DNS GREGORY105_REPAIR- cost breakdownmcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Client: The Gregory
Property: 505 5th Ave S
Edmonds, WA 98020
Operator: DEB
Estimator:
Deb Hardy
Position:
Project Manager
Company:
Mcleod Construction
Business:
1115 N 140th St
Seattle, WA 98133
Reference: Barbara Hartley
Position: HOA Manager
Company: Real Property Associates
Business: 7500 Roosevelt Way
Seattle, WA 98115
Type of Estimate: Sewage
Date Entered: 1/4/2022
Price List:
WAEVBX MAY22
Labor Efficiency:
Restoration/Service/Remodel
Estimate:
GREGORY105_REPAIR
File Number:
DH22009
Date Assigned:
Business: (206) 545-7837
E-mail: deb@mcleodconstruction.
com
Business: (206) 523-0300
E-mail: bhartley@rpapm.com
The following is not a contract but a general overview of Mcleod Construction LLC policies. Please see accompanying formal
contract for your signature.
This estimate is presented utilizing the Xactimate estimating software customized to reflect the specific scope of work presented
in this loss.
The work descriptions in this estimate are maintained by Xactanalysis, using a customized pricing database accepted by most
insurance carriers, and may not precisely describe the actual work to be completed. It is intended to be used to arrive at the
nearest approximate cost of repairs. To satisfy the needs of the insurance industry, this estimate is written to provide a specific
scope of work at a package price. Line items include a description of the work to be done, the unit of measure and quantity
needed.
The May 2022 price list for the Everett WA market was used for some or all of the unit costs. The estimator also may have relied
on the use of written or verbal quotes from subcontract labor or suppliers who were deemed capable of completing their
respective scopes of work.
Quantities in this estimate are for estimating purposes only and are not guaranteed to be accurate. In some cases, quantities are
factored for waste, pattern matching and other circumstances.
Costs which are unknown at this time remain "OPEN." Prior to the commencement of work, it may not be possible to tell if some
items will be restorable or if there is concealed damage. Mechanical trade bids (i.e. plumbing, electrical, heating and cooling) are
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
often not possible to bid in a timely manner due to a delay in receiving proposals from qualified subcontractors. "OPEN' items
and additional costs addressing concealed damage, code upgrades or other necessary work related to the restoration of the
damaged property will be presented upon discovery and added to the contract amount.
Although every effort has been made to ensure accuracy, this estimate is subject to change. We reserve the right to submit
supplements due to: Code upgrades, newly discovered damages, inability to match material (i.e. flooring, paint, cabinets, etc).
All supplements will be submitted in writing and will include pictures and explanations.
NO supplemental work will begin until the work has been approved in writing (Email or fax) by the adjuster in charge or the
financially responsible party.
Unless specifically accounted for in this estimate, content manipulation is the sole responsibility of the home owner/occupant.
Mcleod Construction can remove/reset contents at our standard rate of $80.00 per hour. This cost will be approved by and billed
to the home owner.
Deborah Hardy
Project Manager
Insurance Division
206-545-7837
GREGORY105_REPAIR 5/16/2022 Page:2
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
GREGORY105_REPAIR
RESIDENTIAL
UNIT 105
UNIT 105
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
1. CLN FINALR + Final cleaning - construction - Residential
F 1245.71 SF 0.00+ 0.40 = 65.40 124.57 688.25
2. DMO LAB - General Demolition - per hour
4 4.00 HR [N] 66.00+ 0.00 = 27.72 0.00 291.72
Labor to convey demolition debris to dump vehicle: cabinetry, millwork & doors
2 technicians x 2 hours @ Mcleod Construction T&M rate of $80/hr
No OHP added
3. DMO DTRLR - Tandem axle dump trailer - per load - including dump fees
1 1.00 EA 326.70+ 0.00 = 42.88 81.68 451.26
Total: UNIT 105
k;(51.-
Entry/Foyer
s a-4
218.95 SF Walls
Entry/Foyer
258.72 SF Walls & Ceiling
Room
in=
4
1
4.42 SY Flooring
I I"I
23.25 LF Ceil. Perimeter
Missing Wall
3' 11 13/16" X 12'
Door
3' X 6' 8"
Door
3' X 6' 8"
Ditry/Fo �--� d-j_ _ n,.
T t
00 4
3' 81' N
1
41211
211
Door
CAT SEL
CALC
136.00 206.25 1,431.23
Height: 12'
39.77 SF Ceiling
39.77 SF Floor
14.25 LF Floor Perimeter
Opens into HALLWAY
Opens into LAUNDRY -ROOM
Opens into Exterior
Height: 12'
108.00 SF Walls 6.11 SF Ceiling
114.11 SF Walls & Ceiling 6.11 SF Floor
0.68 SY Flooring 7.67 LF Floor Perimeter
10.67 LF Ceil. Perimeter
3' X 6' 8" Opens into ENTRY -FOYER
ACT DESCRIPTION
QTY RESET REMOVE REPLACE TAX O&P TOTAL
5/16/2022 Page:3
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Entry/Foyer
CAT
SEL
CALC
ACT DESCRIPTION
QTY RESET REMOVE REPLACE
TAX
O&P
TOTAL
4. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
44
44.00 SF 0.00+
2.98 =
17.21
32.78
181.11
5. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
22
22.00 LF 0.00+
11.66 =
33.66
64.13
354.31
6. DRY
TEX
+ Texture drywall - light hand texture
88
88.00 SF 0.00+
1.14 =
13.16
25.08
138.56
Blend texture to match existing
as closely as possible
7. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
88
88.00 SF 0.00+
0.97 =
11.20
21.34
117.90
8. PNT
P
+ Paint the walls - one coat
W
326.95 SF 0.00+
0.68 =
29.18
55.58
307.09
9. PNT
OP
+ Paint door or window opening - 2 coats (per side)
3
3.00 EA 0.00+
32.29 =
12.71
24.22
133.80
10. FNC
DOP
+ Door opening (jamb & casing) - 32"to36"wide - paint grade
1
1.00 EA 0.00+
177.98 =
23.36
44.50
245.84
Closet
11. DOR
BFPNL<
+ Bifold door - solid fir 4 or 6 panel - Single
1
1.00 EA 0.00+
309.84 =
40.66
77.46
427.96
12. FNH
BFTPRS
I Install Bifold pivot door hardware - Reset
1
1.00 EA 0.00+
13.86 =
1.83
3.47
19.16
13. FNH
DORDHRS
+ Door dummy knob - Detach & reset
1
1.00 EA 0.00+
10.39 =
1.36
2.60
14.35
14. PNT
DORSP
+ Seal & paint door slab only (per side)
1
1.00 EA 0.00+
45.24 =
5.94
11.31
62.49
Laundry
15. PNT
DORI
+ Paint door slab only - 1 coat (per side)
1
1.00 EA 0.00+
25.50 =
3.35
6.38
35.23
Entry
16. PNT
BF<
+ Paint single bifold door - slab only - 2 coats (per side)
2
2.00 EA 0.00+
31.28 =
8.21
15.64
86.41
Closet
17. ELE
OSCOV
+ Outlet or switch cover
1
1.00 EA 0.00+
3.80 =
0.50
0.95
5.25
18. FCW
US»
+ Underlayment - sound/crack membrane - 70+ to 90 mil
MAINT
39.77 SF 0.00+
2.76 =
14.41
27.45
151.63
Durason 3.5mm (140mil)
19. FCW
LAMTF+
+ Engineered wood flooring - floating - High grade
MAINT
39.77 SF [*] 0.00+
13.76 =
71.83
136.81
755.88
Material component pricing established by Itel lab analysis and is subject to local market conditions
GREGORY105_REPAIR
5/16/2022
Page:4
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Entry/Foyer
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
20. FCW LAME
+ End molding - for wood flooring
3,8
3.67 LF
0.00+
6.72 =
3.24
6.17
34.07
Closetthreshold
21. FCC PAD
+ Carpet pad
CLOSETT
6.11 SF
0.00+
0.68 =
0.55
1.04
5.74
Material specification established by Itel lab analysis = 7/16" 61b rebond
22. FCC AV
+ Carpet
(CLOSET.F)*1.15
7.03 SF [*]
0.00+
4.06 =
3.75
7.13
39.42
Material component pricing established by Itel lab analysis and is subject to local
market conditions
15 % waste added for Carpet.
