DNS GREGORY_COMMON_REPAIR- cost breakdownmcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 Client: The Gregory Property: 505 5th Ave S Edmonds, WA 98020 Operator: DEB Estimator: Deb Hardy Position: Project Manager Company: Mcleod Construction Business: 1115 N 140th St Seattle, WA 98133 Reference: Barbara Hartley Position: HOA Manager Company: Real Property Associates Business: 7500 Roosevelt Way Seattle, WA 98115 Type of Estimate: Sewage Date Entered: 1/4/2022 Price List: WAEVBX MAY22 Labor Efficiency: Restoration/Service/Remodel Estimate: GREGORY COMMON REP File Number: DH22009 Date Assigned: Business: (206) 545-7837 E-mail: deb@mcleodconstruction. com Business: (206) 523-0300 E-mail: bhartley@rpapm.com The following is not a contract but a general overview of Mcleod Construction LLC policies. Please see accompanying formal contract for your signature. This estimate is presented utilizing the Xactimate estimating software customized to reflect the specific scope of work presented in this loss. The work descriptions in this estimate are maintained by Xactanalysis, using a customized pricing database accepted by most insurance carriers, and may not precisely describe the actual work to be completed. It is intended to be used to arrive at the nearest approximate cost of repairs. To satisfy the needs of the insurance industry, this estimate is written to provide a specific scope of work at a package price. Line items include a description of the work to be done, the unit of measure and quantity needed. The May 2022 price list for the Everett WA market was used for some or all of the unit costs. The estimator also may have relied on the use of written or verbal quotes from subcontract labor or suppliers who were deemed capable of completing their respective scopes of work. Quantities in this estimate are for estimating purposes only and are not guaranteed to be accurate. In some cases, quantities are factored for waste, pattern matching and other circumstances. Costs which are unknown at this time remain "OPEN." Prior to the commencement of work, it may not be possible to tell if some items will be restorable or if there is concealed damage. Mechanical trade bids (i.e. plumbing, electrical, heating and cooling) are mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 often not possible to bid in a timely manner due to a delay in receiving proposals from qualified subcontractors. "OPEN' items and additional costs addressing concealed damage, code upgrades or other necessary work related to the restoration of the damaged property will be presented upon discovery and added to the contract amount. Although every effort has been made to ensure accuracy, this estimate is subject to change. We reserve the right to submit supplements due to: Code upgrades, newly discovered damages, inability to match material (i.e. flooring, paint, cabinets, etc). All supplements will be submitted in writing and will include pictures and explanations. NO supplemental work will begin until the work has been approved in writing (Email or fax) by the adjuster in charge or the financially responsible party. Unless specifically accounted for in this estimate, content manipulation is the sole responsibility of the home owner/occupant. Mcleod Construction can remove/reset contents at our standard rate of $80.00 per hour. This