Loading...
ENG2022-0576 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of • • . oc�� 98020 ENG2022-0576 www.edmondswa.gov i 1 1 Description: ZIPLY - SMALL SIDEWALK REPAIR TO MOVE RISER ISSUED: 12/22/2022 Address: 660 BELL ST EDMONDS WA 98020-3020 EXPIRES: 06/20/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434209801900 wI 11-14111 a NAME TYPE NAME ADDRESS PHONE APPLICANT VICTORIA COMER 1800 41ST ST STE N-100, EVERETT WA 98230 (830)513-6614 CONTACT ZIPLY FIBER 1800 41ST ST STE N-100, EVERETT WA 98230 (402)670-8384 CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 OWNER JAMES R IRWIN 2507 NW 202ND, SEATTLE WA 98177 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: GRN DATE: 12/22/2022 ENGINEERING DIVISION "DTED 0V 2/22/2022 Printed: Thursday, December 22, 2022 9:35:48 AM 1 of 2 y' v RIGHT OF WAY EUC PERMIT J PERMIT NUMBE City of Edmonds Edmonds : ENG2022-0576 www.edmondswa.gov CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** Printed: Thursday, December 22, 2022 9:35:48 AM 2 of 2 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband provider Ziply Fiber to Make minor sidewalk replacement to to extend conduit into existing riser bundle - RIGHT -OF -WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: * telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Mimi Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 6�6� � Z�)¢'� DATE: 11 /30/2022 APPLICANT PRINTED NAME: Christopher DeLisle APPLICANT TITLE: Traffic Control Plan & Permit Specialist NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM 0 zlply. fiber WHO: Ziiply Fiber WHAT: Disconnected conduit WHERE: 660 Bell St, Edmonds, WA 98020 WHEN: 11/25/2022 WHY: Conduit is disconnected from existing pole. HOW: Minor sidewalk replacement (marked in red) to extend 2" PVC conduit (marked with arrow) into existing riser bundle. APPROVED PROJECT Mike HaKahan Ziply OSP Engineer mike. hakahanpAply.com 42 5-949-0230 z' I pY fiber OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED ,Jeff Whatmore 12/21/2022 RECEIVED DEC 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Exchange: 51419 Halls Lake Project: 5512148-61 Sidewalk replacement 660 Bell St, Edmonds, WA 98020 ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, N MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) O ATCO COMMUNICATIONS SERVICES. LLC www.atcoteiecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Sprague St zipIY fibe, Everett, WA 98206 f ID ;r z z > Z co ; C6 M Q N_ >Q> 2 N Lfi > !) 60 airy+ ll �`'�h LO n O dmonds, WA -9802C co .Salt anc iron N CD O O O Edmonds WORK AREA ckf i n e Weathered w Ln Frame Photography o =r UDowntown Edmondsr WA U > Dayton St - Modern Headshots — � o � Z Q w ob �% o a U U ? e-� O O U w 3 0-C LL M { It Maple St DATE: 11.30.2022 REVIEWED BY: D. LAFLEUR WSTCS# 013259 A Irimr Qt DESIGNED BY: C.DELISLE ATCO CONTACT: 425.299.5494 RECEIVEDchristopher.delisle0atcotelecom.com DEC 01 2022 SCALE: SHEET: VICINITY MAP NOT TO CITY OF EDMONDS SCALE 01 DEVELOPMENT SERVICES DEPARTMENT NO: 1 OF 2 RECEIVED CITY OF EDMONDS Right -of -Way Application #1236578 - 5512148-61 DEC 01 2022 MyBuildingPermik.com CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Victoria Comer Ziply Fiber Number Street Apartment or Suite Number E-mail Address 1800 41st St Ste N-100 victoria.comer@ziply.com City State Zip Phone Number Extension Everett WA 98230 (830) 513-6614 Contractor Company Name ZIPLY FIBER NORTHWEST LLC Number Street Apartment or Suite Number 1220 75th St SW City State Zip Phone Number Extension Everett WA 98203 (425) 231-3928 State License Number License Expiration Date UBI # E-mail Address ZIPLYFN782L3 5/25/2024 iyini i4gn caitlin.reid@Ziply.com Project Location Number Street Floor Number Suite or Room Number 660 BELL ST City Zip Code County Parcel Number EDMONDS 98020 00434209801900 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name James R Irwin Number Street Apartment or Suite Number 2507 NW 202ND City State Zip SEATTLE WA 98177 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 11/30/2022 Submitted By: Victoria Comer Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1236578 - 5512148-61 Project Contact Company Name: Ziply Fiber Name: Arianne Mommsen Email: Arianne.Mommsen@ziply.com Address: 1800 41 st St Ste N-100 Phone #: (402) 670-8384 Everett WA 98230 Project Type Utility Purveyor Activity Type Utility Work Scope of Work Disturbance of Surface Project Name: 5512148-61 Description of Work: Minor sidewalk replacement to extend conduit into existing riser bundle. Project Details Project Information Job Number 5512148-61 Page 2 of 2