Loading...
ENG2023-0073_Utility_Application_2.6.2023_9.13.52_PM_3354720RECEIVED Feb 07 2023 CITY OF EDMONDS of EDtit DEVELOPMENT SERVICES tin DEPARTMENT SEWER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. �Nc. isao SECTION A Applicant Contact/Applicant Name Phone Number Email Address City_ State ,a zip E // Property hiforniation Project Name ",,,,,, e�� & S ) c e, Associated Permit Number '4—C' L•- C", ' S+' Address city f l,'1111)s State a Zip $�7 Parcel No. r_->G, 3.71 iv0 !pC% 7 CC) Does the property currently have sewer service? pYes (City of Edmonds sewer) O No Describe project (number of buildings, number of units, number of stories per building): toll S. ••5/t Ak' Z yy S%��- St':„ems 1 �� <^s� r��-- IOC'`K` `✓., SJ�af Cct P"q—zl . In what phase is the project? I ❑ Design Review �! Building Permit ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: SECTION B P Applicant certifies that this project is a single-family residence, multi -family project of four units or less, or short plat subdivision (four single-family lots or less), in which case completion of a full utility availability study shall not be required. Please sign below and submit this form through www.MyBuildingPermit.com. ❑ For all other permit types, a utility availability study is required and associated fees will be due. Please submit the complete application through www.VftBuildingPermit.com01/ 11 Z APPLICANT SIGNATURE: DATE: 5 ^� 2 APPLICANT PRINTED NAME:_ Form Updated 12/9/2021