REVIEWED BLD BLD2021-1176+Structural_Analysis_or_Calculations+8.24.2021_1.58.16_PM+23735721 of 27
RECEIVED
Aug 25 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2021-1176
LONGITUDE
ONE TWENTYO
ENGINEERING & DESIGN
calculation Package for
...........................................
REVIEWED
BY
CITY OF EDMONDS;;
BUILDING DEPARTMENT
Foundation Stabilization/Lift
STRUCTURAL ENGINEER
L120 ENGINEERING & DESIGN
13150 91s' PL NE
9423 232ND ST SW
EDMONDS. WA 98020
Project no: S210728-7XR
August 9t ; 2021
Prepared for:
R&R Foundation Specialist
3409 McDougall Ave, suite 204
Everett, WA 98201
P: 425.760.5077
KI RKLAN D, WA 98034-5901
CONTACT: MANS THURFJELL, PE
EMAIL: MTHURFJELL@L120ENGINEERING.COM
PHONE: (425) 636-3313
ry
�S
`o
i'.
i
i
i
PARCEL NO.
00498300000600
LEGAL DESCRIPTION
Section 36 Township 27 Range 03 Quarter
NE UNDJORD LANE BLK 000 D-00 - LOT 6
TGW EQ & UND INT TR A & TGW UND 1/10
INT IN FDT - N 559.85FT OF S 579.85FT OF
E 1OFT OF W 12OFT El/2 SW114
NE1/4NE114 SEC 36 TWP 27 RGE 3 TO BE
USED FOR ACCESS & UTILITY PURP
OWNER NAME & ADDRESS
HEDGES ED
9792 EDMONDS WAY 261
EDMONDS, WA 98020
----------------------------------------------
I
i
I
POOL
94th PL W
PROPERTY LINE
_-0_0' __ ___.___-___-_-
__-_-
—
COVERED
GARAGE
GARAGE
(E) RESIDENCE
9423 232ND ST SW
EDMONDS, WA 98020
AAaAorwoak
s
0
�a.az oHwh
;
i
1
-_ PROPERTY LINE
PILE SPACING & LOAD REOGI RM ENTS TABLE
PILE MAXOCSPACING,R MIN VERTICAL CAPACITY, kips PROOF TESTING LOAD kpa
PILES TYPEBTWN ENO ALLOWABLE LOADING I IINVERTICAL CAPACITY LOCATION
PILES OFFSET (MIN ULTIMATECAPACITY)
Typical I HELICAL I 8'-T 3-TUNO 105kip 210kip TYP
NOTES:
a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE
MANUFACTURER. THE MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TOACNEVE THE REQUIRED BEARING
CAPACITY LOADING, INCLUDING A SAFETY FACTOR NO LESS THAN 2. THE MAXIMUM INSTALLATION TORQUE SHALL NOT
EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PART OF THE PILE ASSEMBLY. MAXIMUM
INSTALLATION TORQUE RATING OF 8,300FTYBs FOR A 2-7181NCH DIAMETER HELICAL PILE WITH 0.203INCH SHAFT WALI
THICKNESS PER ESR-3T50.
b. HELICAL ASSEMBLIES AS MANUFACTURED BY IDEAL MANUFACTURING, INC., IN ACCORDANCE WITH ESR3750.
c. PILE ORANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITYAS DETERMINED BY THE MANUFACTURER FOR ANY PAR'
OFTHEASSEMBLY.
A. MAXIMUM ONCENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PLAN.
SITE PLAN NOTES
1. VERIFY EXISTING STRL'CTIIRES AND ALL DIMENSIONS ON SITE,
2, FOUNDATION DIMENSIONS ME TO OUTSIDE FACE OF CONCRETE STEM WALL
PER R&R FOUNDATION SPECIALIST(RSR) LEVEL SURVEY.
3, REFER TO STRUCTURAL CALCUTAVONSPACHAGEBY L120 DATED AUG 9,
2021, FORADDFIONAL INFORMATION, SPECIFICATIONS, AND
REQUIREMENTS.
4. LEVEL SURVEY PER R&R PROPOSAL DATED MAY 28, a GI. REFER TO
STRUCTURAL CALCULATIONS PACT AGE FOR MODIFICATIONS AND
ADDITIONAL REQUIREMENTS FOR LEVEL SURVEY.
5, PARCEL DIMENSIONS APPROXIMATED BY SNOHOMISH COJNTY ASSESSOR
PROPERTY DIMENSIONS ARE APPROXIMATE FOR REPRESENTATIVE
PURPOSES ONLY. NOT TO SCALE. NOT TO BE USED FOR LEGAL PURPOSES
OR IN PLACE OF FIELD SURVEY
6, SITE FEATURES AND SOME EXISTING STRUCTURES ON ADJACENT PARCELS
NOT SHOWN FOR CLARITY.
❑
EXISTING RESIDENCE STRUCTURE
-',
EXISTING ADJACENT STRUCTURE
AREA OF PROPOSED WORK
---
PROPERTY LINE
APPROXIMATE DIMENSION
1
HELICAL PILE
®
C6X8.2 CHANNEL
U)
C
N
C`7 — --
N
Qj
Izr
i
i
a
11a
LOCATE PILE WITHIN I' C6.8CHANNEL I11.B'
?F CORNER TAX 11A1 4 1N a
y
0
...__ 6'U'MA% SIB' - ...
Aaxe (a) P L& ®e OC MPJf
Q 3 Helical Pik
R&R LEVEL SURVEY
SEE STRUCTURAL CALCULATION PACKAGE FOR ADDITIONAL REQUIREMENTS
SITE PLAN
NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS.
NOTE: L120'S SCOPE IS LIMITED TO THE PERIMETER SUPPORT SYSTEWCONTINUOUS FOOTINGS. THE INTERIOR CRAWL SPACE SUPPORTED SYSTEM FOR THE FIRST FLOOR SHALL BE INSTALLED PER R&R.
3of27
LONGITUDE
ONE TWENTY
ENGINEERING & DESIGN
Scone/Obiective
PROJECT NO. SHEET NO.
S210728-7XR
PROJECT 9423 232ND ST SW EDMONDS, WA
SUBJECT Foundation Stabilization/Jackin
BY PAM DATE 08/09/21
To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These
findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the
existing structure above (based on as -built assessments).
The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations
based upon the findings of L120 Engineering & Design.
Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic
damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in
the structural scope presented here.
It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space
support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support
posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas
shall be monitored and further adjustments shall be made if necessary.
Structural Summary:
- The foundation of the residence consists of continuous cast -in -place concrete stem wall and concrete strip footings. Below the footings,
piles are to be spaced at a distance no larger than 8'-0" on -center with C6x8.2 channels installed spanning from pile -to -pile. Piles and
supplemental channel to be installed in accordance with SSK-01 and SSK-02.
- End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of T-0".
- A maximum allowable loading of 2,070 plf was utilized in this analysis. This was determined through inspection of building geometry
and conservative span/tributary loading assumptions based on standard construction practices
- The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment
assemblies with capacities equal to or greater than the indicated load values.
Allowable Load Capacity Requirement:
Exterior/Perimeter Piles @ 8'-0" o.c. ............ 16.5 kip minimum vertical capacity (allowable load)
Note: Refer to the attached General Notes for additional requirements.
- As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and
recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or
expected additional structural analysis will be required.
- Structural recommendations contained in this package are based on site photographs dated May 28, 2021, provided by R&R. To the
knowledge of L120, a geotechnical investigation was not performed on this site. Consequently, all structural recommendations assume
adequate soil conditions to obtain the required pile capacities.
Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the
recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage,
or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need
to be revisited to consider and address the new findings
Refer to the following pages for pile and connection specifications.
L120 ENGINEERING & DESIGN
4 of 27
GENERAL NOTES
HELICAL PILES
1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018
INTERNATIONAL BUILDING CODE (IBC).
2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND
SHALL BE IN ACCORDANCE WITH ESR-3750.
3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH
ESR-3750.
4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES
ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING
POLYMER (EAA) COATINGS (AC228).
5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE
REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING
COMPONENTS PER AC358 SECTION 3.9.
6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS.
7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED.
8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE
OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750.
