Loading...
2016-09-06 City Council - Full Agenda-17461. 2. 3. 4. 5 6 7 o Agenda Edmonds City Council snl. ynyo COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 SEPTEMBER 6, 2016, 7:00 PM CALL TO ORDER/FLAG SALUTE ROLL CALL APPROVAL OF THE AGENDA APPROVAL OF THE CONSENT AGENDA 1. Approval of Council Meeting Minutes of August 23, 2016 2. Approval of Council Special Meeting Minutes of August 23, 2016 3. Acknowledge receipt of a Claim for Damages from Diane M. Lobaugh (amount undetermined) and from Jackie L. Studioso ($240.00) 4. Approval of claim, payroll and benefit direct deposit, checks and wire payments. 5. July 2016 Monthly Budgetary Financial Report 6. Approval of Updated Interagency Agreement with Western Washington University for the Sustainable Cities Partnership 7. Authorization for Mayor to sign the Resolution for the 2017-2022 Six -Year Transportation Improvement Program PRESENTATIONS/REPORTS 1. Presentation on 2016 Scarecrow Festival - Edmonds Museum (10 min.) 2. Presentation on Homelessness by City of Lynnwood Council President M. Christopher Boyer (15 min.) 3. June 2016 Quarterly Financial Report (10 min.) AUDIENCE COMMENTS (3-MINUTE LIMIT PER PERSON) - REGARDING MATTERS NOT LISTED ON THE AGENDA AS CLOSED RECORD REVIEW OR AS PUBLIC HEARINGS JOINT DISCUSSION - BOARDS AND COMMISSIONS 1. Joint Discussion with the Edmonds Planning Board (60 min.) 8. ACTION ITEMS 1. Rejection of Bids for the Edmonds Veteran's Plaza Project (10 min.) 2. Settlement Agreement for ROW Acquisition related to the 228th St. SW Corridor Improvements Project (10 min.) 9. STUDY ITEMS 1. Stormwater Management Code Update, Edmonds Community Development Code Chapter 18.30 (20 min.) 10. REPORTS ON OUTSIDE BOARD AND COMMITTEE MEETINGS Edmonds City Council Agenda September 6, 2016 Page 1 11. MAYOR'S COMMENTS 12. COUNCIL COMMENTS 13. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(1) 14. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION. ADJOURN Edmonds City Council Agenda September 6, 2016 Page 2 4.1 City Council Agenda Item Meeting Date: 09/6/2016 Approval of Council Meeting Minutes of August 23, 2016 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: Cm082316 Packet Pg. 3 4.1.a EDMONDS CITY COUNCIL DRAFT MINUTES August 23, 2016 ELECTED OFFICIALS PRESENT Dave Earling, Mayor Kristiana Johnson, Council President Michael Nelson, Councilmember Adrienne Fraley-Monillas, Councilmember Diane Buckshnis, Councilmember Dave Teitzel, Councilmember Thomas Mesaros, Councilmember Neil Tibbott, Councilmember 1. CALL TO ORDER/FLAG SALUTE STAFF PRESENT E. Yamane, Police Officer Phil Williams, Public Works Director Patrick Doherty, Econ. Dev & Comm. Serv. Dir. Scott James, Finance Director Bertrand Hauss, Transportation Engineer Rob English, City Engineer Jeff Taraday, City Attorney Scott Passey, City Clerk Andrew Pierce, Legislative/Council Assistant Jerrie Bevington, Camera Operator Jeannie Dines, Recorder The Edmonds City Council meeting was called to order at 7:01 p.m. by Mayor Earling in the Council Chambers, 250 5"' Avenue North, Edmonds. The meeting was opened with the flag salute. 2. ROLL CALL City Clerk Scott Passey called the roll. All elected officials were present. 3. APPROVAL OF AGENDA M N 00 COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, 0 TO APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED t� UNANIMOUSLY. d 4. APPROVAL OF CONSENT AGENDA ITEMS z c� COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER Q BUCKSHNIS, TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: 1. APPROVAL OF COUNCIL SPECIAL MEETING MINUTES OF AUGUST 16, 2016 2. APPROVAL OF COUNCIL MEETING MINUTES OF AUGUST 16, 2016 3. ACKNOWLEDGE RECEIPT OF A CLAIM FOR DAMAGES FROM ANNE JOHNSON ($500,000.00), AND FRONTIER (AMOUNT UNDETERMINED) 4. APPROVAL OF CLAIM, PAYROLL AND BENEFIT DIRECT DEPOSIT, CHECKS AND WIRE PAYMENTS Edmonds City Council Draft Minutes August 23, 2016 Page 1 Packet Pg. 4 4.1.a 5. PRESENTATIONS/REPORTS 1. ECONOMIC DEVELOPMENT COMMISSION PRESENTATION Economic Development/Community Services Director Patrick Doherty provided background on the Economic Development Commission (EDC), explaining from June 2009 to December 2015 there was a 17-member EDC. The code provisions that enabled the EDC provided for it to sunset at the end of 2015. In February 2016 the City Council created a new 9-member EDC and the first meeting was held in April. Since its inception, the EDC has met monthly to identify key priorities and establish its short and long term work program. Jamie Reece, Chair, EDC, explained the new EDC is starting over with a blank slate. The EDC is comprised of nine diverse members with respect to age, occupational backgrounds and neighborhoods. He thanked the commissioners for their dedication and a passion for building consensus and creative ideas. He also thanked the liaisons from the Council, Planning Board, Port and Chamber who provide valuable contributions and a greater perspective on the economy and the City's goals. He described: • EDC's duties and responsibilities: o Explore and recommend strategies, programs or activities o Generate economic development o Increase economic activity, jobs and municipal revenue • Process and methodology o Leverage Resources: 0 ■ Strategic Action Plan (SAP) v ■ Comprehensive Plan c ■ Reports of Edmonds Mayor, Council, Staff & Boards/Commissions > ■ Work & Reports of Prior Commission a o Collaborate: Q ■ Council & Mayor - EDC is seeking direction to align goals 000 ■ City Staff ■ Other Boards & Commissions ■ Citizens & Citizen Groups N ■ Monthly Meetings - Entire Commission c ■ Interim Ad Hoc Sub -Committee Meetings v Short term focus o High priority ■ Hwy 99 subarea planning z ■ Civic Field planning and development (alignment with year round Farmers and Art Market) a ■ Parking Strategies and Policies o Standby ■ Five Corners Planning ■ Attract boutique hotel to downtown ■ Recruit mid or large sized businesses Long term focus o High priority ■ Identify opportunities for redevelopment ■ Explore and support Harbor Square planning ■ Ground floor retail requirements o Standby Edmonds City Council Draft Minutes August 23, 2016 Page 2 Packet Pg. 5 4.1.a ■ Community visit and branding, sense of place ■ Alignment of arts and economic development ■ City code related to mixed use and commercial development ■ Growth Management goals Subgroups o Civic Field o Parking o Highway 99 Next steps o Collaboration ■ Discussion with community groups, commissions, citizens, businesses, etc. ■ Presentations at our meetings ■ Encourage public attendance & feedback o Discussion, deliberation and decisions ■ Review, discuss and evaluate work from subgroups ■ Make recommendations based on consensus o Reporting ■ Written recommendations to Council & Mayor's Office ■ Presentations to Council and others Council President Johnson commented Chair Reece brings the history of the former EDC to the new EDC. Observing that one of the the EDC's short term priorities is Civic Field, she announced the second open house tomorrow from 6:00 to 7:30 p.m. in the Library plaza room. Chair Reece recognized Commissioners Darrol Haug and Stephen Clifton and former Commissioner Bruce Witenberg in the audience. Councilmember Tibbott liked that the priorities had been divided into short term, long term and standby. a He asked how the EDC evaluated its effectiveness in reaching objectives, whether there were any Q measures/metrics for measuring how goals are attained. Chair Reece answered measuring achievement of goals was a high priority but it is often difficult to identify direct impacts. As the EDC identifies its goals, 00 it also seeks to identify metrics to measure effectiveness as well as timeliness. Councilmember Tibbott said part of measuring effectiveness is if a priority is not achieved, asking why it was not achieved and cfl what improvements could be made. In his experience, the EDC is comprised of go-getters, creative people N with a variety of skill sets. He looked forward to what the EDC comes up with in the coming year. Chair c Reece thanked Councilmember Tibbott for his service as the Council liaison. E c.� Councilmember Buckshnis said one of the metrics is the SAP, noting some the short and long term focuses do not jibe with the SAP. She referred to the survey which provides additional information and z asked if the EDC planned to integrate the SAP and the survey in its priorities. Chair Reece answered yes, noting the SAP and Comprehensive Plan were available to the EDC as they were creating priorities. A Q number of the SAP items are longer term; one of the EDC's goals is to identify things that are not necessarily easy but demonstrable in the first 6-12 months. The SAP and Comprehensive Plan will have greater influence on the long term goals. There is a great deal of information from the survey which the EDC will consider in the coming months. Councilmember Buckshnis suggested integrating the SAP and survey; the SAP is a living document and the survey may/may not identify new issues. She asked whether the EDC's ad hoc subcommittees were open to the public. Chair Reece answered no, they are comprised of 3-4 members so there is not a quorum. Councilmember Fraley-Monillas expressed her appreciation for the EDC's work. She noted ideas often come to the Council and while they are great ideas, they have not been vetted by the public. She suggested the EDC consider how to better include the public in their process, commenting if the public Edmonds City Council Draft Minutes August 23, 2016 Page 3 Packet Pg. 6 4.1.a had more buyoff on the issues the EDC is pursuing, things may move more smoothly through the process. For example, writing articles so the public is aware of what the EDC is doing. Chair Reece referred to his entrepreneurial and marketing background, expressing his interest in having more public involvement in the EDC. EDC members are a reasonable representation of the Edmonds demographic but not representative of all. 2. EDMONDS SCHOOL DISTRICT FOUNDATION PRESENTATION ON YOUTH HOMELESSNESS Deborah Anderson, Director, Edmond School District Foundation, explained the Foundation was established by the Edmonds School District (ESD) in 1984 to be their partner to help bring resources to the ESD and help support student learning. The ESD came to the Foundation two years ago asking for help with homeless students who leave school on Friday and lunch is their last meal until Monday. The Foundation worked with ESD to launch the Nourishing Network Program. She described: • District Profile w o Largest school district in Snohomish County 3 r 0 11 st largest school district in the state o Serving the cities of Brier, Edmonds, Lynnwood, Mountlake Terrace, Woodway and a unincorporated Bothell 0 20,229 students in 33 schools 0 10,487 students in 20 K-6 schools 0 3,049 students in 4 middles schools 0 6,763 students in high schools 'o o On average 37% (7,400) students body participates in free/reduced lunch programs t� 0 13 Title 1 schools (more than 50% of students receive free/reduced lunch) o ■ SW quadrant (Edmonds, Woodway) = 2 Title 1 schools > ■ SE Quad (Mountlake Terrace, Brier) = 2 Title 1 schools a ■ NW and NE (Edmonds, Lynnwood, Bothell) = 9 Title 1 schools Q Homeless demographics: o City of Edmonds 00 ■ 641 homeless students at June 2016 ■ 114 in shelters ■ 383 families doubling up N ■ 23 families unsheltered c ■ 71 families living in motels v ■ 14 students couch surfing - Number understated; approximately 40% of Scriber Lake High School students are homeless and couch surfing z ■ 17 students waiting for foster care o Homeless by school a ■ City of Edmonds schools = 164 ■ City Lynnwood schools = 245 ■ City of Mountlake Terrace schools = 127 ■ City of Bothell schools = 49 ■ City of Brier schools =36 ■ Other schools = 10 Nourishing Network's objective, in partnership with the ESD, is to develop a systemic solution to help feed hungry and homeless students. What started as a meal program two years ago has expanded to include more services: This year by the end of June, the program had: • 4,573 weekend meals Edmonds City Council Draft Minutes August 23, 2016 Page 4 Packet Pg. 7 4.1.a • 1,240 feminine hygiene kits • 550 hygiene kits • 3 families saved from homelessness Ms. Anderson provided several photographs of students helping with food at the pantry at the Edmonds Heights K-12 campus; the program's partner, Frontier Communication, delivering weekend meals to schools, a cookie drive, and Lanie's birthday party where she asked guests to bring food for Nourishing Network. She explained in addition to weekend meals, the program also provided: • 350 holiday stockings to every documented homeless student in district • 60 holiday meals Summer meal program 0 10-15 children per day 0 2 sites o Feeds low income and homeless kids who not get free/reduced lunch during summer o Allowed ESD to discontinue their summer meal program Ms. Anderson described • Community coalition: 0 45 churches 0 13 businesses and foundations 0 6 civic groups 0 2 scout troops o VOA o Verdant • Reports of increased attendance • Board requested program expansion o • Program adopted by Leadership Snohomish County as a team project n • Homelessness Task Force that discusses: Q o Meet basic needs to o Provide long term prevention and stability o Transitional housing M Councilmember Teitzel was shocked by the numbers, 164 homeless in Edmonds schools. He asked how w citizens can assist Nourishing Network. Ms. Anderson said they rely on an extensive volunteer network to E support the organization as well as food drives and assistance with bagging food and working with the v summer meal program. She invited anyone interested in assisting to contact her directly. c a� E Councilmember Fraley-Monillas commented when you see the numbers and hear the stories, it makes a big impact. She was thankful Nourishing Network was assisting with feeding homeless students in Edmonds on non -school days. a Councilmember Mesaros commented the first step in solving any problem is recognizing that a problem exists. He was hopeful the Council will look at solutions to these problems. Ms. Anderson commented one of the gaps in South County is transitional housing and teen housing. Cocoon housing is considering the feasibility of transition teen housing in South Snohomish County and a women shelter is considering another capital campaign. There is a lack of affordable housing for families throughout Snohomish County. Councilmember Buckshnis commented Nourishing Network has done well in just two years. Every $30 provides 3 snacks and 6 meals; they can expect a check from her. Edmonds City Council Draft Minutes August 23, 2016 Page 5 Packet Pg. 8 4.1.a Councilmember Nelson agreed with a comment from a citizen, George Keefe, at last week's public hearing that all children deserve a home in which to study, learn and thrive. He noted 164 children in Edmonds are not sure where they are sleeping each night, whether on a friend's couch, in a motel, at a foster home, outside or in a shelter. The issue is not just homelessness or hunger but poverty and it's clear poverty cannot be tackled with the help of non -profits and charities alone. He looked forward to the Council discussing its role in assisting those who cannot afford to put food on their table or a roof over their head. Ms. Anderson offered to be a part of that discussion. She explained 90% of homeless families are facing tough economic times; they cannot afford to make ends meet and are one paycheck away from a major catastrophe. She recalled one family where the mom had to make a choice between making her car payment so she had a way to get to work or money for breakfast and lunch for her kids during the summer. These are the difficult choices that families are making. Council President Johnson thanked Ms. Anderson for putting a face on homelessness. Often it is a theoretical issue; but seeing the number of homeless children in Edmonds helps everyone understand the problem. Ms. Anderson relayed a story when she was touring a classroom project with a donor to see kindergarten learner play kits that a group of kindergarten teachers had written a grant to the Foundation 3 to fund. The teacher received a call from the office, a kindergartener was sent to the office and returned with her bag of weekend food. The teacher helped her put it in her backpack and the other students were a unaware. She was proud to see the program at work and the people who make it happen. a� a� 6. AUDIENCE COMMENTS 2 c Al Zahnow, Edmonds, said he moved in three weeks ago after building a new home on Sunset Avenue. 0 Due to the City's concern about heights, he kept his home low to preserve others' view. The cars on t� Sunset block their view but the City does seem to be concerned about parked cars that block views. c Although Sunset is not a parking lot, some people park their all day because the 4-hour limit is not > enforced. A van parks on Sunset every day for 8-10 hours/day and a camper often parks at the south end. 0 If the City wants a parking lot, it should build a parking lot; it is a public street not a city park. He has Q owned the property for 20 years and imagined it would be the ideal place to retire but now is not so sure. co 00 Marlin Phelps, Edmonds, reported on Saturday he called 911 from the Edmonds Police Department parking lot, saying "I'm about to be obnoxious, please bring the cops." A plethora of police showed up, young and old. Among the old, was a huge man, who immediately put on blue gloves because he was N about to get hurt. A young, free thinking crew of handsome, law abiding cops came up against this regime c of murderers and profiteers. He questioned why any member of the police force would work for 36 years, E 6 years over full retirement, essentially working for free unless they had a cause. An articulate, young, v black female cop began talking to him and gave him a ride home and his girlfriend a ride to her car. As a result of a conversation during that ride, he learned the slander against his name and who he is continues z in the Edmonds Police Department, invoking harm on him. He is an intelligent man; the police department has no idea. The City has a cancer in its police force, old crooked men who have hurt people. a He urged the Council to fire the police chief tomorrow and hire someone like Bryan Stanifer, Lynnwood's Assistant Police Chief. He summarized the Edmonds Police Department is a powder keg. Tom Goebel, Edmonds, Mr. Zahnow's neighbor on Sunset, thanked the Councilmembers who visited residents on Sunset. One issue that has not been addressed in any of the proposals is the impact on people who live on Sunset; it is more for the rest of the community. He recalled a consultant's presentation approximately three years ago that stated the location of the parallel parking was because the road was too narrow in places to allow parking elsewhere. Now the parking is back in the old location as well as in additional places although the road configuration has not changed. He asked the Council to investigate whether the road was wide enough to include the walkway, curb, a 2-foot buffer and parking. As was stressed to the Councilmembers who visited their neighborhood, the prominent issue is enforcement. Before and after the interim solution, there has been no enforcement of parking restrictions. Parking on Edmonds City Council Draft Minutes August 23, 2016 Page 6 Packet Pg. 9 4.1.a Sunset is solid every day from approximately 5 until after 10 p.m. The police drive by and do not make any effort to move people parked in no parking areas. Residents called about a car abandoned for 24 hours; the dispatcher was dismissive of the call and the responding officer was very annoyed and simply ticketed the car, leaving it in the no parking zone for another 24 hours. Residents are effectively the parking enforcers which is a bad position to put the residents in. He stressed the need for enforcement, regardless of the scheme the Council adopts. Robin Goebel, Edmonds, a resident on Sunset, said she has the same issues; this has been a challenging summer. There were promises of more enforcement of parking limits and parties after 10 p.m. but that has not happened. She referred to the new proposals, stating the walking lane is great but parking is out of control; people park longer than four hours, in no parking areas, and have parties after 10 p.m. and residents get a lot of resistance when they call the police. If the Council makes any changes, there needs to be a desire and a commitment to enforcement. It appears everyone is allowed to park wherever they want and the police fear there will be too many complaints to the Mayor's office if they ask people to move. She invited the Council to visit to see what it is like living there. She summarized the proposed changes were fine but there needs to be enforcement. Shirley Pauls, Edmond, a resident of Sunset Avenue, said she looked forward to the presentation on Sunset to see what changes can be made. She has had better success calling the police which she does 1-2 times/week, usually due to people partying in parked cars on Sunset after 11 p.m. In the past, police drove through stating no parking after 10 p.m. and moving people along. People are then less likely to parking there when there are no other cars. The police could drive through again an hour later and ticket cars that haven't left. She supported a 2 or 3-hour parking limit plus enforcement, noting people often park on Sunset and take the ferry. They have lived on Sunset and shared the street with the public for 41 years. Before changes were made in the 1980s there would be 600 cars driving through from 10-11 p.m. on a weekday during the summer in addition to cars parked on the street. That is one of the reasons there is no right turn on 2nd Avenue. If that was proposed to be an escape route off Caspers, she recommended consideration be given to how to prevent it becoming a cruising area. She agreed it was definitely an enforcement issue and recommended the parking be spread out to see if that would help calm things down. Darrol Haug, Edmonds, said he has served on several boards and commissions and is currently the vice cfl chair of the EDC, but speaking as private citizen. He referred to the recent public survey, commenting N while the statistically valid survey was being conducted, there was also on online survey that produced c essentially the same results. He suggested the Council consider more online surveys to gather citizen v input rather than just three minutes at Council meetings. While the Council was finalizing the survey questions, he recalled discussion about the wording of questions and the survey results helping with budgeting for the coming year. Due to the uniformity of the questions and interpretation of the results, he z questioned whether the Council knew what citizens wanted with regard to projects. He referred to a list of projects, the Five Corners roundabout, Sunset Avenue, Main Street, 228t1i & Hwy 99, and purchase of a Civic Field, pointing out Edmonds residents paid pennies on the dollar for those projects. He asked whether the same pennies on the dollar should be expected for other services. As an example, street overlays cost $1.5 million/year or $90/year for the average household. He questioned whether the wording of the survey questions provided an accurate response. The survey identified affordable house as a priority; the EDC has considered that issue and he suggested the Council give the EDC direction regarding how to accomplish it. Jim Wassall, Edmonds, a resident on Sunset, between the Zahnows and Goebels, was happy his new neighbors have moved in and there is no more construction. Although he has not yet seen the proposal for Sunset Avenue, he recommended there not be any angle parking on Sunset because of the dangers caused by people backing out without looking. He questioned why there had never been a proposal for parallel Edmonds City Council Draft Minutes August 23, 2016 Page 7 Packet Pg. 10 4.1.a parking only on Sunset all the way to the north end, pointing out parallel parking is much safer than angle parking. He thanked the police department for their enforcement when residents call about illegally parked cars; the police are good about telling people to move on but are not good about giving tickets to people parked in no parking areas. He expressed his appreciation for the happy sounds from a wedding reception at the Zahnow's home last week. Roger Hertrich, Edmonds, commented the Council has been talking about Sunset Avenue for years. He visited Sunset Avenue earlier today and had to squeeze by an angle -parked vehicle that was sticking out in the roadway. He visited Sunset Avenue again later today to measure the distance between an angle - parked vehicle and the curb, finding it about 13 feet. He agreed angle parking was very dangerous, and relayed the difficulty he had seeing cars and pedestrians when backing out of the angle parking. A simple solution to the problem, to provide enough room to drive and park, would be to push the walkway westward approximately one foot, raise the sidewalk, make the sidewalk narrower and install a curb. It appears improvements will take a long time due to the involvement of the utilities. A narrower, elevated sidewalk on the west side would hardly be noticeable because the grass would be at the same level. He encouraged the Council to work diligently on the Sunset Avenue design, commenting the residents on Sunset are the ones who have suffered and the Council's inaction is ruining the neighborhood. 7. STUDY ITEMS 1. SUNSET AVE WALKWAY DESIGN PROPOSALS Public Works Director Phil Williams explained it has become apparent to staff over the last 2-3 years that c whatever final configuration is selected for Sunset Avenue and whatever surface improvements are t� constructed to implement it, they will be in addition to improvements to all three utilities. There is a large o pump station at the north end of Sunset that has an inadequate wet well and there is the potential for an overflow in a power outage if the backup generator does not come on, a significant environmental o concern. A study has been commissioned to look at options, some that could eliminate the pump station Q but would require a new gravity main on Sunset and/or a new force main. Those decisions have not yet been made and the Council would consider the options before a direction is adopted. The old cast iron 00 watermain line also needs to be replaced as well as the service to homes along Sunset and the storm system that needs to be improved. Accomplishing that work will require disturbing most of the surface so it makes little sense to design and build an entirely new surface on Sunset Avenue for the transportation system and tear it up to install new utilities in the future. He requested Council authorization to: c • Continue with overall project design E • Incorporate project design into upcoming utilities projects v • Apply low-cost interim solutions to address issues with current configuration E z He displayed and reviewed design concepts for final design: • Overlook — concept design, 2020s construction a o Build overlook o Remove blackberries, plant dense low growth along hillside o Lengthen lane transition • Intersection Sunset / Edmonds— concept design (2020s construction) o Add crosswalk o Install intersection table • Caspers St — concept design, 2020s construction o Install sidewalk link to 3rd Avenue o Make permanent the interim wrong -way driver solutions o Other features to be determined • Project Wide Surface Amenities Edmonds City Council Draft Minutes August 23, 2016 Page 8 Packet Pg. 11 4.1.a o Picnic tables o Telescope o Landscaping o Kiosks o Decorative solid waste containers Mr. Williams displayed and reviewed interim solutions: • Angled parking — current configuration • Angled parking — concept configuration o Move stalls west by 3' — 5' o Add raised curb areas for viewshed and sightline improvement o Evaluate reducing parking angles • Parallel parking — current configuration o 11 Stalls • Parallel Parking — Concept Configuration o Potential for seven to nine additional stalls possible without significant impacts to adjacent property ingress / egress. • Caspers Street — current conditions — wrong way drivers o Contributing Problems 1. 2-way traffic allowed all the way to 624 Sunset 2. No possible turnaround without using private driveways — 3. Traffic from Caspers to southbound 2nd Avenue forbidden (to discourage `cruising') • Caspers Street wrong way driving reduction v o Possible solution 1. Close/restrict westbound Caspers St traffic at 2nd Avenue 2. Route westbound Caspers traffic onto 2nd Avenue c 3. Retain no -right turn from eastbound Caspers St. n • Interim Solutions -- Other Q o Reduced parking times — 3 hours from 4 hours 00 ■ Requires an ordinance changing the code o Discourage idling vehicles — educational opportunity o Physical separation between walkway and roadway M N 00 Council President Johnson preferred to give staff general direction versus reviewing individual final c design and interim project descriptions. v c COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, THAT THE COUNCIL GIVE STAFF GENERAL DIRECTION TO HAVE FEWER ANGLE z PARKING SPACES AND MORE PARALLEL PARKING SPACES ON SUNSET AVENUE. M a Council President Johnson commented Mr. Williams outlined several ways to accomplish this and make the roadway safer such as moving the curb and the walkway to the west, provide gaps in the angle parking and change the angle and the length of the parking spaces. She summarized all staff needed was general direction and the Council would trust staff to carry out implementation. Councilmember Fraley-Monillas asked why not make Caspers one way. Council President Johnson raised a point of order that Councilmember Fraley-Monillas was not speaking to the motion. Councilmember Fraley-Monillas said she need to have the question answered before she could speak to the motion. Mayor Earling ruled Councilmember Fraley-Monillas could proceed with her question. Edmonds City Council Draft Minutes August 23, 2016 Page 9 Packet Pg. 12 4.1.a Mr. Williams responded there was the same issue on Sunset; residents on the north end of Sunset end up driving downtown and back up Sunset to reach their homes. Some do that and some use Caspers and sneak into the first few houses on the north end. He anticipated the same would happen on 2nd Avenue; if Caspers was one way eastbound to reach the same point on 2nd, residents would need to go all the way to Edmonds Street and up 2nd. If there was a physical way to get into 2nd, residents would like do that because many do it now. Councilmember Fraley-Monillas asked what was wrong with a one-way street. Mr. Williams explained then all the residents on Caspers, even those on the far east end, would need to drive to Edmonds Street and come up either Sunset or 2nd Avenue which would be quite inconvenient and he was unsure it was necessary. He and Council President Johnson talked about the local traffic only sign on 3rd Avenue, a commonly used sign but one that has not been very effective. The Council could adopt an ordinance stating no access onto Caspers other than described in the ordinance; the ordinance would allow residents and their visitors and vendors to access homes via Caspers but does not allow others. Without reading the fine print, the sign would appear to restrict access. That could be tried and supplemented with additional signage at 2nd Avenue Councilmember Buckshnis said she will not support the motion and preferred to be more specific. The interim project has been in place two years. She has friends who live on Sunset and many are not happy with the design and have been traumatized long enough. Councilmember Mesaros said he likely will not support the motion because if it passes, many of his questions will remain unanswered. He referred to concerns expressed about angle parking and the safety of angle parking, noting angle parking with slightly more angle existed prior to the interim project. He asked about the safety record of the previous angle parking and the current angle parking. Mr. Williams recalled there were previously 12 spaces configured similarly to the ones in the proposal although 10 feet further west. He did not recall that the angle parking in the previous configuration was a big safety issue. Although there has been a great deal of concern with the current angle parking, there have not been any accidents in the two years the project has been in place. Councilmember Mesaros referred to the picture of the existing angle parking and a jog in the right-of-way at the north end, noting there was a great deal of flexibility south of the jog. He asked what agreement the cfl City has with BNSF north of the jog. Mr. Williams answered there are no agreements with BNSF other N than the agreements related to the pump station, generator, pipelines and a guardrail if the City wanted to 0 install one. Councilmember Mesaros observed if BNSF wanted to get heavy handed with the City, they v could do something about it north of the jog. Mr. Williams answered north of the jog, the curb has been in place for 50-70 years in the current location but from that point north, it is on BNSF property. He has gotten no indication from BNSF that that is an issue for them; going further west certainly would be. z c� UPON ROLL CALL, MOTION FAILED (3-4), COUNCIL PRESIDENT JOHNSON AND Q COUNCILMEMBERS FRALEY-MONILLAS AND TIBBOTT VOTING YES; AND COUNCILMEMBERS NELSON, BUCKSHNIS, MESAROS AND TEITZEL VOTING NO. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO REMOVE ALL ANGLE PARKING ON SUNSET AVENUE FOR SAFETY PURPOSES. Councilmember Buckshnis said driving her large car on Sunset does not feel safe. If the intent is a walkway, there should be parallel parking only and people can sit on the bluff to look at the view. She preferred to make this residential street as safe as possible. Edmonds City Council Draft Minutes August 23, 2016 Page 10 Packet Pg. 13 4.1.a Councilmember Mesaros asked about the reduction in parking if angle parking is eliminated. Mr. Williams said the linear distance where the angle parking is currently located would support about 9 parallel parking spaces, reducing parking from 21 to 9. Councilmember Teitzel expressed interest in recapturing the ambiance that has been lost on Sunset; one way to do that is to reduce the concentration of cars on Sunset via parallel parking. He agreed with Councilmember Buckshnis that it was appropriate to have parallel parking the length of Sunset. Councilmember Fraley-Monillas agreed with Councilmember Buckshnis' motion regarding parallel parking, commenting there have been many problems with the angle parking. She assumed as many spaces as possible would be located to the north, recalling previously there was parallel parking nearly the entire length. Council President Johnson said it was not possible to make everyone happy; about 50% of people like the angle parking and about 50% like parallel parking. As the diagram indicates, the configuration could be moved 3-5 feet on City property which would make the roadway on Sunset wider. By changing the angle and enforcing the compact -only spaces, it may be possible to get a few more feet. Although the angle parking has clearly has been a problem, it can be improved and allow people who like the angle parking to enjoy it. Councilmember Mesaros emphasized regardless of whether the parking is angle or parallel, he too has also experienced enforcement issues. He walks on Sunset 1-2 times/week and has seen a number of people who ignore the parking limits. Whatever the Council decides, there needs to be a commitment from the administration and the police department that there will be enforcement. The intent is to make Sunset a place the entire community can enjoy without infringing on the residents. He acknowledged it was a delicate balance but if the Council creates rules and they are not enforced, there is no balance. Councilmember Tibbott said he was leaning toward the idea of parallel parking along the entirety of Sunset, especially with the idea of preserving green space west of the walkway which would be an appropriate place for benches. He suggested parallel parking along the entire length may be easier to enforce. COUNCILMEMBER TEITZEL CALLED FOR THE QUESTION. VOTE ON CALL FOR THE N QUESTION CARRIED UNANIMOUSLY. c E UPON ROLL CALL, MOTION CARRIED (4-3). COUNCILMEMBERS FRALEY-MONILLAS, V BUCKSHNIS, MESAROS AND TEITZEL VOTING YES; AND COUNCIL PRESIDENT JOHNSON AND COUNCILMEMBERS NELSON AND TIBBOTT VOTING NO. z COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCIL PRESIDENT JOHNSON, TO LIMIT PARKING ON SUNSET TO TWO HOURS. Q Councilmember Fraley-Monillas said experience has shown extended stays are difficult to control. A 4- hour limit is excessive unless a person is taking ferry. This is a public parking area, and watching sunsets is one of the things that draws visitors to Edmonds. She did not see any reason a person would need to park longer than two hours. For citizens who live on Sunset and their guests, parking permits allow longer parking. She did not see any harm in a 2-hour parking limit and preferred to have the parking turn around more quickly. Councilmember Teitzel expressed support for the motion, stating four hours was more than enough time to enjoy Sunset and many do not abide by that time limit. If someone is visiting the area to eat their lunch, Edmonds City Council Draft Minutes August 23, 2016 Page 11 Packet Pg. 14 he did not envision it would take more than two hours. A 2-hour parking limit coupled with enforcement would encourage people to move on and allow more people to enjoy the view on Sunset. Councilmember Tibbott asked whether a 2-hour limit versus the 3-hour limit in the downtown area would create an enforcement issue. Mr. Williams recalled the police department's preference was to keep the 3- hour parking limit uniform throughout the City. The 4-hour parking limit was special and 2 hours would still be special. MOTION CARRIED (6-1), COUNCILMEMBER TIBBOTT VOTING NO. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO CHANGE THE WALKWAY WIDTH TO THE SAME WIDTH AS ALL SIDEWALKS IN EDMONDS, FROM 8 FEET TO 6 FEET WITH A 2-FOOT BUFFER. Councilmember Buckshnis commented the walkway width is the same width as a car, which creates a public safety issue when vehicles mistakenly drive on the walkway. She felt six feet was wide enough; if necessary, people on the walkway can step up onto the curb to let others pass. Councilmember Teitzel recognized the need for a compromise due to limited space on Sunset, traffic issues, and difficulty exiting driveways. He measured Sunset and found the width between the curb on the east side and the eastern buffer where vehicles parallel park to be 18 feet. Subtracting 8 feet for a car width leaves 10 feet between the car and the curb which is tight for someone to back out of their driveway. Reducing the walkway width by two feet would increase the roadway to ten feet. The 6-foot walkway would also include a 2-foot buffer as well as the top of the bluff that ranges from 2-8 feet where people can walk and stand to enjoy the view. He summarized six feet accommodated the residents' needs and was sufficient for most uses; bicycles are not allowed on the path. Councilmember Fraley-Monillas asked the current width of the path and what is required for ADA. Mr. n Williams answered 8 feet, advising this is not an ADA issue but national guidelines for recommended Q widths. He commented on how the path is used today with people walking side by side pushing strollers00 co with a child beside them, and people on rollerblades, Segways, etc. He envisioned the level of satisfaction would be dramatically changed if those uses in the existing volumes occurred on a 6-foot sidewalk. Councilmember Fraley-Monillas asked whether the change from angle parking to parallel parking would M provide additional space. Mr. Williams commented on the history of parking on Sunset; previously there w was both angle and parallel parking but since it was all 10 feet further west, it was less of an issue. c Moving everything 10 feet east to accommodate the walkway makes not abiding by the parking rules V more problematic due to driveway issues. He said the driveways could be fixed if funds were available r- and in a project design, that would occur. There are areas on Sunset where he did not recommend parallel a) E parking be installed; there were only 17 spaces previously and 11 now, the proposal would add 7-9. c� Councilmember Fraley-Monillas reiterated her question about the change from angle to parallel parking. a Mr. Williams answered adding 2 feet would increase the drive lane to 20 feet. He questioned whether that would be noticeable in the operation of the drive lane but envisioned reducing the width of the walkway by 25% would be very impactful. Councilmember Fraley-Monillas did not support the motion and preferred to retain the 8-foot walkway because it encouraged gathering and walking together and did not appear to have a big impact now that the parking would be parallel. Councilmember Nelson opposed the motion, observing the name was Sunset Avenue Walkway and he wanted to encourage people to walk and exercise in a comfortable environment. Eight feet is a standard walkway width; having a narrower width would not be helpful to someone pushing a stroller or in a wheelchair. With regard to the danger of vehicles driving on the walkway, he suggested a wooden or concrete post at both ends of the walkway with reflectors to physically prevent a car from entering the Edmonds City Council Draft Minutes August 23, 2016 Page 12 Packet Pg. 15 walkway. Mr. Williams answered the solution may not need to be that onerous; a good solution to wrong way driving can be designed. Councilmember Mesaros did not support the motion, finding an 8-foot width ideal for people walking on the walkway. He asked whether the City has the authority to ban bicycles from the walkway. Mr. Williams answered yes, he thought so and because that was the Council's previously stated preference, bicycles on the walkway was not included in the proposal. Councilmember Mesaros relayed his understanding that bicycles have the right to ride on sidewalks. Mr. Williams answered bicycles are not allowed on City sidewalks. The walkway is still a multiuse pathway but it will not include bicycles other than a small child on training wheels accompanied by an adult. Council President Johnson did not support the motion because; 1) the 8-foot walkway is very popular and enjoyable, 2) the yellow striped area will be a mountable or c-curb and not an area to walk in, and 3) wrong way drivers from Caspers onto Sunset can be solved in other ways. Councilmember Teitzel said the width between the curb on the east side and a parked car is about 10 feet. If the walkway is reduced by 2 feet to 6 feet, it adds to 2 feet to the travel lane making it easier for residents to back out of their driveways. He pointed out a 6-foot walkway plus the 2-foot buffer as well as space on top of the bluff provided sufficient space to walk, step out of the way, etc. UPON ROLL CALL, MOTION FAILED (2-5), COUNCILMEMBERS BUCKSHNIS AND TEITZEL VOTING YES; AND COUNCIL PRESIDENT JOHNSON AND COUNCILMEMBERS NELSON, FRALEY-MONILLAS, MESAROS, AND TIBBOTT VOTING NO. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO INSTALL A MODIFIED C-CURB ALONG THE WALKWAY WHERE POSSIBLE TO BETTER SEPARATE AUTOMOBILE TRAFFIC FROM PEDESTRIAN TRAFFIC. Councilmember Fraley-Monillas asked if Council needed to provide specific direction on each item. Mr. Q Williams answered that was his original intent but as this item was scheduled for one hour, he requested direction regarding items that could be accomplished on an interim basis until the utility work can be00 completed. Councilmember Teitzel asked whether the c-curb would need to be removed when utility work was done N in 1-2 years. Mr. Williams answered the intent would be to do it in a way that would salvage the c-curb. 0 Councilmember Teitzel said if the c-curb could not be salvaged, this plan would not proceed. Mr. v Williams agreed. c a� Council President Johnson asked if a c-curb was different than a mountable curb. Mr. Williams answered z yes. There have been discussions in the past about a raised concrete walkway with a mountable curb M which would require 6 inches of concrete on BNSF property. He did not recommend that as it would a require BNSF permission. MOTION CARRIED UNANIMOUSLY. COUNCIL PRESIDENT JOHNSON MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, THAT THE COUNCIL DIRECT STAFF TO HAVE A ONE-WAY ROAD FOR CASPERS STREET FROM 3" AVENUE TO SUNSET. Council President Johnson said several things could be done to make it safer such as clear visual clues to drivers that the street is one-way/do not enter and residents who rely on this short section could be notified they are excused by ordinance. There also needs to be other visual clues such as cars parked in Edmonds City Council Draft Minutes August 23, 2016 Page 13 Packet Pg. 16 4.1.a the same direction as Sunset. It is confusing now because cars are facing west when they should be facing east. There may be other visual clues and signage to prevent wrong way drivers. UPON ROLL CALL, MOTION FAILED (2-5), COUNCIL PRESIDENT JOHNSON AND COUNCILMEMBER FRALEY-MONILLAS VOTING YES; AND COUNCILMEMBERS NELSON, BUCKSHNIS, MESAROS, TEITZEL AND TIBBOTT VOTING NO. Mr. Williams observed the Council had provided direction on the following interim improvement design issues and asked if Council wanted these done on an interim basis. Council indicated yes. Mr. Williams advised funds would be required. • Should appropriate signage and and changes in raised islands be made on Caspers to further discourage and/or prevent wrong way driving on Sunset? • Should parking restrictions on Sunset be changed from 4-hours to 3-hours or 2-hours? • Should a modified c-curb be installed along the edge of the walkway where possible to better separate automobile traffic from pedestrian traffic? • Should additional parallel parking spaces be added to Sunset where driveway issues don't exist or where they can be mitigated Mr. Williams reviewed the following interim improvement design issue: • Should changes be made on an interim basis at 2°d Avenue to prevent circulation motion on 2°d and Sunset but allow vehicle to access it from 3rd Avenue Councilmember Mesaros expressed support for an interim solution to solve the existing issues. COUNCILMEMBER MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO HAVE AN INTERIM SOLUTION TO CASPERS/2ND AVENUE INTERCHANGE AS RECOMMENDED BY MR. WILLIAMS. MOTION CARRIED (6-1), COUNCIL PRESIDENT JOHNSON VOTING NO. Mr. Williams asked whether a decision package should be submitted to make interim improvements as discussed. The Council indicated there should be. W Councilmember Mesaros suggested before the parallel parking was implemented, staff return with the r, design. Although he was interested in maximizing the parking, it was not about squeezing in the most w parking, he wanted it to be comfortable. E c.� Councilmember Buckshnis inquired about the timeline for the interim improvements, noting the one-year c interim had become two years plus. Mr. Williams answered the cost and timeline of the interim E improvements as well as the utility projects will be discussed during the budget process. c� Councilmember Fraley-Monillas asked when the pocket park and the intersection table would be a constructed. Mr. Williams said the request is for Council authorization to design the final condition of Sunset Avenue which include the overlook and final design of Caspers. COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER MESAROS, TO AUTHORIZE DESIGN OF THE FINAL CONDITION OF SUNSET VENUE TO INCLUDE THE OVERLOOK AND FINAL DESIGN OF CASPERS. Councilmember Buckshnis asked whether this had already been designed. Mr. Williams answered there was no detailed design for anything. There was a preliminary design concept for Caspers but it was not finished because the funding was eliminated. Staff will review what was done, establish a process to work with the neighbors, and bring it back to Council. The source of funds would be the $147,000 in grant Edmonds City Council Draft Minutes August 23, 2016 Page 14 Packet Pg. 17 4.1.a funds that have not been used. Councilmember Buckshnis asked whether the sidewalk was on the north side versus the south side and parking eliminated. Mr. Williams said the design proposed tonight was a walkway on the north side of Caspers. He did not guarantee that would be the location once it was designed but it was believed that that would fit. He acknowledged parking may be eliminated. Councilmember Teitzel suggested getting input from residents on Sunset regarding the parallel parking configuration. Mr. Williams answered said once something is designed, it will be vetted with the Council and the public. Councilmember Fraley-Monillas restated the motion as follows: TO APPROVE DESIGNING THE POCKET PARK AND THE INTERSECTION TABLE. MOTION CARRIED UNANIMOUSLY. Mayor Earling declared 5-minute recess. 2. PRESENTATION OF THE 2017-2022 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM Transportation Engineer Bertrand Hauss recalled on May 24, 2016, staff presented the draft TIP, a public hearing held on June 17, 2016 and Council requested staff return at a later date. He highlighted changes since the last presentation, primarily due to grants secured or grant applications submitted: • 84"' Ave W Overlay from 220t'' St SW to 212t" St W v o Secured $750,000 STP grant c ■ $190,000 local match o Previously identified as unsecured o • Hwy 99 Safety Improvements from 216t" SW to 224t" St SW n o Previously identified as $10,000 construction fee to add c-curb Q o More improvements required to allow turns at signalized intersections 00 ■ Required design cost $300,000 ■ Submitted grant application • 220t" St SW Traffic Signal Coordination from Hwy 99 to 76t" Ave W o New project w o Submitted grant application E o Co -application with Mountlake Terrace for signal coordination from Hwy 99 to I-5 on 2201" v 0 95t" PI SW Walkway from 224t" St SW to 220t" St W o TIB grant submitted E ■ TIB grants require road be classified as collector or minor arterial. This is one of last remaining stretches of a collector/minor arterial without a sidewalk a ■ Identified in the 2015 walkway plan o Completes connection from SR-104 to 220t" o Design in 2017 o $20,000 local match • 15t" St SW from 8t" Ave S to 9t" Ave S o Recently added project o Design in 2016 with minor sidewalk program funding o Complete design and construct in 2017 with funds from $200,000 minor sidewalk program Councilmember Buckshnis observed the TIB includes installation of a traffic signal or mini roundabout at Main Street & 9`' and asked if that was included as a placeholder. Mr. Hauss answered the City's accepted LOS standard is D; the intersection is currently LOS E and projected to be LOS F in the future. Edmonds City Council Draft Minutes August 23, 2016 Page 15 Packet Pg. 18 4.1.a Councilmember Buckshnis recalled a second lane was added. Mr. Hauss advised that was at 91h & Walnut. Councilmember Buckshnis asked if that could be done at Main & 91h. Mr. Hauss said that same configuration could be considered at Main. Mr. Williams said the second lane at Walnut has not been fully embraced by Edmonds citizens due to confusion with short distance of the second lane. With two lanes instead of four through the intersection, bike lanes could be considered. With additional space at the corner, a traffic circle or signal could be installed. A project needs to be included in the TIP that addresses the level of service. Councilmember Buckshnis observed traffic in Edmonds at 5 p.m. has increased. Councilmember Buckshnis inquired about the Edmonds Waterfront Analysis. Mr. Williams answered the Mayor's Task Force has been meeting every 2 weeks since October 2015. They have assembled several alternatives that address the ferry, pedestrian/bicycle and emergency access as well as some low hanging fruit. The Task Force will be making recommendation to the Mayor in the next 1-2 moths. Councilmember Teitzel inquired about the trackside warning project. Mr. Williams answered it is funded this year but additional time has been required to work with BNSF on interfacing with their signal cabinet. Answers have been provided by BNSF and a diagnostic meeting will be held in early September. Council President Johnson referred to the trackside warning system and asked if a quiet zone funded by a local improvement of residents affected by the noise had been considered. Mr. Williams answered a full quiet zone at the two intersections would cost approximately $2 million. The trackside warning system will eliminate most of the problem for $300,000. A quiet zone could be pursued when the double track is built; if a quiet zone were established now, it would need to be moved when the double track is installed. Further, BNSF questioned how a full quiet zone would work in that compact geometry particularly at Main. He concluded a quiet zone had been considered but was not being pursued. Council President Johnson asked if the problem of increased number horn blasts would be solved by the trackside warning system. Mr. Williams answered no. Council President Johnson pointed out there would be more noise in a smaller footprint. Mr. Williams answered only for the 8 per day passenger trains out of 40 trains per day. On those eight trains there will be additional horn blasts but it will be quieter for 95% of Edmonds. 0 Council President Johnson inquired about left turn movements from Maplewood Drive across 196th, N recalling the Council discussed a right turn only several years ago to eliminate sight distance issues and 0 0 put it on hold awaiting a traffic signal. Mr. Hauss advised that is 88`h and 196`h; staff recommended that to v Council in the past but it was not approved. Council President Johnson agreed the previous City Council did not approve it but it was in the Transportation Plan previously. She believes it was still a good project and wanted to know how to move it forward. Mr. Hauss said the LOS at that intersection is failing which z is why it is identified in the TIP as SR 524 @ 88t' Avenue W Intersection Improvements. That project � could be brought back to Council. a It was the consensus of Council to schedule approval of the 2017-2022 TIP on the Consent Agenda. 3. STORMWATER MANAGEMENT CODE UPDATE, EDMONDS COMMUNITY DEVELOPMENT CODE CHAPTER 18.30 City Engineer Rob English recalled the Stormwater Management Code was originally presented in June and on August 2, Craig Dubberstein, CPD Solutions, made a presentation and a public hearing was held. At the conclusion of the August 2 meeting, Councilmembers expressed interest in submitting additional questions. One question was received from Councilmember Teitzel yesterday. The SEPA process should be completed by mid -September and the State is in the process of reviewing the code and Edmonds City Council Draft Minutes August 23, 2016 Page 16 Packet Pg. 19 will do an expedited 30-day review. He expected the reviews and the SEPA process to be complete by mid -September and ordinance scheduled on the Consent Agenda in late September. Mr. Dubberstein advised there are no technical or policy changes, only clarifications and corrections. He reviewed changes made since August 2: • Definition of project site and roadway: impervious surface changed to hard surface • Definition of substantially developed removed as the term is no longer used in the code • 18.30.060.C.2, amendment to clarify how the section applies o Mr. Dubberstein will email Councilmembers the exact change Council President Johnson asked how a project such as Main Street that had permeable surface would meet these requirements and asked if there was an exception for 5,000 square feet or more of permeable surface. Mr. Dubberstein advised this paragraph is related to projects that replace or expand the surface. Mr. Williams advised areas where pervious asphalt was installed on portions of Main Street and routed to detention would be counted against the threshold because it is a hard surface but credit for permeability of pavement would be provided at the modeling stage. He said permeable asphalt is still a hard surface. Mr. Dubberstein continued his review of changes made since August 2: • 18.30.060.C.3: Impervious changed to hard surface • 18.30.060.D.4: Sentence changed to read, "To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis a,.,.,ast+ea- from the site *� ther-eeeivingwatef. With regard to Councilmember Teitzel's question, Mr. Dubberstein advised the wording following "underdrain" was deleted in the definition of impervious surface. Councilmember Buckshnis commented this update was very confusing because language had been moved a around. She was concerned about the amount of knowledge whoever administered this code would have Q to have and asked whether the City planned to hire a stormwater specialist. Mr. Williams answered a job offer has been made and accepted and the person will start work September 1. The stormwater specialist00 will report to Mike DeLilla who reports to Rob English. He acknowledged there will be a learning curve for staff. An addendum will be prepared by the end of the year that puts the language in more understandable terms. Councilmember Buckshnis said she was surprised by the amount of director N responsibility. 0 0 Councilmember Buckshnis observed the definition of critical area was removed. Mr. Dubberstein said either it is not a term that needs to be defined or the term is not used in the code. Councilmember Ea) Buckshnis said she did not submit any questions because it had already been sent to the State. Mr. z Williams said it was submitted to the State Department of Commerce for review. Councilmember 2 Buckshnis said she will review the code again and submit questions. Mr. Dubberstein advised the code Q can be sent to Ecology for a courtesy review; Ecology reviewed the 7 Phase 1 jurisdictions but have stated they are unable to do formal review of the 100 Phase 2 jurisdictions. As Ms. Dubberstein will email Council details regarding one change, it was agreed to have approval scheduled as an agenda item. 4. AUTHORIZATION TO CONTRACT WITH JAMES G. MURPHY TO SELL SURPLUS CITY EQUIPMENT Public Works Director Phil Williams explained surplusing of City vehicles is done annually. A number of new vehicles have been purchased and the old ones will be auctioned. Edmonds City Council Draft Minutes August 23, 2016 Page 17 Packet Pg. 20 4.1.a Councilmember Fraley-Monillas commented she has friends who ride Harleys; the Harleys to be surplused and auctioned are 2008 models and she asked why they were being surplused when they were only eight years old. Mr. Williams expected they have reached their expected lifecycle where they are due to be replaced. The two that have been surplused have been replaced. It was the consensus of Council to schedule this for approval on the Consent Agenda. 5. PRESENTATION OF BIDS AND AWARD FOR DOWNTOWN RESTROOM Mayor Earling recalled staff wanted Council to take action on this tonight. Economic Development/Community Services Director Patrick Doherty reviewed: Background: o April 19, 2016 Council approve final design, including unisex/family restroom + landscaped plaza 3 o $390,000 cost estimate o $60,000 from lodging tax funds a o $10,000 from Edmonds Downtown Alliance o $5,000 from Noon Rotary Club o City funds: $315,000 from REET 1 (Fund 126) o Intention: Open for Fall/Holiday activities — by Halloween c Final design and bids 'o o Final design and permitting have ensued v o August 3, 2016 project out to bid — MRSC Small Works Roster o Project consists of site preparation for the new restroom, and support of the prefabricated > restroom placement, and related site improvements ° a o Site work cost estimate: $134,800 ($148,010.40 incl tax) Bids received Q o Five bids received Noon, August 19, 2016 00 o Lowest bidder, K-A General Construction, withdrew bid on August 22, 2016 due to error. o Second lowest bidder, Forrest Gardens, at $147,987 cfl Summary of bids received: N o Construction Estimate: $134,800.00 0 o K-A General Construction: $108,930.50 (withdrawn) E o Forrest Gardens LLC: $147,987.00 o Spirit Ridge Construction: $192,600.65 o ESE Corporation: $234,633.82 z o Accord Contractors LLC: $236,673.90 Available Funding: $390,000 a Final budget o Management Reserve of 15% ($16,340) o Construction Management costs of 20% ($26,960) o Final Project Budget = $428,637 o Increase of $38,637 • Proposed action: o Accept bid by Forrest Gardens and award contract for site preparation and restroom support project in the amount of $147,987. o Approve total project budget of $428,637, approving an increase of $38,637, to be funded by REET 1 (Fund 126) 2015 positive ending cash balance. Edmonds City Council Draft Minutes August 23, 2016 Page 18 Packet Pg. 21 4.1.a o Authorize potential use of 15% Management Reserve (up to $16,340) for changes or unforeseen conditions COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO APPROVE THE PROPOSED ACTION. Council President Johnson asked whether maintenance of the facility was included in the 2017 budget. Mayor Earling answered the 2017 budget is being developing; approximately $25,000 is included for maintenance of the restroom. MOTION CARRIED UNANIMOUSLY. 8. ACTION ITEMS 1. AUTHORIZATION TO MODIFY AN AGREEMENT WITH THE COLD SPRING GRANITE COMPANY FOR THE VETERAN'S PLAZA COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO EXTEND THE MEETING FOR FIVE MINUTES. MOTION CARRIED UNANIMOUSLY. Public Works Director Phil Williams advised this is a proposal to change the size of the stones in the Veteran's Plaza that can be inscribed. The proposal is to cut the stones in half to double the opportunity for revenue via inscriptions. The additional cost is $950. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, FOR APPROVAL. MOTION CARRIED (6-1), COUNCIL PRESIDENT JOHNSON VOTING NO. 9. REPORTS ON OUTSIDE BOARD AND COMMITTEE MEETINGS This item was postponed to future meeting. 10. MAYOR'S COMMENTS Mayor Earling reminded of the Civic Field open house tomorrow and the Town Hall on Thursday at at Faith Community Church. He advised HR Director interviews will be held on Friday. 11. COUNCIL COMMENTS Councilmember Nelson thanked Council President Johnson for organizing the presentations on homelessness; he has found them helpful and informative. Councilmember Fraley-Monillas said she was pleased the Council's long process regarding Sunset Avenue was completed. Councilmember Buckshnis agreed with Councilmember Fraley-Monillas' comment about Sunset Avenue, commenting the residents on Sunset breathed a sigh of relief. Council President Johnson reminded of the Civic Field open house tomorrow. Councilmember Teitzel said today was his wife's and his 415t wedding anniversary. Edmonds City Council Draft Minutes August 23, 2016 Page 19 Packet Pg. 22 4.1.a 12. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(i) This item was not needed. 13. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION This item was not needed. 14. ADJOURN With no further business, the Council meeting was adjourned at 10:05 p.m. Edmonds City Council Draft Minutes August 23, 2016 Page 20 Packet Pg. 23 M N O O E c.i �.i C d E t U 2 a 4.2 City Council Agenda Item Meeting Date: 09/6/2016 Approval of Council Special Meeting Minutes of August 23, 2016 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: Cm082316 spec mtg Packet Pg. 24 4.2.a EDMONDS CITY COUNCIL SPECIAL MEETING DRAFT MINUTES AUGUST 23, 2016 The City Council Special Meeting was called to order at 6:30 p.m. by Mayor Earling in the Council Chambers, 250 5th Avenue North, Edmonds. The Council then convened in the Jury Meeting Room. Elected Officials Present Kristiana Johnson, Council President Mike Nelson, Councilmember Diane Buckshnis, Councilmember Tom Mesaros, Councilmember Dave Teitzel, Councilmember Neil Tibbott, Councilmember Adrienne Fraley-Monillas, Councilmember Mayor Dave Earling Others Present Shane Hope, Development Services Director Kernen Lien, Senior Planner Jeff Taraday, City Attorney 1. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(I). The City Council adjourned to the Jury Meeting Room to discuss pending or potential litigation per RCW 42.3 0.11 0(l)(i). O The meeting was adjourned at 6:58 p.m. Edmonds City Council Draft Minutes August 23, 2016 Page 1 Packet Pg. 25 4.3 City Council Agenda Item Meeting Date: 09/6/2016 Acknowledge receipt of a Claim for Damages from Diane M. Lobaugh (amount undetermined) and from Jackie L. Studioso ($240.00) Staff Lead: {Type Name of Staff Lead} Department: City Clerk's Office Preparer: Linda Hynd Background/History N/A Staff Recommendation Acknowledge receipt of the Claims for Damages by minute entry. Narrative Diane M. Lobaugh 20227 Densmore Avenue North Shoreline, WA 98133 (Amount undetermined) Jackie L. Studioso 19107 83rd Avenue West Edmonds, WA 98026 ($ 240.00 ) Attachments: Lobaugh Claim for Damages Studioso Claim for Damages Packet Pg. 26 4.3.a RECEIVED CITY OF EDMONDS AUG 2 6 2016 CLAIM FOR DAMAGES FORM Date Claim Form �Of Received by CK )MONDS CITY CLERK i /P 8 Please take note that O` t a'rie � Gt"G/ who currently resides at 12OZ-Z- A!yamjlKio!"e- V`U Z I A QYe� P WA mating address r L Pq sr •o '-eAve- ka � 1t home phone # 233 ,work phone # It% n h-e _ and who resided a � �'L�- r, f!N'ri oW r r $ A` at the time of the occurrence and whose date of birth is91Z .S is claiming damages against C (2�z U G a Ma P1 Asin the sum of $ 7­9-0 arising out of the following circumstances listed below. DATE OF OCCURRENCE: 4_// g'1 b LOCATION OF OCCURRENCE: P� /e V f�- . b i S' C. DESCRIPTION: Describe the con uct and circumsta ce that br ght about the injury r damage. !Also TIME: describe 6fo-O AWL, the i'mury or (attach an extra sheet for additional information, if needed) 2. Provide a list o witnesses, if applicable, to the occurrence including names, addresses, and phone numbers. F r►z e wr,��r P 11 �c � :�- �- I ,L- -- � L �f g � 3. Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair. 4. Have you submitted a claim for damages to your insurance company? Yes No If so, please provide the name of the insurance company: and the policy #: * * ADDITIONAL INFORMATION REQUIRED FOR AUTOMOBILE CLAIMS ONLY * * License Plate # A l Driver License # Type Auto: tq q A C (-Cgr Lt kPiC, 2; ate. (year) (make) (model) c DRIVER: OWNER: { �J &L4_ II Address: l-- J ti,r Address: LZ ,A N ' 3 Phone#: Phone#: n 3 Passengers: Name: Name: Address: Address: Forth Revised 05/06/14 Page 1 of 2 Packet Pg. 27 4.3.a * NOTE: THIS FORM MUST BE SIGNED AND NOTARIZED * * �l g - `'° r U being first duly sworn, depose and say that I am the claimant for the above described; that I have read the above claim, know the contents thereof and believe the same to be true. I further acknowledge that any information I provide as part of this claim may be considered a public record and may be subject to disclosure pursuant to RCW 42.56. X 6t 1-� 4 Signature of C}ai nt(s) State of Washington County of �511yo tclyl _ I certify that I know or have satisfactory evidence that SI N 2p46u l is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument and acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the instrument. Dated: -``t4�N��11111j! S ray llr,, ' natur��g51Qay''+++,�5 xv '+, ❑ fi Title s 0 +et��� 'r%� i My appointment expir v A us vy 'r��# � 11W11i61i Please present the completed claim form to: City Clerk's Office City of Edmonds 121 51h Avenue North Edmonds, WA, 98020 8:00 a.m. to 4:30 p.m. Fonn Revised 05/06/14 Page 2 of 2 Packet Pg. 28 4.3.a EXCHANGE OF INFORMATION OFFICER NAME. E FALK 10361 COLLISION: 084511608:00 AM CASE#: 16-20492 AGENCY: EDMONDS PD DISPATCH 0811511608:10 AM LOCALION DALEYSTBN:600 ARRIVAL: 0811511608:15 AM 109.00 FEET SOUTH OF / AVE N NARRATi'dE1 NOTES: UNIT 1 MOTOR VEHICLE• 201: FORD 1`450 PLATE: 52415D (UVA) TOWED BY ......., i i DRIVER: WILLIAMT SANDERS VCH OWNER CITY O EDMONDS i I ADDRESS: 1925 107TH OR SE ADDRESS 7110 210TH ST SW I I LAKE STEVENS, WA 982582008 EDMONDS, WA 98026 I j DL #: SANDEWT405NO STATE: WA ! i PHONE: (425) 771-0235 PHONE: ALT PHONE ALT PHONE INSURED BY: WCIA INSURED BY WCIA I i POLICY #: SELF INSURED POLIO' #: SELF INSURED I I r-- — -- ..-.._---- •............... .. l'NIT 2 MOTOR VEHICLE- 1995 ACCORD PLATE: AJU1174 (VVA7 :.........:.. TOI'VED BY r._ .. _ _.._� -. _ _.....-.-.-...... ...... ...... ...... ..-. .... .. _............__.....- i DRIVER: i NONE VEH OIiVNER: DIANE LOBAUGH i ADDRESS: ADDRESS: 20221 DENSMOREAVE N SHORELINE, WA 98133 i i DL #: STATE: i ) i PHONE: PHONE: (206) 533-2337 ALT PHONE: ALT PHONE. INSURED BY: INSURED BY. USAA POLICY #. PGLIC)' #: 2648269 I I I I "CV �11G 2 � 2016 Page: 1 of 1 N N a1 R E cC w N E Cu U CM 00 N N a1 R 4- E Cu U t O O O J C N t V O a Packet Pg. 29 RIECEWED CITY OF EDMONDS AUG 2 6 2016 CLAIM FOR DAMAGES FORM 4.3.b Date Claim Form EDMONDS CM CLM eceived by Cit Please take note that c— ;l Il(T I ho currentlly�,resides at -_yA I o 1 � v 2�mailing address P t d`� �5 S" 1 VV.• q t L home phone #10�733LI-MSz-/work phone # and who resi ed a at the time of the occurrence and whose date of birth is is claiming damages against t G f o 7)2d 5 in the sum of $ 2-� CAL arising out of the following circumstances listed below. DATE OF OCCURRENCE: MID ry v U� ti` � � U Ito TIME: L4 S LOCATION OF OCCURRENCE �. W 0 f y� V� r A'k (-,nt4 Cy c� E c� L 0 to DESCRIPTION: 1. Describe the conduct and ci ctlrnstance that rought about the in'yiry or damage. Also describe the injury or damage. . ri .` i'\ r l� � r] , e 0' t \--L L s � -e- r\ , L i G t c- r- o- V-1 i r < <7 L -,, -, 1�1 ri �r [rll9 r� C1 enr .�i.,r r-. I. C 1llaraR r r r,�ti t7 _n �l iAlr� c, rr1 1 {1,A AM1`Y�4 i i I ' i - r. � •g6ttach an e a sheet for additional informatidfi, if needed) 2. Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and phone numbers. 3- Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair. 4. Have you submitted a claim for damages to your insurance company? If so, please provide the name of the insurance company: and the policy #: License Plate # Type Auto: Yes A No ""ADDITIONAL INFORMATION REQUIRED FOR AUTOMOBILE CLAIMS ONLY * * Driver License # (year) (make) (model) DRIVER: OWNER: Address: Address: Phone#: Phone#: Passengers: Name: Name: Address: Address: E � U I M 00 Ct ) rn m a� E L 0 E M tU 0 U) 0 �a 3 Cn c 0 E t U r r Q Fenn Revised 05/06/14 Page 1 of 2 Packet Pg. 30 4.3.b * NOTE: THIS FORM MUST BE SIGNED AND NOTARIZED * * being first duly sworn, depose and say that I am the claimant for the above described; that I have read the above claim, know the contents thereof and believe the same to be true. I further acknowledge that any information I provide as part of this claim may be considered a public record and majbub,,ect to disclosure pursuant to RCW 42.56. Signature of Claimant(s) State of Washington County of �N014a vn )614 I certify that I know or have satisfactory evidence that JC e,0 M u it is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument and acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the instrument. Dated: �` �D %� �.��!\\\111111it t1 Rr0 li, Sigii . r Title My appointment expires: Q h 0 co'4 a RS YYY Ifll��S1HLN\t����y_ 0 Please present the completed claim form to: City Clerk's Office City of Edmonds 121 5'h Avenue North Edmonds, WA, 98020 8:00 a.m. to 4:30 p.m. Form Revised 05/06/14 p Packet Pg. 31 4.3.b 11 AW# ' a � by ` 1 a: ` t [ ■ Packet Pg. 32 . _ .'r •• is � yy��i ►i=• �d :. �I !' - r, 1.-' '!Y' k ► .f. Phi ' �'. r - �� s.t `F.��'�'•-�•i �i'r is Y���iiv••-. pti i l%* ..;ti rk .. . •" M. # i Attachment: Studioso Claim for Damages (1483 : Claims for Damages) Attachment: Studioso Claim for Damages (1483 : Claims for Damages) /00 HARVY'S BIKE SHOP (425) 774-8951 Fax 776-3746 19920 Hwy 99 #C Lynnwood, WA 98036 www.harveysbikeshop.com H rvy Massnudrr �`�s VU, c1 � IY i7 Y1�1 CY C E U PL 4.3.b Packet Pg. 36 4.4 City Council Agenda Item Meeting Date: 09/6/2016 Approval of claim, payroll and benefit direct deposit, checks and wire payments. Staff Lead: Scott James Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim checks #221461 through #221597 dated August 25, 2016 for $1,128,687.98 and checks #221598 through #221672 dated September 1, 2016 for $2,477,628.58. Approval of payroll direct deposit and checks #62302 through #62311 for $509,288.96, benefit checks #62312 through #62320 and wire payments of $479,977.77 for the pay period August 16, 2016 through August 31, 2016. Staff Recommendation Approval of claim, payroll and benefit direct deposit, checks and wire payments. Financial Impact Claims $3,606,316.56 Payroll Employee checks and direct deposit $509,288.96 Payroll Benefit checks and wire payments $479,977.77 Total Payroll $989,266.73 Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non -approval of expenditures. Attachments: claim cks 08-25-16 claim cks 09-01-16 FrequentlyUsedProjNumbers 09-01-16 Payroll summary 09-02-16 payroll benefit 09-02-16 Packet Pg. 37 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221461 8/25/2016 065052 AARD PEST CONTROL 221462 8/25/2016 068201 ACTIVE NETWORK INC 221463 8/25/2016 074473 AHERN, RACHEL 221464 8/25/2016 065568 ALLWATER INC 221465 8/25/2016 073620 ALLWEST UNDERGROUND INC Voucher List City of Edmonds Invoice 373213 1000115318 11080840 8/1-8/22 ATTEND 081916034 58217 221466 8/25/2016 074306 AMWINS GROUP BENEFITS INC 4388400 PO # Description/Account WWTP: 8/18/16 PEST CONTROL 8/18/16 PEST CONTROL 423.000.76.535.80.41.00 9.8% Sales Tax 423.000.76.535.80.41.00 Tota PIN PADS FOR ACTIVE PIN PADS FOR ACTIVE 001.000.64.571.22.31.00 9.8% Sales Tax 001.000.64.571.22.31.00 SCANNER FOR ACTIVE PASSES SCANNER FOR ACTIVE PASSES 001.000.64.571.22.35.00 9.8% Sales Tax 001.000.64.571.22.35.00 Tota 8/1-8/22/16 OUTDOOR VOLLEYBA 8/1-8/22/16 OUTDOOR VOLLEYBA 001.000.64.571.25.41.00 Tota WWTP: 8/19/16 DRINKING WATE 8/19/16 Water services (plus 423.000.76.535.80.31.00 Tota WWTP: PIPE PLUG & INF LINE RE PIPE PLUG & INF LINE RENTAL, F 423.000.76.535.80.45.00 Tota RETIREE MEDICAL INSURANCE 4.4.a Page: 1 c ca lid U a� R � Amoun c a m 73.0( =a 7.1: :a 1 : 80.1E c m c c� 585.0( o 57.3, a E 321.2( 4- 0 31.4E I : 995.0: o L Q LI Q- Q LI •• 150.0( 0) 1 : 150.0( ; N r 16.3: ao I : 16.3, w � E w 57.6`. U 1 : 57.6`. m E t R .r r a Page: 1 Packet Pg. 38 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221466 8/25/2016 074306 AMWINS GROUP BENEFITS INC (Continued) AMWINS COVERAGE for Barnard, C 617.000.51.517.20.23.10 AMWINS COVERAGE - ALL OTHER 009.000.39.517.20.23.10 Tota I : 221467 8/25/2016 074718 AQUATIC SPECIALTY SERVICES INC 11642 CHEMICALS YOST POOL CHEMICALS YOST POOL 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Total: 221468 8/25/2016 069751 ARAMARK UNIFORM SERVICES 1988742586 WWTP: UNIFORMS, TOWELS & MA wwtp uniforms 423.000.76.535.80.24.00 wwtp mats & towels 423.000.76.535.80.41.00 9.8% Sales Tax 423.000.76.535.80.24.00 9.8% Sales Tax 423.000.76.535.80.41.00 1988742587 PARKS MAINT UNIFORM SERVICE PARKS MAINT UNIFORM SERVICE 001.000.64.576.80.24.00 1988746566 PUBLIC WORKS OMC LOBBY MATE PUBLIC WORKS OMC LOBBY MATE 001.000.65.518.20.41.00 PUBLIC WORKS OMC LOBBY MATE 111.000.68.542.90.41.00 PUBLIC WORKS OMC LOBBY MAT: 421.000.74.534.80.41.00 PUBLIC WORKS OMC LOBBY MAT: 422.000.72.531.90.41.00 PUBLIC WORKS OMC LOBBY MATE 4.4.a Page: 2 c ca lid U a� Amoun }; 0 a am 1,130.61 a� L 8,373.6� =a 9,504.3E a� c m 240.0( 0 23.5, 263.5; a E U 5.1( o 0 115.9E o L a 0.5( Q 11.31 rn m 56.7: r N 0 0 1.6' Y U 6.1' E Page: 2 Packet Pg. 39 m vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221468 8/25/2016 069751 ARAMARK UNIFORM SERVICES 221469 8/25/2016 071124 ASSOCIATED PETROLEUM Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 423.000.75.535.80.41.00 PUBLIC WORKS OMC LOBBY MAT: 511.000.77.548.68.41.00 9.8% Sales Tax 001.000.65.518.20.41.00 9.8% Sales Tax 111.000.68.542.90.41.00 9.8% Sales Tax 421.000.74.534.80.41.00 9.8% Sales Tax 422.000.72.531.90.41.00 9.8% Sales Tax 423.000.75.535.80.41.00 9.8% Sales Tax 511.000.77.548.68.41.00 1988746567 FLEET DIVISION UNIFORMS & MAT FLEET DIVISION UNIFORMS 511.000.77.548.68.24.00 FLEET DIVISION MATS 511.000.77.548.68.41.00 9.8% Sales Tax 511.000.77.548.68.24.00 9.8% Sales Tax 511.000.77.548.68.41.00 Tota I : 0946227-IN FLEET - REGULAR 6600 GAL Fleet - Regular 6600 Gal 511.000.77.548.68.34.11 WA St Excise Tax Gas, WA Oil Spill 511.000.77.548.68.34.11 Diesel - 2850 Gal 511.000.77.548.68.34.10 WA St Excise Tax Gas, WA Oil Spill 4.4.a Page: 3 c ca lid U a� Amoun }; 0 a 6.1' -0a 6.0£ aUi L =a 0.1E aD c 0.6( 0.6( c�a 0 0.6( L>% c� a 0.6( 0.5� U w 0 6.4( o a 0. 17.3z Q 0.6< 1.7( m r 251.05 Ul) N 00 0 N Y 10,299.3( E 3,407.0( r 4,126.8( E t R .r r Q Page: 3 Packet Pg. 40 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221469 8/25/2016 071124 ASSOCIATED PETROLEUM 221470 221471 221472 8/25/2016 001795 AUTOGRAPHICS 8/25/2016 064706 AWC 8/25/2016 072276 BADGER METER INC Voucher List City of Edmonds Invoice (Continued) 0955521-IN PO # Description/Account 511.000.77.548.68.34.10 Bio-Diesel - 150 Gal 511.000.77.548.68.34.13 WA St Service Fees 511.000.77.548.68.34.13 9.8% Sales Tax 511.000.77.548.68.34.13 WA St Excise Tax Gas, WA Oil Spill 511.000.77.548.68.34.13 WWTP: DIESEL FUEL ULSD #2 DYED - BULK fuel (includ 423.000.76.535.80.32.00 9.8% Sales Tax 423.000.76.535.80.32.00 81084 UNIT E112PO - GRAPHICS Unit E112PO - Graphics 511.100.77.594.48.64.00 9.8% Sales Tax 511.100.77.594.48.64.00 45684 1113943 / 1113943A Tota 4.4.a Page: 4 c ca lid U a� Amoun }; 0 a 1,467.7( -a) 240.0( aa) L =a 50.1: a� c 4.9' 77.5, c�a 0 e 2,304.2( a Total WAPELRA CONFERENCE MAH 2016 WAPELRA FALL CONFERENC 001.000.22.518.10.49.00 WATER - HYDRANT METER Water - Hydrant Meter 421.000.74.534.80.35.00 Freight 421.000.74.534.80.35.00 9.8% Sales Tax 421.000.74.534.80.35.00 Tota E 225.8 'M 22,203.5E 6 0 ca 0 L 200.0( a 219.6( 0) m T 220.0( N 220.0( c N E 756.8( 'W 6 25.6, m E 76.6E R .r r Q Page: 4 Packet Pg. 41 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221472 8/25/2016 072276 072276 BADGER METER INC (Continued) 221473 8/25/2016 073041 BECK & ASSOCIATES PLLC 2016-EDM-07 221474 8/25/2016 071348 BERGERABAM 315864 221475 8/25/2016 069226 BHC CONSULTANTS LLC 8022 8024 221476 8/25/2016 028050 BILL PIERRE FORD INC 626150 221477 8/25/2016 074307 BLUE STAR GAS 0210583-IN 6452 M-off PO # Description/Account Tota PLAN REVIEW BLD2016-0506 PLAN REVIEW BLD2016-0506- po 001.000.62.524.20.41.00 Tota E4MB.SERVICES THRU 8/12/16 E4MB.Services thru 8/12/16 016.000.66.518.30.41.00 Tota E5GB.SERVICES THRU 7/22/16 E5GB.Services thru 7/22/16 423.200.75.594.35.41.00 E5JB.SERVICES THRU 7/22/16 E5JB.Services thru 7/22/16 421.200.74.594.34.41.00 Tota UNIT 23 - MOTOR Unit 23 - Motor 511.000.77.548.68.31.10 9.6% Sales Tax 511.000.77.548.68.31.10 Tota UNIT 452 - PARTS Unit 452 - Parts 511.000.77.548.68.31.10 9.5% Sales Tax 511.000.77.548.68.31.10 FLEET AUTO PROPANE 501.5 GA 4.4.a Page: 5 c ca lid U a� _ Amoun }; 1 : 859.1( 0 m st a� 10,981.3� 1 : 10,981.3$ 4- a� c m L r 488.9, L E t R .r r Q Page: 5 Packet Pg. 42 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221477 8/25/2016 074307 BLUE STAR GAS (Continued) 511.000.77.548.68.34.12 6529 FLEET AUTO PROPANE 657.1 GA 4.4.a Page: 6 L Y c ca lid U a� Amoun }; 0 a 666.6( -0a }, U a� L 603.8' 1 : 1,931.Oi w Y I a0i I � 1,970.71 r I : 1,970.71 0 1, >' 0 7 0' 1,966.9' , I: 1,966.9' 4- 0 1,920.0( o 1,920.0( Q O rn 64.0( m T 64.0( ,n N ao 89.0( G N 89.0( w 15.0( 6 c 14.9( E R' R .r r a Page: 6 Packet Pg. 43 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221481 8/25/2016 067391 BRAT WEAR 221482 8/25/2016 073029 CANON FINANCIAL SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) REMOVE/REPLACE 5 NAMETAGS 001.000.41.521.22.24.00 REMOVE/REPLACE JACKET NAM 001.000.41.521.22.24.00 EMBROIDER 7 NAME TAGS 001.000.41.521.22.24.00 9.8% Sales Tax 001.000.41.521.22.24.00 19547 INV#19547 - EDMONDS PD - HAIR S/S TRADITIONAL SHIRT 001.000.41.521.22.24.00 EMBROIDER NAMETAG 001.000.41.521.22.24.00 9.8% Sales Tax 001.000.41.521.22.24.00 Tota 16400429 INV#16400429 - EDMONDS COPY RENTAL#6255 FOR 8/2016 001.000.41.521.10.45.00 B/W METER USAGE 4/1-7/31/16 001.000.41.521.10.45.00 COPY RENTAL #3325 FOR 8/2016 001.000.41.521.10.45.00 B/W METER USAGE 4/1-7/31/16 001.000.41.521.10.45.00 COLOR METER USAGE 4/1-7/31/1 001.000.41.521.10.45.00 COPY RENTAL #5240 FOR 8/2016 001.000.41.521.10.45.00 B/W METER USAGE 4/1-7/31/16 001.000.41.521.10.45.00 COLOR METER USAGE 4/1-7/31/1 001.000.41.521.10.45.00 4.4.a Page: 7 c Un lid a� Amoun }; 0 0- a) 50.0( E m 32.0( =a 4- 56.0( c m 13.5. D\ ca 0 59.0( L>% M a 8.0( 6.5 - u 4- 1 : 561.01 0 0 0 L a Q. 151.8i Q 230.3, 60.7( w T LO 34.8, N 6 c 429.2: Y 160.0( . c� 97.5< r 6 180.5( E R .r r Q Page: 7 Packet Pg. 44 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221482 8/25/2016 073029 CANON FINANCIAL SERVICES (Continued) 9.8% Sales Tax 001.000.41.521.10.45.00 16400434 COPIER MAINT COPIER MAINT 001.000.23.523.30.48.00 16400435 C/A 572105 CONTRACT# 3091/0521 Finance dept copier contract charge 001.000.31.514.23.45.00 B&W Meter usage IRC5250 001.000.31.514.23.45.00 Color Meter usage IRC5250 001.000.31.514.23.45.00 9.8% Sales Tax 001.000.31.514.23.45.00 16400436 CITY CLERKS COPIER LEASE & US CITY CLERKS COPIER CONTRACT 001.000.25.514.30.45.00 COPIER BW METER USAGE 001.000.25.514.30.45.00 COPIER COLOR METER USAGE- 001.000.25.514.30.45.00 9.8% Sales Tax 001.000.25.514.30.45.00 16400437 PARKS & REC C5250 COPIER CON' PARKS & REC C5250 COPIER CON' 001.000.64.571.21.45.00 16400439 WWTP: 8/16 MO CHG+4/21-7/31 BUA Aug 2016 Monthly Charge - Contract 423.000.76.535.80.45.00 4/21 - 7/31/16 BW Meter Usage 423.000.76.535.80.45.00 4/21 - 7/31/16 Color Meter Usage 423.000.76.535.80.45.00 9.8% Sales Tax 4.4.a Page: 8 c ca lid U a� Amoun }; 0 a am 131.8' a� L 313.1E d c m 209.6' c� 114.7z o L 354.1: a E w 0 340.3� > 0 213.3E a Q 1,520.7E rn 203.3' m T 896.9� N 0 0 N 75.0� E 75.7E 139.1: a0i E t R .r r Q Page: 8 Packet Pg. 45 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221482 8/25/2016 073029 CANON FINANCIAL SERVICES (Continued) 423.000.76.535.80.45.00 16400443 P&R PRINTER IRC2501F CONTRAC' P&R PRINTER IRC2501F CONTRAC' 001.000.64.571.21.45.00 16400444 PARKS IRC2501F COPIER CONTRAi PARKS IRC2501F COPIER CONTRAi 001.000.64.576.80.45.00 16400446 RECEPTIONIST DESK CITY CLERK; RECEPTIONIST DESK COPIER LEA 001.000.25.514.30.45.00 9.8% Sales Tax 001.000.25.514.30.45.00 16403671 ENG. COPIER CHARGES AUGUST Eng. Copier Charges August 2016 001.000.67.518.21.45.00 Total: 221483 8/25/2016 075728 CARDINAL HEATING & A/C 221484 8/25/2016 065171 CARTEGRAPH SYSTEMS INC BLD20161074 REFUND- OVERPAY OF PERMIT BL Refund, overpay of permit bld2016-1( 001.000.257.620 Total SIN001931Taxonly CARTEFLEX ANNUAL SUBSCRIPTI( CarteflexAnnual Subscription Renew 111.000.68.542.90.41.00 CarteflexAnnual Subscription Renew 421.000.74.534.80.41.00 CarteflexAnnual Subscription Renew. 422.000.72.531.90.41.00 CarteflexAnnual Subscription Renew. 423.000.75.535.80.41.00 CarteflexAnnual Subscription Renew 423.000.76.535.80.41.00 Total 4.4.a Page: 9 c ca lid U a� Amoun }; 0 a 28.4' -0a U a� L 71.0. 4. W c 58.0E c c� 26.6z o 2.6, a E 1,171.1� 7,357.7E o 0 L a 20.0( Q 20.0( 421.8 1 N 421.8 1 ao 0 N 421.8 1 E 421.8 1 421.8E c 2,109.31 E t R .r r Q Page: 9 Packet Pg. 46 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221485 8/25/2016 068484 CEMEX LLC 221486 8/25/2016 003510 CENTRAL WELDING SUPPLY Voucher List City of Edmonds Invoice PO # Description/Account 9433844765 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 9433853325 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 9433853326 ROADWAY - LIQUID ASPHALT Roadway - Liquid Asphalt 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 9433861527 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 9433861528 ROADWAY - LIQUID ASPHALT Roadway - Liquid Asphalt 111.000.68.542.31.31.00 9.5% Sales Tax 111.000.68.542.31.31.00 Tota I : LY 236597 WATER SUPPLIES Water Supplies 421.000.74.534.80.31.00 9.8% Sales Tax 421.000.74.534.80.31.00 LY 236856 SPRAY PARK CYLINDER RENTAL SPRAY PARK CYLINDER RENTAL 001.000.64.576.80.31.00 9.8% Sales Tax 4.4.a Page: 10 c ca U a� Amoun }; 0 a am 212.8( a� L 20.2. a� c 247.1( 23.4 , c�a 0 L 55.0( a E 5.2: 'M U 4- 0 110.6( > 0 L 10.5' a Q 55.0( 5.2: r 745.1( L6 s 0 0 N Y 47.0< 0 E 4.6' r c m 69.0( E R .r r Q Page: 10 Packet Pg. 47 4.4.a vchlist Voucher List Page: 11 08/25/2016 11:30:11AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221486 8/25/2016 003510 CENTRAL WELDING SUPPLY (Continued) a 001.000.64.576.80.31.00 6.7 1 d Total: 127.4' m 221487 8/25/2016 003710 CHEVRON AND TEXACO BUSINESS 48229453 INV#48229453 ACCT#7898305185 E FUEL FOR NARCS VEHICLE-POFF 104.000.41.521.21.32.00 4" 101.6: c TAX EXEMPT FILING FEE 104.000.41.521.21.32.00 1.0, Total: 102.61, 221488 8/25/2016 063902 CITY OF EVERETT 116001998 WATER QUALITY - WATER LAB AN/ o L Water Quality - Water Lab Analysis ca 421.000.74.534.80.41.00 664.2( Total: 664.2( . 221489 8/25/2016 064369 CODE PUBLISHING CO 54110 EDMONDS CITY CODE ELECTRONI w EDMONDS CITY CODE ELECTRONI 001.000.25.514.30.41.00 533.5( > 9.8% Sales Tax 001.000.25.514.30.41.00 a 52.2E Q. Total: 585.7E Q 221490 8/25/2016 062975 COLLISION CLINIC INC 30954 UNIT 42 - REPAIRS Unit 42 - Repairs 511.000.77.548.68.48.00 1,843.0( r 9.8% Sales Tax ,n 511.000.77.548.68.48.00 180.6' 00 Total: 2,023.6' G N Y 221491 8/25/2016 069529 D & G BACKHOE INC ESJA.Pmt 2 ESJA.PMT 2 THRU 7/29/16 ESJA.Pmt 2 thru 7/29/16 E 421.200.74.594.34.65.00 279,684.5E ESJA.Ret 2 thru 7/29/16 421.200.223.400 -12,736.1( Total: 266,948.4E E R .r r a Page: 11 Packet Pg. 48 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 221492 8/25/2016 006200 DAILY JOURNAL OF COMMERCE 3316406 E6MA.INVITATION TO BID ADVER 221498 8/25/2016 061384 DRIFTWOOD PLAYERS TP DRIFTWOOD TP DRIFTWOOD TP DRIFTWOOD 123.000.64.573.20.41.00 4.4.a Page: 12 T E: m T 359.7( �n 1 : 359.7( 00 SC Y SC 500.0( . 1 : 500.0( r c m E 2,000.0( R .r r Q Page: 12 Packet Pg. 49 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221498 8/25/2016 061384 061384 DRIFTWOOD PLAYERS 221499 8/25/2016 007675 EDMONDS AUTO PARTS Voucher List City of Edmonds Invoice (Continued) 10064680 221500 8/25/2016 007775 EDMONDS CHAMBER OF COMMERCE 8/18 REFUND 221501 8/25/2016 074302 EDMONDS HARDWARE & PAINT LLC 001736 221502 8/25/2016 074302 EDMONDS HARDWARE & PAINT LLC 001733 221503 8/25/2016 069523 EDMONDS P&R YOUTH SCHOLARSHIP 5127 CYBORON 5128 RAFIPOUR 221504 8/25/2016 008705 EDMONDS WATER DIVISION 1-00575 PO # Description/Account 4.4.a Page: 13 lid ca U aD U _ Amoun }; N Total: 2,000.0( a m PM: HATCH STRUT, MOTOR OIL PM: HATCH STRUT, MOTOR OIL m 001.000.64.576.80.31.00 51.7' ia 9.8% Sales Tax = 4 001.000.64.576.80.31.00 5.0 , c Total : 56.7E 8/18/16 REFUND CANCELLED REN' c 8/18/16 REFUND CANCELLED REN' f° 001.000.239.200 300.0( o Total: 300.0( a PM: PAINT, KEY RINGS_ PM: PAINT, KEY RINGS 001.000.64.576.80.31.00 108.5E 4- 9.8% Sales Tax 001.000.64.576.80.31.00 cu 10.6z > Total: 119.15 0 a Q. STREET - SUPPLIES Q Street - Supplies 111.000.68.542.61.31.00 40.9E 9.8% Sales Tax 111.000.68.542.61.31.00 4.0' Total : 44.9( Ul) N 5127 ELIZABETH CYBORON YOUTF 00 0 5127 ELIZABETH CYBORON YOUTI- Y 122.000.64.571.20.49.00 75.0( 5128 SURI RAFIPOUR YOUTH SCH, E 5128 SURI RAFIPOUR YOUTH SCHi f° 122.000.64.571.20.49.00 75.0( Total: 150.0( OLYMPIC BEACH SPRINKLER / ME - Page: 13 Packet Pg. 50 E vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221504 8/25/2016 008705 EDMONDS WATER DIVISION (Continued) OLYMPIC BEACH SPRINKLER / ME- 001.000.64.576.80.47.00 1-00825 BRACKETT'S LANDING RESTROON BRACKETT'S LANDING RESTROON 001.000.64.576.80.47.00 1-00875 SPRINKLER 21 MAIN ST / METER 11 SPRINKLER 21 MAIN ST / METER 11 001.000.64.576.80.47.00 1-02125 SUNSET & CASPER SPRINKLER/ M SUNSET & CASPER SPRINKLER/ M 001.000.64.576.80.47.00 1-03710 SPRINKLER 290 MAIN ST / METER SPRINKLER 290 MAIN ST / METER 001.000.64.576.80.47.00 1-03900 SPRINKLER 290 DAYTON ST / METE SPRINKLER 290 DAYTON ST / MET[ 001.000.64.576.80.47.00 1-05125 SPRINKLER 101 2ND AVE N / METE SPRINKLER 101 2ND AVE N / METE 001.000.64.576.80.47.00 1-05285 SPRINKLER 102 W DAYTON ST / M[ SPRINKLER 102 W DAYTON ST / MI 001.000.64.576.80.47.00 1-05340 SPRINKLER 190 DAYTON ST / MET[ SPRINKLER 190 DAYTON ST / MET[ 001.000.64.576.80.47.00 1-05650 CITY PARK SPRINKLER/ METER 71, CITY PARK SPRINKLER/ METER 71, 001.000.64.576.80.47.00 1-05675 CITY PARK MAINTENANCE SHOP / CITY PARK MAINTENANCE SHOP / 001.000.64.576.80.47.00 1-05700 SPRINKLER @ 3RD/PINE / METER SPRINKLER @ 3RD/PINE / METER 001.000.64.576.80.47.00 4.4.a Page: 14 c ca lid U a� Amoun }; 0 a m 917.8E a� L 1,230.2: a� c m ca 0 101.5( 0 a 158.2( �a 0 L a 0. 80.2' Q m T 76.6( N 0 0 N Y 41.1 E 783.9( c m E 342.8z R .r r Q Page: 14 Packet Pg. 51 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221504 8/25/2016 008705 EDMONDS WATER DIVISION Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 1-09650 SPRINKLER 350 MAIN ST / METER i SPRINKLER 350 MAIN ST / METER i 001.000.64.576.80.47.00 1-09800 SPRINKLER 390 DAYTON ST / METE SPRINKLER 390 DAYTON ST / METE 001.000.64.576.80.47.00 1-10778 FOUNTAIN 490 MAIN ST/METER 75' FOUNTAIN 490 MAIN ST/METER 75' 001.000.64.576.80.47.00 1-10780 SPRINKLER 500 MAIN ST / METER SPRINKLER 500 MAIN ST / METER 001.000.64.576.80.47.00 1-16130 SPRINKLER 439 5TH AVE S / METEI SPRINKLER 439 5TH AVE S / METEI 001.000.64.576.80.47.00 1-16300 SPRINKLER 500 DAYTON ST / MET[ SPRINKLER 500 DAYTON ST / MET[ 001.000.64.576.80.47.00 1-16420 LOG CABIN SPRINKLER / METER 6' LOG CABIN SPRINKLER / METER 6' 001.000.64.576.80.47.00 1-16450 CENTENNIAL PLAZA SPRINKLER 1 CENTENNIAL PLAZA SPRINKLER 1 001.000.64.576.80.47.00 1-16630 SPRINKLER 575 MAIN ST / METER SPRINKLER 575 MAIN ST / METER 001.000.64.576.80.47.00 1-17475 SPRINKLER 590 DAYTON ST / MET[ SPRINKLER 590 DAYTON ST / MET[ 001.000.64.576.80.47.00 1-19950 PINE STREET PLAYFIELD / METER PINE STREET PLAYFIELD / METER 001.000.64.576.80.47.00 1-36255 SPRINKLER 1141 9TH AVE S / METE SPRINKLER 1141 9TH AVE S / METE 4.4.a Page: 15 c ca lid U a� Amoun }; 0 a a) 97.9E aa) L =a 4- 76.6E c m 371.2< 0 87.3( a E 133.4z 4- 0 ns 275.4' o L a Q. Q 51.8' rn 328.6E T L6 N 676.4( o N Y 76.6( ,E ca Page: 15 Packet Pg. 52 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221504 8/25/2016 008705 EDMONDS WATER DIVISION 221505 8/25/2016 075200 EDUARDO ZALDIBAR Voucher List City of Edmonds Invoice (Continued) 4-34080 14442 221506 8/25/2016 008812 ELECTRONIC BUSINESS MACHINES AR48119 221507 8/25/2016 065789 ESTES, KEN 221508 8/25/2016 009350 EVERETT DAILY HERALD 221509 8/25/2016 066378 FASTENAL COMPANY 051 EDH714712 EDH715244 EDH716019 WAMOU40687 4.4.a Page: 16 c ca lid U a� PO # Description/Account Amoun j U) 0 a 001.000.64.576.80.47.00 41.1 1 m LIFT STATION #14 7909 211TH PL S' LIFT STATION #14 7909 211TH PL S' L 423.000.75.535.80.47.10 41.1 1 'a Total: 6.193.0E INTERPRETER FEE INTERPRETER FEE 001.000.39.512.52.41.00 Tota PM PRINTER C1030 #A7078 PM PRINTER C1030 #A7078 001.000.64.576.80.45.00 Tota LEOFF1 REIMBURSEMENT LEOFF1 MEDICAL REIMBURSEME 009.000.39.517.20.23.00 Tota E6MA.INVITATION TO BID ADVERT E6MA.Invitation to Bid Advertiseme 132.000.64.594.76.41.00 CITY ORDINANCES 4039 CITY ORDINANCE NO. 4039 001.000.25.514.30.41.40 INV#EDH716019 ACCT#14126500 UNCLAIMED PROPERTY AD 8/12/ 001.000.41.521.10.41.00 Tota WATER - MARKING PAINT, SUPPL Water - Marking Paint, Supplies 421.000.74.534.80.31.00 9.8% Sales Tax 103.2z 103.21 — 0 L 0 a 6.41 E 6.4! 4- 0 n ru > 4,060.8E 4,060.8( Q nt 258.0( m T L6 24.0E N 0 - o 1E w 18.9' Cj I : 301.0( •� 0 c m 419.8z E t R .r r Q Page: 16 Packet Pg. 53 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221509 8/25/2016 066378 FASTENAL COMPANY (Continued) 421.000.74.534.80.31.00 WAMOU40850 FLEET SHOP SUPPLIES Fleet Shop Supplies 511.000.77.548.68.31.20 9.8% Sales Tax 511.000.77.548.68.31.20 WAMOU40954 PM: PLIERS, BATTERY CHARGER PM: PLIERS, BATTERY CHARGER 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 WAMOU40991 PM: IC WB CAUTN, 1/4-20X1 S/S PM: IC WB CAUTN, 1/4-20X1 S/S 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tota 221510 8/25/2016 071026 FASTSIGNS OF LYNNWOOD 443-21390 VINYL NUMBERS FOR BIRD FEST Vinyl letters for Bird Fest signage 120.000.31.575.42.41.00 9.8% Sales Tax 120.000.31.575.42.41.00 Tota 221511 8/25/2016 009880 FEDEX 5-511-58734 STORMWATER PLAN REVIEW - C Stormwater Plan Review - Courier 001.000.67.518.21.49.00 Tota 221512 8/25/2016 011900 FRONTIER 425-775-2455 CIVIC CENTER ALARM LINES 250 CIVIC CENTER FIRE AND INTRUS 001.000.66.518.30.42.00 425-776-3896 FRANCES ANDERSON CENTER A FRANCES ANDERSON CENTER F 4.4.a Page: 17 P PF c ca lid U a� Amoun }; 0 41.1< a -0a U 6.41 0.6: c m 112.8E 0 11.0( F a 43.9. 4.3( o 1 : 640.2( 0 a Q. Q 11.2( 1.1( I : 12.3( m r O Ul) N 0 0 29.9( w 1 : 29.9( E 5 IC 63.0( t IF R .r r Q Page: 17 Packet Pg. 54 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221512 8/25/2016 011900 FRONTIER 221513 8/25/2016 075731 FULLER, ELIZABETH 221514 8/25/2016 075538 GAMEZ, OMAR 221515 8/25/2016 075163 GARCIA-GARCIA, CESAR 221516 8/25/2016 074358 GEO-TEST SERVICES 221517 8/25/2016 075725 GIRLS ROCK MATH 221518 8/25/2016 012199 GRAINGER Voucher List City of Edmonds Invoice (Continued) 82416 8116 13570 34450 20914 GIRLS ROCK MAT 9188130216 221519 8/25/2016 060985 HARRINGTON INDUSTRIAL PLASTICS 007H4587 PO # Description/Account 001.000.66.518.30.42.00 Tota REIMBURSEMENT FOR BANK CH REIMBURSEMENT FOR BANK CH 001.000.23.512.50.49.00 Tota TRAVEL REIMBURSEMENT FOR TRAVEL REIMBURSEMENT FOR 001.000.23.523.30.43.00 Tota INTERPRETER FEE INTERPRETER FEE 001.000.23.523.30.41.01 Tota ESJA.SERVICES THRU JULY 2016 ESJA.Services thru July 2016 421.200.74.594.34.41.00 Tota 20914 GIRLS ROCK MATH CRAFT 20914 GIRLS ROCK MATH CRAFT 001.000.64.571.22.41.00 Tota UNIT 37 - FOLDING STEP Unit 37 - Folding Step 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 Tota WWTP: VALVE BALL TUBV ELEC 4.4.a Page: 18 c ca lid U W Amoun }; 0 0- 131.5( -0a I : 194.55 +. Al m Al 4 12.0( c 1 : 12.0( � PF c P FR f° 313.2( o 1 : 313.2( ca a E .2 105.3. ,- 105.3, c c� 0 L Q 0. 2,910.2, Q 1 : 2,910.21, '* rn Y Y m 3,186.0( 1 : 3,186.0( N 0 0 N Y 91.6. E 8.9£ r 1 : 100.6( E R1 R .r r Q Page: 18 Packet Pg. 55 PF c P FR f° 313.2( o 1 : 313.2( ca a E .2 105.3. ,- 105.3, c c� 0 L Q 0. 2,910.2, Q 1 : 2,910.21, '* rn Y Y m 3,186.0( 1 : 3,186.0( N 0 0 N Y 91.6. E 8.9£ r 1 : 100.6( E R1 R .r r Q Page: 18 Packet Pg. 55 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221519 8/25/2016 060985 HARRINGTON INDUSTRIAL PLASTICS (Continued) 221520 8/25/2016 074814 HARRIS & ASSOCIATES INC 221521 8/25/2016 012900 HARRIS FORD INC PO # Description/Account 4.4.a Page: 19 c ca lid U W _ Amoun }; 0 0- VALVE BALL TUBV ELEC REPLACEI 423.000.76.535.80.48.00 459.1E Freight i 423.000.76.535.80.48.00 11.4E =a 9.8% Sales Tax 423.000.76.535.80.48.00 46.1 Tota 32119 E3FH.SERVICES THRU 6/30/16 E3FH.Services thru 6/30/16 422.200.72.594.31.41.00 32219 E3DB.SERVICES THRU 7/31/16 E3DB.Services thru 7/31/16 112.000.68.595.33.41.00 32234 E3FH.SERVICES THRU 6/30/16 E3FH.Services thru 6/30/16 422.200.72.594.31.41.00 Tota 162933 UNIT 959 - LOCKSET Unit 959 - Lockset 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 163487 UNIT 452 - PARTS Unit 452 - Parts 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 163862 UNIT E113PO - BULB Unit E113PO - Bulb 511.100.77.594.48.64.00 Freight 511.100.77.594.48.64.00 9.8% Sales Tax 516.7; c c� 0 566.0, c� a 905.6E 4- 0 5,900.4E I: 7,372.2( 0 L Q Q Q 31.7E 3.1' T L(i N 63.8, c N 6.2E E 122.0( r c m 11.9E E t R .r r Q Page: 19 Packet Pg. 56 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # 221521 8/25/2016 012900 HARRIS FORD INC (Continued) 164081 164298 164630 FOCS417965 221522 8/25/2016 072647 HERRERA ENVIRONMENTAL 38960 221523 8/25/2016 067862 HOME DEPOT CREDIT SERVICES 2064964 Description/Account 511.100.77.594.48.64.00 UNIT 451 - HOUSING Unit 451 - Housing 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 10 - LENS Unit 10 - Lens 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 49 - KIT Unit 49 - Kit 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 FLEET OIL PLUG DRAIN Fleet Oil Plug Drain 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 947 -ALIGNMENT Unit 947 - Alignment 511.000.77.548.68.48.00 9.8% Sales Tax 511.000.77.548.68.48.00 4.4.a Page: 20 c ca lid U a� Amoun }; 0 a 11.9( -a) U a) L 51.4E !a 4 5.0E m 18.7E 0 1.8z j, ca a E 72.0. 7.0E o ca 0 L 48.3E a Q 4.7z 119.9E to T 11.7E N 00 Total: 591.9' o N STORMWATER PLAN REVIEW SUP cYi Stormwater Plan Review Support thrL E 001.000.67.518.21.41.00 2,203.4, Total : 2,203.4, c PM: FILTER NUT/DRAIN CAP, PAPE E PM: FILTER NUT/DRAIN CAP, PAPE R .r r Q Page: 20 Packet Pg. 57 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221523 8/25/2016 067862 HOME DEPOT CREDIT SERVICES (Continued) 001.000.64.576.80.31.00 2232403 PARKS CM FULL GRAIN DEERSK O PARKS CM FULL GRAIN DEERSK O 001.000.64.576.80.31.00 2562301 PM: FLOWER PROG SUPPLIES HO PM: FLOWER PROG SUPPLIES-HO 001.000.64.576.81.31.00 2574612 PM: TRANSPLANTER, PAINTERS T( PM: TRANSPLANTER, PAINTERS T( 001.000.64.576.80.31.00 2574613 PM: EHC, PLC, MULTITOOL PM: EHC, PLC, MULTITOOL 001.000.64.576.80.31.00 3084846 PM: FLOWER PROGRAM SUPPLIEF PM: FLOWER PROGRAM SUPPLIE: 001.000.64.576.80.31.00 3086667 PM: BUCKET, NUTS, BOLTS, GALV PM: BUCKET, NUTS, BOLTS, GALV 001.000.64.576.80.31.00 6011426 PM: CONCRETE FOR HICKMAN SIC - PM: CONCRETE FOR HICKMAN SIC- 001.000.64.576.80.31.00 6064652 PM: BUCKET, PAINT PM: BUCKET, PAINT 001.000.64.576.80.31.00 6082253 PM: ROLLER FRAME, TUBE, HOOK, PM: ROLLER FRAME, TUBE, HOOK, 001.000.64.576.80.31.00 7011253 PM: HOSE CONNECTION VACUUM PM: HOSE CONNECTION VACUUM 001.000.64.576.80.31.00 8060650 PM: DECK SCRUBBER, BRUSH, SLR PM: DECK SCRUBBER, BRUSH, SLd 001.000.64.576.80.31.00 4.4.a Page: 21 c ca lid U a� Amoun }; 0 a 24.0, -0a U -17.4� d c 13.1( c c� 47.8< o 0 a 64.4: U 41.1< o 0 L 178.7z a 5.6z CD m 40.1z N 00 0 70.5, Y U E 25.3' r c m 46.9< E t R .r r Q Page: 21 Packet Pg. 58 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 221523 8/25/2016 067862 067862 HOME DEPOT CREDIT SERVICES (Continued) 221524 8/25/2016 060165 HWA GEOSCIENCES INC 26865 221525 8/25/2016 073548 INDOFF INCORPORATED 2837101 2837382 2839594 2839840 2841366 Description/Account 4.4.a Page: 22 c ca lid U a� Amoun }; 540.3( 0 CL a� 25,380.0( 25,380.0( a� c m � 39.7: c c� 3.8� o a 208.5 1 , w 0 1,711.7E - 0 a 131.7: Q .. PP � rn 46.4( 4.5, 2,146.6° N ao 221526 8/25/2016 071634 INTEGRATELECOM 14072629 C/A768328 PR1-1 & 2 City Phone Service 001.000.31.518.88.42.00 913.6E E Tourism Toll free lines 877.775.6929; w Tota E4MB.SERVICES THRU 7/30/16 E4MB.Services thru 7/30/16 016.000.66.518.30.41.00 Tota WIRELESS MOUSE, SUPER GLUE Wireless mouse, super glue 001.000.31.514.23.31.00 9.8% Sales Tax 001.000.31.514.23.31.00 SUPPLIES SUPPLIES 001.000.23.523.30.31.00 DESK-KRISTIN Desk- Kristin 001.000.62.524.20.49.00 OFFICE SUPPIES- PAPER office supplies- paper 001.000.62.524.10.31.00 CITY CLERKS LEGAL SIZE PAPER LEGAL SIZE PAPER AND 11 X 17 001.000.25.514.30.31.00 9.8% Sales Tax 001.000.25.514.30.31.00 Tota 001.000.61.558.70.42.00 8.5( Econ Devlpmnt Toll free lines 001.000.61.558.70.42.00 8.5( t R .r r Q Page: 22 Packet Pg. 59 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221526 8/25/2016 071634 071634 INTEGRATELECOM 221527 8/25/2016 069366 ISSAQUAH HONDA KUBOTA 221528 8/25/2016 074888 JOYOUS NOISE LLC 221529 8/25/2016 066489 KENT D BRUCE CO LLC 221530 8/25/2016 069343 KRAZAN & ASSOCIATES INC 221531 8/25/2016 017050 KW ICK'N KLEEN CAR WASH 221532 8/25/2016 017135 LANDAU ASSOCIATES INC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Tota 644911 CEMETERY MOWER PARTS CEMETERY MOWER PARTS 130.000.64.536.50.31.00 9.5% Sales Tax 130.000.64.536.50.31.00 Tota 21187 KINDERMUSIK 21187 KINDERMUSIK INSTRUCTI 4.4.a Page: 23 c ca lid U a� Amoun }; 930.6£ 0 m m 351.9£ 33.4z c 385.4, or or � 466.4( o I : 466.4( a L1 E ou 2 23.0( ,- 0 10.3( > 0 L Q 3.1( o. 1 : 36.4E Q H 1E 1,137.1( r 6 L6 1,137.1( 00 1 2,274.2( G N Y J1 7 E 141.1: 2u 141.1; �.; r Q Page: 23 Packet Pg. 60 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221532 8/25/2016 017135 LANDAU ASSOCIATES INC 221533 8/25/2016 075260 LAU, PING 221534 8/25/2016 073603 LIGHTHOUSE LAW GROUP PLLC 221535 8/25/2016 018980 LYNNWOOD HONDA 221536 8/25/2016 075716 MALLORY PAINT STORE INC 221537 8/25/2016 061900 MARC Voucher List City of Edmonds Invoice (Continued) 13933 Aug-16 958584 965200 E0066346 0586889-IN PO # Description/Account 422.200.72.594.31.41.00 Tot INTERPRETER FEE INTERPRETER FEE 001.000.23.523.30.41.01 Tot 08-16 LEGALS FEES 08-16 Legal fees 001.000.36.515.31.41.00 Tot STORM - GENERATOR Storm - Generator 422.000.72.531.40.35.00 9.8% Sales Tax 422.000.72.531.40.35.00 PM: PARTS EQUIPMENT REPAIR PM: PARTS EQUIPMENT REPAIR 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tot FS 20 - PAINT SUPPLIES FS 20 - Paint Supplies 001.000.66.518.30.31.00 9.5% Sales Tax 001.000.66.518.30.31.00 Total: WWTP: SUPER-ZYME 05 COMPOUI SUPER-ZYME 05 COMPOUND CLE) 423.000.76.535.80.31.59 4.4.a Page: 24 c ca lid U a� Amoun }; 0 1,243.0( a a) 1,243.0( a� L 109.3z 4. c 109.3i a) c ca 42,640.0( o 42,640.0( ca a E .2 979.9� ,- 0 96.0zcu > 0 a Q. 23.3( Q 2.2( 1,101.61 " m T L6 N ao 16.9� G N 1.6' 18.6( r c m 1,017.0( E R .r r Q Page: 24 Packet Pg. 61 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221537 8/25/2016 061900 MARC 221538 8/25/2016 020039 MCMASTER-CARR SUPPLY CO 221539 8/25/2016 063773 MICROFLEX Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 9.8% Sales Tax 423.000.76.535.80.31.59 Tota 74390884 WWTP: NESTABLE POLYETHYLE NESTABLE POLYETHYLENE PAN 221540 8/25/2016 020900 MILLERS EQUIP & RENTALL INC 241694 221541 8/25/2016 068662 MINNIHAN, TERRY 242513 053 STREET - SUPPLIES Street - Supplies 111.000.68.542.71.31.00 9.8% Sales Tax 111.000.68.542.71.31.00 STREET - PARTS FOR PLATE CO Street - Parts for Plate Compactor 111.000.68.542.71.31.00 9.8% Sales Tax 111.000.68.542.71.31.00 Tota LEOFF1 REIMBURSEMENT LEOFF1 MEDICAL REIMBURSEM 4.4.a Page: 25 S c ca U a� Amoun }; 0 0- am 99.6 1 1 : 1,116.6, i =a 41 = 4- c 52.4, 18.81 0 100.41 a 6.5� •� 1 : 178.3: 6 4- 0 c� 0 10.0( a 1 : 10.0( Q 12.7: " m T 1.2E N M f ao 0 N 17.6: E 1.7: 'w 1 : 33.3E r c m E� E t R .r r Q Page: 25 Packet Pg. 62 18.81 0 100.41 a 6.5� •� 1 : 178.3: 6 4- 0 c� 0 10.0( a 1 : 10.0( Q 12.7: " m T 1.2E N M f ao 0 N 17.6: E 1.7: 'w 1 : 33.3E r c m E� E t R .r r Q Page: 25 Packet Pg. 62 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221541 8/25/2016 068662 MINNIHAN, TERRY 221542 8/25/2016 072151 MLA ENGINEERING PLLC 221543 8/25/2016 072746 MURRAY SMITH & ASSOCIATES 221544 8/25/2016 075539 NATURE INSIGHT CONSULTING 221545 8/25/2016 024302 NELSON PETROLEUM Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 009.000.39.517.20.23.00 Tota 2941 GRAND STANDS - PROJECT - UN Grand Stands - Project - Unexpecte 016.000.66.518.30.41.00 Tota 15-1662-16 E4JC.SERVICES THRU 7/31/16 E4JC.Services thru 7/31/16 421.200.74.594.34.41.00 15-1715-12 ESKA.SERVICES THRU 7/31/16 ESKA.Services thru 7/31/16 421.200.74.594.34.41.00 16-1852-1 E6JB.SERVICES THRU 7/31/16 E6JB.Services thru 7/31/16 421.200.74.594.34.41.00 4.4.a Page: 26 c ca lid U a� Amoun }; 0 161.9, 0- a) 1 : 161.9; a� L.. E• =a d 2,453.7,1 4" c I : 2,453.7! c ca 4,238.5( o 0 a 2,705.0( n: U 4- 0 14,455.5( Total: 21,399.0( c 0 14 WILLOW CREEK DAYLIGHTING PR, 0' Q. WILLOW CREEK DAYLIGHTING PAF Q 125.000.64.575.50.41.00 937.5( CD WILLOW CREEK DAYLIGHTING EN, 422.200.72.594.31.41.00 1,312.5( " Total : 2.250.0( 0591623-IN FLEET SHOP - COOLANT Fleet Shop - Coolant 511.000.77.548.68.31.20 9.8% Sales Tax 511.000.77.548.68.31.20 0592406-IN FLEET - FILTER INVENTORY Fleet - Filter Inventory 511.000.77.548.68.34.40 9.8% Sales Tax N ao 0 530.7E Y U 52.0' 57.2' a0i E t R .r r a Page: 26 Packet Pg. 63 4.4.a vchlist Voucher List Page: 27 08/25/2016 11:30:11AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221545 8/25/2016 024302 NELSON PETROLEUM (Continued) a 511.000.77.548.68.34.40 5.6' m Total: 645.51 m 221546 8/25/2016 025217 NORTH SOUND HOSE & FITTINGS 75181 UNIT 89 - GAS METER, TANK NOZZ Unit 89 - Gas Meter, Tank Nozzle, = 511.000.77.548.68.31.10 4" 434.3( c 9.2% Sales Tax m 511.000.77.548.68.31.10 39.9( -0 Total: 474.3, 221547 8/25/2016 061013 NORTHWEST CASCADE INC 0550099914 MADRONA ELEMENTARY HONEY B o L MADRONA ELEMENTARY HONEY B 001.000.64.576.80.45.00 111.6E o- 0550099915 MARINA BEACH HONEY BUCKET E MARINA BEACH HONEY BUCKET f° U 001.000.64.576.80.45.00 2,938.8E o 0550099916 FISH HATCHERY HONEY BUCKET FISH HATCHERY HONEY BUCKET - c 001.000.64.576.80.45.00 113.8E a 0550099917 CIVIC FIELD 6TH & BELL HONEY Bl Q- Q CIVIC FIELD 6TH & BELL HONEY Bl 001.000.64.576.80.45.00 113.8E 0550099918 CIVIC FIELD 6TH & EDMONDS HON CIVIC FIELD 6TH & EDMONDS HON 001.000.64.576.80.45.00 178.8E r 0550099919 HAINES WHARF PARK HONEY BUC N HAINES WHARF PARK HONEY BUC ao 001.000.64.576.80.45.00 218.7E w 0550099920 SIERRA PARK HONEY BUCKET Y SIERRA PARK HONEY BUCKET E 001.000.64.576.80.45.00 113.8E 'ca 0550099921 CIVIC FIELD 6TH & EDMONDS HON CIVIC FIELD 6TH & EDMONDS HON 001.000.64.576.80.45.00 113.8E E 0550099922 BALLINGER PARK HONEY BUCKET R .r r Q Page: 27 Packet Pg. 64 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221547 8/25/2016 061013 NORTHWEST CASCADE INC (Continued) 221548 8/25/2016 025690 NOYES, KARIN 221549 8/25/2016 063511 OFFICE MAX INC 221550 8/25/2016 063750 ORCA PACIFIC INC PO # Description/Account BALLINGER PARK HONEY BUCK 001.000.64.576.80.45.00 0550099923 HICKMAN PARK HONEY BUCKET HICKMAN PARK HONEY BUCKET 001.000.64.576.80.45.00 0550099924 YOST PARK HONEY BUCKET YOST PARK HONEY BUCKET 001.000.64.576.80.45.00 0550099925 PINE STREET PARK HONEY BUC PINE STREET PARK HONEY BUC 001.000.64.576.80.45.00 0550099926 EDMONDS ELEMENTARY HONEY EDMONDS ELEMENTARY HONEY 001.000.64.576.80.45.00 0550102076 YOST PARK OFF MAIN HONEY B YOST PARK OFF MAIN HONEY B 4.4.a Page: 28 c ca lid U a� _ Amoun }; 0 a ET 111.6E a� L 587.6, d c m 309.2' KE ca U KE o 113.8E B f° a B 111.6E UC C o 60.0( 1 : 5,197.5' i a PI Q' Q g .. 