Subject: Geotechnical Evaluation
Proposed Single -Family Residence
20323 — 81st Avenue Wert 8003 203RD S
Edmonds, Washington
Reference: RAM Engineering, Inc.
Preliminary Grading & TESC Plan
Ceotechnical Engineering, Construction
Observation/Testing and Environmental Services
BY
CITY OF EDMONDS
Department of Ecology
Stormwater Management Manual for Western Washington
Amended December 2014
James P. Minard
Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles
Washington, 1983
Web Soil Survey (WSS)
Edmonds City Code (ECC)
Chapter 23.80 (Geologically Hazard Areas)
Dear Ms. Nichols:
As requested, Earth Solutions NW, LLC (ESNW) has prepared this geotechnical evaluation report
for the proposed single-family residence project. As part of our scope of services, we completed
a subsurface exploration, laboratory and engineering analyses, and prepared this written report
with our findings and recommendations for the proposed project. Based on our evaluation, the
proposed project is feasible from a geotechnical standpoint.
Project Description
The subject site is located at 20323 — 81 st Avenue West in Edmonds, Washington, as illustrated
on the attached Vicinity Map (Plate 1). The site consists of one tax parcel (Snohomish County
parcel number 00431200001501) covering 0.51 acres. The property is currently developed with
a single-family residence and associated improvements. Based on ESNW's understanding of
the proposed development, the boundary lines will be adjusted to create a new residential lot
behind the existing residence with access along the northern property line. The subject site
generally descends towards the west with total elevation change on the order of five feet or less.
The subject site is bordered by single-family residences on the east and south, 81 St Avenue West
to the west, and 203rd Street Southwest to the north.
15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 • FAX (425) 449-4711
Select Homes, Inc. ES-7573
February 5, 2021 Page 2
We anticipate grading activities will include cuts and fills of about two to four feet to establish the
planned building alignments. We understand infiltration and low impact development methods
are being evaluated for stormwater management. Site improvements will also include
underground utility installations.
At the time this report was prepared, specific building load values were not available. However,
we anticipate the proposed residential structures will consist of relatively lightly loaded wood
framing supported on conventional foundations. Based on our experience with similar
developments, we estimate wall loads on the order of one to two kips per linear foot and slab -on -
grade loading of 150 pounds per square foot (psf).
If the above design assumptions are incorrect or change, ESNW should be contacted to review
the recommendations in this report. ESNW should review the final design to verify the
geotechnical recommendations provided in this report have been incorporated into the plans.
Subsurface Conditions
As part of this geotechnical evaluation, an ESNW representative observed, logged, and sampled
two test pits on December 3, 2020, excavated at accessible locations within the proposed
development area, using a mini-trackhoe and operator provided by the client. The approximate
locations of the test pits are depicted on the Test Pit Location Plan (Plate 2). Please refer to the
test pit logs provided as an attachment to this report for a more detailed description of subsurface
conditions. Representative soil samples collected at the test pit locations were analyzed in
general accordance with the Unified Soil Classification System (USCS) and United States
Department of Agriculture methods and procedures.
Topsoil and Fill
Native topsoil was observed extending to a depth of approximately six inches below existing
ground surface (bgs). The topsoil was characterized by dark brown color and fine organic
material. Fill was encountered at test pit location TP-1 extending to a depth of two and one-half
feet bgs. The fill was characterized primarily as silty sand (USCS: SM) and was encountered in
a moist condition at the time of exploration. Fill may be present to some degree around existing
improvements and, where encountered, should be evaluated by ESNW during construction.
Native Soil
Underlying the topsoil and limited fill, native soil conditions at the test pit locations was observed
to consist primarily of silty sand with gravel (USCS: SM). Overall soil relative density increased
with depth, extending to the maximum exploration depth of about eight feet bgs. The native soil
was generally observed in a weakly to moderately cemented condition at about two to four feet
bgs.
Earth Solutions NW. LLC
Select Homes, Inc.
