DNS-RESUB 1-old plan setNew retractable awnings and screens at 505 5th Ave S, Edmonds
City of Edmonds Building Department i
APPDA
-AVVED PL
t
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
All changes in plans and field
modifications shall be approve by
the local jurisdiction. The esign
professional sliall prepare drawi gs as
required for approval.
IBC 107.4
Awnings will project over
decks of the 3rd floor unit
Walnut St
--------- -PrDpertyline
I
I
I
I
The Gregory
I
505 5th Ave S
Edmonds, WA 98020
I
I
I
I
Nothing in this permit approval
process shall be interpreted as
I allowing or permitting tile
I maintenance of any currently existing
I illegal, nonconforming, or
unpermitted building, structure, or
I site condition which is outside the
I scope of the permit application,
I regardless of whether such building,
structure, or condition is shown on
the site plan or drawing. Such
building, structure, or condition may
be the subject of a separate
enforcement action.
Awnings stop at edge of decks and
will not encroach over city property
Holly Dr
APPROVED
FIRE DEPART ENT
—�PAao �1
We propose to install 2 motorized retractable awnings
and 8 motorized retractable vertical screens at The
Gregory Condominiums.
The awnings will project over the decks of unit #305.
The 8 screens will be mounted to the outsides of the
windows of units 206, 208, 209, 306, and 308.
Applicant shall repair/replace all damage to
utilities or frontage Improvements � that is caused
right-of-way perCity
or occurs during the permitted project.
CITY OF
BUILDING
WORK
ADDREE
OWNER
APPROVED DATE:
BLDG. OFFICIAL:
EDMONDS
DEPARTMENT
7-g Esc/ee,%5,
-J,y 11
PERMIT Nl K"W'F")'E
OWNER/CONTRACTOR IS RESPONSIBLE
FOR EROSION CONTROL AND DRAINAGE
Travis Dever
Northwest Awning & Fabric
206-285-2941
travis@northwestawning.com
�y t 6 l 7 BY ENGINEERING
D*: `fig /►-1
* .J 0 tiew '"re"WAS aw PACES .
CEIVED
DEC 2 2 2016
DEVELOPMENT S
'WMER
( 0'l�'l
Awning attachment detail
3/8"x 5"stainless
steel lag screws
Mounting bracket
max projection 6' 11 "
Awning at 19'6"wide will have 5 mounting brackets,
Each with two 5"stainless lag screws through fascia board
into wood framing
Awning at 11'4"wide will have 3 mounting brackets,
Each with two 5" stainless lag screws through fascia board
into wood framing
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
All framework is brown powder coated aluminum
Fabric is True Brown Sunbrella
Fabric has been treated to meet
Class A/astm E84 flame retardancy
RECEIVED
DEC 2 2 2016
DEVELOPMENT SERVICES,
Q
w
c.�
w6LM
cn w
z Z
w a
20
a C.D
0
w
w
Q