23. FNC B3M
+ Baseboard - 3 1/4" MDF - flat profile
PF
21.91 LF
0.00+
3.59 =
10.33
19.67
108.66
24. PNT B2
+ Paint baseboard - two coats
PF
21.91 LF
0.00+
1.48 =
4.26
8.10
44.79
25. FNC CLOSWRS
+ Shelving - wire (vinyl coated) - Detach & reset
CLOSET.LL
3.67 LF
0.00+
11.28 =
5.44
10.35
57.19
Totals: Entry/Foyer
Laundry Room
T 7' 4,
304.50 SF Walls 45.38 SF Ceiling
Laundry Room 349.88 SF Walls & Ceiling 45.38 SF Floor
5.04 SY Flooring 24.04 LF Floor Perimeter
1 7� 4" 27.04 LF Ceil. Perimeter
1---7' 10"�
Door 3' X 6' 8" Opens into ENTRY -FOYER
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL
26. INS BTLF4 + Batt insulation replacement per LF - 4" - up to 2' tall
6 6.00 LF 0.00+ 2.76 = 2.18 4.14 22.88
27. DRY 5/81-1 + 5/8" drywall - hung only (no tape or finish)
15 15.00 SF 0.00+ 2.05 = 4.04 7.69 42.48
Double layer drywall on exterior wall
GREGORY105_REPAIR 5/16/2022 Page:5
316.14 602.16 3,326.84
Height: 12'
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Laundry Room
CAT
SEL
CALC
ACT DESCRIPTION
QTY RESET REMOVE REPLACE
TAX
O&P
TOTAL
28. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
77
77.00 SF 0.00+
2.98 =
30.11
57.37
316.94
29. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
28
28.00 LF 0.00+
11.66 =
42.85
81.62
450.95
30. DRY
TEX
+ Texture drywall - light hand texture
96
96.00 SF 0.00+
1.14 =
14.36
27.36
151.16
Blend texture to match existing
as closely as possible
31. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
96
96.00 SF 0.00+
0.97 =
12.23
23.28
128.63
32. PNT
P
+ Paint the walls - one coat
W
304.50 SF 0.00+
0.68 =
27.18
51.77
286.01
33. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+
401.64 =
52.71
100.41
554.76
34. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+
32.29 =
4.24
8.07
44.60
35. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 =
5.05
9.63
53.18
36. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+
29.70 =
3.90
7.43
41.03
37. ELE
OSCOV
+ Outlet or switch cover
1
1.00 EA 0.00+
3.80 =
0.50
0.95
5.25
38. FNC
B3M
+ Baseboard - 3 1/4" MDF - flat profile
PF
24.04 LF 0.00+
3.59 =
11.33
21.58
119.21
39. PNT
B2
+ Paint baseboard - two coats
PF
24.04 LF 0.00+
1.48 =
4.68
8.90
49.16
40. FCV
PREP
+ Floor preparation for resilient flooring
F
45.38 SF 0.00+
0.62 =
3.69
7.03
38.86
41. FCV
AV
+ Vinyl floor covering (sheet goods)
FLR_RPL
77.25 SF 0.00+
3.32 =
33.66
64.12
354.25
42. FCW
LAME
+ End molding - for wood flooring
3
3.00 LF 0.00+
6.72 =
2.65
5.04
27.85
43. PLM
WMHS
+ Washing machine hose line - stainless steel (per pair)
1
1.00 EA 0.00+
55.64 =
7.30
13.91
76.85
44. APP
WSHR
+ Washer/Washing machine - Reset
1
1.00 EA 0.00+
32.03 =
4.20
8.00
44.23
45. APP
DRYER
+ Dryer - Electric - Reset
1
1.00 EA 0.00+
24.69 =
3.24
6.17
34.10
46. INS
RBD2
+ Rigid foam insulation board - 2"
4
4.00 SF 0.00+
1.74 =
0.91
1.74
9.61
GREGORY105_REPAIR
5/16/2022
Page:6
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Laundry Room
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE
REPLACE TAX O&P
TOTAL
Foam cushion under overflow drain pan
47. PLM WHPAN I Install
Water heater overflow drain pan
1 1.00 EA
0.00+
39.83 = 5.23 9.95
55.01
48. PLM WHR + Water heater - Reset
1 1.00 EA
0.00+
543.14 = 71.29 135.78
750.21
49. PLM WHSS I Install Water heater seismic strap kit - up to 55
gallon
1 1.00 EA
0.00+
57.15 = 7.50 14.29
7894
Totals: Laundry Room
355.03 676.23
3,736.15
Hallway
Height: 12'
�4' �"
6"
264.72 SF Walls
113.47 SF Ceiling
I thr
1 4"
378.19 SF Walls & Ceiling
113.47 SF Floor
Hallway ?
12.61 SY Flooring
22.61 LF Floor Perimeter
a 9" tz v 1
25.54 LF Ceil. Perimeter
5� 4"
4
Missing Wall - Goes to Ceiling
1' 9" X 9'
Opens into ROOM2
Missing Wall - Goes to Ceiling
1' 6 13/16" X 9'
Opens into ROOM2
Missing Wall
3' 11 13/16" X 12'
Opens into ENTRY —FOYER
Missing Wall
5' 4 1/8" X 12'
Opens into KITCHEN
Missing Wall
1' 6 1/16" X 12'
Opens into KITCHEN
Missing Wall
1' 5 5/8" X 12'
Opens into LIVING ROOM
Missing Wall
4' 7 3/16" X 12'
Opens into LIVING ROOM
Door
3' X 6' 8"
Opens into BEDROOM-2
Door
3' X 6' 8"
Opens into BATHROOM
Door
3' X 6' 8"
Opens into HALL
Missing Wall - Goes to Ceiling
2' 9" X 9'
Opens into OFFICE
Missing Wall
5' 4" X 12'
Opens into AREA
CAT SEL ACT DESCRIPTION
CALC QTY
RESET REMOVE
REPLACE TAX O&P
TOTAL
GREGORY105_REPAIR 5/16/2022 Page:7
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Hallway
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
50. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
46
46.00 SF 0.00+
2.98 =
17.99
34.27
189.34
51. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
23
23.00 LF 0.00+
11.66 =
35.20
67.05
370.43
52. DRY
TEX
+ Texture drywall - light hand texture
92
92.00 SF 0.00+
1.14 =
13.76
26.22
144.86
53. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
92
92.00 SF 0.00+
0.97 =
11.71
22.31
123.26
54. PNT
P
+ Paint the walls - one coat
W
264.72 SF 0.00+
0.68 =
23.63
45.00
248.64
55. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
PF
22.61 LF 0.00+
3.74 =
11.10
21.14
116.80
56. PNT
B2
+ Paint baseboard - two coats
PF
22.61 LF 0.00+
1.48 =
4.39
8.37
46.22
57. FCC
PAD
+ Carpet pad
F
113.47 SF 0.00+
0.68 =
10.13
19.29
106.58
Material specification established by Itel lab analysis = 7/16" 61b rebond
58. FCC
AV
+ Carpet
FLR_RPL
170.08 SF [*] 0.00+
4.09 =
91.30
173.90
960.83
Material component pricing established
by Itel lab analysis and is subject to local market conditions
59. FCC
AVB
+ Additional labor cost for Berber or patterned carpets
(F)*1.15
130.49 SF 0.00+
0.25 =
4.29
8.15
45.06
15 % waste added for Additional labor cost for Berber or patterned carpets.