February 5, 2021
Geologic Setting
ES-7573
Page 3
The referenced geologic map resource identifies Vashon till (Qvt) across the site and surrounding
areas. As reported on the geologic map resource, Vashon till typically consists of a nonsorted
mixture of clay, silt, sand, pebbles, cobbles, and boulders. The till was deposited directly by ice
advanced over previously deposited sediment and rocks. In addition, the referenced WSS
resource identifies Alderwood-urban land complex (Map Unit Symbol: 5) as the primary soil units
underlying the subject site. The Alderwood series was formed in glacial till plains. Based on our
field observations, native soils on the subject site are generally consistent with the geologic
setting outlined in this section.
Groundwater
Groundwater seepage was not observed at the test pit locations during the fieldwork (December
2020). However, seepage should be expected in deeper excavations at this site, particularly
during the winter, spring, and early summer months. Groundwater seepage rates and elevations
fluctuate depending on many factors, including precipitation duration and intensity, the time of
year, and soil conditions.
Geologically Hazardous Areas Assessment
As part of this geotechnical evaluation, the referenced chapter of the ECC was reviewed. Based
on our investigation and review, there are no geologically hazardous areas present on or adjacent
to the site.
Foundations
The proposed structure can be supported on conventional spread and continuous footings
bearing on undisturbed, competent native soil, compacted native soil, or new structural fill.
Competent native soils, suitable for support of the foundation, should be encountered beginning
at depths of approximately two to three feet bgs. Where loose or unsuitable soil conditions are
encountered at foundation subgrade elevations during site preparation activities, compaction of
the soils to the specifications of structural fill, or overexcavation and replacement with granular
structural fill will be necessary. Structural fill should consist of suitable granular soils compacted
to 95 percent of Modified Proctor (ASTM D1557). Compaction of the soil to the levels necessary
for use as structural fill will be difficult during wet weather conditions. Organic material exposed
at foundation subgrade elevations must be removed and grades restored with structural fill.
Provided the structures will be supported as described above, the following parameters can be
used for design of the new foundations:
• Allowable soil bearing capacity 2,500 psf
• Passive earth pressure 300 pcf (equivalent fluid)
• Coefficient of friction 0.40
Earth Solutions NW. LLC
Select Homes, Inc. ES-7573
February 5, 2021 Page 4
The passive earth pressure and coefficient of friction values include a safety factor of 1.5. A one-
third increase in the allowable soil bearing capacity can be assumed for short-term wind and
seismic loading conditions.
With structural loading as expected, total settlement in the range of one inch is anticipated, with
differential settlement of about one-half inch. The majority of the settlements should occur during
construction, as dead loads are applied.
Seismic Considerations
The 2015 and 2018 International Building Code recognizes the American Society of Civil
Engineers (ASCE) for seismic site class definitions. In accordance with Table 20.3-1 of ASCE,
Minimum Design Loads for Buildings and Other Structures, Site Class D, should be used for
design.
In our opinion, the site susceptibility to liquefaction is negligible. The native soil relative density
and the absence of an established, shallow groundwater table are the primary bases for this
opinion.
Drainage
Temporary measures to control surface water runoff during construction would likely involve
passive elements such as interceptor trenches and sumps. ESNW should be consulted during
preliminary grading activities to evaluate seepage areas and provide recommendations to reduce
the potential for seepage -related instability.
Finish grades should be designed to direct surface water away from structures and slopes.
Grades adjacent to buildings should be sloped away at a gradient of either at least 2 percent for
a horizontal distance of up to 10 feet or the maximum allowed by adjacent structures. In our
opinion, foundation drains should be installed along building perimeter footings. A typical footing
drain detail is attached to this letter (Plate 3).
Earth Solutions NW. LLC
Select Homes, Inc.
February 5, 2021
Infiltration Evaluation
ES-7573
Page 5
As indicated in the Subsurface Conditions section, native soils encountered during our fieldwork
were characterized primarily as silty sand glacial till. Based on the results of USDA textural
analyses, the native sand soils at depth were classified primarily as loamy sand with fines
contents of about 13 to 20 percent.
