Loading...
ENG2021-0135 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT MBER City of Edmonds :0- 1 1 C www.edmondswa.gov i Description: COMCAST-BORE CONDUIT AND PULL NEW FIBER TO 210 RAILROAD AVE ISSUED: 01/31/2023 Address: 190 W DAYTON ST EDMONDS WA 98020 EXPIRES: 07/31/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032300406400 NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300 OWNER EDMONDS PORT OF 336 ADMIRAL WAY, EDMONDS WA 98020-7214 -M FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 01/31/2023 Printed: Tuesday, January 31, 2023 12:30:48 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** E-7 TRAFFIC CTRL Printed: Tuesday, January 31, 2023 12:30:48 PM 2 of 2 RECEIVED 0\ t u,tl(-). APR 08 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ROW PERMIT NO.: ENG 2021-0135 ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION "VC. I3'�J PERMIT APPLICATION PROJECT NAME: JB-613572 CONTACT: CONTRACTOR: Cablecomm, LLC Mailing Address: 1316 BONNEVILLE AVE, BLDG A, SNOHOMISH WA 98290 State License #: CABLE*971DP City Business License #: NR-021818 Jourden Lawrence Phone #: 425-921-8201 Fax #: Email #: j ourden_lawrence@comcast.com ❑x Liability Insurance ❑x Bonded Tracking application under 190 W. Dayton St. ADDRESS OR INTERSECTION OF CONSTRUCTION: 210 RAILROAD AVE, Edmonds, WA 98020 ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑x Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family x❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Other ❑ Yes ❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : The proposed work in the right of way is to dig and intercept 4" conduit on north side of W Davton St. overset with new vault: bore new 2" conduit from ROW to private (approx 25' in ROW) towards address 210 RAILROAD AVE. Edmonds. WA 98020: Dull new 90' of 24ct fiber from vault on south side of W Davton St toward address 210 Railroad Ave. WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: PAVEMENT CUT: ❑ Yes x❑ No If yes, indicate size of cut: x CONCRETE CUT: ❑ Yes ❑x No If yes, indicate size of cut: X. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE �` DATE 4/8/21 Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 16' Lane width 42' EOP to EOP SEE SEE NOTE 1 NOTE 1 ROLL SPACING (MIN 50' MAX 100') O O 0 *Spotter to assist pedestrians through work zone BUFFER SPACE (SEE TABLE A) D 0 0 0 o 0 to o 0 0 o 0 0 <Nx>> WITH TAPER LENGTH (SEE TABLE A) W1-4L SEE SEE NOTE 1 NOTE 1 E3 IM E2 E3 I@ a�� 111111� ****40 o 0 0 o 0 0 o 0 0 0 0 o O O O O O O O O O O O O TAPER LENGTH (SEE TABLE A) o 0 t w 0 TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP ROAD ROAD WORK NARROWS OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING AHEAD ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. W20-1 W5-1 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE TABLE A SPEED (MPH) TAPER LENGTH FOR SHIFT WIDTH CONE SPACING (FT) BUFFER SPACING 5' 6' TANGENT TAPER (FT) 25 26' 31' 25 20 55 30 38' 45' 30 85 35 51' 61' 35 120 40 67' 80' 40 170 45 113' 135' 45 220 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. W20-1 ROAD WORK AHEAD W DAYTON ST k4 I NOTES LEGEND 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR 0 CONE OR CHANNELIZING DEVICE SEE STANDARD RESIDENTIAL STREET (25 MPH) AND 350' FOR ARTERIAL DRAWING 713. ROADWAYS. 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR NIGHT-TIME USE (OPTIONAL). ENGINEERING DIVISION . ­­ - A " .'7TED 3. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. 