Loading...
APPROVED BLD Structural Plans-6.9.2022_9.57.16_AM+2922220STRUCTURAL NOTES CODE ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, SPECIFICATIONS, AND THE INTERNATIONAL BUILDING CODE (IBC) AS AMENDED BY THE JURISDICTION SPECIFICATIONS AND STANDARDS WHERE REFERENCED ARE TO BE THE LATEST EDITION. DESIGN LOADS LIVE LOADS: RESIDENTIAL 40 PSF SNOW 25 PSF SPECIAL INSPECTION SPECIAL INSPECTION AND STRUCTURAL OBSERVATION SHALL BE PERFORMED PER CHAPTER 17 OF THE IBC ONLY WHERE REQUIRED BY THE LOCAL JURISDICTION. ALL INSPECTIONS SHALL BE PERFORMED BYA QUALIFIED TESTING AGENCY DESIGNATED BY THE OWNER. THE ARCHITECT, ENGINEER, AND BUILDING OFFICIAL SHALL BE FURNISHED WITH COPIES OF ALL INSPECTION REPORTS. IF ANY INSPECTION FAILS TO MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, IT SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE DESIGN TEAM. FOUNDATIONS: THE FOLLOWING SOIL DESIGN PARAMETERS HAVE BEEN ASSUMED. IF EXCAVATION SHOWS THAT SOIL CONDITIONS DO NOT MATCH THE LISTED DESIGN VALUES, A GEOTECHNICAL ENGINEER SHALL BE RETAINED TO EVALUATE THE SOIL CONDITIONS. NOTIFY THE ENGINEER FOR POSSIBLE FOUNDATION REDESIGN. • 1,500 PSF (ALLOWABLE BEARING PRESSURE) FOOTINGS SHALL BEAR ON FIRM UNDISTURBED EARTH OR COMPACTED STRUCTURAL FILL FOOTING ELEVATIONS SHOWN IN THE DRAWINGS REPRESENT MINIMUM DEPTHS AND ARE FOR BIDDING ONLY. FINAL FOUNDATION ELEVATIONS ARE SUBJECT TO SITE CONDITIONS AND SHALL BE ESTABLISHED BY THE CONTRACTOR. FOOTINGS SHALL BE CENTERED BENEATH THE STRUCTURE ABOVE, UNLESS DIMENSIONED OTHERWISE. WOOD FRAMING ALL WOOD FRAMING SHALL BE PERFORMED IN ACCORDANCE WITH IBC CHAPTER 23, ANSI/A WC "NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION", AND AITC "TIMBER CONSTRUCTION MANUAL". SAWN LUMBER SHALL BE IDENTIFIED BY THE GRADE MARK OF AN AGENCYAPPROVED BYAN ACCREDITATION BODY COMPLIANT WITH DOC PS 20. ALL GRADES SPECIFIED IN THE STRUCTURAL DRAWINGS ARE MINIMUM STANDARDS AND SHALL BE AS FOLLOWS. - STUDS, PLATES, AND BLOCKING DOUG-FIR STUD GRADE • JOISTS DOUG-FIR #2 • 4x OR SMALLER BEAMS AND HEADERS DOUG-FIR #2 • POSTS AND TIMBERS DOUG-FIR #2 WOOD FRAMING SHALL BE KILN -DRIED TO A MAXIMUM MOISTURE CONTENT OF 19%. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY, OR EXPOSED TO EARTH OR WEATHER SHALL BE PRESSURE TREATED IN ACCORDANCE WITH AWPA STANDARD U1 AND M4 FOR THE SPECIES, PRODUCT, PRESERVATIVE, AND END USE REQUIRED. NAILS, SCREWS, BOLTS, AND CONNECTORS REFER TO THE PLANS, NOTES, SCHEDULES, AND DETAILS FOR ALL NAILING REQUIREMENTS. NAILING NOT SPECIFIED SHALL BE PER IBC TABLE 2304.9.1. ALL NAILS SHALL CONFORM TO THE STANDARD DIMENSIONS OF COMMON NAILS AS DEFINED BY THE NDS AND SHALL MEET THE FOLLOWING MINIMUM GUIDELINES: • 8d = 0. 