In -situ testing was completed in accordance with the Small-scale Pilot Infiltration Test (PIT)
procedure, as outlined in Volume III, Chapter 3, Page 526 of the 2014 SMMWW. The testing
was completed at a depth of approximately five feet at TP-1. The in -situ rate obtained during
testing was 0.50 inches per hour. Based on subsurface conditions observed before, during, and
after the PIT, it is our opinion that the low measured infiltration rate represents horizontal
movement of the water rather than vertical infiltration. Infiltration into native soils would move
laterally along the relatively impermeable unweathered till soils and would potentially impact
structural areas and utilities.
Ultimately, the native soil is not ideal for infiltration and it is our opinion other means of stormwater
management should be considered preferential to infiltration. ESNW should review the proposed
grading and drainage plans to confirm the recommendations in this report are followed, and to
provide additional recommendations as necessary.
On -site Stormwater Management
Pursuant to City of Edmonds stormwater management requirements, implementation of on -site
stormwater BMPs are required for proposed developments in accordance with specified
thresholds, standards, and lists. The intent of BMP implementation is to infiltrate, disperse, and
retain stormwater runoff on site to the extent feasible. The table below summarizes our
evaluation of low impact development methods, as outlined in the referenced stormwater manual,
from a geotechnical standpoint. It is instructed in the referenced stormwater manual that BMPs
are to be considered in the order listed (from top to bottom) for each surface type, and the first
BMP that is determined to be viable should be used. For completeness, however, we have
evaluated each listed BMP for the proposed surface types.
Earth Solutions NW. LLC
Select Homes, Inc.
February 5, 2021
ES-7573
Page 6
BMP
Viable?
Limitations or
Infeasibility Criteria
Lawns and Landscaped Areas
T5.13: Post -construction soil
quality and depth (Volume V,
Yes
None.
Chapter 5
Roofs
T5.30: Full dispersion (Volume
Maybe*
Adequate vegetative flow paths will likely not be
V, Chapter 5)
available.
T5.10A: Downspout full
Depth to impermeable layer will not maintain required
infiltration systems (Volume III,
NO
separation from final grades or bottom of infiltration
Chapter 3)
systems.
Roofs
Bioretention (Volume V, Chapter
Based on our review, depths to hardpan (or other low
7)
No
permeability layer) from final grade and/or bottom of
facility elevation will not satisfy minimum requirements.
T5.10B: Downspout dispersion
May be*
Adequate vegetative flow paths will likely not be
systems (Volume III, Chapter 3)
available.
T5.10C: Perforated stub -out
Soil and groundwater conditions to be verified during
connections (Volume III, Chapter
Yes
installation.
3)
T5.30: Full dispersion (Volume
Maybe*
Adequate vegetative flow paths will likely not be
V, Chapter 5)
available.
Shallow depth to impermeable soil (hardpan) which
T5.15: Permeable pavement
NO
would cause saturation and instability of soil directly
(Volume V, Chapter 5)
supporting the pavement. Walkway areas can be
considered.
Bioretention (Volume V, Chapter
Based on our review, depths to hardpan (or other low
7)
No
permeability layer) from final grade and/or bottom of
facility elevation will not satisfy minimum requirements.
T5.12: Sheet flow dispersion
T5.11: Concentrated flow
Maybe*
Adequate vegetative flow paths will likely not be
dispersion (Volume V, Chapter
available.
5
* Viability to be determined by storm designer.
Earth Solutions NW. LLC
Select Homes, Inc.
February 5, 2021
Limitations
ES-7573
Page 7
The recommendations and conclusions provided in this geotechnical evaluation report are
professional opinions consistent with the level of care and skill that is typical of other members in
the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test pit
locations may exist and may not become evident until construction. ESNW should reevaluate
the conclusions in this geotechnical evaluation report if variations are encountered.
