APPROVED ENG INTAKE RESUB-TIA+7.28.2022RECEIVED
Aug 01 2022 BLD2022-0982
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTransportation
Worksheet
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
APPENDIX A
Page 1 of 2
Impact Analysis
Name of Proposed Project: Glacier Environmental Services, Inc.
Owner/Applicant
DRT Holdings Inc.
Name
PO Box 1097 Mukilteo, WA 98275
Street/Mailing Address
Mukilteo, WA 98275
City
Telephone: 425-355-2826
Applicant Contact Person:
Lauren Golembiewski
Name
PO Box 1097
Street/Mailing Address
Mukilteo, WA 98275
State zip City
Telephone: 425-268-9775
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
N/A
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: 7509 212th St SW Edmonds WA
State zip
(Attach a vicinity map and site plan.)
b. Specify existing land use: Single Family Home and 2 ADUs
c. Specify proposed type and size of development: Temporary Office approx 578 SF
(# of residential units andlor square footage of building)
d. Date construction will begin and be completed: Temporary Office for <6 months, then it will
e a job shack during tne site development
e. Define proposed access locations: Fxsiting Driveway/Curb Cut
HANDOUT UPDATED 09.02.2021
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: No change to existing
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130.
V CHANGE IN USE Per Natalie Griggs Fee entered as $0 as this is only Temporary Use
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X
1
New Use Fee: $ - Prior Use Fee: $ _ $ 0
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X —
❑ NO CHANGE
❑ INDEPENDENT FEE CALCULATION
Fee
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$ 0
ENGINEERING DIVISION
---_ -- — •DTED
City of Edmonds, Engineering Division Al �� Date
18/24/2022
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
ALL IMPACT FEES SHALL BE PAID DURING NEW BUILDING
PERMIT, NOT FOR TEMPORARY OFFICE.
HANDOUT UPDATED 09.02.2021