9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE
AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE
INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS.
10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE
THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF
SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE
ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY.
11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY
TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO
LESS THAN TWO (2).
12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE
FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION.
13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE
TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES.
14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED
WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION.
15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.9
MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION
BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST
INCLUDE THE FOLLOWING:
A. PRODUCT MANUFACTURER
B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS
C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,
EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS
SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS
D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT
USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS
E. ANTICIPATED AND ACTUAL PILING DEPTH
F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION
G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH
BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS
ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER.
16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO
MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON
REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED.
HELICAL PILE PROOF TESTING
THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE
(3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE
PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 SEATTLE BUILDING CODE (SBC). THE
MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD.
5 of 27
GENERAL NOTES
STRUCTURAL STEEL
1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE
WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS
AND BRIDGES".
2. MATERIALS:
BOLTS - ASTM A307, UNLESS OTHERWISE NOTED
ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI)
3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES
D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY
E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN
ACCORDANCE WITH 2O18 AND 2012 IBC SECTION 1705.2 IS ALSO REQUIRED.
CONCRETE
1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC.
2. MINIMUM CONCRETE STRENGTH (28 DAYS):
FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX
BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX
SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX
SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI
AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE
3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE
APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A
DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE
SURFACE WATER.
4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE
EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS.
5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP.
GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING
APPROVED ADMIXTURES.
6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM.
7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS
SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER.
8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR
COLD WEATHER.
9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL.
10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT.
SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH
MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER.
6 of 27
PROJECT
LONGITUDE SUBJECT
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
PROJECT NO. SHEET NO.
S210728-7XR
9423 232ND ST SW EDMONDS, WA
Foundation Stabilization/Jacki
DATE 08/09/21
ideal Foundation Systems2-718"O Helical Pile ]0.203-inch wall thickness) - Soil Capacity per ESR-3750
DIGGA6KDrive Head
Pressure
Torque CorrelQtionFactor, Kt
Ultimate Axial Compressive
Allowable Axial Compressive
L120 ENGINEERING &DESIGN
7 of 27
PROJECT NO. SHEET NO.
S210728-7XR
PROJECT 9423 232ND ST SW EDMONDS, WA
LONGITUDE SUBJECT
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
Foundation Stabilization/Jacking
DATE 08/09/21
Ideal Foundation Systems 2-7/8"0
*
Helical Pile (0.203-inch wall thickness) -Soil Capacity
per ESR-3750
DIGGA lOK Drive
Head Pressure
(Psi)
Torque,
T
(ft*Ibs)
Torque Correlation Factor,
Kt [Compression]
(ft i)
Ultimate Axial Compressive Capacity,
P„ = K,*T
(kips)
Allowable Axial Compressive Capacity,
Pa = 0.5*P„
(kips)
500
1,740
9
15.7
7.8
600
2,088
9
18.8
9.4
700
2,436
9
21.9
11.0
800
2,784
9
25.1
12.5
900
3,132
9
28.2
14.1
1000
3,480
9
31.3
15.7
1100
3,828
9
34.5
17.2
1200
4,176
9
37.6
18.8
1300
4,524
9
40.7
20.4
1400
4,872
9
43.8
21.9
1500
5,220
9
47.0
23.5
1600
5,568
9
50.1
25.1
1700
5,916
9
53.2
26.6
1800
6,264
9
56.4
28.2
1900
6,612
9
59.5
29.8
L120 ENGINEERING &DESIGN
8of27
'ridgy, May 28, 2021
SCOPE OF WORK
;rew will install 3" Helical Piles with 6" Steel Channel, and lift home to maximum practical recovery. Crew will drive piles to a
iaximum 25' after there will be a $20 a foot charge per pile.
L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a
maximum pile spacing of 8'-0"o.c. is achieved w/ the installation of supplemental CUM channels spanning from pile -to -pile.
NOTES:
1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered
during pile installation provided that no two adjacent spans exceed the spacing limitation of 8'-0"o.c.
2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance of 3'-0" as marked.
3. Supplemental steel to be anchored to concrete with 5/8" diam Simpson Titen HD screw anchors @ 12"oc with a 4" minimum
embedment. Refer to attached SSK-01 and SSK-02.
0
-OFCORNERI
(4) PIL
1
-1/4
I cn
I 0
5i5'
= 3" Helical Pile
NOTE: L120's scope is limited to the perimeter support systems/continuous footings of the primary structure. All stabilization and replacement efforts of
exterior decks and deck supporting elements are outside of 1-120's contract and scope and are not addressed in this package. - L120
9of27
=riday, May 28, 2021
JOB PHOTOS
Vest side of home, Pile 1 will be installed here
landheld only.
.rew wit remove shims here netore wt.
South side of home, Piles 2-4 will be installed here with
6" Steel Channel. Handheld only.
South side of home, Pile 5 will be installed here with 6"
Steel Channel. Handheld only.
Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as
building geometry, tributary areas, and loading were determined through examination of these
photographs and industry knowledge of standard construction practices. - L120
PROJECT
LONGITUDE SUBJECT
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
(E) WOOD FRAMED
FLOOR SYSTEM,
FIELD VERIFY
8" MIN THICKNESS,
CONTRACTOR TO VERIFY
CONTINUOUS CHANNEL
& ANCHORAGE WHERE
o U- REQ'D PER PLAN
Q w
z o C CHANNEL
- o�
N 6" MAX
10 of 27
PROJECT NO. NO.
S210728-7XR SSK-01
9423 232ND ST SW EDMONDS, WA
Foundation Stabilization/Jacki
DATE 08/09/21
(E) CONC STEM WALL
T/STEM WALL =
FIELD VERIFY
T/FIN GRADE _
IIII=1111= VARIES
1111=IIII=1111
(E) FTG TO BE CUT FLUSH
1111=IIII=1111= WITH FACE OF STEM WALL
' " ' d-1111=IIII=1111
1111=IIII=1111 WITH A 12" MAX WIDTH FOR
'=IIII=1111 III:= INSTALLATION POCKET
�- IIII=1111= I=1
=1111 1111=III, T/CONC FTG =
OL
1111=1111=1111=IIII=11 I = = FIELD VERIFY
""=1111=1111=IIII=1111 � �- � �-=IIII=1111
1111=IIII=11 " � d. ' `" � d IIII=1111=
IIII=1111 . �=IIII=1111
-IIII-11° '_ - � IIII=1111-
'I1=11=1111=1111= 1111=1111=1
(E) CONTINUOUS 1 =lN=IIII=1111= III=1111-
CONIC FOOTING
NOTES:
1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION
DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE
NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET.
2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A
CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT
ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING
SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION
PER ASTM 153/A123.
3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL
REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT
CORROSION.
IDEAL HELICAL PILE & REPAIR
BRACKET ASSEMBLY PER
R&R FOUNDATION SPECIALIST
TO CONFORM TO ESR-3750
L120 ENGINEERING & DESIGN
11 of 27
PROJECT NO. SHEET NO.
S210728-7XR1
PROJECT 9423 232ND ST SW EDMONDS, WA
LONGITUDE SUBJECT
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
Foundation Stabilization/Jacking
STEEL CHANNEL INSTALLATION AT (E) CONCRETE STEM WALL:
ANCHOR PER N0lt 2, TYP -
--------------------------------------------
n
Ir,
STEEL SHALL BE CO< T M�
WHERE I
IF REO'D, JUNC .1 �tB
SEGMENTS TO BE CTRE=OH rp
JUNCTION NOT TO 1
CORNER-ADJAC --
=IIII=
II=IIII
=IIII=
II=IIII
=IIII=
II-IIII
DATE 08/09/21
CONC STE4WALL
CHANNEL
w
0
Z
�a
U
,T Z
O
U
u
Q LLJ Z
II—IIII—II Q m x
�0
11=IIII-��
IIII—III-
1=IIII=11
MmRI=TO EXTEND
FYON"ILE @ EA END;
I 1161'IIh TYP,
II N'11M"T CORNERS
�=IIII=IIII=
„—„II-IIII-11
NOTES:
Aee�nAnaus
CMU = CONCRETE MASONRY UNIT
1) ALL STEEL MEMBERS AND COMPONENTS SHALL BE GALVANIZED FOR EXTERIOR USE.
