 RAILROAD 423.000.75.535.80.47.10 1-01950 LIFT STATION #1 450 SUNSET AVE LIFT STATION #1 450 SUNSET AV a c m 100.8E c c� 0 100.8E ca 1 : 201.7, E w 34.3( c c� 3.2E o OL a i a 66.3( 6.3( 1 : 110.2; T r T o 41.1 0 Y AV AV E w 44.7' U E r 44.7' E Page: 11 Packet Pg. 42 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221388 8/18/2016 008705 EDMONDS WATER DIVISION 221389 221390 221391 221392 8/18/2016 075566 EHRBAR, PAMELA 8/18/2016 031060 ELECSYS INTERNATIONAL CORP Voucher List City of Edmonds Invoice (Continued) 1-03950 1-05350 1-05705 1-13975 1-14000 BID-081216 152614 8/18/2016 008812 ELECTRONIC BUSINESS MACHINES AR44486 8/18/2016 009350 EVERETT DAILY HERALD EDH713537 PO # Description/Account OLD PUBLIC WORKS (NORTH) 20 OLD PUBLIC WORKS 200 DAYTO 421.000.74.534.80.47.00 OLD PUBLIC WORKS (SOUTH) 20 OLD PUBLIC WORKS (SOUTH) 20 421.000.74.534.80.47.00 LIFT STATION #6 100 PINE ST / M LIFT STATION #6 100 PINE ST / M 423.000.75.535.80.47.10 CITY HALL 121 5TH AVE N / METE CITY HALL 121 5TH AVE N / METE 001.000.66.518.30.47.00 CITY HALL 115 5TH AVE N / METE CITY HALL 115 5TH AVE N / METE 001.000.66.518.30.47.00 Tota ADMINISTRATIVE SERVICES 7/26 Administrative Serivices for Ed!, BID 140.000.61.558.70.41.00 Tota RADIX MONTHLY MAINTAGREEM Radix Monthly Maint Agreement - 421.000.74.534.80.48.00 Tota COPIER OVERAGE CHARGE Copier overage charges for Council 001.000.11.511.60.31.00 9.8% Sales Tax 001.000.11.511.60.31.00 LEGAL ADS-PLN20160033 Tota 4.4.a Page: 12 c ca N U) lid a� _ Amoun }; 0 0- 0 -0a +. 622.3� m L 0 0 •' 125.1E El El 83.8( R o R 602.1 1 a R R 143.9E I: 1,708.0E '0-8 > 0 L a 1,306.5( Q I : 1,306.5( r E 152.0( 1 : 152.0( co ao 0 N 11.8E E w 1.1( 6 1 : 13.0' m E t R .r r a Page: 12 Packet Pg. 43 4.4.a vchlist Voucher List Page: 13 08/17/2016 9:03:24AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221392 8/18/2016 009350 EVERETT DAILY HERALD (Continued) a LEGAL ADS-PLN20160033 m 001.000.62.558.60.41.40 56.7( Total: 56.7E i =a 221393 8/18/2016 063953 EVERGREEN STATE HEAT & A/C 31504 CITY HALL - COOLING SYSTEM REI = City Hall - Cooling System Repairs 4- c 001.000.66.518.30.48.00 235.0( 9.8% Sales Tax 001.000.66.518.30.48.00 23.0, c� Total: 258.01 o 221394 8/18/2016 066378 FASTENAL COMPANY WAMOU40798 STORM - EYEWARE L Storm - Eyeware Q" 422.000.72.531.90.24.00 43.7( . 9.8% Sales Tax f° 422.000.72.531.90.24.00 4.2� o WAMOU40854 WWTP: AB -NYLON INSERTS 1/4T AB -NYLON INSERTS 1/4T @ o 423.000.76.535.80.31.00 5.3, a 9.8% Sales Tax Q 423.000.76.535.80.31.00 0.5, Total: 53.9, 221395 8/18/2016 009815 FERGUSON ENTERPRISES INC 0517441 METER - #2036 M-METERIPERL-01 Meter - #2036 M-METERIPERL-01-0 t° r 421.000.74.534.80.34.30 2,437.8( 9.8% Sales Tax 421.000.74.534.80.34.30 238.9( w Total: 2,676.7( E 221396 8/18/2016 075536 FREGON ESE ASSOCIATES 438-007 HWY 99 SUBAREA PLAN -CONSULT M HWY 99 SUBAREA PLAN -CONSULT 001.000.62.524.10.41.00 9,317.5( Total: 9,317.5( E t R .r r Q Page: 13 Packet Pg. 44 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221397 8/18/2016 011900 FRONTIER Voucher List City of Edmonds Invoice PO # Description/Account 253-011-1177 PUBLIC WORKS OMC RADIO LINE PUBLIC WORKS OMC RADIO LINE' 001.000.65.518.20.42.00 PUBLIC WORKS OMC RADIO LINE' 111.000.68.542.90.42.00 PUBLIC WORKS OMC RADIO LINE' 421.000.74.534.80.42.00 PUBLIC WORKS OMC RADIO LINE' 423.000.75.535.80.42.00 PUBLIC WORKS OMC RADIO LINE' 511.000.77.548.68.42.00 PUBLIC WORKS OMC RADIO LINE' 422.000.72.531.90.42.00 425-712-0417 TELEMETRY CIRCUIT LINE TELEMETRY CIRCUIT LINE 421.000.74.534.80.42.00 TELEMETRY CIRCUIT LINE 423.000.75.535.80.42.00 425-712-0423 WWTP: 8/7-9/6/16 AFTER HOUR BU WWTP: AFTER HOUR BUSINESS LI 423.000.76.535.80.42.00 425-712-8251 PUBLIC WORKS OMC ALARM, FAX, PUBLIC WORKS OMC FIRE AND IN' 001.000.65.518.20.42.00 PUBLIC WORKS OMC FIRE AND IN' 111.000.68.542.90.42.00 PUBLIC WORKS OMC FIRE AND IN' 421.000.74.534.80.42.00 PUBLIC WORKS OMC FIRE AND IN' 423.000.75.535.80.42.00 PUBLIC WORKS OMC FIRE AND IN' 511.000.77.548.68.42.00 425-745-4313 CLUBHOUSE ALARM LINES 6801 M CLUBHOUSE FIRE AND INTRUSIOI` 001.000.66.518.30.42.00 4.4.a Page: 14 c ca lid U a� Amoun }; 0 a am 6.3� a� L 24.2� =a 4- 24.2� c m 24.2� c� 24.Z o L 24.3( a E 33.3E u 4- 0 33.3E 0 L Q Q. 71.2( Q r 16.Z m r 81.4: r ao 68.4( G N 68.4( 0 M 91.1E 6 c am 131.5( R .r r Q Page: 14 Packet Pg. 45 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 221397 8/18/2016 011900 FRONTIER (Continued) 425-771-4741 425-775-1344 425-775-7865 221398 8/18/2016 075163 GARCIA-GARCIA, CESAR 13719 221399 8/18/2016 011480 GAYDOS, KEN GAYDOS 07/16 221400 8/18/2016 075725 GIRLS ROCK MATH 2O913 GIRLS ROCK MAT PO # Description/Account 4.4.a Page: 15 c ca lid U a� _ Amoun }; 0 0- 425-771-4741 CEMETERY PHONE/II m 425-771-4741 CEMETERY PHONE/II 130.000.64.536.20.42.00 83.3' m L 425-775-1344 RANGER STATION 425-775-1344 RANGER STATION 001.000.64.571.23.42.00 64.6( UTILITY BILLING RADIO LINE UTILITY BILLING RADIO LINE TO FI' 421.000.74.534.80.42.00 66.5< INTERPRETER FEES INTERPRETER FEES 001.000.23.523.30.41.01 Tota Tota GAYDOS INT'L CONF OF POLICE AIRFARE TO/FM NEW MEXICO 001.000.41.521.40.43.00 CONFERENCE REGISTRATION 001.000.41.521.40.49.00 LUNCH - 7/10 @ HOTEL RESTAU 001.000.41.521.40.43.00 BREAKFAST 7/11 @ HOTEL REST) 001.000.41.521.40.43.00 BREAKFAST 7/12 @ HOTEL REST 001.000.41.521.40.43.00 SIX NIGHTS LODGING @ CONFE 001.000.41.521.40.43.00 Tota 20913 GIRLS ROCK MATH CAMP 20913 GIRLS ROCK MATH CAMP 001.000.64.571.22.41.00 937.4' o 155.3, •� 155.3, U 4- 0 RA l c� 0 429.2( a Q. 250.0( Q � 20.2( ., m 12.6( r AI 06 r 12.6( c RE w 829.4z I: 1,554.1( E r c 3,894.0( t R .r r Q Page: 15 Packet Pg. 46 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221400 8/18/2016 075725 075725 GIRLS ROCK MATH 221401 8/18/2016 075726 GORDON & MARLENE HORMAN 221402 8/18/2016 074722 GUARDIAN SECURITY SYSTEMS 221403 8/18/2016 072417 HAGAN, SUSAN 221404 8/18/2016 013140 HENDERSON, BRIAN 221405 8/18/2016 072647 HERRERA ENVIRONMENTAL Voucher List City of Edmonds Invoice PO # Description/Account 4.4.a Page: 16 c ca lid U w U _ Amoun }; (Continued) Total: 3,894.0( a m 3-15225 #611133690-TW UTILITY REFUND #611133690-TW Utility refund due to 411.000.233.000 134.9E Total: 134.9E 672903 8/11 REFUND 001 221406 8/18/2016 067862 HOME DEPOT CREDIT SERVICES 1024879 1083615 OLD PW SECURITY Old PW Security 001.000.66.518.30.48.00 Tota 8/11/16 REFUND CLASS CANCEL 8/11/16 REFUND CLASS CANCEL 001.000.239.200 Tota LEOFF 1 REIMBURSEMENT CLAI LEOFF 1 PRESC. REIMBURSEME 009.000.39.517.20.23.00 Tota ESFB.SERVICES THRU 7/1/16 ESFB.Services thru 7/1/16 422.000.72.531.90.41.00 Tota CITY HALL DEV SVC PERMIT CO City Hall Dev Svc Permit Counter 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 CITY PARK BUILDING - SUPPLIES City Park Building - Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 a c m 55.0( c 1 : 55.0( 0 L LE L E Q- 52.0( E 1 : 52.0( U w M o N' 64.8( o I : 64.8( a Q r 0 6,250.4' 1 : 6,250.4' m r r 0 71.1: Y 6.7E E r 27.7z r- E 2.61 R .r r Q Page: 16 Packet Pg. 47 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221406 8/18/2016 067862 HOME DEPOT CREDIT SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 14662 FAC MAINT TRUCK SUPPLIES Fac Maint Truck Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 2022079 FAC MAINT TRUCK SUPPLIES Fac Maint Truck Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 2022135 MUSEUM - SUPPLIES Museum - Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 22365 FAC MAINT TRUCK SUPPLIES Fac Maint Truck Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 22413 WATER - SUPPLIES Water - Supplies 421.000.74.534.80.31.00 9.5% Sales Tax 421.000.74.534.80.31.00 23197 CITY HALL - SUPPLIES City Hall - Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 24978 CITY HALL DEV SVC PERMIT CO 4.4.a Page: 17 c ca lid U a� Amoun }; 0 a a) 11.1: aa) L =a 1.0f a� c m 57.8( c� 5.5( o L 0 a 26.9: E 2.5E 4- 0 U� ca 30.9z o a Q. 2.9z Q r 251.0: m r 23.8E ao r 06 0 54.5z Y 5.1E . � Page: 17 Packet Pg. 48 vchlist 08/17/2016 9:03:24AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221406 8/18/2016 067862 HOME DEPOT CREDIT SERVICES (Continued) 33390 33391 4574259 5011507 5021744 520121 573196 PO # Description/Account 001.000.66.518.30.31.00 WATER RETURNS Water Returns 421.000.74.534.80.31.00 9.5% Sales Tax 421.000.74.534.80.31.00 WATER SUPPLIES Water Supplies 421.000.74.534.80.31.00 9.5% Sales Tax 421.000.74.534.80.31.00 CITY HALL SUPPLIES City Hall Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 CITY HALL DEV SVC PERMIT CO City Hall Dev Svc Permit Counter 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 FAC MAINT TRUCK SUPPLIES Fac Maint Truck Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 FAC MAINT SHOP SUPPLIES Fac Maint Shop Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 FAC MAINT SHOP SUPPLIES Fac Maint Shop Supplies 001.000.66.518.30.31.00 4.4.a Page: 18 U� c ca lid U a� _ Amoun }; 0 a 6.2z -0a a� L -68.8, 4 m 52.3: 0 4.9, ca a E 37.9z 3.6( o 0 0 L 23.8E a Q 2.21 r 0 18.6E m r ao 1.71 r 0 N Y 61.4< E 5.8z Page: 18 Packet Pg. 49 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221406 8/18/2016 067862 HOME DEPOT CREDIT SERVICES (Continued) 9.5% Sales Tax 001.000.66.518.30.31.00 6010068 CITY HALL DEV SVC PERMIT CO 4.4.a Page: 19 U� c ca lid U a� Amoun }; 0 a am 1.0z � 65.5E d c 6.2: c c� 10.4z o UN E 2.8. 4- 0 0.21 0 a Q. 25.8( Q r 2.4: m r 60.9E r 00 5.7� o N 29.9E .E c� 2.8: m E t R .r r Q Page: 19 Packet Pg. 50 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221406 8/18/2016 067862 HOME DEPOT CREDIT SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 421.000.74.534.80.31.00 9.5% Sales Tax 421.000.74.534.80.31.00 7096921 SEWER - SUPPLIES Sewer - Supplies 423.000.75.535.80.31.00 9.5% Sales Tax 423.000.75.535.80.31.00 8021211 FAC MAINT TRUCK SUPPLIES Fac Maint Truck Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 8024010 FAC MAINT SHOP SUPPLIES Fac Maint Shop Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 80292 ROADWAY SUPPLIES Roadway Supplies 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 8590649 ROADWAY - SUPPLIES Roadway - Supplies 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 9013361 CITY HALL DEV SVC PERMIT CO City Hall Dev Svc Permit Counter 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 9014795 GYMNASTICS SUPPLIES 4.4.a Page: 20 c ca lid U a� Amoun }; 0 a 116.8, -0a 11.1( aUi L 4- 37.9E c m 3.6' c� 0 j 44.8, , ca a 4.2E U 102.9z o 9.7E o a 0. Q 46.4E r to4.4, m r ao 92.9E 0 8.8< Y Uh 0 E 29.1 � 2 r 2.70 a0i E t R .r r Q Page: 20 Packet Pg. 51 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221406 8/18/2016 067862 HOME DEPOT CREDIT SERVICES 221407 221408 8/18/2016 073548 INDOFF INCORPORATED Voucher List City of Edmonds Invoice (Continued) 9025107 9053756 2831265 KE-19191910111 2836906 8/18/2016 068712 INSITUFORM TECHNOLOGIES LLC 141321 PO # Description/Account Gymnastics Supplies 001.000.64.571.28.31.00 9.5% Sales Tax 001.000.64.571.28.31.00 FAC MAINT SHOP SUPPLIES Fac Maint Shop Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 TRAFFIC SUPPLIES Traffic Supplies 111.000.68.542.64.31.00 9.5% Sales Tax 111.000.68.542.64.31.00 Tota WWTP: LINERS RETURNED/CRE Genuine Joe trash liners 39X56 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 WWTP: 43X46 TRASH CAN LINER Genuine Joe 43X46 TRASH CAN LI 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 WWTP: RETURNED LINERS FRO returned Genuine Joe 39X56 trash 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 Tota HYDRANT USE PERMIT DEPOSIT Hydrant Use Permit Deposit Refund 4.4.a Page: 21 c ca lid U W Amoun }; 0 a am 23.7 1 a� L 2.2E 4. W c 40.7E M 3.8, m E 1.8( 'M I: 1,624.5E U 0 DI 0 L 35.9E a Q 3.5< r S N 31.6E m r 3.1' M 00 0 ca Y -35.9� U E -3.5: 2 1 : 34.8( c R m E t U R .r r Q Page: 21 Packet Pg. 52 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 221408 8/18/2016 068712 INSITUFORM TECHNOLOGIES LLC (Continued) 221409 221410 221411 E2GB.Ret Release 8/18/2016 075661 JANET MAPLES DESIGN /IZZY GIRL BID-08052016 8/18/2016 075378 JUMPIN J'S JUMP ROPE CHAMPS 21191 JUMP ROPE CAMP 8/18/2016 072650 KCDA PURCHASING COOPERATIVE 300051685 221412 8/18/2016 074135 LAFAVE, CAROLYN 081516 PO # Description/Account 421.000.245.110 E2GB.RETAINAGE RELEASE E2GB.Retainage Release 423.000.223.400 Tota SOCIAL MEDIA MANAGEMENT 8/1 Social Media Management for 8/1-8 140.000.61.558.70.41.00 Tota 21191 JUMP ROPE CAMP INSTRU 21191 JUMP ROPE CAMP INSTRU 001.000.64.571.22.41.00 Tota INV#300051685 ACCT#100828 - E HON COMFORTASK CHAIRS 001.000.41.521.22.35.00 9.8% Sales Tax 001.000.41.521.22.35.00 Tota ESCC STUDENT DELEGATION mileage for ESCC student delegatio 138.100.21.557.21.49.00 ESCC student delegation welcome 138.100.21.557.21.49.00 ESCC student delegation luncheon 138.100.21.557.21.49.00 ESCC student delegation lucheons 138.100.21.557.21.49.00 ESCC student delegation UW Activi 138.100.21.557.21.49.00 ESCC student delegation lunches 4.4.a Page: 22 c ca lid U W _ Amoun }; 0 a 950.0( -0) U a� L 6,901.5z 1 : 7,851.5� W 4 a0i /1 510.0( 1 : 510.0( — 0 L C >' 0 C 0' 2,047.5( , I: 2,047.5( w DI 0 0 978.6( o a Q. 95.9( Q I : 1,074.5( n r 15.0( s di r 247.3( c Y 150.9< 113.1( ty 56.3( t R .r r Q Page: 22 Packet Pg. 53 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221412 8/18/2016 074135 LAFAVE, CAROLYN 221413 8/18/2016 075016 LEMAY MOBILE SHREDDING 221414 8/18/2016 069862 MAKERS ARCHITECTURE AND 221415 8/18/2016 019582 MANOR HARDWARE 221416 8/18/2016 019920 MCCANN, MARIAN 221417 8/18/2016 075722 MSC INDUSTRIAL SUPPLY Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 138.100.21.557.21.49.00 ESCC student delegation thank you 138.100.21.557.21.49.00 Tota 4487511 INVOICE#4487511 SHREDDING S INVOICE#4487511- 001.000.25.514.30.41.00 INVOICE#4487511- 001.000.31.514.23.41.00 Tota 1438-21 ECDC REWRITE -CONSULTING ECDE REWRITE -CONSULTING 001.000.62.524.10.41.00 1438-22 ECDC REWRITE ADDENDUM -CO ECDC REWRITE ADDENDUM -CO 001.000.62.524.10.41.00 Tota 728634-00 TRAFFIC - TOOL REPAIR Traffic - Tool Repair 111.000.68.542.64.48.00 9.8% Sales Tax 111.000.68.542.64.48.00 4.4.a Page: 23 c ca lid U a� Amoun }; 0 a 129.5, -0a c +. 3.7£ L 1 : 716.0E Ef a c m 2.3< c c� 2.3: o 1 : 4.6E c� a E 2,935.0( N: w 0 N: 369.2E c I: 3,304.2E a 0. i a 0 36.0( 3.5< Total : 39.5: ao r 50 LEOFF 1 REIMBURSEMENT CLAIM o LEOFF 1 LTC REIMBURSEMENT Y 009.000.39.517.20.29.00 8,410.5( Total: 8,410.5( 11009196 WWTP: PVC TYPE I SHEETS PVC TYPE I SHEETS m 423.000.76.535.80.31.00 82.3, E R .r r Q Page: 23 Packet Pg. 54 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221417 8/18/2016 075722 MSC INDUSTRIAL SUPPLY Voucher List City of Edmonds Invoice (Continued) 221418 8/18/2016 075559 MUSIC CENTER OF THE NORTHWEST 8/7 CONCERT CP 221419 8/18/2016 074724 NEWMAN-BURROW LLC 221420 8/18/2016 075724 NORMAN, BILL 221421 8/18/2016 025690 NOYES, KARIN 221422 8/18/2016 063511 OFFICE MAX INC 51733 8/10 REFUND 000 00 670 654083 734860 PO # Description/Account 9.8% Sales Tax 423.000.76.535.80.31.00 Tota 8/7/16 CONCERT CP CENTERPIE( 8/7/16 CONCERT CP CENTERPIE( 117.100.64.573.20.41.00 Tota FALL DIGITAL CRAZE FALL DIGITAL CRAZE 001.000.64.571.22.49.00 Tota 8/10/16 REFUND 8/10/16 REFUND 001.000.239.200 Tota PLANNING BOARD MIN-7.27.16 PLANNING BOARD MIN-7.27.16 001.000.62.558.60.41.00 Tota PW - OFFICE SUPPLIES PW - Office Supplies 001.000.65.518.20.31.00 9.8% Sales Tax 001.000.65.518.20.31.00 PM: CARTRIDGES, USB DRIVES PM: CARTRIDGES, USB DRIVES 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 4.4.a Page: 24 c ca lid U a� Amoun }; 0 a am 8.0 1 90.35 =a 4- aD c 500.0( 500.0( c c� 0 512.0( ca 512.0( E U 8.0( o 8.0( > 0 L Q Q. Q 245.0( r 245.0( m r ao 31.9( o 0 3.1z Y E 201.9( r 19.8( Total : 256.8E R .r r Q Page: 24 Packet Pg. 55 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 221423 8/18/2016 070166 OFFICE OF THE STATE TREASURER July, 2016 221424 8/18/2016 073714 OLBRECHTS & ASSOC PLLC 221425 8/18/2016 064068 PACIFIC ART PRESS JULY HE SVCS 65765 PO # Description/Account COURT, BLDG CODE & JIS TRANSIN Emergency Medical Services & Traun 001.000.237.120 PSEA 1, 2 & 3 Account 001.000.237.130 Building Code Fee Account 001.000.237.150 State Patrol Death Investigation 001.000.237.330 Judicial Information Systems Account 001.000.237.180 School Zone Safety Account 001.000.237.200 Washington Auto Theft Prevention 001.000.237.250 Traumatic Brain Injury 001.000.237.260 Accessible Communities Acct 001.000.237.290 Multi -Model Transportation 001.000.237.300 Hwy Safety Acct 001.000.237.320 Crime Lab Blood Breath Analysis 001.000.237.170 WSP Hwy Acct 001.000.237.340 Total JULY HE SVCS PLN20160031 PLN21 JULY HE SVCS PLN20160031 PLN21 132.000.64.594.76.41.00 Total STAGES BROCHURE STAGES BROCHURE 4.4.a Page: 25 c ca lid U a� Amoun }; 0 a am 1,344.5' a� L 27,133.1' =a 4- 209.0( c m 41.8E c� 6,359.8< 0 L 96.4z a E 2,662.0( 'M U w 525.4( 0 33.3: o a Q. 33.3: Q 66.5' 42.8: 238.1' 38,786.4; w v E 2 784.0( U 784.0( r c m E t U R .r r Q Page: 25 Packet Pg. 56 vchlist 08/17/2016 9:03:24AM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 221425 8/18/2016 064068 PACIFIC ART PRESS (Continued) 123.000.64.573.20.49.00 9.8% Sales Tax 123.000.64.573.20.49.00 Tota 221426 8/18/2016 065051 PARAMETRIX INC 21-24106 WWTP: 7/3-7/31/16 PLC&SCADA Tota 221428 8/18/2016 073871 PERSONNEL EVALUATION INC 19651 INV 19651 EDMONDS PD - JULY 2 PEP ONLINE TEST (2) 001.000.41.521.10.41.00 Tota 221429 8/18/2016 064552 PITNEY BOWES 06906203 CANCELATION CONTRACT#16077 CANCELATION OF PITNEY BOWE 001.000.25.514.30.45.00 Tota 221430 8/18/2016 028860 PLATT ELECTRIC SUPPLY INC J974488 WWTP: FORCE K/O PCH FORCE K/O PCH 423.000.76.535.80.48.00 9.8% Sales Tax 4.4.a Page: 26 SY c ca lid U a� Amoun }; 0 0- 518.7( -a) 50.8: aa) L I : 569.5: a c c( 17,172.8( en c� 4,080.0( o 11,028.3E ma- 1 32,281.2! U 4- 0 166.0( 0 16.2 1 a 1 : 182.2 i Q 0' r 40.0( " 1 : 40.0( ao 3( r ao S c 250.0( 1 : 250.0( 1,443.1z r a Page: 26 Packet Pg. 57 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221430 8/18/2016 028860 PLATT ELECTRIC SUPPLY INC 221431 8/18/2016 072384 PLAY-WELLTEKNOLOGIES 221432 8/18/2016 073231 POLYDYNE INC 221433 8/18/2016 029117 PORT OF EDMONDS 221434 8/18/2016 075719 ROOSENDAAL, CRAIG 221435 8/18/2016 075637 SCHNEIDER, P DIANE Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 423.000.76.535.80.48.00 J989838 WWTP: SRNRELF CRDCN, COND ISRNRELF CRDCN, CONDUITS, R 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 Tota 21202 LEGO CAMPS 21202 LEGO CAMPS 21202 LEGO CAMPS 001.000.64.571.22.41.00 21203 LEGO CAMPS 21203 LEGO CAMPS 21203 LEGO CAMPS 001.000.64.571.22.41.00 Tota 1069227 WWTP: CLARIFLOC Clarifloc 423.000.76.535.80.31.51 Tota 03870 PORT RIGHT-OF-WAY LEASE FO PORT RIGHT-OF-WAY LEASE FO 422.000.72.531.90.51.00 Tota BLD2016-0648 PERMIT REFUND PERMIT REFUND 001.000.257.620 Tota 13606 INTERPRETER FEE INTERPRETER FEE 001.000.23.523.30.41.01 4.4.a Page: 27 c ca lid U a� Amoun }; 0 a 141.4< -0a U +. D L 48.8 1 4.7� c I : 1,638Z c c� R R 2,352.0( ca a 2,688.0( •� I: 5,040.0( w 0 0 8,184.0( a I : 8,184.0( Q r � 2,770.7� " I : 2,770.75 t° ao ao 0 900.0( Y 1 : 900.0( r 107.6. or) Total: 107.6, E t R .r r Q Page: 27 Packet Pg. 58 4.4.a vchlist Voucher List Page: 28 08/17/2016 9:03:24AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221436 8/18/2016 072733 SCHWING BIOSET INC 61416310 WWTP: FILTER CARTRIDGE PD10 0 FILTER CARTRIDGE PD10 a 423.000.76.535.80.31.00 238.9z Freight L 423.000.76.535.80.31.00 16.6z =a Total: 255.51 a� 221437 8/18/2016 074911 SEATTLE HEALTHY POOLS 390 YOST POOL TILE WORK m YOST POOL TILE WORK 001.000.64.576.80.41.00 414.0( 9.8% Sales Tax — 0 001.000.64.576.80.41.00 40.5 1 391 YOST POOL LANE LINES a YOST POOL LANE LINES 125.000.64.576.80.31.00 874.0E 9.8% Sales Tax 125.000.64.576.80.31.00 85.6E o 397 YOST POOL TILE WORK 0 YOST POOL TILE WORK 0 0 001.000.64.576.80.41.00 L 322.0( 0- 9.8% Sales Tax Q 001.000.64.576.80.41.00 31.5( Total: r 1,767.81 221438 8/18/2016 074906 SITE WORKSHOP LLC 4220 VETERANS PLAZA LANDSCAPE AR ., VETERANS PLAZA LANDSCAPE AR m r 132.000.64.594.76.41.00 1,562.2E °r° Total: 1,562.2E c 221439 8/18/2016 065803 SKYHAWKS SPORTS ACADEMY 20900 SKYHAWKS 20900 SKYHAWKS N 20900 SKYHAWKS E 001.000.64.571.25.41.00 542.5( 'ca 20901 SKYHAWKS 20901 SKYHAWKS 20901 SKYHAWKS 001.000.64.571.25.41.00 1,721.2E 20905 SKYHAWKS 20905 SKYHAWKS R .r r Q Page: 28 Packet Pg. 59 4.4.a vchlist Voucher List Page: 29 08/17/2016 9:03:24AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221439 8/18/2016 065803 SKYHAWKS SPORTS ACADEMY (Continued) a 20905 SKYHAWKS 001.000.64.571.25.41.00 625.6, 20906 SKYHAWKS 20906 SKYHAWKS aci L 20906 SKYHAWKS 001.000.64.571.25.41.00 828.1 , E. 20907 SKYHAWKS 20907 SKYHAWKS w c 20907 SKYHAWKS 001.000.64.571.25.41.00 2,247.5( -o 20911 SKYHAWKS 20911 SKYHAWKS 20911 SKYHAWKS o 001.000.64.571.25.41.00 1,666.2E j, Total: 7,631.21 a 221440 8/18/2016 037303 SNO CO FIRE DIST # 1 16-113 INV#16-113 - EDMONDS PD NITRILE GLOVES - LARGE U 001.000.41.521.22.31.00 394.8( p NITRILE GLOVES - MEDIUM 001.000.41.521.22.31.00 98.7( p NITRILE GLOVES - EXTRA LARGE a 001.000.41.521.22.31.00 98.7( Q 9.8% Sales Tax 001.000.41.521.22.31.00 r 58.0: Total: 650Z v 221441 8/18/2016 037801 SNO CO HUMAN SERVICE DEPT 1000416702 Q2-16 LIQUOR BOARD PROFITS &' r Quarterly Liquor Board Profits 00 r 001.000.39.566.10.51.00 1,742.6, c Quarterly Liquor Excise Taxes w 001.000.39.566.10.51.00 854.1' Total: 29596.7! E 221442 8/18/2016 037375 SNO CO PUD NO 1 2002-0255-4 WWTP: 7/7-8/8/16 FLOW METER 24 WWTP: 7/7 - 8/8/16 FLOW METER 2 c 423.000.76.535.80.47.62 18.5, t 2004-9683-4 LIFT STATION #10 17526 TALBOT R R .r r Q Page: 29 Packet Pg. 60 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221442 8/18/2016 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account (Continued) LIFT STATION #10 17526 TALBOT R 423.000.75.535.80.47.10 2006-5164-4 PARK MAINTENANCE SHOP PARK MAINTENANCE SHOP 001.000.64.576.80.47.00 2007-2302-1 TRAFFIC LIGHT 961 PUGET DR / MI TRAFFIC LIGHT 961 PUGET DR / MI 111.000.68.542.64.47.00 2008-6924-6 CIVIC CENTER PLAYFIELD BLEACF CIVIC CENTER PLAYFIELD BLEACF 001.000.64.576.80.47.00 2011-8453-8 HICKMAN PARK HICKMAN PARK 001.000.64.576.80.47.00 2014-3123-6 PEDEST CAUTION LIGHT 9110 OLY PEDEST CAUTION LIGHT 9110 OLY 111.000.68.542.64.47.00 2014-5305-7 CIVIC CENTER PLAYFIELD LIGHTS CIVIC CENTER PLAYFIELD LIGHTS 001.000.64.576.80.47.00 2017-9000-3 ALDERWOOD INTERIE 6130 168TH ALDERWOOD INTERIE 6130 168TH 421.000.74.534.80.47.00 2019-2988-2 WWTP: 7/7-8/8/16 FLOW METER 84 WWTP FLOW METER 8421 244TH 423.000.76.535.80.47.62 2022-5062-7 9TH/CASPER LANDSCAPED BED 9TH/CASPER LANDSCAPED BED 001.000.64.576.80.47.00 2022-8945-0 TRAFFIC LIGHT 21931 HWY 99 / ME TRAFFIC LIGHT 21931 HWY 99 / ME 111.000.68.542.64.47.00 2044-2584-7 LIFT STATION #2 702 MELODY LN / LIFT STATION #2 702 MELODY LN / 423.000.75.535.80.47.10 4.4.a Page: 30 c ca lid U a� Amoun }; 0 a am 58.1: a� L 728.3� V. a) c m 24.3( c� 0 31.2: j, 0 a E 74.2z 4- 0 15.1 0 0 L a Q. 58.5: Q r 0 21.1E m r ao 18.5z r 0 0 N Y 15.7< E 76.1: c m E 37.8( R .r r Q Page: 30 Packet Pg. 61 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221442 8/18/2016 037375 037375 SNO CO PUD NO 1 221443 8/18/2016 069043 SOLEIL, MAYA 221444 8/18/2016 038300 SOUND DISPOSAL CO 221445 8/18/2016 072319 SUNSET BAY RESORT 221446 8/18/2016 074877 SYRENS VOICE 4.4.a Voucher List Page: 31 City of Edmonds ca lid U a� Invoice PO # Description/Account Amoun }; (Continued) Total: 1,178.0' 0 m 8/11 CONCERT HMP 8/11/16 CONCERT HMP MAYA SOLE 8/11/16 CONCERT HMP MAYA SOLE U W 117.100.64.573.20.41.00 600.0( Total: 600.0( 4- a� 104757 WWTP: 7/16 ROLLOFF ASH DISPO: m Ash Disposal for WWTP 423.000.76.535.80.47.65 3,422.1 E c 20921 BEACH CAMP 20929 BEACH CAMP 8/4 CONCERT HMP 221447 8/18/2016 040917 TACOMA SCREW PRODUCTS INC 18126185 18126668 18127078 Tota 20921 BEACH CAMP 20921 BEACH CAMP 001.000.64.571.22.41.00 20929 BEACH CAMP SLEEPOVER 20929 BEACH CAMP SLEEPOVER 001.000.64.571.22.41.00 Tota 8/4/16 CONCERT HMP SEASTAR 8/4 CONCERT HMP 117.100.64.573.20.41.00 Tota STORM - MARKING PAINT, SUPPL Storm - Marking Paint, Supplies 422.000.72.531.40.31.00 9.8% Sales Tax 422.000.72.531.40.31.00 STORM -WORK GLOVES Storm -Work Gloves 422.000.72.531.90.24.00 9.8% Sales Tax 422.000.72.531.90.24.00 ROADWAY - SUPPLIES Roadway - Supplies 3,422.1( 0 L a 13,588.0( E U w 11,448.0( o 25,036.0( > 0 L Q Q. Q 400.0( r 400.0( m r ao 287.0' r 0 28.1 < Y E 174.9, Page: 31 Packet Pg. 62 vchlist 08/17/2016 9:03:24AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221447 8/18/2016 040917 TACOMA SCREW PRODUCTS INC (Continued) 221448 8/18/2016 073621 TANIMURA, NAOAKI 221449 8/18/2016 075491 TAYLOR'S EXCAVATORS INC 21068 KENDO 21069 KENDO E3DB.Pmt 7 221450 8/18/2016 075139 THE LOUIS BERGER GROUP INC 108311 221451 8/18/2016 075560 TREJO SAVANI, ELSPETH 221452 8/18/2016 068407 TROUT UNLIMITED 221453 8/18/2016 062693 US BANK 8/14 CONCERT 21216 FISH FOR KIDS 0781 PO # Description/Account 111.000.68.542.31.31.00 9.8% Sales Tax 111.000.68.542.31.31.00 Tota 21068 KENDO INSTRUCTION 21068 KENDO INSTRUCTION 001.000.64.571.27.41.00 21069 KENDO INSTRUCTION 21069 KENDO INSTRUCTION 001.000.64.571.27.41.00 Tota E3DB.PMT 7 THRU 6/3/16 E3DB.Pmt 7 thru 6/3/16 112.000.68.595.33.65.00 E3DB.Ret. 7 112.000.223.400 Tota E4FE.SERVICES THRU 7/1/16 E4FE.Services thru 7/1/16 422.200.72.594.31.41.00 Tota 8/14 CONCERT ORCHESTRA ZAR 8/14 CONCERT ORCHESTRA ZAR 117.100.64.573.20.41.00 Tota 21216 FISHING FOR KIDS INSTR 21216 FISHING FOR KIDS INSTR 001.000.64.571.22.41.00 Tota COUNCIL CREDIT CARD 4.4.a Page: 32 c ca lid U a� Amoun }; 0 a 79.9: 7.8z aa) L 594.9� 4- a� c m 228.0( c c� 1,361.0( 1,589.0( a E ns U 49,653.0� o -2,482.6( c 47,170.4: a Q. Q r CO 6,076.5( 1 : 6,076.5( " m r A A r ao 1,100.0( c 1 : 1,100.0( Y UC E UC 169.4( 1 : 169.4( y E t R .r r Q Page: 32 Packet Pg. 63 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221453 8/18/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) PCC Food for Counicl Meeting 001.000.11.511.60.31.00 QFC Food for Council Meeting 001.000.11.511.60.31.00 Office Depot - Namebadges for Coun 001.000.11.511.60.31.00 Coscto - July 4 Parade Supplies 001.000.11.511.60.31.00 2519 INV#2519 08/08/16 - POLICE #1 - El MAIL FLASHLIGHTS FOR REPAIR 001.000.41.521.10.42.00 AIRFAIR/KINNEY-BCKGRD CHECK 001.000.41.521.40.43.00 MEAL/KINNEY-BCKGRD CHECK 001.000.41.521.40.43.00 FUEL/KINNEY-BCKGRD CHECK 001.000.41.521.40.43.00 PARKING/KINNEY-BCKGRD CHECK 001.000.41.521.40.43.00 MEAL/KINNEY-BCKGRD CHECK 001.000.41.521.40.43.00 LODGING/KINNEY-BCKGRD CHECI• 001.000.41.521.40.43.00 PROMOTION CERT - HARDWICK 001.000.41.521.10.31.00 2985 WWTP: 8/16 CC-STAPLER,MICROP Staples - USB Microphone & Cable- 423.000.76.535.80.35.00 Market Forge Door Gasket Replacem 423.000.76.535.80.48.00 3249 PASSPORT MAILING PASSPORT MAILING 001.000.23.512.50.42.00 3314 INV#3314 08/08/16 - LAWLESS - ED 4.4.a Page: 33 c ca lid U a� Amoun }; 0 a am 53.6' a� L 6.9£ =a µ.. 98.7( c m 191.8z c ca 0 16.8( L>% c� a 783.2( 24.4E 4- 0 24.01 0 L 46.7E Q Q 40.2' r 0 218.9( m r 120.0 1 a0 r ao 0 192.7' U 32.9E c 109.6E t U R .r r Q Page: 33 Packet Pg. 64 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221453 8/18/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) FATAL PLUS SOLUTION -ANIMAL CC 001.000.41.521.70.31.00 250 - 1OX13 BROWN ENVELOPES 001.000.41.521.10.31.00 250 - 9X12 BROWN ENVELOPES 001.000.41.521.10.31.00 3520 INV#3520 08/08/16 - POLICE #2 - EE ENERGIZER 2032 BATTERIES 001.000.41.521.22.31.00 DURACELL 9 V BATTERIES 001.000.41.521.22.31.00 LEATHER MTRCYCL JACKET-STRU 001.000.41.521.71.24.00 OMNIVORE 1 YR REN. 7/21-7/20/17 001.000.41.521.21.35.00 EPD PROMO PENS 001.000.41.521.10.31.00 FEDEX CHG #16-16747,17080 001.000.41.521.10.42.00 FEDEX CHG #16-17518 001.000.41.521.10.42.00 FEDEX CHG RETURN TO BRATWE/ 001.000.41.521.10.42.00 FEDEX CHG #15-3344 001.000.41.521.10.42.00 FEDEX CHG #13664 001.000.41.521.10.42.00 FEDEX CHG #16-18386 001.000.41.521.10.42.00 4675 NORBERTS: SPOTTING BELT FOR NORBERTS: SPOTTING BELT FOR 001.000.64.571.28.31.00 ARTS NORTHWEST: MEMBERSHIP 117.100.64.573.20.49.00 4.4.a Page: 34 c ca lid U a� Amoun }; 0 a am 75.5( a� L 38.2E =a 4- 42.1 � c m 16.7: c�a 0 20.81 L>% c� a 1,230.0( 99.0( U 4- 0 270.9: 0 L 15.4: a Q 15.3' r 14.0' m r 17.5( ao r ao 17.5( N 15.3' U 482.6, m 145.0( t U R .r r Q Page: 34 Packet Pg. 65 4.4.a vchlist Voucher List Page: 35 08/17/2016 9:03:24AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221453 8/18/2016 062693 US BANK (Continued) a ORIENTAL TRADING CO: SUPPLIES m 001.000.64.571.28.31.00 218.4E AMAZON: TENNIS NET a0i L 001.000.64.576.80.31.00 334.0( 15 FASTSIGNS: SIGN LF 117.200.64.575.50.49.00 121.0E VISTAPRINT: EXPO BANNERS 001.000.64.571.22.31.00 168.8' QUICKEXHIBITS: EXPO BANNERS- 001.000.64.571.22.31.00 440.8: p AMAZON: LAMINATING POUCH WA 001.000.64.571.22.31.00 44.6z a EBAY: ALPHABET ANIMALS FOR FP 001.000.64.571.28.31.00 31.91, 5 CONSUMER CRAFTS: SUMMER CA 001.000.64.571.28.31.00 w 15.6E C AMAZON: CAMP GT STORAGE SHE f° 001.000.64.571.26.31.00 58.1. o OFFICE DEPOT: WOTS SUPPLIES Q' Q. 117.100.64.573.20.31.00 253.9� Q AMAZON: WELDER ADAPER GENE r 001.000.64.576.80.31.00 92.6< AMAZON: CAMP GT STORAGE SHE 001.000.64.571.26.31.00 58.1, 4697 MAYOR'S MEETING LUNCH ao Sno Cty Cities Dinner 001.000.21.513.10.49.00 35.0( markers 138.200.21.557.21.31.00 13.9E poster paints 5 138.200.21.557.21.31.00 29.9� 6 brush set c 138.200.21.557.21.31.00 9.3E E glitter markers R .r r Q Page: 35 Packet Pg. 66 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221453 8/18/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 138.200.21.557.21.31.00 2016 Mayor's Meeting Luncheon 001.000.21.513.10.49.00 2016 Mayor's Meeting luncheon tip 001.000.21.513.10.49.00 2016 Mayor's Meeting luncheon ice 001.000.21.513.10.49.00 ESCC student delegation Burke Muse 138.100.21.557.21.49.00 ESCC student delegation Mariners 138.100.21.557.21.49.00 EASC Port Report 001.000.21.513.10.49.00 ESCC welcome dinner supplies 138.100.21.557.21.49.00 9.8% Sales Tax 138.200.21.557.21.31.00 9.8% Sales Tax 001.000.21.513.10.49.00 5179 COMPUTER STUFF Amazon - Wellness Committee suppl 001.000.22.518.10.49.00 Amazon - iPad cases for Water/Sewe 421.000.74.534.80.35.00 Amazon - iPad cases for Water/Sewe 423.000.75.535.80.35.00 Newegg.com - Intel NUC BOXNUC61! 001.000.31.518.88.35.00 Newegg.com - Kingston 8GB Ram 2E 001.000.31.518.88.35.00 Curvature - Catalyst 3650 Standalone 001.000.31.518.87.35.00 Newegg.com - ORICO M31-14 High Sr 001.000.31.518.88.31.00 4.4.a Page: 36 c ca lid U W Amoun }; 0 a 14.9( -0) 1,799.4( i =a 150.0( W c 5.01 50.0( c�a 0 360.0( L>% ca a 25.0( 117.7� U 0 2.Z 0 L 176.3: a Q r 38.9( 140.4' m r ao 140.4' o 0 1, 322.2, 91.6z 2, 099.8 0 m 110.81 t R .r r Q Page: 36 Packet Pg. 67 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221453 8/18/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Newegg.com - Intel NUC BOXNUC61! 001.000.31.518.88.35.00 Newegg.com - Kingston ValueRAM 81 001.000.31.518.88.35.00 BulkRegister.com - Domain Name 001.000.31.518.88.49.00 Newegg.com - APC Back -UPS ES 35 001.000.31.518.88.31.00 Abe's of Maine - Samsung 4K UHD 001.000.31.518.88.35.00 Newegg.com - Intel NUC BOXNUC61! 001.000.31.518.88.35.00 Newegg.com - Rosewill RCDC-1401E? 001.000.31.518.88.31.00 BulkRegister - Domain Name Registri 001.000.31.518.88.49.00 Amazon - Microsoft Power Supply for 001.000.31.518.88.31.00 Newegg.com - ID TECH IDMB-33513 001.000.31.518.88.31.00 Amazon - Surface Pen for Surface 3 - 001.000.31.518.88.31.00 Newegg.com - ASUS VE228H 21.5" f 001.000.41.521.22.35.00 Symantec - File Share Encryption 1 y 001.000.31.518.88.41.00 5593 RECORDING FEES SNOHOMISH COUNTY RECORDINC 421.000.74.534.80.49.00 SNOHOMISH COUNTY RECORDINC 423.000.75.535.80.49.00 SNOHOMISH COUNTY RECORDINC 421.000.74.534.80.49.00 SNOHOMISH COUNTY RECORDINC 4.4.a Page: 37 c ca lid U W Amoun }; 0 a a) 1,215.8E a) L 91.6z =a 4- 117.8z m 139.7( c� 2,987.0( 0 L 1,243.9< a E 43.3< 'ca U 29.9E 0 53.0E o a Q. 106.0( Q r 45.8E 240.9,1 t° ao 576.4( 0 N 122.0( M 122.0( u Page: 37 Packet Pg. 68 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221453 8/18/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 423.000.75.535.80.49.00 5923 PAPER, OFFICESPACE ONLINE LIS Paper for Edmonds business surveys 001.000.61.558.70.31.00 Reservation for Economic Alliance 001.000.61.558.70.49.00 Registration for VisitSeattle.org 001.000.61.558.70.49.00 Monthly business property database 001.000.61.558.70.41.00 Registration for Patrick Doherty to 001.000.61.557.20.49.00 7081 WFOA TRAINING FOR D TURLEY WFOA - CAFR Training Advanced Gc 001.000.31.514.23.49.00 7476 INV#7476 08/08/16 - BARD - EDMOI` STREAMLIGHT FLASHLIGHTS 001.000.41.521.40.35.00 TLO SEARCHES 7/2016 001.000.41.521.21.41.00 7483 MAYOR'S MONTHLY LUNCHEON MI July Mayor's luncheon meeting 001.000.21.513.10.49.00 August Mayor's luncheon meeting 001.000.21.513.10.49.00 8296 WFOA CONFERENCE FOR S JAME WFOA 2016 Annual Conference 001.000.31.514.20.49.00 8304 US BANK VISA BILL BAREFOOT STUDENT - MEMBERS[ 001.000.22.518.10.41.40 CL JOB POSTING ASS GYM/YOUTH 001.000.22.518.10.41.40 CL JOB POSTING PARKS BEAUTIFI 4.4.a Page: 38 c ca lid U W Amoun }; 0 a 17.0( -0) U a� L 26.3( 4- 35.0( c m 60.0( c� 100.0( o L 275.0( a E 300.0( w 0 251.4z o a Q. 26.2: Q r to 13.0( m r 14.0( ao r 06 0 325.0( Y U E 100.0( 45.0( a0i E t R .r r Q Page: 38 Packet Pg. 69 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221453 8/18/2016 062693 US BANK Voucher List City of Edmonds Invoice (Continued) 8304 9821 221454 8/18/2016 044960 UTILITIES UNDERGROUND LOC CTR 6070126 PO # Description/Account 001.000.22.518.10.41.40 CL JOB POSTING REC LEADER - G 001.000.22.518.10.41.40 CL JOB POSTING GYM INST. 001.000.22.518.10.41.40 CL JOB POSTING PARKS LABOREF 001.000.22.518.10.41.40 NEOGOV CONFERENCE - YVONNE 001.000.22.518.10.49.00 BAREFOOT STUDENT MEMBERSHI BAREFOOT STUDENT - MEMBERS[ 001.000.22.518.10.41.40 INV#9821 08/08/16 - GREENMUN - E BIANCHI RADIO HOLDER 001.000.41.521.22.35.00 OTTERBOX IPHONE CASE 001.000.41.521.22.35.00 SHIPPING TRAINING SUPPLIES 001.000.41.521.10.42.00 REG-MEHL/INVEST OFFICER SHOC 001.000.41.521.40.49.00 REG-SCHEELE/PROP ROOM MGT 001.000.41.521.40.49.00 BOOK -UNDERSTAND POLICE KILLI 001.000.41.521.40.31.00 USB CABLES FOR PATROL CARS 001.000.41.521.40.31.00 Total UTILITIES UNDERGROUND LOCATI UTILITIES UNDERGROUND LOCATI 421.000.74.534.80.41.00 UTILITIES UNDERGROUND LOCATI 422.000.72.531.90.41.00 4.4.a Page: 39 c ca lid U a� Amoun }; 0 CL 45.0( -0) 45.0( aa) L =a 90.0( 4- W c 90.0( M 825.0( m 0 L -50.0( a E to 35.1, w 0 25.1 ' 0 L 13.5( a Q 299.0( r 0 375.0( m r 25.5 0 r ao 34.7E o 23,642.9' Y U E 89.4( c m 89.4( E t R .r r Q Page: 39 Packet Pg. 70 vchlist 08/17/2016 9:03:24AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221454 8/18/2016 044960 UTILITIES UNDERGROUND LOC CTR (Continued) PO # Description/Account 4.4.a Page: 40 lid ca U w U _ Amoun }; 0 0- UTILITIES UNDERGROUND LOCATI 423.000.75.535.80.41.00 92.1( Total: 270.9( L 221455 8/18/2016 075720 VAN TASSELL, KATRINA BID-073016 PRODUCTION & EDITING OF VIDE =a = Production & editing of video clips to 4- c 140.000.61.558.70.41.00 300.0( Total : 300.0( c 221456 8/18/2016 047200 WA RECREATION & PARK ASSOC 986 FALL SUMMIT CORT f° FALL SUMMIT CORT 0 L 001.000.64.571.22.49.00 149.0( ca Total: 149.0( E 221457 8/18/2016 068259 WA ST CRIMINAL JUSTICE 201126915 INV 201126915 EDMONDS PD - MEI- HANDGUN INSTRUCTOR 1 - MEHL ,- 001.000.41.521.40.49.00 750.0( c Total: 750.0( > 0 L 221458 8/18/2016 075155 WALKER MACY LLC P3282.01-3 CIVIC FIELD MASTER PLAN 0- Q. CIVIC FIELD MASTER PLAN Q 125.000.64.576.80.41.00 r 14,636.7�to Total : 14,636.7t 221459 8/18/2016 072634 WHISTLE WORKWEAR 87428 WATER - WORK JEANS (5) P ROCH m Water - Work Jeans (5) P Rochford o 421.000.74.534.80.24.00 193.4E r 9.5% Sales Tax c 421.000.74.534.80.24.00 18.3E Y TR-299652 FAC MAINT - WORK JEANS (4) - J R Fac Maint - Work Jeans (4) - J Rolfe E 001.000.66.518.30.24.00 170.9( 9.2% Sales Tax 001.000.66.518.30.24.00 15.7: TR-300377 FAC MAINT - WORK JEANS - D HOL E R .r r Q Page: 40 Packet Pg. 71 vchlist 08/17/2016 9:03:24AM Bank code : usbank Voucher Date Vendor 221459 8/18/2016 072634 WHISTLE WORKWEAR Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 4.4.a Page: 41 c ca lid U a� _ Amoun }; 0 a r a) 238.4z a� L 21.9z =a Total : 658.9( aD 221460 8/18/2016 073079 ZONES INC K04093410101 INV#K04093410101 CUST#0058931' m PENTEX PERFORATED PAPER ROL 001.000.41.521.11.31.00 951.2( 9.8% Sales Tax 0 001.000.41.521.11.31.00 93.2, L 110 Vouchers for bank code : usbank 110 Vouchers in this report Fac Maint - Work Jeans - D Housle 001.000.66.518.30.24.00 9.2% Sales Tax 001.000.66.518.30.24.00 Tota Bank tota Total voucher 1: 1,044.4; a 1 : 634,145.51 .E s : 634,145.51 c Page: 41 Packet Pg. 72 r 4.4.b PROJECT NUMBERS (By Project Title) Project Engineering ui Accounting Project 41 a� Funding Project Title Number Number E STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE Q STR 15th St. SW Walkway (Edmonds Way to 8th Ave) c424 E3DC 3 SWR 2013 Sanitary Sewer Pipe Rehabilitation c390 E2GB c SWR 2013 Sewerline Replacement Project c398 E3GA STR 2014 Chip Seals c451 E4CB rn a� STM 2014 Drainage Improvements c433 E4FA STM 2014 Lake Ballinger Associated Projects c436 E4FD N STR 2014 Overlay Program c438 E4CA WTR 2014 Waterline Overlays c452 E4CC v STM 2014 Willow Creek Daylighting/Edmonds Marsh Restoration c435 E41FC L STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STR 2015 Overlay Program c463 E5CA m SWR 2015 Sewerline Overlays i007 E5CC SWR 2015 Sewerline Replacement Project c441 E4GA STR 2015 Traffic Calming c471 E5AB p L WTR 2015 Waterline Overlays c475 E5CB WTR 2015 Waterline Replacement Program c440 E4J13 STR 2016 Overlay Program i008 E6CA v SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA o SWR 2016 Sewerline Overlays i010 E6CC WTR 2016 Water Comp Plan Update c460 E4JC WTR 2016 Waterline Overlays i009 E6CB Q WTR 2016 Waterline Replacement Projects c468 E5JA SWR 2017 Sanitary Sewer Replacement Project i013 E6GA co WTR 2017 Waterline Replacement Projects i014 E6J13 m STR 220th Street Overlay Project c462 E4CD r STM 224th & 98th Drainage Improvements c486 E6FB c WTR 224th Waterline Relocation (2013) c418 E3J13 STR 228th St. SW Corridor Improvements i005 E7AC m E STR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD Z STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB o a STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA y STM 3rd Ave Rain Gardens i012 E6FC STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA r STR 9th Avenue Improvement Project c392 E2AB s m FAC AN Upgrades - Council Chambers c476 E5LA Li STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE a� STR ADA Transition Plan s016 E6DB E t STR Bikelink Project c474 E5DA PRK City Spray Park c417 E4MA r Q SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB Revised 8/16/2016 Packet Pg. 73 4.4.b PROJECT NUMBERS (By Project Title) Funding Project Title Protect Engineering Accounting Project Number Number SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 ESJB Revised 8/16/2016 Packet Pg. 74 4.4.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number STM Dayton Street & SR104 Storm Drainage Alternatives c374 ElFM PM Dayton Street Plaza c276 E7MA STM Dayton Street Storm Improvements (6th Ave - 8th Ave) c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE FAC Edmonds Fishing Pier Rehab c443 E4MB STM Edmonds Marsh Feasibility Study c380 E2FC General Edmonds Waterfront Access Analysis c478 E5DB FAC ESCO III Project c419 E3LB WTR Five Corners Reservoir Re -coating c473 E51KA STIR Five Corners Roundabout (212th Street SW @ 84th Avenue W) c342 E1AA PM Fourth Avenue Cultural Corridor c282 E8MA STIR Hwy 99 Enhancements (Phase III) c405 E2AD SWR Lake Ballinger Trunk Sewer Study sol l E5GB STM LID Retrofits Perrinville Creek Basin c434 E4FB SWR Lift Station #1 Basin & Flow Study c461 E4GC STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon) m013 E7FG STM Perrinville Creek Culvert Replacement c376 E1 FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC FAC Public Safety Controls System Upgrades c444 E4LA STM Seaview Park Infiltration Facility c479 E5FD WWTP Sewer Outfall Groundwater Monitoring c446 E4HA STIR SR104 Corridor Transportation Study c427 E3AB STIR SR104/City Park Mid -Block Crossing c454 E4DB STIR SR99 Safety Improvements (224th to 216th) s014 E6AA UTILITIES Standard Details Updates solo E5NA STM Storm Drainage Improvements - 88th & 194th c429 E3FG STIR Sunset Walkway Improvements c354 E1 DA STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/l06th Ave W Storm Improvements c430 E3FH STIR Trackside Warning System c470 E5AA STIR Train Trench - Concept c453 E4DA STIR Transportation Plan Update c391 E2AA STM Update Stormwater Management Code & Associated Projects c467 E5FB UTILITIES Utility Rate Update s013 E6JA PRK Veteran's Plaza c480 E6MA STM Video Assessment of Stormwater Lines c459 E4FF WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 8/16/2016 Packet Pg. 75 4.4.b PROJECT NUMBERS (By Engineering Number) Engineering Project Project Accounting Funding Number Number Project Title STR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STR 368 ve W at 212th St SW Intersection Improvements STR E1DA c354 Sunset Walkway Improvements STM yton Street & SR104 Storm Drainage Alternatives STM E1 FN c376 Perrinville Creek Culvert Replacement STR ransportation Plan Updat STR E2AB c392 9th Avenue Improvement Project STR E2AD NE1Wy 99 Enhancements (Phase STM E2FA c378 North Talbot Road Drainage Improvements STM SW Edmonds Basin #3-238th St. SW t an Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study SWR 0 2013 Sanitary Sewer Pipe Rehabilitation STR E3AB c427 SR104 Corridor Transportation Study STR 238th St. SW Walkway (100th Ave to 104th Ave) STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) STR E3 c425 236th St. SW Walkway (Edmonds Way to Madrona School) STR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study STM E3FE c410 Northstream Pipe Abandonment on Puget Drive STM E3FG c429 Storm Drainage Improvements - 88th & 194th STM E3FH c430 SW Edmonds-1 05th/1 06th Ave W Storm Improvements SWR E3GA c398 2013 Sewerline Replacement Pr ' WTR E3J13 c418 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Proje INV STR E4CA c438 2014 Overlay Program STR E4CB c451 2014 Chip Seals WTR E4CC c452 2014 Waterline Overlays STR E4CD c462 220th Street Overlay Project STR E4DA c453 Train Trench - Concept STR E4DB c454 SR104/City Park Mid -Block Crossing STM E4FA c433 2014 Drainage Improvements STM c434 LID Retrofits Perrinville Creek Basin STM E4FC c435 2014 Willow Creek Daylighting/Edmonds Marsh Restoration NET c436 2014 Lake Ballinger Associated Projects STM E4FE c455 Dayton Street Stormwater Pump Station `STM Video Assessment of Stormwater Lines SWR E4GA c441 2015 Sewerline Replacement Project `,SWR Citywide CIPP Sewer Rehab Phase I SWR E4GC c461 Lift Station #1 Basin & Flow Study T to Revised 8/16/2016 Packet Pg. 76 4.4.b PROJECT NUMBERS (By Engineering Number) Engineering Project Proiect Accounting N Funding Number Number Project Title E WWTP E4HA c446 Sewer Outfall Groundwater Monitoring WTR E4JB c440 2015 Waterline Replacement Program WTR E4JC c460 2016 Water Comp Plan Update FAC E4LA c444 Public Safety Controls System Upgrades PRK E4MA c417 City Spray Park c� FAC E4MB c443 Edmonds Fishing Pier Rehab c� STIR E5AA c470 Trackside Warning System +; STIR E5AB c471 2015 Traffic Calming p STIR E5CA c463 2015 Overlay Program WTR E5CB c475 2015 Waterline Overlays v m SWR E5CC i007 2015 Sewerline Overlays STIR E5DA c474 Bikelink Project d General E5DB c478 Edmonds Waterfront Access Analysis m STM E51FA c466 2015 Citywide Drainage Improvements/Rehab Projects C STM E5FB c467 Update Stormwater Management Code & Associated Projects cc STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) A STM E5FD c479 Seaview Park Infiltration Facility Q. STM E51FE c484 12th Ave & Sierra Stormwater System Improvements SWR E5GA c469 2016 Sanitary Sewer Replacement Projects c� SWR E5GB s011 Lake Ballinger Trunk Sewer Study WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5JA c468 2016 Waterline Replacement Projects Q WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) Q' Q WTR E5KA c473 Five Corners Reservoir Re -coating co FAC E5LA c476 AN Upgrades - Council Chambers UTILITIES E5NA solo Standard Details Updates STIR E6AA s014 SR99 Safety Improvements (224th to 216th) STIR E6CA i008 2016 Overlay Program r 0 WTR E6CB i009 2016 Waterline Overlays N L SWR E6CC i010 2016 Sewerline Overlays STIR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) Z STIR E6DB s016 ADA Transition Plan L STM E61FA i011 Northstream Culvert Repair Under Puget Drive IL STM E6FB c486 224th & 98th Drainage Improvements STM E6FC i012 3rd Ave Rain Gardens SWR E6GA i013 2017 Sanitary Sewer Replacement Project r SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II m L UTILITIES E6JA s013 Utility Rate Update u_ WTR E6J13 i014 2017 Waterline Replacement Projects N PRK E6MA c480 Veteran's Plaza E STIRE7AC i005 228th St. SW Corridor Improvements r Q STM E7FG m013 NPDES (Students Saving Salmon) PM E7MA c276 Dayton Street Plaza Revised 8/16/2016 Packet Pg. 77 4.4.b PROJECT NUMBERS (By Engineering Number) Engineering Project Proiect Accounting Funding Number Number Proiect Title PM EBMA c282 Fourth Avenue Cultural Corridor Revised 8/16/2016 Packet Pg. 78 4.4.