DNS GREGORY106_REPAIR- cost breakdownmcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Client: The Gregory
Property: 505 5th Ave S
Edmonds, WA 98020
Operator: DEB
Estimator:
Deb Hardy
Position:
Project Manager
Company:
Mcleod Construction
Business:
1115 N 140th St
Seattle, WA 98133
Reference: Barbara Hartley
Position: HOA Manager
Company: Real Property Associates
Business: 7500 Roosevelt Way
Seattle, WA 98115
Type of Estimate: Sewage
Date Entered: 1/4/2022
Price List:
WAEVBX MAY22
Labor Efficiency:
Restoration/Service/Remodel
Estimate:
GREGORY106_REPAIR
File Number:
DH22009
Date Assigned:
Business: (206) 545-7837
E-mail: deb@mcleodconstruction.
com
Business: (206) 523-0300
E-mail: bhartley@rpapm.com
The following is not a contract but a general overview of Mcleod Construction LLC policies. Please see accompanying formal
contract for your signature.
This estimate is presented utilizing the Xactimate estimating software customized to reflect the specific scope of work presented
in this loss.
The work descriptions in this estimate are maintained by Xactanalysis, using a customized pricing database accepted by most
insurance carriers, and may not precisely describe the actual work to be completed. It is intended to be used to arrive at the
nearest approximate cost of repairs. To satisfy the needs of the insurance industry, this estimate is written to provide a specific
scope of work at a package price. Line items include a description of the work to be done, the unit of measure and quantity
needed.
The May 2022 price list for the Everett WA market was used for some or all of the unit costs. The estimator also may have relied
on the use of written or verbal quotes from subcontract labor or suppliers who were deemed capable of completing their
respective scopes of work.
Quantities in this estimate are for estimating purposes only and are not guaranteed to be accurate. In some cases, quantities are
factored for waste, pattern matching and other circumstances.
Costs which are unknown at this time remain "OPEN." Prior to the commencement of work, it may not be possible to tell if some
items will be restorable or if there is concealed damage. Mechanical trade bids (i.e. plumbing, electrical, heating and cooling) are
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
often not possible to bid in a timely manner due to a delay in receiving proposals from qualified subcontractors. "OPEN' items
and additional costs addressing concealed damage, code upgrades or other necessary work related to the restoration of the
damaged property will be presented upon discovery and added to the contract amount.
Although every effort has been made to ensure accuracy, this estimate is subject to change. We reserve the right to submit
supplements due to: Code upgrades, newly discovered damages, inability to match material (i.e. flooring, paint, cabinets, etc).
All supplements will be submitted in writing and will include pictures and explanations.
NO supplemental work will begin until the work has been approved in writing (Email or fax) by the adjuster in charge or the
financially responsible party.
Unless specifically accounted for in this estimate, content manipulation is the sole responsibility of the home owner/occupant.
Mcleod Construction can remove/reset contents at our standard rate of $80.00 per hour. This cost will be approved by and billed
to the home owner.
Deborah Hardy
Project Manager
Insurance Division
206-545-7837
GREGORY106_REPAIR 5/16/2022 Page:2
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
GREGORY106_REPAIR
RESIDENTIAL
UNIT 106
UNIT 106
CAT SEL
CALC
ACT DESCRIPTION
QTY REMOVE REPLACE
TAX
O&P
TOTAL
L CLN FINALR
+ Final cleaning - construction - Residential
F
1012.76 SF 0.00+ 0.40 =
53.18
101.28
559.56
2. DMO LAB
- General Demolition - per hour
4
4.00 HR [N] 66.00+ 0.00 =
27.72
0.00
291.72
Labor to convey demolition debris
to dumb vehicle: cabinetry, millwork, & doors
2 technicians x 2 hours @ Mcleod Construction T&M rate of $80/hr
No OHP added
3. DMO DTRLR
- Tandem axle dump trailer - per load - including dump fees
1
1.00 EA 326.70+ 0.00 =
42.88
81.68
451.26
Total: UNIT 106
123.78
182.96
1,302.54
, J
5
�T
T/Fo-YAP Bat
1
Door
Door
Missing Wall
Missing Wall
Missing Wall
Door
Door
Door
CAT SEL
CALC
Entry/Foyer
250.71 SF Walls
310.61 SF Walls & Ceiling
6.66 SY Flooring
29.78 LF Ceil. Perimeter
3'X6'8"
4'X6'8"
1' 6 5/16" X 12'
2'7 11/16" X 12'
2'45/8"X12'
3'X6'8"
3'X6'8"
YX6'8"
ACT DESCRIPTION
QTY REMOVE REPLACE
Height: 12'
59.90 SF Ceiling
59.90 SF Floor
13.78 LF Floor Perimeter
Opens into BATHROOM
Opens into CLOSET
Opens into AREA
Opens into LIVING ROOM
Opens into LIVING ROOM
Opens into BEDROOM-2
Opens into Exterior
Opens into LAUNDRY
TAX O&P TOTAL
4. INS BTLF4 + Batt insulation replacement per LF - 4" - up to T tall
2 2.00 LF 0.00+ 2.76 = 0.73 1.38
5. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture
28 28.00 SF 0.00+ 2.98 = 10.95 20.86
GREGORY106 REPAIR 5/16/2022
7.63
115.25
Page: 3
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Entry/Foyer
CAT SEL ACT DESCRIPTION
CALC QTY REMOVE REPLACE
TAX O&P TOTAL
6. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
14
14.00 LF 0.00+ 11.66 =
21.43
40.81
225.48
7. DRY
TEX
+ Texture drywall - light hand texture
55
55.00 SF 0.00+ 1.14 =
8.23
15.68
86.61
8. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
55
55.00 SF 0.00+ 0.97 =
7.00
13.34
73.69
9. PNT
P
+ Paint the walls - one coat
W
250.71 SF 0.00+ 0.68 =
22.38
42.62
235.48
10. FCW
US>>
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
59.90 SF 0.00+ 2.76 =
21.70
41.33
228.35
Durason 3.55mm (104mil) or
similar
11. FCV
PLK
+ Vinyl plank flooring
F
59.90 SF [*] 0.00+ 10.60 =
83.34
158.73
877.01
Material component pricing established
by Itel lab analysis and is subject to local market conditions
12. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
PF
13.78 LF 0.00+ 4.33 =
7.84
14.92
82.43
13. PNT
132
+ Paint baseboard - two coats
PF
13.78 LF 0.00+ 1.48 =
2.68
5.10
28.17
14. FNC
CAM>+
+ Casing - 3 1/4" MDF w/detail
14
14.00 LF 0.00+ 3.24 =
5.95
11.34
62.65
15. PNT
OP
+ Paint door or window opening - 2 coats (per side)
3
3.00 EA 0.00+ 32.29 =
12.71
24.22
133.80
16. PNT
OP>
+ Paint door or window opening - Large - 2 coats (per side)
1
1.00 EA 0.00+ 37.98 =
4.99
9.50
52.47
Totals: Entry/Foyer
Laundry
6 4 2
Y �
Laundry
10' N
^1-10' 6"�
334.76 SF Walls
385.99 SF Walls & Ceiling
5.69 SY Flooring
29.56 LF Ceil. Perimeter
209.93 399.83 2,209.02
Height: 12'
51.22 SF Ceiling
51.22 SF Floor
26.56 LF Floor Perimeter
Door Y X 6' 8" Opens into ENTRY -FOYER
GREGORY106_REPAIR 5/16/2022 Page:4
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CAT
SEL
CALC
ACT DESCRIPTION
QTY REMOVE REPLACE
TAX
O&P
TOTAL
17. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
53
53.00 SF 0.00+ 2.98 =
20.73
39.48
218.15
18. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
27
27.00 LF 0.00+ 11.66 =
41.33
78.70
434.85
19. DRY
TEX
+ Texture drywall - light hand texture
106
106.00 SF 0.00+ 1.14 =
15.86
30.21
166.91
20. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
106
106.00 SF 0.00+ 0.97 =
13.50
25.70
142.02
21. PNT
P
+ Paint the walls - one coat
W
334.76 SF 0.00+ 0.68 =
29.88
56.91
314.43
22. FCW
US>>
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
51.22 SF 0.00+ 2.76 =
18.55
35.35
195.27
Durason 3.55mm (104mil) or
similar
23. FCV
PLK
+ Vinyl plank flooring
F
51.22 SF [*] 0.00+ 10.60 =
71.26
135.73
749.92
Material component pricing established by Itel lab analysis and is subject to local market conditions
24. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
PIT
26.56 LF 0.00+ 4.33 =
15.10
28.75
158.85
25. PNT
132
+ Paint baseboard - two coats
PF
26.56 LF 0.00+ 1.48 =
5.16
9.83
54.30
26. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+ 32.29 =
4.24
8.07
44.60
27. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+ 401.64 =
52.71
100.41
554.76
28. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+ 38.50 =
5.05
9.63
53.18
29. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+ 29.70 =
3.90
7.43
41.03
30. ELE
OSCOV
+ Outlet or switch cover
1
1.00 EA 0.00+ 3.80 =
0.50
0.95
5.25
31. INS
RBD2
+ Rigid foam insulation board - 2"
4
4.00 SF 0.00+ 1.74 =
0.91
1.74
9.61
32. PLM
WHPAN
I Install Water heater overflow drain pan
1
1.00 EA 0.00+ 39.83 =
5.23
9.95
55.01
33. PLM
WHR
+ Water heater - Reset
1
1.00 EA 0.00+ 543.14 =
71.29
135.78
750.21
34. PLM
WHSS
I Install Water heater seismic strap kit - up to 55 gallon
1
1.00 EA 0.00+ 57.15 =
7.50
14.29
78.94
Totals: Laundry
382.70
728.91
4,027.29
GREGORY106_REPAIR
5/16/2022
Page:5
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
O
CIOST T Bathroom
Q _ o
n" N
Fovcr Bathroo
6' 4"
Door
�--5' 6"�
T
Missing Wall
CAT SEL
CALC
223.36 SF Walls
259.60 SF Walls & Ceiling
4.03 SY Flooring
20.28 LF Ceil. Perimeter
YX6'8"
Subroom: Tub (1)
120.00 SF Walls
132.50 SF Walls & Ceiling
1.39 SY Flooring
10.00 LF Ceil. Perimeter
Height: 12'
36.24 SF Ceiling
36.24 SF Floor
17.28 LF Floor Perimeter
Opens into ENTRY -FOYER
Height: 12'
12.50 SF Ceiling
12.50 SF Floor
10.00 LF Floor Perimeter
5' X 12' Opens into BATHROOM
ACT DESCRIPTION
QTY REMOVE REPLACE TAX O&P TOTAL
35. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
35
35.00 SF 0.00+ 2.98 =
36. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
17
17.00 LF 0.00+ 11.66 =
37. DRY
TEX
+ Texture drywall - light hand texture
68
68.00 SF 0.00+ 1.14 =
38. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
68
68.00 SF 0.00+ 0.97 =
39. PNT
P
+ Paint the surface area - one coat
MAIN.W
223.36 SF 0.00+ 0.68 =
40. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
MAIN.PF
17.28 LF 0.00+ 4.33 =
41. PNT
132
+ Paint baseboard - two coats
MAIN.PF
17.28 LF 0.00+ 1.48 =
42. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+ 401.64 =
43. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+ 32.29 =
44. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+ 38.50 =
45. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+ 29.70 =
13.69
26.08
144.07
26.01
49.55
273.78
10.18
19.38
107.08
8.66
16.49
91.11
19.94
37.97
209.79
9.83
18.70
103.35
3.35
6.40
35.32
52.71
100.41
554.76
4.24
8.07
44.60
5.05
9.63
53.18
3.90
7.43
41.03
GREGORY106_REPAIR 5/16/2022 Page:6
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Bathroom
CAT
SEL
CALC
ACT DESCRIPTION
QTY REMOVE REPLACE
TAX
O&P
TOTAL
46. CAB
VAN
+ Vanity
3,6
3.50 LF [*] 0.00+
342.14 =
157.18
299.37
1,654.04
Per attached HD quote for like kind & quality
47. CAB
KNPL+
+ Cabinet knob or pull - High grade
7
7.00 EA [*] 0.00+
28.14 =
25.85
49.25
272.08
Per attached HD quote for like kind & quality
48. CAB
CTDK
+ Countertop subdeck - plywood
7
7.00 SF 0.00+
5.22 =
4.80
9.13
50.47
49. TIL
CTTL+
+ Countertop - Tile - High grade
7
7.00 SF [*] 0.00+
48.41 =
44.48
84.72
468.07
Material component pricing established by Itel lab analysis and is subject to local market
conditions
50. TIL
AVB>
+ Ceramic tile - bullnose - 2" x 6"
5,6
5.50 LF 0.00+
14.51 =
10.48
19.95
110.24
51. TIL
CTTLB
+ Add -on for tile backsplash installation
7,6*.5
3.75 SF 0.00+
24.09 =
11.86
22.58
124.78
52. TIL
FSTRIP
+ Add -on for tile feature strip - High grade
6,6
6.50 LF 0.00+
14.59 =
12.45
23.71
131.00
53. TIL
AVB+
+ Ceramic tile - bullnose - 3/4" x 6" - High
grade
6,6
6.50 LF 0.00+
14.35 =
12.24
23.32
128.84
54. PLM
SNKRS
I Sink - single - Reset
1
1.00 EA 0.00+
219.25 =
28.78
54.82
302.85
55. PLM
FAURS
I Sink faucet - Reset
1
1.00 EA 0.00+
175.84 =
23.08
43.96
242.88
56. PLM
TLTR
+ Toilet - Reset
1
1.00 EA 0.00+
216.48 =
28.41
54.12
299.01
57. HVC
REGRS
+ Heat/AC register - Mechanically attached - Detach & Reset
1
1.00 EA 0.00+
25.27 =
3.31
6.32
34.90
58. FNH
TBARRS
+ Towel bar - Detach & reset
2
2.00 EA 0.00+
21.88 =
5.74
10.94
60.44
59. FNH
TPRS
+ Toilet paper holder - Detach & reset
1
1.00 EA 0.00+
23.09 =
3.03
5.77
31.89
Totals: Bathroom
529.25
1,008.07
5,569.56
GREGORY106_REPAIR 5/16/2022 Page:7
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
q�'14'0"�
Entry/Foyer
Door
CAT SEL
CALC
Closet
140.69 SF Walls
150.56 SF Walls & Ceiling
1.10 SY Flooring
13.95 LF Ceil. Perimeter
Height: 12'
9.87 SF Ceiling
9.87 SF Floor
9.95 LF Floor Perimeter
4' X 6' 8" Opens into ENTRY -FOYER
ACT DESCRIPTION
QTY REMOVE REPLACE TAX O&P TOTAL
60. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
20
20.00 SF 0.00+ 2.98 =
7.83
14.90
82.33
61. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
10
10.00 LF 0.00+ 11.66 =
15.30
29.15
161.05
62. DRY
TEX
+ Texture drywall - light hand texture
40
40.00 SF 0.00+ 1.14 =
5.99
11.40
62.99
63. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
40
40.00 SF 0.00+ 0.97 =
5.09
9.70
53.59
64. PNT
P
+ Paint the walls - one coat
W
140.69 SF 0.00+ 0.68 =
12.56
23.92
132.15
65. FCW
US>>
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
9.87 SF 0.00+ 2.76 =
3.58
6.81
37.63
Durason 3.55mm (104mil) or similar
66. FCV
PLK
+ Vinyl plank flooring
F
9.87 SF [*] 0.00+ 10.60 =
13.74
26.15
144.51
Material component pricing established by Itel lab analysis and is subject to local market conditions
67. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
PIT
9.95 LF 0.00+ 4.33 =
5.65
10.77
59.50
68. PNT
132
+ Paint baseboard - two coats
PF
9.95 LF 0.00+ 1.48 =
1.94
3.68
20.35
69. FNC
DOP>>
+ Door opening (jamb & casing) - 60" or wider - paint grade
1
1.00 EA 0.00+ 243.23 =
31.93
60.80
335.96
70. PNT
OP>
+ Paint door or window opening - Large - 2 coats (per side)
1
1.00 EA 0.00+ 37.98 =
4.99
9.50
52.47
71. DOR
BFPNL
+ Bifold door set - solid fir 4 or 6 panel - Double
1
1.00 EA 0.00+ 619.66 =
81.33
154.92
855.91
72. PNT
BF
+ Paint bifold door set - slab only - 2 coats (per side)
1
1.00 EA 0.00+ 51.40 =
6.75
12.85
71.00
73. FNH
BFTPRS
I Install Bifold pivot door hardware - Detach & reset
2
2.00 EA 0.00+ 13.86 =
3.64
6.93
38.29
74. FNH
DORDHRS
+ Door dummy knob - Detach & reset
2
2.00 EA 0.00+ 10.39 =
2.73
5.20
28.71
GREGORY106_REPAIR 5/16/2022 Page:8
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Closet
CAT SEL ACT DESCRIPTION
CALC QTY REMOVE REPLACE
Totals: Closet
Living Room
Y 1 U --w Vim'..