cost will be approved by and billed to the home owner. Deborah Hardy Project Manager Insurance Division 206-545-7837 GREGORY_COMMON_REP 5/16/2022 Page:2 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 GREGORY_COMMON_REP COMMON AREAS Vestibule Vestibule CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL L CLN FINALC + Final cleaning - construction - Commercial F 237.07 SF 0.00+ 0.32 = 9.96 18.97 104.79 Total: Vestibule 9.96 18.97 104.79 Window - Goes to Floor Missing Wall - Goes to Floor CAT SEL CALC Main Entry 534.48 SF Walls 771.55 SF Walls & Ceiling 26.34 SY Flooring 61.83 LF Ceil. Perimeter 12' X 9' 12' 10" X 9' ACT DESCRIPTION QTY REMOVE REPLACE Height: 12' 237.07 SF Ceiling 237.07 SF Floor 37.00 LF Floor Perimeter Opens into Exterior Opens into Exterior TAX O&P TOTAL 2. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 74 74.00 SF 0.00+ 2.98 = 28.94 55.13 304.59 3. DRY PATCHJ + Tape joint for new to existing drywall - per LF 37 37.00 LF 0.00+ 11.66 = 56.63 107.85 595.90 4. DRY TEX + Texture drywall - light hand texture 148 148.00 SF 0.00+ 1.14 = 22.15 42.18 233.05 5. DRY MASKSF + Mask per square foot for drywall work F 237.07 SF 0.00+ 0.31 = 9.65 18.37 101.51 Protect flooring for drywall scope of work 6. PNT SP + Seal/prime then paint the surface area (2 coats) 148 148.00 SF 0.00+ 0.97 = 18.84 35.89 198.29 7. PNT P + Paint the walls - one coat W 534.48 SF 0.00+ 0.68 = 47.70 90.87 502.02 8. PNT MASKSF + Mask the floor per square foot - plastic and tape - 4 mil F 237.07 SF 0.00+ 0.26 = 8.09 15.41 85.14 9. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 37.00 LF 0.00+ 3.74 = 18.16 34.60 191.14 GREGORY_COMMON_REP 5/16/2022 Page:3 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Main Entry CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 10. PNT 132 + Paint baseboard - two coats PF 37.00 LF 0.00+ 1.48 = 7.19 13.69 75.64 Totals: Main Entry 217.35 413.99 2,287.28 Total: Vestibule 227.31 432.96 2,392.07 Hallways Hallways CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 11. CLN FINALC + Final cleaning - construction - Commercial F 945.07 SF 0.00+ 0.32 = 39.69 75.60 417.71 Total: Hallways 39.69 75.60 417.71 Hall-1 Height: 12' 11T lU"y 6, 6„1 1191.42 SF Walls & Ceiling 226.97 SF Floor Fla m _ 25.22 SY Flooring 67.56 LF Floor Perimeter 100.40 LF Ceil. Perimeter Door 3' 10" X 6' 8" Opens into ELEVATOR LOB Door Y X 6' 8" Opens into Exterior Door 3' X 6' 8" Opens into Exterior Door Y X 6' 8" Opens into Exterior Door 3' X 6' 8" Opens into Exterior Missing Wall - Goes to Floor 12' 10" X 9' Opens into Exterior Door 4' 2" X 6' 8" Opens into HALL-2 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL GREGORY_COMMON_REP 5/16/2022 Page:4 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Hall 1 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE 12. INS BT4 + Batt insulation - 4" - RI I- unfaced batt 30 30.00 SF 0.00+ 0.71 = 13. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 135 135.00 SF 0.00+ 2.98 = 14. DRY PATCHJ + Tape joint for new to existing drywall - per LF 68 68.00 LF 0.00+ 11.66 = 15. DRY TEX + Texture drywall - light hand texture 270 270.00 SF 0.00+ 1.14 = 16. PNT SP + Seal/prime then paint the surface area (2 coats) 270 270.00 SF 0.00+ 0.97 = 17. PNT P + Paint the walls - one coat W 964.45 SF 0.00+ 0.68 = 18. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 67.56 LF 0.00+ 3.74 = 19. PNT B2 + Paint baseboard - two coats PF 67.56 LF 0.00+ 1.48 = 20. FNC CAM+ + Casing - 2 1/4" MDF w/detail 14*4 56.00 LF 0.00+ 2.35 = 21. PNT OP + Paint door or window opening - 2 coats (per side) 4 4.00 EA 0.00+ 32.29 = 22. PNT OP>l + Paint door or window opening - Large - 1 coat (per side) 2 2.00 EA 0.00+ 25.69 = 23. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 261.02 SF [*] 0.00+ 4.10 = Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 24. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 261.02 SF 0.00+ 0.25 = 15 % waste added for Additional labor cost for Berber or patterned carpets. 25. ELE OSCOV + Outlet or switch cover 3 3.00 EA 0.00+ 3.80 = Totals: Hall-1 TAX O&P TOTAL 2.80 5.33 29.43 52.80 100.58 555.68 104.06 198.22 1,095.16 40.40 76.95 425.15 34.38 65.48 361.76 86.08 163.95 905.86 33.16 63.17 349.00 13.13 25.00 138.12 17.28 32.90 181.78 16.95 32.29 178.40 6.74 12.85 70.97 140.46 267.55 1,478.19 8.56 16.32 90.14 1.50 2.85 15.75 558.30 1,063.44 5,875.39 GREGORY_COMMON_REP 5/16/2022 Page:5 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 Hall-2 Height: 12' 341 14' 6"1 T 2887.46 SF Walls 640.16 SF Ceiling N t 3527.62 SF Walls & Ceiling 640.16 SF Floor 1-60' 3" 10 71.13 SY Flooring 229.44 LF Floor Perimeter s 4z zT 10" 254.60 LF Ceil. Perimeter Door 6' X 6' 8" Opens into Exterior Door 3' X 6' 8" Opens into Exterior Door 4' 2" X 6' 8" Opens into HALL-1 Door 3' X 6' 8" Opens into Exterior Door 3' X 6' 8" Opens into Exterior Door Y X 6' 8" Opens into Exterior Door 3' X 6' 8" Opens into Exterior CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 26. INS BT4 + Batt insulation - 4" - RI I- unfaced batt 220 220.00 SF 0.00+ 0.71 = 20.50 39.05 215.75 27. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 459 459.00 SF 0.00+ 2.98 = 179.53 341.95 1,889.30 28. DRY PATCHJ + Tape joint for new to existing drywall - per LF 229 229.00 LF 0.00+ 11.66 = 350.45 667.53 3,688.12 29. DRY TEX + Texture drywall - light hand texture 918 918.00 SF 0.00+ 1.14 = 137.35 261.63 1,445.50 30. PNT SP + Seal/prime then paint the surface area (2 coats) 918 918.00 SF 0.00+ 0.97 = 116.88 222.62 1,229.96 31. PNT P + Paint the walls - one coat W 2887.46 SF 0.00+ 0.68 = 257.70 490.87 2,712.04 32. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 229.44 LF 0.00+ 3.74 = 112.63 214.53 1,185.27 33. PNT B2 + Paint baseboard - two coats PF 229.44 LF 0.00+ 1.48 = 44.56 84.90 469.03 34. FNC CAM+ + Casing - 2 1/4" MDF w/detail 14*5 70.00 LF 0.00+ 2.35 = 21.59 41.13 227.22 35. PNT OP + Paint door or window opening - 2 coats (per side) 5 5.00 EA 0.00+ 32.29 = 21.19 40.37 223.01 36. PNT OP>l + Paint door or window opening - Large - 1 coat (per side) 2 2.00 EA 0.00+ 25.69 = 6.74 12.85 70.97 37. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 736.18 SF [*] 0.00+ 4.10 = 396.16 754.58 4,169.08 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. GREGORY_COMMON_REP 5/16/2022 Page:6 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED -Hall 2 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 38. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 736.18 SF 0.00+ 0.25 = 24.16 46.02 254.23 15 % waste added for Additional labor cost for Berber or patterned carpets. 