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Proiect Accounting Funding Number Number Proiect Title PM E7MA c276 Dayton Street Plaza PM E8MA c282 Fourth Avenue Cultural Corridor STIR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STIR E1 DA c354 Sunset Walkway Improvements STIR E1CA c368 76th Ave W at 212th St SW Intersection Improvements STM E1 FM c374 Dayton Street & SR104 Storm Drainage Alternatives STM E1 FN c376 Perrinville Creek Culvert Replacement STM E21FA c378 North Talbot Road Drainage Improvements STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study SWR E2GB c390 2013 Sanitary Sewer Pipe Rehabilitation STIR E2AA c391 Transportation Plan Update STIR E2AB c392 9th Avenue Improvement Project SWR E3GA c398 2013 Sewerline Replacement Project STIR E2AD c405 Hwy 99 Enhancements (Phase III) STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study STM E31FE c410 Northstream Pipe Abandonment on Puget Drive PRK E4MA c417 City Spray Park WTR E3J13 c418 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Project STIR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STIR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) STIR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) STIR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STIR E3AB c427 SR104 Corridor Transportation Study STM E3FG c429 Storm Drainage Improvements - 88th & 194th STM E3FH c430 SW Edmonds-1 05th/1 06th Ave W Storm Improvements STM E41FA c433 2014 Drainage Improvements STM E4FB c434 LID Retrofits Perrinville Creek Basin STM E4FC c435 2014 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 2014 Lake Ballinger Associated Projects STIR E4CA c438 2014 Overlay Program WTR E4J13 c440 2015 Waterline Replacement Program SWR E4GA c441 2015 Sewerline Replacement Project FAC E4MB c443 Edmonds Fishing Pier Rehab FAC E41-A c444 Public Safety Controls System Upgrades WWTP E4HA c446 Sewer Outfall Groundwater Monitoring STIR E4CB c451 2014 Chip Seals WTR E4CC c452 2014 Waterline Overlays Revised 8/16/2016 Packet Pg. 79 4.4.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting N Funding Number Number Project Title j_ STR E4DA c453 Train Trench - Concept STR E4DB c454 SR104/City Park Mid -Block Crossing STM E4FE c455 Dayton Street Stormwater Pump Station SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I STM E4FF c459 Video Assessment of Stormwater Lines c� WTR E4JC c460 2016 Water Comp Plan Update c� SWR E4GC c461 Lift Station #1 Basin & Flow Study +; STR E4CD c462 220th Street Overlay Project p STR E5CA c463 2015 Overlay Program STM E51FA c466 2015 Citywide Drainage Improvements/Rehab Projects v m STM E5FB c467 Update Stormwater Management Code & Associated Projects WTR E5JA c468 2016 Waterline Replacement Projects d SWR E5GA c469 2016 Sanitary Sewer Replacement Projects m STR E5AA c470 Trackside Warning System C STR E5AB c471 2015 Traffic Calming cc STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) A WTR E51KA c473 Five Corners Reservoir Re -coating Q. STR E5DA c474 Bikelink Project WTR E5CB c475 2015 Waterline Overlays c� FAC E5LA c476 AN Upgrades - Council Chambers General E5DB c478 Edmonds Waterfront Access Analysis STM E5FD c479 Seaview Park Infiltration Facility Q PRK E6MA c480 Veteran's Plaza Q' Q WWTP E5HA c481 WWTP Outfall Pipe Modifications co WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) STM E5FE c484 12th Ave & Sierra Stormwater System Improvements STR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) STM E6FB c486 224th & 98th Drainage Improvements r 0 SWR E6GB c488 Citywide CIPP Sewer Rehab Phase IICD N L STR E7AC i005 228th St. SW Corridor Improvements SWR E5CC i007 2015 Sewerline Overlays Z STR E6CA i008 2016 Overlay Program L WTR E6CB i009 2016 Waterline Overlays IL SWR E6CC i010 2016 Sewerline Overlays t°n STM E61FA iol 1 Northstream Culvert Repair Under Puget Drive STM E6FC i012 3rd Ave Rain Gardens r SWR E6GA i013 2017 Sanitary Sewer Replacement Project s d L WTR E6J13 i014 2017 Waterline Replacement Projects u_ STM E7FG m013 NPDES (Students Saving Salmon) N UTILITIES E5NA solo Standard Details Updates E SWR E5GB s011 Lake Ballinger Trunk Sewer Study t r Q UTILITIES E6JA s013 Utility Rate Update STR E6AA s014 SR99 Safety Improvements (224th to 216th) Revised 8/16/2016 Packet Pg. 80 4.4.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Proiect Accounting Funding Number Number Proiect Title STIR E6DB s016 ADA Transition Plan Revised 8/16/2016 Packet Pg. 81 4.4.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Protect Funding Protect Title Number Number FAC A/V Upgrades - Council Chambers c476 E5LA FAC Edmonds Fishing Pier Rehab c443 E4MB FAC ESCO III Project c419 E3LB FAC Public Safety Controls System Upgrades c444 E41-A General Edmonds Waterfront Access Analysis c478 E5DB PM Dayton Street Plaza c276 E7MA PM Fourth Avenue Cultural Corridor c282 E8MA PRK City Spray Park c417 E4MA PRK Veteran's Plaza c480 E6MA STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE STM 2014 Drainage Improvements c433 E4FA STM 2014 Lake Ballinger Associated Projects c436 E4FD STM 2014 Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STM 224th & 98th Drainage Improvements c486 E6FB STM 3rd Ave Rain Gardens i012 E6FC STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1 FM STM Dayton Street Storm Improvements (6th Ave - 8th Ave) c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE STM Edmonds Marsh Feasibility Study c380 E2FC STM LID Retrofits Perrinville Creek Basin c434 E4FB STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon) m013 E7FG STM Perrinville Creek Culvert Replacement c376 E1 FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC STM Seaview Park Infiltration Facility c479 E5FD STM Storm Drainage Improvements - 88th & 194th c429 E3FG STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH STM Update Stormwater Management Code & Associated Projects c467 E5FB STM Video Assessment of Stormwater Lines c459 E4FF STR 15th St. SW Walkway (Edmonds Way to 8th Ave) c424 E3DC STR 2014 Chip Seals c451 E4CB STR 2014 Overlay Program c438 E4CA STR 2015 Overlay Program c463 E5CA STR 2015 Traffic Calming c471 E5AB Revised 8/16/2016 Packet Pg. 82 4.4.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Protect Fundinq Protect Title Number Number STR 2016 Overlay Program i008 E6CA STR 220th Street Overlay Project c462 E4CD STR 228th St. SW Corridor Improvements i005 E7AC STR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STR 9th Avenue Improvement Project c392 E2AB STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE STR ADA Transition Plan s016 E6DB STR Bikelink Project c474 E5DA STR Five Corners Roundabout (212th Street SW @ 84th Avenue W) c342 E1AA STR Hwy 99 Enhancements (Phase III) c405 E2AD STR SR104 Corridor Transportation Study c427 E3AB STR SR104/City Park Mid -Block Crossing c454 E4DB STR SR99 Safety Improvements (224th to 216th) s014 E6AA STR Sunset Walkway Improvements c354 E1 DA STR Trackside Warning System c470 E5AA STR Train Trench - Concept c453 E4DA STR Transportation Plan Update c391 E2AA SWR 2013 Sanitary Sewer Pipe Rehablitation c390 E2GB SWR 2013 Sewerline Replacement Project c398 E3GA SWR 2015 Sewerline Overlays i007 E5CC SWR 2015 Sewerline Replacement Project c441 E4GA SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2016 Sewerline Overlays iolo E6CC SWR 2017 Sanitary Sewer Replacement Project i013 E6GA SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB SWR Lake Ballinger Trunk Sewer Study sol l E5GB SWR Lift Station #1 Basin & Flow Study c461 E4GC UTILITIES Standard Details Updates solo E5NA UTILITIES Utility Rate Update s013 E6JA WTR 2014 Waterline Overlays c452 E4CC WTR 2015 Waterline Overlays c475 E5CB WTR 2015 Waterline Replacement Program c440 E4JB WTR 2016 Water Comp Plan Update c460 E4JC WTR 2016 Waterline Overlays io09 E6CB WTR 2016 Waterline Replacement Projects c468 E5JA WTR 2017 Waterline Replacement Projects i014 E6JB WTR 224th Waterline Relocation (2013) c418 E3JB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 E5JB WTR Five Corners Reservoir Re -coating c473 E5KA Revised 8/16/2016 Packet Pg. 83 PROJECT NUMBERS (By Project Title) 4.4.b Funding Project Title WWTP Sewer Outfall Groundwater Monitoring WWTP WWTP Outfall Pipe Modifications Project Engineering Accounting Project Number Number c446 E4HA c481 E5HA Revised 8/16/2016 Packet Pg. 84 Payroll Earnings Summary Report City of Edmonds Pay Period: 781 (08/01/2016 to 08/15/2016) Hour Type Hour Class Description Hours Amount -ed2 REGULAR HOURS Educational Pay Correction 0.00 -156.28 111 ABSENT NO PAY LEAVE 40.00 0.00 112 ABSENT NO PAY NON HIRED 16.00 0.00 118 ABSENT UNPAID L & 1 13.00 0.00 120 SICK SICK LEAVE - L & 1 28.00 629.54 121 SICK SICK LEAVE 335.42 12,028.77 122 VACATION VACATION 1,914.75 70,559.80 123 HOLIDAY HOLIDAY HOURS 10.00 454.65 124 HOLIDAY FLOATER HOLIDAY 28.00 870.57 125 COMP HOURS COMPENSATORY TIME 219.75 8,175.86 129 SICK Police Sick Leave L & 1 144.00 5,137.49 130 COMP HOURS Holiday Compensation Used 39.00 1,442.75 131 MILITARY MILITARY LEAVE 40.00 1,673.64 141 BEREAVEMENT BEREAVEMENT 61.00 2,521.20 150 REGULAR HOURS Kelly Day Used 188.00 6,823.35 155 COMP HOURS COMPTIME AUTO PAY 61.53 2,773.59 160 VACATION MANAGEMENT LEAVE 1.00 65.67 190 REGULAR HOURS REGULAR HOURS 16,806.65 593,198.55 193 REGULAR HOURS LIGHT DUTY 4.50 101.18 205 OVERTIME HOURS OVERTIME .5 112.50 1,972.31 210 OVERTIME HOURS OVERTIME -STRAIGHT 7.50 234.25 215 OVERTIME HOURS WATER WATCH STANDBY 48.00 2,258.25 216 MISCELLANEOUS STANDBY TREATMENT PLANT 13.00 1,301.70 220 OVERTIME HOURS OVERTIME 1.5 493.75 32,146.05 225 OVERTIME HOURS OVERTIME -DOUBLE 3.50 207.93 410 MISCELLANEOUS WORKING OUT OF CLASS 0.00 111.53 411 SHIFT DIFFERENTIAL SHIFT DIFFERENTIAL 0.00 1,031.11 600 RETROACTIVE PAY RETROACTIVE PAY 0.00 1,280.20 602 COMP HOURS ACCRUED COMP 59.50 0.00 604 COMP HOURS ACCRUED COMP TIME 122.50 0.00 606 COMP HOURS ACCRUED COMP TIME 4.50 0.00 acc MISCELLANEOUS ACCREDITATION PAY 0.00 24.95 acs MISCELLANEOUS ACCRED/POLICE SUPPORT 0.00 143.91 boc MISCELLANEOUS BOC II Certification 0.00 84.53 08/17/2016 Packet Pg. 85 Payroll Earnings Summary Report City of Edmonds Pay Period: 781 (08/01/2016 to 08/15/2016) 4.4.c Hour Type Hour Class Description Hours Amount colre MISCELLANEOUS Collision Reconstructionist 0.00 107.89 cpl MISCELLANEOUS TRAINING CORPORAL 0.00 147.28 crt MISCELLANEOUS CERTIFICATION III PAY 0.00 622.35 ctr MISCELLANEOUS CTR INCENTIVES PROGRAM 0.00 75.00 det MISCELLANEOUS DETECTIVE PAY 0.00 102.75 det4 MISCELLANEOUS Detective 4% 0.00 989.84 ed1 EDUCATION PAY EDUCATION PAY 2% 0.00 731.26 ed2 EDUCATION PAY EDUCATION PAY 4% 0.00 891.06 ed3 EDUCATION PAY EDUCATION PAY 6% 0.00 5,117.28 fmla ABSENT FAMILY MEDICAL/NON PAID 48.00 0.00 k9 MISCELLANEOUS K-9 PAY 0.00 102.75 Iq1 LONGEVITY LONGEVITY PAY 2% 0.00 888.29 Ig10 LONGEVITY LONGEVITY 5.5% 0.00 396.36 Ig11 LONGEVITY LONGEVITY PAY 2.5% 0.00 737.53 Iq2 LONGEVITY PAY LONGEVITY PAY 4% 0.00 997.22 Iq3 LONGEVITY PAY LONGEVITY 6% 0.00 5,661.69 Iq4 LONGEVITY Lonqevitv 1 % 0.00 240.75 Iq6 LONGEVITY Lonqevitv .5% 0.00 274.08 Iq7 LONGEVITY Lonqevitv 1.5% 0.00 931.11 Iq9 LONGEVITY Lonqevitv 3.5% 0.00 82.46 mels SICK Medical Leave Sick 40.00 1,630.91 mtc MISCELLANEOUS MOTORCYCLE PAY 0.00 200.57 pds MISCELLANEOUS Public Disclosure Specialist 0.00 47.12 phv MISCELLANEOUS PHYSICAL FITNESS PAY 0.00 1,923.49 prof MISCELLANEOUS PROFESSIONAL STANDARDS SER 0.00 157.56 sdp MISCELLANEOUS SPECIAL DUTY PAY 5% 0.00 514.51 sqt MISCELLANEOUS ADMINISTRATIVE SERGEANT 0.00 157.56 traf MISCELLANEOUS TRAFFIC 0.00 323.67 20,903.35 $771,149.39 Total Net Pay: $513,710.39 08/17/2016 Packet Pg. 86 4.4.d Benefit Checks Summary Report City of Edmonds Pay Period: 781 - 08/01/2016 to 08/15/2016 Bank: usbank - US Bank Check # Date Payee # Name Check Amt 62296 08/19/2016 chap1 CHAPTER 13 TRUSTEE 50.00 62297 08/19/2016 epoa2 EPOA-POLICE 2,925.00 62298 08/19/2016 epoa3 EPOA-POLICE SUPPORT 388.00 62299 08/19/2016 flex NAVIA BENEFIT SOLUTIONS 789.99 62300 08/19/2016 teams TEAMSTERS LOCAL 763 5,111.30 62301 08/19/2016 icma VANTAGE TRANSFER AGENTS 304884 2,149.81 11,414.10 Bank: wire - US BANK Check # Date Payee # Name Check Amt 2432 08/19/2016 awc AWC 321,036.93 2435 08/19/2016 wadc WASHINGTON STATE TREASURER 19,766.00 2436 08/19/2016 us US BANK 109,040.15 2437 08/19/2016 mebt WTRISC FBO #N3177131 94,624.55 2440 08/19/2016 pb NATIONWIDE RETIREMENT SOLUTION 5,715.92 2441 08/19/2016 flex NAVIA BENEFIT SOLUTIONS 158.00 2442 08/19/2016 oe OFFICE OF SUPPORT ENFORCEMENT 673.50 551,015.05 Grand Totals: 562,429.15 8/ 17/2016 .r .y O Direct Deposit 0.00 0.00 i 0.00 0.00 0.00 c 0.00 c 0.00 0 L Q Direct Deposit E M 0.00 0 0.00 0 0.00 0 0.00 0 0.00 L a 0.00 Q 0.00 m 0.00 v co 0.00 a6 0 0 a c m 0 L Q d E t V a Q Packet Pg. 87 5.1 City Council Agenda Item Meeting Date: 08/23/2016 Economic Development Commission Presentation (20 min.) Staff Lead: Patrick Doherty Department: Economic Development Preparer: Patrick Doherty Background/History From June of 2009 through December 2015 a 17-member Citizens Economic Development Commission served Edmonds, pursuant to Edmonds City Code Chapter 10.75. The code provisions enabling that commission expired at the end of 2015, and on February 2, 2016 a new nine -member Citizens Economic Development Commission was established pursuant to City Council -approved amendments to Chapter 10.75. Staff Recommendation N/A Narrative Since its creation this past Spring the new Economic Development Commission has met monthly to identify key priorities for its continuing work in the short-term and long-term. Jamie Reece, Chair of the Commission, will be presenting a brief PowerPoint presentation that will share the Commission's work to date, with a particular emphasis on their work program priorities for the rest of this year and beyond into 2017. Packet Pg. 88 5.2 City Council Agenda Item Meeting Date: 08/23/2016 Edmonds School District Foundation Presentation on Youth Homelessness (15 min.) Staff Lead: Andrew Pierce Department: City Council Preparer: Scott Passey Background/History N/A Staff Recommendation N/A Narrative ESD Foundation Director Anderson will provide information to the City Council on youth homelessness. Packet Pg. 89 7.1 City Council Agenda Item Meeting Date: 08/23/2016 Sunset Ave Walkway Design Proposals (60 min.) Staff Lead: Phil Williams Department: Engineering Preparer: Megan Luttrell Background/History December 20, 2011. An amendment to the Capital Facilities Plan, which includes the Sunset Ave. Walkway is passed. April 17, 2012. A Resolution of the Council in support of pursuing an RCO grant for the design of City Park and the Sunset Overlook projects is passed. June 4, 2013. A Resolution of the City Council in strong support of a 2013 Transportation Investment Package, including the Sunset Avenue Walkway is passed. December 3, 2013. Public Comment and discussion of the Sunset Avenue Walkway Project. March 4, 2014. Discussion and potential action regarding modifying or terminating the Sunset Walkway Project. March 25, 2014. Public comment and continued discussion of the Sunset Avenue Project. April 1, 2014. A continuation of discussion concerning the project. June 24, 2014. The City's Transportation Improvement Plan, including the Sunset Avenue Walkway Project passes. July 16, 2014. A motion to amend the Transportation Improvement Plan to remove the Sunset Avenue Walkway Project was defeated. August 19, 2014. A proposal to restripe Sunset Avenue to emulate what the project may look like as a proof -of -concept was approved. May 5, 2015. An update to the status of the proof -of -concept was presented. August 25, 2015. A presentation of traffic and pedestrian data was presented. December 8, 2015. A motion to strip the term 'multiuse' and replace it with the term 'walkway' in describing the project was approved. February 9, 2016. A presentation of the public survey results was presented to the Council. Packet Pg. 90 7.1 May 24, 2016. Several design concepts were presented, and Public Works was asked to bring a proposal at a later Council meeting so that staff could move forward with design. Staff Recommendation That Council authorize Public Works to re -start design activities regarding the Sunset Avenue Walkway, which will be incorporated into future utility projects, and until those projects are complete, allow interim improvements to address current concerns with parking, pedestrian safety, and wrong -way motorists. Narrative This presentation will provide an overall proposed design effort, along with several concepts for low-cost interim improvements to the current configuration. Over the last approximately two years there has been a growing awareness that any construction of the Sunset Avenue Walkway will need to be sequenced behind several significant upgrades to City utilities. These utility projects will impact significant portions of the street surface. This will result in the replacement of a large percentage of the existing roadway. Furthermore, the design, funding, and construction of the underground utilities are likely to push walkway construction further into the future, perhaps by several years. Staff is asking for authorization to continue the design of the walkway project so these utility projects can be designed with a clear picture of how the street level improvements are expected to look. In that way the surface restoration required after completing utility upgrades can be done in a way to reduce duplication and lower the cost of the future surface improvements. Examples of some recommended design features that could be done as part of utility upgrading include the design of the Sunset Overlook, the table -top intersection at Edmonds Street, in addition to other required surface fixtures, landscaping, and amenities. If construction of a "permanent" project is not imminent it leaves the question of how to address the current "temporary"configuration. The pilot project that re -striped Sunset Avenue to include the walkway was completed and fully opened for public use on September 18th of 2014. Several field adjustments were made to the walkway application as it was installed, and subsequent, targeted adjustments to particular areas have also been made as needed when issues have been identified. There are, however, several items that would benefit from additional interim solutions while we wait for the permanent project to be built. These include improvements at the angled parking area, a method for discouraging wrong -way traffic on the road, and installing a physical separator between the walkway and the roadway, and other improvements that will be discussed in the presentation. There are also some very -low cost improvements that should be considered, such as reducing parking times and adding some additional parallel parking. It is hoped that Council will give staff clear direction on the interim improvements being recommended as well as the clear authority to continue with the design of the permanent project which has been in suspension for approximately two years. Attachments: Sunset Presentation 082316 DRAFT R2 PHW Packet Pg. 91 4 (.n rb o r-�- o C �^ r0 rb Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) 7.1.a !4R JAM Sunset Avenue Walkway Design Proposals --Continue with overall Project Design Packet Pg. 93 7.1.a 31,1'' ii I r AMMVR JAM AV Sunset Avenue Walkway Design Proposals --Continue with overall Project Design --Incorporate Project Design into coming Utilities PrcjE Packet Pg. 94 7.1.a 31,1'' ii I r AMMVR JAM AV Sunset Avenue Walkway Design Proposals --Continue with overall Project Design --Incorporate Project Design into upcoming Utilities Projects --Apply low-cost interim solutions to address issues with current configuration Packet Pg. 95 Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) 7.1.a Overlook —Concept Design, 2020s Construction LAM �T Packet Pg. 97 0 ' . n O10 .i rTl Ln 1 I I rb • • ro �. - ON V 3 a1 Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) rn�' ` V ftftft , �r Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) ro ro ro ro 4k j 'A_ .t3 Q ro W Ln Z3 < rb Ln rb vi mkR Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) � r W !N k4 �yzNJ �-r3 C ~1 � O M Ln tn Q �.: to � o � o � a �.,•, • N O N Oo i Ll w fb w�- s rb v1 `(: f P P.jm O. L-11 0 X M rt (Q 0 00 Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) V 3 a1 M O CD3 CD � Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) Decisions Needed Final Design Issues: • Should the final design move the 3-5 feet further west and change approximately 5 deg.? — Staff recommendation -yes angled parking area the angle used by • Should s table-top intersection be added at Edmonds Street to calm traffic and improve pedestrian safety? — Staff recommendation - yes • Should the numb reduced from the 13 as discussed? !r of angle parking spaces be current 21 spaces to either 15 or to — Staff recommendation —13 �a U) 0 0. 0 a` a� y as 0 a y _ 3 LO CL N W H LL CD r M N 00 O _ 0 CU CL fC w w Q Packet Pg. 110 Decisions Needed Final Design Issues (cont.) • Should the width of the walkway be maintained at the current 8 feet or narrowed to 6 feet or 5 feet? — Staff recommendation - no • Should a modified c-curb be installed along the edge of the walkway where possible to better separate automobile traffic from pedestrian traffic? — Staff recommendation - yes Packet Pg. 111 Decisions Needed Final Design Issues (cont.) • Should 7-9 additional parallel parking spaces be added to Sunset where driveway issues don't exist or where they can be mitigated? — Staff recommendation —yes • Should the Sunset Avenue Overlook and an extension of the walkway on Gaspers Street be designed as part of the project with continued and frequent public involvement? — Staff recommendation -yes LO r d N H LL CD 0 r M N 00 O _ O r CU CL Packet Pg. 112 7.1.a Decisions Needed Final Design Issues (cont.) 1-1 Should appropriate signage and and changes in raised islands be made on Gaspers to further discourage and/or driving on Sunset? — Staff recommendation —yes prevent wrong way Should parking restrictions on Sunset be changed from 4-hours to 3-hours or 2-hours? — Staff recommendation — 3-hours N a 0 M N W O a E a Packet Pg. 113 Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) Decisions Needed Interim Improvement Design Issues: 1-1 Should appropriate signage and and changes d in raised islands be made on Gaspers to further discourage and/or driving on Sunset? — Staff recommendation —yes prevent wrong way Should parking restrictions on Sunset be N U_ CD 0 M All N O _ 0 changed from 4-hours to 3-hours or 2-hours? E U fC w w Q — Staff recommendation — 3-hours Packet Pg. 115 Decisions Needed Interim Improvement Design Issues: Should the final design move the angled �a U) 0 0. 0 a` a� y as 0 3 Q y _ 3 parking area 3-5 feet further west and changeLO the angle used by approximately 5 deg.? a — Staff recommendation —yes Q 0 Should the number of angle parking spaces b CD reduced from the current 21 spaces to either 15 or to 13 as discussed? a d — Staff recommendation —13 Packet Pg. 116 Decisions Needed Interim Improvement Design Issues: • Should a modified c-curb be installed along the edge of the walkway where possible to better separate automobile traffic from pedestrian traffic? — Staff recommendation - yes • Should 7-9 additional parallel parking spaces be added to Sunset where driveway issues don't exist or where they can be mitigated? — Staff recommendation —yes LO r CL N W H LL to 0 r M N 00 O _ O r E w Q Packet Pg. 117 Decisions Needed Interim Improvement Design Issues: 1-1 Should appropriate signage and and changes d in raised islands be made on Gaspers to further discourage and/or driving on Sunset? — Staff recommendation —yes prevent wrong way Should parking restrictions on Sunset be N U_ CD 0 M All N O _ 0 changed from 4-hours to 3-hours or 2-hours? E U fC w w Q — Staff recommendation — 3-hours Packet Pg. 118 Decisions Needed • Should a decision package be submitted to make inte improvements as discussed? rp &a Packet Pg. 119 ICJ Attachment: Sunset Presentation 082316 DRAFT R2 PHW (1459 : Sunset Ave Walkway Design Proposals) 7.2 City Council Agenda Item Meeting Date: 08/23/2016 Presentation of the 2017-2022 Six -Year Transportation Improvement Program (15 min.) Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On May 24, 2016, staff presented the draft 2017-2022 Transportation Improvement Program to Council. On June 7, 2016, a Public Hearing was held on the 2017-2022 Six -Year Transportation Improvement Program Staff Recommendation Place the Resolution on the consent agenda for the City Council meeting on September 6, 2017. Narrative The Six Year Transportation Improvement Program (TIP) is a transportation planning document that identifies funded, partially funded, and unfunded projects that are planned or needed over the next six calendar years. The TIP also identifies the expenditures and secured or reasonably expected revenues for each of the projects included in the TIP. The City practice in preparing the TIP each year has been to keep it financially constrained the first 3 years (2017-2019), but not the last 3 years (2020-2022). RCW 35.77.010 and 36.81.121 require that each city update and adopt their TIP prior to adoption of the budget. A copy of the adopted TIP will be submitted to the Puget Sound Regional Council, Washington State Department of Transportation, and adjacent jurisdictions after it has been approved by City Council. Some of the projects in the TIP are shown as funded through secured or unsecured Federal / State grants, as well as from the local funds. Due to a shortfall in transportation funding, a number of unsecured State and Federal transportation grants have been programmed to fund projects beginning in 2020. Most transportation grants are competitive, and the success of how many grants are secured in the future will depend on other transportation needs and funding requests in the region. Projects not identified in this document may not be eligible for Federal / State funding. All projects in the 2017-2022 TIP are identified in the 2015 Transportation Plan. Since the June 7t", 2016 Public Hearing, the following projects have been added / modified to the document: The funding source for the 84t" Ave. W Overlay from 220t" St. SW to 212" St. SW has been modified from "unsecured" to "Federal secured", since a grant will be awarded later this year. Packet Pg. 121 7.2 The funding amount identified for the Hwy 99 Safety Improvements from 224t" St. SW to 220t" St. SW in 2017 has been increased from $10,000 to $300,000 since additional improvements need to be completed (Federal grant recently submitted). The 220t" St. SW Coordination project from Hwy. 99 to 76t" Ave. W has been added (grant recently submitted). 95t" Pl. W Walkway from 224t" St. SW to 220t" St. SW has been added (grant recently submitted). 15t" St. SW Walkway from 8t" Ave. S to 9t" Ave. S has been added in 2017 (Minor Sidewalk Program). The funding for the Minor Sidewalk Program is eliminated in 2017, since staff is proposing to fund the 151h St. SW Walkway project from 81h Ave. S to 91h Ave. S. Attachments: Resolution for TIP 2017-22 6-yrTIP Version Packet Pg. 122 7.2.a RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING THE 2017-2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 and 36.81.121 require that each city and town is required to adopt a Transportation Improvement Program (TIP) and file a copy of such adopted program with the Washington State Department of Transportation (WSDOT); and WHEREAS, the TIP identifies all planned projects over the next 6 years, along with the appropriate funding source; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The Transportation Improvement Program is hereby adopted pursuant to the requirements of RCW 35.77.010 and 36.81.121 to be effective on September 71h, 2016 and to continue in full force and effect until amended. A copy of such Transportation Improvement Program for the years 2017 to 2022 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth. Section 2. The City Clerk is hereby requested and directed to file a certified copy of the Transportation Improvement Program with the Washington State Department of Transportation. -1- Packet Pg. 123 7.2.a RESOLVED this day of 32016. ATTEST/AUTHENTICATED: CITY CLERK, SCOTT PASSEY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO. APPROVED: MAYOR, DAVE O. EARLING -2- Packet Pg. 124 City of Edmonds Six Year Transportation Improvement Program (2017-2022) Project Name Purpose Grant Opportunity Proj Phasect es) (2017-2022) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 New projects not included in 2016-2021 TIP Secured rant since 2016-2021 TIP Recently submitted gmnt Preservation/Maintenance Projects: Annual Street Preservation Grind pavement, overlay, chip seal, Possible Grant Engineering $1,900,000 (Federal, unsecured) $900,000 $1,000,000 Program & & $0 (State) and slurry seal Local Funds Construction $10,976,000 Local, General Fund $1,190,000 $1,420,000 $2,000,000 $2,060,000 $2,120,000 $2,186,000 84th Ave. W Oveday from 220th St. SW to 212th St. SW Grind pavement and overlay Or Possible Grant & Engineering & $750,000 $0 (Federal, secured) (State) $750,000 Local Funds Construction $190,000 Local, General Fund $190,000 Citywide Signal Upgrade traffic signal cabinets and Possible Grant Engineering $650,000 (Federal, unsecured) $325,000 $325,000 Improvements & & $0 (State) improve technology Local Funds Construction $0 Local Puget Dr. @ OVD Signal Upgrades Possible grant Engineering $287,500 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & $0 (State) Local Funds Construction $212,500 Local $37.500 1 $175,000 238th @ 100th Ave. Signal Upgrades Rebuild traffic signal system Engineering $0 (Federal) with new signal mast arms, cabinet, and Possible Grant & $765,000 (State, unsecured) $765,000 video detection Construction $0 Local Main St. @ 3rd Signal Upgrades Possible grant Engineering $287,500 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & $0 (State) Local Funds Construction $87,500 Local $37,500 $50,000 TOTAL $2,130,000 $1,420,000 $2,900,000 $3,225,000 $3,945,000 $2,486,000 Safety Capacity Projects: 228th St. SW. Corridor Safety Construct missing roadway link on 228th St. SW between Secured grant $10,000 (Federal, secured) $10,000 Improvements Hwy. 99 and 76th Ave. W, with various utility upgrades. & Construction $0 (State) Local Funds $0 Local 228th St. SW. from Widen roadway to add two-way left turn lane along stretch or Possibe grant $50,000 (Federal, unsecured) $50,000 Hwy. 99 to 95th PI. W left turn lanes at specific intersections. & Design $0 (State) Install sidewalk and bike lanes. Local Funds $50,000 Local $50,000 76th Av. W @ 212th St. SW Intersection Re -design intersection to reduce intersection delay and $3,006,500 (Federal, secured) $2,920,000 $86,500 $1,930,827 (State, unsecured) $1,930,827 $113,500 Improvements improve level of service (LOS). Various utility Secured Grant (Local, Traffic Impact Fees) $100,000 $13,500 improvements are also included in the project. & Construction $776,475 (Local, Fund 421) $776,475 $450,528 Local Funds (Local, Fund 422) $450,528 $718,685 Loral, Fund 423 $718,685 Hwy. 99 Safety Improvements Install C-Curb along this section of Hwy. 99 to restrict left turns into Local Funds / Design, $4,012,000 (Federal, unsecured) $300,000 $700,000 $474,000 $2,538,000 from 216th St. SW to 224th St. SW driveway from the two-way left turn lane and add left turn pockets Possible Grant ROW, & $0 (State, secured) in certain areas. Construction $282,000 Local, General Funds $282,000 SR-99 Gateway / Revitalization Install gateway elements and safety improvements Engineering $0 (Federal) along the SR-99 Corridor. Grant secured & $5,000,000 (State, secured) $500,000 $4,500,000 Construction $0 Local SR 524 (196th St. SW) @ Design intersection improvements and addition of guardrail on Design $0 (Federal) 881h Ave W. Intersection the west side of intersection due to 12' vertical drop (grade. Possible Grant $122,000 (State, unsecured) $122,000 $71,000 Improvements adjustment to improve sight distance to be considered). Local, traffic impact fees $71,000 ROW acquisition ROW $0 (Federal) & $87,500 (State, unsecured) $87,500 $87,500 Local $87:500 Complete intersection improvements Construction $585,000 (Federal, unsecured) $585,000 Local Funds $0 (State) $0 Local Main St. @ 9th Ave. Installation of traffic signal or mini -roundabout. Possible grant Engineering $788,000 (Federal, unsecured) $118,000 $670,000 & & $0 (State) Local Funds Construction $123,000 Local $18,000 1 $105,000 76th Av. W @ 220th St. SW Installation of new traffic signal to convert existing split phasing for Possible Grant Engineering, $5,186,000 (Federal, unsecured) $951,500 $951,500 $3,283,000 Intersection Improvements eastbound and westbound movements to concurrent lef turn phasing & ROW, & $0 (State) with addition of right turn lane for the southbound movement. Local Funds Construction $809,000 Local $148,500 $148,500 $512,000 220th St. SW Traffic Signal Coordination Coordinate the traffic signals along 76th Ave. W Engineering $300,000 (Federal, unsecured) $300,000 from Hwy. 99 to 76th Ave. W from Hwy. 99 to 76th Ave. W to Possible Grants & $0 (State) improve corridor efficiencies through adaptive system. Construction $0 Local Hwy. 99 @ 212th St. SW Widen 212th St. SW to add a WB and EB left turn lane. Possible Grants Engineering, $2,427,000 (Federal, unsecured) $152,000 $943,000 $1,332,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & $0 (State) movements shared jurisdiction with Cityof Lynnwood) Local Funds Construction $379,000 Local w/ _It, i of Lynnwood) $23,000 $148,000 $208,000 V Page 1 N Attachment: 2017-22 6-yrTIP Version (1458 : 2017-2022 TIP - Presentation) City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phase(s) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 Hwy. 99 @ 216th St. SW Widen 216th St. SW to add a WB and EB left turn lane. Possible Grants Engineering, $2,021,000 (Federal, unsecured) $142,000 $289,000 $1,590,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & $0 (State) movements. Local Funds Construction $314,000 Local, w/ City of Lynnwood) $22,000 $45,000 $247,000 Hwy. 99 @ 220th St. SW Widen 220th St .SW to add westbound right turn lane and Possible Grants Engineering, $2,783,000 (Federal, unsecured) $152,000 $939,000 $1,692,000 Intersection Improvements Hwy. 99 to add 2nd southbound left turn lane. & ROW, & $0 (State) Local Funds Construction $432,000 Local, w/. City Mountlake Terrace) 1 $23,000 $146,000 1 $263,000 SR-104 @ 226th St. SW / 15th St. SW Extend SR-104 Westbound left turn lane and complete pedestrian Possible Grants Engineering, $179,000 (Federal, unsecured) $15,000 $164,000 Intersection Improvements and bicycle improvements with signage and traffic signal & & $0 (State) improvements. Local Funds Construction $15,000 Local $15,000 SR-104 @ 95th PI. W Modify existing signal timing to include protected left turn phasing Possible Grants Engineering, $420,000 (Federal, unsecured) $65,000 $355,000 Intersection Improvements and provide C-Curb with left turn channeli-tion & & $0 (State) for access management. Local Funds Construction $75,000 Local $10,000 $65,000 SR-104 @ 238th St. SW Install traffic signal and other Possible Grants Engineering, $1,157,000 (Federal, unsecured) $173,000 $984,000 Intersection Improvements improvement intersections. & ROW, & $0 (State) Local Funds Construction $181,000 Local $27,000 $154,000 Type 2 Raised Pavement Install Type 2 Raised Pavement Markers Engineering $100,000 (Federal, unsecured) $100,000 Markers along the centerline of arterials and collectors, improving Possible Grant & $0 (State) roadway safety during night hours and on rainy days Construction $0 Local Trackside Warning Systerm Install Wayside Homs $0 (Federal) at Dayton St. and Main St. at (2) railroad crossings, reducing noise levels Local Funds Only Construction $0 (State) railroad crossings within Downtown Edmonds during train crossings. $10,000 Local, General Fund $10,000 TOTAL $7,516,515 $800,000 $474,000 $5,168,000 $6,782,000 $14,312,000 Pedestrian Projects: Sunset Ave. Walkway Provide walkway on the west side of Sunset Av., Secured Grant, Engineering $44,000 (Federal, secured) $44,000 from Bell St. to Caspem St. w/ various utility upgrades. $687,000 (Federal, unsecured) $687,000 $650,000 Unsecured Grant, & & (Local, Fund 421) $75,000 $575,000 $200,000 (Local, Fund 423) $50,000 $150,000 Local Funds Construction $692,000 Local $5,000 $687,000 Maplewood Walkway from Main St. to Install sidewalk on Maplewood St. from Main St. to 200th St. SW, Engineering $1,591,000 (Federal, unsecured) $100,000 $130,000 $1,361,000 200th St. SW creating connection to Maplewood Elementary and Yost Park. Possible Grant & $0 (State) Construction $0 Local Elm Way Walkway from 8th Ave. S Install sidewalk on Elm Way from 8th Ave. S to 9th Ave. S, creating Engineering $789,000 (Federal, unsecured) $56,000 $600,000 $133,000 to 9th Ave. S connections to Westgate and Sherwood Elementary Schools. Possible grant & $0 (State) Construction $0 Local 80th Ave. W Walkway from Install sidewalk on 80th Ave. W from 2121h St. SW to 206th St. SW, Engineering $1,449,000 (Federal, unsecured) $100,000 $110,000 $1,239,000 212th St. SW to 206th St. SW creating connections to Chase Lake and College Place Possible Grant & $0 (State) Elementary Schools. Construction $0 Local Citywide Pedestrian Add Flashing pedestrian beacons, HAWK signal, or pedestrian actuations Engineering $1,310,000 (Federal, unsecured) $100,000 $800,000 $410,000 Crossing Enhancements existing signal at various location throughout the City Possible Grants & $0 (State) to improve pedestrian safety. Construction $0 Local 95th PI. SW Walkway from Install sidewalk on 95th PI. W from Engineering $0 (Federal) 224th St. SW to 220th St. SW 224th St. SW to 220th St. SW Possible Grants & $468,000 (State, unsecured) $80,000 $388,000 to improve pedestrian safety. Construction $117,000 Local $20,000 $97,000 Dayton St. Walkway from 7th Ave. S to Install sidewalk on the south side of Dayton St. Possible Grant Engineering $37,500 (Federal, unsecured) $37,500 8th Ave. S & & $0 (State) Local Funds Construction $37,500 Local $37,500 232nd St. SW from 100th Ave. W to Install sidewalk on one side of 232nd St. SW Possible Grant Engineering $1,055,000 (Federal, unsecured) $100,000 $955,000 SR-104 & & $0 (State) Local Funds Construction $250,000 Local $100,000 $150,000 236th St. SW Walkway from SR-104 to Provide sidewalk on south side of 236th St. Secured Grant $10,000 (Federal,secured) $10,000 Madrona Elementary & Construction $0 (State) Local Funds $10,000 Local, Fund 422 $10,000 236th St. SW Walkway from SR-104 to Provide sidewalk on one side of 236th St. SW Possible Grant Engineering $697,500 (Fedeml,unsecured) $106,500 $591,000 97th PI. W & & $0 (State) Local Funds Construction $697,500 Local $106,500 $591,000 84th Ave. W Walkway from 238th St. SW to Provide sidewalk on one side of 841h Ave. W Possible Grant Engineering $45,000 (Fedeml,unsecured) $45,000 234th St. SW & & $0 (State) Local Funds Construction $45,000 Local $45,000 2nd Ave. S Walkway from James St. Engineering $0 (Federal) to Main St. Provide sidewalk along short missing link. Local Funds Only & $0 (State) Construction $30,000 Local $30,000 fl1 <i rtF-41 (Q Page 2 J°' Attachment: 2017-22 6-yrTIP Version (1458 : 2017-2022 TIP - Presentation) City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phase(s) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 218th St. SW Walkway from 76th Ave. W to Possible Grant Engineering $615,000 (Federal, unsecured) $100,000 $515,000 Install sidewalk along missing link & & $0 (State) 84th Ave. W Local Funds Construction $600,000 Local $100,000 $500,000 Wanut St. Walkway from 3rd Ave. to 4th Ave. Engineering $0 (Federal) Install sidewalk along short missing link Possible Grant & $105,000 (State, unsecured) $105,000 Construction $0 Local 216th St. SW Walkway from Hwy. 99 Install 300' sidewalk on the north side of 216th St. SW Possible Grant Engineering $137,000 (Federal, unsecured) $137,000 to 72nd Ave. W & & $0 (State) from Hwy. 99 to 72nd Ave. W Local Funds Construction $20,000 Local $20,000 238th St. SW Walkway from SR-104 Install 800' of sidewalk on the north side of 238th St. SW Secured Grant Engineering $0 (Federal) to Hwy. 99 & & $294,000 (State, secured) $294,000 from SR-104 to Hwy. 99 Local Funds Construction $95,000 Local $95,000 15th St. SW from 8th Ave. S to 9th Ave. S Install sidewalk on the south side of 15th St. SW from Engineering $0 (Federal) Local Funds & $0 (State) 8th Ave. S to 9th Ave. S Construction $200,000 Local $200,000 4th Ave. Corridor Enhancement Create corridor improvements to encourage pedestrian Possible Grant Engineering $3,450,000 (Federal, unsecured) $100,000 $1,000,000 $2,350,000 Walkway activity along 4th Ave. N from Main St. to & & $0 (State) 3rd Ave. N from Downtown retail to Edmonds Center for the Arts Local Funds Construction $675,000 Local, Fund 125 $100,000 1 $150,000 $425,000 Minor Sidewalk Complete sidewalk missing links (from Short Walkway list of Engineering $0 (Federal) Program 2015 Transportation Plan or other identified projects) Local Funds & $0 (State) Construction $1,000,000 Local, General Fundt$50,OOOI $200,000 $200,000 $200,000 $200,000 $200,000 ADA Curb Ramps Improvements Construct Citywide ADA compliant curb ramps where Possible Grant Engineering $0 (Federal) facilities don't exist nor meet current standards & Local Funds & Construction $750,000 900,000 (State, unsecured) Local, General Fund $50,000 1 $50,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 Audible Pedestrian Install audible pedestrian signals to Engineering $0 (Federal) Signals pedestrians heads at signalized intersections to improve Possible Grant & $0 (State) pedestrians with disabilities safety Construction $25,000 Local $25,000 TOTAL $1,314,000 $2,375,000 $793,000 $6,179,000 $3,432,000 $5,685,000 Bike -Link Install bike lanes and sharrows [ key bicycle locations to ) g ( (Fede 91) ) complete missinglinks such as along76th Ave. W, 212th St. SW... Secured rent Construction $560,000 Verdant rant $560,000 Traffic Calmina / Non -Motorized Transportation Safetv Protects Traffic Calming Program / Traffic circles, speed cushions, Engineering $0 (Federal) Non -Motorized Transportation radar feedback signs, bulb -outs, etc. Local Funds only & $0 (State) 1 1 Safety Construction 1 $120,000 (Local, General Fund) $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 Ferry Projects Ferry Storage Improvements from Provide additional ferry storage area closer to the Ferry Terminal Engineering $357,000 (Federal, unsecured) $357,000 Dayton St. to Pine St. (through striping revisions / C-Curb addition...). Possible Grant & $0 (State) Construction $0 Local Traffic Plannina Projects: Edmonds Waterfront Study: 1) Waterfront Access issues emphasizing and prioritizing near term solutions t( Engineering $0 Port of Edmonds Analysis providing emergency access; 2) At -grade conflicts where Main and Dayton St. interSE Unsecured Grant and & $0 (State) $865,000 BNSF rail lines; 3) Pedesitrian /Bicycle Access; 4) Options to the Edmonds Crossin (Federal, unsecured) $200,000 $665,000 Multimodal Terminal Pro'act identified as Modified Alternative 2 within the 2004 EIS Local Funds Planning $135,000 Local, General Funds $31,000 $104,000 Citywide Complete an compliance evaluation of all existing ADA Engineering $0 (Federel) Transition Plan curb ramps, as well as long range plan on how to address Local Funds Only & $0 (State) those deffciencies. Planning $50,000 Local, General Funds $50,000 Pavement Rating Analyse the pavement condition of all arterial, collector, and local streets $0 (Federal) Study to determine the stretches to be repaved as part of future Local Funds Only Planning $0 (State) annual overa s. $30,000 Local / General Funds $30,000 Transportation Plan Update Engineering $0 (Federal) Update Transportation Plan Local Funds Only & $0 (State) Planning $175,000 Local $175,000 TOTAL 1 $311,000 $769,000 $0 $0 $175,000 so Total $73,228,515 Page 3 $11,851,515 $5,384,000 $4,187,000 $14,949,000 $14,354,000 $22,503,000 Attachment: 2017-22 6-yrTIP Version (1458 : 2017-2022 TIP - Presentation) City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phases) Total Cost source(s) 2017 2018 2019 M. 2021 2022 Total Federal $5,190,000 $3,091,500 $1,917,000 $8,794,000 $8,699,000 $12,647,000 Tolal Federal (Secured/ $3:734,000 $86,500 $0 $0 $0 $0 Total Federal (Unsecured) $1,456,000 $3,005,000 $1,917,000 $8,794,000 $8,699,000 $12,647,000 Total State $2,304,827 $388,000 $0 $1,242,000 $837,500 $4,750,000 Total State (Secured) $294,000 $0 $0 $0 $50() 00 $4,500,000 Total State (Unsecured) $2,010,827 $388,000 $0 $1,242,000 $337,500 $250,000 Total Verdant $560,000 $0 $0 $0 $0 $0 Total Verdant (Secured) $560,000 $0 $0 $0 $0 $0 Total Port of Edmonds $0 $0 $0 $0 $0 $0 Total Local Fund $4,096,688 $1,904,500 $2,270,000 $4,913,000 $4,671,500 $5,106,000 Total Local (Fund 112) $125,000 $0 $0 $1,137,000 $1,738,500 $1,307,000 Total Local (Fund 125) $0 $0 $0 $100,000 $150,000 $425,000 Toal Local (Fund 421) $851,475 $0 $0 $575,000 $0 $0 Total Local (Fund 422) $460,528 $0 $0 $0 $0 $0 Total Local (Fund 4231 $768,685 $0 $0 $150,000 $0 $0 Total Local with other jurisdictions $0 $0 $0 $68,000 $339,000 $718,000 Total Local (Tra10c Impact Fees) $100,000 $13,500 $0 $71,000 $0 $0 Total Local (General Fundl $1,571,000 $1,794,000 $2,270,000 $2,812,000 $2,370,000 $2,436,000 fl1 <i rtF41(Q Page 4 J00 Attachment: 2017-22 6-yrTIP Version (1458 : 2017-2022 TIP - Presentation) 7.3 City Council Agenda Item Meeting Date: 08/23/2016 Stormwater Management Code Update, Edmonds Community Development Code Chapter 18.30 (20 min.) Staff Lead: Phil Williams Department: Engineering Preparer: Rob English Background/History On August 2, 2016, a public hearing was held on the proposed update to the stormwater management code. On June 14, 2016, staff provided an update on the required stormwater code changes. Staff Recommendation Prepare an Ordinance and place it on the consent agenda for a City Council meeting in late September. Narrative A public hearing was held on the proposed stormwater code on August 2, 2016. The item is being presented to the City Council for further discussion. Staff has made minor revisions, since the August 2nd City Council meeting, to correct terminology and improve wording to make it more clear and concise. The proposed stormwater code has been sent to the State for review and the SEPA process is anticipated to be completed in September. Staff recommends placing an ordinance on the consent agenda for a future City Council meeting in September, to adopt the proposed stormwater management code changes and make it effective on January 1, 2017. The following documents are attached for reference: Attachment 1 Proposed Stormwater Code Attachment 2 Redlined Changes since August 2, 2016 Attachment 3 Original Redlined Changes Attachment 4 August 2, 2016 Staff Presentation BACKGROUND: The City of Edmonds is a Department of Ecology Phase II Western Washington Municipal Stormwater Permittee. As a Phase II permit holder, the City is required to update our stormwater code by December 31, 2016 to meet the minimum requirements of the 2012 Ecology Stormwater Management Manual. This includes reviewing and revising all development -related codes, rules, and standards to incorporate Packet Pg. 129 7.3 and require Low Impact Development principles and best management practices to make Low Impact Development the preferred and commonly used approach to site development. The goal is to infiltrate, disperse, and retain stormwater runoff onsite to the extent feasible. Attachments: Attachment 1 - ECDC 18.30-FINAL DRAFT-08.22.2016 Attachment 2 - ECDC 18.30-FINAL DRAFT-08.23.2016-redlines from 08.02.2016 version Attachment 3 - ECDC 18.30-Redline Version Attachment 4 - SW Code Council Public Hearing-20160802 Packet Pg. 130 7.3.