Additional Services
ESNW should be retained to provide additional geotechnical services in association with this
project, including testing and consulting services during construction. ESNW should have an
opportunity to review final project plans with respect to geotechnical recommendations provided
in this letter.
We trust this letter meets your current needs. Should you have questions, or if any additional
information is required, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
Adam Z. Shier, L.G.
Project Geologist
Attachments: Plate 1 — Vicinity Map
Plate 2 — Test Pit Location Plan
Plate 3 — Footing Drain Detail
Test Pit Logs
Grain Size Distribution
02/05/2021
Henry T. Wright, P.E.
Senior Project Manager
cc: RAM Engineering, Inc.
Attention: Mr. Rob Long, P.E. (Email only)
Earth Solutions NW. LLC
187th Street Southwest 9 ❑ o ° ❑ +
c 188[h Street Southwest _ Lynndole o�j......,�l000- 188th Street Southwest
aPark Penny Lane
❑ O p0 �a ch - m n 189[h Place South at 189th Place Southwess
oD o <Ef♦5oa ^�ISO� 3 Q
N
oO a
6tn 0 o a 190th Street Southwest
pap❑ 0�[r�O6�ygt 0 Odd a ¢ 791 st S"et Southwest = 791s
p p Q Q L��p 0. q9 p Ij tStreet Southwest
9a 192 Id Street Southwest "
o 4
P t14 LSl , QO �,O Y� u,
G
❑ ❑ p' qp 6 8 ° I q o o., ❑ po 9I �j 0 ,8 06 D v 192nd Place South )g ester
�Po p�4PO��c. west 2nd P\ace Southw
AI
❑ a O O °' o a D. Ci d rn
dC' Q(]a � 6 pPo Q tle c orrve 7b Fp]�P(jcY,IooO'.. s
7s - 193rd Place Southwest D
^�1u\tdoleCrep�a
P9 „5„e`t�•utOhwest-
p❑tvy 4p, oQ
eo -0.o q J �0 111111r
' � ., -. ' co. o o t ir1o e, L� od..
'
ty(y. 1fJop0LF1 4.'��. m
N
5� ?'
WA 524 f 9 96th Street Southwest_ _ WA 524 _196-th_S-treet S-outhw-est_ — ---�
oa° ° . o �❑ — ----
0 f
a UU�w o Ir
tP; af766CsCS D ❑h' a 1 ` Ne�nzQ, O Crossr,
9 '."� 46�---�
�. ----
y a
ab al ❑ i� 199Ih Street Southwest I pc c
❑66 p i❑ 0 �'c7o p i 9 ❑<'C�009ttin2- -a "
NI4io®r1..Il&op m WA
. 'e 6 V o, o,
al- _ P m
a o Q � L
o pC a — Edmonds_._
, 200th%Street Southwest _, 200th Street Southwest
5; c Community r
s
I
t Place w 201stStreet sourth t I College P
w " 202nd Street Southwest i° _
3 ' 202nd Street
', '-
202nd Place Sou[hwesti — -. Southwest
^ f ^
` °'� 203 d Street Southwest r I�
m
S I T E $
N Lynnwood
p Q Cl ua _ Municipal /❑
(7 d�-�aQ`GolfCourse
0
C
d'206thStretouthwest
Ids ��RrCollege
=
3 Q❑ p o PQratSf p o Place Middle = i4
S School �� ❑
H,
— -- �t' p N 208th Street Southwest
Maln Street
pp Ippp Seattle Heights _
g
Creek
w 2101h Stree t souwest�
P
Yost ParkSouthwest.