CONC = CONCRETE
2) ALL ANCHORS SHALL BE 5/8"8 SIMPSON TITEN HD SCREW ANCHORS W/ 4" MINIMUM EMBEDMENT INTO
EAR EACHNTERED
CONCRETE. ANY SUBSTITUTION SHALL BE SUBMITTED TO L120 FOR APPROVAL PRIOR TO INSTALLATION.
FT MNc
MIN IMAX MMAX=INIMUM/MAXIMUM
3) ANCHORS SHALL BE INSTALLED WITHIN 6" OR LESS FROM EACH END OF STEEL MEMBER.
OC=ON-CENTER
4) ADDITIONAL REQUIREMENTS PER ANCHOR MANUFACTURER.
UNO=UNLESSSNOTED OTHERWISE
L120 ENGINEERING & DESIGN
11/2X1
SLOT (TYP)
2 7/8" TRUFORCE BRKT BASE GALV.
TOP
2 7/8 TRUFORCE BRKT BASE GALV.
FRONT"
TRUFORCE UNDERPINNING BRACKET FOR 2 7/8'' PILE SHAFT
7%
1 1/2 X 1
2 7/8" TRUFORCE BRKT T-BRKT GALV. SLOT (TYP)
TOP
2 7/8" TRUFORCE BRKT T-BRKT GALV.
FRONT
NOTES:
1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI.
2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.1 STRUCTURAL
WELDING CODE - STEEL.
3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE.
4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS.
5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7).
6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194.
7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF
EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY.
8. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE
CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES.
�K
4 22 2020
m
�ED
D Ec A L
4 23 2020
1
kL MANUFACTURING,
INC.
PICTURE PARKWAY
STER, NY 14580
Group
789-4810 1 WWW.IDL-GRP.COM
NOT TO SCALE
SIZE
DWG NO R
ALL UNITS IN INCHES U.N.O.
B
I 278TFG
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
IDEAL MANUFACTURING, INC. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT WRITTEN
PERMISSION OF IDEAL
MANUFACTURING, INC. IS PROHIBITED.
SHEET 1 OF 1
4
v
MAXIMUM TORQUE NOT TO EXCEED 8,300 FT-LBS.
ULTIMATE CAPACITY IS 74.7 KIPS BASED ON A CAPACITY TO
TORQUE RATIO OF kc = 9 FT-1
[L]
ILI
D�
�p3 � �p3
` L COUPLING
m. BOLTS & NUTS
EXTENSION FLIGHTED EXTENSION FLIGHTED EXTENSION
(EX: 278203EXT[L]G) SINGLE HELIX (SH) DOUBLE HELIX (DH)
(EX: 278203FESH[L][DI]X[T]G) (EX: 278203FEDH[Q[DiD�]X[T]G)
NOTES:
1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI.
2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50.
3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE
TAPERED TO IMPROVE INSTALLATION CAPABILITIES.
4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX.
B SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES
THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT.
5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX
THICKNESS IS 3/8".
6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE
WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL.
7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO
AVAILABLE.
8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325
AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 2H).
9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES
AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL
FOUNDATION SYSTEMS AND DEVICES.
� W
57/8 (TYP)
2 7/8" O.D. X 0.203" W.T. HELICAL LEADS & EXTENSIONS
ICC-ES AC358 - REPORT #ESR-3750
� I I D4
D3
�p3
r D=
SINGLE HELIX (SH) DOUBLE HELIX (DH) TRIPLE HELIX (TH) QUAD HELIX (QH)
LEAD LEAD LEAD LEAD
(EX: 278203SH[L][D3]X[T]G) (EX: 278203DH[L][D3D2]X[T]G) (EX: 278203TH[L][DiD2D3]X[T]G) (EX: 278203QH[L][WD2D3D4]X[T]G)
2% O.D. X 2
4
IDEAL PART # ABREVIATIONS: 0.203 W.T.
278 = SHAFT DIAMETER] 3 PITCH
203 = SHAFT WALL THICKNESS (TYP)
EXT = EXTENSION
FE = FLIGHTED EXTENSION 015/16
SH, DH, TH, QH = SINGLE, DOUBLE,
TRIPLE, OR QUAD. HELIX
[L] = SHAFT LENGTH IN FEET BOLT HOLE HELIX FORMED BY
(EXAMPLE: 7' = 7) DETAIL PRESS DIE
[D] = HELIX DIAMETER(S) IN INCHES
DRAWN
(EXAMPLE: 10" = 10)
X— X (SEPARATES HELIX DIAMETER(S)
AP
4/3/ 2
CHECKED
LRS
4/7/ 2
AND HELIX THICKNESS)
[T] — HELIX THICKNESS
IDEAL MANUFACTURING, INC.
(EXAMPLE: 3/8" = 38)
999 PICTURE PARKWAY
G = GALVANIZED
WEBSTER, NY 14580
800-789-4810 1 WWW.IDL-GRP.COM
NOT TO SCALE
ALL UNITS IN INCHES U.N.O.
SmDCAL
Group
278203
:NSION
SINGLE
HELIX
(TENSION
IPLE
=LIX
-AD
CUT
45°
TYPICAL PILE
ASSEMBLY
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
IDEAL MANUFACTURING, INC. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT WRITTEN
PERMISSION OF IDEAL
MANUFACTURING, INC. IS PROHIBITED.
SHEET 1 OF 1
B
W
O
N
4
14of27
PROJECT NO. SHEET NO.
S210728-7XR
PROJECT 9423 232ND ST SW EDMONDS, WA
LONGITUDE SUBJECT Foundation Stabilization/Jacki
ONE TWENTYO
ENGINEERING & DESIGN
BY PAM
LOAD ANALYSIS: IBC 2018 - 1-Story Building
8' SPAN
Roof LL (snow ground): 25 psf
Floor LL: 40psf
Floor/Roof DL: 15psf
Wall DL: 12psf
Basement Wall DL: 150pcf*(8"/12") = 100psf
Roof Trib = 0.5*36' max span = 18'
Floor Trib = 0.5*6' max span = 3'
Typical Flr Ht = 10' x 1 stories = 10'
wo, = 15psf'(18'+3')+12psf*10'+100psf*8' = 1.24 klf
wLL= 25psf*18'+40psf*3' = 0.57 klf
w,L_,,,ow = D+L = 1.24kif + 0.57kif = 1.81 klf
ws,,, = 0.25 klf
w.L+Ste,,.A,,,µ. = D+L+Stem = 1.24kif + 0.57kif + 0.25kif = 2.06 kill
8' Span PpL = 1.24klf * 8' = 9.92 k
8' Span PLL = 0.57klf * 8' = 4.56 k
8' Span P.L_A,,,„, = 9.92k + 4.56k = 14.48 k
8' Span PS,,, =0.25klf * 8' = 2.0 k
8' Span P.L+S,Q,,.A,,,w = 9.92k + 4.56k + 2.Ok = 16.48 k
Case 1: Point Load
8'-0" Span: (Conc Only)
Pt Load = 16.5k
Refer to attached calculations for
analysis.
Case 2: Uniform Load
8'-0" Span: (Conc Only)
Uniform Load
DL = 1,500 plf
LL = 120 plf
LL, (snow) = 450 plf
Refer to attached calculations for
analysis.
DATE 08/09/21
---------------------- -----------------------
L/2 L/2
20
Per Plan
NOTES:
1. Both uniform and point loads analyzed in the following calculations. Uniform loads are
assumed to be standard due to load distribution from bearing walls, however, the additional
point load is conservatively considered here for any major beam supports from above.
2. Maximum loading on the grade beam was determined by inspection of the building
geometry and through conservative assumptions regarding span lengths and support
wall/foundation. All concrete walls assumed full tributary span of floor and roof members.
Conclusion:
Based on the loading and geometry of the structure we conclude that the foundation
may be stabilized through the use of piles and connections per R&R. These are to be
attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than
8'-0" with the installation of C6x8.2 channels, bolted to the existing foundation
(connections per R&R), spanning pile -to -pile.