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Chapter 18.30 STORMWATER MANAGEMENT Sections: 18.30.000 Purposes. 18.30.010 Definitions. 18.30.020 Authority and Regulation. 18.30.030 Applicability. 18.30.040 Exemptions. 18.30.050 Administration. 18.30.060 Requirements. 18.30.070 Exceptions, Adjustments, and Appeal. 18.30.080 Access and Covenants. 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. 18.30.100 Enforcement Procedures. 18.30.000 Purposes. Page 1/23 A. To set forth standards for managing stormwater runoff from construction and development sites to minimize: 1. Degradation of surface water quality by controlling the scouring and sedimentation of creeks, streams, wetlands, ponds, lakes, other water bodies. 2. Degradation of groundwater quality. 3. Damage to adjacent and other downstream private properties from erosion or other impacts from stormwater runoff. 4. Damage of City -owned parcels, City roads, rights -of -way and associated infrastructure. B. To comply with requirements in the Phase II National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit as issued by the Washington State Department of Ecology (Ecology). C. To complement site planning activities that minimize: 1. Impervious surfaces area. 2. The loss of native or non-native site vegetation. 3. The generation of stormwater runoff. D. To make low impact development (LID) the preferred and commonly used approach to site development; to require LID be considered at the site planning stage; and to implement LID BMPs unless they are infeasible. E. To require that all publicly -owned and privately -owned Stormwater Treatment and Flow Control best management practices (BMPs)/Facilities are operated, maintained and repaired in manner that conforms to this chapter. F. To provide the authority for the City to inspect privately -owned Stormwater Treatment and Flow Control BMPs/Facilities. G. To provide enforcement procedures for ensuring compliance with this chapter. Version: August 22, 2016 Packet Pg. 131 7.3.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 2/23 18.30.010 Definitions. For the purposes of this chapter, the following definitions shall apply: Arterial. A road or street primarily for through traffic. The term generally includes roads or streets considered collectors. It does not include local access roads which are generally limited to providing access to abutting property. See also RCW 35.78.010, RCW 36.86.070, and RCW 47.05.021. Adjustment. A variation in the application of a minimum requirement to a particular project. Adjustments provide substantially equivalent environmental protection. Applicant. The owning individual(s) or corporations or their representatives applying for the permits or approvals described in this chapter. Approval. The proposed work or completed work conforming to this chapter as approved by the public works Director or their designee. Best management practices (BMPs). The schedules of activities, prohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by the City that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to waters of Washington State. Bioretention. Engineered facilities that treat stormwater by passing it through a specified soil profile, and either retain or detain the treated stormwater for flow attenuation. Refer to the 2014 Stormwater Management Manual for Western Washington (SWMMWW), Chapter 7 of Volume V for bioretention BMP types and design specifications. Category 1 Project Site. A project site subject to Minimum Requirements No.1 through No.S. See ECDC 18.30.60.C. Category 2 Project Site. A project site subject to Minimum Requirements No.l through No.9. See ECDC 18.30.60.C. Certified Erosion and Sediment Control Lead (CESCL). An individual who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMMWW). A CESCL is knowledgeable in the principles and practices of erosion and sediment control. The CESCL must have the skills to assess site conditions and construction activities that could impact the quality of stormwater and, the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Certification is obtained through an Ecology approved erosion and sediment control course. Course listings are provided online at Ecology's website. City's municipal separate storm sewer system or "MS4." A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) that are owned or operated by the City of Edmonds, designed or used for collecting or conveying stormwater, and are not a combined sewer nor part of a publicly owned treatment works as defined in 40 Code of Federal Regulations (CFR) 122.2, and which is defined as "large" or "medium" or "small" or otherwise designated by Ecology pursuant to 40 CFR 122.26. Clearing. The destruction and removal of vegetation by manual, mechanical, or chemical methods. Commercial Agriculture. Those activities conducted on lands defined in RCW 84.34.020(2) and activities involved in the production of crops or livestock for commercial trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. Common plan of development or sale. A site where multiple separate and distinct construction activities may be taking place at different times on different schedules and/or by different contractors, but still under a single plan. Examples include: 1) phase projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; 3) projects in a contiguous area that maybe unrelated but still under the same contract, such Version: August 22, 2016 Packet Pg. 132 7.3.a Edmonds Page 3/23 Chapter 18.30 STORM WATER MANAGEMENT as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determine permit requirements. Converted vegetation (areas). The change in land cover changed from native vegetation, pasture scrub/shrub, or unmaintained non-native vegetation to lawn or landscaped areas, or where native vegetation is converted to pasture. Creek. Is synonymous with "streams," which is defined in ECDC 23.40.320. Detention facility. An above or below ground facility, such as a pond or tank, that temporarily stores stormwater runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored stormwater. Development. Land -disturbing activities, including Class IV general forest practices that are conversions from timber land to other uses. Creation or addition of hard surfaces, or replacement of hard surface that is not part of a routine maintenance activity. Structural development, including construction, installation, replacement, or expansion of a building or other structure. Subdivision, short subdivision, and binding site plans, as defined and applied in Chapter 58.17 RCW Director. The City's Public Works and Utilities Director or a designee with an appropriate background in engineering or another related discipline. Discharge point. The location where a discharge leaves the municipal separate storm sewer system (MS4) through the City's MS4 facilitiesBMPs designed to infiltrate. Ecology. The Washington State Department of Ecology. Effective impervious surface. Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system. Impervious surfaces on residential development sites are considered ineffective if: 1) the runoff is dispersed through at least 100 feet of native vegetation in accordance with BMP T5.30 — "Full Dispersion," as described in Chapter 5 of Volume V of the SWMMWW; 2) residential roof runoff is infiltrated in accordance with downspout Full Infiltration Systems in BMP T5.10A in Volume III of the SWMMWW; or 3) approved continuous runoff modeling methods indicate the entire runoff file is infiltrated. Erodible or leachable materials. Wastes, chemicals, or other substances that measurably alter the physical or chemical characteristics of runoff when exposed to rainfall. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Erosion. The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Also, detachment and movement of soil or rock fragments by water, wind, ice, or gravity. See the SWMMWW Glossary for examples of types of water erosion. Excavation. The mechanical removal of earth material. Exception. Relief from the application of a minimum requirement to a project. Fill. A deposit of earth material placed by artificial means. Groundwater. Water in a saturated zone or stratum beneath the land surface or below a water body. Hard surface. An impervious surface, a permeable pavement, or a vegetated roof. Highway. A main public road connecting towns and cities. In Edmonds, this includes State Route 99, State Route 524, and portions of State Route 104, that are classified as principal arterials in the City's comprehensive transportation plan. Illicit discharge. Any direct or indirect non-stormwater discharge to the City's MS4, groundwaters, or a water body, except as expressly allowed by ECDC Chapter 7.200. Version: August 22, 2016 Packet Pg. 133 7.3.a Edmonds Page 4/23 Chapter 18.30 STORM WATER MANAGEMENT Impervious surface. A non -vegetated surface area that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non -vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces that similarly impede the natural infiltration of stormwater. Open, uncovered retention/detention facilities shall not be considered impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. Open, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. Outdoor swimming pools shall be considered impervious surfaces in all situations. In addition, lawns, landscaping, sports fields, golf courses, and other areas that have modified runoff characteristics resulting from the addition of underdrains and impermeable or low permeability liners are to be considered impervious surfaces. If no liner is installed, these areas (lawns, landscaping, sports fields, golf courses, etc.) served by underdrains may be considered pervious if the underdrain is set a minimum of 8 inches above the in -situ soils in a manner to allow infiltration over the facility bottom. Lake. An inland body of fresh water surrounded by land. Land disturbing activity. Any activity that results in a change in the existing soil cover (both vegetative and non -vegetative) and/or the existing soil topography. Land -disturbing activities include but are not limited to demolition, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land -disturbing activity. Vegetation maintenance practices, including landscape maintenance and gardening, are not considered land -disturbing activity. Stormwater facility maintenance is not considered land disturbing activity if conducted according to established standards and procedures. Low impact development (LID). A stormwater and land use strategy that strives to mimic pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on -site features, site planning, and distributed stormwater management practices that are integrated into a project design. LID Best Management Practices (BMPs). Distributed stormwater management practices, integrated into a project design, that emphasize pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re -use. LID principles. Land use management strategies that emphasize conservation, use of on -site natural features, and site planning to minimize impervious surfaces, native vegetation loss, and stormwater runoff. Maintenance. Repair and maintenance activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include replacement of dysfunctional facilities, including cases where environmental permits require replacing an existing structure with a different type structure, as long as the functioning characteristics of the original structure are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. In regard to stormwater facilities, maintenance includes assessment to ensure ongoing proper operation, removal of built up pollutants (i.e., sediments), replacement of failed or failing treatment media, and other actions taken to correct defects as identified in the maintenance standards of Chapter 4, Volume V of the SWMMWW. Maximum extent practicable (MEP). Refers to paragraph 402(p)(3)(B)(iii) of the federal Clean Water Act which reads as follows: Permits for discharges from municipal storm sewers shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques, and system, design, and engineering methods, and other such provisions as the Administrator or the State determines appropriate for the control of such pollutants. MS4. The City's municipal separate storm sewer system. Version: August 22, 2016 Packet Pg. 134 7.3.a Edmonds Page 5/23 Chapter 18.30 STORM WATER MANAGEMENT Native vegetation. Vegetation comprised of plant species, other than noxious weeds, indigenous to the coastal region of the Pacific Northwest which could have been reasonably expected to occur naturally on the site. Examples include trees such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. Natural drainage systems and outfalls. The location of the channels, swales, and other non -manmade conveyance systems as defined by the earliest documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. Outfall. A point source as defined by 40 CFR 122.2 at the point where a discharge leaves the City's MS4 and enters a surface receiving waterbody or surface receiving waters. Outfall does not include pipes, tunnels, or other conveyances which connect segments of the same stream or other surface waters and are used to convey primarily surface waters (i.e., culverts). On -site Stormwater Management BMPs. A synonym for Low Impact Development BMPs. Permeable pavement. Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Pervious Surface. Any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. Person. Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or City government unit, however designated. Pollution -generating hard surface (PGHS). Those hard surfaces considered to be a significant source of pollutants in stormwater runoff. See the listing of surfaces under pollution -generating impervious surface. Pollution -generating impervious surface (PGIS). Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to: vehicular use; industrial activities (as further defined in the glossary of the SWMMWW); storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall; metal roofs unless they are coated with an inert, non -leachable material (e.g., baked -on enamel coating); or roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities. Pollution -generating pervious surfaces (PGPS). Any non -impervious surface subject to vehicular use, industrial activities (as further defined in the glossary of the SWMMWW); or storage of erodible or leachable materials, wastes, or chemicals, and that receive direct rainfall or run-on or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include permeable pavement subject to vehicular use, lawns, and landscaped areas including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). Pre -developed condition. The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre -developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. Project site. That portion of a property, properties, and/or right-of-way subject to land -disturbing activities, new hard surfaces, or replaced hard surfaces. For projects that involve land disturbing activity on one or more parcels and land disturbing activity in the City right-of-way, the "Project site" includes all areas of land disturbance. If the project is part of a common development plan or sale, the disturbed area of the entire plan shall be used in determining permit requirements. Rain garden. A non -engineered shallow landscaped depression, with compost -amended native soils and adapted plants. The depression is designed to pond and temporarily store stormwater runoff from adjacent areas, and to allow stormwater to pass through the amended soil profile. Version: August 22, 2016 Packet Pg. 135 7.3.a Edmonds Page 6/23 Chapter 18.30 STORM WATER MANAGEMENT Receiving waterbody or Receiving waters. Naturally and/or reconstructed naturally occurring surface water bodies, such as creeks, streams, rivers, lakes, wetlands, estuaries, and marine waters, or groundwater, to which a MS4 discharges. Replaced hard surface. For structures means the removal and replacement of hard surfaces down to the foundation. For other hard surfaces, it means the removal down to bare soil or base course and replacement. Replaced impervious surface. For structures, the removal and replacement of any exterior impervious surfaces down to the foundation. For other impervious surfaces, it means the removal down to bare soil or base course and replacement. Roadway. Traveled hard surface portion of any public or private road or street. Road -related project. A project that all of, or the majority of, the new or replaced hard surface consist of roadway, shoulders, curbs, gutters, sidewalks, or walkways, either publicly or privately funded. Runoff. Water originating from rainfall and other precipitation that is found in drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands, as well as shallow ground water. It also means the portion of rainfall or other precipitation that becomes surface flow and interflow. Site. The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to development. For road projects, or utility projects in the right-of-way, the length of the project site and the right-of-way boundaries define the site. Slope. The degree of deviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a 90-degree slope being vertical (maximum) and 45 degrees being a 1:1 or 100 percent slope. Soil. The unconsolidated mineral and organic material on the intermediate surface of the earth that serves as a natural medium for the growth of land plants. Source control BMPs. A structure or operation that is intended to prevent pollutants from coming into contact with storm water through physical separation of areas or careful management of activities that are sources of pollutants. The SWMMWW separates source control BMPs into two types. Structural source control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume IV of the SWMMWW for details. Stormwater facility. A constructed component of a stormwater drainage system, designed and constructed to perform a particular function or multiple functions. Stormwater facilities include, but are not limited to, pipes, swales, ditches, culverts, street gutters, detention ponds, retention ponds, constructed wetlands, infiltration devices, catch basins, oil/water separators, and biofiltration swales. Stormwater Management Manual for Western Washington (SWMMWW). The Washington State Department of Ecology's 2012 (as amended in 2014) Stormwater Management Manual for Western Washington. Referred to as the 2014 SWMMWW. Stormwater site plan. The comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed development project for compliance with stormwater requirements. Contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It includes a Construction Stormwater Pollution Prevention Plan (Construction SWPPP) and a Permanent Stormwater Control Plan (PSC Plan). Guidance on preparing a Stormwater Site Plan is contained in Chapter 3 of Volume I of the SWMMWW. Stormwater Treatment and Flow Control BMPs/Facilities. Detention facilities, treatment BMPs/facilities, bioretention, vegetated roofs, and permeable pavements that help meet Minimum Requirements No.6 (Treatment), Minimum Requirement No.7 (Flow Control), or both as described in ECDC 18.30.060. Version: August 22, 2016 Packet Pg. 136 7.3.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 7/23 Threshold discharge area. An on -site area that drains to either a single natural discharge location or multiple natural discharge locations that combine within one -quarter mile downstream (as determined by the shortest flowpath). The examples below and in Figure G.1 presented in Volume I of the SWMMWW illustrate this definition. The purpose of this definition is to clarify how the thresholds of this code are applied to project sites with multiple discharge points. Example of a Site with a Example of a Site with Example of a Site with Single Natural Discharge Multiple Natural Multiple Natural Discharges and a Single Threshold Discharges and a Single and Multiple Threshold Discharge Area Threshold Discharge Area Discharge Areas 4Natural Natural Natural ,N ral Natural bischar�"4-- :flischarge� •� Discharge Dischalge •. ", Dischprge-----• -.. ------ -- Area Area 1 Area 2 Area 1 Area 2 THRESHOLD THRE HOLD HRESHOLD THRESHOLD DFSOHARGE AREA. �NSC ARGE--� ISCHARGE DISCHI�RGE-; (Shaded), ,A '" AREA Tti, A1�EA2 �ed) (ha)',""{ � Natural �� Natural —� i � Natural s Discharge discharge Discharge i Location l Location i Location f r r %Mile Downstream -_---------------- ------ Nhortest flow path) j Vehicular Use. Regular use of an impervious or pervious surface by motor vehicles. The following are subject to regular vehicular use: roads, un-vegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unrestricted access fire lanes, vehicular equipment storage yards, and airport runways. The following are not considered subject to regular vehicular use: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, restricted access fire lanes, and infrequently used maintenance access roads. Waterbody. Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. Waters of the state. Includes those waters defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State, and "waters of the state" as defined in Chapter 90.48 RCW which includes lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. Wetlands. As defined in ECDC 23.40.005. [Ord. 4026 § 1 (Att. A), 2016]. 18.30.020 Authority and Regulation. A. The Public Works and Utilities Director shall administer this chapter and shall be referred to as the Director. B. The Director shall have the authority to develop, implement, and enforce policies and procedures to administer and enforce this chapter per ECDC 18.30.110 and 18.30.120, such as the Edmonds Stormwater Addendum. Version: August 22, 2016 Packet Pg. 137 7.3.a Edmonds Page 8/23 Chapter 18.30 STORM WATER MANAGEMENT C. The requirements of this chapter are minimum requirements. They do not replace, repeal, abrogate, supersede, or affect any other more stringent requirements, rules, regulations, covenants, standards, or restrictions. Where this chapter imposes requirements that are more protective of human health or the environment than those set forth elsewhere, the provisions of this chapter shall prevail. When this chapter imposes requirements that are less protective of human health or the environment than those set forth elsewhere, the provisions of the more protective requirements shall prevail. D. The Director shall have the authority to impose additional requirements on a project or site to meet the purpose of this chapter based on site -specific factors including, but not limited to, location, soil conditions, slope, and designated use. E. Approvals and permits granted under this chapter are not waivers of the requirements of any other laws, nor do they indicate compliance with any other laws. Compliance is still required with all applicable federal, state and local laws and regulations, including rules promulgated under authority of this chapter. F. Compliance with the provisions of this chapter does not necessarily mitigate all impacts to the environment. Thus, compliance with this chapter should not be construed as mitigating all drainage water or other environmental impacts, and additional mitigation may be required to protect the environment pursuant to other applicable laws and regulations. The primary obligation for compliance with this chapter and for preventing environmental harm on or from property is placed upon the applicant. [Ord. 3792 § 1, 2010]. 18.30.030 Applicability. A. This chapter applies to applications submitted on or after January 1, 2017 and applications submitted prior to January 1, 2017, which have not started construction by January 1, 2022. B. This chapter applies to the following actions on sites that discharge to the City's MS4 or discharges to waters of the state whether or not a City -issued permit is required: 1. Land -disturbing activity, or 2. Creation of new hard surfaces, or 3. Replacement of existing hard surfaces, or 4. Conversion of pervious surfaces, or 5. New connections to the City's MS4, or 6. Any other actions that can increase the volume or rate of stormwater runoff, or cause the generation of pollutants, from the site. 18.30.040 Exemptions. A. Full Exemptions. The following land uses and land -disturbing activities are exempt from the provisions of this chapter: 1. Forest practices regulated under WAC Title 222, except for Class IV general forest practices that are conversions from timberland to other uses, are exempt from the provisions of the minimum requirements. 2. Commercial agriculture practices that involve working land for production are generally exempt. However, land conversion from timberland to agriculture and the construction of impervious surfaces are not exempt. 3. Construction of drilling sites, waste management pits, and associated access roads, and construction of transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations are exempt. Operators are encouraged to implement and Version: August 22, 2016 Packet Pg. 138 7.3.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 9/23 maintain best management practices to minimize erosion and control sediment during and after construction activities to help ensure protection of surface water quality during storm events. 4. The following pavement maintenance practices or activities are exempt: pothole and square -cut patching, overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of coverage, shoulder grading, reshaping/regrading drainage systems, crack sealing, resurfacing with in -kind material without expanding the road prism, pavement preservation activities that do not expand the road prism, and vegetation maintenance. B. Partial Exemptions. The following land uses and land -disturbing activities are partially exempt from the provisions of this chapter: 1. Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. 2, Construction Stormwater Pollution Prevention. 2. The following pavement maintenance practices or activities are considered development, and therefore are not categorically exempt. The extent to which these requirements apply is explained for each circumstance. a. Removing and replacing a paved surface to base course or a lower level, or repairing the pavement base: If impervious surfaces are not expanded, Minimum Requirements No. 1 — No. 5 apply when the thresholds identified for development projects in ECDC 18.30.060 are met. Where appropriate, project proponents are encouraged to look for opportunities to use permeable and porous pavements. b. Extending the pavement edge without increasing the size of the road prism or paving graveled shoulders: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. c. Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; or upgrading from gravel to asphalt or concrete; or upgrading from a bituminous surface treatment ("chip seal") to asphalt or concrete: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. 18.30.050 Administration. A. Application, Submittals, and Review. 1. The Director shall review all plans and all other submittals required by ECDC 18.30.050.A.3 for compliance with this chapter when: a. An application for a City permit is required under all other chapters of ECDC Title 18 or 19, or b. A subdivision application is submitted per ECDC 20.75.040. In all other situations when actions under ECDC 18.30.030 apply to a project site, review shall be under a Stormwater permit. 3. All stormwater review submittals shall contain, in addition to the information required under any other applicable City code, a Stormwater Site Plan as described in the Edmonds Stormwater Addendum (see ECDC 18.30.060) and any other information required by the Director. B. Inspections. 1. The Director shall inspect projects at various stages of the work to determine if they comply with the requirements of this chapter, and enforcement actions shall be taken as necessary. These inspections will include, but not be limited to, the following: a. Prior to site clearing and construction to assess site erosion potential, and Version: August 22, 2016 Packet Pg. 139 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 10/23 b. During construction to verify proper installation and maintenance of required erosion and sediment controls and other approved plan components, and c. All permanent stormwater treatment and flow control BMPs/facilities and catch basins in new residential developments every six months until 90 percent of the lots are constructed (or when construction is stopped and the site is fully stabilized) to identify maintenance needs and enforce compliance with maintenance standards as needed, and d. Upon completion of construction and prior to final approval to ensure proper installation of permanent stormwater control facilities and verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater treatment and flow control BMPs/facilities, and e. Post -Construction inspections per ECDC 18.30.090. 2. When reasonably required by the Director to accomplish the purpose of this chapter or to comply with local, state or federal law or regulation on stormwater, special inspection or testing shall be performed by the applicant. C. Fees. Application, review and inspection fees as set in ECDC Chapter 15.00 shall be paid. 18.30.060 Requirements. A. Documents. The sources of the stormwatcr management requirements for the City are from the following documents: 1. Western Washington Phase II Municipal Stormwater Permit, Appendix 1, modification date January 16, 2015 2. 2014 Stormwater Management Manual for Western Washington (SWMMWW) 3. The Edmonds Stormwater Addendum In the event of conflicts between the various provisions, the more stringent provision shall apply. B. Illicit Discharges and Connections. Non-Stormwater illicit discharges, including spills, into the MS4, groundwaters, or a water body from any developed or undeveloped lands are prohibited per ECDC Chapter 7.200 C. Thresholds and Applicability The thresholds outlined in this section are only applicable to ECDC 18.30.060.C. See also the Edmonds Stormwater Addendum for supplemental information on thresholds. a. All development shall be required to comply with Minimum Requirement No. 2. b. Category 1 project sites shall comply with Minimum Requirements No. 1 through No. 5. Category 1 includes projects that: i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or ii. Have land disturbing activity of 7,000 square feet or greater. c. Category 2 project sites shall comply with Minimum Requirements No. 1 through No. 9. Category 2 includes projects that: i. Result in 5,000 square feet, or greater, of new plus replaced hard surface area, or ii. Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or iii. Convert 2.5 acres, or more, of native vegetation to pasture. 2. Additional Requirements for road -related projects. For road -related projects, runoff from the new hard surfaces (including pavement, shoulders, curbs, and sidewalks) and the converted vegetation areas shall meet all the minimum requirements if the new hard surfaces total 5,000 square feet or more. In addition, if the new hard surfaces total 5,000 square feet or more and total 50 percent or more of the existing hard surfaces within Version: August 22, 2016 Packet Pg. 140 7.3.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 11/23 the project limits, runoff from the new and replaced hard surfaces and the converted vegetation areas shall meet all the minimum requirements. The project limits shall be defined by the length of the project and the width of the right-of-way. New Connections to the City's MS4 when the proposed connection does not involve activity that meets the definition of development. Sites that are not currently connected to the City's MS4 but that wish to connect directly or indirectly to the City's MS4 may be allowed on a case -by -case basis, subject to City approval. For sites that propose to drain greater than or equal to 2,000 square feet of hard surface area to the City's MS4, minimum requirements and BMPs associated with stormwater flow control and/or water quality treatment (such as those outlined in ECDC 18.30.060.D [I] through [9]) may be required if the connection poses any risk to downstream systems such as erosion, flooding, property damage, habitat damage, water quality degradation, or other related impacts. D. Minimum Technical Requirements. This section describes the minimum technical requirements for stormwater management at development sites. 1. Minimum Requirement No. 1 — Preparation of Stormwater Site Plans The City shall require a Stormwater Site Plan from all projects meeting the thresholds in ECDC 18.30.060.0 Stormwater Site Plans shall use site -appropriate development principles to retain native vegetation and minimize impervious surfaces to the extent feasible. Stormwater Site Plans shall be prepared in accordance with Chapter 3 of Volume 1 of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 2. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention Plan (SWPPP) a. Thresholds: i. All development projects are responsible for preventing erosion and discharge of sediment and other pollutants into receiving waters. Compliance with this minimum requirement can be achieved for an individual site if the site is covered under Ecology's General NPDES Permit for Stormwater Discharges Associated with Construction Activities and fully implementing the requirements of that permit. ii. A Construction SWPPP is required for all projects which a) result in 2,000 square feet or more of new plus replaced hard surface area, b) where a structure with an exterior hard surface area of at least 2,000 square feet is being demolished, c) which disturb 7,000 square feet or more of land, or d) when the site falls within the Earth Subsidence Landslide Hazard Area, Landslide Hazard Area or steep slope critical area. Projects that do not meet any of the above criteria are not required to prepare a Construction SWPPP, but must consider all of the elements listed below for Construction SWPPPs and develop controls for all Construction SWPPP elements that pertain to the project site. b. General Requirements: The SWPPP shall include a narrative and drawings. All BMPs shall be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative shall include documentation to explain and justify the pollution prevention decisions made for the project. Each of the thirteen elements referenced below must be considered and included in the SWPPP unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the narrative of the SWPPP. ii. Clearing and grading activities for developments shall be permitted only if conducted pursuant to an approved site development plan (e.g., building permit, subdivision approval) that establishes permitted areas of clearing, grading, cutting, and filling. These permitted clearing and grading areas and any other areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree retention areas as required by the City, shall be delineated on the site plans and the development site. Version: August 22, 2016 Packet Pg. 141 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 12/23 iii. The SWPPP shall be implemented beginning with initial land disturbance and until final stabilization. Sediment and Erosion control BMPs shall be consistent with the BMPs contained in Chapter 4 of Volume II of the SWMMWW. c. Seasonal Work Limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities may only be authorized by the City if it can be demonstrated that silt -laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and ii. Limitations on activities and the extent of disturbed areas; and iii. Proposed erosion and sediment control measures, in accordance with ECDC 18.30.060.D.2.d below. Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations, except for sites lying in whole or in part within an earth subsidence and landslide hazard area as defined by ECDC 19.10.020.F: Routine maintenance and necessary repair of erosion and sediment control BMPs, ii. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil, and iii. Activities where there is one hundred percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. d. Construction SWPPP Elements Construction SWPPP elements are required in accordance with Chapter 2, Section 2.5.2 of Volume I of the SWMMWW and the requirements in the Edmonds Stormwater Addendum 3. Minimum Requirement No. 3 — Source Control of Pollution All known, available and reasonable source control BMPs must be required for all projects approved by the City. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. 4. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location, to the maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. The discharge must have an identified overflow route that is safe and certain, and leads to the ultimate outfall location (such as a receiving water or municipal drainage system). All outfalls require energy dissipation. To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis. If an existing problem (or potential future problem after development) is identified, mitigation will be required to prevent worsening of that problem. A quantitative analysis may be required for any project deemed to need additional information or where the project proponent or the City determines that a quantitative analysis is necessary to evaluate the off -site impacts or the capacity of the conveyance system. See the Edmonds Stormwater Addendum for additional details on complying with this requirement. Version: August 22, 2016 Packet Pg. 142 Edmonds Chapter 18.30 STORM WATER MANAGEMENT 5. Minimum Requirement No. 5 — On -site Stormwater Management a. Applicability: Page 13/23 On -site Stormwater Management BMPs are required in accordance with the following project thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff on -site to the extent feasible without causing flooding or erosion impacts. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Project Thresholds: There are five project scenarios outlined below that determine the applicability of Minimum Requirement No. 5 — On -site Stormwater Management. The first four scenarios apply to projects that discharge directly or indirectly to the City's MS4. The fifth scenario applies to project discharges that do not enter the City's MS4. Note that more than one of the five scenarios may apply to a given project: Retrofit. Projects that discharge directly or indirectly to the City's MS4 and that contain existing hard surfaces on the parcel or common plan of development that do not drain to an approved Stormwater management facility are required to provide On -site Stormwater Management BMPs to manage a portion of those existing hard surfaces that will remain after project completion. BMPs from List No.I (See ECDC 18.30.060.D.5.d) shall be applied to a minimum of 25 percent of those existing unmanaged surfaces, but to no more than the area equal to the proposed new plus replaced hard surfaces. Only for those existing unmanaged hard surfaces that remain after project completion, applicants are not required to evaluate BMPs in priority order or document infeasibility for these existing surfaces (as is required under ECDC 18.30.060.D.5.b [ii] and [iii] below). However, if it is determined that the minimum 25 percent requirement cannot be met due to BMP infeasibility, documentation of BMP infeasibility is required. In addition, when runoff from exiting unmanaged hard surfaces is mixed with runoff from new plus replaced hard surfaces, those BMPs must be selected and designed in accordance with the requirements for management of new plus replaced hard surfaces (per sections [ii] and [iii] below). See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. ii. Category 1. Category 1 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 5 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.1 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.d); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iii. Category2. Category 2 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 9 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.2 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.e); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. Version: August 22, 2016 Packet Pg. 143 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 14/23 iv. Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the City's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID Performance Standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following: a. Projects must implement BMP T5.13 (Post -Construction Soil Quality & Depth); BMPs T5.I OA Downspout Full Infiltration Systems, T5.1 OB Downspout Dispersion Systems, or T5.1 OB Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Edmonds Way specific requirements. After applying the requirements in item (a) above, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post -development 10-, and 100-year recurrence interval peak flows shall not exceed, 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. V. Projects that do not drain directly or indirectly to the City's MS4 are required to implement one of the following: a. Project sites may discharge to the downstream private property (e.g., projects located above BNSF property) with approval from the downstream property owner(s). b. Project sites may discharge runoff to an on -site system. For sites located within earth subsidence and landslide hazard areas or their buffers, a geotechnical design, analysis, and report by a geotechnical engineer is required for the on -site system. On -site Stormwater Management BMPs from List No.1 in ECDC 18.30.060.D.5.d shall be evaluated for all new plus replaced hard surfaces and land disturbed. Projects are not required to evaluate BMPs in priority order or document infeasibility. The project applicant may be subject to an extra permit processing fee for City review of the geotechnical analysis. Projects are required to comply with all other applicable City requirements, such as ECDC 19.10 (earth subsidence and landslide hazard areas). ii. For sites located outside earth subsidence and landslide hazard areas or their buffers, ECDC 18.30.060.D.5.ii and ECDC 18.30.060.D.5.iii shall be followed to evaluate site appropriate BMP's. Subject to prior approval by the City, project sites may pump on -site runoff to the City's MS4. A quantitative downstream analysis in accordance with Minimum Requirement No. 4 and the Edmonds Stormwater Addendum will be required. If the City's MS4 does not have adequate capacity to receive the applicant's pumped flows, the applicant is required to install an on -site detention system to store runoff and pump it to the MS4 at an approved rate. c. LID Performance Standard For projects that elect to meet the LID Performance Standard to comply with ECDC 18.30.060.D.b (ii) and (iii), Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow from the project site. Refer to the Standard Flow Control Requirement section in Minimum Requirement No. 7 for information about the assignment of the pre -developed condition. Version: August 22, 2016 Packet Pg. 144 7.3.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 15/23 Project sites that must also meet Minimum Requirement No. 7 shall match flow durations between 8 percent of the 2-year flow through the full 50-year flow. d. List No.I for Category 1 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 5. For projects that elect to use List No. 1 to comply with ECDC 18.30.060.D.b (ii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW and the Edmonds Stormwater Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5. I OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Downspout Dispersion Systems in accordance with BMP T5.1 OB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. iv. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. e. List No.2 for Category 2 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 9. Version: August 22, 2016 Packet Pg. 145 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 16/23 For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5. I OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iii. Downspout Dispersion Systems in accordance with BMP T5.1OB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW. ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW. iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Version: August 22, 2016 Packet Pg. 146 Edmonds Chapter 18.30 STORM WATER MANAGEMENT 6. Minimum Requirement No. 6 — Runoff Treatment Page 17/23 a. Project Thresholds: When assessing road -related projects against the following thresholds, only consider those hard and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following require construction of stormwater treatment facilities: Projects in which the total of pollution -generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or ii. Projects in which the total of pollution -generating pervious surfaces (PGPS) — not including permeable pavements — is 0.75 acres or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. b. Treatment -Type Thresholds and Facility Sizing: Treatment -Type Thresholds in accordance with Step 2 (Oil Control), Step 4 (Phosphorus Treatment), Step 5 (Enhanced Treatment), and Step 6 (Basic Treatment) of Chapter 2, Section 2.1, Volume V of the SWMMWW. Phosphorus treatment shall be required for projects draining to Hall Creek and Lake Ballinger. ii. Treatment Facility Sizing, including Water Quality Design Storm Volume, Water Quality Design Flow Rate, and Downstream Facilities, of Chapter 2, Section 2.5.6, Volume I of the SWMMWW. c. Treatment Facility Selection, Design, and Maintenance Stormwater treatment facilities shall be: i. Selected in accordance with the process identified in Chapter 4 of Volume I, and Chapter 2 of Volume V of the SWMMWW, ii. Designed in accordance with the design criteria in Volume V of the SWMMWW, and iii. Maintained in accordance with the maintenance schedule in Volume V of the SWMMWW. d. Additional Requirements The discharge of untreated stormwater from pollution -generating surfaces to ground water will not be authorized by the City. All associated runoff must be treated using On -site Stormwater Management BMPs designed to provide the required level of treatment in accordance with Chapter 5, Volume V and Chapter 7, Volume V of the SWMMWW; or by infiltration through soils meeting the soil suitability criteria in Chapter 3 of Volume III of the SWMMWW. Minimum Requirement No. 7 — Flow Control a. Applicability: Flow control is required on projects meeting the thresholds summarized below to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. Flow control in accordance with Minimum Requirement No. 7 is not required for projects that discharge directly to, or indirectly through the City's MS4 to Puget Sound (other minimum requirements may still apply). See ECDC 18.30.060.D.5.b.iv and Section 2.5.7 of Volume I of the SWMMWW for additional restrictions applicable to direct discharges to Puget Sound. If the discharge drains to a stream that leads to a wetland, or to a wetland that has an outflow to a stream, both this minimum requirement (Minimum Requirement No. 7) and Minimum Requirement No. 8 apply. Version: August 22, 2016 Packet Pg. 147 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 18/23 b. Thresholds: When assessing road -related projects against the following thresholds, only consider only those impervious, hard, and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following circumstances require achievement of the standard flow control requirement for western Washington: Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or ii. Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold discharge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or iii. Projects that through a combination of hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second (cfs) increase or greater in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one -hour time steps (or a 0.15 cfs increase or greater using 15-minute time steps). Standard Flow Control Requirement (applies to discharges directly or indirectly to the City's MS4, except for projects that meet the direct discharge requirements outlined in "a" above): Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. The pre -developed condition to be matched shall be a forested land cover unless reasonable, historic information is available that indicates the site was prairie prior to settlement (modeled as "pasture" in the Western Washington Hydrology Model). This standard requirement is waived for sites that will reliably infiltrate all the runoff from hard surfaces and converted vegetation areas. d. Additional Requirement: Flow Control BMPs shall be selected, designed, and maintained in accordance with Volume III of the SWMMWW or an approved equivalent. 8. Minimum Requirement No. 8 — Wetlands Protection a. Applicability: The requirements below apply only to projects whose stormwater discharges into a wetland, either directly or indirectly through a conveyance system. b. Thresholds: The thresholds identified in Minimum Requirement No. 6 — Runoff Treatment, and Minimum Requirement No. 7 — Flow Control shall also be applied to determine the applicability of this requirement to discharges to wetlands. c. Standard Requirement: Projects shall comply with Guide Sheets No. 1 through No. 3 in Appendix I-D of the SWMMWW. The hydrologic analysis shall use the existing land cover condition to determine the existing hydrologic conditions unless directed otherwise by a regulatory agency with jurisdiction. d. Additional Requirements: Stormwater treatment and flow control facilities shall not be built within a natural vegetated buffer, except for: i. Necessary conveyance systems as approved by the City; or ii. As allowed in wetlands approved for hydrologic modification or treatment in accordance with Guide Sheet 2 in Appendix I-D of the SWMMWW. An adopted and implemented basin plan prepared in accordance with the provisions of Section 7 of Appendix 1 of the Phase II NPDES Municipal Stormwater Permit. Version: August 22, 2016 Packet Pg. 148 Edmonds Chapter 18.30 STORM WATER MANAGEMENT 9. Minimum Requirement No. 9 — Operation and Maintenance Page 19/23 An operation and maintenance manual that is consistent with the provisions in Volume I and Volume V of the SWMMWW is required for proposed Stormwater Treatment and Flow Control BMPs/facilities. The party (or parties) responsible for maintenance and operation shall be identified in the operation and maintenance manual. For private facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -site or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate department. A log of maintenance activity that indicates what actions were taken shall be kept and be available for inspection. 18.30.070 Exceptions, Adjustments, and Appeals. A. Exceptions. 1. The Director may approve a request for an exception to the minimum requirements of this chapter following legal public notice of an application for an exception and of the Director's decision on the application. All legal public notice related to this request for an exception shall be in the manner prescribed in ECDC 20.03.002 and the applicant shall pay all costs to publish the legal public notices required by this provision. The Director shall provide and keep written findings of fact of the decision. 2. The approval of the exception shall only be granted when the applicant demonstrates that the requirement would cause a severe and unexpected economic hardship. To determine whether the requirement imposes a severe and unexpected economic hardship on the project applicant, the applicant must document for City review and approval, all of the following, at a minimum: a. The current, pre -project use of the site; and b. How application of the requirement(s) for which an exception is being requested restricts the proposed use of the site compared to the restrictions that existed prior to adoption of this chapter; and c. The possible remaining uses of the site if the exception were not granted; and d. The possible uses of the site that would have been allowed prior to the adoption of this chapter; and e. A comparison of the estimated amount and percentage of value loss as a result of the requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the requirements of this chapter; and f. The feasibility of the applicant to alter the project to apply the requirements of this chapter. 3. Any exception must meet the following criteria: a. The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and b. The exception is the least possible exception that could be granted to comply with the intent of the minimum requirements. 4. An exception to the requirements shall only be granted to the extent necessary to provide relief from the economic hardship as determined by the Director, to alleviate the harm or threat of harm to the degree that compliance with the requirement becomes technically feasible, or to perform the emergency work that the Director determines is warranted. 5. The Director may require an applicant to provide additional information at the applicant's expense, including (but not limited to) an engineer's report or analysis. Version: August 22, 2016 Packet Pg. 149 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 20/23 6. When an exception is granted, the Director may impose new or additional requirements to offset or mitigate harm or the threat of harm that may be caused by granting the exception, or that would have been prevented if the exception had not been granted. B. Adjustments. 1. The Director may approve a request for adjustments to the requirements of this chapter when the Director finds that: a. The adjustment provides substantially equivalent environmental protection; and b. The objectives of safety, function, environmental protection, and facility maintenance are met, based on sound engineering practices. During construction, the Director may require, or the applicant may request, that the construction of drainage control facilities and associated project designs be adjusted if physical conditions are discovered on the site that are inconsistent with the assumptions on which the approval was based, including (but not limited to) unexpected soil or water conditions, weather -generated problems, or changes in the design of the improved areas; and A request by the applicant for an adjustment shall be submitted to the Director for review and approval prior to implementation. The request shall be in writing and shall provide facts substantiating the requirements of subsection (C)(1) of this section, and if made during construction, the factors in subsection (C)(2) of this section. Any such modifications made during the construction of drainage control facilities shall be included with the final approved drainage control plan. C. Appeal. 1. The Director's decision on an application for an exception or adjustment may appeal to the hearing examiner in accordance with a Type II appeal process in ECDC Chapter 20.06. 2. The applicant shall carry the burden of proof. 3. The decision of the hearing examiner is appealable to superior court in accordance with Chapter 36.70C RCW. [Ord. 3792 § 1, 2010]. 18.30.080 Access and Covenants. A. Access. Proper ingress and egress shall be provided to the City to inspect or perform any duty imposed upon the City by this Title. The City shall notify the responsible party in writing of a failure to provide access. If the responsible parry fails to respond within seven days from the receipt of notification, the City may order the work required completed or otherwise address the cause of improper access. The obligation for the payment of all cost that may be incurred or expended by the City in causing such work to be done shall be imposed on the person holding title to the subject property B. Covenants. Maintenance covenants shall be required for each site/lot that will be maintained by a private entity such as an individual, corporation, or homeowner's association. The maintenance covenant shall address or append requirements and responsibilities for long-term management and maintenance the applicable BMP(s). Maintenance covenants shall be as specified in City Engineering Division documents or approved by the Director, and recorded with Snohomish County and on all proper deeds [Ord. 3792 § 1, 2010]. 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. Proper construction inspection and maintenance of stormwater facilities is essential for the protection of the City's MS4 and the environment. A. Stormwater Maintenance and Inspection Standards. Stormwater facilities shall be inspected and maintained per the requirements of Volume I and Volume V of the SWMMWW. For systems which do not have a maintenance standard, the owner shall develop a standard based on guidelines from the manufacturer, designer, or a registered professional Version: August 22, 2016 Packet Pg. 150 7.3.a Edmonds Page 21/23 Chapter 18.30 STORM WATER MANAGEMENT engineer and submit the standards to the Director for approval. The purpose of the maintenance standard is to determine if maintenance is required. The maintenance standard is not a measure of the facility's required condition at all times between inspections. Exceeding the maintenance standard between inspections is not a violation of this chapter. B. Ownership. Stormwater facilities are either privately or publicly owned and maintained. All stormwater facilities that serve private property are private, unless an agreement between the property owner and the City states otherwise. Stormwater facilities that are privately owned by a homeowner's association or similar organization also are private. The City may offer an incentive program to owners to support the proper maintenance of private storm drainage facilities. C. Public Stormwater Facilities. The City shall be responsible for operating, maintaining, repairing, and replacing public stormwater facilities as funded through the Stormwater Utility. D. Maintenance and Inspection of Permanent Facilities. All privately owned storm drainage facilities or controls shall be maintained by the owner, or the homeowner or owner association ("owner") if one is established as part of a residential or commercial development. All private storm drainage facilities shall be regularly inspected to ensure proper operation and shall monitor the facility or control as required or as set forth in the SWMMWW. The Owner shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person who took it, the date said action was taken, how it was done, and any problems encountered or follow-up actions required. The records shall be made available to the City upon request. The Owner shall maintain a copy of the Stormwater Operations and Maintenance Manual (if required) on site, and shall make reference to such document in real property records filed with Snohomish County, so others who acquire real property served by the privately owned storm drainage facilities or controls are notified of their obligation to maintain such facilities or controls. E. City Inspection of private stormwater facilities. The City shall have the authority to periodically inspect private stormwater facilities, including low impact development stormwater facilities, for compliance with this chapter. F. Right of Entry. An authorized representative of the City may enter private property at all reasonable times to conduct inspections, tests or to carry out other duties imposed by the a state or Federal program provided that the City makes a good faith effort to notify the property owner or person responsible for the premises prior to entering and presents proper credentials to that person. If entry is refused or cannot be obtained, the Director shall have recourse to every remedy provided by law to secure entry, including but not limited to, obtaining an administrative warrant for entry. G. Right of Entry for Illicit Discharge. In the event of an illicit discharge from a privately -owned stormwater facility caused by improper maintenance or operation or other circumstance, the provisions of ECC 7.200 shall apply. H. Maintenance Responsibilities. Upon written notice by the City, a private stormwater facility shall be promptly repaired and/or brought up to applicable standards by the property owner or the person responsible for said facility. If a private stormwater facility serves multiple lots and the responsibility for maintenance has not been specified on a recorded subdivision plat, short plat, or other legal document, maintenance, operation and repair responsibility shall rest with the homeowners' association, if one exists, or otherwise with the properties served by the facility, or finally, with the owners of the property on which the facilities are located. I. Disposal of Waste from Maintenance Activities. Disposal of waste from maintenance activities shall be conducted in accordance with the minimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines for disposal of waste materials from storm water maintenance activities, and where appropriate, the Dangerous Waste Regulations, Chapter 173-303 WAC. 18.30.100 Enforcement Procedures. A. General enforcement action shall be in accordance with this chapter whenever a person has violated any provision of this chapter. The choice of enforcement action is at the discretion of the City. Version: August 22, 2016 Packet Pg. 151 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 22/23 B. Civil Penalties Adopted. ECDC Chapter 20.110 enforcement procedures are herein adopted in full, as modified in this chapter, with the proviso that repeat offenders or violations deemed an immediate public hazard shall be subject to compliance and appeal timelines as deemed appropriate by the Director based on the specific nature of the violation. C. Maintenance Orders. The Director shall have the authority to issue to an owner or person an order to maintain or repair a component of a stormwater facility or BMP to bring it into compliance with this chapter, the SWMMWW, the Edmonds Stormwater Addendum, and the Edmonds Community Development Code. The order shall include: 1. A description of the specific nature, extent and time of the violation and the damage or potential damage that reasonably might occur; 2. A notice that the violation or the potential violation cease and desist and, in appropriate cases, the specific corrective actions to be taken; and 3. A reasonable time to comply, depending on the circumstances. D. Civil Penalty. A person who fails to comply with the requirements of this chapter, who fails to conform to an approval or order issued, who undertakes development without first obtaining approval, or who fails to comply with a stop work order issued under these regulations shall be subject to a civil penalty levied in accordance with the provisions of ECDC Chapter 20.110; provided, however, that the appeal process shall commence with a notice of violation as provided in ECDC 20.110.040.13. 1. Civil penalties for code violations shall be imposed in accordance with the provisions of ECDC Chapter 20.110; provided, however, that in addition to the penalties set forth in that chapter, the hearing examiner is authorized to levy a penalty of up to twenty thousand dollars ($20,000) per occurrence based upon an assessment of the following factors. Where such factors are present, the hearing examiner is authorized to levy such penalty after taking into consideration the full impact of the violation and any mitigating circumstances (see subsection (2) below): a. The violation created a risk to public health and the significance of the risk. b. The violation damaged the environment and the significance of the damage. c. The violation caused damage to public and private property and the significance of such damage. d. A history of similar violations, if any. e. The economic benefit of the violations, if any, to the person or entity responsible for the violations. 2. Mitigating circumstances which may be used to offset or reduce the time resulting from the application of the preceding factors are limited to: a. Full compliance with a voluntary compliance agreement and no history of similar violations. b. Full compliance with a voluntary compliance agreement and a history of one or two similar violations (lesser reduction). c. A "voluntary compliance agreement" is defined as a legally binding agreement entered into between the City and the alleged violators, by which the violator(s) acknowledge the existence of the violation, waive all appeal rights, and agree to and do pay a fine in an amount stipulated to between the violator and the City. 3. If the violation(s) are not corrected as ordered, or a voluntary compliance agreement is not entered into within that time period and no appeal is filed, the penalty for the next 15-day period shall be 150 percent of the initial penalties, and the penalties for the next 15-day period shall be 200 percent of the initial penalties. The intent of this subsection is to increase penalties beyond the maximum penalties stated as an additional means to achieve timely compliance. Version: August 22, 2016 Packet Pg. 152 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 23/23 Unless otherwise provided in a voluntary compliance agreement, civil penalties shall be paid within 30 days of service of the notice and order or stop work order if not appealed. Payment of the civil penalties assessed under this chapter does not relieve a person found to be responsible for a code violation of his or her duty to correct the violation or to pay any and all civil penalties or other cost assessments issued pursuant to this chapter. The City may suspend immediate payment of civil penalties if the person responsible for a code violation has entered into a voluntary compliance agreement. Penalties shall begin to accrue again pursuant to the terms of the voluntary compliance agreement if any necessary permits applied for are denied, canceled or not pursued, if corrective action identified in the voluntary compliance agreement is not completed as specified, or if the property is allowed to return to a condition similar to that condition which gave rise to the voluntary compliance agreement; provided, however, that additional penalties shall not be imposed until additional notice and opportunity for hearing have been provided in accordance with ECDC Chapter 20.110. Civil penalties assessed create joint and several personal obligations in all persons responsible for a code violation. E. The determination of the hearing examiner issued in accordance with ECDC Chapter 20.110 shall be appealable to the Snohomish County superior court in accordance with the provisions of Chapter 36.70C RCW. F. The remedies provided for in this section shall not be exclusive. The City may also use other civil and administrative remedies available to it, including but not limited to the remedies provided in ECDC Title 19 and the state building and dangerous buildings codes I Version: August 22, 2016 Packet Pg. 153 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Chapter 18.30 STORMWATER MANAGEMENT Sections: 18.30.000 Purposes. 18.30.010 Definitions. 18.30.020 Authority and Regulation. 18.30.030 Applicability. 18.30.040 Exemptions. 18.30.050 Administration. 18.30.060 Requirements. 18.30.070 Exceptions, Adjustments, and Appeal. 18.30.080 Access and Covenants. 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. 18.30.100 Enforcement Procedures. Page 1/23 18.30.000 Purposes. A. To set forth standards for managing stormwater runoff from construction and development sites to minimize: 1. Degradation of surface water quality by controlling the scouring and sedimentation of creeks, streams, wetlands, ponds, lakes, other water bodies. 2. Degradation of groundwater quality. 3. Damage to adjacent and other downstream private properties from erosion or other impacts from stormwater runoff. 4. Damage of City -owned parcels, City roads, rights -of -way and associated infrastructure. B. To comply with requirements in the Phase 11 National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit as issued by the Washington State Department of Ecology (Ecology). C. To complement site planning activities that minimize: 1. Impervious surfaces area. 2. The loss of native or non-native site vegetation. 3. The generation of stormwater runoff. D. To make low impact development (LID) the preferred and commonly used approach to site development; to require LID be considered at the site planning stage; and to implement LID BMPs unless they are infeasible. E. To require that all publicly -owned and privately -owned Stormwater Treatment and Flow Control best management practices (BMPs)/Facilities are operated, maintained and repaired in manner that conforms to this chapter. F. To provide the authority for the City to inspect privately -owned Stormwater Treatment and Flow Control BMPs/Facilities. G. To provide enforcement procedures for ensuring compliance with this chapter. 18.30.010 Definitions. For the purposes of this chapter, the following definitions shall apply: Version: SeptembeF4August 22, 20156 Packet Pg. 154 7.3.b Edmonds Page 2/23 Chapter 18.30 STORM WATER MANAGEMENT Arterial. A road or street primarily for through traffic. The term generally includes roads or streets considered collectors. It does not include local access roads which are generally limited to providing access to abutting property See also RCW 35.78.010, RCW 36.86.070, and RCW 47.05.021. Adjustment. A variation in the application of a minimum requirement to a particular project. Adjustments provide substantially equivalent environmental protection. Applicant. The owning individual(s) or corporations or their representatives applying for the permits or approvals described in this chapter. Approval. The proposed work or completed work conforming to this chapter as approved by the public works Director or their designee. Best management practices (BMPs). The schedules of activities, prohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by the City that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to waters of Washington State. Bioretention. Engineered facilities that treat stormwater by passing it through a specified soil profile, and either retain or detain the treated stormwater for flow attenuation. Refer to the 2014 Stormwater Management Manual for Western Washington (SWMMWW), Chapter 7 of Volume V for bioretention BMP types and design specifications. Category 1 Project Site. A project site subject to Minimum Requirements No.l through No.S. See ECDC 18.30.60.0 Category 2 Project Site. A project site subject to Minimum Requirements No.l through No.9. See ECDC 18.30.60.0 Certified Erosion and Sediment Control Lead (CESCL). An individual who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMMWW). A CESCL is knowledgeable in the principles and practices of erosion and sediment control. The CESCL must have the skills to assess site conditions and construction activities that could impact the quality of stormwater and, the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Certification is obtained through an Ecology approved erosion and sediment control course. Course listings are provided online at Ecology's website. City's municipal separate storm sewer system or "MS4." A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) that are owned or operated by the City of Edmonds, designed or used for collecting or conveying stormwater, and are not a combined sewer nor part of a publicly owned treatment works as defined in 40 Code of Federal Regulations (CFR) 122.2, and which is defined as "large" or "medium" or "small" or otherwise designated by Ecology pursuant to 40 CFR 122.26. Clearing. The destruction and removal of vegetation by manual, mechanical, or chemical methods. Commercial Agriculture. Those activities conducted on lands defined in RCW 84.34.020(2) and activities involved in the production of crops or livestock for commercial trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. Common plan of development or sale. A site where multiple separate and distinct construction activities may be taking place at different times on different schedules and/or by different contractors, but still under a single plan. Examples include: 1) phase projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; 3) projects in a contiguous area that may be unrelated but still under the same contract, such as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, Version: SeptembeF4August 22, 20156 a� 0 U c a� E d O C O L d M 3 E L 0 N c0 C O .y L d to O N N O O O E 0 w J a Z LL O M C6 U 0 U W N C 0 E t v R a C N E t t� O r r Q Packet Pg. 155 7.3.b Edmonds Page 3/23 Chapter 18.30 STORM WATER MANAGEMENT pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determine permit requirements. Converted vegetation (areas). The change in land cover changed from native vegetation, pasture scrub/shrub, or unmaintained non-native vegetation to lawn or landscaped areas, or where native vegetation is converted to pasture. Creek. Is synonymous with "streams," which is defined in ECDC 23.40.320. Detention facility. An above or below ground facility, such as a pond or tank, that temporarily stores stormwater runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored stormwater. Development. Land -disturbing activities, including Class IV general forest practices that are conversions from timber land to other uses. Creation or addition of hard surfaces, or replacement of hard surface that is not part of a routine maintenance activity. Structural development, including construction, installation, replacement, or expansion of a building or other structure. Subdivision, short subdivision, and binding site plans, as defined and applied in Chapter 58.17 RCW Director. The City's Public Works and Utilities Director or a designee with an appropriate background in engineering or another related discipline. Discharge point. The location where a discharge leaves the municipal separate storm sewer system (MS4) through the City's MS4 facilitiesBMPs designed to infiltrate. Ecology. The Washington State Department of Ecology. Effective impervious surface. Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system. Impervious surfaces on residential development sites are considered ineffective if: 1) the runoff is dispersed through at least 100 feet of native vegetation in accordance with BMP T5.30 — "Full Dispersion," as described in Chapter 5 of Volume V of the SWMMWW; 2) residential roof runoff is infiltrated in accordance with downspout Full Infiltration Systems in BMP T5.10A in Volume III of the SWMMWW; or 3) approved continuous runoff modeling methods indicate the entire runoff file is infiltrated. Erodible or leachable materials. Wastes, chemicals, or other substances that measurably alter the physical or chemical characteristics of runoff when exposed to rainfall. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Erosion. The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Also, detachment and movement of soil or rock fragments by water, wind, ice, or gravity. See the SWMMWW Glossary for examples of types of water erosion. Excavation. The mechanical removal of earth material. Exception. Relief from the application of a minimum requirement to a project. Fill. A deposit of earth material placed by artificial means. Groundwater. Water in a saturated zone or stratum beneath the land surface or below a water body. Hard surface. An impervious surface, a permeable pavement, or a vegetated roof. Highway. A main public road connecting towns and cities. In Edmonds, this includes State Route 99, State Route 524, and portions of State Route 104, that are classified as principal arterials in the City's comprehensive transportation plan. Illicit discharge. Any direct or indirect non-stormwater discharge to the City's MS4, groundwaters, or a water body, except as expressly allowed by ECDC Chapter 7.200. Version: SeptembeF4Aqgust 22, 20156 to C O .y L N to O N N O 00 O E O L w J a Z LL O M O U 0 U W r Q Packet Pg. 156 7.3.b Edmonds Page 4/23 Chapter 18.30 STORM WATER MANAGEMENT Impervious surface. A non -vegetated surface area that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non -vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces that similarly impede the natural infiltration of stormwater. Open, uncovered retention/detention facilities shall not be considered impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. Open, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. Outdoor swimming pools shall be considered impervious surfaces in all situations. In addition, lawns, landscaping, sports fields, golf courses, and other areas that have modified runoff characteristics resulting from the addition of underdrains and impermeable or low permeability liners are to be considered impervious surfaces. If no liner is installed, these areas (lawns, landscaping, sports fields, golf courses, etc.) served by underdrains may be considered pervious if the underdrain is set a minimum of 8 inches above the in -situ soils in a manner to allow infiltration over the facility bottom. Lake. An inland body of fresh water surrounded by land. Land disturbing activity. Any activity that results in a change in the existing soil cover (both vegetative and non -vegetative) and/or the existing soil topography. Land -disturbing activities include but are not limited to demolition, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land -disturbing activity. Vegetation maintenance practices, including landscape maintenance and gardening, are not considered land -disturbing activity. Stormwater facility maintenance is not considered land disturbing activity if conducted according to established standards and procedures. Low impact development (LID). A stormwater and land use strategy that strives to mimic pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on -site features, site planning, and distributed stormwater management practices that are integrated into a project design. LID Best Management Practices (BMPs). Distributed stormwater management practices, integrated into a project design, that emphasize pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re -use. LID principles. Land use management strategies that emphasize conservation, use of on -site natural features, and site planning to minimize impervious surfaces, native vegetation loss, and stormwater runoff. Maintenance. Repair and maintenance activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include replacement of dysfunctional facilities, including cases where environmental permits require replacing an existing structure with a different type structure, as long as the functioning characteristics of the original structure are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. In regard to stormwater facilities, maintenance includes assessment to ensure ongoing proper operation, removal of built up pollutants (i.e., sediments), replacement of failed or failing treatment media, and other actions taken to correct defects as identified in the maintenance standards of Chapter 4, Volume V of the SWMMWW. Maximum extent practicable (MEP). Refers to paragraph 402(p)(3)(B)(iii) of the federal Clean Water Act which reads as follows: Permits for discharges from municipal storm sewers shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques, and system, design, and engineering methods, and other such provisions as the Administrator or the State determines appropriate for the control of such pollutants. MS4. The City's municipal separate storm sewer system. Version: SeptembeF4Aqgust 22, 201-56 J a Z LL O M O U 0 U W r Q Packet Pg. 157 7.3.b Edmonds Page 5/23 Chapter 18.30 STORM WATER MANAGEMENT Native vegetation. Vegetation comprised of plant species, other than noxious weeds, indigenous to the coastal region of the Pacific Northwest which could have been reasonably expected to occur naturally on the site. Examples include trees such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. Natural drainage systems and outfalls. The location of the channels, swales, and other non -manmade conveyance systems as defined by the earliest documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. Outfall. A point source as defined by 40 CFR 122.2 at the point where a discharge leaves the City's MS4 and enters a surface receiving waterbody or surface receiving waters. Outfall does not include pipes, tunnels, or other conveyances which connect segments of the same stream or other surface waters and are used to convey primarily surface waters (i.e., culverts). On -site Stormwater Management BMPs. A synonym for Low Impact Development BMPs Permeable pavement. Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Pervious Surface. Any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. Person. Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or City government unit, however designated. Pollution -generating hard surface (PGHS). Those hard surfaces considered to be a significant source of pollutants in stormwater runoff. See the listing of surfaces under pollution -generating impervious surface. Pollution -generating impervious surface (PGIS). Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to: vehicular use; industrial activities (as further defined in the glossary of the SWMMWW); storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall; metal roofs unless they are coated with an inert, non -leachable material (e.g., baked -on enamel coating); or roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities. Pollution -generating pervious surfaces (PGPS). Any non -impervious surface subject to vehicular use, industrial activities (as further defined in the glossary of the SWMMWW); or storage of erodible or leachable materials, wastes, or chemicals, and that receive direct rainfall or run-on or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include permeable pavement subject to vehicular use, lawns, and landscaped areas including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). Pre -developed condition. The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre -developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. Project site. That portion of a property, properties, and/or right-of-way subject to land -disturbing activities, new impervious -hard surfaces, or replaced impervious -hard surfaces. For projects that involve land disturbing activity on one or more parcels and land disturbing activity in the City right-of-way, the "Project site" includes all areas of land disturbance. If the project is part of a common development plan or sale, the disturbed area of the entire plan shall be used in determining permit requirements. Rain garden. A non -engineered shallow landscaped depression, with compost -amended native soils and adapted plants. The depression is designed to pond and temporarily store stormwater runoff from adjacent areas, and to allow stormwater to pass through the amended soil profile. Version: SeptembeF4Aqgust 22, 20156 J a z LL O M 00 U 0 U W N C d E t v R a C N E t t� O r r Q Packet Pg. 158 7.3.b Edmonds Page 6/23 Chapter 18.30 STORM WATER MANAGEMENT Receiving waterbody or Receiving waters. Naturally and/or reconstructed naturally occurring surface water bodies, such as creeks, streams, rivers, lakes, wetlands, estuaries, and marine waters, or groundwater, to which a MS4 discharges. Replaced hard surface. For structures means the removal and replacement of hard surfaces down to the foundation. For other hard surfaces, it means the removal down to bare soil or base course and replacement. Replaced impervious surface. For structures, the removal and replacement of any exterior impervious surfaces down to the foundation. For other impervious surfaces, it means the removal down to bare soil or base course and replacement. Roadway. Traveled impervious -hard surface portion of any public or private road or street. Road -related project. A project that all of, or the majority of, the new or replaced hard surface consist of roadway, shoulders, curbs, gutters, sidewalks, or walkways, either publicly or privately funded. Runoff. Water originating from rainfall and other precipitation that is found in drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands, as well as shallow ground water. It also means the portion of rainfall or other precipitation that becomes surface flow and interflow. Site. The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to development. For road projects, or utility projects in the right-of-way, the length of the project site and the right-of-way boundaries define the site. Slope. The degree of deviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a 90-degree slope being vertical (maximum) and 45 degrees being a 1:1 or 100 percent slope. Soil. The unconsolidated mineral and organic material on the intermediate surface of the earth that serves as a natural medium for the growth of land plants. Source control BMPs. A structure or operation that is intended to prevent pollutants from coming into contact with storm water through physical separation of areas or careful management of activities that are sources of pollutants. The SWMMWW separates source control BMPs into two types. Structural source control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume IV of the SWMMWW for details. Stormwater facility. A constructed component of a stormwater drainage system, designed and constructed to perform a particular function or multiple functions. Stormwater facilities include, but are not limited to, pipes, swales, ditches, culverts, street gutters, detention ponds, retention ponds, constructed wetlands, infiltration devices, catch basins, oil/water separators, and biofiltration swales. Stormwater Management Manual for Western Washington (SWMMWW). The Washington State Department of Ecology's 2012 (as amended in 2014) Stormwater Management Manual for Western Washington. Referred to as the 2014 SWMMWW. Stormwater site plan. The comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed development project for compliance with stormwater requirements. Contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It includes a Construction Stormwater Pollution Prevention Plan (Construction SWPPP) and a Permanent Stormwater Control Plan (PSC Plan). Guidance on preparing a Stormwater Site Plan is contained in Chapter 3 of Volume I of the SWMMWW. Stormwater Treatment and Flow Control BMPs/Facilities. Detention facilities, treatment BMPs/facilities, bioretention, vegetated roofs, and permeable pavements that help meet Minimum Requirements No.6 (Treatment), Minimum Requirement No.7 (Flow Control), or both as described in ECDC 18.30.060. Version: SeptembeF4August 22, 20156 J a z O M 00 U 0 U W N C d E t v R a C N E t t� O r r Q Packet Pg. 159 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 7/23 Threshold discharge area. An on -site area that drains to either a single natural discharge location or multiple natural discharge locations that combine within one -quarter mile downstream (as determined by the shortest flowpath). The examples below and in Figure G.1 presented in Volume I of the SWMMW W illustrate this definition. The purpose of this definition is to clarify how the thresholds of this code are applied to project sites with multiple discharge points. Example of a Site with a Example of a Site with Example of a Site with Single Natural Discharge Multiple Natural Multiple Natural Discharges and a Single Threshold Discharges and a Single and Multiple Threshold Discharge Area Threshold Discharge Area ❑is charge Areas Natllra! •- Mscharge—"•"." NAgral Natural bischiMe"..-- ---Discharge----- -." Natural Natural " ---bischarge",_ Discharge-----• -.. """""""-"l Area Area 1 Area 2 Area 1 Area 2 THRESHOLD DfSCHARGE _---- THRE HOLD W "�""' "" HREStiOLD THRESHD DISCHARB AREA_ NSC ARG�-� SCHARGE Shaded ti [ } \A AREA 1%• 4T EA2 .4 ed) , ...... " Natural � � Natural i Discharge �� Discharge Natural s Discharge i Location Location 's Location F ' r � 1 % M i le Downstream .!----------------- --- -------------- ^- -- (shortest flow Path) 4--- Vehicular Use. Regular use of an impervious or pervious surface by motor vehicles. The following are subject to regular vehicular use: roads, un-vegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unrestricted access fire lanes, vehicular equipment storage yards, and airport runways. The following are not considered subject to regular vehicular use: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, restricted access fire lanes, and infrequently used maintenance access roads. Waterbody. Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. Waters of the state. Includes those waters defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State, and "waters of the state" as defined in Chapter 90.48 RCW which includes lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. Wetlands. As defined in ECDC 23.40.005. [Ord. 4026 § 1 (Art. A), 2016]. Version: 4Au�st 2222, 201-56 Packet Pg. 160 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT 18.30.020 Authority and Regulation. Page 8/23 A. The Public Works and Utilities Director shall administer this chapter and shall be referred to as the Director. B. The Director shall have the authority to develop, implement, and enforce policies and procedures to administer and enforce this chapter per ECDC 18.30.110 and 18.30.120, such as the Edmonds Stormwater Addendum. C. The requirements of this chapter are minimum requirements. They do not replace, repeal, abrogate, supersede, or affect any other more stringent requirements, rules, regulations, covenants, standards, or restrictions. Where this chapter imposes requirements that are more protective of human health or the environment than those set forth elsewhere, the provisions of this chapter shall prevail. When this chapter imposes requirements that are less protective of human health or the environment than those set forth elsewhere, the provisions of the more protective requirements shall prevail. D. The Director shall have the authority to impose additional requirements on a project or site to meet the purpose of this chapter based on site -specific factors including, but not limited to, location, soil conditions, slope, and designated use. E. Approvals and permits granted under this chapter are not waivers of the requirements of any other laws, nor do they indicate compliance with any other laws. Compliance is still required with all applicable federal, state and local laws and regulations, including rules promulgated under authority of this chapter. F. Compliance with the provisions of this chapter does not necessarily mitigate all impacts to the environment. Thus, compliance with this chapter should not be construed as mitigating all drainage water or other environmental impacts, and additional mitigation may be required to protect the environment pursuant to other applicable laws and regulations. The primary obligation for compliance with this chapter and for preventing environmental harm on or from property is placed upon the applicant. [Ord. 3792 § 1, 2010]. 18.30.030 Applicability. A. This chapter applies to applications submitted on or after January 1, 2017 and applications submitted prior to January 1, 2017, which have not started construction by January 1, 2022. B. This chapter applies to the following actions on sites that discharge to the City's MS4 or discharges to waters of the state whether or not a City -issued permit is required: 1. Land -disturbing activity, or 2. Creation of new hard surfaces, or 3. Replacement of existing hard surfaces, or p 4. Conversion of pervious surfaces, or 5. New connections to the City's MS4, or 6. Any other actions that can increase the volume or rate of stormwater runoff, or cause the generation of pollutants, from the site. 18.30.040 Exemptions. A. Full Exemptions. The following land uses and land -disturbing activities are exempt from the provisions of this chapter: 1. Forest practices regulated under WAC Title 222, except for Class IV general forest practices that are conversions from timberland to other uses, are exempt from the provisions of the minimum requirements. Version: SeptembeF4Aqgust 22, 20156 Packet Pg. 161 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 9/23 2. Commercial agriculture practices that involve working land for production are generally exempt. However, land conversion from timberland to agriculture and the construction of impervious surfaces are not exempt. 3. Construction of drilling sites, waste management pits, and associated access roads, and construction of transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations are exempt. Operators are encouraged to implement and maintain best management practices to minimize erosion and control sediment during and after construction activities to help ensure protection of surface water quality during storm events. 4. The following pavement maintenance practices or activities are exempt: pothole and square -cut patching, overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of coverage, shoulder grading, reshaping/regrading drainage systems, crack sealing, resurfacing with in -kind material without expanding the road prism, pavement preservation activities that do not expand the road prism, and vegetation maintenance. B. Partial Exemptions. The following land uses and land -disturbing activities are partially exempt from the provisions of this chapter: 1. Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. 2, Construction Stormwater Pollution Prevention. 2. The following pavement maintenance practices or activities are considered development, and therefore are not categorically exempt. The extent to which these requirements apply is explained for each circumstance. a. Removing and replacing a paved surface to base course or a lower level, or repairing the pavement base: If impervious surfaces are not expanded, Minimum Requirements No. 1 — No. 5 apply when the thresholds identified for development projects in ECDC 18.30.060 are met. Where appropriate, project proponents are encouraged to look for opportunities to use permeable and porous pavements. b. Extending the pavement edge without increasing the size of the road prism or paving graveled shoulders: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. c. Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; or upgrading from gravel to asphalt or concrete; or upgrading from a bituminous surface treatment ("chip seal') to asphalt or concrete: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. 18.30.050 Administration. A. Application, Submittals, and Review. 1. The Director shall review all plans and all other submittals required by ECDC 18.30.050.A.3 for compliance with this chapter when: a. An application for a City permit is required under all other chapters of ECDC Title 18 or 19, or b. A subdivision application is submitted per ECDC 20.75.040. 2. In all other situations when actions under ECDC 18.30.030 apply to a project site, review shall be under a Stormwater permit. 3. All stormwater review submittals shall contain, in addition to the information required under any other applicable City code, a Stormwater Site Plan as described in the Edmonds Stormwater Addendum (see ECDC 18.30.060) and any other information required by the Director. Version: SeptembeF4Aqgust 22, 20156 Packet Pg. 162 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT B. Inspections. Page 10/23 1. The Director shall inspect projects at various stages of the work to determine if they comply with the requirements of this chapter, and enforcement actions shall be taken as necessary. These inspections will include, but not be limited to, the following: a. Prior to site clearing and construction to assess site erosion potential, and b. During construction to verify proper installation and maintenance of required erosion and sediment controls and other approved plan components, and c. All permanent stormwater treatment and flow control BMPs/facilities and catch basins in new residential developments every six months until 90 percent of the lots are constructed (or when construction is stopped and the site is fully stabilized) to identify maintenance needs and enforce compliance with maintenance standards as needed, and d. Upon completion of construction and prior to final approval to ensure proper installation of permanent stormwater control facilities and verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater treatment and flow control BMPs/facilities, and e. Post -Construction inspections per ECDC 18.30.090. 2. When reasonably required by the Director to accomplish the purpose of this chapter or to comply with local, state or federal law or regulation on stormwater, special inspection or testing shall be performed by the applicant. C. Fees. Application, review and inspection fees as set in ECDC Chapter 15.00 shall be paid. 18.30.060 Requirements. A. Documents. The sources of the stormwater management requirements for the City are from the following documents: 1. Western Washington Phase H Municipal Stormwater Permit, Appendix 1, modification date January 16, 2015 2. 2014 Stormwater Management Manual for Western Washington (SWMMWW) 3. The Edmonds Stormwater Addendum In the event of conflicts between the various provisions, the more stringent provision shall apply. EB. Illicit Discharges and Connections. Non-stormwater illicit discharges, including spills, into the MS4, t groundwaters, or a water body from any developed or undeveloped lands are prohibited per ECDC Chapter 7.200. C. Thresholds and Applicability 1. The thresholds outlined in this section are only applicable to ECDC 18.30.060.C. See also the Edmonds Stormwater Addendum for supplemental information on thresholds. a. All development shall be required to comply with Minimum Requirement No. 2. b. Category 1 project sites shall comply with Minimum Requirements No. 1 through No. 5. Category 1 includes projects that: i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or ii. Have land disturbing activity of 7,000 square feet or greater. c. Category 2 project sites shall comply with Minimum Requirements No. 1 through No. 9. Category 2 includes projects that: Version: SeptembeF4August 22, 20156 Formatted: Numbered + Level: 1 + Numbering Style: A, B, C, ... + Start at: Alignment: Left + Aligned at: 0" + Inc at: 0.25" C O .y L N co O N N O M O E O L w N d C L m O N M N M O t— LL C J Q Z LL O M O c.� C V W N C d E t V M Q r.+ C N E t U O r r Q Packet Pg. 163 7.3.b Edmonds Page 11/23 Chapter 18.30 STORM WATER MANAGEMENT i. Result in 5,000 square feet, or greater, of new plus replaced hard surface area, or ii. Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or iii. Convert 2.5 acres, or more, of native vegetation to pasture. 2hard suFfaees (including paveraent, shoulders, cuFbs, and sidewalks) and the converted vegeta , ticm Area , q sha , 11 4:n all dhe rAinim-um requifements only if the new hafd surfaces total 5,000 squia-re, -feet- om mwne and total 50 pereent or ,Additional Requirements for road -related projects. For road -related projects, runoff from the new hard surfaces (including -pavement, shoulders, curbs, and sidewalks) and the converted vegetation areas shall meet all the minimum requirements if the new hard surfaces total 5,000 square feet or more. In addition, if the new hard surfaces total 5,000 square feet or more and total 50 percent or more of the existing hard surfaces within the project limits, runoff from the new and replaced hard surfaces and the converted vegetation areas shall meet all the minimum requirements. The project limits shall be defined by the length of the project and the width of the right-of-way. New Connections to the City's MS4 when the proposed connection does not involve activity that meets the definition of development. Sites that are not currently connected to the City's MS4 but that wish to connect directly or indirectly to the City's MS4 may be allowed on a case -by -case basis, subject to City approval. For sites that propose to drain greater than or equal to 2,000 square feet of irnpeFvieus-hard surface area to the City's MS4, minimum requirements and BMPs associated with stormwater flow control and/or water quality treatment (such as those outlined in ECDC 18.30.060.1) [1] through [9]) may be required if the connection poses any risk to downstream systems such as erosion, flooding, property damage, habitat damage, water quality degradation, or other related impacts. D. Minimum Technical Requirements. This section describes the minimum technical requirements for stormwater management at development sites. 1. Minimum Requirement No. 1 — Preparation of Stormwater Site Plans The City shall require a Stormwater Site Plan from all projects meeting the thresholds in ECDC 18.30.060.C. Stormwater Site Plans shall use site -appropriate development principles to retain native vegetation and minimize impervious surfaces to the extent feasible. Stormwater Site Plans shall be prepared in accordance with Chapter 3 of Volume 1 of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 2. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention Plan (S)NPPP) a. Thresholds: All development projects are responsible for preventing erosion and discharge of sediment and other pollutants into receiving waters. Compliance with this minimum requirement can be achieved for an individual site if the site is covered under Ecology's General NPDES Permit for Stormwater Discharges Associated with Construction Activities and fully implementing the requirements of that permit. A Construction SWPPP is required for all projects which a) result in 2,000 square feet or more of new plus replaced hard surface area, b) where a structure with an exterior hard surface area of at least 2,000 square feet is being demolished, c) which disturb 7,000 square feet or more of land, or d) when the site falls within the Earth Subsidence Landslide Hazard Area, Landslide Hazard Area or steep slope critical area. Projects that do not meet any of the above criteria are not required to prepare a Construction SWPPP, but must consider all of the elements listed below for Construction SWPPPs and develop controls for all Construction SWPPP elements that pertain to the project site. Version: SeptembeF4August 22, 20156 Formatted: Indent: Left: 0", Space Af 10 pt, Line spacing: single, Don't adju space between Latin and Asian text, D adjust space between Asian text and numbers, Tab stops: 0.5", Left Formatted: Font: Times New Roman, Formatted: Normal, Indent: Left: 0.2- No bullets or numbering m 0 c� .r c d E d O C O L d 3 E L 0 N O C O .y N to O N N O 00 O E 0 w r Q Packet Pg. 164 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT b. General Requirements: Page 12/23 i. The SWPPP shall include a narrative and drawings. All BMPs shall be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative shall include documentation to explain and justify the pollution prevention decisions made for the project. Each of the thirteen elements referenced below must be considered and included in the SWPPP unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the narrative of the SWPPP. ii. Clearing and grading activities for developments shall be permitted only if conducted pursuant to an approved site development plan (e.g., building permit, subdivision approval) that establishes permitted areas of clearing, grading, cutting, and filling. These permitted clearing and grading areas and any other areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree retention areas as required by the City, shall be delineated on the site plans and the development site. iii. The SWPPP shall be implemented beginning with initial land disturbance and until final stabilization. Sediment and Erosion control BMPs shall be consistent with the BMPs contained in Chapter 4 of Volume II of the SWMMWW. c. Seasonal Work Limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities may only be authorized by the City if it can be demonstrated that silt -laden runoff will be prevented from leaving the site through a combination of the following: i. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and ii. Limitations on activities and the extent of disturbed areas; and iii. Proposed erosion and sediment control measures, in accordance with ECDC 18.30.060.D.2.d below. Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations, except for sites lying in whole or in part within an earth subsidence and landslide hazard area as defined by ECDC 19.10.020.F: i. Routine maintenance and necessary repair of erosion and sediment control BMPs, ii. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil, and iii. Activities where there is one hundred percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. d. Construction SWPPP Elements i. Construction SWPPP elements are required in accordance with Chapter 2, Section 2.5.2 of Volume I of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 3. Minimum Requirement No. 3 — Source Control of Pollution All known, available and reasonable source control BMPs must be required for all projects approved by the City. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. Version: SeptembeF4August 22, 20156 Packet Pg. 165 7.3.b Edmonds Page 13/23 Chapter 18.30 STORM WATER MANAGEMENT 4. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location, to the maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. The discharge must have an identified overflow route that is safe and certain, and leads to the ultimate outfall location (such as a receiving water or municipal drainage system). All outfalls require energy dissipation. To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis .,,...,as, F,.am e_,.m tiie site to the _ewes..:.,.. w t, _ If an existing problem (or potential future problem after development) is identified, mitigation will be required to prevent worsening of that problem. A quantitative analysis may be required for any project deemed to need additional dewtrstrearn-information or where the project proponent or the City determines that a quantitative analysis is necessary to evaluate the off -site impacts or the capacity of the conveyance system. See the Edmonds Stormwater Addendum for additional details on complying with this requirement. 5. Minimum Requirement No. 5 — On -site Stormwater Management a. Applicability: On -site Stormwater Management BMPs are required in accordance with the following project thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff on -site to the extent feasible without causing flooding or erosion impacts. See the SWMMW W and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Project Thresholds: There are five project scenarios outlined below that determine the applicability of Minimum Requirement No. 5 — On -site Stormwater Management. The first four scenarios apply to projects that discharge directly or indirectly to the City's MS4. The fifth scenario applies to project discharges that do not enter the City's MS4. Note that more than one of the five scenarios may apply to a given project: i. Retrofit. Projects that discharge directly or indirectly to the City's MS4 and that contain existing hard surfaces on the parcel or common plan of development that do not drain to an approved stormwater management facility are required to provide On -site Stormwater Management BMPs to manage a portion of those existing hard surfaces that will remain after project completion. BMPs from List No.l (See ECDC 18.30.060.D.5.d) shall be applied to a minimum of 25 percent of those existing unmanaged surfaces, but to no more than the area equal to the proposed new plus replaced hard surfaces. Only for those existing unmanaged hard surfaces that remain after project completion, applicants are not required to evaluate BMPs in priority order or document infeasibility for these existing surfaces (as is required under ECDC 18.30.060.D.5.b [ii] and [iii] below). However, if it is determined that the minimum 25 percent requirement cannot be met due to BMP infeasibility, documentation of BMP infeasibility is required. In addition, when runoff from exiting unmanaged hard surfaces is mixed with runoff from new plus replaced hard surfaces, those BMPs must be selected and designed in accordance with the requirements for management of new plus replaced hard surfaces (per sections [ii] and [iii] below). See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. Category 1. Category 1 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 5 (per ECDC 18.30.060.C) shall either: Use On -site Stormwater Management BMPs from List No.1 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.d); or Version: SeptembeF4August 22, 20156 J a Z LL O M C6 U 0 U W r Q Packet Pg. 166 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 14/23 Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iii. Category 2. Category 2 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 9 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.2 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.e); or Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the City's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID Performance Standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following: a. Projects must implement BMP T5.13 (Post -Construction Soil Quality & Depth); BMPs T5.10A Downspout Full Infiltration Systems, T5.10B Downspout Dispersion Systems, or T5.10B Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. Edmonds Way specific requirements. After applying the requirements in item (a) above, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post -development 10-, and 100-year recurrence interval peak flows shall not exceed, 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. Projects that do not drain directly or indirectly to the City's MS4 are required to implement one of the following: a. Project sites may discharge to the downstream private property (e.g., projects located above BNSF property) with approval from the downstream property owner(s). b. Project sites may discharge runoff to an on -site system. For sites located within earth subsidence and landslide hazard areas or their buffers, a geotechnical design, analysis, and report by a geotechnical engineer is required for the on -site system. On -site Stormwater Management BMPs from List No.1 in ECDC 18.30.060.D.5.d shall be evaluated for all new plus replaced hard surfaces and land disturbed. Projects are not required to evaluate BMPs in priority order or document infeasibility. The project applicant may be subject to an extra permit processing fee for City review of the geotechnical analysis. Projects are required to comply with all other applicable City requirements, such as ECDC 19.10 (earth subsidence and landslide hazard areas). For sites located outside earth subsidence and landslide hazard areas or their buffers, ECDC 18.30.060.D.5.ii and ECDC 18.30.060.D.5.iii shall be followed to evaluate site appropriate BMP's. Version: SeptembeF4August 22, 20156 J a Z LL O M O U 0 U W r a Packet Pg. 167 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 15/23 c. Subject to prior approval by the City, project sites may pump on -site runoff to the City's MS4. A quantitative downstream analysis in accordance with Minimum Requirement No. 4 and the Edmonds Stormwater Addendum will be required. If the City's MS4 does not have adequate capacity to receive the applicant's pumped flows, the applicant is required to install an on -site detention system to store runoff and pump it to the MS4 at an approved rate. c. LID Performance Standard For projects that elect to meet the LID Performance Standard to comply with ECDC 18.30.060.D.b (ii) and (iii), sormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow from the project site. Refer to the Standard Flow Control Requirement section in Minimum Requirement No. 7 for information about the assignment of the pre -developed condition. Project sites that must also meet Minimum Requirement No. 7 shall match flow durations between 8 percent of the 2-year flow through the full 50-year flow. d. List No.l for Category 1 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 5. For projects that elect to use List No. 1 to comply with ECDC 18.30.060.D.b (ii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW and the Edmonds Stormwater Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: i. Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Roofs: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.10A in Section 3.1.1 of Volume III of the SWMMWW. ii. Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP TS.IOC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW. Version: SeptembeF4August 22, 20156 Packet Pg. 168 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 16/23 ii. Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. iv. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. e. List No.2 for Category 2 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 9. For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: i. Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Roofs: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.10A in Section 3.1.1 of Volume III of the SWMMWW. ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP TS.IOC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW. ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW. Version: SeptembeF4August 22, 20156 Packet Pg. 169 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 17/23 iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. 6. Minimum Requirement No. 6 — Runoff Treatment a. Project Thresholds: When assessing road -related projects against the following thresholds, only consider those hard and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following require construction of stormwater treatment facilities: i. Projects in which the total of pollution -generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or ii. Projects in which the total of pollution -generating pervious surfaces (PGPS) — not including permeable pavements — is 0.75 acres or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. b. Treatment -Type Thresholds and Facility Sizing: i. Treatment -Type Thresholds in accordance with Step 2 (Oil Control), Step 4 (Phosphorus Treatment), Step 5 (Enhanced Treatment), and Step 6 (Basic Treatment) of Chapter 2, Section 2.1, Volume V of the SWMMWW. Phosphorus treatment shall be required for projects draining to Hall Creek and Lake Ballinger. ii. Treatment Facility Sizing, including Water Quality Design Storm Volume, Water Quality Design Flow Rate, and Downstream Facilities, of Chapter 2, Section 2.5.6, Volume I of the SWMMWW. c. Treatment Facility Selection, Design, and Maintenance Stormwater treatment facilities shall be: i. Selected in accordance with the process identified in Chapter 4 of Volume I, and Chapter 2 of Volume V of the SWMMWW, ii. Designed in accordance with the design criteria in Volume V of the SWMMWW, and iii. Maintained in accordance with the maintenance schedule in Volume V of the SWMMWW. d. Additional Requirements The discharge of untreated stormwater from pollution -generating surfaces to ground water will not be authorized by the City. All associated runoff must be treated using On -site Stormwater Management BMPs designed to provide the required level of treatment in accordance with Chapter 5, Volume V and Chapter 7, Volume V of the SWMMWW; or by infiltration through soils meeting the soil suitability criteria in Chapter 3 of Volume III of the SWMMWW. Version: SeptembeF4August 22, 20156 Packet Pg. 170 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT 7. Minimum Requirement No. 7 — Flow Control Page 18/23 a. Applicability: Flow control is required on projects meeting the thresholds summarized below to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. Flow control in accordance with Minimum Requirement No. 7 is not required for projects that discharge directly to, or indirectly through the City's MS4 to Puget Sound (other minimum requirements may still apply). See ECDC 18.30.060.D.5.b.iv and Section 2.5.7 of Volume I of the SWMMWW for additional restrictions applicable to direct discharges to Puget Sound. If the discharge drains to a stream that leads to a wetland, or to a wetland that has an outflow to a stream, both this minimum requirement (Minimum Requirement No. 7) and Minimum Requirement No. 8 apply. Thresholds: When assessing road -related projects against the following thresholds, only consider only those impervious, hard, and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following circumstances require achievement of the standard flow control requirement for western Washington: Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold discharge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or iii. Projects that through a combination of hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second (cfs) increase or greater in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one -hour time steps (or a 0.15 cfs increase or greater using 15-minute time steps). Standard Flow Control Requirement (applies to discharges directly or indirectly to the City's MS4, except for projects that meet the direct discharge requirements outlined in "a" above): Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. The pre -developed condition to be matched shall be a forested land cover unless reasonable, historic information is available that indicates the site was prairie prior to settlement (modeled as "pasture" in the Western Washington Hydrology Model). This standard requirement is waived for sites that will reliably infiltrate all the runoff from hard surfaces and converted vegetation areas. d. Additional Requirement: Flow Control BMPs shall be selected, designed, and maintained in accordance with Volume III of the SWMMWW or an approved equivalent. 8. Minimum Requirement No. 8 — Wetlands Protection a. Applicability: The requirements below apply only to projects whose stormwater discharges into a wetland, either directly or indirectly through a conveyance system. b. Thresholds: The thresholds identified in Minimum Requirement No. 6 — Runoff Treatment, and Minimum Requirement No. 7 — Flow Control shall also be applied to determine the applicability of this requirement to discharges to wetlands. c. Standard Requirement: Projects shall comply with Guide Sheets No. 1 through No. 3 in Appendix I-D of the SWMMWW. The hydrologic analysis shall use the existing land cover condition to determine the existing hydrologic conditions unless directed otherwise by a regulatory agency with jurisdiction. Version: SeptembeF4August 22, 20156 J a Z LL 0 M O U 0 U W r Q Packet Pg. 171 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 19/23 d. Additional Requirements: Stormwater treatment and flow control facilities shall not be built within a natural vegetated buffer, except for: i. Necessary conveyance systems as approved by the City; or ii. As allowed in wetlands approved for hydrologic modification or treatment in accordance with Guide Sheet 2 in Appendix I-D of the SWMMWW. An adopted and implemented basin plan prepared in accordance with the provisions of Section 7 of Appendix 1 of the Phase II NPDES Municipal Stormwater Permit. 9. Minimum Requirement No. 9 — Operation and Maintenance An operation and maintenance manual that is consistent with the provisions in Volume I and Volume V of the SWMMWW is required for proposed Stormwater Treatment and Flow Control BMPs/facilities. The party (or parties) responsible for maintenance and operation shall be identified in the operation and maintenance manual. For private facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -site or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate department. A log of maintenance activity that indicates what actions were taken shall be kept and be available for inspection. 18.30.070 Exceptions, Adjustments, and Appeals. A. Exceptions. 1. The Director may approve a request for an exception to the minimum requirements of this chapter following legal public notice of an application for an exception and of the Director's decision on the application. All legal public notice related to this request for an exception shall be in the manner prescribed in ECDC 20.03.002 and the applicant shall pay all costs to publish the legal public notices required by this provision. The Director shall provide and keep written findings of fact of the decision. 2. The approval of the exception shall only be granted when the applicant demonstrates that the requirement would cause a severe and unexpected economic hardship. To determine whether the requirement imposes a severe and unexpected economic hardship on the project applicant, the applicant must document for City review and approval, all of the following, at a minimum: a. The current, pre -project use of the site; and b. How application of the requirement(s) for which an exception is being requested restricts the proposed use of the site compared to the restrictions that existed prior to adoption of this chapter; and c. The possible remaining uses of the site if the exception were not granted; and d. The possible uses of the site that would have been allowed prior to the adoption of this chapter; and e. A comparison of the estimated amount and percentage of value loss as a result of the requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the requirements of this chapter; and f. The feasibility of the applicant to alter the project to apply the requirements of this chapter. 3. Any exception must meet the following criteria: a. The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and b. The exception is the least possible exception that could be granted to comply with the intent of the minimum requirements. Version: SeptembeF4August 22, 201-56 Packet Pg. 172 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 20/23 4. An exception to the requirements shall only be granted to the extent necessary to provide relief from the economic hardship as determined by the Director, to alleviate the harm or threat of harm to the degree that compliance with the requirement becomes technically feasible, or to perform the emergency work that the Director determines is warranted. 5. The Director may require an applicant to provide additional information at the applicant's expense, including (but not limited to) an engineer's report or analysis. 6. When an exception is granted, the Director may impose new or additional requirements to offset or mitigate harm or the threat of harm that may be caused by granting the exception, or that would have been prevented if the exception had not been granted. B. Adjustments. The Director may approve a request for adjustments to the requirements of this chapter when the Director finds that: a. The adjustment provides substantially equivalent environmental protection; and b. The objectives of safety, function, environmental protection, and facility maintenance are met, based on sound engineering practices. During construction, the Director may require, or the applicant may request, that the construction of drainage control facilities and associated project designs be adjusted if physical conditions are discovered on the site that are inconsistent with the assumptions on which the approval was based, including (but not limited to) unexpected soil or water conditions, weather -generated problems, or changes in the design of the improved areas; and 3. A request by the applicant for an adjustment shall be submitted to the Director for review and approval prior to implementation. The request shall be in writing and shall provide facts substantiating the requirements of subsection (C)(1) of this section, and if made during construction, the factors in subsection (C)(2) of this section. Any such modifications made during the construction of drainage control facilities shall be included with the final approved drainage control plan. C. Appeal. 1. The Director's decision on an application for an exception or adjustment may appeal to the hearing examiner in accordance with a Type II appeal process in ECDC Chapter 20.06. 2. The applicant shall carry the burden of proof. 3. The decision of the hearing examiner is appealable to superior court in accordance with Chapter 36.70C RCW. [Ord. 3792 § 1, 2010]. 