Loading...
ENG CORRECTION NOTICE 1.11.2023CITY OF EDMONDS of ED4o CORRECTION NOTICE 1P ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov �Sr. 1 gqo BLD2021-0172/ DATE: January 11, 2023 PERMIT NUMBER: ENG2021-0233 OWNER: Dennis Parker SITE CONTACT: Roger Wilson ADDRESS: 327 Daley St TYPE OF INSPECTION: FINAL INSPECTION ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ® RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR Curb Ramp: It is the City's understanding that the applicant is seeking final certificate of occupancy for this project. We have thoroughly gone through all of the permit files and recognized that the curb ramp inspection at the corner of 4th and Daley was never finalized. Upon a site visit, it was discovered that the curb ramp was not installed properly and is currently not in ADA compliance. The panels marked with red "x's" in the image below will need to be replaced. Furthermore, expansion joints will need to be added to make the flares separate from the sidewalk (marked in blue), as discussed with the contractor prior to pouring of the concrete. The design that was discussed with the contractor is attached for reference. Next Steps: 1. Schedule form inspection for curb ramp on My Building Permit www.mybuildingpermit.com. 2. Schedule inspection prior to pouring so slopes can be verified. 3. Additional inspection fees are due on the right-of-way permit (ENG2021-0233) prior to final of the ROW and building permits. Currently the balance is $495; please note, additional inspection fees may be added prior to final. • Payment can be made at Development Services to City Hall or by calling 425-771-0220. 4. A pickhole is required the for the 12" sewer cleanout cover that is in front of 323 Daley. This pickhole can be drilled into the existing cast iron cover. Recall for inspection when this completed. Paperwork: 1. Records for the ROW dedication shall be provided to City prior to final. a. The notarized copy will need to be signed by City officials prior to being recorded with Snohomish County. b. The owner providing signature will need to be the correct owner at time of recording of the document. For clarification, if documents are to be recorded after the sale of the property, then the new property owner will need to be signing the document. 2. Stormwater covenant with accurate exhibits required prior to final. a. The notarized copy shall be signed by the City inspector prior to recording. b. The owner providing signature will need to be the correct owner at time of recording of the document. For clarification, if documents are to be recorded after the sale of the property, then the new property owner will need to be signing the document. Please submit all documents to en ine�ermgpermits ckedmondswa. og_v. THE ACTIONS OR CORRECTIONSINDICATED ABOVE ARE REQUIRED TO BE CORRECTED PRIOR TO FINAL OF ALL PERMITS. FOR INSPECTION SCHEDULE THROUGH mybuildingpermit.com Inspector: Natalie Griggs Date: January 11, 2023 Page 2 of 2 L,ow-as d,brn