383.09 SF Walls
1,
T
Living Room �a'6"_
553.25 SF Walls & Ceiling
1
18.91 SY Flooring
2' 8.,1
3' 6"-1 12' 10" 1
30.62 LF Ceil. Perimeter
i1-3'8�� 12'a..
Missing Wall
9 9/16" X 12'
Missing Wall - Goes to Ceiling
5' 2 1/2" X 9'
Missing Wall
4' 6 3/16" X 12'
Missing Wall
2' 7 11/16" X 12'
Missing Wall
2' 4 5/8" X 12'
F-2181-1-6'-------- 4-2'4"A Subroom: Dining Room (1)
Ta°�
12'2"
N
194.57 SF Walls
DiningRoom (1)
263.54 SF Walls & Ceiling
°
7.66 SY Flooring
1
19.55 LF Ceil. Perimeter
9' 1011---------------1
Missing Wall
9' 10 7/16" X 12'
Door
6' X 6' 8"
Missing Wall
7 9/16" X 12'
Missing Wall
4' 7 3/4" X 12'
TAX O&P TOTAL
203.05 386.68 2,136.44
Height: 12'
170.16 SF Ceiling
170.16 SF Floor
35.83 LF Floor Perimeter
Opens into KITCHEN
Opens into KITCHEN
Opens into KITCHEN
Opens into ENTRY —FOYER
Opens into ENTRY —FOYER
Height: 12'
68.96 SF Ceiling
68.96 SF Floor
13.55 LF Floor Perimeter
Opens into LIVING ROOM
Opens into Exterior
Opens into KITCHEN
Opens into KITCHEN
GREGORY106_REPAIR 5/16/2022 Page:9
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
I=-
i1 4.
III 1/
Missing Wall
Missing Wall
Door
CAT SEL
CALC
Subroom: Area (2) Height: 12'
86.68 SF Walls 13.71 SF Ceiling
100.39 SF Walls & Ceiling 13.71 SF Floor
1.52 SY Flooring 5.89 LF Floor Perimeter
8.89 LF Ceil. Perimeter
1' 6 5/16" X 12' Opens into ENTRY -FOYER
4' 11" X 12' Opens into LIVING ROOM
3' X 61811 Opens into MBDRM
ACT DESCRIPTION
QTY REMOVE REPLACE TAX O&P TOTAL
75. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
40
40.00 SF 0.00+ 2.98 =
15.65
29.80
164.65
76. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
22
22.00 LF 0.00+ 11.66 =
33.66
64.13
354.31
77. DRY
TEX
+ Texture drywall - light hand texture
80
80.00 SF 0.00+ 1.14 =
11.98
22.80
125.98
78. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
80
80.00 SF 0.00+ 0.97 =
10.19
19.40
107.19
79. PNT
P
+ Paint the walls - one coat
W
664.34 SF 0.00+ 0.68 =
59.29
112.94
623.98
80. FCW
US>>
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
252.83 SF 0.00+ 2.76 =
91.59
174.45
963.85
Durason 3.55mm (104mil) or
similar
81. FCV
PLK
+ Vinyl plank flooring
F
252.83 SF [*] 0.00+ 10.60 =
351.75
670.00
3,701.75
Material component pricing established
by Itel lab analysis and is subject to local market conditions
82. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
PIT
55.27 LF 0.00+ 4.33 =
31.41
59.83
330.56
83. PNT
132
+ Paint baseboard - two coats
PF
55.27 LF 0.00+ 1.48 =
10.74
20.45
112.99
84. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+ 32.29 =
4.24
8.07
44.60
85. HVC
REGRS
+ Heat/AC register - Mechanically attached - Detach & reset
2
2.00 EA 0.00+ 25.27 =
6.64
12.63
69.81
86. HVC
CARS
+ Cold air return cover - Detach & reset
2
2.00 EA 0.00+ 34.52 =
9.06
17.26
95.36
Totals: Living Room
636.20 1,211.76 6,695.03
GREGORY106_REPAIR 5/16/2022 Page:10
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
`
V
r
3, $;,
Kitchen
Height: 12'
330.85 SF Walls
111.43 SF Ceiling
442.29 SF Walls & Ceiling
111.43 SF Floor
l012.38
JKitchen
SY Flooring
31.48 LF Floor Perimeter
1
26.27 LF Ceil. Perimeter
1-4' 6"
Missing Wall
4' 6 3/16" X 12'
Opens into LIVING ROOM
Missing Wall - Goes to Ceiling 5' 2 1/2" X 9'
Opens into LIVING ROOM
Missing Wall
9 9/16" X 12'
Opens into LIVING ROOM
Missing Wall
4' 7 3/4" X 12'
Opens into DINING_ROOM
Missing Wall
7 9/16" X 12'
Opens into DINING_ROOM
CAT SEL
ACT DESCRIPTION
CALC
QTY REMOVE REPLACE
TAX O&P
TOTAL
87. INS BTLF4
+ Batt insulation replacement per LF - 4" - up to 2' tall
5
5.00 LF 0.00+ 2.76 =
1.81 3.45
19.06
88. DRY 5/8-
+ 5/8" drywall - hung, taped, ready for texture
63
63.00 SF 0.00+ 2.98 =
24.64 46.93
259.31
89. DRY PATCHJ
+ Tape joint for new to existing drywall - per LF
PF
31.48 LF 0.00+ 11.66 =
48.18 91.77
507.01
90. DRY TEX
+ Texture drywall - light hand texture
94
94.00 SF 0.00+ 1.14 =
14.06 26.79
148.01
91. PNT SP
+ Seat/prime then paint the surface area (2 coats)
94
94.00 SF 0.00+ 0.97 =
11.96 22.80
125.94
92. PNT P
+ Paint part of the walls - one coat
W-42
288.85 SF 0.00+ 0.68 =
25.78 49.10
271.30
93. FCW US>>
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
111.43 SF 0.00+ 2.76 =
40.36 76.89
424.80
Durason 3.55mm (104mil) or
similar
94. FCV PLK
+ Vinyl plank flooring
F
111.43 SF [*] 0.00+ 10.60 =
155.03 295.29
1,631.48
Material component pricing established by Itel lab analysis and is subject to local market conditions
95. FNC B4M+
+ Baseboard - 4 1/4" MDF - w/profile
5
5.00 LF 0.00+ 4.33 =
2.84 5.42
29.91
96. PNT B2
+ Paint baseboard - two coats
5
5.00 LF 0.00+ 1.48 =
0.98 1.85
10.23
97. FNC SHOE
+ Base shoe
17,6
17.50 LF 0.00+ 1.82 =
4.18 7.97
44.00
98. CAB CTDK
+ Countertop subdeck - plywood
48
48.00 SF 0.00+ 5.22 =
32.89 62.64
346.09
99. TIL CTTL+
+ Countertop - Tile - High grade
48
48.00 SF 0.00+ 38.86 =
244.81 466.32
2,576.41
GREGORY106_REPAIR