60. ELE
OSCOV
+ Outlet or switch cover
2
2.00 EA 0.00+
3.80 =
1.00
1.90
10.50
Totals: Hallway
224.50 427.60 2,362.52
GREGORY105_REPAIR 5/16/2022 Page:8
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Kitchen Height: 12'
Missing Wall - Goes to Ceiling
Missing Wall
Missing Wall
CAT SEL
CALC
335.18 SF Walls 108.40 SF Ceiling
443.58 SF Walls & Ceiling 108.40 SF Floor
12.04 SY Flooring 35.27 LF Floor Perimeter
24.27 LF Ceil. Perimeter
11' X 8' Opens into LIVING ROOM
1' 6 1/16" X 12' Opens into HALLWAY
5' 4 1/8" X 12' Opens into HALLWAY
ACT DESCRIPTION
QTY RESET REMOVE REPLACE TAX O&P TOTAL
61. INS BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
9
9.00 LF 0.00+
2.76 =
62. DRY 5/8H
+ 5/8" drywall - hung only (no tape or finish)
9
9.00 SF 0.00+
2.05 =
Double layer drywall on demising
wall
63. DRY 5/8-
+ 5/8" drywall - hung, taped, ready for texture
70
70.00 SF 0.00+
2.98 =
64. DRY PATCHJ
+ Tape joint for new to existing drywall - per LF
35
35.00 LF 0.00+
11.66 =
65. DRY TEX
+ Texture drywall - light hand texture
106
106.00 SF 0.00+
1.14 =
66. PNT SP
+ Seal/prime then paint the surface area (2 coats)
106
106.00 SF 0.00+
0.97 =
67. PNT P
+ Paint the surface area - one coat
165
165.00 SF 0.00+
0.68 =
68. CAB CTDK
+ Countertop subdeck - plywood
52
52.00 SF 0.00+
5.22 =
69. TIL CTTL+
+ Countertop - Tile - High grade
52
52.00 SF [*] 0.00+
48.41 =
3/8" [1 cm] granite tile: includes tile, counter trim (edge treatment), grout, thinset
Material component pricing is subject to Itel analysis and local market conditions
70. FCW US»
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
108.40 SF 0.00+
2.76 =
Durason 3.5mm (140mil)
Material component pricing is subject to Itel analysis and local market conditions
71. FCW LAMTF+
+ Engineered wood flooring - floating - High grade
F
108.40 SF [*] 0.00+
13.76 =
Material component pricing established by Itel lab analysis and is subject to local market conditions
72. FCW LAME
+ End molding - for wood flooring
5,4
5.33 LF 0.00+
6.72 =
Closetthreshold
GREGORY 105_REPAIR
3.26
6.21
34.31
2.43
4.62
25.50
27.38
52.15
288.13
53.56
102.03
563.69
15.86
30.21
166.91
13.50
25.70
142.02
14.73
28.05
154.98
35.63
67.86
374.93
330.40
629.33
3,477.05
39.26 74.80 413.24
195.78 372.90 2,060.26
4.70 8.95 49.47
5/16/2022 Page:9
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Kitchen
CAT
SEL
CALC
ACT DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX
O&P
TOTAL
73. APP
RFRS
+ Refrigerator - Remove & reset
1
1.00 EA 0.00+
65.82 =
8.64
16.45
90.91
74. APP
MWSRS
+ Microwave oven - over range type - Detach & reset
1
1.00 EA 0.00+
159.07 =
20.88
39.77
219.72
75. PLM
SNKDRS
I Sink - double basin - Reset
1
1.00 EA 0.00+
234.30 =
30.75
58.58
323.63
76. APP
GDRS
I Garbage disposer - Reset
1
1.00 EA 0.00+
234.93 =
30.84
58.73
324.50
77. APP
RGGRS
I Range - gas - Reset
1
1.00 EA 0.00+
234.93 =
30.84
58.73
324.50
78. APP
DWRS
I Dishwasher - Reset
1
1.00 EA 0.00+
342.73 =
44.99
85.68
473.40
79. TIL
AV+
& R&R Ceramic/porcelain tile - High grade
48
48.00 SF [*] 2.61+
29.98 =
205.32
391.08
2,160.72
80. TIL
AVB+
& R&R Ceramic tile - bullnose - 3/4" x 6" - High grade
22
22.00 LF 3.07+
14.35 =
50.30
95.81
529.35
81. TIL
CTTLB
+ Add -on for tile backsplash installation
48
48.00 SF 0.00+
24.09 =
151.76
289.08
1,597.16
82. TIL
DIAGADD
+ Add -on for diagonal tile installation
48
48.00 SF 0.00+
2.41 =
15.19
28.92
159.79
83. CAB
UP
- Remove Cabinetry - upper (wall) units
21
21.00 LF 10.93+
0.00 =
30.13
57.38
317.04
84. CAB
BIDITM
+ Cabinetry (Bid Item)
1
1.00 EA [*] 0.00+
22,745.28 =
2,985.31
5,686.32
31,416.91
MATERIAL
ONLY: Home Depot pricing to replace cabinets with like kind & quality. Quote includes
all cabinets,
fillers, crown,
appearance
panels, under -cabinet
lighting, and hardware.
85. LIT
PUCK
I Install Puck light - shallow
4
4.00 EA 0.00+
88.44 =
46.43
88.44
488.63
86. CAB
LOW
I Install Cabinetry - lower (base) units
22
22.00 LF 0.00+
48.02 =
138.66
264.11
1,459.21
87. CAB
KNPL+
I Install Cabinet knob or pull - High grade
43
43.00 EA 0.00+
6.10 =
34.43
65.58
362.31
88. CAB
UP
I Install Cabinetry - upper (wall) units
21
21.00 LF 0.00+
48.02 =
132.35
252.10
1,392.87
Totals: Kitchen
4,693.31
8,939.57
49,391.14
GREGORY105_REPAIR 5/16/2022 Page:10
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
r� ri
Living Room
1---8' 11 17' 3"4
13'1 �-6'---4 13'-C'
," 1
8' 7°+1-17' 1"
slim �3
7Y rl -
14' 7"
Missing Wall - Goes to Ceiling
Missing Wall
Missing Wall
Door
CAT SEL
CALC
735.48 SF Walls
1066.50 SF Walls & Ceiling
36.78 SY Flooring
61.57 LF Ceil. Perimeter
Height: 12'
331.02 SF Ceiling
331.02 SF Floor
66.73 LF Floor Perimeter
11' 2" X 8'
Opens into KITCHEN
1' 5 5/8" X 12'
Opens into HALLWAY
4' 7 3/16" X 12'
Opens into HALLWAY
6' X 8'
Opens into Exterior
ACT DESCRIPTION
QTY RESET REMOVE REPLACE TAX
89. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
27
27.00 LF 0.00+
2.76 =
90. DRY
5/8H
+ 5/8" drywall - hung only (no tape or finish)
18
18.00 SF 0.00+
2.05 =
Double layer drywall on demising wall
91. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
156
156.00 SF 0.00+
2.98 =
92. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
67
67.00 LF 0.00+
11.66 =
93. DRY
TEX
+ Texture drywall - light hand texture
206
206.00 SF 0.00+
1.14 =
94. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
206
206.00 SF 0.00+
0.97 =
95. PNT
P
+ Paint the walls - one coat
W
735.48 SF 0.00+
0.68 =
96. TIL
MBL
+ Marble or Granite tile
18
18.00 SF 0.00+
30.44 =
Fireplace face & hearth
Material component pricing established
by Itel lab analysis and is subject to local market conditions
97. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
63
63.00 LF 0.00+
3.74 =
98. PNT
B2
+ Paint baseboard - two coats
63
63.00 LF 0.00+
1.48 =
99. FCC
PAD
+ Carpet pad
F
331.02 SF 0.00+
0.68 =
Material specification established by Itel lab analysis = 7/16" 61b rebond
100. FCC
AV
+ Carpet
FLR_RPL
391.50 SF [*] 0.00+
4.09 =
101. FCC
AVB
+ Additional labor cost for Berber or patterned carpets
(F)*1.15
380.67 SF 0.00+
0.25 =
GREGORY 105_REPAIR
O&P TOTAL
9.78
18.63
102.93
4.84
9.23
50.97
61.01
116.22
642.11
102.54
195.30
1,079.06
30.83
58.71
324.38
26.23
49.95
276.00
65.64
125.03
690.80
71.91
136.98
756.81
30.93
58.90
325.45
12.24
23.31
128.79
29.54
56.27
310.90
210.16
400.31
2,211.71
12.49
23.80
131.46
5/16/2022
Page: II
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Living Room
CAT
SEL
CALC
ACT DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX
O&P
TOTAL
15 % waste added for Additional labor cost for Berber or patterned carpets.