18.30.080 Access and Covenants. A. Access. Proper ingress and egress shall be provided to the City to inspect or perform any duty imposed upon the City by this Title. The City shall notify the responsible party in writing of a failure to provide access. If the responsible party fails to respond within seven days from the receipt of notification, the City may order the work required completed or otherwise address the cause of improper access. The obligation for the payment of all cost that may be incurred or expended by the City in causing such work to be done shall be imposed on the person holding title to the subject property B. Covenants. Maintenance covenants shall be required for each site/lot that will be maintained by a private entity such as an individual, corporation, or homeowner's association. The maintenance covenant shall address or append requirements and responsibilities for long-term management and maintenance the applicable BMP(s). Maintenance covenants shall be as specified in City Engineering Division documents or approved by the Director, and recorded with Snohomish County and on all proper deeds [Ord. 3792 § 1, 2010]. Version: SeptembeF4August 22, 20156 J a Z LL O M 00 U 0 U W N C d E t v R a C N E t t) O r r Q Packet Pg. 173 7.3.b Edmonds Page 21/23 Chapter 18.30 STORM WATER MANAGEMENT 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. Proper construction inspection and maintenance of stormwater facilities is essential for the protection of the City's MS4 and the environment. A. Stormwater Maintenance and Inspection Standards. Stormwater facilities shall be inspected and maintained per the requirements of Volume I and Volume V of the SWMMWW. For systems which do not have a maintenance standard, the owner shall develop a standard based on guidelines from the manufacturer, designer, or a registered professional engineer and submit the standards to the Director for approval. The purpose of the maintenance standard is to determine if maintenance is required. The maintenance standard is not a measure of the facility's required condition at all times between inspections. Exceeding the maintenance standard between inspections is not a violation of this chapter. B. Ownership. Stormwater facilities are either privately or publicly owned and maintained. All stormwater facilities that serve private property are private, unless an agreement between the property owner and the City states otherwise. Stormwater facilities that are privately owned by a homeowner's association or similar organization also are private. The City may offer an incentive program to owners to support the proper maintenance of private storm drainage facilities. C. Public Stormwater Facilities. The City shall be responsible for operating, maintaining, repairing, and replacing public stormwater facilities as funded through the Stormwater Utility. D. Maintenance and Inspection of Permanent Facilities. All privately owned storm drainage facilities or controls shall be maintained by the owner, or the homeowner or owner association ("owner") if one is established as part of a residential or commercial development. All private storm drainage facilities shall be regularly inspected to ensure proper operation and shall monitor the facility or control as required or as set forth in the SWMMWW. The Owner shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person who took it, the date said action was taken, how it was done, and any problems encountered or follow-up actions required. The records shall be made available to the City upon request. The Owner shall maintain a copy of the Stormwater Operations and Maintenance Manual (if required) on site, and shall make reference to such document in real property records filed with Snohomish County, so others who acquire real property served by the privately owned storm drainage facilities or controls are notified of their obligation to maintain such facilities or controls. E. City Inspection of private stormwater facilities. The City shall have the authority to periodically inspect private stormwater facilities, including low impact development stormwater facilities, for compliance with this chapter. F. Right of Entry. An authorized representative of the City may enter private property at all reasonable times to conduct inspections, tests or to carry out other duties imposed by the a state or Federal program provided that the City makes a good faith effort to notify the property owner or person responsible for the premises prior to entering and presents proper credentials to that person. If entry is refused or cannot be obtained, the Director shall have recourse to every remedy provided by law to secure entry, including but not limited to, obtaining an administrative warrant for entry. G. Right of Entry for Illicit Discharge. In the event of an illicit discharge from a privately -owned stormwater facility caused by improper maintenance or operation or other circumstance, the provisions of ECC 7.200 shall apply. H. Maintenance Responsibilities. Upon written notice by the City, a private stormwater facility shall be promptly repaired and/or brought up to applicable standards by the property owner or the person responsible for said facility. If a private stormwater facility serves multiple lots and the responsibility for maintenance has not been specified on a recorded subdivision plat, short plat, or other legal document, maintenance, operation and repair responsibility shall rest with the homeowners' association, if one exists, or otherwise with the properties served by the facility, or finally, with the owners of the property on which the facilities are located. I. Disposal of Waste from Maintenance Activities. Disposal of waste from maintenance activities shall be conducted in accordance with the minimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines Version: SeptembeF4August 22, 20136 J a Z LL O M CO U 0 U W N r C d E t v R a C C) E t t� M r r Q Packet Pg. 174 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 22/23 for disposal of waste materials from storm water maintenance activities, and where appropriate, the Dangerous Waste Regulations, Chapter 173-303 WAC. 18.30.100 Enforcement Procedures. A. General enforcement action shall be in accordance with this chapter whenever a person has violated any provision of this chapter. The choice of enforcement action is at the discretion of the City. B. Civil Penalties Adopted. ECDC Chapter 20.110 enforcement procedures are herein adopted in full, as modified in this chapter, with the proviso that repeat offenders or violations deemed an immediate public hazard shall be subject to compliance and appeal timelines as deemed appropriate by the Director based on the specific nature of the violation. C. Maintenance Orders. The Director shall have the authority to issue to an owner or person an order to maintain or repair a component of a stormwater facility or BMP to bring it into compliance with this chapter, the SWMMW W, the Edmonds Stormwater Addendum, and the Edmonds Community Development Code. The order shall include: 1. A description of the specific nature, extent and time of the violation and the damage or potential damage that reasonably might occur; 2. A notice that the violation or the potential violation cease and desist and, in appropriate cases, the specific corrective actions to be taken; and 3. A reasonable time to comply, depending on the circumstances. D. Civil Penalty. A person who fails to comply with the requirements of this chapter, who fails to conform to an approval or order issued, who undertakes development without first obtaining approval, or who fails to comply with a stop work order issued under these regulations shall be subject to a civil penalty levied in accordance with the provisions of ECDC Chapter 20.110; provided, however, that the appeal process shall commence with a notice of violation as provided in ECDC 20.110.040.B. 1. Civil penalties for code violations shall be imposed in accordance with the provisions of ECDC Chapter 20.110; provided, however, that in addition to the penalties set forth in that chapter, the hearing examiner is authorized to levy a penalty of up to twenty thousand dollars ($20,000) per occurrence based upon an assessment of the following factors. Where such factors are present, the hearing examiner is authorized to levy such penalty after taking into consideration the full impact of the violation and any mitigating circumstances (see subsection (2) below): a. The violation created a risk to public health and the significance of the risk. b. The violation damaged the environment and the significance of the damage. c. The violation caused damage to public and private property and the significance of such damage. d. A history of similar violations, if any. e. The economic benefit of the violations, if any, to the person or entity responsible for the violations. 2. Mitigating circumstances which may be used to offset or reduce the time resulting from the application of the preceding factors are limited to: a. Full compliance with a voluntary compliance agreement and no history of similar violations. b. Full compliance with a voluntary compliance agreement and a history of one or two similar violations (lesser reduction). c. A "voluntary compliance agreement' is defined as a legally binding agreement entered into between the City and the alleged violators, by which the violator(s) acknowledge the existence of the violation, waive Version: SeptembeF4August 22, 20136 Packet Pg. 175 7.3.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 23/23 all appeal rights, and agree to and do pay a fine in an amount stipulated to between the violator and the City. 3. If the violation(s) are not corrected as ordered, or a voluntary compliance agreement is not entered into within that time period and no appeal is filed, the penalty for the next 15-day period shall be 150 percent of the initial penalties, and the penalties for the next 15-day period shall be 200 percent of the initial penalties. The intent of this subsection is to increase penalties beyond the maximum penalties stated as an additional means to achieve timely compliance. 4. Unless otherwise provided in a voluntary compliance agreement, civil penalties shall be paid within 30 days of service of the notice and order or stop work order if not appealed. Payment of the civil penalties assessed under this chapter does not relieve a person found to be responsible for a code violation of his or her duty to correct the violation or to pay any and all civil penalties or other cost assessments issued pursuant to this chapter. 5. The City may suspend immediate payment of civil penalties if the person responsible for a code violation has entered into a voluntary compliance agreement. Penalties shall begin to accrue again pursuant to the terms of the voluntary compliance agreement if any necessary permits applied for are denied, canceled or not pursued, if corrective action identified in the voluntary compliance agreement is not completed as specified, or if the property is allowed to return to a condition similar to that condition which gave rise to the voluntary compliance agreement; provided, however, that additional penalties shall not be imposed until additional notice and opportunity for hearing have been provided in accordance with ECDC Chapter 20.110. 6. Civil penalties assessed create joint and several personal obligations in all persons responsible for a code violation. E. The determination of the hearing examiner issued in accordance with ECDC Chapter 20.110 shall be appealable to the Snohomish County superior court in accordance with the provisions of Chapter 36.70C RCW. The remedies provided for in this section shall not be exclusive. The City may also use other civil and administrative remedies available to it, including but not limited to the remedies provided in ECDC Title 19 and the state building and dangerous buildings codes Version: SeptembeF4August 22, 20156 J a z u= 0 M O U 0 U W r Q Packet Pg. 176 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Chapter 18.30 STORMWATER MANAGEMENT Sections: 18.30.000Purpose Purposes. 18.30.010 Definitions. 18.30.020 Authority and Regulation. 18.30.030 Applicability. 18.30.040 Exemptions. 18.30.050 Administration. 18.30.050 Pr-eje,.t elassifieatien. 18.30.060 S*afm water management requirements Requirements. 18.30.070 Exemptions, exeeptions, adjustments and appeal Exceptions, Adjustments, and Appeal. 18.30.080 E^^^m^p'^, deeds, Access and eaveaan4sCovenants. 18.30.090 Post Construction Inspection and „ aipAenanee r-e Maintenance Roles and respensibilitiesR 18.30.100 Enforcement pfocedufesProcedures. 18.30.000 Pu-rposePurposes. Page 1/30 existing storm water systems that directly or indireetly discharge to the eivy storm water A. To set forth standards for managing stormwater runoff from construction and development sites to minimize: 1. Degradation of surface water quality by controlling the scouring and sedimentation of creeks, streams, wetlands, ponds, lakes, other water bodies. 2. Degradation of groundwater quality. 3. Damage to adjacent and other downstream private properties from erosion or other impacts from stormwater runoff. 4. Damage of City -owned parcels, City roads, rights -of -way and associated infrastructure. B. To comply with requirements in ^ manner that oomplies with the Wester Washington -the Phase II National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit as issued by the Washington State Department of Ecology.- (Ecology). C. To complement site planning activities that minimize: 1. Impervious surfaces area. The--, Ed-m-offlids City Code and Gonmutmity Development Gode, ffe, eurreat Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 177 7.3.c Edmonds Chapter 19.30 STORM AL TER NIAN GENILINT Edmonds Chapter 18.30 STORM WATER MANAGEMENT 2. The loss of native or non-native site vegetation. 3. The generation of stormwater runoff. Page 2/30 D. To make low impact development (LID) the preferred and commonly used approach to site development; to require LID be considered at the site planning stage; and to implement LID BMPs unless they are infeasible. E. To i3r-avide for- insi3eetion aad maifAeaa-nee ef ster-m,�A,ater facilities in the e4v te easttr-e that these f4eilities Derfor F: To require that all p. lie and pr-iv. e s*e: w er ��publicly-owned and privately -owned Stormwater Treatment and Flow Control best management practices (BMPs)/Facilities are operated, maintained, and repaired in a manner that conforms to this chapter. G. To establish the mininium standards that must be met for oomplianee, 14F. To provide ^^ the authority for all—Mhethe City to inspect privately -owned Stormwater Treatment and maintain sta f... wa4er- f eili Flow Control BMPs/Facilities. G. To provide enforcement procedures for ensuring compliance with this chapter. 18.30.010 Definitions. For the purposes of this chapter, the following definitions shall apply: L`Arterial. A road or street primarily for through traffic. The term generally includes roads or streets considered collectors. It does not include local access roads which are generally limited to providing access to abutting property See also RCW 35.78.010, RCW 36.86.070, and RCW 47.05.021. Adjustment. A variation in the application of a minimum requirement to a particular project. Adjustments provide substantially equivalent environmental protection. L`Applicant" means the. The owning individual(s) or corporations or their representatives applying for the permits or approvals described in this chapter. L'Approval. The proposed work or completed work conforming to this chapter as approved by the public works direetefDirector or their designee. "Best management practice (BN4P)" means the sehe ulepractices (BMPs). The schedules of activities, prohibitienprohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by the 64yCity that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to waters of Washington State. LBioretention. Engineered facilities that treat stormwater by passing it through a specified soil profile, and either retain or detain the treated stormwater for flow attenuation. Refer to the 2014 Stormwater Management Manual for Western Washington (SWMMWW), Chapter 7 of Volume V for bioretention BMP types and design specifications. Category 1 Project Site. A project site subject to Minimum Requirements No.l through No.S. See ECDC 18.30.60.C. Category 2 Project Site. A project site subject to Minimum Requirements No.I through No.9. See ECDC 18.30.60.C. Certified Erosion and Sediment Control Lead (CESCL). An individual who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMMWW). A CESCL is knowledgeable in the principles and practices of erosion and sediment control. The CESCL must have the skills to assess site conditions and construction activities that could The--, Ed-m-onds City Code and Gonmnunity Development Gode, are--, e_-,urremt ffi-r-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 178 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 3/30 impact the quality of stormwater and, the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Certification is obtained through an Ecology approved erosion and sediment control course. Course listings are provided online at Ecology's website. City's municipal separate storm sewer system'—' or "MS4 ."A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) that are owned or operated by the eityCity of Edmonds, designed or used for collecting or conveying ovate stormwater, and are not a combined sewer nor part of a publicly owned treatment works as defined in 40 Code of Federal Regulations (CFR) 122.2, and which is defined as "large" or "medium" or "small" or otherwise designated by Ecology pursuant to 40 CFR 122.26. "Clearing" means the act. The destruction and removal of vegetation, including grubbing. by manual, mechanical, or chemical methods. L'Commercial Agriculture. Those activities conducted on lands defined in RCW 84.34.020(2) and activities involved in the production of crops or livestock for commercial trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. Common plan of development or sale" means a. A site where multiple separate and distinct construction activities may takebe taking place at different times on different schedules and/or by different contractors, but still under a single plan. For example! „hale Examples include: 1) phase projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; ef3) projects in a contiguous area that may be unrelated but still under the same contract, such as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determine permit requirements. ,> means land disturbing operations including elearing, grading, or excavation that disturbs "Converted pervious sur?aee" means-t evegetation (areas). The change in land cover changed from native vegetation, pasture scrub/shrub, or unmaintained non-native vegetation to lawn, lands ape, or landscaped areas, or where native vegetation is converted to pasture -areas. L'Creeks. Is synonymous with "stfeastreams," which is defined in ECDC 23.40.005320. "Critical areas" is defined in I CDC 23.40.005. "Design stora' means a rainfall event or pattern of events for use in analyzing and designing drainage faeilities. "Deten4ion" means a f4eility fer eapArelling sterm wmer ruflog for a preseribed design sterm and releasing the Storm water at a preseribed rate LDetention facility. An above or below ground facility, such as a pond or tank, that temporarily stores stormwater runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored stormwater. Development. Land -disturbing activities, including Class IV general forest practices that are conversions from timber land to other uses. Creation or addition of hard surfaces, or replacement of hard surface that is not part of a routine maintenance activity. Structural development, including construction, installation, replacement, or expansion of a The--, Ed-m-onds City Code and Gonmutmity Development Gode -are eurrent Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 179 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 4/30 building or other structure. Subdivision, short subdivision, and binding site plans, as defined and applied in Chapter 58.17 RCW Director" means the public works aireete . The City's Public Works and Utilities Director or a designee with an appropriate background in engineering or another related discipline. "Discharge point. The location where a discharge leaves the municipal separate storm sewer system (MS4) through the City's MS4 facilities/BMPs designed to infiltrate. Ecology. The Washington State Department of Ecology. "Effective impervious surface. Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system including the ciy's N4S4.. Impervious surfaces on residential development sites are considered ineffective if: 1) the runoff is dispersed through at least 100 feet of native vegetation in accordance with BMP T5.30 — "Full Dispersion," as described in Chapter 5 of Volume V of the Star -.water Management N4an....1 f r Westo..., Washington (2005) SWMMWW; 2) residential roof runoff is infiltrated in accordance with downspout Full Infiltration Systems in BMP T5.10A in Volume III of the SWMMWW; or 3) approved continuous runoff modeling methods indicate the entire runoff file is infiltrated. "Erosion" means the displaeement of any earffi material or existing vegetation by rainfall, storm water runoff-, or seepage. "Erodible or leachable materials. Wastes, chemicals, or other substances that measurably alter the physical or chemical characteristics of runoff when exposed to rainfall. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Erosion. The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Also, detachment and movement of soil or rock fragments by water, wind, ice, or gravity. See the SWMMWW Glossary for examples of types of water erosion. Excavation'=. The mechanical removal of dearth material. °`Exceptions Relief from the application of a minimum requirement to a project. L'Fi11!Lmeans-a. A deposit of earth material placed by artificial means. L'Groundwater. Water in a saturated zone or stratum beneath the land surface or below a water body. "Hard surface. An impervious surface, a permeable pavement, or a vegetated roof. Highway. A main public road connecting towns and cities. In Edmonds, this includes State HighwayRoute 99, State Route 524, and portions of State Highwa 104, beththat are classified as principal arterials in the citylsCity's comprehensive transportation plan. L'Illicit discharge" ea y. Any direct or indirect ,meta.- . , ate non-stormwater discharge to the eitylsCity's MS4, groundwaters, or a water body, except as expressly allowed by ECDC Chapter 7.200EGG. "Impervious surface. A non -vegetated surface area that either prevents or retards the entry of water into the soil mantle as' sunder natural conditions prior to development, res'a ing it ste . A non -vegetated surface area which causes water Ito run off the surface in greater quantities or at an increased rate of flow eempare to s*a-n Water- ....ne ff,.>,.,..aete -isti s from the flow present under natural conditions prior to development. Common impervious surfaces include4, but are not limited to) rooftops, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces that similarly impede the natural infiltration of stafm wate stormwater. Open, uncovered retention/detention facilities . Version: September 8, 2015 Packet Pg. 180 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 5/30 shall not be considered impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. However-, epeeOpen, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. Outdoor swimming pools shall be considered impervious surfaces in all situations. In addition, lawns, landscaping, sports fields, golf courses, and other areas that have modified runoff characteristics resulting from the addition of underdrains and impermeable or low permeability liners are to be considered impervious surfaces. If no liner is installed, these areas (lawns, landscaping, sports fields, golf courses, etc.) served by underdrains may be considered pervious if the underdrain is set a minimum of 8 inches above the in -situ soils in a manner to allow infiltration over the facility bottom. "Lake" means an. An inland body of fresh water surrounded by land. "Land -disturbing activity. Any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and nonvegetat ve) non -vegetative) and/or the existing soil topography. Land -disturbing activities include but are not limited to demolition, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land -disturbing activity. Vegetation maintenance practices, including landscape maintenance and gardening, are not considered land -disturbing activity. Stormwater facility maintenance is not considered land disturbing activity if conducted according to established standards and procedures. L'Low impact development" means deve opm^ff* ean"eted in a ...a (LID). A stormwater and land use strategy that seeksto ^' Aely prevent alterations to the Natural ydrologystrives to mimic pre -disturbance hydrologic processes of the infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on -site. Low impaot deve opmen4 includes features, site planning and design to redue^ alterations of natural soil and vegetati nme imperviouss surkwes,, and specifiedistributed stormwater management practices that help to replieme aa�ur l hydrology stiek asare integrated into a project design. LID Best Management Practices (BMPs). Distributed stormwater management practices, integrated into a project design, that emphasize pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, s, ail amend en4s bioretenti^n systems, ^^a roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re -use. LID principles. Land use management strategies that emphasize conservation, use of on -site natural features, and site planning to minimize impervious surfaces, native vegetation loss, and stormwater runoff. "Maintenance. Repair and maintenance activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing; and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include replacement of dysfunctional facilities, including cases where environmental permits require replacing an existing structure with a different type structure, as long as the functioning characteristics of the original structure are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. In regard to stormwater facilities, maintenance includes assessment to ensure ongoing proper operation, removal of built up pollutants (i.e., sediments), replacement of failed or failing treatment media, and other actions taken to correct defects as identified in the maintenance standards of Chapter 4, Volume V of the SWMMWW. "Maximum ex4ent feasible" means the requirement is to be fully implemented, constrained only by the physical limitations of the site, practical eonsiderations of engineering design, and reasonable considerations of financial eosts and environmental ^tom "Maximum extent practicable (MEP). Refers to paragraph 402(p)(3)(B)(iii) of the federal Clean Water Act which reads as follows: Permits for discharges from municipal storm sewers shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques, and system, design, and engineering methods, and other such provisions as the Administrator or the State determines appropriate for the control of such pollutants. The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 181 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT MS4" means the eity s. The City's municipal separate storm sewer system. Page 6/30 `Native vegetation" fneans vegeta . Vegetation comprised of plant species4, other than noxious weeds), indigenous to the coastal region of the Pacific Northwest which could have been reasonably expected to occur naturally on the site. Examples include trees such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. L'Natural drainage systems and outfalls=mean the. The location of the channels, swales, and other neffmanmadenon-manmade conveyance systems as defined by the earliest documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. plans,'!New development" means land disturbing aetivities, ineluding Class 13.1 general forest praetiees that are eonver-sio from timber land to other uses per RCW 76 09.050; stvdetural development, ineluding eonstruetion or installation of building er- at -her struetufe; er-eation of impetwiiaus swir-A-estes; and s4division, sheft s4division, and binding site as defined and applied in Chapter- 58.17 R-CW. Pr-ojeets meeting the deAnition of redevelopment shali not be nsiderea new devel pme . Outfall. A point source as defined by 40 CFR 122.2 at the point where a discharge leaves the City's MS4 and enters a surface receiving waterbody or surface receiving waters. Outfall does not include pipes, tunnels, or other conveyances which connect segments of the same stream or other surface waters and are used to convey primarily surface waters (i.e., culverts). On -site Stormwater Management BMPs. A synonym for Low Impact Development BMPs. Permeable pavement. Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Pervious Surface. Any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. Person. Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or City government unit, however designated. Pollution -generating hard surface (PGHS). Those hard surfaces considered to be a significant source of pollutants in stormwater runoff. See the listing of surfaces under pollution -generating impervious surface. Pollution -generating impervious surface (PGIS). Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to: vehicular use; industrial activities (as further defined in the glossary of the SWMMWW); storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall; metal roofs unless they are coated with an inert, non -leachable material (e.g., baked -on enamel coating); or roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities. Pollution -generating pervious surfaces (PGPS). Any non -impervious surface subject to vehicular use, industrial activities (as further defined in the glossary of the SWMMWW); or storage of erodible or leachable materials, wastes, or chemicals, and that receive direct rainfall or run-on or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include permeable pavement subject to vehicular use, lawns, and landscaped areas including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). Pre -developed condition. The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre -developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. Project site. That portion of a property, properties, and/or right-of-way subject to land -disturbing activities, new hard surfaces, or replaced hard surfaces. For projects that involve land disturbing activity on one or more parcels and land The--, Ed-m-onds City Code and Gonmnunity Development Gode, -are, eurremit 0hrough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 182 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 7/30 disturbing activity in the City right-of-way, the "Project site" includes all areas of land disturbance. If the project is part of a common development plan or sale, the disturbed area of the entire plan shall be used in determining permit requirements. _ ---- __1 r- - r t __._ __, ------------, -a _ __, t __ ... , r-� � _- ---r- corporation, ageneystate, of the or cc local unit,overnment however designated. impeFvieus 0prepeAies, er righ4 ef way subjeet if the is te land disturbinge development new th-e or replaeed disihar-h-ed the surfaees. projeet part of be in deter a eommon is disehafged plan or sale, wrea of entire plan shall "Reeeiving used -mining permit requiremen4s. to waters" means water-bedies setffee of st,.rm water „ via sheet or- stwfaee wa4er- systems whiek suffaee flew. Funeff via a point L'Rain garden. A non -engineered shallow landscaped depression, with compost -amended native soils and adapted plants. The depression is designed to pond and temporarily store stormwater runoff from adjacent areas, and to allow stormwater to pass through the amended soil profile. Receiving waterbody or Receiving waters. Naturally and/or reconstructed naturally occurring surface water bodies, such as creeks, streams, rivers, lakes, wetlands, estuaries, and marine waters, or groundwater, to which a MS4 discharges. Replaced hard surface. For structures means the removal and replacement of hard surfaces down to the foundation. For other hard surfaces, it means the removal down to bare soil or base course and replacement. Replaced impervious surface" means, fo. For structures, the removal and replacement of any exterior impervious surfaces erdown to the foundation. For other impervious surfaces, it means the removal down to bare soil or base course and replacement. For- sites with existifig single family dwelling units (as defined in ECDC 2 i.90.080), a pr-64ec4 shall not be eensidered replaeed impei=Aeus sur-faee fer- the purposes of this ehapter-, unless the pr-ejeet site has one aer-e in this seetien-.) "`Roadway" means the traveled imper-..;,.. Traveled hard surface portion of any public or private road or street. L'Road-related project. A project that all of, or the majority of, the new or replaced hard surface consist of roadway, shoulders, curbs, gutters, sidewalks, or walkways, either publicly or privately funded. Runoff. Water originating from rainfall and other precipitation that is found in drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands, as well as shallow ground water. It also means the portion of rainfall or other precipitation that becomes surface flow and interflow. Site. The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to development er redo elepment. For road projects, or utility projects in the right-of-way, the length of the project site and the right-of-way boundaries define the site. The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurreat Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 183 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 8/30 L'Slope''—means the. The degree of slaetdeviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a 90-degree slope being vertical (maximum) and 45 degrees being a 1:1 or 100 percent slope. "Soil1Lmeanie. The unconsolidated mantlemineral and organic material on the intermediate surface of the earth that serves as a natural medium for the growth of land plants. L'Source control" eans BMPs. A structure or operation that is intended to prevent pollutants from coming into contact with storm water through physical separation of areas or careful management of activities that are sources of pollutants. The SWMMWW separates source control BMPs into two types. Structural source control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume IV of the SWMMWW for details. Stormwater facility. A constructed component of a storm wate stormwater drainage system, designed and constructed to perform a particular function or multiple functions. Storm wme facilities include, but are not limited to, pipes, pwnpiag systeffis-,swales, ditches, culverts, street gutters, ^a'e'�detention basins -,ponds, retention ponds, constructed wetlands, infiltration devices, catch basins, oil/water separators, and ^lluta * removal devices.biofiltration swales. "Storm waterStormwater Management Manual for Western Washington (SWMMWW). The Washington State Department of Ecology's 2012 (as amended in 2014) Stormwater Management Manual for Western Washington. Referred to as the 2014 SWMMWW. Stormwater site plan. The comprehensive report and rise iatea pop containing all of the technical information and analysis necessary for * regulatory agencies to evaluate a proposed new development er- redevelopmen* project for compliance with staffn wa4e stormwater requirements. Contents of the storm ,, a4ef site planStormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It may- includeincludes a constmetion storm water pollution prevention plan (contra ^^Construction Stormwater Pollution Prevention Plan (Construction SWPPP) and a permanent storm water ^^^*rol I' Permanent Stormwater Control Plan (PSC plarr}Plan). Guidance on preparing a Stormwater Site Plan is contained in Chapter 3 of Volume I of the SWMMWW. L'Stormwater Treatment and Flow Control BMPs/Facilities. Detention facilities, treatment BMPs/facilities, bioretention, vegetated roofs, and permeable pavements that help meet Minimum Requirements No.6 (Treatment), Minimum Requirement No.7 (Flow Control), or both as described in ECDC 18.30.060. Threshold discharge area�n. An on -site area that drains to either a single natural discharge location or multiple natural discharge locations that combine within one -quarter mile downstream (as determined by the shortest flowpath). The examples below and in Figure 2-G.1 presented in Volume I of the S*^.....water Ma-aagefnei . Mai+u.' f r Weston. Washington (2005)SWMMWW illustrate this definition. The purpose of this definition is to clarify how the thresholds of this code are applied to project sites with multiple discharge points. . Version: September 8, 2015 Packet Pg. 184 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 9/30 Example of a Site with a Example of a Site with Example of a Site with Single Natural Discharge Multiple Natural Multiple Natural Discharges and a SingleThreshold Discharges and a Single and Multiple Threshold Discharge Area Threshold Discharge Area Discharge Areas Natural •'• -Natural Natural N44al Natural bischarge- ;Discharger•_ Discharge-..-- discharge-----• -.- �ischgge Y. -- Area Area 1 Area 2 Area 1 Area 2 THRESHOLD DFSOHARGE — ---THRE HOLD HRES11OLD THRESHGL DISCWR r', AREA., CSC ARG�.-- 15CHAFZGE r (Shaded)ti4 A FA- AREA i,, AAEA 2 I add Natural i Natural — Natural f Discharge Discharge Discharge Location Location •i = Location F i 1 'ti 4 f � � r Y. Mile Downstream - ------------------------+----------------- fshorlest flow pathl jy Vehicular Use. Regular use of an impervious or pervious surface by motor vehicles. The following are subject to regular vehicular use: roads, un-vegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unrestricted access fire lanes, vehicular equipment storage yards, and airport runways. The following are not considered subject to regular vehicular use: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, restricted access fire lanes, and infrequently used maintenance access roads. Waterbody. Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. Waters of the state. Includes those waters defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State, and "waters of the state" as defined in Chapter 90.48 RCW which includes lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. °`Wetlands —are as. As defined in ECDC 23.40.005. [Ord. 37924026 § 1—,204-0 (Att. A), 2016]. 18.30.020 Authority and Regulation. A. The public works aireeter or ^ desig e-ePublic Works and Utilities Director shall administer this chapter and shall be referred to as the d-ireeterDirector. B. The direeterDirector shall have the authority to develop -and, implement, and enforce policies and procedures to administer and enforce this chapter.- per ECDC 18.30.110 and 18.30.120, such as the Edmonds Stormwater Addendum The--, Edmonds City Code and Gonmnunity Development Gode -are eurrent Glar-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 185 7.3.c Edmonds Page 14,114 Edmonds Page 10/30 Chapter 18.30 STORM WATER MANAGEMENT O E M O th this tef. r�3-792 1, 2010]. > -e1 § C �E This chapter applies if .,,y of the following pertains to a site: 0 E 1. issuance of a city permit is required under all other chapters of ECDC Title 18 or . E O a 2.C. A iS SUbMitted p D 2 75 v sea 3• C proposed project: p O E a. involves 500 square feet or more of land distff-bing aetivity, new impervious surfaee, or replaeed 'a Title 23) farming be ++ there is the for and ongoing or gardening aetivities shall exeluded unless potenfial sueh Q b. is 500 lineal feet treneh d a utility or other eonstmetion projeet consisting of or more of excavation. O area buffer. C d E This ehaptef applies to aetions whenever the difeeteF deteffflines there is a potential d R of C ' ' IC 2. Aviolation federal laws, to of applieable city, state, or regulations, or permits related water quality. L if has been issued R for in (A) a city permit or a subdivision appheation submitted a site, as provided subsection of - is the this be those if the triggered i seetion, requirements of ehapter shall administered under permits. site aetivities E bseetion this do issued the this be O (A)(3) or (B) of section not neeessitate a eity permit, requirements of ehapter shall The requirements of this chapter are minimum requirements. They do not replace, repeal, abrogate, supersede, or Ln W affect any other more stringent requirements, rules, regulations, covenants, standards, or restrictions. Where this chapter imposes requirements that are more protective of human health or the environment than those set forth c elsewhere, the provisions of this chapter shall prevail. When this chapter imposes requirements that are less protective w of human health or the environment than those set forth elsewhere, the provisions of the more protective requirements shall prevail. m c ED. The director shall have the authority to impose additional requirements that apply te on a project or site � will diffe o meet the purpose of this chapter based on {site -specific factors including, but are -not limited to}— � following: p eet scope and , fig r.,tio physical site ,a,,,racteristies site location and conditions.- o 18.30.050. stelz ...,tor ffl o eI4 ro 0 e is ., e ,less fibed i ECDC; 1 0 3n 06n slope, and designated use. U EE. Approvals and permits granted under this chapter are not waivers of the requirements of any other laws, nor do W they indicate compliance with any other laws. Compliance is still required with all applicable federal, state and local , laws and regulations, including rules promulgated under authority of this chapter. �" � 2 GF. Compliance with the provisions of this chapter does not necessarily mitigate all impacts to the environment. Thus, c d E compliance with this chapter should not be construed as mitigating all drainage water or other environmental impacts, and additional mitigation may be required to protect the environment pursuant to other applicable laws and M Q regulations. The primary obligation for compliance with this chapter and for preventing environmental harm on or from property is placed upon the applicant. [Ord. 3792 § 1, 2010]. m E Q . Version: September 8, 2015 Packet Pg. 186 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 11/30 1 ,30,030 Applicability, i�30.0 4 0-Y7cd MiHxStf-atieir. A. This chapter applies to applications submitted on or after January 1, 2017 and applications submitted prior to January 1, 2017, which have not started construction by January 1, 2022. This chapter applies A. Appliemians. All storm water- review submit4als shall eantain, in addition to the infer-mation r-equired under- a -ay other applieable city code, a storm water site plan as deseribed in the storm water- supplemen4 (see ECDC 18.30.060) and other infer-mation as the director- shall . . B. to the following actions on sites that discharge to the City's MS4 or discharges to waters of the state whether or not a City -issued permit is required: 1. The d reefer shall review all plansfor o „1:.,nee with this ,.L.apter projeets for approval at various stages of the work to determine that they are being constFueted per the approved storm water site plans. Stages of work requiring inspeetion include (but are not limited to) preeonstmetion, installation fBN4n land Land -disturbing aetivities installation ofti lities landseapingT- and ehapter or to eomply with loeal, state or fedeFal law or regulation on storm water-, a speeial inspeetion or testing shall be performed. The drainage system shall be installed eoneurrently with site development a shall be eempleted as shwA% on the approved plan befer-e eity appFeval of an eeetipaney per-mit of final inspeetion.activity, or D2. Creation of new hard surfaces, or 3. Replacement of existing hard surfaces, or 4. Conversion of pervious surfaces, or 5. New connections to the City's MS4, or 6. Any other actions that can increase the volu or rate of stormwater runoff, or cause the generation of pollutants, from the site. I I I----�------- -------- ----------eeerae're:�eer+�si��!erssriiTifri�s���!