5/16/2022
Page: II
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Kitchen
CAT SEL ACT DESCRIPTION
CALC QTY REMOVE REPLACE TAX O&P TOTAL
3/8" [1 cm] granite tile: includes tile, counter trim (edge treatment), grout, thinset
Material component pricing is subject to Itel analysis and local market conditions
100. APP
MWSRS
+ Microwave oven - over range type - Detach & reset
1
1.00 EA 0.00+ 159.07 =
20.88
39.77
219.72
101. PLM
SNKDRS
I Sink - double basin - Reset
1
1.00 EA 0.00+ 234.30 =
30.75
58.58
323.63
102. APP
GDRS
I Garbage disposer - Reset
1
1.00 EA 0.00+ 234.93 =
30.84
58.73
324.50
103. APP
RGGRS
I Range - gas - Reset
1
1.00 EA 0.00+ 234.93 =
30.84
58.73
324.50
104. APP
DWRS
I Dishwasher - Reset
1
1.00 EA 0.00+ 342.73 =
44.99
85.68
473.40
105. APP
RFRS
+ Refrigerator - Remove & reset
1
1.00 EA 0.00+ 65.82 =
8.64
16.45
90.91
106. TIL
AV+
& R&R Ceramic/porcelain tile - High grade
36
36.00 SF 2.61+ 20.43 =
108.88
207.36
1,145.68
107. TIL
AVB+
& R&R Ceramic tile - bullnose - 3/4" x 6" - High grade
17
17.00 LF 3.07+ 14.35 =
38.86
74.04
409.04
108. TIL
CTTLB
+ Add -on for tile backsplash installation
36
36.00 SF 0.00+ 24.09 =
113.83
216.81
1,197.88
109. TIL
DIAGADD
+ Add -on for diagonal tile installation
36
36.00 SF 0.00+ 2.41 =
11.39
21.69
119.84
110. CAB
UP
- Remove Cabinetry - upper (wall) units
10,4
10.33 LF 10.93+ 0.00 =
14.83
28.23
155.97
111. CAB
BIDITM
+ Cabinetry (Bid Item)
1
1.00 EA [*1 0.00+ 17,251.68 =
2,264.29
4,312.92
23,828.89
MATERIAL
ONLY: Quote from Home Depot (attached) to replace cabinets with like kind & quality. Quote includes all cabinets, fillers,
crown, appearance panels, under -cabinet lighting, and hardware.
112. CAB
KNPL+
I Install Cabinet knob or pull - High grade
26
26.00 EA 0.00+ 6.10 =
20.81
39.65
219.06
113. CAB
LOW
I Install Cabinetry - lower (base) units
17
17.00 LF 0.00+ 48.02 =
107.15
204.08
1,127.57
114. CAB
UP
I Install Cabinetry - upper (wall) units
10,4
10.33 LF 0.00+ 48.02 =
65.11
124.02
685.18
115. LIT
PUCK
I Install Puck light - shallow
3
3.00 EA 0.00+ 88.44 =
34.83
66.33
366.48
Totals: Kitchen 3,554.44 6,770.29 37,405.80
GREGORY106_REPAIR 5/16/2022 Page:12
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
�--io' 6^1
Door
Bedroom 2
521.51 SF Walls
650.32 SF Walls & Ceiling
14.31 SY Flooring
48.46 LF Ceil. Perimeter
YX6'8"
Subroom: Closet (1)
184.00 SF Walls
198.67 SF Walls & Ceiling
1.63 SY Flooring
18.67 LF Ceil. Perimeter
Height: 12'
128.81 SF Ceiling
128.81 SF Floor
39.46 LF Floor Perimeter
Opens into ENTRY -FOYER
Height: 12'
14.67 SF Ceiling
14.67 SF Floor
12.67 LF Floor Perimeter
H2- 6"-,
Door
6' X 6' 8" Opens into
BEDROOM-2
CAT
SEL
ACT DESCRIPTION
CALC
QTY REMOVE REPLACE
TAX
O&P
TOTAL
116. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
4
4.00 LF 0.00+ 2.76 =
1.45
2.76
15.25
117. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
21
21.00 SF 0.00+ 2.98 =
8.21
15.65
86.44
118. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
21
21.00 LF 0.00+ 11.66 =
32.14
61.22
338.22
119. DRY
TEX
+ Texture drywall - light hand texture
42
42.00 SF 0.00+ 1.14 =
6.29
11.97
66.14
120. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
42
42.00 SF 0.00+ 0.97 =
5.35
10.18
56.27
121. PNT
P
+ Paint the walls - one coat
W
705.51 SF 0.00+ 0.68 =
62.96
119.94
662.65
122. FCW
US>>
+ Underlayment - sound/crack membrane - 70+ to 90 mil
F
143.48 SF 0.00+ 2.76 =
51.98
99.00
546.98
Durason 3.55mm
(104mil) or
similar
123. FCV
PLK
+ Vinyl plank flooring
F
143.48 SF [*] 0.00+ 10.60 =
199.61
380.22
2,100.72
Material component
pricing established by Itel lab analysis and is subject to local market conditions
124. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
PF
52.13 LF 0.00+ 3.74 =
25.59
48.75
269.31
125. PNT
B2
+ Paint baseboard - two coats
PF
52.13 LF 0.00+ 1.48 =
10.13
19.29
106.57
GREGORY106_REPAIR
5/16/2022
Page:13
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Bedroom 2
CAT
SEL
CALC
ACT DESCRIPTION
QTY REMOVE REPLACE
TAX
O&P
TOTAL
126. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+ 401.64 =
52.71
100.41
554.76
127. PNT
OP
+ Paint door or window opening - 2 coats (per side)
1
1.00 EA 0.00+ 32.29 =
4.24
8.07
44.60
128. PNT
DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+ 38.50 =
5.05
9.63
53.18
129. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+ 29.70 =
3.90
7.43
41.03
130. FNC
DOP>>
+ Door opening (jamb & casing) - 60" or wider - paint grade
1
1.00 EA 0.00+ 243.23 =
31.93
60.80
335.96
131. PNT
OP>
+ Paint door or window opening - Large - 2 coats (per side)
1
1.00 EA 0.00+ 37.98 =
4.99
9.50
52.47
132. DOR
BFPNL
+ Bifold door set - solid fir 4 or 6 panel - Double
1
1.00 EA 0.00+ 619.66 =
81.33
154.92
855.91
133. FNH
BFTPRS
I Install Bifold pivot door hardware - Detach & reset
2
2.00 EA 0.00+ 13.86 =
3.64
6.93
38.29
134. FNH
DORDHRS
