Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED
Parcel No: 27032300405800 Site Address: 320 DAYTON ST SUITE 250 EDMONDS,WA 98020- Applied: 12/7/2022
3567
Subdivision: 008592
Fire Sprinklers: No
Valuation: $1,000.00
Code Edition: 2018
Lot Area:
Occupancy Type: B
No. Stories: 0
Lot: 0
Zoning:
Construction Type:
# of Dwelling Units: 0
Scope of Work: WESTERLY -REMODEL, EXPANDING CURRENT OFFICE,COMBINE 2 SUITES
WA State Contractor L & I #: WESTEL*824DM
Issued:12/19/2022
Final:
Expiration Date: 12/14/2023
Issued by: BAC
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KATIE DAYLEY
320 DAYTON STREET, EDMONDS
(425)876-4368
KATIE@WESTERLYRE.COM
WA 98020
320 DAYTON STREET, EDMONDS
CONTACT
KATIE DAYLEY
(425)876-4368
katie@westerlyre.com
WA 98020
CONTRACTOR
WESTERLY LLC
320 DAYTON ST #108,
(425)422-0053
katie@westerlyre.com
EDMONDS WA 98020
320 DAYTON ST 101, EDMONDS
OWNER
320 DAYTON LLC
WA 98020
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
12/8/22
R24874
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
12/19/22
R25056
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$154.00
$154.00
12/19/22
R25056
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$130.90
$130.90
12/8/22
R24874
TOTALS: $349.90
$349.90
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, December 19, 2022 1:56:00 PM 1 of 2
•MERCIAL BLDG PermitCity
• • • • -
•:0i 1 ...
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Monday, December 19, 2022 1:56:00 PM 2 of 2