L120 ENGINEERING & DESIGN
15of27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
Lic. #: KW-06011993 L120 Engineering and Design
DESCRIPTIO 8ft Concrete Beam w/ Channel- Max Point Load
CODE REFERENCES
Calculations per ACI 318-14, IBC 2015, CBC 2016, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
f'c = 2.50 ksi
Phi Values
Flexure: 0.90
8"
1)2
fr = fc 7.50 = 375.0 psi
Shear : 0.750
C6x8.2
yr Density = 145.0 pcf
R 1
= 0.850
LtWt Facto = 1.0
5/8"Ox4" Titen HD
Elastic Modulu= 3,122.0 ksi
Fy - Stirrups
36.0 ksi
Screw Anchor@ 18"oc
fy - Main Reba= 36.0 ksi
E -Stirrups = 29,000.0 ksi
Stirrup Bar Size # 3
z6°
STEEL AREA EQUIV. "max
E -Main Reba-- 2 ,000.0 ksi
(1) #14 = 2.25in'
Nu ber of Resisting Legs Per Stirrup
= 2
C6x8.2 = 2.39in'
f, EQUIV.
C6x8.2 = 36ksi
12" -
D(8 L(10) S(10)
Loading is conservative and
therefore has not been reduced
for loads calculated on previous
page.
8" vJ3)PL6" h
Cross Section & Reinforcing Details
Inverted Tee Section, Stem Width = 8.0 in, Total Height = 26.0 in, Top Flange Width = 12.0 in, Flange Thickness = 8.0 in
Span #1 Reinforcing....
1-#14 at 13.0 in from Bottom, from 0.0 to 8.0 ft in this span
Beam self weight calculated and added to loads
Point Load : D = 8.0, L = 10.0,
S = 10.0 k @ 4.0 ft, (Loading from above (2-story) - Pt load)
DESIGN SUMMARY
•
Maximum Bending Stress Ratio =
0.983 : 1
Maximum Deflection
Section used for this span
Typical Section
Max Downward Transient Deflection
0.004 in Ratio = 22992 -361
Mu : Applied
63.409 k-ft
Max Upward Transient Deflection
0.000 in Ratio = 0 <360.
MnPhi : Allowable
64.502 k-ft
Max Downward Total Deflection
0.021 in Ratio = 4600>=241
Max Upward Total Deflection
0.000 in Ratio = 0 <240.
Location of maximum on span
4.007 ft
Span # where maximum occurs
Span # 1
Vertical Reactions
Support notation : Far left is #1
Load Combination
Support 1 Support 2
Overall MAXimum
12.467 12.467
Overall MINimum
2.980 2.980
+D+H
4.967 4.967
+D+L+H
9.967 9.967
+D+Lr+H
4.967 4.967
+D+S+H
9.967 9.967
+D+0.750Lr+0.750L+H
8.717 8.717
+D+0.750L+0.750S+H
12.467 12.467
+D+0.60W+H
4.967 4.967
+D+0.70E+H
4.967 4.967
+D+0.750Lr+0.750L+0.450W+H
8.717 8.717
+D+0.750L+0.750S+0.450W+H
12.467 12.467
+D+0.750L+0.750S+0.5250E+H
12.467 12.467
+0.60D+0.60W+0.60H
2.980 2.980
16of27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
DESCRIPTIO 8ft Concrete Beam w/ Channel- Max Point Load
Vertical Reactions
Support
notation
: Far left is #1
Load Combination
Support 1
Support
2
+0.60D+0.70E+0.60H
2.980
2.980
D Only
4.967
4.967
L Only
5.000
5.000
S Only
5.000
5.000
H Only
Detailed Shear Information
Span Distance 'd'
Vu
(k)
Mu
d*Vu/Mu
Phi*Vc
Comment
Phi*Vs
Phi*Vn
Spacing (in)
Load Combination
Number
(ft)
(in)
Actual
Design
(k-ft)
(k)
(k)
(k)
Req'6uggest
+1.20D+0.50L+1.60S+1.60H
1
0.00
13.00
16.46
16.46
0.00
1.00
11.63
PhiVc < Vu
4.831
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.09
13.00
16.43
16.43
1.44
1.00
11.63
PhiVc < Vu
4.806
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.17
13.00
16.41
16.41
2.87
1.00
11.63
PhiVc < Vu
4.781
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.26
13.00
16.38
16.38
4.31
1.00
11.63
PhiVc < Vu
4.755
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.35
13.00
16.36
16.36
5.74
1.00
11.63
PhiVc < Vu
4.730
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.44
13.00
16.33
16.33
7.17
1.00
11.63
PhiVc < Vu
4.704
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.52
13.00
16.31
16.31
8.59
1.00
11.63
PhiVc < Vu
4.679
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.61
13.00
16.28
16.28
10.02
1.00
11.63
PhiVc < Vu
4.654
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.70
13.00
16.26
16.26
11.44
1.00
11.63
PhiVc < Vu
4.628
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.79
13.00
16.23
16.23
12.86
1.00
11.63
PhiVc < Vu
4.603
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.87
13.00
16.21
16.21
14.28
1.00
11.63
PhiVc < Vu
4.578
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
0.96
13.00
16.18
16.18
15.70
1.00
11.63
PhiVc < Vu
4.552
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.05
13.00
16.16
16.16
17.11
1.00
11.63
PhiVc < Vu
4.527
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.14
13.00
16.13
16.13
18.52
0.94
11.39
PhiVc < Vu
4.740
24.3
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.22
13.00
16.11
16.11
19.93
0.88
11.10
PhiVc < Vu
5.002
24.0
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.31
13.00
16.08
16.08
21.34
0.82
10.85
PhiVc < Vu
5.226
23.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.40
13.00
16.05
16.05
22.74
0.76
10.64
PhiVc < Vu
5.418
23.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.49
13.00
16.03
16.03
24.14
0.72
10.44
PhiVc < Vu
5.585
23.3
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.57
13.00
16.00
16.00
25.55
0.68
10.27
PhiVc < Vu
5.730
23.1
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.66
13.00
15.98
15.98
26.94
0.64
10.12
PhiVc < Vu
5.858
23.0
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.75
13.00
15.95
15.95
28.34
0.61
9.98
PhiVc < Vu
5.970
22.9
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.84
13.00
15.93
15.93
29.73
0.58
9.86
PhiVc < Vu
6.069
22.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
1.92
13.00
15.90
15.90
31.12
0.55
9.75
PhiVc < Vu
6.157
22.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.01
13.00
15.88
15.88
32.51
0.53
9.64
PhiVc < Vu
6.235
22.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.10
13.00
15.85
15.85
33.90
0.51
9.55
PhiVc < Vu
6.304
22.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.19
13.00
15.83
15.83
35.29
0.49
9.46
PhiVc < Vu
6.366
22.3
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.27
13.00
15.80
15.80
36.67
0.47
9.38
PhiVc < Vu
6.421
22.2
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.36
13.00
15.78
15.78
38.05
0.45
9.30
PhiVc < Vu
6.470
22.2
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.45
13.00
15.75
15.75
39.43
0.43
9.24
PhiVc < Vu
6.514
22.1
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.54
13.00
15.72
15.72
40.80
0.42
9.17
PhiVc < Vu
6.553
22.0
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.62
13.00
15.70
15.70
42.18
0.40
9.11
PhiVc < Vu
6.588
22.0
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.71
13.00
15.67
15.67
43.55
0.39
9.05
PhiVc < Vu
6.619
21.9
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.80
13.00
15.65
15.65
44.92
0.38
9.00
PhiVc < Vu
6.646
21.9
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.89
13.00
15.62
15.62
46.28
0.37
8.95
PhiVc < Vu
6.671
21.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
2.97
13.00
15.60
15.60
47.65
0.35
8.91
PhiVc < Vu
6.692
21.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.06
13.00
15.57
15.57
49.01
0.34
8.86
PhiVc < Vu
6.710
21.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.15
13.00
15.55
15.55
50.37
0.33
8.82
PhiVc < Vu
6.727
21.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.23
13.00
15.52
15.52
51.73
0.33
8.78
PhiVc < Vu
6.741
21.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.32
13.00
15.50
15.50
53.09
0.32
8.74
PhiVc < Vu
6.752
21.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.41
13.00
15.47
15.47
54.44
0.31
8.71
PhiVc < Vu
6.762
21.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.50
13.00
15.45
15.45
55.79
0.30
8.68
PhiVc < Vu
6.771
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.58
13.00
15.42
15.42
57.14
0.29
8.64
PhiVc < Vu
6.777
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.67
13.00
15.40
15.40
58.49
0.29
8.61
PhiVc < Vu
6.782
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.76
13.00
15.37
15.37
59.83
0.28
8.58
PhiVc < Vu
6.786
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.85
13.00
15.34
15.34