+ Door dummy knob - Detach & reset
2
2.00 EA 0.00+ 10.39 =
2.73
5.20
28.71
135. FNC
CLOSWRS
+ Shelving - wire (vinyl coated) - Detach & reset
10
10.00 LF 0.00+ 11.28 =
14.80
28.20
155.80
136. HVC
REGRS
+ Heat/AC register - Mechanically attached - Detach & reset
1
1.00 EA 0.00+ 25.27 =
3.31
6.32
34.90
137. HVC
CARS
+ Cold air return cover - Detach & reset
1
1.00 EA 0.00+ 34.52 =
4.53
8.63
47.68
Totals: Bedroom 2
616.87
1,175.02
6,491.84
GREGORY106_REPAIR
5/16/2022
Page:14
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Door
Door
Door
3' 1'HS'�3� 2"
a
a�
ster Bedr
^ k5 6 I_ _
0
to -
Foyc athr
Mastc
T2' 4"
N N
2' 2"
Master Bedroom
686.83 SF Walls
878.59 SF Walls & Ceiling
21.31 SY Flooring
61.96 LF Ceil. Perimeter
YX6'8"
3'X6'8"
2'6"X6'8"
Subroom: Linens (1)
77.64 SF Walls
81.90 SF Walls & Ceiling
0.47 SY Flooring
6.47 LF Ceil. Perimeter
Height: 12'
191.76 SF Ceiling
191.76 SF Floor
53.46 LF Floor Perimeter
Opens into MBTH
Opens into AREA
Opens into WIC
Height: 12'
4.27 SF Ceiling
4.27 SF Floor
6.47 LF Floor Perimeter
F-2' 4" �
I
Missing Wall
CAT SEL
CALC
1' 11 5/8" X 12' Opens into MBDRM
ACT DESCRIPTION
QTY REMOVE REPLACE TAX
O&P
TOTAL
138. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
20
20.00 LF 0.00+ 2.76 =
7.25
13.80
76.25
139. DRY
5/8H
+ 5/8" drywall - hung only (no tape or finish)
26
26.00 SF 0.00+ 2.05 =
7.00
13.33
73.63
140. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
133
133.00 SF 0.00+ 2.98 =
52.03
99.08
547.45
141. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
PF
59.93 LF 0.00+ 11.66 =
91.71
174.70
965.19
142. DRY
TEX
+ Texture drywall - light hand texture
240
240.00 SF 0.00+ 1.14 =
35.91
68.40
377.91
143. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
42
42.00 SF 0.00+ 0.97 =
5.35
10.18
56.27
144. PNT
P
+ Paint the walls - one coat
W
764.47 SF 0.00+ 0.68 =
68.23
129.96
718.03
145. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
PF
59.93 LF 0.00+ 4.33 =
34.06
64.88
358.44
146. PNT
B2
+ Paint baseboard - two coats
PF
59.93 LF 0.00+ 1.48 =
11.64
22.18
122.52
147. FCC
PAD
+ Carpet pad
F
196.02 SF 0.00+ 0.68 =
17.50
33.32
184.11
Material component
pricing established by Itel lab analysis and is subject to local market conditions
GREGORY106_REPAIR
5/16/2022
Page:15
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Master Bedroom
CAT
SEL
ACT DESCRIPTION
CALC
QTY REMOVE REPLACE
TAX
O&P
TOTAL
148. FCC
AV
+ Carpet
FLR_RPL
286.00 SF 0.00+ 3.70 =
138.89
264.55
1,461.64
149. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+ 401.64 =
52.71
100.41
554.76
150. PNT
OP
+ Paint door or window opening - 2 coats (per side)
3
3.00 EA 0.00+ 32.29 =
12.71
24.22
133.80
151. PNT
DOR
+ Paint door slab only - 2 coats (per side)
3
3.00 EA 0.00+ 38.50 =
15.16
28.88
159.54
152. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+ 29.70 =
3.90
7.43
41.03
153. FNC
CLOSWRS
+ Shelving - wire (vinyl coated) - Detach & reset
5
5.00 LF 0.00+ 11.28 =
7.40
14.10
77.90
154. HVC
REGRS
+ Heat/AC register - Mechanically attached - Detach & reset
1
1.00 EA 0.00+ 25.27 =
3.31
6.32
34.90
155. HVC
CARS
+ Cold air return cover - Detach & reset
1
1.00 EA 0.00+ 34.52 =
4.53
8.63
47.68
Totals: Master Bedroom
569.29
1,084.37
5,991.05
1,
Walk-in Closet
Height: 12'
T332.47
SF Walls
46.90 SF Ceiling
losetom379.37
r"z
SF Walls & Ceiling
46.90 SF Floor
e
5.21 SY Flooring
26.59 LF Floor Perimeter
s' 9" 1
29.09 LF Ceil. Perimeter
s11^
Door
2' 6" X 6' 8" Opens into MBDRM
CAT
SEL
ACT DESCRIPTION
CALC
QTY REMOVE REPLACE
TAX
O&P
TOTAL
156. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to 2' tall
6,6
6.50 LF 0.00+ 2.76 =
2.35
4.48
24.77
157. DRY
5/8H
+ 5/8" drywall - hung only (no tape or finish)
17
17.00 SF 0.00+ 2.05 =
4.58
8.72
48.15
GREGORY106_REPAIR 5/16/2022 Page:16
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Walk-in Closet
CAT SEL ACT DESCRIPTION
CALC QTY REMOVE REPLACE
TAX O&P TOTAL
158. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
60
60.00 SF 0.00+ 2.98 =
23.46
44.70
246.96
159. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
PF
26.59 LF 0.00+ 11.66 =
40.69
77.51
428.24
160. DRY
TEX
+ Texture drywall - light hand texture
106
106.00 SF 0.00+ 1.14 =
15.86
30.21
166.91
161. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
106
106.00 SF 0.00+ 0.97 =
13.50
25.70
142.02
162. PNT
P
+ Paint the walls - one coat
W
332.47 SF 0.00+ 0.68 =
29.68
56.52
312.28
163. FNC
B4M+
+ Baseboard - 4 1/4" MDF - w/profile
PF
26.59 LF 0.00+ 4.33 =
15.11
28.78
159.02
164. PNT
132
+ Paint baseboard - two coats
PF
26.59 LF 0.00+ 1.48 =
5.16
9.84
54.35
165. FCC
PAD
+ Carpet pad
F
46.90 SF 0.00+ 0.68 =
4.19
7.97
44.05
Material component pricing established
by Itel lab analysis and is subject to local market conditions
166. FCC
AV
+ Carpet
(F)* 1.15
53.94 SF 0.00+ 3.73 =
26.41
50.30
277.91
15 % waste added for Carpet.