* �f�r�teyc.Ts� 18.30.050 Projeet elassil0eat-ion. For puiposes of this ehapter, projeets are eiassified as large site, small site, or minor site as deseribed below, primarily based on the extent of land disturbing aetivities. The--, Ed-m-onds City Code and Gonmutmity Development Gode, -are, eurremit Ular-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 187 Attachment: Attachment 3 - ECDC 18.30-Redline Version (1465 : Stormwater Management Code Update, Edmonds Community Development 7.3.c Edmonds Page 14,114 Edmonds Page 13/30 Chapter 18.30 STORM WATER MANAGEMENT 4) E la. O N,.SSN4RNe.5 On Site StefmwateFNUnagemefit; 2 d vi. SSN4R No. 7 Flow Centrol. This SSN4R may be waived by the director- based on the extent of C appheation of SSN4R No. 5 to infiltrate, disperse, and retain storm water nmoff on site without causing- flooding or erosion impaet, per the criteria in the storm water s"pleme E vii. SSN4R No 8 Wetland Preteetion; E O v}i}. �Slbll?c lye. V C . E W ++ landseaped ,of, !Z d O i. SSN4R Ne 1 Prep..,•.,tie e f St...-.n...4er Site Plan; C Plan; d SSN4R No. 3 SoureeControl Pollution-, n}. of C � iv. cc>\aD Ne A Prmese.•ymie« „fN t..,•.,1 rlFaif age Systems ..,,.,1 Ott f 11s. , N,.SSN4RNe.5 Oa Site Stei4nwa4efManagement; y+ v}. SSN4 TATo. 6 R-uneffe—me-nt; E L O vii. SW No '7 Fio=v` Gontre-lr, ix. cc>\an No. 9 Opera m and 1\ ai tenan,.o. , C 1n Off Site n,,.,lysisMitigation; O x.cc>\anNo. and V) L xi. SSN4R No. 11 Finaneial Liability. > Aay the SSN4Rs be by the dir-eetof to the e. or all of may required on a+ty small site pr-ejeet based factors ineluding, but limited to, loeation, meet pufpose-af ehapter off site speeifie not soil designated, slope,this eonditions, Gi c3. O M Minof Site Pfejeets. The fellewing mini fi4s apply te fninof site projee O U W M puTese ef this ehapter based en site speeifie faeters ineluding, W4 net lifnited to, laea4ioa, soil eeaditie*s-, r+ slepe, anddesi-pmed use. r�3792 § 1, 2". d E s M 70 Exemptions, e3keeptions, adjustments and appeal.Q c A. Full Exemptions. The following land uses and land -disturbing activities are exempt from the provisions of this chapter: The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremat t-h-rough Ordinanee 4037, passed Q . Version: September 8, 2015 Packet Pg. 189 7.3.c Edmonds Page 14,114 Edmonds Page 14/30 Chapter 18.30 STORM WATER MANAGEMENT 1. Forest practices regulated under WAC Title 222, except for Class IV general forest practices that are conversions from *��timberland to other uses, are exempt from the provisions of the minimum requirements. 2. Commercial agriculture practices that involve working land for production are generally exempt. However, land conversion from timberland to agriculture and the construction of impervious surfaces are not exempt. 3. Construction of drilling sites, waste management pits, and associated access roads, and construction of transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations are exempt. Operators are encouraged to implement and maintain best management practices to minimize erosion and control sediment during and after construction activities to help ensure protection of surface water quality during storm events. 4. Roadway Pr-oj The following readwaypavement maintenance practices or activities are exempt: pothole and square -cut patching, overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of coverage, shoulder grading, reshaping/regrading drainage systems, crack sealing, resurfacing with in -kind material without expanding the road prism, ^pavement preservation activities that do not expand the road prism, and vegetation maintenance. a. For large site projects o ly *1t B. Partial Exemptions. The following land uses and land -disturbing activities are partially exempt from the provisions of this chapter: Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. fead2, Construction Stormwater Pollution Prevention. "I \ 4-.2. The following pavement maintenance practices or activities are considered redevelopmen4development, and therefore are not categorically exempt. The extent to which this exemption apphesthese requirements apply is explained for each circumstance. a. Removing and replacing a paved surface to base course or a lower level, or repairing the feadwaypavement base: iflf impervious surfaces are not expanded, lafge site pr-ejeet mini requirements No 1 throughMinimum Requirements No. 1 — No. 5 apply. However, i - mob- ., _ t.-.I--------.---»----...1­ - .... -, ____ - - ­ _......_y .,��»�� required when the thresholds identified for development projects in ECDC 18.30.060 are met. Where appropriate, project proponents are encouraged to look for opportunities to use permeable and porous pavements. b. i4—.Extending the pavement edge without increasing the size of the road prism or paving graveled shoulders: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for rr^a^velopme development projects in ECDC 18.30.060 are met. c. ii4—.Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; or upgrading from gravel to asphalt or concrete; or upgrading from a bituminous surface treatment ("chip seal') to asphalt or concrete: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for r-edev�development projects in ECDC 18.30.060 are met. 18.30.050 Administration. A. Application, Submittals, and Review. 1. The Director shall review all plans and all other submittals required by ECDC 18.30.050.A.3 for compliance with this chapter when: The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 190 7.3.c Edmonds Page 14,114 Edmonds Page 15/30 Chapter 18.30 STORM WATER MANAGEMENT a. An application for a City permit is required under all other chapters of ECDC Title 18 or 19, or b. A subdivision application is submitted per ECDC 20.75.040. 2. In all other situations when actions under ECDC 18.30.030 apply to a project site, review shall be under a Stormwater permit. 3. All stormwater review submittals shall contain, in addition to the information required under any other applicable City code, a Stormwater Site Plan as described in the Edmonds Stormwater Addendum (see ECDC 18.30.060) and any other information required by the Director. B. Inspections. 1. The Director shall inspect projects at various stages of the work to determine if they comply with the requirements of this chapter, and enforcement actions shall be taken as necessary. These inspections will include, but not be limited to, the following: a. Prior to site clearing and construction to assess site erosion potential, and b. During construction to verify proper installation and maintenance of required erosion and sediment controls and other approved plan components, and c. All permanent stormwater treatment and flow control BMPs/facilities and catch basins in new residential developments every six months until 90 percent of the lots are constructed (or when construction is stopped and the site is fully stabilized) to identify maintenance needs and enforce compliance with maintenance standards as needed, and d. Upon completion of construction and prior to final approval to ensure proper installation of permanent stormwater control facilities and verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater treatment and flow control BMPs/facilities, and e. Post -Construction inspections per ECDC 18.30.090. 2. When reasonably required by the Director to accomplish the purpose of this chapter or to comply with local, state or federal law or regulation on stormwater, special inspection or testing shall be performed by the applicant. C. Fees. Application, review and inspection fees as set in ECDC Chapter 15.00 shall be paid. 18.30.060 Requirements. A. Documents. The sources of the stormwater management requirements for the City are from the following documents: 1. Western Washington Phase II Municipal Stormwater Permit, Appendix 1, modification date January 16, 2015 2. 2014 Stormwater Management Manual for Western Washington (SWMMWW) 3. The Edmonds Stormwater Addendum In the event of conflicts between the various provisions, the more stringent provision shall apply. B. Illicit Discharges and Connections. Non-stormwater illicit discharges, including spills, into the MS4, groundwaters, or a water body from any developed or undeveloped lands are prohibited per ECDC Chapter 7.200. The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurreat Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 191 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT C. Thresholds and Applicability Page 16/30 The thresholds outlined in this section are only applicable to ECDC 18.30.060.C. See also the Edmonds Stormwater Addendum for supplemental information on thresholds. a. All development shall be required to comply with Minimum Requirement No. 2. b. Category 1 project sites shall comply with Minimum Requirements No. 1 through No. 5. Category 1 includes projects that: i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or ii. Have land disturbing activity of 7,000 square feet or greater. c. Category 2 project sites shall comply with Minimum Requirements No. 1 through No. 9. Category 2 includes projects that: i. Result in 5,000 square feet, or greater, of new plus replaced hard surface area, or ii. Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or iii. Convert 2.5 acres, or more, of native vegetation to pasture. 4-.2. Additional Requirements for road -related projects. For road -related projects, runoff from the new hard surfaces (including pavement, shoulders, curbs, and sidewalks) and the converted vegetation areas shall meet all the minimum requirements if the new hard surfaces total 5,000 square feet or more. In addition, if the new hard surfaces total 5,000 square feet or more and total 50 percent or more of the existing hard surfaces within the project limits, runoff from the new and replaced hard surfaces and the converted vegetation areas shall meet all the minimum requirements. The project limits shall be defined by the length of the project and the width of the right-of-way. D. Minimum Technical Requirements. This section describes the minimum technical requirements for stormwater management at development sites. 1. Minimum Requirement No. 1 — Preparation of Stormwater Site Plans The City shall require a Stormwater Site Plan from all projects meeting the thresholds in ECDC 18.30.060.C. Stormwater Site Plans shall use site -appropriate development principles to retain native vegetation and minimize impervious surfaces to the extent feasible. Stormwater Site Plans shall be prepared in accordance with Chapter 3 of Volume 1 of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 4-.2. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention.. Plan (SWPPP) a. Thresholds: All development projects are responsible for preventing erosion and discharge of sediment and other pollutants into receiving waters. Compliance with this minimum requirement can be achieved for an individual site if the site is covered under Ecology's General NPDES Permit for Stormwater Discharges Associated with Construction Activities and fully implementing the requirements of that permit. ii. A Construction SWPPP is required for all projects which a) result in 2,000 square feet or more of new plus replaced hard surface area, b) where a structure with an exterior hard surface area of at least 2,000 square feet is being demolished, c) which disturb 7,000 square feet or more of land, or d) when the site falls within the Earth Subsidence Landslide Hazard Area, Landslide Hazard Area or steep slope critical area. Projects that do not meet any of the above criteria are not required to prepare a Construction SWPPP, but must consider all of the elements listed The--, Edim-onds City Code and Gonmnunity Development Gode, -are, eurremit 0hrough Ordinanee 4037, passed haly . Version: September 8, 2015 Packet Pg. 192 7.3.c Edmonds Page 14,114 Edmonds Page 17/30 Chapter 18.30 STORM WATER MANAGEMENT below for Construction SWPPPs and develop controls for all Construction SWPPP elements that pertain to the project site. b. General Requirements: The SWPPP shall include a narrative and drawings. All BMPs shall be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative shall include documentation to explain and justify the pollution prevention decisions made for the project. Each of the thirteen elements referenced below must be considered and included in the SWPPP unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the narrative of the SWPPP. ii. Clearing and grading activities for developments shall be permitted only if conducted pursuant to an approved site development plan (e.g., building permit, subdivision approval) that establishes permitted areas of clearing, grading, cutting, and filling. These permitted clearing and grading areas and any other areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree retention areas as required by the City, shall be delineated on the site plans and the development site. iii. The SWPPP shall be implemented beginning with initial land disturbance and until final stabilization. Sediment and Erosion control BMPs shall be consistent with the BMPs contained in Chapter 4 of Volume II of the SWMMWW. c. Seasonal Work Limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities may only be authorized by the City if it can be demonstrated that silt -laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and ii. Limitations on activities and the extent of disturbed areas; and iii. Proposed erosion and sediment control measures, in accordance with ECDC 18.30.060.D.2.d below. Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations, except for sites lying in whole or in part within an earth subsidence and landslide hazard area as defined by ECDC 19.10.020.F: Routine maintenance and necessary repair of erosion and sediment control BMPs, ii. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil, and iii. Activities where there is one hundred percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. d. Construction SWPPP Elements Construction SWPPP elements are required in accordance with Chapter 2, Section 2.5.2 of Volume I of the SWMMWW and the requirements in the Edmonds Stormwater Addendum 3. Minimum Requirement No. 3 — Source Control of Pollution The--, Ed-m-onds City Code and Gonmutmity Development Gode, are--, e_-,urremt Glar-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 193 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 18/30 All known, available and reasonable source control BMPs must be required for all projects approved by the City. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. 4. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location, to the maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. The discharge must have an identified overflow route that is safe and certain, and leads to the ultimate outfall location (such as a receiving water or municipal drainage system). All outfalls require energy dissipation. To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis. If an existing problem (or potential future problem after development) is identified, mitigation will be required to prevent worsening of that problem. A quantitative analysis may be required for any project deemed to need additional information or where the project proponent or the City determines that a quantitative analysis is necessary to evaluate the off -site impacts or the capacity of the conveyance system. See the Edmonds Stormwater Addendum for additional details on complying with this requirement. 5. Minimum Requirement No. 5 — On -site Stormwater Management a. Applicability: On -site Stormwater Management BMPs are required in accordance with the following project thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff on -site to the extent feasible without causing flooding or erosion impacts. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Project Thresholds: There are five project scenarios outlined below that determine the applicability of Minimum Requirement No. 5 — On -site Stormwater Management. The first four scenarios apply to projects that discharge directly or indirectly to the City's MS4. The fifth scenario applies to project discharges that do not enter the City's MS4. Note that more than one of the five scenarios may apply to a given project: Retrofit. Projects that discharge directly or indirectly to the City's MS4 and that contain existing hard surfaces on the parcel or common plan of development that do not drain to an approved stormwater management facility are required to provide On -site Stormwater Management BMPs to manage a portion of those existing hard surfaces that will remain after project completion. BMPs from List No.I (See ECDC 18.30.060.D.5.d) shall be applied to a minimum of 25 percent of those existing unmanaged surfaces, but to no more than the area equal to the proposed new plus replaced hard surfaces. Only for those existing unmanaged hard surfaces that remain after project completion, applicants are not required to evaluate BMPs in priority order or document infeasibility for these existing surfaces (as is required under ECDC 18.30.060.D.5.b [ii] and [iii] below). However, if it is determined that the minimum 25 percent requirement cannot be met due to BMP infeasibility, documentation of BMP infeasibility is required. In addition, when runoff from exiting unmanaged hard surfaces is mixed with runoff from new plus replaced hard surfaces, those BMPs must be selected and designed in accordance with the requirements for management of new plus replaced hard surfaces (per sections [ii] and [iii] below). See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 194 7.3.c Edmonds Chapter 19.30 STORM ALATER MANAGEMENT Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 19/30 ii. Category 1. Category 1 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 5 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.1 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.d); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iii. Category 2. Category 2 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 9 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.2 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.e); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iv. Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the City's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID Performance Standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following: a. Projects must implement BMP T5.13 (Post -Construction Soil Quality & Depth); BMPs T5.I OA Downspout Full Infiltration Systems, T5.1 OB Downspout Dispersion Systems, or T5.1 OB Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Edmonds Way specific requirements. After applying the requirements in item (a) above, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post -development 10-, and 100-year recurrence interval peak flows shall not exceed, 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. V. Projects that do not drain directly or indirectly to the City's MS4 are required to implement one of the following: a. Project sites may discharge to the downstream private property (e.g., projects located above BNSF property) with approval from the downstream property owner(s). b. Project sites may discharge runoff to an on -site system. For sites located within earth subsidence and landslide hazard areas or their buffers, a geotechnical design, analysis, and report by a geotechnical engineer is required for the on -site system. On -site Stormwater Management BMPs from List No.I in ECDC 18.30.060.D.5.d shall be evaluated for all new plus replaced hard surfaces and land disturbed. Projects are not required The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurreat t-la-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 195 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 20/30 to evaluate BMPs in priority order or document infeasibility. The project applicant may be subject to an extra permit processing fee for City review of the geotechnical analysis. Projects are required to comply with all other applicable City requirements, such as ECDC 19.10 (earth subsidence and landslide hazard areas). ii. For sites located outside earth subsidence and landslide hazard areas or their buffers, ECDC 18.30.060.D.5.ii and ECDC 18.30.060.D.5.iii shall be followed to evaluate site appropriate BMP's. Subject to prior approval by the City, project sites may pump on -site runoff to the City's MS4. A quantitative downstream analysis in accordance with Minimum Requirement No. 4 and the Edmonds Stormwater Addendum will be required. If the City's MS4 does not have adequate capacity to receive the applicant's pumped flows, the applicant is required to install an on -site detention system to store runoff and pump it to the MS4 at an approved rate. c. LID Performance Standard For projects that elect to meet the LID Performance Standard to comply with ECDC 18.30.060.D.b (ii) and (iii), stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow from the project site. Refer to the Standard Flow Control Requirement section in Minimum Requirement No. 7 for information about the assignment of the pre -developed condition. Project sites that must also meet Minimum Requirement No. 7 shall match flow durations between 8 percent of the 2-year flow through the full 50-year flow. d. List No.I for Category 1 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 5. For projects that elect to use List No. 1 to comply with ECDC 18.30.060.D.b (ii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW and the Edmonds Stormwater Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.1 OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit t-la-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 196 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 21/30 iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. iv. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. e. List No.2 for Category 2 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 9. For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.10A in Section 3.1.1 of Volume III of the SWMMWW. ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit t-la-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 197 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 22/30 V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW. iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. 6. Minimum Requirement No. 6 — Runoff Treatment a. Project Thresholds: When assessing road -related projects against the following thresholds, only consider those hard and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following require construction of stormwater treatment facilities: Projects in which the total of pollution -generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or ii. Projects in which the total of pollution -generating pervious surfaces (PGPS) — not including permeable pavements — is 0.75 acres or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. b. Treatment -Type Thresholds and Facility Sizing: Treatment -Type Thresholds in accordance with Step 2 (Oil Control), Step 4 (Phosphorus Treatment), Step 5 (Enhanced Treatment), and Step 6 (Basic Treatment) of Chapter 2, Section 2.1, Volume V of the SWMMWW. Phosphorus treatment shall be required for projects draining to Hall Creek and Lake Ballinger. ii. Treatment Facility Sizing, including Water Quality Design Storm Volume, Water Quality Design Flow Rate, and Downstream Facilities, of Chapter 2, Section 2.5.6, Volume I of the SWMMWW. c. Treatment Facility Selection, Design, and Maintenance The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 198 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Stormwater treatment facilities shall be: Page 23/30 Selected in accordance with the process identified in Chapter 4 of Volume I, and Chapter 2 of Volume V of the SWMMWW, ii. Designed in accordance with the design criteria in Volume V of the SWMMWW, and iii. Maintained in accordance with the maintenance schedule in Volume V of the SWMMWW d. Additional Requirements The discharge of untreated stormwater from pollution -generating surfaces to ground water will not be authorized by the City. All associated runoff must be treated using On -site Stormwater Management BMPs designed to provide the required level of treatment in accordance with Chapter 5, Volume V and Chapter 7, Volume V of the SWMMWW; or by infiltration through soils meeting the soil suitability criteria in Chapter 3 of Volume III of the SWMMWW. Minimum Requirement No. 7 — Flow Control a. Applicability: Flow control is required on projects meeting the thresholds summarized below to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. Flow control in accordance with Minimum Requirement No. 7 is not required for projects that discharge directly to, or indirectly through the City's MS4 to Puget Sound (other minimum requirements may still apply). See ECDC 18.30.060.D.5.b.iv and Section 2.5.7 of Volume I of the SWMMWW for additional restrictions applicable to direct discharges to Puget Sound. If the discharge drains to a stream that leads to a wetland, or to a wetland that has an outflow to a stream, both this minimum requirement (Minimum Requirement No. 7) and Minimum Requirement No. 8 apply- b. Thresholds: When assessing road -related projects against the following thresholds, only consider only those impervious, hard, and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following circumstances require achievement of the standard flow control requirement for western Washington: Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or ii. Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold discharge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or iii. Projects that through a combination of hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second (cfs) increase or greater in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one -hour time steps (or a 0.15 cfs increase or greater using 15-minute time steps). c. Standard Flow Control Requirement (applies to discharges directly or indirectly to the City's MS4, except for projects that meet the direct discharge requirements outlined in "a" above): Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. The pre -developed condition to be matched shall be a forested land cover unless reasonable, historic information is available that indicates the site was prairie prior to settlement (modeled as "pasture" in the The--, Edim-onds City Code and Gonmnunity Development Gode, -are, eurremit 0hrough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 199 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 24/30 Western Washington Hydrology Model). This standard requirement is waived for sites that will reliably infiltrate all the runoff from hard surfaces and converted vegetation areas. d. Additional Requirement: Flow Control BMPs shall be selected, designed, and maintained in accordance with Volume III of the SWMMWW or an approved equivalent. 8. Minimum Requirement No. 8 - Wetlands Protection a. Applicability: The requirements below apply only to projects whose stormwater discharges into a wetland, either directly or indirectly through a conveyance system. b. Thresholds: The thresholds identified in Minimum Requirement No. 6 - Runoff Treatment, and Minimum Requirement No. 7 - Flow Control shall also be applied to determine the applicability of this requirement to discharges to wetlands. c. Standard Requirement: Projects shall comply with Guide Sheets No. 1 through No. 3 in Appendix I-D of the SWMMWW. The hydrologic analysis shall use the existing land cover condition to determine the existing hydrologic conditions unless directed otherwise by a regulatory agency with jurisdiction. d. Additional Requirements: Stormwater treatment and flow control facilities shall not be built within a natural vegetated buffer, except for: Necessary conveyance systems as approved by the City; or ii. As allowed in wetlands approved for hydrologic modification or treatment in accordance with Guide Sheet 2 in Appendix I-D of the SWMMWW. An adopted and implemented basin plan prepared in accordance with the provisions of Section 7 of Appendix 1 of the Phase II NPDES Municipal Stormwater Permit. Minimum Requirement No. 9 - Operation and Maintenance6. With r-espeet to ~eplaeea e ff ees SSN4R 8 (wetlands pr-eteetiea) (er- the asseeia4ed applieabl �_ir-emefAs for- lafge sites) should the eity adopt a plan and sehedule that fialfills th ' . ts thr-aidg� - . I . nage eat+tr-el plan ., via An operation and maintenance manual that is consistent with the provisions in Volume I and Volume V of the SWMMWW is required for proposed Stormwater Treatment and Flow Control BMPs/facilities. The party (or parties) responsible for maintenance and operation shall be identified in the operation and maintenance manual. For private facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -site or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate department. A log of maintenance activity that indicates what actions were taken shall be kept and be available for inspection. 18.30.070 13==Exceptions, Adjustments, and Appeals. 4— A. Exceptions. 1. The dir-eete Director may approve a request for an exception to the minimum requirements of this chapter following legal public notice of an application for an exception and of the Director's decision on The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 200 7.3.c Edmonds Page 14,114 Edmonds Page 25/30 Chapter 18.30 STORM WATER MANAGEMENT the application. All legal public notice related to this request for an exception shall be in the manner prescribed in ECDC 20.03.002 and the applicant shall pay all costs to publish the legal public notices required by this provision. The director Director shall provide and keep written findings of fact of the decision. The approval of the exception shall only be granted when the applicant demonstrates that the exception will ^* increase risks to publie health, safety, and welfare, or to water quality, or to publie and private property in the vioinity or downstream of the property, and the exeeption shall be the least possible exeeption that eoul granted and still provide eomplianee with the intent of th i i itirements. in addition, the exeeption shall enly be gran4ed when it has been deter -mined by the direetor- thm one or mere ef the follewing applies: ache -requirement would cause a severe and unexpected €inaneialeconomic hardship that outweighs the requirement's benefits, and the er;teri for ., adjustment e „t be et; or ham. To determine whether the requirement would eause harm or a significant threat of harm to publie health, safety, and welfare, the environment, or publie and pFivate property, and the oriteria for an adjustment cannot be met; o e. The requirement is not technically feasible, and the oriteria for an adjustment cannot be met; 0 ,l An emerge.,;r..., r; o sts th..t « s;t..tes approval of the v rtion 2. imposes a severe and unexpected economic hardship shall aos^r;hv, at a rr.;..;rr.0 on the project applicant, the applicant must document for City review and approval, all of the following:, at a minimum: a. a -.-The current, pre -project use of the site; and b. b-How application of the requirement(s) for which an exception is being requested restricts the proposed use of the site compared to the restrictions that existed prior to adoption of this chapter; and c. e-The possible remaining uses of the site if the exception were not granted; and d. d-The possible uses of the site that would have been allowed prior to the adoption of this chapter; and e. e-A comparison of the estimated amount and percentage of value loss as a result of the requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the requirements of this chapter; and f. The feasibility of the applicant to alter the project to apply the requirements of this chapter. 3. Any exception must meet the following criteria: a. The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and b. The exception is the least possible exception that could be granted to comply with the intent of the minimum requirements. 3-A. An exception to the requirements shall only be granted to the extent necessary to provide relief from the economic hardship as determined by the dir-e6tefDirector, to alleviate the harm or threat of harm to the degree that compliance with the requirement becomes technically feasible, or to perform the emergency work that the direeto Director determines is warranted. 4.5.5-The direeterDirector may require an applicant to provide additional information at the applicant's expense, including (but not limited to) an engineer's report or analysis. The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 201 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 26/30 -5-.6.6-When an exception is granted, the dir-eeteeDirector may impose new or additional requirements to offset or mitigate harm or the threat of harm that may be caused by granting the exception, or that would have been prevented if the exception had not been granted. CB. Adjustments. 1. The di-ect Director may approve a request for adjustments to the requirements of this chapter when the derDirector finds that: a. a -.-The adjustment provides substantially equivalent environmental protection; and b. b-The objectives of safety, function, environmental protection, and facility maintenance are met, based on sound engineering practices. 2—During construction, the directorDirector may require, or the applicant may request, that the construction of drainage control facilities and associated project designs be adjusted if physical conditions are discovered on the site that are inconsistent with the assumptions on which the approval was based, including (but not limited to) unexpected soil or water conditions, weather -generated problems, or changes in the design of the improved areas; and 3—A request by the applicant for an adjustment shall be submitted to the di-ree4orDirector for review and approval prior to implementation. The request shall be in writing and shall provide facts substantiating the requirements of subsection (C)(1) of this section, and if made during construction, the factors in subsection (C)(2) of this section. Any such modifications made during the construction of drainage control facilities shall be included with the final approved drainage control plan. 13C. Appeal. 1. The Director's decision on an application for an exception or adjustment may appeal to the hearing examiner in accordance with a Type II appeal process in ECDC Chapter 20.06 ECDC. 2. The applicant shall carry the burden of proof. 3. The decision of the hearing examiner is appealable to superior court in accordance with Chapter 36.70C RCW. [Ord. 3792 § 1, 2010]. 1 18.30.080 Easements, deeds -,Access and covenants.Covenants. A. Easements. A publie sterm drainage inspeetion easement shall be required v4wre-.-Access. Proper ingress and egress shall be provided to the City to inspect or perform any duty imposed upon the City by this Title. The City shall notify the responsible party in writing of a failure to provide access. If the responsible party fails to respond within seven days from the receipt of notification, the City may order the work required completed or otherwise address the cause of improper access. The obligation for the payment of all cost that may be incurred or expended by the City in causing such work to be done shall be imposed on the person holding title to the subject property these storm water best management pracfces confines to fimetion& Covenants. Maintenance covenants shall be required for each site/lot that will be maintained by a private entity such as designed. Rase a ffts shall be an individual, corporation, or homeowner's association. The maintenance covenant shall address or append requirements and responsibilities for long-term management and maintenance the applicable BMP(s). Maintenance covenants shall be as specified in o.,gi ffee -inn div sio City Engineering Division documents or approved by the directorDirector, and recorded with Snohomish County and on all proper deeds. The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 202 Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 27/30 B. Deeds and Covenants fer- Lew impaet Development. Deed restr4etiens and eeveaaa4s shall be r-eqttif-ed 99F all sit ftmetion as designed. The deed restrietiens of eevefia-fits shall address er append fequiremeffts a -ad responsibilities long term management and inaintenanee of these best management prae [Ord. 3792 § 1, 2010]. 18.30.090 Post Construction Inspection and maintenanee rolesMaintenance Roles and responAesResponsibilities. Proper construction inspection and maintenance of storm wate stormwater facilities (including ing eonst etion BNWs' is essential for the protection of the eiPfIsCity's MS4 and the environment. laspeetion and m .mien., e of all steizm water facilities shall be required in aceor-dance with the storm water supplement. A. Storm Wate Stormwater Maintenance and Inspection Standards. Storm wate Stormwater facilities shall be inspected and maintained per the requirements of the storm water � .o *Volume I and Volume V of the SWMMWW. For systems which do not have a maintenance standard, the owner shall develop a standard based on guidelines from the manufacturer, designer, or a registered professional engineer and submit the standards to the director- for apprev-a Director for approval. The purpose of the maintenance standard is to determine if maintenance is required. The maintenance standard is not a measure of the facility's required condition at all times between inspections. Exceeding the maintenance standard between inspections is not a violation of this chapter. B. Ownership. Storm wate Stormwater facilities are either privately or publicly owned and maintained. All storm waterstormwater facilities that serve commercial and industrial site private property are private. Storm drama facilities, unless an agreement between the property owner and the City states otherwise. Stormwater facilities or - controls -that are privately owned by a homeowner's association or similar organization also are private. The City may offer an incentive program to owners to support the proper maintenance of private storm drainage facilities. C. Public Stormwater Facilities. The City shall be responsible for operating, maintaining, repairing, and replacing public stormwater facilities as funded through the Stormwater Utility. D. Maintenance and Inspection of Permanent Facilities. All privately owned storm drainage facilities or controls shall be maintained by the owner, or the homeowner or owner association ("owner") if one is established as part of a residential or commercial development. All private storm drainage facilities shall be regularly inspected to ensure proper operation and shall monitor the facility or control as required or as set forth in theme „�SWMMWW. The eOwner shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person who took it, the date said action was taken, how it was done, rests is of any r mitering off +t, and any problems encountered or follow-up actions required. The records shall be made available to the eityCity upon request. The a Owner shall maintain a copy of the Stormwater Operations and Maintenance Manual (if required) on site, and shall make reference to such document in real property records filed with Snohomish County, so others who acquire real property served by the privately owned storm drainage facilities or controls are notified of their obligation to maintain such facilities or controls. 1. Within one year for wet pool f4eilities and retention'detention faeilities; z. Within six months for typieal maintenanee-, 3. Within omenthsvrev'Ing, 4. Within two yeafs for maintenance that requir-es eapital eanstr+Ietion of less than . EE. City Inspection of private stormwater facilities. The City shall have the authority to periodically inspect private stormwater facilities, including low impact development stormwater facilities, for compliance with this chapter. F. Right of Entry. An authorized representative of the City may enter private property at all reasonable times to conduct inspections, tests or to carry out other duties imposed by the a state or Federal program provided that the City The--, Ed-m-onds City Code and Gonmnunity Development Gode, -are, e_-,urremt Glar-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 203 7.3.c Edmonds Page 14/44 Edmonds Page 28/30 Chapter 18.30 STORM WATER MANAGEMENT E makes a good faith effort to notify the property owner or person responsible for the premises prior to entering and Q. m presents proper credentials to that person. If entry is refused or cannot be obtained, the Director shall have recourse to m every remedy provided by law to secure entry, including but not limited to, obtaining an administrative warrant for entry. c 0 G. Right of Entry for Illicit Discharge. In the event of an illicit discharge from a privately -owned stormwater facility E caused by improper maintenance or operation or other circumstance, the provisions of ECC 7.200 shall apply. E 0 U H. Maintenance Responsibilities. Upon written notice by the City, a private stormwater facility shall be promptly repaired and/or brought up to applicable standards by the property owner or the person responsible for said facility. If c a private stormwater facility serves multiple lots and the responsibility for maintenance has not been specified on a E recorded subdivision plat, short plat, or other legal document, maintenance, operation and repair responsibility shall w rest with the homeowners' association, if one exists, or otherwise with the properties served by the facility, or finally, with the owners of the property on which the facilities are located. c a I. Disposal of Waste from Maintenance Activities. Disposal of waste from maintenance activities shall be conducted in accordance with the h4nimumminimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines for disposal of waste materials from storm water maintenance activities, and where appropriate, the 0 V Dangerous Waste Regulations, Chapter 173-303 WAC. F. City inspection. The inspection drainage f4eilities is to E regular- of privately owned storm or eontrels essential ena the city to evaluate the operation of the eity's MS4 and the en-vironment. The eity shall have aeoess to m proper private storm water facilities for inspeetion to enstire they are operated and main4ained in aeeor-danee vflith EGG 0 c properly drainage f eil;ties [Ord' 3 792 § 1 20101. L r 18.30.100 Enforcement pfoc esProcedures. t4 E L A. General enforcement action shall be in accordance with this chapter whenever a person has violated any provision 0 Cn of this chapter. The choice of enforcement action is at the discretion of the eit The seve ity f any penalty shall be based en the natwe of the vialatien, the dafflage, er risk to the publie er to publie r-esetifees, or- the degree of bad faith Ln m of the person „jeet to the en f r,.oment aetio .City. � c B. Notiee of Violation and Order- to Correet. The direetoF shall have the authority to serve a person a notice of violat 0 and or -der to eorreet O�OVQTC) if an aetion is being undertaken in violation of this •issuanee of any otherL y `d warning, notiee, or or -der is not a eondition pFeeedent for the direetor to issue an • / l 0 in M desist, oappFapFime eases, the speei W U • il ith ; U W M 2 either by certified ,v..,:l with fetff receipt C 0 rolls of the Snohomish County assessor as die- E M r r Q C E t 0 rnugQ t, OrdinA4ipp 4037 r ..oa r,,,., n �n, Version: September 8, 2015 Packet Pg. 204 7.3.c Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 29/30 B. Civil Penalties Adopted. ECDC Chapter 20.110 enforcement procedures are herein adopted in full, as modified in this chapter, with the proviso that repeat offenders or violations deemed an immediate public hazard shall be subject to compliance and appeal timelines as deemed appropriate by the Director based on the specific nature of the violation. C. Maintenance Orders. The dir-eetefDirector shall have the authority to issue to an owner or person an order to maintain or repair a component of astorm wate stormwater facility or BMP to bring it into compliance with this chapter, the storm water s,.ppleme SWMMWW, the Edmonds Stormwater Addendum, and the Edmonds Community Development Code. The order shall include: _ 1. 