BLD2022-1740_Supplementals_Mechanical_Equipment_-_Residential_Building_Permits_12.26.2022_2.07.43_PM_3285160r
0
Jurisdiction: Edmonds
Project Name: Kitchenette
Application ID: 1243193
Supplemental Name: Mechanical Equipment - Residential Building Permits
Enter the # of mechanical equipment units being
- installed, altered, repaired, added or relocated
Furnace
- Forced -air or gravity -type, includes ducts and appliance vents
- QTY #
Air handler
- Includes ducts (Diffusers, blowers, etc.)
- Up to and including 10,000 cfm (4719 L/s)
-QTY#
Air handler
- Includes ducts (Diffusers, blowers, etc.)
- Over 10,000 cfm (4719 L/s)
-QTY#
Gas Heater
- Suspended, recessed wall, or floor -mounted units
- QTY #
Hydronic Heating System
- QTY #
Appliance Vent
- Type B, BW, L gas vent, etc.
- QTY #
Incinerator
-QTY#
Ventilation and Exhaust
- Fans connected to single duct (bath, laundry, kitchen exhaust - range hood)
or each system which is not a portion of any heating or air-conditioning system
-QTY#
1
Hood
- Type 1, Type 2 or Fume Hood including ducts (Note: these typically only apply to commercial projects).
- QTY # and Type
Gas Piping / # of Outlets
- New or relocated
- QTY #
Boiler or Compressor
- Up to and including 50 HP (176 KKK
- QTY #
Boiler or Compressor
- Over 50 HP (176 KW)
-QTY#
MyBuildingPermitxom
Air Conditioner, Heat Pump, or Absorption System - OUTDOOR UNITS - INCLUDE UNIT ON SITE PLAN - Upload manufacturer installation and
specification sheets.
- Up to and including 1,750,000 Btu/h (512.9 kVV)
- QTY # & Height of Unit
Air Conditioner, Heat Pump, or Absorption System - OUTDOOR UNITS - INCLUDE UNIT ON SITE PLAN - Upload manufacturer installation and
specification sheets.
- Over 1,750,000 Btu/h (512.9 kVl9
- QTY # & Height of Unit
Roof Mounted HVAC Units are:
Not applicable
Each appliance or piece of equipment regulated by the IMC for which no other item is listed
- Fire dampers, ductless mini -split systems, etc.
- QTY # and Equipment Item
Did you use a heat pump as an energy credit in your energy calculations? And if so, did you include it in your counts above and show it on the
site plan?
fro