280.0( 1 : 280.0( m T L(i N 66.1( ao 0 N 6.4� I : 72.6E E c 575.0( t R .r r Q Page: 28 Packet Pg. 65 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 221550 8/25/2016 063750 ORCA PACIFIC INC (Continued) 001.000.64.576.80.31.00 Tota 221551 8/25/2016 072539 OTAK INC-WASHINGTON 81600167 E6DA.SERVICES THRU 8/5/16 E6DA.Services thru 8/5/16 112.000.68.595.33.41.00 Tota 221552 8/25/2016 075694 PACIFIC SOUND DESIGN 2 PMT 2 CONCERT STATE PMT 2 CONCERT STATE 117.100.64.573.20.41.00 Tota 221553 8/25/2016 070962 PAULSONS TOWING INC 111262 INV#111262 - EDMONDS PD TOW 1995 FORD #151XKD 001.000.41.521.22.41.00 9.8% Sales Tax 001.000.41.521.22.41.00 111288 INV#111288 - EDMONDS PD TOW 2002 VW JETTA#AWP0121 001.000.41.521.22.41.00 9.8% Sales Tax 001.000.41.521.22.41.00 Tota 221554 8/25/2016 027450 PAWS JULY 2016 JULY 2016 ANIMAL SHELTERING - SHELTERING 12 ANIMALS @ $17 4.4.a Page: 29 5 r Q Page: 29 Packet Pg. 66 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221555 8/25/2016 069690 PERFORMANCE RADIATOR 221556 8/25/2016 075183 PETERSON FRUIT CO 221557 8/25/2016 028860 PLATT ELECTRIC SUPPLY INC 221558 8/25/2016 075730 POFF, MICHELLE 221559 8/25/2016 064088 PROTECTION ONE 221560 8/25/2016 030695 PUMPTECH INC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Unit 40 - Battery 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 Tota 357219 WELNESS COMMITTEE FRUIT PLUOTS 25# BOX 001.000.22.518.10.49.00 PEACHES 25# BOX 001.000.22.518.10.49.00 Tota K021767 CITY HALL - SUPPLIES City Hall - Supplies 001.000.66.518.30.31.00 9.8% Sales Tax 001.000.66.518.30.31.00 Tota AZ12647 L&I SICK LEAVE BUY BACK REIM 157.68 REFUNDED FOR HOLIDAY 001.000.41.521.21.11.00 Tota 291104 ALARM MONITORING - PARKS M ALARM MONITORING FOR PARK 4.4.a Page: 30 c ca lid U a� Amoun }; 0 a am 160.0( a� L 15.6E =a 175.61 W c m 28.8( 0 15.0( "% 43.8( a E U 16.9< —00 1.6( o I : 18.5t a 0. Bl Q S S F7 rn 182.5< I : 182.5: m T Alf I 00 21.3z o I � 21.3z E 1 : 42.61 � 1,894.1, E R .r r Q Page: 30 Packet Pg. 67 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221560 8/25/2016 030695 PUMPTECH INC 221561 8/25/2016 070955 R&R STAR TOWING 221562 8/25/2016 071702 RAILROAD MGMT CO III LLC 221563 8/25/2016 074156 RAZZ CONSTRUCTION INC 221564 8/25/2016 031500 REID MIDDLETON & ASSOC INC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 9.8% Sales Tax 423.000.76.535.80.48.00 Tota 114768 INV#114768 - EDMONDS PD TOW 1994 CAD DEVILLE #AWP39 001.000.41.521.22.41.00 9.8% Sales Tax 001.000.41.521.22.41.00 Tota 331857 LIC # 305234 MEADOWDALE STO Lic # 305234 Meadowdale Storm Dr 4.4.a Page: 31 a c ca lid U a� Amoun }; 0 a am 185.6< I: 2,079.8( i =a 4- 3 c 166.0( 16.21 cm 1 : 182.2 , o 0 R CU a 176.8E . D F f° U w 0 @ 176.8E R > 0 a 176.8E Q R 176.8E 1 : 707.41 r LO N ao 400,937.0E w Total: 400,937.0E 1607071 E3FE/E6FA.SERVICES THRU 7/22/1 E .2 E3FE.Services thru 7/22/16 422.200.72.594.31.41.00 2,784.0( E6FA,Services thru 7/22/16 422.200.72.594.31.41.00 8,353.2( R .r r a Page: 31 Packet Pg. 68 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221564 8/25/2016 031500 031500 REID MIDDLETON & ASSOC INC (Continued) 221565 8/25/2016 067447 RILEY, CHARLES H. 052 221566 8/25/2016 064769 ROMAINE ELECTRIC 5-010294 221567 8/25/2016 074256 RYDIN DECAL 322765 221568 8/25/2016 033550 SALMON BAY SAND & GRAVEL 2393408 221569 8/25/2016 067802 SAN DIEGO POLICE EQUIP CO 623943 221570 8/25/2016 073752 SCIACCA, MATTHEW 8/23 HMP CONCERT PO # Description/Account Tota LEOFF1 REIMBURSEMENT CLAIM MEDICAL REIMBURSEMENTS 009.000.39.517.20.23.00 Tota UNIT 998 - BATTERY Unit 998 - Battery 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 Tota EMPLOYEE & RESIDENTIAL PARK EMPLOYEE & RESIDENTIAL PARK 001.000.25.514.30.31.00 Freight 001.000.25.514.30.31.00 Tota STORM-SPEEDCRETE Storm -Speedcrete 422.000.72.531.40.31.00 9.8% Sales Tax 422.000.72.531.40.31.00 Tota INV#623943 CUST#1733 - EDMON LAWMAN CLEANFIRE .40 S&W 001.000.41.521.23.31.00 9.8% Sales Tax 001.000.41.521.23.31.00 Tota 8/23/16 HMP CONCERT RANGER 8/23/16 HMP CONCERT RANGER 4.4.a Page: 32 c ca lid U a� Amoun }; 11,137.2( 0 CL a) U a) 622.0E 622.0E 4- a� c m 89.1� c c� 8.71 o 97.8£ ca a E .2 1,537.5( ,- 0 34.4£ > 1,571.9£ a Q. Q 1,242.0( 121.7. m T 1 : 1,363.7; N D 00 0 N Y 4,984.6( E 488.4� 1 : 5,473.0$ c m AI E AI � R .r r Q Page: 32 Packet Pg. 69 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221570 8/25/2016 073752 SCIACCA, MATTHEW (Continued) 221571 8/25/2016 066964 SEATTLE AUTOMOTIVE DIST INC S3-1035556 S3-1053481 S3-1064000 S3-1072486 Yc�iIiI:Z:1:Li�] S3-1090553 PO # Description/Account 117.100.64.573.20.41.00 Tota UNIT 455 - SPARK PLUGS & COIL Unit 455 - Spark Plugs & Coil 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 452 - COOLING MOTOR W/F Unit 452 - Cooling Motor w/Fan 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 36 - BATTERY Unit 36 - Battery 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 FLEET RETURNS Fleet Returns 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 62 - BATTERY Unit 62 - Battery 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 UNIT 125 - ANTIFREEZE Unit 125 - Antifreeze 511.000.77.548.68.31.10 9.8% Sales Tax 511.000.77.548.68.31.10 Tota 4.4.a Page: 33 AI 221.5z L- c� a 21.7' E .2 U 85.8( 0 8.4' o L a Q. Q -34.0, rn -3.3: E 32.41 f° r 3.1f y I : 484.95 E t R .r r Q Page: 33 Packet Pg. 70 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221572 8/25/2016 068489 SIRENNET.COM 0203786-IN UNIT E122EN - LIGHTS Unit E122EN - Lights 511.100.77.594.48.64.00 Tota 221573 8/25/2016 060889 SNAP -ON INDUSTRIAL ARV/29747643 FLEET SHOP TOOLS Fleet Shop Tools 511.000.77.548.68.35.00 9.8% Sales Tax 511.000.77.548.68.35.00 Tota 221574 8/25/2016 037303 SNO CO FIRE DIST# 1 20977 FIRSTAID/CPR 20977 FIRSTAID/CPR INSTRUCTI 20977 FIRSTAID/CPR INSTRUCTI 001.000.64.571.22.41.00 Tota 221575 8/25/2016 066754 SNO CO PUBLIC WORKS 1000416130 E6CA.SERVICES THRU JUNE 201 E6CA.Services thru June 2016 112.000.68.595.33.41.00 Tota 221576 8/25/2016 037375 SNO CO PUD NO 1 2002-0254-7 PEDEST CAUTION LIGHT 21930 9 PEDEST CAUTION LIGHT 21930 9 111.000.68.542.64.47.00 2002-6027-1 YOST POOL YOST POOL 001.000.64.576.80.47.00 2003-8645-6 CLUBHOUSE 6801 MEADOWDAL LIFT STATION #4 8311 TALBOT R 4.4.a Page: 34 E E T T c ca lid U a� Amoun }; 0 0- am 349.7: I : 349.7E =a 4. aD c 107.7 1 10.5( CM I : 118.X o 0 O (a O 0- 150.0( ._ 1 : 150.0( TU w 6 0 5,858.7' a 1 : 5,858.7' Q 5- 5- 19.1( m r U 1,493.0� 00 Y 27.7 1 : •� D 659.2( / m D/ E t R .r r a Page: 34 Packet Pg. 71 4.4.a vchlist Voucher List Page: 35 08/25/2016 11:30:11AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221576 8/25/2016 037375 SNO CO PUD NO 1 (Continued) a 423.000.75.535.80.47.10 190.01 d 2006-1131-7 LIFT STATION #9 19300 80TH AVE V LIFT STATION #9 19300 80TH AVE V L 423.000.75.535.80.47.10 121.4E 2006-3860-9 OLD PUBLIC WORKS 200 DAYTON ;_' OLD PUBLIC WORKS 200 DAYTON w c 421.000.74.534.80.47.00 129.4< 2007-1403-8 SEAVIEW PARK SEAVIEW PARK 001.000.64.576.80.47.00 34.7( o 2007-3984-5 SEAVIEW RESERVOIR 18520 90TH SEAVIEW RESERVOIR 18520 90TH a 421.000.74.534.80.47.00 13.4E E 2011-9708-4 SEAVIEW PARK SEAVIEW PARK 001.000.64.576.80.47.00 61.6E o 2012-3682-5 FISHING PIER FISHING PIER p L 001.000.64.576.80.47.00 223.5� 0- 2012-6598-0 LIFT STATION #12 16121 75TH PL � a Q LIFT STATION #12 16121 75TH PL � 423.000.75.535.80.47.10 120.6E 0) 2013-7496-4 LIFT STATION #11 6811 1/2 157TH P v LIFT STATION #11 6811 1/2 157TH P m 423.000.75.535.80.47.10 15.4E 2014-3124-4 PEDEST CAUTION LIGHT 9301 PUC N PEDEST CAUTION LIGHT 9301 PUC 00 0 111.000.68.542.64.47.00 16.8E Y 2014-4175-5 TRAFFIC LIGHT 21531 HWY 99 / ME TRAFFIC LIGHT 21531 HWY 99 / ME E 111.000.68.542.63.47.00 264.0, 2015-5174-4 SNO-ISLE LIBRARY 650 MAIN ST / � r SNO-ISLE LIBRARY 650 MAIN ST / � m 001.000.66.518.30.47.00 1,735.2z E 2015-7289-8 TRAFFIC LIGHT 117 3RD AVE S / ME R .r r Q Page: 35 Packet Pg. 72 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221576 8/25/2016 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account (Continued) TRAFFIC LIGHT 117 3RD AVE S / ME 111.000.68.542.64.47.00 2015-9448-8 LIFT STATION #15 7710 168TH PL S LIFT STATION #15 7710 168TH PL S 423.000.75.535.80.47.10 2017-5147-6 TRAFFIC LIGHT 9932 220TH ST SW TRAFFIC LIGHT 9932 220TH ST SW 111.000.68.542.64.47.00 2017-8264-6 TRAFFIC LIGHT 901 WALNUT ST / � TRAFFIC LIGHT 901 WALNUT ST / � 111.000.68.542.64.47.00 2019-4248-9 PUBLIC WORKS OMC 7110 210TH ; PUBLIC WORKS OMC 7110 210TH 001.000.65.518.20.47.00 PUBLIC WORKS OMC 7110 210TH ; 111.000.68.542.90.47.00 PUBLIC WORKS OMC 7110 210TH 421.000.74.534.80.47.00 PUBLIC WORKS OMC 7110 210TH 423.000.75.535.80.47.10 PUBLIC WORKS OMC 7110 210TH ; 511.000.77.548.68.47.00 PUBLIC WORKS OMC 7110 210TH ; 422.000.72.531.90.47.00 2022-9166-2 CIVIC CENTER & FIRE STATION #1 , CIVIC CENTER & FIRE STATION #1 , 001.000.66.518.30.47.00 2023-8937-5 STREET LIGHT 7601 RIDGE WAY / I STREET LIGHT 7601 RIDGE WAY / I 111.000.68.542.63.47.00 2024-3924-6 CITY HALL 121 5TH AVE N / METER CITY HALL 121 5TH AVE N / METER 001.000.66.518.30.47.00 2025-4064-7 SIERRA PARK IRRIGATION 8100 191 4.4.a Page: 36 c ca lid U a� Amoun }; 0 a am 34.4' a� L 14.3( V aD c m 36.9( c� 0 15.1 0 j, 0 a E 85.1( 323.3 0 323.3 1 o a 0. 323.3 1 Q 323.3 1 Tq 323.3 1 m T L6 N 5,274.5'00 o N 8.0, .E ca U 2,388.9z a0i E t R .r r a Page: 36 Packet Pg. 73 4.4.a vchlist Voucher List Page: 37 08/25/2016 11:30:11AM City of Edmonds ca lid Bank code : usbank U W Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221576 8/25/2016 037375 SNO CO PUD NO 1 (Continued) a SIERRA PARK IRRIGATION 8100 191 a) 001.000.64.576.80.47.00 18.5z 2028-0763-2 TRAFFIC LIGHT 8429 196TH ST SW L TRAFFIC LIGHT 8429 196TH ST SW 001.000.66.518.30.47.00 18.7, 2030-9778-7 WWTP: 7/16-8/15/16 200 2ND AVE,' WWTP: 7/16-8/15/16 200 2ND AVE! 423.000.76.535.80.47.61 26,786.3E 2036-5215-1 FIVE CORNERS RESERVOIR 85191 FIVE CORNERS RESERVOIR 85191 0 421.000.74.534.80.47.00 126.5� j, 2202-1638-6 PEDEST CAUTION LIGHTS 8410 MF f° a PEDEST CAUTION LIGHTS 8410 MF 111.000.68.542.64.47.00 56.5E 2205-4757-4 TRAFFIC LIGHT SR104 @ 236TH S1 TRAFFIC LIGHT SR104 @ 236TH S1 o 111.000.68.542.63.47.00 52.0< Total: 41,658.9E i a 221577 8/25/2016 063941 SNO CO SHERIFFS OFFICE 2016-3304 INV 2016-3304 INMATE MEDICAL JL Q' Q INMATE HOSPITAL SERVICES - 05/' 001.000.39.523.60.41.00 680.2E INMATE HOSPITAL SERVICES - 04/' 001.000.39.523.60.41.00 302.0( m INMATE MEDICATION - 06/16 r 001.000.39.523.60.31.00 365.4( N 2016-3304 CM 2016-3304 CREDIT INMATE ME[ 00 0 CREDIT FOR INMATE MEDS - 05/16 w 001.000.39.523.60.31.00 -8.6: Total: 1,339.w E 221578 8/25/2016 039775 STATE AUDITOR'S OFFICE L116003 07-16 AUDIT FEES 07-16 Audit Fees c 001.000.39.514.20.51.00 10,119.5( E 07-16 Audit Fees R .r r Q Page: 37 Packet Pg. 74 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221578 8/25/2016 039775 STATE AUDITOR'S OFFICE 221579 8/25/2016 072319 SUNSET BAY RESORT Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 111.000.68.543.30.51.00 07-16 Audit Fees 421.000.74.534.80.51.00 07-16 Audit Fees 422.000.72.531.90.51.00 07-16 Audit Fees 423.000.75.535.80.51.00 07-16 Audit Fees 423.000.76.535.80.51.00 07-16 Audit Fees 511.000.77.548.68.51.00 Tota 4.4.a Page: 38 c ca lid U a� Amoun }; 0 a 299.0( -0a 3,685.1( i =a 1,978.1( aD c 5,208.2, 1,365.0' c�a 0 521.6' L>% I : 23,176.61 a E 20922 BEACH CAMP 20922 BEACH CAMP •2 20922 BEACH CAMP U 001.000.64.571.22.41.00 13,588.0( o 20930 BEACH CAMP 20930 BEACH CAMP - SLEEPOVER 20930 BEACH CAMP - SLEEPOVER 0 0 001.000.64.571.22.41.00 L 11,448.0( 0- Total : 25,036.0( Q 221580 8/25/2016 040917 TACOMA SCREW PRODUCTS INC 18125280 221581 8/25/2016 075729 TERRY GRALL 221582 8/25/2016 071666 TETRATECH INC 3-20675 51078310 FLEET SHOP SUPPLIES Fleet Shop Supplies 511.000.77.548.68.31.20 9.8% Sales Tax 511.000.77.548.68.31.20 Tota #4243-2680819 UTILITY REFUND #4243-2680819 Utility refund due to 411.000.233.000 Tota E4GC.SERVICES THRU 7/22/16 E4GC.Services thru 7/22/16 137.4' m T 13.41 N 150.81 c N E 59.6: 'M 59.6: r c m E t R .r r Q Page: 38 Packet Pg. 75 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 221582 8/25/2016 071666 TETRA TECH INC (Continued) 423.200.75.594.35.41.00 Tota 221583 8/25/2016 069596 THE DOWNTOWN MOUNTAIN BOYS 8/21 CONCERT 8/21/16 CONCERT DOWNTOWN 8/21/16 CONCERT DOWNTOWN 117.100.64.573.20.41.00 Tota 221584 8/25/2016 075139 THE LOUIS BERGER GROUP INC 110871 E4FE.SERVICES THRU 7/29/16 E4FE.Services thru 7/29/16 422.200.72.594.31.41.00 Tota 221585 8/25/2016 072649 THE WIDE FORMAT COMPANY 93203 HP PAGEWIDE COPY MACHINE L HP PAGEWIDE COPY MACHINE L 001.000.62.594.58.64.00 Tota 221586 8/25/2016 069357 THIES, MIKE Aug-16 WACE CONFERENCE AND DUES WACE- conference, THIES, Leaven 001.000.62.524.10.49.00 WACE- membership dues 001.000.62.524.10.49.00 Tota 221587 8/25/2016 042800 TRI-CITIES SECURITY 40800 FAC MAINT - KEY STOCK Fac Maint - Key Stock 001.000.66.518.30.31.00 9.8% Sales Tax 001.000.66.518.30.31.00 Tota 221588 8/25/2016 075556 TSUTAKAWA, DEEMS 8/18 HMP CONCERT 8/18/16 HMP CONCERT DEEMS A 8/18/16 HMP CONCERT DEEMS A 117.100.64.573.20.41.00 4.4.a Page: 39 MC MC c ca lid U a� Amoun }; 0 16,327.7( a m I: 16,327.7( m 600.0( 4 c 1 : 600.0( a) c c� 9,499.41 o I: 9,499.4, M a X, E X 2 27,448.9( ,- I: 27,448.9( c c� 0 L W Q 0. 200.0( Q 40.0( 240.0( m r LO N 42.0( c N Y 4.1, 1 : 46.1, . ca NI r NI 1,000.0( E t R .r r Q Page: 39 Packet Pg. 76 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221588 8/25/2016 075556 075556 TSUTAKAWA, DEEMS 221589 8/25/2016 070774 ULINE INC 221590 8/25/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Tota 79254210 INV#79254210 CUST#2634605 - E 7X4X4 KRAFT MAILERS 001.000.41.521.80.31.00 7X7X4 KRAFT MAILERS 001.000.41.521.80.31.00 15X12X10 STORAGE BOXES 001.000.41.521.80.31.00 24X15X10 STORAGE BOXES 001.000.41.521.80.31.00 Freight 001.000.41.521.80.31.00 9.8% Sales Tax 001.000.41.521.80.31.00 Tota 2674 AMAZON - FLEET SHOP - SCANNF Amazon - Fleet Shop - Scanner Bat 511.000.77.548.68.31.20 Tire Rack - Unit 10 - Tire 511.000.77.548.68.34.30 Crest Chev - Unit 5 Parts 511.000.77.548.68.31.10 Home Depot - Unit 52 Supplies 511.000.77.548.68.31.10 David Clark - Unit 46 - Supplies 511.000.77.548.68.31.10 Sirennet - Uint EQ96PO - Parts 511.100.77.594.48.64.00 Car Toys - Unit 36 - Supplies 511.000.77.548.68.31.10 WeatherTech - Unit E123SO - Parts 511.100.77.594.48.64.00 David Clark - Unit 46 - Comm Cord 511.000.77.548.68.31.10 4.4.a Page: 40 c ca lid U W Amoun }; I: 1,000.0( 0 CL DI m 62.0( 4 121.0( c m 35.4( c c� 135.6( o 69.8: a 41.5: E 1 : 465.3E U 4- 0 M to > 0 20.2E a Q. Q 230.6( 623.8' m 265.6z r N 136.7E c N 1,574.2: cYi E 65.8z f° U r 74.9E KI E 291.5( R .r r Q Page: 40 Packet Pg. 77 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221590 8/25/2016 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Chuck Olson - Unit 89 - Latch 511.000.77.548.68.31.10 Innovative Light - Unit E112PO - 511.100.77.594.48.64.00 Home Depot - Shop Supplies 511.000.77.548.68.31.20 Wesco - Unit E112PO - Supplies 511.100.77.594.48.64.00 3535 NAPA - PARTS Napa - Parts 511.000.77.548.68.31.10 Apple - Charging Cords 001.000.65.518.20.31.00 NW Restaurant - Charged for Svc cal 001.000.65.518.20.48.00 7000 US BANK VISA- SHANES Parking fee's 001.000.62.524.10.43.00 8592 RETURN OF FILE FOLDERS Amazon- File Folders 001.000.62.524.10.31.00 8592 DEPT VISA, MISC CHARGES office supplies- Dev Services 001.000.62.524.10.31.00 Framed zoning map- Hobby Lobby 001.000.62.524.10.49.00 Meter- for code enforcment 001.000.62.524.10.35.00 Code Books- Bldg 001.000.62.524.20.49.00 Brad class- Presenting Data and info 001.000.62.558.60.49.00 software fee's- Adobe and Bluebeam 001.000.62.524.10.31.00 4.4.a Page: 41 c ca lid U W Amoun }; 0 a am 105.0E a� L 82.5� =5 4- 11.2E c m 114.4 c c� 0 26.11 L>% ca a 63.6E .5 522.2 1 U w 0 635.4: r L6 252.20 N 0 0 389.9( Y 90.0( •� 420.0( m 65.8( R .r r a Page: 41 Packet Pg. 78 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221590 8/25/2016 062693 US BANK 221591 8/25/2016 067865 VERIZON WIRELESS Voucher List City of Edmonds Invoice PO # Description/Account (Continued) BID-1687 POSTAGE, FACEBOOK AD, UMBRE Facebook advertising 140.000.61.558.70.41.40 Postage for mailing Ed! logo for bike 140.000.61.558.70.49.00 Purchase of umbrella container 140.000.61.558.70.31.00 Total 9770277050 C/A 671247844-00001 Cell Service-Eng 001.000.67.518.21.42.00 Cell Service Fac-Maint 001.000.66.518.30.42.00 Cell Service Parks Maint 001.000.64.576.80.42.00 Cell Service-PD 001.000.41.521.22.42.00 Cell Service-PD 104 Fund 104.100.41.521.21.42.00 Cell Service-PW Street 111.000.68.542.90.42.00 Cell Service-PW Street/Storm 111.000.68.542.90.42.00 Cell Service-PW Street/Storm 422.000.72.531.90.42.00 Cell Service-PW Water 421.000.74.534.80.42.00 Cell Service-PW Sewer 423.000.75.535.80.42.00 Cell Service-WWTP 423.000.76.535.80.42.00 9770277050 C/A 671247844-00001 Cell Service -Bldg 4.4.a Page: 42 c ca lid U a� Amoun }; 0 a a) 8.7z aa) L =a 12.0z it a� c 55.0E 6,076M c� 0 92.6 1 a 127.1z 62.61 0 328.6, o L a Q. 133.5, Q 18.5( 32.71 m T LO 32.7( N 00 0 56.2z Y 80.3, . ca 36.9( r c m E t R .r r Q Page: 42 Packet Pg. 79 vchlist 08/25/2016 11:30:11 AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221591 8/25/2016 067865 VERIZON WIRELESS (Continued) 221592 8/25/2016 072312 VERSATILE MOBILE SYSTEMS INC 0000082231 221593 8/25/2016 073472 WAPRO 221594 8/25/2016 075635 WCP SOLUTIONS 1674 1704 1716 9674992 CR 9683320 9700708 PO # Description/Account 001.000.62.524.20.42.00 Tota INV#0000082231 CUST#EDMPOL HONEYWELL BAR CODE SCANN 001.000.41.521.22.31.00 9.8% Sales Tax 001.000.41.521.22.31.00 Tota INV 1674 WAPRO FALL CONFERE FALL CONFERENCE REGISTRATI 001.000.41.521.40.49.00 INV 1704 WAPRO FALL CONFERE FALL CONF REGISTRATION 001.000.41.521.40.49.00 INV 1716 - FALL CONF REGISTRA FALL CONF REGISTRATION 001.000.41.521.40.49.00 FAC MAINT RETURNS Fac Maint Returns 001.000.66.518.30.31.00 9.8% Sales Tax 001.000.66.518.30.31.00 FAC MAINT - SUPPLIES Fac Maint - Supplies 001.000.66.518.30.31.00 9.8% Sales Tax 001.000.66.518.30.31.00 FAC MAINT - SUPPLIES Fac Maint - Supplies 001.000.66.518.30.31.00 9.8% Sales Tax Tota 4.4.a Page: 43 - TI c ca lid U a� _ Amoun }; 0 0- -0a 1 : 988.0' +. m I EF 4" 687.0( c m 67.3< 1 : 754.1 N o 0 CU 175.0( N E U 175.0( o � 0 175.0( a 1 : 525.0( Q Cn -281.9( " m T -27.6: N ao 0 N 508.5: � E 49.81 c 42.7� E t R .r r Q Page: 43 Packet Pg. 80 vchlist 08/25/2016 11:30:11 AM Bank code : usbank Voucher Date Vendor 221594 8/25/2016 075635 WCP SOLUTIONS 221595 221596 221597 8/25/2016 073552 WELCO SALES LLC 8/25/2016 074609 WEST COASTARMORY NORTH Voucher List City of Edmonds Invoice (Continued) 7090 7137 JUL-16 8/25/2016 069605 WEST COAST CODE CONSULTANTS 2016-EDM-JUL 137 Vouchers for bank code : usbank PO # Description/Account 001.000.66.518.30.31.00 Tota BUSINESS CARDS COUNCIL, EN( CITY COUNCIL BUSINESS CARD 001.000.11.511.60.31.00 ENGINEERING BUSINESS CARD 001.000.67.518.21.49.00 PARKS AND REC BUSINESS CAR 130.000.64.536.50.31.00 9.8% Sales Tax 001.000.11.511.60.31.00 9.8% Sales Tax 001.000.67.518.21.49.00 9.8% Sales Tax 130.000.64.536.50.31.00 1500 DOOR HANGERS 1500 Door Hangers 001.000.67.518.21.49.00 Tota INV#JUL-16 CUST ID-EDMONDS RANGE USAGE-GAGNER 7/8/16 001.000.41.521.40.41.00 9.8% Sales Tax 001.000.41.521.40.41.00 Tota FIRE PLAN REVIEW BLD2016-011 FIRE PLAN REVIEW BLD2016-011 001.000.62.524.20.41.00 Tota Bank tota 4.4.a Page: 44 I S S c ca lid U a� _ Amoun }; 0 0- 4.1� m 1 : 295.8; U a� - .•� 4 35.0( - � 35.0( D; c� 35.0( o 3.4: a 3.4: E U 3.4: c 0 L 306.3z m I : 421.6: Q PC 13.6( T 1.3z N I : 15.0( c N 7, �c 7, E 3,654.1E 'm I : 3,654.1E r c I: 1,128,687.91 E t R .r r a Page: 44 Packet Pg. 81 4.4.a vchlist Voucher List Page: 45 08/25/2016 11:30:11AM City of Edmonds lid ca Bank code: usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 137 Vouchers in this report Total vouchers : 1,128,687.91 a m m L Page: 45 Packet Pg. 82 4.4.b vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221598 9/1/2016 069798 A.M. LEONARD INC 221599 221600 Voucher List City of Edmonds Invoice 669242 C116153162 9/1/2016 074718 AQUATIC SPECIALTY SERVICES INC 11741 PO # Description/Account RETURNED GLOVES 2012 INV C112 RETURNED GLOVES 2012 INV CI1; 001.000.64.576.81.31.00 HORTICULTURAL VINEGAR HORTICULTURAL VINEGAR 001.000.64.576.80.31.00 Total CHEMICALS SPRAY PARK CHEMICALS SPRAY PARK 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Total 9/1/2016 069751 ARAMARK UNIFORM SERVICES 1988753203 PARKS MAINT UNIFORM SERVICE PARKS MAINT UNIFORM SERVICE 001.000.64.576.80.24.00 1988757200 PUBLIC WORKS OMC LOBBY MATE PUBLIC WORKS OMC LOBBY MAT: 001.000.65.518.20.41.00 PUBLIC WORKS OMC LOBBY MAT: 111.000.68.542.90.41.00 PUBLIC WORKS OMC LOBBY MAT: 421.000.74.534.80.41.00 PUBLIC WORKS OMC LOBBY MATE 422.000.72.531.90.41.00 PUBLIC WORKS OMC LOBBY MATE 423.000.75.535.80.41.00 PUBLIC WORKS OMC LOBBY MATE 511.000.77.548.68.41.00 9.8% Sales Tax 001.000.65.518.20.41.00 9.8% Sales Tax 111.000.68.542.90.41.00 Page: c ca lid U a� Amoun N 0 a m U -30.9E L 150.5E c 119.5, c c� 0 406.0( c� a 39.7� 445.75 4- 0 M 56.2E o L 0- 0. Q 1.6' rn 6.1' m 6.1' r r 0 6.1' o N Y 6.1' E 6.0E f° Page: 1 Packet Pg. 83 4.4.b vchlist Voucher List Page: 2 09/01/2016 8:20:47AM City of Edmonds ca lid Bank code : usbank U W Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221600 9/1/2016 069751 ARAMARK UNIFORM SERVICES (Continued) a 9.8% Sales Tax m 421.000.74.534.80.41.00 0.6( 9.8% Sales Tax a� L 422.000.72.531.90.41.00 0.6( =a 9.8% Sales Tax 423.000.75.535.80.41.00 0.6( 9.8% Sales Tax 511.000.77.548.68.41.00 0.5� 1988757201 FLEET DIVISION UNIFORMS & MAT c�a FLEET DIVISION UNIFORMS mm o 511.000.77.548.68.24.00 6.4( FLEET DIVISION MATS a 511.000.77.548.68.41.00 19.4( 9.8% Sales Tax 511.000.77.548.68.24.00 0.6: u 9.8% Sales Tax 4- C 511.000.77.548.68.41.00 1.9' > Total: 119.95 0 a 221601 9/1/2016 075678 BOYD LEGAL PLLC BL-16-007 CONFLICT PUBLIC DEFENDER Q' Q CONFLICT PUBLIC DEFENDER 001.000.39.512.52.41.00 1,200.0( Total : 1,200.0( v 221602 9/1/2016 075739 BUSHNELL, JEANETTE 8/22 REFUND 8/22/16 REFUND UNUSED MONITOI m 8/22/16 REFUND UNUSED MONITOI c 001.000.239.200 515.0( c Total: 515.0( w 221603 9/1/2016 073029 CANON FINANCIAL SERVICES 16388335 CONTRACT CHARGE -PLANNING Ci E CONTRACT CHARGE -PLANNING 0 ca 001.000.62.524.10.45.00 36.2( 16388336 CONTRACT CHARGE-BLDG COPIEI CONTRACT CHARGE-BLDG COPIEI E 001.000.62.524.10.45.00 36.2( R .r r Q Page: 2 Packet Pg. 84 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221603 9/1/2016 073029 CANON FINANCIAL SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 16400438 C5250 Contract charge 001.000.22.518.10.45.00 Contract charge 001.000.61.557.20.45.00 Contract charge 001.000.21.513.10.45.00 BW meter usage 001.000.22.518.10.45.00 BW meter usage 001.000.61.557.20.45.00 BW meter usage 001.000.21.513.10.45.00 CLR meter usage 001.000.22.518.10.45.00 CLR meter usage 001.000.61.557.20.45.00 CLR meter usage 001.000.21.513.10.45.00 9.8% Sales Tax 001.000.22.518.10.45.00 9.8% Sales Tax 001.000.61.557.20.45.00 9.8% Sales Tax 001.000.21.513.10.45.00 16400440 C250 Contract charge 001.000.21.513.10.45.00 B&W meter usage 001.000.21.513.10.45.00 Color meter usage 001.000.21.513.10.45.00 9.8% Sales Tax 001.000.21.513.10.45.00 4.4.b Page: 3 c ca U a� Amoun }; 0 a am 146.7: aUi L =a 31.4z V W c 31.4z 201.2' c�a 0 43.1, L>% ca a 43.1' 426.5E U w 0 75.9( 16.2 1 m r 16.2( r 0 o� 0 26.4, 13.8( 56.6( m 9.5' t R .r r Q Page: 3 Packet Pg. 85 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221603 9/1/2016 073029 CANON FINANCIAL SERVICES 221604 221605 221606 221607 221608 9/1/2016 075627 CAPITOL STRATEGIES Voucher List City of Edmonds Invoice (Continued) 16400441 16400442 826 9/1/2016 075023 CAROLYN DOUGLAS COMMUNICATION 57 9/1/2016 069457 CITY OF EDMONDS 9/1/2016 019215 CITY OF LYNNWOOD 9/1/2016 022200 CITY OF MOUNTLAKE TERRACE E6GA.ENG20160312 12455 221609 9/1/2016 004095 COASTWIDE LABS GW2903861 PO # Description/Account CONTRACT CHARGE -COPIER BL CONTRACT CHARGE -COPIER BL 001.000.62.524.10.45.00 CONTRACT CHARGE-PLNNING C CONTRACT CHARGE -PLANNING 001.000.62.524.10.45.00 Tota FEDERAL LOBBYIST FOR AUGUS Federal Lobbyist for August 2016 001.000.61.557.20.41.00 Tota COMMUNICATIONS/COMMUNITY Communications/community outrea 001.000.61.557.20.41.00 Tota E6GA.ENG20160312 ROW PERMI E6GA.ENG20160312 ROW Permit 423.200.75.594.35.41.00 Tota WWTP: JULY 2016 M/O & SEWER July 2016 M/O & SEWER 423.000.75.535.80.47.20 Tota EDMONDS PORTION OF FALL CR EDMONDS PORTION OF FALL CR 001.000.64.571.22.42.00 Tota PM: LINERS, ECOGREEN RL, TT PM: LINERS, ECOGREEN RL, TT 001.000.64.576.80.31.00 4.4.b Page: 4 c ca lid U a� Amoun }; _ 0 DI a 4) D( +. 71.0, m L O •• C1 71.0. 4- c I : 1,535.8t T c� 5,000.0( I: 5,000.0( a O E cr f° U 2,500.0( o I: 2,500.0( T 0 a Q. 115.0( Q 1 : 115.0( m r 27,602.0( r 1 : 27,602.0( 9 0 A, Y A, 6,842.31 .E I : 6,842.31 r c m E 679.7� R .r r Q Page: 4 Packet Pg. 86 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221609 9/1/2016 004095 COASTWIDE LABS Voucher List City of Edmonds Invoice (Continued) N W 2903861 221610 9/1/2016 075738 CORRECTIONAL COUNSELING INC SEA-DV-SEP16-60715 221611 9/1/2016 075042 COVERALL OF WASHINGTON 221612 9/1/2016 068190 DATEC INC 221613 9/1/2016 006626 DEPT OF ECOLOGY 7100166392 32817 MS17001001 221614 9/1/2016 070864 DEX MEDIA 610028337724 [:Ti[i0 PO # Description/Account 9.8% Sales Tax 001.000.64.576.80.31.00 PM: ACCLAIM, BRAWNY, DISNF C PM: ACCLAIM, BRAWNY, DISNF C 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tota PROBATION TRAINING OMAR PROBATION TRAINING OMAR 001.000.23.523.30.43.00 Tota WWTP: AUG 2016 JANITORIAL SE AUG 2016 janitorial service 423.000.76.535.80.41.00 Tota INV#32817 - EDMONDS PD POCKET 7 USB THERMAL PRINTE 001.000.41.521.22.31.00 9.8% Sales Tax 001.000.41.521.22.31.00 Tota WWTP: EDUENAS+MVANPELT IN( Incinerator Renewal Certificates for 423.000.76.535.80.49.00 Tota C/A 730211600 07/2016 Web Hosting for Internet 001.000.31.518.88.42.00 C/A 730211599 4.4.b Page: 5 c ca lid U a� Amoun }; _ 0 a am 66.6, L L 647.2 a� c 63.4: I: 1,457.1' c� 0 500.0( a 500.0( F U 4- 0 514.0( @ 514.0( c L Q Q. F Q 719.4( 70.5( " 789.9( :I o o� 0 400.0( 400.0( U 2 U r 39.9E a0i E t R .r r Q Page: 5 Packet Pg. 87 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 221614 9/1/2016 070864 DEX MEDIA (Continued) 610028822941 610028822977 221615 9/1/2016 064531 DINES, JEANNIE 16-3688 221616 221617 221618 9/1/2016 074302 EDMONDS HARDWARE & PAINT LLC 001747 9/1/2016 069523 EDMONDS P&R YOUTH SCHOLARSHIP 5062 DIAZ 9/1/2016 008705 EDMONDS WATER DIVISION 2-25150 2-25175 2-26950 PO # Description/Account Basic e-commerce hosting 07/02/16 001.000.31.518.88.42.00 C/A 730211600 08/2016 Web Hosting for Internet 001.000.31.518.88.42.00 C/A 730211599 Basic e-commerce hosting 08/02/16 001.000.31.518.88.42.00 Tota CITY COUNCIL MINUTES 8/23/201 08/23/16 CITY COUNCIL MINUTES 001.000.25.514.30.41.00 Tota PM: ZINC QUICK LINK, TURNBUC PM: ZINC QUICK LINK, TURNBUC 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tota 5062 OMAR DIAZ YOUTH SCHOL 5062 OMAR DIAZ YOUTH SCHOL 122.000.64.571.20.49.00 Tota WEST PLANTER IRRIGATION 870 WEST PLANTER IRRIGATION 870 001.000.64.576.80.47.00 EAST PLANTER IRRIGATION 875 EAST PLANTER IRRIGATION 875 001.000.64.576.80.47.00 LIFT STATION #3 729 NORTHSTR LIFT STATION #3 729 NORTHSTR 4.4.b Page: 6 c ca hd U a� Amoun }; 0 a am 39.9E 5D 40.5( a� c m 40.5( 160.9( c�a E/ 6 0 P 0 a 346.5( 1 : 346.5( KI o KI ra 10.9E c a 1.0E Q 1 : 12.0E AF AF 75.0( 1 : 75.0( c C o C Y 73.1' 94.4( � E/ E R .r r a Page: 6 Packet Pg. 88 4.4.b vchlist Voucher List Page: 7 09/01/2016 8:20:47AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221618 9/1/2016 008705 EDMONDS WATER DIVISION (Continued) a 423.000.75.535.80.47.10 83.8( 2-28275 PLANTER IRRIGATION 1400 9TH AV +. PLANTER IRRIGATION 1400 9TH AV L 001.000.64.576.80.47.00 112.1E 2-29118 LIFT STATION #2 702 MELODY LN / LIFT STATION #2 702 MELODY LN / c 423.000.75.535.80.47.10 44.7' 2-37180 SAM STAMM OVERLOOK / METER £ SAM STAMM OVERLOOK / METER £ 001.000.64.576.80.47.00 55.6E o 7-05276 CEMETERY SEWER & STORM 820 >, CEMETERY SEWER & STORM 820 a 130.000.64.536.50.47.00 154.8E Total: 618.6£ 221619 9/1/2016 075566 EHRBAR, PAMELA BID-083016 BID ADMINISTRATIVE SERVICES 8/ o BID Administrative services 8/12-8/29 @ 140.000.61.558.70.41.00 532.5( o Total: 532.5( a Q. 221620 9/1/2016 008812 ELECTRONIC BUSINESS MACHINES AR47848 COPIER B&W COPIES Q COPIER B&W COPIES 001.000.23.512.50.48.00 7.8E AR48117 CONTRACT CHARGE -PLANNING Cj CONTRACT CHARGE -PLANNING C tD 001.000.62.524.10.45.00 1.1E c AR48118 CONTRACT CHARGE-BLDG CANOP d6 CONTRACT CHARGE-BLDG CANOP 001.000.62.524.10.45.00 N 1.4£ AR49007 ACCT#MK5648 CONTRACT 2600-02 E Maintenance for printers 08/21/16 - 001.000.31.518.88.48.00 307.2( Overage charge for 07/21/16 - 8/20/1 001.000.31.518.88.48.00 15.9, E 9.8% Sales Tax R .r r Q Page: 7 Packet Pg. 89 vchlist 09/01 /2016 8:20:47AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221620 9/1/2016 008812 ELECTRONIC BUSINESS MACHINES (Continued) PO # Description/Account 001.000.31.518.88.48.00 4.4.b Page: 8 c ca lid U a� Amoun }; 0 0- 31.6 1 a) Total : 365.3' 41 U m 221621 9/1/2016 066378 FASTENAL COMPANY WAMOU41102 PM: SUPPLIES PM: SUPPLIES 001.000.64.576.81.31.00 4" 163.7( c 9.8% Sales Tax m 001.000.64.576.81.31.00 16.0: Total: 179.8' 221622 9/1/2016 065427 FCS GROUP 2509-21608020 E6JA.SERVICES THRU 8/19/16 0 L E6JA.Services thru 8/19/16 ca 421.000.74.534.80.41.00 960.0( o- E6JA.Services thru 8/19/16 E 422.000.72.531.90.41.00 960.0( TU E6JA.Services thru 8/19/16 c 423.000.75.535.80.41.00 960.0( -,; Total: 2,880.0( c 0 221623 9/1/2016 011900 FRONTIER 253-007-4989 SEAVIEW RESERVOIR TELEMETR) a SEAVIEW RESERVOIR TELEMETR) Q 421.000.74.534.80.42.00 30.9E 253-012-9166 TELEMETRY CIRCUIT LINES TELEMETRY CIRCUIT LINES 421.000.74.534.80.42.00 161.7 0 TELEMETRY CIRCUIT LINES c 423.000.75.535.80.42.00 300.4z 253-012-9189 WWTP: 8/25-9/24/16 AUTO DIALER 8/25-9/24/16 AUTO DIALER - 1 VOIC N 423.000.76.535.80.42.00 41.3z E 253-014-8062 TELEMETRY CIRCUIT LINE TELEMETRY CIRCUIT LINE 421.000.74.534.80.42.00 19.7( TELEMETRY CIRCUIT LINE t 423.000.75.535.80.42.00 36.7( R .r r Q Page: 8 Packet Pg. 90 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 221623 9/1/2016 011900 FRONTIER (Continued) 253-017-4360 253-017-7256 425-712-8347 425-771-0158 425-771-5553 425-776-6829 509-022-0049 PO # Description/Account TELEMETRY CIRCUIT LINE TELEMETRY CIRCUIT LINE 421.000.74.534.80.42.00 TELEMETRY CIRCUIT LINE 423.000.75.535.80.42.00 WWTP: 8/25-9/24/16 TELEMETRY WWTP: 8/25-9/24/16 TELEMETRY 423.000.76.535.80.42.00 CIVIC CENTER ELEVATOR PHONE CIVIC CENTER ELEVATOR PHONE 001.000.66.518.30.42.00 FIRE STATION #16 ALARM AND F FIRE STATION #16 ALARM AND F 001.000.66.518.30.42.00 WWTP: 8/25-9/24-16 AUTO DIALE 8/25-9/24-16 AUTO DIALER - 1 BU 423.000.76.535.80.42.00 CITY HALLALARM LINES 121 5TH CITY HALL FIRE AND INTRUSION 001.000.66.518.30.42.00 LIFT STATION #2 VG SPECIAL AC( LIFT STATION #2 VG SPECIAL AC( 423.000.75.535.80.42.00 Tota 221624 9/1/2016 075163 GARCIA-GARCIA, CESAR 13640 INTERPRETER FEE INTERPRETER FEE 001.000.23.523.30.41.01 14126 INTERPRETER FEE INTERPRETER FEE 001.000.23.523.30.41.01 Tota 221625 9/1/2016 073821 GEODESIGN INC 1607-303 ESGA.SERVICES THRU 7/22/16 ESGA.Services thru 7/22/16 4.4.b Page: 9 c ca lid U a� Amoun }; 0 a am 46.7 0 aUi L =a 86.8E a� c m 224.0E c� 0 j 68.3< , A} E 131.5( R S o 114.6E @ P o L AI a 131.5( Q 26.2E 1,420.9 i to 0 o� 0 105.3, Y E 105.3, ca 1 : 210.61 r c m E t R .r r Q Page: 9 Packet Pg. 91 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221625 9/1/2016 073821 GEODESIGN INC (Continued) 423.200.75.594.35.41.00 Tota 221626 9/1/2016 075740 GIL, ROSA 8/23 REFUND 8/23/16 REFUND DAMAGE DEPO 4.4.b Page: 10 S SI- c ca lid U W Amoun }; 0 0- 3,164.4( -0a I : 3,164.45 m I' 4 500.0( c 1 : 500.0( a)c c� s — 3,975.0( o I: 3,975.0( M a V E .2 200.0( ,- 1 : 200.0( c c� D o eti 0- 0. 1,500.0( Q 1 : 1,500.0( Tf me m 674.0( r ei C 221.6' c ed w 221.6' E 109.4� I : 1,226.7' c m E t R .r r Q Page: 10 Packet Pg. 92 V E .2 200.0( ,- 1 : 200.0( c c� D o eti 0- 0. 1,500.0( Q 1 : 1,500.0( Tf me m 674.0( r ei C 221.6' c ed w 221.6' E 109.4� I : 1,226.7' c m E t R .r r Q Page: 10 Packet Pg. 92 vchlist 09/01 /2016 8:20:47AM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 221631 9/1/2016 060165 HWA GEOSCIENCES INC (Continued) 016.000.66.518.30.41.00 Tota 221632 9/1/2016 073548 INDOFF INCORPORATED 2840807 OFFICE SUPPLIES -STAMP OFFICE SUPPLIES -STAMP 001.000.62.524.10.31.00 2841421 OFFICE SUPPLIES -STAMP OFFICE SUPPLIES -STAMP 001.000.62.524.10.31.00 2843394 WWTP: COPIER PAPER - LTR SIZI Navigator Platinum Office Multipurp 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 2844019 WWTP: DRY ERASE MARKERS DRY ERASE MARKERS 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 Tota 221633 9/1/2016 014940 INTERSTATE BATTERY SYSTEMS 300-10012405 PM: GLOVES, BRAKE CLEAN PM: SUPPLIES 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tota 221634 9/1/2016 075661 JANET MAPLES DESIGN /IZZY GIRL BID-08312016 BID SOCIAL MEDIA Social media for 8/16-8/31 /16 140.000.61.558.70.41.00 Tota 221635 9/1/2016 075356 JENNIFER ZIEGLER PUBLIC 014 STATE LOBBYIST FOR AUGUST 2 State lobbyist for August 2016 4.4.b Page: 11 c ca lid U W Amoun }; 0 a 14,262.7( a) 14,262.7( m L 95.4E c m 21.6, r- o: 41.9E a 4.1, •� U 4- 0 2.7( 0 0.2 1 a I : 166.21 Q rn m r 22.4< c 1 : 251.2E d6 0 N U E 1 : 510.0( r 01 a0i E t U R .r r Q Page: 11 Packet Pg. 93 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221635 9/1/2016 075356 JENNIFER ZIEGLER PUBLIC 221636 9/1/2016 074168 JOHNSON, MELISSA 221637 9/1/2016 070019 JUDICIAL CONF REGISTRAR Voucher List City of Edmonds Invoice (Continued) 8/11 CEMETERYAD 101716 1018716 221638 9/1/2016 075646 K-A GENERAL CONST CONTRACTOR 10142 221639 9/1/2016 074135 LAFAVE, CAROLYN PO # Description/Account 001.000.61.557.20.41.00 Tota 8/11/16 CEMETERYAD EWHS 8/11/16 CEMETERYAD EWHS 130.000.64.536.20.41.40 Tota LINE -STAFF COURT TRAINING K LINE -STAFF COURT TRAINING K 001.000.23.512.50.49.00 LINE -STAFF COURT TRAINING G LINE -STAFF COURT TRAINING G 001.000.23.512.50.49.00 Tota DAYTON STREET PLAZA DAYTON STREET PLAZA 132.000.64.594.76.65.00 RETAINAGE 132.000.223.400 Tota 081116 ESCC STUDENT EXCHANGE Gas for ESCC student exchange 138.100.21.557.21.49.00 Tota 221640 9/1/2016 017135 LANDAU ASSOCIATES INC 0037747 221641 9/1/2016 075159 LIFE INSURANCE CO OF NO AMER September 2016 4.4.b Page: 12 c ca lid U W Amoun }; 0 a 3,358.0( a) 3,358.0( a� L 4 75.0( c 75.0( ER E R� R� c R f° 50.0( o 0- 50.0( . 1 : 100.0( 4- 0 n: 114,840.01 0 CL Q. -5,229.5' Q 109,610.5E m r 187.0( r 1 : 187.0( 9 0 PROFESSIONAL SVC Y PROFESSIONAL SVS-ENV SERVICE 001.000.62.558.60.41.00 3,000.0( . Total: 3,000.0( f° SEPTEMBER 2016 CIGNA PREMIUK c September 2016 Cigna premiums m E 811.000.231.550 11,433.41 R .r r Q Page: 12 Packet Pg. 94 vchlist 09/01 /2016 8:20:47AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 221641 9/1/2016 075159 075159 LIFE INSURANCE CO OF NO AMER (Continued) 221642 9/1/2016 074263 LYNNWOOD WINSUPPLY CO 014371 00 221643 9/1/2016 075664 MAJOR, JENNA 221644 9/1/2016 069053 MICRO COM SYSTEMS LTD 221645 9/1/2016 020900 MILLERS EQUIP & RENTALL INC 221646 9/1/2016 024910 NORMED 014521 00 8/4-8/25 FIELDATTEN 16748 243331 24808-727785 Description/Account Tota PM: ELEC VALVE, SXM UNIN PM: ELEC VALVE, SXM UNIN 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 FISHING PIER SUPPLIES FISHING PIER SUPPLIES 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tota 8/4-8/25/16 SOFTBALL FIELD ATT 8/4-8/25/16 SOFTBALL FIELD ATTE 001.000.64.571.25.41.00 Tota SCANNING SCANNING 001.000.62.524.10.41.00 Tota WWTP: PROPANE FOR FORKLIST Propane for forklift 423.000.76.535.80.31.00 9.8% Sales Tax 423.000.76.535.80.31.00 Tota INV#24808-727785 EDMONDS PD PROPRINAL PAIN RELIEVER 001.000.41.521.10.31.00 NUTRALOX ANTACID 001.000.41.521.10.31.00 4.4.b Page: 13 c ca lid U a� Amoun }; 11,433.41 0 am m 417.1� 40.8E c m 177.4z 17.3E 1 : 652.9( a E1` E r � U 135.0( o 135.0( -cu- 0 a Q. 2,313.1 ' Q 1 : 2,313.1 , cc 28.6z 0 a� 2.8' o 1 : 31.4! Y E 41.8E c m 15.3( E R .r r Q Page: 13 Packet Pg. 95 4.4.b vchlist Voucher List Page: 14 09/01/2016 8:20:47AM City of Edmonds ca lid Bank code : usbank U a� Voucher Date Vendor Invoice PO # Description/Account Amoun }; 221646 9/1/2016 024910 NORMED (Continued) a RELIEF - PE COLD TABLETS m 001.000.41.521.10.31.00 17.7z Freight i 001.000.41.521.10.31.00 10.5( =a 9.8% Sales Tax 001.000.41.521.10.31.00 8.30 Total: 93.7E 221647 9/1/2016 073213 NORTHWEST TRAVEL& LIFE 2016-116 TOURISM AD SEPTEMBER/OCTOBI c� Tourism promotion ad September/Ocl 0 120.000.31.575.42.41.40 998.0( ", Total: 998.0( a 221648 9/1/2016 063511 OFFICE MAX INC 846934 P&R OFFICE SUPPLIES P&RADMIN: TAPE, PAPER, LAM PC f° U 001.000.64.571.21.31.00 172.6< c P&R DISC: LABELS -cu- 001.000.64.571.23.31.00 22.0, c 9.8% Sales Tax 0- 001.000.64.571.21.31.00 16.9' Q 9.8% Sales Tax 001.000.64.571.23.31.00 2.1( 857604 P&RADMIN: CLOCK P&RADMIN: CLOCK 001.000.64.571.21.31.00 9.8% Sales Tax c 001.000.64.571.21.31.00 0.9E c Total: 224.7( rn 221649 9/1/2016 063750 ORCA PACIFIC INC 23314 CHEMICALS YOST E CHEMICALS YOST ca 001.000.64.576.80.31.00 924.6E 9.8% Sales Tax 001.000.64.576.80.31.00 90.6, E t R .r r Q Page: 14 Packet Pg. 96 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 221649 9/1/2016 063750 063750 ORCA PACIFIC INC (Continued) 221650 9/1/2016 075735 PACIFIC SECURITY 16505 221651 9/1/2016 064070 PALMATIER, LISA 8/25 CONCERT COORD CONCERTS LP 221652 9/1/2016 070003 PAXTON, LAUREL 21046 ACTING CAMP 221653 9/1/2016 028860 PLATT ELECTRIC SUPPLY INC K068141 221654 9/1/2016 046900 PUGET SOUND ENERGY 200000704821 200002411383 200007876143 200009595790 PO # Description/Account COURT SECURITY COURT SECURITY 001.000.23.512.50.41.00 Tota Tota 8/25/16 CONCERT COORDINATO 8/25/16 CONCERT COORDINATO 117.100.64.573.20.41.00 CONCERTS LP CONCERTS LP 117.100.64.573.20.41.00 Tota 21046 ACTING CAMP INSTRUCTI 21046 ACTING CAMP INSTRUCTI 001.000.64.571.22.41.00 Tota HAZEL MILLER PLAZA PUMP HAZEL MILLER PLAZA PUMP 001.000.64.576.80.31.00 9.8% Sales Tax 001.000.64.576.80.31.00 Tota FRANCES ANDERSON CENTER 7 FRANCES ANDERSON CENTER 7 001.000.66.518.30.47.00 YOST PARK/POOL 9535 BOW DOI YOST PARK/POOL 9535 BOW DOI 001.000.64.576.80.47.00 OLD PUBLIC WORKS 200 DAYTO OLD PUBLIC WORKS 200 DAYTO 421.000.74.534.80.47.00 FIRE STATION #16 8429 196TH S 4.4.b Page: 15 R R c ca lid U a� _ Amoun }; 1 : 1,015.21 a m a� 45.0( 1 : 45.0( 4- a� � m � 1,250.0( c c� 0 320.0( ca 1,570.0( a- E or to or w 4,508.4( o I: 4,508.4( > 0 Q L Q. Q 70.4z rn 6.9( N N T 1 : 77.31 m IL r CD 0( °) 0 599.0' Y N N E 1,414.2E � m 35.2E E R .r r Q Page: 15 Packet Pg. 97 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221654 9/1/2016 046900 PUGET SOUND ENERGY Voucher List City of Edmonds Invoice PO # Description/Account (Continued) FIRE STATION #16 8429 196TH ST 001.000.66.518.30.47.00 200011439656 FIRE STATION #20 23009 88TH AVE FIRE STATION #20 23009 88TH AVE 001.000.66.518.30.47.00 200016815843 FIRE STATION #17 275 6TH AVE N / FIRE STATION #17 275 6TH AVE N / 001.000.66.518.30.47.00 200017676343 FLEET MAINTENANCE BAY 21105 7 FLEET MAINTENANCE BAY 21105 7 511.000.77.548.68.47.00 200019375639 MEADOWDALE CLUBHOUSE 6801 MEADOWDALE CLUBHOUSE 6801 001.000.66.518.30.47.00 200019895354 SNO-ISLE LIBRARY 650 MAIN ST / � SNO-ISLE LIBRARY 650 MAIN ST / � 001.000.66.518.30.47.00 200020415911 PUBLIC WORKS OMC 7110 210TH ; PUBLIC WORKS OMC 7110 210TH 001.000.65.518.20.47.00 PUBLIC WORKS OMC 7110 210TH 111.000.68.542.90.47.00 PUBLIC WORKS OMC 7110 210TH ; 421.000.74.534.80.47.00 PUBLIC WORKS OMC 7110 210TH ; 423.000.75.535.80.47.10 PUBLIC WORKS OMC 7110 210TH 511.000.77.548.68.47.00 PUBLIC WORKS OMC 7110 210TH 422.000.72.531.90.47.00 200021829581 WWTP: 7/21-8/22/16 200 2ND AVE E WWTP: 200 2ND AVE S / METER 00 423.000.76.535.80.47.63 200024711901 CITY PARK BUILDING 600 3RD AVE 4.4.b Page: 16 c ca lid U a� Amoun }; 0 a am 85.7( 51.8: a� c m 123.3E c� 0 56.1( j, 0 a E 35.2E 4- 0 35.2E @ 0 L a 0. 3.6( Q 13.9. 13.9. w r r 13.9. c a� 0 13.9, Y 13.9< E Page: 16 Packet Pg. 98 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221654 9/1/2016 046900 PUGET SOUND ENERGY 221655 9/1/2016 075737 ROBINSON, HUA 221656 9/1/2016 074997 SEITEL SYSTEMS, LLC 221657 9/1/2016 075733 SIBREL, ED 221658 9/1/2016 037303 SNO CO FIRE DIST# 1 221659 9/1/2016 066754 SNO CO PUBLIC WORKS 4.4.b Voucher List Page: 17 City of Edmonds ca lid U a� Invoice PO # Description/Account Amoun }; (Continued) 0 CITY PARK BUILDING 600 3RD AVE 001.000.66.518.30.47.00 77.4: Total: 2,628.3E i =a 11792 INTERPRETER FEE = INTERPRETER FEE 4- 001.000.23.523.30.41.01 115.7E Total: 115.7E c 37680 REMOTE COMPUTER SUPPORT Remote Computer Support 7/27/16 0 001.000.31.518.88.41.00 87.5( 37789 ONSITE COMPUTER SUPPORT Q- Onsite computer support 7/19/16, 7/2 001.000.31.518.88.41.00 697.5( Total: 785.0( c 8/3 REIMB PLAN COPIE 8/3/16 REIMB PLAN COPIES 8/3/16 REIMB PLAN COPIES 132.000.64.594.76.65.00 Tota Q4-2016 Q4-2016 FIRE SERVICES CONT RA 1,776,042.5( b r 200,507.6( 9 1,976,550.1( G N Y E 32,774.5E 2u r 61,076.8( 93,851.3E E R .r r Q Page: 17 Packet Pg. 99 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221660 9/1/2016 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account 1900015566 E1 CA.RELOCATION E1 CA.Relocation 112.000.68.595.33.41.00 2001-2487-3 TRAFFIC LIGHT 9933 100TH AVE W TRAFFIC LIGHT 9933 100TH AVE W 111.000.68.542.64.47.00 2003-4823-3 TRAFFIC LIGHT 22000 84TH AVE W TRAFFIC LIGHT 22000 84TH AVE W 111.000.68.542.64.47.00 2004-2241-8 FRANCES ANDERSON CENTER 70( FRANCES ANDERSON CENTER 70( 001.000.66.518.30.47.00 2004-9314-6 MAPLEWOOD PARK IRRIGATION M MAPLEWOOD PARK IRRIGATION M 001.000.64.576.80.47.00 2007-4860-6 TRAFFIC LIGHT 9730 220TH ST SW TRAFFIC LIGHT 9730 220TH ST SW 111.000.68.542.64.47.00 2008-6520-2 LIFT STATION #3 1529 NORTHSTRE LIFT STATION #3 1529 NORTHSTRE 423.000.75.535.80.47.10 2013-2711-1 PINE ST PARK PINE ST PARK 001.000.64.576.80.47.00 2015-5730-3 CEMETERY BUILDING CEMETERY BUILDING 001.000.64.576.80.47.00 2015-6343-4 TRAFFIC LIGHT 660 EDMONDS WA TRAFFIC LIGHT 660 EDMONDS WA 111.000.68.542.64.47.00 2015-8215-2 TRAFFIC LIGHT 19600 80TH AVE W TRAFFIC LIGHT 19600 80TH AVE W 111.000.68.542.63.47.00 2016-1027-6 OVERHEAD STREET LIGHTING AT i OVERHEAD STREET LIGHTING AT 1 001.000.64.576.80.47.00 4.4.b Page: 18 c ca lid U a� Amoun }; 0 a am 21,101.9z 28.8' d c m 39.4< c� 0 904.1� 0 a E 17.4, 4- 0 17.9E 0 L a Q. 58.3( Q 14.6' m r r 43.9E c a� 0 N Y 21.41 E 27.2E c m E 8.0, R .r r Q Page: 18 Packet Pg. 100 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221660 9/1/2016 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 2016-1195-1 TRAFFIC LIGHT 20801 76TH AVE W TRAFFIC LIGHT 20801 76TH AVE W 111.000.68.542.63.47.00 2016-5690-7 DECORATIVE LIGHTING 413 MAIN,' DECORATIVE LIGHTING 413 MAIN,' 111.000.68.542.63.47.00 2017-0375-8 PEDEST CAUTION LIGHT 23190 10( PEDEST CAUTION LIGHT 23190 10( 111.000.68.542.64.47.00 2017-6210-1 415 5TH AVE S 415 5TH AVE S 001.000.64.576.80.47.00 2019-0786-2 TRAFFIC LIGHT 7133 212TH ST SW TRAFFIC LIGHT 7133 212TH ST SW 111.000.68.542.63.47.00 2019-2991-6 WWTP: 7/23-8/23-16 FLOW METER 7/23-8/23-16 FLOW METER 23219 7 423.000.76.535.80.47.62 2020-8787-0 LIFT STATION #6 100 PINE ST / MEl LIFT STATION #6 100 PINE ST / MEl 423.000.75.535.80.47.10 2021-6153-5 CEMETERY WELL PUMP CEMETERY WELL PUMP 001.000.64.576.80.47.00 2022-8912-0 TRAFFIC LIGHT 23801 HWY 99 / ME TRAFFIC LIGHT 23801 HWY 99 / ME 111.000.68.542.64.47.00 2024-2158-2 LOG CABIN & DECORATIVE LIGHTI LOG CABIN & DECORATIVE LIGHTI 001.000.66.518.30.47.00 2026-2041-5 MATHAY BALLINGER PARK IRRIGA MATHAY BALLINGER PARK IRRIGA 001.000.64.576.80.47.00 2042-9221-3 CHARGE STATION #1 552 MAIN ST CHARGE STATION #1 552 MAIN ST 4.4.b Page: 19 c ca lid U a� Amoun }; 0 a am 28.9E L 97.7E c m 22.2' 0 17.3( a E 32.0z 4- 0 17.9E o L a 0. El 209.8E rn 212.6( m r 0 57.31 c N Y 38.5 1 E ca Page: 19 Packet Pg. 101 vchlist 09/01 /2016 8:20:47AM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 221660 9/1/2016 037375 SNO CO PUD NO 1 (Continued) 2044-6743-5 221661 9/1/2016 038100 SNO-KING STAMP 221662 9/1/2016 075495 SOFTWARE ONE 60214 US-PSI-510431 221663 9/1/2016 074990 STANTEC CONSULTING SERVICES 1075277 221664 9/1/2016 072319 SUNSET BAY RESORT 1088509 20923 BEACH CAMP PO # Description/Account 111.000.68.542.64.47.00 HAZEL MILLER PLAZA HAZEL MILLER PLAZA 001.000.64.576.80.47.00 Tota INV#60214 - EDMONDS PD LOCKER MAGNET - BRUGGMAN 001.000.41.521.22.31.00 MAGMATE PLATES - BRUGGMAN 001.000.41.521.22.31.00 Freight 001.000.41.521.22.31.00 9.8% Sales Tax 001.000.41.521.22.31.00 Tota ADOBE ACROBAT PROFESSIONA Adobe Acrobat Professional DC 001.000.41.521.21.41.00 9.8% Sales Tax 001.000.41.521.21.41.00 Tota E4JB.SERVICES THRU 7/1/16 E4JB.Services thru 7/1/16 421.200.74.594.34.41.00 E4JB.SERVICES THRU 7/29/16 E4JB.Services thru 7/29/16 421.200.74.594.34.41.00 20923 BEACH CAMP 20923 BEACH CAMP 001.000.64.571.22.41.00 Tota 4.4.b Page: 20 c ca lid U a� Amoun }; 0 a 52.6z -0a a� L 34.2. 23,121.9' a� c m 4.5( 6.0( ca a 2.7E E .2 1.3( U 1 : 14.5E o L c a 612.8E Q 60.0( 1 : 672.91 m r 0 867.8E 0 N U 2,428.1z E 1 : 3,296.0, c 13,588.0( t U R .r r Q Page: 20 Packet Pg. 102 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher Date Vendor 221664 9/1/2016 072319 SUNSET BAY RESORT 221665 221667 221668 221669 9/1/2016 071666 TETRATECH INC 9/1/2016 070744 TIGER OAK MEDIA 9/1/2016 075741 TREDER, LISA 9/1/2016 043935 UPS Voucher List City of Edmonds Invoice (Continued) 20931 BEACH CAMP 35009-10B 35009-9B 51078837 2016-159041 8/22 REFUND 00002T4T13346 9/1/2016 047455 WA ST DEPT OF TRANSPORTATION RE-313-ATB60815001 PO # Description/Account 20931 BEACH CAMP - SLEEPOVE 20931 BEACH CAMP - SLEEPOVE 001.000.64.571.22.41.00 Tota ESDB.SERVICES THRU JULY 201 ESDB.Services thru July 2016 001.000.67.518.21.41.00 ESDB.SERVICES THRU JUNE 201 ESDB.Services thru June 2016 001.000.67.518.21.41.00 ESFD.SERVICES THRU JULY 201 ESFD.Services thru July 2016 422.200.72.594.31.41.00 Tota BUSINESS RECRUITMENT AD IN Business recruitment ad in Seattle 001.000.61.558.70.41.40 Tota 8/22/16 REFUND UNUSED MONIT 8/22/16 REFUND UNUSED MONIT 001.000.239.200 Tota SHIPPING FEE FOR GROUNDWA Shipping Fee for Groundwater Moni 422.000.72.531.40.35.00 Tota IT MAINTENANCE & OPERATION IT Maintenance & Operations Fiber 001.000.31.518.87.48.00 Tota 4.4.b Page: 21 6 c ca lid U W _ Amoun }; 0 0- R -0) R }, 8,586.0( i 1 : 22,174.0( a c m 45,518.3( 6 c� 6 S 60,835.4z L, 0 a 18,378.0( •� I: 124,731.8( w 31 0 0 1,200.0( a I: 1,200.0( Q OI OI 522.0( " 1 : 522.0( TE C tc o 21.1( Y 1 : 21.1( 1 O 768.1' 1 : 768.1, E t R .r r a Page: 21 Packet Pg. 103 vchlist 09/01 /2016 8:20:47AM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 221670 9/1/2016 075283 WAVE BROADBAND 8136 50 211 00055035 FIBER HIGH SPEED INTERNET S High Speed Internet service 09/01/1 001.000.31.518.87.42.00 Tota 221671 9/1/2016 073552 WELCO SALES LLC 7142 #10 WINDOW ENVELOPES FOR #10 Window Envelopes - Qty 5,000 001.000.31.514.23.31.00 9.8% Sales Tax 001.000.31.514.23.31.00 Tota 221672 9/1/2016 075736 YOUNG FINE ART STUDIO INC 1 50% PAYMENT TO START ART W 50% PAYMENT TO START ART W 132.000.64.594.76.65.00 Tota 75 Vouchers for bank code : usbank Bank tota 75 Vouchers in this report Total voucher 4.4.b Page: 22 c ca lid U a� Amoun }; a 6 -a) 816.0( 1 : 816.0( i =a Fit 4- aD c 324.0( 31.7: cm I : 355.7! o L OF CU OF Q- 4,250.0( . I: 4,250.0( TU w I: 2,477,628.5E c c� s : 2,477,628.5E o a Q. Q r C d E t V R r a Page: 22 Packet Pg. 104 4.4.c PROJECT NUMBERS (By Project Title) Project Engineering c Accounting 4 Project s c Funding Project Title Number Number E STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE s STR 15th St. SW Walkway (Edmonds Way to 8th Ave) c424 s E3DC c SWR 2013 Sanitary Sewer Pipe Rehabilitation c390 E2GB z s SWR 2013 Sewerline Replacement Project c398 E3GA c STR 2014 Chip Seals c451 c E4CB c STM 2014 Drainage Improvements c433 E4FA STM 2014 Lake Ballinger Associated Projects c436 E4FD STR 2014 Overlay Program c438 E4CA WTR 2014 Waterline Overlays c452 E4CC z i STM 2014 Willow Creek Daylighting/Edmonds Marsh Restoration c435 E41FC ; STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STR 2015 Overlay Program c463 w E5CA i c SWR 2015 Sewerline Overlays i007 E5CC s s SWR 2015 Sewerline Replacement Project c441 E4GA i STR 2015 Traffic Calming c471 E5AB s WTR 2015 Waterline Overlays c475 E5CB i s WTR 2015 Waterline Replacement Program c440 E4J13 I STR 2016 Overlay Program i008 E6CA c SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2016 Sewerline Overlays i010 E6CC S WTR 2016 Water Comp Plan Update c460 i E4JC i WTR 2016 Waterline Overlays i009 E6CB < WTR 2016 Waterline Replacement Projects c468 E5JA c SWR 2017 Sanitary Sewer Replacement Project i013 E6GA 19 WTR 2017 Waterline Replacement Projects i014 E6J13 a STR 220th Street Overlay Project c462 E4CD STM 224th & 98th Drainage Improvements c486 E6FB c WTR 224th Waterline Relocation (2013) c418 E3J13 c i STR 228th St. SW Corridor Improvements i005 E7AC STR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB G STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA i c STM 3rd Ave Rain Gardens i012 E6FC STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STR 9th Avenue Improvement Project c392 E2AB = c FAC AN Upgrades - Council Chambers c476 E5LA u STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE i c STR ADA Transition Plan s016 E6DB s STR Bikelink Project c474 E5DA i PRK City Spray Park c417 E4MA SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB Revised 9/1/2016 Packet Pg. 105 PROJECT NUMBERS (By Project Title) 4.4.c Funding Project Title Protect Engineering Accounting Project Number Number SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 ESJB Revised 9/1/2016 Packet Pg. 106 4.4.c PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number STM Dayton Street & SR104 Storm Drainage Alternatives c374 ElFM PM Dayton Street Plaza c276 E7MA STM Dayton Street Storm Improvements (6th Ave - 8th Ave) c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE FAC Edmonds Fishing Pier Rehab c443 E4MB STM Edmonds Marsh Feasibility Study c380 E2FC General Edmonds Waterfront Access Analysis c478 E5DB FAC ESCO III Project c419 E3LB WTR Five Corners Reservoir Re -coating c473 E51KA STIR Five Corners Roundabout (212th Street SW @ 84th Avenue W) c342 E1AA PM Fourth Avenue Cultural Corridor c282 E8MA STIR Hwy 99 Enhancements (Phase III) c405 E2AD SWR Lake Ballinger Trunk Sewer Study sol l E5GB STM LID Retrofits Perrinville Creek Basin c434 E4FB SWR Lift Station #1 Basin & Flow Study c461 E4GC STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon) m013 E7FG STM Perrinville Creek Culvert Replacement c376 E1 FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC FAC Public Safety Controls System Upgrades c444 E4LA STM Seaview Park Infiltration Facility c479 E5FD WWTP Sewer Outfall Groundwater Monitoring c446 E4HA STIR SR104 Corridor Transportation Study c427 E3AB STIR SR104/City Park Mid -Block Crossing c454 E4DB STIR SR99 Safety Improvements (224th to 216th) s014 E6AA UTILITIES Standard Details Updates solo E5NA STM Storm Drainage Improvements - 88th & 194th c429 E3FG STIR Sunset Walkway Improvements c354 E1 DA STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/l06th Ave W Storm Improvements c430 E3FH STIR Trackside Warning System c470 E5AA STIR Train Trench - Concept c453 E4DA STIR Transportation Plan Update c391 E2AA STM Update Stormwater Management Code & Associated Projects c467 E5FB UTILITIES Utility Rate Update s013 E6JA PRK Veteran's Plaza c480 E6MA STM Video Assessment of Stormwater Lines c459 E4FF WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 9/1/2016 Packet Pg. 107 4.4.c PROJECT NUMBERS (By Engineering Number) Engineering Project Project Accounting Funding Number Number Project Title STR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STR 368 ve W at 212th St SW Intersection Improvements STR E1DA c354 Sunset Walkway Improvements STM yton Street & SR104 Storm Drainage Alternatives STM E1 FN c376 Perrinville Creek Culvert Replacement STR ransportation Plan Updat STR E2AB c392 9th Avenue Improvement Project STR E2AD NE1Wy 99 Enhancements (Phase STM E2FA c378 North Talbot Road Drainage Improvements STM SW Edmonds Basin #3-238th St. SW t an Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study SWR 0 2013 Sanitary Sewer Pipe Rehabilitation STR E3AB c427 SR104 Corridor Transportation Study STR 238th St. SW Walkway (100th Ave to 104th Ave) STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) STR E3 c425 236th St. SW Walkway (Edmonds Way to Madrona School) STR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study STM E3FE c410 Northstream Pipe Abandonment on Puget Drive STM E3FG c429 Storm Drainage Improvements - 88th & 194th STM E3FH c430 SW Edmonds-1 05th/1 06th Ave W Storm Improvements SWR E3GA c398 2013 Sewerline Replacement Pr ' WTR E3J13 c418 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Proje INV STR E4CA c438 2014 Overlay Program STR E4CB c451 2014 Chip Seals WTR E4CC c452 2014 Waterline Overlays STR E4CD c462 220th Street Overlay Project STR E4DA c453 Train Trench - Concept STR E4DB c454 SR104/City Park Mid -Block Crossing STM E4FA c433 2014 Drainage Improvements STM c434 LID Retrofits Perrinville Creek Basin STM E4FC c435 2014 Willow Creek Daylighting/Edmonds Marsh Restoration NET c436 2014 Lake Ballinger Associated Projects STM E4FE c455 Dayton Street Stormwater Pump Station `STM Video Assessment of Stormwater Lines SWR E4GA c441 2015 Sewerline Replacement Project `,SWR Citywide CIPP Sewer Rehab Phase I SWR E4GC c461 Lift Station #1 Basin & Flow Study Revised 9/1/2016 Packet Pg. 108 4.4.c PROJECT NUMBERS (By Engineering Number) Engineering Project Proiect Accounting Funding Number Number Project Title WWTP E4HA c446 Sewer Outfall Groundwater Monitoring WTR E4JB c440 2015 Waterline Replacement Program WTR E4JC c460 2016 Water Comp Plan Update FAC E4LA c444 Public Safety Controls System Upgrades PRK E4MA c417 City Spray Park FAC E4MB c443 Edmonds Fishing Pier Rehab STIR E5AA c470 Trackside Warning System STIR E5AB c471 2015 Traffic Calming STIR E5CA c463 2015 Overlay Program WTR E5CB c475 2015 Waterline Overlays SWR E5CC i007 2015 Sewerline Overlays STIR E5DA c474 Bikelink Project General E5DB c478 Edmonds Waterfront Access Analysis STM E51FA c466 2015 Citywide Drainage Improvements/Rehab Projects STM E5FB c467 Update Stormwater Management Code & Associated Projects STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) STM E5FD c479 Seaview Park Infiltration Facility STM E51FE c484 12th Ave & Sierra Stormwater System Improvements SWR E5GA c469 2016 Sanitary Sewer Replacement Projects SWR E5GB s011 Lake Ballinger Trunk Sewer Study WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5JA c468 2016 Waterline Replacement Projects WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) WTR E5KA c473 Five Corners Reservoir Re -coating FAC E5LA c476 AN Upgrades - Council Chambers UTILITIES E5NA solo Standard Details Updates STIR E6AA s014 SR99 Safety Improvements (224th to 216th) STIR E6CA i008 2016 Overlay Program WTR E6CB i009 2016 Waterline Overlays SWR E6CC i010 2016 Sewerline Overlays STIR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) STIR E6DB s016 ADA Transition Plan STM E61FA i011 Northstream Culvert Repair Under Puget Drive STM E6FB c486 224th & 98th Drainage Improvements STM E6FC i012 3rd Ave Rain Gardens SWR E6GA i013 2017 Sanitary Sewer Replacement Project SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II UTILITIES E6JA s013 Utility Rate Update WTR E6J13 i014 2017 Waterline Replacement Projects PRK E6MA c480 Veteran's Plaza STIR E7AC i005 228th St. SW Corridor Improvements STM E7FG m013 NPDES (Students Saving Salmon) PM E7MA c276 Dayton Street Plaza Revised 9/1/2016 Packet Pg. 109 4.4.c PROJECT NUMBERS (By Engineering Number) Engineering Project Proiect Accounting Funding Number Number Proiect Title PM EBMA c282 Fourth Avenue Cultural Corridor Revised 9/1/2016 Packet Pg. 110 4.4.c PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Proiect Accounting Funding Number Number Proiect Title PM E7MA c276 Dayton Street Plaza PM E8MA c282 Fourth Avenue Cultural Corridor STIR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STIR E1 DA c354 Sunset Walkway Improvements STIR E1CA c368 76th Ave W at 212th St SW Intersection Improvements STM E1 FM c374 Dayton Street & SR104 Storm Drainage Alternatives STM E1 FN c376 Perrinville Creek Culvert Replacement STM E21FA c378 North Talbot Road Drainage Improvements STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study SWR E2GB c390 2013 Sanitary Sewer Pipe Rehabilitation STIR E2AA c391 Transportation Plan Update STIR E2AB c392 9th Avenue Improvement Project SWR E3GA c398 2013 Sewerline Replacement Project STIR E2AD c405 Hwy 99 Enhancements (Phase III) STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study STM E31FE c410 Northstream Pipe Abandonment on Puget Drive PRK E4MA c417 City Spray Park WTR E3J13 c418 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Project STIR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STIR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) STIR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) STIR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STIR E3AB c427 SR104 Corridor Transportation Study STM E3FG c429 Storm Drainage Improvements - 88th & 194th STM E3FH c430 SW Edmonds-1 05th/1 06th Ave W Storm Improvements STM E41FA c433 2014 Drainage Improvements STM E4FB c434 LID Retrofits Perrinville Creek Basin STM E4FC c435 2014 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 2014 Lake Ballinger Associated Projects STIR E4CA c438 2014 Overlay Program WTR E4J13 c440 2015 Waterline Replacement Program SWR E4GA c441 2015 Sewerline Replacement Project FAC E4MB c443 Edmonds Fishing Pier Rehab FAC E41-A c444 Public Safety Controls System Upgrades WWTP E4HA c446 Sewer Outfall Groundwater Monitoring STIR E4CB c451 2014 Chip Seals WTR E4CC c452 2014 Waterline Overlays Revised 9/1/2016 Packet Pg. 111 4.4.c PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting Funding Number Number Project Title STR E4DA c453 Train Trench - Concept STR E4DB c454 SR104/City Park Mid -Block Crossing STM E41FE c455 Dayton Street Stormwater Pump Station SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I STM E4FF c459 Video Assessment of Stormwater Lines WTR E4JC c460 2016 Water Comp Plan Update SWR E4GC c461 Lift Station #1 Basin & Flow Study STR E4CD c462 220th Street Overlay Project STR E5CA c463 2015 Overlay Program STM E51FA c466 2015 Citywide Drainage Improvements/Rehab Projects STM E5FB c467 Update Stormwater Management Code & Associated Projects WTR E5JA c468 2016 Waterline Replacement Projects SWR E5GA c469 2016 Sanitary Sewer Replacement Projects STR E5AA c470 Trackside Warning System STR E5AB c471 2015 Traffic Calming STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) WTR E51KA c473 Five Corners Reservoir Re -coating STR E5DA c474 Bikelink Project WTR E5CB c475 2015 Waterline Overlays FAC E5LA c476 AN Upgrades - Council Chambers General E5DB c478 Edmonds Waterfront Access Analysis STM E5FD c479 Seaview Park Infiltration Facility PRK E6MA c480 Veteran's Plaza WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) STM E51FE c484 12th Ave & Sierra Stormwater System Improvements STR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) STM E6FB c486 224th & 98th Drainage Improvements SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II STR E7AC i005 228th St. SW Corridor Improvements SWR E5CC i007 2015 Sewerline Overlays STR E6CA i008 2016 Overlay Program WTR E6CB i009 2016 Waterline Overlays SWR E6CC i010 2016 Sewerline Overlays STM E61FA iol 1 Northstream Culvert Repair Under Puget Drive STM E6FC i012 3rd Ave Rain Gardens SWR E6GA i013 2017 Sanitary Sewer Replacement Project WTR E6J13 i014 2017 Waterline Replacement Projects STM E7FG m013 NPDES (Students Saving Salmon) UTILITIES E5NA solo Standard Details Updates SWR E5GB s011 Lake Ballinger Trunk Sewer Study UTILITIES E6JA s013 Utility Rate Update STR E6AA s014 SR99 Safety Improvements (224th to 216th) Revised 9/1/2016 Packet Pg. 112 4.4.c PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Proiect Accounting Funding Number Number Proiect Title STIR E6DB s016 ADA Transition Plan Revised 9/1/2016 Packet Pg. 113 4.4.c PROJECT NUMBERS (By Project Title) Project Engineering Accounting Protect Funding Protect Title Number Number FAC A/V Upgrades - Council Chambers c476 E5LA FAC Edmonds Fishing Pier Rehab c443 E4MB FAC ESCO III Project c419 E3LB FAC Public Safety Controls System Upgrades c444 E41-A General Edmonds Waterfront Access Analysis c478 E5DB PM Dayton Street Plaza c276 E7MA PM Fourth Avenue Cultural Corridor c282 E8MA PRK City Spray Park c417 E4MA PRK Veteran's Plaza c480 E6MA STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE STM 2014 Drainage Improvements c433 E4FA STM 2014 Lake Ballinger Associated Projects c436 E4FD STM 2014 Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STM 224th & 98th Drainage Improvements c486 E6FB STM 3rd Ave Rain Gardens i012 E6FC STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1 FM STM Dayton Street Storm Improvements (6th Ave - 8th Ave) c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE STM Edmonds Marsh Feasibility Study c380 E2FC STM LID Retrofits Perrinville Creek Basin c434 E4FB STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon) m013 E7FG STM Perrinville Creek Culvert Replacement c376 E1 FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC STM Seaview Park Infiltration Facility c479 E5FD STM Storm Drainage Improvements - 88th & 194th c429 E3FG STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH STM Update Stormwater Management Code & Associated Projects c467 E5FB STM Video Assessment of Stormwater Lines c459 E4FF STR 15th St. SW Walkway (Edmonds Way to 8th Ave) c424 E3DC STR 2014 Chip Seals c451 E4CB STR 2014 Overlay Program c438 E4CA STR 2015 Overlay Program c463 E5CA STR 2015 Traffic Calming c471 E5AB Revised 9/1/2016 Packet Pg. 114 4.4.c PROJECT NUMBERS (By Project Title) Project Engineering Accounting Protect Fundinq Protect Title Number Number STR 2016 Overlay Program i008 E6CA STR 220th Street Overlay Project c462 E4CD STR 228th St. SW Corridor Improvements i005 E7AC STR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STR 9th Avenue Improvement Project c392 E2AB STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE STR ADA Transition Plan s016 E6DB STR Bikelink Project c474 E5DA STR Five Corners Roundabout (212th Street SW @ 84th Avenue W) c342 E1AA STR Hwy 99 Enhancements (Phase III) c405 E2AD STR SR104 Corridor Transportation Study c427 E3AB STR SR104/City Park Mid -Block Crossing c454 E4DB STR SR99 Safety Improvements (224th to 216th) s014 E6AA STR Sunset Walkway Improvements c354 E1 DA STR Trackside Warning System c470 E5AA STR Train Trench - Concept c453 E4DA STR Transportation Plan Update c391 E2AA SWR 2013 Sanitary Sewer Pipe Rehablitation c390 E2GB SWR 2013 Sewerline Replacement Project c398 E3GA SWR 2015 Sewerline Overlays i007 E5CC SWR 2015 Sewerline Replacement Project c441 E4GA SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2016 Sewerline Overlays iolo E6CC SWR 2017 Sanitary Sewer Replacement Project i013 E6GA SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB SWR Lake Ballinger Trunk Sewer Study sol l E5GB SWR Lift Station #1 Basin & Flow Study c461 E4GC UTILITIES Standard Details Updates solo E5NA UTILITIES Utility Rate Update s013 E6JA WTR 2014 Waterline Overlays c452 E4CC WTR 2015 Waterline Overlays c475 E5CB WTR 2015 Waterline Replacement Program c440 E4JB WTR 2016 Water Comp Plan Update c460 E4JC WTR 2016 Waterline Overlays io09 E6CB WTR 2016 Waterline Replacement Projects c468 E5JA WTR 2017 Waterline Replacement Projects i014 E6JB WTR 224th Waterline Relocation (2013) c418 E3JB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 E5JB WTR Five Corners Reservoir Re -coating c473 E5KA Revised 9/1/2016 Packet Pg. 115 4.4.c PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number WWTP Sewer Outfall Groundwater Monitoring c446 E4HA WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 9/1/2016 Packet Pg. 116 Payroll Earnings Summary Report City of Edmonds Pay Period: 782 (08/16/2016 to 08/31/2016) Hour Type Hour Class Description Hours Amount -ed2 REGULAR HOURS Educational Pav Correction 0.00 -156.28 111 ABSENT NO PAY LEAVE 50.50 0.00 118 ABSENT UNPAID L & 1 57.81 0.00 120 SICK SICK LEAVE - L & 1 38.69 931.91 121 SICK SICK LEAVE 469.58 15,158.21 122 VACATION VACATION 1,993.55 67,663.67 123 HOLIDAY HOLIDAY HOURS 33.00 1,253.86 124 HOLIDAY FLOATER HOLIDAY 49.00 1,418.04 125 COMP HOURS COMPENSATORY TIME 219.00 7,389.59 129 SICK Police Sick Leave L & 1 144.00 5,137.50 130 COMP HOURS Holidav Compensation Used 9.00 299.27 131 MILITARY MILITARY LEAVE 40.00 1,534.17 141 BEREAVEMENT BEREAVEMENT 74.00 2,623.53 150 REGULAR HOURS Kellv Dav Used 228.00 8,335.21 155 COMP HOURS COMPTIME AUTO PAY 45.64 1,926.19 160 VACATION MANAGEMENT LEAVE 2.00 98.94 170 REGULAR HOURS COUNCIL BASE PAY 700.00 7,000.00 174 REGULAR HOURS COUNCIL PRESIDENTS PAY 0.00 130.00 175 REGULAR HOURS COUNCIL PAY FOR NO MEDICP 0.00 2,821.24 190 REGULAR HOURS REGULAR HOURS 17,902.20 584,329.67 191 REGULAR HOURS FIRE PENSION PAYMENTS 4.00 1,886.58 196 REGULAR HOURS LIGHT DUTY 24.00 856.25 205 OVERTIME HOURS OVERTIME .5 41.00 676.84 210 OVERTIME HOURS OVERTIME -STRAIGHT 6.00 194.20 215 OVERTIME HOURS WATER WATCH STANDBY 60.00 2,879.48 216 MISCELLANEOUS STANDBY TREATMENT PLANT 14.00 1,213.42 220 OVERTIME HOURS OVERTIME 1.5 251.25 13,899.97 225 OVERTIME HOURS OVERTIME -DOUBLE 1.00 71.72 410 MISCELLANEOUS WORKING OUT OF CLASS 0.00 118.80 411 SHIFT DIFFERENTIAL SHIFT DIFFERENTIAL 0.00 1,471.47 600 RETROACTIVE PAY RETROACTIVE PAY 0.00 144.27 602 COMP HOURS ACCRUED COMP 29.50 0.00 m rt 604 COMP HOURS ACCRUED COMP TIME 49.25 0.00 (Q 9/01 Toni F Attachment: Payroll summary 09-02-16 (1494 : Approval of claim, payroll and benefit direct deposit, checks and wire payments.) Payroll Earnings Summary Report City of Edmonds Pay Period: 782 (08/16/2016 to 08/31/2016) Hour Type Hour Class Description Hours Amount 606 COMP HOURS ACCRUED COMP TIME 5.00 0.00 acc MISCELLANEOUS ACCREDITATION PAY 0.00 24.95 acs MISCELLANEOUS ACCRED/POLICE SUPPORT 0.00 143.91 boc MISCELLANEOUS BOC II Certification 0.00 84.53 colre MISCELLANEOUS Collision Reconstruction ist 0.00 107.89 cpl MISCELLANEOUS TRAINING CORPORAL 0.00 147.28 crt MISCELLANEOUS CERTIFICATION III PAY 0.00 622.35 det MISCELLANEOUS DETECTIVE PAY 0.00 102.75 det4 MISCELLANEOUS Detective 4% 0.00 989.84 ed1 EDUCATION PAY EDUCATION PAY 2% 0.00 731.26 ed2 EDUCATION PAY EDUCATION PAY 4% 0.00 891.06 ed3 EDUCATION PAY EDUCATION PAY 6% 0.00 5,117.28 fmla ABSENT FAMILY MEDICAL/NON PAID 91.00 0.00 hol HOLIDAY HOLIDAY 8.00 270.25 k9 MISCELLANEOUS K-9 PAY 0.00 102.75 Iq1 LONGEVITY LONGEVITY PAY 2% 0.00 888.29 Ig10 LONGEVITY LONGEVITY 5.5% 0.00 396.36 Ig11 LONGEVITY LONGEVITY PAY 2.5% 0.00 737.53 Iq2 LONGEVITY PAY LONGEVITY PAY 4% 0.00 997.22 I0 LONGEVITY PAY LONGEVITY 6% 0.00 5,661.69 Iq4 LONGEVITY Lonqevitv 1 % 0.00 240.75 Ici6 LONGEVITY Lonqevitv .5% 0.00 274.75 Iq7 LONGEVITY Lonqevitv 1.5% 0.00 931.11 Iq9 LONGEVITY Lonqevitv 3.5% 0.00 82.46 mels SICK Medical Leave Sick 102.00 3,646.94 mtc MISCELLANEOUS MOTORCYCLE PAY 0.00 200.57 nds MISCELLANEOUS Public Disclosure Specialist 0.00 47.12 phv MISCELLANEOUS PHYSICAL FITNESS PAY 0.00 1,923.49 prof MISCELLANEOUS PROFESSIONAL STANDARDS 0.00 157.56 sdp MISCELLANEOUS SPECIAL DUTY PAY 5% 0.00 514.51 sqt MISCELLANEOUS ADMINISTRATIVE SERGEANT 0.00 157.56 slw SICK SICK LEAVE ADD BACK 35.30 0.00 m rt str MISCELLANEOUS Street Crimes 0.00 157.56 (Q 9/01 Toni F 00 Attachment: Payroll summary 09-02-16 (1494 : Approval of claim, payroll and benefit direct deposit, checks and wire payments.) P- A porn 2 o a Payroll Earnings Summary Report City of Edmonds Pay Period: 782 (08/16/2016 to 08/31/2016) Hour Type Hour Class Description Hours Amount traf MISCELLANEOUS TRAFFIC 0.00 323.67 22,777.27 $757,982.96 Total Net Pay: $509,288.96 9/01 i.)ni F Attachment: Payroll summary 09-02-16 (1494 : Approval of claim, payroll and benefit direct deposit, checks and wire payments.) A porn 3 o a Benefit Checks Summary Report City of Edmonds Pay Period: 782 - 08/16/2016 to 08/31/2016 Bank: usbank - US Bank Check # Date Payee # Name Check Amt Direct Deposit 62312 09/02/2016 chapl CHAPTER 13 TRUSTEE 50.00 0.00 62313 09/02/2016 epoa EPOA-1 POLICE 1,219.00 0.00 62314 09/02/2016 epoa4 EPOA-4 POLICE SUPPORT 104.00 0.00 62315 09/02/2016 jhan JOHN HANCOCK 1,028.10 0.00 62316 09/02/2016 flex NAVIA BENEFIT SOLUTIONS 789.99 0.00 62317 09/02/2016 cope SEIU COPE 72.00 0.00 62318 09/02/2016 seiu SEIU LOCAL 925 4,187.93 0.00 62319 09/02/2016 uw UNITED WAY OF SNOHOMISH COUNTY 698.24 0.00 62320 09/02/2016 icma VANTAGE TRANSFER AGENTS 304884 1,449.81 0.00 Bank: wire - US BANK 9,599.07 0.00 Check # Date Payee # Name Check Amt Direct Deposit 2438 09/02/2016 pens DEPT OF RETIREMENT SYSTEMS 240,281.52 0.00 2439 09/02/2016 aflac AFLAC 6,161.10 0.00 2443 09/02/2016 wadc WASHINGTON STATE TREASURER 19,766.00 0.00 2444 09/02/2016 us US BANK 104,387.23 0.00 2445 09/02/2016 mebt WTRISC FBO #N3177B1 93,419.43 0.00 2447 09/02/2016 pb NATIONWIDE RETIREMENT SOLUTION 5,715.92 0.00 2448 09/02/2016 oe OFFICE OF SUPPORT ENFORCEMENT 647.50 0.00 0.00 470,378.70 Grand Totals: 479,977.77 0.00 c 1 /201 R Attachment: payroll benefit 09-02-16 (1494 : Approval of claim, payroll and benefit direct deposit, checks and wire payments.) poge 1 io 4.5 City Council Agenda Item Meeting Date: 09/6/2016 July 2016 Monthly Budgetary Financial Report Staff Lead: Scott James Department: Administrative Services Preparer: Sarah Mager Staff Recommendation No Action needed; informational only. Narrative July 2016 Monthly Budgetary Financial Report Attachments: July 2016 Monthly Financial Report Packet Pg. 121 Z O z r 00 c v 0 M D 70 mn z D z 0 D r 70 M MU O 70 0 O mn M v 9 O z v 00 0 Attachment: July 2016 Monthly Financial Report (1498 : July 2016 Monthly Budgetary Financial Report) ►�-Tt C11 4.5.a Page 1 of 1 C ITY O F EDMO NDS REVENUES BY FUND - SUMMARY Fund 2016 Amended 7/31/2015 7/31/2016 Amount No. Title Budget Revenues Revenues Remaining %Received 001 GENERAL FUND $ 39,280,321 $ 20,889,506 $ 22,256,068 $ 17,024,253 570 009 LEOFF-MEDICAL INS. RESERVE 278,770 139,760 140,085 138,685 500 011 RISK MANAGEMENT FUND 6,660 4,813 5,137 1,523 770 012 CONTINGENCY RESERVE FUND 28,110 25,240 8,911 19,199 320 013 MULTIMODAL TRANSPORTATION FUND - 264 288 (288) 00 014 HISTORIC PRESERVATION GIFT FUND 5,000 3 2,531 2,469 510 016 BUILDING MAINTENANCE 1 2,505,000 252,640 921,723 1,583,277 370 104 DRUG ENFORCEMENT FUND 153,000 11,295 68,705 84,295 450 111 STREET FUND 1,760,500 1,041,090 1,119,234 641,266 640 112 COMBINED STREET CONST/IMPROVE 2 8,160,017 936,416 4,577,872 3,582,145 560 117 MUNICIPAL ARTS ACQUIS. FUND 106,008 38,286 35,097 70,911 330 118 MEMORIAL STREET TREE 110 84 91 19 830 120 HOTEL/MOTEL TAX REVENUE FUND 82,150 37,446 41,799 40,351 510 121 EMPLOYEE PARKING PERMIT FUND 21,390 9,061 8,740 12,650 410 122 YOUTH SCHOLARSHIP FUND 5,550 243 85 5,465 20 123 TOURISM PROMOTIONAL FUND/ARTS 27,530 12,655 14,113 13,417 510 125 REAL ESTATE EXCISE TAX 2 1,108,000 824,820 728,690 379,310 660 126 REAL ESTATE EXCISE TAXI, PARKS ACQ FUND 1,102,000 823,351 729,679 372,321 660 7 127 GIFTSCATALOGFUND 46,900 37,679 28,604 18,296 61° 129 SPECIAL PROJECTS FUND 280 179 196 84 700 00 14 130 CEMETERY MAINTENANCE/IMPROVEMT 177,260 114,770 104,008 73,252 59° v 132 PARKS CONSTRUCTION FUND 1,352,240 193,786 1,095,637 256,603 810, C 136 PARKS TRUST FUND 630 711 776 (146) 1230 CD 137 CEMETERY MAINTENANCE TRUST FD 19,880 14,542 13,997 5,883 700 W TV 138 SISTER CITY COMMISSION 12,010 3,613 5,779 6,231 480, C 139 TRANSPORTATION BENEFIT DISTRICT 682,500 413,803 423,195 259,305 620 140 BUSINESS IMPROVEMENT DISTRICT - 58,976 59,909 (59,909) 00 LL 211 L.I.D. FUND CONTROL 14,400 9,718 773 13,627 50, t 213 L.I.D. GUARANTY FUND 14,400 - - 14,400 r� 00 0 O 231 2012 LT GO DEBT SERVICE FUND 677,380 75,464 70,301 607,079 100 2 232 2014 DEBT SERVICE FUND 949,540 9,201 936,429 13,111 990 p N 411 COMBINED UTILITY OPERATION - 28,259 95,769 (95,769) 00 >, 421 WATER UTILITY FUND 4 8,443,460 4,137,629 4,893,911 3,549,549 580 422 STORM UTILITY FUND 4,131,780 2,301,593 2,216,582 1,915,198 540 C 423 SEWER/WWTP UTILITY FUND s 12,645,240 5,460,864 6,163,141 6,482,099 N 490, E t 424 BOND RESERVE FUND 1,989,900 337,210 667,447 1,322,453 340 511 EQUIPMENT RENTAL FUND 1,579,570 929,894 966,070 613,500 r 610 Q 617 FIREMEN'S PENSION FUND 64,840 56,840 57,650 7,190 890, $ 87,432,326 $ 39,231,705 $ 48,459,024 $ 38,973,302 550, Differences between 2015 and 2016 are due to grant invoicing for Fishing Pier Rehab and mid -year transfer from Fund 001. 2 Difference between 2015 and 2016 is due to grant invoicing for various projects in 2016. 3 Differences between 2015 and 2016 are due to a SnoCo grant, parks dona tionA and park impact fees 4 Difference between 2015 and 2016 islargely due to a substantial water connection fee and the 9%increase to water base rates 5 Differences are due to increases in invoicing and sewer connection fees in 2016, as well as a 9.5%increase to sewer base rates 1 Packet Pg. 123 4.5.a Page 1 of 1 C ITY O F EDMO NDS EXPENDITURES BY FUND - SUMMARY Fund 2016 Amended 7/31/2015 7/31/2016 Amount No. Title Budget Expenditures Expenditures Remaining %Spent 001 GENERAL FUND 6 $ 41,011,287 $ 21,504,246 $ 23,796,385 $ 17,214,902 580/( 009 LEOFF-MEDICAL INS. RESERVE 279,480 165,488 152,760 126,720 5501( 011 RISK MANAGEMENT RESERVE FUND - 70,546 - - 00/( 012 CONTINGENCY RESERVE FUND 800,000 400,000 800,000 0°/ 014 HISTORIC PRESERVATION GIFT FUND 5,400 5,250 - 5,400 0°/ Q. 016 BUILDING MAINT ENANCE 2,395,000 105,250 1,045,633 1,349,367 44% tY 104 DRUG ENFORCEMENT FUND 76,030 29,637 43,559 32,471 570/( .� v 111 STREET FUND 1,716,120 963,970 1,088,895 627,225 630/( 112 COMBINED STREET CONST/IMPROVE 8 8,173,112 2,019,302 2,514,392 5,658,720 310/( LL 117 MUNICIPAL ARTS ACQUIS. FUND 181,380 35,023 34,084 147,296 19% ca 118 MEMORIAL STREET TREE - - - - 0% d 120 HOTEL/MOTEL TAX REVENUE FUND 149,650 30,084 27,681 121,969 180/( 121 EMPLOYEE PARKING PERMIT FUND 26,880 - - 26,880 00/( M 122 YOUTH SCHOLARSHIP FUND 3,000 1,416 985 2,015 33% r 123 TOURISM PROMOTIONAL FUND/ARTS 31,500 6,501 10,703 20,797 C 340/, O 125 REAL ESTATE EXCISE TAX 2 2,100,565 125,849 296,873 1,803,692 14% to 126 REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 9 2,750,000 28,845 498,915 2,251,085 180/( N 127 GIFTSCATALOGFUND 44,950 20,296 35,120 9,830 780/( �+ 7 129 SPECIAL PROJECTS FUND - - - - 00/( 130 CEMETERY MAINTENANCE/IMPROVEMT 210,370 91,397 92,223 118,147 440/( 00 132 PARKS CONSTRUCTION FUND 9 1,575,770 283,468 596,604 979,166 qq 380/( 136 PARKSTRUST FUND - - - - 00 O 138 SISTER CITY COMMISSION 12,500 3,414 2,895 9,605 230/( d 139 TRANSPORTATION BENEFIT DISTRICT 682,500 441,738 423,195 259,305 620/( 140 BUSINESS IMPROVEMENT DISTRICT - 38,759 33,667 (33,667) R C 211 L.I.D. FUND CONTROL 14,400 - - 14,400 00/( C 213 L.I.D. GUARANTY FUND - - - - 00% LL 231 2012 LT GO DEBT SERVICE FUND 677,380 75,517 70,301 607,079 100/( t 232 2014 DEBT SERVICE FUND 6 949,540 9,201 936,429 13,111 99% C 421 WATER UTILITY FUND 12,717,507 4,171,305 4,481,014 8,236,493 350/( c2o 422 STORM UTILITY FUND 8,057,048 1,464,315 1,862,356 6,194,692 230/( p N 423 SEWER/WWTP UTILITY FUND 17,921,050 4,905,107 5,179,657 12,741,393 290/( >, 424 BOND RESERVE FUND 1,990,920 388,251 667,442 1,323,478 340/( 511 EQUIPMENT RENTAL FUND 1,971,820 691,455 978,698 993,122 5001( d 617 FIREMEN'S PENSION FUND 59,610 29,735 24,471 35,139 41% E s $ 106,584,769 $ 38,105,364 $ 44,894,937 $ 61,689,832 420% r Q 6 Differences between 2015 and 2016 are primarily due to final payment of 2014 debt. 7 Differences between 2015 and 2016 are primarily due to the Edmonds Fishing Pier Rehabilitation Project. 8 Differences between 2015 and 2016 are due to invoices for construction projects in 2016. 9 Differences between 2015 and 2016 are due to purchase of Civic Field in 2016. 2 .Pack__ .,_ 12 rac,ecei Pg. ie4 4.5.a Page 1 of 3 C TIY O F IDMO NDS REVENUES - GENERAL FUND 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Revenues Revenues Remaining %Received TAXES: REAL PERSONAL / PROPERTY TAX EMS PROPERTY TAX 10 VOTED PROPERTY TAX LOCAL RETAIL SALES/USE TAX 11 NATURAL GAS USE TAX 1/10 SALES TAX LOCAL CRIM JUST ELECTRIC UTILITY TAX GAS UTILITY TAX SOLID WASTE UTILITY TAX WATER UTILITY TAX SEWER UT ILIT Y TAX ST ORMWAT ER UT ILIT Y TAX T.V. CABLE UTILITY TAX TELEPHONE UTILITY TAX PULLTABS TAX AMUSEMENT GAMES LEASEHOLD EXCISE TAX LICENSES AND PERNHTS: FIRE PERMITS -SPECIAL USE POLICE - FINGERPRINTING PROF AND OCC LICENSE -TAXI AMUSEMENTS FRANCHISE AGREEMENT -COMCAST FRANCHISE FEE-EDUCATION/GOVERNMENT FRANCHISE AGREEMENT -VERIZON/FRONT IER FRANCHISE AGREEMENT -BLACKROCK OLYMPIC VIEW WATER DISTRICT FRANCHISE GENERAL BUSINESS LICENSE DEV SERV PERMIT SURCHARGE NON-RESIDENT BUS LICENSE RIGHT OF WAY FRANCHISE FEE BUILDING STRUCTURE PERMITS 12 ANIMAL LICENSES STREET AND CURB PERMIT OT R NON -BUS LIC/P ERMIT S INTERGOVERNMENTAL: FEDERAL GRANT S-BUDGET ONLY DOJ 15-0404-0-1-754 - BULLET PROOF VEST USDA FOREST SERVICE ROOFTOP SOLAR CHALLENGE GRANT ROOFTOP SOLAR CHALLENGE II WA ASSOC OF SHERIFFS TRAFFIC GRANT TARGET ZERO TEAMS GRANT HIGH VISIBILITY ENFORCEMENT DOCKSIDE DRILLS GRANT REIMBURSE WA STATE ADMIN OFFICE COURTS GRANT 2014 COMMUNITY FORESTRY GRANT WATERFRONT ANALYSIS GRANT PUD PRIVILEDGE TAX MVET/SPECIAL DISTRIBUTION JUDICIAL SALARY CONTRIBUTION -STATE CRIMINAL JUSTICE -SPECIAL PROGRAMS DUI - CITIES LIQUOR EXCISE TAX LIQUOR BOARD PROFIT S MISCELLANEOUS INTERLOCAL REVENUE 13 INTERLOCAL GRANTS VERDANT INTERLOCAL GRANTS $ 10,068,020 $ 5,355,897 $ 5,377,548 $ 4,690,472 53% 3,688,090 1,818,569 1,967,958 1,720,132 53% 949,540 496,545 507,295 442,245 53% 6,144,400 3,704,663 3,843,359 2,301,041 63% 9,800 4,121 3,688 6,112 38% 626,700 356,614 381,738 244,962 61% .-. 1,451,800 980,692 1,025,239 426,561 71% p 647,900 442,408 415,562 232,338 64% 306,500 184,169 189,248 117,252 62% 1,229,110 616,137 669,719 559,391 54% 629,140 335,806 371,244 257,896 59% 'v 330,430 179,870 188,132 142,298 57% 846,000 495,327 496,447 349,553 59% 1,349,100 768,922 732,953 616,147 54% li 60,600 36,295 38,477 22,123 63% �+ 40 - 141 (101) 351% 242,200 121,178 126,667 115,533 52% 28,579,370 15,897,212 16,335,416 12,243,954 57% 7 250 215 190 60 76% m 300 - 250 50 83% z 630 - - 630 0% C 4,740 4,325 - 4,740 0% O 710,600 532,250 534,338 176,263 75% 2 44,900 27,184 24,664 20,236 55% 100,900 49,706 50,705 50,195 50% N 18,400 9,091 8,172 10,228 44% 268,000 197,208 138,558 129,442 52% 116,000 90,852 80,066 35,934 69% 42,000 28,440 32,090 9,910 76% co 70,400 30,750 45,000 25,400 64% 15,000 5,388 46,623 (31,623) 311% 525,000 371,334 446,158 78,843 85% 38,800 16,068 10,507 28,293 27% O 42,100 21,179 29,212 12,888 69% y 13,100 8,405 10,707 2,393 82% �! 2,011,120 1,392,395 1,457,239 553,881 72% �p - - - - 0% 11,970 3,018 6,920 5,050 58% - - - - 0% LL 3,750 - - 0% 6,000 5,250 5,250 750 88% - - 995 (995) 0% O 7,500 5,287 2,830 4,670 38% 22 3,000 - 2,663 337 89% c0 - - 614 (614) 0% o 300 300 - 300 0% N - 1,000 - - 0% - - 330,649 (330,649) 0% 192,500 - - 192,500 0% 10,000 7,946 8,297 1,703 83% d 13,000 8,189 9,150 3,850 70% E 36,980 29,139 30,279 6,701 82% V 7,240 4,458 4,740 2,500 65% M 65,200 63,087 139,331 (74,131) 214% Q 357,800 175,055 174,541 183,259 49% - - 75,757 (75,757) 0% 383,330 - - 383,330 0% 2,000 2,120 (2,120) 0% 1,094,820 308,478 794,135 300,685 73% 10 2016 EMS Property Tax revenues are $149,390 higher than 2015 revenues. 11 2016 Local Retail Sales/Use Taxrevenues are $138,696 higher than 2015 revenues. Please also see pages 18 & 19. 12 2016 Building Structure Permits are $74,823 higher than 2015 revenues. 13 Difference between 2015 and 2016 revenues is due to funds received for closure of ESCA in 2016. 3 Packet Pg. 125 1 4.5.a Page 2 of 3 C ITY O F EDMO NDS REVENUES - GENERAL FUND 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Revenues Revenues Remaining %Received CHARGES FOR GOODS AND SERVICES: MUNICIPAL COURT CIVIC FILINGS $ - $ - $ 25 $ (25) 0% RECORD/LEGAL INSTRUMTS 2,000 1,430 1,413 588 71% ATM SURCHARGE FEES 250 67 152 98 61% COURT RECORD SERVICES - - - - 0% D/M COURT REC SER 50 7 17 33 33% SHARED COURT COSTS - - - - 0% MUNIC.-DIST. COURT CURR EXPEN 400 294 298 102 74% SALE MAPS & BOOKS 100 - - 100 0% C CLERKS TIME FOR SALE OF PARKING PERMITS 25,100 25,100 0% N BID SUPPLIES REIMBURSEMENT 600 - - 600 0% PHOTOCOPIES 2,000 1,182 558 1,442 28% cC POLICE DISCLOSURE REQUESTS 4,000 2,407 2,003 1,997 50% V ENGINEERING FEES AND CHARGES 180,350 123,372 147,614 32,736 82% R ELECTION CANDIDATE FILING FEES - - - - 0% .� SNO-ISLE 58,000 29,757 50,484 7,516 87% LL PASSPORTS AND NATURALIZATION FEES 15,000 11,975 13,428 1,572 90% POLICE SERVICES SPECIAL EVENTS 26,000 11,746 13,363 12,637 51% OCDETF OVERTIME - - - - 0% CAMPUS SAFETY-EDM. SCH. DIST. 12,300 3,782 2,873 9,427 23% WOODWAY-LAW PROTECTION 39,500 31,510 49,211 (9,711) 125% m MISCELLANEOUS POLICE SERVICES 1,500 - 538 962 36% >, DUI EMERGENCY FIRE SERVICES 300 305 - 300 0% r FIRE PROTECTION & EMS FOR DUI - - 36 (36) 0% FIRE DISTRICT #1 STATION BILLINGS 45,000 27,223 39,031 5,969 87% 0 LEGAL SERVICES - - 177 (177) 0% to ADULT PROBATION SERVICE CHARGE 60,000 37,893 41,099 18,901 68% BOOKINGFEES 6,000 4,001 2,382 3,618 40% N FIRE CONSTRUCTION INSPECTION FEES 8,000 13,276 15,536 (7,536) 194% >+ EMERGENCY SERVICE FEES 15,000 6,135 4,960 10,040 33% EMS TRANSPORT USER FEE 14 822,100 407,087 487,513 334,587 59% CRIM CONY FEE CT - - - - 0% 00 CRIM CONV FEE CN - - - - 0% r FIBER SERVICES 9,200 5,355 6,860 2,340 75% " INTERGOVERNMENTAL FIBER SERVICES 7,200 4,200 4,200 3,000 58%' FLEX FUEL PAYMENTS FROM STATIONS 1,800 1,226 1,171 629 65% 0 ANIMAL CONTROL SHELTER 6,000 1,636 184 5,817 3% ZONING/SUBDIVISION FEE 75,000 61,297 53,146 21,854 71% PLAN CHECKING FEES 425,000 324,937 250,865 174,135 59% .� FIRE PLAN CHECK FEES 3,000 6,345 6,885 (3,885) 230% V C PLANNING 1% INSPECTION FEE 1,250 939 1,740 (490) 139% S.E.P.A. REVIEW 7,000 7,545 610 6,390 9% LL CRITICAL AREA STUDY 15,000 11,625 11,660 3,340 78% DV COORDINATOR SERVICES 10,000 5,538 6,486 3,514 65% t SWIM POOL ENTRANCE FEES - - - - 0% GYM AND WEIGHT ROOM FEES 7,800 4,605 7,520 280 96% 0 LOCKERFEES - - - - 0% SWIM CLASS FEES - - - - 0% w PROGRAM FEES 861,700 545,591 623,291 238,409 72% N TAXABLE RECREATION ACTIVITIES 19,130 79,426 964 18,166 5% SWIM TEAM/DIVE TEAM - 0% WINTER MARKET REGISTRATION FEES 5,000 25 4,975 1% BIRD FEST REGISTRATION FEES 950 180 220 730 23% INTERFUND REIMBURSEMENT -CONTRACT SVCS 2,964,600 488,815 1,186,041 1,778,559 40% 5,743,180 2,262,709 3,034,579 2,708,601 53% a) s t� ea r+ Q 14 2016 EMS Transport User Fees are $80,426 higher than 2015 revenues. 4 Packet Pg. 126 4.5.a Page 3 of 3 C PIY O F EDMO NDS REVENUES - GENERAL FUND 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Revenues Revenues Remaining %Received FINES AND FO RFEITURES : PROOF OF VEHICLE INS PENALTY 8,000 4,039 4,159 3,841 52% TRAFFIC INFRACTION PENALTIES 25,000 25,338 119,093 (94,093) 476% NC TRAFFIC INFRACTION 260,000 164,592 35,718 224,282 14% CRT COST FEE CODE LEG ASSESSMENT (LGA) 24,600 14,700 12,365 12,235 50% SPEEDINGDOUBLE - - - - 0% NON -TRAFFIC INFRACTION PENALTIES 1,300 1,780 38,868 (37,568) 2990% OTHER INFRACTIONS'04 1,000 352 1,284 (284) 128% PARKINGINFRACTION PENALTIES 43,000 26,698 13,860 29,140 32% PR -HANDICAPPED - - - - 0% PARK/INDDISZONE 1,300 1,134 1,903 (603) 146% DWI PENALTIES 6,000 3,129 15,544 (9,544) 259% DUI - DP ACCT 2,500 1,700 1,544 956 62% CRIM CNV FEE DUI 300 309 310 (10) 103% OTHER CRIMINAL TRAF MISDEM PEN - - - - 0% CRIMINAL TRAFFIC MISDEMEANOR 8/03 33,000 19,284 18,930 14,070 57% CRIMINAL CONVICTION FEE CT 1,900 1,475 1,602 298 84% CRIM CONV FEE CT 2,300 1,147 1,051 1,249 46% OTHER NON-TRAF MISDEMEANOR PEN 130 92 - 130 0% OTHER NON TRAFFIC MISD. 8/03 9,000 7,547 5,058 3,942 56% COURT DV PENALTY ASSESSMENT 900 763 307 593 34% CRIMINAL CONVICTION FEE CN 1,900 1,101 1,056 844 56% CRIM CONV FEE CN 900 388 284 616 32% CRIMINAL COST S-RECOUPMENTS 60,000 36,628 16,983 43,017 28% PUBLIC DEFENSE RECOUPMENT 33,000 18,471 14,648 18,352 44% BANK CHARGE FOR CONV. DEFENDANT - - 3,709 (3,709) 0% COURT INTERPRETER COSTS 100 256 66 34 66% BUS. LICENSE PERMIT PENALTY 5,000 12,810 10,580 (5,580) 212% MISC FINES AND PENALTIES 1,000 720 720 280 72% 522,130 3449454 319,643 202,487 61% MISCELLANEOUS : INVESTMENT INTEREST 38,600 18,392 31,246 7,354 81% INTEREST ON COUNTY TAXES 5,700 2,020 3,862 1,838 68% INTEREST - COURT COLLECTIONS 5,000 3,302 3,250 1,750 65% PARKING 14,000 9,610 9,591 4,409 69% SPACE/FACILITIESRENTALS 128,000 70,019 83,239 44,762 65% BRACKET ROOM RENTAL 5,000 3,480 3,160 1,840 63% LEASESLONG-TERM 218,100 103,530 104,667 113,433 48% VENDING MACHINE/CONCESSION 50,000 24,216 15,030 34,970 30% OTHER RENTS& USE CHARGES 4,500 3,300 1,800 2,700 40% DONATION/CONTRIBUTION 5,000 - - 5,000 0% PARKSDONATIONS 9,500 11,282 4,350 5,150 46% BIRD FEST CONTRIBUTIONS 950 1,200 1,200 (250) 126% 125TH ANNIVERSARY CONTRIBUTIONS - 1,700 - - 0% VOLUNT EER P ICNIC CONTRIBUTIONS - - 1,201 (1,201) 0% POLICE CONT RIBUT IONS FROM PRIV SOURCES 1,000 - - 1,000 0% PARKS GRANT S-PRIVATE SOURCES - - - - 0% SALE OF JUNK/SALVAGE 150 - 303 (153) 202% SALES OF UNCLAIM PROPERTY 2,000 896 4,802 (2,802) 240% CONFISCATED AND FORFEITED PROPERTY 2,000 - - 2,000 0% OT HER JUDGEMENT /SET T LEMENT 5,651 58 3,801 1,850 67% POLICE JUDGMENTS✓RESTITUTION 200 10 276 (76) 138% CASHIER'S OVERAGES/SHORTAGES - (88) 161 (161) 0% OTHER MISC REVENUES 1,000 15,214 12,966 (11,966) 1297% SMALL OVERPAYMENT 50 25 22 28 45% NSF FEES - PARKS & REC 120 30 - 120 0% NSF FEES - MUNICIPAL COURT 330 201 141 189 43% FLEX -PLAN SERVICES FORFEITURES 1,010 - - 1,010 0% US BANK REBATE 6,000 4,774 4,153 1,847 69% 503,861 273,170 289,221 214,640 5707c TRANSFERS -IN: PROCEEDS OF REFUNDING DEBT - - - - 0% TRANSFER FROM FUND 012 800,000 400,000 - 800,000 0% TRANSFER FROM FUND 127 25,840 11,088 25,835 5 100% 825,840 411,088 25,835 800,005 3% TO TAL GENERAL FUND REVENUE $ 39,280,321 $ 20,889,506 $ 22,256,068 $17,024,253 57% 5 Packet Pg. 127 I 4.5.a I Page 1 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent GENERAL FUND EXPENDITURES (001) SALARIES AND WAGES $ 14,010,590 $ 7,420,784 $ 7,836,963 $ 6,173,627 56% OVERTIME 423,510 282,482 273,106 150,404 64% HOLIDAY BUY BACK 217,790 1,543 2,349 215,441 1% BENEFITS 5,356,460 2,754,394 2,978,015 2,378,445 56% UNIFORMS 89,290 48,384 52,220 37,070 58% SUPPLIES 393,950 197,659 197,818 196,132 50% SMALL EQUIPMENT 161,680 83,303 66,877 94,803 41% PROFESSIONAL SERVICES 3,644,903 1,144,840 1,573,470 2,071,433 43% COMMUNICATIONS 211,890 93,255 85,450 126,440 40% TRAVEL 46,210 20,903 18,760 27,450 41% EXCISE TAXES 6,500 - 2,211 4,289 34% ADVERTISING - 2,118 - - 0% RENTAL/LEASE 916,390 528,750 543,616 372,774 59% INSURANCE 534,440 418,367 538,732 (4,292) 101% UTILITIES 457,800 252,458 258,534 199,266 56% REPAIRS & MAINTENANCE 429,510 266,929 129,424 300,086 30% MISCELLANEOUS 400,094 185,515 220,067 180,027 55% INTERGOVERNMENTAL SERVICES 10,384,010 7,168,437 7,256,298 3,127,712 70% INTERGOVERNMENTAL PAYMENTS 135,000 - - 135,000 0% INTERFUND SUBSIDIES 2,909,320 526,556 1,739,021 1,170,299 60% MACHINERY/EQUIPMENT 67,500 14,777 - 67,500 0% GENERAL OBLIGATION BOND PRINCIPAL 168,300 - 168,300 0% CAPITAL LEASES AND INSTALLMENT PURCHASES - 65,297 - 0% OTHER DEBT - 33 - - 0% INTEREST ON LONG-TERM EXTERNAL DEBT 46,150 27,460 23,454 22,696 51% DEBT ISSUE COSTS - - - - 0% INTERFUND SERVICES - - - - 0% 41,011,287 21,504,246 23,796,385 17,214,902 58% LEO FF-MEDICAL INS. RESERVE (009) BENEFITS IN HOME LTC CLAIMS PROFESSIONAL SERVICES TRAVEL MISCELLANEOUS RISK MANAGEMENT RESERVE FUND (011) MISCELLANEOUS CONTINGENCY RESERVEFUND (012) INTERFUND LOAN INTERFUND SUBSIDIES HISTORIC PRESERVATION GIFT FUND (014) SUPPLIES PROFESSIONAL SERVICES MISCELLANEOUS BUILDING MAINTENANCE SUBFUND (016) SUPPLIES PROFESSIONAL SERVICES REPAIRS & MAINTENANENCE MISCELLANEOUS MACHINERY/EQUIPMENT CONSTRUCTION PROJECTS DRUG INFO RC EMENT FUND (104) FUEL CONSUMED SMALL EQUIPMENT COMMUNICATIONS REPAIR/MAINT MISCELLANEOUS INTERGOVERNMENTAL SERVICES $ 178,720 $ 108,663 $ 98,441 $ 80,279 55% 100,480 56,550 51,861 48,619 52% - - 1,286 (1,286) 0% - - 447 (447) 0% 280 275 725 (445) 259% 279,480 165,488 152,760 126,720 55% $ - $ 70,546 $ - $ - 0% 70,546 - $ - 00/0 $ - $ - $ $ - 0% 800,000 400,000 800,000 0% 800,000 400,000 800,000 0% $ 100 $ - $ $ 100 0% 200 5,250 200 0% 5,100 - 5,100 0% 5,400 5,250 5,400 0% $ - $ 1,834 $ 1,756 $ (1,756) 0% 162,459 80,931 195,329 (32,870) 120% 2,062,000 22,178 35,390 2,026,610 2% - - 546 (546) 0% 33,000 307 170,972 (137,972) 518% 137,541 - 641,640 (504,099) 467% $ 2,395,000 105,250 1,045,633 1,349,367 44% $ 3,000 $ 949 $ 743 $ 2,257 25% 5,000 - 4,968 32 99% 2,230 1,215 1,009 1,221 45 % 800 - - 800 0% 20,000 5,000 5,000 15,000 25% 45,000 22,473 31,839 13,161 71% 76,030 29,637 43,559 32,471 57% r- O Q. d OC R C co C M t C O 2 cc 0 N 7 C N s c� ev w Q 6 Packet Pg. 128 4.5.a Page 2 of 6 CITY OF EDMO NDS EXPENDITURES BY FUND - DEIAAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent STREETFUND (111) SALARIES AND WAGES $ 515,160 $ 322,697 $ 353,469 $ 161,691 69% OVERTIME 18,400 9,801 13,706 4,694 74% BENEFITS 265,870 163,484 181,335 84,535 68% UNIFORMS 6,000 4,927 3,745 2,255 62% SUPPLIES 240,000 70,063 169,153 70,848 70% SMALL EQUIPMENT 26,000 9,243 545 25,455 2% PROFESSIONAL SERVICES 14,050 5,756 8,634 5,416 61% COMMUNICATIONS 3,500 2,325 2,210 1,290 63% TRAVEL 1,000 300 - 1,000 0% RENTAL/LEASE 190,950 110,513 110,344 80,606 58% INSURANCE 87,620 81,386 97,912 (10,292) 112% UTILITIES 270,170 145,042 135,884 134,286 50% REPAIRS & MAINTENANCE 45,000 26,332 8,470 36,530 19% MISCELLANEOUS 24,250 1,349 1,430 22,820 6% INTERGOVERNMENTAL SERVICES 3,000 - 1,193 1,807 40% INTERFUND SUBSIDIES - - - - 0% MACHINERY/EQUIPMENT - 9,828 - 0% GENERAL OBLIGATION BOND PRINCIPAL 3,420 - 3,420 0% OTHER INTEREST & DEBT SERIVCE COSTS - - - - 0% INTEREST ON LONG-TERM EXTERNAL DEBT 1,730 925 865 865 50% $ 1,716,120 $ 963,970 $ 1,088,895 $ 627,225 63% COMBINED STREETCONST/IMPROVE(112) PROFESSIONAL SERVICES $ 1,747,910 $ 600,117 $ 710,812 $ 1,037,098 41% INTERFUND SUBSIDIES 358,240 40,956 40,908 317,332 11% LAND 438,000 90,160 132,896 305,104 30% CONSTRUCTION PROJECTS 5,553,332 1,212,424 1,554,179 3,999,153 28% INTERGOVERNMENTAL LOANS 72,220 72,201 72,201 19 100% INTEREST 3,410 3,444 3,396 14 100% INTERGOVERNMENTAL SERVICES - - - - 0% $ 8,173,112 $ 2,019,302 $ 2,514,392 $ 5,658,720 31% MUNICH'AL ARTS ACQUIS. FUND (117) SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES TRAVEL ADVERTISING RENT AL/LEASE REPAIRS & MAINTENANCE MISCELLANEOUS HO TEL/MO TEL TAX REVENUE FUND (120) PROFESSIONAL SERVICES ADVERTISING MISCELLANEOUS INTERFUND SUBSIDIES CONSTRUCTION PROJECTS EMPLOYEE PARKING PERMIT FUND (121) SUPPLIES PROFESSIONAL SERVICES YOUTH SCHOLARSHIP FUND (122) MISCELLANEOUS TOURISM PROMOTIONAL FUND/ARTS (123) PROFESSIONAL SERVICES ADVERTISING MISCELLANEOUS $ 4,400 $ 520 $ 132 $ 4,268 3% 1,500 - 150 1,350 10% 166,500 32,725 30,912 135,588 19% 80 - 11 70 13% - - - 0% 2,000 2,000 0% 300 - - 300 0% 6,600 1,778 2,879 3,721 44% $ 181,380 S 35,023 $ 34,084 $ 147,296 19% $ 77,500 $ 28,003 $ 25,580 $ 51,920 33% - - - - 0% 8,150 82 101 8,049 1% 4,000 2,000 2,000 2,000 50% 60,000 - - 60,000 0% $ 149,650 $ 30,084 $ 27,681 $ 121,969 18% $ 1,790 $ - $ $ 1,790 0% 25,090 - 25,090 0% $ 26,880 $ $ $ 26,880 0% $ 3,000 $ 1,416 $ 985 $ 2,015 33% $ 3,000 $ 1,416 $ 985 $ 2,015 33% $ 28,300 $ 5,228 $ 8,282 $ 20,018 29% - - - - 0% 3,200 1,273 2,420 780 76% $ 31,500 $ 6,501 $ 10,703 $ 20,797 34% 7 Packet Pg. 129 I 4.5.a I Page 3 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent REAL ES TATE EXC IS E TAX 2 (125) SUPPLIES $ 21,000 $ 31,652 $ 44,574 $ (23,574) 212% PROFESSIONAL SERVICES 186,788 86,372 81,751 105,037 44% RENTAL/LEASE - - 2,790 (2,790) 0% UTILITIES - - - - 0% REPAIRS & MAINTENANCE 140,000 7,825 12,605 127,395 9% MISCELLANEOUS - - 181 (181) 0% CONSTRUCTION PROJECTS 1,752,777 - 154,972 1,597,805 9% $ 2,100,565 $ 125,849 $ 296,873 $ 1,803,692 14% REAL ES TATE EXC IS E TAX 1, PARKS AC (126) PROFESSIONAL SERVICES MISCELLANEOUS INTERFUND SUBSIDIES LAND CONSTRUCTION PROJECTS GENERAL OBLIGATION BONDS OTHER DEBT & DEBT SERVICE COST S INTEREST GIFTS CATALOG FUND (127) SUPPLIES PROFESSIONAL SERVICES INTERFUND SUBSIDIES SPECIAL PROJECTS FUND (129) CONSTRUCTION PROJECTS CEWEIERY MAINTENANCE%IMPRO VEMENT (130) SALARIES AND WAGES OVERTIME BENEFIT S UNIFORMS SUPPLIES SUPPLIES PURCHASED FOR INVENTORY/RESALE PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE UTILITIES REPAIRS & MAINTENANCE MISCELLANEOUS PARKS CONSTRUCTION FUND (132) SUPPLIES PROFESSIONAL SERVICES LAND CONSTRUCTION PROJECTS INTERFUND SUBSIDIES SISTER CITY COMMISSION (138) SUPPLIES TRAVEL MISCELLANEOUS TRANSPORTATION BENEFIT DISTRICT (139) PROFESSIONAL SERVICES INSURANCE INTERGOVERNMENTAL SERVICES $ 314,560 $ - $ $ 314,560 0% - 1,200 - 0% 139,430 18,263 17,213 122,218 12% 692,180 4,000 476,669 215,511 69% 1,573,870 - - 1,573,870 0% 19,890 - 19,890 0% - - - - 0% 10,070 5,382 5,033 5,037 50% $ 2,750,000 $ 28,845 $ 498,915 $ 2,251,085 18% $ 13,110 $ 8,793 $ 2,985 $ 10,125 23% 6,000 415 6,300 (300) 105% 25,840 11,088 25,835 5 100% $ 44,950 $ 20,296 $ 35,120 $ 9,830 78% $ - $ - $ $ - 0% $ - $ - $ $ - 0% $ 108,410 $ 46,197 $ 48,384 $ 60,026 45% 3,500 1,438 1,015 2,485 29% 44,500 19,532 20,625 23,875 46% 00 1,000 197 - 1,000 0% 7,000 1,393 1,376 5,624 20% 20,000 7,763 10,516 9,484 53% v 4,200 5,676 654 3,546 16% G 1,410 811 583 827 41% Q. 500 - - 500 0% - - - - 0% 11,550 5,824 6,738 4,813 58% v 3,800 434 455 3,345 12% C 500 - - 500 0% 4,000 2,132 1,878 2,122 47% jL $ 210,370 $ 91,397 $ 92,223 $ 118,147 44% >, t $ - $ - $ - $ - 0% r� C 225,000 44,602 37,058 187,942 16% 2 500,000 - 475,710 24,291 95% �p 850,770 234,666 83,837 766,933 10% C - 4,200 - - 0% N $ 1,575,770 $ 283,468 $ 596,604 $ 979,166 38% �+ 7 $ 2,000 $ - $ 98 $ 1,902 5% 4.; 4,500 2,953 2,515 1,985 56% r- 6,000 461 282 5,718 5% N $ 12,500 $ 3,414 $ 2,895 $ 9,605 23% s t� ev $ - $ - $ - $ - 0% w Q 2,500 2,500 2,500 - 100% 680,000 439,238 420,695 259,305 62% $ 682,500 $ 441,738 $ 423,195 $ 259,305 62% 8 Packet Pg. 130 I 4.5.a I Page 4 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent BUSINESS EMPROVEVIENTDISTRICT FUND (140) SUPPLIES $ - $ 13,840 $ 1,436 $ (1,436) 0% PROFESSIONAL SERVICES - 24,885 31,289 (31,289) 0% MISCELLANEOUS - 35 941 (941) 0% $ - 38,759 33,667 (33,667) 0% LID FUND C O NTRO L (211) INTERFUND SUBSIDIES 2012 LTGO DEBT SERVIC FUND (231) GENERAL OBLIGATION BOND INTEREST OTHER INTEREST & DEBT SERVICE COSTS 2014 DEBT SERVICE FUND (232) GENERAL OBLIGATION BOND INTEREST WATER FUND (421) SALARIES AND WAGES OVERTIME BENEFITS UNIFORMS SUPPLIES WATER PURCHASED FOR RESALE SUPPLIES PURCHASED FOR INVENTORY/RESALE SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL EXCISE TAXES RENT AL/LEASE INSURANCE UTILITIES REPAIRS & MAINTENANCE MISCELLANEOUS INTERGOVERNMENTAL SERVICES INTERFUND TAXES INTERFUND SUBSIDIES MACHINERY/EQUIPMENT CONSTRUCTION PROJECTS GENERAL OBLIGATION BONDS REVENUE BONDS INTERGOVERNMENTAL LOANS INTEREST DEBT ISSUE COSTS OTHER INTEREST & DEBT SERVICE COSTS INTERGOVERNMENTAL SERVICES $ 14,400 $ - $ $ 14,400 0% $ 14,400 $ - $ $ 14,400 0% $ 536,270 $ - $ - $ 536,270 0% 140,610 75,464 70,301 70,309 50% 500 54 - 500 0% $ 677,380 $ 75,517 $ 70,301 $ 607,079 10% $ 933,210 $ - $ 933,208 $ 2 100% 16,330 9,201 3,221 13,109 20% $ 949,540 $ 9,201 $ 936,429 $ 13,111 99% $ 795,220 $ 424,066 $ 459,041 $ 336,179 58% 24,000 9,752 13,130 10,870 55% 372,550 192,351 209,727 162,823 56% 4,000 2,032 2,311 1,689 58% 151,000 89,174 67,910 83,090 45% 1,600,000 829,968 858,568 741,432 54% 143,000 81,414 59,554 83,446 42% 11,000 8,251 2,846 8,154 26% 1,793,286 372,036 586,064 1,207,222 33% 30,000 18,175 17,167 12,833 57% 200 - - 200 0% 340,000 181,242 220,386 119,614 65% 100,750 55,564 57,454 43,296 57% 58,920 70,904 52,335 6,585 89% 40,000 12,804 12,861 27,139 32% 17,000 16,764 5,480 11,520 32% 70,450 39,674 37,908 32,542 54% 30,000 16,173 22,076 7,924 74% 1,229,110 616,137 669,719 559,391 54% 731,220 119,415 219,326 511,894 30% 15,000 9,828 - 15,000 0% 4,551,921 825,913 752,302 3,799,619 17% 2,300 - - 2,300 0% 323,870 - - 323,870 0% 25,840 45,839 25,839 1 100% 256,870 133,799 129,008 127,862 50% - - - - 0% - 31 - 0% - - - - 0% $ 12,717,507 $ 4,171,305 $ 4,481,014 $ 8,236,493 35% r Q 9 Packet Pg. 131 I 4.5.a I Page 5 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent S TO RM FUND (422) SALARIES AND WAGES $ 640,470 $ 261,252 $ 297,030 $ 343,440 46% OVERTIME 6,000 8,584 6,717 (717) 112% BENEFITS 313,950 130,187 150,344 163,606 48% UNIFORMS 6,500 4,850 5,210 1,290 80% SUPPLIES 46,500 21,595 11,826 34,674 25% SMALL EQUIPMENT 4,000 1,510 130 3,870 3% PROFESSIONAL SERVICES 2,683,530 385,966 496,511 2,187,019 19% COMMUNICATIONS 3,200 1,856 1,510 1,690 47% TRAVEL 4,300 - 300 4,000 7% EXCISE TAXES 55,000 38,518 30,673 24,327 56% RENTAL/LEASE 252,990 123,779 144,583 108,407 57% INSURANCE 64,120 39,269 63,187 933 99% UTILITES 10,500 5,318 5,672 4,828 54% REPAIR & MAINTENANCE 13,000 8,576 2,266 10,734 17% MISCELLANEOUS 94,950 32,206 29,441 65,509 31% INTERGOVERNMENTAL SERVICES 85,000 69,082 88,101 (3,101) 104% INTERFUND TAXES AND OPERATING ASSESSMENT 330,430 179,870 188,132 142,298 57% INTERFUND SUBSIDIES 413,678 20,254 95,380 318,298 23% LAND 25,000 - - 25,000 0% MACHINERY/EQUIPMENT - 9,828 - - 0% CONSTRUCTION PROJECTS 2,563,330 2,000 129,348 2,433,982 5% GENERAL OBLIGATION BONDS 83,800 - - 83,800 0% REVENUE BONDS 158,300 - - 158,300 0% INTERGOVERNMENTAL LOANS 32,070 32,063 32,063 8 100% INTEREST 166,430 87,739 83,932 82,498 50% DEBT ISSUE COSTS - - - - 0% OTHER INTEREST & DEBT SERVICE COSTS - 15 - 0% INTERGOVERNMENTAL SERVICES - - - - 0% $ 8,057,048 $ 1,464,315 $ 1,862,356 $ 6,194,692 23% SEWER FUND (423) SALARIES AND WAGES OVERTIME BENEFITS UNIFORMS SUPPLIES FUEL CONSUMED SUPPLIES PURCHASED FOR INV OR RESALE SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL EXCISE TAXES RENT AL/LEASE INSURANCE UTILITIES REPAIR & MAINTENANCE MISCELLANEOUS INTERGOVERNMENTAL SERVICES INTERFUND TAXES AND OPERATING ASSESSMENT INTERFUND SUBSIDIES MACHINERY/EQUIPMENT CONSTRUCTION PROJECTS GENERAL OBLIGATION BONDS REVENUE BONDS INTERGOVERNMENTAL LOANS INTEREST DEBT ISSUE COSTS OTHER INTEREST & DEBT SERVICE COSTS INTERGOVERNMENTAL SERVICES BOND RESERVE FUND (424) REVENUE BONDS DEBT ISSUE COSTS INTEREST OTHER INTEREST & DEBT SERVICE COSTS $ 1,721,530 $ 958,596 $ 996,531 $ 724,999 58% 100,000 55,596 48,606 51,394 49% 771,920 420,352 447,177 324,743 58% 9,500 5,740 5,730 3,770 60% 420,200 130,695 146,378 273,822 35% 90,000 35,760 24,395 65,605 27% 4,000 - - 4,000 0% 46,000 13,835 20,829 25,171 45% 1,954,696 629,270 871,111 1,083,585 45% 43,000 24,060 22,917 20,083 53% 5,000 - 1,097 3,903 22% 150,000 80,992 118,208 31,792 79% 182,670 114,610 104,139 78,531 57% 96,630 140,834 106,915 (10,285) 111% 1,056,660 574,317 812,388 244,272 77% 325,000 187,415 160,424 164,576 49% 105,450 34,063 33,677 71,773 32% 150,000 75,386 89,400 60,600 60% 629,140 335,806 371,244 257,896 59% 2,563,949 367,729 518,760 2,045,189 20% - 25,251 - - 0% 6,999,825 470,233 58,445 6,941,380 1% 130,140 - - 130,140 0% 72,840 - - 72,840 0% 170,620 156,729 157,034 13,586 92% 122,280 64,747 61,299 60,981 50% - - - - 0% - 3,093 2,955 (2,955) 0% - - - - 0% $ 17,921,050 $ 4,905,107 $ 5,179,657 $ 12,741,393 29% $ 655,010 $ - $ $ 655,010 0% - - - 0% 1,334,910 337,208 667,442 667,468 50% 1,000 51,044 - 1,000 0% $ 1,990,920 $ 388,251 $ 667,442 $ 1,323,478 34% 10 Packet Pg. 132 I 4.5.a I Page 6 of 6 CITY OF EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent EQ UIPMENT RENTAL FUND (511) SALARIES AND WAGES $ 224,880 $ 121,491 $ 128,898 $ 95,982 57% OVERTIME 2,000 554 - 2,000 0% BENEFITS 105,050 55,546 56,711 48,339 54% UNIFORMS 1,000 883 770 230 77% SUPPLIES 110,000 53,260 48,596 61,404 44% FUEL CONSUMED 1,000 - - 1,000 0% SUPPLIES PURCHASED FOR INVENTORY/RESALE 308,200 90,894 62,971 245,229 20% SMALL EQUIPMENT 58,000 20,210 4,647 53,353 8% PROFESSIONAL SERVICES 44,000 682 795 43,205 2% COMMUNICATIONS 3,000 1,177 1,372 1,628 46% TRAVEL 1,000 2,935 1,000 - 100% RENTAL/LEASE 19,440 8,408 11,347 8,093 58% INSURANCE 29,560 40,605 29,967 (407) 101% UTILITIES 14,000 7,026 7,156 6,844 51% REPAIRS& MAINTENANCE 60,000 24,743 31,880 28,120 53% MISCELLANEOUS 7,190 3,834 6,760 430 94% INTERGOVERNMENTAL SERVICES 2,500 - 766 1,734 31% MACHINERY/EQUIPMENT 981,000 259,206 585,062 395,938 60% INTERFUND RENTAL - - - - 0% $ 1,971,820 $ 691,455 $ 978,698 $ 993,122 50% FIREMEN'S PENSION FUND (617) BENEFITS $ 30,940 $ 14,329 $ 10,258 $ 20,682 33% PENSION AND DISABILITY PAYMENTS 27,470 15,406 13,999 13,471 51% PROFESSIONAL SERVICES 1,200 - 214 986 18% S 59,610 $ 29,735 $ 24,471 $ 35,139 41% TOTAL EXPENDITURE ALL FUNDS $ 106,584,769 $ 38,105,364 $ 44,894,937 $ 61,689,832 42% 11 Packet Pg. 133 4.5.a Page 1 of 1 CITY OF EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN SUMMARY 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining '%, Spent CITY COUNCIL $ 295,500 $ 125,175 $ 120,390 $ 175,110 410/c OFFICE OF MAYOR 260,250 145,515 148,207 112,043 570/c HUMAN RESOURCES 462,044 203,528 206,637 255,407 450/c MUNICIPAL COURT 909,270 473,213 503,006 406,264 550/c CITY CLERK 589,290 332,476 323,638 265,652 550/c ADMINISTRATIVE SERVICES 1,839,930 915,521 829,876 1,010,054 450/c CITY ATTORNEY 741,560 385,025 425,065 316,495 570/c NON -DEPARTMENTAL 14,956,000 8,463,703 9,839,305 5,116,695 660/c POLICE SERVICES 9,633,050 5,029,065 5,342,881 4,290,169 550/c COMMUNITY SERVICES✓ECONOMIC DEV. 535,580 223,086 274,304 261,276 510/c DEVELOPMENT SERVICES 2,688,352 1,222,591 1,381,541 1,306,811 510/c PARKS& RECREATION 3,774,541 1,899,573 2,007,609 1,766,932 530/c PUBLIC WORKS 2,842,120 1,218,288 1,571,283 1,270,837 550/c FACILITIES MAINTENANCE 1,483,800 867,487 822,642 661,158 550/c $ 41,011,287 $ 21,504,246 $ 23,796,385 $ 17,214,902 580/c C ITY O F EDMO NDS r_ EXPENDITURES - UTILITY- BY FUND IN SUMMARY O C. d 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent v WATER UTILITY FUND $ 12,717,507 $ 4,171,305 $ 4,481,014 $ 8,236,493 C C 35"� STORM UTILITY FUND 8,057,048 1,464,315 1,862,356 6,194,692 LL 23% >, SEWER/WWTP UTILITY FUND 17,921,050 4,905,107 5,179,657 12,741,393 t 29% BOND RESERVE FUND 1,990,920 388,251 667,442 1,323,478 34"� 0 $ 40,686,525 $ 10,928,979 $ 12,190,469 $ 28,496,056 300/c 0 N 7 r+ C N E t t� O r r Q 12 Packet Pg. 134 Page 1 of 4 CITY OF EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL Title 2016 Amended Budget 7/31/2015 Expenditures 7/31/2016 Expenditures Amount Remaining %Spent CITY COUNCIL SALARIES $ 119,100 $ 72,806 $ 64,190 $ 54,910 54% OVERTIME 1,000 - 93 907 9% BENEFITS 88,550 43,032 49,131 39,419 55% SUPPLIES 2,000 467 1,178 822 59% SMALL EQUIPMENT - 832 - - 0% PROFESSIONAL SERVICES 47,160 5,062 1,432 45,728 3% t' COMMUNICATIONS 3,000 1,801 1,801 1,199 60% O0. TRAVEL 6,700 723 1,277 5,423 19% RENTAL/LEASE 490 327 219 271 45% _ REPAIRS/MAINTENANCE 500 - 15 485 3% 2 MISCELLANEOUS 27,000 125 1,055 25,945 4% C $ 295,500 $ 125,175 $ 120 390 $ 175,110 41% R C O FFIC E O F MAYO R li SALARIES $ 197,160 $ 115,465 $ 115,198 $ 81,962 58% �+ BENEFITS 48,190 26,317 28,045 20,145 58% +O, SUPPLIES 1,500 545 733 767 49% SMALL EQUIPMENT - - - - 0% D PROFESSIONAL SERVICES 2,000 908 1,191 809 60% m COMMUNICATION 1,400 240 700 700 50% >, TRAVEL 3,000 149 538 2,462 18% r RENTAL/LEASE 2,400 1,108 813 1,587 34% REPAIR/MAINTENANCE - - - - 0% 2 MISCELLANEOUS 4,600 782 989 3,611 21% to $ 260,250 $ 145,515 $ 148,207 $ 112,043 57% p HUMAN RESOURCES N SALARIES $ 226,880 $ 121,293 $ 125,267 $ 101,613 55% 7 OVERTIME - - 43 (43) 0% BENEFITS 73,380 39,851 42,877 30,503 58% SUPPLIES 2,300 766 2,503 (203) 109% 00 C1 SMALL EQUIPMENT 300 - - 300 0% qq PROFESSIONAL SERVICES 114,000 41,512 29,898 84,102 26% v COMMUNICATIONS 700 572 586 114 84% O TRAVEL 1,000 482 416 584 42% 0- ADVERTISING - - - - 0% RENTAL/LEASE 2,200 1,109 680 1,520 31% REPAIR/MAINTENANCE 7,850 7,793 - 7,850 0% MISCELLANEOUS 33,434 (9,849) 4,368 29,066 13% $ 462,044 $ 203,528 $ 206,637 $ 255,407 45% MUNIC H'AL C O URT LL SALARIES $ 566,190 $ 305,167 $ 325,303 $ 240,887 57% OVERTIME 600 2,301 1,738 (1,138) 290% BENEFITS 222,750 105,102 116,765 105,985 52% O SUPPLIES 9,930 9,161 4,307 5,623 43% 2 SMALL EQUIPMENT 2,800 1,360 262 2,538 9% PROFESSIONAL SERVICES 64,000 36,775 42,424 21,576 66% N COMMUNICATIONS 1,800 1,143 1,354 446 75% TRAVEL 2,500 2,971 1,546 954 62% RENTAL/LEASE 800 172 539 261 67% REPAIR/MAINTENANCE 1,700 687 794 906 47% MISCELLANEOUS 36,200 8,375 7,973 28,227 22% $ 909,270 $ 473,213 $ 503,006 $ 406,264 55% s 13 Packet Pg. 135 Page 2 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent CITY CLERK SALARIES AND WAGES $ 324,480 $ 195,336 $ 198,397 $ 126,083 61% OVERTIME - 797 1,509 (1,509) 0% BENEFITS 129,300 69,370 74,785 54,515 58% SUPPLIES 10,240 3,694 2,866 7,374 28% SMALL EQUIPMENT - 420 1,416 (1,416) 0% PROFESSIONAL SERVICES 28,310 16,585 13,172 15,138 47% COMMUNICATIONS 50,000 24,365 7,183 42,817 14% TRAVEL 1,000 423 - 1,000 0% ADVERTISING - - - - 0% RENTAL/LEASE 20,000 12,094 10,310 9,690 52% REPAIRS&MAINTENANCE 21,960 7,096 10,448 11,512 48% MISCELLANEOUS 4,000 2,296 3,553 447 89% $ 589,290 $ 332,476 $ 323,638 $ 265,652 55% ADMINISTRATIVE SERVICES SALARIES $ 892,390 $ 453,218 $ 481,259 $ 411,131 54% OVERTIME 6,670 1,192 1,633 5,037 24% BENEFITS 305,800 153,059 163,247 142,553 53% SUPPLIES 43,050 3,823 3,412 39,638 8% SMALL EQUIPMENT 110,650 46,512 35,295 75,355 32% PROFESSIONAL SERVICES 111,400 37,310 18,699 92,701 17% COMMUNICATIONS 61,500 25,558 29,830 31,670 49% TRAVEL 2,900 540 833 2,067 29% RENTAL/LEASE 8,200 7,078 6,819 1,381 83% REPAIR/MAINTENANCE 242,680 146,762 35,285 207,395 15% MISCELLANEOUS 15 14,690 25,692 53,564 (38,874) 365% MACHINERY/EQUIPMENT 40,000 14,777 - 40,000 0% $ 1,839,930 $ 915,521 $ 829,876 $ 1,010,054 45% CITY ATTO RNEY PROFESSIONAL SERVICES $ 741,560 $ 385,025 $ 422,929 $ 318,631 57% MISCELLANEOUS - - 2,137 (2,137) 0% $ 741,560 $ 385,025 $ 425,065 $ 316,495 57% NON -DEPARTMENTAL SALARIES $ 100,000 $ - $ - $ 100,000 0% BENEFITS -UNEMPLOYMENT 34,500 4,099 2,775 31,725 8% SUPPLIES 3,000 1,880 1,185 1,815 39% PROFESSIONAL SERVICES 643,420 209,381 234,079 409,341 36% EXCISE TAXES 6,500 2,118 2,211 4,289 34% RENTAL/LEASE 3,600 3,600 3,600 - 100% INSURANCE 534,440 418,367 538,732 (4,292) 101% REPAIR & MAINTENANCE - - - - 0% MISCELLANEOUS 69,010 46,746 48,223 20,787 70% INTERGOVT SERVICES 10,302,760 7,158,165 7,246,024 3,056,736 70% ECA LOAN PAYMENT 135,000 - - 135,000 0% INTERFUND SUBSIDIES 2,909,320 526,556 1,739,021 1,170,299 60% GENERAL OBLIGATION BOND 168,300 - - 168,300 0% INSTALLMENT PURCHASES - 65,297 - - 0% OTHER DEBT - - - - 0% INTEREST ON LONG-TERM DEBT 46,150 27,460 23,454 22,696 51% DEBT ISSUANCE COSTS - - - - 0% FISCAL AGENT FEES 33 - - 0% INTERFUND SERVICES - 0% $ 14,956,000 $ 8,463,703 $ 9,839,305 $ 5,116,695 66% r_ O a d R C to C LL 21 t C O 2 co O N 7 C N s eo r Q 15 Difference between 2015 and 2016 is due to Microsoft Office Windows Software Renewal in 2016. 