61.18
0.27
8.56
PhiVc < Vu
6.788
21.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
3.93
13.00
15.32
15.32
62.52
0.27
8.53
PhiVc < Vu
6.789
21.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.02
13.00
-15.31
15.31
63.19
0.26
8.52
PhiVc < Vu
6.789
21.4
6.5
6.0
17of27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
Lic. #: KW-06011993 L120 Engineering and Design
DESCRIPTIO 8ft Concrete Beam w/ Channel- Max Point Load
Detailed Shear Information
Span Distance 'd'
Vu
(k)
Mu
d*Vu/Mu
Phi*Vc
Comment
Phi*Vs Phi*Vn Spacing (in)
Load Combination
Number
(ft)
(in)
Actual
Design
(k-ft)
(k)
(k)
(k)
Req'diuggest
+1.20D+0.50L+1.60S+1.60H
1
4.11
13.00
-15.33
15.33
61.85
0.27
8.54
PhiVc < Vu
6.789
21.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.20
13.00
-15.36
15.36
60.50
0.27
8.57
PhiVc < Vu
6.787
21.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.28
13.00
-15.38
15.38
59.16
0.28
8.60
PhiVc < Vu
6.784
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.37
13.00
-15.41
15.41
57.81
0.29
8.63
PhiVc < Vu
6.780
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.46
13.00
-15.43
15.43
56.47
0.30
8.66
PhiVc < Vu
6.774
21.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.55
13.00
-15.46
15.46
55.12
0.30
8.69
PhiVc < Vu
6.767
21.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.63
13.00
-15.48
15.48
53.76
0.31
8.73
PhiVc < Vu
6.758
21.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.72
13.00
-15.51
15.51
52.41
0.32
8.76
PhiVc < Vu
6.747
21.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.81
13.00
-15.53
15.53
51.05
0.33
8.80
PhiVc < Vu
6.734
21.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.90
13.00
-15.56
15.56
49.69
0.34
8.84
PhiVc < Vu
6.719
21.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
4.98
13.00
-15.59
15.59
48.33
0.35
8.88
PhiVc < Vu
6.701
21.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.07
13.00
-15.61
15.61
46.97
0.36
8.93
PhiVc < Vu
6.682
21.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.16
13.00
-15.64
15.64
45.60
0.37
8.98
PhiVc < Vu
6.659
21.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.25
13.00
-15.66
15.66
44.23
0.38
9.03
PhiVc < Vu
6.633
21.9
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.33
13.00
-15.69
15.69
42.86
0.40
9.08
PhiVc < Vu
6.604
22.0
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.42
13.00
-15.71
15.71
41.49
0.41
9.14
PhiVc < Vu
6.571
22.0
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.51
13.00
-15.74
15.74
40.11
0.43
9.20
PhiVc < Vu
6.534
22.1
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.60
13.00
-15.76
15.76
38.74
0.44
9.27
PhiVc < Vu
6.493
22.1
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.68
13.00
-15.79
15.79
37.36
0.46
9.34
PhiVc < Vu
6.447
22.2
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.77
13.00
-15.81
15.81
35.98
0.48
9.42
PhiVc < Vu
6.395
22.3
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.86
13.00
-15.84
15.84
34.59
0.50
9.50
PhiVc < Vu
6.336
22.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
5.95
13.00
-15.86
15.86
33.21
0.52
9.59
PhiVc < Vu
6.271
22.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.03
13.00
-15.89
15.89
31.82
0.54
9.69
PhiVc < Vu
6.197
22.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.12
13.00
-15.91
15.91
30.43
0.57
9.80
PhiVc < Vu
6.115
22.7
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.21
13.00
-15.94
15.94
29.04
0.59
9.92
PhiVc < Vu
6.021
22.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.30
13.00
-15.97
15.97
27.64
0.63
10.05
PhiVc < Vu
5.916
22.9
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.38
13.00
-15.99
15.99
26.24
0.66
10.19
PhiVc < Vu
5.796
23.1
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.47
13.00
-16.02
16.02
24.85
0.70
10.36
PhiVc < Vu
5.660
23.2
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.56
13.00
-16.04
16.04
23.44
0.74
10.54
PhiVc < Vu
5.504
23.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.64
13.00
-16.07
16.07
22.04
0.79
10.74
PhiVc < Vu
5.325
23.6
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.73
13.00
-16.09
16.09
20.63
0.84
10.97
PhiVc < Vu
5.118
23.8
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.82
13.00
-16.12
16.12
19.23
0.91
11.24
PhiVc < Vu
4.876
24.1
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.91
13.00
-16.14
16.14
17.82
0.98
11.55
PhiVc < Vu
4.592
24.4
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
6.99
13.00
-16.17
16.17
16.40
1.00
11.63
PhiVc < Vu
4.540
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.08
13.00
-16.19
16.19
14.99
1.00
11.63
PhiVc < Vu
4.565
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.17
13.00
-16.22
16.22
13.57
1.00
11.63
PhiVc < Vu
4.590
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.26
13.00
-16.24
16.24
12.15
1.00
11.63
PhiVc < Vu
4.616
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.34
13.00
-16.27
16.27
10.73
1.00
11.63
PhiVc < Vu
4.641
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.43
13.00
-16.30
16.30
9.31
1.00
11.63
PhiVc < Vu
4.666
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.52
13.00
-16.32
16.32
7.88
1.00
11.63
PhiVc < Vu
4.692
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.61
13.00
-16.35
16.35
6.45
1.00
11.63
PhiVc < Vu
4.717
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.69
13.00
-16.37
16.37
5.02
1.00
11.63
PhiVc < Vu
4.743
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.78
13.00
-16.40
16.40
3.59
1.00
11.63
PhiVc < Vu
4.768
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.87
13.00
-16.42
16.42
2.16
1.00
11.63
PhiVc < Vu
4.793
24.5
6.5
6.0
+1.20D+0.50L+1.60S+1.60H
1
7.96
13.00
-16.45
16.45
0.72
1.00
11.63
PhiVc < Vu
4.819
24.5
6.5
6.0
Maximum Forces & Stresses for Load Combinations
Load Combination
Location (ft)
Bending
Stress Results
( k-ft )
Segment
Span
# along Beam
Mu: Max
Phi*Mnx
Stress Ratio
MAXimum BENDING Envelope
Span # 1
1
8.000
63.41
64.50
0.98
+1.40D+1.60H
Span # 1
1
8.000
25.07
64.50
0.39
+1.20D+0.50Lr+1.60L+1.60H
Span # 1
1
8.000
53.43
64.50
0.83
+ 1.20 D+ 1.60 L+0.50 S+ 1.60 H
18of27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
DESCRIPTIO 8ft Concrete Beam w/ Channel- Max Point Load
Load Combination
Location (ft)
Segment
Span #
along Beam
Span # 1
1
8.000
+1.20D+1.60Lr+0.50L+1.60H
Span # 1
1
8.000
+1.20D+1.60Lr+0.50W+1.60H
Span # 1
1
8.000
+ 1.2 0 D +0.50 L+ 1.60 S + 1.60 H
Span # 1
1
8.000
+1.20D+1.60S+0.50W+1.60H
Span # 1
1
8.000
+ 1.20 D+0.50 L r+0.50 L+W + 1.60 H
Span # 1
1
8.000
+ 1.20 D+0.50 L+0.50 S+W + 1.60 H
Span # 1
1
8.000
+ 1.20 D+0.50 L+0.20 S+E+ 1.60 H
Span # 1
1
8.000
+0.90D+W+0.90H
Span # 1
1
8.000
+0.90D+E+0.90H
Span # 1
1
8.000
Overall Maximum Deflections
Bending Stress Results ( k-ft )
Mu: Max
Phi'Mnx
Stress Ratio
63.41
64.50
0.98
31.47
64.50
0.49
21.49
64.50
0.33
63.41
64.50
0.98
53.43
64.50
0.83
31.47
64.50
0.49
41.45
64.50
0.64
35.46
64.50
0.55
16.11
64.50
0.25
16.11
64.50
0.25
Load Combination Span Max. "-" Defl (in) .ocation in Span (ft Load Combination \lax. "+" Defl (invocation in Span (ft
+D+0.750L+0.750S+0.5250E+H 1 0.0209 4.000 0.0000 0.000
19of27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
Lic. #: KW-06011993 L120 Engineering and Design
DESCRIPTIO 8ft + 3ft cantilever Concrete Beam w/ Channel - Max Uniform Load
CODE REFERENCES
Calculations per ACI 318-14, IBC 2015, CBC 2016, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
f'c = 2.50 ksi
Phi Values Flexure:
0.90
8"
1/2
fr = fc 7.50 = 375.0 psi
Shear :
0.750
C6x8.2
yr Density = 145.0 pcf
R 1 =
0.850
LtWt Facto = 1.0
5/8"Ox4" Titen HD
Elastic Modulu= 3,122.0 ksi
Fy - Stirrups
36.0 ksi
Screw Anchor@ 18"oc
fy -Main Reba- 36.0 ksi
E Reba- 2 ksi
E - Stirrups = 29,000.0 ksi
Stirrup Bar Size # 3
26"
(1)#E=AREAEQUIV.
