APPROVED BLD-BLD2022-0856+Architectural_Plan+6.30.2022_12.57.05_PM+2964558R-E SIDENTIAL - UNIT 105
Existing: Scale 1/4"= 1' r
WHERE ADDITIONS, REPAIRS OR ALTERATIONS
REQUIRE A PERMIT TO BE ISSUED
INTERCONNECTED SMOKE ALRAM AND CO I
DETECTORS THROUGHOUT THE DWELLING IS
REQUIRED. REFER TO 2018 IRC R314 AND 315 FOR I
MORE INFORMATION
'----------------------I
24, ,k. R I 541
�i
1
1
Description of existing space:
L iviing Doom
' 5H'I i FF h },
-Flood cuts up 24" throughout the unit
from sewer backup
-All flooring removed aside from tile
bathrooms
-Kitchen cabinets and bathroom vanities
removed
-Toilets removed
-Appliances removed
-Doors and trim removed
City Ot Edmonds
Building Department
Work
------------------
SEWER DAMAGE REPAIR
Address
505- 5TH AVE S UNIT 105
---------------------------------------
Owner ;
MARCEAU
Approved Date
07/21/2022
Building Official: Official ;
/Lei,4 &Ioaw� a
Permit Number
------ ----
.
�4'
T
r U' 2F U
r i' ' eq
1
1441
51 4"
Entry Toyer
' Laundry Room
71 W1
1
1---7' 10" 4'
OBTAIN ELECTRICAL
PERMIT FROM
STATE LABOR &
INDUSTRIES
4'1
APPROVED
PLANS MUST BE
ON JOB SITE
Bedroom 2
I I'
T
�I
F M T 6Ih—
4
Bathmw
Existing tile
' 101,E
Hal [way
11 � Ih�il
Master Bum
F a1 11 71 1 M
`4 6 910
balk-i.n C I t
213'r -P-4' 6-
�-F 1 i it �1 '-F
h �1 �I
Ld
�4 T r
10
1 1u 2 71 r
Office Existing tile =
1 11Iaster Bath
5�5
Ea qI, 9
fly 7il
9 11"
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
r- — - — - — - — - — - — - — - — - — -
I SEPARATE PLUMBING PERMIT ,
REQUIRED FOR THIS PROJECT.
RECEIVED
Jul 01 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
8
M
UNIT 105
RESIDENTIAL TIAL - UNIT 105
Proposed: Scale 1/4"= 1'
44' 6- 17 4" 11, 1 11h
ri
+A
L ivi n4p R&oni
New floors
SF 3" 11 ` 2i'
111 1 5"
Description of proposed:
-Drywall and paint affected walls
corner to corner
-New cabinetry and countertops
to be installed exactly where
they were previously, as shown
on floorplan
-New backsplash to be installed in
the kitchen and in the bathrooms
-Appliances to stay in same locations
-New flooring to be installed throughout
the unit with the exception of the
bathrooms
-New doors and trim to be installed
throughout the unit
-New toilets, sinks, and faucets to be
installed in the kitchen and the bathrooms
-Separate plumbing permit will be submitted
14' 7„
New floors
T
4-40
&'L� I "
1 JI 4`1 �.t_ 51 4
" 41
New floors, New floors
Entrff over
Laundry Doom
4
1---71 10^ 1 24'---- 4
�a —
� New floors
Bath
Existing tie
1-.— 5' 1 Ili' ---I ,
Hallway
1i 1F i1 New floors �-30 2"
i �1 Ih
' 4 �Ld �
[Master Bedrc�onn
New floors
F �141 f1 IN
`4 r6 9"
Walk --In C Iowt
New floors
11 10
a1 1 (31 1
— 2� v ,
New floors Ir
70 1r 'Si 1r
P
off , Existing tile
ILI
liaster Bath
1"41"t I _r
De —
Illy 7"
1` 1" 2' V 11"
***Will need to remove and reinstall water heater in order to install floors
RECEIVED
Jul 01 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
UNIT 105