14 r- Packet Pg. 136 1 I 4.5.a I Page 3 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTIVIENTIN DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent PO LIC E S ERVIC ES SALARIES $ 5,778,330 $ 3,045,321 $ 3,272,269 $ 2,506,061 57% OVERTIME 396,240 268,074 247,955 148,285 63% HOLIDAY BUYBACK 217,790 1,543 2,349 215,441 1% BENEFITS 2,220,940 1,173,209 1,271,729 949,211 57% UNIFORMS 80,310 41,503 46,794 33,516 58% SUPPLIES 86,730 45,546 36,126 50,604 42% SMALL EQUIPMENT 24,900 10,361 17,116 7,785 69% PROFESSIONAL SERVICES 117,170 48,640 51,479 65,691 44% COMMUNICATIONS 26,210 13,047 15,644 10,566 60% TRAVEL 17,310 13,975 7,978 9,332 46% ADVERTISING - - - - 0% RENTAL/LEASE 595,100 334,511 343,888 251,212 58% REPAIR/MAINTENANCE 14,620 6,587 4,971 9,649 34% MISCELLANEOUS 46,850 21,478 19,311 27,539 41% INTERGOVTL SERVICES 10,550 5,272 5,274 5,276 50% $ 9,633,050 $ 5,029,065 $ 5,342,881 $ 4,290,169 55% COMMUNITY SERVIC ES/EC 0 N DEV. SALARIES BENEFITS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS DEVELOPMENT S ERVIC ES/PLANNING SALARIES OVERTIME BENEFITS UNIFORMS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE REPAIRS & MAINTENANCE MISCELLANEOUS MACHINERY/EQUIPMENT ENGINEERING SALARIES OVERTIME BENEFITS UNIFORMS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS $ 224,960 $ 127,471 $ 131,805 $ 93,155 59% 67,430 36,863 40,162 27,268 60% 7,000 192 5,847 1,153 84% 800 - 125 676 16% 222,400 52,953 93,040 129,360 42% 1,490 545 585 905 39% 2,000 179 - 2,000 0% - - - - 0% 2,000 1,109 1,117 883 56% 500 - - 500 0% 7,000 3,774 1,623 5,377 23% $ 535,580 $ 223,086 $ 274,304 $ 261,276 51% $ 1,444,230 $ 776,290 $ 842,061 $ 602,169 58% 1,300 72 6,103 (4,803) 469% G 534,670 274,979 307,556 227,114 58% d 500 - - 500 0% 16,100 8,174 8,138 7,962 51% 6,950 4,338 2,855 4,095 41% 'V 573,942 90,072 170,141 403,801 30% 8,500 2,428 3,059 5,441 36% 4,250 568 3,976 274 94% - - - - 0% 24,750 20,442 12,204 12,546 49% 6,800 6,612 1,177 5,623 17% O 38,860 38,617 24,272 14,588 62% 2 27,500 - - 27,500 0% r $ 2,688,352 $ 1,222,591 $ 1,381,541 $ 1,306,811 51% N $ 1,373,500 $ 714,006 $ 735,288 $ 638,212 54% 7 5,000 796 3,290 1,710 66% 561,900 280,451 292,624 269,276 52% 360 - - 360 0% - 79 (79) 0% s 2,200 1,952 248 89% 465,000 - 296,254 168,746 64% Q 11,800 4,447 5,746 6,054 49% 600 21 296 304 49% 26,370 8,680 13,497 12,873 51% 2,600 - - 2,600 0% 21,000 6,105 13,351 7,649 64% $ 2,470,330 $ 1,014,506 $ 1,362,376 $ 1,107,954 55% 15 Packet Pg. 137 I 4.5.a I Page 4 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 2016 Amended 7/31/2015 7/31/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent PARKS & REC REATIO N SALARIES $ 1,830,090 $ 988,817 $ 1,020,927 $ 809,163 56% OVERTIME 10,000 6,499 7,277 2,723 73% BENEFITS 695,310 358,771 387,426 307,884 56% UNIFORMS 5,370 5,094 3,786 1,584 70% SUPPLIES 117,500 74,823 88,270 29,230 75% SMALL EQUIPMENT 9,080 9,205 6,645 2,435 73% PROFESSIONAL SERVICES 514,341 174,911 196,843 317,498 38% COMMUNICATIONS 30,140 10,410 9,926 20,214 33% TRAVEL 4,450 871 1,889 2,561 42% ADVERTISING - - - - 0% RENTAL/LEASE 170,310 104,362 115,013 55,297 68% PUBLIC UTILITY 175,000 95,004 98,592 76,408 56% REPAIR/MAINTENANCE 50,800 27,658 31,337 19,463 62% MISCELLANEOUS 91,450 38,147 34,678 56,772 38% MACHINERY/EQUIPMENT - - - - 0% INTERGOVTL SERVICES 70,700 5,000 5,000 65,700 7% $ 3,774,541 $ 1,899,573 $ 2,007,609 $ 1,766,932 53% PUBLIC WORKS SALARIES $ 263,850 $ 148,963 $ 152,709 $ 111,141 58% OVERTIME 200 - - 200 0% BENEFITS 81,750 44,701 48,363 33,387 59% SUPPLIES 7,600 2,320 2,028 5,572 27% SMALL EQUIPMENT 1,000 1,479 108 892 11% PROFESSIONAL SERVICES 200 33 46 154 23% COMMUNICATIONS 1,350 340 381 969 28% TRAVEL 500 - - 500 0% RENTAL/LEASE 7,640 3,444 3,584 4,056 47% PUBLIC UTILITY 2,800 1,400 1,493 1,307 53% REPAIR/MAINTENANCE 1,000 - - 1,000 0% MISCELLANEOUS 3,900 1,103 195 3,705 5% $ 371,790 $ 203,782 $ 208,907 $ 162,883 56% FACILITIES MAINTENANCE SALARIES 669,430 356,632 372,292 297,138 56% OVERTIME 2,500 2,751 3,465 (965) 139% BENEFITS 291,990 144,590 152,530 139,460 52% UNIFORMS 2,750 1,787 1,641 1,109 60% SUPPLIES 87,000 46,269 41,146 45,854 47% SMALL EQUIPMENT 3,000 8,795 1,104 1,896 37% PROFESSIONAL SERVICES - 45,675 1,843 (1,843) 0% COMMUNICATIONS 14,000 8,359 8,656 5,344 62% TRAVEL - - 12 (12) 0% RENTAL/LEASE 52,530 30,716 31,331 21,199 60% PUBLIC UTILITY 280,000 156,054 158,449 121,551 57% REPAIR/MAINTENANCE 78,500 63,735 45,397 33,103 58% MISCELLANEOUS 2,100 2,122 4,777 (2,677) 227% $ 1,483,800 $ 867,487 $ 822,642 $ 661,158 55% TOTAL GENERAL FUND EXPENDITURES $ 41,011,287 $ 21,504,246 $ 23,796,385 $ 17,214,902 58% r Q 16 Packet Pg. 138 I 4.5.a I City of Edmonds, WA Monthly Revenue Summary -General Fund 2016 General Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 1,919,004 $ February 4,636,502 March 6,896,316 April 10,558,092 May 18,450,255 June 20,426,901 July 22,548,644 August 24,737,797 September 26,744,456 October 29,966,202 November 37,308,511 December 39,280,321 Real Estate Excise Tax 1 & 2 1,919,004 $ 2,112,632 10.09% 2,717,499 4,307,339 -7.10% 2,259,814 6,797,209 -1.44% 3,661,775 10,797,010 2.26% 7,892,163 18,037,636 -2.24% 1,976,647 20,334,355 -0.45% 2,121,742 22,256,068 -1.30% 2,189,153 2,006,660 3,221,745 7,342,310 1,971,810 City of Edmonds, WA Monthly Revenue Summary -Real Estate Excise Tax 2016 Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 189,874 $ February 316,058 March 479,194 April 640,872 May 800,918 June 986,094 July 1,276,157 August 1,480,830 September 1,690,614 October 1,875,616 November 2,069,074 December 2,200,000 189,874 $ 216,395 13.97% 126,183 447,070 41.45% 163,136 551,728 15.14% 161,679 768,326 19.89% 160,046 977,560 22.05% 185,176 1,234,188 25.16% 290,062 1,436,215 12.54 204,673 209,784 185,002 193,458 130,926 r Q *The monthly budget forecast columns are based on a five-year average. 17 Packet Pg. 139 1 4.5.a Contractors 604,113 Health & Personal Care 59,115 Retail Eating & Drinking 489,624 Gasoline Stations 19,225 Automotive Repair 98,894- Retail Automotive 1,000, Total Retail Automotive Misc Retail Trade Retail Eating & Drinking Business Services Retail Food Stores Others Amusement & Recreation Wholesale Trade Accommodation Clothing and Accessories Health & Personal Care Gasoline Stations Automotive Repair Communications Contractors ($150,000) Sales Tax Analysis By Category Current Period: July 2016 Year -to -Date Total $3,843,476 Wholesale Trade 155,885 1 Corrnnwiications 142,437 I -Misc Retail Trade 469,065 23,603 Services 264,995 _ Amusement & Recreation 39,472 Retail Food Stores 154,140 Others 196,139 Clothing and Accessories 125,772 Change in Sales Tax Revenue: July 2016 compared to July 2015 ($100,000) ($50,000) $0 $50,000 $100,000 $150,000 r- O a d c c� c LL 21 t C O 2 co 0 N 7 r.+ C N E t U O r r Q 18 Packet Pg. 140 I 4.5.a I City of Edmonds, WA Monthly Revenue Summary -Sales and Use Tax 2016 Sales and Use Tax Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 471,315 $ 471,315 $ 539,867 14.54% February 1,055,135 583,820 1,204,754 14.18% March 1,506,759 451,624 1,693,551 12.40% April 1,936,463 429,704 2,173,926 12.26% May 2,478,856 542,394 2,754,132 11.10% June 2,960,731 481,875 3,295,015 11.29% July 3,457,813 497,082 3,843,359 11.15% August 3,998,806 540,993 September 4,517,576 518,770 October 5,055,818 538,242 November 5,626,862 571,044 December 6,144,400 517,538 Sales and Use Tax 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget mar Prior Year City of Edmonds, WA Monthly Revenue Summary -Gas Utility Tax 2016 Gas Utility Tax Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 90,678 $ 90,678 $ 85,977 -5.18% February 190,868 100,190 176,574 -7.49% March 272,706 81,838 249,556 -8.49% April 346,987 74,281 311,852 -10.13% May 405,847 58,860 352,987 -13.02% June 445,893 40,046 385,669 -13.51% July 477,342 31,449 415,562 -12.94% August 501,633 24,291 September 523,862 22,229 October 548,406 24,545 November 586,112 37,705 December 647,900 61,788 Gas Utility Tax 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year -Budget -0-- Prior Yeaz r Q *The monthly budget forecast columns are based on a five-year average. 19 Packet Pg. 141 1 I 4.5.a I City of Edmonds, WA Monthly Revenue Summary -Telephone Utility Tax 2016 Telephone Utility Tax Cumulative Monthly Budget Forecast Budget Forecast TrD Actuals Variance % January $ 125,356 $ 125,356 $ 91,384 -27.10% February 226,461 101,105 230,098 1.61% March 344,917 118,456 328,246 -4.83% April 457,974 113,057 432,105 -5.65% May 577,752 119,778 532,012 -7.92% June 685,900 108,148 633,125 -7.69% July 794,692 108,792 732,953 -7.77% August 904,737 110,045 September 1,019,063 114,326 October 1,131,491 112,428 November 1,235,975 104,484 December 1,349,100 113,125 Telephone Utility Tax 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget --dr- Prior Year City of Edmonds, WA Monthly Revenue Summary -Electric Utility Tax 2016 1lectric Utility Tax Cumulative Monthly TrD Variance Budget Forecast Budget Forecast Actuals % January $ 155,396 $ 155,396 $ 177,383 14.15% February 311,244 155,848 348,280 11.90% March 463,906 152,662 509,702 9.87% April 612,759 148,854 674,873 10.14% May 749,676 136,917 801,429 6.90% June 854,497 104,821 913,790 6.94% July 956,312 101,815 1,025,239 7.21% August 1,049,934 93,622 September 1,145,581 95,647 October 1,239,871 94,290 November 1,346,584 106,712 December 1,451,800 105,216 Electric Utility Tax 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year -Budget --O-Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 20 Packet Pg. 142 1 I 4.5.a I City of Edmonds, WA Monthly Revenue Summary -Meter Water Sales 2016 Meter Water Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 573,717 $ 573,717 $ 553,882 -3.46% February 969,279 395,562 943,114 -2.70% March 1,534,923 565,644 1,529,160 -0.38% April 1,915,226 380,303 1,904,819 -0.54% May 2,481,868 566,642 2,446,538 -1.42% June 2,912,390 430,522 2,888,880 -0.81% July 3,586,469 674,079 3,581,142 -0.15% August 4,157,711 571,242 September 4,946,125 788,414 October 5,503,014 556,889 November 6,162,012 658,998 December 6,572,750 410,738 City of Edmonds, WA Monthly Revenue Summary -Storm Water Sales 2016 Storm Water Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 238,091 $ 238,091 $ 238,442 14.15% February 750,139 512,049 750,909 11.90% March 988,469 238,330 988,089 9.87% April 1,200,403 211,933 1,195,226 10.14% May 1,439,120 238,718 1,432,240 6.90% June 1,651,173 212,053 1,642,773 6.94% July 1,891,010 239,837 1,880,842 -0.54% August 2,403,804 512,795 September 2,641,727 237,923 October 2,853,622 211,895 November 3,092,120 238,497 December 3,304,340 212,220 Storm Water Sales 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dr,- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 21 Packet Pg. 143 1 I 4.5.a I City of Edmonds, WA Monthly Revenue Summary-Unmeter Sewer Sales 2016 Unmeter Sewer Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 571,975 $ 571,975 $ 566,825 -0.90% February 1,033,695 461,721 1,035,133 0.14% March 1,603,598 569,903 1,607,616 0.25% April 2,066,627 463,029 2,078,557 0.58% May 2,641,462 574,835 2,642,003 0.02% June 3,110,919 469,457 3,115,575 0.15% July 3,697,613 586,694 3,712,853 0.41% August 4,168,968 471,356 September 4,762,598 593,630 October 5,236,709 474,111 November 5,819,454 582,746 December 6,291,410 471,956 r Q *The monthly budget forecast columns are based on a five-year average. 22 Packet Pg. 144 1 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -General Fund 2016 General Fund Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 4,569,721 $ 4,569,721 $ 4,953,956 8.41% February 7,094,785 2,525,063 7,893,221 11.25% March 10,275,445 3,180,660 10,217,655 -0.56% April 14,311,141 4,035,695 14,305,106 -0.04% May 16,503,187 2,192,046 16,509,045 0.04% June 20,293,310 3,790,123 19,669,418 -3.07% July 23,552,060 3,258,750 23,796,385 1.04% August 27,167,965 3,615,905 September 30,799,365 3,631,400 October 33,408,392 2,609,027 November 37,036,218 3,627,826 December 41,011,287 3,975,069 City of Edmonds, WA Monthly Expenditure Report -Non -Departmental 2016 Non -Departmental Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 2,640,077 $ 2,640,077 $ 3,074,199 16.44% February 3,094,175 454,098 4,065,136 31.38% March 4,182,251 1,088,076 4,389,675 4.96% April 6,122,668 1,940,417 6,454,134 5.41% May 6,283,708 161,041 6,679,708 6.30% June 7,925,981 1,642,273 7,828,525 -1.23% July 8,993,121 1,067,140 9,839,305 9.41% August 10,291,465 1,298,344 September 11,817,373 1,525,908 October 12,249,051 431,678 November 13,411,675 1,162,624 December 14,956,000 1,544,325 Non -Departmental 16,000,000 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year —Budget —dm- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 23 Packet Pg. 145 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -City Council 2016 City Council Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 19,588 $ 19,588 $ 13,340 -31.90% February 43,238 23,650 27,668 -36.01% March 68,617 25,379 44,120 -35.70% April 91,002 22,385 58,113 -36.14% May 115,388 24,386 71,981 -37.62% June 142,957 27,568 98,095 -31.38% July 169,613 26,656 120,390 -29.02% August 194,018 24,404 September 218,163 24,145 October 242,646 24,484 November 268,263 25,616 December 295,500 27,237 City of Edmonds, WA Monthly Expenditure Report -Office of Mayor 2016 Office of Mayor Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 22,161 $ 22,161 $ 21,296 -3.90% February 44,020 21,859 43,294 -1.65% March 65,603 21,583 64,319 -1.96% April 86,693 21,090 85,409 -1.48% May 108,016 21,323 106,249 -1.64% June 129,368 21,352 127,277 -1.62% July 151,400 22,032 148,207 -2.11% August 172,781 21,380 September 193,702 20,921 October 217,172 23,470 November 239,237 22,065 December 260,250 21,013 Office of Mayor 300,000.00 250,000.00 200,000.00 150,000.00 100,000.00 50,000.00 0,00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dr,- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 24 Packet Pg. 146 1 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -Community Services/Economic Development 2016 Community Services/Economic Development Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 31,041 $ 31,041 $ 25,054 -19.29% February 72,203 41,162 61,145 -15.31% March 112,713 40,509 101,724 -9.75% April 168,538 55,825 146,484 -13.09% May 209,518 40,980 183,771 -12.29% June 247,117 37,599 232,729 -5.82% July 292,697 45,580 274,304 -6.28% August 335,893 43,196 September 383,280 47,387 October 429,917 46,636 November 475,538 45,621 December 535,580 60,042 City Clerk Community Services/Economic Development 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dp- Prior Year City of Edmonds, WA Monthly Expenditure Report -City Clerk 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 50,833 $ 50,833 $ 44,524 -12.41% February 96,778 45,946 87,838 -9.24% March 146,191 49,413 142,107 -2.79% April 191,236 45,044 188,255 -1.56% May 235,619 44,383 234,593 -0.44% June 283,490 47,872 281,026 -0.87% July 331,509 48,019 323,638 -2.37% August 381,757 50,248 September 431,132 49,374 October 489,238 58,106 November 538,959 49,721 December 589,290 50,331 City Clerk 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget -dr- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 25 Packet Pg. 147 1 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -Human Resources 2016 Human Resources Cumulative Budget Forecast Monthly Budget Forecast YTD Actuals Variance % January $ 34,273 $ 34,273 $ 28,007 -18.28% February 71,193 36,920 58,708 -17.54% March 115,298 44,105 90,412 -21.58% April 150,430 35,132 115,675 -23.10% May 189,556 39,126 146,734 -22.59% June 227,772 38,216 175,479 -22.96% July 266,108 38,336 206,637 -22.35% August 302,589 36,480 September 344,265 41,676 October 381,533 37,268 November 414,723 33,190 December 462,044 47,321 Human Resources 500,000 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget t Prior Year City of Edmonds, WA Monthly Expenditure Report -Municipal Court 2016 Municipal Court Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 67,768 $ 67,768 $ 67,346 -0.62% February 140,999 73,231 145,300 3.05% March 219,268 78,269 219,191 -0.04% April 293,243 73,975 290,918 -0.79% May 365,511 72,268 366,411 0.25% June 440,872 75,361 435,326 -1.26% July 515,865 74,993 503,006 -2.49% August 594,541 78,676 September 669,574 75,033 October 750,559 80,985 November 828,307 77,748 December 909,270 80,963 Municipal Court 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dm- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 26 Packet Pg. 148 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -Information Services 2016 Information Services Cumulative Monthly Budget Forecast Budget Forecast TrD Actuals Variance % January $ 87,065 $ 87,065 $ 55,507 -36.25% February 163,617 76,552 158,620 -3.05% March 224,796 61,179 205,381 -8.64% April 281,617 56,821 242,036 -14.05% May 331,746 50,129 283,871 -14.43% June 381,470 49,725 325,732 -14.61% July 448,514 67,044 370,139 -17.47% August 521,686 73,171 September 590,807 69,121 October 648,167 57,360 November 735,478 87,311 December 900,110 164,632 Finance Information Services 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year - Budget Prior Year City of Edmonds, WA Monthly Expenditure Report -Finance 2016 Cumulative Monthly Budget Forecast Budget Forecast TrD Actuals Variance % January $ 97,947 $ 97,947 $ 62,994 -35.69% February 174,402 76,455 130,335 -25.27% March 249,528 75,126 197,850 -20.71% April 330,097 80,569 265,012 -19.72% May 403,825 73,728 330,595 -18.13% June 478,183 74,359 391,632 -18.10% July 551,010 72,826 459,737 -16.56% August 624,240 73,230 September 699,491 75,251 October 782,345 82,854 November 857,044 74,699 December 939,820 82,776 Finance 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC +Current Year - Budget -dP-- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 27 Packet Pg. 149 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -City Attorney 2016 City Attorney Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 61,797 $ 61,797 $ 60,070 -2.79% February 123,593 61,797 120,220 -2.73% March 185,390 61,797 162,968 -12.09% April 247,187 61,797 224,651 -9.12% May 308,983 61,797 286,857 -7.16% June 370,780 61,797 347,078 -6.39% July 432,576 61,797 425,065 -1.74% August 494,373 61,797 September 556,170 61,797 October 617,966 61,797 November 679,763 61,797 December 741,560 61,797 Police 800,000 City Attorney 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC +Current Year - Budget -d�- Prior Year City of Edmonds, WA Monthly Expenditure Report -Police 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 742,786 $ 742,786 $ 771,955 3.93% February 1,501,528 758,742 1,527,193 1.71% March 2,271,626 770,097 2,295,467 1.05% April 3,026,048 754,422 3,078,848 1.74% May 3,780,240 754,192 3,832,659 1.39% June 4,598,322 818,082 4,596,670 -0.04% July 5,363,806 765,484 5,342,881 -0.39% August 6,136,928 773,122 September 6,902,315 765,387 October 7,698,702 796,387 November 8,768,959 1,070,257 December 9,633,050 864,091 Police 10,000,000 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year - Budget -*I,- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 28 Packet Pg. 150 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -Development Services 2016 Development Services Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 204,243 $ 204,243 $ 170,060 -16.74% February 415,923 211,680 361,353 -13.12% March 648,648 232,726 565,548 -12.81% April 859,812 211,164 764,404 -11.10% May 1,077,954 218,142 985,455 -8.58% June 1,286,181 208,226 1,183,128 -8.01% July 1,508,767 222,586 1,381,541 -8.43% August 1,735,150 226,383 September 1,959,377 224,226 October 2,208,198 248,821 November 2,436,068 227,870 December 2,688,352 252,284 Parks & Recreation Development Services 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget t Prior Year City of Edmonds, WA Monthly Expenditure Report -Parks & Recreation 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 243,592 $ 243,592 $ 252,899 3.82% February 505,386 261,794 502,972 -0.48% March 781,095 275,709 770,996 -1.29% April 1,058,904 277,810 1,041,241 -1.67% May 1,359,582 300,677 1,333,112 -1.95% June 1,677,232 317,651 1,609,632 -4.03% July 2,108,378 431,146 2,007,609 -4.78% August 2,567,286 458,908 September 2,889,106 321,820 October 3,183,247 294,141 November 3,438,023 254,776 December 3,774,541 336,518 Parks & Recreation 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Yeaz Budget -dm- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 29 Packet Pg. 151 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -Public Works 2016 Public Works Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 31,230 $ 31,230 $ 29,570 -5.31% February 62,130 30,900 59,034 -4.98% March 92,810 30,680 89,046 -4.05% April 123,243 30,434 118,682 -3.70% May 154,320 31,076 148,411 -3.83% June 185,380 31,060 178,420 -3.75% July 216,622 31,243 208,906 -3.56% August 246,986 30,363 September 276,279 29,293 October 308,266 31,987 November 337,169 28,904 December 371,790 34,621 Facilities Maintenance Public Works 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget --AP- Prior Year City of Edmonds, WA Monthly Expenditure Report -Facilities Maintenance 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 115,588 $ 115,588 $ 116,661 0.93% February 236,621 121,033 240,595 1.68% March 365,554 128,934 357,601 -2.18% April 487,500 121,946 468,138 -3.97% May 604,005 116,504 595,677 -1.38% June 723,757 119,752 697,556 -3.62% July 857,071 133,314 822,642 -4.02% August 967,719 110,648 September 1,099,287 131,567 October 1,211,418 112,132 November 1,335,849 124,431 December 1,483,800 147,951 Facilities Maintenance 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --#- Current Year -Budget --O-Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 30 Packet Pg. 152 1 I 4.5.a I City of Edmonds, WA Monthly Expenditure Report -Engineering 2016 Engineering Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 198,055 $ 198,055 $ 160,475 -18.97% February 396,423 198,368 303,810 -23.36% March 597,281 200,858 521,251 -12.73% April 796,160 198,879 763,107 -4.15% May 1,001,003 204,843 922,959 -7.80% June 1,201,964 200,961 1,161,113 -3.40% July 1,401,670 199,706 1,362,376 -2.80% August 1,603,612 201,942 September 1,807,951 204,339 October 2,023,470 215,519 November 2,232,307 208,838 December 2,470,330 238,023 Engine a ring 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget —dp-- Prior Year r Q *The monthly budget forecast columns are based on a five-year average. 31 Packet Pg. 153 4.5.a INVESTMENT PORTFOLIO SUMMARY Investment Portfolio Summary As of July 31, 2016 (a) Term Purchase Purchase Maturity Yield to Weighted Agency/Issuer Investment Type (months) Date Price Date 1 Maturity Average Washington State Local Investment Pool Various $12,631,968 Various 0.49% 0.10% Government Investment Pool ! Snohomish County Investment Pool Various $30,561,335 Various 0.82% 0.42% Investment Pool FICO Bonds 33 9/19/2014 1,027,000 6/6/2017 0.96% 0.02% Li s FHLMC Bonds 61 12/28/2012 1,000,000 12/28/2017 0.90% 0.02% 1 FFCB Bonds 36 1/25/2016 2,000,000 12/28/2018 1.42% 0.05% C FFCB Bonds 37 1/25/2016 2,000,000 1/25/2019 1.23% 0.04% FNMA Bonds 61 9/19/2014 1,000,000 9/19/2019 1.87% 0.03% FHLB Bonds 48 5/5/2016 2,000,000 3/30/2020 1.45% 0.05% ` c FHLMC Bonds 48 5/5/2016 2,000,000 4/28/2020 1.35% 0.05% FHLB Bonds 49 7/13/2016 3,000,000 7/13/2020 1.20% 0.06% FNMA Bonds 55 7/19/2016 2,000,000 1/19/2021 0.95% 0.03% (a) To maturity. 55,000 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 TOTAL Investment Mix State Investment Pool Bonds Snohomish County Investment Pool $59,220,302 0.87% % of Total Rate Comparison 21.33% Current6-monthtreasuryrate 0.38% 27.06% Current State Pool rate 0.49% 51.61% Blended Edmonds rate 0.87% 100.0% Interest Income Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0.87% O m ca .v O c LL 21 t .r c O 2 m r O N 21 ■ 2012 ■ 2013 y 2014 t ■ 2015 2016 Q 32 Packet Pg. 154 4.5.a GENERAL FUND OVERVIEW FUND BALANCES CHANGE IN FUND BALANCES GENERAL FUND & SUBFUNDS ---- ACTUAL ---- 0 ---- ACTUAL ---- 0- 12/31 /2015 6/30/2016 7/31 /2016 Q2 YTD 001-General Fund $ 9,359,436 $ 10,024,373 $ 7,819,119 $ 4,248,681 $ (1,540,31" Fa 009-Leoff-Medical Ins. Reserve 519,409 532,581 506,734 78,821 (12,67t c 011-Risk Management Fund 961,513 965,713 966,650 2,373 5,13- c� ii 012-Contingency Reserve Fund 4,677,030 4,684,313 4,685,941 3,016,660 8,91 013-Mulitmodal Transportation FD 56,487 56,720 56,775 126 28t 014-Historic Preservation Gift Fund 2,590 5,116 5,121 (3,927) 2,53 -a 016-Building Maintenance 118,086 (48,433) (5,824) (181,693) (123,91( m Total General Fund & Subfunds $ 15,694,551 $ 16,220,385 $ 14,034,516 $ 7,161,041 $ (1,660,03! c 0 co r O N _A 7 7 O O General Fund & Subfunds r 20 0 $15.69 $16.22 0 16 $14.03 � .v 12 c o 0 u. � 8 21 c 0 4 2 m _ r O N , Dec 2015 June 2016 July 2016 3 c a� E t U r Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 33 Packet Pg. 155 I 4.5.a I GOVERNMENTAL FUNDS OVERVIEW CHANGE IN FUND FUND BALANCES BALANCES GOVERNMENTAL FUNDS ---- ACTUAL ---- ---- ACTUAL ---- 12/31 /2015 6/30/2016 7/31 /2016 Q2 YTD General Fund & Subfunds $ 15,694,551 $ 16,220,385 $ 14,034,516 $ 7,161,041 $ (1,660,03 s Special Revenue 7,711,341 10,255,835 11,067,758 (1,631,894) 3,356,41 p Debt Service 114,790 115,563 115,563 (0) 77 .� i Total Governmental Funds $ 23,520,682 $ 26,591,783 $ 25,217,837 $ 5,529,147 $ 1,697,15 i 20 16 ,12 0 8 4 Governmental Fund Balances -By Fund Group General Fund & 1.03 Subfunds $11.or Special 0.26 Revenue $7.71 Debt Service $0.11 $0.12 $0.12 Dec 2015 June 2016 July 2016 30 24 c 18 0 12 6 Governmental Fund Balances - Combined Dec 2015 June 2016 July 2016 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. r_ 0 o_ m c ii 21 t .r a 0 2 m r O N 21 c a� E t v r Q 34 Packet Pg. 156 1 4.5.a SPECIAL REVENUE FUNDS OVERVIEW GOVERNMENTAL SPECIAL REVENUE FUND BALANCES CHANGE IN FUND BALANCE; ---- ACTUAL ---- 12/31/2015 6/30/2016 7/31/2016 ---- ACTUAL ---- Q2 YTD 104 - Drug Enforcement Fund $ 68,732 $ 109,613 $ 93,878 $ (10,919) $ 25,14( 111 - Street Fund 514,445 556,641 544,784 129,712 30,33� 112 - Combined Street Const/Improve 9,339 1,393,845 2,072,819 (2,419,981) 2,063,48( 117 - Municipal Arts Acquis. Fund 468,471 472,727 469,484 (9,357) 1,01: 118 - Memorial Street Tree 17,919 17,993 18,010 40 9' 120 - Hotel/Motel Tax Revenue Fund 153,884 162,241 168,002 (2,268) 14,11E 121 - Employee Parking Permit Fund 64,480 72,599 73,220 835 8,74( 122 - Youth Scholarship Fund 15,469 14,705 14,569 (468) (90( 123 - Tourism Promotional Fund/Arts 84,567 86,674 87,977 188 3,41( 125 - Real Estate Tax 2 1,629,535 1,996,449 2,061,352 122,191 431,811 126 - Real Estate Excise Tax 1 2,239,007 2,366,504 2,469,771 324,283 230,76z 127 - Gifts Catalog Fund 265,924 261,169 259,408 (23,445) (6,51( 129 - Special Projects Fund 38,393 38,551 38,589 85 19( 130 - Cemetery Maintenance/Improvement 137,256 154,038 149,040 11,869 11,78z 132 - Parks Construction Fund 897,413 1,392,690 1,396,446 232,085 499,03: 136 - Parks Trust Fund 152,249 152,877 153,025 339 77( 137 - Cemetery Maintenance Trust Fund 883,729 895,815 897,726 6,085 13,991 138 - Sister City Commission 3,785 6,921 6,669 3,129 2,88z 139 - Transportation Benefit District - - - (0) - 140 - Business Improvement Disrict 66,744 103,780 92,986 3,704 26,24,' Total Special Revenue $ 7,711,341 $ 10,255,835 $ 11,067,758 $ (1,631,894) $ 3,356,41 15 12 9 c 0 6 3 Special Revenue Funds $10.26 ■ Special Revenue Dec 2015 June 2016 July 2016 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. Q 35 Packet Pg. 157 I 4.5.a I ENTERPRISE FUNDS OVERVIEW ENTERPRISE FUND BALANCES CHANGE IN FUND ---- ACTUAL ---- ---- ACTUAL ---- FUNDS 12/31/2015 6/30/2016 7/31/2016 Q2 YTD 421 - Water Utility Fund $ 16,750,820 $ 17,135,816 $ 17,163,717 $ 1,622,668 $ 412,891 422 - Storm Utility Fund 9,695,327 10,084,412 10,049,553 (488,470) 354,22E 423 - Sewer/WWTP Utility Fund 43,067,458 44,186,132 44,050,942 233,885 983,48, < 424 - Bond Reserve Fund - 4 5 (843,959) 411 - Combined Utility Operation - 83,251 95,769 36,122 95,76� . Total Enterprise Funds $ 69,513,605 $ 71,489,615 $ 71.359,986 $ 560,246 $ 1,846,38' , $70, 000,000 $60,000,000 $50, 000,000 $40, 000,000 $30,000,000 $20,000,000 $10, 000,000 Enterprise Fund Balances as of July 31, 2016 $95,769 Combined Utility 17.163.717 $10,049,553 $5 Storm Sewer/WWTP Bond Reserve r Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 36 Packet Pg. 158 SUMMARY OVERVIEW 4.5.a I CITY-WIDE FUND BALANCES ACTUAL CHANGE IN FUND BALANCES ---- ACTUAL ---- Governmental Funds $ 23,520,682 $ 26,591,783 $ 25,217,837 $ 5,529,147 $ 1,697,15E Enterprise Funds 69,513,605 71,489,615 71,359,986 560,246 1,846,38- Internal Services Fund 7,645,840 7,549,040 7,633,212 (724,516) (12,62E Agency Funds 203,101 239,169 236,280 47,333 33,M Total City-wide Total $100,883,228 $105,869,607 $104,447,315 $ 5,412,209 $ 3,564,08i Governmental Fund Balances as of July 31, 2016 General Fund & Subfunds Drug Enforcement Fund Street Fund Combined Street Const/Improve Fund Municipal Arts Acquis. Fund Memorial Street Fund Hotel/Motel Tax Revenue Fund Employee Parking Permit Fund Youth Scholarship Fund Tourism Promotional Fund/Arts Real Estate Excise Tax 2 Real Estate Excise Tax 1, Parks Acq Gifts Catalog Fund Special Projects Fund Cemetery Maintenance/Improvement Parks Construction Fund Parks Trust Fund Cemetery Maintenance Trust Fund Sister City Commission Transportation Benefit District$ (0) Business Improvement District L.I.D. Fund Control L.I.D. Guaranty Fund 2012 LTGO Debt Service Fund $ (0) Equipment Rental Fund Firemen's Pension Fund $1 $14,034,511 $93,878 $544,784 � $2,072,8�9 $469,484 $18,010 - $168,002 � $73,220 $14,569 � $87,977 $2,061,3$2 r $2,469, 71 - $259,408 O $38,589 Q' m — $149,040 W $1,396,44 — $153,025 $897,726 C $6,669 � $92,986 r $10,428 $105,135 S236.280 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. I.L t C O co 0 • $7, 33,21: N , 7 $20,000,000 }; c a� E t v is r Q 37 Packet Pg. 159 I 4.5.a I INTERNAL SERVICE FUNDS OVERVIEW FUND BALANCES CHANGE IN FUNDal INTERNAL SERVICE BALANCES ---- ACTUAL ---- - - ACTUAL ---- FUNDS 12/31 /2015 6/30/2016 7/31 /2016 02_ YTD 511 - Equipment Rental Fund $ 7,645,840 $ 7,549,040 $ 7,633,212 $ (724,516) $ (12,62£ i Total Internal Service Funds $ 7,645,840 $ 7,549,040 $ 7,633,212 $ (724,516) $ (12,6Z 10 8 6 0 4 2 Internal Service Fund Balances $7.65 $7.55 $7.63 Dec 2015 June 2016 July 2016 r_ 0 0. 511-Equipment Rental Fund M r Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 38 Packet Pg. 160 4.6 City Council Agenda Item Meeting Date: 09/6/2016 Approval of Updated Interagency Agreement with Western Washington University for the Sustainable Cities Partnership Staff Lead: Rob Chave Department: Planning Division Preparer: Rob Chave Background/History The City Council had presentations of the Sustainable Cities Partnership on April 12 and 26, 2016, and approved an Interlocal Agreement with Western Washington University on July 19, 2016. Staff Recommendation Authorize the Mayor to sign the updated Interagency Agreement with Western Washington University (Exhibit 1). Narrative On July 19, 2016, the City Council approved an Interlocal Agreement with Western Washington University for the Sustainable Cities Partnership for 2016-2017. However, the University has realized that in order to sign the interlocal agreement, the Board of Trustees has to approve the document, and unfortunately the Trustees don't meet until October. In order to complete the agreement, the University has proposed substituting an "Interagency Agreement" for the interlocal. In all other respects the provisions and projects remain the same; essentially only the form (title) of the agreement has changed. The Edmonds City Attorney has reviewed the Interagency Agreement and has approved it, noting that Washington State law does not mandate an interlocal as the required form. In order to meet the University's contracting needs, staff recommends approving the updated form of the agreement. Note the University has already provided its signatures. Attachments: Exhibit 1: Proposed Interagency Agreement Packet Pg. 161 Aoue6eialul polepdn jo lenoaddV : 99-p luaweeAV Aoua6eaalul pesodWd : l llgl4x3 :1uawL1oepV co a. m M a. INTERAGENCY AGREEMENT Between the City of Edmonds and Western Washington University THIS Agreement is by and between the City of Edmonds, a Washington municipal corporation ('Edmonds"), and Western Washington University, a higher education institution of the State of Washington ("WWU"), known collectively as "the Parties." I. RECITALS WHEREAS, there are numerous pending municipal projects in Edmonds, the completion of which would result in sustainable ecological, economic and social benefits; and ' WHEREAS, WWU's Sustainable Cities Partnership ("SCP") works with a single city each academic year, arranging to use the resources of WWU to undertake projects of benefit to said city; and WHEREAS, Edmonds wishes to contract with WWU to be SCP's partner city for the 2016 — 2017 academic year; and NOW, THEREFORE, in consideration of the mutual promises and obligations hereinafter set forth, the Parties agree as follows: II. AGREEMENT PURPOSE The purpose of this Agreement is to establish the scope of work that WWU's SCP will perform for Edmonds, as well as the terms and conditions of the relationship between the Parties. 2. SERVICE Aoue6eia;ul pa;epdn jo lenoaddd : 99-p .) }uaweeAV Aoua6eaa}ul pesodWd : l }Igl4x3 :}u9uayoe11V M q CO t0 � a. m M WWU SCP agrees to provide those services and deliverable products set forth in attached a. Exhibit "A," Scope of Work and Budget, incorporated herein by reference. Edmonds agrees to provide the staff collaboration and background data set forth in Exhibit "A." 3. ADMINISTRATION AND MANAGEMENT 3.1 The Parties are not creating any new or separate organization or entity to administer the provisions of this agreement. WWU shall administer the planning and implementation of the Scope of Work. 3.2 The Edmonds Planning Manager, Rob Chave, shall have primary responsibility for administering and approving services to be performed by WWU, and shall coordinate all communications between WWU and Edmonds. 3.3 The WWU SCP Program Coordinator, David Davidson, shall have primary responsibility for administering and approving services to be performed by WWU, and shall coordinate all communications between WWU and Edmonds. 4. INVOICE AND PAYMENT PROCEDURES 4.1 Edmonds shall reimburse WWU for incurred project expenses and program overhead expenses, as specified in attached Exhibit "A." 4.2 At the end of each academic quarter (i.e., on approximately December 31, 2016, March 31, 2017, and June 30, 2017) WWU shall submit to Edmonds an invoice for work performed in the prior quarter. Edmonds shall initiate authorization for payment after receipt of said invoice and shall make payment to WWU within approximately 45 days of initial receipt. PROPERTY 5.1 Real: No real property shall be acquired or held under this Agreement. 5.2 Intellectual: Any and all reports, electronic databases and datasets, plans, drawings, videos, photographs, or other creation of the mind created by WWU SCP pursuant to completion of the Scope of Work shall be shared jointly among the Parties and may be used by Edmonds and WWU for any purpose. WWU retains intellectual property rights in documents and intangible property created by WWU prior to engagement with Edmonds, or not created by WWU for its performance of this Agreement. 6. MODIFICATION AND TERMINATION. INTERAGENCY AGREEMENT "U—Edmonds Page 2 of 6 Aoue6eialul polepdn jo 1eAoaddd : gg-p�) }uaweeAV Aoua6eaa}ul pesodWd : }igiyxg :}u9uayoe11V q CD co a. m M 6.1 Modification. Any change, addition or other modification to this Agreement shall a. not be valid or binding upon any party hereto unless such change, addition or modification is in writing and executed by an authorized representative of the Parties hereto. 6.2 Termination. Termination of this Agreement may be initiated by either party hereto with or without cause. Such termination shall be memorialized by written agreement of all Parties hereto, which shall be executed by an authorized representative of each party. In the event of termination, Edmonds shall reimburse WWU pursuant to the terms of paragraph (7) below. 7. ADJUSTMENT OF BUDGET AND SCOPE OF WORK 7.1 Paragraph (4) of Exhibit "A" governs instances in which either party seeks to delete one or more specific projects from the Scope of Work. 7.2 In the event that WWU initiates termination of the Agreement, Edmonds shall reimburse WWU for only the cost of completed projects (i.e., projects for which deliverables have already been received by Edmonds) and for the cost of program overhead incurred as of the date of termination. 7.3 In the event that Edmonds initiates termination of the Agreement, WWU will complete projects that are underway and Edmonds shall reimburse WWU the actual costs incurred for said projects. WWU will not commence projects not yet underway (i.e., projects with scheduled start dates that fall after the date of termination of the Agreement) and will not invoice Edmonds for said projects. WWU will make its best effort (consistent with union contracts and labor laws) to minimize program overhead costs incurred after the date of termination of the Agreement, and Edmonds shall reimburse WWU for program overhead costs that are unavoidably incurred by WWU. TERM This Agreement shall become effective on the date upon which it has been executed by both Parties. The Agreement shall remain in effect until September 30, 2017. INTERAGENCY AGREEMENT )WU—Edmonds Page 3 of 6 Aoue6eialul polepdn jo IeAoaddd : 99-p .) }uaweeAV Aoueftie;ul pesodWd : l }Igl4x3 :1uawL1oepV LO to co a. m M 9. LEGAL RELATIONS AND INDEMNIFICATION The Parties agree to the following distribution and allocation of legal responsibility and indemnification: 9.1 Neither party to this Agreement will be considered the agent of the other nor does either party assume any responsibility to the other party for the consequences of any act or omission of any person or entity not a party to this Agreement. 9.2 The Parties shall separately maintain their own liability and casualty insurance policies as they, in their sole discretion, deem appropriate. The Parties further agree that no indemnification shall be provided for, except as specifically set forth below, and that the respective liability of the Parties to each other and to third persons shall be deemed in accordance with the laws of the State of Washington. 9.3 WWU will protect, defend, indemnify, and hold harmless Edmonds, its officers, employees, or agents from any and all costs, claims, judgments or awards of damages arising out of, or in any way resulting from, the acts or omissions of WWU, its officers, employees or agents. Edmonds will protect, defend, indemnify, and hold harmless WWU, its officers, employees or agents from any and all costs, claims, judgments or awards of damages arising out of, or in any way resulting from, the acts or omissions of Edmonds, its officers, employees volunteers or agents. In the event of concurrent liability, the parties shall have the right of contribution in proportion to the respective liability of each party. Nothing contained in this section shall be deemed to waive immunities established pursuant to state statutes or to create third party rights or immunities. 9.4 Notwithstanding the provisions set forth above, Edmonds understands and supports the project's academic and experiential learning benefits for WWU students. Edmonds acknowledges that many aspects of the project will be completed by WWU students under the supervision of WWU faculty, and that neither the faculty nor students are licensed professionals. Neither WWU, nor anyone acting on behalf of WWU, makes any warranty or representation, express or implied, with respect to the accuracy, completeness, or usefulness of the information provided pursuant to this agreement, whether or not contained in any written report; or that use of any data, information, method or process disclosed in any report may not infringe privately owned rights. Edmonds hereby releases WWU from liability for damages which may result to the City from the negligent acts or omissions of WWU students in the performance of work under this Agreement. 9.5 The terms of this section (9) shall survive the termination of the Agreement. INTERAGENCY AGREEMENT WNW —Edmonds Page 4 of 6 Aoue6eaa;ul pa;epdn jo lenoaddV : gg-p�) }uaweeAV Aoueftie;ul pesodWd : I }Igl4x3 :;uawLjoejjV 10. MISCELLANEOUS PROVISIONS. 10.1 Entire Agreement. This document is the complete and exclusive agreement among the Parties with respect to the SCP program. It supersedes all oral or written proposals and/or other communications among the Parties regarding the SCP. 10.2 Severability. If any provision of this Agreement is held to be invalid, illegal or unenforceable for whatever reason, that shall not affect or impair, in any manner, the validity, legality or enforceability of the remainder of this Agreement. 10.3 Waivers. A waiver or failure by either party to enforce any provision of this Agreement shall not be construed as a continuing waiver of such provisions, nor shall the same constitute a waiver of any other provision of this Agreement 10.4 Status of Employees. This Agreement shall not create any employment or worker's compensation rights, duties or obligations.,No agent, employee or other representative of the Parties shall be deemed an employee of any other party hereto for any reason. 10.5 Status of Agreement. This Agreement is in addition to, and is not intended to replace, substitute, modify or otherwise amend any other agreement between the Parties. Those other agreements continue in effect according to the terms of those agreements. 10.6 Rights and Remedies. The rights and remedies provided in this Agreement are in addition to any other rights and remedies that may be provided by law. 10.7 Third Parties. The Parties do not intend to create any rights or benefits in any entity, organization or person that is not a party hereto. 10.8 Venue. Washington law shall govern the interpretation of this Agreement. Whatcom County shall be the venue of any arbitration or lawsuit arising out of this Agreement. 10.8 Compliance with Laws. WWU shall comply with all applicable federal, state and local laws, ordinances, rules, and regulations. 10.9 Assignment. The Parties hereto shall not assign or delegate any or all duty, obligation, right or interest in this Agreement. 10.10 Nondiscrimination. During the performance of this Agreement, the parties shall comply with all federal and, state nondiscrimination laws and regulations and INTERAGENCY AGREEMENT WWU — Edmonds Page 5 of 6 to a. d 1 M a. Aoue6eao;ul polepdn jo IeAoaddd : gg-p�) }uewe9jBV Aoueftie;ul pesodWd : I }Igl4x3 :}uouayoejjV q co v policies. In the event of a party's noncompliance or refusal to comply with any nondiscrimination law or regulation, this Agreement may be rescinded, canceled, or terminated in whole or in part. The party shall, however, be given a reasonable time in which to cure this noncompliance. 10.11 Force Majeure. The obligations of the parties under this Agreement shall be suspended and excused if the performance of either is prevented or delayed by . acts of nature, earthquakes, fire, flood, or the elements, malicious mischief, insurrection, riots, strikes, lockouts, boycotts, picketing, labor disturbances, war, compliances with any directive, order or regulation of any governmental authority or representative thereof made under claim or color of authority or for any reason beyond the control of either party whether or not similar to the foregoing. 10.12 Records. The Parties shall each maintain records in accordance with generally accepted accounting principles of the funds expended pursuant to this Agreement. Such records shall be available during normal working hours for the review of the other party, their accounting representatives or the State Auditor. IN WITNESS WHEREOF the Parties hereto have executed this Agreement as of the day and year last below written. City of Edmonds Western Washington University David Earling, Mayor Title Date: Date: ATTEST/AUTHENTICATED : Scott Passey, City Clerk APPROVED AS TO FORM: Sharon Cates Office of the City Attorney INTERAGENCY AGREEMENT W WU — Edmonds Title ���_Ul Date jV Page 6 of 6 4.6.a Exhibit "A" Scope of Work and Budget 1. Preamble. This Exhibit contains the best available information regarding the scope of work (SOW) and associated budget, as of the date of execution of the Agreement. For each identified project, a WWU faculty member has confirmed that he/she will undertake the project and has also provided a best estimate of the associated logistics (e.g., the enrollment cap and the number and timing of anticipated visits to Edmonds). The Parties understand that the actual logistics will likely differ from the estimates provided here, based upon actual enrollment and upon the professor's final decision regarding number of visits to Edmonds. 2. Scope%ost of individual projects. The Parties agree that the actual cost of an individual project might exceed or might fall short of the estimate provided in this Exhibit. The Parties agree that for each individual project, a refined project definition and cost estimate (in written form and signed by the Parties' representatives identified in paragraph (3) of the Agreement) shall be established a minimum of two weeks prior to the scheduled start date (see section (8) below) of the project. The refined definitions shall contain information such as: identification of personnel at Edmonds and WWU that will collaborate on the project; resources to be provided by Edmonds (e.g., data, reports, visits to WWU campus by Edmonds staff); deliverables to be produced by WWU; logistics of travel. 3. Firm overall SOW and cost. The Parties agree that the projects listed below shall comprise the SOW, and that the total amount due WWU from Edmonds in completion of the SOW shall not exceed $77,500, EXCEPT that pursuant to section (7.c) below, said total amount may be increased to account for excess laboratory analytical costs. The quarterly invoices described in paragraph (4.2) of the Agreement shall be based upon actual expenses, so overall cost might fall short of the "not to exceed" value established here. 4. Reduction in SOW. With written notice at least 30 days prior to the scheduled start date of a project (see section (8) below), either party may delete a project from the SOW. In that event, the overall cost identified in paragraph (3) above shall be reduced by an amount equal to the estimated project cost as identified in this Exhibit. 5. Augmentation of SOW. An augmentation of the SOW shall be in the form of a written addendum to this Exhibit, ratified pursuant to paragraph (6.1) of the Agreement. 6. Program overhead. Edmonds acknowledges that the overall cost identified in paragraph (3) above includes overhead costs incurred by WWU in operation of the SCP program in the period July 1, 2016, through June 30, 2017. SCP overhead costs amount to $44,800 and include: a. Project Coordinator. A part-time position averaging 0.6 FTE. b. Incidental travel. Travel necessary for generic support of the SCP program. c. Office expense. The costs of I.T., telecom, copying, supplies, etc. d. Events. SCP will host a program -launch event in September 2016 and a finale event in May 2017. Edmonds officials will participate in these events, which will be held at WWU. Packet Pg. 168 4.6.a 7. Suite ofprojects. Following are brief descriptions of the manner in which WWU's academic capacity will be used upon specific Edmonds projects. The estimated cost directly assignable to each project is identified. That cost includes course -specific travel, faculty support, Intern salary (if any), field crew salaries (if any), laboratory analytical costs (if any), and report production (editorial/ design/ duplication). a. Sea -level Rise Mitigation Planning. $2,150. At the current sea level elevation, Edmonds experiences occasional flooding in the waterfront area when high tides combine with storm events. As sea level rises in response to climate change, extreme weather events and flooding in the waterfront area are likely to become more frequent and potentially more damaging. The City has a Hazard Mitigation Plan, but it doesn't address specific risks related to climate change. In addition, the City doesn't have a current specific strategy on how to approach the issue in the coming years. This project would assist the City in evaluating risks associated with climate change and sea level rise and identifying scenarios and options to address prospective impacts. The course will be the focus of the Disaster Reduction and Emergency Planning Studio course (ENVS 476, 25 students) taught in spring 2017 by Dr. Rebekah Paci-Green. The course provides students with an opportunity to apply their knowledge and skills in disaster reduction and emergency planning, with an emphasis on community -based approaches. Students work in groups with a client on a quarter -long project of practical significance. Students are exposed to best practices through case studies across disaster reduction and emergency planning. Project management, client interactions, report writing, and communicating technical information to diverse audiences are emphasized. Dr. Green anticipates three field trips to Edmonds. A single report will be delivered. b. Edmonds Memorial Cemetery. $7,000. Since 1982, when the City acquired the Edmonds Memorial Cemetery, the City has been operating the cemetery with no markings, rows, aisles, or accurate electronic mapping. It is essential that the City procure an accurate digital map of the cemetery, linked to their existing MS Access database that identifies occupants, and also linked to digital photos (not yet in existence) of headstones. The digital map can then be used for management of the cemetery, as well as public -access research. The GIS/cartographic component of the course will be the focus of a student team in the Advanced Spatial Analytics course (ENVS 422, 25 students) taught in spring 2017 by Dr. Aquila Flower. The course focuses upon computer tools for identifying spatial patterns and processes, effective communication of results (including web -based display via tools such as StoryMaps), and professional development for geospatial analysts. While making predominate use of ESRI software, it includes an introduction to open source analytical and cartographic software options. Packet Pg. 169 4.6.a Some of the necessary tasks (e.g., digital photos of gravestones) are not suited to any course's curriculum and must be completed before the Spatial Analytics course begins. Following are such tasks: • Edmonds will deploy survey -grade GPS to determine the coordinates of existing capped rebars placed throughout the cemetery. • A GIS-track 4th-year Intern will use existing survey records and paper maps, together with the GPS points delivered by Edmonds, to build a shapefile of the grid of graves. • The Intern will link the existing MS Access database to the shapefile by way of a grave -addressing scheme developed in cooperation with city staff. • The Intern and a field team will take photos of all gravestones and assess the condition of each. The Intern will incorporate the photos/data into the GIS application, correlated to matching polygons. The team will also map other features in the cemetery, such as benches, flagpoles, light standards, etc., and such features will be incorporated into the GIS application. The Spatial Analytics course will use all of the above material to develop the administrative and public -display (web -based) GIS applications that will be provided to Edmonds c. Stella's Landing Site Assessment. $4,950. The project relates to Stella's Landing, a parcel of private property adjacent to the Edmonds Marsh, east of SR 104, which may soon be donated to the City. Edmonds needs to identify restoration options and complete a Phase 1 environmental assessment. Public participation and ongoing community stewardship are key aspects. The course will be the focus of a two -course sequence, Science and Management of Contaminated Sites (ESCI 453 winter 2017 & ESCI 454 spring 2017, 25 students), taught by Dr. Ruth Sofield. The winter quarter discusses methods, but with reference to the specific site. Students develop a proposal for work to be completed in the subsequent course. The spring quarter involves completion of the cleanup design, including technical components and with emphasis upon communication of technical information to a general audience. Students will visit the site once in winter quarter and four times in spring quarter. A single report will be delivered at the conclusion of each quarter. The exact cost of necessary laboratory analyses is not yet known and will be subject to discussion and confirmation with Edmonds. The estimated budget includes an allowance of $1,000 for lab work. Should Edmonds opt for extensive lab analyses (e.g., pesticides), costs in excess of the $1,000 allowance will be added to the "not to exceed" amount identified in paragraph (3) above. d. Promotion of 0' Ave. Cultural Corridor. $1,575. The City wants to promote planning and development for a three to four block arts/culture corridor, just off the main downtown street (Main Street), which links to the performing arts center (Edmonds Center for the Arts) to the north. The corridor was designated as an Arts Corridor with unique zoning in 2006 and initial concept planning for the corridor was completed in 2009. Since then the project has languished, and a Packet Pg. 170 4.6.a promotion campaign is needed in order to reengage the community and foster support for the project. The target audience includes citizen stakeholders, as well as elected officials and staff within city government. The project will be the focus of the Public Relations Research and Campaigns course (JOUR 440, 14 students) taught in fall 2016 by Dr. Jennifer Keller. The class will be organized as three competing independent teams. City staff will visit the class to discuss the project goals, describe the geographic scope and the prior concept planning, etc. Each of the teams will thereafter proceed independently, scheduling at least one (and possibly as many as three) trips to Edmonds, in order to conduct interviews with citizens and staff. The three competing P.R. campaigns will be presented, and Edmonds will then select a "winner." Edmonds will receive all three reports, allowing the city to opt for preferred items gleaned from any of the three teams. e. Zero -Waste Program and Food -Waste Program. $1,500. Zero -Waste: Research an approach to increase diversion (from landfill) of recyclable construction and demolitions materials generated by commercial development in the City. This should include an examination of resources and companies that are doing this type of recycling and what is, or could be, available to the Edmonds community. Are incentives or requirements the way to go? How can we be assured that materials are actually being recycled? Food -Waste: The City is interested in introducing a food waste reduction program, focusing initially on public events that take place at City facilities. We need a policy or ordinance with procedures that specifies the added collection of organic discards at organized public events taking place on City property. Both projects will be the focus of the Campus Sustainability Planning Studio course (ENVS 471, 10 students) taught in fall 2016 by Seth Vidaiia. While typically focused upon projects on the WWU campus, the course can readily focus upon projects in Edmonds. In the past, the course has worked on topics such as reduction of food waste and solid waste. Student teams will determine relevant parameters and conditions in Edmonds, research programs in existence elsewhere, and provide recommendations appropriate to Edmonds. One team will address each waste stream. The students will visit Edmonds twice, and two reports will be delivered. f. Edmonds Marsh Enhancement. $2,475 The estuarine marsh ("Edmonds Marsh"), which is greatly loved but impacted by past and present urban uses, including adjacent development and stormwater runoff, could benefit from creation of "buffer" areas that feature new low impact stormwater management (raingardens or other techniques) while still allowing adjacent development. What conceptual designs should be considered? How would we know the approach would work? This project needs to be coordinated with the City, the Port of Edmonds, and environmental and business interests. Packet Pg. 171 4.6.a This project will be the focus of the Ecological Restoration course (ESCI 470, 20 students) taught in fall 2016 by Dr. James Helfield and Dr. John Tuxill. Through the lens of an actual restoration project, the course investigates the theory and practice of ecological restoration, including methods for evaluating success. Physical, ecological, economic, and cultural considerations are all incorporated in analyses. A single report will be delivered, including a set of detailed recommendations for restoration work (e.g., schemes for plantings, stormwater management bioswales) and plans for monitoring and assessment and public education. The students will visit Edmonds twice, and Edmonds staff will visit campus once, near the start of the quarter, to describe the site and the objectives of the restoration. g. Wastewater Treatment Plant Educational Material. $4,675. Edmonds seeks a new brochure pertaining to the wastewater treatment process, describing what's been done to improve the plant and what might be next for energy efficiency. A 4th-year Intern in the Environmental Education track will be recruited by faculty member Wendy Walker, who is a specialist in environmental interpretation and education. This paid Intern will work closely with city staff to develop the brochure, as well as signs and content for WWTP tours (both adult and youth). The Intern will make four visits to Edmonds and will deliver the brochure and other described content. h. Downtown Business/Tourism Mobile App. $125. The City and the Edmonds Downtown Alliance have created websites, brochures, ads, and other materials both to attract visitors to Edmonds as well as to inform and orient them to businesses, attractions and events in Edmonds. Greater information about the type and locations of various businesses, as well as the various attractions and events, helps bring visitors to town and keeps them there longer, thereby enhancing economic activity through their expenditures. Edmonds has not yet developed a mobile -device app or apps that could help guide the more tech -savvy visitor who does not necessarily rely on brochures or printed maps. In addition, apps can convey greater and more updated information than printed materials. Key to this project is to understand the true potential for app usage among Edmonds visitors, make the app extremely accessible, as well as a sustainable tool that staff of both the City and the Downtown Alliance can access and update easily. The course will be the focus of a three- or four -person team of computer science students, completing a full -year senior capstone project (CSCI 491, 492, & 493). In the first week of fall quarter 2016, an Edmonds staff member will visit campus to describe the project to the cohort of senior C.S. majors. Students will self-select onto a team. The team is likely to visit Edmonds no more than three times over the course of the year. There will be extensive interaction with Edmonds staff (to identify content, select a software platform, discuss application aestheticsibranding, etc.), which primarily would occur via Skype, but which also will involve visits to Western by Edmonds staff. The application is the main Packet Pg. 172 4.6.a deliverable, but it will be accompanied by a specifications document and other documentation related to internal structure, software maintenance, etc. i. "Playful City" Recreation Program. $3,350. Playful City USA is a national recognition program that honors cities and towns across the country for taking bold steps that make it easy for all kids to get the balanced and active play they need to thrive. These communities are recognized for their efforts to create more playable, family -friendly cities. Through policy changes, programs, and infrastructure investments, Playful City USA communities are driving a deeper understanding of the importance of play and engaging their citizens to reimagine cities with kids in mind. The City seeks to explore the possibility of achieving designation as a Playful City USA. This project will be the focus of two courses in winter 2017: Management of Recreation and Leisure Services (RECR 372, 60 students) taught by Dr. Randy Burtz, and Recreation Programming (RECR 373, identical 60 students) taught by Dr. Jasmine Goodnow. The students will visit Edmonds twice —first for a discussion with city staff and a parks/facilities tour, and later for a workshop reviewing deliverables. City staff will visit the course once, soon after the parks/facilities tour, to discuss expectations and specifics. A single report will be delivered. j. Green Business Program. $2,400. The City established a Green Business Pledge in the spring of 2014. The purpose of the pledge was to raise awareness amongst the City's business community and encourage local businesses to employ green business practices in their daily operations. To date, approximately 35 businesses have taken the pledge. Due to limited staff time, the City has not been able to provide as much follow-up with the businesses who have taken the pledge, nor further get the word out to encourage additional businesses to take the pledge. Additionally, the intention when creating the pledge was for it to be converted into a full Green Business Program where additional resources and benefits would be available to participants. The City would like assistance in fleshing out and marketing the Green Business Program. The project will be the focus of the Greening Business Applications course (MGMT 466, 30 students) taught in spring 2017 by Dr. Craig Dunn. The course is an experiential capstone that draws upon both the business school and the environmental studies department. The students will visit Edmonds three times and will deliver a single report. k. Walkability Assessment. $2,500 Like many other cities, Edmonds' pedestrian infrastructure is lacking, outside the downtown core. The City is interested in identifying gaps and obstacles in the pedestrian network that impede walkability. The study area lies just outside the downtown core and contains important route between key destinations (two schools, a medical campus, parks, and three shopping nodes). The goal of the project is to analyze the relationship between the perception of the urban street environment and how it affects walking behavior. Packet Pg. 173 4.6.a The project will be the focus of the Participatory Action Research course (ANTH 454, 25 students) taught in spring 2017 by Dr. Sean Bruna. The course teaches a methodology of researching, analyzing, and carrying out actions that directly benefits members of a community. Aside from cataloguing the state of pedestrian assets in the target area, the course will interact with citizens to understand the human factors that influence people's decisions regarding walking. The students will visit Edmonds four times and will deliver a single report 8. Summary of projects, courses, timetable and costs. Project Course (or other WWU resource) Scheduled start Cost 7.d. 4th Avenue Promotion JOUR 440 fall `16 9/21/16 $1,575 Te. Zero Waste & Food Waste ENVS 471 fall `16 9/21/16 $1,500 71. Edmonds Marsh ESCI 470 fall `16 9/21/16 $2,475 7.g. WWTP Ed. Material Intern, all 3 quarters 9/21/16 $4,675 Th. Mobile app. C.S. capstone team, all 3 quarters CSCI 491, 492, 493 9/21/16 $125 7.c. Stella's Landing ESCI453 winter `17 ESCI454 spring `17 1/4/17 $4,950 Ti. Playful City RECR 372 winter `17 RECR 373 winter `17 1/4/17 $3,350 7.b. Cemetery GIS intern, field crew, & ENVS 422 spring `17 1/4/17 $7,000 Ta. Sea -level Rise ENVS 476 spring `17 3/28/17 $2,150 7.j. Green Business MGMT 466 spring `17 3/28/17 $2,400 71. Walkability Assessment ANTH 454 spring `17 3/28/17 $2,500 6. Program Overhead Program Coordinator, etc. 7/1/16 — 6/30/17 $44,800 Total Cost $77,500 Packet Pg. 174 4.7 City Council Agenda Item Meeting Date: 09/6/2016 Authorization for Mayor to sign the Resolution for the 2017-2022 Six -Year Transportation Improvement Program Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On May 24, 2016, staff presented the draft 2017-2022 Transportation Improvement Program to Council. On June 7, 2016, a Public Hearing was held on the 2017-2022 Six -Year Transportation Improvement Program On August 23, 2016, staff presented the 2017-2022 Six -Year Transportation Improvement Program to Council and it was forwarded to the September 6, 2016 consent agenda for approval. Staff Recommendation Authorize Mayor to sign the Resolution. Narrative The Six Year Transportation Improvement Program (TIP) is a transportation planning document that identifies funded, partially funded, and unfunded projects that are planned or needed over the next six calendar years. The TIP also identifies the expenditures and secured or reasonably expected revenues for each of the projects included in the TIP. The City practice in preparing the TIP each year has been to keep it financially constrained the first 3 years (2017-2019), but not the last 3 years (2020-2022). RCW 35.77.010 and 36.81.121 require that each city update and adopt their TIP prior to adoption of the budget. A copy of the adopted TIP will be submitted to the Puget Sound Regional Council, Washington State Department of Transportation, and adjacent jurisdictions after it has been approved by City Council. Some of the projects in the TIP are shown as funded through secured or unsecured Federal / State grants, as well as from the local funds. Due to a shortfall in transportation funding, a number of unsecured State and Federal transportation grants have been programmed to fund projects beginning in 2020. Most transportation grants are competitive, and the success of how many grants are secured in the future will depend on other transportation needs and funding requests in the region. Projects not identified in this document may not be eligible for Federal / State funding. All projects in the 2017-2022 TIP are identified in the 2015 Transportation Plan. Since the June 7t", 2016 Public Hearing, the following projects have been added / modified to the document: Packet Pg. 175 4.7 The funding source for the 84th Ave. W Overlay from 2201h St. SW to 212" St. SW has been modified from "unsecured" to "Federal secured", since a grant will be awarded later this year. The funding amount identified for the Hwy 99 Safety Improvements from 224th St. SW to 220th St. SW in 2017 has been increased from $10,000 to $300,000 since additional improvements need to be completed (Federal grant recently submitted). The 220th St. SW Coordination project from Hwy. 99 to 76th Ave. W has been added (grant recently submitted). 95th Pl. W Walkway from 224th St. SW to 220th St. SW has been added (grant recently submitted). 15th St. SW Walkway from Sth Ave. S to 9th Ave. S has been added in 2017 (Minor Sidewalk Program). The funding for the Minor Sidewalk Program is eliminated in 2017, since staff is proposing to fund the 15th St. SW Walkway project from 8th Ave. S to 9th Ave. S. Attachments: Resolution for TIP 2017-22 6-yrTIP Version Packet Pg. 176 4.7.a RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING THE 2017-2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 and 36.81.121 require that each city and town is required to adopt a Transportation Improvement Program (TIP) and file a copy of such adopted program with the Washington State Department of Transportation (WSDOT); and WHEREAS, the TIP identifies all planned projects over the next 6 years, along with the appropriate funding source; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The Transportation Improvement Program is hereby adopted pursuant to the requirements of RCW 35.77.010 and 36.81.121 to be effective on September 71h, 2016 and to continue in full force and effect until amended. A copy of such Transportation Improvement Program for the years 2017 to 2022 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth. Section 2. The City Clerk is hereby requested and directed to file a certified copy of the Transportation Improvement Program with the Washington State Department of Transportation. -1- Packet Pg. 177 4.7.a RESOLVED this day of 32016. ATTEST/AUTHENTICATED: CITY CLERK, SCOTT PASSEY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO. APPROVED: MAYOR, DAVE O. EARLING -2- Packet Pg. 178 City of Edmonds Six Year Transportation Improvement Program (2017-2022) Project Name Purpose Grant Opportunity Proj Phasect es) (2017-2022) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 New projects not included in 2016-2021 TIP Secured rant since 2016-2021 TIP Recently submitted gmnt Preservation/Maintenance Projects: Annual Street Preservation Grind pavement, overlay, chip seal, Possible Grant Engineering $1,900,000 (Federal, unsecured) $900,000 $1,000,000 Program & & $0 (State) and slurry seal Local Funds Construction $10,976,000 Local, General Fund $1,190,000 $1,420,000 $2,000,000 $2,060,000 $2,120,000 $2,186,000 84th Ave. W Oveday from 220th St. SW to 212th St. SW Grind pavement and overlay Or Possible Grant & Engineering & $750,000 $0 (Federal, secured) (State) $750,000 Local Funds Construction $190,000 Local, General Fund $190,000 Citywide Signal Upgrade traffic signal cabinets and Possible Grant Engineering $650,000 (Federal, unsecured) $325,000 $325,000 Improvements & & $0 (State) improve technology Local Funds Construction $0 Local Puget Dr. @ OVD Signal Upgrades Possible grant Engineering $287,500 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & $0 (State) Local Funds Construction $212,500 Local $37.500 1 $175,000 238th @ 100th Ave. Signal Upgrades Rebuild traffic signal system Engineering $0 (Federal) with new signal mast arms, cabinet, and Possible Grant & $765,000 (State, unsecured) $765,000 video detection Construction $0 Local Main St. @ 3rd Signal Upgrades Possible grant Engineering $287,500 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & $0 (State) Local Funds Construction $87,500 Local $37,500 $50,000 TOTAL $2,130,000 $1,420,000 $2,900,000 $3,225,000 $3,945,000 $2,486,000 Safety Capacity Projects: 228th St. SW. Corridor Safety Construct missing roadway link on 228th St. SW between Secured grant $10,000 (Federal, secured) $10,000 Improvements Hwy. 99 and 76th Ave. W, with various utility upgrades. & Construction $0 (State) Local Funds $0 Local 228th St. SW. from Widen roadway to add two-way left turn lane along stretch or Possibe grant $50,000 (Federal, unsecured) $50,000 Hwy. 99 to 95th PI. W left turn lanes at specific intersections. & Design $0 (State) Install sidewalk and bike lanes. Local Funds $50,000 Local $50,000 76th Av. W @ 212th St. SW Intersection Re -design intersection to reduce intersection delay and $3,006,500 (Federal, secured) $2,920,000 $86,500 $1,930,827 (State, unsecured) $1,930,827 $113,500 Improvements improve level of service (LOS). Various utility Secured Grant (Local, Traffic Impact Fees) $100,000 $13,500 improvements are also included in the project. & Construction $776,475 (Local, Fund 421) $776,475 $450,528 Local Funds (Local, Fund 422) $450,528 $718,685 Loral, Fund 423 $718,685 Hwy. 99 Safety Improvements Install C-Curb along this section of Hwy. 99 to restrict left turns into Local Funds / Design, $4,012,000 (Federal, unsecured) $300,000 $700,000 $474,000 $2,538,000 from 216th St. SW to 224th St. SW driveway from the two-way left turn lane and add left turn pockets Possible Grant ROW, & $0 (State, secured) in certain areas. Construction $282,000 Local, General Funds $282,000 SR-99 Gateway / Revitalization Install gateway elements and safety improvements Engineering $0 (Federal) along the SR-99 Corridor. Grant secured & $5,000,000 (State, secured) $500,000 $4,500,000 Construction $0 Local SR 524 (196th St. SW) @ Design intersection improvements and addition of guardrail on Design $0 (Federal) 881h Ave W. Intersection the west side of intersection due to 12' vertical drop (grade. Possible Grant $122,000 (State, unsecured) $122,000 $71,000 Improvements adjustment to improve sight distance to be considered). Local, traffic impact fees $71,000 ROW acquisition ROW $0 (Federal) & $87,500 (State, unsecured) $87,500 $87,500 Local $87:500 Complete intersection improvements Construction $585,000 (Federal, unsecured) $585,000 Local Funds $0 (State) $0 Local Main St. @ 9th Ave. Installation of traffic signal or mini -roundabout. Possible grant Engineering $788,000 (Federal, unsecured) $118,000 $670,000 & & $0 (State) Local Funds Construction $123,000 Local $18,000 1 $105,000 76th Av. W @ 220th St. SW Installation of new traffic signal to convert existing split phasing for Possible Grant Engineering, $5,186,000 (Federal, unsecured) $951,500 $951,500 $3,283,000 Intersection Improvements eastbound and westbound movements to concurrent lef turn phasing & ROW, & $0 (State) with addition of right turn lane for the southbound movement. Local Funds Construction $809,000 Local $148,500 $148,500 $512,000 220th St. SW Traffic Signal Coordination Coordinate the traffic signals along 76th Ave. W Engineering $300,000 (Federal, unsecured) $300,000 from Hwy. 99 to 76th Ave. W from Hwy. 99 to 76th Ave. W to Possible Grants & $0 (State) improve corridor efficiencies through adaptive system. Construction $0 Local Hwy. 99 @ 212th St. SW Widen 212th St. SW to add a WB and EB left turn lane. Possible Grants Engineering, $2,427,000 (Federal, unsecured) $152,000 $943,000 $1,332,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & $0 (State) movements shared jurisdiction with Cityof Lynnwood) Local Funds Construction $379,000 Local w/ _It, i of Lynnwood) $23,000 $148,000 $208,000 Page 1 y Attachment: 2017-22 6-yrTIP Version (1499 : 2017-2022 TIP - Presentation) City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phase(s) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 Hwy. 99 @ 216th St. SW Widen 216th St. SW to add a WB and EB left turn lane. Possible Grants Engineering, $2,021,000 (Federal, unsecured) $142,000 $289,000 $1,590,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & $0 (State) movements. Local Funds Construction $314,000 Local, w/ City of Lynnwood) $22,000 $45,000 $247,000 Hwy. 99 @ 220th St. SW Widen 220th St .SW to add westbound right turn lane and Possible Grants Engineering, $2,783,000 (Federal, unsecured) $152,000 $939,000 $1,692,000 Intersection Improvements Hwy. 99 to add 2nd southbound left turn lane. & ROW, & $0 (State) Local Funds Construction $432,000 Local, w/. City Mountlake Terrace) 1 $23,000 $146,000 1 $263,000 SR-104 @ 226th St. SW / 15th St. SW Extend SR-104 Westbound left turn lane and complete pedestrian Possible Grants Engineering, $179,000 (Federal, unsecured) $15,000 $164,000 Intersection Improvements and bicycle improvements with signage and traffic signal & & $0 (State) improvements. Local Funds Construction $15,000 Local $15,000 SR-104 @ 95th PI. W Modify existing signal timing to include protected left turn phasing Possible Grants Engineering, $420,000 (Federal, unsecured) $65,000 $355,000 Intersection Improvements and provide C-Curb with left turn channeli-tion & & $0 (State) for access management. Local Funds Construction $75,000 Local $10,000 $65,000 SR-104 @ 238th St. SW Install traffic signal and other Possible Grants Engineering, $1,157,000 (Federal, unsecured) $173,000 $984,000 Intersection Improvements improvement intersections. & ROW, & $0 (State) Local Funds Construction $181,000 Local $27,000 $154,000 Type 2 Raised Pavement Install Type 2 Raised Pavement Markers Engineering $100,000 (Federal, unsecured) $100,000 Markers along the centerline of arterials and collectors, improving Possible Grant & $0 (State) roadway safety during night hours and on rainy days Construction $0 Local Trackside Warning Systerm Install Wayside Homs $0 (Federal) at Dayton St. and Main St. at (2) railroad crossings, reducing noise levels Local Funds Only Construction $0 (State) railroad crossings within Downtown Edmonds during train crossings. $10,000 Local, General Fund $10,000 TOTAL $7,516,515 $800,000 $474,000 $5,168,000 $6,782,000 $14,312,000 Pedestrian Projects: Sunset Ave. Walkway Provide walkway on the west side of Sunset Av., Secured Grant, Engineering $44,000 (Federal, secured) $44,000 from Bell St. to Caspem St. w/ various utility upgrades. $687,000 (Federal, unsecured) $687,000 $650,000 Unsecured Grant, & & (Local, Fund 421) $75,000 $575,000 $200,000 (Local, Fund 423) $50,000 $150,000 Local Funds Construction $692,000 Local $5,000 $687,000 Maplewood Walkway from Main St. to Install sidewalk on Maplewood St. from Main St. to 200th St. SW, Engineering $1,591,000 (Federal, unsecured) $100,000 $130,000 $1,361,000 200th St. SW creating connection to Maplewood Elementary and Yost Park. Possible Grant & $0 (State) Construction $0 Local Elm Way Walkway from 8th Ave. S Install sidewalk on Elm Way from 8th Ave. S to 9th Ave. S, creating Engineering $789,000 (Federal, unsecured) $56,000 $600,000 $133,000 to 9th Ave. S connections to Westgate and Sherwood Elementary Schools. Possible grant & $0 (State) Construction $0 Local 80th Ave. W Walkway from Install sidewalk on 80th Ave. W from 2121h St. SW to 206th St. SW, Engineering $1,449,000 (Federal, unsecured) $100,000 $110,000 $1,239,000 212th St. SW to 206th St. SW creating connections to Chase Lake and College Place Possible Grant & $0 (State) Elementary Schools. Construction $0 Local Citywide Pedestrian Add Flashing pedestrian beacons, HAWK signal, or pedestrian actuations Engineering $1,310,000 (Federal, unsecured) $100,000 $800,000 $410,000 Crossing Enhancements existing signal at various location throughout the City Possible Grants & $0 (State) to improve pedestrian safety. Construction $0 Local 95th PI. SW Walkway from Install sidewalk on 95th PI. W from Engineering $0 (Federal) 224th St. SW to 220th St. SW 224th St. SW to 220th St. SW Possible Grants & $468,000 (State, unsecured) $80,000 $388,000 to improve pedestrian safety. Construction $117,000 Local $20,000 $97,000 Dayton St. Walkway from 7th Ave. S to Install sidewalk on the south side of Dayton St. Possible Grant Engineering $37,500 (Federal, unsecured) $37,500 8th Ave. S & & $0 (State) Local Funds Construction $37,500 Local $37,500 232nd St. SW from 100th Ave. W to Install sidewalk on one side of 232nd St. SW Possible Grant Engineering $1,055,000 (Federal, unsecured) $100,000 $955,000 SR-104 & & $0 (State) Local Funds Construction $250,000 Local $100,000 $150,000 236th St. SW Walkway from SR-104 to Provide sidewalk on south side of 236th St. Secured Grant $10,000 (Federal,secured) $10,000 Madrona Elementary & Construction $0 (State) Local Funds $10,000 Local, Fund 422 $10,000 236th St. SW Walkway from SR-104 to Provide sidewalk on one side of 236th St. SW Possible Grant Engineering $697,500 (Fedeml,unsecured) $106,500 $591,000 97th PI. W & & $0 (State) Local Funds Construction $697,500 Local $106,500 $591,000 84th Ave. W Walkway from 238th St. SW to Provide sidewalk on one side of 841h Ave. W Possible Grant Engineering $45,000 (Fedeml,unsecured) $45,000 234th St. SW & & $0 (State) Local Funds Construction $45,000 Local $45,000 2nd Ave. S Walkway from James St. Engineering $0 (Federal) to Main St. Provide sidewalk along short missing link. Local Funds Only & $0 (State) Construction $30,000 Local $30,000 fl1 0 X F411(Q Page 2 CO CO Attachment: 2017-22 6-yrTIP Version (1499 : 2017-2022 TIP - Presentation) City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phase(s) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 218th St. SW Walkway from 76th Ave. W to Possible Grant Engineering $615,000 (Federal, unsecured) $100,000 $515,000 Install sidewalk along missing link & & $0 (State) 84th Ave. W Local Funds Construction $600,000 Local $100,000 $500,000 Wanut St. Walkway from 3rd Ave. to 4th Ave. Engineering $0 (Federal) Install sidewalk along short missing link Possible Grant & $105,000 (State, unsecured) $105,000 Construction $0 Local 216th St. SW Walkway from Hwy. 99 Install 300' sidewalk on the north side of 216th St. SW Possible Grant Engineering $137,000 (Federal, unsecured) $137,000 to 72nd Ave. W & & $0 (State) from Hwy. 99 to 72nd Ave. W Local Funds Construction $20,000 Local $20,000 238th St. SW Walkway from SR-104 Install 800' of sidewalk on the north side of 238th St. SW Secured Grant Engineering $0 (Federal) to Hwy. 99 & & $294,000 (State, secured) $294,000 from SR-104 to Hwy. 99 Local Funds Construction $95,000 Local $95,000 15th St. SW from 8th Ave. S to 9th Ave. S Install sidewalk on the south side of 15th St. SW from Engineering $0 (Federal) Local Funds & $0 (State) 8th Ave. S to 9th Ave. S Construction $200,000 Local $200,000 4th Ave. Corridor Enhancement Create corridor improvements to encourage pedestrian Possible Grant Engineering $3,450,000 (Federal, unsecured) $100,000 $1,000,000 $2,350,000 Walkway activity along 4th Ave. N from Main St. to & & $0 (State) 3rd Ave. N from Downtown retail to Edmonds Center for the Arts Local Funds Construction $675,000 Local, Fund 125 $100,000 1 $150,000 $425,000 Minor Sidewalk Complete sidewalk missing links (from Short Walkway list of Engineering $0 (Federal) Program 2015 Transportation Plan or other identified projects) Local Funds & $0 (State) Construction $1,000,000 Local, General Fundt$50,OOOI $200,000 $200,000 $200,000 $200,000 $200,000 ADA Curb Ramps Improvements Construct Citywide ADA compliant curb ramps where Possible Grant Engineering $0 (Federal) facilities don't exist nor meet current standards & Local Funds & Construction $750,000 900,000 (State, unsecured) Local, General Fund $50,000 1 $50,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 Audible Pedestrian Install audible pedestrian signals to Engineering $0 (Federal) Signals pedestrians heads at signalized intersections to improve Possible Grant & $0 (State) pedestrians with disabilities safety Construction $25,000 Local $25,000 TOTAL $1,314,000 $2,375,000 $793,000 $6,179,000 $3,432,000 $5,685,000 Bike -Link Install bike lanes and sharrows [ key bicycle locations to ) g ( (Fede 91) ) complete missinglinks such as along76th Ave. W, 212th St. SW... Secured rent Construction $560,000 Verdant rant $560,000 Traffic Calmina / Non -Motorized Transportation Safetv Protects Traffic Calming Program / Traffic circles, speed cushions, Engineering $0 (Federal) Non -Motorized Transportation radar feedback signs, bulb -outs, etc. Local Funds only & $0 (State) 1 1 Safety Construction 1 $120,000 (Local, General Fund) $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 Ferry Projects Ferry Storage Improvements from Provide additional ferry storage area closer to the Ferry Terminal Engineering $357,000 (Federal, unsecured) $357,000 Dayton St. to Pine St. (through striping revisions / C-Curb addition...). Possible Grant & $0 (State) Construction $0 Local Traffic Plannina Projects: Edmonds Waterfront Study: 1) Waterfront Access issues emphasizing and prioritizing near term solutions t( Engineering $0 Port of Edmonds Analysis providing emergency access; 2) At -grade conflicts where Main and Dayton St. interSE Unsecured Grant and & $0 (State) $865,000 BNSF rail lines; 3) Pedesitrian /Bicycle Access; 4) Options to the Edmonds Crossin (Federal, unsecured) $200,000 $665,000 Multimodal Terminal Pro'act identified as Modified Alternative 2 within the 2004 EIS Local Funds Planning $135,000 Local, General Funds $31,000 $104,000 Citywide Complete an compliance evaluation of all existing ADA Engineering $0 (Federel) Transition Plan curb ramps, as well as long range plan on how to address Local Funds Only & $0 (State) those deffciencies. Planning $50,000 Local, General Funds $50,000 Pavement Rating Analyse the pavement condition of all arterial, collector, and local streets $0 (Federal) Study to determine the stretches to be repaved as part of future Local Funds Only Planning $0 (State) annual overa s. $30,000 Local / General Funds $30,000 Transportation Plan Update Engineering $0 (Federal) Update Transportation Plan Local Funds Only & $0 (State) Planning $175,000 Local $175,000 TOTAL 1 $311,000 $769,000 $0 $0 $175,000 so Total $73,228,515 Page 3 $11,851,515 $5,384,000 $4,187,000 $14,949,000 $14,354,000 $22,503,000 Attachment: 2017-22 6-yrTIP Version (1499 : 2017-2022 TIP - Presentation) P- a' City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phases) Total Cost source(s) 2017 2018 2019 M. 2021 2022 Total Federal $5,190,000 $3,091,500 $1,917,000 $8,794,000 $8,699,000 $12,647,000 Tolal Federal (Secured/ $3:734,000 $86,500 $0 $0 $0 $0 Total Federal (Unsecured) $1,456,000 $3,005,000 $1,917,000 $8,794,000 $8,699,000 $12,647,000 Total State $2,304,827 $388,000 $0 $1,242,000 $837,500 $4,750,000 Total State (Secured) $294,000 $0 $0 $0 $50() 00 $4,500,000 Total State (Unsecured) $2,010,827 $388,000 $0 $1,242,000 $337,500 $250,000 Total Verdant $560,000 $0 $0 $0 $0 $0 Total Verdant (Secured) $560,000 $0 $0 $0 $0 $0 Total Port of Edmonds $0 $0 $0 $0 $0 $0 Total Local Fund $4,096,688 $1,904,500 $2,270,000 $4,913,000 $4,671,500 $5,106,000 Total Local (Fund 112) $125,000 $0 $0 $1,137,000 $1,738,500 $1,307,000 Total Local (Fund 125) $0 $0 $0 $100,000 $150,000 $425,000 Toal Local (Fund 421) $851,475 $0 $0 $575,000 $0 $0 Total Local (Fund 422) $460,528 $0 $0 $0 $0 $0 Total Local (Fund 4231 $768,685 $0 $0 $150,000 $0 $0 Total Local with other jurisdictions $0 $0 $0 $68,000 $339,000 $718,000 Total Local (Tra10c Impact Fees) $100,000 $13,500 $0 $71,000 $0 $0 Total Local (General Fundl $1,571,000 $1,794,000 $2,270,000 $2,812,000 $2,370,000 $2,436,000 fl1 <i rt[411 (Q Page 4 �'JAttachment: 2017-22 6-yrTIP Version (1499 : 2017-2022 TIP - Presentation) 5.1 City Council Agenda Item Meeting Date: 09/6/2016 Presentation on 2016 Scarecrow Festival - Edmonds Museum (10 min.) Staff Lead: Andrew Pierce Department: City Council Preparer: Scott Passey Background/History N/A Staff Recommendation For information only. Narrative The Edmonds Historical Museum is sponsoring the Fourth Annual Edmonds Scarecrow Festival. Dave Buelow of the Edmonds Historical Museum Board will provide a brief presentation about the event. Packet Pg. 183 5.2 City Council Agenda Item Meeting Date: 09/6/2016 Presentation on Homelessness by City of Lynnwood Council President M. Christopher Boyer (15 min.) Staff Lead: Andrew Pierce Department: City Council Preparer: Scott Passey Background/History N/A Staff Recommendation N/A Narrative City of Lynnwood Council President M. Christopher Boyer will make a presentation on issues related to homelessness. Packet Pg. 184 5.3 City Council Agenda Item Meeting Date: 09/6/2016 June 2016 Quarterly Financial Report (10 min.) Staff Lead: Scott James Department: Administrative Services Preparer: Sarah Mager No action needed; informational only. Attachments: Complete June 2016 Quarterly Financial Report 2nd Qtr 2016 Financial Management Report Packet Pg. 185 5.3.a bAt vX, OF E� O,� d u "J7 1 Rao AT A GLANCE: General Fund operating revenues are ahead of last year's revenues. 2016 sales tax revenue out performs 2015 (see page 18) 2016 Interest Earnings are higher than 2015.. (see page 32) INSIDE THIS ISSUE: Revenues By Fund Summary Expenditures By Fund Summary 2 General Fund Summary of All Operating Funds: Revenue The Financial Management Report is a summary report of the City's 2nd Quarter 2016 financial results with a comparison to 2nd Quarter 201 • Notable Revenue Highlights: => 2016 Investment earnings are $54,714 Higher than 2015 => 2016 tax revenues are $654,975 higher than 2015. These increases are led by: *Property Taxes $198,441 *Sales Taxes $154,185 *Real Estate Excise Tax $185,110 Revenues Expenditures By Fund Specific Revenue Highlights by Fund: • Additional Special Revenue Fund Highlights: • Street Fund 1112016 grant revenues are $85,516 higher than 2015. • Hotel/Motel Lodging tax revenues grew 12.1 % over 2015. • Real Estate Excise Tax revenues in- creased $185,110 or 17.6% over 2015. Details 6 • General Fund second quarter 2016 General Fund operating revenue is $1.4 million park Construction Fund 132 Park grant revenues increased $456,474 Expenditure Detail or 7.5 percent over last year, over 2015. largely due to increased property tax, sales tax and grant revenues. A Utility Funds: Investment Portfolio 32 detailed analysis of General Fund => Water sales increased by $251,918 or revenues can be found on page 4, 9.6 percent over 2015. Fund Balance 33 with sales tax performance dis- Overview cussed on page 18. => Stormwater sales increased by • Special Revenue Funds 2016 rev- $70,968 or 4.5 percent over 2015. Comers 8 enues are $4,252,886 or 121.per- p => Sewer sales increased by $285,941 or cent higher than 2015. The 2016 10.1 percent over 2015. revenue increase is primarily due to: • During 2016 the Street Construc- tion Fund 112 billed grant agen- cies for $2.9 million more than in 2015. F 0 a m c M c U_ 0 M cY c� 0 N c CD Financial Management Report as of June 30, 2016 Packet Pg. 186 City of Edmonds Purchase of Civic Field completed with help of $1.4 million in grants Pr1_ffL http:// visitedmonds.com/ http:// visitedmonds.com/ — — — — — — — — — — — — Summary of All Operating Funds: Expenditures • General Fund expenditures ended the quarter with 48% of the budget expended. Operating expenditures increased $216,915 or 1.1% over 2015. General Fund expense by catego- ries are on page 6 and departmental expenses are on pages 13-16 Additional General Fund expendi- tures information can be found on pages 23-31. Special Revenue Fund expendi- tures increased $2,613,602 in 2016 over 2015. The majority of this increase comes from increased con- struction outlays, with street con- struction expenses being $1,494,871 higher than 2015. Ad- ditional Special Revenue Fund ex- penditure information can be found on pages 6-8. • Utility Funds 2016 expenses in- creased $900,4444 over 2015, pri- marily due to increase capital ex- penses for water line replacements. Additional Utility Fund expense information can be found on pages 9 —10. I • The Water Fund expenditures for were $333,492 higher than 2015 mainly due to increased capital ex- penditures. (see page 11 for ex- penditure details.) I Investment Portfolio • The City's investment earnings in- creased over 36.7% over 2015 1 earnings primarily due to diversifying the portfolio. (see page 32 for addition- al investment details) I I I Fund Balances • During the first two quarters of 2016, the General Fund balance decreased $3,40,446. The 2016 fund balance de- crease is primarily due to the timing of I when the City receives its bi-annual property tax payments. • Additional fund balance information can be found on pages 3338. I Other Notable Highlights I • In 2014, the City received a $1.67 mil- lion retroactive invoice from Fire Dis- trict 1 as the result of their settled labor agreement. Subsequently to receiving this invoice, the City negotiated a small reduction and were able to pay the re- maining $1,603,000 over eight quarterly payments. To date, the City has paid $1,202,250 towards this settlement. • During the Week of May 2nd 2016, the City invested in another $4,000,000 of investment bonds (see page 32 for in- vestment portfolio summary.) • City closed on purchase of Civic Field on February 9, 2016. • On February 12, 2016, the City made its last Public Safety Bond payment early, saving the City approximately $13,000 in interest expense. Sunset in Edmonds By Deb Sharp Financial Management Report as of June 30, 2016 Packet Pg. 187 I 5.3.a I Page I of I C ITY O F EDMO NDS REVENUES BY FUND - SUMMARY Fund 2016 Amended 6/30/2015 6/30/2016 Amount No. Title Budget Revenues Revenues Remaining %Received 001 GENERAL FUND $ 39,276,670 $ 18,922,673 $ 20,334,355 $ 18,942,315 520 009 LEOFF-MEDICAL INS. RESERVE 278,770 139,484 139,584 139,186 500 011 RISK MANAGEMENT FUND 6,660 4,285 4,200 2,460 63° 012 CONTINGENCY RESERVE FUND 28,110 22,594 7,283 20,827 260 p C. 013 MULTIMODAL TRANSPORTATION FUND - 234 233 (233) 00, 014 HISTORIC PRESERVATION GIFT FUND 5,000 3 2,526 2,474 51° 016 BUILDING MAINTENANCE 2,005,000 237,914 591,195 1,413,805 .0 290 C 104 DRUG ENFORCEMENT FUND 153,000 11,276 68,661 84,339 450 IL 111 STREET FUND 1,760,500 907,722 989,658 770,842 56" 112 COMBINED STREET CONST/IMPROVE t 8,314,697 805,704 3,779,444 4,535,253 450 117 MUNICIPAL ARTS ACQUIS. FUND 102,410 37,748 29,531 72,879 290 118 MEMORIAL STREET TREE 110 74 74 36 670, Cy co 120 HOTEL/MOTEL TAX REVENUE FUND 82,150 30,743 34,503 47,648 420 p N 121 EMPLOYEE PARKING PERMIT FUND 21,390 8,598 8,119 13,271 38' C C 122 YOUTH SCHOLARSHIP FUND 5,550 189 71 5,479 10, 123 TOURISM PROMOTIONAL FUND/ARTS 27,530 10,402 11,649 15,881 420 125 REAL ESTATE EXCISE TAX 2 2 1,108,000 531,403 625,801 482,199 560 14 126 REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 2 1,102,000 530,078 626,412 475,588 570 .. r- 127 GIFTSCATALOGFUND 46,900 34,538 28,386 18,514 610 0 0. 129 SPECIAL PROJECTS FUND 280 159 158 122 570 130 CEMETERY MAINTENANCE/IMPROVEMT 177,260 96,753 94,494 82,766 530 132 PARKS CONSTRUCTIONFUND3 2,552,240 131,214 1,079,454 1,472,786 420, C 136 PARKS TRUST FUND 630 631 628 2 1000 137 CEMETERY MAINTENANCE TRUST FD 19,880 12,091 12,086 7,794 610 138 SISTER CITY COMMISSION 12,010 3,611 5,772 6,238 480 139 TRANSPORTATION BENEFIT DISTRICT 682,500 339,276 350,193 332,307 510 140 BUSINESS IMPROVEMENT DISTRICT - 48,443 51,256 (51,256) 00 211 L.I.D. FUND CONTROL 14,400 9,718 773 13,627 50, 213 L.I.D. GUARANTY FUND 14,400 - - 14,400 00 231 2012 LT GO DEBT SERVICE FUND 677,380 75,464 70,301 607,079 100 232 2014 DEBT SERVICE FUND 949,540 9,201 936,429 13,111 990 411 COMBINED UTILITY OPERATION - 12,880 83,251 (83,251) 00 421 WATER UTILITY FUND 4 8,443,460 3,260,676 4,041,301 4,402,159 480 422 STORM UTILITY FUND 4,131,780 2,043,886 1,946,923 2,184,857 470 423 SEWER/WWTP UTILITY FUND 5 12,645,240 4,368,878 5,321,028 7,324,212 420 424 BOND RESERVE FUND 1,989,900 337,210 667,446 1,322,454 340 511 EQUIPMENT RENTAL FUND 1,579,570 803,646 831,427 748,143 530 617 FIREMEN'S PENSION FUND 64,840 56,725 57,418 7,422 890, $ 88,279,757 $ 33,846,124 $ 42,832,027 $ 45,447,730 490, 1 Difference between 2015 and 2016 is due to grant invoicing for various projects in 2016. 2 Real Estate Excise Tax revenues for both funds 125 and 126 is up a total of $185,110 from 2015. 3 Differences between 2015 and 2016 are due to a SnoCo grant, parks dona tionA and park impact fees 4 Difference between 2015 and 2016 is largely due to a substantial water connection fee and the 9%increase to water base rates 5 Differences are due to increases in invoicing and sewer connection fees in 2016, as well as a 9.5%increase to sewer base rates 1 Packet Pg. 188 1 5.3.a Page 1 of 1 C ITY O F EDMO NDS EXPENDITURES BY FUND - SUMMARY Fund 2016 Amended 6/30/2015 6/30/2016 Amount No. Title Budget Expenditures Expenditures Remaining %Spent 001 GENERAL FUND 6 $ 40,929,107 $ 19,452,503 $ 19,669,418 $ 21,259,689 480/( 009 LEOFF-MEDICAL INS. RESERVE 279,480 138,255 126,411 153,069 450/( 011 RISK MANAGEMENT RESERVE FUND - - 00/( 012 CONTINGENCY RESERVE FUND 800,000 400,000 800,000 0% C 014 HISTORIC PRESERVATION GIFT FUND 5,400 3,750 - 5,400 0°/ d 016 BUILDING MAINT ENANCE 7 2,175,000 96,369 757,714 1,417,286 350/( 104 DRUG ENFORCEMENT FUND 76,030 18,256 27,780 48,250 370/( _ 111 STREET FUND 1,716,120 826,372 947,462 768,658 5501( 112 COMBINED STREET CONST/IMPROVE 8 8,327,792 900,067 2,394,938 5,932,854 290/( LL 117 MUNICIPAL ARTS ACQUIS. FUND 181,380 27,036 25,274 156,106 140/( 118 MEMORIAL STREET TREE - - - - 00/( M 7 120 HOTEL/MOTEL TAX REVENUE FUND 149,650 25,294 26,145 123,505 170/( U' co 121 EMPLOYEE PARKING PERMIT FUND 26,880 - - 26,880 00/( C 122 YOUTH SCHOLARSHIP FUND 3,000 1,341 835 2,165 28% 4) 123 TOURISM PROMOTIONAL FUND/ARTS 31,500 5,501 9,543 21,957 307 % 125 REAL ESTATE EXCISE TAX 2 2,100,565 113,403 258,888 1,841,677 120/( 126 REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 9 2,595,320 28,845 498,915 2,096,405 r 190/( 14 127 GIFTSCATALOGFUND 44,950 12,631 33,140 11,810 T 740/( 129 SPECIAL PROJECTS FUND - - 00/( p CL 130 CEMETERY MAINTENANCE/IMPROVEMT 210,370 74,803 77,712 132,658 370/c 132 PARKS CONSTRUCTION FUND 9 2,775,770 223,266 584,177 2,191,593 21% 136 PARKSTRUST FUND - - - 00% .D C M 138 SISTER CITY COMMISSION 12,500 10 2,636 9,864 210/( ,r LL 139 TRANSPORTATION BENEFIT DISTRICT 682,500 367,211 350,193 332,307 5101( 140 BUSINESS IMPROVEMENT DISTRICT - 25,924 14,219 (14,219) L 0°/ 211 L.I.D. FUND CONTROL 14,400 - 14,400 0°/ 213 L.I.D. GUARANTY FUND - - 00% CY co 231 2012 LT GO DEBT SERVICE FUND 677,380 75,517 70,301 607,079 100/, p 232 2014 DEBT SERVICE FUND 6 949,540 9,201 936,429 13,111 N 990/( d C 421 WATER UTILITY FUND 12,717,507 3,322,813 3,656,305 9,061,202 290/( 422 STORM UTILITY FUND 7,613,450 1,315,116 1,557,839 6,055,611 200/( 2; 423 SEWER/WWTP UTILITY FUND 17,921,050 4,187,306 4,202,354 13,718,696 230/( Q. p 424 BOND RESERVE FUND 1,990,920 358,261 667,442 1,323,478 34% V 511 EQUIPMENT RENTAL FUND 1,971,820 584,355 928,227 1,043,593 470/( r 617 FIREMEN'S PENSION FUND 59,610 24,782 21,351 38,259 C 360/, G1 E $ 107,038,991 $ 32,618,187 $ 37,845,648 $ 69,193,343 350% 6 Differences between 2015 and 2016 are primarily due to final payment of 2014 debt. 7 Differences between 2015 and 2016 are primarily due to the Edmonds Fishing Pier Rehabilitation Project. 