Loading...
APPROVED ENG Wall Culvert Deferred Submittal PLN2021-0037 Letter of Transmittal Update: February 2, 2023 RAM Job No: 20-024 To: City of Edmonds Public Works Department Engineering Division 121 5th Avenue N. Edmonds, WA 98020 From: Rob Long, PE RAM Engineering 19109 36th Ave W, Suite 100 Lynnwood WA 98036 Subject: Brackett’s Reserve, PLN2021-0037 - Wall Culvert Deferred Submittal, Revision 1 Per the City of Edmonds construction plan approval, the applicant shall provide a deferred submittal for the wall culvert crossing under the proposed plat road cul-de-sac. Attached are the wall construction details for the Lock + Load wall design plans and culvert penetration detail. The proposed culvert design has been shifted north to align the new culvert out of and on the edge of the future public right-of-way. The below sketch provides the adjusted intake and outlet elevations, and new northing and eastings for the two pipe ends. The 18” culvert will be a private pipe and shall be maintained by the Brackett’s Reserve homeowners’ association. The below sketch shows the proposed wall culvert location. Culvert Revision: Red line represents new culvert design location. Attachments: 1. Geotechnical Wall Culvert Recommendation Memo (2 pages) 2. Lock + Load Wall Pipe Penetration Detail (1 page) 3. Lock + Load Wall Design Plan (1 page) 15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 • FAX (425) 449-4711 Earth Solutions NW LLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services November 22, 2022 ES-7610.04 Pacific Ridge – DRH, LLC 17921 Bothell-Everett Highway, Suite 100 Bothell, Washington 98012 Attention: Mr. Jeff Wegener Subject: Storm Pipe Outlet at Lock and Load Wall Bracket’s Reserve 9125 – 240th Street Southwest Edmonds, Washington Reference: Earth Solutions NW, LLC (ESNW) Lock & Load Wall Designs and Notes, revised September 15, 2022 RAM Engineering, Inc. (RAM) Civil Plans, revised May 13, 2022 Dear Mr. Wegener: As requested by RAM, ESNW has prepared this letter with recommendations for the storm pipe outlet at the Lock and Load wall. The storm pipe outlet that will penetrate the Lock and Load wall should incorporate the design notes and details provided by the wall manufacturer, see attached detail sheet. Pacific Ridge – DRH, LLC ES-7610.04 November 22, 2022 Page 2 Earth Solutions NW, LLC We trust this letter meets your current needs. If you have any questions, please call. Sincerely, EARTH SOLUTIONS NW, LLC Henry T. Wright, P.E. Associate Principal Engineer Attachment: LOCK+LOAD Storm Pipe Outlet Detail Sheet cc: Pacific Ridge – DRH, LLC Attention: Ms. Jen Norton (Email only) RAM Engineering, Inc. Attention: Mr. Rob Long, P.E. (Email only) 11/22/2022 EarthSolutionsNWLLCEarth Solutions NWLLCGeotechnical Engineering,ConstructionProj. No.Drwn. ByChecked ByDateDateRevisionsObservation/Testing and Environmental ServicesLock & Load Wall Designs and NotesBRACKET’S RESERVEEdmonds, Washington7610.0302/04/2022MRSHTWFRONTFRONTBACKBACKWall Batter -1H : 10VWall Batter - 1H : 10V