"maxNu
-Main ,000.0
-��
ber of Resisting Legs Per Stirrup =
2
C6x8.
f, EQUIV.
C6x8.2 = 36ksi
12"
D(3a L(34 S(2
rb
D(3) L�3) S(1) a d
Loading is conservative and
therefore has not been reduced
for loads calculated on previous
page.
wx26"h1 8"wx26"h
Cross Section & Reinforcing Details
Inverted Tee Section, Stem Width = 8.0 in, Total Height = 26.0 in, Top Flange Width = 12.0 in, Flange Thickness = 8.0 in
Span #1 Reinforcing....
1-#14 at 13.0 in from Bottom, from 0.0 to 3.0 ft in this span
Span #2 Reinforcing....
1-#14 at 13.0 in from Bottom, from 0.0 to 8.0 ft in this span
Beam self weight calculated and added to loads
Load for Span Number 1
Uniform Load : D = 3.0, L = 3.0, S = 2.0 k/ft, Tributary Width = 1.0 ft, (Loading from above (2-story) - Uniform load (Max))
Load for Span Number 2
Uniform Load : D = 3.0, L = 3.0, S = 1.0 k/ft, Tributary Width = 1.0 ft, (Loading from above (2-story) - Uniform load)
DESIGN SUMMARY
•
Maximum Bending Stress Ratio =
0.827 : 1
Maximum Deflection
Section used for this span
Typical Section
Max Downward Transient Deflection
0.004 in Ratio =
23027 >=36i
Mu : Applied
53.333 k-ft
Max Upward Transient Deflection
-0.002 in Ratio =
34286 >=36i
Mn * Phi : Allowable
64.502 k-ft
Max Downward Total Deflection
0.012 in Ratio =
8059 >=241
Max Upward Total Deflection
-0.007 in Ratio =
10554 >=241
Location of maximum on span
4.604 ft
Span # where maximum occurs
Span # 2
Vertical Reactions
Support notation : Far left is #1
Load Combination
Support 1 Support 2
Support 3
Overall MAXimum
49.874
21.456
Overall MINimum
11.125
2.875
+D+H
24.515
11.143
+D+L+H
47.203
21.456
+D+Lr+H
24.515
11.143
+D+S+H
35.640
14.018
20 of 27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
DESCRIPTIO 8ft + 3ft cantilever Concrete Beam w/ Channel - Max Uniform Load
Vertical Reactions Support notation : Far left is #1
Load Combination
Support 1 Support 2
Support 3
+D+0.750Lr+0.750L+H
41.531
18.878
+D+0.750L+0.750S+H
49.874
21.034
+D+0.60W+H
24.515
11.143
+D+0.70E+H
24.515
11.143
+D+0.750Lr+0.750L+0.450W+H
41.531
18.878
+D+0.750L+0.750S+0.450W+H
49.874
21.034
+D+0.750L+0.750S+0.5250E+H
49.874
21.034
+0.60D+0.60W+0.60H
14.709
6.686
+0.60D+0.70E+0.60H
14.709
6.686
D Only
24.515
11.143
L Only
22.687
10.312
S Only
11.125
2.875
H Only
Detailed Shear Information
Span Distance 'd'
Vu
(k)
Mu
d*Vu/Mu
Phi*Vc
Comment
Phi*Vs
Phi*Vn
Spacing (in)
Load Combination
Number
(ft)
(in)
Actual
Design
(k-ft)
(k)
(k)
(k)
Req'6uggest
+1.20D+1.60L+0.50S+1.60H
1
0.00
13.00
-0.00
0.00
0.00
1.00
11.63
Vu < PhiVC/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.07
13.00
-0.71
0.71
0.03
1.00
11.63
Vu < PhiVC/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.15
13.00
-1.42
1.42
0.10
1.00
11.63
Vu < PhiVc/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.22
13.00
-2.14
2.14
0.24
1.00
11.63
Vu < PhiVc/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.29
13.00
-2.85
2.85
0.42
1.00
11.63
Vu < PhiVc/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.37
13.00
-3.56
3.56
0.65
1.00
11.63
Vu < PhiVC/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.44
13.00
-4.27
4.27
0.94
1.00
11.63
Vu < PhiVc/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.51
13.00
-4.98
4.98
1.28
1.00
11.63
Vu < PhiVc/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.59
13.00
-5.70
5.70
1.67
1.00
11.63
Vu < PhiVc/2
A Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.66
13.00
-6.41
6.41
2.12
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.73
13.00
-7.12
7.12
2.62
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.81
13.00
-7.83
7.83
3.16
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.88
13.00
-8.54
8.54
3.77
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
0.96
13.00
-9.25
9.25
4.42
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
1.03
13.00
-9.97
9.97
5.13
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
1.10
13.00
-10.68
10.68
5.88
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
1.18
13.00
-11.39
11.39
6.69
1.00
11.63
PhiVc/2 < Vu <= )t Reqd 9.E
11.6
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
1
1.25
13.00
-12.10
12.10
7.56
1.00
11.63
PhiVc < Vu
0.4739
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.32
13.00
-12.81
12.81
8.47
1.00
11.63
PhiVc < Vu
1.186
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.40
13.00
-13.53
13.53
9.44
1.00
11.63
PhiVc < Vu
1.898
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.47
13.00
-14.24
14.24
10.46
1.00
11.63
PhiVc < Vu
2.610
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.54
13.00
-14.95
14.95
11.53
1.00
11.63
PhiVc < Vu
3.322
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.62
13.00
-15.66
15.66
12.66
1.00
11.63
PhiVc < Vu
4.033
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.69
13.00
-16.37
16.37
13.83
1.00
11.63
PhiVc < Vu
4.745
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.76
13.00
-17.09
17.09
15.06
1.00
11.63
PhiVc < Vu
5.457
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.84
13.00
-17.80
17.80
16.35
1.00
11.63
PhiVc < Vu
6.169
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.91
13.00
-18.51
18.51
17.68
1.00
11.63
PhiVc < Vu
6.881
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
1.98
13.00
-19.22
19.22
19.06
1.00
11.63
PhiVc < Vu
7.593
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.06
13.00
-19.93
19.93
20.50
1.00
11.63
PhiVc < Vu
8.305
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.13
13.00
-20.65
20.65
21.99
1.00
11.63
PhiVc < Vu
9.017
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.20
13.00
-21.36
21.36
23.54
0.98
11.56
PhiVc < Vu
9.80
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.28
13.00
-22.07
22.07
25.13
0.95
11.42
PhiVc < Vu
10.646
30.7
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.35
13.00
-22.78
22.78
26.78
0.92
11.30
PhiVc < Vu
11.483
30.6