8 Differences between 2015 and 2016 are due to invoices for construction projects in 2016. 9 Differences between 2015 and 2016 are due to purchase of Civic Field in 2016. 2 rac,ecei Pg. 189 5.3.a Page 1 of 3 C TTY O F IDMO NDS REVENUES - GENERAL FUND 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Revenues Revenues Remaining %Received TAXES: REAL PERSONAL / PROPERTY TAX EMS PROPERTY TAX 10 VOTED PROPERTY TAX LOCAL RETAIL SALES/USE TAX 11 NATURAL GAS USE TAX 1/10 SALES TAX LOCAL CRIM JUST ELECTRIC UTILITY TAX GAS UTILITY TAX SOLID WASTE UTILITY TAX WATER UTILITY TAX SEWER UT ILIT Y TAX ST ORMWAT ER UT ILIT Y TAX T.V. CABLE UTILITY TAX TELEPHONE UTILITY TAX PULLTABS TAX AMUSEMENT GAMES LEASEHOLD EXCISE TAX LICENSES AND PERNHTS: FIRE PERMITS -SPECIAL USE POLICE - FINGERPRINTING PROF AND OCC LICENSE -TAXI AMUSEMENTS FRANCHISE AGREEMENT -COMCAST FRANCHISE FEE-EDUCATION/GOVERNMENT FRANCHISE AGREEMENT -VERIZON/FRONT IER FRANCHISE AGREEMENT -BLACKROCK OLYMPIC VIEW WATER DISTRICT FRANCHISE GENERAL BUSINESS LICENSE DEV SERV PERMIT SURCHARGE NON-RESIDENT BUS LICENSE RIGHT OF WAY FRANCHISE FEE BUILDING STRUCTURE PERMITS 12 ANIMAL LICENSES STREET AND CURB PERMIT OT R NON -BUS LIC/P ERMIT S INTERGOVERNMENTAL: FEDERAL GRANT S-BUDGET ONLY DOJ 15-0404-0-1-754 - BULLET PROOF VEST USDA FOREST SERVICE ROOFTOP SOLAR CHALLENGE GRANT ROOFTOP SOLAR CHALLENGE II WA ASSOC OF SHERIFFS TRAFFIC GRANT TARGET ZERO TEAMS GRANT HIGH VISIBILITY ENFORCEMENT DOCKSIDE DRILLS GRANT REIMBURSE WA STATE ADMIN OFFICE COURTS GRANT 2014 COMMUNITY FORESTRY GRANT WATERFRONT ANALYSIS GRANT PUD PRIVILEDGE TAX MVET/SPECIAL DISTRIBUTION JUDICIAL SALARY CONTRIBUTION -STATE CRIMINAL JUSTICE -SPECIAL PROGRAMS DUI - CITIES LIQUOR EXCISE TAX LIQUOR BOARD PROFIT S MISCELLANEOUS INTERLOCAL REVENUE 13 INTERLOCAL GRANTS VERDANT INTERLOCAL GRANTS $ 10,068,020 $ 5,309,480 $ 5,343,422 $ 4,724,598 53% 3,688,090 1,802,797 1,955,463 1,732,627 53% 949,540 492,243 504,076 445,464 53% 6,144,400 3,140,830 3,295,015 2,849,385 54% 9,800 3,743 3,365 6,435 34% 626,700 305,477 327,165 299,535 52% C 1,451,800 871,282 913,790 538,010 63% Q. 647,900 413,611 385,669 262,231 60% 4' 306,500 157,023 162,220 144,280 53% 1,229,110 493,120 540,263 688,847 44% 5 629,140 282,765 311,566 317,574 50% 330,430 157,184 164,329 166,101 50% 846,000 423,940 425,407 420,593 50% jL 1,349,100 664,312 633,125 715,975 47% >, 60,600 24,272 25,643 34,957 42% 40 - 141 (101) 351%' 242,200 121,178 126,667 115,533 52% 28,579,370 14,663,255 15,117,325 13,462,045 53% (+J co 250 215 190 60 76% p 300 - 200 100 67% N 630 - - 630 0% 4,740 4,325 - 4,740 0% 7 710,600 353,509 358,427 352,173 50% 44,900 23,684 21,148 23,752 47% f� 100,900 49,706 50,705 50,195 50% 18,400 9,091 8,172 10,228 44% v 268,000 134,672 138,558 129,442 52% 116,000 88,922 76,241 39,759 66% O 42,000 23,090 26,515 15,485 63% C 70,400 27,850 42,900 27,500 61% W 15,000 5,388 44,623 (29,623) 297% 525,000 310,690 402,155 122,846 77% 38,800 15,135 9,792 29,008 25% C 42,100 12,757 21,432 20,668 51% 13,100 6,715 8,987 4,113 69% L+ 2,011,120 1,065,749 1,210,044 801,076 60% i d 0% M 11,970 1,472 6,920 5,050 58% = - - - - 0% 3,000 - - 0% r 6,000 5,250 - 6,000 0% N 995 (995) 0% C 7,500 5,287 2,273 5,227 30% 3,000 - 2,663 337 89% 614 (614) 0% r 300 300 - 300 0% Q. - 1,000 - - 0% - - 251,859 (251,859) 0% O 192,500 - - 192,500 0% V 10,000 5,215 5,441 4,559 54% 13,000 8,189 9,150 3,850 70% d 36,980 19,160 19,893 17,087 54% E 7,240 3,512 3,166 4,074 44% U 65,200 44,733 96,625 (31,425) 148% 357,800 175,055 174,541 183,259 49% Q - - 75,757 (75,757) 0% 383,330 - - 383,330 0% 2,000 2,000 (2,000) 0% 1,094,820 274,174 651,896 442,924 60% 10 2016 EMS Property Tax revenues are $152,666 higher than 2015 revenues. 11 2016 Local Retail Sales/Use Taxrevenues are $154,185 higher than 2015 revenues. Please also see pages 18 & 19. 12 2016 Building Structure Permits are $91,464 higher than 2015 revenues. 13 Difference between 2015 and 2016 revenues is due to funds received for closure of ESCA in 2016. 3 Packet Pg. 190 1 I 5.3.a I Page 2 of 3 C ITY O F EDMO NDS REVENUES - GENERAL FUND 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Revenues Revenues Remaining %Received CHARGES FOR GOODS AND SERVICES: RECORD/LEGAL INSTRUMTS ATM SURCHARGE FEES COURT RECORD SERVICES D/M COURT REC SER SHARED COURT COSTS MUNIC.-DIST. COURT CURREXPEN SALE MAPS & BOOKS CLERKS TIME FOR SALE OF PARKING PERMIT S BID SUPPLIES REIMBURSEMENT PHOTOCOPIES POLICE DISCLOSURE REQUESTS ENGINEERING FEES AND CHARGES ELECTION CANDIDATE FILING FEES SNO-ISLE PASSPORTS AND NATURALIZATION FEES POLICE SERVICES SPECIAL EVENTS OCDETF OVERTIME CAMPUS SAFETY-EDM. SCH. DIST. WOODWAY-LAW PROTECTION MISCELLANEOUS POLICE SERVICES DUI EMERGENCY FIRE SERVICES FIRE PROTECTION & EMS FORDUI FIRE DISTRICT #1 STATION BILLINGS LEGAL SERVICES ADULT PROBATION SERVICE CHARGE BOOKING FEES FIRE CONSTRUCTION INSPECTION FEES EMERGENCY SERVICE FEES EMS TRANSPORT USER FEE 14 CRIM CONV FEE CT CRIM CONV FEE CN FIBER SERVICES INTERGOVERNMENTAL FIBER SERVICES FLEX FUEL PAYMENTS FROM STATIONS ANIMAL CONTROL SHELTER ZONING/SUBDIVISION FEE PLAN CHECKING FEES FIRE PLAN CHECK FEES PLANNING 1% INSPECTION FEE S.E.P.A. REVIEW CRITICAL AREA STUDY DV COORDINATOR SERVICES SWIM POOL ENTRANCE FEES GYM AND WEIGHT ROOM FEES LOCKER FEES SWIM CLASS FEES PROGRAM FEES TAXABLE RECREATION ACTIVITIES SWIM TEAM/DIVE TEAM WINTER MARKET REGISTRATION FEES BIRD FEST REGISTRATION FEES INTERFUND REIMBURSEMENT -CONTRACT SVCS 2,000 1,120 1,251 750 63% 250 67 86 164 34% - - - - 0% 50 7 7 43 13% - - - - 0% 400 270 284 116 71%^, 100 - - 100 0% p 25,100 25,100 0% 600 - - 600 0% 2,000 1,111 540 1,460 27% 4,000 2,179 1,772 2,228 44% '7j 180,350 108,952 139,289 41,061 77% - - - - 0% C 58,000 29,757 33,996 24,004 59% M 15,000 10,085 11,100 3,900 74% 2% 26,000 1,365 8,757 17,243 34% d - - - - 0% 12,300 3,782 2,873 9,427 23% 7 39,500 20,030 20,907 18,593 53% U' 1,500 - - 1,500 0% r 300 230 - 300 0% N - - 31 (31) 0% C 45,000 27,223 28,234 16,766 63% C - - 159 (159) 0% 60,000 31,359 36,610 23,390 61% 6,000 3,397 2,081 3,919 35% 8,000 11,293 14,119 (6,119) 176% 15,000 5,587 4,460 10,540 30% .r. 822,100 407,087 487,513 334,587 59% C - - - - 0% C. - - - - 0% 9,200 4,590 6,095 3,105 66% 7,200 3,600 3,600 3,600 50% v 1,800 993 876 925 49% C 6,000 1,556 184 5,817 3% 75,000 47,198 47,321 27,679 63% jy 425,000 259,285 231,123 193,877 54% >, 3,000 5,265 6,255 (3,255) 209% d 1,250 750 1,740 (490) 139% V_ 7,000 5,715 1,220 5,780 17% 3 15,000 9,920 10,590 4,410 71% CY 10,000 4,747 5,560 4,440 56% c0 - - - - 0% r 0 7,800 4,109 6,578 1,222 84% N - - - - 0% C - - - - 0% 861,700 497,941 596,167 265,533 69% C 19,130 75,715 881 18,249 5% - - - - 0% Q. 5,000 - 25 4,975 1% E 950 180 190 760 20% V 2,964,600 422,095 1,107,179 1,857,421 37% 5,743,180 2,008,559 2,819,651 2,923,529 49% C 14 2016 EMS Transport User Fees are $80,426 higher than 2015 revenues. 4 Packet Pg. 191 1 5.3.a Page 3 of 3 C TTY O F EDMO NDS REVENUES - GENERAL FUND 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Revenues Revenues Remaining %Received FINES AND FO RFEITURES : PROOF OF VEHICLE INS PENALTY 8,000 3,497 3,632 4,368 45% TRAFFIC INFRACTION PENALTIES 25,000 15,950 99,153 (74,153) 397% NC TRAFFIC INFRACTION 260,000 149,533 31,109 228,891 12% CRT COST FEE CODE LEG ASSESSMENT (LGA) 24,600 12,653 10,353 14,247 42% SPEEDING DOUBLE - - - - 0% NON -TRAFFIC INFRACTION PENALTIES 1,300 902 38,628 (37,328) 2971% OTHER INFRACTIONS'04 1,000 316 1,068 (68) 107% P ARKING INFRACT ION P ENALT IES 43,000 22,980 12,645 30,355 29% PR -HANDICAPPED - - - - 0% PARK/INDDISZONE 1,300 1,064 1,820 (520) 140% DWI PENALTIES 6,000 2,476 14,581 (8,581) 243% DUI - DP ACCT 2,500 1,408 1,420 1,080 57% CRIM CNV FEE DUI 300 292 274 26 91% OTHER CRIMINAL TRAF MISDEM PEN - - - - 0% CRIMINAL TRAFFIC MISDEMEANOR 8/03 33,000 15,996 16,805 16,195 51% CRIMINAL CONVICTION FEE CT 1,900 1,221 1,396 504 73% CRIM CONV FEE CT 2,300 1,019 962 1,338 42% OT HER NON-T RAF MISDEMEANOR PEN 130 91 - 130 0% OTHER NON TRAFFIC MISD. 8/03 9,000 6,445 4,659 4,341 52% COURT DV PENALTY ASSESSMENT 900 522 283 617 31% CRIMINAL CONVICTION FEE CN 1,900 914 939 961 49% CRIM CONV FEE CN 900 316 267 633 30% CRIMINAL COST S-RECOUPMENTS 60,000 31,836 15,430 44,570 26% PUBLIC DEFENSE RECOUPMENT 33,000 15,457 12,823 20,177 39% BANK CHARGE FOR CONV. DEFENDANT - - 2,935 (2,935) 0% COURT INTERPRETER COSTS 100 256 65 35 65% BUS. LICENSE PERMIT PENALTY 5,000 12,810 10,050 (5,050) 201% MISC FINES AND PENALTIES 1,000 720 240 760 24% 522,130 2989675 281,536 240,594 54% MISCELLANEOUS : INVESTMENT INTEREST 38,600 15,772 24,758 13,842 64% INTEREST ON COUNTY TAXES 5,700 1,728 3,332 2,368 58% INTEREST - COURT COLLECTIONS 5,000 2,868 2,697 2,303 54% PARKING 14,000 7,786 7,899 6,101 56% SPACE/FACILITIESRENTALS 128,000 53,925 65,334 62,666 51% BRACKET ROOM RENTAL 5,000 2,120 3,160 1,840 63% LEASESLONG-TERM 218,100 88,218 90,087 128,013 41% VENDING MACHINE/CONCESSION 50,000 1,969 2,769 47,231 6% OTHER RENTS& USE CHARGES 4,500 3,300 1,800 2,700 40% DONATION/CONTRIBUTION 5,000 - - 5,000 0% PARKSDONATIONS 9,500 9,282 4,250 5,250 45% BIRD FEST CONTRIBUTIONS 950 1,200 700 250 74% 125TH ANNIVERSARY CONTRIBUTIONS - 1,700 - - 0% VOLUNT EER P ICNIC CONT RIBUT IONS - - 1,201 (1,201) 0% POLICE CONT RIBUT IONS FROM PRIV SOURCES 1,000 - - 1,000 0% PARKS GRANTS- PRIVATE SOURCES - - - - 0% SALE OF JUNK/SALVAGE 150 - 324 (174) 216% SALES OF UNCLAIM PROPERTY 2,000 896 4,770 (2,770) 239% CONFISCATED AND FORFEITED PROPERTY 2,000 - - 2,000 0% OT HER JUDGEMENT /SET T LEMENT 2,000 58 3,801 (1,801) 190% POLICE JUDGMENT SIREST IT UT ION 200 10 276 (76) 138% CASHIER'S OVERAGES/SHORTAGES - (87) 161 (161) 0% OTHER MISC REVENUES 1,000 8,376 6,439 (5,439) 644% SMALL OVERPAYMENT 50 20 16 34 33% NSF FEES - PARKS & REC 120 30 - 120 0% NSF FEES - MUNICIPAL COURT 330 174 140 190 42% FLEX -PLAN SERVICES FORFEITURES 1,010 - - 1,010 0% US BANK REBATE 6,000 1,829 4,153 1,847 69% 500,210 2019174 228,068 272,142 46% TRANSFERS -IN: PROCEEDS OF REFUNDING DEBT - - - - 0% TRANSFER FROM FUND 012 800,000 400,000 - 800,000 0% TRANSFER FROM FUND 127 25,840 11,088 25,835 5 100% 825,840 411,088 25,835 800,005 3% TOTAL GENERAL FUND REVENUE $ 39,276,670 $18,922,673 $ 20,334,355 $18,942,315 52% F O C. <0 C C IL L 4) ev 7 Cl co O N C C 7 r CD 5 Packet Pg. 192 I 5.3.a I Page 1 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent GENERAL FUND EXPENDITURES (001) SALARIES AND WAGES $ 14,010,590 $ 6,343,286 $ 6,703,094 $ 7,307,496 48% OVERTIME 423,510 240,823 232,475 191,035 55% HOLIDAY BUY BACK 217,790 1,543 2,349 215,441 1% BENEFITS 5,356,460 2,355,934 2,543,636 2,812,824 47% UNIFORMS 89,290 42,017 43,398 45,892 49% SUPPLIES 393,950 176,111 161,232 232,718 41% SMALL EQUIPMENT 155,480 81,268 57,399 98,081 37% PROFESSIONAL SERVICES 3,600,403 879,502 1,294,297 2,306,106 36% COMMUNICATIONS 211,890 76,661 74,771 137,119 35% TRAVEL 46,210 20,056 15,499 30,711 34% EXCISE TAXES 6,500 - 1,699 4,801 26% ADVERTISING - 1,546 - - 0% RENTAL/LEASE 916,390 456,373 456,537 459,853 50% INSURANCE 534,440 418,367 538,732 (4,292) 101% UTILITIES 457,800 201,261 201,160 256,640 44% REPAIRS & MAINTENANCE 425,530 230,990 123,090 302,440 29% MISCELLANEOUS 400,094 175,977 210,608 189,486 53% INTERGOVERNMENTAL SERVICES 10,384,010 7,116,666 5,246,967 5,137,043 51% INTERGOVERNMENTAL PAYMENTS 135,000 - - 135,000 0% INTERFUND SUBSIDIES 2,909,320 526,556 1,739,021 1,170,299 60% MACHINERY/EQUIPMENT 40,000 14,777 - 40,000 0% GENERAL OBLIGATION BOND PRINCIPAL 168,300 - 168,300 0% CAPITAL LEASES AND INSTALLMENT PURCHASES - 65,297 - 0% OTHER DEBT - 33 - - 0% INTEREST ON LONG-TERM EXTERNAL DEBT 46,150 27,460 23,454 22,696 51% DEBT ISSUE COSTS - - - - 0% INTERFUND SERVICES - - - - 0% 40,929,107 19,452,503 19,669,418 21,259,689 48% LEO FF-MEDICAL INS. RESERVE (009) BENEFITS IN HOME LTC CLAIMS PROFESSIONAL SERVICES TRAVEL MISCELLANEOUS RISK MANAGEMENT RESERVE FUND (011) MISCELLANEOUS CONTINGENCY RESERVEFUND (012) INTERFUND LOAN INTERFUND SUBSIDIES HISTORIC PRESERVATION GIFT FUND (014) SUPPLIES PROFESSIONAL SERVICES MISCELLANEOUS BUILDING MAINTENANCE SUBFUND (016) SUPPLIES PROFESSIONAL SERVICES REPAIRS & MAINTENANENCE MISCELLANEOUS MACHINERY/EQUIPMENT CONSTRUCTION PROJECTS DRUG INFO RC EMENT FUND (104) FUEL CONSUMED SMALL EQUIPMENT COMMUNICATIONS REPAIR/MAINT MISCELLANEOUS INTERGOVERNMENTAL SERVICES $ 178,720 $ 89,604 $ 80,462 $ 98,258 45% 100,480 48,376 43,491 56,989 43% - - 1,286 (1,286) 0% - - 447 (447) 0% 280 275 725 (445) 259% 279,480 138,255 126,411 153,069 45% 0% $ - $ - $ $ - 0% 800,000 400,000 800,000 0% 800,000 400,000 T 800,000 0% $ 100 $ - $ $ 100 0% 200 3,750 200 0% 5,100 - 5,100 0% 5,400 3,750 5,400 0% $ - $ 1,834 $ 1,756 $ (1,756) 0% 80,000 79,741 161,272 (81,272) 202% 2,062,000 14,487 35,390 2,026,610 2% - - 546 (546) 0% 33,000 307 169,691 (136,691) 514% - - 389,059 (389,059) 0% $ 2,175,000 96,369 757,714 1,417,286 35% $ 3,000 $ 785 $ 647 $ 2,353 22% 5,000 - - 5,000 0% 2,230 1,069 877 1,354 39% 800 - - 800 0% 20,000 5,000 5,000 15,000 25% 45,000 11,402 21,257 23,743 47% 76,030 18,256 27,780 48,250 37% 6 Packet Pg. 193 5.3.a Page 2 of 6 CITY OF EDMO NDS EXPENDITURES BY FUND - DEIAAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent STREETFUND (111) SALARIES AND WAGES $ 515,160 $ 272,252 $ 291,347 $ 223,813 57% OVERTIME 18,400 7,428 10,757 7,643 58% BENEFITS 265,870 135,865 149,949 115,921 56% UNIFORMS 6,000 4,927 3,745 2,255 62% SUPPLIES 240,000 62,821 167,167 72,833 70% SMALL EQUIPMENT 26,000 9,243 545 25,455 2% PROFESSIONAL SERVICES 14,050 5,006 4,146 9,904 30% COMMUNICATIONS 3,500 2,011 1,850 1,650 53% TRAVEL 1,000 300 - 1,000 0% RENTAL/LEASE 190,950 94,725 94,581 96,369 50% INSURANCE 87,620 81,386 97,912 (10,292) 112% UTILITIES 270,170 124,057 113,801 156,369 42% REPAIRS & MAINTENANCE 45,000 14,248 8,470 36,530 19% MISCELLANEOUS 24,250 1,349 1,430 22,820 6% INTERGOVERNMENTAL SERVICES 3,000 - 896 2,104 30% INTERFUND SUBSIDIES - - - - 0% MACHINERY/EQUIPMENT - 9,828 - 0% GENERAL OBLIGATION BOND PRINCIPAL 3,420 - 3,420 0% OTHER INTEREST & DEBT SERIVCE COSTS - - - - 0% INTEREST ON LONG-TERM EXTERNAL DEBT 1,730 925 865 865 50% $ 1,716,120 $ 826,372 $ 947,462 $ 768,658 55% COMBINED STREETCONST/IMPROVE(112) PROFESSIONAL SERVICES $ 1,850,420 $ 393,387 $ 654,883 $ 1,195,537 35% INTERFUND SUBSIDIES 358,240 40,956 40,908 317,332 11% LAND 438,000 82,247 132,896 305,104 30% CONSTRUCTION PROJECTS 5,605,502 307,832 1,490,654 4,114,848 27% INTERGOVERNMENTAL LOANS 72,220 72,201 72,201 19 100% INTEREST 3,410 3,444 3,396 14 100% INTERGOVERNMENTAL SERVICES - - - - 0% $ 8,327,792 $ 900,067 $ 2,394,938 $ 5,932,854 29% MUNICH'AL ARTS ACQUIS. FUND (117) SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES TRAVEL ADVERTISING RENT AL/LEASE REPAIRS & MAINTENANCE MISCELLANEOUS HO TEL/MO TEL TAX REVENUE FUND (120) PROFESSIONAL SERVICES ADVERTISING MISCELLANEOUS INTERFUND SUBSIDIES CONSTRUCTION PROJECTS EMPLOYEE PARKING PERMIT FUND (121) SUPPLIES PROFESSIONAL SERVICES YOUTH SCHOLARSHIP FUND (122) MISCELLANEOUS TOURISM PROMOTIONAL FUND/ARTS (123) PROFESSIONAL SERVICES ADVERTISING MISCELLANEOUS $ 4,400 $ 520 $ 132 $ 4,268 3% 1,500 - 150 1,350 10% 166,500 24,943 22,232 144,268 13% 80 - 11 70 13% - - - - 0% 2,000 - 2,000 0% 300 - - 300 0% 6,600 1,573 2,750 3,850 42% $ 181,380 S 27,036 $ 25,274 $ 156,106 14% $ 77,500 $ 23,212 $ 24,080 $ 53,420 31% - - - - 0% 8,150 82 65 8,085 1% 4,000 2,000 2,000 2,000 50% 60,000 - - 60,000 0% $ 149,650 $ 25,294 $ 26,145 $ 123,505 17% $ 1,790 $ - $ $ 1,790 0% 25,090 25,090 0% $ 26,880 $ $ $ 26,880 0% $ 3,000 $ 1,341 $ 835 $ 2,165 28% $ 3,000 $ 1,341 $ 835 $ 2,165 28% $ 28,300 $ 4,228 $ 8,282 $ 20,018 29% - - - - 0% 3,200 1,273 1,260 1,940 39% $ 31,500 $ 5,501 $ 9,543 $ 21,957 30% O C. d 2 v C C IL L d ev 7 Cl co T 0 N C C 7 r CD 7 Packet Pg. 194 I 5.3.a I Page 3 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent REAL ES TATE EXC IS E TAX 2 (125) SUPPLIES $ 21,000 $ 30,508 $ 42,366 $ (21,366) 202% PROFESSIONAL SERVICES 186,788 77,199 47,575 139,213 25% RENTAL/LEASE - - 2,790 (2,790) 0% UTILITIES - - - - 0% REPAIRS & MAINTENANCE 140,000 5,696 12,605 127,395 9% MISCELLANEOUS - - 181 (181) 0% CONSTRUCTION PROJECTS 1,752,777 153,371 1,599,406 9% C REAL ES TATE EXC IS E TAX 1, PARKS AC (126) PROFESSIONAL SERVICES MISCELLANEOUS INTERFUND SUBSIDIES LAND CONSTRUCTION PROJECTS GENERAL OBLIGATION BONDS OTHER DEBT & DEBT SERVICE COST S INTEREST GIFTS CATALOG FUND (127) SUPPLIES PROFESSIONAL SERVICES INTERFUND SUBSIDIES SPECIAL PROJECTS FUND (129) CONSTRUCTION PROJECTS CEWEIERY MAINTENANCE%IMPRO VEMENT (130) SALARIES AND WAGES OVERTIME BENEFIT S UNIFORMS SUPPLIES SUPPLIES PURCHASED FOR INVENTORY/RESALE PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE UTILITIES REPAIRS & MAINTENANCE MISCELLANEOUS PARKS CONSTRUCTION FUND (132) SUPPLIES PROFESSIONAL SERVICES LAND CONSTRUCTION PROJECTS INTERFUND SUBSIDIES SISTER CITY COMMISSION (138) SUPPLIES TRAVEL MISCELLANEOUS TRANSPORTATION BENEFIT DISTRICT (139) PROFESSIONAL SERVICES INSURANCE INTERGOVERNMENTAL SERVICES $ 2,100,565 $ 113,403 $ 258,888 $ 1,841,677 12% 0) $ 212,050 $ $ $ 212,050 0% ea - 1,200 - - 0% _ 139,430 18,263 17,213 122,218 12% 692,180 4,000 476,669 215,511 69% LL 1,521,700 - - 1,521,700 0% 19,890 - 19,890 0% i - - - - 0% .�M+ 10,070 5,382 5,033 5,037 50% (a $ 2,595,320 $ 28,845 $ 498,915 $ 2,096,405 19% 3 co $ 13,110 $ 1,271 $ 1,005 $ 12,105 8% C 6,000 273 6,300 (300) 105% N 25,840 11,088 25,835 5 100% 4) $ 44,950 $ 12,631 $ 33,140 $ 11,810 74% 7 $ - $ - $ - $ - 0% $ 108,410 $ 39,267 $ 40,451 $ 67,959 37% 3,500 1,388 963 2,537 28% p 44,500 16,595 17,524 26,976 39% d 1,000 197 1,000 0% w 7,000 1,286 745 6,255 11% 20,000 7,238 9,096 10,904 45% 'tt 4,200 719 594 3,607 14% 1,410 729 499 911 35% r- 500 - 500 0% - - - 0% 11,550 4,992 5,775 5,775 50% G� 3,800 434 300 3,500 8% R 500 - 500 0% = 4,000 1,958 1,765 2,235 44% Cy $ 210,370 $ 74,803 $ 77,712 $ 132,658 37% r $ - $ - $ - $ - 0% 225,000 41,931 30,809 194,191 14% 500,000 - 475,710 24,291 95% 2,050,770 177,136 77,659 1,973,111 4% - 4,200 - - 0% $ 2,775,770 $ 223,266 $ 584,177 $ 2,191,593 21% $ 2,000 $ $ 98 $ 1,902 5% 4,500 - 2,515 1,985 56% 6,000 10 23 5,977 0% $ 12,500 $ 10 $ 2,636 $ 9,864 21% $ - $ - $ - $ - 0% 2,500 2,500 2,500 - 100% 680,000 364,711 347,693 332,307 51% $ 682,500 $ 367,211 $ 350,193 $ 332,307 51% 8 Packet Pg. 195 I 5.3.a I Page 4 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent BUSINESS EMPROVEVIENTDISTRICT FUND (140) SUPPLIES $ - $ 14,726 $ 789 $ (789) 0% PROFESSIONAL SERVICES - 11,164 12,536 (12,536) 0% MISCELLANEOUS - 35 894 (894) 0% - 25,924 14,219 (14,219) 0% LID FUND C O NTRO L (211) INTERFUND SUBSIDIES 2012 LTGO DEBT SERVIC FUND (231) GENERAL OBLIGATION BOND INTEREST OTHER INTEREST & DEBT SERVICE COSTS 2014 DEBT SERVICE FUND (232) GENERAL OBLIGATION BOND INTEREST WATER FUND (421) SALARIES AND WAGES OVERTIME BENEFITS UNIFORMS SUPPLIES WATER PURCHASED FOR RESALE SUPPLIES PURCHASED FOR INVENTORY/RESALE SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL EXCISE TAXES RENT AL/LEASE INSURANCE UTILITIES REPAIRS & MAINTENANCE MISCELLANEOUS INTERGOVERNMENTAL SERVICES INTERFUND TAXES INTERFUND SUBSIDIES MACHINERY/EQUIPMENT CONSTRUCTION PROJECTS GENERAL OBLIGATION BONDS REVENUE BONDS INTERGOVERNMENTAL LOANS INTEREST DEBT ISSUE COSTS OTHER INTEREST & DEBT SERVICE COSTS INTERGOVERNMENTAL SERVICES $ 14,400 $ - $ $ 14,400 0% $ 14,400 $ - $ $ 14,400 0% $ 536,270 $ - $ - $ 536,270 0% 140,610 75,464 70,301 70,309 50% 500 54 - 500 0% $ 677,380 $ 75,517 $ 70,301 $ 607,079 105/0 $ 933,210 $ - $ 933,208 $ 2 100% 16,330 9,201 3,221 13,109 20% $ 949,540 $ 9,201 $ 936,429 $ 13,111 99% $ 795,220 $ 364,575 $ 387,645 $ 407,575 49% 24,000 9,072 11,046 12,954 46% 372,550 164,407 181,285 191,265 49% 4,000 2,032 1,517 2,483 38% 151,000 78,804 52,790 98,210 35% 1,600,000 623,442 695,668 904,332 43% 143,000 71,827 48,285 94,715 34% 11,000 8,072 2,087 8,913 19% 1,793,286 315,687 532,814 1,260,472 30% 30,000 15,832 14,523 15,477 48% 200 - - 200 0% 340,000 155,645 189,240 150,760 56% 100,750 47,697 49,367 51,383 49% 58,920 70,904 52,335 6,585 89% 40,000 11,607 11,502 28,498 29% 17,000 16,612 5,328 11,672 31% 70,450 37,227 34,332 36,118 49% 30,000 16,173 18,423 11,577 61% 1,229,110 493,120 540,263 688,847 44% 731,220 119,415 219,326 511,894 30% 15,000 9,828 - 15,000 0% 4,551,921 511,166 453,681 4,098,240 10% 2,300 - - 2,300 0% 323,870 - - 323,870 0% 25,840 45,839 25,839 1 100% 256,870 133,799 129,008 127,862 50% - - - - 0% - 31 - 0% - - - - 0% $ 12,717,507 $ 3,322,813 $ 3,656,305 $ 9,061,202 29% F O Q. d w C C IL L d ev 7 Cl co T O N O C 7 r O 9 Packet Pg. 196 I 5.3.a I Page 5 of 6 C ITY O F EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent S TO RM FUND (422) SALARIES AND WAGES $ 640,470 $ 229,709 $ 263,505 $ 376,965 41% OVERTIME 6,000 7,374 6,750 (750) 113% BENEFITS 313,950 113,241 130,472 183,478 42% UNIFORMS 6,500 4,611 5,210 1,290 80% SUPPLIES 46,500 20,988 10,382 36,118 22% SMALL EQUIPMENT 4,000 787 23 3,977 1% PROFESSIONAL SERVICES 2,638,530 347,573 414,875 2,223,655 16% COMMUNICATIONS 3,200 1,611 1,276 1,924 40% TRAVEL 4,300 - 300 4,000 7% EXCISE TAXES 55,000 35,155 27,043 27,957 49% RENTAL/LEASE 252,990 106,168 124,000 128,990 49% INSURANCE 64,120 39,269 63,187 933 99% UTILITES 10,500 4,451 4,691 5,809 45% REPAIR & MAINTENANCE 13,000 8,576 2,266 10,734 17% MISCELLANEOUS 94,950 26,456 25,800 69,150 27% INTERGOVERNMENTAL SERVICES 85,000 62,065 83,369 1,631 98% INTERFUND TAXES AND OPERATING ASSESSMENT 330,430 157,184 164,329 166,101 50% INTERFUND SUBSIDIES 410,080 20,254 91,782 318,298 22% LAND 25,000 - - 25,000 0% MACHINERY/EQUIPMENT - 9,828 - - 0% CONSTRUCTION PROJECTS 2,168,330 - 22,583 2,145,747 1% GENERAL OBLIGATION BONDS 83,800 - - 83,800 0% REVENUE BONDS 158,300 - - 158,300 0% INTERGOVERNMENTAL LOANS 32,070 32,063 32,063 8 100% INTEREST 166,430 87,739 83,932 82,498 50% DEBT ISSUE COSTS - - - - 0% OTHER INTEREST & DEBT SERVICE COSTS - 15 - 0% INTERGOVERNMENTAL SERVICES - - - - 0% $ 7,613,450 $ 1,315,116 $ 1,557,839 $ 6,055,611 20% SEWER FUND (423) SALARIES AND WAGES OVERTIME BENEFITS UNIFORMS SUPPLIES FUEL CONSUMED SUPPLIES PURCHASED FOR INV OR RESALE SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL EXCISE TAXES RENT AL/LEASE INSURANCE UTILITIES REPAIR & MAINTENANCE MISCELLANEOUS INTERGOVERNMENTAL SERVICES INTERFUND TAXES AND OPERATING ASSESSMENT INTERFUND SUBSIDIES MACHINERY/EQUIPMENT CONSTRUCTION PROJECTS GENERAL OBLIGATION BONDS REVENUE BONDS INTERGOVERNMENTAL LOANS INTEREST DEBT ISSUE COSTS OTHER INTEREST & DEBT SERVICE COSTS INTERGOVERNMENTAL SERVICES BOND RESERVE FUND (424) REVENUE BONDS DEBT ISSUE COSTS INTEREST OTHER INTEREST & DEBT SERVICE COSTS $ 1,721,530 $ 820,648 $ 857,530 $ 864,000 50% 100,000 48,118 39,997 60,003 40% 771,920 358,199 385,485 386,435 50% 9,500 5,659 4,717 4,783 50% 420,200 117,367 125,809 294,391 30% 90,000 29,588 21,000 69,000 23% 4,000 - - 4,000 0% 46,000 13,835 19,596 26,404 43% 1,954,696 562,955 735,582 1,219,114 38% 43,000 21,014 19,231 23,769 45% 5,000 - 1,097 3,903 22% 150,000 67,152 96,745 53,255 64% 182,670 98,489 89,518 93,152 49% 96,630 139,648 105,637 (9,007) 109% 1,056,660 510,417 344,354 712,306 33% 325,000 178,455 139,778 185,222 43% 105,450 29,978 28,195 77,255 27% 150,000 74,786 82,285 67,715 55% 629,140 282,765 311,566 317,574 50% 2,563,949 312,301 518,760 2,045,189 20% - 25,251 - - 0% 6,999,825 266,110 54,182 6,945,643 1% 130,140 - - 130,140 0% 72,840 - - 72,840 0% 170,620 156,729 157,034 13,586 92% 122,280 64,747 61,299 60,981 50% - - - - 0% - 3,093 2,955 (2,955) 0% - - - - 0% $ 17,921,050 $ 4,187,306 $ 4,202,354 $ 13,718,696 23% $ 655,010 $ - $ $ 655,010 0% - - - 0% 1,334,910 337,208 667,442 667,468 50% 1,000 21,054 - 1,000 0% $ 1,990,920 $ 358,261 $ 667,442 $ 1,323,478 34% F O C. d C C M L M 7 Cl co T 0 N C C 7 r CD 10 Packet Pg. 197 I 5.3.a I Page 6 of 6 CITY OF EDMO NDS EXPENDITURES BY FUND - DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent EQ UIPMENT RENTAL FUND (511) SALARIES AND WAGES $ 224,880 $ 103,968 $ 110,075 $ 114,805 49% OVERTIME 2,000 384 - 2,000 0% BENEFITS 105,050 47,363 48,651 56,399 46% UNIFORMS 1,000 815 600 400 60% SUPPLIES 110,000 48,481 46,214 63,786 42% FUEL CONSUMED 1,000 - - 1,000 0% SUPPLIES PURCHASED FOR INVENTORY/RESALE 308,200 58,319 55,716 252,484 18% SMALL EQUIPMENT 58,000 14,698 4,462 53,538 8% PROFESSIONAL SERVICES 44,000 520 696 43,304 2% COMMUNICATIONS 3,000 1,006 1,194 1,806 40% TRAVEL 1,000 2,935 1,000 - 100% RENTAL/LEASE 19,440 7,207 9,786 9,654 50% INSURANCE 29,560 40,605 29,967 (407) 101% UTILITIES 14,000 6,103 6,175 7,825 44% REPAIRS & MAINTENANCE 60,000 20,569 31,687 28,313 53% MISCELLANEOUS 7,190 3,834 6,711 479 93% INTERGOVERNMENTAL SERVICES 2,500 - 249 2,251 10% MACHINERY/EQUIPMENT 981,000 227,547 575,043 405,957 59% INTERFUND RENTAL - - - - 0% $ 1,971,820 $ 584,355 $ 928,227 $ 1,043,593 470/. FIREMEN'S PENSION FUND (617) BENEFITS $ 30,940 $ 11,527 $ 9,024 $ 21,916 29% PENSION AND DISABILITY PAYMENTS 27,470 13,255 12,112 15,358 44% PROFESSIONAL SERVICES 1,200 - 214 986 18% S 59,610 $ 24,782 $ 21,351 $ 38,259 36% TOTAL EXPENDITURE ALL FUNDS $ 107,038,991 $ 32,618,187 $ 37,845,648 $ 69,193,343 35% F O C. d C C IL L ev 7 Cl co T 0 N C C 7 CD 11 Packet Pg. 198 5.3.a Page 1 of 1 CITY OF EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN SUMMARY 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent CITY COUNCIL $ 295,500 $ 107,828 $ 98,095 $ 197,405 33% OFFICE OF MAYOR 260,250 123,379 127,277 132,973 490/c HUMAN RESOURCES 462,044 177,419 175,479 286,565 38% C MUNICIPAL COURT 909,270 400,792 435,326 473,944 48% d w CITY CLERK 585,310 285,114 281,026 304,284 481/c i3 ADMINISTRATIVE SERVICES 1,839,930 818,119 717,364 1,122,566 390/c _ CITY ATTORNEY 741,560 329,666 347,078 394,482 47% LL NON -DEPARTMENTAL 14,956,000 8,369,406 7,828,525 7,127,475 520/c 2' L POLICE SERVICES 9,628,550 4,329,129 4,596,670 5,031,880 480/c 4) COMMUNITY SERVICES✓ECONOMIC DEV. 493,580 188,019 232,729 260,851 470/c CY DEVELOPMENT SERVICES 2,656,652 1,059,255 1,183,128 1,473,524 450/c r 0 PARKS& RECREATION 3,774,541 1,528,030 1,609,632 2,164,909 430/c C PUBLIC WORKS 2,842,120 1,041,687 1,339,534 1,502,586 470/c FACILITIES MAINTENANCE 1,483,800 694,660 697,556 786,244 470/c $ 40,929,107 $ 19,452,503 $ 19,669,418 $ 21,259,689 480/c C ITY O F EDMO NDS EXPENDITURES - U ITY- BY FUND IN SUMMARY Title 2016 Amended Budget 6/30/2015 Expenditures 6/30/2016 Expenditures Amount Remaining %Spent WATER UTILITY FUND $ 12,717,507 $ 3,322,813 $ 3,656,305 $ 9,061,202 290/ STORM UTILITY FUND 7,613,450 1,315,116 1,557,839 6,055,611 200/ SEWER/WWTP UTILITY FUND 17,921,050 4,187,306 4,202,354 13,718,696 230/ BOND RESERVE FUND 1,990,920 358,261 667,442 1,323,478 340/ $ 40,242,927 $ 9,183,496 $ 10,083,940 $ 30,158,987 25% 12 Packet Pg. 199 Page 1 of 4 CITY OF EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DEIAAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent CITY COUNCIL SALARIES OVERTIME BENEFITS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL RENT AL/LEASE REPAIRS/MAINTENANCE MISCELLANEOUS OFFICEOFMAYOR SALARIES BENEFITS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATION TRAVEL RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS HUMAN RESOURCES SALARIES OVERTIME BENEFITS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS MUNIC IPAL C O URT SALARIES OVERTIME BENEFITS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS $ 119,100 $ 62,169 $ 51,510 $ 67,590 43% 1,000 - - 1,000 0% 88,550 36,893 40,257 48,293 45% 2,000 467 885 1,115 44% 832 - - 0% 'C 47,160 5,062 1,432 45,728 3% 0 CL 3,000 1,501 1,501 1,500 50% 4) 6,700 483 1,277 5,423 19% w 490 296 219 271 45% ea 500 - 15 485 3% _ 27,000 125 1,000 26,000 4% $ 295,500 $ 107,828 $ 98,095 $ 197A05 33% jL $ 197,160 $ 97,937 $ 98,741 $ 98,419 50% d 48,190 22,346 24,042 24,148 50% 'i 1,500 352 635 865 42% 7 - - - - 0% CY 2,000 764 1,191 809 60% r 1,400 200 599 801 43% N 3,000 149 538 2,462 18% O 2,400 1,098 720 1,680 30% - - - - 0% 4,600 533 813 3,787 18% $ 260,250 $ 123,379 $ 127,277 $ 132,973 49% cn $ 226,880 $ 103,878 $ 107,092 $ 119,788 47% .. - - 43 (43) 0% O 73,380 33,959 36,467 36,913 50% 0 2,300 624 2,306 (6) 100% lY 300 - - 300 0% 114,000 39,894 24,266 89,734 21% 'V 700 476 485 215 69% r- 1,000 482 416 584 42% ,r- _ - - - - 0% LL 2,200 1,098 646 1,554 29% i 7,850 7,793 - 7,850 0% a) 33,434 (10,786) 3,759 29,675 11% M $ 462,044 $ 177,419 $ 175,479 $ 286,565 38% M $ 566,190 $ 259,843 $ 282,245 $ 283,945 50% 600 1,469 419 181 70% 222,750 87,659 101,792 120,958 46% 9,930 6,627 4,263 5,667 43% 2,800 1,360 262 2,538 9% 64,000 32,067 35,884 28,116 56% 1,800 1,006 1,272 528 71% 2,500 2,413 1,040 1,460 42% 800 172 467 333 58% 1,700 585 794 906 47% 36,200 7,591 6,886 29,314 19% $ 909,270 $ 400,792 $ 435,326 $ 473,944 48% 13 Packet Pg. 200 Page 2 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent CITY CLERK SALARIES AND WAGES $ 324,480 $ 170,547 $ 172,246 $ 152,234 53% OVERTIME - 742 1,509 (1,509) 0% BENEFITS 129,300 59,308 63,634 65,666 49% SUPPLIES 10,240 3,373 2,626 7,614 26% SMALL EQUIPMENT - 420 610 (610) 0% PROFESSIONAL SERVICES 28,310 14,773 11,331 16,979 40% COMMUNICATIONS 50,000 16,308 7,093 42,907 14% TRAVEL 1,000 423 - 1,000 0% ADVERTISING - - - - 0% RENTAL/LEASE 20,000 10,019 8,337 11,663 42% REPAIRS & MAINTENANCE 17,980 7,096 10,448 7,532 58% MISCELLANEOUS 4,000 2,105 3,193 807 80% $ 585,310 $ 285,114 $ 28L026 $ 304,284 48% ADMINISTRATIVE SERVICES SALARIES $ 892,390 $ 388,906 $ 410,852 $ 481,538 46% OVERTIME 6,670 1,192 1,308 5,362 20% BENEFITS 305,800 130,850 139,652 166,148 46% SUPPLIES 43,050 3,756 2,538 40,512 6% SMALL EQUIPMENT 110,650 46,301 28,760 81,890 26% PROFESSIONAL SERVICES 111,400 34,614 17,762 93,638 16% COMMUNICATIONS 61,500 22,216 26,068 35,432 42% TRAVEL 2,900 540 833 2,067 29% RENTAL/LEASE 8,200 6,487 3,555 4,645 43% REPAIR/MAINTENANCE 242,680 144,126 34,479 208,201 14% MISCELLANEOUS 15 14,690 24,354 51,555 (36,865) 351% MACHINERY/EQUIPMENT 40,000 14,777 - 40,000 0% $ 1,839,930 $ 818,119 $ 717,364 $ 1,122,566 39% CITY ATTO RNEY PROFESSIONAL SERVICES $ 741,560 $ 329,666 $ 344,942 $ 396,618 47% MISCELLANEOUS - - 2,137 (2,137) 0% $ 741,560 $ 329,666 $ 347,078 $ 394,482 47% NON -DEPARTMENTAL SALARIES $ 100,000 $ - $ - $ 100,000 0% BENEFITS -UNEMPLOYMENT 34,500 1,444 1,037 33,463 3% SUPPLIES 3,000 1,888 2,089 911 70% PROFESSIONAL SERVICES 643,420 170,076 233,976 409,444 36% EXCISE TAXES 6,500 1,546 1,699 4,801 26% RENTAL/LEASE 3,600 3,600 3,600 - 100% INSURANCE 534,440 418,367 538,732 (4,292) 101% REPAIR & MAINTENANCE - - - - 0% MISCELLANEOUS 69,010 46,746 48,223 20,787 70% INTERGOVT SERVICES 10,302,760 7,106,394 5,236,693 5,066,067 51% ECA LOAN PAYMENT 135,000 - - 135,000 0% INTERFUND SUBSIDIES 2,909,320 526,556 1,739,021 1,170,299 60% GENERAL OBLIGATION BOND 168,300 - - 168,300 0% INSTALLMENT PURCHASES - 65,297 - - 0% OTHER DEBT - - - - 0% INTEREST ON LONG-TERM DEBT 46,150 27,460 23,454 22,696 51% DEBT ISSUANCE COSTS - - - - 0% FISCAL AGENT FEES 33 - 0% INTERFUND SERVICES - 0% $ 14,956,000 $ 8,369,406 $ 7,828,525 $ 7,127,475 52% F O C. <0 U C W C IL L d e0 7 Cl co T 0 N 0) C 7 r` CD 15 Difference between 2015 and 2016 is due to Microsoft Office Windows Software Renewal in 2016. 14 r- Packet Pg. 201 1 I 5.3.a I Page 3 of 4 CITY OF EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENTIN DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent PO LIC E S ERVIC ES SALARIES $ 5,778,330 $ 2,612,850 $ 2,812,687 $ 2,965,643 49% OVERTIME 396,240 229,070 211,860 184,380 53% HOLIDAY BUYBACK 217,790 1,543 2,349 215,441 1% BENEFITS 2,220,940 1,010,101 1,090,825 1,130,115 49% UNIFORMS 80,310 36,063 39,223 41,087 49% SUPPLIES 86,730 43,669 33,652 53,078 39% 0 SMALL EQUIPMENT 20,400 8,800 16,103 4,297 79% CL 4) PROFESSIONAL SERVICES 117,170 44,860 45,981 71,189 39% w COMMUNICATIONS 26,210 11,120 12,897 13,313 49% ea TRAVEL 17,310 13,998 6,674 10,636 39% C ADVERTISING - - - - 0% C RENTAL/LEASE 595,100 286,660 294,955 300,145 50% li REPAIR/MAINTENANCE 14,620 4,665 6,065 8,555 41% >, MISCELLANEOUS 46,850 20,458 18,124 28,726 39% d INTERGOVTL SERVICES 10 550 5 272 5 274 5 276 50% ': COMMUNITY SERVIC ES/EC 0 N DEV. SALARIES BENEFITS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS DEVELOPMENT SERVICES /PLANNING SALARIES OVERTIME BENEFITS UNIFORMS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL ADVERTISING RENT AL/LEASE REPAIRS & MAINTENANCE MISCELLANEOUS ENGINEERING SALARIES OVERTIME BENEFITS UNIFORMS SUPPLIES SMALL EQUIPMENT PROFESSIONAL SERVICES COMMUNICATIONS TRAVEL RENT AL/LEASE REPAIR/MAINTENANCE MISCELLANEOUS $ 9.628.550 $ 4329.129 $ 4.596 670 $ 5.031,880 48% 7 Cl $ 224,960 $ 109,166 $ 112,969 $ 111,991 50% r 67,430 31,283 34,424 33,006 51% N 7,000 192 280 6,720 4% 4) 800 - 125 676 16% r- 180,400 41,872 82,038 98,362 45% 1,490 454 486 1,004 33% 2,000 179 - 2,000 0% as - - - - 0% 2,000 1,098 955 1,045 48% .. 500 - - 500 0% 7,000 3,774 1,453 5,547 21% C $ 493,580 $ 188,019 $ 232,729 $ 260,851 47% W $ 1,444,230 $ 668,256 $ 718,769 $ 725,461 50% 1,300 72 6,052 (4,752) 466% 534,670 236,997 261,658 273,012 49% 500 - - 500 0% 16,100 7,492 6,513 9,587 40% 5,250 4,338 2,745 2,505 52% 571,442 80,990 145,991 425,451 26% 8,500 2,034 2,523 5,977 30% 4,250 517 3,945 305 93% - - - - 0% 24,750 18,211 10,699 14,051 43% 6,800 3,395 1,177 5,623 17% 38,860 36,953 23,056 15,804 59% $ 2,656,652 $ 1,059,255 $ 1,183,128 $ 1,473,524 45% $ 1,373,500 $ 610,990 $ 624,922 $ 748,578 45% 5,000 796 2,890 2,110 58% 561,900 239,095 249,286 312,614 44% 360 - - 360 0% - 79 (79) 0% 2,200 1,952 248 89% 465,000 - 252,650 212,350 54% 11,800 3,693 4,691 7,109 40% 600 - 296 304 49% 26,370 7,440 11,717 14,653 44% 2,600 - - 2,600 0% 21,000 5,427 12,630 8,370 60% $ 2,470,330 $ 867,442 $ 1,161,113 $ 1,309,217 47% 15 Packet Pg. 202 Page 4 of 4 C ITY O F EDMO NDS EXPENDITURES - GENERAL FUND - BY DEPARTMENTIN DETAIL 2016 Amended 6/30/2015 6/30/2016 Amount Title Budget Expenditures Expenditures Remaining %Spent PARKS & REC REATIO N SALARIES $ 1,830,090 $ 823,210 $ 861,110 $ 968,980 47% OVERTIME 10,000 5,696 4,928 5,072 49% BENEFITS 695,310 304,482 328,840 366,470 47% UNIFORMS 5,370 4,537 2,643 2,727 49% SUPPLIES 117,500 63,638 71,171 46,329 61% SMALL EQUIPMENT 9,080 9,205 6,645 2,435 73% PROFESSIONAL SERVICES 514,341 84,567 96,739 417,602 19% COMMUNICATIONS 30,140 9,974 9,492 20,648 31% TRAVEL 4,450 871 468 3,982 11% ADVERTISING - - - - 0% RENTAL/LEASE 170,310 90,872 90,716 79,594 53% PUBLIC UTILITY 175,000 68,491 67,472 107,528 39% REPAIR/MAINTENANCE 50,800 21,737 31,337 19,463 62% MISCELLANEOUS 91,450 35,749 33,069 58,381 36% MACHINERY/EQUIPMENT - - - - 0% INTERGOVTL SERVICES 70,700 5,000 5,000 65,700 7% $ 3,774,541 $ 1,528,030 $ 1,609,632 $ 2,164,909 43% PUBLIC WORKS SALARIES $ 263,850 $ 127,495 $ 130,896 $ 132,955 50% OVERTIME 200 - - 200 0% BENEFITS 81,750 37,926 41,455 40,295 51% SUPPLIES 7,600 1,997 1,410 6,190 19% SMALL EQUIPMENT 1,000 1,479 - 1,000 0% PROFESSIONAL SERVICES 200 27 39 162 19% COMMUNICATIONS 1,350 290 315 1,035 23% TRAVEL 500 - - 500 0% RENTAL/LEASE 7,640 2,952 3,072 4,568 40% PUBLIC UT ILITY 2,800 1,171 1,235 1,565 44% REPAIR/MAINTENANCE 1,000 - - 1,000 0% MISCELLANEOUS 3,900 908 3,900 0% $ 371,790 $ 174,245 $ 178,420 $ 193,370 48% FACILITIES MAINTENANCE SALARIES 669,430 308,038 319,055 350,375 48% OVERTIME 2,500 1,785 3,465 (965) 139% BENEFITS 291,990 123,592 130,267 161,723 45% UNIFORMS 2,750 1,418 1,531 1,219 56% SUPPLIES 87,000 42,037 32,786 54,214 38% SMALL EQUIPMENT 3,000 8,531 197 2,803 7% PROFESSIONAL SERVICES - 270 76 (76) 0% COMMUNICATIONS 14,000 7,388 7,350 6,650 52% TRAVEL - - 12 (12) 0% RENTAL/LEASE 52,530 26,368 26,878 25,652 51% PUBLIC UTILITY 280,000 131,599 132,454 147,546 47% REPAIR/MAINTENANCE 78,500 41,594 38,775 39,725 49% MISCELLANEOUS 2,100 2,040 4,711 (2,611) 224% $ 1,483,800 $ 694,660 $ 697,556 $ 786,244 47% TOTAL GENERAL FUND EXPENDITURES $ 40,929,107 $ 19,452,503 $ 19,669,418 $ 21,259,689 48% F O C, <0 U C ILC L d 'C ev 7 Cl to T 0 N C C 7 r CD 16 Packet Pg. 203 I 5.3.a I City of Edmonds, WA Monthly Revenue Summary -General Fund 2016 General Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 1,918,825 $ February 4,636,071 March 6,895,675 April 10,557,110 May 18,448,540 June 20,425,003 July 22,546,548 August 24,735,497 September 26,741,970 October 29,963,416 November 37,305,043 December 39,276,670 Real Estate Excise Tax 1 & 2 1,918,825 $ 2,112,632 10.10% 2,717,246 4,307,339 -7.09% 2,259,604 6,797,209 -1.43% 3,661,435 10,797,010 2.27% 7,891,430 18,037,636 -2.23% 1,976,463 20,334,355 -0.44% 2,121, 545 2,188, 949 2,006,473 3,221,446 7,341,627 1,971,627 City of Edmonds, WA Monthly Revenue Summary -Real Estate Excise Tax 2016 Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals January $ 189,874 $ February 316,058 March 479,194 April 640,872 May 800,918 June 986,094 July 1,276,157 August 1,480,830 September 1,690,614 October 1,875,616 November 2,069,074 December 2,200,000 189,874 $ 216,395 13.97% 126,183 447,070 41.45% 163,136 551,728 15.14% 161,679 768,326 19.89% 160,046 977,560 22.05% 185,176 1,234,188 25.16% 290,062 204,673 209,784 185,002 193,458 130,926 *The monthly budget forecast columns are based on a five-year average. 17 Packet Pg. 204 1 5.3.a Sales Tax Analysis By Category Current Period: June 2016 Year -to -Date Total $3,295,015 Wholesale Trade 136,045 Corrnnwiications 122,075 � Contractors 518,015 Q' Misc Retail Trade 407,222 � Health & Personal Care 51,387 i0 Retail Eating & Drinking Accommodation 19,521 M 414,328 IL Business Services 231,267 Gasoline Stations 15,819 O Amusement & Recreation y 34,139 co Automotive Repair 85,558 r Retail Food Stores 133,652 N O Retail Automotive 847,642 7 Others 167,992 Clothing and Accessories CD 110,355 Total Retail Automotive Misc Retail Trade Retail Eating & Drinking Business Services Retail Food Stores Others Amusement & Recreation Wholesale Trade Clothing and Accessories Accommodation Health & Personal Care Gasoline Stations Automotive Repair Communications Contractors ($100,000) Change in Sales Tax Revenue: June 2016 compared to June 2015 ($50,000) $0 $50,000 $100,000 $150,000 O CL 18 Packet Pg. 205 I 5.3.a I City of Edmonds, WA Monthly Revenue Summary -Sales and Use Tax 2016 Sales and Use Tax Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 471,315 $ 471,315 $ 539,867 14.54% February 1,055,135 583,820 1,204,754 14.18% March 1,506,759 451,624 1,693,551 12.40% April 1,936,463 429,704 2,173,926 12.26% May 2,478,856 542,394 2,754,132 11.10% June 2,960,731 481,875 3,295,015 11.29% July 3,457,813 497,082 August 3,998,806 540,993 September 4,517,576 518,770 October 5,055,818 538,242 November 5,626,862 571,044 December 6,144,400 517,538 Sales and Use Tax 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 too 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget mar Prior Year City of Edmonds, WA Monthly Revenue Summary -Gas Utility Tax 2016 Gas Utility Tax Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 90,678 $ 90,678 $ 85,977 -5.18% February 190,868 100,190 176,574 -7.49% March 272,706 81,838 249,556 -8.49% April 346,987 74,281 311,852 -10.13% May 405,847 58,860 352,987 -13.02% June 445,893 40,046 385,669 -13.51% July 477,342 31,449 August 501,633 24,291 September 523,862 22,229 October 548,406 24,545 November 586,112 37,705 December 647,900 61,788 Gas Utility Tax 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year -Budget -0-- Prior Yeaz O O C M a LL O O M CY O N O C 7 7 *The monthly budget forecast columns are based on a five-year average. 19 Packet Pg. 206 1 I 5.3.a I City of Edmonds, WA Monthly Revenue Summary -Telephone Utility Tax 2016 Telephone Utility Tax Cumulative Monthly Budget Forecast Budget Forecast TrD Actuals Variance January $ 125,356 $ 125,356 $ 91,384 -27.10% February 226,461 101,105 230,098 1.61% March 344,917 118,456 328,246 -4.83% April 457,974 113,057 432,105 -5.65% May 577,752 119,778 532,012 -7.92% June 685,900 108,148 633,125 -7.69% July 794,692 108,792 August 904,737 110,045 September 1,019,063 114,326 October 1,131,491 112,428 November 1,235,975 104,484 December 1,349,100 113,125 Telephone Utility Tax 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget --dr- Prior Year City of Edmonds, WA Monthly Revenue Summary -Electric Utility Tax 2016 1lectric Utility Tax Cumulative Monthly TrD Variance Budget Forecast Budget Forecast Actuals January $ 155,396 $ 155,396 $ 177,383 14.15% February 311,244 155,848 348,280 11.90% March 463,906 152,662 509,702 9.87% April 612,759 148,854 674,873 10.14% May 749,676 136,917 801,429 6.90% June 854,497 104,821 913,790 6.94% July 956,312 101,815 August 1,049,934 93,622 September 1,145,581 95,647 October 1,239,871 94,290 November 1,346,584 106,712 December 1,451,800 105,216 Electric Utility Tax 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year -Budget --O-Prior Year F O C. C O C M C LL O M CY O N O C 7 7 *The monthly budget forecast columns are based on a five-year average. 20 Packet Pg. 207 1 I 5.3.a I City of Edmonds, WA Monthly Revenue Summary -Meter Water Sales 2016 Meter Water Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 573,717 $ 573,717 $ 553,882 -3.46% February 969,279 395,562 943,114 -2.70% March 1,534,923 565,644 1,529,160 -0.38% April 1,915,226 380,303 1,904,819 -0.54% May 2,481,868 566,642 2,446,538 -1.42% June 2,912,390 430,522 2,888,880 -0.81% July 3,586,469 674,079 August 4,157,711 571,242 September 4,946,125 788,414 October 5,503,014 556,889 November 6,162,012 658,998 December 6,572,750 410,738 City of Edmonds, WA Monthly Revenue Summary -Storm Water Sales 2016 Storm Water Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 238,091 $ 238,091 $ 238,442 14.15% February 750,139 512,049 750,909 11.90% March 988,469 238,330 988,089 9.87% April 1,200,403 211,933 1,195,226 10.14% May 1,439,120 238,718 1,432,240 6.90% June 1,651,173 212,053 1,642,773 6.94% July 1,891,010 239,837 August 2,403,804 512,795 September 2,641,727 237,923 October 2,853,622 211,895 November 3,092,120 238,497 December 3,304,340 212,220 Storm Water Sales 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dr,- Prior Year O C. O C M C_ M C O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 21 Packet Pg. 208 1 I 5.3.a I City of Edmonds, WA Monthly Revenue Summary-Unmeter Sewer Sales 2016 Unmeter Sewer Sales Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 571,975 $ 571,975 $ 566,825 -0.90% February 1,033,695 461,721 1,035,133 0.14% March 1,603,598 569,903 1,607,616 0.25% April 2,066,627 463,029 2,078,557 0.58% May 2,641,462 574,835 2,642,003 0.02% June 3,110,919 469,457 3,115,575 0.15% July 3,697,613 586,694 August 4,168,968 471,356 September 4,762,598 593,630 October 5,236,709 474,111 November 5,819,454 582,746 December 6,291,410 471,956 O C. FY O C M C M C O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 22 Packet Pg. 209 1 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -General Fund 2016 General Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 4,560,564 $ 4,560,564 $4,953,956 8.63% February 7,080,568 2,520,004 7,893,221 11.48% March 10,254,855 3,174,287 10,217,655 -0.36% April 14,282,463 4,027,609 14,305,106 0.16% May 16,470,117 2,187,654 16,509,045 0.24% June 20,252,645 3,782,528 19,669,418 -2.88% July 23,504,866 3,252,220 August 27,113,525 3,608,659 September 30,737,648 3,624,123 October 33,341,447 2,603,799 November 36,962,003 3,620,556 December 40,929,107 3,967,104 City of Edmonds, WA Monthly Expenditure Report -Non -Departmental 2016 Non -Departmental Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 2,640,077 $ 2,640,077 $ 3,074,199 16.44% February 3,094,175 454,098 4,065,136 31.38% March 4,182,251 1,088,076 4,389,675 4.96% April 6,122,668 1,940,417 6,454,134 5.41% May 6,283,708 161,041 6,679,708 6.30% June 7,925,981 1,642,273 7,828,525 -1.23% July 8,993,121 1,067,140 August 10,291,465 1,298,344 September 11,817,373 1,525,908 October 12,249,051 431,678 November 13,411,675 1,162,624 December 14,956,000 1,544,325 Non -Departmental 16,000,000 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year —Budget —dm- Prior Year F O C. O C M C_ M O O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 23 Packet Pg. 210 1 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -City Council 2016 City Council Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 19,588 $ 19,588 $ 13,340 -31.90% February 43,238 23,650 27,668 -36.01% March 68,617 25,379 44,120 -35.70% April 91,002 22,385 58,113 -36.14% May 115,388 24,386 71,981 -37.62% June 142,957 27,568 98,095 -31.38% July 169,613 26,656 August 194,018 24,404 September 218,163 24,145 October 242,646 24,484 November 268,263 25,616 December 295,500 27,237 City of Edmonds, WA Monthly Expenditure Report -Office of Mayor 2016 Office of Mayor Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 22,161 $ 22,161 $ 21,296 -3.90% February 44,020 21,859 43,294 -1.65% March 65,603 21,583 64,319 -1.96% April 86,693 21,090 85,409 -1.48% May 108,016 21,323 106,249 -1.64% June 129,368 21,352 127,277 -1.62% July 151,400 22,032 August 172,781 21,380 September 193,702 20,921 October 217,172 23,470 November 239,237 22,065 December 260,250 21,013 Office of Mayor 300,000.00 250,000.00 200,000.00 150,000.00 100,000.00 50,000.00 0.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dr,- Prior Year F O C. O C M C LL C O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 24 Packet Pg. 211 1 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -Community Services/Economic Development 2016 Community Services/Economic Development Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 28,607 $ 28,607 $ 25,054 -12.42% February 66,541 37,934 61,145 -8.11% March 103,874 37,333 101,724 -2.07% April 155,321 51,448 146,484 -5.69% May 193,087 37,766 183,771 -4.82% June 227,738 34,651 232,729 2.19% July 269,744 42,006 August 309,552 39,808 September 353,224 43,671 October 396,203 42,979 November 438,246 42,044 December 493,580 55,334 City Clerk Community Services/Economic Development 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -dp- Prior Year City of Edmonds, WA Monthly Expenditure Report -City Clerk 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 50,489 $ 50,489 $ 44,524 -11.81% February 96,125 45,635 87,838 -8.62% March 145,204 49,079 142,107 -2.13% April 189,944 44,740 188,255 -0.89% May 234,027 44,083 234,593 0.24% June 281,576 47,549 281,026 -0.20% July 329,270 47,695 August 379,179 49,909 September 428,220 49,041 October 485,933 57,714 November 535,319 49,385 December 585,310 49,991 City Clerk 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget -0-- Prior Year O C. O C M C LL O O M CY to T O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 25 Packet Pg. 212 1 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -Human Resources 2016 Human Resources Cumulative Budget Forecast Monthly Budget Forecast YTD Actuals Variance % January $ 34,273 $ 34,273 $ 28,007 -18.28% February 71,193 36,920 58,708 -17.54% March 115,298 44,105 90,412 -21.58% April 150,430 35,132 115,675 -23.10% May 189,556 39,126 146,734 -22.59% June 227,772 38,216 175,479 -22.96% July 266,108 38,336 August 302,589 36,480 September 344,265 41,676 October 381,533 37,268 November 414,723 33,190 December 462,044 47,321 Human Resources 500,000 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget t Prior Year City of Edmonds, WA Monthly Expenditure Report -Municipal Court 2016 Municipal Court Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January $ 67,768 $ 67,768 $ 67,346 -0.62% February 140,999 73,231 145,300 3.05% March 219,268 78,269 219,191 -0.04% April 293,243 73,975 290,918 -0.79% May 365,511 72,268 366,411 0.25% June 440,872 75,361 435,326 -1.26% July 515,865 74,993 August 594,541 78,676 September 669,574 75,033 October 750,559 80,985 November 828,307 77,748 December 909,270 80,963 Municipal Court 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget -0-- Prior Year O C. C O 0 C M C LL O O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 26 Packet Pg. 213 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -Information Services 2016 Information Services Cumulative Monthly Budget Forecast Budget Forecast TrD Actuals Variance % January $ 87,065 $ 87,065 $ 55,507 -36.25% February 163,617 76,552 158,620 -3.05% March 224,796 61,179 205,381 -8.64% April 281,617 56,821 242,036 -14.05% May 331,746 50,129 283,871 -14.43% June 381,470 49,725 325,732 -14.61% July 448,514 67,044 August 521,686 73,171 September 590,807 69,121 October 648,167 57,360 November 735,478 87,311 December 900,110 164,632 Finance Information Services 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year - Budget -dr- Prior Year City of Edmonds, WA Monthly Expenditure Report -Finance 2016 Cumulative Monthly Budget Forecast Budget Forecast TrD Actuals Variance % January $ 97,947 $ 97,947 $ 62,994 -35.69% February 174,402 76,455 130,335 -25.27% March 249,528 75,126 197,850 -20.71% April 330,097 80,569 265,012 -19.72% May 403,825 73,728 330,595 -18.13% June 478,183 74,359 391,632 -18.10% July 551,010 72,826 August 624,240 73,230 September 699,491 75,251 October 782,345 82,854 November 857,044 74,699 December 939,820 82,776 Finance 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --*---Current Year -Budget --&- Prior Year F O C. C O C M C LL O O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 27 Packet Pg. 214 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -City Attorney 2016 City Attorney Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 61,797 $ 61,797 $ 60,070 -2.79% February 123,593 61,797 120,220 -2.73% March 185,390 61,797 162,968 -12.09% April 247,187 61,797 224,651 -9.12% May 308,983 61,797 286,857 -7.16% June 370,780 61,797 347,078 -6.39% July 432,576 61,797 August 494,373 61,797 September 556,170 61,797 October 617,966 61,797 November 679,763 61,797 December 741,560 61,797 Police 800,000 City Attorney 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC +Current Year - Budget -d�- Prior Year City of Edmonds, WA Monthly Expenditure Report -Police 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 742,439 $ 742,439 $ 771,955 3.98% February 1,500,827 758,388 1,527,193 1.76% March 2,270,564 769,738 2,295,467 1.10% April 3,024,634 754,070 3,078,848 1.79% May 3,778,474 753,839 3,832,659 1.43% June 4,596,174 817,700 4,596,670 0.01% July 5,361,301 765,126 August 6,134,061 772,761 September 6,899,091 765,029 October 7,695,105 796,015 November 8,764,862 1,069,757 December 9,628,550 863,688 Police 10,000,000 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC -*--Current Year - Budget -*I,- Prior Year F O C. C O C M C LL C M M CY to O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 28 Packet Pg. 215 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -Development Services 2016 Development Services Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 201,835 $ 201,835 $ 170,060 -15.74% February 411,018 209,184 361,353 -12.08% March 641,000 229,982 565,548 -11.77% April 849,674 208,674 764,404 -10.04% May 1,065,243 215,570 985,455 -7.49% June 1,271,014 205,771 1,183,128 -6.91% July 1,490,976 219,962 August 1,714,690 223,714 September 1,936,272 221,582 October 2,182,160 245,887 November 2,407,343 225,183 December 2,656,652 249,309 Parks & Recreation Development Services 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget t Prior Year City of Edmonds, WA Monthly Expenditure Report -Parks & Recreation 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance January $ 243,592 $ 243,592 $ 252,899 3.82% February 505,386 261,794 502,972 -0.48% March 781,095 275,709 770,996 -1.29% April 1,058,904 277,810 1,041,241 -1.67% May 1,359,582 300,677 1,333,112 -1.95% June 1,677,232 317,651 1,609,632 -4.03% July 2,108,378 431,146 August 2,567,286 458,908 September 2,889,106 321,820 October 3,183,247 294,141 November 3,438,023 254,776 December 3,774,541 336,518 Parks & Recreation 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Yeaz Budget -dm- Prior Year F O C. d t0 C C M 21 L ._ O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 29 Packet Pg. 216 1 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -Public Works 2016 Public Works Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 31,230 $ 31,230 $ 29,570 -5.31% February 62,130 30,900 59,034 -4.98% March 92,810 30,680 89,046 -4.05% April 123,243 30,434 118,682 -3.70% May 154,320 31,076 148,411 -3.83% June 185,380 31,060 178,420 -3.75% July 216,622 31,243 August 246,986 30,363 September 276,279 29,293 October 308,266 31,987 November 337,169 28,904 December 371,790 34,621 Facilities Maintenance Public Works 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 JAN FL MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Current Year Budget --AP- Prior Year City of Edmonds, WA Monthly Expenditure Report -Facilities Maintenance 2016 Cumulative Monthly Budget Forecast Budget Forecast YTD Actuals Variance % January $ 115,588 $ 115,588 $ 116,661 0.93% February 236,621 121,033 240,595 1.68% March 365,554 128,934 357,601 -2.18% April 487,500 121,946 468,138 -3.97% May 604,005 116,504 595,677 -1.38% June 723,757 119,752 697,556 -3.62% July 857,071 133,314 August 967,719 110,648 September 1,099,287 131,567 October 1,211,418 112,132 November 1,335,849 124,431 December 1,483,800 147,951 Facilities Maintenance 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC --#- Current Year -Budget --O-Prior Year O C. C O C M C LL O O M CY O N O C 7 7 *The monthly budget forecast columns are based on a five-year average. 30 Packet Pg. 217 1 I 5.3.a I City of Edmonds, WA Monthly Expenditure Report -Engineering 2016 Engineering Cumulative Budget Forecast Monthly Budget Forecast YTD Actuals Variance % January $ 198,055 $ 198,055 $ 160,475 -18.97% February 396,423 198,368 303,810 -23.36% March 597,281 200,858 521,251 -12.73% April 796,160 198,879 763,107 -4.15% May 1,001,003 204,843 922,959 -7.80% June 1,201,964 200,961 1,161,113 -3.40% July 1,401,670 199,706 August 1,603,612 201,942 September 1,807,951 204,339 October 2,023,470 215,519 November 2,232,307 208,838 December 2,470,330 238,023 Engine a ring 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC t Current Year Budget —dp-- Prior Year O C. C FY O C M C LL C O M CY O N O C 7 7 CD *The monthly budget forecast columns are based on a five-year average. 31 Packet Pg. 218 INVESTMENT PORTFOLIO SUMMARY I 5.3.a I City of Edmonds Investment Portfolio Summary As of June 30, 2016 (a) Term Purchase Purchase Maturity Agency/Issuer Investment Type (months) Date Price Date Washington State Local Investment Pool Various $12,734,097 Various Government Investment Pool Snohomish County Investment Pool Various $30,533,049 Various Investment Pool FICO Bonds 33 9/19/2014 1,027,000 6/6/2017 FH LMC Bonds 61 12/28/2012 1,000,000 12/28/2017 FFCB Bonds 36 1/25/2016 2,000,000 12/28/2018 FFCB Bonds 37 1/25/2016 2,000,000 1/25/2019 FNMA Bonds 61 9/19/2014 1,000,000 9/19/2019 FHLB Bonds 48 5/5/2016 2,000,000 3/30/2020 FHLMC Bonds 48 5/5/2016 2,000,000 4/28/2020 (a) To maturity. 55,000 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 TOTAL Investment Mix State Investment Pool Bonds Snohomish County Investment Pool % of Total Rate Comparison Yield to Weighted Q. Maturity Average IY 0.49% 0.12% v c tv 0.82% 0.46% ii 0.96% 0.02% ` m 0.90% 0.02% 3 CI 1.42% 0.05% m 1.23% 0.05% 0 C14 a� 1.87% 0.03% 1.45% 0.05% rn 1.35% 0.05% 23.45% Current 6-month treasury rate 0.36% 20.31 % Current State Pool rate 0.49% 56.24% Blended Edmonds rate 0.85% 100.0% Interest Income Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0.85% 2012 ■ 2013 2014 . ■ 2015 2016 32 Packet Pg. 219 5.3.a GENERAL FUND OVERVIEW FUND BALANCES CHANGE IN FUND BALANCES GENERAL FUND � & SUBFUNDS ---- ACTUAL ---- 0. ---- ACTUAL ---- 12/31 /2015 3/31 /2016 6/30/2016 Q2 am YTD W 001-General Fund $ 9,359,436 $ 5,775,692 $ 10,024,373 $ 4,248,681 $ 664,93 'U 009-Leoff-Medical Ins. Reserve 519,409 453,760 532,581 78,821 c 13,17, m c 011-Risk Management Fund 961,513 963,340 965,713 2,373 4,20( ii 012-Contingency Reserve Fund 4,677,030 1,667,653 4,684,313 3,016,660 21 7,28. 013-Mulitmodal Transportation FD 56,487 56,594 56,720 126 23: i 014-Historic Preservation Gift Fund 2,590 9,043 5,116 (3,927) 2,52E CY 016-Building Maintenance 118,086 133,260 (48,433) (181,693) (166,51$ 0 Total General Fund & Subfunds $ 15,694,551 $ 9,059,344 $ 16,220,385 $ 7,161,041 $ 525,83, N a� c ti rn 0 a a� - General Fund & Subfunds 2 20 U $15.69 $16.22 0 ii 16 >, a� 1` 12 c $9.06 CY o — 8 m r O N 4 N a� _ a� Q Dec2015 Mar2016 June 2016 E 0 t) c m E t v cv r r Q *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 33 Packet Pg. 220 5.3.a GOVERNMENTAL FUNDS OVERVIEW CHANGE IN FUND FUND BALANCES BALANCES GOVERNMENTAL ---- ACTUAL ---- FUNDS ---- ACTUAL ---- 12/31 /2015 3/31 /2016 6/30/2016 Q2 YTD 0 General Fund & Subfunds $ 15,694,551 $ 9,059,344 $ 16,220,385 $ 7,161,041 $ 525,83 Q- Special Revenue 7,711,341 11,887,729 10,255,835 (1,631,894) 2,544,49, m Debt Service 114,790 115,564 115,563 (0) 77 u- c Total Governmental Funds $ 23,520,682 $ 21,062,636 $ 26,591,783 $ 5,529,147 $ 3,071,10 ii 21 L L CY Governmental Fund Balances -By Fund Group Governmental Fund CD N 20 16 N12 c 0 8 4 $16.22 General Fund & Subfunds t Special $10.26 Revenue Debt Service $0.11 $0.12 $0.12 Dec 2015 Mar2016 June 2016 Balances - Combined c 0 ti 30 1 $26.59 24 c 18 0 12 6 $23.52 Dec 2015 Mar2016 June 2016 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 34 Packet Pg. 221 1 5.3.a SPECIAL REVENUE FUNDS OVERVIEW FUND BALANCES CHANGE IN FUND BALANCE; GOVERNMENTAL ---- ACTUAL ---- ---- ACTUAL ---- SPECIAL REVENUE 12/31/2015 3/31/2016 6/30/2016 Q2 YTD 104 - Drug Enforcement Fund $ 68,732 $ 120,531 $ 109,613 $ (10,919) $ 40,88' .. 111 - Street Fund 514,445 426,929 556,641 129,712 42,19E o 112 - Combined Street Const/Improve 9,339 3,813,826 1,393,845 (2,419,981) 1,384,50E 117 - Municipal Arts Acquis. Fund 468,471 482,084 472,727 (9,357) 4,25E 118 - Memorial Street Tree 17,919 17,953 17,993 40 7e 2 120 - Hotel/Motel Tax Revenue Fund 153,884 164,509 162,241 (2,268) 8,35d r- 121 - Employee Parking Permit Fund 64,480 71,765 72,599 835 8,11 t 122 - Youth Scholarship Fund 15,469 15,173 14,705 (468) LL (76,e >, 123 - Tourism Promotional Fund/Arts 84,567 86,486 86,674 188 2,10- `m 125 - Real Estate Tax 2 1,629,535 1,874,258 1,996,449 122,191 366,91, 126 - Real Estate Excise Tax 1 2,239,007 2,042,221 2,366,504 324,283 127,491 CY 127 - Gifts Catalog Fund 265,924 284,615 261,169 (23,445) (4,75, 129 - Special Projects Fund 38,393 38,466 38,551 85 15£ N 130 - Cemetery Maintenance/Improvement 137,256 142,169 154,038 11,869 16,78. 132 - Parks Construction Fund 897,413 1,160,606 1,392,690 232,085 495,271 136 - Parks Trust Fund 152,249 152,538 152,877 339 62£ 137 - Cemetery Maintenance Trust Fund 883,729 889,731 895,815 6,085 12,08E cn 138 - Sister City Commission 3,785 3,792 6,921 3,129 3,13E 139 - Transportation Benefit District - 0 - (0) - 140 - Business Improvement Disrict 66,744 100,076 103,780 3,704 37,03E Q. Total Special Revenue $ 7,711,341 $ 11,887,729 $ 10,255,835 $ (1,631,894) $ 2,544,49, 15 12 9 c 0 6 3 Special Revenue Funds $11.89 $10.26 Special Revenue Dec2015 Mar2016 m4-- June 2016 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 35 Packet Pg. 222 ENTERPRISE FUNDS OVERVIEW I 5.3.a I ENTERPRISE FUNDS 421 - Water Utility Fund 422 - Storm Utility Fund 423 - Sewer/WWTP Utility Fund 424 - Bond Reserve Fund 411 - Combined Utility Operation Total Enterprise Funds FUND BALANCES ---- ACTUAL ---- $ 16, 750, 820 $ 15, 513,148 $ 17,135, 816 $ 9,695,327 10, 572, 881 10, 084, 412 43, 067, 458 43, 952, 248 44,186,132 - 843,964 4 - 47,129 83,251 $ 69, 513, 605 $ 70, 929, 369 $ 71, 489, 615 $ CHANGE IN FUND Q. ---- ACTUAL ---- 1,622,668 $ (488, 470) 233,885 (843, 959) 36,122 560,246 $ YTD @ 384,99( c 389,08! LL 1,118, 67L >, L L � 1` 83, 25' 1,976,01( co 0 N N C 7 7 $70, 000,000 $60,000,000 $50, 000,000 $40, 000,000 $30,000,000 $20,000,000 $10, 000,000 Enterprise Fund Balances as of June 30, 2016 583.251 Combined Utility $17,135,816 $10,084,412 16 Storm Sewer/WWTP Bond Reserve *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 36 Packet Pg. 223 SUMMARY OVERVIEW 5.3.a I CITY-WIDE FUND BALANCES ACTUAL CHANGE IN FUND BALANCES ---- ACTUAL ---- Governmental Funds $ 23,520,682 $ 21,062,636 $ 26,591,783 $ 5,529,147 Enterprise Funds 69,513,605 70,929,369 71,489,615 560,246 Internal Services Fund 7,645,840 8,273,556 7,549,040 (724,516) Agency Funds 203,101 191,835 239,169 47,333 Total City-wide Total $100,883,228 $100,457,398 $105,869,607 1 $ 5,412,209 Governmental Fund Balances as of June 30, 2016 General Fund & Subfunds Drug Enforcement Fund Street Fund Combined Street Const/Improve Fund Municipal Arts Acquis. Fund Memorial Street Fund Hotel/Motel Tax Revenue Fund Employee Parking Pennit Fund Youth Scholarship Fund Tourism Promotional Fund/Arts Real Estate Excise Tax 2 Real Estate Excise Tax 1, Parks Acq Gifts Catalog Fund Special Projects Fund Cemetery Maintenance/Improvement Parks Construction Fund Parks Trust Fund Cemetery Maintenance Trust Fund Sister City Commission Transportation Benefit District $ (0) Business Improvement District L.I.D. Fund Control L.I.D. Guaranty Fund 2012 LTGO Debt Service Fund $ (0) Equipment Rental Fund Firemen's Pension Fund $ 3,071,10p 1,976,01( (96,80( 36,06E c $ 4,986,37E LL y+ fC CI W $16,220,38! o $109,613 N a� $556,641 3 $1,393,845 $472,727 ti $17,993 $162,241 $72,599 r- $14,705 $86,674 $1,996,4 9 6 $2,366, 04 '3 $261,169 ca $38,551 LL $154,038 > a $1,392, - $152,877 $895,815 $6,921 $103,780 $10,428 $105,135 $7,549,04( $239,169 $1 $20,000,000 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 37 Packet Pg. 224 INTERNAL SERVICE FUNDS OVERVIEW I 5.3.a I INTERNAL SERVICE FUNDS 511 - Equipment Rental Fund Total Internal Service Funds 10 8 6 0 4 2 FUND BALANCES ---- ACTUAL ---- 12/31 /2015 3/31 /2016 6/30/2016 $ 7,645,840 $ 8,273,556 $ 7,549,040 $ $ 7,645,840 $ 8,273,556 $ 7,549,040 1 $ Internal Service Fund Balances $8.27 $7.65 $7.55 Dec 2015 Mar 2016 June 2016 CHANGE IN FUND 0 BALANCES Q' m ---- ACTUAL ---- 02_ YTD (724, 516) $ (96, 80( LEL 21 (724,516) $ (96,80( 0 M Cl c0 T 0 N M C 7 7 CD 511- Equipment Rental Fund i *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. 38 Packet Pg. 225 5.3.b 2nd Quarter 2016 Financial Management Report '(11C. t oo9v ➢ 2nd Quarter Financial Highlights ➢ Financial Quiz ➢ Q &A Packet Pg. 226 5.3.b Quiz rnc. 1$y" Question: 1) The City has beautiful parks, open spaces, a spray park and beach access, playgrounds, walking trails, picnic shelters, scenic views of Puget Sound and more! Our 23 city parks include more than 325 acres of parkland and X# feet of waterfront shoreline for our citizens to enjoy. Tonight's first quiz question is: How many feet of beach are available for our citizens to enjoy a) 1,000 Feet b) 750 Feet c) 2,250 Feet Packet Pg. 227 5.3.b Quiz Question: 2. In addition to the many park amenities our citizens get to enjoy, our City also offers numerous and different restaurants for our citizens and visitors to Edmonds to patronize. Our 2"d quiz question is: How many Eating &Drinking establishments are operating in Edmonds today? a) 97 b)102 c)122 Packet Pg. 228 5.3.b General Fund - Funds Revenue Comparison 'Ile. 1009V 2nd QUARTER 2016 REVENUE SUMMARY - GENERAL FUND TYPES Fund N0. Fund Name YTD 2015 Receipts YTD 2016 Receipts $ Change ' 16 - ' 15 % Change ' 16 - ' 15 001 GENERAL FUND $18,9229673 $209334,355 $194119682 7.5% 009 LEOFF-MEDICAL INS. RESERVE $1399484 $139,584 $100 0.1% O11 RISK MANAGEMENT FUND $49285 $4,200 ($85) -2.0% 012 CONTINGENCY RESERVE FUND $229594 $79283 ($15,311) -67.8% 013 MULTIMODAL TRANSPORTATION FUND $234 $233 ($1) -0.4% 014 HISTORIC PRESERVATION GIFT FUND $3 $29526 $29523 84114.0% 016 BUILDING MAINTENANCE $237,914 $5911195 $353,281 148.5% Totals 1 $1993279187 1 $2190799377 1 $197529190 9.1% Packet Pg. 229 General Fund Revenue Budget to Actual General Fund Year -to -Date Actual Budget % of Budget 6/30/2015 6/30/2016 % 2015 2016° 2015 2016 Resource Category Taxes Property Taxes 7,604,520 7,802,961 2.6% 14,320,535 14,705,650 2.7% 53.1% 53.1% Sales Tax 3,140,830 3,295,015 4.9% 5,627,000 6,144,400 9.2% 55.8% 53.6% Utility Taxes 3,463,237 3,536,369 2.1% 6,732,519 6,789,980 0.9% 51.4% 52.1% Other Taxes 454,668 482,981 6.2% 872,750 939,340 7.6% 52.1% 51.4% Total Taxes 14,663,255 15,117,325 3.1% 27,552,804 28,579,370 3.7% 53.2% 1 52.9% Licenses & Permits Business Licenses & Misc. Permits 143,162 138310 -3.4% 236,680 244,220 3.2% 60.5% 56.6% Franchise Fees 570,662 577:010 1.1% 1,093,490 1,142,800 4.5% 52.2% 50.5% Development Related Permits 351,925 494,724 40.6% 567,370 624,100 10.0% 62.0% 79.3% Total Licenses & Permits 1,065,749 1,210,044 13.5% 1,897,540 2,011,120 6.0% 56.2% 60.2% Intergovermnental Revenues Liquor Board Profits 175,055 174,541 -0.3% 356,890 357,800 0.3% 49.1% 48.8% Liquor Excise Tax 44,733 96,625 116.0% 65,000 65,200 0.3% 68.8% 148.2% Grants 18,310 267,324 1360.0% 48,470 412,100 750.2% 37.8% 64.9% Other Intergovernmental 36,076 113,407 214.4% 254,190 259,720 2.2% 14.2% 43.7% Total Intergovernmental Revenues 274,174 651,896 137.8% 724,550 1,094,820 51.1% 37.8% 59.5% Fees For Service Interfund Reimbursement 422,095 1,107,179 162.3% 1,902,614 2,964,600 55.8% 22.2% 37.3% Engineering Services 108,952 139,289 27.8% 272,000 180,350 -33.7% 40.1% 77.2% Plan Check & Inspection Fees 292,228 265,047 -9.3% 323,060 459,250 42.2% 90.5% 57.7% Zoning& Subdivision Fees 47,198 47,321 0.3% 75,000 75,000 0.0% 62.9% 63.1% EMS Transport Fees 412,674 491,973 19.2% 818,000 837,100 2.3% 50.4% 58.8% Parks & Recreational Fees 577,945 603,841 4.5% 1,066,360 889,580 -16.6% 54.2% 67.9% Other Charges for Services 147,467 165,001 11.9% 395,452 337,300 -14.7% 37.3% 48.9% Total Fees For Service 2,008,559 2,819,651 40.4%1 4,852,486 5,743,180 18.4% 41.4% 49.1% Fines & Forfeitures Fines & Forfeitures 298,675 281,536 -5.7% 602,450 522,130 -13.3% 49.6% 53.9% Total Fines & Forfeitures 298,675 281,536 -5.7% 602,450 522,130 -13.3% 49.6% 53.9% Miscellaneous Revenues Interest Earnings & Misc. 201,174 228,068 13.4% 366,539 500,210 36.5% 54.9% 45.6% Total Miscellaneous Revenues 201,174 228,068 13.4% 366,539 500,210 36.5% 54.9% 45.6% Other Financing Sources Interfund Transfers 411,088 25,835 -93.7% 822,175 825,840 0.4% 50.0% 3.1% Total Other Financing Sources 411,088 25,835 -93.7% 822,175 825,840 0.4% 50.0% 3.1% Total Revenues 18,922,673 20,334,355 7.5% 36,818,544 39,276,670 6.7% 51.4% 51.8% d M CY co 0 N a) c 3 Q Packet Pg. 230 General Fund Revenue Comparison D.3.b771 Year -to -Date Actual % General Fund Resource Category 6/30/2015 6/30/2016 Change Taxes Property Taxes 704,520 702,961 2.6% Sales Tax 3J40,830 3,295,015 4.9% Utility Taxes 3,4631237 315361369 2.1% Other Taxes 4541668 4821981 6.2% Total Taxes 149663,255 1591179325 1 3.1% Licenses & Permits Business Licenses & Misc. Permits 143,162 1381310 -3.4% Franchise Fees 5701662 577M 10 1.1 % Development Related Permits 351X5 4941724 40.6% Total Lice ns e s & Pe rmits 19065J49 14109044 13.5 % 2, to c� 0 N d r- r Q Packet Pg. 231 I 5.3.b I Sales Tax Analysis By Category Current Period: June 2016 Year -to -Date Total $3,295,015 Wholesale Trade 136,045 Contractors 518,015 Health & Personal Care 51,387 1 N Retail Eating & Drinking 414,328 Gasoline Stations 15,819 Automotive Repair 85,558 Retail Automotive 847,642 Communications 122,075 Clothing and Accessories 110,355 Retail Trade 407,222 Accommodation 19,521 Business Services 231,267 ;nt & Recreation 34,139 Retail Food Stores 133,652 Others 167,992 Packet Pg. 232 5.3.b Change in Sales Tax Revenue: June 2016 compared to June 2015 Total Retail Automotive Misc Retail Trade Retail Eating & Drinking Business Services Retail Food Stores Others Amusement & Recreation Wholesale Trade Clothing and Accessories Accommodation Health & Personal Care Gasoline Stations Automotive Repair Communications Contractors ($100,000) ($50,000) $0 $50,000 $100,000 $150,000 Packet Pg. 233 'Ile. 1009V General Fund Type5.3.b Expenditure Comparison 2nd QUARTER 2016 EXPENSE SUMMARY - GENERAL FUND TYPES Fund NO. Fund Name YTD 2015 Expenses YTD 2016 Expenses $ Change '16 -'15 % Change 16 -'15 001 GENERAL FUND $1994529503 $1996699418 $2169915 1.1% 009 LEOFF-MEDICAL INS. RESERVE $1389255 $1269411 ($119844) -8.6% O11 RISK MANAGEMENT FUND $0 $0 $0 0.0% 012 CONTINGENCY RESERVE FUND $4009000 $0 ($400,000) 0.0% 014 HISTORIC PRESERVATION GIFT FUND $39750 $0 ($39750) 0.0% 016 BUILDING MAINTENANCE $969369 $757,714 $661,345 686.3% Totals $2090909877 $2095539543 $462,666 2.3% Packet Pg. 234 '11C. 1009v General Fund Departm Expense Summary r_ �.j N d 2016 Amended 6/30/2015 6/30/2016 Amount M 'Title Budget Eipenditures Expenditures Remaining %Spent CITY COUNCIL OFFICE OF MAYOR HUMAN RESOURCES MUNICIPAL COURT CITY CLERK ADMINISTRATIVE SERVICES CITY ATTORNEY NON -DEPARTMENTAL POLICE SERVICES COMMUNITY SERVICES/ECONOMIC DEV DEVELOPMENT SERVICES PARKS & RECREATION PUBLIC WORKS FACILITIES MAINTENANCE $ 295,500 $ 107,828 $ 98,095 $ 197,405 33% on 260,250 123,379 127,277 132,973 49% o 462,044 177,419 175,479 286,565 38% a 909,270 400,792 435,326 473,944 48% 585,310 285,114 281,026 304,284 48% c 1,839,930 818,119 717,364 1,122,566 39% M 741,560 329,666 347,078 394,482 47% •5 14,956,000 8,369,406 7,828,525 7,127,475 52% c c ii 9,628,550 4,329,129 4,596,670 5,031,880 48% 493,580 188,019 232,729 260,851 47% cm cJ 2,656,652 1,059,255 1,183,128 1,473,524 45% N 3,774,541 1,528,030 1,609,632 2,164,909 43% d 2,842,120 1,041,687 1,339,534 1,502,586 47% z 1,483,800 694,660 697,556 786,244 47% cc Q $ 40,929,107 $ 19,452,503 $ 19,669,418 $ 21,259,689 48% in Packet Pg. 235 5.3.b Special Revenue Funds Revenue Comparison 2nd QUARTER 2016 REVENUE SUMMARY - SPECIAL REVENUE FUNDS Fund YTD 2015 YTD 2016 $ Change L % Chang NO. Fund Name Receipts Receipts '16 -'15 '16 -'15 C:'y 104 DRUG ENFORCEMENT FUND $119276 $689661 $579385 508.9' o 111 STREET FUND $9079722 $989,658 $819936 N 9.0' o 112 COMBINED STREET CONST/IMPROVE $805,704 $397799444 $299739740 369.14 117 MUNICIPAL ARTS ACQUIS. FUND $379748 $29,531 ($89217) -21.8' 118 MEMORIAL STREET TREE $74 $74 ($0) -0.1' 120 HOTEL/MOTEL TAX REVENUE FUND $309743 $349503 $39760 12.2' OQ 121 EMPLOYEE PARKING PERMIT FUND $89598 $89119 ($479) -5.64 122 YOUTH SCHOLARSHIP FUND $189 $71 ($118) -62.3' 123 TOURISM PROMOTIONAL FUND/ARTS $109402 $11,649 $19247 12.04 125 REAL ESTATE EXCISE TAX 2 $5319403 $6259801 $949398 17.8' 126 REAL ESTATE EXCISE TAX 1 $5309078 $6269412 $969334 18.2' . 127 GIFTS CATALOG FUND $349538 $289386 ($6,152) -17.8' 129 SPECIAL PROJECTS FUND $159 $158 ($1) -0.4' 130 CEMETERY MAINTENANCE/IMPROVEMT $969753 $949494 ($29259) r -2.34 N 132 PARKS CONSTRUCTION FUND $1319214 $1,0799454 $9489240 L 722.7' 136 PARKS TRUST FUND $631 $628 ($3) -0.5' N 137 CEMETERY MAINTENANCE TRUST FD $129091 $129086 ($5) 0.04 r- 138 SISTER CITY COMMISSION $3,611 $59772 $29161 59.9' E 139 TRANSPORTATION BENEFIT DISTRICT $3399276 $3509193 $10,917 3.24 a Totals $394929210 $79745,096 $492529886 121.84 11 Packet Pg. 236 'Ile. 1009V 5.3.b Motor Vehicle Fuel Tax Revenues $500,000 $4501000 $400,000 $350,000 $300,000 $250,000 $200,000 2nd Quarter 2016 Motor Vehicle Fuel Tax Revenues $390,998 $391,699 $408,618 $387 2012 2013 2014 2015 2016 The City receipts 82% of its Motor Vehicle Fuel Excise Tax (gas tax) into the Street Fund. This fund is used for costs related to street maintenance. The remaining 18% of the gas tax is used for street construction and improvement projects. 19 Packet Pg. 237 5.3.b $0 Hotel/Motel Lodging Revenues Quarter 2016 Hotel/Motel Lodging Tax Revenues 2011 2012 2013 2014 2015 2016 j 21 L L M ry� V r 0 N d C 3 ti Cn The City receipts 75% of its Lodging Tax into the Hotel/Motel Tax Fund, which uses the funds for the purpose of promoting tourism and visitors to Edmonds. The remaining 25% of the Lodging Tax a is receipted into the Fund 123 Tourism Promotion/Arts Fund, which uses the funds to promote tourism through support arts and culture events. 1.11 Packet Pg. 238 rnc. 1$y" $1,400,000 $1,200,000 $1,000,000 $800,000 Real.,Estate Excise 3.b Tax Revent j 2nd Quarter 2016 Real Estate Excise Tax Revenue Comparison $600,000 r $636,825 $400,000 $200,000 $888,732 $820,540 $1,049,07 $1,234,188 $0 2012 2013 2014 2015 2016 14 Packet Pg. 239 Special Revenue Funds Expenditure 0 5.3.b Comparison 2nd QUARTER 2016 EXPENSE SUMMARY - SPECIAL REVENUE FUNDS Fund NO. Fund Name YTD 2015 Expenses YTD 2016 Expenses $ Change '16 -'15 % Change 16 -'15 104 DRUG ENFORCEMENT FUND $189256 $27,780 $9,524 52.20% 111 STREET FUND $8269372 $947,462 $1219090 14.70% 112 COMBINED STREET CONST/IMPROVE $9009067 $2,394,938 $1,4949871 166.10% 117 MUNICIPAL ARTS ACQUIS. FUND $279036 $25,274 ($1,762) -6.50% 118 MEMORIAL STREET TREE $0 $0 $0 0.00% 120 HOTEL/MOTEL TAX REVENUE FUND $259294 $269145 $851 3.40% 121 EMPLOYEE PARKING PERMIT FUND $0 $0 $0 0.00% 122 YOUTH SCHOLARSHIP FUND $1,341 $835 ($506) -37.70% 123 TOURISM PROMOTIONAL FUND/ARTS $5,501 $99543 $49042 73.50% PP 125 REAL ESTATE EXCISE TAX 2 $113,403 $2589888 $1459485 128.30% 126 REAL ESTATE EXCISE TAX 1 $28,845 $498,915 $4709070 1629.60% 127 GIFTS CATALOG FUND $12,631 $33,140 $209509 162.40% 129 SPECIAL PROJECTS FUND $0 $0 $0 0.00% 130 CEMETERY MAINTENANCE/IMPROVEMT $74,803 $779712 $29909 3.90% 132 PARKS CONSTRUCTION FUND $223,266 $5849177 $3609911 161.70% 136 PARKS TRUST FUND $0 $0 $0 0.00% 138 SISTER CITY COMMISSION $10 $29636 $29626 26260.00% 139 TRANSPORTATION BENEFIT DISTRICT $3679211 1 $3509193 ($179018) -4.60% Totals $2,624,036 $592379638 $296139602 99.60% L c� to 0 N r 0 CL U- r O N L V N E 0 M a Packet Pg. 240 Utility FwOP Revenue Comparison 2nd QUARTER 2016 REVENUE SUMMARY - UTILITY FUNDS Fund NO. Fund Name YTD 2015 Receipts YTD 2016 Receipts $ Change '16 -'15 % Change '16 -'15 411 COMBINED UTILITY OPERATION $12,880 $83,251 $70,371 546.4% 421 WATER UTILITY FUND $39260,676 $490419301 $780,625 23.9% 422 STORM UTILITY FUND $29043,886 $199469923 ($969963) -4.7% 423 SEWER/WWTP UTILITY FUND $493689878 $5,3219028 $9529150 21.8% 424 BOND RESERVE FUND $3379210 $6679446 $3309236 97.9% Totals $1090239530 $1290599950 $2,036,420 20.3% Packet Pg. 241 Utility FuifjP Expense Comparison r17C. 1009v 2nd QUARTER 2016 EXPENSE SUMMARY - UTILITY FUNDS Fund NO. Fund Name YTD 2015 Expenses YTD 2016 Expenses $ Change '16 -'15 % Chang( 16 -'15 421 WATER UTILITY FUND $393229813 $396569305 $3339492 10.00/ 422 STORM UTILITY FUND $193159116 $195579839 $2429723 18.50/ 423 SEWER/WWTP UTILITY FUND $491879306 $492029354 $159048 0.40/ 424 BOND RESERVE FUND $3589261 $6679442 $3099181 1 86.30/ Totals $991839496 $1090839940 $9009444 1 9.80/ 17 Packet Pg. 242 I .i Z �f `.r'� ���'C'r .-"•�..._ t -j J .!"' -YAW ...-� \ � � -* � �F �.... s�4 � _j r, _ .. t � „fs 5�ai.4. { �yt,.k•"��t��2 ti" A! ,,..--� .'"'. t't4a � _ �.'-.s^• 1 _ c �r< Garr �`�''•�.� 4Ei',��{,.tiv',2tix.,rY;y*i;r. lk xC9 ...1' _e, :t. ,� ��.' �'..: �' 1r - ..i4�`��., r -. ���x�=k'-x__ .. .,,,. � _�'.� ,- �►.urL R�a.�.�.-'S '>n � � �.__ _ _ i4' ` •c ��, 5.3.b http://visitedmonds.com/ Quiz Answer 2 How many restaurants are operating in Edmonds today? a) 97 b) 102 c) 122 Packet Pg. 244 CD � O . m co C/1 cn w Attachment: 2nd Qtr 2016 Financial Management Report (1497 : June 2016 Quarterly 7.1 City Council Agenda Item Meeting Date: 09/6/2016 Joint Discussion with the Edmonds Planning Board (60 min.) Staff Lead: Shane Hope Department: Planning Division Preparer: Rob Chave Background/History The Planning Board typically meets at least once per year with the City Council. Staff Recommendation N/A Narrative This is an opportunity to meet and discuss upcoming issues and priorities with the Planning Board. Exhibit 1 contains a discussion memo from Shane Hope to the Planning Board, along with other related materials. Attachments: Exhibit 1: Discussion memo from Shane Hope to the Planning Board Exhibit 2: Discussion memo from Phil Lovell Exhibit 3: Housing Element from the Comprehensive Plan Exhibit 4: AHA Housing Profile for Edmonds 2014 Exhibit 5: Planning Board minutes Exhibit 6: PB Retreat Summary Minutes 3/9/16 Exhibit 7: Council Retreat Minutes of 3/4 - 3/5/16 Packet Pg. 246 7.1.a Planning Board Agenda Item Meeting Date: 08/24/2016 Preparing for Joint City Council / Planning Board Meeting Staff Lead: Shane Hope Department: Planning Division Prepared By: Rob Chave Background/History The Planning Board and City Council periodically have joint meetings to discuss issues and for the Council to provide direction. The next such joint meeting is scheduled to be on September 6. It will focus primarily on housing, but other topics may be discussed too. In preparation for the joint meeting, the Planning Board had some discussion at its August 10 meeting. (See Attachment 1 for the menu of issues, developed by the Board's Chair and Vice Chair, which was discussed on August 10.) Preparation for the joint meeting will continue at the Planning Board's August 24 meeting. Staff Recommendation Discuss preparing for the September 6 joint meeting, especially: 1. Developing a Housing Strategy, with data and a policy basis, for consider housing ideas 2. Getting City Council direction on any other topics Narrative A. Housing Housing, especially affordable housing for different income levels, is a big issue in our region. Edmonds cannot solve it alone. But we do have a role. For example, Edmonds partners with organizations, such as Alliance for Housing Affordability, to help identify and meet affordable housing needs. The Alliance prepared a Housing Profile for Edmonds, which contains extensive housing data. It is on the City website at: <http://www.edmondswa.gov/images/COE/Government/Departments/Development Services/Planning Division/Data/AHA Profile Edmonds 2015.pdf>. Edmonds is also a member of larger organizations, such as Puget Sound Regional Council and Snohomish County Tomorrow, which provide coordination and guidance on housing issues. Edmonds' share of additional housing is projected at about 2200 more units by 2035. While existing zoning may be able to accommodate the additional units, other issues -such as affordability, location, sustainability, and diversity -are important too. The City's Comprehensive Plan has a Housing Element (attached as Attachment 2), which includes: Background information Goals and Policies Implementation Action and Performance Measure Packet Pg. 247 7.1.a The Housing goals and policies in the Comprehensive Plan are broad -based, for example, calling for our regulatory systems to avoid adding to the cost of housing and for decent housing in a suitable environment to be provided for "special needs" populations. The implementation and monitoring part of the Housing Element gets more specific: Implementation Action: Develop a strategy by 2019 for increasing the supply of affordable housing and meeting diverse housing needs. Performance Measure: Report the number of residential units permitted each year with a goal of reaching 21,168 units by 2035, or approximately 112 additional units annually. Proposed key questions for discussion with the City Council on September 6 include: 1. Should the Planning Board be involved with the Housing Strategy that is promised in the Comprehensive Plan? If so, should the Strategy start getting developed sooner than 2019? 2. Should the Housing Strategy provide a framework that includes both data and recommendations for addressing housing issues? 3. While the Housing Strategy is to focus on "increasing the supply of affordable housing and meeting diverse housing needs", should it prioritize particular issues or population groups (for example, seniors)? B. Other Topics The City Council may have input for the Planning Board on other topics, too. Here is a partial list, as developed by the Board: 1. Highway 99 area redevelopment 2. 5 Corners redevelopment 3. Edmonds Marsh progress 4. Railroad crossing alternative 5. Civic Field master planning Whether these topics -or other topics -get discussed at the joint meeting on September 6 will depend on the available time, as well as the choices of Council and Board members. Attachments Exhibit 1: Planning Board menu of joint topics Exhibit 2: Housing Element of Comprehensive Plan Attachments: Attachment 1: Discussion from Phil Lovell Attachment 2: Housing Element from the Comprehensive Plan Packet Pg. 248 Aug 1, 2016 Rev. 8/6/16 PBL RE: Joint PB/Council work meeting scheduled for Sept. 6, 2016 Strategy menu for increasing housing units within Edmonds. Ideas/concepts/procedures generated and/or discussed over several recent years and during PB 2016 Retreat [3/9/16] in the interests of increasing available housing units within the City of Edmonds. The below list is 'neutral' with respect to tax revenues generated by housing ownership within the City, nor does the order of listing represent any priorities associated. A. Refer to Seattle Sunday Times of 7/31/16 for Op. Ed.: "Growth Management Act can't keep up with housing demand". [Some smaller cities have already been advised by PSRC to 'up' their projections based on current trending regarding population growth in the area.] Current PSRC target for Edmonds is +/- 5200 housing units B. Housing 'expansion' in Edmonds • Adjust residential zoning criteria to allow smaller platting towards accommodating increased housing units and PRD's. [current Code Revisions in progress] • Look at RM vs. RS zoning changes ['nibble at the edges' of current RS/RM areas within the city with goal of rezoning given areas to RM from RS]. • Rezone to lower requirement for mixed use retail/commercial to 15t floor of buildings. —particularly 5- Corners and Hwy. 99. [done already on Hwy 99] • Study codes with goal of allowing/encouraging more ADU's on given RS properties. • 'Apodments' on given parcels (ala ADU's). 'Additions' to RS homes to enable double units —either horizontally or vertically [study height criteria for each situation and proceed accordingly/appropriately- be aware of Esperance conditions] • Incentivize developers/property owners, builders to incorporate affordable housing within their new/redevelopments. • If appropriate/available, create public -private partnership(s) with developer(s) in order to generate/create/develop more RM housing within the city • Residential Target Area [Tax exemption -deferral program] —currently being looked at for Westgate area • Encourage mix of condos vs. rental units which address market demands. • Impacts/trending of Air B&B towards more 'room rentals' or'in-law apt living'? • Look at'subdividing'/retrofitting existing RS homes to RM configurations —conditions allowing/enabling same within RS zones. • Esperance? C. Other potential areas for discussion/exploration/future undertakings [2016 vs. 2017]: • Hwy 99 redevelopment Low entry housing (homeless challenge) Trailer parks Low rent motels • 5 Corners redevelopment • Edmonds Marsh progress • RR crossing alternatives • Civic Field Packet Pg. 249 7.1.c Housing Element Introduction. This section looks at the character and diversity of housing in the City of Edmonds. Part of this process includes looking at housing types and affordability. The goal of this section is to provide the necessary information to anticipate housing needs. General Background According to the Office of Financial Management (OFM), there were an estimated 18,378 housing units within the City of Edmonds in 2010. This represents an increase of 5 percent in the city's housing stock since 2000, when there were 17,508 housing units. In comparison, over the period 1990-2000, the city's housing stock grew 35.2 percent, or approximately 3.5 percent per year. This increase is largely explained by annexations that occured during the 1990s in the south and southwest portions of the city. Figure 21 summarizes recent growth trends and forecasts for the City of Edmonds. Of the total stock of housing in 2010, 11,685 (63.5 percent) were single family units, 6,664 (36.3 percent) were multi -family units, and 29 (0.2 percent) were mobile homes or trailers. Compared with Snohomish County as a whole, Edmonds has a lower percentage of single-family homes (63.6 percent vs. 66.9 percent, respectively) and mobile homes (0.2 percent vs. 6.8 percent, respectively) and a higher proportion of multi -family homes (36.3 percent vs. 26.4 percent, respectively). Much of the existing housing stock was built between 1950 and 1969 (see Figure 22) as Edmonds annexed lands east on Main Street, through Five Corners, and over to the western side of Lake Ballinger. As part of the greater Seattle metropolitan area, Edmonds experienced growth earlier than most in Snohomish County. Housing Units Increase Percent Increase Avg. Annual Increase Census: 1980 10,702 1990 12,245 1,543 21.0% 1.9% 2000 17,508 5,263 35.2% 3.1% 2010 18,378 870 5.0% 0.5% Growth Target: 2035 21,168 2,790 15.2% 0.6% Figure 21: City of Edmonds Housing Growth Source: US Census; Snohomish County Tomorrow Housing 79 Packet Pg. 250 7.1.c 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% 1949 or earlier 1950 to 1969 1970 to 1989 1990 to 1999 2000 or later ❑ Edmonds ❑ King County ■ Snohomish County Figure 22: Age Distribution of Housing Stock, City of Edmonds and Snohomish County Source: American Community Survey Household Characteristics At the time of the 2010 Census, Edmonds Housing stock was approximately 94.6 percent occupied. The average household size has declined since 1990, when it was 2.37 persons, to 2.26 persons in 2010. The average household size within the city is expected to decrease to approximately 2.2 persons by 2035 (Snohomish County Tomorrow, 2013). Understanding how the City's population is changing offers insight for planning housing types that will be in demand. Based on Census data, residents of Edmonds are older than those of Snohomish County, taken as a whole. In 2000, the median age of Edmonds residents was 42.0 years, compared with 34.7 years countywide. By 2010, the median age in Edmonds had increased to 46.3 years, compared to 37.1 years countywide. During the same period, the population of Edmonds residents, 14 years of age and younger, shrank in each age category (Figure 24). A natural increase in population is likely to decline as the female population ages beyond childbearing age. These trends are consistent with national trends. Housing 80 Packet Pg. 251 7.1.c 90 + 85 - 89 80 - 84 75 - 79 70 - 74 65 - 69 60 - 64 55 - 59 50 - 54 45 - 49 40 - 44 35 - 39 30 - 34 25 - 29 20 - 24 15-19 10 - 14 5-9 0-4 2,C a ie 00 s I ema le I 1,500 1,000 500 0 500 1,000 1,500 2,000 2,500 ■ 2010 2000 Figure 23: Edmonds Population Pyramid Source: US Census Bureau, 2000 and 2010 4 F 0% 10% 5% 0% -5% -10% -15% -emu o Age Groups 0 to 4 5 to 9 10 to 14 ❑ Edmonds ■ Snohomish ■ Washington State Figure 24: Population Growth of Children 14 years of Age and Younger, 2000 to 2010 Source: US Census Bureau, 2000 and 2010 Housing 81 Packet Pg. 252 7.1.c Household Income: In general, residents of Edmonds earn relatively more income than residents of Snohomish County as a whole. The Edmonds' median household income was $67,228 according to the 2011-2013 American Community Survey 3-year data, similar to the County median of $67,192. This is in contrast to per capita income, which is substantially higher in Edmonds compared to Snohomish County ($40,892 vs. $31,049, respectively). These figures reflect Edmonds' relatively smaller household sizes. Housing Ownership: According to the 2000 Census, 68.1 percent of the housing units within the city were owner -occupied and 31.9 percent were renter -occupied. This represented an increase in owner - occupancy from the 65.3 percent reported in the 1990 Census. The trend continued into 2010, with 69 percent of the City's housing being occupied by owners. The direction of the trend in housing occupancy is similar for Snohomish County as a whole, although ownership rates countywide were slightly lower in 2010, at 67 percent. Housing Values: According to the 2011-2013 ACS 3-year data, the median value of owner -occupied units had increased to $371,700 in Edmonds and $276,800 in Snohomish County, with Edmonds approximately 34.3 percent higher than the countywide median. Within Edmonds, median housing values vary considerably between neighborhoods; the highest valued homes are found along the waterfront, while the lowest values are found within interior neighborhoods and east of Highway 99. Housing Affordability: For the purposes of calculating the housing affordability in Edmonds, this document uses the median income for the Seattle -Bellevue HUD Fair Market Rent Area (HMFA) instead of the Snohomish County Area Median Income (AMI). The Seattle -Bellevue AMI is used as Edmonds is considered a suburb of Seattle, not Everett. The 2013 HMFA AMI for Seattle -Bellevue is $86,700, which is the same as Snohomish County's AMI at $86,700. The 2013 median household income for Edmonds is $67,192. AMI is an important calculation used by many agencies to measure housing affordability. Standard income levels are as follows: • Extremely low income: <30 percent AMI • Very Low Income: between 30 and 50 percent AMI • Low Income: between 50 and 80 percent AMI • Moderate income: between 80 and 95 percent AMI • Middle Income: between 95 and 120 percent AMI Using rental data obtained from Dupre and Scott by the Alliance for Housing Affordability (AHA), Figure 25 provides a clearer view of what a household looking for a home in Edmonds would expect to pay for rent and utilities. The data includes both single family and multifamily rental units. Housing sizes and the corresponding minimum income required for a full time worker to afford the home are listed. For example, a family of four searching for a 3 bedroom unit could expect to pay on average $1,679 per month for rent and utilities. In order to afford housing, the family would need an annual income of $67,160. Housing 82 Packet Pg. 253 7.1.c Average Rent (w/ Utilities) Minimum Income Required Lowest Rent Highest Rent Per Hour Annual Studio $ 833 $ 16.02 $ 33,320 $ 546 $ 1,187 1 Bedroom $ 887 $ 17.06 $ 35,480 $ 662 $ 1,521 2 Bedroom $ 1,097 $ 21.10 $ 43,880 $ 777 $ 1,916 3 Bedroom $ 1,679 $ 32.29 $ 67,160 $ 1,094 $ 4,215 4 Bedroom $ 2,545 $ 48.94 $ 101,800 $ 1,947 $ 41347 5 Bedroom $ 2,844 $ 54.69 $ 113,760 $ 2,276 $ 3,771 Figure 25: Average Rent and Affordability (housing plus utilities) by Size Source: Dupree and Scott, 2013; National Low Income Housing Coalition, 2014 Figure 26 shows the distribution of rent affordability at different income levels using the Seattle - Bellevue AMI. "Yes" means that the average rent is affordable to a household at that income level, adjusting for size, "Limited" means that the average rent is not affordable but there are lower end affordable units, and "No" means that the entire rent range is not affordable. As seen below, a four bedroom home is not affordable for persons with a household income at 80 percent or below of the HFMA AMI. Income Level Number of Bedrooms Studio 1 2 3 4+ Extrememly Low No No No No No Very Low Limited limited Limited Limited No Low Yes Yes Yes Limited No Moderate Yes Yes Yes Yes Limited Middle Yes Yes Yes Yes Yes Figure 26: Distribution of Rent Affordability by Size Source: Dupree and Scott, 2013 Between 2008 and 2012, 85 percent of home sales in Edmonds were three or four bedrooms in size according to County records. According to tax assessor data, the 2012 median sales price for a single family home in Edmonds was $339,975. Assuming a 20 percent down payment and using average rates of interest, taxes, utilities, and insurance as determined by the Federal Housing Funding Board, the monthly payment for this home would be $1,895. For a family to not be cost burdened, they would require an annual income of at least $75,796, which is above the City's median income. Figure 27 shows that the percentage of home sales affordable to each income level has changed between 2008 and 2012. Housing 83 Packet Pg. 254 7.1.c 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Extremely Very Low Low Moderate Middle Low Figure 27: Home Sales Affordability, 2008-2012 Source: Dupree and Scott, 2013 2008 2009 2010 2011 2012 Housing Needs: Edmonds is targeted to grow from a 2013 population of 40,381 to 45,550 by 2035. This translates to an estimated need of 2,790 housing units in the city to accommodate the targeted growth. The Buildable Lands Report for Snohomish County indicates that the majority of this increase will be in redevelopment occurring on multifamily properties, including mixed use projects. Because the City of Edmonds does not construct housing itself, the housing targets are helpful in assessing needs and providing a sense of the policy challenges that exist. Future housing needs will be met by a combination of the housing market, housing authorities, and governmental housing agencies. However, the City of Edmonds can do things to assist in accommodating projected housing needs, such as adjusting zoning and land use regulations. The City may also be able to assist in supporting the quality of housing through progressive building codes and programs for healthy living. Forecasting future housing needs for specific populations and income ranges is difficult. One method to arrive at an initial estimate of housing needs is to take the Edmonds' housing target (2,790) and apply the countywide breakdown for each income group. Data shown in Error! Reference source not found.29 is based on household income from the 5-year American Community Survey in 2007- 2011. The City of Edmonds will take into account local population and housing characteristics when determining housing targets. Housing Total Projected Under 30%AMI 30-50%AMI 50-80%AMI Jurisdiction Housing Unit Housing Need Housing Need Housing Need Growth Need (11% of Total) (11% of Total) (17% of Total) Edmonds 2,790 307 307 474 Figure 28: Projected Housing Need Source: Snohomish County Tomorrow, "Housing Characteristics and Needs in Snohomish County," 2014 84 Packet Pg. 255 7.1.c As previously mentioned, the median age of Edmonds residents is the highest in Snohomish County at 48.1 years compared to 37.5 years countywide (2011-2013 American Community Survey) and second highest of Washington state cities with a population of 25,000 or more. In 2011, the first persons of the Baby Boom generation turned 65 years of age and represent, what demographers project, the fastest growing age group over the next 20 years. An older population will require specific needs if they are to "age in place." In Edmonds, the effects may be particularly strong. Developing healthy, walkable communities with nearby retail and transit options will help an aging population retain their independence. Assisted Housing Availability: In 1995 there were two HUD -assisted developments providing a total of 87 units for low-income, senior residents within the City of Edmonds. This was more than doubled by a new development approved in 2004 for an additional 94 units. Since 1995, 167 assisted care living units have been built in the downtown area, specifically targeting senior housing needs. Although the Housing Authority of Snohomish County did not operate any public housing units within Edmonds prior to 1995, it purchased an existing housing complex totaling 131 units in 2002. The Housing Authority continues to administer 124 Section 8 rent supplement certificates and vouchers within the city. In addition, there are currently 36 adult family homes providing shelter for 187 residents. This is a substantial increase from the 13 adult family homes providing shelter for 66 residents in 1995. Growth Management goals and policies contained in the City's Comprehensive Plan encourage availability of resources to ensure basic community services and ample provisions made for necessary open space, parks and other recreation facilities; preservation of light (including direct sunlight), privacy, views, open spaces, shorelines and other natural features, and freedom from air, water, noise and visual pollution; and a balanced mixture of income and age groups. Land Use policies encourage strategic planning for development and redevelopment that achieve a balanced and coordinated approach to economic development, housing and cultural goals; and encourage a more active and vital setting for new businesses supported by nearby residents, downtown commercial activity and visitors throughout the area. Policies encourage identification and maintenance of significant public and private social areas, cultural facilities, and scenic areas; and maintenance and preservation of historical sites. Commercial Land Use policies encourage identification and reservation of sufficient sites suited for a variety of commercial uses. Housing goals are directed toward providing housing opportunities for all segments of the city's households; supporting existing neighborhoods and preserving/rehabilitating the housing stock; maintaining high quality residential environments; and providing assistance to developing housing for special needs populations, such as senior, disabled and low-income households. These goals are supported by policies which include review of regulatory impediments to control of housing costs and affirmative measures to support construction of housing for protected groups; encouraging expansion of the types of housing available, including accessory dwelling units, mixed use, and multi -family housing; flexible development standards; and review and revision of development regulations, including assessing the feasibility of establishing time limits for permitting; consolidating permitting; implementing administrative permitting procedures and instituting preapplication hearings. Other measures to mitigate potential housing impacts include determining whether any public land is available which could be used to help meet affordable housing targets; development of a strategy plan, including target number of units and development timeline; technical assistance programs or information to encourage housing rehabilitation and development of accessory units; and a strong monitoring program with mid -course correction features (see the discussion below). Housing 85 Packet Pg. 256 7.1.c Strategies to Promote Affordable Housing. In order to respond to the continuing need to provide affordable housing for the community, the City has undertaken a series of reasonable measures to accomplish this goal, consistent with the policy direction indicated by Snohomish County Tomorrow and the Countywide Planning Policies. These reasonable measures or strategies to promote affordable housing include: Land Use Strategies • Upzoning. The City upzoned a substantial area of previously large lot (12,000+ square foot lots) zoning to ensure that densities can be obtained of at least 4.0 dwelling units per acre. The City has also approved changes to its zoning codes to encourage more multifamily development in mixed use areas, especially in corridors served by transit (e.g. Highway 99 along the Swift high capacity transit corridor). • Density Bonus. A targeted density bonus is offered for the provision of low income senior housing in the City. Parking requirements are also reduced for this housing type, making the density obtainable at lower site development cost. • Cluster Subdivisions. This is accomplished in the city through the use of PRDs. In Edmonds, a PRD is defined as an alternate form of subdivision, thereby encouraging its use as a normal form of development. In addition, PRDs follow essentially the same approval process as that of a subdivision. • Planned Residential Development (PRD). The City has refined and broadened the applicability of its PRD regulations. PRDs can still be used to encourage the protection of environmentally sensitive lands; however, PRDs can also be used to encourage infill development and flexible housing types. • Infill Development. The City's principal policy direction is aimed at encouraging infill development consistent with its neighborhoods and community character. This overall plan direction has been termed "designed infill" and can be seen in the City's emphasis and continued work on streamlining permitting, revising codes to provide more flexible standards, and improving its design guidelines. The City is also continuing the process of developing new codes supporting mixed use development in key locations supported by transit and linked to nearby neighborhoods. Conversion/Adaptive Reuse. The City has established a historic preservation program intended to support the preservation and adaptive reuse of existing buildings, especially in the historic downtown center. Part of the direction of the plans and regulations for the Downtown/Waterfront area is to provide more flexible standards that can help businesses move into older buildings and adapt old homes to commercial or mixed use spaces. An example is the ability of buildings on the Edmonds Register of Historic Places to get an exception for parking for projects that retain the historic character of the site. Housing 86 Packet Pg. 257 7.1.c Administrative Procedures Streamlined approval processing. The City generally uses either a Hearing Examiner or staff to review and issue discretionary land use decisions, thereby reducing permitting timelines and providing an increased degree of certainty to the process. The City continues to provide and improve on an extensive array of information forms and handouts explaining its permitting processes and standards. The City has also established standards for permit review times, tailored to the type and complexity of the project. For example, the mean processing time for processing land use permits in 2011 was 36 days, less than one-third of the 120-day standard encouraged by the State's Regulatory Reform act. • Use -by -Right. The City has been actively reviewing its schedule of uses and how they are divided between uses that are permitted outright vs. permitted by some form of conditional use. The City has expanded this effort to include providing clearer standards, allowing more approvals to be referred to staff instead of the Hearing Examiner hearing process. Impact mitigation payment deferral. The City's traffic mitigation impact fees are assessed at the time of development permit application, but are not collected until just prior to occupancy. This provides predictability while also minimizing "carrying costs" of financing. Development Standards • Front yard or side yard setback requirements. Some of the City's zones have no front or side yard setback requirements, such as in the downtown mixed use zones. In single family zones, average front setbacks can be used to reduce otherwise required front yard setbacks. • Zero lot line. This type of development pattern can be achieved using the City's PRD process, which is implemented as an alternative form of subdivision. • Street design and construction. Edmonds has adopted a `complete streets' policy. Street standards are reviewed and updated periodically, taking advantage of new technologies whenever possible. A comprehensive review and update of the city's codes is underway • Alleys. The City has an extensive system of alleys in the downtown area and makes use of these in both mixed use and residential developments. • Off-street parking requirements. The City has substantially revised its off-street parking standards, reducing the parking ratios required for multifamily development and in some mixed use areas, thereby reducing housing costs and encouraging more housing in areas that are walkable or served by transit. • Sanitary Sewer, Water, and Stormwater systems. Innovative techniques are explored and utilized in both new systems and in the maintenance of existing infrastructure. Housing 87 Packet Pg. 258 7.1.c Low -Cost Housing Types • Accessory dwellings. The City substantially revised its accessory dwelling regulations, providing clearer standards and streamlining their approval as a standard option for any single family lot. Mixed -use development. The City has strengthened and expanded its mixed use development approach. Downtown mixed use development no longer has a density cap, and this — combined other regulatory changes — has resulted in residential floor space drawing even with commercial floor space in new developments in the downtown area. Mixed use zoning was applied in the Westgate Corridor, and revised mixed use development regulations have been updated and intensified in the Hospital/Highway 99 Activity Center as well as along Highway 99. • Mobile/manufactured housing. The City's regulation of manufactured homes has been revised to more broadly permit this type of housing in single family zones. Housing Production & Preservation Programs • Housing preservation. The City provides strict enforcement of its building codes, intended to protect the quality and safety of housing. The City has also instituted a historic preservation program intended to provide incentives to rehabilitate and restore commercial, mixed use, and residential buildings in the community. • Public housing authority / Public and nonprofit housing developers. The City supports the Housing Authority of Snohomish County, as evidenced by its approval of the conversion of housing units to Housing Authority ownership. Edmonds is also a participant in the Alliance for Housing Affordability (AHA) in Snohomish County, which is a consortium of cities pooling resources to collectively address housing needs in the county. For -profit housing builders and developers. Many of the strategies outlined above are aimed at the for -profit building market. The City's budget restrictions limit its ability to directly participate in the construction or provision of affordable housing, so it has chosen instead to affect the cost of housing by reducing government regulation, providing flexible development standards, and otherwise minimize housing costs that can be passed on to prospective owners or renters. However, as noted above, the City is also a participant in the Alliance for Housing Affordability in Snohomish County, which is intended to collaborate on housing strategies countywide. Housing Financing Strategies • State / Federal resources. The City supports the use of State and Federal resources to promote affordable housing through its participation in the Snohomish County Consortium and the Community Development Block Grant program. These are important inter jurisdictional efforts to address countywide needs. Housing 88 Packet Pg. 259 7.1.c Jurisdictions face challenges in meeting affordability goals or significantly reducing the current affordable housing deficit. Edmonds is a mature community with limited opportunities for new development and has limited powers and resources to produce subsidized housing on its own. However, it is hoped that Edmonds' participation in joint planning and coordination initiatives, such as the Alliance for Affordable Housing will point the way to new housing initiatives in the future. Housing Goals & Policies Each key goal in this element (or section) is identified by an alphabet letter (for example, "D"). Goals are typically followed by associated policies and these are identified by the letter of the goal and a sequential number (for example, "D.2") Housing Goal A. Encourage adequate housing opportunities for all families and individuals in the community regardless of their race, age, sex, religion, disability or economic circumstances A.1 Consider opportunities for short-term housing that can meet local needs in case of an emergency or disaster. Housing Goal B. Ensure that past attitudes do not establish a precedent for future decisions pertaining to public accommodation and fair housing. Housing Goal C. Provide for special needs populations — such as low income, disabled, or senior residents — to have a decent home in a healthy and suitable living environment, including through the following policies: C.1. Encourage the utilization of the housing resources of the state or federal government to assist in providing adequate housing opportunities for special needs populations, such as low income, disabled, or senior residents. C.2. Work with the Alliance for Housing Affordability and other agencies to: C.2.a. Provide current information on housing resources; C.2.b. Determine the programs which will work best for the community. C.2.c. Conduct periodic assessments of the housing requirements of special needs populations to ensure that reasonable opportunities exist for all forms of individual and group housing within the community. Housing Goal D. Maintain a valuable housing resource by encouraging preservation and rehabilitation of the older housing stock in the community through the following policies: D.1. Support programs that offer assistance to households in need, such as units with low income or senior householders. Housing 89 Packet Pg. 260 7.1.c D.2. Enforce building codes, as appropriate, to conserve healthy neighborhoods and encourage rehabilitation of housing that shows signs of deterioration. D.3. Ensure that an adequate supply of housing exists to accommodate all households that are displaced as a result of any community action. DA. Evaluate City ordinances and programs to determine if they prevent rehabilitation of older buildings. Housing Goal E. Provide opportunities for affordable housing (subsidized, if need be) for special needs populations, such as disadvantaged, disabled, low income, and senior residents through the following policies: E.1. Aggressively support efforts to fund the construction of housing for seniors, low income, and other special needs populations, while recognizing that units should blend into the neighborhood and/or be designed to be an asset to the area and create pride for inhabitants. E.2. Aim for city zoning regulations to expand, not limit, housing opportunities for all special needs populations. Housing Goal F. Provide for a variety of housing that respects the established character of the community. F.I. Expand and promote a variety of housing opportunities by establishing land use patterns that provide a mixture of housing types and densities. F. La. Provide for mixed use, multifamily and single family housing that is targeted and located according to the land use patterns established in the land use element. F.2. Encourage infill development that is consistent with or enhances the character of the surrounding neighborhood. F.2.a. Within single family neighborhoods, encourage infill development by considering innovative single family development patterns such as Planned Residential Developments (PRDs). F.2.b. Provide for accessory housing in single family neighborhoods to address the needs of extended families and encourages housing affordability. F.2.c. Provide flexible development standards for infill development, such as non- conforming lots, when development in these situations will be consistent with the character of the neighborhood and with the goal to provide affordable single family housing. Housing Goal G. Provide housing opportunities within Activity Centers consistent with the land use, transportation, and economic goals of the Comprehensive Plan. G.I. Promote development within Activity Centers that supports the centers' economic activities and transit service. Housing 90 Packet Pg. 261 7.1.c G.l.a. Provide for mixed use development within Activity Centers. G. Lb. Plan for housing that is located with easy access to transit and economic activities that provide jobs and shopping opportunities. G.l.c. Consider adjusting parking standards for housing within Activity Centers to provide incentives for lower -cost housing when justified by available transit service. Housing Goal H. Review and monitor permitting processes and regulatory systems to assure that they promote housing opportunities and avoid, to the extent possible, adding to the cost of housing. H.1. Provide the maximum amount of efficiency and predictability in government permitting processes. H.1.a. Consider a wide variety of measures to achieve predictability and efficiency, including such ideas as: ... establishing time limits for permitting processes; ... developing consolidated permitting and appeals processes; ... implementing administrative permitting procedures; ...using pre -application processes to highlight problems early. H.2. Establish monitoring programs for permitting and regulatory processes. H.2.a. Monitoring programs should review the types and effectiveness of government regulations and incentives, in order to assess whether they are meeting their intended purpose or need to be adjusted to meet new challenges. Housing Goal I. Increase affordable housing opportunities with programs that seek to achieve other community goals as well. I.1. Research housing affordability and program options that address Comprehensive Plan goals and objectives. I.2. Develop housing programs to encourage housing opportunities that build on linkages between housing and other complementary Comprehensive Plan goals. I.2.a. New programs that address housing affordability should be coordinated with programs that address development of the arts, encourage historic preservation, promote the continued development of Activity Centers and transit -friendly development, and that encourage economic development. Housing Goal J. Recognize that in addition to traditional height and bulk standards, design is an important aspect of housing and determines, in many cases, whether or not it is compatible with its surroundings. Design guidelines for housing should be integrated, as appropriate, into the policies and regulations governing the location and design of housing. J.1. Provide design guidelines that encourage flexibility in housing types while ensuring compatibility of housing with the surrounding neighborhood. Housing 91 Packet Pg. 262 7.1.c J.1.a. Incentives and programs for historic preservation and neighborhood conservation should be researched and established to continue the character of Edmonds' residential and mixed use neighborhoods. J. Lb. Design guidelines for housing should be developed to ensure compatibility of housing with adjacent land uses. Implementation Actions and Performance Measures Implementation actions are steps that are intended to be taken within a specified timeframe to address high priority sustainability goals. In addition, the Comprehensive Plan contains a small number performance measures (no more than one per element) that can be used to monitor and annually report on the implementation and effectiveness of the Comprehensive Plan. Performance measures, as identified in the Comprehensive Plan, are specific, meaningful, and easily obtainable items that relate to sustainability and can be reported on an annual basis. They are intended to help assess progress toward achieving the goals and policy direction of each major Comprehensive Plan element. {Note: The measure identified below is specifically called out as matching the above criteria and being important to housing goals and will be reported annually, along with performance measures for other Comprehensive Plan elements. It is not intended to be the only measure that the City may use for housing purposes. Implementation Action: Develop a strategy by 2019 for increasing the supply of affordable housing and meeting diverse housing needs. Performance Measure: Report the number of residential units permitted each year with a goal of reaching 21,168 units by 2035, or approximately 112 additional dwelling units annually from 2011 to 2035. Housing 92 Packet Pg. 263 Attachment: Exhibit 4: AHA Housing Profile for Edmonds 2014 (1487 : Joint Discussion with the Edmonds Planning Board) 7.1.d Acknowledgements Special thanks to all those who helped prepare this profile. City Staff Rob Chave, Planning Director Shane Hope, Development Services Director Alliance for Housing Affordability Kristina Gallant, Analyst Will Hallett, Intern Packet Pg. 265 7.1.d Table of Contents ExecutiveSummary........................................................ iv Maps, Figures, & Tables ................................................. vi Introduction............................................................................. 1 Population and Community............................................3 HouseholdProfiles.................................................................................................................. 8 Existing Housing Stock.................................................10 Subsidized Housing Units: Permanent and Transitional.............................................12 MarketRate Rental Units....................................................................................................13 SharedRental Housing........................................................................................................19 Current Challenges and Opportunities ..........................20 Maps........................................................................................ 22 Appendices.................................................................... 40 Appendix A: Multifamily Rent Comparables by Property, City of Edmonds .......... A 1 Appendix B: Assisted Units by Property, City of Edmonds ........................................... B 1 Appendix C. Single Family Home Sales, 2008-2012......................................................CI Appendix D: Affordable Housing Glossary.................................................................... D 1 AppendixE. Methodology..................................................................................................... 1 Packet Pg. 266 7.1.d Executive Summary The City of Edmonds, currently home to 39,950 people, is projected to accommodate nearly 6,000 new residents by 2035, a dramatic change over the stable population levels the City has seen over the past 20 years. Housing in Edmonds is currently mostly comprised of single family homes, though most growth will have to be accommodated in multifamily development.The City's median income is relatively high compared to other cities in the region, and home values are generally higher as well. Homes are diverse in age, with a significant concentration of units built between 1950 and 1969 compared to the County overall. Currently 38% of Edmonds households are estimated to be cost burdened, meaning they spend more than 30% of their monthly income on rent or home ownership costs. Cost burden is most challenging for those with low incomes, who may have to sacrifice other essential needs in order to afford housing. Other summary statistics are provided below. A Summary of Edmonds by the Numbers Population 39,9501 Total Households 17,3962 Family Households with Minor Children 4,054 Cost -Burdened Households 6,672 Households Earning Less than 50%AMI1 5,322 2012 Median Household Income $73,072 Minimum Income to Afford 2012 Median Home $75,796 Total Homes 17,396 Single Family Homes, Detached or Attached 12,047 Multifamily Homes 6,471 Manufactured Homes 126 Section 8 Housing Choice Vouchers 195 Other Dedicated Subsidized Housing 125 Transitional Units 16 Workforce Housing 201 Total Renter -Occupied Housing Units 5,000 Total Owner -Occupied Housing Units 12,396 Total Vacant Housing Units 1,248 According to 2013 Dupre and Scott data, Edmonds'rental housing market is generally affordable to households earning at least 80% AMI. Households earning between 50 and 80% AMI will find the majority of homes smaller than five bedrooms affordable as well. A limited supply of small units is affordable to those earning between 30 and 50% AMI (Area Median Income for the Seattle -Bellevue metropolitan area). Market rents are not affordable to iv Packet Pg. 267 7.1.d extremely low income households, though this is expected in almost all communities, due to the costs of construction and maintenance in today's market. Shared rental housing is a market rate option for these households, though it will not work for all households, particularly families. A lack of affordable rental housing for extremely low and very low income households is very common, as, in order to operate a property and keep rents low enough in today's housing market, some kind of financial assistance is typically required. Assistance can be ongoing, to make up the difference between 30% of tenants' income and market rents (such units are considered'subsidized' in this report), or be provided as capital funding, reducing overall project costs and making it possible to keep rent levels down (con sidered'workforce' units). Edmonds currently has 320 units of subsidized housing and 201 units of workforce housing. In addition, the City has 16 units of transitional housing. However, with 5,322 households earning less than 50% AMI, there is still a need to increase this supply. The City is pursuing a number of strategies to address this challenge. In 2012, the median sale price for a single family home in Edmonds was $339,975. The estimated monthly payment for this home would be $1,895, including debt service, insurance, taxes, and utilities. For a family to afford this payment without being cost burdened, they would require an annual income of at least $75,796, which is just above the City's median income.' Affordability for 2013 cannot be calculated at this time, but average assessed values suggest that home prices are rising as the housing market continues to recover following the recession, and affordability is retreating. Edmonds has the third highest average assessed 2014 home value in Snohomish County behind Woodway and Mukilteo respectively, at $351,100, which represented a 10.7% increase over 2013.2 Snohomish County Assessor, 2014 Snohomish County Assessor, "Snohomish County Assessor's Annual Report for 2014Taxes , 2014. V Packet Pg. 268 7.1.d Maps, Figures, & Tables Figure 1.1. Total Population, City of Edmonds, 1990-2013.................................................................................3 Figure 1.2. Population Share by Housing Tenure, City of Edmonds & Snohomish County....................4 Table I.I. Cost Burden by Income and Housing Tenure, City of Edmonds & Snohomish County ....... 5 Figure 1.3. Household Share by Income Level, City of Edmonds and Snohomish County....................5 Figure 1.4. Estimated Housing &Transportation Costs as a Share of Income, City of Edmonds & SnohomishCounty....................................................................................................................................................................6 Figure 1.5. Population Pyramid, 2000-2010, City of Edmonds..........................................................................7 Figure 2.1. Age Distribution of Housing Stock, City of Edmonds & Snohomish County......................10 Figure 2.2. Units in Structure by Housing Tenure, City of Edmonds............................................................10 Figure 2.3. Net Newly -Permitted Units, City of Edmonds & Snohomish County.....................................11 Source: Puget Sound Regional Council................................................................................................ 11 Figure 2.4. Newly Permitted Units by Type, City of Edmonds........................................................................11 ..............................................................................................................................................................................................11 Table 2.1. Assisted Units by Income Level Served, City of Edmonds...........................................................12 Table 2.2. Permanent Subsidized Units by Funding Source, City of Edmonds........................................12 Table 2.3. Workforce Units by Funding Source, City of Edmonds.................................................................13 Table 2.4. Renter -Occupied Units by Rent and Unit Size, City of Edmonds (Without Utilities) .......... 14 Table 2.5. Average Rent and Affordability by Size, City of Edmonds (Including Utilities)....................14 Table 2.6. Distribution of Rent Affordability by Size, City of Edmonds.......................................................15 Table 2.7. Average Rents by Size, Single- and Multifamily, City of Edmonds...........................................15 Table 2.8. Affordable Home Sales by Size, City of Edmonds, 2012...............................................................16 Figure 2.5. Home Sale Affordability Gap, 2012, City of Edmonds.................................................................17 Figure 2.6. Home Sale Affordability, 2008-2012, City of Edmonds...............................................................17 Table 2.9.2012 Affordable Home Sales by Type, City of Edmonds ........................................................................................................................................................................................................18 Table 2.10. Size of Homes Sold by Type, 2012, City of Edmonds...................................................................19 Figure 3.1. Income allocation of projected new housing units, City of Edmonds .................................. 20 Map 1.1.Total Population (Block Groups)............................................................................................................. 23 Map 1.2. Average Family Size (Block Groups)...................................................................................................... 24 Map 1.3. Average Household Size (Block Groups).............................................................................................. 25 Map 1.4. Renter -Occupied Housing Units............................................................................................................. 26 Map 1.5.Vacant Housing Units (Block Groups)...................................................................................................27 Map 1.6. Homeowners with Mortgages................................................................................................................ 28 Map 1.7. Very Low -Income Households................................................................................................................. 29 Map1.8. Cost -Burdened Renters.............................................................................................................................. 30 Map1.9. Cost -Burdened Owners.............................................................................................................................. 31 Map 1.10. Housing &Transportation, Percent of Low HH Income...............................................................32 Map 2.1. Voucher Location and Transit Access.................................................................................................... 33 Map2.2. Age of Housing Stock................................................................................................................................. 34 Map 2.3. Condition of Housing Stock..................................................................................................................... 35 Map2.4. Housing Density........................................................................................................................................... 36 Map 2.7. New Single Family Permits by Census Tract, 2011........................................................................... 37 Map 2.8. New Multifamily Permits by Census Tract, 2011............................................................................... 38 Map 2.9. Average Renter Household Size.............................................................................................................. 39 Table E.I. Maximum Monthly Housing Expense by Household Size, Seattle -Bellevue HMFA 2012...I Vi Packet Pg. 269 7.1.d Introduction In Snohomish County's Countywide Planning Policies, Housing Goal 5 states that"the cities and the county shall collaborate to report housing characteristics and needs in a timely manner for jurisdictions to conduct major comprehensive plan updates and to assess progress toward achieving CPPs on housing" Building on the County's efforts in preparing the countywide HO-5 Report, this profile furthers this goal by providing detailed, local information on existing conditions for housing in Edmonds so the City can plan more effectively to promote affordable housing and collaborate with neighboring jurisdictions. This profile will present the full spectrum of its subsidized and market rate housing stock. Permanent settlement in present day Edmonds dates back to 1890, making Edmonds the oldest incorporated city in Snohomish County. Edmonds was born out of homesteading and logging operations in the late 1800's and, through the years, built economic foundations on a host of platforms including milling, shingle splitting, and manufacturing, among others. Today, Edmonds has almost 40,000 residents and over 17,000 households. Edmonds' growth has been modest in recent years (less than 1 % annually), and this trend is expected to continue.The majority of the City's neighborhoods are composed of single family homes, though future growth is likely to follow recent trends emphasizing more multifamily development. Existing multifamily residential developments are focused on major arterials, downtown, and near Highway 99.The Downtown/Waterfront and Highway 99 corridor areas are considered the primary commercial centers of Edmonds, with one smaller but significant center at Westgate (located at the intersection of Edmonds Way and 100th Avenue West). Smaller neighborhood commercial centers are located in several neighborhoods, such as Five Corners, Firdale, and Perrinville. Several affordable housing -specific terms and concepts will be used throughout the profile. Income levels will be defined by their share of"Area Median Income, or AMI. For this report, median income for the Seattle -Bellevue HUD Metro Fair Market Rent Area (HMFA) will be used for AMI because it is the measure HUD uses to administer its programs. Housing agencies typically define income levels as they relate to AMI. These are: • Extremely Low Income - up to 30% AMI • Very Low Income - up to 50% AMI • Low Income - up to 80% AMI • Moderate Income - up to 95% AMI • Middle Income - up to 120% AMI When a household spends more than 30% of their income on housing, it is considered to be "cost burdened", and, if lower income, will likely have to sacrifice spending on other essentials like food and medical care. "Costvburden" is used as a benchmark to evaluate housing affordability. Packet Pg. 270 N Attachment: Exhibit 4: AHA Housing Profile for Edmonds 2014 (1487 : Joint Discussion with the Edmonds Planning Board) V Q 7.1.d Population and Community In 2013, Edmonds was home to an estimated 39,950 people, only slightly higher than its 2000 population of 39,544.3The City's population has been stable since the mid-1990s, when there were several large jumps due to annexations in south and southwest Edmonds. The City is projected to grow at a modest rate moving forward, accommodating an estimated 5,841 additional residents by 2035.This increase would require 2,790 additional housing units, which is near its estimated capacity of 2,646 additional units. Of the current capacity, the vast majority is in multifamily properties, with a high portion through redevelopment 4 Figure 1.1. Total Population, City of Edmonds, 1990-2013 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 O � N M t Ln �O � W a% O N M � Ln kO r` w m O � N c2 ON d\ M ON M ON ON M ON ON O O O O O O O O O O ON d> O O O O O O O CD CD CDO O O O c-- N N N N N N N N N N N N N N Source: Washington State Office of Financial Management, 2013 The 20121 population includes 17,396 households with an average household size of 2.3 people, compared to 2.6 for the County. Of these, 10,997, or 63%, are family' households. Overall, 23.3% of households have children. In Snohomish County overall, 68% of households are families, and 32.5% of households have children.The average family size in Edmonds is 2.8, compared to 3.12 for the county. The average Edmonds renter household is smaller than the average owner household - 2 people per renter household versus 2.4 per owner household.' The share of foreign born residents in Edmonds is similar to the County overall - 13.9% 3 Washington State Office of Financial Management, 2013 4 Snohomish County Tomorrow Planning Advisory Committee,"Housing Characteristics and Needs in Snohomish County", 2014 5 2012 data is used as, at time of writing, it is the most recent ACS 5-year data available 6 Based on the US Census Bureau's definition of family, which "consists of two or more people (one of whom is the householder) related by birth, marriage, or adoption residing in the same housing unit" 7 US Census Bureau; American Community Survey, 2008-2012 3 Packet Pg. 272 7.1.d versus 14.1 % for the County. The population of foreign born residents who are not U.S. citizens is lower in Edmonds than the County - 44% of foreign born residents versus 51 % of foreign born County residents. Residents born in Asia constitute 47% of the foreign born Edmonds population while European residents make up 20% of foreign born residents. 16% of Edmonds residents speak a language other than English in the home and 6% of residents speak English "less than very well", both proportions are lower than the County's numbers.' The share of the population living in rented homes is similar to the share Countywide. 31 % of Edmonds residents and 33% of Snohomish County residents currently live in rented homes. As shown in Figure 1.2, the proportion of homeowners remained relatively constant between 2000 and 2010, increasing slightly from 68% to about 69%.1 36% of Edmonds' population lives in multifamily homes, compared to 31 % across the County (renters and owners combined). The City's vacancy rate is 6.7% compared to 6.4% for the County as a whole.10 Figure 1.2. Population Share by Housing Tenure, City of Edmonds & Snohomish County 100% 80% 60% 40% 20% 0% Edmonds Snohomish County 100% 80% 60% 40% 20% 0% 2000 2010 2000 2010 ■ Owners Renters Owners Renters Source: US Census Bureau, 2000,• US Census Bureau, 2010 The 2012 HMFA AMI for Seattle -Bellevue, which is referenced in this report as a standard for AMI, is $88,000, higher than the County's overall 2012 median income of $68,338. Edmonds 2012 median income is higher than the County AMI at $73,072. However, some economic segments of the City's population could be at risk of being housing burdened. Compared to HUD HMFA AMI and based on 2012 American Community Survey (ACS) 5-year estimates: • 2,638 households, or 15%of Edmonds'total, are considered to be extremely low income, earning less than 30% of area median income (AMI), • 2,684, or 15%, are considered very low income, earning between 30 and 50% of AMI, • 2,604, or 15%, are considered low income, earning between 50 and 80% of AMI, and • 1,773, or 10%, are considered moderate income, earning between 80 and 90% of AMI 8 Ibid. 9 US Census Bureau, 2000; US Census Bureau, 2010 10 US Census Bureau; American Community Survey, 2008-2012 4 Packet Pg. 273 7.1.d A comparison of income distribution in the City and County is presented graphically in Figure 1.3. As shown, Edmonds has a higher percentage of very low income households and households earning higher than middle income than the County as a whole, but lower percentages of every other income group. The combined percentage of extremely low, very low, and low income households is approximately 46%, compared to about 21 % moderate and middle income and 33% above middle income. Note that these percentages are not adjusted for household size due to data constraints. Here, a household consisting of two adults with an income level equal to another household consisting of two adults and three children would both be placed at the same percentage of AMI, even though the larger family would likely be more constrained financially. HUD's AMI calculations include ranges for households sized 1-8 people, and, in this report, sensitivity for household size is used wherever possible, as detailed in Appendix E. Maps 1.8 and 1.9 show the percentages of renter and owner households in each census tract that are cost burdened, meaning that they spend more than 30% of their income on housing. Overall, 38% of households in Edmonds are cost burdened, renters and owners combined. Table 1.1 shows the percentage of each income group that is cost burdened in Edmonds and Snohomish County by Figure 1.3. Household Share by Income Level, City of Edmonds and Snohomish County 40% 35% 30% 25% 20% 15% 10% 5% 0% Extremely Very Low Low Moderate Middle Above Low Middle ■ Edmonds ■ Snohomish County Source: US Census Bureau, American Community Survey, 2008-2012 housing tenure. According to this data, the City's renters are all less likely to be cost burdened compared to renters Countywide, except low income renters. While owners earning less than 50% AMI in the City are more likely to be cost burdened, this relationship reverses above that income level. For both renters and owners, there is a significant drop in cost burden above 50% AMI. This table does not address differences in degrees of cost burden — for example, a household that spends 31 % of its income on housing would be considered cost burdened along with a household that spends 80% of its income on housing." Table 1.1. Cost Burden by Income and Housing Tenure, City of Edmonds & Snohomish County Renters owners All Income Snohomish Snohomish Snohomish Level Edmonds Edmonds Edmonds County County County Extremely 79% 80% 82% 73% 82% 78% Low Very Low 81% 85% 86% 80% 63% 64% Low 29% 28% 46% 72% 47% 65% Moderate 13% 18% 43% 48% 38% 40% 11 Ibid �i Packet Pg. 274 7.1.d Middle 7% 1 5% 1 26% 1 32% 22% 25% Source: US Census Bureau; American Community Survey, 2008 - 2012 HUD's Location Affordability Index uses a number of variables to estimate the affordability of a location including both housing and transportation costs. According to the index, a "regional typical household '2"could expect to spend 49% of its income on housing and transportation if renting or owning in Edmonds. 45% is proposed as a targeted maximum percentage of income to be spent on housing and transportation combined to be affordable according to HUD standards. A low income household,13 however, could expend to spend 71 % of their income on housing and transportation. A regional moderate family may have to devote up to 57% of their income on housing and transportation.14 Housing and transportation affordability estimates for a number of different household types are presented in Figure 1.4. In general, estimates for Edmonds residents are very close to those for the Figure 1.4. Estimated Housing & Transportation Costs as a Share of Income, City of Edmonds & Snohomish County 120% 100% 80% 60% 40% 20% 0% All Households Renters Owners Source: US Dept. of Housing & Urban Development, • Location Affordability Portal, 2013 Median Income HH Moderate Income HH ■ Very Low Income HH ■ Median Income Individual County overall. In either case, it is estimated that owners will generally spend more on housing and transportation than renters, regardless of jurisdiction or household type. The 2012 unemployment rate was 4.2% in Edmonds, compared to 5.9% for the County. For employed Edmonds residents, the mean commute time is 27 minutes, compared with 29 for the County. 71 % of City residents drive to work alone compared with 74% of all County workers. The most common occupations for Edmonds residents are in management, business, science and arts occupations, at 12 Defined as a household with average household size, median income, and average number of commuters in Seattle -Bellevue HUD HMFA 13 Defined as a household with 3 individuals, one commuter, and income equal to 50% AMI 14 US Department of Housing & Urban Development; Location Affordability Portal, 2013 M Packet Pg. 275 7.1.d 49% of the employed population, followed by sales and office occupations, with 25% of the employed population. The two most dominant industry groups employing City residents are educational services, healthcare and assistance industries with 23% of workers, and the professional, scientific, management, administrative and waste industries, with 13% of workers.15 According to the Puget Sound Regional Council, Edmonds is home to 12,449 jobs. The majority of these jobs are in the services sector, with 8,540jobs. 4,918 of those jobs are in healthcare and social assistance and 1,369 jobs are in the accommodation and food service fields.16 Edmonds has 0.7 jobs for every occupied home compared to 1.2 employed people per home. Even assuming all of these people only have one job and only local people are employed locally, this means that a significant portion of the population must commute to work. In actuality, 80% of employed Edmonds residents work outside the City. More than half of these commuters work outside Snohomish County, most likely in King County. Across Snohomish County, there are only .9jobs per occupied home compared to 1.3 employed people per home." The shape of the City's population pyramid, shown in Figure 1.5, offers additional insight into its housing needs and how they may be changing. As shown, between 2000 and 2010 the population of older residents grew and the population of younger residents shrank. As the baby boomer generation continues to retire, every community will see an increase in the share of elderly people, but in Edmonds the effects may be particularly strong - the City's 2012 median age was 46, compared to Figure 1.5. Population Pyramid, 2000-2010, City of Edmonds 90 + 85-89 80-84 75-79 70-74 65-69 60-64 55-59 50-54 45-49 40-44 35-39 30-34 25-29 20-24 15 - 19 10 - 14 5-9 0-4 LI'IJ 2,000 1,500 1,000 500 500 1,000 1,500 2,000 2,500 Source: US Census Bureau, 2000; US Census Bureau, 2010 ■ 2010 2000 15 US Census Bureau; American Community Survey, 2008-2012 16 Puget Sound Regional Council; Covered Employment Estimates, 2012 17 US Census; American Community Survey, 2008-2012; Puget Sound Regional Council; Covered Employment Estimates, 2012 N Packet Pg. 276 7.1.d 37 across the County. Out of all age groups, the greatest increases from 2000-2010 was in residents between the ages of 55 and 65, while the greatest decrease was in residents between 35 and 40. The number of young children is also decreasing. Household Profiles These are the stories of several actual Edmonds households who receive some kind of housing assistance from the Housing Authority of Snohomish County. All names and many nonessential details have been changed to respect their privacy. Beth Beth lives in a two bedroom apartment in Edmonds with her two children. She works full time at a grocery store and makes a total annual income of $21,079, or about $1,757 per month. This translates to an hourly wage just under $11 per hour. With Assistance With her voucher administered through the Housing Authority of Snohomish County (HASCO), Beth pays $462 in rent and $163 in utilities for her two bedroom apartment. After rent and utilities are paid, Beth has $1,132 left over per month to support her family. Without Assistance Without a voucher, Beth's monthly rent obligation would be $1,088, including utilities, more than 60% of her total monthly income. The average rent for a two bedroom unit in Edmonds is $1,066, so finding a significantly more affordable unit could be challenging. Beth could look for a shared living arrangement as a cheaper alternative, however, it would be difficult to find a living situation that would accommodate her and her children. Having two children, downsizing from a two bedroom unit is not a feasible option either. In order to afford her current apartment, Beth would need to find a job that pays more than double her current income —about $43,520 a year, or $21 per hour. Jamie Jamie is an elderly disabled woman living in a one bedroom apartment in Edmonds. Jamie's sole source of income is Social Security payments that provide $8,672 a year, or about $723 a month. With Assistance Jamie receives a voucher through HASCO for $550 toward her monthly rent. The market rent for her one bedroom apartment is $705 per month plus $62 in utilities. After her voucher is applied to her rent, Jamie pays $155 plus $62 in utilities per month. This leaves Jamie with $506 per month to support herself. Without Assistance The market rent for Jamie's home is $767 including utilities, more than her monthly income. If Jamie had to look for an apartment she could afford without a voucher, the most affordable studio apartment she could expect to find would rent for around $550, including utilities, which would still be 76% of her income. Without the means to acquire a job or family or friends who could help, Jamie would have few options without a housing voucher. Dave 8 Packet Pg. 277 7.1.d Dave and his wife live in a two bedroom apartment in Edmonds. Dave works in a local warehouse and his wife receives income from Social Security payments due to a disability. Together, they receive employment and Social Security income totaling $18,044 per year, or $1,504 per month. With Assistance With his voucher, Dave and his wife pay $581 in rent plus $193 in utilities per month. This leaves Dave and his wife with $730 left over for the month. Without Assistance If Dave did not receive a Section 8 Voucher, he would have to pay $1,068 per month for rent and utiIities.This would leave the couple with only $436 per month to spend on food and other essentials. At this rate, Dave would be spending about 70% of his family's income on rent alone. The average rent for a two bedroom unit in Edmonds is $1,097, so finding a market rate apartment of the same size but at a cheaper price than his current apartment could be challenging. At the time of this report, two bedroom apartments for rent in the area range from $777 to $1,916 per month. If Dave were able to rent the cheapest two bedroom apartment in Edmonds, without a voucher he and his wife would still be paying 52% of their monthly income on rent, making them significantly cost burdened. As the most they could afford with their current income would be $450, there are not even any studio units that would be affordable. n Packet Pg. 278 7.1.d Existing Housing Stock The City of Edmonds is located in southwest Snohomish County, bounded to the west by the Puget Sound, east by the cities of Mountlake Terrace and Lynnwood, south by King County, and north by Mukilteo. Edmonds' primary commercial centers are the Highway 99 corridor and the Downtown/Waterfront area.The southern portion of the Waterfront area houses a concentration of businesses as well as the Port of Edmonds, where the Washington State Ferry provides service to the Kitsap Peninsula. The City's neighborhoods are mostly composed of single family homes, which make up 66% of the total housing stock. Multifamily residential developments are located just south and north of the downtown area. As shown in Figure 2.1, the City has a high concentration of homes constructed between 1950 and 1969 compared to the County, and fewer constructed after 1990.11 The number of units projected to accommodate population growth over the next 20 years isjust overthe City's current capacity.The majority of this potential will be in multifamily properties, and nearly half of all potential is in redevelopable parcels.19 Figure 2.2 shows the distribution of renters and owners among different types of housing, with owners in the inner ring and renters in the outer ring. As shown, 85% of homeowners live in single family homes. While 24% of renters also live in single family homes, the next largest group of renters, 22% of the total, live in properties with 20 to 49 units 20 Figures 2.3 and 2.4 provide information on newly permitted units in the City in recent years. Figure 2.3 shows the total number of net newly permitted residential units per year from 2001 to 2012 for both the City and County, with the City on the left axis and the County on the right. Figure 2.4 shows the share of the City's new units composed of single- and multifamily units. Figure 2.1. Age Distribution of Housing Stock, Figure 2.2. Units in Structure by City of Edmonds & Snohomish County Housing Tenure, City of Edmonds 50% 40% 30% 20% 100/ 0% • , Before 1949 1950-1969 1970-1989 1990 or Later ■ Edmonds ■ Snohomish County ■ 1 ■ 2 ■3or4 ■5to9 ■ 10 to 19 ■ 20 to 49 Source: US Census Bureau, American Community Survey Source: US Census Bureau, American 2008-2012 Community Survey 2008-2012 18 US Census Bureau; American Community Survey, 2008-2012 19 Snohomish County Tomorrow Planning Advisory Committee,"Housing Characteristics and Needs in Snohomish County", 2014 20 US Census Bureau; American Community Survey, 2008-2012 10 Packet Pg. 279 7.1.d Figure 2.3. Net Newly -Permitted Units, City of Figure 2.4. Newly Permitted Units by Type, City Edmonds & Snohomish County of Edmonds 250 200 150 100 50 Edmonds Snohomish County 7,000 250 6,000 200 5,000 150 4,000 3,000 100 2,000 50 1,000 0 0 -50 Single Family Multi -family Source: Puget Sound Regional Council Source: Puget Sound Regional Council, 2012 As shown, newly permitted units peaked in 2004 in the City, just before the County did, and crashed during the recession. While newly -permitted units began to recover across the County in 2010, as of 2012 Edmonds had not yet begun to recover at the same pace. As shown in Figure 2.4, newly permitted units in Edmonds since 2001 have primarily consisted of multifamily units.21 For the purposes of this report, Edmonds'housing stock is divided into subsidized rental units, workforce rental units, market rate rental units (both single- and multi -family), and home ownership. Subsidized rental units are targeted toward households with the lowest incomes, typically less than 30% AMI. Populations targeted for subsidized rental units often include the disabled, elderly, and other populations living on fixed incomes with special needs. A subsidized property is one that receives funding, perhaps rental assistance or an operating subsidy, to insure that its residents pay rents that are affordable for their income level. Some properties only apply their subsidy to select units. It is also common for subsidized units to be restricted to certain groups like families, the elderly, or homeless. A subsidized property may have also benefited from workforce -type housing subsidies, and it is also common for just a portion of a property's units to receive an ongoing subsidy. Workforce rental units are targeted to working households that still cannot afford market rents. Workforce rental units and subsidized rental units are both considered "assisted', but differ in several areas.The key difference between subsidized and workforce units is that workforce units have a subsidy "built in"through the use of special financing methods and othertools, allowing (and typically requiring) the landlord to charge less for rent. An example of this would be when a private investor benefits from low income housing tax credits when building a new residential development. In exchange for the tax credit savings, the property owner would have to restrict a certain number of units to a certain income level for a certain period of time. When the owner is a for -profit entity, this often means that rents on restricted units will become market rate units when the period of restriction has ended. While nonprofit owners may also utilize workforce tools for capital funding, they are more likely to preserve restrictions 21 Puget Sound Regional Council, Residential Building Permit Summaries 2012 11 Packet Pg. 280 7.1.d on units longer than required. The distribution of Edmonds'assisted units by income level served, both subsidized and workforce, is presented in Table 2.1. Market rate rental units are the stock of all housing units available for rent in the open market. These are units that are privately owned and whose rents are determined by market supply and demand pressures. A market rate rental unit can also be a subsidized rental unit, as is the case with the Federal Section 8 Housing Choice Voucher (HCV) Program. Section 8 vouchers can be used to rent any unit, as detailed below. Table 2.1. Assisted Units by Income Level Served, City of Edmonds Extremely Low 233 Very Low 79 Low 194 Moderate 2 Total 508 Homeownership units include all single family homes for sale Sources: HASCO, 2014, EHA, 2014 - detached and attached single family homes, condominiums, and manufactured homes. Subsidized Housing Units: Permanent and Transitional Edmonds has 303 units of subsidized housing with a range of rental assistance sources including Section 8 Housing Choice Vouchers (HCVs), HUD Supportive Housing Program, Section 8 Project - Based Vouchers, and the Sound Families Initiative. As of July 2014, there were 195 HCVs in use in Edmonds administered by the Housing Authority of Snohomish County (HASCO) and the Everett Housing Authority (EHA).22 All assisted units and buildings are listed in Appendix B.Table 2.2 shows the distribution of permanent subsidized units by funding source. Families making up to 50% of AMI are eligible for Section Table 2.2. Permanent Subsidized Units 8 housing vouchers; however, 75% of these vouchers are by Funding Source, City of Edmonds limited to those making no more than 30% of AMI. Public Housing Authorities (PHAs) receive federal funds from the US Department of Housing and Urban Development (HUD) to administer the HCV program. HUD sets Fair Market Rents (FMRs) annually and PHAs determine their individual payment standards (a percentage of FMR) by unit bedroom size. The tenant identifies a unit, then the PHA inspects the unit to make sure it meets federal Housing Quality Standards Section 8 Housing Choice Voucher 195 Section 8 Project -Based 98 Voucher HUD Supportive Housing 10 Program Sound Families Initiative 12 and determines if the asked rent is reasonable. If the unit Source: HASCO, 2014 is approved, the tenant pays rent equal to 30-40% of their income, and the PHA pays the difference directly to the landlord. While the voucher amount is set up so that a family does not need to spend more than 30% of their income on housing, including an allowance for utilities, a family may choose to spend up to 40% of their income on housing. This happens most often when the family chooses a home that is larger than the size approved for their voucher. The two PHAs that administer the HCV program in Snohomish County are HASCO and the Everett Housing Authority (EHA). Vouchers issued by both PHAs can be used in Edmonds. Because the number of vouchers a PHA can distribute is limited by the amount of federal funding they receive, the wait for a new applicant to receive an HCV can be extremely long and is usually 22 Housing Authority of Snohomish County, 2014; Everett Housing Authority, 2014 12 Packet Pg. 281 7.1.d dependent on existing voucher holders leaving the program. Until recently, the wait to receive an HCV from HASCO had been about 6 years. Federal funding for the HCV program was frozen during the 2013 budget sequester, at which time HASCO had to close its waitlist. Workforce Housing Edmonds is home to 201 units of workforce housing distributed across 3 properties, all listed in Appendix B. Assisted workforce housing units are defined by the fact that they received some form of one-time subsidy in exchange for rent restrictions. Workforce funding types do not involve ongoing rental assistance, and rents are not tailored to individual household incomes. These subsidies can include: Capital Financing - Low -interest -rate mortgages, mortgage insurance, tax-exempt bond financing, loan guarantees, and pre -development cost reduction financing. Table 2.3. Workforce Units by Funding Source, City of Edmonds Tax Credit 92 Bond 200 Housing Trust Fund 1 Low -Income Housing Tax Credits (LIHTC) —Tax credits tRate and Co provided to developers that can be sold for the Source: HASCO, 2014 purposes of up front debt reduction. Federal, State, and County Grant Programs — Grants provided to local governments from the federal government for construction or renovation of below -market -rate units. Community Development Block Grants and HOME grants are two popular examples Workforce housing in Edmonds has been funded through a variety of sources, including low-income housing tax credits (LIHTC), tax-exempt bonds, and State and County Housing Trust Fund dollars. While the name may suggest otherwise, it is common for developers to use workforce funding sources to funding housing for populations like seniors. Table 2.3 shows the number of workforce units funded per major source in Edmonds, with full information provided in Appendix B. Table 2.3 only includes units that do not have additional rental assistance (Considered'subsidized' in this report), which often also use workforce subsidies as part of their financing. As most workforce properties use more than one funding source, there are units counted multiple times in the different funding categories listed in Table 2.3. Financing for any affordable housing project is often very complicated and can involve an array of public, nonprofit, and private entities. While not currently the case in Edmonds'workforce properties, many workforce housing properties only dedicate a portion of their units for lower income tenants. This is typical of properties developed or rehabilitated by private entities using tax credits or tax-exempt bond financing in exchange for income restrictions on the properties. In those cases, affordable housing requirements are limited to a certain period of time, typically 20 to 30 years, after which time the property owners can increase rents to market rates. Some properties feature both subsidized and workforce units. Market Rate Rental Units There are an estimated 5,000 rental units in Edmonds of every type, from single family homes to large 13 Packet Pg. 282 7.1.d apartment buildings. According to American Community Survey estimates, 3,739 out of 5,000 renter - occupied housing units are in multifamily properties. This compares to 1,904 multifamily units out of 12,396 owner -occupied homeS.23 Table 2.4 summarizes ACS data on the number of units available at certain rent levels by bedroom size in Edmonds. No evidence was found of any market rents below $500, despite ACS data to the contrary.This could be because the ACS Sample may include subsidized units and less formal rent arrangements, such as renting rooms or mother-in-law suites in single family homes or renting from family members that could be more affordable. ACS rent data also does not include utility allowances. Table 2.4. Renter -Occupied Units by Rent and Unit Size, City of Edmonds (Without Utilities) No Bedrooms i Bedroom Units 2 Bedroom Units 3+ Bedroom Less than $zoo 0 18 0 $200 to $299 0 52 10 $300 to $499 0 104 0 27 $500 to $749 101 237 110 $750 to $999 103 786 652 $1,000 or more o 186 1486 Source: US Census Bureau; American Community Survey, 2008-2012 To provide a better idea of what a household looking for a home today could expect to pay in rent and utilities in Edmonds, rent data was obtained from Dupre and Scott. This data, which includes both multifamily and single family rental units, is summarized in Table 2.5 and presented in full in Appendix A. Table 2.5 lists the minimum full time wage to afford each average rent in hourly and annual terms as well as the number of hours one would have to work per week earning Washington State's minimum wage to afford the unit. Table 2.5. Average Rent and Affordability by Size, City of Edmonds (Including Utilities) Average Rent (w/ Utilities) Minimum Income Required Lowest Rent Highest Rent Per Hour Annual Studio $ 833 $ 16.02 $33,320 $ 546 $ 1,187 1 Bedroom $ 887 $ 17.06 $35,480 $ 662 $ 1,521 2 Bedroom $ 1,097 $ 21.10 $43,880 $ 777 $ 1,916 3 Bedroom $ 1,679 $ 32.29 $67,160 $ 1,094 $ 4,215 4 Bedroom $ 2,545 $ 48.94 $101,800 $ 1,947 $ 4,347 5 Bedroom $ 2,844 $ 54.69 $113,760 $ 2,276 $ 3,771 Source: Dupre & Scott 2013, National Low Income Housing Coalition, 2014 Table 2.6, on the following page, shows the affordability distribution of average rents in Edmonds by size. In this table, "Yes" means that the average rent is affordable to a household at that income level, adjusting for household size, "Limited" means that the average rent is not affordable but there are lower end affordable units, and "No" means that the entire rent range is not affordable. As shown, the City's rental housing is generally affordable to households earning at least 80% AMI — the moderate 23 US Census Bureau; American Community Survey, 2008-2012 14 Packet Pg. 283 7.1.d Table 2.6. Distribution of Rent Affordability by Size, City of Edmonds Number of Bedrooms Income Level Studio i 3 4+ Extremely Low No No No No No Very Low Limited Limited Limited Limited No Low Yes Yes Yes Limited No Moderate Yes Yes Yes Yes Limited Middle Yes Yes Yes Yes Yes Source: Dupre and Scott, 2013 income level and above. Average units two bedrooms or less in size are also affordable to low income renters, with a limited supply affordable to very low income renters.There is also a limited supply of three bedroom units affordable to this group. The difference in minimum required income by size between single- and multifamily units is shown in Table 2.7. As shown, multifamily units tend to be more affordable than single family homes. As multifamily units also tend to be smaller than single family homes, there is a lack of larger affordable units. Table 2.7. Average Rents by Size, SIngle- and Multifamily, City of Edmonds Multifamily Ave. Rent 0 Minimum Income Single Family Ave. Rent Minimum Income Studio $833 Low n/a n/a 1 Bedroom $887 Low $1,521 Moderate 2 Bedroom $1,070 Low $1,548 Moderate 3 Bedroom $1,336 Low $1,992 Moderate 4 Bedroom n/a n/a $2,545 Middle 5 Bedroom n/a n/a $2,844 Middle Source: Dupre and Scott, 2013 Even after accounting for the fact that utility allowances are not included in ACS data, the range of rents available in the conventional market is generally higher than that reported in the ACS. Again, this could be explained by the ACS sample including subsidized units and informal rent arrangements. While ACS data is important as it shows what Edmonds renters are actually paying, it does not give an accurate indication of what a typical renter searching for a market rate unit can expect to pay. Home Ownership Between 2008 and 2012,61 % of single family homes sold in Edmonds were three bedrooms in size. 24% of homes sold were four bedrooms in size, meaning that three and four bedroom homes together represented 85% of sales. 9% were two bedrooms and 6% were five bedrooms or larger. This includes freestanding single family homes, common wall single family homes (townhouses), manufactured homes, and condominiums24. 24 Snohomish County property use codes 111, 112, 116, 117, 118, 119, 141, 142, 143 R Packet Pg. 284 7.1.d In 2012, the median sale price for a single family home in Edmonds was $339,975. Assuming a 20% down payment and using average rates of interest, property taxes, utilities and insurance as determined by the Federal Housing Funding Board, the monthly payment for this home would be $1,895. For a family to afford this payment without being cost burdened, they would require an annual income of at least $75,796, which is just above the City's median income.21 Appendix C provides statistics on sales of single family homes from 2008-2012, as well the minimum income necessary to afford the median sale home by year. During that time period, median home sales prices declined by 17%. In 2012 dollars this translates to a difference of more than $33,000 in minimum income required to afford the median home 26The housing market across the region has since begun to recover from the recession. While home sale affordability for 2013 cannot be calculated at this time, Edmonds currently has the County's third highest average assessed residential value. The 2014 average assessed value of $351,100 represented a 10.7% increase over 2013.27 Table 2.8 lists the percentage of 2012 sales of homes of different sizes that are affordable to each income level by home size."Not affordable" means that the minimum income required is higher than the middle income upper cutoff. All of the percentages specify the portion of homes of that size that someone in the particular income group could afford, adjusting for household size as detailed in Appendix E. As shown, there is decreasing affordability as size increases, though moderate and middle income households could theoretically afford the monthly cost of most of the homes sold in 2012. Moderate income is recommended as the minimum ideal household income for home ownership to be a reasonable option. Table 2.8. Affordable Home Sales by Size, City of Edmonds, 2012 Low ery ow ow oderate iddle Not Affordable Total Sales 71-2 12% 17% 57% 73% 85% 15% 60 0% 7% 46% 74% 87% 13% 405 3 0% 4% 21% 54% 78% 22% 165 5+ 0% 3% 23% 49% 69% 31% 35 Source: Snohomish County Assessor, 2014 The"affordability gap" describes situations where there are more households at a given income level than there are housing options affordable to those households. Figure 2.5 displays the percentage of households in Edmonds at each income level compared with the percentage of all home sales in 2012 that each income level could afford. As Figure 2.5 compares the overall income distribution of the City with the affordability distribution of one year, this is a rough approximation, and other factors should be considered in examining home ownership affordability. As shown, there were plenty of sales theoretically affordable for households earning at least 80% AMI in 2012, which is the minimum income required for home ownership. (Moderate income and above) This analysis does not consider 25 Snohomish County Assessor, 2014 26 Ibid 27 Snohomish County Assessor, "Snohomish County Assessor's Annual Report for 2014Taxes , 2014 16 Packet Pg. 285 7.1.d Figure 2.5. Home Sale Affordability Gap, 2012, City of Edmonds 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Extremely Very Low Law Moderate Middle Low us ❑ Households ■ Sales whether or not these income groups are able to access financing, including a down payment, or other barriers to home ownership. There is also sufficient supply for the City's low income households, though home ownership may only be a good choice for certain households in this group. Further, this does not include competition from households above middle income, which comprise 33% of the City's total. Figure 2.6 shows how the percentage of sales affordable to each income level has changed from 2008 to 2012. As shown, affordability improved dramatically for moderate income households during this period, and all other income groups as well. As the housing market continues Figure 2.6. Home Sale Affordability, 2008-2012, City of Edmonds to improve following the recession, affordability for this 100% group may retreat again. While 909% there are affordable options 809% for low income households, 70g° and ownership may be a good 60% ■ 2008 option for certain low income 50% 02009 households (those earning 403% ■ 2010 between 50 and 80% AMI), these 30O° ❑ 2611 households are considered the 2�, exception rather than the rule. 10go ❑ 2612 0% 4- Many of the most affordable Extremely Very Low Low Moderate Middle Low sales were likely only so affordable because they were Source: Snohomish County Assessor, 2014 foreclosed homes sold by banks. 517 Paradise Lane, for example, is a three bedroom home that Wells Fargo Bank sold for $240,000 in 2012. At that price, a household with a minimum income of $46,216 could afford the monthly debt service of around $1,155.This same home sold for $378,000 in 2004, which is well out of reach to the household with the minimum income necessary to afford it in 2012. While low priced foreclosed homes can put home ownership within reach for more households, this is accomplished at the expense of previously displaced homeowners. Additionally, these sales contribute to ongoing uncertainty about market home values. Low income home buyers could also become cost burdened by higher property taxes on these"bargain" homes. Figure 2.7, on the following page, shows how sales have been divided between single family homes, condominiums, and manufactured homes between 2008 and 2012. In Edmonds, condominiums 17 Packet Pg. 286 7.1.d Figure 2.7. Home Sales by Type, 2008-2012, City of Edmonds 1000/0 MENEEMENEV- 9WO 96❑/❑ 94% 9 2❑/❑ 90❑/❑ 88% 2008 2009 2010 2011 2012 ■ Condo ■ Mfg. Home ■ Single Family Source: Snohomish County Assessor, 2014 represent a larger portion of the market than in other cities in Snohomish County. Table 2.9 shows how many sales of each of these three types were affordable to each income level in 2012. Manufactured homes were most likely to be affordable to lower income households, with a dramatically lower median sale price, though there was still a significant number of single family and condominium sales affordable to very low and low income households. The median home sale prices for single family homes and condominiums were also very close to each other in 2012. Table 2.10 shows how many homes were sold in 2012 by type and number of bedrooms. Table 2.9. 2012 Affordable Home Sales by Type, City of Edmonds Single Manufactured Condo Family Home Extremely Low 1 6 0 Very Low 37 0 2 Low 208 0 9 Moderate 171 0 17 Middle 104 0 3 Not 108 0 0 Affordable Median Sale $ 339,975 $8,150 $341,705 Price Source: Snohomish County Assessor, 2014 18 Packet Pg. 287 7.1.d Table 2.10. Size of Homes Sold by Type, 2012, City of Edmonds Bedrooms Single Family Mobile Home Condo Source: Snohomish County Assessor, 2014 Shared Rental Housing A popular market rate affordable housing option is to split housing costs with other roommates. These arrangements include renting a room, suite, or accessory dwelling unit (ADU) from a homeowner living on site. For 8 shared rooms advertised on Craigslist in the City, the monthly cost ranged from $500 to $650, including utilities. While they were more rooms advertised, they did not include an address or cross streets, so it could not be verified that they were actually located within the City. Their rents were generally not outside this range, however. Rents in this range are easily within reach for very low income single individuals, and possibly even extremely low income couples. Individuals seeking roommates are able to discriminate in who they choose to share their housing, however, and often stipulate a preferred gender or bar couples from sharing a room. It may be difficult for families with children and households with disabilities or other special needs to find a suitable shared housing situation. In these cases, a household's ability to find shared housing will likely depend on whether or not they have local connections to help them find understanding roommates. 19 Packet Pg. 288 7.1.d Current Challenges and Opportunities The City of Edmonds is faced with the challenge of accommodating greater growth over the next 20 years than it has seen in the past, requiring an additional 2,790 additional housing units, when the current capacity is only 2,646 additional units. Of the current capacity, the vast majority is in multifamily properties, with a high portion to come through redevelopment.28 In general, the City will see a shift toward more multifamily housing if growth continues as predicted. Edmonds enjoys a higher median income compared to other areas in the County. All the same, assuming that the City's income mix stays constant, it is estimated that 1,257 units, or 55% of the total projected increase, will serve households at or below 50% AMI. The share of projected units by income level is shown in Figure 3.1. According to 2013 Dupre and Scott data, Edmonds'rental housing market is generally affordable to households earning at least 80% AMI. Households earning between 50 and 80% AMI will find the majority of homes smaller than five bedrooms affordable as well.There is a limited supply of small units affordable to those earning between 30 and 50% AMI. Market rents are not affordable to extremely low income households, though this is expected in almost all communities, due to the costs of construction and maintenance in today's market. Cost burden data Figure 3.1. Income allocation of projected new housing units, City of Edmonds 1,535 or 2,000 55% 1,500 1,000 41 % � rr 419 or 15% Projected New Homes Moderate + Above AM I ■ Low AMI ■ Very Low AMI ■ Extremely Low AMI 55%, or 1,257 u nits, at or below 80%AMI supports these conclusions, with a significant reduction in cost burden for both renters and owners at income levels above 50% AMI. Overall, 38% of Edmonds households are cost burdened. Renters and owners earning less than middle income are all less likely to be cost burdened in Edmonds when compared to the County, with the exception of homeowners below 50% AMI who are more likely to be cost burdened.29 In 2012, the median sale price for a single family home in Edmonds was $339,975. The estimated monthly payment for this home would be $1,895, including debt service, insurance, taxes, and utilities. For a family to afford this payment without being cost burdened, they would require an annual income of at least $75,796, which is just 28 Snohomish County Tomorrow Planning Advisory Committee,"Housing Characteristics and Needs in Snohomish County, 2014 29 US Census Bureau; American Community Survey, 2008-2012 Packet Pg. 289 7.1.d above the City's median income.30 Affordability for 2013 cannot be calculated at this time, but average assessed values suggest that home prices are rising and affordability is retreating. At $351,100, Edmonds has the third highest average assessed 2014 home value in Snohomish County after Woodway and Mukilteo, and it represented a 10.7% increase over 2013.31 The age of units in Edmonds is a possible contributing factor to affordability, as the City features a significant stock of homes constructed between 1950 and 1969. As properties are redeveloped to build the denser housing the City needs to accommodate growth, it is likely that a portion of these naturally affordable older units will be replaced with higher priced new units. While preservation of older housing is an effective strategy for affordability, preservation must be balanced with the need to accommodate growth. In addition, the higher priced new units of today will be the quality affordable older units of tomorrow. Edmonds has one of the highest percentages of elderly residents among all Snohomish County cities. According to the ACS estimates, almost 25% of households in Edmonds have individuals 65 years or older.32 In addition to having generally lower incomes, seniors will require different types of housing and services if they desire to age in place. Additionally, as the "baby boomer" generation continues to move into retirement, there will be an increase in the number of people with disabilities as well. To respond to the continuing need to provide affordable housing for the community, the City has undertaken a series of measures and strategies to promote affordable housing including: • Land Use Strategies: upzoning from single family to multifamily zoning, offering density bonuses for low income and senior housing provision, clustering subdivisions, planned residential developments to protect the environment, encouraging infill developments, and promoting conversion/adaptive reuse programs. • Administrative Procedures: streamlined approval processes, updated use -by -right policies, and updated impact mitigation payment deferral. • Development Standards: installed front and side yard setback requirements, zero lot line development, improved street design and construction, off-street parking requirements, and innovative sanitary, sewer, water and storm water systems. • Low -Cost Housing Types: encourage the use of accessory dwellings, cottage houses, mixed -use developments and mobile/manufactured housing. In addition to promoting, adjusting, and providing incentives for these policies where appropriate, the City should continue to monitor their use and evaluate policies to make sure there are not unnecessary regulatory barriers to affordable housing. Additionally, the City could consider adopting a multifamily tax abatement program for certain locations and, when opportunities arise, the City could partner with nonprofit organizations developing housing for households earning below 30% AMI, the income group generally not served by the traditional housing market. 30 Snohomish County Assessor, 2014 31 Snohomish County Assessor, "Snohomish County Assessor's Annual Report for 2014Taxes , 2014 32 US Census Bureau; American Community Survey, 2008-2012 21 Packet Pg. 290 N N Attachment: Exhibit 4: AHA Housing Profile for Edmonds 2014 (1487 : Joint Discussion with the Edmonds Planning Board) C!� V Q 7.1.d Map 1.1. Total Population (Block Groups) Sources: American Community Survey, 2008-2012; Snohomish County Information Services, 2013 / % t'I /• I / I I z l v / < 196thStS 196th St SW �' rn IN 196th St SW i i Main Street j > 41 Qmi r--------------i I � I cj I Population (Block Groups) - r MUGA r, f� City Limits 10s, I 0 - 464 465 - 958 j 959 - 1284 I \ 1285-1553 -- -- — -- a— -- �— --- -- 1554 - 2040 0 0.375 0.75 1.5 Miles Packet Pg. 292 7.1.d Map 1.2. Average Family Size (Block Groups) Sources: American Community Survey, 2008-2012; Snohomish County Information Services, 2013 'uget Drive Street Family Size 0.00 0.01 - 2.15 2.16 - 2.95 2.96 - 3.34 - 3.35 - 4.12 ' City Limits MUGA .I I I S§th St SW i i i i i i Z� I I r--j Lry I I-_ i 196th St SW NEENEEP- all 0 0.375 0.75 1.5 Miles Packet Pg. 293 7.1.d Map 1.3. Average Household Size (Block Groups) Sources: American Community Survey, 2008-2012; Snohomish County Information Services, 2013 .r- I I I I I % '----------7 % I 1 I j 96thstSbv 19$th St SW 196th St SW / I � I i Main Street i L------------ I i I I--- I Household Size 0.00 - 1.70 I d I 1.71 - 2.30 I I-_ 2.31 - 2.77 I i 2.78 - 3.42 _ I r City Limits -_f --------L --- -------------- r MUGA-------25 0 0.375 0.75 1.5 Miles Packet Pg. 294 7.1.d Map 1.4. Renter -Occupied Housing Units Sources: American Community Survey, 2008-2012; Snohomish County Information Services, 2013 C n Renter -Occupied Homes (By Block Group) 0% - 7% 8% - 17% ,5■M bV JL MR SW 196th St SW I I I 18% - 27% 28%-41% i I ' _ 42% - 72% r- City Limits r= MUGA 0 0.375 0.75 1.5 Miles Packet Pg. 295 7.1.d Map 1.5. Vacant Housing Units (Block Groups) Sources: American Community Survey, 2008-2012; Snohomish County Information Services, 2013 I I I I I I j I � I I"- 7 i" i I i " 1 Z •1 Ig i sthStsW 19�th St SW 196th St SW i i i" Main Street I L" CA " �1 I Vacant Homes j (By Block Group) Fq, 0% - 2% F i 3% - 7% I s 1 8% - 10% I j 11%- 19% 20% - 25% j 1 r ' City Limits I \ r MUGA - ------------------- 0 0.375 0.75 1.5 Miles Packet Pg. 296 7.1.d Map 1.6. Homeowners with Mortgages Sources: American Community Survey, 2008 - 2012; Snohomish County Information Services, 2073 i F- -----------7 i" i" i" i� i � Q Ig � sth St 19¢th St SW 196th St SW � I � I i" Main Street I L� i a' 3�i• ------------ �i ----1 I I Mortgaged Homes 0% s 1%-64% I ! 65% - 73% 7 i 74% -79% 1 80% - 95% r_T City Limits __—_—_ r_t MUGA ------------------- 0 0.375 0.75 1.5 Miles Packet Pg. 297 7.1.d Map 1.7. Very Low -Income Households Sources: American Community Survey, 2008 - 2012; Snohomish County Information Services, 2013 Households <50%AMI 0% - 12% 13% - 20% 21%-33% 34% - 46% 47% - 68% City Limits MUGA I I I I I I I I I I rn I j I j I j / I �•, , F- J. i/ i i i i• i i �l I 196th St SW 196th St SW 0 0.375 0.75 1.5 Miles Packet Pg. 298 7.1.d Map 1.8. Cost -Burdened Renters Sources: American Community Survey, 2008 - 2012; Snohomish County Information Services, 2073 P Cost -Burdened Renters 0% 1%- 35% 36% - 52% 53% - 78% _ 79% - 100% r_r City Limits r MUGA Street 796t6 St S(V 0 0.375 0.75 1.5 Miles Packet Pg. 299 7.1.d Map 1.9. Cost -Burdened Owners Sources: American Community Survey, 2008 - 2012; Snohomish County Information Services, 2013 j I I I I j I •-------- / �• I /• I i z 1 / > i i 796th S tsIV I IP-6th St SW 196th St SW i i ;• Main Street I L• � ¢ S I I Cost -Burdened Owners - .I I-Q - - 'co - 0% - 10% 11%-28% 29% - 36% I I 37% - 48% j 1 49% - 65% I - -r_1- City Limits �.�----------- - =r MUGA - v ------ 31 0 0.375 0.75 1.5 Miles Packet Pg. 300 7.1.d Map 1.10. Housing & Transportation, Percent of Low HH Income Sources: US Housing & Urban Developme nt, 2013; Snohomish County Information Services, 2012 r I I 1 j I ----- % I !� I i z l % > < Puget Drive 196th St SW 196th St SW 1 � I � I i' Main Street j L, 41 Percent of Income 51% - 58% 59% - 65% I � --- j 66% - 73% I �� dM 74%-81% � 1 82% - 100% I 1 — �_� City Limits —� — —,_!- MUGA 0 0.375 0.75 1.5 Miles Packet Pg. 301 7.1.d Map 2.1. Voucher Location and Transit Access Sources: HASCO 2014; Snohomish County Community Transit, 2014; Snohomish County Information Services, 2013 • • �GG r—i • • so • • • the t � i • • 1 66th St SW • 0 0.375 0.75 1.5 Miles Packet Pg. 302 7.1.d Map 2.2. Age of Housing Stock Sources: Snohomish County Assessor, 2012, Snohomish County Information Services, 2012 la i 314 0 0.375 0.75 1.5 Miles n 196th St SW Year Built 1872 - 1904 1905 - 1918 1919-1934 1935 - 1948 1949 - 1957 1958 - 1964 1965 - 1972 1973 - 1983 1984 - 1997 1998 - 2013 s;r City Limits MUGA Packet Pg. 303 7.1.d Map 2.3. Condition of Housing Stock Sources: Snohomish County Assessor, 2014, Snohomish County Information Services, 2013 V 196th St SW 1 1 1 1 1 1 1 1 1 0 0.375 0.75 1.5 Miles Packet Pg. 304 7.1.d Map 2.4. Housing Density Sources: American Community Survey, 2008 - 2012; Snohomish County Information Services, 2073 I j I I I I � I �r I------- -� i i� % I � I 196 h s I r tsIV 196th St SW 196th St SW � I I i Main Street I / L_ r; o� Housing I I Units/Acre (By I I Block Group) F 0.0-1.4I_7 1.5 - 3.0 d � 3.1 - 4.3 I j 4.4 - 6.6 I � 6.7 - 11.7 City Limits j r: r� MUGA------�� --- ---- — ------------- ------ 0 0.375 0.75 1.5 Miles Packet Pg. 305 7.1.d Map 2.5. Net Single Family Permits by Census Tract, 2011 Sources: Snohomish County Information Services, 2012; PSRC, 2011 I I I I J I % I t ----- i� o� .I96thsts �V 19�th St SW r 196th St SW I � I Main Street I > --------- si I -------------- m' Net Newly- I Permitted Units by _� I -5-0 1-2 L' �) I L 3-4 — 5-8 ra-1 � —_IJ City Limits �\ 'r MUGA _----------- -------------------- y 1 r 1 1 1 1 1 137 0 0.375 0.75 1.5 Miles Packet Pg. 306 7.1.d Map 2.6. Net Multifamily Permits by Census Tract, 2011 Sources: Snohomish County Information Services, 2012; PSRC, 2011 I j I j I I � I IN L---------- 7 i• % % I � I --i i �• I i /• l % s Ig6 r h StS W 196th St SW 196th St SW � I i Main Street I / L_ r; ----------------, o, ?i I m I Net Newly- j I Permitted Units by--� j Tract F �- -4 q� d -3-0 I i I � 2-8 J City Limits MUGA 0 0.375 0.75 1.5 Miles Packet Pg. 307 7.1.d Map 2.7. Average Renter Household Size Sources: American Community Survey, 2008 - 2012, Snohomish County Information Services, 2013 I I I I I I j I � I — •" I-- ' I------- i� i7� I Z •1 Igs r hstsW 19�th St SW 196th St SW � I � I i Main Street I L" a' 3A.%" I Cn mac, k I Average H H Size - I Renters -- O 0.00 - 1.65 I r I a j 1.66 - 2.18 f 2.19 - 2.68 I I 2.69 - 3.73 3.74 - 7.42 I 1 r City Limits I \ .�.�t-______-_-_ ___ r M_-__ UGA 0 0.375 0.75 1.5 Miles Packet Pg. 308 M Attachment: Exhibit 4: AHA Housing Profile for Edmonds 2014 (1487 : Joint Discussion with the Edmonds Planning Board) v Q 7.1.d Appendix A: Multifamily Rent Comparables by Property, City of Edmonds Units in 4:20+ 2010 $1,035 $ 152 $1,187 Low 420+ 1975 $682 $ 152 $834 Low 4:20+ 1975 $690 $ 152 $842 Low 4:20+ 1975 $685 $ 152 $837 Low 420+ 1965 5425 S 152 5577 Very Low 4:20+ 1985 $793 $ 152 $945 Low 3:4-19 1975 5850 S 46 S896 Low Ilm 1Bd-Rent 19fi5 $fi89 $ 965 $850 $1 1965 $785 S 1945 $810 $ 1965 1775 $ 1945 :650 $ 945 619 $ 1965 $670 $ 1985 5800 $ 1985 5725 $ 975 $760 $ 2010 $1,207 $ 1985 $710 $ 985 $825 S 1975 5744 $ 965 $695 $ 975 $78fi $ 975 $700 $ 1975715 $ 19755 $705 $ 1975 5735 $ 965 $710 $ 1985 $860 S 1900 $1,350 $ 1975 $755 $ 945 $750 $ 1965 $710 $ 1945 $800 $ 1945 $631 $ $860 Low 5912 Low $956 Low $981 Low 5837 Low $712 VeryLow $681 Very Low $732 Very Low9 $971 Low $787 Very Low $931 Low $1,378 Moderate 5881 Low $887 Low $915 Low $757 VeryLow 5957 Low $871 Low $88fi Low $876 Low $797 Very Low $881 Low $1,031 Low $1,521 Moderate 5817 VeryLow 5812 VeryLow $772 Very Low $862 Low 5693 VeryLow 4:20+ 196S $770 420+ 1965 $950 4:20+ 196 $1,050 4:20+ 1945 $795 420+ 1945 5725 4:20+ 1945 $845 3:4-19 1975 $810 4:20+ 1985 $955 3:419 1975 $925 4:20+ 1975 $820 420+ 2010 $1,325 4:20+ 1985 $770 420+ 1975 $932 4:20+ 1975 $891 4.20+ 1975 $750 420+ 1975 5795 4:20+ 1975 $885 420+ 1965 $795 4:20+ 1985 $957 1:SF 1945 $1,150 3:4-19 1945 $850 3:419 1965 $840 3:4-19 1945 $985 3:4-19 1945 $900 3:419 1945 $839 2:2-3 1945 5925 Minimum Units in Minimum Units in Minimum Units in Minimum 2/2-Rent Utilities Total _ Aqe 3/1-Rent Utilities Total _ _.. Aqe 3/2-Rent Utilities Total _ Aqe 4Bed-Rent Utilities Total _ 191 $961 VeryLow 4:20+ 196S $870 $191 $1,061 Low 4:20+ 196S $985 77 $1,027 Low 420+ 1965 5875 $77 $952 Very Low 420+ 1965 51,050 191 $1,241 Low 3:4-19 1985 $1,015 $77 $1,092 Low 4:20+ 1945 $1,000 191 $98fi Very Low 4:20+ 19fi5 $925 $77 $1,002 Low 4:20+ 1975 $976 77 $802 VeryLow 4:20+ 1965 $1,025 $191 $1,216 Low 420+ 1965 $875 77 $922 Very Low 4:20+ 2010 $1,431 $191 $1,622 Moderate 1:SF 1945 $1,400 77 $887 Very Low 3:4-19 196 $895 $77 $972 Very Low 1:SF 1945 $1,895 191 $1,146 Low 420+ 1985 $1,050 $191 $1,241 Low 1:SF 1945 $1,595 77 $1,002 Low 420+ 1985 5925 577 $1,002 Low 1:SF 1945 51,650 191 $1,011 Low 4:20+ 1985 5875 577 $952 Very Low 1:SF 1965 $1,375 191 $1,516 Moderate 420+ 1975 $950 $77 $1,027 Low 1:SF 1945 $1,250 191 $961 Very Low 420+ 1965 $880 $77 $957 VeryLow 1:SF 1945 $1,395 191 $1,123 Low 4:20+ 1975 5992 $191 $1,183 Low 1:SF 1945 $1,250 191 $1,082 Low 4:20+ 1975 $975 $191 $1,166 Low 3:4-19 1945 $1,400 191 5941 Very Low 4:20+ 1975 $840 $191 $1,031 Low 3:4-19 1945 $1,100 191 $986 Very Low 4:20+ 1975 $850 $77 $927 VeryLow 77 $962 Very Low 4:20+ 19. $1,028 $191 51,219 Low 191 $986 Very Low 1:SF 1945 $1,725 $191 $1,916 Middle 191 $1,148 Low 3:419 1975 $700 $77 $777 VeryLow 191 $1,341 Low 1:SF 1900 $1,195 $191 $1,386 Low 77 5927 Very Low 3:419 1975 $850 577 5927 Very Low 77 $917 Very Low 2:2-3 1965 $1,475 $77 $1,552 Moderate 77 $1,062 Low 2:2-3 1945 $1,495 $191 $1,686 Moderate 77 5977 Very Low 1 2:2-3 1945 $1,200 5191 $1,391 Low 77 $916 Very ow 77 St.002 Low 220 $1,205 Low 94 $1,144 Low 94 51,094 Very Low 220 $1,196 Low 220 $1,095 VeryLow 220 $1,620 Low 220 52,115 Moderate 220 $1,815 Moderate 220 $1,870 Moderate 220 $1,595 Low 220 $1,470 Low 220 $1,615 Low 220 51A 0 Low 94 51,494 Low 94 51,194 Low 4:20+ 19fi5 $1,06fi $ 220 $1,286 Low 420+ 1965 $1,050 $ 94 $1,144 Low 4:20+ 1985 $1,200 $ 220 51,420 Low 3:4-19 1985 $1,100 $ 94 $1,194 Low 4:20+ 1965 $910 5 220 $1,130 VeryLow 4:20+ 1985 $1,293 $ 220 51,513 Low 1:SF 1945 $2,200 $ 220 $2,420 Middle 1:SF 1965 $1,695 5 220 51,915 Moderate 1:SF 1965 $1,800 5 220 52,020 Moderate 1:SF 1945 $3,995 $ 220 $4,215 Not Affordable 1:SF 1945 $1,495 $ 220 $1,715 Moderate 1:5F 1945 $1,395 $ 2' 51,fi15 Low 1:SF 1945 51,595 $ 220 51,815 Moderate 1:5F 1945 52,400 $ 220 $2,620 Middle 1:5F 1945 $1,395 $ 220 $1,615 Low 3:4-19 1975 51,000 $ 94 $1,094 VeryLow 3:4-19 1975 $2, 195 5 94 $2,289 Middle 3:419 1965 51,200 $ 94 51,294 Low 2.2-3 2000 $1,425 $ 220 $1,645 Low 2:2-3 2000 $1,425 $ 220 $1,645 Low 2:2-3 1945 $1,295 $ 94 $1,389 Low 1:SF 2000 $2,250 5 220 $2,470 Middle 1:SF 1975 $1,675 $ 220 51,895 Moderate 1:SF 1975 $1,975 $ 220 $2, 195 Middle 1:SF 1975 $1,995 $ 220 $2,215 Middle 1:SF 1985 $1,400 5 220 $1,620 Low 1:SF 1945 $2,200 $ 247 $2,447 Middle 1:SF 1965 $1,700 $ 247 $1,947 Moderate 1:SF 2000 $2,100 $ 247 $2,347 Moderate 1:SF 1975 $1,995 $ 247 $2,242 Moderate 1:SF 1975 $2,295 $ 247 $2,542 Middle 1:SF 1975 $2,000 $ 247 $2,247 Moderate 1:SF 1990 $1,895 5 247 $2,142 Moderate 1:SF 2000 $4,100 $ 247 $4,347 Not Affordable 5 Bedroom �+ tits in Minimum ildinis Age 56ed-Rent Utilities Total Income +� 1:S1 1945 12,400 $ 276 $2,676 Middle 1:SF 1945 $2,000 $ 276 $2,276 Moderate 1:SF 2000 $3,495 $ 276 $3,771 Not Affordable 1:5F 1975 $2,395 $ 27fi $Z671 Middle O 1:5F 2000 $2,550 $ 276 $2,826 Middle 'y ci 2 O i ti 00 r r N O E W L O O L a tM c .y 7 O 2 Q 2 Q r.+ x w c m E z a Packet Pg. 310 7.1.d Appendix B: Assisted Units by Property, City of Edmonds PROPERTY NAME ADDRESS EutLeoWely Very Low Low Moderate SUBSIDIZED UNITS WORKFORCE UNITS POPULATION 5ER RIDING SOURCFJ =5TREET Section 8 Housing Choice Various Various 122 33 21 2 178 Public (HASCO) Vaious HUD Section 8 Housing Choice Vouchers Vouchers (HASCO) Section 8 Housing Choice Various Various 14 2 1 17 Public (EHA) Various HUD Section 8 Housing Choice Vouchers Vouchers (EHA) Aurora House 20903 70th Ave W 27042000302700 16 16 Public (HASCO) Mentally III Bond Ballinger Court Apts. 22707 76th Ave. W 27042900308400 28 64 92 Private Nonprofit (SHAG) Seniors Tax Credit, Bond Edmonds Highlands 23326 Edmonds Way 00555300100300 108 12 108 Public (HASCO) Family Section 8 Project -Based Vouchers, Bond, Sound Families McKinney House 19515 73rd Ave W 27041700303300 5 5 Private Nonprofit (Compass Mentally III HUD Supportive Housing Program Health) Section 8 Project -Based Voucher, Tax Credit, Olympic View Apartments 303 Howell Way 27032600100300 43 43 Public (HASCO) Seniors Bond, County Housing Trust Fund, State Housing Trust Fund Section 8 Project -Based Voucher, Tax Credit, Sound View Apartments 417Third Ave S 27032600100500 43 43 Public (HASCO) Seniors Bond, County Housing Trust Fund, State Housing Trust Fund Tri-level House 8629196th St SW 27041800309900 5 5 Private Nonprofit (Compass Mentally III HUD Supportive Housing Program Health) Zeigen House 20208 73rd Ave W 00400600001400 1 1 Private Nonprofit (Compass Mentally III State Housing Trust Fund, County Housing Trust Health) Fund a B1 Packet Pg. 311 7.1.d Appendix C: Single Family Home Sales, 2008-2012 2008 2009 2010 2011 2012 Number of Sales 416 517 577 586 666 Average Sale Price $ 465,736 $ 409,870 $ 404,634 $ 359,465 $ 383,157 Median Sale Price $ 411,000 $ 355,000 $ 346,500 $ 315,000 $ 339,975 Median Sale Price Home Affordability 2008 2009 2010 2011 2012 Mortgage Amount $ 328,800 $ 284,000 $ 277,200 $ 252,000 $ 271,980 Interest Rate 6.09% 5.06% 4.83% 4.58% 3.66% Monthly PITI Principal + Interest $ 1,990 $ 1,535 $ 1,459 $ 1,289 $ 1,246 Property Taxes $ 343 $ 296 $ 289 $ 263 $ 283 Insurance $ 130 $ 112 $ 110 $ 100 $ 108 Utilities $ 269 $ 269 $ 276 $ 281 $ 258 TOTAL $ 2,463 $ 1,943 $ 1,858 $ 1,651 $ 1,637 Minimum Annual Income $ 98,522 $ 77,730 $ 74,315 $ 66,044 $ 65,468 in 2012 Dollars $ 105,061 $ 83,186 $ 78,247 $ 67,411 First Quartile Sale Price Home Affordability 2008 2009 2010 2011 2012 Mortgage Amount $ 264,000 $ 240,000 $ 218,305 $ 192,000 $ 200,000 Interest Rate 6.09% 5.06% 4.83% 4.58% 3.66% Monthly PITI Principal + Interest $ 1,598 $ 1,297 $ 1,149 $ 982 $ 916 Property Taxes $ 275 $ 250 $ 227 $ 200 $ 208 Insurance $ 105 $ 95 $ 86 $ 76 $ 79 Utilities $ 269 $ 269 $ 276 $ 281 $ 258 TOTAL $ 2,247 $ 1,911 $ 1,739 $ 1,539 $ 1,462 Minimum Annual Income $ 89,867 $ 76,444 $ 69,566 $ 61,557 $ 58,470 in 2012 Dollars $ 95,832 $ 81,810 $ 73,247 $ 62,831 C1 Packet Pg. 312 7.1.d Appendix D: Affordable Housing Glossary Affordable Housing: For housing to be considered affordable, a household should not pay more than 30 percent of its annual income on housing.This includes all costs related to housing - rent, mortgage payments, utilities, etc. AMI: Area Median Income. The measure of median income used in this report is that of the Seattle -Bellevue HMFA.This measure is used in administering the Section 8 voucher program in Snohomish County. Cost -Burdened: Households that spend more than 30 percent of their income on housing. Extremely Low Income: Households that make up to 30 percent of AMI. Fair Market Rent: HUD determines what a reasonable rent level should be for a geographic area, and sets this as the area's fair market rent. Section 8 voucher holders are limited to selecting units that do not rent for more than fair market rent. HMFA: HUD Metro FMR Area Low Income: Households that make up to 80 percent of AMI. Median Income: The median income for a community is the annual income at which half the households earn less and half earn more. Middle Income: Households that make up to 120 percent of AMI. Moderate Income: Households that make up to 95 percent of AMI. PHA: Public Housing Agency Section 8: HUD's Section 8 Housing Choice voucher program. Qualifying households can take their voucher to any housing unit which meets HUD safety and market rent standards. HUD funds are administered by PHAs. Severely Cost -Burdened: Households that spend more than 50 percent of their income on housing. Subsidized Rental Unit: A unit which benefits from a direct, monthly rent subsidy.This subsidy will vary to ensure that a household does not spend more than 30% of their income on housing. Section 8 Housing Choice Vouchers are an example of a direct rent subsidy. Very Low Income: Households that make up to 50 percent of AMI. Workforce Rental Housing: Workforce rental units have rents which are set in order to be affordable to households at certain income levels. While a household may need to have income below a certain level to apply for a workforce rental unit, the rent level does not adjust to their actual income. A property may feature units with rents affordable to households with 50% AMI, D1 Packet Pg. 313 v N Attachment: Exhibit 4: AHA Housing Profile for Edmonds 2014 (1487 : Joint Discussion with the Edmonds Planning Board) V Q 7.1.d Appendix E: Methodology Affordability - Adjustment for Household Size Where it is indicated that housing cost affordability is assessed adjusting for household size, several factors are considered. First, using HUD standards, the appropriate size range that could inhabit the housing unit in question is determined. For example, the appropriate range for a 2 bedroom unit would be 2-4 people. Next, the cutoff income levels are averaged across the household size range, and this average is used for comparison. To assess whether or not a 2 bedroom unit is affordable to extremely low income households using this method, one would first average the extremely low cutoff levels for 2-, 3-, and 4-person households. For 2012, these levels were $21,150, $23,800, and $26,400.Their average is $23,783. A household with this income can afford to spend no more than $595 per month on housing. If the unit in question rents for less than this amount, then one can say that, on average, it is affordable to extremely low income households, adjusting for household size. Table E.1, below, shows the maximum a household at each income level can afford to spend on housing per month by household size. Table E.1. Maximum Monthly Housing Expense by Household Size, Seattle -Bellevue HMFA 2012 HMFA Overall Extremely Low $455 $520 $585 s650 $703 $755 s8o6 $859 s650 Very Low $759 s868 $976 si,o84 $1,171 $1,258 $1,345 $1,431 si,o84 Low $1,128 $1,289 $1,450 s1,610 $1,740 s1,869 s1,998 $2,126 $1,734 Moderate $1,442 s1,648 s1,855 $2,059 $2,225 $2,389 $2,556 $2,719 $2,059 Moddle $i,821 $2,082 $2,343 $2,601 $2,811 $3,018 $3,228 $3,435 $2,601 Source: US Department of Housing & Urban Development, 2012 Home ownership affordability Home ownership affordability was calculated using similar techniques to the California Association of Realtor's Housing Affordability Index. First, property sale data was acquired from the Snohomish County Assessor, and single family home sales in Everett were separated. Next, the monthly payment for these homes was calculated using several assumptions: • Assuming a 20% down payment, the loan amount is then 80% of the total sale price • Mortgage term is 30 years • Interest rate is the national average effective composite rate for previously occupied homes as reported by the Federal Housing Finance Board • Monthly property taxes are assumed to be 1 % of the sale price divided by 12 • Monthly insurance payments are assumed to be 0.38% of the sale price divided by 12 Packet Pg. 315 7.1.d Using all oftheseassumptions,the month lypaymentisthesurn of principal and interest;taxes;and insurance. Household Income Levels Area Median Income, or AMI, is an important part of many housing affordability calculations. In Snohomish County, HUD uses the Seattle -Bellevue HMFA median income as AMI. This is recalculated every year, both as an overall average and by household size up to 8 individuals. Standard income levels are as follows: • Extremely low income: <30% AMI • Very low income: between 30 and 50% AMI • Low income: between 50 and 80% AMI • Moderate income: between 80 and 95% AMI • Middle income: between 95 and 120% AMI Household Profiles Information on households was gathered from Section 8 Housing Choice Voucher data from both the Housing Authority of Snohomish County (HASCO) and Everett Housing Authority (EHA). All names have been changed as well as many other nonessential details to protect privacy. rel Packet Pg. 316 7.1.e Chair Lovell referred to the list of highlights (Page 7 of the Summary Memorandum) and noted that 56% of those earning less than $49,999 rated the ease of travel by public transportation highly compared to only 24% of those earning $100,000 or more. He commented that these responses track with people who have higher incomes, have lived in Edmonds longer and are older. Mr. Doherty pointed that this group of people do not typically rely on public transportation as much. Perhaps they may perceive it is not easy to use because they do not use. Board Member Cheung commented that sometimes Edmonds is generalized as being an older community. He asked if this perception was indicative to the primary demographics of the respondents. Mr. Doherty answered that there was a good representation across all age cohorts. He pointed out that fewer people in the 55+ cohort responded that Edmonds was a good place to retire than in the younger group. Chair Lovell asked if all of the detailed statistics would be made available to the community when the study is rolled out at the open house. Mr. Doherty replied that the information is already accessible via the City's website, and the City issued a press release relative to the summary findings. The study was also covered on My Edmonds News. PREPARING FOR JOINT CITY COUNCIL/PLANNING BOARD MEETING Chair Lovell reviewed that, at their last meeting, the Board discussed the results of a preparatory meeting that he and Vice Chair Rubenkonig had with Ms. Hope to discuss the agenda for the upcoming joint Planning Board/City Council meeting on September 6th. He recalled that Ms. Hope encouraged the Board Members to review information that was prepared by Snohomish County's Alliance for Housing Affordability, as well as the Housing Element contained in the City's Comprehensive Plan. She suggested, and he concurred, that the goals and policies called out in the Housing Element should be the focus of the joint discussion. Chair Lovell specifically referred to the last section, which identifies an implementation action and performance measure for evaluating the City's progress towards achieving its goals and policy direction. He asked if the City has been tracking the number of residential units permitted each year. Mr. Chave replied that the Building Division reports on housing on a monthly basis, and the Board can extract data from this report to contribute to the metric for the Housing Element. He pointed out that housing information is also reported to the Washington State Office of Financial Management, and they produce estimates on population changes on a yearly basis. Board Member Cloutier recalled that the last time the Board talked about metrics for measuring the City's progress towards achieving its housing goals and policies was in 2010. Since that time, he conducted a web search to learn how other jurisdictions make their metrics available. Board Member Monroe asked if the Board has previously discussed how to get affordable housing on a regional basis and improve transportation partnerships with the City's regional neighbors rather than doing it all on a local basis. Vice Chair Rubenkonig said she and Chair Lovell discussed this concept with Ms. Hope, who indicated that Snohomish County's approach is to make sure affordable housing is provided, and one way to address this need is to look at road network improvements. However, more specifically, the Board is being asked to look at Edmonds. Although infrastructure is in place to support affordable housing, it seems that the majority of affordable housing is located outside of Edmonds. She agreed that one strategy could be for the City to work more closely with neighboring jurisdictions to address the need. Affordable housing will not be possible in many areas of Edmond, so it will be important to take advantage of and improve upon the affordable housing opportunities that are provided in neighboring communities by improving connections. Chair Lovell recalled that, at their last meeting, the Board discussed Ms. Hope's recommendation that they look at housing from two perspectives: What can be done to create more opportunities and an environment that encourages the development of affordable housing and what can be done to force the development affordable housing. He voiced concern that simply creating opportunities for affordable housing might not be enough without the ability to force it upon future redevelopment. Board Member Cloutier clarified that affordable housing is only one subset of the housing issue. While affordability needs to be addressed as part the mix of solutions, the discussion must also include other potential strategies such as retrofitting existing buildings and encouraging opportunities for residents to age in place. He pointed out that the goals in the Housing Element of the Comprehensive Plan read more like strategic goals, and each has a set of policies the City could use to implement them. What is missing is prioritization on which strategies should be pushed harder than others. He suggested Planning Board Minutes August 24, 2016 Page 5 Packet Pg. 317 that the joint meeting discussion should focus on the goals and policies of the Comprehensive Plan, specifically seeking feedback from the City Council relative to prioritization. Once they identify the policies they want to focus on, they can create metrics to measure the City's progress. As progress is measured, the City can create a follow up plan as necessary. Vice Chair Rubenkonig suggested that the joint meeting discussion could focus on the housing needs of a segment of the City's vulnerable population such as housing that allows people to age in place. This group could be used as a focus for addressing the housing strategies. She specifically suggested the discussion could focus on the following Housing Goals: Housing Goal C. Encourage the utilization of the housing resources of the state or federal government to assist in providing adequate housing opportunities for special needs populations, such as low income, disabled, or senior residents. Housing Goal E. Provide opportunities for affordable housing (subsidized, if need be) for special needs populations, such as disadvantaged, disabled, low income, and senior residents. Housing Goal F. Provide for a variety of housing that respects the established character of the community. Vice Chair Rubenkonig suggested that the Board could focus on potential regulatory changes and the City Council could consider possible incentives that would encourage the type of development that meets the needs of the vulnerable populations. She said she views strategies that allow people to age in place as one way to promote affordable housing. Board Member Robles asked if Vice Chair Rubenkonig is suggesting that "aging in place" should be used as a proxy for affordable housing. In other words, if they serve that need, they will, in fact, be serving the entire need. Vice Chair Rubenkonig acknowledged that addressing the needs of the elderly would not necessarily address the more general need for more affordable housing opportunities. Board Member Cloutier emphasized that, in order to solve problems, the Board must first identify the problems and then prioritize them. The Housing Element contains a number of goals, policies and strategies, and the ones they choose to focus on should be data driven. He reminded the Board that the survey indicated that older people feel that housing is less affordable, which indicates there is a concern that they will not be able to stay in the community. This survey information could be considered a data point. At the request of Board Member Monroe, Vice Chair Rubenkonig explained the concept of "aging in place." As people age, their physical, economic and social circumstances change and they may find they no longer have the physical and/or economic ability to remain in their current homes or even in their communities. The concept is to create strategies that result in housing opportunities for this segment of the population, such as accessory dwelling units. She said studies show that people live longer and are happier if they can remain in their communities. Board Member Robles added that one strategy for "aging in place" is to split a fairly large house into two units, where the aging person lives on one floor and rents the other space for additional income. He expressed his belief that the strategies should be aimed at economic incentives that allow the citizens of Edmonds to act in their own best interest. While these types of strategies would not count towards meeting the City's statistical requirements for housing, they would benefit the existing citizens rather than just turning the property over to a developer. He suggested that incentives should be aimed towards what people can do in their community rather than towards developers. Mr. Chave referred the Board to the memorandum prepared by Ms. Hope, in which she recommended that the joint meeting agenda include a 90-minute discussion about developing a Housing Strategy and the remaining time could be spent soliciting direction from the City Council on other topics (Highway 99 redevelopment, 5 Corners redevelopment, Edmonds Marsh progress, railroad crossing alternatives, and Civic Field master planning). He reviewed that because time will be limited, Ms. Hope recommended the Board identify a few key questions they would like to discuss relative to