Loading...
APPROVED BLD-BLD2022-0858+Architectural_Plan+6.30.2022_2.55.31_PM+2965211RESIDENTIAL - LrN 1T 106 Existing: Scale 1/4 If= 1' 1 t" 114 21" j [ ' " t'd a,ti " 1" Dining Room (1) Kitchen 2a'' a r I I [Master Bedroom, = _ _ ~fir .6d Living Roo n rt T T 1-3'' City Of Edmonds Building Department Work SEWER DAMAGE REPAIR Address 505 5TH AVE S - UNIT 106 ------------ Owne-------_-_-_-_-_-_-_-_- WATSON rApproved Date; 07/20/2022 -----------------------�/ Building Official: /f e/yK 66aw�eGGI PermitNumber: ------ BLD2022-0858 12' 4" EL CI--� I 1 �' OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES APPROVED PLANS MUST BE ON JOB SITE 1r BatF,r� Existin Tile r-- — - — - — - — - — - — - — - — - — - INSULATION REMOVED FROM EXTERIOR WALL CAVITY AS PART OF THE REPAIR TO BE REPLACED WITH MINIMUM R-15 IN EXTERIOR 2X4 WALLS ' AND R-21 IN 2X6 EXTERIOR WALLS. '----------------- RECEIVED Jul 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Description of existing space: -Flood cuts up 24" throughout the unit from sewer backup -All flooring removed aside from tile bathrooms -Kitchen cabinets and bathroom vanities removed -Toilets removed -Appliances removed -Doors and trim removed _8r 540 —alI 1 W alk-!ln C limet + r 441 �P fi �-21 i11h Master Bath 6i Llr�� {� Existing Tile Laundry T 1 ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE �I I SEPARATE PLUMBING PERMIT REQUIRED FOR THIS PROJECT. L——-———-———-—— — - — — — - G7 4 UNIT 106 LSE SI DENTIAL - UNIT 106 Existing: Scale 1/4 If= 1' 2.. 1 Li 3" Ir � Kitchen - New floors - ' I 0 21 fa'' � [Master Bedrooi j I � Lii}ring Room New floors F3'( 1---3, �,, 1 2i 4" - Ltry,Foyer r �a Ec droorn 2 r = New floors I 6"-I I _ N ew I floors New floors T �i BatKm 7 Existingr T ge 4'--4 6' 61"'—­�-21 Ti. . New floors { Laundry RECEIVED Jul 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Description of proposed: -Drywall and paint affected walls corner to corner -New cabinetry and countertops to be installed exactly where they were previously, as shown on floorplan -New backsplash to be installed in the kitchen and in the bathrooms -Appliances to stay in same locations -New flooring to be installed throughout the unit with the exception of the bathrooms -New doors and trim to be installed throughout the unit -New toilets, sinks, and faucets to be installed in the kitchen and the bathrooms -Separate plumbing permit will be submitted 141 Walk. -In Closet •�• New floors T �-21 410 Master Bath Existing Tile T 1' ***Will need to remove and reinstall water heater in order to install floors a 4 UNIT 106