4-.A description of the specific nature, extent and time of the violation and the damage or potential damage that reasonably might occur; 2. 2-.A notice that the violation or the potential violation cease and desist and, in appropriate cases, the specific corrective actions to be taken; and 3. 3-A reasonable time to comply, depending on the circumstances. D. Civil Penalty. A person who fails to comply with the requirements of this chapter, who fails to conform to an approval or order issued, who undertakes new development without first obtaining approval, or who fails to comply with a stop work order issued under these regulations shall be subject to a civil penalty levied in accordance with the provisions of ECDC Chapter 20.110ECDE; provided, however, that the appeal process shall commence with a notice of violation as provided in ECDC 20.110.040(.B)-.. Civil penalties for code violations shall be imposed in accordance with the provisions of ECDC Chapter 20.110; provided, however, that in addition to the penalties set forth in that chapter, the hearing examiner is authorized to levy a penalty of up to $twenty thousand dollars ($20,000) per occurrence based upon an assessment of the following factors. Where such factors are present, the hearing examiner is authorized to levy such penalty after taking into consideration the full impact of the violation and any mitigating circumstances (see subsection (D)(2) ^ below): a. a. The violation created a risk to public health and the significance of the risk. b. b-The violation damaged the environment and the significance of the damage. c. e-The violation caused damage to public and private property and the significance of such damage. d. d A history of similar violations, if any. e. e-The economic benefit of the violations, if any, to the person or entity responsible for the violations. 2. Mitigating circumstances which may be used to offset or reduce the time resulting from the application of the preceding factors are limited to: a. a -.-Full compliance with a voluntary compliance agreement and no history of similar violations. b. b-Full compliance with a voluntary compliance agreement and a history of one or two similar violations (lesser reduction). c. c-.-A "voluntary compliance agreement" is defined as a legally binding agreement entered into between the cityCity and the alleged violators, by which the violator(s) acknowledge the existence of the violation, waive all appeal rights, and agree to and do pay a fine in an amount stipulated to between the violator and the eiyCity. The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 205 Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 30/30 3—If the violation(s) are not corrected as ordered, or a voluntary compliance agreement is not entered into within that time period and no appeal is filed, the penalty for the next 15-day period shall be 150 percent of the initial penalties, and the penalties for the next 15-day period shall be 200 percent of the initial penalties. The intent of this subsection is to increase penalties beyond the maximum penalties stated as an additional means to achieve timely compliance. Unless otherwise provided in a voluntary compliance agreement, civil penalties shall be paid within 30 days of service of the notice and order or stop work order if not appealed. Payment of the civil penalties assessed under this chapter does not relieve a person found to be responsible for a code violation of his or her duty to correct the violation or to pay any and all civil penalties or other cost assessments issued pursuant to this chapter. The eityCity may suspend immediate payment of civil penalties if the person responsible for a code violation has entered into a voluntary compliance agreement. Penalties shall begin to accrue again pursuant to the terms of the voluntary compliance agreement if any necessary permits applied for are denied, canceled or not pursued, if corrective action identified in the voluntary compliance agreement is not completed as specified, or if the property is allowed to return to a condition similar to that condition which gave rise to the voluntary compliance agreement; provided, however, that additional penalties shall not be imposed until additional notice and opportunity for hearing have been provided in accordance with ECDC Chapter 20.110 ECDC. 6-Civil penalties assessed create joint and several personal obligations in all persons responsible for a code violation. E. The determination of the hearing examiner issued in accordance with ECDC Chapter 20.110ECDC shall be appealable to the Snohomish County superior court in accordance with the provisions of Chapter 36.70C RCW F. The remedies provided for in this section shall not be exclusive. The eityCity may also use other civil and administrative remedies available to it, including but not limited to the remedies provided in ECDC Title 19 and the state building and dangerous buildings codes. [Ord �792 § 1 20101. The--, Edmonds City Code and Gonmutmity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 206 VW c 0 a VQ N r+ N N O N n O 4 Attachment: Attachment 4 - SW Code Council Public Hearing-20160802 (1465 : Stormwater Management i c 0 O h n r-+ n 0 rD Attachment: Attachment 4 - SW Code Council Public Hearing-20160802 (1465 : Stormwater Management Why is the Code being updated? Mandated by Department of Ecology Compliance with 2013-2018 Western Washington Phase II Municipal Stormwater Permit (NPDES Permit) required Compliance with 2014 Stormwater Management Manual for Western Washington (Ecology's Manual) required (Edmonds is essentially implementing identical requirements as 87 "NPDES Phase II" municipalities across western Washington) c aD E L E L 0 U) LO CD IV N O 00 O 0 N al C 0 U a� 0 U a r E w r a (H arMar) A LVA I Packet Pg. 209 What changes can be expected? Most substantial change has to do with new Low Impact Development requirements ("Minimum Requirement (MR) #5" in the Permit) Affects small projects (>2,000 sq. ft. of impervious) More complex site assessment requirements Additional City review requirements VAI Packet Pg. 210 What changes can be expected? m Stormwater Management (SWM) L - MR #5: Implementation Category 1 Project Sites (Trigger MR #1-#5) Category 2 Project Sites (Trigger MR #1-#9) 5 LO CD N O 00 List #1 orto 0 N Modeling Cu (LID Performance Standard] O U a� O List #2 or Modeling y (LID Performance Standard) a w r a VAI Packet Pg. 211 "List 1" and "List 2" _ L List 1 and List 2 provide options, established by Department of 0 Ecology, for managing stormwater runoff on a project site. �' Roofs N O O 53 0 N al C CU O - 2 V d C 7 O U d O U 0 E t V R Separate lists must be followed for each type of surface. LWA I H Packet Pg. 212 "i ist 1" and "List 2" L In design, all SWM options must be considered in the order listed. 0 0 The first option that is considered feasible is to be used.LO 1. Soil Quality and Depth Roofs W7 1. Full Dispersion or Downspout Full Infiltration 2. Rain Gardens [or Bioretention] 3. Downspout Dispersion Systems 4. Perforated Stub -out Connections 5. Detention pipes or vaults (City -specific standard) N O O O r Other Hard Surfaces 0 N tM C �L R _j d a 0 RV MMMV U 1. Full Dispersion co 2. Permeable Pavement [or Rain Gardens or Bioretentic E 3. Sheet Flow Dispersion, or 2 Concentrated Flow Dispersi 4. Detention pipes or vaults ' (City -specific standard) w a (H a E) E) a D A L&A I Packet Pg. 213 What changes can be expected? City will not require historical tracking of impervious surface area on individual properties. Stormwater management of at least 25% of existing unmanaged impervious surfaces, but no more than area equal to proposed (retrofitting). new plus replaced area c aD E (D L E L O r U) LO IV N O 00 O 0 N al C �L 2 V 0 U a� 0 U E a r E w r a (H aDDar) A LVA I Packet Pg. 214 7.3.d F ^ 9 The project includes an existing "unmanaged" parking lot, and an existing structure. The project will tear down and rebuild the structure, but will not alter the parking area. The project discharges to the City's storm system. Triggers Minimum Requirements No. 1-5 Plus Retrofit Requirement Project site contains existing hard surfaces that do not drain to an approved stormwater management facility, and will not be modified as part of the proposed project. c a E m c List No. 1 L Existing hard surfaces: Use o any BMPs from List No. 1 to manage at least 25% of existing unmanaged surface o 00 area. BMPs are not required 0 to be evaluated in priority order or document infeasibility. _ 1 0 0 U Minimum Req. 5 Applies 00 for Replaced Structure r New/Replaced surfaces: Sei 0 details on requirements in Project Scenarios 2-5. a 0 E w a 9 Packet Pg. 215 IN - �. eaaeaI The project results in 3,000 square feet of new plus replaced hard surface area and discharges to the City's storm system. 10 Triggers Minimum Requirements No. 1-5 • Result in 2,000 square feet or greater of new plus replaced hard surface area, or • Has land disturbing activity of 7,000 square feet or greater List No. 1 or Modeling (LID Performance Standard) 11� � �II II � The project removes and replaces structures and pavement totaling 12,000 square feet of area and discharges to the City's storm system. 11 Triggers Minimum Requirements No. 1-9 • Result in 5,000 square feet or greater of new plus replaced hard surface area, or • Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or • Convert 2.5 acres, or more, of native vegetation to pasture List No. 2 or Modeling (LID Performance Standard) 7.3.d The project is located in a direct discharge basin and includes specific requirements for the Edmonds Way basin. The project results in 3,000 square feet of new plus replaced hard surface area. 13 Triggers MRs No. 1-5 (Category 1 Project) Direct Discharge to Puget Sound CATEGORY 1 OR 2 PROJECTS Only a subset of List No. 1 applies If project is also located in the Provide peak flow Edmonds Way basin control for all remaining project site runoff The project removes and replaces structures and pavement totaling 6,000 square feet and does NOT discharge to the City's storm system. Triggers Min. Req. No. 1-9 (Category 2 Project) M c CATEGORY 1 OR 2 ' PROJECTS L r 3 E L O Approval from LO LO Discharge to Downstream Downstream Property Owner(s) co 0 Discharge On -site to List No. BMP (not required to be evaluated in priority order or document infeasibility) Pump On -Site Runoff to City's storm system 0 N 01 CU d Geotech Required Peer Review Fee L O U a� O Quantitative Downstream Analysis a s r r ZI 14 1 Packet Pg. 219 Schedule / Status June 14, 2016 — City Council Study Session July 20, 2016 — Public Meetings • August 2, 2016 — City Council Public Hearing August 16, 2016 — City Council Action Item (Seeking approval of code with an effective date of Jan 1, 2017) Fall 2016 — Completion of Stormwater Development of implementation tools checklists) Addendum. (e.g., review WAI Packet Pg. 220 7.4 City Council Agenda Item Meeting Date: 08/23/2016 Authorization to contract with James G. Murphy to sell surplus city equipment (5 min.) Staff Lead: Mike Adams Department: Public Works & Utilities Preparer: Royce Napolitino Background/History Previously, the city has utilized the services of James G. Murphy Auctioneers to sell surplus city vehicles and equipment. The City vehicles being submitted for review. Unit# 58-STR 1999 Dodge % ton pickup VIN# 3B7KC26ZIXM557492 Unit# 79-POL 1991 GMC Step Van VIN# 1GTHP32KOM3502431 Unit# 203-POL 2008 Harley Davidson FLHTP VIN# 1HD1FMM138Y704203 Unit# 277-POL 2005 Dodge Stratus VIN# 1133AL46T651\1645277 Unit# 405-POL 2008 Harley Davidson FLHTP VIN# 1HD1FMM198Y705405 Unit# 495-FLT 1999 GMC 5-15 Pickup VIN# 1GTCS19X3XK513495 Unit# 681-POL 2006 Ford Crown Victoria VIN# 2FAHP71W76X135681 Staff Recommendation It is recommended that authorization be granted to Public Works to contract with James G. Murphy Auctioneers to sell surplus city vehicles. Narrative The utilization of James G. Murphy Auctioneers for the sale of surplus vehicles has proven to be a cost effective method to manage surplus items. The surplus sales monies will be considered 2016 Revenue for the B-Fund Replacement Account. Packet Pg. 221 8.1 City Council Agenda Item Meeting Date: 08/23/2016 Authorization to modify an Agreement with the Cold Spring Granite Company for the Veteran's Plaza (10 min.) Staff Lead: Carrie Hite Department: Engineering Preparer: Rob English Background/History On January 20, 2015, Council approved the concept for the Veterans Plaza. On August 2, 2016, City Council authorized the Mayor to sign the revised Goods & Materials Agreement for the procurement of stone cladding, paving and site furnishings for the Edmonds Veterans Plaza from Cold Spring Granite Company. Staff Recommendation Authorize Mayor to sign the Change Authorization document. Narrative On August 2, 2016 City Council authorized the signing of a Goods & Materials Agreement with Cold Spring Granite Company for the procurement of stone cladding, paving and site furnishings for the Veterans Plaza. Meanwhile, VFW Post 8870, the project sponsor, has received so many contributions for the Veterans Plaza from that the number of donors outnumbers the quantity of donor pavers available in the plaza. To accommodate all of the additional donors, Cold Spring Granite Company will provide 1 foot square pavers in place of the previously ordered 1 foot by 2 foot pavers to provide more opportunities for donor recognition. The Change Authorization has been reviewed and approved by Legal. Attachments: Change Authorization Revised Goods Materials Agreement - Signed Packet Pg. 222 8.1.a � /� 14 >lwlkll * ._ . � CHANGE AUTHORIZATION Date:0f3115/2016 REPLACEMENT PIECES: ❑ Purchaser hereby pays the cost for the replacement pieces listed below. ❑ ADDITIONS ❑ DELETIONS ® MODIFICATIONS Purchaser hereby agrees to accept the changes specified and further agrees to pay the amounts as shown. TO: City of Edmonds - City Clerk (J361721) ATTN: Henry Schroder, P.E. 121 5th Avenue North Edmonds, WA 98020 PHONE: 425-771-0220 FAX: 425-672-5750 JOB NO: 1003707 NAME: Veterans Plaza LOCATION: Edmonds, WA Change size of typical Academy Black pavers to 1 1-3/4" x 11-3/4" ----------- please sign and return allowing drafting to incorporate change $ 950.00 *Price DOES NOT include any applicable taxes. CURRENT TAXES WILL BE ADDED AT THE TIME OF THE INVOICING UNLESS AN APPROVED EXEMPT TAX CERTIFICATE HAS BEEN RECEIVED PRIO TO INVOICING. Shop Drawings Weeks Shop Tickets Weeks O Initial O Partial O Complete Delivery: Start delivery weeks after receipt of approved shop drawings, cutting lists or shop tickets with all pertinent cutting information & signed Change Authorization. Balance of delivery per mutually agreed upon schedules for shop drawing submission, approvals, & fabrication time. Please sign and return this Proposal & return via fax, this will authorize us to AMOUNT $950.00 *TOTAL $950.00 USD NOTE: This Change Authorization becomes part of and is specifically incorporated as a part of the existing contract and is subject to the same terms and conditions contained therein. Please sign and return a copy of this form and retain a copy for your records. No work will commence until this signed form is returned. ACCEPTED BY BUYER: City of Edmonds - City Clerk COLD SPRING GRANITE COMPANY (J361721) BUYER SIGNATURE: (Officer or Authorized Rep) DATE 17482 Granite West Road, Cold Spring, MN 56320-4578 USA P:800-328-5040 P:320-685-3621 F:320-685-8490 Tom Eisenschenk PROP Y: PROJECT MANAGER ' DATE CS-031-2(MAY2013) a Packet Pg. 223 GOODS & MATERIALS AGREEMENT between the City of Edmonds and Coldspring THIS AGREEMENT ("Agreement") is made by and between the City of Edmonds, a Washington municipal corporation (the "City"), and Coldspring located and doing business at 17482 Granite West Road, MN 56320-4578, telephone number (800) 328-55040, respectively (the "Vendor") as a sole source procurement contract for goods and materials. AGREEMENT I. DESCRIPTION OF WORK. The Vendor shall provide the following goods and materials to the City: Exterior stone paving, stone cladding and stone site furnishings as follows: Manufacturer Name / Part Description Coldspring - 556 square feet of Academy Black paving, 1-15/16" thick, Thermal finish - 24 square feet of Academy Black steps, 6-1/8" thick, Thermal finish - 1065 square feet of Mountain Green wall cladding, varying thicknesses, Diamond 10, Diamond 100 finish - 50 square feet of Mountain Green seat cubes, 1' — 3" thick, Diamond 10 finish - 103 square feet of Mountain Green Type 2 benches, 6" thick, Diamond 100, Diamond 10 finish - Shop Drawings Goods and materials shall comply with Site Workshop LLC drawings T0.00, L1.10, L2.10, L3.00, L3.01, L3.20, L3.40 and L3.50 dated May 10, 2016 and specification Section 044256 — Exterior Stone Cladding, Section 321440 — Stone Paving and Section 129310 — Stone Site Furnishings dated June 17, 2016. Veteran's Plaza PN E6MA/c480 Packet Pg. 224 Price includes freight. Unloading is not included. Reference: Coldspring quote dated 7/6/16 (4 pages). II. TIME OF COMPLETION. Upon the effective date of this Agreement, the Vendor shall provide and deliver shop drawings to the City of Edmonds four to five weeks after the Agreement is signed and start delivery of stone paving, cladding and site furnishings eight to ten weeks after receipt of approved shop drawings. Delivery of goods and materials shall be to the City of Edmonds Veteran's Plaza, 250 5th Avenue N, Edmonds, WA and. Time is of the essence for this Agreement. The delivery date shall be mutually agreed upon between 8:00 AM and 2:00 PM, Monday through Friday only. III. COMPENSATION. The City shall pay the Vendor an amount not to exceed One Hundred Forty-four Thousand, One Hundred Twelve Dollars and Fifty Cents ($144,112.50), including freight and Washington State Sales Tax, for the goods and materials included in this Agreement. The City shall pay the Vendor the full amount of invoice within 30 days of receipt of all merchandise listed above when received in good condition. If the City objects to all or any portion of an invoice, it shall notify the Vendor and reserves the option to only pay that portion of the invoice not in dispute. In that event, the parties will immediately make every effort to settle the disputed portion. Certification of Price: The Vendor hereby certifies that the City is receiving the lowest price offered as compared to the Vendors' similarly situated clients, terms and conditions. Defective Goods. The Vendor guarantees the City that the goods and materials shall be free of any and all defects in the workmanship and materials. The City reserves its right to withhold payment from the Vendor for any defective or unauthorized goods or materials. Final Payment: Waiver of Claims. VENDOR ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY VENDOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. IV. WARRANTY. See attachment "A" V. INDEMNIFICATION. See attachment "A" Veteran's Plaza C:PN E6MA/c480 Packet Pg. 225 VI. INSURANCE. The Vendor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the provision of goods or materials to the City. No Limitation. The Vendors' maintenance of insurance as required by the Agreement shall not be construed to limit the liability of the Vendor to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. Minimum Scope of Insurance. The Vendor shall obtain insurance of the types described below: Commercial General Liability insurance shall be written on Insurance Services Office (ISO) occurrence form CG 00 01 and shall cover products liability. The City shall be named as an insured under the Vendors' Commercial General Liability insurance policy using ISO Additional Insured -Vendors Endorsement CG 20 15 or a substitute endorsement providing equivalent coverage. Minimum Amounts of Insurance. Vendor shall maintain the following insurance limits: Commercial General Liability insurance shall be written with limits no Iess than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 product liability aggregate limit. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions for Commercial General Liability insurance: 1. The Vendors' insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Vendors' insurance and shall not contribute with it. 2. The Vendors' insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. Verification of Coverage. The Vendor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Vendor before goods or materials will be accepted by the City. Veteran's Plaza CPN E6MA/c480 2 Packet Pg. 226 VII. MISCELLANEOUS PROVISIONS. A. Non -Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. B. Resolution of Disputes and Governing Law. This agreement shall be governed by the laws of the State of Minnesota. Both parties agree to bring suit only in the Minnesota state court located in the Count of Stearns, State of Minnesota. BOTH PARTIES CONSENT TO THE JURISDICTION OF THE MINNESOTA STATE DISTRICT COURT, STEARNS COUNTY, FOR ADJUDICATION OF DISPUTES ARISING OUT OF THIS AGREEMENT. Violation of this covenant will bar recovery by BUYER in any other court. C. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. D. Assignment. Any assignment of this Agreement by either party without the written consent of the non -assigning party shall be void. If the non - assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. a� �n E. Modification. No waiver, alteration, or modification of any of the c provisions of this Agreement shall be binding unless in writing and signed by a duly E authorized representative of the City and Vendor. L F. Entire Agreement. The written provisions and terms of this Q Agreement, together with any Exhibits attached hereto, shall supersede all prior y verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part M of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits c to this Agreement conflict with any language contained in this Agreement, the terms ° of this Agreement shall prevail. N G. Compliance with Laws. The Vendor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Vendors' business, equipment, and personnel engaged �a Veteran's Plaza a . CPN E6MA f c4•84 4 Packet Pg. 227 in the provision of goods or materials as set forth in this Agreement or accruing out of the provision of those goods or materials. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. VENDOR: CITY OF EDMONDS: - - By: Print Name, fz �tn rY1� Its W uj- a-e l Print Name: David 0. Earling Its Mayor DATE: DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: VENDOR: CITY OF EDMONDS: Coldspring City Clerk, City of Edmonds 17482 Granite West Road 121 5th Avenue North MN 56320-4578 Edmonds, WA 98020 ATTEST/AUTHENTICATE: Scott Passe , City Clerk APPROVED AS TO FORM: Office of the City Attorney Vt'.Y:(:.rarl's Plaza C:PN E()MA/c480 Packet Pg. 228 ATTACHMENT G0A" WARRANTY. Subject to natural differences in color and other characteristics common in stone, Vendor promises to City the material sold follows the description of material in the Agreement, is free of defects, and meets the version of the National Building Granite Quarries Association, Inc. specification in place as of the date of the contract. WARRANTY REMEDY AND LIMITATION OF WARRANTY REMEDY. The only remedy for breach of these promises shall be, at the Vendor's discretion, correction of the materials, replacement of the materials, refund of the amount by which the value of the materials is reduced by defect, or any combination of these alternatives. The remedies stated in this paragraph are sole and exclusive remedies. DISCLAIMER OF IMPLIED WARRANTIES. THERE IS NO IMPLIED WARRANTY OF MERCHANTABILITY AND THERE IS NO IMPLIED WARRANTY OF FITNESS FOR CITY'S PARTICULAR PURPOSE; THE IMPLIED WARRANTY OF MERCHANTABILITY AND THE IMPLIED WARRANTY OF FITNESS FOR CITY'S PARTICULAR PURPOSE ARE HEREBY DISCLAIMED. City shall NOT in any event be entitled to recover consequential damages. TIME LIMITATION. To make a warranty claim, City must give Vendor written notice of the breach within 30 days of discovering the breach. No warranty claim can be made more than 1 year after Vendor delivers goods to City. CITY'S OBLIGATION TO INDEMNIFY VENDOR: In claims by any third party in any action or proceeding wherein it is determined that Vendor is at fault, this paragraph does not require Q indemnity by the City. However, in any other action or proceeding by a third party in which a third to le party makes a claim against Vendor and it is determined that Vendor is not at fault, then and in that 77 event, City shall indemnify the Vendor and hold the Vendor harmless from any and all such claims. .a In any action by a third party wherein fault is apportioned between City and Vendor, each party shall be responsible only for the portion of the fault attributed to it. This agreement is not for the benefit in of any third party. c d E m m L a N f� �L M G Packet Pg. 229 COLDS PR I NGTm DATE: 06 Jul 2016 ATTN: Henry Schroder, P.E. COMPANY: City of Edmonds - City Clerk 121 5th Avenue North Edmonds, WA 98020 PROPOSAL & AGREEMENT (Material Supply Only) Proposed By: Lisa Hennen PROJECT: Veterans Plaza LOCATION: Edmonds, WA JOB NUMBER: PHONE: 425-771-0220 FAX: 425-672-5750 Unless revoked earlier in accordance with the attached Terms & Conditions, this quote expires after 30 days. COLD SPRING GRANITE COMPANY d.b,a Coldspring (Hereinafter "Seller") of Cold Spring, MN, proposes to furnish materials as described below. The following bid documents, drawings & specifications will be referred to as Agreement Documents and shall apply insofar as these documents do not conflict with the terms and conditions of this agreement. REFERENCE: Reference the attached bid documents: 1. Exhibit A — Bid Clarifications dated 6 July, 2016 2. Exhibit B —Quantities dated 6 July, 2016 3. Terms & Conditions Please review, sign and return — this will authorize Coldspring to proceed with this as an order MATERIAL / FINISH: Academy Black@, Mountain Green@ / Thermal, Diamond(B) 10, DiamondO 100 The Agreement Documents, so for as they relate to material listed herein, are made a part of this Agreement. Seller's Standard Anchors are Included: ❑ NO ® YES Seller's Shop Drawings are Included: ❑ NO Z YES Contract Price: $131,250.00 U5D* *Contract Price DOES NOT include any applicable taxes. CURRENT TAXES WILL BE ADDED AT THE TIME OF THE INVOICING UNLESS AN APPROVED EXEMPT TAX CERTIFICATE HAS BEEN RECEIVED PRIOR TO INVOICING. Materials to be delivered F.O.B. Edmonds, WA City, State, ZIP Code NOTE: Change of delivery address may affect applicable tax rate. PAYMENT TERMS: Paid as shipped, net 30 days, no retainer. In the event purchaser delays shipment of scheduled fabricated material, terms will be paid as fabricated, net 30 days, no retainer. (Subject to Credit Approval. Payment can be made by business check or wire transfer. Payment with order can eliminate the need for this agreement.) SHOP DRAWINGS: 44-5 weeks SHOP TICKETS: weeks O Initial O Partial 40 Complete submission DELIVERY: Start delivery 8-10 weeks after receipt of approved shop drawings or cutting lists with all necessary cutting information & returned signed Agreement. Balance of delivery per mutually agreed upon schedules for shop drawing submissions, approvals, and fabrication time. A 107. minimum upcharge of the total contract amount applies for expedited delivery. THIS PROPOSAL & AGREEMENT FOR MATERIAL INCORPORATES ALL OF THE TERMS & CONDITIONS PRINTED ON THE FRONT OF THIS DOCUMENT AND/OR INCLUDING ANY ATTACHMENTS. Buyer hereby accepts Seller's offer to sell and agrees to perform In accordance with all terms and conditions. The document is not a binding agreement until accepted and signed by Coldspring Authorized Signer; however, Buyer, by acceptance of the first delivery of material will be deemed to have accepted all terms and conditions contained herein regardless of whether this document has been executed by Buyer. The recipient agrees and acknowledges that this bid proposal is proprietary and confidential and shall not be disseminated or disclosed to any third -parties without the express written consent of the Seller, This provision is binding upon receipt of this document and regardless as to whether It is signed by either party or whatever materials are delivered. ACCEPTED BY BUYER: City of Edmonds - City Clerk COLD SPRING GRANITE COMPANY SIGNATURE: (Officer or Authorized Rep) 17482 Granite West Road, Cold Spring, MN 56320-4578 T: 800-551-7502 F: 320-685-8490 DATE ACCEPTED BY: Coldspring Authorized Signer DATE CS-031 -1 (APR2014) Packet Pg. 230 0 COLDS PR ING"" Exhibit A - Bid Clarification Project: Veterans Plaza Location: Edmonds, WA 06 July 2016 1 This proposal is based on Site Workshop LLC drawings T0.00, 1-1.10, L2.10, L3.00, L3.01, L3.20, L3.40 and L3.50 dated May 10, 2016, and specifications 'Section 044256 - Exterior Stone Cladding' and 'Section 321440 - Stone Paving' dated June 17, 2016. 2 Physical property testing, anchor testing, and samples for testing are not included in this proposal. Gratis historical test data is available on request. 3 Standard Coldspring anchors and anchor provisions are a part of this proposal. Backup framing materials, miscellaneous support metals, and fasteners that tie the granite anchors back to the structure are not included. 4 Design and engineering of the granite and anchorage systems are the responsibility of others. 5 Pavers are priced 1-15/16" + 1 /8" - 1 /16" thick. 77 6 Stair treads are priced 6 1 /8" +/- 1 /8" thick. Exposed edges will be gauged to a uniform thickness. c a� 7 Paver engraving is not included in this proposal. c a� 8 (5) Veterans Wall medallions are included and priced as sandblast incised with standar E accenting. L a� a 9 All paving is priced 'flat'. Warped tops and/or feathered edges (to accommodate grade w changes) are not included. as M 10 Shop drawings are included. 11 Price includes freight to Edmonds, WA. Unloading will be the responsibility and expense of °o others. as N N 17482 Granite West Road, Cold Spring, MN 56320 T 800.328.5040 W www.coldspringusa.com Q Rev: Apr13 Page 1 of 1 Packet Pg. 231 �ErsnCOLDSPRING- Project: Veterans Plaza Location: Edmonds, WA Item Description 1 Paving 2 Steps 3 Veterans Wall 4 Seat cubes 5 Type 2 benches Exhibit B - Quantities Granite Academy Black Academy Black Mountain Green Mountain Green Mountain Green Finish Thermal Thermal Diamond 10, Diamond 100 Diamond 10 Diamond 100, Diamond 10 The piece counts and square foot values noted are for reference only. They are based on Coldspring's internal estimate surveys which include calculated rough stock overages utilized in the fabrication processes and will not reflect finished, in place coverages. 'Contract Price DOES NOT include any applicable taxes. CURRENTTAXES WILL BE ADDED AT THE TIME OF INVOICING UNLESS AN APPROVED EXEMPT TAX CERT€FICATE HAS BEEN RECEIVED PRIOR TO INVOICING. 17482 Granite West Road, Cold Spring, MN 56320 T800.328.5040 W www.coldspringuso.com Thickness Sq Ft 1-15/16' 556 6-1 /8" 24 various 1,065 1'-3" 50 6" 103 1,799 06 July 2016 Amount $ 19,760.00 $ 2,020.00 $ 67,680.00 $ 25,260.00 $ 16,530.00 $ 131,250.00 TAXES ** Rev: Apr13 Page 1 of 1 Attachment: Revised Goods Materials Agreement - Signed (1466 : Authorization to modify an Agreement with the Cold Spring Granite 8.1.b CSGC, d.b.a. Coidspring - TERMS AND CONDITIONS 1. WARRANTY. Subject to natural differences in color and other 13. FIELD MEASUREMENTS: Seller is NOT responsible for making, verifying, or characteristics common in stone, Seiler promises to Buyer that the ensuring the accuracy of field measurements for the materials sold material sold follows the description of material in the Agreement, Is hereunder nor for any loss or damage arising as a result of Inaccurate free of defects, and meets the version of the National Building field measurements or discrepancies between information supplied by Granite Quarries Association, Inc. specification in place as of the Buyer and actual field dimensions, date of the contract. 14. ENGINEERING & DESIGN: Engineer's calculations (sealed or unsealed) or 2. WARRANTY REMEDY AND LIMITATION OF WARRANTY REMEDY. The engineer's seal on shop drawings are specifically excluded. Seller is NOT only remedy for breach of these promises shall be, at the Seller's responsible for any engineering or design with regard to the work on this discretion, correction of the materials, replacement of the project. Shop drawings, if provided by Seller, will show stone anchoring materials, refund of the amount by which the value of the methods and/or design concepts which must be approved by Buyer's materials is reduced by defect, or any combination of these engineer within the context of the Buyer's overall engineering and design alternatives. The remedies stated in this paragraph are sole and requirements of the project. exclusive remedies. 15. PAYMENT, PERFORMANCE, OR SUPPLY BONDS: No bonds are Included Ir 3. DISCLAIMER OF IMPLIED WARRANTIES. THERE IS NO IMPLIED Agreement Price. WARRANTY OF MERCHANTABILITY AND THERE IS NO IMPLIED 16. PUBLIC PROJECTS: Upon request, Buyer will supply Seller with a copy of WARRANTY OF FITNESS FOR BUYER'S PARTICULAR PURPOSE; THE Buyer's Labor and Material Payment Bond prior to initial shipment of IMPLIED WARRANTY OF MERCHANTABILITY AND THE IMPLIED material on public projects. WARRANTY OF FITNESS FOR BUYER'S PARTICULAR PURPOSE ARE 17. SUPERSEDING CLAUSE: This document contains the terms and condition; HEREBY DISCLAIMED. upon which Seller offers this quotation for materials and/or services on the 4. Buyer shall NOT in any event be entitled to recover consequential project referred to herein. Buyer hereby acknowledges that the term! damages. and conditions contained in this document supersede all conflicting a 5. TiME LIMITATION. To make a warranty claim, Buyer must give Seller otherwise inconsistent terms and conditions contained elsewhere. written notice of the breach within 30 days of discovering the 18, CHANGE ORDERS/REPLACEMENT PIECES: Change orders anc breach, No warranty claim can be made more than 1 year after replacement pieces shall be priced separately from this Agreement anc Seller delivers goods to Buyer. Seiler will NOT begin work on any change orders or replacement piece; 6. CONDITIONS BEYOND CONTROL OF SELLER. Seller will not be liable without the order and price being put in writing and the Buyer's writter for any delay or failure to make delivery occasioned in whole or acknowledgement of the change order. part by the owner, architect, general contractor, Buyer or any of 19. INVOICES & PAYMENT: Invoices for materials sold hereunder will be Buyer's subcontractors or materialmen or by any cause beyond provided to Buyer monthly as material is fabricated. Payment is due 3( Seller's control, including, without limitation, failure of Buyer to return days from date of invoice unless other terms are specifically agreed to it approved shop drawings to Seller on schedule, strikes, lockouts, fire, writing. Payments are due within thirty (30) days of invoice. date whethe embargoes, war, terrorists attacks or other outbreaks or hostilities, or NOT delivery of material has been made and whether or NOT Buye inability of Seller to obtain shipping space, governmental acts and has been paid by the owner or other Contractor. Failure of Buyer to pa, regulations, accidents, acts of God, influenza or other sickness Seller in accordance with the payment terms of this Agreement is c outbreaks, or other conditions beyond Seller's control. In the event breach and relieves Seller of the obligation to ship material to Buyer; afte of any delay not excused as provided herein, Seller's liability shall such breach by Buyer, Seller may require full payment in advance fo be limited as provided for in paragraphs 2 and 4, future delivery of materials to Buyer. It is agreed the buyer will pay Seller' 7. BUYER'S OBLIGATION TO INSPECT UPON DELIVERY. Buyer will reasonable attorney's fees in any action for the collection of amount inspect material before material is unloaded from the freight due. hauler, and will note in writing all visible damage on the freight 20. CANCELLATION OR RESTOCKING CHARGE: Orders cancelled by Buyer wi receipt before the material is removed from freight hauler. Except be subject to a cancellation or restocking charge. Charges will includ( as to damage which is concealed at the time of inspection, fabrication and/or administrative expense. material unloaded without such written record of damage shall be 21. ASSIGNMENT: This agreement may NOT be assigned by Buyerwithout thf deemed delivered in good condition. Concealed damage must written consent of Seller. be noted by Buyer in writing, with proper documentation, and must 22. SEVERABILITY: If any provision of this agreement is determined to bf be reported by Buyer to Seiler within ten days of delivery. unenforceable or invalid, the unenforceable or invalid part shall bE 8. FREIGHT: Freight rates have been established based upon current deemed severed from this agreement, and the remaining portions of thi fuel prices/surcharges. Seiler reserves the right to review fuel agreement shall be carried out with the same force as if the severe( prices/surcharges in the event the project is delayed through no portions had NOT been part of this agreement. fault of Seller. Changes will be communicated via Change 23. APPLICABLE LAW: This agreement shall be governed by the laws of th( Authorization and fully executed prior to shipment. State of Minnesota. 9. BUYER'S OBLIGATION TO INDEMNIFY SELLER: In claims by any third 24. FORUM SELECTION: Both parties agree to bring suit only in the Minnesotc party in any action or proceeding wherein it Is determined that state court located in the County of Stearns, State of Minnesota. BOTI Seller is at fault, this paragraph does not require indemnity by the PARTIES CONSENT TO THE JURISDICTION OF THE MINNESOTA STATE DISTRIC Buyer. However, in any other action or proceeding by a third party COURT, STEARNS COUNTY, FOR ADJUDICATION OF DISPUTES ARISING OU in which a third party makes a claim against Seller and It is OF THIS AGREEMENT. Violation of this covenant will bar recovery b determined that Seller is not at fault, then and in that event, Buyer BUYER In any other court. shall indemnify the Seller and hold the Seller harmless from any and 25, CREDIT AVAILABILITY: Should credit availability be granted by Seller, o all such claims. In any action by a third party wherein fault is decisions with respect to the extension or continuation of credit shall b, apportioned between Buyer and Seller, each party shall be the sole discretion of Seller. Seller may terminate any credit availabilit responsible only for the portion of the fault attributed to it. This within its sole discretion. agreement is not for the benefit of any third party. 26. EO Clause: When applicable, the contractor and subcontractor sha 10. BACK CHARGES: Buyer agrees that Buyer will NOT have the right abide by the requirements of 41 CFR 60-1.4(a), 60-300.5(a), 60-741.5(c of offset against the Agreement price or the right to back charge and Appendix A of Subpart A of 29 CPR 471. These regulations prohib the Agreement unless an officer of the Seller has agreed to such discrimination against qualified individuals based on their status e charges in writing. protected veterans or individuals with disabilities, and prohib 11. LIEN WAIVERS: Seller will furnish interim partial lien waivers for discrimination against all individuals based on their race, color, rellgioi payments received. Seller agrees to furnish a final release of lien sex, or national origin. Moreover, these regulations require that covere upon receipt of final payment. Buyer acknowledges that Seller is prime contractors and subcontractors take affirmative action to emplo required by law to file pre -lien notices in certain states. and advance in employment individuals without regard to race, colo 12. MATERIAL ONLY: Notwithstanding anything to the contrary in the religion, sex, national origin, protected veteran status or disability. Agreement Documents, Seller will provide only materials ready to set and will not provide shelf angles, caulking, testing, Form CS-031-01 (07Aug1 +, engineering, support steel, mockups or setting. Q Packet Pg. 233 8.2 City Council Agenda Item Meeting Date: 08/23/2016 Presentation of Bids and Award for Downtown Restroom (5 min.) Staff Lead: Patrick Doherty Department: Economic Development Preparer: Patrick Doherty Background/History The Strategic Action Plan includes Action Item 3a.2 that reads as follows: Develop a public restroom facility to serve pedestrians, customers, and tourists in the Downtown district. In pursuit of this Action Item, and in response to public demand, the City Council approved a preliminary budget allocation of $260,000 in the 2016 budget to develop a Downtown restroom on the City -owned parking lot adjacent to City Hall. That allocation was comprised of $110,000 from the General Fund, $90,000 from REET 1, and $60,000 from the Lodging Tax Fund 120. In addition, the Edmonds Downtown Alliance has committed $10,000, and the Noon Rotary Club has committed $5,000 (with a prospective match by the Rotary District office of $5,000). On April 19, 2016 City Council approved an enhanced restroom design that includes a unisex/family restroom, along with the associated costs, for a total cost of $390,000 ($X total in City money) and approved purchase of the restroom unit from CXT, Inc. Staff Recommendation Staff will provide the bid results, construction budget and potential recommendation to award the project during the staff presentation. Narrative On 8/3/16 the City issued a "Project Invitation" for bids from the MRSC Small Works Roster for site work involving grading, new underground utilities, precast pavers, asphalt paving and patching, masonry, carpentry, irrigation, landscaping, site restoration, and after -market architectural treatment of the prefab restroom unit, per City -approved design. The engineer's estimate included in the Project Invitation is $134,800. Bids were solicited through Noon, August 19, 2016 and will be presented at the 8/23/16 City Council meeting. Staff will review the low bidder's submittal to determine if it is complete and acceptable prior to the City Council meeting. Packet Pg. 234