102. HVC
DVENTHD
R Detach & Reset Air exchange vent cover
2
2.00 EA 54.99 0.00+
0.00 =
14.44
27.50
151.92
103. ELE
TVCAB
I Install Television cable outlet
1
1.00 EA 0.00+
68.88 =
9.04
17.22
95.14
104. ELE
OSCOV
+ Outlet or switch cover
5
5.00 EA 0.00+
3.80 =
2.50
4.75
26.25
105. HVC
REGRS
I Install Heat/AC register - Mechanically attached - Reset
1
1.00 EA 0.00+
25.27 =
3.31
6.32
34.90
Totals: Living Room
697.43
1,328.43
7,339.58
Master Bedroom
536.19 SF Walls
685.54 SF Walls & Ceiling
16.59 SY Flooring
44.68 LF Ceil. Perimeter
Subroom: Linens (2)
29 108.29 SF Walls
114.49 SF Walls & Ceiling
1 0.69 SY Flooring
10.14 LF Ceil. Perimeter
�2' 7"
_f::7
Door 2' X 61811
GREGORY 105_REPAIR
Height: 12'
149.35 SF Ceiling
149.35 SF Floor
44.68 LF Floor Perimeter
Height: 12'
6.20 SF Ceiling
6.20 SF Floor
8.14 LF Floor Perimeter
Opens into HALL
5/16/2022 Page: 12
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
a a^ Subroom: Hall (1)
•° 1 i
alk-i 268.86 SF Walls
? T o 321.04 SF Walls & Ceiling
1 1 5.80 SY Flooring
aY-4 i 28.52 LF Ceil. Perimeter
4„
Maser I
Height: 12'
52.19 SF Ceiling
52.19 SF Floor
17.52 LF Floor Perimeter
Door
Y X 6' 8"
Opens into HALLWAY
Missing Wall
4' 4 3/16" X 12'
Opens into MASTER BDRM
Door
3' X 6' 8"
Opens into WALKIN_CLOS
Door
2' X 6' 8"
Opens into LINENS
Door
3' X 6' 8"
Opens into MBTH
CAT SEL
ACT DESCRIPTION
CALC
QTY RESET REMOVE
REPLACE TAX
O&P
TOTAL
106. DRY 5/8-
+ 5/8" drywall - hung, taped, ready for texture
52
52.00 SF 0.00+
2.98 = 20.34
38.74
214.04
107. DRY PATCHJ
+ Tape joint for new to existing drywall - per LF
28
28.00 LF 0.00+
11.66 = 42.85
81.62
450.95
108. DRY TEX
+ Texture drywall - light hand texture
108
108.00 SF 0.00+
1.14 = 16.16
30.78
170.06
Blend texture to match existing
as closely as possible
109. PNT SP
+ Seal/prime then paint the surface area (2 coats)
92
92.00 SF 0.00+
0.97 = 11.71
22.31
123.26
110. PNT P
+ Paint the walls - one coat
W
913.33 SF 0.00+
0.68 = 81.51
155.27
857.84
111. FNC B3M+
+ Baseboard - 3 1/4" MDF w/profile
PF
70.33 LF 0.00+
3.74 = 34.53
65.75
363.31
112. PNT B2
+ Paint baseboard - two coats
PF
70.33 LF 0.00+
1.48 = 13.66
26.02
143.77
113. FCC PAD
+ Carpet pad
F
207.74 SF 0.00+
0.68 = 18.54
35.32
195.12
Material specification established
by Itel lab analysis = 7/16" 61b rebond
114. FCC AV
+ Carpet
FLR_RPL
273.17 SF [*] 0.00+
4.09 = 146.64
279.32
1,543.23
Material component pricing is
subject to Itel analysis and local market conditions
115. FCC AVB
+ Additional labor cost for Berber or patterned carpets
(F)* 1.15
238.90 SF 0.00+
0.25 = 7.84
14.93
82.50
15 % waste added for Additional labor cost for Berber or patterned carpets.
116. DOR PNL
+ Interior door - solid fir door w/paint-grade jamb
& case
1
1.00 EA 0.00+
401.64 = 52.71
100.41
554.76
117. PNT DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 = 5.05
9.63
53.18
GREGORY105_REPAIR 5/16/2022 Page:13
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Master Bedroom
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
118. FNH DORHRS + Door knob/lockset - Detach & reset
1 1.00 EA 0.00+ 29.70 = 3.90 7.43 41.03
119. FNC DOP + Door opening (jamb & casing) - 32"to36"wide - paint grade
1 1.00 EA 0.00+ 177.98 = 23.36 44.50 245.84
Linen Closet
120. DOR BFPNL< + Bifold door - solid fir 4 or 6 panel - Single
1 1.00 EA 0.00+ 309.84 = 40.66 77.46 427.96
121. FNH BFTPRS I Install Bifold pivot door hardware - Reset
1 1.00 EA 0.00+ 13.86 = 1.83 3.47 19.16
122. FNH DORDHRS + Door dummy knob - Detach & reset
1 1.00 EA 0.00+ 10.39 = 1.36 2.60 14.35
123. PNT OP + Paint door or window opening - 2 coats (per side)
3 3.00 EA 0.00+ 32.29 = 12.71 24.22 133.80
124. ELE OSCOV + Outlet or switch cover
1 1.00 EA 0.00+ 3.80 = 0.50 0.95 5.25
125. FNC CLOSWRS + Shelving - wire (vinyl coated) - Detach & reset
5*2 10.00 LF 0.00+ 11.28 = 14.80 28.20 155.80
126. HVC DVENTHD R Detach & Reset Air exchange vent cover
1 1.00 EA 54.99 0.00+ 0.00 = 7.21 13.75 75.95
127. HVC REGRS I Install Heat/AC register - Mechanically attached - Reset
1 1.00 EA 0.00+ 25.27 = 3.31 6.32 34.90
Totals: Master Bedroom
Door
CAT
N 6' 9" T
Walk-in Closet -
1 N �4� 6��
561.18 1,069.00 5,906.06
Floor
Walk-in Closet Height: 12'
346.00 SF Walls 57.38 SF Ceiling
403.38 SF Walls & Ceiling 57.38 SF Floor
6.38 SY Flooring 27.50 LF Floor Perimeter
30.50 LF Ceil. Perimeter
Y X 6' 8" Opens into HALL
SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
GREGORY105_REPAIR 5/16/2022 Page:14
Totals: Master Bedroom
Door
CAT
N 6' 9" T
Walk-in Closet -
1 N �4� 6��
561.18 1,069.00 5,906.06
Floor
Walk-in Closet Height: 12'
346.00 SF Walls 57.38 SF Ceiling
403.38 SF Walls & Ceiling 57.38 SF Floor
6.38 SY Flooring 27.50 LF Floor Perimeter
30.50 LF Ceil. Perimeter
Y X 6' 8" Opens into HALL
SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
GREGORY105_REPAIR 5/16/2022 Page:14
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Walk-in Closet
CAT
SEL
CALC
ACT DESCRIPTION
QTY RESET REMOVE REPLACE
TAX
O&P
TOTAL
128. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
8,6
8.50 LF 0.00+
2.76 =
3.08
5.87
32.41
129. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
55
55.00 SF 0.00+
2.98 =
21.51
40.98
226.39
130. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
27
27.00 LF 0.00+
11.66 =
41.33
78.70
434.85
131. DRY
TEX
+ Texture drywall - light hand texture
110
110.00 SF 0.00+
1.14 =
16.46
31.35
173.21
Blend texture to match existing as closely as possible
132. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
110
110.00 SF 0.00+
0.97 =
14.00
26.68
147.38
133. PNT
P
+ Paint the walls - one coat
W
346.00 SF 0.00+
0.68 =
30.88
58.82
324.98
134. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
PF
27.50 LF 0.00+
3.74 =
13.50
25.72
142.07
135. PNT
B2
+ Paint baseboard - two coats
PF
27.50 LF 0.00+
1.48 =
5.34
10.18
56.22
136. FCC
PAD
+ Carpet pad
F
57.38 SF 0.00+
0.68 =
5.13
9.75
53.90
Material specification established by Itel lab analysis = 7/16" 61b rebond
137. FCC
AV
+ Carpet
(F)*1.15
65.98 SF [*] 0.00+
4.09 =
35.43
67.47
372.76
Material component pricing is
subject to Itel analysis and local market conditions
15 % waste added
for Carpet.