1 /31 /202� - Owv 4. SPOTTERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO APPROVAL FOR ALL WORK RECEIVED ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT IN CITY RIGHT-OF-WAY. (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). COMCAST TO APR 08 2021 COORDINATE WITH ALL 5. FOR ALTERNATE LANE SHIFT WIDTH REFER TO MANUAL WORK ON CUSTOMER'S ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) PRIVATE PROPERTY. CITYODs TABLE 6C-2 PAGE 6C-10. DEVELOPMENT SERVICES DEPARTMENT 6. SIGN SIZE PER MUTCD. 7. THIS PLAN IS PROVIDED AS A GUIDE ONLY. FOR SPECIFIC TITLE TRAFFIC CONTROL PLAN INFORMATION ON THE TRAFFIC CONTROL PLANS SEE 2 LANE ROADWAY: CURRENT MUTCD. PARTIAL LANE CLOSURE Route Overview Completed By: KCS Address: 210 RAILROAD AVE, EDMONDS, WA 98020 Completion Date: 3/20/2021 Footages ^ � � A � T (�J) IProject Survey Revision Date: New Aerial Coax 0 Overlash Coax 0 New UG Fiber 677 Survey Revision Task ID: New Aerial Fiber 0 Overlash Fiber 0 Existing UG Fiber 0 Engineered For: ISP Footage 0 New UG Coax 0 Total Aerial 0 Manager: Conduit Only 0 Existing UG Coax 0 Total Underground 677 P2 ID: JB0000613572 Are Additional Pages Needed No Total Private Footage 0 Legend ,,n4e %/�. C �� Ili .••• Existing Vault New Vault V ❑ Existing U/G Pole Lock Box ♦O`s�`�~,e,� \. ♦ e ♦eeti.� p. . - :�`: �� ❑ - � / ❑ � •, .. e: •- . ; CONTINUE PULLING 1-24CT INTO '•'�>-�`o``• f PROOF AND PULL 1-24CT FIBER � ������ eo1 � � 210 BUILDING TO SERVER 55 Footage 150' FROM TIE IN TO VAULTS LABELED i� %;.`;�.�e� LOCATION. LEAVE COIL FOR E Existing Aerial Text Box Text "SYSTEMS" �1 3 \ 7; ''' xi': r INSTALL , TA New U/G Callout Arrow y i ` , % ❑' ?' �, . •xs" ! ', �� New Aerial 0 �. ;� 73, '•r. Interior Path New Tap Phase Identifier �., !� _%♦ ,I��►�I i 3 ' / iP �, o •� Footage Break �•� '� ' �'. Power Supply PSI Fiber Splice Point H Hard Surface Cut OC Storage Loop . .i >• AV Route Overview Provide Clear Detail about the Project/� Construction Notes: �^ ° ` • j _., - ENGINEERING DIVISION RESUB "7TED Jan 12 2023 BORE 120 AND PULLBACK 1-2" Im CONDUIT TO VAULT IN / •'< .� ;. CITY OF EDMONDS 11 /31 /2023 DEVELOPMENT SERVICES SIDEWALK LABELED "SYSTEMS"�� tI� I..DIG DEPARTMENT r. 194' AND INTERCEPT 4" 40. APPROVAL FOR ALL WORK - CONDUIT ON NORTH SIDE OF W -� IN CITY RIGHT—OF—WAY. Applicant shall repair/replace all DAYTON ST. PLACE NEW 24"x36"x36" VAULT in COMCAST TO damage to utilities or frontage improvements in City right-of-way LANDSCAPE BEHIND SIDEWALK COORDINATE WITH ALL per ndards that is caused or occurs durriingthe permitted project. - -•, '• WORK ON CUSTOMER'S 0 : 2 Ai PRIVATE PROPERTY.FW- , .+ .. lid OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE PROOF EXISTING 4"- �< , COMCAST CONDUIT AND PULL NEW FIBER '= Q 65' ` PLACE NEW STRAP OUT OF ' ail✓ OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING CROSSING W CASE SP.WALY.8815 IN VAULT AND TIE IN ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY DAYTON ST 'l UTILITIES MAY REQUIRE A SEPERATE PERMIT. La!s. „• ,.tea. _. �� I %4!�n. It �ci► ':,.' '-�'- - — O Map data C92020 Gooqle. C2021 Route Overview Completed By: KCS Address: 210 RAILROAD AVE, EDMONDS, WA 98020 Completion Date: 3/20/2021 Footages COMCAST Survey Revision Date: New Aerial Coax 0 Overlash Coax 0 New UG Fiber 677 Survey Revision Task ID: New Aerial Fiber 0 Overlash Fiber 0 Existing UG Fiber 0 Engineered For: ISP Footage 0 New UG Coax 0 Total Aerial 0 Project Manager: Conduit Only 0 Existing UG Coax 0 Total Underground 677 P2 ID: JB0000613572 Are Additional Pages Needed No Total Private Footage r 0 Legend _=14wo _9+r ,7 . - . N. • r �,.