131 "0 x 2 112" • 10d = 0. 148"0 X 3" • 16d = 0.162"0 x 3 1/2" 10d BOX NAILS (0.128"0 x 3') MAYBE SUBSTITUTED FOR 8d COMMON NAILS WITH NO CHANGE IN NAIL SPACING. FRAMING MEMBERS MAY BE NAILED WITH 16d SINKERS (0.148"0 x 3 1/4'), BUT ONLY 16d COMMON NAILS SHALL BE USED WHERE 16d NAILS ARE INDICATED IN THE DRAWINGS. OTHER NAILS MAY BE SUBSTITUTED ONLY WITH THE ENGINEER'S APPROVAL PRIOR TO START OF CONSTRUCTION. ALL WOOD CONNECTORS SHALL BE SIMPSON STRONG -TIE OR ENGINEER APPROVED EQUIVALENT. CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS USING THEIR SPECIFIED NUMBER AND SIZE OF FASTENERS. IF STRAPS CONNECT TWO MEMBERS, PLACE 1/2 OF THE NAILS, SCREWS, OR BOLTS INTO EACH MEMBER. ALL NAILS, SCREWS, BOLTS, AND METAL CONNECTORS IN CONTACT WITH PRESSURE TREATED OR FIRE RETARDANT TREATED WOOD SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A153. WOOD FRAMING GENERAL NOTES ALL HEADERS SHALL BE SUPPORTED BYA MINIMUM OF (1) CRIPPLE AND (1) FULL HEIGHT STUD. COLUMNS BELOW FLUSH FRAMED MULTIPLE JOIST BEAMS SHALL BE EQUAL IN WIDTH TO THE BEAM. ALL COLUMNS NOT CALLED OUT SHALL BE (2) STUDS. BEAMS SHALL HAVE FULL BEARING ON COLUMNS AND POSITIVE CONNECTION SHALL BE PROVIDED. PROVIDE SOLID BLOCKING BETWEEN JOISTS AND RAFTERS AT ALL SUPPORTS, AT 8'_0" OC MAXIMUM SPACING BETWEEN SUPPORTS, AND BENEATH PARTITIONS PERPENDICULAR TO THE DIRECTION OF FRAMING. MINIMUM NAILING REQUIREMENTS SHALL BE PER IBC TABLE 2304.10.1. THE USE OF NAIL GUNS IS APPROVED IF NAILING INTO THE DIAPHRAGMS IS FLUSH WITH FACE OF SHEATHING. NAIL PENETRATIONS GREATER THAN 1/16" ARE NOT ACCEPTABLE. NOTCHES AND HOLES IN WALL STUDS ARE ALLOWED WITHIN THE PARAMETERS OF IBC SECTIONS 2308.5.9 AND 2308.5.10. NOTCHES AND HOLES IN JOISTS AND RAFTERS ARE ALLOWED WITHIN THE PARAMETERS OF IBC SECTIONS 2308.4.2 AND 2308.7.4. 0 r\ N GENERAL NOTES STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE ARCHITECTURAL, CIVIL, ELECTRICAL, AND MECHANICAL DRAWINGS FOR BIDDING AND CONSTRUCTION. REFER TO THE ARCHITECTURAL DRAWINGS FOR ELEVATIONS, SLOPES, NON -BEARING WALLS, STAIRS, CURBS, DRAINS, RAILINGS, WATERPROOFING, FINISHES, ETC. REFER TO THE ARCHITECTURAL, CIVIL, ELECTRICAL, AND MECHANICAL DRAWINGS FOR SIZE AND LOCATION OF PIPES, VENTS, DUCTS, AND OTHER OPENINGS NOT SPECIFICALLY INDICATED ON THE STRUCTURAL DRAWINGS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS FOR COMPATIBILITY WITH THE PLANS, SPECIFICATIONS, AND REFERENCED STANDARDS BEFORE PROCEEDING WITH ANY WORK. THE MOST STRINGENT REQUIREMENT SHALL GOVERN ANY CONFLICT UNLESS APPROVED IN WRITING OTHERWISE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN TEAM BEFORE PROCEEDING. CONTRACTOR SHALL BE RESPONSIBLE FOR STRENGTH AND STABILITY OF ANY PARTLY COMPLETED STRUCTURE. CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY AND SHALL PROVIDE TEMPORARY SHORING AND SUPPORT AS REQUIRED UNTIL THE STRUCTURE HAS BEEN COMPLETED. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE DESIGN TEAM FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES ON SHOP DRAWINGS DO NOT SATISFY THIS REQUIREMENT. REVIEW OF ALTERNATE SYSTEMS MAY BE AN ADDITIONAL SERVICE BY THE ENGINEER. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF A SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE DESIGN TEAM. II II III II II NO WORK PERFORMED IN THIS AREA. II II II KITCHEN II II II II II II II II REMOVE CEILING JOISTS TO VAULT CEILING TO MATCH REMAINDER OF HOUSE II DASHED WALLS TO BE REMOVED II II 6x6 DF#2 POST WITH CC OR CCQ POST CAP. PROVIDE A35 OR RPBZ II ON (2) SIDES AT BASE II ----------------------------------- - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — : — II II II 4x6 DF#2 POST WITH ECC 5 1/2 x 12 DF GLULAM OR ECCQ POST CAP. (DROPPED) PROVIDE A35 OR RPBZ ON (2) SIDES AT BASE NO WORK PERFORMED IN THIS AREA. LIVING ROOM EXISTING VAULTED 2x ROOF JOISTS, TYP DINING ROOM EXISTING 6x12 DF#2 (DROPPED) EXISTING STUD SUPPORT The following documentation shall be available on site for the building inspector: 1 ■ 0 COE APPROVED ARCHITECTURAL PLAN SET ' COE APPROVED STRUCTURAL PLAN SET ❑ COE REVIEWED CALCULATION PACKET ! ❑ ENERGY CREDIT WORKSHEET ■ ❑ SITE PLAN ; CIVIL PLAN ■ ❑ 1 ■ � 1 ■ CITY OF EDMONDS BUILDING DEPARTMENT 2021 VFY/PROVIDE BLKG BTWN EXIST JOISTS EXIST JOISTS & SHEATHING (3) 1Od TOENAIL EA JOIST TO BEAM BEAM PER PLAN SECTION SCALE: NTS COLUMN PER PLAN FILL JOIST SPACE W/ BLKG EQUAL TO WIDTH OF COL ABOVE EXISTING BEAM LINE 4x6 DF COLUMN W/ AC6 CAP DBL BEVELED PLATE MATCHING ROOF SLOPE SIMPSON ABU SERIES POST BASE W/ 1/2" 0 ROD EPDXIED 4" MIN INTO FTG OR TITEN HD ANCHOR o - o Cr M J SIZE AND REINF U PER PLAN AND SCHED z CI_CL LU o LU RECEIVED Jun 09 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT W A l 0 N o U00 rn CL LQ (f) Q N 0 Lo I1�I111 W U Uj a Q_ A. ��So4oF SPAS � 40785 sIONAL 05/ 03/ 22 REV. DATE 05103122 DESCRIPTION PERMIT SUBMITTAL 0 PROJECT NO.: 22033.01 DESIGNED BY: CAB DRAWN BY: CAB CHECKED BY: CAB SHEET TITLE: NOTES, FRAMING IL PLANS, & DETAILS �,1 FOUNDATION / MAIN FLOOR FRAMING PLAN / SCALE: 3/16" = V-0" ROOF FRAMING PLAN SCALE: 3/16" = V-0" CRAWL SPACE FOOTING SCALE: 1 " = 1 '-O" BLD2022-0724 SHEET NO.: S-1