Loading...
ENG PROJECT ASBUILTPORTION OF SECTION 25, TOWNSHIP 27 N., RANGE 03 W., W.M. \ 15ACCESS EASEMENT / PERVIOUS CONCRETE DRIVEWAY PAVEMENT SEE DETAIL 1/C3.1 \ TEMPORARY PROJECT BENCHMARK / L / \/ � 'cr ♦ \ \ \ \ FOUND REBAR & CAP LS #9891 \ \ \ ELEV 287.43 \ \ \ \ CONTRACTOR SHALL VERIFY \ \ \ EXACT LOCATION AND ELEVATION ' / / \ / / / \ p / / 8.5' TILITY \ / i/ / EASE NT 293.16- \ ♦ / \ PERMEABLE SIDEWALK PAVEMENT �\ \ 102 SEE DETAIL 21C3.1 / a S , i \ NEW GAS METER & SERVICE LINE SERVICE LINE TO MAINTAIN 18 COVER MIN. PROVIDE 12" MIN. SEPARATION AT AL4 I s• \ \ 1 GRADING SHOWN ON ADJACENT LOTS FOR DEC. 293 asphalt INSPECTION PORT SEE DETAIL 3/C3.1 LOT 2 GRAVELLESS CHAMBER 3' W x 32'-2" L x 2.33' D MIN RIM 292.86 IE 290.0 SEE DETAIL 5/C3.1 1 LF 6" PVC @ 2% MIN CATCH BASIN, TYPE 1 1 1 293.62 ♦ W/ SEDIMENT RISER 1 �1 1 1 1 1 ♦ II O TO GRADE 11111111111111 �� \ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CONNECT FOOTING DRAINS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ♦ ♦TO STORM SYSTEM 11 11111111111 1 /�\ 11111111111111 DS \ 293.77 1 1 1 1 1 1 1 1 1 ATE 293.81 293.93 /S g . \ 293.87 \ 293.36 \ REFERENCE ONLY GAS/SD CROSSINGS G/ \ \ 1\ A ry POWER/TELEPHONE/CABLE POC 4" SIDE SEWER CLEAN OUT - tis / \ \ / r v ,.. CONNECT TO ROOF \ i �3° �/ Ds / > o \ \ \ \ / / / DOWNSPOUTS (TYP) DS 4" SDCO NEW RESIDENCE \ \ p ° \ \ \ 6 \\ TYPICAL PIPE DIMENSION NOTE THE PIPE DIMENSIONS SHOWN ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE SURVEY DATUM VERTICAL DATUM: NAVD88 BENCHMARK: 2" BRASS DISK IN CASED CONCRETE MONUMENT IN CENTERLINE OF 100TH AVENUE WEST 600' NORTH OF INTERSECTION WITH SR 104/EDMONDS WAY, OPPOSITE THE SOUTHEAST CORNER OF CEMETERY PROPERTY. ELEVATION = 312.10 FEET. (WGS CONTROL POINT #22) HORIZONTAL BASIS OF BEARING: N74000'00"E BETWEEN FOUND MONUMENTS ON 15TH STREET SW. EQUIPMENT USED: INSTRUMENTATION FOR THIS SURVEY WAS A 5 SECOND THEODOLITE AND AN ELECTRONIC DISTANCE MEASURING UNIT. PROCEDURES USED IN THIS SURVEY WERE FIELD TRAVERSE, MEETING OR EXCEEDING STANDARDS SET BY WAC 332-130-090. CONNECT TO EX GAS GS MAIN \ GPi\PN IS/ 0 GPS i 29ti 'o / 6co / \ \EX SSC� IE 283.5 RIM TO GRADE ROOF AREA: 2211 SF \ o / / /♦ / \ \ IE 292.0 FF 294 \ / I \<' /\\ \ \ WATER SERVICE POC Ds \ 4" ROOF DRAIN TIGHTLINE @ 1.0% MIN / 1 \ DS EX SSCO \ \ `J� ♦ / IE 287.83 ♦ p \ / DS`� S / NEW GAS MAIN TO MAINTAIN 