•'f y . ! Existing Vault Pole., New Vault ❑V Lock Box BORE 120' AND PULLBACK 1-2" ; Existing U/G Footage g 150' CONDUIT TO VAULT IN SIDEWALK LABELED "SYSTEMS" " r Existing Aerial Text Box Text � ,' • 120' � - New U/G Callout Arrow ' °'' ' ., or � f New Aerial New Tap �� �• .r. DIG AND INTERCEPT 4" Interior Path Phase Identifier ❑1 • . CONDUIT ON NORTH SIDE OF W DAYTON ST. PLACE NEW Footage Break Fiber Splice Point Power Supply Hard Surface Cut Ps OC o `�fi�+= _ 24"x36"x36" VAULT in j �- LANDSCAPE BEHIND SIDEWALK i► �' Storage Loop INKROW �° � ..� WORK Overview Provide Clear Detail about the Project Construction Notes:, ENDEDMON CITY F � 0 — *ZOOM OF ROW WORK LOCATION ROW ' 66, r•r lV o 6$' o . o Dayton PROOF EXISTING 4" COMCAST _ — 4 CONDUIT AND PULL NEW — — FIBER CROSSING W DAYTON _. r STNor- - 1 RESUB Jan 12 2023 i PLACE NEW STRAP OUT OF CASE SP.WALY.8815 IN CITY OF EDMONDS DEVELOPMENT SERVICES EXISTING VAULT AND TIE IN DEPARTMENT Right of Way Completed By: KCS N ° 7 �( o •- _ : E a. • ••• � s Completion Date: 3/20/2021 Address 210 RAILROAD AVE, EDMONDS, WA 98020 COMCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Route Overview Sheet Engineered For: Project Manager: - P2 ID: JB0000613572 Additional Pages Needed No Legend Existing Vault Pole New Vault IV] Lock Box Existing U/G Footage Existing Aerial Text Box New U/G Callout Arrow New Aerial New Tap Interior Path Phase Identifier Footage Break Power Supply Fiber Splice Point Hard Surface Cut Storage Loop w Right of Way Provide Clear Detail about the Project Construction Notes: RESUB Jan 12 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 150' Text �1 PS O PLACE NEW STRAP OUT OF ;` PROOF EXISTING 4" i CASE SP.WALY.8815 IN VAULT COMCAST CONDUIT AND TIE IN AND PULL NEW FIBER CROSSING W DAYTON ST ;20 - - 65' BEER PATIO V BORE 120' AND PULLBACK 1-2" CONDUIT TO VAULT IN SIDEWALK LABELED "SYSTEMS" ■ V DIG AND INTERCEPT 4" CONDUIT ON NORTH SIDE OF W DAYTON ST. PLACE NEW 24"x36"x36"VAULT in LANDSCAPE BEHIND SIDEWALK 1 T PROOF AND PULL 1-24CT FIBER FROM TIE IN TO VAULTS LABELED "SYSTEMS" Ir .1= 225' Q Grade Level Box BULK® z4 /oiv mm aeptn RESUB Jan 12 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT M Now with Covers FEATURES Upgradeable Lightweight/Strong (TIER 22) Patented Anti -Slip Technology Anti -Seize Bolt Technology Industry Leader in Anti -Trip Hazard Prevention Superior Fatigue Resistance (EST)'" Vertical and Horizontal Rib Design Embedded Vertical Racking Reduced Installation Cost Highest Load Rating to Weight Ratio in the Industry TESTING CRITERIA Covers meet or exceed: EST'" 3 Million Cycles Telecordia GR-902-CORE Western Underground Committee Guide 3.6 ANSI/SCTE 77 2013-TIER 22 EN124 Class B125 Bodies meet or exceed: Telecordia GR-902-CORE Western Underground Committee Guide 3.6 ANSI/SCTE 772013-TIER 22 EN 124 Class 13125/C250 ASTM-457 AASHTO M-306 (H-20/25) AS3996-Class B/C PRODUCT SUMMARY With over 90 years experience in global (OSP) infrastructure, Channell has developed the most advanced pit and chamber technology in the world! Channell's BULK and SHIELD patented designs with the complement of SUPER BULK for roadway applications offer global users, consumer, and craft installers safety benefits never before contemplated, but critical when considering new global health and safety standards. BULK's lightweight design increases installation efficiencies while improving overall body weight carrying load capacities versus concrete, polymer concrete, and many other body materials. Reduction of BULK's body weight protects the safety of installers while shortening installation times. Additionally, with BULK bodies, cutting ducts in the field produces no harmful dust