167. DOR
PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+ 401.64 =
52.71
100.41
554.76
168. PNT
OP
+ Paint door or window opening - 2 coats (per side)
3
3.00 EA 0.00+ 32.29 =
12.71
24.22
133.80
169. PNT
DOR
+ Paint door slab only - 2 coats (per side)
3
3.00 EA 0.00+ 38.50 =
15.16
28.88
159.54
170. FNH
DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+ 29.70 =
3.90
7.43
41.03
171. FNC
CLOSWRS
+ Shelving - wire (vinyl coated) - Detach & reset
23
23.00 LF 0.00+ 11.28 =
34.05
64.86
358.35
Totals: Walk-in Closet
299.52 570.53 3,152.14
GREGORY106_REPAIR 5/16/2022 Page:17
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Door
1--4' 6"--4
4' 10" T
(V
51211
Missing Wall
CAT SEL
CALC
Master Bath
424.35 SF Walls
503.49 SF Walls & Ceiling
8.79 SY Flooring
37.03 LF Ceil. Perimeter
YX6'8"
Subroom: Shower (1)
123.68 SF Walls
136.90 SF Walls & Ceiling
1.47 SY Flooring
10.31 LF Ceil. Perimeter
Height: 12'
79.13 SF Ceiling
79.13 SF Floor
34.03 LF Floor Perimeter
Opens into MBDRM
Height: 12'
13.22 SF Ceiling
13.22 SF Floor
10.31 LF Floor Perimeter
4' 9 11/16" X 12' Opens into MBTH
ACT DESCRIPTION
QTY REMOVE REPLACE TAX O&P TOTAL
172. INS
BTLF4
+ Batt insulation replacement per LF - 4" - up to T tall
9*2
18.00 LF 0.00+ 2.76 =
173. DRY
5/81-1
+ 5/8" drywall - hung only (no tape or finish)
18
18.00 SF 0.00+ 2.05 =
174. DRY
5/8-
+ 5/8" drywall - hung, taped, ready for texture
44
44.00 SF 0.00+ 2.98 =
175. DRY
PATCHJ
+ Tape joint for new to existing drywall - per LF
34
34.00 LF 0.00+ 11.66 =
176. DRY
TEX
+ Texture drywall - light hand texture
136
136.00 SF 0.00+ 1.14 =
177. PNT
SP
+ Seal/prime then paint the surface area (2 coats)
136
136.00 SF 0.00+ 0.97 =
178. PNT
P
+ Paint the surface area - one coat
MAIN.W
424.35 SF 0.00+ 0.68 =
179. FNC
B3M+
+ Baseboard - 3 1/4" MDF w/profile
MAIN.PF
34.03 LF 0.00+ 3.74 =
180. PNT
B2
+ Paint baseboard - two coats
MAIN.PF
34.03 LF 0.00+ 1.48 =
181. CAB
VAN
+ Vanity
5
5.00 LF [*1 0.00+ 342.14 =
Per attached HD quote for like
kind & quality
182. CAB
KNPL+
+ Cabinet knob or pull - High grade
7
7.00 EA [*1 0.00+ 28.14 =
GREGORY 106_REPAIR
6.53
12.42
68.63
4.84
9.23
50.97
17.21
32.78
181.11
52.04
99.11
547.59
20.35
38.76
214.15
17.31
32.98
182.21
37.88
72.14
398.58
16.70
31.82
175.79
6.61
12.59
69.56
224.53
427.68
2,362.91
25.85
49.25
272.08
5/16/2022
Page:18
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
CONTINUED - Master Bath
CAT SEL
ACT DESCRIPTION
CALC
QTY REMOVE REPLACE
TAX
O&P
TOTAL
Per attached HD quote for like kind & quality
183. CAB CTDK
+ Countertop subdeck - plywood
10
10.00 SF 0.00+
5.22 =
6.85
13.05
72.10
184. TIL CTTL+
+ Countertop - Tile - High grade
10
10.00 SF [*] 0.00+
48.41 =
63.54
121.03
668.67
3/8" [1 cm] marble tile: includes tile, counter trim (edge treatment), backsplash, grout, thinset
Material component pricing established
by Itel lab analysis and is subject to local market conditions
185. TIL CTTLB
+ Add -on for tile backsplash installation
7*.5
3.50 SF 0.00+
24.09 =
11.06
21.08
116.46
186. TIL AVB+
& R&R Ceramic tile - bullnose - 3/4" x 6"
- High grade
7
7.00 LF 3.07+
14.35 =
16.02
30.49
168.45
187. PLM SNKRS
I Sink - single - Reset
2
2.00 EA 0.00+
219.25 =
57.55
109.63
605.68
188. PLM FAURS
I Sink faucet - Reset
2
2.00 EA 0.00+
175.84 =
46.16
87.92
485.76
189. PLM TLTRS
+ Toilet - Detach & reset
1
1.00 EA 0.00+
355.32 =
46.64
88.83
490.79
190. DOR PNL
+ Interior door - solid fir door w/paint-grade jamb & case
1
1.00 EA 0.00+
401.64 =
52.71
100.41
554.76
191. PNT OP
+ Paint door or window opening - 2 coats
(per side)
1
1.00 EA 0.00+
32.29 =
4.24
8.07
44.60
192. PNT DOR
+ Paint door slab only - 2 coats (per side)
1
1.00 EA 0.00+
38.50 =
5.05
9.63
53.18
193. FNH DORHRS
+ Door knob/lockset - Detach & reset
1
1.00 EA 0.00+
29.70 =
3.90
7.43
41.03
194. HVC REGRS
+ Heat/AC register - Mechanically attached - Detach & Reset
1
1.00 EA 0.00+
25.27 =
3.31
6.32
34.90
195. FNH TBARRS
+ Towel bar - Detach & reset
2
2.00 EA 0.00+
21.88 =
5.74
10.94
60.44
196. FNH TPRS
+ Toilet paper holder - Detach & reset
1
1.00 EA 0.00+
23.09 =
3.03
5.77
31.89
Totals: Master Bath
755.65
1,439.36
7,952.29
Total: UNIT 106
7,880.68
14,957.78
82,933.00
Total: RESIDENTIAL
7,880.68
14,957.78
82,933.00
Line Item Totals: GREGORY106_REPAIR
7,880.68
14,957.78
82,933.00
GREGORY106_REPAIR
5/16/2022
Page:19
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Grand Total Areas:
4,415.20 SF Walls
1,012.76 SF Floor
0.00 SF Long Wall
1,012.76 Floor Area
1,912.20 Exterior Wall Area
0.00 Surface Area
0.00 Total Ridge Length
1,012.76 SF Ceiling
112.53 SY Flooring
0.00 SF Short Wall
1,107.65 Total Area
151.71 Exterior Perimeter of
Walls
0.00 Number of Squares
0.00 Total Hip Length
5,427.95 SF Walls and Ceiling
347.30 LF Floor Perimeter
400.88 LF Ceil. Perimeter
4,415.20 Interior Wall Area
0.00 Total Perimeter Length
GREGORY106_REPAIR 5/16/2022 Page:20
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Summary
Line Item Total
60094.54
Overhead
8:974.70
Profit
5,983.08
Sales Tax
7,880.68
Replacement Cost Value
$82,933.00
Net Claim
$82,933.00
Deb Hardy
Project Manager
GREGORY106_REPAIR 5/16/2022 Page:21
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
Recap by Category
O&P Items Total
APPLIANCES
1,037.48
1.25%
CABINETRY
22,364.12
26.97%
CLEANING
405.10
0.49%
GENERAL DEMOLITION
607.25
0.73%
DOORS
3,649.16
4.40%
DRYWALL
5,775.07
6.96%
ELECTRICAL
3.80
0.00%
FLOOR COVERING - CARPET
1,424.58
1.72%
FLOOR COVERING - VINYL
6,664.54
8.04%
FLOOR COVERING - WOOD
1,735.29
2.09%
FINISH CARPENTRY / TRIMWORK
2,242.72
2.70%
FINISH HARDWARE
408.90
0.49%
HEAT, VENT & AIR CONDITIONING
289.70
0.35%
INSULATION
160.14
0.19%
LIGHT FIXTURES
265.32
0.32%
PLUMBING
2,631.49
3.17%
PAINTING
5,001.16
6.03%
TILE
5,164.72
6.23%
O&P Items Subtotal
59,830.54
72.14%
Non-O&P Items
Total
%
GENERAL DEMOLITION
264.00
0.32%
Non-O&P Items Subtotal
264.00
0.32%
O&P Items Subtotal
59,830.54
72.14%
Overhead
8,974.70