138. FCC
AVB
+ Additional labor cost for Berber or patterned carpets
(F)*1.15
65.98 SF 0.00+
0.25 =
2.16
4.13
22.79
15 % waste added
for Additional labor cost for Berber or patterned carpets.
139. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+
401.64 =
52.71
100.41
554.76
140. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 =
5.05
9.63
53.18
141. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+
32.29 =
4.24
8.07
44.60
142. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+
29.70 =
3.90
7.43
41.03
143. FNC
CLOSWRS
+ Shelving - wire (vinyl coated) - Detach & reset
43
43.00 LF 0.00+
11.28 =
63.66
121.26
669.96
Totals: Walk-in Closet
318.38
606.45
3,350.49
GREGORY105_REPAIR
5/16/2022
Page: 15
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
2 2' 1"
T' 4'1-2- 4' 4" T
Master Bath '^ v
D- 1
Door
Missing Wall
CAT SEL
CALC
Master Bath
322.46 SF Walls
373.39 SF Walls & Ceiling
5.66 SY Flooring
28.54 LF Ceil. Perimeter
YX6'8"
Subroom: Shower (1)
124.19 SF Walls
137.24 SF Walls & Ceiling
1.45 SY Flooring
10.35 LF Ceil. Perimeter
Height: 12'
50.93 SF Ceiling
50.93 SF Floor
25.54 LF Floor Perimeter
Opens into HALL
Height: 12'
13.05 SF Ceiling
13.05 SF Floor
10.35 LF Floor Perimeter
4' 4 3/16" X 12' Opens into MBTH
ACT DESCRIPTION
QTY RESET REMOVE REPLACE TAX O&P TOTAL
144. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
5
5.00 LF 0.00+
2.76 =
145. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
51
51.00 SF 0.00+
2.98 =
146. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
25
25.00 LF 0.00+
11.66 =
147. DRY
TEX
+ Texture drywall - light hand texture
100
100.00 SF 0.00+
1.14 =
148. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
100
100.00 SF 0.00+
0.97 =
149. PNT
P
+ Paint the surface area - one coat
MAIN.W
322.46 SF 0.00+
0.68 =
150. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
17
17.00 LF 0.00+
3.74 =
151. PNT
B2
+ Paint baseboard - two coats
17
17.00 LF 0.00+
1.48 =
152. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+
401.64 =
153. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 =
154. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+
32.29 =
1.81
3.45
19.06
19.95
38.00
209.93
38.26
72.88
402.64
14.96
28.50
157.46
12.74
24.25
133.99
28.78
54.82
302.87
8.35
15.90
87.83
3.30
6.29
34.75
52.71
100.41
554.76
5.05
9.63
53.18
4.24
8.07
44.60
GREGORY105_REPAIR 5/16/2022 Page:16
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Master Bath
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
155. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+
29.70 =
3.90
7.43
41.03
156. CAB
VAN
+ Vanity
6
6.00 LF [*] 0.00+
342.14 =
269.44
513.21
2,835.49
157. CAB
KNPL+
+ Cabinet knob or pull - High grade
9
9.00 EA [*] 0.00+
28.14 =
33.24
63.32
349.82
158. CAB
CTDK
+ Countertop subdeck - plywood
12
12.00 SF 0.00+
5.22 =
8.23
15.66
86.53
159. TIL
CTTL+
+ Countertop - Tile - High grade
16
16.00 SF [*] 0.00+
48.41 =
101.66
193.64
1,069.86
3/8" [1 cm] marble tile: includes
tile, counter trim (edge treatment), backsplash, grout, thinset
Material component pricing established by Itel lab analysis and is subject to local market conditions
160. TIL
AVB+
& R&R Ceramic tile - bullnose - 3/4" x 6" - High grade
6
6.00 LF 3.07+
14.35 =
13.71
26.13
144.36
161. TIL
CTTLB
+ Add -on for tile backsplash installation
8*.5
4.00 SF 0.00+
24.09 =
12.65
24.09
133.10
162. PLM
SNKRS
I Sink - single - Reset
2
2.00 EA 0.00+
219.25 =
57.55
109.63
605.68
163. PLM
TLT+
+ Toilet - High grade
1
1.00 EA 0.00+
753.56 =
98.90
188.39
1,040.85
ADA-height
toilet
164. FNH
TBARRS
+ Towel bar - Detach & reset
2
2.00 EA 0.00+
21.88 =
5.74
10.94
60.44
165. HVC
REGRS
I Install Heat/AC register - Mechanically attached - Reset
1
1.00 EA 0.00+
25.27 =
3.31
6.32
34.90
Totals: Master Bath
Office
315.38 SF Walls
384.20 SF Walls & Ceiling
7.65 SY Flooring
25.59 LF Ceil. Perimeter
798.48 1,520.96 8,403.13
Height: 12'
68.82 SF Ceiling
68.82 SF Floor
28.34 LF Floor Perimeter
Missing Wall - Goes to Ceiling 2' 9" X 9' Opens into HALLWAY
GREGORY105_REPAIR 5/16/2022 Page:17
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
5' 4" -
o
1
Missing Wall
Missing Wall
Missing Wall
Missing Wall
�— 1' 9" ------
T
1
1' S"
Missing Wall
Missing Wall
Missing Wall - Goes to Ceiling
Missing Wall - Goes to Ceiling
2'�
T
CEfl T
CAT SEL
CALC
166. ELE OSCOV
3
Detach
GREGORY 105_REPAIR
Subroom: Area (1)
10.56 SF Walls & Ceiling
1.17 SY Flooring
5'4"X12'
1' 11 3/4" X 12'
5'4"X12'
V93/4"X12'
Subroom: Area2 (2)
7.96 SF Walls
9.71 SF Walls & Ceiling
0.19 SY Flooring
1'27/8"X12'
1'5"X12'
1' 2 13/16" X 9'
1'5"X9'
Subroom: Chase (3)
80.00 SF Walls
82.78 SF Walls & Ceiling
0.31 SY Flooring
6.67 LF Ceil. Perimeter
10.56 SF Ceiling
10.56 SF Floor
Opens into HALLWAY
Opens into OFFICE
Opens into OFFICE
Opens into OFFICE
Height: 12'
Height: 12'
1.75 SF Ceiling
1.75 SF Floor
2.65 LF Floor Perimeter
Opens into OFFICE
Opens into OFFICE
Opens into HALLWAY
Opens into HALLWAY
ACT DESCRIPTION
QTY RESET REMOVE REPLACE
+ Outlet or switch cover
3.00 EA 0.00+ 3.80 =
Height: 12'
2.78 SF Ceiling
2.78 SF Floor
6.67 LF Floor Perimeter
TAX O&P TOTAL
1.50 2.85 15.75
5/16/2022 Page:18
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Office
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL
167. INS
BTF4
+ Batt insulation - 4" - RI I - paper / foil faced
11
11.00 SF 0.00+
0.87 =
1.25
2.40
13.22
168. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
75
75.00 SF 0.00+
2.98 =
29.34
55.88
308.72
169. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
PF
37.66 LF 0.00+
11.66 =
57.64
109.78
606.54
170. DRY
TEX
+ Texture drywall - light hand texture
150
150.00 SF 0.00+
1.14 =
22.45
42.75
236.20
171. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
150
150.00 SF 0.00+
0.97 =
19.10
36.38
200.98
172. PNT
P
+ Paint the walls - one coat
W
403.34 SF 0.00+
0.68 =
36.00
68.57
378.84
173. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
PF
37.66 LF 0.00+
3.74 =
18.49
35.22
194.56
174. PNT
B2
+ Paint baseboard - two coats
PF
37.66 LF 0.00+
1.48 =
7.31
13.93
76.98
175. FCC
PAD
+ Carpet pad
F
83.91 SF 0.00+
0.68 =
7.49
14.27
78.82
Material specification established by Itel lab analysis = 7/16" 61b rebond
176. FCC
AV
+ Carpet
(F)* 1.15
96.50 SF [*] 0.00+
4.09 =
51.80
98.67
545.16
Material component pricing established by Itel lab analysis and is subject to local market conditions
15 % waste added
for Carpet.
