Building Permit 2020•M MERCIAL
BLDG
PermitCity
-
J[M
• • • •
121 5th Ave N,
EdmondsPERMITNUM
98020BLD2019-0951
ww.edmondswa.gov
Type: COMMERCIAL BLDG
Owner/ Business: EDMONDS CROSSING APARTMENTS
Status: ISSUED
Subtype: NEW APT OR CONDO
BLDG
Parcel No: 00463301000302 Site Address: 23830 EDMONDS
WAY EDMONDS,WA 98026-9028
Applied: 8/1/2019
Subdivision: 004633, SP 635 (11-78)
Lot:
Issued: 2/1/2021
Fire Sprinklers: Yes Lot Area: 15,682
Zoning: RM-1.5
Final:
Valuation: $825,603.04 Occupancy Type: R2
Construction
Type: VB
Expiration Date: 1/27/2022
Code Edition: No. Stories: 3
# of Dwelling
Units: 10
Issued by: NED
Scope of Work: EDMONDS CROSSING: NEW 3 STORY 10 UNIT APT BLDG
WA State Contractor L & I #: LZGCOCL873PP
City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS I
PHONE
EMAIL
APPLICANT HAYNES WILSON LUND 385 101ST AVE SE, BELLEVUE
(425)643-3921
HWLARCH@COMCAST.NET
ARCHITECTS LLC
WA 98004
CONTRACTOR LZG CONSTRUCTION
LLC 2042 S 312TH
ST, FEDERAL WAY
(253)740-3303
LZGCONSTRUCTION@GMAIL.COM
WA 98003
OWNER EDMONDS CROSSING 2603 78TH AVE NE, MEDINA WA
(425)442-7433
kkorovkin@gmail.com
APARTMENTS
98039
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
2020 TRANSPORTATION IMPACT
112.502.345.86.000.00
$31,499.86
$31,499.86
9/9/20
R7468
FEE
B-BUILDING PERMIT FEE
001.000.322.10.000.00
$6,136.00
$6,136.00
9/9/20
R7468
B-STATE BUILDING CODE
001.000.237.150
$25.00
$25.00
9/9/20
R7468
SURCHARGE
ENGINEERING INSPECTION FEE 3.3
001.000.341.82.000.00
$16,651.88
$16,651.88
9/9/20
R7468
PERCENT
ENGINEERING PEER REVIEW
001.000.245.963
$1,267.50
$1,267.50
7/31/20
R6797
ENGINEERING PEER REVIEW
001.000.245.963
$480.00
$480.00
9/9/20
R7468
PARK IMPACT FEE - COM ADMIN
001.000.322.10.000.00
$100.00
$100.00
9/9/20
R7468
PARK IMPACT FEE - MULTI FAMILY
332.100.345.85.000.00
$17,933.50
$17,933.50
9/9/20
R7468
PEER REVIEW FEES
001.000.245.965
$282.50
$282.50
9/9/20
R7468
STORMWATER GENERAL FACILITY
422.000.379.00.000.00
$3,306.26
$3,306.26
9/9/20
R7468
CHARGE MF COMM
TRANSPORTATION IMPACT ADMIN
001.000.341.82.000.00
$100.00
$100.00
9/9/20
R7468
FEE - MF COMM
X-PHOTOCOPIES
001.000.341.81.000.00
$19.80
$19.80
9/9/20
R7468
X-RECORDING FEE
001.000.345.89.030.00
$174.00
$174.00
9/9/20
R7468
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00
$35.00
9/9/20
R7468
TOTALS:
$78,011.30
$78,011.30
CONDITIONS
Printed: Monday, February 01, 2021 12:16:25 PM 1 of 4
• '-
City •Edmonds
98020 1 951
www.edmondswa.gov •
CONDITION TYPE
STATUS
NOTES
48 HRS NOTICE-ENGR FINAL
FOR
48 Hours notice is required when requesting your FINAL engineering inspection.
NFORMATION
Damage to Frontage
Applicant shall repair/replace all damage to utilities or frontage improvements in City
Improvments
right-of-way per City standards that is caused by or occurs during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
ESC REQUIRED
FOR
Maintain erosion & sediment control per city standards.