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.42
13.00
-23.49
23.49
28.48
0.89
11.18
PhiVc < Vu
12.313
30.5
6.3
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.50
13.00
-24.21
24.21
30.23
0.87
11.07
PhiVc < Vu
13.136
30.4
5.9
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.57
13.00
-24.92
24.92
32.04
0.84
10.96
PhiVc < Vu
13.952
30.3
5.5
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.64
13.00
-25.63
25.63
33.89
0.82
10.87
PhiVc < Vu
14.763
30.2
5.2
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.72
13.00
-26.34
26.34
35.80
0.80
10.77
PhiVc < Vu
15.568
30.1
5.0
4.0
+1.20D+1.60L+0.50S+1.60H
1
2.79
13.00
-27.05
27.05
37.76
0.78
10.68
Vs>(4bdfc^.5)
16.369
49.3
3.3
2.0
21 of 27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
Lic. #: KW-06011993 L120 Engineering and Design
DESCRIPTIO 8ft + 3ft cantilever Concrete Beam w/ Channel - Max Uniform Load
Detailed Shear Information
Load Combination
Span Distance 'd'
Number (ft) (in)
Vu
Actual
(k)
Design
Mu
(k-ft)
d*Vu/Mu
Phi*Vc
(k)
Comment
Phi*Vs
(k)
Phi*Vn Spacing (in)
(k) Req'diuggest
+1.20D+1.60L+0.50S+1.60H
1
2.87
13.00
-27.76
27.76
39.78
0.76
10.60
Vs>(4bdfc^.5)
17.165
49.2
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
1
2.94
13.00
-28.48
28.48
41.84
0.74
10.52
Vs>(4bdfc^.5)
17.956
49.1
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
2
3.03
13.00
41.91
41.91
42.23
1.00
11.63
Vs>(4bdfc^.5)
30.282
50.2
2.6
2.0
+1.20D+1.60L+0.50S+1.60H
2
3.23
13.00
40.11
40.11
34.20
1.00
11.63
Vs>(4bdfc^.5)
28.481
50.2
2.7
2.0
+1.20D+1.60L+0.50S+1.60H
2
3.42
13.00
38.31
38.31
26.52
1.00
11.63
Vs>(4bdfc^.5)
26.681
50.2
2.9
2.0
+1.20D+1.60L+0.50S+1.60H
2
3.62
13.00
36.51
36.51
19.19
1.00
11.63
Vs>(4bdfc^.5)
24.880
50.2
3.1
2.0
+1.20D+1.60L+0.50S+1.60H
2
3.82
13.00
34.71
34.71
12.21
1.00
11.63
Vs>(4bdfc^.5)
23.080
50.2
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
2
4.01
13.00
32.91
32.91
5.59
1.00
11.63
Vs>(4bdfc^.5)
21.279
50.2
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
2
4.21
13.00
31.11
31.11
0.69
1.00
11.63
Vs>(4bdfc^.5)
19.479
50.2
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
2
4.40
13.00
29.31
29.31
6.60
1.00
11.63
Vs>(4bdfc^.5)
17.678
50.2
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
2
4.60
13.00
27.51
27.51
12.17
1.00
11.63
Vs>(4bdfc^.5)
15.878
50.2
3.3
2.0
+1.20D+1.60L+0.50S+1.60H
2
4.80
13.00
25.71
25.71
17.38
1.00
11.63
PhiVc < Vu
14.077
30.9
5.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
4.99
13.00
23.91
23.91
22.24
1.00
11.63
PhiVc < Vu
12.277
30.9
6.3
4.0
+1.20D+1.60L+0.50S+1.60H
2
5.19
13.00
22.11
22.11
26.75
0.90
11.19
PhiVc < Vu
10.918
30.5
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
5.38
13.00
20.30
20.30
30.90
0.71
10.41
PhiVc < Vu
9.892
29.7
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
5.58
13.00
18.50
18.50
34.70
0.58
9.85
PhiVc < Vu
8.657
29.2
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
5.78
13.00
16.70
16.70
38.15
0.47
9.41
PhiVc < Vu
7.293
28.7
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
5.97
13.00
14.90
14.90
41.25
0.39
9.06
PhiVc < Vu
5.842
28.4
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
6.17
13.00
13.10
13.10
43.99
0.32
8.77
PhiVc < Vu
4.332
28.1
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
6.36
13.00
11.30
11.30
46.38
0.26
8.52
PhiVc < Vu
2.779
27.8
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
6.56
13.00
9.50
9.50
48.42
0.21
8.31
PhiVc < Vu
1.195
27.6
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
6.76
13.00
7.70
7.70
50.11
0.17
8.11
PhiVc/2 < Vu <_ )t Reqd 9.E
8.1
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
2
6.95
13.00
5.90
5.90
51.44
0.12
7.93
PhiVc/2 < Vu <_ )t Reqd 9.E
7.9
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
2
7.15
13.00
4.10
4.10
52.42
0.08
7.77
PhiVc/2 < Vu <_ )t Reqd 9.E
7.8
0.0
0.0
+1.20D+0.50L+1.60S+1.60H
2
7.34
13.00
2.44
2.44
37.84
0.07
7.70
Vu < PhiVc/2
A Reqd 9.E
7.7
0.0
0.0
+1.20D+0.50L+1.60S+1.60H
2
7.54
13.00
1.07
1.07
38.18
0.03
7.54
Vu < PhiVc/2
A Reqd 9.E
7.5
0.0
0.0
+1.20D+0.50Lr+1.60L+1.60H
2
7.73
13.00
-1.50
1.50
51.21
0.03
7.54
Vu < PhiVc/2
A Reqd 9.E
7.5
0.0
0.0
+1.20D+0.50Lr+1.60L+1.60H
2
7.93
13.00
-3.20
3.20
50.75
0.07
7.70
Vu < PhiVc/2
A Reqd 9.E
7.7
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
2
8.13
13.00
-4.90
4.90
52.03
0.10
7.84
PhiVc/2 < Vu <_ )t Reqd 9.E
7.8
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
2
8.32
13.00
-6.70
6.70
50.89
0.14
8.01
PhiVc/2 < Vu <_ )t Reqd 9.E
8.0
0.0
0.0
+1.20D+1.60L+0.50S+1.60H
2
8.52
13.00
-8.50
8.50
49.40
0.19
8.20
PhiVc < Vu
0.3065
27.5
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
8.71
13.00
-10.30
10.30
47.56
0.23
8.40
PhiVc < Vu
1.903
27.7
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
8.91
13.00
-12.10
12.10
45.36
0.29
8.63
PhiVc < Vu
3.475
27.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
9.11
13.00
-13.90
13.90
42.81
0.35
8.89
PhiVc < Vu
5.010
28.2
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
9.30
13.00
-15.71
15.71
39.91
0.43
9.21
PhiVc < Vu
6.497
28.5
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
9.50
13.00
-17.51
17.51
36.66
0.52
9.59
PhiVc < Vu
7.913
28.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
9.69
13.00
-19.31
19.31
33.06
0.63
10.08
PhiVc < Vu
9.227
29.4
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
9.89
13.00
-21.11
21.11
29.10
0.79
10.73
PhiVc < Vu
10.381
30.0
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
10.09
13.00
-22.91
22.91
24.78
1.00
11.63
PhiVc < Vu
11.278
30.9
6.5
4.0
+1.20D+1.60L+0.50S+1.60H
2
10.28
13.00
-24.71
24.71
20.12
1.00
11.63
PhiVc < Vu
13.079
30.9
5.9
4.0
+1.20D+1.60L+0.50S+1.60H
2
10.48
13.00
-26.51
26.51
15.10
1.00
11.63
PhiVc < Vu
14.879
30.9
5.2
4.0
+1.20D+1.60L+0.50S+1.60H
2
10.67
13.00
-28.31
28.31
9.73
1.00
11.63
Vs>(4bdfc^.5)
16.680
37.4
3.3
3.0
+1.20D+1.60L+0.50S+1.60H
2
10.87
13.00
-30.11
30.11