177. FCC
AVB
+ Additional labor cost for Berber or patterned carpets
(F)*1.15
96.50 SF 0.00+
0.25 =
3.16
6.03
33.32
15 % waste added
for Additional labor cost for Berber or patterned carpets.
178. HVC
REGRS
I Install Heat/AC register - Mechanically attached
- Reset
1
1.00 EA 0.00+
25.27 =
3.31
6.32
34.90
Totals: Office 258.84 493.05 2,723.99
GREGORY105_REPAIR 5/16/2022 Page:19
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
�s s
Bedroom 2 Io 0
n-I=c6�sP h
]F05
Bedroom 2
532.00 SF Walls
664.56 SF Walls & Ceiling
14.73 SY Flooring
49.33 LF Ceil. Perimeter
Door Y X 6' 8"
Bedroom II Subroom: Closet (1)
F
T T
r 6° n
Door
CAT SEL
CALC
200.00 SF Walls
216.00 SF Walls & Ceiling
1.78 SY Flooring
20.00 LF Ceil. Perimeter
Height: 12'
132.56 SF Ceiling
132.56 SF Floor
40.33 LF Floor Perimeter
Opens into HALLWAY
Height: 12'
16.00 SF Ceiling
16.00 SF Floor
14.00 LF Floor Perimeter
6' X 6' 8" Opens into BEDROOM-2
ACT DESCRIPTION
QTY RESET REMOVE REPLACE TAX O&P TOTAL
179. DRY 5/8-
+ 5/8" drywall - hung, taped, ready for texture
5
5.00 SF 0.00+
2.98 =
180. DRY PATCHJ
+ Tape joint for new to existing drywall - per LF
4,6
4.50 LF 0.00+
11.66 =
181. DRY TEX
+ Texture drywall - light hand texture
12
12.00 SF 0.00+
1.14 =
Blend texture to match existing as closely as possible
182. PNT SP
+ Seal/prime then paint the surface area (2 coats)
12
12.00 SF 0.00+
0.97
183. PNT P
+ Paint the walls - one coat
W
732.00 SF 0.00+
0.68
184. FNC B3M+
+ Baseboard - 3 1/4" MDF w/profile
PF
54.33 LF 0.00+
3.74
185. PNT B2
+ Paint baseboard - two coats
PF
54.33 LF 0.00+
1.48 =
186. FCC PAD
+ Carpet pad
F
148.56 SF 0.00+
0.68 =
Material specification established by Itel lab analysis = 7/16" 61b rebond
187. FCC AV
+ Carpet
FLR_RPL
205.58 SF [*] 0.00+
4.09 =
Material component pricing established
by Itel lab analysis and is subject to local market conditions
188. FCC AVB
+ Additional labor cost for Berber or patterned carpets
(F)*1.15
170.84 SF 0.00+
0.25 =
GREGORY 105_REPAIR
1.95
3.73
20.58
6.89
13.12
72.48
1.80
3.42
18.90
1.53
2.91
16.08
65.33
124.44
687.53
26.66
50.80
280.65
10.55
20.10
111.06
13.26
25.25
139.53
110.36
210.20
1,161.38
5.60
10.68
58.99
5/16/2022
Page:20
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Bedroom 2
CAT SEL ACT DESCRIPTION
CALC QTY RESET REMOVE REPLACE
TAX O&P TOTAL
15 % waste added for Additional labor cost for Berber or patterned carpets.
189. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+
401.64 =
52.71
100.41
554.76
190. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 =
5.05
9.63
53.18
191. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+
29.70 =
3.90
7.43
41.03
192. INC
DOP
+ Door opening (jamb & casing) - 32"to36"wide - paint grade
1
1.00 EA 0.00+
177.98 =
23.36
44.50
245.84
Linen Closet
193. DOR
BFPNL
+ Bifold door set - solid fir 4 or 6 panel - Double
1
1.00 EA 0.00+
619.66 =
81.33
154.92
855.91
194. FNH
BFTPRS
I Install Bifold pivot door hardware - Reset
2
2.00 EA 0.00+
13.86 =
3.64
6.93
38.29
195. FNH
DORDHRS
+ Door dummy knob - Detach & reset
2
2.00 EA 0.00+
10.39 =
2.73
5.20
28.71
196. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+
32.29 =
4.24
8.07
44.60
197. ELE
OSCOV
+ Outlet or switch cover
3
3.00 EA 0.00+
3.80 =
1.50
2.85
15.75
198. HVC
CARS
+ Cold air return cover - Detach & reset
1
1.00 EA 0.00+
34.52 =
4.53
8.63
47.68
Totals: Bedroom 2
5' 6"-------- I
v Bathroo
1 2'4"
6"
Hallway
Door
Bathroom
172.00 SF Walls
199.50 SF Walls & Ceiling
3.06 SY Flooring
16.00 LF Ceil. Perimeter
3'X6'8"
426.92 813.22 4,492.93
Height: 12'
27.50 SF Ceiling
27.50 SF Floor
13.00 LF Floor Perimeter
Opens into HALLWAY
GREGORY105_REPAIR 5/16/2022 Page:21
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
�-2- 6"
0
a
1
Missing Wall
CAT SEL
CALC
Subroom: Tub (1)
120.00 SF Walls
132.50 SF Walls & Ceiling
1.39 SY Flooring
10.00 LF Ceil. Perimeter
5'X12'
Height: 12'
12.50 SF Ceiling
12.50 SF Floor
10.00 LF Floor Perimeter
Opens into BATHROOM
ACT DESCRIPTION
QTY RESET REMOVE REPLACE TAX O&P TOTAL
199. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
16
16.00 SF 0.00+
2.98 =
6.26
11.92
65.86
200. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
10
10.00 LF 0.00+
11.66 =
15.30
29.15
161.05
201. DRY
TEX
+ Texture drywall - light hand texture
20
20.00 SF 0.00+
1.14 =
2.99
5.70
31.49
202. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
20
20.00 SF 0.00+
0.97 =
2.55
4.85
26.80
203. PNT
P
+ Paint the surface area - one coat
MAIN.W
172.00 SF 0.00+
0.68 =
15.35
29.24
161.55
204. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
MAIN.PF
13.00 LF 0.00+
3.74 =
6.39
12.15
67.16
205. PNT
B2
+ Paint baseboard - two coats
MAIN.PF
13.00 LF 0.00+
1.48 =
2.53
4.81
26.58
206. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+
401.64 =
52.71
100.41
554.76
207. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 =
5.05
9.63
53.18
208. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+
32.29 =
4.24
8.07
44.6C
209. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+
29.70 =
3.90
7.43
41.03
210. CAB
VAN
+ Vanity
3
3.00 LF [-] 0.00+
342.14 =
134.71
256.60
1,417.73
211. CAB
KNPL
+ Cabinet knob or pull
3
3.00 EA [*] 0.00+
28.14 =
11.08
21.10
116.60
212. CAB
CTDK
+ Countertop subdeck - plywood
6
6.00 SF 0.00+
5.22 =
4.11
7.83
43.26
213. TIL
CTTL+
+ Countertop - Tile - High grade
6
6.00 SF [*] 0.00+
48.41 =
38.13
72.62
401.21
Material component pricing established by Itel lab analysis and is subject to local market conditionsMaterial
component pricing is subject
to Itel
analysis and local market conditions
214. TIL
AVB>
+ Ceramic tile - bullnose - 2" x 6"
5 5.00 LF 0.00+ 14.51 = 9.53 18.14 100.22
GREGORY105_REPAIR 5/16/2022 Page:22
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Bathroom
CAT SEL
ACT DESCRIPTION
CALC
QTY RESET REMOVE
REPLACE
TAX
O&P
TOTAL
215. TIL CTTLB
+ Add -on for tile backsplash installation
5*.5
2.50 SF 0.00+
24.09 =
7.90
15.05
83.18
216. TIL FSTRIP
+ Add -on for tile feature strip - High grade
5
5.00 LF 0.00+
14.59 =
9.58
18.24
100.77
217. TIL AVB+
+ Ceramic tile - bullnose - 3/4" x 6" - High grade
5
5.00 LF 0.00+
14.35 =
9.41
17.94
99.10
218. PLM SNKRS
I Sink - single - Reset
1
1.00 EA 0.00+
219.25 =
28.78
54.82
302.85
219. PLM FAURS
I Sink faucet - Reset
1
1.00 EA 0.00+
175.84 =
23.08
43.96
242.88
220. FNH TBARRS
