Loading...
ENG2023-0074_Utility_Application_2.6.2023_9.16.51_PM_3354729RECEIVED Feb 07 2023 CITY OF EDMONDS pF EPA10yJ DEVELOPMENTDEPARTMENT RVICES WATER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. /Nc. I Sao SECTION A Applicant Contact/Applicant Name Phone Number Z b - `f09_ Email Address 5 7— city State zip IrR2, Propeity Information Project Name G . n , �� S2 c, . 6 -1ce— Associated Permit Number i-'> G: Address City Lf d t ^ �S State A � •) � Zip q $o e'- i/ Parcel No. Z)D 3 i t °I a c, 10 0 7 OCR Does the property currently have water service? ❑ Yes (City of Edmonds water) p No Describe project (number of buildings, number of units, number of stories per building): In what phase is the project? ❑ Design Review 4 Building Permit ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: SECTION B ,® Applicant certifies that this project is a single-family residence, multi -family project of four units or less with combo water/fire lines, or short plat subdivision (four single-family lots or less), in which case completion of a full utility availability study shall not be required. Please sign below and submit this form through www.MyBuildingPermit.com. ❑ For all other permit types, a utility availability study is required and associated fees will be due. Please submit the complete application through www.M uildin Permit.com. "3 / - Z -2— APPLICANT SIGNATURE: DATE: APPLICANT PRINTED NAME: ti <: Z t� , J7,'�n.� Form Updated 12/9/2021