4.01
1.00
11.63
Vs>(4bdfc^.5)
18.480
37.4
3.3
3.0
Maximum Forces & Stresses
for Load Combinations
Load Combination
Location (ft)
Bending Stress Results
( k-ft )
Segment
Span #
along Beam
Mu: Max Phi*Mnx
Stress Ratio
MAXimum BENDING Envelope
Span # 1
1
3.000
-43.25 69.33
0.62
Span # 2
2
8.000
53.33 64.50
0.83
+1.40D+1.60H
Span # 1
1
3.000
-20.26 69.33
0.29
Span # 2
2
8.000
26.81 64.50
0.42
+1.20D+0.50Lr+1.60L+1.60H
Span # 1
1
3.000
-38.79 69.33
0.56
Span # 2
2
8.000
51.34 64.50
0.80
22 of 27
Project Title:
Engineer:
Project ID:
Project Descr:
Concrete Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24
Lic. #: KW-06011993 L120 Engineering and Design
DESCRIPTIO 8ft + 3ft cantilever Concrete Beam w/ Channel - Max Uniform Load
Load Combination
Location (ft)
Bending Stress Results
( k-ft )
Segment
Span #
along Beam
Mu: Max
Phi'Mnx
Stress Ratio
+ 1. 2 0 D + 1. 60 L+0. 50 S + 1. 60 H
Span # 1
1
3.000
-43.25
69.33
0.62
Span # 2
2
8.000
53.33
64.50
0.83
+1.20D+1.60Lr+0.50L+1.60H
Span # 1
1
3.000
-24.06
69.33
0.35
Span # 2
2
8.000
31.84
64.50
0.49
+1.20D+1.60Lr+0.50W+1.60H
Span # 1
1
3.000
-17.36
69.33
0.25
Span # 2
2
8.000
22.98
64.50
0.36
+ 1.2 0 D +0.50 L+ 1.60 S + 1.60 H
Span # 1
1
3.000
-38.34
69.33
0.55
Span # 2
2
8.000
38.26
64.50
0.59
+1.20D+1.60S+0.50W+1.60H
Span # 1
1
3.000
-31.65
69.33
0.46
Span # 2
2
8.000
-31.90
69.33
0.46
+ 1.20 D+0.50 L r+0.50 L+W + 1.60 H
Span # 1
1
3.000
-24.06
69.33
0.35
Span # 2
2
8.000
31.84
64.50
0.49
+ 1.20 D+0.50 L+0.50 S+W + 1.60 H
Span # 1
1
3.000
-28.52
69.33
0.41
Span # 2
2
8.000
33.84
64.50
0.52
+ 1.20 D+0.50 L+0.20 S+E+ 1.60 H
Span # 1
1
3.000
-25.84
69.33
0.37
Span # 2
2
8.000
32.64
64.50
0.51
+0.90D+W+0.90H
Span # 1
1
3.000
-13.02
69.33
0.19
Span # 2
2
8.000
17.24
64.50
0.27
+0.90D+E+0.90H
Span # 1
1
3.000
-13.02
69.33
0.19
Span # 2
2
8.000
17.24
64.50
0.27
Overall Maximum Deflections
Load Combination Span
Max. "-" Defl (in) .ocation in Span (ft
Load Combination
\lax. "+" DO (invocation in Span (ft
+D+L+H 1
0.0004
3.114
+D+L+H
-0.0068 0.000
+D+L+H 2
O.0119
4.229
0.0000 0.000
23 of 27
Appendix
Parcel Details
& Photographs
24 of 27
Snh1h Online Government Information S Sarvicea
County 4O
Washington
Property Account Summary
8/3/2021
Parcel Number
00498300000600
Property Address
9423 232ND ST SW, EDMONDS, WA 98020-5087
General Information
Property Description
Section 36 Township 27 Range 03 Quarter NE LINDJORD LANE
BLK 000 D-00 - LOT 6 TGW EQ & UND INT TR A & TGW UND
1/10 INT IN FDT - N 559.85FT OF S 579.85FT OF E IOFT OF W
120FT E1/2 SW1/4 NE1/4NE1/4 SEC 36 TWP 27 RGE 3 TO BE
USED FOR ACCESS & UTILITY PURP
Property Category
Land and Improvements
Status
Tax Code Area
Active, Locally Assessed
00216
Property Characteristics
Use Code
Unit of Measure
111 Single Family Residence - Detached
Acre(s)
0.36
Size (gross)
Related Properties
No Related Properties Found
Parties
Role
Percent
Name
Address
HEDGES 9792 EDMONDS WAY 261, EDMONDS, WA
Taxpayer 100 ED 98020 United States
HEDGES 9792 EDMONDS WAY 261, EDMONDS, WA
Owner 100 ED 198020 United States
Property Values
Value Type
Tax Year
2021
Tax Year
2020
Tax Year
2019
Tax Year
2018
Tax Year
2017
Taxable Value Regular
$755,000
$714,500
$683,800
$602,900
$541,100
Exemption Amount Regular
Market Total
$755,000
$714,500
$683,800
$602,900
$541,100
Assessed Value
$755,000
$714,500
$683,800
$602,900
$541,100
Market Land
$424,900
$403,500
$370,500
$316,200
$274,500
Market Improvement
Personal Property
$330,100
$311,000
$313,300
$286,700
$266,600
Active Exemptions
No Exemptions Found
25 of 27
I Events
Effective Date jEntry Date -Time IType IRemarks
No Events Found
Tax Balance
Distribution of Current Taxes
District
Rate
Amount
Voted
Amount
Non -
Voted
Amount
CENTRAL PUGET SOUND REGIONAL TRANSIT AUT
0.20
$148.80
$0.00
$148.80
CITY OF EDMONDS
1.26
$954.081
$269.88
$684.20
EDMONDS SCHOOL DISTRICT NO 15
2.80
$2,113.12
$2,113.12
$0.00
PORT OF EDMONDS
0.06
$43.71
$0.00
$43.71
PUB HOSP #2
0.06
$46.64
$0.00
$46.64
SNO-ISLE INTERCOUNTY RURAL LIBRARY
0.42
$320.44
$0.00
$320.44
SNOHOMISH COUNTY-CNT
0.64
$480.32
$0.00
$480.32
STATE
2.83
$2,133.14
$0.00
$2,133.14
SNOHOMISH CONSERVATION DISTRICT
$8.03
$0.00
$8.03
TOTAL
8.27
$6,248.28
$2,383.00
33,865.28
Pending Property Values
Pending Market Market Market Current Use Current Use Current U
Tax Year Land Value Improvement Total Value Land Value Improvement Total Val
Value
2022 $515,100.001 $304,700.00 $819,800.001 $0.00 $0.00 $0.
I Levy Rate History
Tax Year
Total Levy Rate
2020
9.337975
2019
9.270960
2018
10.730353
I Real Property Structures I
Description
IType
IYear Built
IMore Information
1 Story w/Basement
Dwelling
11942
IView Detailed Structure Information
� Receipts
Date
Receipt No.
Amount Tendered
Amount Due
04/22/202100:00:00
11537563
$6,248.28
$6,248.28
10/15/2020 00:00:00
11199508
$3,340.01
$3,340.01
04/10/2020 00:00:00
10925826
$3,340.01
$6,680.02
04/10/2019 00:00:00
10346629
$6,346.51
$6,346.51
03/30/2018 00:00:00
9769461
$6,475.35
$6,475.35
04/07/2017 00:00:00
9218325
$5,554.24
$5,554.24
04/07/2016 00:00:00
8658072
$5,097.68
$5,097.68
Sales History
ISale Entry Recording Recording Sale Excise Deed Transfer Grantor(Seller) Grantee(Buyer) Other I
26 of 27
11-woFin
72D sd.
0
k
CH 00r
4W ■ -f_
all
Fr d Fr CP
264 i.t_ 2zn
JL2'
RFx
a
,0nc
a6 s_f.
Existing building plan provided by Snohomish County records for Parcel #:00498300000600 for
address: 9423 232ND ST SW, EDMONDS, WA 98020
Note that analysis assumptions such as building geometry, tributary areas, and loading were
determined through examination of these photographs and industry knowledge of standard
construction practices.
-1-120
27 of 27
# I'
1
Ip
i
Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary
areas, and loading were determined through examination of these photographs and industry
knowledge of standard construction practices.
-L 120