contaminants which could lead to installer respiratory issues. All SHIELD covers meet or exceed 33,750 pound -force or 150 kilonewtons in strength. They never break and offer a lid weight reduction over concrete and polymer concrete of 50%, and over 70% when compared to cast iron. SHIELD's lighter weight design cover reduces craft injuries while improving health and safety specifications. RESUB Jan 12 2023 Consumers also benefit from SHIELD's patented anti -slip design and anti -trip features. SHIELD's cover tread design raises global industry standards by offering 20% greater slip resistance when compared to concrete, polymer concrete, steel or cast iron covers. SHIELD meets and exceeds Australia AS4586 skid specification, the highest global standard in the world! Overall, BULK's strength in combination with Channell's SHIELD covers offers a universal solution to meet and exceed every company's needs. Safety always comes first, and that's why BULK and SHIELD are tested to the highest standards available in the global market and Channell is proud to have pioneered Endurance Stress Testing (ESTTI) which analyzes cover fatigue in the field. ESTTM provides essential data on the life expectancy of a SH I ELD lid in the field and confirms its potential life expectancy. Product design, product innovation, safety attributes, and new manufacturing technology is why global customers are specifying Channell's BULK and SHIELD products for their new OSP infrastructure requirements. STANDARD FEATURES lE Anti -Slip Tread Design Anti -Trip Cover Recessed Lifting Pin Non -Seizing Bolt System Flush Mounted Sidewall Racks with Cover Allows Field Replacement Increase Usable Space Mounting Studs OPTIONAL FEATURES L-Bolt Security System (SHIELD Cover Shown) CITY OF E DEVELOPMENTT SERVICES DEPARTMENT Design and specifications may vary. Logo Puck (Custom Options Available) Winterized Cable Drop Slide Marker Locator Device Swing -Arm with Butterfly Cable Hook Step Bracket Mounting Plate Bracket with Wedge THE NEW SOLUT 3 covers Composite Ring Optional #LAlta t[!%% _ E I� 1 bady RESUB Jan 12 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT HDPE Plastic Cover Light Duty 3,000 Ibf (13.5 kN) ,�Ww Composite Cover 33,750 Ibf (150 kN) Ductile Iron Cover with steel Ring 56,200 Ibf (250 kN) SPECIFICATION PROOF LOAD PRnmjrTS STANDARDSAMERICAS Pedestrian/Light Duty 3,000 Ibf (13.5 kN) Q ANSI/SCTE 77TIER 15 22,500 Ibf (100 kN) �L z' K ANSI/SCTE 77 TIER 22 33,750 IF (150 kN) eq Q AASHTO M-306-10 H 20 40,000 Ibf (178 kN) AASHTO M-306-10 H 25 50,000 Ibf (222.4 kN) ASTM-457 46,000 Ibf (205 kN) r1ff fit Pedestrian/Light Duty 2,250 IV (10 kN) Q EN 124 Class B125 28,100 Ibf (125 kN) Q EN 125 Class C125 56,200 IV (250 kN) Pedestrian/Light Duty 3,370 Ibf (15 kN) z% AM— AS3996-Class B 18,000 IV (80 kN) AS3996-Class C 33,750 Ibf (150 kN)� L��'n��►� :•X044Z Straight wall design improves lid load strength. Flush mounted racks enhance sidewall and vertical strength of pit while increasing usable space. Ribbed sidewall design secures body into backfill soil and eliminates sidewall deflection. HDPE bodies provide easy field alteration while eliminating water absorption and material degradation while maintaining structural integrity, and eliminating toxic fiberglass dust. RESUB Jan 12 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BODY SPECIFICATIONS Cover Weight Pit Weight Assembled Weight Drawing shown with (9 Composite Cover PT� BULK 4 Vault Body 36" (914 mm] Depth Shown RESUB Jan 12 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 50 Ibs [23 kg] 82 Ibs [37 kg] 132 Ibs [60 kg]