¢` \ ^ ° <
Q 3 I
�arP 3 08 �- ..—�
s:
o Pork
� �I/� °—_� Edmonds/ 212-,fn
a > Q 3
� � 7 0 0 0., a
�
-III
BOwdo
�° o - 000q igh SchoApartmentsqo?
t�Q � Hi h School
°'d o 7o g
❑ -w m
=
ay o 0 00 oa t o
o__
J ,,i � ❑ n o �a��� 9 P . cvoo� o� d or�
p� � � �J 00 00 I p0 p
q
21 Sth S(eet Southwest �51 >7°.� 9 n i]c-..,. 6 .. or,.�nooarl 0 , • n�y,o P
�
z16m street Southwest Chose Lake _ �Ob� �I` I .f_./wr/./�/w�]
�.. ^ .216th Street Southwest
216th Street Southwest s Elementary 216th Street Southwest -
P�
1� WA 99 -`�
School Q B Lk L?
znm Beet so°!naves � CNX�I L. i
oya�
o /-ot Ll¢u
a 3v�
8th StreetAso mw�t
3 9I`
o8 6❑ C❑d ❑ 0 op 0 . ,cam P
$ nh n ❑ P4 0 4 act p ❑ ❑ fl�� o a a ° P
c o flb o cg000a °❑ a0❑o d o d ,L 9 �1
w
a_220[h Street Southwest_ __—220th7Sireet Southwest- —_;
Reference: NORTHns
,Snohomish
County, Washington•
V--
. - Engineering,Construction
OpenStreetMap.org00�
•se • • • - •
lib hL
Vicinity Map
81 st Avenue SFR
Edmonds, Washington
Drwn. MRS
Date 12/16/2020
Proj. No. 7573
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
Checked AZS
Date Dec. 2020
Plate 1
I I
I I I I
I I
2O3KD STREET S.W.
wr--------------i i------
W I I TP_1 — I
I (~ I
0 I
I
I I I
TP-2
I I — ■ —
I I I I I I
I I I
' L------
2O3RD PLACE S.W.
LEGEND
TP-1 Approximate Location of
— ■ — ESNW Test Pit, Proj. No.
ES-7573, Dec. 2020
I Subject Site
Existing Building
NOTE: The graphics shown on this plate are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and / or proposed site features. The information illustrated
is largely based on data provided by the client at the time of our
study. ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
0 30 60 120
1 "=60'
Scale in Feet
Drvvn. MRS Date 12/16/2020 Proj. No. 7573
Checked AZS Date Dec. 2020 Plate 2
NOTES:
• Do NOT tie roof downspouts
to Footing Drain.
• Surface Seal to consist of
12" of less permeable, suitable
soil. Slope away from building.
LEGEND:
Surface Seal: native soil or
other low -permeability material.
1-inch Drain Rock
r�r�r�r�r
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Earth
Solutions
N W uc
Footing Drain Detail
81 st Avenue SFR
Edmonds, Washington
Drwn. MRS Date 12/17/2020 Proj. No. 7573
Checked AZS Date Dec. 2020 Plate 3
Earth Solutions NWLLC
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS
SYMBOLS
TYPICAL
DESCRIPTIONS
GRAPH
LETTER
GRAVEL
AND
CLEAN
GRAVELS
''�
I.�•� �
� � A.
GW
WELL -GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO
FINES
GRAVELLY
SOILS
(LITTLE OR NO FINES)
° �° o �°
o pOo p
Q Q oQ
GP
POORLY -GRADED GRAVELS,
GRAVEL - SAND MIXTURES, LITTLE
OR NO FINES
COARSE
GRAINED
SOILS
MORE THAN 50%
OF COARSE
GRAVELS WITH
FINES
o
Q
0
°°
o
'
p
GM
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
FRACTION
RETAINED ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
�±�
V
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
SAND
AND
CLEAN SANDS
SW
WELL -GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
MORE THAN 50%
OF MATERIAL IS
LARGER THAN
SANDY
NO. 200 SIEVE
SIZE
SOILS
(LITTLE OR NO FINES)
::.
