Loading...
Building Permit (4)FIRE OPERATIONAL PERMIT Permit of Edmonds PERMIT NUM IL EdmondsCity 98020FIR2022-01125 www.edmondswa.gov Type: FIRE OPERATIONAL Subtype: Status: ISSUED PERMIT Parcel No: 27032400217100 Site Address: 828 CASPERS ST EDMONDS,WA 98020-2618 Applied: 11/15/2022 Subdivision: BLA LL-2001-203, SP S-94-33, 011573, SP S-42-85, SP S-2001-195 Lot: 0 Issued: 12/28/2022 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 12/23/2023 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC Scope of Work: EDMONDS FOOD BANK -TEMPORARY TENT WA State Contractor L & I #: • NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT CASEY DAVIS 828 CASPERS ST L100, (425)778-5833 DIRECTOR@EDMONDSFOODBANK.OR EDMONDS WA 98020 G CONTACT EDMONDS FOOD BANK 828 CASPERS ST L100, (425)778-5833 director@edmondsfoodbank.org EDMONDS WA 98020 CONTRACTOR CONTRACTOR UNKNOWN OWNER EDMONDS UNITED 828 CASPERS ST, EDMONDS WA (425)778-2119 METHODIST CHURCH 98020-2618 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/18/22 R24537 PER PERMIT FIRE - OPERATIONAL BLDG FEE 001.000.322.10.000.00 $50.00 $50.00 11/18/22 R24537 FIRE - OPERATIONAL PERMIT FEE 001.000.321.30.000.00 $50.00 $50.00 11/18/22 R24537 TOTALS: $140.00 $140.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, December 28, 2022 8:38:14 AM 1 of 2 FE _ OPERATIONALFIRE - City of • • • 98020 1 1 . •. � i I• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. ' •IMIM - • • • • INSPECTIONTYPE INSPECTOR COMPLETED RESULT 7N0TES7%Eff!!! F-1 FIRE DEPT INSPECTION X-1 FIRE FINAL** Printed: Wednesday, December 28, 2022 8:38:14 AM 2 of 2