10.82 %
Profit
5,983.08
7.21 %
Sales Tax
7,880.68
9.50%
Total 82,933.00 100.00%
GREGORY106_REPAIR 5/16/2022 Page:22
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
1 1-106 LVP
Date Taken: 2/28/2022
076 Corporate Center Parkway KaylieKlemp turn: ITEL ustomer xperience ep
/ S.K. 107 c Mcloed Construction LLCE— : cuetomerexperience�i[elinc.c
Jacksonwille. Ft 32216met
Phone: j800j 8W-41335
VINYL EVALUATION
ustamer:
Generic Custome rl, FL
CUSTOMER
Control AF
INFORMATION
Additional: Mdced Construction LLC
V]f58170106
ust ID:
CUST0004
Date Received:
2125f2022
Vendor Job#: 22022010306
djoster:
Pre -Paid "a Bill
Date Inwiced:
212512()22
Contact: K ylie Klem p,
kklemp@mc4oedconstrucfion.nom
men Lr:
INSURED INFORMATION
laim#: NOT PROVIDED TO ITEL Loss Date: 11312022
nsumd Name: THE Gregory COA R—s.D-0 ed: Unit 106
ity,statszip: Edmonds,WA 9B020 Flooring Cola,. Brown
wnrnems:
Manufacturer
DEL HEW HMARK
Style
Width
SgFVCarton
Shaw Industries
Heritage Oak 720C Plus
8.8w, x
21.79
59.06, 9'r x
59'r
Shaw Industries
Cathedral Oak 720C Plus
8.86rrx
21.79
59.06'r, 9'r x
59'r
Shaw Industries
Blue Ridge Pine 770C HD Plus
8.8w, x
21.7D
59.06". 9'r x
59'r
Shaw Industries
Cross -Sawn Pine
8.86rrx
21.79
59A W', 9- x
6w,
�omrnen ts:
Per Sq Yd: Vinyl: N1A
ITEL BK PRI CJ= ANA LYSI S"
Flood ng Labor: NA
Total: HIP
Per Sq Ft: Vinyl: $6.80
Flooring Labor: $0.00
Total: $6.8(
" Exdudes tax. Minimum shipping or drop charges may apply_
Comments:
VINYL ANALYSIS
roducl Fnrm:
Plank
Weadayer Type: Urethane
- ilelPlank s
N!A
Weadayer Thickness: 20 mits
Construction :
Printed
Overall Thickn ess: 260 mi Is
3—king:
om—rts
F oa m
INVOICE
ontral #: vx Sal 70100 Test Fee: $T1.95
ustomer ID: CUST0004 Shipping: $16.50
Total Due: $66.45
lease note Customer ID # and Control # on all correspondence. FEDERALTA% ID NUMBER: 26-2574564
omments: THIS INVOICE IS FOR YOUR RECORD ONtYI Our records indicate thatthis invoice has been pre -paid by credit card
or cheek. I
GREGORY106_REPAIR 5/16/2022 Page:23
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
2 2-Entry
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:24
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
3-Entry
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:25
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
4 4-Entry
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:26
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
5 5-Laundry1
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:27
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
6 6-Bathroom
Date Taken: 2/17/2022
4
r�- r
i
GREGORY106_REPAIR 5/16/2022 Page:28
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
7-Kitchen
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:29
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
8-Kitchen
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:30
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
9 9-Kitchen
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:31
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
10 10-Kitchen
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:32
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
11 11-Living Room
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:33
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
12 12-Bedroom 2
GREGORY106_REPAIR 5/16/2022 Page:34
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
13 13-Bedroom 2
Date Taken: 2/17/2022
L d
GREGORY106_REPAIR 5/16/2022 Page:35
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
14 14-Master Bedroom
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:36
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
15 15-Master Bedroom
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:37
�d80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC#MCLEODCL951DD
(206) 545-7837
16 16-Master Bedroom
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:38
mcleod Mcleod Construction LLC
construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
17 17-Master Bedroom
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:39
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
18 18-Master Bath
Date Taken: 1/11/2022
GREGORY106_REPAIR 5/16/2022 Page:40
�d80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC#MCLEODCL951DD
(206) 545-7837
19 19-Master Bath
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:41
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
20 20-Master Bath
Date Taken: 2/17/2022
0
GREGORY106_REPAIR 5/16/2022 Page:42
�d80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
21 21-Master Closet
Date Taken: 2/17/2022
GREGORY106_REPAIR 5/16/2022 Page:43
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
22 22-HD Quote KM Natural Maple
P1
Date Taken: 5/16/2022
QUOTE
Store 4711 BELLEVUE, WA
325 120TH AVE NE
BELLEVUE, WA 98005
Phone: (425) 451-7351
Salesperson: EXC613
Reviewer: EXC613
Hame pweI
07
A°tlf 505 5TH AVE S VWe2
C°mpa"p Name
cm EDMONDS '°°ems° atl°" Design with Natural Maple
''
r' WA vp 98D20 °ounh SNOHOMISH
Page f of 3 Nv. H4711-345605
Lid
2022.05-09 14:43
Prices Valid Thru: D511672022
VENDOR DIRECT SHIP #1
MERCHANDISE AND SERVICE SUMMARY 'Sod oG wetheto limitfhequantities of merchandise
em
TO:CUSTOMER
SiO - MERCHANDISE TO BE SHIPPED: SIO KRAFTMAID REF # S01 ESTIMATED ARRIVAL DATE: 071M202�j
FACTORY
REF #
SKU
QTY
UM
DESCRIPTION
PI
TAX
CH
EXTENSION
S01D1
1OD2-568-978
1.DD
EA
BF3 1 BF3 BASE FILLER 3 {BASE} 1 BF3 FSIDES:B MODS: W=1" W2=1"
H=34 112" D=24"
A
$44.79
$44.79
S0102
10D2-568-978
1.00
EA
BD36.31 BD36.3 BASE THREE DRAWER 361 BD36.3 FSIDES:B
Y
$1,32D.14
$1,320.14
S01D3
10D2-568-978
1.DO
EA
S1336BUTT.W 1 SB36BUTT.W SINK BASE 36BUTT W 1 SB36BUTT
FSIDES:B HINGES:L
A
Y
$709.48
$709.48
SO104
1002-568-978
1.DD
EA
I NONE A 1 NONE(A) NO SINK) ATT:SB36BUTT.W NO S:B
A
Y
$D.00
$O.DO
S0105
10D2-568-978
1.DD
EA
EZR33L.WSS 1 EZR33L.WSS EASY REACH 33L 33L.WSS
FSIDES:B HINGES:L
A
Y
$1,324.41
$1,324.41
S01D6