housing and not get into too many details. For example: Should the Board be involved with the Housing Strategy that is promised in the Comprehensive Plan? If so, should the Strategy start getting developed sooner than 2019? Should the Housing Strategy provide a framework that includes both data and recommendations for addressing housing issues? While the Housing Strategy is to focus on increasing the supply of affordable housing and meeting diverse housing needs, should it prioritize particular issues or population groups? Planning Board Minutes August 24, 2016 Page 6 Packet Pg. 318 7.1.e In addition to the questions outlined in the memorandum, Mr. Chave suggested it might be helpful to review the goals contained in the Housing Element of the Comprehensive Plan to determine if some should be prioritized over others. Board Member Cheung reminded the Board that one of the overarching goals of the Housing Element is to accommodate the anticipated growth by providing a variety of housing options. In addition, there are goals to address the housing needs for diverse levels of income. Mr. Chave said affordability is only one component of addressing the City's diverse housing needs. Aging in place is another component that addresses both demographics and affordability. He acknowledged that housing is a complex subject, and he cautioned against diving too far into the details without a strategic overview of the issues and implementation strategies, as well as direction on prioritization. Board Member Cheung asked if an Accessory Dwelling Unit (ADU) would count as an additional housing unit. He said he would like to explore the possibility of allowing detached ADUs, particularly for people who want to age in place. Mr. Chave answered that ADU's could help address the issue of affordability by allowing a homeowner to subsidize housing costs, and they could also provide a different housing type. However, they would not change the density equation. Currently, the code defines ADUs in such a way that makes them part of an extended family situation, which means that only one family can live on the property. A "family" is defined in the code as up to five unrelated people. The fact that an ADU is constructed on the property does not change the requirement. If the code is changed to allow two families to live on the property (one in the house and another in the ADU), you are essentially allowing duplexes in the single-family zones. Board Member Robles suggested that the City could revise the definition of "family." Mr. Chave acknowledged that is possible, but cautioned that there would be implications that must be considered. Board Member Cheung said he would be interested in gauging the public's general support for the concept of detached ADUs. Mr. Chave cautioned that attached ADUs would be an easier argument to make than detached ADUs, and the public may be willing to support the concept as long as the definition of "family" is maintained. Once you cross over to allow more than one family to live on a single- family residential property, he suspects there will be significant neighborhood concerns. He explained that although ADU permits are straightforward and there is no appeal process, there is still a lot of skepticism from surrounding neighbors. He emphasized that it is important to have a clear definition of "family" in order to address enforcement issues that come up. Mr. Chave pointed out that expanding the code to allow detached ADUs without changing the definition of "family" would not really address the density issue, but it could address other aspects of the housing such as affordability, different housing styles and/or living arrangements, aging in place, etc.) He suggested that the City needs to be strategic when addressing density. He reminded the Board that the Westgate Plan was intended to include more residential density, and that is one of the goals of the Highway 99 Study, as well. The City currently has enough density to accommodate anticipated growth, so it is not necessary, at this time, to density the single-family neighborhoods. However, he acknowledged there may be other reasons to consider ADUs to meet certain housing needs. Mr. Chave suggested that the joint meeting discussion could focus on the goals called out in the Housing Element of the Comprehensive Plan, which cover a broad spectrum of issues. The intent of the discussion would be to identify the goals they want to actively pursue. This would allow the City to move forward with a Housing Strategy that sets out a plan for accomplishing the goals. He noted that there is a lengthy list of housing strategies the Board and City Council could consider. It may be valuable to gauge whether the City Council would be amenable to considering other options, in addition to those the City has already implemented. Vice Chair Rubenkonig asked who would moderate the joint meeting, and Mr. Chave answered that, typically, the Mayor would moderate the meeting, but he will not be available on September 6th. Therefore, it is likely the Council President will lead the meeting on behalf of the City Council. However, the Board Chair will likely have an opportunity to encapsulate the Board's discussion by introducing a few thoughts to start off. Vice Chair Rubenkonig asked staff to clarify the land -use strategies to promote affordable housing, as listed on Page 90 of the Housing Element. She asked if staff could map where upzoning has occurred and if there is a size criterion to qualify for a density bonus. She also asked how small of a parcel can be developed as a Planned Residential Development (PRD) and if there are areas in Edmonds where infill development could occur. Mr. Chave pointed out that the density bonus would only apply to multi -family development. He also said "infill development" is a generic term, and typically occurs on multi -family Planning Board Minutes August 24, 2016 Page 7 Packet Pg. 319 7.1.e zoned properties that are currently developed as single-family residential. He said it would be very difficult to map where infill development has and can occur. Vice Chair Rubenkonig asked if the Conversion/Adaptive Reuse Strategy would apply more to commercial properties than residential properties, and Mr. Chave said the strategy can have a broad application and could include converting single-family homes into multiple units. He said it would also be difficult to map these changes. Mr. Chave suggested that the joint meeting could include a review of the land -use strategies on Page 90 of the Housing Element, as well as a discussion about how well each one is working. The list could then be tweaked as appropriate and other strategies could be added. He acknowledged that it will not be possible to reach conclusions on the list of strategies at the joint meeting. The purpose of the Housing Strategy is to evaluate the different strategies, match them with the Comprehensive Plan goals, and identify other strategies the City hasn't yet tried. To create the Housing Strategy, it will be necessary to review all of the data and information that has been assembled and identify the goals they want to achieve. This approach will allow them to focus on the needs, adjust and/or expand the list of strategies, and identify the metrics that will be used to gauge the success of the strategies. Board Member Cloutier asked if the Housing Strategy would be done by City staff or if an outside consultant would be hired. Mr. Chave answered that the project may require help from a consultant, which means it will have budget implications. He reminded the Board that a Housing Strategy is high on the City Council's agenda, and it was also identified in the Strategic Action Plan (SAP) as a high priority. Given the current status of projects such as Highway 99 and 5 Corners, it is not likely that the Housing Strategy can be completed in 2017, but it could be started in 2017 and finished in 2018. This schedule would still be well ahead of the 2019 date. Board Member Cloutier suggested there are things the City could do in the meantime while waiting to hire a consultant to work on the Housing Strategy. This could include amendments to the Development Code to address ADUs and PRDs. Mr. Chave agreed and said the City could also update its Multi -Family Residential (RM) zoning provisions. Currently, the bulk requirements are the same across all of the RM zones, and the only thing that is different is density. Because the bulk standards are the same, the buildings also look the same. Independent of the Housing Strategy, the Board could ask the City Council to evaluate the different RM zones to see if the regulations could be tweaked. Also, Mr. Chave reminded the Board that staff is working with a consultant to introduce stronger design standards for the RM zones. If the design standards are improved, perhaps density would become much less important. Board Member Cloutier expressed his belief that reviewing the RM zone bulk standards at the same time as the design standards are being created would have an impact on affordability, as well as meeting the Growth Management Act requirements for additional units to accommodate growth. Mr. Chave agreed and noted that these changes would not impact single-family neighborhoods, either. Board Member Cheung referred to upzoning, which is listed as a land use strategy to promote affordable housing. He asked what the main objections would be to allowing development lots to be smaller. Mr. Chave explained that the number of units allowed on a property is based on zoning. While one strategy is to change the zoning for a certain area to allow smaller lot sizes, it is important to recognize that change would not happen all at once. He said Snohomish County used another interesting approach where existing lots that were 1.5 times the minimum lot size required could be developed as a duplex. Many of the areas that were annexed more recently into the City were developed with duplexes because they were slightly larger lots. He summarized that there are different ways to address infill and density. However, there will likely be push back because people typically do not like change. Board Member Cheung said he has often heard the argument that changing zoning will decrease property values. Mr. Chave said people tend to believe that allowing more units will decrease the value of the existing homes and change the character of the neighborhood. Upzoning is not something the City has tried to do. Board Member Cheung asked if there is evidence to support the claim that property values would decrease, and Mr. Chave answered that it depends upon the character of the neighborhood. A change in zoning might be subtler in newer neighborhoods and more noticeable in older neighborhoods with oversized lots. He summarized that, to date, the City has taken a very cautious view of zoning changes in the single- family neighborhoods because it can have very unexpected results. They have tried to focus more on multi -family zones where they can get more "bang for their buck." Board Member Cloutier reviewed the handout he prepared for the Board's discussion, which outlines potential housing metrics that could be used to evaluate each of the goals. He noted that a list of other resources was provided at the bottom of the page for the Board Member's information. The overall community/region metrics dashboard example from southern Planning Board Minutes August 24, 2016 Page 8 Packet Pg. 320 7.1.e Arizona includes a website for showing the metrics to the public in a simple and graphic way. The Metrics for Affordable and Sustainable Housing from the Federation of American Scientists provides a study paper about affordable housing across the board, focusing on affordable and sustainable housing and what metrics can be used. He encouraged the Board Members to review the links, which may help them pick the "low -hanging fruit" that can be addressed before the Housing Strategy has been completed. He suggested they could ask the City Council the following questions: • What are some opportunities to improve Edmonds' housing stock today? • What is the goal for affordable housing? • What is the goal for the coming year to accommodate the housing goals identified in the Comprehensive Plan? • What type of units should the City focus on? Chair Lovell agreed with Mr. Chave that the joint meeting should follow the approach outlined in Ms. Hope's memorandum. In preparation for the meeting, he encouraged the Board Members to carefully review the Housing Element of the Comprehensive Plan. While the City Council will likely take the lead in the discussion, the Board will have an opportunity to seek direction as to what it should focus on over the coming year. The Board could seek feedback with respect to amending the RM zoning standards to create greater opportunities and perhaps incentive for property owners to redevelop. They could also discuss opportunities for public/private partnerships to redevelop properties along Highway 99. Mr. Chave commented that a number of things can impact housing. For example, subdivision regulations can discourage the retention of existing housing stock if there is not sufficient flexibility. As currently written, the code may not allow a property owner to subdivide an oversized lot into two or three lots without tearing down the existing home, and existing homes usually provide more affordable housing options. One housing strategy could be to tweak the existing subdivision code to allow variation in lot size, while still achieving the same density overall, but with flexibility in how the lots are arranged so the existing house can remain. The PRD concept could also be used as an effective housing strategy. Mr. Chave advised that the packet that is prepared for the joint meeting will provide a link to the Housing Element of the Comprehensive Plan as well as the Snohomish County Alliance for Housing Affordability Report that contains useful data. REVIEW OF EXTENDED AGENDA Chair Lovell reviewed that the September 14th agenda will include continued discussion on the Civic Center Master Plan and an update on the Land Division Code. The September 28th agenda will include a discussion on the Highway 99 Subarea Plan and a presentation on the 2017 Capital Improvement Plan and Capital Facilities Plan. Based on feedback the Board receives from the City Council at the joint meeting, they can begin working on housing issues in the near future. In addition, Council President Johnson expressed interest in the Board starting its work on the 5 Corners Subarea Plan as early as October 26th The initial discussions will include a review of the work performed by the University of Washington students. PLANNING BOARD CHAIR COMMENTS Chair Lovell announced that the Mayor's Task Force studying railroad crossing alternatives will provide a report to the City Council later this fall. There will be no report to the Planning Board. PLANNING BOARD MEMBER COMMENTS There were no Board Member comments. ADJOURNMENT The Board meeting was adjourned at 9:04 p.m. Planning Board Minutes August 24, 2016 Page 9 Packet Pg. 321 7.1.e move goals and policies forward. For example, the Planning Board will need to do follow-up work relative to the walkability assessment and sea level rise. I I 111 M WI [!' Chair Lovell announced that the Planning Board and City Council would meet in a joint work session on September 6th at 7:00 p.m. to discuss issues relative to growth and housing. He recalled that at their March retreat, they talked about growth in Edmonds and how housing is a significant part of the equation. There are number of components to the issue including buildability, the status of housing in Edmonds, single-family residential versus multi -family residential, different types of housing needs, affordable housing, homelessness, etc. He advised that he and Vice Chair Rubenkonig met with the Shane Hope, Development Services Director, to discuss the large list of subject matter. Ms. Hope agreed to prepare an introductory memorandum for the City Council and Planning Board to use as a catalyst to get the discussion going. The intent is to tie the discussion back to the goals and policies contained in the Comprehensive Plan. He encouraged the Board Members to review the Housing Element contained in the Comprehensive Plan, as well as the report that was prepared in 2014 by the Housing Affordability Alliance of Snohomish County. Both of the documents should be available to the Board and City Council Members, as well as the public, on line. Chair Lovell referred the Board to the memorandum that he prepared with the help of Vice Chair Rubenkonig. He specifically referred to Item B of the memorandum, which provides a list of discussion items that have been identified in the past as potential ideas for accommodating more housing in Edmonds. Some of the items on the list, if successful, would contribute to the City's ability to meet its growth targets, as outlined in the Growth Management Act (GMA). As the Board reviews the items on the list, he invited them to share their thoughts on if and how they would help the City implement the goals and policies in the Comprehensive Plan. He also invited the Board members to identify other potential topics of discussion. Vice Chair Rubenkonig pointed out that the Comprehensive Plan goals and policies focus on the supply of affordable housing and meeting diverse housing needs. The items in the memorandum were not sorted into categories, but it may be appropriate to do so to help focus the discussion. Board Member Robles suggested that the discussion should include all of the housing possibilities that exist (intentional living, tech -enhanced housing, Airbnb, opportunities for the people to age in place, etc.) and not just those that address Comprehensive Plan goals and policies. Vice Chair Rubenkonig acknowledged that most of the items on the list, if pursued, would go towards providing the housing units needed to meet the GMA requirements. However, some of the items would also address homelessness and other citizen needs for housing options, which is separate from meeting the GMA. She asked the Board Members to provide direction as to whether the discussion should be dedicated to concepts that allow the City to meet the GMA goals or also include concepts that are of interest to citizens. Board Member Robles reminded the Board that its charter is to represent the citizens and what they need to fulfill their lifestyles. Vice Chair Rubenkonig reviewed that the Comprehensive Plan was put together to represent the needs of the citizenry. Therefore, the Board should look at the supply of affordable housing and address the diverse housing needs of the community's citizens. Board Member Crank suggested that the joint meeting discussion should focus on specific goals, and then the various concepts associated with the goals could be divided into those that are intended to meet the GMA requirements and those that address community needs. However, it is important to recognize that many of the concepts will overlap and serve both purposes. She reminded the Board of her earlier suggestion that the housing discussion must also consider post -retirement housing needs such as assisted living, senior housing, etc. Many aging citizens want to downsize from their single-family homes, but they still want to stay in the Edmonds community. In addition, new residents from out of state and out of the country are moving to Edmonds with their extended families, and the City must provide housing options to serve their needs, as well. Chair Lovell said that in the discussion with Ms. Hope, he noted that that there are things the City can do to enhance opportunities to create a wide range of and more housing capacity. There are also things the City can do to force this to happen. One approach is to make it happen and another is to create the conditions by which it is allowed to happen. He Planning Board Minutes August 10, 2016 Page 4 Packet Pg. 322 expressed his belief that issues related to housing type, housing diversity and housing affordability are distinctly different than the housing requirements associated with meeting the GMA growth targets. Board Member Cloutier recalled that when the Board last discussed the Housing Element of the Comprehensive Plan, they talked about the need to create metrics by which success could be measured. Coming up with a lot of great ideas will not result in success. The City must clearly identify what they want to happen and create a mechanism for measuring success. For example, if one of the goals is to provide opportunities for people to age in place, then there should be a way to measure whether or the not the City's housing policies are having an impact. If they are looking to create new housing units, then the occupancy rate could be used as a measure of success. Rather than throwing out answers, they should identify the right goals first. Vice Chair Rubenkonig recalled that the last time the Board discussed housing, they were reminded that the GMA is looking for 2,500 additional housing units in the City by a certain year. They were also told that the buildable land numbers are promising for meeting that target number. Perhaps the discussion should focus on what the buildable land numbers does not address: affordable and diverse housing needs. Board Member Cloutier agreed that the City currently has capacity to provide for future housing needs. Rather than having policies and regulations in place that allow the growth to happen, the City must have policies and regulations in place to make it happen. The City already has zoning regulations that allow the housing to be built, but it is not being built. The question of why should be the focus of the discussion. The Board asked Mr. Chave to frame a set of questions based on the current regulations and what the City wants to accomplish. Board Member Cloutier agreed to compile a list of issues and possible metrics for measuring and monitoring to determine if the City's goals are being met. The Board agreed to discuss the issue again at their August 24th meeting. REVIEW OF EXTENDED AGENDA In addition to a continued discussion on August 241h about the agenda for the joint City Council/Planning Board work session, the Board will also have a discussion about the Land Division Code Update. The September 14th meeting agenda will include an introduction to the Land Use Procedures and Code Update, as the City Council recently approved a resolution providing some direction to the Planning Board. PLANNING BOARD CHAIR COMMENTS Chair Lovell did not provide any additional comments. PLANNING BOARD MEMBER COMMENTS Board Member Robles reported on his experience judging the sand castle contest at Marina Beach Park. He also announced that he had a paper published with the National Association of Insurance Commissioners titled, "Launching Technology in Insurance." Board Member Crank reminded the Board of the Taste of Edmonds Festival that will take place on August 12th through 14th She noted that a few Board Members will work as volunteers at the event. Board Member Crank advised that the consultant provided a presentation on the Civic Center Master Plan at the last City Council Meeting. Comments were made by City Council Members and members of the audience relative to the Taste of Edmonds being at the Civic Center in future years. She cautioned that there may be another round of the Board engaging with the business community and neighborhood regarding this particular issue. Vice Chair Rubenkonig requested additional information about the City's Volunteer Picnic that is scheduled for September. Mr. Chave agreed to forward information to the Board Members. ADJOURNMENT The Board meeting was adjourned at 8:04 p.m. Planning Board Minutes August 10, 2016 Page 5 Packet Pg. 323 7.1.f CITY OF EDMONDS PLANNING BOARD RETREAT Summary Minutes March 9, 2016 Chair Lovell called the meeting of the Edmonds Planning Board to order at 6:00 p.m. in the Brackett Room, Yd Floor of City Hall, 121 — 5 h Avenue North. BOARD MEMBERS PRESENT Philip Lovell, Chair Carreen Rubenkonig, Vice Chair Matthew Cheung Alicia Crank Nathan Monroe Daniel Robles Valerie Stewart BOARD MEMBERS ABSENT Todd Cloutier Samuel Kleven (Student Representative) READING/APPROVAL OF MINUTES STAFF PRESENT Kemen Lien, Senior Planner Diane Cunningham, Administrative Assistant Patricia Taraday, City Attorney Rosa Fruehling-Watson, City Attorney VICE CHAIR RUBENKONIG MOVED THAT THE MINUTES OF FEBRUARY 24, 2016 BE APPROVED AS AMENDED. BOARD MEMBER STEWART SECONDED THE MOTION, WHICH CARRIED UNANIMOUSLY. ANNOUNCEMENT OF AGENDA The agenda was accepted as presented. PUBLIC COMMENT Natalie Shippen, Edmonds, provided copies of pages from Carmel, California's sign code and suggested the Planning Board consider the information as they review and update the City's Sign Code. Chair Lovell announced that the Board's op first public hearing on the Sign Code is scheduled for April 271h, which will be followed by more discussion and possibly a a recommendation to the City Council on May 11'h. io THE BOARD RECESSED THE MEETING FOR DINNER AT 6:10 PM, AND THE MEETING RECONVENED AT 6:20 z PM. w TRAINING: PRESENTATION AND DISCUSSION WITH THE CITY ATTORNEY(S) ON THE PUBLIC RECORDS ACT E M Ms. Taraday and Ms. Fruehling-Watson led a discussion regarding the Public Records Act, which included the following: Q Packet Pg. 324 7.1.f A public record is defined as "any writing containing information relating to the conduct of government or the performance of any governmental or proprietary function that is prepared, owned, used or retained by any state or local agency, regardless of its physical form or characteristics." Personal notes written by Board Members that relate to the conduct of government or the business at hand could be considered a public record. For example, if the note remains in the Board Member's control and he/she is able to discard it at their pleasure, it would be considered more of a personal record, but notes that are intended to be circulated amongst others would be considered a public record. Because interpretation of the law is complicated, Board Members were encouraged to contact the City Attorney with specific questions. Public records can include written documentation, audio, sound, voice messages, presentations, etc. It is not limited to what many people consider an actual record. When identifying whether a record is public or not, it is important to consider whether the record was created while acting in the capacity of a Board Member or if it was created under a different, personal context. Purely personal emails between Board Members that have no relation to the conduct of government would not be considered public records. However, once you mix the record to contain both personal and public information, it becomes entirely a public record and it would not be possible to redact the personal information. • The courts have agreed that records created on personal devices or accounts can be public records. The courts look at the content, rather than the origin or source of the record. For example, depending on the content, text messages can be public records. They must be retained so they can be disclosed if asked. The City is in the process of adopting a text messaging policy, which will limit the use of text because it is too hard to manage those types of records. • The City has an obligation to assess when a public records request has been made. Public records request can come in a variety of sources, including requests made by the public during a public meeting. If a public records request is received, in any format, the City has an obligation to respond to the request within 5 days. If a Board Member receives a public records request, it should be immediately forwarded to the City Clerk, who has been trained to coordinate responses. This approach will allow each request and response to be accurately recorded. If the City receives a request pertaining to Planning Board activity, Board Members will be notified. • There is no charge for public records, and many local agencies are concerned that the staff time involved with large, complicated requests is not being compensated for in any way. Currently, there is no reasonable standard and/or limitation built into the Act. Therefore, the City is obligated to respond to every request, regardless of how large. • There are very few situations in which a public records request can be denied. Many are simple and the documents can be provided within five days. Other times is it necessary to request clarification from the requester, and having a conversation with the requester can often result in a narrower scope. When a large request is received, the City must assess how long it will take to fulfill the response. It's important to keep an open dialogue with the requester and keep him/her updated on the City's progress and turn over documents on a regular basis. • If a request is received pertaining to Planning Board business, a reasonable approach would be for Board Members to search all devices that could have been used to create relevant documents. It would be a good idea to provide the City Clerk with a summary documenting the places you looked and the information that was found. If a document meets the defmition of a public record and there is no applicable exemption, it must be disclosed, no matter how embarrassing it may be. • While there are certain exemptions that address the issue of privacy, the standards are very high. The City Clerk will review these issues on a case -by -case basis and consult with the City Attorney. It was cautioned that the exemption must be applied very judicially. x w • Revised Code of Washington (RCW) 40.14.020 outlines the specific retention guidelines that govern the period of time c that local agencies must retain particular records and is based on the content, function and purpose of the record. There E was a lengthy discussion about the City of Edmonds' retention schedule for various documents, which follows the RCW guidelines and can be found in the City Clerk's Office or online. It was suggested that Board Members clean out their M in -boxes and delete documents that do not have a retention value. Otherwise, the search can be cumbersome when a Q Planning Board Minutes March 9, 2016 Page 2 Packet Pg. 325 7.1.f request comes in. Although emails that go through the City's server are retained by the server, senders should keep the records, as well. • There are consequences (penalties) to the City for failing to respond in a timely manner, failing to produce all relevant documents, or failing to do a proper search. There are also penalties associated with the failure to retain records for the required amount of time. Chair Lovell summarized that the important things for the Board to remember relative to the Public Records Act are to: • Use the City's website for Planning Board communication. • Avoid conducting "chain" meetings via email. • Anytime more than three Board members are together would constitute a quorum and qualify as a public meeting. • Once the minutes are approved in their final form, they become part of the public record. The Council relies heavily on the Board's minutes for information. DISCUSSION: GROWTH PATTERNS AND STRATEGIES FOR EDMONDS Chair Lovell reviewed that the focus of this discussion is related to growth in Edmonds, and specifically the issue of housing. He briefly reviewed the attachments in the Staff Report, which include a presentation on future growth, Comprehensive Plan discussion of growth and capacity, adopted Comprehensive Plan Housing Element, Revised Code of Washington addressing affordable housing programs, a presentation by the Alliance for Housing Affordability (AHA), and housing performance measures from the City of Kirkland. Chair Lovell briefly reviewed the statistics that were provided in the Development Services Director's presentation on future growth pertaining to demographics, income levels, and housing types. He said it is also important to keep in mind that the City is nearly built out, and there is very little land available to produce substantial new housing. He sees the City's options to be fairly limited. They can rezone fringe areas that are currently single-family to multi -family, encourage infill development, rezone large areas of land, or create zoning standards that allow for and encourage multi -family housing on Highway 99. Board Member Crank stressed the need to consider the specific housing needs of the people who will be moving to Edmonds in the future. She reviewed how the City of Mountain View changed its zoning code over a period of time to allow the types of development that was desired and needed to accommodate its growth. Vice Chair Rubenkonig agreed and recalled that the Housing Element in the Comprehensive Plan also talks about the need to consider the housing needs of the special populations in the City. Chair Lovell suggested that rather than trying to predict and determine where people can go and what category, the Board's job is to make sure that the conditions exist to allow for an expansion of housing types and opportunities. Board Member Stewart suggested that the Board review the current zoning map and specifically identify the potential Cn housing opportunities in areas such as Westgate, Firdale Village, Five Corners, Highway 99, etc. The Board raised some d questions about whether or not housing types such as cottage housing, assisted living, and accessory dwelling units could be m counted towards meeting the density requirement. Board Member Crank said it is possible the City will receive more W rezone request as the population continues to increase. As the current aging population either passes away or moves away, a developers could purchase and consolidate lots that could then be developed into greater densities. co The Board discussed whether or not the large lots (RS-20) in the northern portion of the City could be consolidated and rezoned to RS-8 to accommodate additional density. Mr. Lien explained that the properties zoned RS-12 and RS-20 are designated in the Comprehensive Plan Map as Single -Family Resource because there are steep slopes and critical areas w present. Before a rezone could be approved, the Comprehensive Plan would have to be amended. Board Member Stewart cautioned that when considering opportunities to increase density, they must also continue to protect the green spaces and natural areas. t Mr. Lien reminded the Board that Edmonds is supposed to have a population of 45,550 by 2035, which is a growth of about Q 245 people per year. A 2012 Buildable Lands Report found that there was capacity under the existing zoning for 2,646 Planning Board Minutes March 9, 2016 Page 3 Packet Pg. 326 7.1.f additional housing units by 2035. There have also been some changes to zoning on Highway 99 and at Westgate, which crated an opportunity for an additional 267 housing units. He summarized that under the existing zoning, there is capacity for 3,339 housing units, which would meet the City's population projections. Board Member Cheung pointed out that the cost of land in the downtown area is very high, and the same size lot on Highway 99 would likely be half the cost. He suggested that future development is more likely to occur along Highway 99. The Board agreed that they would like to encourage mixed -use development in the Edmonds portion of Highway 99, particularly because there is already rapid transit bus service available along the highway all the way to Seattle. They further agreed that affordable homes and apartments in the areas with the highest mobility would be very desirable. Chair Lovell shared that a number of multi -family residential complexes have been developed recently in Mountlake Terrace and more are being planned. However, they are primarily apartment units rather than condominium units because the land is less costly. However, with the exception of perhaps Highway 99, these conditions do not exist in Edmonds. Board Member Crank pointed out that apartment units are often converted to condominium units over time. Board Member Robles added that, typically, these units are built to a higher standard in anticipation of converting them to condominiums later on. Board Member Crank asked if the City could require that a certain number of units in a new development must be affordable or a developer must pay into an in -lieu -of program to construct affordable units elsewhere. Mr. Lien said some cities use this approach, but Edmonds does not. However, some zones in the City, such as the Commercial Business -Edmonds Way (BL- EW) zone, offer reduced setbacks and/or height as an incentive to encourage affordable housing. The Board talked about the need for a diversity of units that are dispersed throughout the City, serving all types of people, including the special populations. Housing types could include micro units, community living, and co-ops. Mr. Lien referred the Board to Pages 82 and 83 of the Housing Element of the Comprehensive Plan, which talks about Area Medium Income (AMI) for the Seattle/Bellevue area. He noted that medium income for Edmonds is about $67,000. The Housing Element also talks about the average rents in Edmonds and the distribution of affordability. At this time, there is no extremely low- income housing available in Edmonds, and only limited very low-income housing. While the capacity might be adequate, the mix of housing types and affordability will be a bigger challenge to address. The Board discussed the City's goal to create opportunities for people who live in Edmonds to work in Edmonds. they agreed that creating employment in Edmonds of a nature and variety that can generate enough income for individuals and families to live in Edmonds will be quite a challenge. Mr. Lien pointed out that the CG zone along Highway 99 allows development up to 60 feet in height and the CG2 zone allows up to 75 feet in height. There are also two high-rise nodes that allow unlimited height. It was discussed that redevelopment of Highway 99 will play a key role in the City's economic future, and it is important to obtain input from and discuss opportunities with the property owners along the highway. Board Member Cheung commented that if the City could attract several quality office buildings on Highway 99, they could attract businesses that do not want to pay the higher Seattle rents. It was noted that the availability of transit service is also attractive to businesses. Chair Lovell pointed out that, with the exception of Highway 99, the height limits in Edmonds make it very difficult and less attractive for developers to construct multi -family housing. Board Member Cheung said most people do not see Edmonds as being an affordable place for apartments. Less costly apartments are available in Lynnwood and Mountlake Terrace. People do not choose Edmonds for the convenience factor, either, because Lynnwood is more convenient and closer to 99. Board Member Monroe observed that the City has a high percentage of single-family homes and people own more of the is community. He said he would hate to see this sacrificed in order to meet the demands of growth. Board Member Cheung agreed and, once again, noted that it is hard to compete with some of the cheaper areas. Board Member Stewart and Vice z Chair Rubenkonig stressed the need to provide housing opportunities that allow people to stay in their communities when i j they need to downsize from their single-family homes as they age or their circumstances change. c m The Board Members spent time reviewing the existing development Highway 99 and discussing potential opportunities for t both commercial and residential development. Mr. Lien reminded the Board that the City is currently in the process of creating a subarea plan for Highway 99, which will include a Planned Action State Environmental Policy Act (SEPA) Q Planning Board Minutes March 9, 2016 Page 4 Packet Pg. 327 7.1.f Review. This approach removes some of the hoops that developers have to jump through, and may encourage more redevelopment along the highway. Board Member Crank reminded the Board that "affordable housing" is different than "low-income housing." Mr. Lien agreed and referred to the information provided in the Housing Element of the Comprehensive Plan. Vice Chair Rubenkonig suggested that a more accurate term for "affordable housing" is "living -wage housing." Mr. Lien referred to the chart on Page 84 of the Housing Element, which identifies the projected housing needs based on income. It was noted that the Housing Element projects that 2,790 new units will be needed to accommodate the anticipated growth, and the Board agreed that the City has an opportunity to steer the type of new development that occurs. While the capacity is already available, attracting the appropriate type of development to meet the needs will be the challenge. They need to look ahead and learn from other communities. Chair Lovell suggested that the Board invite a representative from the Puget Sound Regional Council (PSRC) to attend a future meeting and provide information on what is going on in the rest of the county and how other jurisdictions are addressing the issue of housing. The remainder of the Board agreed that would be helpful. The Board agreed that mass density should be focused along the corridors where adequate public transportation and services are already available. However, they also agreed it is important to provide housing options that allow people who already live in Edmonds to remain as they age or their circumstances change. Potential options include Airbnb, cottage housing, and accessory dwelling units. Board Member Robles said the City of Twentynine Palms did an extensive research on the topic of vacation home rentals and came up with a massive code that covers everything. He suggested that the Board consider this research as they continue their code update discussion. This is one way the City can provide more overnight accommodations to visitors and help property owners at the same time. As the Board continues its discussion about housing, Vice Chair Rubenkonig suggested that options to consider include: affordable housing requirements with off -setting density bonuses; multi -family residential tax exemptions; standards for transit -oriented development; impact fee exemptions for affordable housing; cottage and/or carriage housing regulations; small -lot, single-family allowances; broader accessory dwelling unit regulations; and allowing duplexes in single-family zones. Mr. Lien reminded the Board Members of the public workshop for Highway 99 planning and visioning on March 24th at 7:00 p.m. at City Hall. ADJOURNMENT The Board meeting was adjourned at 8:55 p.m. Q Planning Board Minutes March 9, 2016 Page 5 Packet Pg. 328 7.1.g have study and action items on all agendas so 2-3 touches on items. Have a process that allows informal, frank discussion at dais • Well run organizations allow time for small group discussion • Consecutive committee meetings, allow Councilmembers to attend both if want. Affords opportunity for Councilmember discussion between meetings • Committees foster better communication rather than surprises • Negatives can be overcome • All models have been tried at different cities • Regardless of process, articulate what "small" decisions are. Agree on typical things that do not need much time and could go directly to Consent • Every city has its own unique way to get business done. Kirkland has two Council meetings/month, study session 6:00-7:00 p.m. on policy -related topics such as homelessness, pedestrian safety, CAO in roundtable format with staff support. At 7:00 p.m. move to Council Chambers for business meeting. Also have four committees with three Councilmembers on each, each Councilmember serves on two committees. Committee meetings held throughout the month • Form a subcommittee to develop a proposal to meet the needs of the Council — save time, frank discussion, informal discussion, efficient way to move business through • Most federal, state and local governments have committees, not everyone on committee, that is reality of legislative process. It works, may need to build on trust issue • Technical challenges related to transparency are not a big leap • Is stilted communication at study sessions at dais the problem we're trying to solve? Mayor tends to run study sessions and business meetings the same. Could excuse Mayor from study session and have Council President run the meetings at a table • As new Councilmember, would be tempted to attend committee meetings not assigned to so would not save him time • Committee meetings allow for more free flowing discussion and back and forth with staff Council President Johnson declared a brief recess. ORGANIZING GOALS, PRIORITIES AND 2016 TIMELINE Council President Johnson advised the packet includes priorities from 2014 and 2015. The following list of priorities was developed prior to the retreat, with the addition of a few at the retreat. Council and staff participated in a dot exercise to identify what they wanted on the 2016 work plan (each person was provided 5 dots): Council Issues Council Dots Staff Dots Long Range Financial Plan 1 3 Homelessness 1 3 Affordable housing 4 1 Traffic safety 2 1 Sea level rise 2 Crumb rubber 3 Reassess work meetings Walkway system safer and connected 1 Highway 99 5 Marijuana shop in Esperance ADA accessibility Five Corners redevelopment 3 Public comment process 1 Review boards and commissions Edmonds City Council Retreat Draft Minutes March 4-5, 2016 Page 15 Packet Pg. 329 7.1.g Effective leadership training Code updates with and without redlines Strategic Action Plan 3 Follow-up Annexation/Esperance 2 3 Staff Issues Council Dots Staff Dots Affordable housing Homelessness 1 Sea level rise FD1/Budget 1 3 Livability Quality of life: transit services, park system, beach access to Waterfront Community vision/branding/theme Maintain charm Attract younger generation 2 Public safety staffing needs: crime prevention, crime analysis, narcotics, SRO 2 2 Port of Edmonds coordination Economic development and planning 4 Height issue 2 Attract best candidates to fill key positions Succession planning for senior staff 1 Build and maintain customer service culture Improve communications including city's web pages and social media Financially sustainable funding of pipe replacement via rate revenue 1 City's IT system Maintenance of City owned buildings 1 Pavement preservation system — long time secure funding 1 4 Capital investments in parks 2 Workforce: hiring and retaining experienced staff Long range financial plan 1 3 Highway 99 2 Code updates (other than land use) 1 2 The exercise revealed the following priorities: Issue Combined Council/Staff Dots Long range financial plan 8 Highway 99 7 Affordable housing 5 Pavement preservation system — long time secure funding 5 Annexation/Es erance 5 Public safety staffing needs: crime prevention, crime analysis, narcotics, SRO 4 FD1/Budget 4 Economic development & planning 4 Edmonds City Council Retreat Draft Minutes March 4-5, 2016 Page 16 Packet Pg. 330 7.1.g Sea level rise 1 4 Council President Johnson advised she and Ms. Chase will summarize the above and provide the results to Council. Next, Council President Johnson explained in addition to the extended agenda, she wanted to have a planner for the year with upcoming issues for the Council. The planning calendar will be posted in the Council office and she requested Councilmembers and staff add to it. Suggestions included putting the calendar on a shared drive so everyone has access to it and developing a yearlong Extended Agenda. CITY BOARDS, COMMISSIONS COMMITTEES AND TASK FORCES 1. What are our expectations for the City's advisory groups? 2. Should we provide training to the City's advisory groups? 3. Should we reestablish Transportation Committee, Parking Committee or Salary Commission? Council President Johnson referred to a list of advisory groups and disbanded/inactive groups. It was agreed to: • Bring to Council as an agenda item disbanding the Library Board. (There has been a recommendation from the Library Board and Mayor to disband the Board, but no official action has been taken.) • Add Mayor's Task Force on Pedestrian/Bicycle Safety Discussion followed regarding the formation of a public advisory committee for Civic Field, the Civic Field master planning process, boards/commissions versus Mayor's task forces and the functions of each, and committees subject to OPMA only if created by ordinance. Expectations • Notes vs. Minutes The following comments/suggestions were voiced by Council and staff. o Planning Board/Parks and Architectural Design Board (ADB) need to be as detailed as possible o Historic Preservation Commission could have focused notes o Depends on impact of committee, want more detail for Planning Board and ADB o Summary notes are good for most, less expensive, annual report to Council o Prefer notes instead of minutes, written comments can make discussion sound worse o Summary notes and audio is available if meeting is recorded or talk to person in attendance o Three types of minutes: detailed, summary, action minutes — decide for each. In favor of summary minutes for Council, have full audio/video record. Minutes are record of what happened, not what was said o Detailed minutes are not necessary and may be redundant when there is audio/video, but action minutes may not be enough. Summary minutes identify issues, concerns o Like the current fairly detailed minutes for City Council, Planning Board and ADB o More detail is important for City Council, Planning Board and ADB. Detailed minutes can be misunderstood. Summary/action sufficient for some boards/commissions o Detailed minutes for ADB, Planning Board, City Council, notes for the rest. o Minutes are approved by the body at next meeting, notes are not. Reason executive session notes are called notes and not minutes is because they are never reviewed/approved by City Council. Notes are unapproved notation of what took place o Originally took notes at committee meetings, expanded to minutes o Lodging Tax Advisory Committee is required by State law o Take notes (not approved at next meeting) at meetings except Planning Board, ADB and City Council o Option: record meeting and create minutes after the meeting Edmonds City Council Retreat Draft Minutes March 4-5, 2016 Page 17 Packet Pg. 331 8.1 City Council Agenda Item Meeting Date: 09/6/2016 Rejection of Bids for the Edmonds Veteran's Plaza Project (10 min.) Staff Lead: Carrie Hite Department: Engineering Preparer: Megan Luttrell Background/History On January 20, 2015, Council approved the concept for the Veterans Plaza. On August 2, 2016, council authorized the Mayor to sign the revised Goods & Materials Agreement for the procurement of stone cladding, paving and site furnishings for the Edmonds Veterans Plaza from Coldspring. On August 23, 2016, council authorized the Mayor to sign a Change Authorization for the Goods & Materials Agreement for the procurement of stone cladding, paving and site furnishings for the Edmonds Veterans Plaza from Coldspring. Staff Recommendation Reject bids. Narrative On August 18, 2016, the City received two bids for the Edmonds Veterans Plaza. The bids ranged from a low of $ 416,383.56 by R. L. Alia Company to a high of $734,962 by A-1 Landscape and Construction, Inc. The architect's estimate was $248,683. The low bid along with a 10% Management Reserve has resulted in a $227,393 budget shortfall in the project budget. Refer to the budget attachment (Exhibit A). The Edmonds Veterans Plaza Committee has been briefed on the August 18th bids and the current project budget. The committee has agreed to resume capital fundraising activities to provide additional money for the project. The consultant, Site Workshop, is reviewing the architect's estimate and is evaluating the current construction bidding climate. The City plans to call for bids by late 2016 with the goal of completing the project in time for Memorial Day 2017. The Edmonds Veterans Plaza is a community project to support, create and build memorials to Edmonds military veterans. The project will provide site improvements and enhancements to the existing City of Edmonds Municipal Court Plaza and immediate surroundings. It includes a new stone -clad wall with two waterfall feature elements, related mechanical, plumbing and electrical work, new paving, walls, stairs and handrails, new site furnishings and lighting, modifications to existing planting and irrigation, minor modifications to the existing parking lot and new utility connections. Attachments: Exhibit A - Veterans Plaza Budget Packet Pg. 332 8.1.a Exhibit A Edmonds Veterans Plaza Project Construction Budget (with low bid from R.L. Alia) Description Amount Contract Bid (R.L. Alia) $416,384 Design & Construction Management (Site Workshop) $55,550 Owner Furnished Stone Materials (Coldspring) $145,156 Owner Furnished Benches & Plaques $24,200 Owner Furnished Dog Statue $8,500 Permit Fees $8,175 Staff Time $15,000 Utility Connections (Water & Sewer) $9,467 Management Reserve (10%) $41,638 Bid Advertising $843 Total = $724,913 Construction Funding runaing Amount Edmonds Veterans Plaza Fund $482,520 Parks: 132 Fund $15,000 Total = $497,520 Packet Pg. 333 8.2 City Council Agenda Item Meeting Date: 09/6/2016 Settlement Agreement for ROW Acquisition related to the 228th St. SW Corridor Improvements Project (10 min.) Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On June 23, 2015, City Council approved the Possession and Use Deposit for the County Farms property as part of the 228th St. SW Corridor Improvements project. Staff Recommendation Approve the Settlement Agreement. Narrative The City concluded right of way negotiations earlier this month with the property owner at the southwest corner of 228th St and Highway 99 for the 228th St. Corridor Improvement Project. The negotiations to acquire 491 square feet of right of way and 1,556 square feet of temporary construction easement began in February, 2013. The City's initial offer was $14,600 and the proposed settlement is $65,000. During negotiations, staff identified the need to increase the compensation for the loss of parking. The proposed settlement amount is significantly less than the amount requested by the property owner. The right of way acquisition cost will be funded by the federal transportation grant for the project. Attachments: Settlement Agreement Memorandum of Understanding Packet Pg. 334 I 8.2.a I 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SUPERIOR COURT OF WASHINGTON FOR SNOHOMISH COUNTY CITY OF EDMONDS, a Washington municipal corporation, No. 14-2-04564-4 Petitioner, vs. RJ WILLY, L.L.C., a Washington corporation; and ALL UNKNOWN OWNERS and ENCUMBRANCERS, Respondents. STIPULATED JUDGMENT, DECREE OF APPROPRIATION AND ORDER FOR DISBURSEMENT Tax Parcel Nos. 005767-000-002-04 and 005767-000-002-02 I. STIPULATION Petitioner, the City of Edmonds, filed a condemnation action against Respondent RJ Willy, LLC, seeking to acquire certain property and property rights for the construction, operation and maintenance of the 2281h Street SW Corridor Improvements Project in Edmonds, Washington. The parties have reached an agreed settlement of this condemnation matter. Therefore, the Petitioner and the Respondent, by and through their undersigned counsel of record, hereby stipulate and agree to the Court's entry of the following Judgment, Decree of Appropriation and Order for Disbursement: STIPULATED JUDGMENT, DECREE OF LIGHTHOUSE LAW GROUP PLLC 1100 DEXTER AVENUE N., SUITE I00 APPROPRIATION & ORDER FOR DISBURSEMENT - I SEATTLE, WASHINGTON 98109 ♦ 206-273-7440 Cl O �L O U t 00 N N a N .3 a' a 0 M c as E a� a� L a r a� U) c a� U a Packet Pg. 335 1 I 8.2.a I 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 I. JUDGMENT SUMMARY 1. Judgment Creditor: 2. Judgment Debtor: 3. Total Judgment: 4. Amount of Previous Deposit: 5. Remaining Amount Due: 6. Attorney for Judgment Creditor: 7. Attorneys for Judgment Debtor: 8. Legal Description: 9. Snohomish County Tax Parcel Nos RJ Willy, LLC City of Edmonds $65,000.00 $14,600.00 $50,400.00 William B. Foster, Attorney at Law Sharon Cates and Jeffrey Taraday Lighthouse Law Group PLLC See Attached Exhibit 1 005767-000-002-04 & 005767-000-002-02 II. JUDGMENT, DECREE OF APPROPRIATION AND ORDER FOR DISBURSEMENT The Court, having reviewed the records, files, and pleadings herein, and the stipulation to entry of the Judgment, Decree of Appropriation and Order for Disbursement, above, it is now, therefore ORDERED, ADJUDGED AND DECREED that: 1. On or about June 4, 2013, the City Council of the City of Edmonds enacted Ordinance No. 3924, exercising its power of eminent domain and authorizing the acquisition of certain real property and property rights for the purpose of constructing, locating, operating and maintaining the 2281h Street SW Corridor Improvements Project in Edmonds ("Project"). In particular, through Ordinance No. 3924, the City Council declared the existence of public use and necessity for the acquisition of certain real property and property rights of fee owner RJ Willy, LLC located in Edmonds, Washington, Snohomish County Tax Parcel Nos. 005767-000-002-04 and 005767- 000-002-02. STIPULATED JUDGMENT, DECREE OF LIGHTHOUSE LAW GROUP PLLC 00 APPROPRIATION & ORDER FOR DISBURSEMENT - 2 iioo DEXHINGTOER ``t'EN., * 206-ITE 73- SEArrLE, WASFTTNGTON 9$].09 � 20fr273-7440 L 0 �L `0 U 00 N N a 0 .3 a' a 0 M c as E a� a� L a� a as E as r a� U) c a� a Packet Pg. 336 1 I 8.2.a I 1 2 4 51 6 7 8: 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2. The City of Edmonds commenced eminent domain proceedings in June 2014. In September 2014, the Court entered the parties' Stipulation and Agreed Order on Public Use and Necessity and Stipulated Order for Immediate Possession and Use for the real property and property rights of Respondent legally described and depicted in Exhibit 1, attached hereto and incorporated herein by this reference ("Condemned Property"). 3. The Respondent has agreed to accept as full and final just compensation for the appropriation of the Condemned Property by eminent domain the total amount of Sixty -Five Thousand Dollars and Zero Cents (S65,000.00), which includes all costs and fees associated with this matter. The City previously deposited with the registry of the Court a Possession and Use Deposit in the amount of Fourteen Thousand Six Hundred Dollars and Zero Cents ($14,600.00). Therefore, the remaining just compensation to be paid by the City of Edmonds to Respondent for the Condemned Property, together with all attorneys' fees, costs, expert/evaluation fees and interest, if any, is the amount of Fifty Thousand Four Hundred Dollars and Zero Cents (S50,400.00). Within five (5) business days of the entry of this Stipulated Judgment, Decree of Appropriation and Order for Disbursement by the Court, the City of Edmonds shall pay the remaining amount due into the registry of the Court for subsequent disbursement to Respondent pursuant to the Order of Disbursement, incorporated herein. 4. All of the rights, title, and interests of Respondent to the Condemned Property are conveyed to the City of Edmonds free from all claims of fee interest, leasehold interest, or any other property interest. Such rights as they relate to the parcel acquisition are hereafter vested in the City of Edmonds in fee simple absolute. The City's use of the temporary construction easements is complete and those easements have been released. STIPULATED JUDGMENT, DECREE OF LIGHTHOUSE LAW GROUP PLLc 1100 DEXTER AvENUE N., SUITE 100 APPROPRIATION & ORDER FOR DISBURSEMENT - 3 SE.ATTLE, WASAINGTON 98109 ♦ Z06-273.7440 0 �L Lo U t 00 N N c 0 a' a 0 c as as L a a� a� U) c a� U a Packet Pg. 337 1 I 8.2.a I 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 74 25 26 5. The total Just Compensation paid includes all claims for fees and costs of any kind incurred in this matter, including expenses incurred in evaluating the City's offer pursuant to RCW 8.25.020. 6. Any property taxes due and owing shall be disbursed to Snohomish County. 7. Respondent is entitled to the net judgment amount less the amount of property taxes disbursed to Snohomish County, if any. Disbursement of the balance shall be made by issuing a check, made payable to RJ Willy, LLC in the amount of Fifty Thousand Four Hundred Dollars and Zero Cents ($50,400.00), less the amount disbursed to Snohomish County, if any, and the Clerk's handling fee, if any, and mailed to RJ Willy, LLC at 1529 Broadway, Everett, Washington, 98201. 8. Entry of this Decree of Appropriation resolves all claims in this matter with respect to the Condemned Property, and the Clerk may remove it from the trial calendar. This matter is dismissed. 9. The City of Edmonds shall record a certified copy of this Stipulated Judgment, Decree of Appropriation and Order for Disbursement in the Office of the Snohomish County Auditor. DONE IN OPEN COURT this day of HONORABLE Presented by: LIGHTHOUSE LAW GROUP PLLC SHARON CATES, WSBA #2927-1 JEFFREY B. TARADAY, WSBA #28182 Attorneys for Petitioner City of Edmonds STIPULATED JUDGMENT, DECREE OF APPROPRIATION & ORDER FOR DISBURSEMENT - 4 2016. Approved for entry; Presentation waived by; WILLIAM B. FOSTER, TTORNEY AT LAW 1 WILL B. F T WSB #8270 Attorney forlttsp dent RJ Willy, LLC LIGHTHOUSE LAW GROUP PLLC 1100 DExTEP AVENUE N., SUITE 100 SEATTLE, WAS11INGTON 98109 t Z06-273-7440 0 L `o U t 00 N N c 0 .3 a 0 M c as E as a a� E a� a� U) c a� E a Packet Pg. 338 1 8.2.b Memorandum of Understanding Amended to the AGREEMENT by and between CITY OF EDMONDS, WASHINGTON and RJ WILLY, LLC Effective July 1, 2015 THIS MEMORANDUM OF UNDERSTANDING is by and between the CITY OF EDMONDS, a Washington municipal corporation (hereinafter "Edmonds") and RJ WILLY, LLC, a Washington limited liability company (hereinafter "Willy"), currently involved in Iitigation under Snohomish Co. Cause No. 14.2-04564-4. Following a day of mediation, the parties agree as follows: 1. Edmonds agrees to pay Willy the sum of $65,000 in full and complete settlement of this matter. 2. This offer will remain open until the close of business Dec. 31, 2415. 3. Prior to the date in para. 2 and after completion of the SR 991228d, St. intersection project, the parties agree to meet in good faith to make effort to finalize the settlement of this matter. RJ WILLY, LLC Rod Waters, Member Date r CITY OF EDMONDS S ates, Office o e City Attorney i n Date 1 of 1 Packet Pg. 339 9.1 City Council Agenda Item Meeting Date: 09/6/2016 Stormwater Management Code Update, Edmonds Community Development Code Chapter 18.30 (20 min.) Staff Lead: Phil Williams Department: Engineering Preparer: Megan Luttrell Background/History On June 14, 2016, staff provided an update on the required stormwater code changes. On August 2, 2016, a public hearing was held on the proposed update to the stormwater management code. On August 23, 2016, staff presented the proposed update to the stormwater management code. Staff Recommendation Prepare an Ordinance and place it on the consent agenda for a future City Council meeting. Narrative This item is on the agenda for further discussion. During the August 23rd City Council meeting, there was a question regarding the wording in section 18.30.060(C)2 of the proposed code. Staff determined that this section of the code, provided in the August 23rd City Council packet, was the correct version. Also attached are the responses to Councilmember Buckshinis' questions that were submitted to staff on August 25th. Attachment 1 is the current version of the proposed code. Attachment 2 is the redlined version of the proposed code which captures the changes since the public hearing on August 2, 2016. The proposed stormwater code has been sent to the State for review and the SEPA process is anticipated to be completed in September. Staff recommends placing an ordinance on the consent agenda for a future City Council meeting in late September or early October, to adopt the proposed stormwater management code changes and make it effective on January 1, 2017. BACKGROUND: The City of Edmonds is a Department of Ecology Phase II Western Washington Municipal Stormwater Permittee. As a Phase II permit holder, the City is required to update our stormwater code by December 31, 2016 to meet the minimum requirements of the 2012 Ecology Stormwater Management Manual. This includes reviewing and revising all development -related codes, rules, and standards to incorporate and require Low Impact Development principles and best management practices to make Low Impact Packet Pg. 340 9.1 Development the preferred and commonly used approach to site development. The goal is to infiltrate, disperse, and retain stormwater runoff onsite to the extent feasible. Attachments: Attachmen 1 - ECDC 18.30-FINAL DRAFT-08.23.2016 Attachment 2 - ECDC 18.30-FINAL DRAFT-08.23.2016-redlines from 08.02.2016 version Attachment 3 - Response to Buckshnis questions-09012016 PHW02 Attachment 4 - ECDC 18.30-Redline Version Attachment 5 - SW Code Council Public Hearing-20160802 Packet Pg. 341 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Chapter 18.30 STORMWATER MANAGEMENT Sections: 18.30.000 Purposes. 18.30.010 Definitions. 18.30.020 Authority and Regulation. 18.30.030 Applicability. 18.30.040 Exemptions. 18.30.050 Administration. 18.30.060 Requirements. 18.30.070 Exceptions, Adjustments, and Appeal. 18.30.080 Access and Covenants. 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. 18.30.100 Enforcement Procedures. 18.30.000 Purposes. Page 1/23 A. To set forth standards for managing stormwater runoff from construction and development sites to minimize: 1. Degradation of surface water quality by controlling the scouring and sedimentation of creeks, streams, wetlands, ponds, lakes, other water bodies. 2. Degradation of groundwater quality. 3. Damage to adjacent and other downstream private properties from erosion or other impacts from stormwater runoff. 4. Damage of City -owned parcels, City roads, rights -of -way and associated infrastructure. B. To comply with requirements in the Phase II National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit as issued by the Washington State Department of Ecology (Ecology). C. To complement site planning activities that minimize: 1. Impervious surfaces area. 2. The loss of native or non-native site vegetation. 3. The generation of stormwater runoff. D. To make low impact development (LID) the preferred and commonly used approach to site development; to require LID be considered at the site planning stage; and to implement LID BMPs unless they are infeasible. E. To require that all publicly -owned and privately -owned Stormwater Treatment and Flow Control best management practices (BMPs)/Facilities are operated, maintained and repaired in manner that conforms to this chapter. F. To provide the authority for the City to inspect privately -owned Stormwater Treatment and Flow Control BMPs/Facilities. G. To provide enforcement procedures for ensuring compliance with this chapter. Version: August 23, 2016 Packet Pg. 342 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 2/23 18.30.010 Definitions. For the purposes of this chapter, the following definitions shall apply: Arterial. A road or street primarily for through traffic. The term generally includes roads or streets considered collectors. It does not include local access roads which are generally limited to providing access to abutting property. See also RCW 35.78.010, RCW 36.86.070, and RCW 47.05.021. Adjustment. A variation in the application of a minimum requirement to a particular project. Adjustments provide substantially equivalent environmental protection. Applicant. The owning individual(s) or corporations or their representatives applying for the permits or approvals described in this chapter. Approval. The proposed work or completed work conforming to this chapter as approved by the public works Director or their designee. Best management practices (BMPs). The schedules of activities, prohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by the City that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to waters of Washington State. Bioretention. Engineered facilities that treat stormwater by passing it through a specified soil profile, and either retain or detain the treated stormwater for flow attenuation. Refer to the 2014 Stormwater Management Manual for Western Washington (SWMMWW), Chapter 7 of Volume V for bioretention BMP types and design specifications. Category 1 Project Site. A project site subject to Minimum Requirements No.1 through No.S. See ECDC 18.30.60.C. Category 2 Project Site. A project site subject to Minimum Requirements No.l through No.9. See ECDC 18.30.60.C. Certified Erosion and Sediment Control Lead (CESCL). An individual who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMMWW). A CESCL is knowledgeable in the principles and practices of erosion and sediment control. The CESCL must have the skills to assess site conditions and construction activities that could impact the quality of stormwater and, the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Certification is obtained through an Ecology approved erosion and sediment control course. Course listings are provided online at Ecology's website. City's municipal separate storm sewer system or "MS4." A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) that are owned or operated by the City of Edmonds, designed or used for collecting or conveying stormwater, and are not a combined sewer nor part of a publicly owned treatment works as defined in 40 Code of Federal Regulations (CFR) 122.2, and which is defined as "large" or "medium" or "small" or otherwise designated by Ecology pursuant to 40 CFR 122.26. Clearing. The destruction and removal of vegetation by manual, mechanical, or chemical methods. Commercial Agriculture. Those activities conducted on lands defined in RCW 84.34.020(2) and activities involved in the production of crops or livestock for commercial trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. Common plan of development or sale. A site where multiple separate and distinct construction activities may be taking place at different times on different schedules and/or by different contractors, but still under a single plan. Examples include: 1) phase projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; 3) projects in a contiguous area that maybe unrelated but still under the same contract, such Version: August 23, 2016 Packet Pg. 343 9.1.a Edmonds Page 3/23 Chapter 18.30 STORM WATER MANAGEMENT as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determine permit requirements. Converted vegetation (areas). The change in land cover changed from native vegetation, pasture scrub/shrub, or unmaintained non-native vegetation to lawn or landscaped areas, or where native vegetation is converted to pasture. Creek. Is synonymous with "streams," which is defined in ECDC 23.40.320. Detention facility. An above or below ground facility, such as a pond or tank, that temporarily stores stormwater runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored stormwater. Development. Land -disturbing activities, including Class IV general forest practices that are conversions from timber land to other uses. Creation or addition of hard surfaces, or replacement of hard surface that is not part of a routine maintenance activity. Structural development, including construction, installation, replacement, or expansion of a building or other structure. Subdivision, short subdivision, and binding site plans, as defined and applied in Chapter 58.17 RCW Director. The City's Public Works and Utilities Director or a designee with an appropriate background in engineering or another related discipline. Discharge point. The location where a discharge leaves the municipal separate storm sewer system (MS4) through the City's MS4 facilitiesBMPs designed to infiltrate. Ecology. The Washington State Department of Ecology. Effective impervious surface. Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system. Impervious surfaces on residential development sites are considered ineffective if: 1) the runoff is dispersed through at least 100 feet of native vegetation in accordance with BMP T5.30 —'Tull Dispersion," as described in Chapter 5 of Volume V of the SWMMWW; 2) residential roof runoff is infiltrated in accordance with downspout Full Infiltration Systems in BMP T5.10A in Volume III of the SWMMWW; or 3) approved continuous runoff modeling methods indicate the entire runoff file is infiltrated. Erodible or leachable materials. Wastes, chemicals, or other substances that measurably alter the physical or chemical characteristics of runoff when exposed to rainfall. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Erosion. The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Also, detachment and movement of soil or rock fragments by water, wind, ice, or gravity. See the SWMMWW Glossary for examples of types of water erosion. Excavation. The mechanical removal of earth material. Exception. Relief from the application of a minimum requirement to a project. Fill. A deposit of earth material placed by artificial means. Groundwater. Water in a saturated zone or stratum beneath the land surface or below a water body. Hard surface. An impervious surface, a permeable pavement, or a vegetated roof. Highway. A main public road connecting towns and cities. In Edmonds, this includes State Route 99, State Route 524, and portions of State Route 104, that are classified as principal arterials in the City's comprehensive transportation plan. Illicit discharge. Any direct or indirect non-stormwater discharge to the City's MS4, groundwaters, or a water body, except as expressly allowed by ECDC Chapter 7.200. Version: August 23, 2016 Packet Pg. 344 9.1.a Edmonds Page 4/23 Chapter 18.30 STORM WATER MANAGEMENT Impervious surface. A non -vegetated surface area that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non -vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces that similarly impede the natural infiltration of stormwater. Open, uncovered retention/detention facilities shall not be considered impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. Open, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. Outdoor swimming pools shall be considered impervious surfaces in all situations. In addition, lawns, landscaping, sports fields, golf courses, and other areas that have modified runoff characteristics resulting from the addition of underdrains are to be considered impervious surfaces. Lake. An inland body of fresh water surrounded by land. Land disturbing activity. Any activity that results in a change in the existing soil cover (both vegetative and non -vegetative) and/or the existing soil topography. Land -disturbing activities include but are not limited to demolition, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land -disturbing activity. Vegetation maintenance practices, including landscape maintenance and gardening, are not considered land -disturbing activity. Stormwater facility maintenance is not considered land disturbing activity if conducted according to established standards and procedures. Low impact development (LID). A stormwater and land use strategy that strives to mimic pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on -site features, site planning, and distributed stormwater management practices that are integrated into a project design. LID Best Management Practices (BMPs). Distributed stormwater management practices, integrated into a project design, that emphasize pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re -use. LID principles. Land use management strategies that emphasize conservation, use of on -site natural features, and site planning to minimize impervious surfaces, native vegetation loss, and stormwater runoff. Maintenance. Repair and maintenance activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include replacement of dysfunctional facilities, including cases where environmental permits require replacing an existing structure with a different type structure, as long as the functioning characteristics of the original structure are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. In regard to stormwater facilities, maintenance includes assessment to ensure ongoing proper operation, removal of built up pollutants (i.e., sediments), replacement of failed or failing treatment media, and other actions taken to correct defects as identified in the maintenance standards of Chapter 4, Volume V of the SWMMWW. Maximum extent practicable (MEP). Refers to paragraph 402(p)(3)(B)(iii) of the federal Clean Water Act which reads as follows: Permits for discharges from municipal storm sewers shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques, and system, design, and engineering methods, and other such provisions as the Administrator or the State determines appropriate for the control of such pollutants. MS4. The City's municipal separate storm sewer system. Native vegetation. Vegetation comprised of plant species, other than noxious weeds, indigenous to the coastal region of the Pacific Northwest which could have been reasonably expected to occur naturally on the site. Examples include trees such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. Version: August 23, 2016 Packet Pg. 345 9.1.a Edmonds Page 5/23 Chapter 18.30 STORM WATER MANAGEMENT Natural drainage systems and outfalls. The location of the channels, swales, and other non -manmade conveyance systems as defined by the earliest documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. Outfall. A point source as defined by 40 CFR 122.2 at the point where a discharge leaves the City's MS4 and enters a surface receiving waterbody or surface receiving waters. Outfall does not include pipes, tunnels, or other conveyances which connect segments of the same stream or other surface waters and are used to convey primarily surface waters (i.e., culverts). On -site Stormwater Management BMPs. A synonym for Low Impact Development BMPs. Permeable pavement. Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Pervious Surface. Any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. Person. Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or City government unit, however designated. Pollution -generating hard surface (PGHS). Those hard surfaces considered to be a significant source of pollutants in stormwater runoff. See the listing of surfaces under pollution -generating impervious surface. Pollution -generating impervious surface (PGIS). Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to: vehicular use; industrial activities (as further defined in the glossary of the SWMMWW); storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall; metal roofs unless they are coated with an inert, non -leachable material (e.g., baked -on enamel coating); or roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities. Pollution -generating pervious surfaces (PGPS). Any non -impervious surface subject to vehicular use, industrial activities (as further defined in the glossary of the SWMMWW); or storage of erodible or leachable materials, wastes, or chemicals, and that receive direct rainfall or run-on or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include permeable pavement subject to vehicular use, lawns, and landscaped areas including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). Pre -developed condition. The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre -developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. Project site. That portion of a property, properties, and/or right-of-way subject to land -disturbing activities, new hard surfaces, or replaced hard surfaces. For projects that involve land disturbing activity on one or more parcels and land disturbing activity in the City right-of-way, the "Project site" includes all areas of land disturbance. If the project is part of a common development plan or sale, the disturbed area of the entire plan shall be used in determining permit requirements. Rain garden. A non -engineered shallow landscaped depression, with compost -amended native soils and adapted plants. The depression is designed to pond and temporarily store stormwater runoff from adjacent areas, and to allow stormwater to pass through the amended soil profile. Receiving waterbody or Receiving waters. Naturally and/or reconstructed naturally occurring surface water bodies, such as creeks, streams, rivers, lakes, wetlands, estuaries, and marine waters, or groundwater, to which a MS4 discharges. Replaced hard surface. For structures means the removal and replacement of hard surfaces down to the foundation. For other hard surfaces, it means the removal down to bare soil or base course and replacement. Version: August 23, 2016 Packet Pg. 346 9.1.a Edmonds Page 6/23 Chapter 18.30 STORM WATER MANAGEMENT Replaced impervious surface. For structures, the removal and replacement of any exterior impervious surfaces down to the foundation. For other impervious surfaces, it means the removal down to bare soil or base course and replacement. Roadway. Traveled hard surface portion of any public or private road or street. Road -related project. A project that all of, or the majority of, the new or replaced hard surface consist of roadway, shoulders, curbs, gutters, sidewalks, or walkways, either publicly or privately funded. Runoff. Water originating from rainfall and other precipitation that is found in drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands, as well as shallow ground water. It also means the portion of rainfall or other precipitation that becomes surface flow and interflow. Site. The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to development. For road projects, or utility projects in the right-of-way, the length of the project site and the right-of-way boundaries define the site. Slope. The degree of deviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a 90-degree slope being vertical (maximum) and 45 degrees being a 1:1 or 100 percent slope. Soil. The unconsolidated mineral and organic material on the intermediate surface of the earth that serves as a natural medium for the growth of land plants. Source control BMPs. A structure or operation that is intended to prevent pollutants from coming into contact with storm water through physical separation of areas or careful management of activities that are sources of pollutants. The SWMMWW separates source control BMPs into two types. Structural source control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume IV of the SWMMWW for details. Stormwater facility. A constructed component of a stormwater drainage system, designed and constructed to perform a particular function or multiple functions. Stormwater facilities include, but are not limited to, pipes, swales, ditches, culverts, street gutters, detention ponds, retention ponds, constructed wetlands, infiltration devices, catch basins, oil/water separators, and biofiltration swales. Stormwater Management Manual for Western Washington (SWMMWW). The Washington State Department of Ecology's 2012 (as amended in 2014) Stormwater Management Manual for Western Washington. Referred to as the 2014 SWMMWW. Stormwater site plan. The comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed development project for compliance with stormwater requirements. Contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It includes a Construction Stormwater Pollution Prevention Plan (Construction SWPPP) and a Permanent Stormwater Control Plan (PSC Plan). Guidance on preparing a Stormwater Site Plan is contained in Chapter 3 of Volume I of the SWMMWW. Stormwater Treatment and Flow Control BMPs/Facilities. Detention facilities, treatment BMPs/facilities, bioretention, vegetated roofs, and permeable pavements that help meet Minimum Requirements No.6 (Treatment), Minimum Requirement No.7 (Flow Control), or both as described in ECDC 18.30.060. Threshold discharge area. An on -site area that drains to either a single natural discharge location or multiple natural discharge locations that combine within one -quarter mile downstream (as determined by the shortest flowpath). The examples below and in Figure G.1 presented in Volume I of the SWMMWW illustrate this definition. The purpose of this definition is to clarify how the thresholds of this code are applied to project sites with multiple discharge points. Version: August 23, 2016 Packet Pg. 347 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 7/23 Example of a Site with a Example of a Site with Example of a Site with Single Natural Discharge Multiple Natural Multiple Natural Discharges and a Single Threshold Discharges and a Single and Multiple Threshold Discharge Area Threshold Discharge Area Discharge Areas Natural NaWral Natural NAvral Natural dDischarge--...-- bischart -. Discharge-----• ... bischarge_ Discharx3e------ -.. Area Area 1 Area 2 . Area 1 Area 2 THRESHOLD DISCHARGE f----.THRE HOLD THRESHOLD THRESHOL D15CFiAd - NSC ARG�. - DISCHARGE AREIi--.,, . •••••• f Shaded ti :,.A AREA T,,, AFfEA2 ed) (Shade Natural Natural Natural Discharge discharge Discharge i Location Location Location f .ti tJ is s f 1 f r '!4 Mile Downstream.w------------------------ 4___________� {shortest flow path) by V Vehicular Use. Regular use of an impervious or pervious surface by motor vehicles. The following are subject to regular vehicular use: roads, un-vegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unrestricted access fire lanes, vehicular equipment storage yards, and airport runways. The following are not considered subject to regular vehicular use: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, restricted access fire lanes, and infrequently used maintenance access roads. Waterbody. Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. Waters of the state. Includes those waters defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State, and "waters of the state" as defined in Chapter 90.48 RCW which includes lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. Wetlands. As defined in ECDC 23.40.005. [Ord. 4026 § 1 (Att. A), 2016]. 18.30.020 Authority and Regulation. A. The Public Works and Utilities Director shall administer this chapter and shall be referred to as the Director. B. The Director shall have the authority to develop, implement, and enforce policies and procedures to administer and enforce this chapter per ECDC 18.30.110 and 18.30.120, such as the Edmonds Stormwater Addendum. C. The requirements of this chapter are minimum requirements. They do not replace, repeal, abrogate, supersede, or affect any other more stringent requirements, rules, regulations, covenants, standards, or restrictions. Where this chapter imposes requirements that are more protective of human health or the environment than those set forth elsewhere, the provisions of this chapter shall prevail. When this chapter imposes requirements that are less protective Version: August 23, 2016 Packet Pg. 348 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 8/23 of human health or the environment than those set forth elsewhere, the provisions of the more protective requirements shall prevail. D. The Director shall have the authority to impose additional requirements on a project or site to meet the purpose of this chapter based on site -specific factors including, but not limited to, location, soil conditions, slope, and designated use. E. Approvals and permits granted under this chapter are not waivers of the requirements of any other laws, nor do they indicate compliance with any other laws. Compliance is still required with all applicable federal, state and local laws and regulations, including rules promulgated under authority of this chapter. F. Compliance with the provisions of this chapter does not necessarily mitigate all impacts to the environment. Thus, compliance with this chapter should not be construed as mitigating all drainage water or other environmental impacts, and additional mitigation may be required to protect the environment pursuant to other applicable laws and regulations. The primary obligation for compliance with this chapter and for preventing environmental harm on or from property is placed upon the applicant. [Ord. 3792 § 1, 2010]. 18.30.030 Applicability. A. This chapter applies to applications submitted on or after January 1, 2017 and applications submitted prior to January 1, 2017, which have not started construction by January 1, 2022. B. This chapter applies to the following actions on sites that discharge to the City's MS4 or discharges to waters of the state whether or not a City -issued permit is required: 1. Land -disturbing activity, or 2. Creation of new hard surfaces, or 3. Replacement of existing hard surfaces, or 4. Conversion of pervious surfaces, or 5. New connections to the City's MS4, or 6. Any other actions that can increase the volume or rate of stormwater runoff, or cause the generation of pollutants, from the site. 18.30.040 Exemptions. A. Full Exemptions. The following land uses and land -disturbing activities are exempt from the provisions of this chapter: 1. Forest practices regulated under WAC Title 222, except for Class IV general forest practices that are conversions from timberland to other uses, are exempt from the provisions of the minimum requirements 2. Commercial agriculture practices that involve working land for production are generally exempt. However, land conversion from timberland to agriculture and the construction of impervious surfaces are not exempt. 3. Construction of drilling sites, waste management pits, and associated access roads, and construction of transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations are exempt. Operators are encouraged to implement and maintain best management practices to minimize erosion and control sediment during and after construction activities to help ensure protection of surface water quality during storm events. 4. The following pavement maintenance practices or activities are exempt: pothole and square -cut patching, overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of Version: August 23, 2016 Packet Pg. 349 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 9/23 coverage, shoulder grading, reshaping/regrading drainage systems, crack sealing, resurfacing with in -kind material without expanding the road prism, pavement preservation activities that do not expand the road prism, and vegetation maintenance. B. Partial Exemptions. The following land uses and land -disturbing activities are partially exempt from the provisions of this chapter: 1. Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. 2, Construction Stormwater Pollution Prevention. 2. The following pavement maintenance practices or activities are considered development, and therefore are not categorically exempt. The extent to which these requirements apply is explained for each circumstance. a. Removing and replacing a paved surface to base course or a lower level, or repairing the pavement base: If impervious surfaces are not expanded, Minimum Requirements No. 1 — No. 5 apply when the thresholds identified for development projects in ECDC 18.30.060 are met. Where appropriate, project proponents are encouraged to look for opportunities to use permeable and porous pavements. b. Extending the pavement edge without increasing the size of the road prism or paving graveled shoulders: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. c. Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; or upgrading from gravel to asphalt or concrete; or upgrading from a bituminous surface treatment ("chip seal") to asphalt or concrete: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. 18.30.050 Administration. A. Application, Submittals, and Review. 1. The Director shall review all plans and all other submittals required by ECDC 18.30.050.A.3 for compliance with this chapter when: a. An application for a City permit is required under all other chapters of ECDC Title 18 or 19, or b. A subdivision application is submitted per ECDC 20.75.040. 2. In all other situations when actions under ECDC 18.30.030 apply to a project site, review shall be under a Stormwater permit. 3. All stormwater review submittals shall contain, in addition to the information required under any other applicable City code, a Stormwater Site Plan as described in the Edmonds Stormwater Addendum (see ECDC 18.30.060) and any other information required by the Director. B. Inspections. 1. The Director shall inspect projects at various stages of the work to determine if they comply with the requirements of this chapter, and enforcement actions shall be taken as necessary. These inspections will include, but not be limited to, the following: a. Prior to site clearing and construction to assess site erosion potential, and b. During construction to verify proper installation and maintenance of required erosion and sediment controls and other approved plan components, and Version: August 23, 2016 Packet Pg. 350 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 10/23 c. All permanent stormwater treatment and flow control BMPs/facilities and catch basins in new residential developments every six months until 90 percent of the lots are constructed (or when construction is stopped and the site is fully stabilized) to identify maintenance needs and enforce compliance with maintenance standards as needed, and d. Upon completion of construction and prior to final approval to ensure proper installation of permanent stormwater control facilities and verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater treatment and flow control BMPs/facilities, and e. Post -Construction inspections per ECDC 18.30.090. 2. When reasonably required by the Director to accomplish the purpose of this chapter or to comply with local, state or federal law or regulation on stormwater, special inspection or testing shall be performed by the applicant. C. Fees. Application, review and inspection fees as set in ECDC Chapter 15.00 shall be paid. 18.30.060 Requirements. A. Documents. The sources of the stormwater management requirements for the City are from the following documents: 1. Western Washington Phase II Municipal Stormwater Permit, Appendix 1, modification date January 16, 2015 2. 2014 Stormwater Management Manual for Western Washington (SWMMWW) 3. The Edmonds Stormwater Addendum In the event of conflicts between the various provisions, the more stringent provision shall apply. B. Illicit Discharges and Connections. Non-stormwater illicit discharges, including spills, into the MS4, groundwaters, or a water body from any developed or undeveloped lands are prohibited per ECDC Chapter 7.200. C. Thresholds and Applicability The thresholds outlined in this section are only applicable to ECDC 18.30.060.C. See also the Edmonds Stormwater Addendum for supplemental information on thresholds. a. All development shall be required to comply with Minimum Requirement No. 2. b. Category 1 project sites shall comply with Minimum Requirements No. 1 through No. 5. Category 1 includes projects that: i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or ii. Have land disturbing activity of 7,000 square feet or greater. c. Category 2 project sites shall comply with Minimum Requirements No. 1 through No. 9. Category 2 includes projects that: i. Result in 5,000 square feet, or greater, of new plus replaced hard surface area, or ii. Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or iii. Convert 2.5 acres, or more, of native vegetation to pasture. 2. Additional Requirements for road -related projects. For road -related projects, runoff from the new hard surfaces (including pavement, shoulders, curbs, and sidewalks) and the converted vegetation areas shall meet all the minimum requirements if the new hard surfaces total 5,000 square feet or more. In addition, if the new hard surfaces total 5,000 square feet or more and total 50 percent or more of the existing hard surfaces within the project limits, runoff from the new and replaced hard surfaces and the converted vegetation areas shall meet all the minimum requirements. The project limits shall be defined by the length of the project and the width of the right-of-way. Version: August 23, 2016 Packet Pg. 351 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 11/23 New Connections to the City's MS4 when the proposed connection does not involve activity that meets the definition of development. Sites that are not currently connected to the City's MS4 but that wish to connect directly or indirectly to the City's MS4 may be allowed on a case -by -case basis, subject to City approval. For sites that propose to drain greater than or equal to 2,000 square feet of hard surface area to the City's MS4, minimum requirements and BMPs associated with stormwater flow control and/or water quality treatment (such as those outlined in ECDC 18.30.060.D [1] through [9]) may be required if the connection poses any risk to downstream systems such as erosion, flooding, property damage, habitat damage, water quality degradation, or other related impacts. D. Minimum Technical Requirements. This section describes the minimum technical requirements for stormwater management at development sites. 1. Minimum Requirement No. 1 — Preparation of Stormwater Site Plans The City shall require a Stormwater Site Plan from all projects meeting the thresholds in ECDC 18.30.060.C. Stormwater Site Plans shall use site -appropriate development principles to retain native vegetation and minimize impervious surfaces to the extent feasible. Stormwater Site Plans shall be prepared in accordance with Chapter 3 of Volume 1 of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 2. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention Plan (SWPPP) a. Thresholds: i. All development projects are responsible for preventing erosion and discharge of sediment and other pollutants into receiving waters. Compliance with this minimum requirement can be achieved for an individual site if the site is covered under Ecology's General NPDES Permit for Stormwater Discharges Associated with Construction Activities and fully implementing the requirements of that permit. ii. A Construction SWPPP is required for all projects which a) result in 2,000 square feet or more of new plus replaced hard surface area, b) where a structure with an exterior hard surface area of at least 2,000 square feet is being demolished, c) which disturb 7,000 square feet or more of land, or d) when the site falls within the Earth Subsidence Landslide Hazard Area, Landslide Hazard Area or steep slope critical area. Projects that do not meet any of the above criteria are not required to prepare a Construction SWPPP, but must consider all of the elements listed below for Construction SWPPPs and develop controls for all Construction SWPPP elements that pertain to the project site. b. General Requirements: The SWPPP shall include a narrative and drawings. All BMPs shall be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative shall include documentation to explain and justify the pollution prevention decisions made for the project. Each of the thirteen elements referenced below must be considered and included in the SWPPP unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the narrative of the SWPPP. ii. Clearing and grading activities for developments shall be permitted only if conducted pursuant to an approved site development plan (e.g., building permit, subdivision approval) that establishes permitted areas of clearing, grading, cutting, and filling. These permitted clearing and grading areas and any other areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree retention areas as required by the City, shall be delineated on the site plans and the development site. Version: August 23, 2016 Packet Pg. 352 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 12/23 iii. The SWPPP shall be implemented beginning with initial land disturbance and until final stabilization. Sediment and Erosion control BMPs shall be consistent with the BMPs contained in Chapter 4 of Volume II of the SWMMWW. c. Seasonal Work Limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities may only be authorized by the City if it can be demonstrated that silt -laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and ii. Limitations on activities and the extent of disturbed areas; and iii. Proposed erosion and sediment control measures, in accordance with ECDC 18.30.060.D.2.d below. Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations, except for sites lying in whole or in part within an earth subsidence and landslide hazard area as defined by ECDC 19.10.020.F: Routine maintenance and necessary repair of erosion and sediment control BMPs, ii. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil, and iii. Activities where there is one hundred percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. d. Construction SWPPP Elements Construction SWPPP elements are required in accordance with Chapter 2, Section 2.5.2 of Volume I of the SWMMWW and the requirements in the Edmonds Stormwater Addendum 3. Minimum Requirement No. 3 — Source Control of Pollution All known, available and reasonable source control BMPs must be required for all projects approved by the City. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. 4. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location, to the maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. The discharge must have an identified overflow route that is safe and certain, and leads to the ultimate outfall location (such as a receiving water or municipal drainage system). All outfalls require energy dissipation. To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis. If an existing problem (or potential future problem after development) is identified, mitigation will be required to prevent worsening of that problem. A quantitative analysis may be required for any project deemed to need additional information or where the project proponent or the City determines that a quantitative analysis is necessary to evaluate the off -site impacts or the capacity of the conveyance system. See the Edmonds Stormwater Addendum for additional details on complying with this requirement. Version: August 23, 2016 Packet Pg. 353 Edmonds Chapter 18.30 STORM WATER MANAGEMENT 5. Minimum Requirement No. 5 — On -site Stormwater Management a. Applicability: Page 13/23 On -site Stormwater Management BMPs are required in accordance with the following project thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff on -site to the extent feasible without causing flooding or erosion impacts. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Project Thresholds: There are five project scenarios outlined below that determine the applicability of Minimum Requirement No. 5 — On -site Stormwater Management. The first four scenarios apply to projects that discharge directly or indirectly to the City's MS4. The fifth scenario applies to project discharges that do not enter the City's MS4. Note that more than one of the five scenarios may apply to a given project: Retrofit. Projects that discharge directly or indirectly to the City's MS4 and that contain existing hard surfaces on the parcel or common plan of development that do not drain to an approved Stormwater management facility are required to provide On -site Stormwater Management BMPs to manage a portion of those existing hard surfaces that will remain after project completion. BMPs from List No.I (See ECDC 18.30.060.D.5.d) shall be applied to a minimum of 25 percent of those existing unmanaged surfaces, but to no more than the area equal to the proposed new plus replaced hard surfaces. Only for those existing unmanaged hard surfaces that remain after project completion, applicants are not required to evaluate BMPs in priority order or document infeasibility for these existing surfaces (as is required under ECDC 18.30.060.D.5.b [ii] and [iii] below). However, if it is determined that the minimum 25 percent requirement cannot be met due to BMP infeasibility, documentation of BMP infeasibility is required. In addition, when runoff from exiting unmanaged hard surfaces is mixed with runoff from new plus replaced hard surfaces, those BMPs must be selected and designed in accordance with the requirements for management of new plus replaced hard surfaces (per sections [ii] and [iii] below). See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. ii. Category 1. Category 1 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 5 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.l for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.d); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iii. Category2. Category 2 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 9 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.2 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.e); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. Version: August 23, 2016 Packet Pg. 354 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 14/23 iv. Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the City's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID Performance Standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following: a. Projects must implement BMP T5.13 (Post -Construction Soil Quality & Depth); BMPs T5.I OA Downspout Full Infiltration Systems, T5.1 OB Downspout Dispersion Systems, or T5.1 OB Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Edmonds Way specific requirements. After applying the requirements in item (a) above, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post -development 10-, and 100-year recurrence interval peak flows shall not exceed, 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. V. Projects that do not drain directly or indirectly to the City's MS4 are required to implement one of the following: a. Project sites may discharge to the downstream private property (e.g., projects located above BNSF property) with approval from the downstream property owner(s). b. Project sites may discharge runoff to an on -site system. For sites located within earth subsidence and landslide hazard areas or their buffers, a geotechnical design, analysis, and report by a geotechnical engineer is required for the on -site system. On -site Stormwater Management BMPs from List No.I in ECDC 18.30.060.D.5.d shall be evaluated for all new plus replaced hard surfaces and land disturbed. Projects are not required to evaluate BMPs in priority order or document infeasibility. The project applicant may be subject to an extra permit processing fee for City review of the geotechnical analysis. Projects are required to comply with all other applicable City requirements, such as ECDC 19.10 (earth subsidence and landslide hazard areas). ii. For sites located outside earth subsidence and landslide hazard areas or their buffers, ECDC 18.30.060.D.5.ii and ECDC 18.30.060.D.5.iii shall be followed to evaluate site appropriate BMP's. Subject to prior approval by the City, project sites may pump on -site runoff to the City's MS4. A quantitative downstream analysis in accordance with Minimum Requirement No. 4 and the Edmonds Stormwater Addendum will be required. If the City's MS4 does not have adequate capacity to receive the applicant's pumped flows, the applicant is required to install an on -site detention system to store runoff and pump it to the MS4 at an approved rate. c. LID Performance Standard For projects that elect to meet the LID Performance Standard to comply with ECDC 18.30.060.D.b (ii) and (iii), Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow from the project site. Refer to the Standard Flow Control Requirement section in Minimum Requirement No. 7 for information about the assignment of the pre -developed condition. Version: August 23, 2016 Packet Pg. 355 9.1.a Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 15/23 Project sites that must also meet Minimum Requirement No. 7 shall match flow durations between 8 percent of the 2-year flow through the full 50-year flow. d. List No.I for Category 1 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 5. For projects that elect to use List No. 1 to comply with ECDC 18.30.060.D.b (ii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW and the Edmonds Stormwater Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5. I OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Downspout Dispersion Systems in accordance with BMP T5.1 OB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. iv. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. e. List No.2 for Category 2 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 9. Version: August 23, 2016 Packet Pg. 356 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 16/23 For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5. I OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iii. Downspout Dispersion Systems in accordance with BMP T5.1OB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW. iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Version: August 23, 2016 Packet Pg. 357 Edmonds Chapter 18.30 STORM WATER MANAGEMENT 6. Minimum Requirement No. 6 — Runoff Treatment Page 17/23 a. Project Thresholds: When assessing road -related projects against the following thresholds, only consider those hard and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following require construction of stormwater treatment facilities: Projects in which the total of pollution -generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or ii. Projects in which the total of pollution -generating pervious surfaces (PGPS) — not including permeable pavements — is 0.75 acres or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. b. Treatment -Type Thresholds and Facility Sizing: Treatment -Type Thresholds in accordance with Step 2 (Oil Control), Step 4 (Phosphorus Treatment), Step 5 (Enhanced Treatment), and Step 6 (Basic Treatment) of Chapter 2, Section 2.1, Volume V of the SWMMWW. Phosphorus treatment shall be required for projects draining to Hall Creek and Lake Ballinger. ii. Treatment Facility Sizing, including Water Quality Design Storm Volume, Water Quality Design Flow Rate, and Downstream Facilities, of Chapter 2, Section 2.5.6, Volume I of the SWMMWW. c. Treatment Facility Selection, Design, and Maintenance Stormwater treatment facilities shall be: i. Selected in accordance with the process identified in Chapter 4 of Volume I, and Chapter 2 of Volume V of the SWMMWW, ii. Designed in accordance with the design criteria in Volume V of the SWMMWW, and iii. Maintained in accordance with the maintenance schedule in Volume V of the SWMMWW. d. Additional Requirements The discharge of untreated stormwater from pollution -generating surfaces to ground water will not be authorized by the City. All associated runoff must be treated using On -site Stormwater Management BMPs designed to provide the required level of treatment in accordance with Chapter 5, Volume V and Chapter 7, Volume V of the SWMMWW; or by infiltration through soils meeting the soil suitability criteria in Chapter 3 of Volume III of the SWMMWW. Minimum Requirement No. 7 — Flow Control a. Applicability: Flow control is required on projects meeting the thresholds summarized below to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. Flow control in accordance with Minimum Requirement No. 7 is not required for projects that discharge directly to, or indirectly through the City's MS4 to Puget Sound (other minimum requirements may still apply). See ECDC 18.30.060.D.5.b.iv and Section 2.5.7 of Volume I of the SWMMWW for additional restrictions applicable to direct discharges to Puget Sound. If the discharge drains to a stream that leads to a wetland, or to a wetland that has an outflow to a stream, both this minimum requirement (Minimum Requirement No. 7) and Minimum Requirement No. 8 apply. Version: August 23, 2016 Packet Pg. 358 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 18/23 b. Thresholds: When assessing road -related projects against the following thresholds, only consider only those impervious, hard, and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following circumstances require achievement of the standard flow control requirement for western Washington: Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or ii. Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold discharge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or iii. Projects that through a combination of hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second (cfs) increase or greater in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one -hour time steps (or a 0.15 cfs increase or greater using 15-minute time steps). Standard Flow Control Requirement (applies to discharges directly or indirectly to the City's MS4, except for projects that meet the direct discharge requirements outlined in "a" above): Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. The pre -developed condition to be matched shall be a forested land cover unless reasonable, historic information is available that indicates the site was prairie prior to settlement (modeled as "pasture" in the Western Washington Hydrology Model). This standard requirement is waived for sites that will reliably infiltrate all the runoff from hard surfaces and converted vegetation areas. d. Additional Requirement: Flow Control BMPs shall be selected, designed, and maintained in accordance with Volume III of the SWMMWW or an approved equivalent. 8. Minimum Requirement No. 8 — Wetlands Protection a. Applicability: The requirements below apply only to projects whose stormwater discharges into a wetland, either directly or indirectly through a conveyance system. b. Thresholds: The thresholds identified in Minimum Requirement No. 6 — Runoff Treatment, and Minimum Requirement No. 7 — Flow Control shall also be applied to determine the applicability of this requirement to discharges to wetlands. c. Standard Requirement: Projects shall comply with Guide Sheets No. 1 through No. 3 in Appendix I-D of the SWMMWW. The hydrologic analysis shall use the existing land cover condition to determine the existing hydrologic conditions unless directed otherwise by a regulatory agency with jurisdiction. d. Additional Requirements: Stormwater treatment and flow control facilities shall not be built within a natural vegetated buffer, except for: i. Necessary conveyance systems as approved by the City; or ii. As allowed in wetlands approved for hydrologic modification or treatment in accordance with Guide Sheet 2 in Appendix I-D of the SWMMWW. An adopted and implemented basin plan prepared in accordance with the provisions of Section 7 of Appendix 1 of the Phase II NPDES Municipal Stormwater Permit. Version: August 23, 2016 Packet Pg. 359 Edmonds Chapter 18.30 STORM WATER MANAGEMENT 9. Minimum Requirement No. 9 — Operation and Maintenance Page 19/23 An operation and maintenance manual that is consistent with the provisions in Volume I and Volume V of the SWMMWW is required for proposed Stormwater Treatment and Flow Control BMPs/facilities. The party (or parties) responsible for maintenance and operation shall be identified in the operation and maintenance manual. For private facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -site or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate department. A log of maintenance activity that indicates what actions were taken shall be kept and be available for inspection. 18.30.070 Exceptions, Adjustments, and Appeals. A. Exceptions. 1. The Director may approve a request for an exception to the minimum requirements of this chapter following legal public notice of an application for an exception and of the Director's decision on the application. All legal public notice related to this request for an exception shall be in the manner prescribed in ECDC 20.03.002 and the applicant shall pay all costs to publish the legal public notices required by this provision. The Director shall provide and keep written findings of fact of the decision. 2. The approval of the exception shall only be granted when the applicant demonstrates that the requirement would cause a severe and unexpected economic hardship. To determine whether the requirement imposes a severe and unexpected economic hardship on the project applicant, the applicant must document for City review and approval, all of the following, at a minimum: a. The current, pre -project use of the site; and b. How application of the requirement(s) for which an exception is being requested restricts the proposed use of the site compared to the restrictions that existed prior to adoption of this chapter; and c. The possible remaining uses of the site if the exception were not granted; and d. The possible uses of the site that would have been allowed prior to the adoption of this chapter; and e. A comparison of the estimated amount and percentage of value loss as a result of the requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the requirements of this chapter; and f. The feasibility of the applicant to alter the project to apply the requirements of this chapter. 3. Any exception must meet the following criteria: a. The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and b. The exception is the least possible exception that could be granted to comply with the intent of the minimum requirements. 4. An exception to the requirements shall only be granted to the extent necessary to provide relief from the economic hardship as determined by the Director, to alleviate the harm or threat of harm to the degree that compliance with the requirement becomes technically feasible, or to perform the emergency work that the Director determines is warranted. 5. The Director may require an applicant to provide additional information at the applicant's expense, including (but not limited to) an engineer's report or analysis. Version: August 23, 2016 Packet Pg. 360 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 20/23 6. When an exception is granted, the Director may impose new or additional requirements to offset or mitigate harm or the threat of harm that may be caused by granting the exception, or that would have been prevented if the exception had not been granted. B. Adjustments. 1. The Director may approve a request for adjustments to the requirements of this chapter when the Director finds that: a. The adjustment provides substantially equivalent environmental protection; and b. The objectives of safety, function, environmental protection, and facility maintenance are met, based on sound engineering practices. During construction, the Director may require, or the applicant may request, that the construction of drainage control facilities and associated project designs be adjusted if physical conditions are discovered on the site that are inconsistent with the assumptions on which the approval was based, including (but not limited to) unexpected soil or water conditions, weather -generated problems, or changes in the design of the improved areas; and A request by the applicant for an adjustment shall be submitted to the Director for review and approval prior to implementation. The request shall be in writing and shall provide facts substantiating the requirements of subsection (C)(1) of this section, and if made during construction, the factors in subsection (C)(2) of this section. Any such modifications made during the construction of drainage control facilities shall be included with the final approved drainage control plan. C. Appeal. 1. The Director's decision on an application for an exception or adjustment may appeal to the hearing examiner in accordance with a Type II appeal process in ECDC Chapter 20.06. 2. The applicant shall carry the burden of proof. 3. The decision of the hearing examiner is appealable to superior court in accordance with Chapter 36.70C RCW. [Ord. 3792 § 1, 2010]. 18.30.080 Access and Covenants. A. Access. Proper ingress and egress shall be provided to the City to inspect or perform any duty imposed upon the City by this Title. The City shall notify the responsible party in writing of a failure to provide access. If the responsible parry fails to respond within seven days from the receipt of notification, the City may order the work required completed or otherwise address the cause of improper access. The obligation for the payment of all cost that may be incurred or expended by the City in causing such work to be done shall be imposed on the person holding title to the subject property B. Covenants. Maintenance covenants shall be required for each site/lot that will be maintained by a private entity such as an individual, corporation, or homeowner's association. The maintenance covenant shall address or append requirements and responsibilities for long-term management and maintenance the applicable BMP(s). Maintenance covenants shall be as specified in City Engineering Division documents or approved by the Director, and recorded with Snohomish County and on all proper deeds [Ord. 3792 § 1, 2010]. 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. Proper construction inspection and maintenance of stormwater facilities is essential for the protection of the City's MS4 and the environment. A. Stormwater Maintenance and Inspection Standards. Stormwater facilities shall be inspected and maintained per the requirements of Volume I and Volume V of the SWMMWW. For systems which do not have a maintenance standard, the owner shall develop a standard based on guidelines from the manufacturer, designer, or a registered professional Version: August 23, 2016 Packet Pg. 361 9.1.a Edmonds Page 21/23 Chapter 18.30 STORM WATER MANAGEMENT engineer and submit the standards to the Director for approval. The purpose of the maintenance standard is to determine if maintenance is required. The maintenance standard is not a measure of the facility's required condition at all times between inspections. Exceeding the maintenance standard between inspections is not a violation of this chapter. B. Ownership. Stormwater facilities are either privately or publicly owned and maintained. All stormwater facilities that serve private property are private, unless an agreement between the property owner and the City states otherwise. Stormwater facilities that are privately owned by a homeowner's association or similar organization also are private. The City may offer an incentive program to owners to support the proper maintenance of private storm drainage facilities. C. Public Stormwater Facilities. The City shall be responsible for operating, maintaining, repairing, and replacing public stormwater facilities as funded through the Stormwater Utility. D. Maintenance and Inspection of Permanent Facilities. All privately owned storm drainage facilities or controls shall be maintained by the owner, or the homeowner or owner association ("owner") if one is established as part of a residential or commercial development. All private storm drainage facilities shall be regularly inspected to ensure proper operation and shall monitor the facility or control as required or as set forth in the SWMMWW. The Owner shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person who took it, the date said action was taken, how it was done, and any problems encountered or follow-up actions required. The records shall be made available to the City upon request. The Owner shall maintain a copy of the Stormwater Operations and Maintenance Manual (if required) on site, and shall make reference to such document in real property records filed with Snohomish County, so others who acquire real property served by the privately owned storm drainage facilities or controls are notified of their obligation to maintain such facilities or controls. E. City Inspection of private stormwater facilities. The City shall have the authority to periodically inspect private stormwater facilities, including low impact development stormwater facilities, for compliance with this chapter. F. Right of Entry. An authorized representative of the City may enter private property at all reasonable times to conduct inspections, tests or to carry out other duties imposed by the a state or Federal program provided that the City makes a good faith effort to notify the property owner or person responsible for the premises prior to entering and presents proper credentials to that person. If entry is refused or cannot be obtained, the Director shall have recourse to every remedy provided by law to secure entry, including but not limited to, obtaining an administrative warrant for entry. G. Right of Entry for Illicit Discharge. In the event of an illicit discharge from a privately -owned stormwater facility caused by improper maintenance or operation or other circumstance, the provisions of ECC 7.200 shall apply. H. Maintenance Responsibilities. Upon written notice by the City, a private stormwater facility shall be promptly repaired and/or brought up to applicable standards by the property owner or the person responsible for said facility. If a private stormwater facility serves multiple lots and the responsibility for maintenance has not been specified on a recorded subdivision plat, short plat, or other legal document, maintenance, operation and repair responsibility shall rest with the homeowners' association, if one exists, or otherwise with the properties served by the facility, or finally, with the owners of the property on which the facilities are located. I. Disposal of Waste from Maintenance Activities. Disposal of waste from maintenance activities shall be conducted in accordance with the minimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines for disposal of waste materials from storm water maintenance activities, and where appropriate, the Dangerous Waste Regulations, Chapter 173-303 WAC. 18.30.100 Enforcement Procedures. A. General enforcement action shall be in accordance with this chapter whenever a person has violated any provision of this chapter. The choice of enforcement action is at the discretion of the City. Version: August 23, 2016 Packet Pg. 362 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 22/23 B. Civil Penalties Adopted. ECDC Chapter 20.110 enforcement procedures are herein adopted in full, as modified in this chapter, with the proviso that repeat offenders or violations deemed an immediate public hazard shall be subject to compliance and appeal timelines as deemed appropriate by the Director based on the specific nature of the violation. C. Maintenance Orders. The Director shall have the authority to issue to an owner or person an order to maintain or repair a component of a stormwater facility or BMP to bring it into compliance with this chapter, the SWMMWW, the Edmonds Stormwater Addendum, and the Edmonds Community Development Code. The order shall include: 1. A description of the specific nature, extent and time of the violation and the damage or potential damage that reasonably might occur; 2. A notice that the violation or the potential violation cease and desist and, in appropriate cases, the specific corrective actions to be taken; and 3. A reasonable time to comply, depending on the circumstances. D. Civil Penalty. A person who fails to comply with the requirements of this chapter, who fails to conform to an approval or order issued, who undertakes development without first obtaining approval, or who fails to comply with a stop work order issued under these regulations shall be subject to a civil penalty levied in accordance with the provisions of ECDC Chapter 20.110; provided, however, that the appeal process shall commence with a notice of violation as provided in ECDC 20.110.040.13. 1. Civil penalties for code violations shall be imposed in accordance with the provisions of ECDC Chapter 20.110; provided, however, that in addition to the penalties set forth in that chapter, the hearing examiner is authorized to levy a penalty of up to twenty thousand dollars ($20,000) per occurrence based upon an assessment of the following factors. Where such factors are present, the hearing examiner is authorized to levy such penalty after taking into consideration the full impact of the violation and any mitigating circumstances (see subsection (2) below): a. The violation created a risk to public health and the significance of the risk. b. The violation damaged the environment and the significance of the damage. c. The violation caused damage to public and private property and the significance of such damage. d. A history of similar violations, if any. e. The economic benefit of the violations, if any, to the person or entity responsible for the violations. 2. Mitigating circumstances which may be used to offset or reduce the time resulting from the application of the preceding factors are limited to: a. Full compliance with a voluntary compliance agreement and no history of similar violations. b. Full compliance with a voluntary compliance agreement and a history of one or two similar violations (lesser reduction). c. A "voluntary compliance agreement" is defined as a legally binding agreement entered into between the City and the alleged violators, by which the violator(s) acknowledge the existence of the violation, waive all appeal rights, and agree to and do pay a fine in an amount stipulated to between the violator and the City. 3. If the violation(s) are not corrected as ordered, or a voluntary compliance agreement is not entered into within that time period and no appeal is filed, the penalty for the next 15-day period shall be 150 percent of the initial penalties, and the penalties for the next 15-day period shall be 200 percent of the initial penalties. The intent of this subsection is to increase penalties beyond the maximum penalties stated as an additional means to achieve timely compliance. Version: August 23, 2016 Packet Pg. 363 Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 23/23 Unless otherwise provided in a voluntary compliance agreement, civil penalties shall be paid within 30 days of service of the notice and order or stop work order if not appealed. Payment of the civil penalties assessed under this chapter does not relieve a person found to be responsible for a code violation of his or her duty to correct the violation or to pay any and all civil penalties or other cost assessments issued pursuant to this chapter. The City may suspend immediate payment of civil penalties if the person responsible for a code violation has entered into a voluntary compliance agreement. Penalties shall begin to accrue again pursuant to the terms of the voluntary compliance agreement if any necessary permits applied for are denied, canceled or not pursued, if corrective action identified in the voluntary compliance agreement is not completed as specified, or if the property is allowed to return to a condition similar to that condition which gave rise to the voluntary compliance agreement; provided, however, that additional penalties shall not be imposed until additional notice and opportunity for hearing have been provided in accordance with ECDC Chapter 20.110. Civil penalties assessed create joint and several personal obligations in all persons responsible for a code violation. E. The determination of the hearing examiner issued in accordance with ECDC Chapter 20.110 shall be appealable to the Snohomish County superior court in accordance with the provisions of Chapter 36.70C RCW. F. The remedies provided for in this section shall not be exclusive. The City may also use other civil and administrative remedies available to it, including but not limited to the remedies provided in ECDC Title 19 and the state building and dangerous buildings codes I Version: August 23, 2016 Packet Pg. 364 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Chapter 18.30 STORMWATER MANAGEMENT Sections: 18.30.000 Purposes. 18.30.010 Definitions. 18.30.020 Authority and Regulation. 18.30.030 Applicability. 18.30.040 Exemptions. 18.30.050 Administration. 18.30.060 Requirements. 18.30.070 Exceptions, Adjustments, and Appeal. 18.30.080 Access and Covenants. 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. 18.30.100 Enforcement Procedures. 18.30.000 Purposes. Page 1/23 A. To set forth standards for managing stormwater runoff from construction and development sites to minimize: 1. Degradation of surface water quality by controlling the scouring and sedimentation of creeks, streams, wetlands, ponds, lakes, other water bodies. 2. Degradation of groundwater quality. 3. Damage to adjacent and other downstream private properties from erosion or other impacts from stormwater runoff. 4. Damage of City -owned parcels, City roads, rights -of -way and associated infrastructure. B. To comply with requirements in the Phase II National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit as issued by the Washington State Department of Ecology (Ecology). C. To complement site planning activities that minimize: 1. Impervious surfaces area. 2. The loss of native or non-native site vegetation. 3. The generation of stormwater runoff. D. To make low impact development (LID) the preferred and commonly used approach to site development; to require LID be considered at the site planning stage; and to implement LID BMPs unless they are infeasible. E. To require that all publicly -owned and privately -owned Stormwater Treatment and Flow Control best management practices (BMPs)/Facilities are operated, maintained and repaired in manner that conforms to this chapter. F. To provide the authority for the City to inspect privately -owned Stormwater Treatment and Flow Control BMPs/Facilities. G. To provide enforcement procedures for ensuring compliance with this chapter. 18.30.010 Definitions. For the purposes of this chapter, the following definitions shall apply: Version: August 22, 201-56 Packet Pg. 365 9.1.b Edmonds Page 2/23 Chapter 18.30 STORM WATER MANAGEMENT Arterial. A road or street primarily for through traffic. The term generally includes roads or streets considered collectors. It does not include local access roads which are generally limited to providing access to abutting property. See also RCW 35.78.010, RCW 36.86.070, and RCW 47.05.021. Adjustment. A variation in the application of a minimum requirement to a particular project. Adjustments provide substantially equivalent environmental protection. Applicant. The owning individual(s) or corporations or their representatives applying for the permits or approvals described in this chapter. Approval. The proposed work or completed work conforming to this chapter as approved by the public works Director or their designee. Best management practices (BMPs). The schedules of activities, prohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by the City that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to waters of Washington State. Bioretention. Engineered facilities that treat stormwater by passing it through a specified soil profile, and either retain or detain the treated stormwater for flow attenuation. Refer to the 2014 Stormwater Management Manual for Western Washington (SWMMWW), Chapter 7 of Volume V for bioretention BMP types and design specifications. Category 1 Project Site. A project site subject to Minimum Requirements No.l through No.S. See ECDC 18.30.60.0 Category 2 Project Site. A project site subject to Minimum Requirements No.l through No.9. See ECDC 18.30.60.0 Certified Erosion and Sediment Control Lead (CESCL). An individual who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMMWW). A CESCL is knowledgeable in the principles and practices of erosion and sediment control. The CESCL must have the skills to assess site conditions and construction activities that could impact the quality of stormwater and, the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Certification is obtained through an Ecology approved erosion and sediment control course. Course listings are provided online at Ecology's website. City's municipal separate storm sewer system or "MS4." A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) that are owned or operated by the City of Edmonds, designed or used for collecting or conveying stormwater, and are not a combined sewer nor part of a publicly owned treatment works as defined in 40 Code of Federal Regulations (CFR) 122.2, and which is defined as "large" or "medium" or "small" or otherwise designated by Ecology pursuant to 40 CFR 122.26. Clearing. The destruction and removal of vegetation by manual, mechanical, or chemical methods. Commercial Agriculture. Those activities conducted on lands defined in RCW 84.34.020(2) and activities involved in the production of crops or livestock for commercial trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. Common plan of development or sale. A site where multiple separate and distinct construction activities may be taking place at different times on different schedules and/or by different contractors, but still under a single plan. Examples include: 1) phase projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; 3) projects in a contiguous area that may be unrelated but still under the same contract, such as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, Version: August 22, 201-56 a� 0 U c d E d t0 C O L d M 3 E L 0 N 0 O C O .y L d to O N N 0 O E 0 w J a z LL 0 M eo U 0 U W r Q Packet Pg. 366 9.1.b Edmonds Page 3/23 Chapter 18.30 STORM WATER MANAGEMENT pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determine permit requirements. Converted vegetation (areas). The change in land cover changed from native vegetation, pasture scrub/shrub, or unmaintained non-native vegetation to lawn or landscaped areas, or where native vegetation is converted to pasture Creek. Is synonymous with "streams," which is defined in ECDC 23.40.320 Detention facility. An above or below ground facility, such as a pond or tank, that temporarily stores stormwater runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored stormwater. Development. Land -disturbing activities, including Class IV general forest practices that are conversions from timber land to other uses. Creation or addition of hard surfaces, or replacement of hard surface that is not part of a routine maintenance activity. Structural development, including construction, installation, replacement, or expansion of a building or other structure. Subdivision, short subdivision, and binding site plans, as defined and applied in Chapter 58.17 RCW Director. The City's Public Works and Utilities Director or a designee with an appropriate background in engineering or another related discipline. Discharge point. The location where a discharge leaves the municipal separate storm sewer system (MS4) through the City's MS4 facilities/BMPs designed to infiltrate. Ecology. The Washington State Department of Ecology. Effective impervious surface. Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system. Impervious surfaces on residential development sites are considered ineffective if: 1) the runoff is dispersed through at least 100 feet of native vegetation in accordance with BMP T5.30 — "Full Dispersion," as described in Chapter 5 of Volume V of the SWMMWW; 2) residential roof runoff is infiltrated in accordance with downspout Full Infiltration Systems in BMP T5.10A in Volume III of the SWMMWW; or 3) approved continuous runoff modeling methods indicate the entire runoff file is infiltrated. Erodible or leachable materials. Wastes, chemicals, or other substances that measurably alter the physical or chemical characteristics of runoff when exposed to rainfall. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Erosion. The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Also, detachment and movement of soil or rock fragments by water, wind, ice, or gravity. See the SWMMWW Glossary for examples of types of water erosion. Excavation. The mechanical removal of earth material. Exception. Relief from the application of a minimum requirement to a project. Fill. A deposit of earth material placed by artificial means. Groundwater. Water in a saturated zone or stratum beneath the land surface or below a water body. Hard surface. An impervious surface, a permeable pavement, or a vegetated roof. Highway. A main public road connecting towns and cities. In Edmonds, this includes State Route 99, State Route 524, and portions of State Route 104, that are classified as principal arterials in the City's comprehensive transportation plan. Illicit discharge. Any direct or indirect non-stormwater discharge to the City's MS4, groundwaters, or a water body, except as expressly allowed by ECDC Chapter 7.200. Version: August 22, 201-56 O O C O .y N to O N N O 00 O E O L J a Z LL 0 M 00 U 0 U W r Q Packet Pg. 367 9.1.b Edmonds Page 4/23 Chapter 18.30 STORM WATER MANAGEMENT Impervious surface. A non -vegetated surface area that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non -vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces that similarly impede the natural infiltration of stormwater. Open, uncovered retention/detention facilities shall not be considered impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. Open, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. Outdoor swimming pools shall be considered impervious surfaces in all situations. In addition, lawns, landscaping, sports fields, golf courses, and other areas that have modified runoff characteristics resulting from the addition of underdrains and :.-...,......,.. ble ,._ le _,......eabil:t.,1:..,,.. are to be considered impervious surfaces. , Lake. An inland body of fresh water surrounded by land. Land disturbing activity. Any activity that results in a change in the existing soil cover (both vegetative and non -vegetative) and/or the existing soil topography. Land -disturbing activities include but are not limited to demolition, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land -disturbing activity. Vegetation maintenance practices, including landscape maintenance and gardening, are not considered land -disturbing activity. Stormwater facility maintenance is not considered land disturbing activity if conducted according to established standards and procedures. Low impact development (LID). A stormwater and land use strategy that strives to mimic pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on -site features, site planning, and distributed stormwater management practices that are integrated into a project design. LID Best Management Practices (BMPs). Distributed stormwater management practices, integrated into a project design, that emphasize pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re -use. LID principles. Land use management strategies that emphasize conservation, use of on -site natural features, and site planning to minimize impervious surfaces, native vegetation loss, and stormwater runoff. Maintenance. Repair and maintenance activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include replacement of dysfunctional facilities, including cases where environmental permits require replacing an existing structure with a different type structure, as long as the functioning characteristics of the original structure are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. In regard to stormwater facilities, maintenance includes assessment to ensure ongoing proper operation, removal of built up pollutants (i.e., sediments), replacement of failed or failing treatment media, and other actions taken to correct defects as identified in the maintenance standards of Chapter 4, Volume V of the SWMMWW. Maximum extent practicable (MEP). Refers to paragraph 402(p)(3)(B)(iii) of the federal Clean Water Act which reads as follows: Permits for discharges from municipal storm sewers shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques, and system, design, and engineering methods, and other such provisions as the Administrator or the State determines appropriate for the control of such pollutants. MS4. The City's municipal separate storm sewer system. Version: August 22, 201-56 0 O O .y L d to O N N 0 O E O J a Z LL O M 00 U 0 U W r Q Packet Pg. 368 9.1.b Edmonds Page 5/23 Chapter 18.30 STORM WATER MANAGEMENT Native vegetation. Vegetation comprised of plant species, other than noxious weeds, indigenous to the coastal region of the Pacific Northwest which could have been reasonably expected to occur naturally on the site. Examples include trees such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. Natural drainage systems and outfalls. The location of the channels, swales, and other non -manmade conveyance systems as defined by the earliest documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. Outfall. A point source as defined by 40 CFR 122.2 at the point where a discharge leaves the City's MS4 and enters a surface receiving waterbody or surface receiving waters. Outfall does not include pipes, tunnels, or other conveyances which connect segments of the same stream or other surface waters and are used to convey primarily surface waters (i.e., culverts). On -site Stormwater Management BMPs. A synonym for Low Impact Development BMPs Permeable pavement. Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Pervious Surface. Any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. Person. Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or City government unit, however designated. Pollution -generating hard surface (PGHS). Those hard surfaces considered to be a significant source of pollutants in stormwater runoff. See the listing of surfaces under pollution -generating impervious surface. Pollution -generating impervious surface (PGIS). Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to: vehicular use; industrial activities (as further defined in the glossary of the SWMMWW); storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall; metal roofs unless they are coated with an inert, non -leachable material (e.g., baked -on enamel coating); or roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities. Pollution -generating pervious surfaces (PGPS). Any non -impervious surface subject to vehicular use, industrial activities (as further defined in the glossary of the SWMMWW); or storage of erodible or leachable materials, wastes, or chemicals, and that receive direct rainfall or run-on or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include permeable pavement subject to vehicular use, lawns, and landscaped areas including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). Pre -developed condition. The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre -developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. Project site. That portion of a property, properties, and/or right-of-way subject to land -disturbing activities, new impe-rvieus-hard surfaces, or replaced imp€-rvieus-hard surfaces. For projects that involve land disturbing activity on one or more parcels and land disturbing activity in the City right-of-way, the "Project site" includes all areas of land disturbance. If the project is part of a common development plan or sale, the disturbed area of the entire plan shall be used in determining permit requirements. Rain garden. A non -engineered shallow landscaped depression, with compost -amended native soils and adapted plants. The depression is designed to pond and temporarily store stormwater runoff from adjacent areas, and to allow stormwater to pass through the amended soil profile. Version: August 22, 201-56 r Q Packet Pg. 369 9.1.b Edmonds Page 6/23 Chapter 18.30 STORM WATER MANAGEMENT Receiving waterbody or Receiving waters. Naturally and/or reconstructed naturally occurring surface water bodies, such as creeks, streams, rivers, lakes, wetlands, estuaries, and marine waters, or groundwater, to which a MS4 discharges. Replaced hard surface. For structures means the removal and replacement of hard surfaces down to the foundation. For other hard surfaces, it means the removal down to bare soil or base course and replacement. Replaced impervious surface. For structures, the removal and replacement of any exterior impervious surfaces down to the foundation. For other impervious surfaces, it means the removal down to bare soil or base course and replacement. Roadway. Traveled irnpepAeu-s-hard surface portion of any public or private road or street. Road -related project. A project that all of, or the majority of, the new or replaced hard surface consist of roadway, shoulders, curbs, gutters, sidewalks, or walkways, either publicly or privately funded. Runoff. Water originating from rainfall and other precipitation that is found in drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands, as well as shallow ground water. It also means the portion of rainfall or other precipitation that becomes surface flow and interflow. Site. The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to development. For road projects, or utility projects in the right-of-way, the length of the project site and the right-of-way boundaries define the site. Slope. The degree of deviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a 90-degree slope being vertical (maximum) and 45 degrees being a 1:1 or 100 percent slope. Soil. The unconsolidated mineral and organic material on the intermediate surface of the earth that serves as a natural medium for the growth of land plants. Source control BMPs. A structure or operation that is intended to prevent pollutants from coming into contact with storm water through physical separation of areas or careful management of activities that are sources of pollutants. The SWMMWW separates source control BMPs into two types. Structural source control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume IV of the SWMMWW for details. Stormwater facility. A constructed component of a stormwater drainage system, designed and constructed to perform a particular function or multiple functions. Stormwater facilities include, but are not limited to, pipes, swales, ditches, culverts, street gutters, detention ponds, retention ponds, constructed wetlands, infiltration devices, catch basins, oil/water separators, and biofiltration swales. Stormwater Management Manual for Western Washington (SWMMWW). The Washington State Department of Ecology's 2012 (as amended in 2014) Stormwater Management Manual for Western Washington. Referred to as the 2014 SWMMWW. Stormwater site plan. The comprehensive report containing all of the technical information and analysis necessary for regulatory agencies to evaluate a proposed development project for compliance with stormwater requirements. Contents of the Stormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It includes a Construction Stormwater Pollution Prevention Plan (Construction SWPPP) and a Permanent Stormwater Control Plan (PSC Plan). Guidance on preparing a Stormwater Site Plan is contained in Chapter 3 of Volume I of the SWMMWW. Stormwater Treatment and Flow Control BMPs/Facilities. Detention facilities, treatment BMPs/facilities, bioretention, vegetated roofs, and permeable pavements that help meet Minimum Requirements No.6 (Treatment), Minimum Requirement No.7 (Flow Control), or both as described in ECDC 18.30.060. Version: August 22, 201-56 a� 0 U c d E d t0 C O L d M 3 E L 0 N O O C O .y N to O N N O 0 E 0 w J a Z LL O M eo U 0 U W N r C 0 E t U R a N E t t� tv r r Q Packet Pg. 370 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 7/23 Threshold discharge area. An on -site area that drains to either a single natural discharge location or multiple natural discharge locations that combine within one -quarter mile downstream (as determined by the shortest flowpath). The examples below and in Figure G.1 presented in Volume I of the SWMMWW illustrate this definition. The purpose of this definition is to clarify how the thresholds of this code are applied to project sites with multiple discharge points. Example of a Site with a Example of a Site with Example of a Site with Single Natural Discharge Multiple Natural Multiple Natural Discharges and a Single Threshold Discharges and a Single and Multiple Threshold Discharge Area Threshold Discharge Area discharge Areas Natural fs t h�rgE�._ Natural Natural bischiMe...-- ---Discharge • ... Natural Natural bischaige...--—Dischpcge-----• .. —.ats Area Area 1 Area 2 Area 1 Area 2 THRESHOLD ptSGHARGE ....THRE HDLD ' ,HI3EStJOLD THRESHDL DISCHAf2GE- AlRb-. dISC ARGE,r""' ISCHARGE [Shaded} ti4 1;A edj AREA t%_ , AREA2 [ hade ]'... Natural —� Natural i Discharge Discharge Natural Discharge i Location 11 Location 1 Location i s i / r s i I %Mile Downstream .w----------------- -------� ----�- f---- (shortest Clow path) Vehicular Use. Regular use of an impervious or pervious surface by motor vehicles. The following are subject to regular vehicular use: roads, un-vegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unrestricted access fire lanes, vehicular equipment storage yards, and airport runways. The following are not considered subject to regular vehicular use: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, restricted access fire lanes, and infrequently used maintenance access roads. Waterbody. Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. Waters of the state. Includes those waters defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State, and "waters of the state" as defined in Chapter 90.48 RCW which includes lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. Wetlands. As defined in ECDC 23.40.005. [Ord. 4026 § 1 (Att. A), 2016] Version: August 22, 201-56 Packet Pg. 371 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT 18.30.020 Authority and Regulation. Page 8/23 A. The Public Works and Utilities Director shall administer this chapter and shall be referred to as the Director. B. The Director shall have the authority to develop, implement, and enforce policies and procedures to administer and enforce this chapter per ECDC 18.30.110 and 18.30.120, such as the Edmonds Stormwater Addendum. C. The requirements of this chapter are minimum requirements. They do not replace, repeal, abrogate, supersede, or affect any other more stringent requirements, rules, regulations, covenants, standards, or restrictions. Where this chapter imposes requirements that are more protective of human health or the environment than those set forth elsewhere, the provisions of this chapter shall prevail. When this chapter imposes requirements that are less protective of human health or the environment than those set forth elsewhere, the provisions of the more protective requirements shall prevail. D. The Director shall have the authority to impose additional requirements on a project or site to meet the purpose of this chapter based on site -specific factors including, but not limited to, location, soil conditions, slope, and designated use. E. Approvals and permits granted under this chapter are not waivers of the requirements of any other laws, nor do they indicate compliance with any other laws. Compliance is still required with all applicable federal, state and local laws and regulations, including rules promulgated under authority of this chapter. F. Compliance with the provisions of this chapter does not necessarily mitigate all impacts to the environment. Thus, compliance with this chapter should not be construed as mitigating all drainage water or other environmental impacts, and additional mitigation may be required to protect the environment pursuant to other applicable laws and regulations. The primary obligation for compliance with this chapter and for preventing environmental harm on or from property is placed upon the applicant. [Ord. 3792 § 1, 2010]. 18.30.030 Applicability. A. This chapter applies to applications submitted on or after January 1, 2017 and applications submitted prior to January 1, 2017, which have not started construction by January 1, 2022. B. This chapter applies to the following actions on sites that discharge to the City's MS4 or discharges to waters of the state whether or not a City -issued permit is required: 1. Land -disturbing activity, or 2. Creation of new hard surfaces, or 3. Replacement of existing hard surfaces, or 4. Conversion of pervious surfaces, or 5. New connections to the City's MS4, or 6. Any other actions that can increase the volume or rate of stormwater runoff, or cause the generation of pollutants, from the site. 18.30.040 Exemptions. A. Full Exemptions. The following land uses and land -disturbing activities are exempt from the provisions of this chapter: 1. Forest practices regulated under WAC Title 222, except for Class IV general forest practices that are conversions from timberland to other uses, are exempt from the provisions of the minimum requirements. Version: August 22, 201-56 Packet Pg. 372 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 9/23 2. Commercial agriculture practices that involve working land for production are generally exempt. However, land conversion from timberland to agriculture and the construction of impervious surfaces are not exempt. 3. Construction of drilling sites, waste management pits, and associated access roads, and construction of transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations are exempt. Operators are encouraged to implement and maintain best management practices to minimize erosion and control sediment during and after construction activities to help ensure protection of surface water quality during storm events. 4. The following pavement maintenance practices or activities are exempt: pothole and square -cut patching, overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of coverage, shoulder grading, reshaping/regrading drainage systems, crack sealing, resurfacing with in -kind material without expanding the road prism, pavement preservation activities that do not expand the road prism, and vegetation maintenance. B. Partial Exemptions. The following land uses and land -disturbing activities are partially exempt from the provisions of this chapter: 1. Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. 2, Construction Stormwater Pollution Prevention. 2. The following pavement maintenance practices or activities are considered development, and therefore are not categorically exempt. The extent to which these requirements apply is explained for each circumstance. a. Removing and replacing a paved surface to base course or a lower level, or repairing the pavement base: If impervious surfaces are not expanded, Minimum Requirements No. 1 — No. 5 apply when the thresholds identified for development projects in ECDC 18.30.060 are met. Where appropriate, project proponents are encouraged to look for opportunities to use permeable and porous pavements. b. Extending the pavement edge without increasing the size of the road prism or paving graveled shoulders: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. c. Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; or upgrading from gravel to asphalt or concrete; or upgrading from a bituminous surface treatment ("chip seal") to asphalt or concrete: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for development projects in ECDC 18.30.060 are met. 18.30.050 Administration. A. Application, Submittals, and Review. 1. The Director shall review all plans and all other submittals required by ECDC 18.30.050.A.3 for compliance with this chapter when: a. An application for a City permit is required under all other chapters of ECDC Title 18 or 19, or b. A subdivision application is submitted per ECDC 20.75.040. 2. In all other situations when actions under ECDC 18.30.030 apply to a project site, review shall be under a Stormwater permit. 3. All stormwater review submittals shall contain, in addition to the information required under any other applicable City code, a Stormwater Site Plan as described in the Edmonds StormwaterAddendum (see ECDC 18.30.060) and any other information required by the Director. Version: August 22, 201-56 Packet Pg. 373 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT B. Inspections. Page 10/23 1. The Director shall inspect projects at various stages of the work to determine if they comply with the requirements of this chapter, and enforcement actions shall be taken as necessary. These inspections will include, but not be limited to, the following: a. Prior to site clearing and construction to assess site erosion potential, and b. During construction to verify proper installation and maintenance of required erosion and sediment controls and other approved plan components, and c. All permanent stormwater treatment and flow control BMPs/facilities and catch basins in new residential developments every six months until 90 percent of the lots are constructed (or when construction is stopped and the site is fully stabilized) to identify maintenance needs and enforce compliance with maintenance standards as needed, and d. Upon completion of construction and prior to final approval to ensure proper installation of permanent stormwater control facilities and verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater treatment and flow control BMPs/facilities, and e. Post -Construction inspections per ECDC 18.30.090. 2. When reasonably required by the Director to accomplish the purpose of this chapter or to comply with local, state or federal law or regulation on stormwater, special inspection or testing shall be performed by the applicant. C. Fees. Application, review and inspection fees as set in ECDC Chapter 15.00 shall be paid. 18.30.060 Requirements. A. Documents. The sources of the stormwater management requirements for the City are from the following documents: 1. Western Washington Phase II Municipal Stormwater Permit, Appendix 1, modification date January 16, 2015 2. 2014 Stormwater Management Manual for Western Washington (SWMMWW) 3. The Edmonds Stormwater Addendum In the event of conflicts between the various provisions, the more stringent provision shall apply. QB. Illicit Discharges and Connections. Non-stormwater illicit discharges, including spills, into the MS4, Formatted: Numbered + Level: 1 i groundwaters, or a water body from any developed or undeveloped lands are prohibited per ECDC Chapter 7.200. Numbering Style: A, B, C, ... + Start C. Thresholds and Applicability Alignment: Left + Aligned at: 0" + at: 0.25" 1. The thresholds outlined in this section are only applicable to ECDC 18.30.060.C. See also the Edmonds Stormwater Addendum for supplemental information on thresholds. a. All development shall be required to comply with Minimum Requirement No. 2. b. Category 1 project sites shall comply with Minimum Requirements No. 1 through No. 5. Category 1 includes projects that: i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or ii. Have land disturbing activity of 7,000 square feet or greater. c. Category 2 project sites shall comply with Minimum Requirements No. 1 through No. 9. Category 2 includes projects that: Version: August 22, 201-56 Packet Pg. 374 9.1.b a� 0 U Edmonds Page 11/23 d Chapter 18.30 STORM WATER MANAGEMENT E d i. Result in 5,000 square feet, or greater, of new plus replaced hard surface area, or t0� ii. Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or iii. Convert 2.5 acres, or more, of native vegetation to pasture. 2. Additional Requirements for For from the Formatted: Indent: Left: 0", Spacehard L d � road related projects. road related projects, runoff new and replaced swfaees (ineittding pa-vement, shettliders, etffbs, and sidewalks) and the eeavei4ed vegetation areas shall mee 10 pt, Line spacing: single, Don't aall 3 t�he m-4;im-iim reEfdirements only ifthe now hard stiffaees total 5,000 squar-e feet or more and total 50 pereent a space between Latin and Asian text E 't more ofthe existing hard surfaees within the projeet limits. Otherwise, the minimum requirements only apply4o- adjust space between Asian text an 0 4� the-, now 4;ard q--r-4issq and the emwet4ed vegetation areas. The projeet limits shall he. dy-Anuef by the length e project and the width o fthe Fight of-w,,, ,Additional Requirements for road -related projects. For road -related runoff from the new hard surfaces (including shoulders, curbs, and sidewalks) and the numbers, Tab stops: 0.5", Left � Formatted: F.M. Times New Rome projects, pavement, 0 converted vegetation areas shall meet all the minimum requirements if the new hard surfaces total 5,000 square feet or more. In addition, if the new hard surfaces total 5,000 square feet or more and total 50 percent or more of the existing hard surfaces within the project limits, runoff from the new and replaced hard surfaces and the O converted vegetation areas shall meet all the minimum requirements. The project limits shall be defined by the O length of the project and the width of the right-of-way. i • .. __ N ' to _. "Formatted: Normal, Indent: Left: ( No bullets or numbering G 3. New Connections to the City's MS4 when the proposed connection does not involve activity that meets the N definition of development. Sites that are not currently connected to the City's MS4 but that wish to connect cm directly or indirectly to the City's MS4 may be allowed on a case -by -case basis, subject to City approval. For G sites that propose to drain greater than or equal to 2,000 square feet of inffwF ous-hard surface area to the p City's MS4, minimum requirements and BMPs associated with stormwater flow control and/or water quality E treatment (such as those outlined in ECDC 18.30.060.D [1] through [9]) may be required if the connection 0 poses any risk to downstream systems such as erosion, flooding, property damage, habitat damage, water quality degradation, or other related impacts. to d C D. Minimum Technical Requirements. This section describes the minimum technical requirements for stormwater :a management at development sites. 1. Minimum Requirement No. 1 — Preparation of Stormwater Site Plans O N� The City shall require a Stormwater Site Plan from all projects meeting the thresholds in ECDC 18.30.060.C. � Stormwater Site Plans shall use site -appropriate development principles to retain native vegetation and N minimize impervious surfaces to the extent feasible. Stormwater Site Plans shall be prepared in accordance W O with Chapter 3 of Volume 1 of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. L~L a 2. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention Plan (SWPPP) W eN a. Thresholds: J a z i. All development projects are responsible for preventing erosion and discharge of sediment and LL other pollutants into receiving waters. Compliance with this minimum requirement can be p achieved for an individual site if the site is covered under Ecology's General NPDES Permit for C'? Stormwater Discharges Associated with Construction Activities and fully implementing the 00 requirements of that permit. U 0 ii. A Construction SWPPP is required for all projects which a) result in 2,000 square feet or more U of new plus replaced hard surface area, b) where a structure with an exterior hard surface area of LL at least 2,000 square feet is being demolished, c) which disturb 7,000 square feet or more of N land, or d) when the site falls within the Earth Subsidence Landslide Hazard Area, Landslide Hazard Area or steep slope critical area. Projects that do not meet any of the above criteria are y not required to prepare a Construction SWPPP, but must consider all of the elements listed E below for Construction SWPPPs and develop controls for all Construction SWPPP elements that pertain to the project site. a Version: August 22, 201-56 E t t� cC r r Q Packet Pg. 375 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT b. General Requirements: Page 12/23 i. The SWPPP shall include a narrative and drawings. All BMPs shall be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative shall include documentation to explain and justify the pollution prevention decisions made for the project. Each of the thirteen elements referenced below must be considered and included in the SWPPP unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the narrative of the SWPPP. ii. Clearing and grading activities for developments shall be permitted only if conducted pursuant to an approved site development plan (e.g., building permit, subdivision approval) that establishes permitted areas of clearing, grading, cutting, and filling. These permitted clearing and grading areas and any other areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree retention areas as required by the City, shall be delineated on the site plans and the development site. iii. The SWPPP shall be implemented beginning with initial land disturbance and until final stabilization. Sediment and Erosion control BMPs shall be consistent with the BMPs contained in Chapter 4 of Volume II of the SWMMWW. c. Seasonal Work Limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities may only be authorized by the City if it can be demonstrated that silt -laden runoff will be prevented from leaving the site through a combination of the following: i. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and 4 ii. Limitations on activities and the extent of disturbed areas; and iii. Proposed erosion and sediment control measures, in accordance with ECDC 18.30.060.D.2.d below. Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations, except for sites lying in whole or in part within an earth subsidence and landslide hazard area as defined by ECDC 19.10.020.F: i. Routine maintenance and necessary repair of erosion and sediment control BMPs, ii. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil, and iii. Activities where there is one hundred percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. d. Construction SWPPP Elements i. Construction SWPPP elements are required in accordance with Chapter 2, Section 2.5.2 of Volume I of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 3. Minimum Requirement No. 3 — Source Control of Pollution All known, available and reasonable source control BMPs must be required for all projects approved by the City. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. Version: August 22, 201-56 Packet Pg. 376 9.1.b Edmonds Page 13/23 Chapter 18.30 STORM WATER MANAGEMENT 4. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location, to the maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. The discharge must have an identified overflow route that is safe and certain, and leads to the ultimate outfall location (such as a receiving water or municipal drainage system). All outfalls require energy dissipation. To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis ,,, v ffi.....eam 4em the site to the reeeiving wa4e If an existing problem (or potential future problem after development) is identified, mitigation will be required to prevent worsening of that problem. A quantitative analysis may be required for any project deemed to need additional devmstfeam information or where the project proponent or the City determines that a quantitative analysis is necessary to evaluate the off -site impacts or the capacity of the conveyance system. See the Edmonds Stormwater Addendum for additional details on complying with this requirement. 5. Minimum Requirement No. 5 — On -site Stormwater Management a. Applicability: On -site Stormwater Management BMPs are required in accordance with the following project thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff on -site to the extent feasible without causing flooding or erosion impacts. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Project Thresholds: There are five project scenarios outlined below that determine the applicability of Minimum Requirement No. 5 — On -site Stonnwater Management. The first four scenarios apply to projects that discharge directly or indirectly to the City's MS4. The fifth scenario applies to project discharges that do not enter the City's MS4. Note that more than one of the five scenarios may apply to a given project: Retrofit. Projects that discharge directly or indirectly to the City's MS4 and that contain existing hard surfaces on the parcel or common plan of development that do not drain to an approved stormwater management facility are required to provide On -site Stormwater Management BMPs to manage a portion of those existing hard surfaces that will remain after project completion. BMPs from List No.I (See ECDC 18.30.060.D.5.d) shall be applied to a minimum of 25 percent of those existing unmanaged surfaces, but to no more than the area equal to the proposed new plus replaced hard surfaces. Only for those existing unmanaged hard surfaces that remain after project completion, applicants are not required to evaluate BMPs in priority order or document infeasibility for these existing surfaces (as is required under ECDC 18.30.060.D.5.b [ii] and [iii] below). However, if it is determined that the minimum 25 percent requirement cannot be met due to BMP infeasibility, documentation of BMP infeasibility is required. In addition, when runoff from exiting unmanaged hard surfaces is mixed with runoff from new plus replaced hard surfaces, those BMPs must be selected and designed in accordance with the requirements for management of new plus replaced hard surfaces (per sections [ii] and [iii] below). See the SWMMW W and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. Category1. Category 1 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 5 (per ECDC 18.30.060.C) shall either: Use On -site Stormwater Management BMPs from List No.1 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.d); or Version: August 22, 201-56 J a Z LL 0 M CO U 0 U W r Q Packet Pg. 377 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 14/23 Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iii. Category2. Category 2 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 9 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.2 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.e); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the City's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID Performance Standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following: a. Projects must implement BMP T5.13 (Post -Construction Soil Quality & Depth); BMPs T5.10A Downspout Full Infiltration Systems, T5.10B Downspout Dispersion Systems, or T5.1 OB Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. Edmonds Way specific requirements. After applying the requirements in item (a) above, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post -development 10-, and 100-year recurrence interval peak flows shall not exceed, 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. Projects that do not drain directly or indirectly to the City's MS4 are required to implement one of the following: a. Project sites may discharge to the downstream private property (e.g., projects located above BNSF property) with approval from the downstream property owner(s). b. Project sites may discharge runoff to an on -site system. For sites located within earth subsidence and landslide hazard areas or their buffers, a geotechnical design, analysis, and report by a geotechnical engineer is required for the on -site system. On -site Stormwater Management BMPs from List No.1 in ECDC 18.30.060.D.5.d shall be evaluated for all new plus replaced hard surfaces and land disturbed. Projects are not required to evaluate BMPs in priority order or document infeasibility. The project applicant may be subject to an extra permit processing fee for City review of the geotechnical analysis. Projects are required to comply with all other applicable City requirements, such as ECDC 19.10 (earth subsidence and landslide hazard areas). For sites located outside earth subsidence and landslide hazard areas or their buffers, ECDC 18.30.060.D.5.ii and ECDC 18.30.060.D.5.iii shall be followed to evaluate site appropriate BMP's. Version: August 22, 201-56 O C O y N to O N N O O E O J a Z LL O M O U 0 U W r Q Packet Pg. 378 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 15/23 c. Subject to prior approval by the City, project sites may pump on -site runoff to the City's MS4. A quantitative downstream analysis in accordance with Minimum Requirement No. 4 and the Edmonds Stormwater Addendum will be required. If the City's MS4 does not have adequate capacity to receive the applicant's pumped flows, the applicant is required to install an on -site detention system to store runoff and pump it to the MS4 at an approved rate. c. LID Performance Standard For projects that elect to meet the LID Performance Standard to comply with ECDC 18.30.060.D.b (ii) and (iii), sormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow from the project site. Refer to the Standard Flow Control Requirement section in Minimum Requirement No. 7 for information about the assignment of the pre -developed condition. Project sites that must also meet Minimum Requirement No. 7 shall match flow durations between 8 percent of the 2-year flow through the fall 50-year flow. d. List No.1 for Category 1 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 5. For projects that elect to use List No. 1 to comply with ECDC 18.30.060.D.b (ii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW and the Edmonds Stormwater Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: i. Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Roofs: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.I OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP TS.IOC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW. Version: August 22, 201-56 Packet Pg. 379 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 16/23 ii. Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. iv. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. e. List No.2 for Category 2 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 9. For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Roofs: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.I OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP TS.IOC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. hi addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW. ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW. Version: August 22, 201-56 Packet Pg. 380 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 17/23 iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. 6. Minimum Requirement No. 6 — Runoff Treatment a. Project Thresholds: When assessing road -related projects against the following thresholds, only consider those hard and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following require construction of stormwater treatment facilities: i. Projects in which the total of pollution -generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or ii. Projects in which the total of pollution -generating pervious surfaces (PGPS) — not including permeable pavements — is 0.75 acres or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. b. Treatment -Type Thresholds and Facility Sizing: i. Treatment -Type Thresholds in accordance with Step 2 (Oil Control), Step 4 (Phosphorus Treatment), Step 5 (Enhanced Treatment), and Step 6 (Basic Treatment) of Chapter 2, Section 2.1, Volume V of the SWMMWW. Phosphorus treatment shall be required for projects draining to Hall Creek and Lake Ballinger. ii. Treatment Facility Sizing, including Water Quality Design Storm Volume, Water Quality Design Flow Rate, and Downstream Facilities, of Chapter 2, Section 2.5.6, Volume I of the SWMMWW. c. Treatment Facility Selection, Design, and Maintenance Stormwater treatment facilities shall be: i. Selected in accordance with the process identified in Chapter 4 of Volume I, and Chapter 2 of Volume V of the SWMMWW, ii. Designed in accordance with the design criteria in Volume V of the SWMMWW, and iii. Maintained in accordance with the maintenance schedule in Volume V of the SWMMWW. d. Additional Requirements The discharge of untreated stormwater from pollution -generating surfaces to ground water will not be authorized by the City. All associated runoff must be treated using On -site Stormwater Management BMPs designed to provide the required level of treatment in accordance with Chapter 5, Volume V and Chapter 7, Volume V of the SWMMWW; or by infiltration through soils meeting the soil suitability criteria in Chapter 3 of Volume III of the SWMMWW. Version: August 22, 201-56 Packet Pg. 381 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT 7. Minimum Requirement No. 7 — Flow Control Page 18/23 Applicability: Flow control is required on projects meeting the thresholds summarized below to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. Flow control in accordance with Minimum Requirement No. 7 is not required for projects that discharge directly to, or indirectly through the City's MS4 to Puget Sound (other minimum requirements may still apply). See ECDC 18.30.060.D.5.b.iv and Section 2.5.7 of Volume I of the SWMMWW for additional restrictions applicable to direct discharges to Puget Sound. If the discharge drains to a stream that leads to a wetland, or to a wetland that has an outflow to a stream, both this minimum requirement (Minimum Requirement No. 7) and Minimum Requirement No. 8 apply. Thresholds: When assessing road -related projects against the following thresholds, only consider only those impervious, hard, and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following circumstances require achievement of the standard flow control requirement for western Washington: Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold discharge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or iii. Projects that through a combination of hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second (cfs) increase or greater in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one -hour time steps (or a 0.15 cfs increase or greater using 15-minute time steps). Standard Flow Control Requirement (applies to discharges directly or indirectly to the City's MS4, except for projects that meet the direct discharge requirements outlined in "a" above): Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. The pre -developed condition to be matched shall be a forested land cover unless reasonable, historic information is available that indicates the site was prairie prior to settlement (modeled as "pasture" in the Western Washington Hydrology Model). This standard requirement is waived for sites that will reliably infiltrate all the runoff from hard surfaces and converted vegetation areas. d. Additional Requirement: Flow Control BMPs shall be selected, designed, and maintained in accordance with Volume III of the SWMMWW or an approved equivalent. 8. Minimum Requirement No. 8 — Wetlands Protection a. Applicability: The requirements below apply only to projects whose stormwater discharges into a wetland, either directly or indirectly through a conveyance system. b. Thresholds: The thresholds identified in Minimum Requirement No. 6 — Runoff Treatment, and Minimum Requirement No. 7 — Flow Control shall also be applied to determine the applicability of this requirement to discharges to wetlands. c. Standard Requirement: Projects shall comply with Guide Sheets No. 1 through No. 3 in Appendix I-D of the SWMMWW. The hydrologic analysis shall use the existing land cover condition to determine the existing hydrologic conditions unless directed otherwise by a regulatory agency with jurisdiction. Version: August 22, 201-56 J a Z LL 0 M 00 U 0 U W r Q Packet Pg. 382 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 19/23 d. Additional Requirements: Stormwater treatment and flow control facilities shall not be built within a natural vegetated buffer, except for: Necessary conveyance systems as approved by the City; or As allowed in wetlands approved for hydrologic modification or treatment in accordance with Guide Sheet 2 in Appendix I-D of the SWMMWW. An adopted and implemented basin plan prepared in accordance with the provisions of Section 7 of Appendix 1 of the Phase II NPDES Municipal Stormwater Permit. 9. Minimum Requirement No. 9 — Operation and Maintenance An operation and maintenance manual that is consistent with the provisions in Volume I and Volume V of the SWMMW W is required for proposed Stormwater Treatment and Flow Control BMPs/facilities. The parry (or parties) responsible for maintenance and operation shall be identified in the operation and maintenance manual. For private facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -site or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate department. A log of maintenance activity that indicates what actions were taken shall be kept and be available for inspection. 18.30.070 Exceptions, Adjustments, and Appeals. A. Exceptions. 1. The Director may approve a request for an exception to the minimum requirements of this chapter following legal public notice of an application for an exception and of the Director's decision on the application. All legal public notice related to this request for an exception shall be in the manner prescribed in ECDC 20.03.002 and the applicant shall pay all costs to publish the legal public notices required by this provision. The Director shall provide and keep written findings of fact of the decision. 2. The approval of the exception shall only be granted when the applicant demonstrates that the requirement would cause a severe and unexpected economic hardship. To determine whether the requirement imposes a severe and unexpected economic hardship on the project applicant, the applicant must document for City review and approval, all of the following, at a minimum: a. The current, pre -project use of the site; and b. How application of the requirement(s) for which an exception is being requested restricts the proposed use of the site compared to the restrictions that existed prior to adoption of this chapter; and c. The possible remaining uses of the site if the exception were not granted; and d. The possible uses of the site that would have been allowed prior to the adoption of this chapter; and e. A comparison of the estimated amount and percentage of value loss as a result of the requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the requirements of this chapter; and f. The feasibility of the applicant to alter the project to apply the requirements of this chapter. 3. Any exception must meet the following criteria: a. The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and b. The exception is the least possible exception that could be granted to comply with the intent of the minimum requirements. Version: August 22, 20136 O O C O .y N to O N N O 00 O E O L w J a z U_ O M 00 U 0 U W r Q Packet Pg. 383 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 20/23 An exception to the requirements shall only be granted to the extent necessary to provide relief from the economic hardship as determined by the Director, to alleviate the harm or threat of harm to the degree that compliance with the requirement becomes technically feasible, or to perform the emergency work that the Director determines is warranted. 5. The Director may require an applicant to provide additional information at the applicant's expense, including (but not limited to) an engineer's report or analysis. 6. When an exception is granted, the Director may impose new or additional requirements to offset or mitigate harm or the threat of harm that may be caused by granting the exception, or that would have been prevented if the exception had not been granted. B. Adjustments. The Director may approve a request for adjustments to the requirements of this chapter when the Director finds that: a. The adjustment provides substantially equivalent environmental protection; and b. The objectives of safety, function, environmental protection, and facility maintenance are met, based on sound engineering practices. During construction, the Director may require, or the applicant may request, that the construction of drainage control facilities and associated project designs be adjusted if physical conditions are discovered on the site that are inconsistent with the assumptions on which the approval was based, including (but not limited to) unexpected soil or water conditions, weather -generated problems, or changes in the design of the improved areas; and A request by the applicant for an adjustment shall be submitted to the Director for review and approval prior to implementation. The request shall be in writing and shall provide facts substantiating the requirements of subsection (C)(1) of this section, and if made during construction, the factors in subsection (C)(2) of this section. Any such modifications made during the construction of drainage control facilities shall be included with the final approved drainage control plan. C. Appeal. 1. The Director's decision on an application for an exception or adjustment may appeal to the hearing examiner in accordance with a Type II appeal process in ECDC Chapter 20.06. 2. The applicant shall carry the burden of proof. 3. The decision of the hearing examiner is appealable to superior court in accordance with Chapter 36.70C RCW. [Ord. 3792 § 1, 20101. 18.30.080 Access and Covenants. A. Access. Proper ingress and egress shall be provided to the City to inspect or perform any duty imposed upon the City by this Title. The City shall notify the responsible parry in writing of a failure to provide access. If the responsible party fails to respond within seven days from the receipt of notification, the City may order the work required completed or otherwise address the cause of improper access. The obligation for the payment of all cost that may be incurred or expended by the City in causing such work to be done shall be imposed on the person holding title to the subject property B. Covenants. Maintenance covenants shall be required for each site/lot that will be maintained by a private entity such as an individual, corporation, or homeowner's association. The maintenance covenant shall address or append requirements and responsibilities for long -tern management and maintenance the applicable BMP(s). Maintenance covenants shall be as specified in City Engineering Division documents or approved by the Director, and recorded with Snohomish County and on all proper deeds [Ord. 3792 § 1, 2010]. Version: August 22, 201-56 a� 0 U c d E d t0 C O d to 3 E L 0 N O O C O .y L d to O N N O 00 O E 0 w J a z 0 M 00 U 0 U W r Q Packet Pg. 384 9.1.b Edmonds Page 21/23 Chapter 18.30 STORM WATER MANAGEMENT 18.30.090 Post Construction Inspection and Maintenance Roles and Responsibilities. Proper construction inspection and maintenance of stormwater facilities is essential for the protection of the City's MS4 and the environment. A. Stormwater Maintenance and Inspection Standards. Stormwater facilities shall be inspected and maintained per the requirements of Volume I and Volume V of the SWMMWW. For systems which do not have a maintenance standard, the owner shall develop a standard based on guidelines from the manufacturer, designer, or a registered professional engineer and submit the standards to the Director for approval. The purpose of the maintenance standard is to determine if maintenance is required. The maintenance standard is not a measure of the facility's required condition at all times between inspections. Exceeding the maintenance standard between inspections is not a violation of this chapter. B. Ownership. Stormwater facilities are either privately or publicly owned and maintained. All stormwater facilities that serve private property are private, unless an agreement between the property owner and the City states otherwise. Stormwater facilities that are privately owned by a homeowner's association or similar organization also are private. The City may offer an incentive program to owners to support the proper maintenance of private storm drainage facilities. C. Public Stormwater Facilities. The City shall be responsible for operating, maintaining, repairing, and replacing public stormwater facilities as funded through the Stormwater Utility. D. Maintenance and Inspection of Permanent Facilities. All privately owned storm drainage facilities or controls shall be maintained by the owner, or the homeowner or owner association ("owner") if one is established as part of a residential or commercial development. All private storm drainage facilities shall be regularly inspected to ensure proper operation and shall monitor the facility or control as required or as set forth in the SWMMWW. The Owner shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person who took it, the date said action was taken, how it was done, and any problems encountered or follow-up actions required. The records shall be made available to the City upon request. The Owner shall maintain a copy of the Stormwater Operations and Maintenance Manual (if required) on site, and shall make reference to such document in real property records filed with Snohomish County, so others who acquire real property served by the privately owned storm drainage facilities or controls are notified of their obligation to maintain such facilities or controls. E. City Inspection of private stormwater facilities. The City shall have the authority to periodically inspect private stormwater facilities, including low impact development stormwater facilities, for compliance with this chapter. F. Right of Entry. An authorized representative of the City may enter private property at all reasonable times to conduct inspections, tests or to carry out other duties imposed by the a state or Federal program provided that the City makes a good faith effort to notify the property owner or person responsible for the premises prior to entering and presents proper credentials to that person. If entry is refused or cannot be obtained, the Director shall have recourse to every remedy provided by law to secure entry, including but not limited to, obtaining an administrative warrant for entry. G. Right of Entry for Illicit Discharge. In the event of an illicit discharge from a privately -owned stormwater facility caused by improper maintenance or operation or other circumstance, the provisions of ECC 7.200 shall apply. H. Maintenance Responsibilities. Upon written notice by the City, a private stormwater facility shall be promptly repaired and/or brought up to applicable standards by the property owner or the person responsible for said facility. If a private stormwater facility serves multiple lots and the responsibility for maintenance has not been specified on a recorded subdivision plat, short plat, or other legal document, maintenance, operation and repair responsibility shall rest with the homeowners' association, if one exists, or otherwise with the properties served by the facility, or finally, with the owners of the property on which the facilities are located. I. Disposal of Waste from Maintenance Activities. Disposal of waste from maintenance activities shall be conducted in accordance with the minimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines Version: August 22, 20136 J a Z LL 0 M 00 U 0 U W r Q Packet Pg. 385 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 22/23 for disposal of waste materials from storm water maintenance activities, and where appropriate, the Dangerous Waste Regulations, Chapter 173-303 WAC. 18.30.100 Enforcement Procedures. A. General enforcement action shall be in accordance with this chapter whenever a person has violated any provision of this chapter. The choice of enforcement action is at the discretion of the City. B. Civil Penalties Adopted. ECDC Chapter 20.110 enforcement procedures are herein adopted in full, as modified in this chapter, with the proviso that repeat offenders or violations deemed an immediate public hazard shall be subject to compliance and appeal timelines as deemed appropriate by the Director based on the specific nature of the violation. C. Maintenance Orders. The Director shall have the authority to issue to an owner or person an order to maintain or repair a component of a stormwater facility or BMP to bring it into compliance with this chapter, the SWMMW W, the Edmonds StormwaterAddendum, and the Edmonds Community Development Code. The order shall include: 1. A description of the specific nature, extent and time of the violation and the damage or potential damage that reasonably might occur; 2. A notice that the violation or the potential violation cease and desist and, in appropriate cases, the specific corrective actions to be taken; and 3. A reasonable time to comply, depending on the circumstances. D. Civil Penalty. A person who fails to comply with the requirements of this chapter, who fails to conform to an approval or order issued, who undertakes development without first obtaining approval, or who fails to comply with a stop work order issued under these regulations shall be subject to a civil penalty levied in accordance with the provisions of ECDC Chapter 20.110; provided, however, that the appeal process shall commence with a notice of violation as provided in ECDC 20.110.040.B. Civil penalties for code violations shall be imposed in accordance with the provisions of ECDC Chapter 20.110; provided, however, that in addition to the penalties set forth in that chapter, the hearing examiner is authorized to levy a penalty of up to twenty thousand dollars ($20,000) per occurrence based upon an assessment of the following factors. Where such factors are present, the hearing examiner is authorized to levy such penalty after taking into consideration the full impact of the violation and any mitigating circumstances (see subsection (2) below): a. The violation created a risk to public health and the significance of the risk. b. The violation damaged the environment and the significance of the damage. c. The violation caused damage to public and private property and the significance of such damage. d. A history of similar violations, if any. e. The economic benefit of the violations, if any, to the person or entity responsible for the violations. Mitigating circumstances which may be used to offset or reduce the time resulting from the application of the preceding factors are limited to: a. Full compliance with a voluntary compliance agreement and no history of similar violations. b. Full compliance with a voluntary compliance agreement and a history of one or two similar violations (lesser reduction). c. A "voluntary compliance agreement' is defined as a legally binding agreement entered into between the City and the alleged violators, by which the violator(s) acknowledge the existence of the violation, waive Version: August 22, 20136 a� 0 U c d E d t0 C O d to 3 E L 0 N O O C O .y N to O N N O 00 O E 0 w J a z U- O M 00 U 0 U W N r c 0 E t U fC .r a N E t t) cC r r Q Packet Pg. 386 9.1.b Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 23/23 all appeal rights, and agree to and do pay a fine in an amount stipulated to between the violator and the City. 3. If the violation(s) are not corrected as ordered, or a voluntary compliance agreement is not entered into within that time period and no appeal is filed, the penalty for the next 15-day period shall be 150 percent of the initial penalties, and the penalties for the next 15-day period shall be 200 percent of the initial penalties. The intent of this subsection is to increase penalties beyond the maximum penalties stated as an additional means to achieve timely compliance. 4. Unless otherwise provided in a voluntary compliance agreement, civil penalties shall be paid within 30 days of service of the notice and order or stop work order if not appealed. Payment of the civil penalties assessed under this chapter does not relieve a person found to be responsible for a code violation of his or her duty to correct the violation or to pay any and all civil penalties or other cost assessments issued pursuant to this chapter. 5. The City may suspend immediate payment of civil penalties if the person responsible for a code violation has entered into a voluntary compliance agreement. Penalties shall begin to accrue again pursuant to the terms of the voluntary compliance agreement if any necessary permits applied for are denied, canceled or not pursued, if corrective action identified in the voluntary compliance agreement is not completed as specified, or if the property is allowed to return to a condition similar to that condition which gave rise to the voluntary compliance agreement; provided, however, that additional penalties shall not be imposed until additional notice and opportunity for hearing have been provided in accordance with ECDC Chapter 20.110. 6. Civil penalties assessed create joint and several personal obligations in all persons responsible for a code violation. E. The determination of the hearing examiner issued in accordance with ECDC Chapter 20.110 shall be appealable to the Snohomish County superior court in accordance with the provisions of Chapter 36.70C RCW. The remedies provided for in this section shall not be exclusive. The City may also use other civil and administrative remedies available to it, including but not limited to the remedies provided in ECDC Title 19 and the state building and dangerous buildings codes Version: August 22, 201-56 O O C O .y L N to O N N O 00 O E O L w J a z 0 M 00 U 0 U W r Q Packet Pg. 387 9.1.c Following are responses to the stormwater code questions received via email from Councilmember Buckshnis on August 25, 2016. The entirety of the e-mail is presented to provide context. Specific responses to each question are interlaced in the text. Additional responses are included at the end. These come from a separate e-mail sent to Councilmember Buckshnis on August 31 st Good Morning Phil, I did not bring forth many questions as it appeared that the Mayor wanted to move this item along as well. As I have stated in the last meeting, this has 'flown "past Council with only one presentations in June and August (without PowerPoint prevention prior) and one in public hearing when it is such a huge and detailed document. I am also concerned from a global perspective that everything points to you (Director) being in charge of every decision (pre and post construction). And on Tuesday, you now you are saying we are hiring a Stormwater Specialists which I agree should have occurred when Jerry left. Yet you want this approved by Council now even though you have already sent it off to the State for review? As such, it seems Council is merely a rubber stamp at this point? Or am I totally off base on this authority of things? 1) In the definition you have now removed Critical Areas - I could not see how the critical areas were treated in the Stoomwater code and it is so confusing, it is not easy for me to ascertain what process or trigger occurs when there is a critical area ? (P179) Response: The Critical Area requirements of the ECDC (Title 23) still apply citywide, alongside the Stormwater code. Nothing in the existing or proposed new Stormwater code changes City Critical Area requirements. Rather, we are avoiding redundancy by eliminating content that is not specifically discussed in this code section. The definition of "critical areas" was removed from the Stormwater code since the term is not used in this section and does not have a unique definition for the purposes of this section. 2) The Director definition indicates that it is the Director or designee with an appropriate background in engineering or another related discipline? What other related discipline would we be expecting other than an engineer specializing in Stormwater management? (P180) Response: Designation of some tasks can be made to specific staff members on a day-to-day basis but the Director retains responsibility for the proper implementation of this code section. Certainly one key staff member would be the City's Stormwater Engineer as you point out. Other key staff would include the City Engineer, the Senior Utilities Engineer, the Engineering Program Manager, and potentially other staff. There may be times when a decision requires expertise in a discipline not available on our staff. This might include Packet Pg. 388 9.1.c wetland sciences, water quality, or land use for example. The main point is that no change is being proposed to this definition as it has worked well for the City in the past. 3) There is a tremendous amount of low impact development language in this document and yet the City has yet to have any LID code in its current code. How are we to determine if this is correct or not in terms of best management practices? Many of us do not want zero lot lines in an LID and so we how will we be interfacing this with our upcoming code? (Page 181) Response: The LID -related requirements that are reflected in the proposed Stormwater code are explicitly required as part of the City's NPDES Municipal Stormwater Permit. The stormwater requirements in the NPDES Permit are quite technical and very prescriptive, but also have been determined by the Department of Ecology to be best practices. The City would be out of compliance with the NPDES Permit if the LID requirements in the proposed Stormwater code were not all included. These requirements are being implemented by all NPDES permitted municipalities across western Washington. Related to the Stormwater code updates, but on a separate Council approval track, are the broader LID integration code updates. These are being proposed across all sections of the Edmonds Code. These proposed changes are also in compliance with the NPDES Permit, but are intended to 1) make the rest of the City's code work well with the new stormwater code, and 2) address barriers that may exist throughout the current code that do not allow for or could prevent the use of LID during development. The LID integration code updates are currently being drafted and will be discussed with Council separately from the Stormwater code section. 