Loading...
REVIEWED BLD-BLD2021-0373+Energy_Calculations+3.14.2021_1.20.37_PM+2091323BLD2021-0373 (RECEIVED Alterations Worksheet - 2018 Washington State Energy Code Project Information Contact Information CL QN The WSEC requirements for alterations are located in Chapter 5 of the code text. Alterations (remodels) do not need to obtain energy credits from Table R406.3 Mar 16 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Additions must meet the requirements for new construction. This includes nonconditioned space being altered to become conditioned space. ..,.,.,.,.,..............................., Will the wall cavities be exposed? REVIEWED Yes t- No BY If yes: Exposed wall cavities must be insulated - CITY OF EDMONDS 2 X 4 wall studs require R-15 Insulation BUILDING DEPARTMENT 2 X 6 wall studs require R-21 insulation """""""""""""""""""""""" Will the roof/ceiling framing cavities or attic be exposed? Fes I— No If yes: Exposed roof/ceil�g assemblies must be insulated - Vaulted ceilings: Insulate to the full depth of the framing member while allowing for the minimum 1" ventilated space Flat ceilings Will the floor framing cavities be exposed? Install R-49 insulation or what the attic space can accommodate based on the roof pitch Yes F No If yes: Exposed floor cavities must be insulate o R-30 Are the windows and/or doors I�Yes F No (includes both window or door and frames) If yes: New windows and doors must have an area weighted avers e �of Will the heating or cooling system be replaced? IW Yes KN0 If yes: New equipment must meet current requirements and ducts need to be tested Will the hot water system be altered? 1— Yes kNo If yes: New water heating equipment must meet current code requirements Are more than 50% of the light fixtures being changed? r Yes No If yes: 75% of all lamps must be high efficacy (LED or CFL)