SP
POORLY -GRADED SANDS,
GRAVELLY SAND, LITTLE OR NO
FINES
SANDS WITH
FINES
c•M
c
SILTY SANDS, SAND - SILT
MIXTURES
MORE THAN 50%
OF COARSE
FRACTION
PASSING ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
cC
�7
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
FINE
GRAINED
SOILS
SILTS
AND LIQUID LIMIT
LESS THAN 50
CLAYS
CL
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS,
LEAN CLAYS
OL
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN
NO. 200 SIEVE
MH
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SILTY SOILS
SIZE
SILTS
AND LIQUID LIMIT
CLAYS GREATER THAN 50
CI I
INORGANIC CLAYS OF HIGH
PLASTICITY
OH
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
HIGHLY ORGANIC SOILS
'/ ` 1/ 01/ 01/ N
\„ \„ „
0 0„
PT
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil classifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
v Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
TEST PIT NUMBER TP-1
PAGE 1 OF 1
PROJECT NUMBER ES-7573 PROJECT NAME 81st Avenue SFR
DATE STARTED 12/3/20 COMPLETED 12/3/20 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 9": grass AFTER EXCAVATION -
L
}�
U
=
w
H L
Lu
g
TESTS
2
Q O
MATERIAL DESCRIPTION
❑
2 Z
Uj
�
Q
0
TPSL
Dark brown TOPSOIL (Fill)
0.7 -roots
Brownish gray silty SAND, loose to medium dense, moist (Fill)
-
SM
-ash
MC = 15.3% Brown silty SAND, medium dense, moist
SM -roots
4.0
Gray silty SAND with gravel, dense, moist
5 MC - 11.0% -moderately cemented
Fines = 13.5% [USDA Classification: gravelly loamy coarse SAND]
-infiltration test at 5'
SM
MC = 11.6% g 0 [USDA Classification: gravelly loamy SAND]
Fines = 20.4% Test pit terminated at 8.0 feet below existing grade. No groundwater encountered during
excavation. No caving observed.
y Earth Solutions NW, LLC TEST PIT NUMBER TP-2
15365 N.E. 90th Street, Suite 100 PAGE 1 OF 1
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
PROJECT NUMBER ES-7573 PROJECT NAME 81st Avenue SFR
DATE STARTED 12/3/20 COMPLETED 12/3/20 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 6": grass AFTER EXCAVATION -
L
=
}�
H L
U
2
w
g
TESTS
Q O
MATERIAL DESCRIPTION
❑
2 Z
U
Q
U
0
TPSL �.. 0.5
Dark brown TOPSOIL
Brown silty SAND, medium dense, moist
MC = 15.3% SM
Fines = 22.1 % 2.0
[USDA Classification: sandy LOAM]
Gray silty SAND, dense, moist
MC = 7.4%
-moderately cemented
SM
5
MC = 7.5% 7.0
Test pit terminated at 7.0 feet below existing grade. No groundwater encountered during
excavation. No caving observed.
Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
' Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
GRAIN SIZE DISTRIBUTION
PROJECT NUMBER ES-7573 PROJECT NAME 81st Avenue SFR
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS I HYDROMETER
100
95
90
85
80
75
70
65
x
w
60
m
55
w 50
z
LL
45
z
w
rr 40
w
a
35
30
25
20
15
10
5
0
rc � 1/4H[:>•�= l.�:f I loll L'!I L74i�Us Ui.1�1:71�1 Ul1�l L' 1114411
I�11®■■■I■■i��\III�II■■v■■IIIIIII■■�II���I®II�IIII�lllllll�l��®�
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
Specimen Identification Classification Cc CU
• TP-01 5.00ft. USDA: Gray Gravelly Loamy Coarse Sand. USCS: SM.
m TP-01 8.00ft. USDA: Gray Gravelly Loamy Sand. USCS: SM.
A TP-02 1.50ft. USDA: Brown Gravelly Sandy Loam. USCS: SM with Gravel.
Specimen Identification
D100
D60
D30
D10
LL
PL
PI
%Silt
%Clay
0
TP-01 5.0%
19
1.191
0.289
13.5
m
TP-01 8.Oft.
19
0.524
0.165
20.4
A
TP-02 1.5ft.
19
0.637
0.143
22.1