Loading...
BLD2022-1660_Supplementals_Plumbing_Fixture_Counts_12.7.2022_1.32.31_PM_3257162MyBuildingPermit.com Jurisdiction: Edmonds Project Name: Gasworks Investments Application ID: 1239473 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # gas Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # 2 Drains w/in footprint of building - Rainwater systems, roof deck drains, etc. -QTY# Re -pipe - Drain, vent, or water piping for each fixture served -QTY# 6 Water service line - Replacement or repair - QTY # Water service line - New -QTY# Water treating equipment (water softener) -QTY# Backflow protective device - 2" and smaller -QTY# Backflow protective device - Over 2" - QTY # Graywater or reclaimed water system - In addition to fixtures - QTY # Non -grease waste pre-treatment interceptor - Oil/water separator -QTY# Medical gas piping system - QTY # Grease trap - HGI inside building - QTY # Gravity grease interceptor - GGI - QTY # Gas piping outlets - QTY #