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
Hold Harmless
officials, employees, and agents from any and all claims for damages of whatever nature,
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSPECTION PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
Occupancy
Official prior to use or occupancy of the building or structure. Check the job card for all
required City inspections including final project approval and final occupancy inspections.
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
and for which a variance has not been specifically identified, requested and considered
by the appropriate city official in accordance with the appropriate provision of city code
or state law does not approve any items not to code specification.
PROJECT ASBUILT
FOR
INFORMATION
REQUIRED SPECIAL
FOR
SPECIAL INSPECTIONS are required for Soils; and for Structural: Concrete, Bolts in
INSPECTIONS
INFORMATION
Concrete, Lateral Wood.
Separate Permit Required For:Fire Sprinkler and Fire Alarm
For final:
Stripe and sign entrance and parking area, standards attached.
Separate Permit Required
Fire extinguishers, Knox box key entry (see attached standard)
FDC placement must have prior approval.
Plumbing, Mechanical, Electrical (L&I), Signage
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Printed: Monday, February 01, 2021 12:16:25 PM 2 of 4
•MMERCIAL BLDG Permit
City of Edmonds PERMIT NU
121 . 98020 1 1'
-. •. •
SPECIAL INSPECTION BUILDING
DIVISION
FOR
INFORMATION
Special inspections have been called for on this project and are noted on the approved
construction plans. It is the owner and or contractors responsibility to ensure that reports
are provided to the City on a weekly basis.
SPECIAL INSPECTIONS
ENGINEERING
FOR
INFORMATION
Special inspections have been called for on this project and are noted on the approved
civil plans. It is the owner and or contractors responsibility to ensure that reports are
provided to the Engineering Division on a weekly basis.
UNDERGROUND UTILITY
LOCATES
FOR
INFORMATION
Call for locates of underground utilities prior to any excavation.
UNDERGROUND WIRING
FOR
INFORMATION
All new extended rebuilt or relocated electrical utility and/or service shall be placed
underground.
INSPECTIONS- -. •https://Inspection.MVBuildingPermit.com
SEQID INSPECTION TYPE INSPECTOR
COMPLETED
DATE
RESULT
NOTES
X-1 PLANNING FINAL
X-3 BUILDING FINAL"
X-1 FIRE FINAL
X-2 ENGINEERING FINAL
F-1 FIRE DEPT INSPECTION
F-2 FIRE DCDA
E-4 WATER SERVICE LINE
E-3 STRM CONVEYANCE
E-3 STRM MGMT FACILITY
B-2 SLAB INSULATION
E-5 DRIVEWAY SLOPE
B-2 RETAINING WALL
B-2 FOOTINGS
B-4 INTERIOR SHEAR
B-5 INSULATION ENERGY
B-4 HEIGHT VERIFICATION
B-4 FRAMING
B-2 FOUNDATION WALL
A-1 ENGINEERING PRECON
E-9 FIRE AND AID SIGN
F-0 FIRE EXTINGUISH EXITS
F-0 FIRE ADDRESS VISIBLE
B-4 DRYWALL FASTENING
E-9 PARKING STRIPING
E-7 SEWER MANHOLE
A-1 BUILDING PRECON
B-1 SETBACKS
Printed: Monday, February 01, 2021 12:16:25 PM 3 of 4
• Permit
City •EdmondsPERMIT-
- NU
•:� i 1 1'
. •.
1.0220
B-3 EXT WALL SHEATHING
B-3 PRE ROCK SHAFTS ETC
B-3 ROOF SHEATHING
B-5 BLDG SPECIAL
INSPECTION
B-5 WSEC COMPLIANCE
REPORTS
B-7 BUILDING OTHER INSP
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-4 RPBA AND HOTBOX
E-5 ENG SPECIAL INSPECTION
E-5 TRASH ENCLOSURE
E-8 BOND RELEASE
E-9 COMPOST AMEND
B-7 BUILDING OTHER INSP
Printed: Monday, February 01, 2021 12:16:25 PM 4 of 4