36" COVER MIN. 10' SEWER PROVIDE T MIN. SEPARATION EASEMENT FROM SD LINES \ CONNECT TO EX WATER \\ \ \ SERVICE STUB PER \ \Z,<, \ \ OLYMPIC VIEW WATER \ AND SEWER DISTRICT i \ "00, \ \ \% , 4" SDCO RIM TO GRADE IE 291.5 \\ v / e' / I I � I TEMPORARY PROJECT BENCHMARK FOUND REBAR & CAP LS #9891 ELEV 289.73 CONTRACTOR SHALL VERIFY EXACT LOCATION AND ELEVATION \ \ \ I � I ALL DISTURBED SOILS WILL BE COMPOST AMENDED PER BMP T5.13 IF THE RIM TO INVERT ELEVATION EXCEEDS 5-FEET, THEN A TYPE 2 MANHOLE WILL BE REQUIRED. GENERAL NOTES 1. CITY OF EDMONDS WILL TV SEWER LINE PRIOR TO FINAL ACCEPTANCE. 2. ALL SEWER PIPE SHALL BE SDR 35 OR BETTER 3. PER ECDC 18.05 ALL UTILITY SERVICES SHALL BE INSTALLED UNDERGROUND. 4. PLACE CABLE/TEL/TV LINE IN POWER LINE TRENCH. 5. CONDITION OF EXISTING LATERAL SHALL BE VERIFIED BY THE CITY OF EDMONDS. CONTACT THE SEWER DIVISION AT 425-771-0235. 6. IF NEW LATERAL IS REQUIRED, A MANHOLE WILL BE INSTALLED AT THE CONNECTION TO THE MAIN UNLESS SEWER DIVISION DETERMINES OTHERWISE. UTILITY NOTE: THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT HAPPEN DUE TO THE CONTRACTOR'S FAILURE TO LOCATE EXACTLY AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. BEYLER CONSULTING ASSUMES NO LIABILITY FOR THE LOCATION OF UNDERGROUND UTILITIES. 4" SDCO RIM TO GRADE IE 291.0 • a e Know what's below. Cal I before you dig. 10 5 0 10 SCALE: 1" = 10' IMPERVIOUS AREAS EXISTING: NO EXISTING IMPERVIOUS PROPOSED: SINGLE FAMILY RESIDENCE PERMEABLE SIDEWALK DRIVEWAY (PGIS) TOTAL: 2211 SF (0.060 Ac) 27 SF 421 SF 0.009 Ac + 670 sf asphalt 3329 F ( .07�Ac 1 ULTILTY NOTE ALL UTILITY TRENCHES WITHIN 10 FT OF AN INFILTRATION FACILITIES AND PERMEABLE PAVEMENTS/PAVERS TO BE WRAPPED WITH AN IMPERVIOUS LAYER IN ORDER TO PREVENT MIGRATION OF INFILTRATION WATER THROUGH UTILITY TRENCHES. APPROVED FOR CONSTRUCTION OLYMPIC VIEW WATER AND SEWER DISTRI APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY: CITY ENGINEERING DIVISION w Q 0 z d Ln N W 0 U�mo u - 6 cU' °' 4-1Q00 *' W (n;->9 3 Q 'n c 000N O 00 U O 3 c � N O i' Orn�� a� U �n _J a m W zZ a 0 cd-w Ja 9; Z X w LL O � W 2 �� a LL z J -4 I , � C- J J 0) LLJ O En a) W _ z 3 z W U 1 1 1��11 Z w W 2: J W . c�¢ �Z U E cU a�� � U 660 � a > U 0 N Q�O z oLn CL t- � - Z) Q o ^ W zILL U_ z OLu W � Q � Z Q V Q W LL1 z = U L O Q N W ILL U CL � J JOB NUMBER 16.00089 SHEET 4 OF 6 C3. 0