+ Towel bar - Detach & reset
2
2.00 EA 0.00+
21.88 =
5.74
10.94
60.44
221. FNH SRODRS
I Install Shower curtain rod - Reset
1
1.00 EA 0.00+
20.79 =
2.73
5.20
28.72
222. FNH TPRS
I Install Toilet paper holder - Reset
1
1.00 EA 0.00+
23.09 =
3.03
5.77
31.89
223. HVC REGRS
I Install Heat/AC register - Mechanically attached - Reset
1
1.00 EA 0.00+
25.27 =
3.31
6.32
34.90
224. PLM TLTRS
+ Toilet - Detach & reset
1
1.00 EA 0.00+
355.32 =
46.64
88.83
490.79
Detach toilet and re -install with a new wax ring due to exposure to Cat 3 water
Totals: Bathroom
455.03
866.72
4,788.60
Total: UNIT 105
9,241.24
17,549.64
97,252.66
Total: RESIDENTIAL
9,241.24
17,549.64
97,252.66
Line Item Totals: GREGORY105 REPAIR
9,241.24
17,549.64
97,252.66
GREGORY105_REPAIR 5/16/2022 Page:23
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Grand Total Areas:
5,100.15 SF Walls
1,245.71 SF Floor
0.00 SF Long Wall
1,245.71 Floor Area
2,080.49 Exterior Wall Area
0.00 Surface Area
0.00 Total Ridge Length
1,245.71 SF Ceiling
138.41 SY Flooring
0.00 SF Short Wall
1,355.63 Total Area
165.27 Exterior Perimeter of
Walls
0.00 Number of Squares
0.00 Total Hip Length
6,345.86 SF Walls and Ceiling
419.28 LF Floor Perimeter
452.64 LF Ceil. Perimeter
5,100.16 Interior Wall Area
0.00 Total Perimeter Length
GREGORY105_REPAIR 5/16/2022 Page:24
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Summary
Line Item Total
70,461.78
Overhead
10,529.81
Profit
7,019.83
Sales Tax
9,241.24
Replacement Cost Value
$97,252.66
Net Claim
$97,252.66
Deb Hardy
Project Manager
GREGORY105_REPAIR 5/16/2022 Page:25
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Recap by Category
O&P Items Total
APPLIANCES
1,094.20
1.13%
CABINETRY
28,854.78
29.67%
CLEANING
498.28
0.51 %
GENERAL DEMOLITION
767.47
0.79%
DOORS
3,649.18
3.75%
DRYWALL
6,835.97
7.03%
ELECTRICAL
129.68
0.13%
FLOOR COVERING - CARPET
5,863.67
6.03%
FLOOR COVERING - VINYL
284.61
0.29%
FLOOR COVERING - WOOD
2,528.41
2.60%
FINISH CARPENTRY / TRIMWORK
2,480.44
2.55%
FINISH HARDWARE
406.60
0.42%
HEAT, VENT & AIR CONDITIONING
325.84
0.34%
INSULATION
169.71
0.17%
LIGHT FIXTURES
353.76
0.36%
PLUMBING
2,872.53
2.95%
PAINTING
5,465.71
5.62 %
TILE
7,616.94
7.83%
O&P Items Subtotal
70,197.78
72.18%
Non-O&P Items
Total
%
GENERAL DEMOLITION
264.00
0.27%
Non-O&P Items Subtotal
264.00
0.27%
O&P Items Subtotal
70,197.78
72.18%
Overhead
10,529.81
10.83 %
Profit
7,019.83
7.22%
Sales Tax
9,241.24
9.50%
Total 97,252.66 100.00%
GREGORY105_REPAIR 5/16/2022 Page:26
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
1 1-105 Carpet & Pad
Date Taken: 2/28/2022
6676 Corporate Center Parkway ftn. ayie emp more: uuomer xperience epSuitef07 McLeod Construction Erca : cus[amerexperience@itelinc.
Jad—i
Phone: 8I40j�89035 LLC
> rSmmn
iret
CARPET EVALUATION
CUSTOMER INFDRMATIDN
:usfomer: Generic Customer!, FL Control #. CX56170242 Additional: McLeod Construction LLC
:ust ID: CUST0004 Date Received: 2125nC22 Vendor Job#: 2022010305
tdjuster: Pre -Paid Not. Bill Date Iced: 2125Ia022 Contact: K ylre IQenrp,
1Ghle mp�ncleodconstrua5art. c on
: omments:
INSURED INFORMATION
:lain 0: NOT PROVIDED TO ITEL Loss Date: 173l2022
.cured Name: The Gregory CDA Rooms Damaged: Unit t05
:ity,State.zrp: Edmonds,WA DE020 Flooring Color. DeangelBrown
:umments:
N ill: Style: Fiber: Width:
'hiladelphia Franchise 1128 Unbranded Nylon 12R
'hiladelPhi' Speak Out Unh ra nded Nylon 12it
'h i ladelphia SP527 Unbranded Nylon 12111
omments: The above sele ;.o (s) is the closest availa hle for the specifications listed. y Praduc6 matching all of the
specifications of the sample prnductwere not found. Benchmark price and selections am based on available
products with similar construction method, texture, and face weight.I The seleciion(s) listed arefrom our
commercial database and were matched to the above specifications only. In swne circumstances, commercial
carpet must meetbuilding codes and regulations. The installer should check all regulations before i nstallauon.
REL SENC HMA RN PRICE ANALYSIS ^r
'er Sq Yd: Carpet $22.67 Flooring Labor59.69 Pad:53-97 Pad Labor: $OM Total: 597.62
'er Sq Ft: Carpet: $2.52 Flooring Labor;l.lf Pad: $0-44 Pad Labor: $0.11 Total: $4.11
Excludes tax, but includes standard shipping fees. Other'rninimum freight' rates may apply on small ordere-
: Dmments:
CARPET ANALYSIS
:onstiuction: Tufted Multi Lerel Loop Gauge: 522 in Face Weight': 29.6 oz
'iben'Fiber Type: Nylon I BCF Stitches Per loch: 9.D &aching Material: Synthetic
ilx=r Ply: 2 - Ply Pile Height 0.29 in TuftslSO Inch: 58
:omments: The accuracy DFth. carpettest may have been degraded due tD the small sample size receiw:d. f ' Based on HUDIF111
standards, mill published face weights may vary by up to +1-7%-
PADANALYSIS
'ad Type: Pad HeighL Pad Density (lb.) Dr Pad Weight (w.):
tebortd 7116" 6.0 I bs7cu bic feet
:.roman[%:
ADDITI ORAL COMMENTS
INVOICE
ont-IC CXS6170242 Test Fee: $T1.95
:ust.-.r ID: CUST0004 Shipping: $16.50
Total Due: $B8.45
'lease note Customer ID 9 and Control A on all correspondence. FE DERAL TAX ID N UMB ER: 26 25745fr
:omm.nts- THIS INVOICE IS FOR YOUR RECORD ONLY! Our records indicale that this invoice has been pre -paid by credit card
Dr check. y
GREGORY105_REPAIR 5/16/2022 Page:27
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
2 2-105 Tile
Date Taken: 2/28/2022
9870 Corporate Center Parkway ttn: ay ie emp mrc: ustomty xperience ep
Suite 107 ❑ Mcleod Construction LLC Ewa : customererperience�itelincc
4-6-0.1-140
It e Pwrw :e 00) 204K9 ma
STONE EVALUATION
: ustomer:
Generic Customer!, FIL
CUSTOMER
INFORMATION
Additional: Mcleod Construction LLC
169980
Cust ID:
CUST0084
Dam Received:
2125f2022
Vendor Job#: 2022010306
4djuster:
Pre -Paid Not. Bill
Date Invoiced=
212110022
Contact Kaylie Klemp,
hklemporn deodconst ucuon.cort
Comments:
INSURED INFORMATION
Claim #: NOT PROVIDED TO ITEL Loss Date: ff312022
Insured Name: The Gregory COA Rooms Damaged: Unit 10516athroom
City,StateZip: Edmonds, WA 98020 Flooring Colas Orangel6rawn
Comments:
rrEL RENC "MARK
anut.otu— Sryle Slone Type Face
Dimensions
a1Tde Phaedra Cream Marble 12.0002.00
omments: Natural shade variations are inherentin Slone. Be sure to inspectmuhipie samples ofthe stone before selecdon
to ensure satisfaction with calars and patterns.!
