Loading...
Building Permit (3)Type: COMMERCIAL BLDG Subtype: CHANGE OF USE I Status: ISSUED Parcel No: 27032300104500 Subdivision: 004548 Fire Sprinklers: Yes Valuation: $0.00 Code Edition: 2018 Site Address: 172 SUNSET AVE S EDMONDS,WA 98020-4134 Lot: 0 Lot Area: Occupancy Type: B/M No. Stories: 0 Scope of Work: VIE & VIN - CHANGE OF USE (no const) Zoning: Construction Type: VB # of Dwelling Units: 0 WA State Contractor L & I #: Applied: 12/15/2022 Issued:1/12/2023 Final: Expiration Date:1/7/2024 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRANDON MCKERNEY 172 SUNSET AVENUE, (425)387-1659 BRANDON@VIEANDVIN.COM EDMONDS WA 98020 CONTACT VIE & VIN 172 SUNSET AVENUE, (425)387-1659 brandon@vieandvin.com EDMONDS WA 98020 CONTRACTOR OWNER 923 POWELL AVE SW, RENTON OWNER SALISH CROSSING GROUP LLC WA 97057 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CHANGE OF USE - SUB NO CONST - 001.000.322.10.000.00 $210.00 $210.00 12/16/22 R25040 BLDG PERMIT FEE CHANGE OF USE - SUB NO CONST - 001.000.345.83.000.00 $100.00 $100.00 12/16/22 R25040 BLDG PLAN REVIEW FEE CHANGE OF USE - SUB NO CONST - 001.000.342.40.000.00 $100.00 $100.00 12/16/22 R25040 FIRE INSP FEE CHANGE OF USE - SUB NO CONST - 001.000.345.83.100.00 $100.00 $100.00 12/16/22 R25040 FIRE PLAN REVIEW FEE CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/16/22 R25040 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 12/16/22 R25040 TOTALS: $575.00 $575.00 wr • R • CONDITION TYPE STATUS NOTES Printed: Thursday, January 12, 2023 11:42:03 AM 1 of 2 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2022-1713 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" A-1 BUILDING PRECON B-7 BUILDING OTHER INSP Printed: Thursday, January 12, 2023 11:42:03 AM 2 of 2