10D2-568-978
3-DO
EA
LED.PCK1 1 LED.PCK1 LED PUCK GHT W 8FT PO 1 LED.PCK1
FSIDES:B
A
Y
$67.54
$202.62
S0107
10D2-568-978
1.DD
EA
LED.DDR40 1 LED.DDR4 K DIMDRV 24V DC 46W 12P 1
LED.DDR40 `SIDES
A
Y
$174.17
$174.17
S01DB
10D2-568-978
1.OD1
EA
I BD21.31 BD2 THREE DRAWER 211 BD21.3 FSIDES :B
A
Y
$9D3.55
$903.55
S0109
10D2-568-978
1.DO
EA
TEP1 1 1 1121 90 TALL END PANEL 1 112L 90 1 TEP1 112L.90
F S: INGES:L
A
Y
$208.29
$208.29
S0110
1002-568-978
1.D0
FA
1 MIAPFC MATCHING INTERIOR ALL PLYWOOD FUR 1 AT f:TEP1
L.90 MIAPFC FSIDES:B
A
Y
$114.56
$114.56
"' CONTINUED ON NEXT PAGE -
Page f of 3 No. H4711-345605
Customer Copy
GREGORY106_REPAIR 5/16/2022 Page:44
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
23 23-HD Quote KM Natural Maple
P2
Date Taken: 5/16/2022
QUOTE - Continued
Page 2 of 3 No. H4711-345605
VENDOR DIRECT SHIP #1
(Continued)
TO: CUSTOMER
S0111
10D2-568-978
1.DD
EA
WPL4834I WPL4834 WOOD PANELING 4834 {BASE}! WPL4834 FSIDES:B
MODS: W=T' W2=7" H=34 112" D=D 318"
A
Y
$171.33
$171.33
S0112
1002-568-978
1.DD
EA
WPL9634I WPL9634 WOOD PANELING 9634 (BASE) 1 WPL9634 FSIDES:B
MODS: W=62 114" W2=62 114" H=34 112" D=D 318"
A
Y
$448.58
$448.58
S0113
10D2-568-978
1.DD
EA
BEA12L I BEA12L BASE END ANGLE 12L 1 BEA12L FSIDES:B HINGES:L
A
Y
$47D.62
$470.62
S0114
10D2-568-978
1.DD
EA
DBEL 1 DBEL INTEGRATED DECOR BASE END PANEL LEF 1 ATT:BEA12L
DBEL FSIDES:B
A
Y
$381.75
$381.75
S0115
10D2-568-978
1.D0
EA
B24BUTT2DXFWT 1 B24BUTT2DXFWT BASE 24BUTT 2 FW DELUXE D 1
B24BUTT2DXFWT FSIDES:B HINGES:L
A
Y
$1,086.26
$1,086.26
S0116
1002568-978
1.00
EA
BEA12R 1 BEA12R BASE END ANGLE 12R 1 BEA12R FSIDES:B HINGES
A
Y
$47D.62
$470.62
S0117
10D2-568-978
1.DD
EA
DBER 1 DBER INTEGRATED DECOR BASE END PANEL RIG I ATT-BEA12R
DBER FSIDES:B
A
Y
$381.75
$381.75
S0118
1002-568-978
1.DD
EA
WPL4834I WPL4834 WOOD PANELING 4834 {BASE} I WPL4834 FSIDES:B
MODS: W=6 15116" W2=6 15116" H=34 112" D=O 318"
A
Y
$171.33
$171.33
S0119
1002568-978
2.00
EA
WF3.361 WF3.36 WALL FILLER 3 36-IN H fWALLJ 1 WF3.36 FSIDES:B
A
Y
$54.74
$109.48
S0120
10D2-568-978
1.DD
EA
W3D36BUTT 1 W3036BUTT WALL 3036BUTT 1 W3036BUTT FSIDES:B
HINGES
A
Y
$877.25
$877.25
S0121
1002-568-978
1.DD
EA
W3012BUTT 1 W3012BUTT WALL 3012BUTT 1 W3012BUTT FSIDES:B
HINGES
A
Y
$479.15
$479.15
S0122
1002568-978
1.00
EA
W1836R 1 W1836R WALL 1836R 1 W1836R FSIDES:B HINGES:R
A
Y
$533.89
$533.89
S0123
10D2-568-978
1.DD
EA
WR3618BUTT 1 WR3618BUTT WALL REFRIGERATOR 3618BUTT I
WR3618BUTT FSIDES:B HINGES:L
A
Y
$876.54
$876.54
S0124
1002-568-978
1.D6
EA
WF3.30 (18H) 1 WF3.30 {18H} WALL FILLER 3 30-IN H (WALL 1 WF3.30 flSH)
FSIDES:B MODS: W=2 518" H=18" D=24"
A
Y
$44.79
$44.79
S0125
1002568-978
1.DD
EA
LSTCM8 1 LSTCM8 LARGE STERLING CROWN MOLDING fACC 1 LSTCM8
A
Y
$125.83
$125.83
S0126
1002-568-978
2.00
EA
OGP8) OGP8 OGEE PILASTER 8 JACCESSORYJ 1 OGP8
A
Y
$154.98
$309.96
S0127
1002-568-978
2.DD
EA
OSC81 OSC8 OUTSIDE CORNER ACCESSORr 1 OSC8
A
Y
$44.79
$89.58
S0128
10D2-568-978
5.DD
EA
SM8! SM8 SCRIBE MOLDING ACCESSOR 1 SM8
A
Y
$39.81
$199.05
S0129
1002-568-978
2.DD
EA
STR10 1 STR10 STARTER MOLDING JACCESSORn 1 STR10
A
Y
$346.92
$693.B4
S0130
10D2-568-978
1.DD
EA
APC 1 APC APC - ALL PLYWOOD CONSTRUCTION %1 APC
A
Y
$2 512.85
$2 512.85
S0131
10D2-568-978
14.DD
EA
PULL7133SN) PULL7133SN PULL7133SN -GALILEO SATIN NI 1
PULL7133SN
A
Y
$22.04
$308.56
S0132
1002568-978
10.00
EA
PULL71333N I PULL7133SN PULL7133SN-GALILEO SATIN NI 1
PULL7133SN
A
Y
$22.04
$220.40
S0133
1002-568-978
2.DD
EA
S3S1 JHJ 1 S3S1 JHJ SOLID STOCK 1 112 HORIZONTAL 1 S3S1 H
A
Y
$49.05
$98.1D
S0134
1002-568-978
2.DD
EA
LSTCM8 1 LSTCM8 LARGE STERLING CROWN MOLDING 1 LSTCM8
A
Y
$125.83
$251.66
S0135
1002-568-978
3.00
EA
0GP81 OGP8 OGEE PILASTER 81 OGPS
A
Y
$154.98
$464.94
S0136
1002-568-978
1.00
EA
WF3.361 WF3.36 WALL FILLER 3 36-1N H ALL 1 WF3.36
A
Y
$54.74
$54.74
""" CONTINUED ON NEXT PAGE ""
Page 2 of 3 No. H4711-345605
Customer Copy
GREGORY106_REPAIR 5/16/2022 Page:45
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
24 24-HD Quote KM Natural Maple
P3
Date Taken: 5/16/2022
QUOTE - Continued
Page3of3 No. H4711-345605
VENDOR DIRECT SHIP #1
(Continued)
TO: CUSTOMER
S0137
1002-568-978
1 1.00
EA
BF6 1 BF6 BASE FILLER 6 BASE 1 BF6
A
Y
$66.82
$66.82
S01 FR
OODD-506-658
1 1.0D
SIO FREIGHT SKU
A
Y
$35D.00
$350.DD
VENDOR - SPECIAL INSTRUCTIONS:
LINE: KMFRAME DSTYLE:AJ1M4 - COLE MAPLE USTYLE:AJIM4 DWRSTYLE:NO OPTION WOOD:APC, STANDARD
HINGE FINISH -NAM HDW-PULL7133SN DSGNR:exc613
VENDOR WILL SHIP MDSE TO:
ADDRESS: 5D5 5TH AVE S CITY: EDMONDS
STATE: WA LIP: 98020
COUNTY: SNOHOMISH SALES TAX RATE: 10.5
• $17251.68
PHONE:
ALTERNATE PHONE: PAGER:
END OF VENDOR DIRECT SHIP
ITOTAL CHARGES OF ALL MERCHANDISE & SERVICES
Policy Id (PII:
A: 90 DAYS DEFAULT POLICY;
The Nome Depot reserves the rignt to limit 1 deny iefurns. Please see the return policy sign in stores for details.'
Page 3 of 3 No. H4711-345605
END OF ORDER No. H4711-345605
Customer Copy
BALANCE DUEJ $F ""
Exempt - wholesale
GREGORY106_REPAIR 5/16/2022 Page:46
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC4MCLEODCL951DD
(206) 545-7837
25 25-Kitchen Layout - HD quote
Date Taken: 5/16/2022
GREGORY106_REPAIR 5/16/2022 Page:47
�t80 mcleod Mcleod Construction LLC
f� construction
McLeod Construction, LLC
1115 N 140th St
Seattle, WA 98133
LIC#MCLEODCL951DD
(206) 545-7837
26 26-Island layout - HD quote
Date Taken: 5/16/2022
GREGORY106_REPAIR 5/16/2022 Page:48
UNIT 106
11'
11' 2"
11' 3"�
10' 6"
-
101911
c`1
_
nw
1
_
g
—10, 10"
Dining Room (1)
Kitchen
ft
o�
2 s
9l W 0'
v '
6"
CIA
CIA-
1
Master Bedroom
0
�4' 6"
°O
Living Room
8' 5"
1
1- —51 611
2'
o
c
O
-�
Walk-in Closet
cn
1
3' 6" 12' 10"
'�'
00
i;
+
1
4"�
�38
12' 4��sgt
T
�o
a
N
o
F2' 4"
z''
4' 7" �2'2"
5' 9"ntry/Foyer
_
Bathro
-
F2' 4" 1
5'
_71
-
N
o
- Bedroom 2
o
-
-
'4"
M
cn
2' -
Master Bath
°O loefr{
�''
Y-
w
�l
Laundry
T 2
l
_
o
10'
.661146111
10'
`'
`J' 4'
101611
i2' 6" �
i15'
7"
41611
GREGORY 106_REPAIR
5/16/2022
UNIT 106
Page: 49