PRICE ANALYSIS •'
er Sq Ft: Flooring: $14.95 Flooring Labor: 50.D0 Total: 514.95
"Excludes tax. Minimum shipping or drop charges mayapply.
omments: Partial sample was received. "12 x 12' Face Dimension was used for pricing and selections fisted above based on
information provided on the test request form. Please contact ITEL Customer Senrvce and reference this —trDI numbs
with arty questions_ 1
ndustry Name: HIA
tone Type: Marble
T. hckness: 0.377 Surface Texture: Polished
ace Dimension: 3_60x4_10 Edge Design: MIA
omme M Product categories and classifications such as Granite, Marble, Traxertine, Limestone, Quartzite, etc. are based on
generally accepted industry acceptan—They do not necessarily reflect the geological composition of the material. In
many eases, these materials are technically made of a different geological makeup. For example, many stones are
commonly known as granites, but geologicallyt they are actually Charnockhes, Polimilic Mataconglomerates, and any of
other various different geological stones. In addition, many stones commonly referred to as marble are geclogicalty
limestone. I
ADDITIONAL COMMENTS
lease note the price listed does not include tabor. !
Control#:
l�i3[el E! Cr jeE14yelCE
14RS81699910
Test Fee:
$f40.00
Customer ID:
CUSTDD04
Shipping:
Total Due:
$140.00
Please note Customer
0} C and Control # on al correspondence.
FE DERAL TAX ID N UMB ER:
2925745&
Comments:
THIS INVOICE IS FCR YOUR RECORD ONLY! Our records indicate
that this invoice has been pre -paid by
credit card
or check. )
GREGORY105_REPAIR 5/16/2022 Page:28
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
3 3-105 Wood
Date Taken: 2/28/2022
All
667d Corporate Center Parkway
ttn: Kaylie emp
o_ Mcloed Construction
mm, ustamer xperience
LLCEma: customerexperience@itelina
Itet
Jacksw7 }
Jaeksorrville. R 32216
Phone: l800 890-035
ma?:
Rrrxw.
itel�nc.can•
WOOD EVALUATION
CUSTOMER
INFDRMATION
u stomer:
Generic Customer.,
FIL Control tk
WXS8189991
Additional: Mdoed Construciian LLC
ust ID:
CUST0004
Date Received:
272512922
Vendor Job#: 2022010305
duster:
Pre -Paid Nota Bill
Date Lnvoiced:
272512D22
Contact Kaylie Klemp,
omments:
INSURED INFORMATION
laim#: NOT PROVIDED TO ITE L Loss Date: 1f312022
-red Name: The Gregory COA Rooms Damaged: Unit 105
iy.State'zip: Edmonds; WA 98D20 Flooring Color Drange76rown
omrnents:
lfanufacturer Style Widh (inches} Length SgFtiCarton
Kahrs Avanti Tres 3—S" 7.88 in 96 375" 36.5
Kahrs American Naturals 3strip 7.86 in 95 3f8" 31.32
Comments: The overall thickness of the selection (s) listed above may vary slightly from the sample tested. JThe overall
width ofthe selection (s) listed may vary slighdyfrom the sample tested.)The locking system of the selections
listed may vary slightly from the sample Eested_ 1
ITEL BENCHMARK PRICE ANALYSIS
Per 9q Ft: Wood: $9.00 =louring Labor: $0.00 Underiayment 90-00 Underlayment Labor: $0.00 Total: $9.0a
°t Excludes tax. Minimum shipping or drop charges may apply_
Comments:
IVGG D AMA LYS IS
induct Form (Construction):
Engineered
Species:
Maple
card Thickness:
0.562 in
Veneer Thickness:
0.107 in
ut:
Plain Sawn
Veneer Cut
Peeled
ocking Type:
Tongue L Groove
Surface Finish:
Factory
lies:
3
Ply Composition:
Pine
isual:
Lang Strip
lidth:
TAd in
omments:
UNOERLAYMEttT ANALYSIS
nderlayment Type: Underlaynn nt Thickness
omments:
RD DITI D NA L COMdI E NTS
IN VOW E
ontrol #r WX58169981 Test Fee= $T1.95
ustomer ID: CU ST0004 Shipping: $16.50
Total Due: $99.45
lease note Customer ID # and Control # on aH Correspondence_ FEDERALTAX ID NUMBER- 26-25T456
omments= THIS INVOICE IS FOR YOUR RECORD DNLYI Our records indicate thatthis invoice has been pre -paid by credit card
or check.!
GREGORY105_REPAIR 5/16/2022 Page:29
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
4 4-Entry
Date Taken: 2/17/2022
4
N
GREGORY105_REPAIR 5/16/2022 Page:30
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
5-Entry
Date Taken: 2/17/2022
A.i
GREGORY105_REPAIR 5/16/2022 Page:31
�d80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
6 6-Entry .
Date Taken: 2/17/2022
ft
74
F
l
r
GREGORY105_REPAIR 5/16/2022 Page:32
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
7-Laundry
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:33
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
8 8-Kitchen
Date Taken: 2/17/2022
r
GREGORY105_REPAIR 5/16/2022 Page:34
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
9-Kitchen
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:35
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
10 10-Living Room
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:36
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
11 11-Living Room
Date Taken: 1/24/2022
GREGORY105_REPAIR 5/16/2022 Page:37
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
12 12-Living Room .
Date Taken: 2/17/2022
Y
GREGORY105_REPAIR 5/16/2022 Page:38
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
13 13-Living Room
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:39
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC#MCLEODCL951DD
(206) 545-7837
14 14-Bedroom 2
Date Taken: 2/17/2022
41
-0000�- ,
a.r
GREGORY105_REPAIR 5/16/2022 Page:40
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
15 15-Hallway
Date Taken: 2/17/2022
El
GREGORY105_REPAIR 5/16/2022 Page:41
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
16 16-Master Bedroom
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:42
�d80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC#MCLEODCL951DD
(206) 545-7837
17 17-Master Bedroom
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:43
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
18 18-Master Closet
Date Taken: 2/17/2022
Ot rl
GREGORY105_REPAIR 5/16/2022 Page:44
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
19 19-Master Bath
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:45
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
20 20-Master Bath
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:46
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
21 21-Den
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:47
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
22 22-Bathroom
Date Taken: 2/17/2022
GREGORY105_REPAIR 5/16/2022 Page:48
UNIT 105
t24' 6" 121411 24' 12'
N �O
1 �i -
0
Living Room N Bedroom 2
1
1
41711
8' 3" 111211
11' 11"
11' 5"
Master Bedroom F
.� ■
■
U•61911
5"
2'
DW
N
Bathro
51)
t
o,
Walk-in Closet `O
s
Kitchen
?
i5' 1011�
Hallway -
T
3' 2
2' 3" -I----4' 6"
716'
16"
�o
_
0
2' 1 If"�0
4' 4"
4' 6f'
00
1 ��
.-5' 4
=
4'
N
15„1
-
-=
`� Entry/Foyer
-
`O `�'
-
2' 7" -1 o0
N Laundry Room
Office
N
`O
�O
Master Bath 2
-
3' g
5' 4"
o o
0
°
V'
7' 4"
N
N
10' 7"
1
1
�7' 1011
4' 2
—2'
9' 11"�
GREGORY I05_REPAIR
UNIT 105
5/16/2022 Page:49