4) We have removed the definition of Redevelopment? I see a lot of language about redevelopment, especially in our CAO, so why is this being removed (p183) Response: The Stormwater code does not differentiate between "new" development and "re" development. The term "redevelopment" is not used in the proposed Stormwater code; therefore, we are proposing to remove it from the definitions section. Moreover, note that the definitions provided in the proposed new stormwater code are specific to Chapter 18.30, and do not apply to other portions of City code. 5) We have removed the definition of watershed. Are we not concerned about our watersheds and how or where they drain, especially in Stormwater management (p 185) Response: The term "watershed" is not used in the proposed Stormwater code; therefore, we removed it from the definitions section. The stormwater requirements have and will continue to be tailored to and sensitive to City -specific and watershed -specific issues. Moreover, the majority of the proposed changes, including the NPDES Permit -required changes, are intended to improve protection of City watersheds and water resources. Nothing has changed with regards to the City's ability to tailor the stormwater requirements to watershed -specific issues as needed and as they evolve in the future. Packet Pg. 389 9.1.c 6) The entire "subdivision" section now has been removed? Are we totally removing subdivisions from our existing code (page 186) Response: No, stormwater regulations will, of course, apply to subdivisions. Those requirements have mostly been moved to the Administration section (18.30.050). 7) 18.30.30 (new) (p187) and applicability regarding submissions or applications is very confusing to me as suddenly we bring in the City's MS4 guidelines (which only show up on page 194 or maybe I missed it somewhere before now) and the issuance of a permit with inspections completely being removed? Can you just explain what the meaning of this section is now? Response: The existing Applicability section is not comprehensive enough to meet the NPDES Permit requirements. In short, it implies that the Stormwater code was only "applicable" when a permit was issued. This is not correct, as portions of the Stormwater code apply regardless of whether a City permit is required or not. Therefore, the proposed Applicability section has been revised to meet the NPDES Permit requirements and to clarify that stormwater requirements apply to a much wider range of situations that may impact stormwater runoff and downstream water resources. 8) On thresholds -you have removed Underground utility projects (p 182). Does this mean the City is not subject to any requirement? Response: We assume you are referring to page 192, as opposed to page 182, to the text that reads "Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. 2." If so, this portion of the Stormwater code has simply been moved to the Exemptions section (18.30.040), since it made more sense for it to reside in that location. Regardless, utilities are still subject to certain stormwater requirements, except per the exemption language. Note that this proposed language is straight out of the NPDES Permit requirements (exemptions section) and is essentially unchanged relative to the existing Stormwater code. 9) Seasonal work limitation (p193) - I think this makes sense, but it seems as the weather changes - this might be too limiting? Response: This language is excerpted from (and required by) the City's NPDES Permit. However, please note that Minimum Requirement No. 2 (Construction Stormwater Pollution Prevention) still applies year-round, and thus will help protect receiving waters from construction site runoff regardless of the season. In addition, the proposed Stormwater code also includes some flexibility with the seasonal requirement where it states "Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance." 10) Back to the LID performance standards - a lot of new guidance, WOW is all I wrote. How is this going to interface with our zoning code on LID? Packet Pg. 390 9.1.c Response: As noted under question #3, the proposed Stormwater code elements are required in order to update long-standing stormwater requirements related to development activity, whereas the broader LID code updates are aimed at changes throughout City code to eliminate barriers to LID and make LID the preferred approach to development. These code changes will be complimentary, with the Stormwater code focusing on stormwater issues, and the LID integration code updates focusing on broader City policies on land use, zoning, and other important issues. 11) Post construction Inspection and Maintenance - I see the city only brin scup MS4 but what about MSS? How will the city sign off? (P203) Response: Apologies, but we are uncertain what you mean by "MS5." You may have confused the acronym MS4 (Municipal Separate Storm Sewer System) with MR5 (Minimum Requirement 5). That could easily happen. Regarding sign off, projects with private stormwater facilities have been (and will continue to be) required to submit a maintenance plan for City approval. In addition, projects are required to comply with that maintenance plan after project completion (i.e., for long-term maintenance of their stormwater facilities). The City is also required (by the NPDES permit) to inspect and enforce these maintenance requirements. The associated inspections occur during construction, upon project completion, and roughly annually after that (there is some flexibility to the ongoing inspection processes and requirements). 12) Enforcement (p 204) How can we make sure Council is being made aware of any significant issues as it says the choice of enforcement is at the discretion of the City. I can think of issues with the CAO where we put in at least some mechanism that when a large "issue" comes forward, the city is aware of it. Same issue with Penalties that follow (p205). Response: The enforcement portion of this code section relates to construction activities and maintenance of stormwater systems post -construction. City staff administers this portion of the code now and would do so going forward. If a major event took place such as a significant spill into the City's MS4 system or a major slide associated with failure of a stormwater detention or treatment facility, or a similar significant event the administration has, in the past, and would continue to be open in sharing that information with the Council and the public. But these types of events are not what the proposed code changes are addressing. Email sent on 8/31/2016 Ms. Buckshnis, We have been working since last week to get you good answers to the questions you have asked. Those should be coming out to you and other Council members tomorrow and they will be included in the agenda packet as well for the 9/13 Council meeting. The notification to the Department of Commerce was a requirement we were not aware of until recently. It wasn't even obvious these proposed code revisions triggered that requirement. In an abundance of caution we decided to submit the draft stormwater code to them for review and approval Packet Pg. 391 9.1.c I have been told that many of the cities working to meet the same state mandate have not taken this step at all. It is my understanding that the Commerce review is done at a very high level and mostly related to any requirements that might be contrary to state law or regulation. Since this draft stormwater code only contains a blend of our existing code and state -mandated changes it does seem unlikely they would find fault with it. Worst case would be that Council approves a version of the code that Commerce finds fault with for some reason and we have to make an amendment. At that point we would make the change and ask Council to review and approve that change. Again, this seems unlikely. As far as the Department of Ecology is concerned I misspoke when I told council we would also send it to Ecology for their review and approval. I thought that was required. It is not a requirement. You can apparently send your draft code to them for a courtesy review but that is not a required part of the adoption process. The SEPA review is a requirement. There are specific timelines on that process. We will not put this item back on your agenda for approval until that is complete. I want to respond to your comments about the Stormwater Engineering position. We have made an offer to a highly qualified applicant to fill this vacancy. Robert Edwards starts work for the City tomorrow. Your comment seemed to suggest that we had somehow waited to do that until recently. That is definitely not the case. We did lose some time initially when we decided to change the job description for the position and re -organize the utility engineering staff. All of that had to be taken through Council for approval and that took a couple months to complete. We then recruited for this position for many months and were unable to find the right person. After going through a complete recruitment and hiring process twice we finally found what we believe to be a great fit for the City. Believe me, we have worked hard to fill this position and it is important to me that you understand that. Council is not being asked to rubber stamp anything. This code is being presented to you for review, comment, and approve like any other code change would be. I agree these are important and impactful changes. The only caveat is that most of the changes are required by state law. We have tried very hard to highlight the areas in the draft code where some latitude exists and how staff and our consultant team are proposing to handle those areas. We are not in a huge hurry as you have apparently perceived The only true deadline is that this code and the LID integration code changes in the rest of the EDC must be done by the end of the year. If you have other questions please don't hesitate to ask them. The following was added Today 9/1/2016 In the above e-mail I indicated that we are not in a complete rush to get this done. That is true but I would like to point out that adopting this section of the code is not the end of the process. We need to be fully compliant by January 1 st, 2017. Once this code is adopted we then need to turn our attention to the "LID Integration codes" update mentioned above in several of our responses. Next, we will produce the Stormwater Addendum which will provide additional specifics and procedures related to the revised codes. After that we need to train staff on implementation procedures and policies. Finally, we need to prepare a number of handouts and checklists to explain the new code to many different audiences. None of these additional tasks can be Packet Pg. 392 9.1.c undertaken until we know exactly what the new stormwater code section will contain. That is what is driving us to get this section of the code re -write adopted sooner rather than later. Packet Pg. 393 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Chapter 18.30 STORMWATER MANAGEMENT Sections: 18.30.000Purpose Purposes. 18.30.010 Definitions. 18.30.020 Authority and Regulation. 18.30.030 Applicability. 18.30.040 Exemptions. 18.30.050 Administration. 18.30.050 Pr-eje,.t elassifieatien. 18.30.060 S*afm water management requirements Requirements. 18.30.070 Exemptions, exeeptions, adjustments and appeal Exceptions, Adjustments, and Appeal. 18.30.080 E^^^m^p'^, deeds, Access and eaveaan4sCovenants. 18.30.090 Post Construction Inspection and „ aipAenanee r-e Maintenance Roles and respensibilitiesR 18.30.100 Enforcement pfocedufesProcedures. 18.30.000 Pu-rposePurposes. Page 1/30 existing storm water systems that directly or indireetly discharge to the eivy storm water A. To set forth standards for managing stormwater runoff from construction and development sites to minimize: 1. Degradation of surface water quality by controlling the scouring and sedimentation of creeks, streams, wetlands, ponds, lakes, other water bodies. 2. Degradation of groundwater quality. 3. Damage to adjacent and other downstream private properties from erosion or other impacts from stormwater runoff. 4. Damage of City -owned parcels, City roads, rights -of -way and associated infrastructure. B. To comply with requirements in ^ manner that oomplies with the Wester Washington -the Phase II National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permit as issued by the Washington State Department of Ecology.- (Ecology). C. To complement site planning activities that minimize: 1. Impervious surfaces area. The--, Ed-m-offlids City Code and Gonmutmity Development Gode, ffe, eurreat Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 394 9.1.d Edmonds Chapter 19.30 STORM AL TER NIAN GENILINT Edmonds Chapter 18.30 STORM WATER MANAGEMENT 2. The loss of native or non-native site vegetation. 3. The generation of stormwater runoff. Page 2/30 D. To make low impact development (LID) the preferred and commonly used approach to site development; to require LID be considered at the site planning stage; and to implement LID BMPs unless they are infeasible. E. To i3r-avide for- insi3eetion aad maifAeaa-nee ef ster-m,�A,ater facilities in the e4v te easttr-e that these f4eilities Derfor F: To require that all p. lie and pr-iv. e s*e: w er ��publicly-owned and privately -owned Stormwater Treatment and Flow Control best management practices (BMPs)/Facilities are operated, maintained, and repaired in a manner that conforms to this chapter. G. To establish the mininium standards that must be met for oomplianee, 14F. To provide ^^ the authority for all—Mhethe City to inspect privately -owned Stormwater Treatment and maintain sta f... wa4er- f eili Flow Control BMPs/Facilities. G. To provide enforcement procedures for ensuring compliance with this chapter. 18.30.010 Definitions. For the purposes of this chapter, the following definitions shall apply: L`Arterial. A road or street primarily for through traffic. The term generally includes roads or streets considered collectors. It does not include local access roads which are generally limited to providing access to abutting property See also RCW 35.78.010, RCW 36.86.070, and RCW 47.05.021. Adjustment. A variation in the application of a minimum requirement to a particular project. Adjustments provide substantially equivalent environmental protection. L`Applicant" means the. The owning individual(s) or corporations or their representatives applying for the permits or approvals described in this chapter. L'Approval. The proposed work or completed work conforming to this chapter as approved by the public works direetefDirector or their designee. "Best management practice (BN4P)" means the sehe ulepractices (BMPs). The schedules of activities, prohibitienprohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by the 64yCity that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to waters of Washington State. LBioretention. Engineered facilities that treat stormwater by passing it through a specified soil profile, and either retain or detain the treated stormwater for flow attenuation. Refer to the 2014 Stormwater Management Manual for Western Washington (SWMMWW), Chapter 7 of Volume V for bioretention BMP types and design specifications. Category 1 Project Site. A project site subject to Minimum Requirements No.l through No.S. See ECDC 18.30.60.C. Category 2 Project Site. A project site subject to Minimum Requirements No.I through No.9. See ECDC 18.30.60.C. Certified Erosion and Sediment Control Lead (CESCL). An individual who has current certification through an approved erosion and sediment control training program that meets the minimum training standards established by Ecology (see BMP C160 in the SWMMWW). A CESCL is knowledgeable in the principles and practices of erosion and sediment control. The CESCL must have the skills to assess site conditions and construction activities that could The--, Ed-m-onds City Code and Gonmnunity Development Gode, are--, e_-,urremt ffi-r-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 395 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 3/30 impact the quality of stormwater and, the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. Certification is obtained through an Ecology approved erosion and sediment control course. Course listings are provided online at Ecology's website. City's municipal separate storm sewer system'—' or "MS4 ."A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains) that are owned or operated by the eityCity of Edmonds, designed or used for collecting or conveying ovate stormwater, and are not a combined sewer nor part of a publicly owned treatment works as defined in 40 Code of Federal Regulations (CFR) 122.2, and which is defined as "large" or "medium" or "small" or otherwise designated by Ecology pursuant to 40 CFR 122.26. "Clearing" means the act. The destruction and removal of vegetation, including grubbing. by manual, mechanical, or chemical methods. L'Commercial Agriculture. Those activities conducted on lands defined in RCW 84.34.020(2) and activities involved in the production of crops or livestock for commercial trade. An activity ceases to be considered commercial agriculture when the area on which it is conducted is proposed for conversion to a nonagricultural use or has lain idle for more than five years, unless the idle land is registered in a federal or state soils conservation program, or unless the activity is maintenance of irrigation ditches, laterals, canals, or drainage ditches related to an existing and ongoing agricultural activity. Common plan of development or sale" means a. A site where multiple separate and distinct construction activities may takebe taking place at different times on different schedules and/or by different contractors, but still under a single plan. For example! „hale Examples include: 1) phase projects and projects with multiple filings or lots, even if the separate phases or filings/lots will be constructed under separate contract or by separate owners (e.g., a development where lots are sold to separate builders); 2) a development plan that may be phased over multiple years, but is still under a consistent plan for long-term development; ef3) projects in a contiguous area that may be unrelated but still under the same contract, such as construction of a building extension and a new parking lot at the same facility; and 4) linear projects such as roads, pipelines, or utilities. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determine permit requirements. ,> means land disturbing operations including elearing, grading, or excavation that disturbs "Converted pervious sur?aee" means-t evegetation (areas). The change in land cover changed from native vegetation, pasture scrub/shrub, or unmaintained non-native vegetation to lawn, lands ape, or landscaped areas, or where native vegetation is converted to pasture -areas. L'Creeks. Is synonymous with "stfeastreams," which is defined in ECDC 23.40.005320. "Critical areas" is defined in I CDC 23.40.005. "Design stora' means a rainfall event or pattern of events for use in analyzing and designing drainage faeilities. "Deten4ion" means a f4eility fer eapArelling sterm wmer ruflog for a preseribed design sterm and releasing the Storm water at a preseribed rate LDetention facility. An above or below ground facility, such as a pond or tank, that temporarily stores stormwater runoff and subsequently releases it at a slower rate than it is collected by the drainage facility system. There is little or no infiltration of stored stormwater. Development. Land -disturbing activities, including Class IV general forest practices that are conversions from timber land to other uses. Creation or addition of hard surfaces, or replacement of hard surface that is not part of a routine maintenance activity. Structural development, including construction, installation, replacement, or expansion of a The--, Ed-m-onds City Code and Gonmutmity Development Gode -are eurrent Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 396 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 4/30 building or other structure. Subdivision, short subdivision, and binding site plans, as defined and applied in Chapter 58.17 RCW Director" means the public works aireete . The City's Public Works and Utilities Director or a designee with an appropriate background in engineering or another related discipline. "Discharge point. The location where a discharge leaves the municipal separate storm sewer system (MS4) through the City's MS4 facilities/BMPs designed to infiltrate. Ecology. The Washington State Department of Ecology. "Effective impervious surface. Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system including the ciy's N4S4.. Impervious surfaces on residential development sites are considered ineffective if: 1) the runoff is dispersed through at least 100 feet of native vegetation in accordance with BMP T5.30 — "Full Dispersion," as described in Chapter 5 of Volume V of the Star -.water Management N4an....1 f r Westo..., Washington (2005) SWMMWW; 2) residential roof runoff is infiltrated in accordance with downspout Full Infiltration Systems in BMP T5.10A in Volume III of the SWMMWW; or 3) approved continuous runoff modeling methods indicate the entire runoff file is infiltrated. "Erosion" means the displaeement of any earffi material or existing vegetation by rainfall, storm water runoff-, or seepage. "Erodible or leachable materials. Wastes, chemicals, or other substances that measurably alter the physical or chemical characteristics of runoff when exposed to rainfall. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Erosion. The wearing away of the land surface by running water, wind, ice, or other geological agents, including such processes as gravitational creep. Also, detachment and movement of soil or rock fragments by water, wind, ice, or gravity. See the SWMMWW Glossary for examples of types of water erosion. Excavation'=. The mechanical removal of dearth material. °`Exceptions Relief from the application of a minimum requirement to a project. L'Fi11!Lmeans-a. A deposit of earth material placed by artificial means. L'Groundwater. Water in a saturated zone or stratum beneath the land surface or below a water body. "Hard surface. An impervious surface, a permeable pavement, or a vegetated roof. Highway. A main public road connecting towns and cities. In Edmonds, this includes State HighwayRoute 99, State Route 524, and portions of State Highwa 104, beththat are classified as principal arterials in the citylsCity's comprehensive transportation plan. L'Illicit discharge" ea y. Any direct or indirect ,meta.- . , ate non-stormwater discharge to the eitylsCity's MS4, groundwaters, or a water body, except as expressly allowed by ECDC Chapter 7.200EGG. "Impervious surface. A non -vegetated surface area that either prevents or retards the entry of water into the soil mantle as' sunder natural conditions prior to development, res'a ing it ste . A non -vegetated surface area which causes water Ito run off the surface in greater quantities or at an increased rate of flow eempare to s*a-n Water- ....ne ff,.>,.,..aete -isti s from the flow present under natural conditions prior to development. Common impervious surfaces include4, but are not limited to) rooftops, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces that similarly impede the natural infiltration of stafm wate stormwater. Open, uncovered retention/detention facilities . Version: September 8, 2015 Packet Pg. 397 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 5/30 shall not be considered impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. However-, epeeOpen, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. Outdoor swimming pools shall be considered impervious surfaces in all situations. In addition, lawns, landscaping, sports fields, golf courses, and other areas that have modified runoff characteristics resulting from the addition of underdrains and impermeable or low permeability liners are to be considered impervious surfaces. If no liner is installed, these areas (lawns, landscaping, sports fields, golf courses, etc.) served by underdrains may be considered pervious if the underdrain is set a minimum of 8 inches above the in -situ soils in a manner to allow infiltration over the facility bottom. "Lake" means an. An inland body of fresh water surrounded by land. "Land -disturbing activity. Any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and nonvegetat ve) non -vegetative) and/or the existing soil topography. Land -disturbing activities include but are not limited to demolition, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land -disturbing activity. Vegetation maintenance practices, including landscape maintenance and gardening, are not considered land -disturbing activity. Stormwater facility maintenance is not considered land disturbing activity if conducted according to established standards and procedures. L'Low impact development" means deve opm^ff* ean"eted in a ...a (LID). A stormwater and land use strategy that seeksto ^' Aely prevent alterations to the Natural ydrologystrives to mimic pre -disturbance hydrologic processes of the infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on -site. Low impaot deve opmen4 includes features, site planning and design to redue^ alterations of natural soil and vegetati nme imperviouss surkwes,, and specifiedistributed stormwater management practices that help to replieme aa�ur l hydrology stiek asare integrated into a project design. LID Best Management Practices (BMPs). Distributed stormwater management practices, integrated into a project design, that emphasize pre -disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, s, ail amend en4s bioretenti^n systems, ^^a roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re -use. LID principles. Land use management strategies that emphasize conservation, use of on -site natural features, and site planning to minimize impervious surfaces, native vegetation loss, and stormwater runoff. "Maintenance. Repair and maintenance activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing; and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include replacement of dysfunctional facilities, including cases where environmental permits require replacing an existing structure with a different type structure, as long as the functioning characteristics of the original structure are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. In regard to stormwater facilities, maintenance includes assessment to ensure ongoing proper operation, removal of built up pollutants (i.e., sediments), replacement of failed or failing treatment media, and other actions taken to correct defects as identified in the maintenance standards of Chapter 4, Volume V of the SWMMWW. "Maximum ex4ent feasible" means the requirement is to be fully implemented, constrained only by the physical limitations of the site, practical eonsiderations of engineering design, and reasonable considerations of financial eosts and environmental ^tom "Maximum extent practicable (MEP). Refers to paragraph 402(p)(3)(B)(iii) of the federal Clean Water Act which reads as follows: Permits for discharges from municipal storm sewers shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques, and system, design, and engineering methods, and other such provisions as the Administrator or the State determines appropriate for the control of such pollutants. The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 398 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT MS4" means the eity s. The City's municipal separate storm sewer system. Page 6/30 `Native vegetation" fneans vegeta . Vegetation comprised of plant species4, other than noxious weeds), indigenous to the coastal region of the Pacific Northwest which could have been reasonably expected to occur naturally on the site. Examples include trees such as Douglas fir, western hemlock, western red cedar, alder, big -leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. L'Natural drainage systems and outfalls=mean the. The location of the channels, swales, and other neffmanmadenon-manmade conveyance systems as defined by the earliest documented topographic contours existing for the subject property, either from maps or photographs, or such other means as appropriate. plans,'!New development" means land disturbing aetivities, ineluding Class 13.1 general forest praetiees that are eonver-sio from timber land to other uses per RCW 76 09.050; stvdetural development, ineluding eonstruetion or installation of building er- at -her struetufe; er-eation of impetwiiaus swir-A-estes; and s4division, sheft s4division, and binding site as defined and applied in Chapter- 58.17 R-CW. Pr-ojeets meeting the deAnition of redevelopment shali not be nsiderea new devel pme . Outfall. A point source as defined by 40 CFR 122.2 at the point where a discharge leaves the City's MS4 and enters a surface receiving waterbody or surface receiving waters. Outfall does not include pipes, tunnels, or other conveyances which connect segments of the same stream or other surface waters and are used to convey primarily surface waters (i.e., culverts). On -site Stormwater Management BMPs. A synonym for Low Impact Development BMPs. Permeable pavement. Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Pervious Surface. Any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. Person. Any individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, agency of the state, or City government unit, however designated. Pollution -generating hard surface (PGHS). Those hard surfaces considered to be a significant source of pollutants in stormwater runoff. See the listing of surfaces under pollution -generating impervious surface. Pollution -generating impervious surface (PGIS). Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to: vehicular use; industrial activities (as further defined in the glossary of the SWMMWW); storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall; metal roofs unless they are coated with an inert, non -leachable material (e.g., baked -on enamel coating); or roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities. Pollution -generating pervious surfaces (PGPS). Any non -impervious surface subject to vehicular use, industrial activities (as further defined in the glossary of the SWMMWW); or storage of erodible or leachable materials, wastes, or chemicals, and that receive direct rainfall or run-on or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include permeable pavement subject to vehicular use, lawns, and landscaped areas including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). Pre -developed condition. The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre -developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. Project site. That portion of a property, properties, and/or right-of-way subject to land -disturbing activities, new hard surfaces, or replaced hard surfaces. For projects that involve land disturbing activity on one or more parcels and land The--, Ed-m-onds City Code and Gonmnunity Development Gode, -are, eurremit 0hrough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 399 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 7/30 disturbing activity in the City right-of-way, the "Project site" includes all areas of land disturbance. If the project is part of a common development plan or sale, the disturbed area of the entire plan shall be used in determining permit requirements. _ ---- __1 r- - r t __._ __, ------------, -a _ __, t __ ... , r-� � _- ---r- corporation, ageneystate, of the or cc local unit,overnment however designated. impeFvieus 0prepeAies, er righ4 ef way subjeet if the is te land disturbinge development new th-e or replaeed disihar-h-ed the surfaees. projeet part of be in deter a eommon is disehafged plan or sale, wrea of entire plan shall "Reeeiving used -mining permit requiremen4s. to waters" means water-bedies setffee of st,.rm water „ via sheet or- stwfaee wa4er- systems whiek suffaee flew. Funeff via a point L'Rain garden. A non -engineered shallow landscaped depression, with compost -amended native soils and adapted plants. The depression is designed to pond and temporarily store stormwater runoff from adjacent areas, and to allow stormwater to pass through the amended soil profile. Receiving waterbody or Receiving waters. Naturally and/or reconstructed naturally occurring surface water bodies, such as creeks, streams, rivers, lakes, wetlands, estuaries, and marine waters, or groundwater, to which a MS4 discharges. Replaced hard surface. For structures means the removal and replacement of hard surfaces down to the foundation. For other hard surfaces, it means the removal down to bare soil or base course and replacement. Replaced impervious surface" means, fo. For structures, the removal and replacement of any exterior impervious surfaces erdown to the foundation. For other impervious surfaces, it means the removal down to bare soil or base course and replacement. For- sites with existifig single family dwelling units (as defined in ECDC 2 i.90.080), a pr-64ec4 shall not be eensidered replaeed impei=Aeus sur-faee fer- the purposes of this ehapter-, unless the pr-ejeet site has one aer-e in this seetien-.) "`Roadway" means the traveled imper-..;,.. Traveled hard surface portion of any public or private road or street. L'Road-related project. A project that all of, or the majority of, the new or replaced hard surface consist of roadway, shoulders, curbs, gutters, sidewalks, or walkways, either publicly or privately funded. Runoff. Water originating from rainfall and other precipitation that is found in drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands, as well as shallow ground water. It also means the portion of rainfall or other precipitation that becomes surface flow and interflow. Site. The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to development er redo elepment. For road projects, or utility projects in the right-of-way, the length of the project site and the right-of-way boundaries define the site. The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurreat Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 400 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 8/30 L'Slope''—means the. The degree of slaetdeviation of a surface from the horizontal; measured as a numerical ratio, percent, or in degrees. Expressed as a ratio, the first number is the horizontal distance (run) and the second is the vertical distance (rise), as 2:1. A 2:1 slope is a 50 percent slope. Expressed in degrees, the slope is the angle from the horizontal plane, with a 90-degree slope being vertical (maximum) and 45 degrees being a 1:1 or 100 percent slope. "Soil1Lmeanie. The unconsolidated mantlemineral and organic material on the intermediate surface of the earth that serves as a natural medium for the growth of land plants. L'Source control" eans BMPs. A structure or operation that is intended to prevent pollutants from coming into contact with storm water through physical separation of areas or careful management of activities that are sources of pollutants. The SWMMWW separates source control BMPs into two types. Structural source control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume IV of the SWMMWW for details. Stormwater facility. A constructed component of a storm wate stormwater drainage system, designed and constructed to perform a particular function or multiple functions. Storm wme facilities include, but are not limited to, pipes, pwnpiag systeffis-,swales, ditches, culverts, street gutters, ^a'e'�detention basins -,ponds, retention ponds, constructed wetlands, infiltration devices, catch basins, oil/water separators, and ^lluta * removal devices.biofiltration swales. "Storm waterStormwater Management Manual for Western Washington (SWMMWW). The Washington State Department of Ecology's 2012 (as amended in 2014) Stormwater Management Manual for Western Washington. Referred to as the 2014 SWMMWW. Stormwater site plan. The comprehensive report and rise iatea pop containing all of the technical information and analysis necessary for * regulatory agencies to evaluate a proposed new development er- redevelopmen* project for compliance with staffn wa4e stormwater requirements. Contents of the storm ,, a4ef site planStormwater Site Plan will vary with the type and size of the project, and individual site characteristics. It may- includeincludes a constmetion storm water pollution prevention plan (contra ^^Construction Stormwater Pollution Prevention Plan (Construction SWPPP) and a permanent storm water ^^^*rol I' Permanent Stormwater Control Plan (PSC plarr}Plan). Guidance on preparing a Stormwater Site Plan is contained in Chapter 3 of Volume I of the SWMMWW. L'Stormwater Treatment and Flow Control BMPs/Facilities. Detention facilities, treatment BMPs/facilities, bioretention, vegetated roofs, and permeable pavements that help meet Minimum Requirements No.6 (Treatment), Minimum Requirement No.7 (Flow Control), or both as described in ECDC 18.30.060. Threshold discharge area�n. An on -site area that drains to either a single natural discharge location or multiple natural discharge locations that combine within one -quarter mile downstream (as determined by the shortest flowpath). The examples below and in Figure 2-G.1 presented in Volume I of the S*^.....water Ma-aagefnei . Mai+u.' f r Weston. Washington (2005)SWMMWW illustrate this definition. The purpose of this definition is to clarify how the thresholds of this code are applied to project sites with multiple discharge points. . Version: September 8, 2015 Packet Pg. 401 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 9/30 Example of a Site with a Example of a Site with Example of a Site with Single Natural Discharge Multiple Natural Multiple Natural Discharges and a SingleThreshold Discharges and a Single and Multiple Threshold Discharge Area Threshold Discharge Area Discharge Areas Natural •'• -Natural Natural N44al Natural bischarge- ;Discharger•_ Discharge-..-- discharge-----• -.- �ischgge Y. -- Area Area 1 Area 2 Area 1 Area 2 THRESHOLD DFSOHARGE — ---THRE HOLD HRES11OLD THRESHGL DISCWR r', AREA., CSC ARG�.-- 15CHAFZGE r (Shaded)ti4 A FA- AREA i,, AAEA 2 I add Natural i Natural — Natural f Discharge Discharge Discharge Location Location •i = Location F i 1 'ti 4 f � � r Y. Mile Downstream - ------------------------+----------------- fshorlest flow pathl jy Vehicular Use. Regular use of an impervious or pervious surface by motor vehicles. The following are subject to regular vehicular use: roads, un-vegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unrestricted access fire lanes, vehicular equipment storage yards, and airport runways. The following are not considered subject to regular vehicular use: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, restricted access fire lanes, and infrequently used maintenance access roads. Waterbody. Surface waters including rivers, streams, lakes, marine waters, estuaries, and wetlands. Waters of the state. Includes those waters defined as "waters of the United States" in 40 CFR Subpart 122.2 within the geographic boundaries of Washington State, and "waters of the state" as defined in Chapter 90.48 RCW which includes lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. "Wetlands —are as. As defined in ECDC 23.40.005. [Ord. 37924026 § 1—,204-0 (Att. A), 2016]. 18.30.020 Authority and Regulation. A. The public works aireeter or ^ desig e-ePublic Works and Utilities Director shall administer this chapter and shall be referred to as the direeterDirector. B. The direeterDirector shall have the authority to develop -and, implement, and enforce policies and procedures to administer and enforce this chapter.- per ECDC 18.30.110 and 18.30.120, such as the Edmonds Stormwater Addendum The--, Edmonds City Code and Gonmnunity Development Gode -are eurrent Glar-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 402 9.1.d Edmonds Page 14,114 Edmonds Page 10/30 Chapter 18.30 STORM WATER MANAGEMENT O E M O th this tef. r�3-792 1, 2010]. > -e1 § C �E This chapter applies if .,,y of the following pertains to a site: 0 E 1. issuance of a city permit is required under all other chapters of ECDC Title 18 or . E O a 2.C. A iS SUbMitted p D 2 75 U sea 3• C proposed project: p O E a. involves 500 square feet or more of land distff-bing aetivity, new impervious surfaee, or replaeed 'a Title 23) farming be ++ there is the for and ongoing or gardening aetivities shall exeluded unless potenfial sueh Q b. is 500 lineal feet treneh d a utility or other eonstmetion projeet consisting of or more of excavation. O area buffer. C d E This ehaptef applies to aetions whenever the difeeteF deteffflines there is a potential d R of C ' ' IC 2. Aviolation federal laws, to of applieable city, state, or regulations, or permits related water quality. L if has been issued R for in (A) a city permit or a subdivision appheation submitted a site, as provided subsection of - is the this be those if the triggered i E seetion, requirements of ehapter shall administered under permits. site aetivities bseetion this do issued the this be O (A)(3) or (B) of section not neeessitate a eity permit, requirements of ehapter shall The requirements of this chapter are minimum requirements. They do not replace, repeal, abrogate, supersede, or O affect any other more stringent requirements, rules, regulations, covenants, standards, or restrictions. Where this 77 chapter imposes requirements that are more protective of human health or the environment than those set forth elsewhere, the provisions of this chapter shall prevail. When this chapter imposes requirements that are less protective o •N of human health or the environment than those set forth elsewhere, the provisions of the more protective requirements shall prevail. m c ED. The director shall have the authority to impose additional requirements that apply te on a project or site � will diffe o meet the purpose of this chapter based on {site -specific factors including, but are -not limited to}— � following: p eet scope and , fig r.,tio physical site ,a,,,racteristies site location and conditions.- o M 18.30.050. stelz ...,tor ffl o eI4 ro 0 e is ., e ,less fibed i ECDC; 1 0 3n 06-0 slope, and designated use. r U EE. Approvals and permits granted under this chapter are not waivers of the requirements of any other laws, nor do W they indicate compliance with any other laws. Compliance is still required with all applicable federal, state and local , laws and regulations, including rules promulgated under authority of this chapter. GF. Compliance with the provisions of this chapter does not necessarily mitigate all impacts to the environment. Thus, c a� E compliance with this chapter should not be construed as mitigating all drainage water or other environmental impacts, and additional mitigation may be required to protect the environment pursuant to other applicable laws and f° regulations. The primary obligation for compliance with this chapter and for preventing environmental harm on or Q from property is placed upon the applicant. [Ord. 3792 § 1, 2010]. m E Q . Version: September 8, 2015 Packet Pg. 403 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 11/30 1 ,30,030 Applicability, i�30.0 4 0-Y7cd MiHxStf-atieir. A. This chapter applies to applications submitted on or after January 1, 2017 and applications submitted prior to January 1, 2017, which have not started construction by January 1, 2022. This chapter applies A. Appliemians. All storm water- review submit4als shall eantain, in addition to the infer-mation r-equired under- a -ay other applieable city code, a storm water site plan as deseribed in the storm water- supplemen4 (see ECDC 18.30.060) and other infer-mation as the director- shall . . B. to the following actions on sites that discharge to the City's MS4 or discharges to waters of the state whether or not a City -issued permit is required: 1. The d reefer shall review all plansfor o „1:.,nee with this ,.L.apter projeets for approval at various stages of the work to determine that they are being constFueted per the approved storm water site plans. Stages of work requiring inspeetion include (but are not limited to) preeonstmetion, installation fBN4n land Land -disturbing aetivities installation ofti lities landseapingT- and ehapter or to eomply with loeal, state or fedeFal law or regulation on storm water-, a speeial inspeetion or testing shall be performed. The drainage system shall be installed eoneurrently with site development a shall be eempleted as shwA% on the approved plan befer-e eity appFeval of an eeetipaney per-mit of final inspeetion.activity, or D2. Creation of new hard surfaces, or 3. Replacement of existing hard surfaces, or 4. Conversion of pervious surfaces, or 5. New connections to the City's MS4, or 6. Any other actions that can increase the volu or rate of stormwater runoff, or cause the generation of pollutants, from the site. I I I----�------- -------- ----------eeerae're:�eer+�si��!erssriiTifri�s���!* �f�r�teyc.Ts� 18.30.050 Projeet elassil0eat-ion. For puiposes of this ehapter, projeets are eiassified as large site, small site, or minor site as deseribed below, primarily based on the extent of land disturbing aetivities. The--, Ed-m-onds City Code and Gonmutmity Development Gode, -are, eurremit Ular-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 404 Attachment: Attachment 4 - ECDC 18.30-Redline Version (1490 : Stormwater Management Code Update, Edmonds Community Development 9.1.d Edmonds Page 14,114 Edmonds Page 13/30 Chapter 18.30 STORM WATER MANAGEMENT 4) E la. O N,.SSN4RNe.5 On Site StefmwateFNUnagemefit; 2 d vi. SSN4R No. 7 Flow Centrol. This SSN4R may be waived by the director- based on the extent of C appheation of SSN4R No. 5 to infiltrate, disperse, and retain storm water nmoff on site without causing- flooding or erosion impaet, per the criteria in the storm water s"pleme E vii. SSN4R No 8 Wetland Preteetion; E O v}i}. �Slbll?c lye. U C . E W ++ landseaped ,of, !Z d O i. SSN4R Ne 1 Prep..,•.,tie e f St...-.n...4er Site Plan; C 7 f'onstruetio Plan; ct.,,-,v.w.,ter D..!Mio„ ii. SSN4R No n Prevent:.,... , E d SSN4R No. 3 SoureeControl Pollution-, n}. of C � iv. cc>\aD Ne A D.•osv.•ymie« „fN t..,•.,1 rlFaif age Systems ..,,.,1 Ott f 11s. , N,.SSN4RNe.5 Oa Site Stei4nwa4efManagement; v}. SSN4 TATo. 6 Tez—me-nt• � E L O vil. ccTaD No '7 Ti ow'-Contre-lr, v/ ix. cc>\aD No. 9 Opera m and 1\ ai teaaa,.o. , C S SN4R No. 1 n Off Site n,,.,lysis Mitigation; O x. and �fA L xi. SSN4R No. 11 Finaneial iability. > Aay the SSN4Rs be by the dir-eetef to the C e. or all of may required an a+ty small site pr-ejeet this based factors ineluding, but limited to, loeation, meet pufPose-af ehapter off site speeifie not soil designated , eonditions, slope, O M 3. Minef Site Pfejeets. The fellewing mini fi4s apply te fnifief site prejee O r U W puTese ef this ehapter based en site speeifie faeters ineluding, W4 net lifnited to, laea4ioa, soil eeaditiefl&,- slepe, anddesi-pmed use. r�3792 § 1, 2". 0 E t * FIRR441U 70 Exemptions, e3keeptions, adjustments and appeal.Q c A. Full Exemptions. The following land uses and land -disturbing activities are exempt from the provisions of this chapter: Q ' "� '' Version: September 8, 2015 Packet Pg. 406 9.1.d Edmonds Page 14,114 Edmonds Page 14/30 Chapter 18.30 STORM WATER MANAGEMENT 1. Forest practices regulated under WAC Title 222, except for Class IV general forest practices that are conversions from *��timberland to other uses, are exempt from the provisions of the minimum requirements. 2. Commercial agriculture practices that involve working land for production are generally exempt. However, land conversion from timberland to agriculture and the construction of impervious surfaces are not exempt. 3. Construction of drilling sites, waste management pits, and associated access roads, and construction of transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations are exempt. Operators are encouraged to implement and maintain best management practices to minimize erosion and control sediment during and after construction activities to help ensure protection of surface water quality during storm events. 4. Roadway Pr-oj The following readwaypavement maintenance practices or activities are exempt: pothole and square -cut patching, overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of coverage, shoulder grading, reshaping/regrading drainage systems, crack sealing, resurfacing with in -kind material without expanding the road prism, ^pavement preservation activities that do not expand the road prism, and vegetation maintenance. a. For large site projects o ly *1t B. Partial Exemptions. The following land uses and land -disturbing activities are partially exempt from the provisions of this chapter: Underground utility projects that replace the ground surface with in -kind material or materials with similar runoff characteristics are only subject to Minimum Requirement No. fead2, Construction Stormwater Pollution Prevention. "I \ 4-.2. The following pavement maintenance practices or activities are considered redevelopmen4development, and therefore are not categorically exempt. The extent to which this exemption apphesthese requirements apply is explained for each circumstance. a. Removing and replacing a paved surface to base course or a lower level, or repairing the feadwaypavement base: iflf impervious surfaces are not expanded, lafge site pr-ejeet mini requirements No 1 throughMinimum Requirements No. 1 — No. 5 apply. However, i - mob- ., _ t.-.I--------.---»----...1­ - .... -, ____ - - ­ _......_y .,��»�� required when the thresholds identified for development projects in ECDC 18.30.060 are met. Where appropriate, project proponents are encouraged to look for opportunities to use permeable and porous pavements. b. i4—.Extending the pavement edge without increasing the size of the road prism or paving graveled shoulders: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for rr^a^velopme development projects in ECDC 18.30.060 are met. c. ii4—.Resurfacing by upgrading from dirt to gravel, asphalt, or concrete; or upgrading from gravel to asphalt or concrete; or upgrading from a bituminous surface treatment ("chip seal') to asphalt or concrete: these are considered new impervious surfaces and are subject to the minimum requirements that are triggered when the thresholds identified for r-edev�development projects in ECDC 18.30.060 are met. 18.30.050 Administration. A. Application, Submittals, and Review. 1. The Director shall review all plans and all other submittals required by ECDC 18.30.050.A.3 for compliance with this chapter when: The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 407 9.1.d Edmonds Page 14,114 Edmonds Page 15/30 Chapter 18.30 STORM WATER MANAGEMENT a. An application for a City permit is required under all other chapters of ECDC Title 18 or 19, or b. A subdivision application is submitted per ECDC 20.75.040. 2. In all other situations when actions under ECDC 18.30.030 apply to a project site, review shall be under a Stormwater permit. 3. All stormwater review submittals shall contain, in addition to the information required under any other applicable City code, a Stormwater Site Plan as described in the Edmonds Stormwater Addendum (see ECDC 18.30.060) and any other information required by the Director. B. Inspections. 1. The Director shall inspect projects at various stages of the work to determine if they comply with the requirements of this chapter, and enforcement actions shall be taken as necessary. These inspections will include, but not be limited to, the following: a. Prior to site clearing and construction to assess site erosion potential, and b. During construction to verify proper installation and maintenance of required erosion and sediment controls and other approved plan components, and c. All permanent stormwater treatment and flow control BMPs/facilities and catch basins in new residential developments every six months until 90 percent of the lots are constructed (or when construction is stopped and the site is fully stabilized) to identify maintenance needs and enforce compliance with maintenance standards as needed, and d. Upon completion of construction and prior to final approval to ensure proper installation of permanent stormwater control facilities and verify that a maintenance plan is completed and responsibility for maintenance is assigned for stormwater treatment and flow control BMPs/facilities, and e. Post -Construction inspections per ECDC 18.30.090. 2. When reasonably required by the Director to accomplish the purpose of this chapter or to comply with local, state or federal law or regulation on stormwater, special inspection or testing shall be performed by the applicant. C. Fees. Application, review and inspection fees as set in ECDC Chapter 15.00 shall be paid. 18.30.060 Requirements. A. Documents. The sources of the stormwater management requirements for the City are from the following documents: 1. Western Washington Phase II Municipal Stormwater Permit, Appendix 1, modification date January 16, 2015 2. 2014 Stormwater Management Manual for Western Washington (SWMMWW) 3. The Edmonds Stormwater Addendum In the event of conflicts between the various provisions, the more stringent provision shall apply. B. Illicit Discharges and Connections. Non-stormwater illicit discharges, including spills, into the MS4, groundwaters, or a water body from any developed or undeveloped lands are prohibited per ECDC Chapter 7.200. The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurreat Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 408 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT C. Thresholds and Applicability Page 16/30 The thresholds outlined in this section are only applicable to ECDC 18.30.060.C. See also the Edmonds Stormwater Addendum for supplemental information on thresholds. a. All development shall be required to comply with Minimum Requirement No. 2. b. Category 1 project sites shall comply with Minimum Requirements No. 1 through No. 5. Category 1 includes projects that: i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or ii. Have land disturbing activity of 7,000 square feet or greater. c. Category 2 project sites shall comply with Minimum Requirements No. 1 through No. 9. Category 2 includes projects that: i. Result in 5,000 square feet, or greater, of new plus replaced hard surface area, or ii. Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or iii. Convert 2.5 acres, or more, of native vegetation to pasture. 4-.2. Additional Requirements for road -related projects. For road -related projects, runoff from the new hard surfaces (including pavement, shoulders, curbs, and sidewalks) and the converted vegetation areas shall meet all the minimum requirements if the new hard surfaces total 5,000 square feet or more. In addition, if the new hard surfaces total 5,000 square feet or more and total 50 percent or more of the existing hard surfaces within the project limits, runoff from the new and replaced hard surfaces and the converted vegetation areas shall meet all the minimum requirements. The project limits shall be defined by the length of the project and the width of the right-of-way. D. Minimum Technical Requirements. This section describes the minimum technical requirements for stormwater management at development sites. 1. Minimum Requirement No. 1 — Preparation of Stormwater Site Plans The City shall require a Stormwater Site Plan from all projects meeting the thresholds in ECDC 18.30.060.C. Stormwater Site Plans shall use site -appropriate development principles to retain native vegetation and minimize impervious surfaces to the extent feasible. Stormwater Site Plans shall be prepared in accordance with Chapter 3 of Volume 1 of the SWMMWW and the requirements in the Edmonds Stormwater Addendum. 4-.2. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention.. Plan (SWPPP) a. Thresholds: All development projects are responsible for preventing erosion and discharge of sediment and other pollutants into receiving waters. Compliance with this minimum requirement can be achieved for an individual site if the site is covered under Ecology's General NPDES Permit for Stormwater Discharges Associated with Construction Activities and fully implementing the requirements of that permit. ii. A Construction SWPPP is required for all projects which a) result in 2,000 square feet or more of new plus replaced hard surface area, b) where a structure with an exterior hard surface area of at least 2,000 square feet is being demolished, c) which disturb 7,000 square feet or more of land, or d) when the site falls within the Earth Subsidence Landslide Hazard Area, Landslide Hazard Area or steep slope critical area. Projects that do not meet any of the above criteria are not required to prepare a Construction SWPPP, but must consider all of the elements listed The--, Edim-onds City Code and Gonmnunity Development Gode, -are, eurremit 0hrough Ordinanee 4037, passed haly . Version: September 8, 2015 Packet Pg. 409 9.1.d Edmonds Page 14,114 Edmonds Page 17/30 Chapter 18.30 STORM WATER MANAGEMENT below for Construction SWPPPs and develop controls for all Construction SWPPP elements that pertain to the project site. b. General Requirements: The SWPPP shall include a narrative and drawings. All BMPs shall be clearly referenced in the narrative and marked on the drawings. The SWPPP narrative shall include documentation to explain and justify the pollution prevention decisions made for the project. Each of the thirteen elements referenced below must be considered and included in the SWPPP unless site conditions render the element unnecessary and the exemption from that element is clearly justified in the narrative of the SWPPP. ii. Clearing and grading activities for developments shall be permitted only if conducted pursuant to an approved site development plan (e.g., building permit, subdivision approval) that establishes permitted areas of clearing, grading, cutting, and filling. These permitted clearing and grading areas and any other areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree retention areas as required by the City, shall be delineated on the site plans and the development site. iii. The SWPPP shall be implemented beginning with initial land disturbance and until final stabilization. Sediment and Erosion control BMPs shall be consistent with the BMPs contained in Chapter 4 of Volume II of the SWMMWW. c. Seasonal Work Limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities may only be authorized by the City if it can be demonstrated that silt -laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and ii. Limitations on activities and the extent of disturbed areas; and iii. Proposed erosion and sediment control measures, in accordance with ECDC 18.30.060.D.2.d below. Based on the information provided and/or local weather conditions, the City may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations, except for sites lying in whole or in part within an earth subsidence and landslide hazard area as defined by ECDC 19.10.020.F: Routine maintenance and necessary repair of erosion and sediment control BMPs, ii. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil, and iii. Activities where there is one hundred percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. d. Construction SWPPP Elements Construction SWPPP elements are required in accordance with Chapter 2, Section 2.5.2 of Volume I of the SWMMWW and the requirements in the Edmonds Stormwater Addendum 3. Minimum Requirement No. 3 — Source Control of Pollution The--, Ed-m-onds City Code and Gonmutmity Development Gode, are--, e_-,urremt Glar-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 410 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 18/30 All known, available and reasonable source control BMPs must be required for all projects approved by the City. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. 4. Minimum Requirement No. 4 — Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location, to the maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. The discharge must have an identified overflow route that is safe and certain, and leads to the ultimate outfall location (such as a receiving water or municipal drainage system). All outfalls require energy dissipation. To demonstrate compliance with this core requirement, all projects shall submit an off -site qualitative analysis. If an existing problem (or potential future problem after development) is identified, mitigation will be required to prevent worsening of that problem. A quantitative analysis may be required for any project deemed to need additional information or where the project proponent or the City determines that a quantitative analysis is necessary to evaluate the off -site impacts or the capacity of the conveyance system. See the Edmonds Stormwater Addendum for additional details on complying with this requirement. 5. Minimum Requirement No. 5 — On -site Stormwater Management a. Applicability: On -site Stormwater Management BMPs are required in accordance with the following project thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff on -site to the extent feasible without causing flooding or erosion impacts. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Project Thresholds: There are five project scenarios outlined below that determine the applicability of Minimum Requirement No. 5 — On -site Stormwater Management. The first four scenarios apply to projects that discharge directly or indirectly to the City's MS4. The fifth scenario applies to project discharges that do not enter the City's MS4. Note that more than one of the five scenarios may apply to a given project: Retrofit. Projects that discharge directly or indirectly to the City's MS4 and that contain existing hard surfaces on the parcel or common plan of development that do not drain to an approved stormwater management facility are required to provide On -site Stormwater Management BMPs to manage a portion of those existing hard surfaces that will remain after project completion. BMPs from List No.I (See ECDC 18.30.060.D.5.d) shall be applied to a minimum of 25 percent of those existing unmanaged surfaces, but to no more than the area equal to the proposed new plus replaced hard surfaces. Only for those existing unmanaged hard surfaces that remain after project completion, applicants are not required to evaluate BMPs in priority order or document infeasibility for these existing surfaces (as is required under ECDC 18.30.060.D.5.b [ii] and [iii] below). However, if it is determined that the minimum 25 percent requirement cannot be met due to BMP infeasibility, documentation of BMP infeasibility is required. In addition, when runoff from exiting unmanaged hard surfaces is mixed with runoff from new plus replaced hard surfaces, those BMPs must be selected and designed in accordance with the requirements for management of new plus replaced hard surfaces (per sections [ii] and [iii] below). See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 411 9.1.d Edmonds Chapter 19.30 STORM ALATER MANAGEMENT Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 19/30 ii. Category 1. Category 1 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 5 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.1 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.d); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iii. Category 2. Category 2 project sites that discharge directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements No. 1 through No. 9 (per ECDC 18.30.060.C) shall either: a. Use On -site Stormwater Management BMPs from List No.2 for all new plus replaced hard surfaces and land disturbed (See ECDC 18.30.060.D.5.e); or b. Demonstrate compliance with the LID Performance Standard (See ECDC 18.30.060.D.5.c). Projects selecting this option cannot use rain gardens. They may choose to use bioretention BMPs as described in the SWMMWW. iv. Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the City's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID Performance Standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following: a. Projects must implement BMP T5.13 (Post -Construction Soil Quality & Depth); BMPs T5.I OA Downspout Full Infiltration Systems, T5.1 OB Downspout Dispersion Systems, or T5.1 OB Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on On -site Stormwater Management BMP infeasibility. b. Edmonds Way specific requirements. After applying the requirements in item (a) above, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post -development 10-, and 100-year recurrence interval peak flows shall not exceed, 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. V. Projects that do not drain directly or indirectly to the City's MS4 are required to implement one of the following: a. Project sites may discharge to the downstream private property (e.g., projects located above BNSF property) with approval from the downstream property owner(s). b. Project sites may discharge runoff to an on -site system. For sites located within earth subsidence and landslide hazard areas or their buffers, a geotechnical design, analysis, and report by a geotechnical engineer is required for the on -site system. On -site Stormwater Management BMPs from List No.I in ECDC 18.30.060.D.5.d shall be evaluated for all new plus replaced hard surfaces and land disturbed. Projects are not required The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurreat t-la-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 412 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 20/30 to evaluate BMPs in priority order or document infeasibility. The project applicant may be subject to an extra permit processing fee for City review of the geotechnical analysis. Projects are required to comply with all other applicable City requirements, such as ECDC 19.10 (earth subsidence and landslide hazard areas). ii. For sites located outside earth subsidence and landslide hazard areas or their buffers, ECDC 18.30.060.D.5.ii and ECDC 18.30.060.D.5.iii shall be followed to evaluate site appropriate BMP's. Subject to prior approval by the City, project sites may pump on -site runoff to the City's MS4. A quantitative downstream analysis in accordance with Minimum Requirement No. 4 and the Edmonds Stormwater Addendum will be required. If the City's MS4 does not have adequate capacity to receive the applicant's pumped flows, the applicant is required to install an on -site detention system to store runoff and pump it to the MS4 at an approved rate. c. LID Performance Standard For projects that elect to meet the LID Performance Standard to comply with ECDC 18.30.060.D.b (ii) and (iii), stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8 percent of the 2-year peak flow to 50 percent of the 2-year peak flow from the project site. Refer to the Standard Flow Control Requirement section in Minimum Requirement No. 7 for information about the assignment of the pre -developed condition. Project sites that must also meet Minimum Requirement No. 7 shall match flow durations between 8 percent of the 2-year flow through the full 50-year flow. d. List No.I for Category 1 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 5. For projects that elect to use List No. 1 to comply with ECDC 18.30.060.D.b (ii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW and the Edmonds Stormwater Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.1 OA in Section 3.1.1 of Volume III of the SWMMWW. ii. Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit t-la-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 413 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 21/30 iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain garden or bioretention facility must have a minimum horizontal projected surface area below the overflow which is at least 5 percent of the area draining to it. iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. iv. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. The City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. e. List No.2 for Category 2 project sites: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements No. 1 through No. 9. For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other On -site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW. Lawn and landscaped areas: Roofs: Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of Volume V of the SWMMWW. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.10A in Section 3.1.1 of Volume III of the SWMMWW. ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iii. Downspout Dispersion Systems in accordance with BMP TS.IOB in Section 3.1.2 of Volume III of the SWMMWW. iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of Volume III of the SWMMWW. The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit t-la-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 414 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 22/30 V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. Other Hard Surfaces: Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW. iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it. iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW. V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial. 6. Minimum Requirement No. 6 — Runoff Treatment a. Project Thresholds: When assessing road -related projects against the following thresholds, only consider those hard and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following require construction of stormwater treatment facilities: Projects in which the total of pollution -generating hard surface (PGHS) is 5,000 square feet or more in a threshold discharge area of the project, or ii. Projects in which the total of pollution -generating pervious surfaces (PGPS) — not including permeable pavements — is 0.75 acres or more in a threshold discharge area, and from which there will be a surface discharge in a natural or man-made conveyance system from the site. b. Treatment -Type Thresholds and Facility Sizing: Treatment -Type Thresholds in accordance with Step 2 (Oil Control), Step 4 (Phosphorus Treatment), Step 5 (Enhanced Treatment), and Step 6 (Basic Treatment) of Chapter 2, Section 2.1, Volume V of the SWMMWW. Phosphorus treatment shall be required for projects draining to Hall Creek and Lake Ballinger. ii. Treatment Facility Sizing, including Water Quality Design Storm Volume, Water Quality Design Flow Rate, and Downstream Facilities, of Chapter 2, Section 2.5.6, Volume I of the SWMMWW. c. Treatment Facility Selection, Design, and Maintenance The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 415 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Stormwater treatment facilities shall be: Page 23/30 Selected in accordance with the process identified in Chapter 4 of Volume I, and Chapter 2 of Volume V of the SWMMWW, ii. Designed in accordance with the design criteria in Volume V of the SWMMWW, and iii. Maintained in accordance with the maintenance schedule in Volume V of the SWMMWW d. Additional Requirements The discharge of untreated stormwater from pollution -generating surfaces to ground water will not be authorized by the City. All associated runoff must be treated using On -site Stormwater Management BMPs designed to provide the required level of treatment in accordance with Chapter 5, Volume V and Chapter 7, Volume V of the SWMMWW; or by infiltration through soils meeting the soil suitability criteria in Chapter 3 of Volume III of the SWMMWW. Minimum Requirement No. 7 — Flow Control a. Applicability: Flow control is required on projects meeting the thresholds summarized below to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. Flow control in accordance with Minimum Requirement No. 7 is not required for projects that discharge directly to, or indirectly through the City's MS4 to Puget Sound (other minimum requirements may still apply). See ECDC 18.30.060.D.5.b.iv and Section 2.5.7 of Volume I of the SWMMWW for additional restrictions applicable to direct discharges to Puget Sound. If the discharge drains to a stream that leads to a wetland, or to a wetland that has an outflow to a stream, both this minimum requirement (Minimum Requirement No. 7) and Minimum Requirement No. 8 apply- b. Thresholds: When assessing road -related projects against the following thresholds, only consider only those impervious, hard, and pervious surfaces that are subject to this minimum requirement per ECDC 18.30.060.C.2. For all other projects, the requirements apply to the new plus replaced hard surfaces and the converted vegetation areas. The following circumstances require achievement of the standard flow control requirement for western Washington: Projects in which the total of effective impervious surfaces is 10,000 square feet or more in a threshold discharge area, or ii. Projects that convert 0.75 acres or more of vegetation to lawn or landscape, or convert 2.5 acres or more of native vegetation to pasture in a threshold discharge area, and from which there is a surface discharge in a natural or man-made conveyance system from the site, or iii. Projects that through a combination of hard surfaces and converted vegetation areas cause a 0.10 cubic feet per second (cfs) increase or greater in the 100-year flow frequency from a threshold discharge area as estimated using the Western Washington Hydrology Model or other approved model and one -hour time steps (or a 0.15 cfs increase or greater using 15-minute time steps). c. Standard Flow Control Requirement (applies to discharges directly or indirectly to the City's MS4, except for projects that meet the direct discharge requirements outlined in "a" above): Stormwater discharges shall match developed discharge durations to pre -developed durations for the range of pre -developed discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. The pre -developed condition to be matched shall be a forested land cover unless reasonable, historic information is available that indicates the site was prairie prior to settlement (modeled as "pasture" in the The--, Edim-onds City Code and Gonmnunity Development Gode, -are, eurremit 0hrough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 416 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 24/30 Western Washington Hydrology Model). This standard requirement is waived for sites that will reliably infiltrate all the runoff from hard surfaces and converted vegetation areas. d. Additional Requirement: Flow Control BMPs shall be selected, designed, and maintained in accordance with Volume III of the SWMMWW or an approved equivalent. 8. Minimum Requirement No. 8 - Wetlands Protection a. Applicability: The requirements below apply only to projects whose stormwater discharges into a wetland, either directly or indirectly through a conveyance system. b. Thresholds: The thresholds identified in Minimum Requirement No. 6 - Runoff Treatment, and Minimum Requirement No. 7 - Flow Control shall also be applied to determine the applicability of this requirement to discharges to wetlands. c. Standard Requirement: Projects shall comply with Guide Sheets No. 1 through No. 3 in Appendix I-D of the SWMMWW. The hydrologic analysis shall use the existing land cover condition to determine the existing hydrologic conditions unless directed otherwise by a regulatory agency with jurisdiction. d. Additional Requirements: Stormwater treatment and flow control facilities shall not be built within a natural vegetated buffer, except for: Necessary conveyance systems as approved by the City; or ii. As allowed in wetlands approved for hydrologic modification or treatment in accordance with Guide Sheet 2 in Appendix I-D of the SWMMWW. An adopted and implemented basin plan prepared in accordance with the provisions of Section 7 of Appendix 1 of the Phase II NPDES Municipal Stormwater Permit. Minimum Requirement No. 9 - Operation and Maintenance6. With r-espeet to ~eplaeea e ff ees SSN4R 8 (wetlands pr-eteetiea) (er- the asseeia4ed applieabl �_ir-emefAs for- lafge sites) should the eity adopt a plan and sehedule that fialfills th ' . ts thr-aidg� - . I . nage eat+tr-el plan ., via An operation and maintenance manual that is consistent with the provisions in Volume I and Volume V of the SWMMWW is required for proposed Stormwater Treatment and Flow Control BMPs/facilities. The party (or parties) responsible for maintenance and operation shall be identified in the operation and maintenance manual. For private facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -site or within reasonable access to the site, and shall be transferred with the property to the new owner. For public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate department. A log of maintenance activity that indicates what actions were taken shall be kept and be available for inspection. 18.30.070 13==Exceptions, Adjustments, and Appeals. 4— A. Exceptions. 1. The dir-eete Director may approve a request for an exception to the minimum requirements of this chapter following legal public notice of an application for an exception and of the Director's decision on The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 417 9.1.d Edmonds Page 14,114 Edmonds Page 25/30 Chapter 18.30 STORM WATER MANAGEMENT the application. All legal public notice related to this request for an exception shall be in the manner prescribed in ECDC 20.03.002 and the applicant shall pay all costs to publish the legal public notices required by this provision. The director Director shall provide and keep written findings of fact of the decision. The approval of the exception shall only be granted when the applicant demonstrates that the exception will ^* increase risks to publie health, safety, and welfare, or to water quality, or to publie and private property in the vioinity or downstream of the property, and the exeeption shall be the least possible exeeption that eoul granted and still provide eomplianee with the intent of th i i itirements. in addition, the exeeption shall enly be gran4ed when it has been deter -mined by the direetor- thm one or mere ef the follewing applies: ache -requirement would cause a severe and unexpected €inaneialeconomic hardship that outweighs the requirement's benefits, and the er;teri for ., adjustment e „t be et; or ham. To determine whether the requirement would eause harm or a significant threat of harm to publie health, safety, and welfare, the environment, or publie and pFivate property, and the oriteria for an adjustment cannot be met; o e. The requirement is not technically feasible, and the oriteria for an adjustment cannot be met; 0 ,l An emerge.,;r..., r; o sts th..t « s;t..tes approval of the v rtion 2. imposes a severe and unexpected economic hardship shall aos^r;hv, at a rr.;..;rr.0 on the project applicant, the applicant must document for City review and approval, all of the following:, at a minimum: a. a -.-The current, pre -project use of the site; and b. b-How application of the requirement(s) for which an exception is being requested restricts the proposed use of the site compared to the restrictions that existed prior to adoption of this chapter; and c. e-The possible remaining uses of the site if the exception were not granted; and d. d-The possible uses of the site that would have been allowed prior to the adoption of this chapter; and e. e-A comparison of the estimated amount and percentage of value loss as a result of the requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the requirements of this chapter; and f. The feasibility of the applicant to alter the project to apply the requirements of this chapter. 3. Any exception must meet the following criteria: a. The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and b. The exception is the least possible exception that could be granted to comply with the intent of the minimum requirements. 3-A. An exception to the requirements shall only be granted to the extent necessary to provide relief from the economic hardship as determined by the dir-e6tefDirector, to alleviate the harm or threat of harm to the degree that compliance with the requirement becomes technically feasible, or to perform the emergency work that the direeto Director determines is warranted. 4.5.5-The direeterDirector may require an applicant to provide additional information at the applicant's expense, including (but not limited to) an engineer's report or analysis. The--, Ed-m-onds City Code and Gonmutmity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 418 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 26/30 -5-.6.6-When an exception is granted, the dir-eeteeDirector may impose new or additional requirements to offset or mitigate harm or the threat of harm that may be caused by granting the exception, or that would have been prevented if the exception had not been granted. CB. Adjustments. 1. The di-ect Director may approve a request for adjustments to the requirements of this chapter when the derDirector finds that: a. a -.-The adjustment provides substantially equivalent environmental protection; and b. b-The objectives of safety, function, environmental protection, and facility maintenance are met, based on sound engineering practices. 2—During construction, the directorDirector may require, or the applicant may request, that the construction of drainage control facilities and associated project designs be adjusted if physical conditions are discovered on the site that are inconsistent with the assumptions on which the approval was based, including (but not limited to) unexpected soil or water conditions, weather -generated problems, or changes in the design of the improved areas; and 3—A request by the applicant for an adjustment shall be submitted to the di-ree4orDirector for review and approval prior to implementation. The request shall be in writing and shall provide facts substantiating the requirements of subsection (C)(1) of this section, and if made during construction, the factors in subsection (C)(2) of this section. Any such modifications made during the construction of drainage control facilities shall be included with the final approved drainage control plan. 13C. Appeal. 1. The Director's decision on an application for an exception or adjustment may appeal to the hearing examiner in accordance with a Type II appeal process in ECDC Chapter 20.06 ECDC. 2. The applicant shall carry the burden of proof. 3. The decision of the hearing examiner is appealable to superior court in accordance with Chapter 36.70C RCW. [Ord. 3792 § 1, 2010]. 1 18.30.080 Easements, deeds -,Access and covenants.Covenants. A. Easements. A publie sterm drainage inspeetion easement shall be required v4wre-.-Access. Proper ingress and egress shall be provided to the City to inspect or perform any duty imposed upon the City by this Title. The City shall notify the responsible party in writing of a failure to provide access. If the responsible party fails to respond within seven days from the receipt of notification, the City may order the work required completed or otherwise address the cause of improper access. The obligation for the payment of all cost that may be incurred or expended by the City in causing such work to be done shall be imposed on the person holding title to the subject property these storm water best management pracfces confines to fimetion& Covenants. Maintenance covenants shall be required for each site/lot that will be maintained by a private entity such as designed. Rase a ffts shall be an individual, corporation, or homeowner's association. The maintenance covenant shall address or append requirements and responsibilities for long-term management and maintenance the applicable BMP(s). Maintenance covenants shall be as specified in o.,gi ffee -inn div sio City Engineering Division documents or approved by the directorDirector, and recorded with Snohomish County and on all proper deeds. The--, Edim-onds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 419 Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 27/30 B. Deeds and Covenants fer- Lew impaet Development. Deed restr4etiens and eeveaaa4s shall be r-eqttif-ed 99F all sit ftmetion as designed. The deed restrietiens of eevefia-fits shall address er append fequiremeffts a -ad responsibilities long term management and inaintenanee of these best management prae [Ord. 3792 § 1, 2010]. 18.30.090 Post Construction Inspection and maintenanee rolesMaintenance Roles and responAesResponsibilities. Proper construction inspection and maintenance of storm wate stormwater facilities (including ing eonst etion BNWs' is essential for the protection of the eiPfIsCity's MS4 and the environment. laspeetion and m .mien., e of all steizm water facilities shall be required in aceor-dance with the storm water supplement. A. Storm Wate Stormwater Maintenance and Inspection Standards. Storm wate Stormwater facilities shall be inspected and maintained per the requirements of the storm water � .o *Volume I and Volume V of the SWMMWW. For systems which do not have a maintenance standard, the owner shall develop a standard based on guidelines from the manufacturer, designer, or a registered professional engineer and submit the standards to the director- for apprev-a Director for approval. The purpose of the maintenance standard is to determine if maintenance is required. The maintenance standard is not a measure of the facility's required condition at all times between inspections. Exceeding the maintenance standard between inspections is not a violation of this chapter. B. Ownership. Storm wate Stormwater facilities are either privately or publicly owned and maintained. All storm waterstormwater facilities that serve commercial and industrial site private property are private. Storm drama facilities, unless an agreement between the property owner and the City states otherwise. Stormwater facilities or - controls -that are privately owned by a homeowner's association or similar organization also are private. The City may offer an incentive program to owners to support the proper maintenance of private storm drainage facilities. C. Public Stormwater Facilities. The City shall be responsible for operating, maintaining, repairing, and replacing public stormwater facilities as funded through the Stormwater Utility. D. Maintenance and Inspection of Permanent Facilities. All privately owned storm drainage facilities or controls shall be maintained by the owner, or the homeowner or owner association ("owner") if one is established as part of a residential or commercial development. All private storm drainage facilities shall be regularly inspected to ensure proper operation and shall monitor the facility or control as required or as set forth in theme „�SWMMWW. The eOwner shall maintain records of inspection and maintenance, disposal receipts, and monitoring results. The records shall catalog the action taken, the person who took it, the date said action was taken, how it was done, rests is of any r mitering off +t, and any problems encountered or follow-up actions required. The records shall be made available to the eityCity upon request. The a Owner shall maintain a copy of the Stormwater Operations and Maintenance Manual (if required) on site, and shall make reference to such document in real property records filed with Snohomish County, so others who acquire real property served by the privately owned storm drainage facilities or controls are notified of their obligation to maintain such facilities or controls. 1. Within one year for wet pool f4eilities and retention'detention faeilities; z. Within six months for typieal maintenanee-, 3. Within omenthsvrev'Ing, 4. Within two yeafs for maintenance that requir-es eapital eanstr+Ietion of less than . EE. City Inspection of private stormwater facilities. The City shall have the authority to periodically inspect private stormwater facilities, including low impact development stormwater facilities, for compliance with this chapter. F. Right of Entry. An authorized representative of the City may enter private property at all reasonable times to conduct inspections, tests or to carry out other duties imposed by the a state or Federal program provided that the City The--, Ed-m-onds City Code and Gonmnunity Development Gode, -are, e_-,urremt Glar-ough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 420 9.1.d Edmonds Page 14/44 Edmonds Page 28/30 Chapter 18.30 STORM WATER MANAGEMENT E makes a good faith effort to notify the property owner or person responsible for the premises prior to entering and Q. m presents proper credentials to that person. If entry is refused or cannot be obtained, the Director shall have recourse to m every remedy provided by law to secure entry, including but not limited to, obtaining an administrative warrant for entry. c 0 G. Right of Entry for Illicit Discharge. In the event of an illicit discharge from a privately -owned stormwater facility E caused by improper maintenance or operation or other circumstance, the provisions of ECC 7.200 shall apply. E 0 U H. Maintenance Responsibilities. Upon written notice by the City, a private stormwater facility shall be promptly repaired and/or brought up to applicable standards by the property owner or the person responsible for said facility. If c a private stormwater facility serves multiple lots and the responsibility for maintenance has not been specified on a E recorded subdivision plat, short plat, or other legal document, maintenance, operation and repair responsibility shall w rest with the homeowners' association, if one exists, or otherwise with the properties served by the facility, or finally, with the owners of the property on which the facilities are located. c a I. Disposal of Waste from Maintenance Activities. Disposal of waste from maintenance activities shall be conducted in accordance with the h4nimumminimum Functional Standards for Solid Waste Handling, Chapter 173-304 WAC, guidelines for disposal of waste materials from storm water maintenance activities, and where appropriate, the 0 V Dangerous Waste Regulations, Chapter 173-303 WAC. F. City inspection. The inspection drainage f4eilities is to E regular- of privately owned storm or eontrels essential ena the city to evaluate the operation of the eity's MS4 and the en-vironment. The eity shall have aeoess to m proper private storm water facilities for inspeetion to enstire they are operated and main4ained in aeeor-danee vflith EGG 0 c properly drainage f4eilities. ' r 18.30.100 Enforcement pfoc esProcedures. R E L A. General enforcement action shall be in accordance with this chapter whenever a person has violated any provision 0 of this chapter. The choice of enforcement action is at the discretion of the eit The seve Pity of any penlty shall be based the the the dafflage, to the to the degree bad faith 77 en natwe of vialatien, er risk publie er publie r-esetifees, or- of of the person „l jeet to the en f r,.om ent .,etio,...City. c B. Notiee of Violation and Order- to Correet. The direetoF shall have the authority to serve a person a notice of violat 0 and or -der to eorreet O�OVQTC) if an aetion is being undertaken in violation of this ehapter. issuanee of any other warning, notiee, or or -der is not a eondition pFeeedent for the direetor to issue an L a� • > m and time of vielation and the e e oF etefftial e O L A __, * _,_.1—aL,. L-.-.,4, :..1 _.. ,_l..a: ,_— _---- ---3 A--:-. --A .— ------- .--- __--- O r U U W 2. Notiee. An N0V/0TC may be imposed by a notice in writing, either by certified mail with r-etufn rveeipt­ C E owner- of the site, noted as the applioant on any application for development approval or obseFved doing regulated— t v aetivity on the site. r� by the person to whom the order is direeted. E t 0 r� The--, Ed-m-onds City Code and Gonmnunity Development Gode. ffe eurrent t-h-rough Ordinanee 4037, passed July r� Q . Version: September 8, 2015 Packet Pg. 421 9.1.d Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 29/30 B. Civil Penalties Adopted. ECDC Chapter 20.110 enforcement procedures are herein adopted in full, as modified in this chapter, with the proviso that repeat offenders or violations deemed an immediate public hazard shall be subject to compliance and appeal timelines as deemed appropriate by the Director based on the specific nature of the violation. C. Maintenance Orders. The dir-eetefDirector shall have the authority to issue to an owner or person an order to maintain or repair a component of astorm wate stormwater facility or BMP to bring it into compliance with this chapter, the storm water s,.ppleme SWMMWW, the Edmonds Stormwater Addendum, and the Edmonds Community Development Code. The order shall include: _ 1. 4-.A description of the specific nature, extent and time of the violation and the damage or potential damage that reasonably might occur; 2. 2-.A notice that the violation or the potential violation cease and desist and, in appropriate cases, the specific corrective actions to be taken; and 3. 3-A reasonable time to comply, depending on the circumstances. D. Civil Penalty. A person who fails to comply with the requirements of this chapter, who fails to conform to an approval or order issued, who undertakes new development without first obtaining approval, or who fails to comply with a stop work order issued under these regulations shall be subject to a civil penalty levied in accordance with the provisions of ECDC Chapter 20.110ECDE; provided, however, that the appeal process shall commence with a notice of violation as provided in ECDC 20.110.040(.B)-.. Civil penalties for code violations shall be imposed in accordance with the provisions of ECDC Chapter 20.110; provided, however, that in addition to the penalties set forth in that chapter, the hearing examiner is authorized to levy a penalty of up to $twenty thousand dollars ($20,000) per occurrence based upon an assessment of the following factors. Where such factors are present, the hearing examiner is authorized to levy such penalty after taking into consideration the full impact of the violation and any mitigating circumstances (see subsection (D)(2) ^ below): a. a. The violation created a risk to public health and the significance of the risk. b. b-The violation damaged the environment and the significance of the damage. c. e-The violation caused damage to public and private property and the significance of such damage. d. d A history of similar violations, if any. e. e-The economic benefit of the violations, if any, to the person or entity responsible for the violations. 2. Mitigating circumstances which may be used to offset or reduce the time resulting from the application of the preceding factors are limited to: a. a -.-Full compliance with a voluntary compliance agreement and no history of similar violations. b. b-Full compliance with a voluntary compliance agreement and a history of one or two similar violations (lesser reduction). c. c-.-A "voluntary compliance agreement" is defined as a legally binding agreement entered into between the cityCity and the alleged violators, by which the violator(s) acknowledge the existence of the violation, waive all appeal rights, and agree to and do pay a fine in an amount stipulated to between the violator and the eiyCity. The--, Edmonds City Code and Gonmnunity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed July . Version: September 8, 2015 Packet Pg. 422 Edmonds Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 30/30 3—If the violation(s) are not corrected as ordered, or a voluntary compliance agreement is not entered into within that time period and no appeal is filed, the penalty for the next 15-day period shall be 150 percent of the initial penalties, and the penalties for the next 15-day period shall be 200 percent of the initial penalties. The intent of this subsection is to increase penalties beyond the maximum penalties stated as an additional means to achieve timely compliance. Unless otherwise provided in a voluntary compliance agreement, civil penalties shall be paid within 30 days of service of the notice and order or stop work order if not appealed. Payment of the civil penalties assessed under this chapter does not relieve a person found to be responsible for a code violation of his or her duty to correct the violation or to pay any and all civil penalties or other cost assessments issued pursuant to this chapter. The eityCity may suspend immediate payment of civil penalties if the person responsible for a code violation has entered into a voluntary compliance agreement. Penalties shall begin to accrue again pursuant to the terms of the voluntary compliance agreement if any necessary permits applied for are denied, canceled or not pursued, if corrective action identified in the voluntary compliance agreement is not completed as specified, or if the property is allowed to return to a condition similar to that condition which gave rise to the voluntary compliance agreement; provided, however, that additional penalties shall not be imposed until additional notice and opportunity for hearing have been provided in accordance with ECDC Chapter 20.110 ECDC. 6-Civil penalties assessed create joint and several personal obligations in all persons responsible for a code violation. E. The determination of the hearing examiner issued in accordance with ECDC Chapter 20.110ECDC shall be appealable to the Snohomish County superior court in accordance with the provisions of Chapter 36.70C RCW F. The remedies provided for in this section shall not be exclusive. The eityCity may also use other civil and administrative remedies available to it, including but not limited to the remedies provided in ECDC Title 19 and the state building and dangerous buildings codes. [Ord �792 § 1 20101. The--, Edmonds City Code and Gonmutmity Development Gode, ffe, eurremit Ula-Fough Ordinanee 4037, passed . Version: September 8, 2015 Packet Pg. 423 VW c 0 a VQ N r+ N N O N n iV 4 Attachment: Attachment 5 - SW Code Council Public Hearing-20160802 (1490 : Stormwater Management i c 0 O h n r-+ n 0 rD Attachment: Attachment 5 - SW Code Council Public Hearing-20160802 (1490 : Stormwater Management Why is the Code being updated? Mandated by Department of Ecology Compliance with 2013-2018 Western Washington Phase II Municipal Stormwater Permit (NPDES Permit) required Compliance with 2014 Stormwater Management Manual for Western Washington (Ecology's Manual) required (Edmonds is essentially implementing identical requirements as 87 "NPDES Phase II" municipalities across western Washington) c aD E L E L 0 U) CD IV N O 00 O 0 N al C 0 U a� 0 U a r E w r a (H arMar) A LVA I Packet Pg. 426 What changes can be expected? Most substantial change has to do with new Low Impact Development requirements ("Minimum Requirement (MR) #5" in the Permit) Affects small projects (>2,000 sq. ft. of impervious) More complex site assessment requirements Additional City review requirements VAI Packet Pg. 427 What changes can be expected? m Stormwater Management (SWM) L - MR #5: Implementation Category 1 Project Sites (Trigger MR #1-#5) Category 2 Project Sites (Trigger MR #1-#9) 5 N O 00 List #1 orto 0 N Modeling Cu (LID Performance Standard] O U a� O List #2 or LO Modeling y (LID Performance Standard) a w r a VAI Packet Pg. 428 "List 1" and "List 2" _ L List 1 and List 2 provide options, established by Department of 0 Ecology, for managing stormwater runoff on a project site. Roofs N O O 53 0 N al C CU O - 2 V d C 7 O U d O U LO 0 E t v R Separate lists must be followed for each type of surface. LWA I H Packet Pg. 429 "i ist 1" and "List 2" L In design, all SWM options must be considered in the order listed. 0 0 The first option that is considered feasible is to be used. 1. Soil Quality and Depth Roofs W7 1. Full Dispersion or Downspout Full Infiltration 2. Rain Gardens [or Bioretention] 3. Downspout Dispersion Systems 4. Perforated Stub -out Connections 5. Detention pipes or vaults (City -specific standard) N O O O r Other Hard Surfaces 0 N tM C �L R _j d a 0 RV MMMV U 1. Full Dispersion 2. Permeable Pavement [or Rain Gardens or Bioretentic E 3. Sheet Flow Dispersion, or 2 Concentrated Flow Dispersi 4. Detention pipes or vaults ' (City -specific standard) w a (H a E) E) a D A L&A I Packet Pg. 430 What changes can be expected? City will not require historical tracking of impervious surface area on individual properties. Stormwater management of at least 25% of existing unmanaged impervious surfaces, but no more than area equal to proposed (retrofitting). new plus replaced area c aD E (D L E L O r U) 0 M IV N O 00 O 0 N al C �L 2 V 0 U a� 0 U E a r E w r a (H aDDar) A LVA I Packet Pg. 431 The project includes an existing "unmanaged" parking lot, and an existing structure. The project will tear down and rebuild the structure, but will not alter the parking area. The project discharges to the City's storm system. Triggers Minimum Requirements No. 1-5 Plus Retrofit Requirement Project site contains existing hard surfaces that do not drain to an approved stormwater management facility, and will not be modified as part of the proposed project. M c a E m c List No. 1 L Existing hard surfaces: Use o any BMPs from List No. 1 to manage at least 25% of existing unmanaged surface o 00 area. BMPs are not required 0 to be evaluated in priority order or document infeasibility. _ 1 0 0 U Minimum Req. 5 Applies 00 for Replaced Structure New/Replaced surfaces: Sei details on requirements in Project Scenarios 2-5. a 0 E 0 w r Q 9 Packet Pg. 432 IN - �. eaaeaI The project results in 3,000 square feet of new plus replaced hard surface area and discharges to the City's storm system. 10 Triggers Minimum Requirements No. 1-5 • Result in 2,000 square feet or greater of new plus replaced hard surface area, or • Has land disturbing activity of 7,000 square feet or greater List No. 1 or Modeling (LID Performance Standard) 11� � �II II � The project removes and replaces structures and pavement totaling 12,000 square feet of area and discharges to the City's storm system. 11 Triggers Minimum Requirements No. 1-9 • Result in 5,000 square feet or greater of new plus replaced hard surface area, or • Convert 0.75 acres, or more, of vegetation to lawn or landscaped areas, or • Convert 2.5 acres, or more, of native vegetation to pasture List No. 2 or Modeling (LID Performance Standard) 9.1.e The project is located in a direct discharge basin and includes specific requirements for the Edmonds Way basin. The project results in 3,000 square feet of new plus replaced hard surface area. 13 Triggers MRs No. 1-5 (Category 1 Project) Direct Discharge to Puget Sound CATEGORY 1 OR 2 PROJECTS Only a subset of List No. 1 applies If project is also located in the Provide peak flow Edmonds Way basin control for all remaining project site runoff The project removes and replaces structures and pavement totaling 6,000 square feet and does NOT discharge to the City's storm system. Triggers Min. Req. No. 1-9 (Category 2 Project) M c CATEGORY 1 OR 2 ' PROJECTS L r 3 E L O Approval from U) CD Discharge to Downstream Downstream Property Owner(s) co 0 Discharge On -site to List No. BMP (not required to be evaluated in priority order or document infeasibility) Pump On -Site Runoff to City's storm system 0 N 01 CU d Geotech Required Peer Review Fee L O U a� O Quantitative Downstream Analysis E a 14 1 Packet Pg. 436 Schedule / Status June 14, 2016 — City Council Study Session July 20, 2016 — Public Meetings • August 2, 2016 — City Council Public Hearing August 16, 2016 — City Council Action Item (Seeking approval of code with an effective date of Jan 1, 2017) Fall 2016 — Completion of Stormwater Development of implementation tools checklists) Addendum. (e.g., review WAI Packet Pg. 437