39. ELE OSCOV + Outlet or switch cover 4 4.00 EA 0.00+ 3.80 = 2.00 3.80 21.00 40. FNH THRRS + Door threshold - Detach & reset 2 2.00 LF 0.00+ 12.84 = 3.38 6.42 35.48 Totals: Hall-2 1,694.82 3,228.25 17,835.96 Elevator Lobby Height: 12' 1' 21-3' 10"-4" ' 287.78 SF Walls 45.83 SF Ceiling `c tVvator Lobb 333.61 SF Walls & Ceiling 45.83 SF Floor 1 5.09 SY Flooring 20.50 LF Floor Perimeter 1 - 28.33 LF Ceil. Perimeter 5' 1-s 8 1 Door 3' 10" X 6' 8" Opens into HALL-1 Door 4' X 6' 8" Opens into ELEVATOR CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 41. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 41 41.00 SF 0.00+ 2.98 = 16.04 30.55 168.77 42. DRY PATCHJ + Tape joint for new to existing drywall - per LF 21 21.00 LF 0.00+ 11.66 = 32.14 61.22 338.22 43. DRY TEX + Texture drywall - light hand texture 82 82.00 SF 0.00+ 1.14 = 12.28 23.37 129.13 44. PNT SP + Seal/prime then paint the surface area (2 coats) 82 82.00 SF 0.00+ 0.97 = 10.44 19.88 109.86 45. PNT P + Paint the walls - one coat W 287.78 SF 0.00+ 0.68 = 25.69 48.92 270.30 46. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 20.50 LF 0.00+ 3.74 = 10.06 19.17 105.90 GREGORY_COMMON_REP 5/16/2022 Page:7 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Elevator Lobby CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 47. PNT B2 + Paint baseboard - two coats PF 20.50 LF 0.00+ 1.48 = 3.99 7.58 41.91 48. PNT OP>1 + Paint door or window opening - Large - 1 coat (per side) 1 1.00 EA 0.00+ 25.69 = 3.38 6.42 35.49 49. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 52.71 SF [*] 0.00+ 4.10 = 28.36 54.03 298.50 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 50. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 52.71 SF 0.00+ 0.25 = 1.73 3.30 18.21 15 % waste added for Additional labor cost for Berber or patterned carpets. Totals: Elevator Lobby 144.11 274.44 1,516.29 5' g.. 41 Elevator Height: 12' 245.33 SF Walls 32.11 SF Ceiling T � Elevator 277.44 SF Walls & Ceiling 32.11 SF Floor I� 3.57 SY Flooring 18.67 LF Floor Perimeter 22.67 LF Ceil. Perimeter 6'--------- I 1 Door 4' X 6' 8" Opens into ELEVATOR LOB CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL REFERENCE ONLY Totals: Elevator 0.00 0.00 0.00 Total: Hallways Stairsl GREGORY_COMMON_REP 2,436.92 4,641.73 25,645.35 Stairsl 5/16/2022 Page:8 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 51. CLN FINALC + Final cleaning - construction - Commercial F 372.70 SF 0.00+ 0.32 = 15.65 29.82 164.73 Total: Stairsl 15.65 29.82 164.73 Entry-G Height: 12' 1-10' 3"1 9' 7" I 275.00 SF Walls 46.23 SF Ceiling E"hy_G NI 321.23 SF Walls & Ceiling 46.23 SF Floor 4, 5 4. 1 5.14 SY Flooring 21.58 LF Floor Perimeter 5'4 24.58 LF Ceil. Perimeter Door 3' X 6' 8" Opens into Exterior Missing Wall 4' 3" X 12' Opens into STAIRS_G1 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 52. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 11 11.00 SF 0.00+ 2.98 = 4.30 8.20 45.28 53. DRY PATCHJ + Tape joint for new to existing drywall - per LF 7,4 7.33 LF 0.00+ 11.66 = 11.21 21.37 118.05 54. DRY TEX + Texture drywall - light hand texture 22 22.00 SF 0.00+ 1.14 = 3.29 6.27 34.64 55. DRY MASKSF + Mask per square foot for drywall work F 46.23 SF 0.00+ 0.31 = 1.88 3.58 19.79 56. PNT SP + Seal/prime then paint the surface area (2 coats) 22 22.00 SF 0.00+ 0.97 = 2.80 5.33 29.47 57. PNT P + Paint the walls - one coat W 275.00 SF 0.00+ 0.68 = 24.55 46.75 258.30 58. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile 5,4 5.33 LF 0.00+ 3.74 = 2.61 4.98 27.52 59. PNT B2 + Paint baseboard - two coats 5,4 5.33 LF 0.00+ 1.48 = 1.04 1.97 10.90 Totals: Entry-G 51.68 98.45 543.95 GREGORY_COMMON_REP 5/16/2022 Page:9 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 4' 3 Stairs G-1 �o Missing Wall 46" _ 1011 9' 7" 10' Y Missing Wall Missing Wall CAT SEL CALC Stairs G-1 234.93 SF Walls 267.52 SF Walls & Ceiling 6.75 SY Flooring 15.50 LF Ceil. Perimeter 4'3" X 18'2 15/16" Subroom: Landing (1) 263.00 SF Walls 312.77 SF Walls & Ceiling 5.53 SY Flooring 21.92 LF Ceil. Perimeter 4'3"X12' 4'6"X12' ACT DESCRIPTION QTY REMOVE REPLACE Height: 18' 3" 32.58 SF Ceiling 60.73 SF Floor 19.01 LF Floor Perimeter Opens into ENTRYG Height: 12' 49.77 SF Ceiling 49.77 SF Floor 21.92 LF Floor Perimeter Opens into STAIRS_G1 Opens into Exterior 60. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture LANDING.0 49.77 SF 0.00+ 2.98 = 61. DRY PATCHJ + Tape joint for new to existing drywall - per LF LANDING.PC 21.92 LF 0.00+ 11.66 = 62. DRY TEX++ + Texture drywall - smooth / skim coat C+75 157.35 SF 0.00+ 1.88 = 63. PNT SP + Seal/prime then paint the surface area (2 coats) 157.35 157.35 SF 0.00+ 0.97 = 64. PNT P + Paint the surface area - one coat LANDING.WC 312.77 SF 0.00+ 0.68 = 65. FCC PFE + Pad - felt F 110.50 SF 0.00+ 0.64 = 66. FCC GDC + Glue down carpet - heavy traffic (F)* 1.15 127.07 SF [*] 0.00+ 4.10 = Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 67. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 127.07 SF 0.00+ 0.25 = 15 % waste added for Additional labor cost for Berber or patterned carpets. 68. FCC STP + Step charge for "waterfall" carpet installation 15 15.00 EA 0.00+ 10.35 = TAX O&P TOTAL 19.46 37.08 204.85 33.55 63.90 353.04 38.83 73.95 408.60 20.04 38.15 210.82 27.91 53.17 293.76 9.29 17.68 97.69 68.38 130.25 719.62 4.18 7.95 43.90 20.38 38.82 214.45 GREGORY_COMMON_REP 5/16/2022 Page:10 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Stairs G-1 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 69. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile LANDING.PF 21.92 LF 0.00+ 3.74 = 10.76 20.50 113.24 70. PNT B2 + Paint baseboard - two coats LANDING.PF 21.92 LF 0.00+ 1.48 = 4.26 8.11 44.81 Totals: Stairs G-1 257.04 489.56 2,704.78 Entry-1 Height: 12' 0-10' 3"1 M97 242.74 SF Walls 288.05 SF Walls & Ceiling 5.03 SY Flooring 11 20.33 LF Ceil. Perimeter Missing Wall 4' 3" X 12' Door 3' X 6' 8" Missing Wall 4' 1" X 12' CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE 71. INS BT4 + Batt insulation - 4" - Rl 1- unfaced batt 18 18.00 SF 0.00+ 0.71 = 72. DRY 5/81-1 + 5/8" drywall - hung only (no tape or finish) 22 22.00 SF 0.00+ 2.05 = 73. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 33 33.00 SF 0.00+ 2.98 = 74. DRY PATCHJ + Tape joint for new to existing drywall - per LF 11 11.00 LF 0.00+ 11.66 = 75. DRY TEX + Texture drywall - light hand texture 68 68.00 SF 0.00+ 1.14 = 76. PNT SP + Seat/prime then paint the surface area (2 coats) 68 68.00 SF 0.00+ 0.97 = 77. PNT P + Paint the walls - one coat W 242.74 SF 0.00+ 0.68 = 45.31 SF Ceiling 45.31 SF Floor 17.33 LF Floor Perimeter Opens into STAIRS_12 Opens into Exterior Opens into STAIRS TAX O&P TOTAL 1.68 3.20 17.66 5.93 11.28 62.31 12.91 24.58 135.83 16.84 32.07 177.17 10.18 19.38 107.08 8.66 16.49 91.11 21.66 41.27 227.99 GREGORY_COMMON_REP 5/16/2022 Page: II mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Entry-1 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 78. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 17.33 LF 0.00+ 3.74 = 8.51 16.20 89.52 79. PNT B2 + Paint baseboard - two coats PF 17.33 LF 0.00+ 1.48 = 3.36 6.42 35.43 80. FCC PFE + Pad - felt F 45.31 SF 0.00+ 0.64 = 3.81 7.25 40.06 81. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 52.11 SF [*] 0.00+ 4.10 = 28.04 53.42 295.11 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 82. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 52.11 SF 0.00+ 0.25 = 1.71 3.25 17.99 15 % waste added for Additional labor cost for Berber or patterned carpets. Totals: Entry-1 123.29 234.81 1,297.26 Stairs 1-2 Height: 141311 194.76 SF Walls Stairs 1-2 = 231.24 SF Walls & Ceiling 7.18 SY Flooring 17.50 LF Ceil. Perimeter Missing Wall 4' 3" X 14' 2 15/16" �tEfUI I Subroom: Landing (3) 194.00 SF Walls LE��4'3" a - 238.63 SF Walls & Ceiling 4.96 SY Flooring 1 Flo s„� 24.25 LF Ceil. Perimeter Missing Wall 4' 3" X 8' 36.48 SF Ceiling 64.62 SF Floor 20.92 LF Floor Perimeter Opens into ENTRY1 Height: 8' 44.63 SF Ceiling 44.63 SF Floor 24.25 LF Floor Perimeter Opens into STAIRS_12 GREGORY_COMMON_REP 5/16/2022 Page:12 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 4' 4Subroom: Stairs (1) Height: 20' 6" 376.01 SF Walls 34.37 SF Ceiling 410.37 SF Walls & Ceiling 61.41 SF Floor 6.82 SY Flooring 24.53 LF Floor Perimeter 21.08 LF Ceil. Perimeter 1 4'3"---- Missing Wall 4' 1" X 20' 5 15/16" Opens into ENTRYI CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 83. FCC PFE + Pad - felt MAINT 64.62 SF 0.00+ 0.64 = 5.43 10.34 57.13 84. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 196.26 SF [*] 0.00+ 4.10 = 105.61 201.17 1,111.45 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 85. FCC STP + Step charge for "waterfall" carpet installation 10 10.00 EA 0.00+ 10.35 = 13.59 25.88 142.97 86. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 196.26 SF 0.00+ 0.25 = 6.44 12.27 67.78 15 % waste added for Additional labor cost for Berber or patterned carpets. Totals: Stairs 1-2 131.07 249.66 1,379.33 Total: Stairsl 578.73 1,102.30 6,090.05 Stairs2 Stairs2 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 87. CLN FINALC + Final cleaning - construction - Commercial F 466.34 SF 0.00+ 0.32 = 19.59 37.30 206.12 Total: Stairs2 19.59 37.30 206.12 GREGORY_COMMON_REP 5/16/2022 Page:13 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 -4'3" 4 - 4� 8'�- 1-5'4^--1 Entry-G 14' 4" Missing Wall Door CAT SEL CALC Entry-G Height: 8' 292.67 SF Walls 66.96 SF Ceiling 359.63 SF Walls & Ceiling 66.96 SF Floor 7.44 SY Flooring 36.08 LF Floor Perimeter 39.08 LF Ceil. Perimeter 4' 3" X 8' Opens into STAIRS_G1 3' X 6' 8" Opens into Exterior ACT DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 88. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 20 20.00 SF 0.00+ 2.98 = 7.83 14.90 82.33 89. DRY PATCHJ + Tape joint for new to existing drywall - per LF 12 12.00 LF 0.00+ 11.66 = 18.36 34.98 193.26 90. DRY TEX + Texture drywall - light hand texture 40 40.00 SF 0.00+ 1.14 = 5.99 11.40 62.99 91. DRY MASKSF + Mask per square foot for drywall work F 66.96 SF 0.00+ 0.31 = 2.73 5.19 28.68 92. PNT SP + Seal/prime then paint the surface area (2 coats) 40 40.00 SF 0.00+ 0.97 = 5.09 9.70 53.59 93. PNT P + Paint the walls - one coat W 292.67 SF 0.00+ 0.68 = 26.13 49.75 274.90 94. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile 10 10.00 LF 0.00+ 3.74 = 4.91 9.35 51.66 95. PNT B2 + Paint baseboard - two coats 10 10.00 LF 0.00+ 1.48 = 1.94 3.70 20.44 Totals: Entry-G �-4' 3"� Stairs G-1 Missing Wall Stairs G-1 192.39 SF Walls 228.87 SF Walls & Ceiling 7.18 SY Flooring 17.33 LF Ceil. Perimeter 4'3" X 14'2 15/16" 72.98 138.97 767.85 Height: 14' 3" 36.48 SF Ceiling 64.62 SF Floor 20.72 LF Floor Perimeter Opens into ENTRYG GREGORY_COMMON_REP 5/16/2022 Page:14 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 �1oa 4^� 9� 8" I 4� 3„�, r�41 3° I o., 4„ y Missing Wall Missing Wall CAT SEL CALC Subroom: Landing (1) 164.00 SF Walls 210.63 SF Walls & Ceiling 5.18 SY Flooring 20.50 LF Ceil. Perimeter 4' 3" X 8' 4' 3" X 8' ACT DESCRIPTION QTY REMOVE REPLACE Height: 8' 46.63 SF Ceiling 46.63 SF Floor 20.50 LF Floor Perimeter Opens into STAIRS_G1 Opens into Exterior TAX O&P TOTAL 96. FCC PFE + Pad - felt F 111.25 SF 0.00+ 0.64 = 9.35 17.80 98.35 97. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 127.93 SF [*] 0.00+ 4.10 = 68.84 131.13 724.48 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 98. FCC STP + Step charge for "waterfall" carpet installation 15 15.00 EA 0.00+ 10.35 = 20.38 38.82 214.45 99. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 127.93 SF 0.00+ 0.25 = 4.20 8.00 44.18 15 % waste added for Additional labor cost for Berber or patterned carpets. Totals: Stairs G-1 102.77 195.75 1,081.46 ~6 " ° 6� 3„ � cJ Ent 1 Y Y- Height: 12' g 490.00 SF Walls 113.77 SF Ceiling 603.77 SF Walls & Ceiling 113.77 SF Floor 12.64 SY Flooring 38.17 LF Floor Perimeter 44.17 LF Ceil. Perimeter 6 13� 1 Door Y X 6' 8" Opens into Exterior Missing Wall 4' 6" X 12' Opens into LANDING Door 3' X 6' 8" Opens into Exterior CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL GREGORY_COMMON_REP 5/16/2022 Page: 15 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Entry-1 CAT SEL CALC ACT DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL 100. INS BT4 + Batt insulation - 4" - RI I- unfaced batt 34 34.00 SF 0.00+ 0.71 = 3.16 6.03 33.33 101. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 76 76.00 SF 0.00+ 2.98 = 29.73 56.62 312.83 102. DRY PATCHJ + Tape joint for new to existing drywall - per LF PF 38.17 LF 0.00+ 11.66 = 58.41 111.27 614.74 103. DRY TEX + Texture drywall - light hand texture 153 153.00 SF 0.00+ 1.14 = 22.89 43.60 240.91 104. PNT SP + Seal/prime then paint the surface area (2 coats) 153 153.00 SF 0.00+ 0.97 = 19.48 37.10 204.99 105. PNT P + Paint the walls - one coat W 490.00 SF 0.00+ 0.68 = 43.74 83.30 460.24 106. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 38.17 LF 0.00+ 3.74 = 18.74 35.69 197.19 Detach gate 107. PNT B2 + Paint baseboard - two coats PF 38.17 LF 0.00+ 1.48 = 7.41 14.12 78.02 108. FNC CAM+ + Casing - 2 1/4" MDF w/detail 14 14.00 LF 0.00+ 2.35 = 4.31 8.23 45.44 109. PNT OP + Paint door or window opening - 2 coats (per side) 2 2.00 EA 0.00+ 32.29 = 8.48 16.15 89.21 110. FCC PEE + Pad - felt F 113.77 SF 0.00+ 0.64 = 9.56 18.20 100.57 Material component pricing is subject to Itel analysis and local market conditions 111. FCC GDC + Glue down carpet - heavy traffic (F)* 1.15 130.84 SF [*] 0.00+ 4.10 = 70.41 134.11 740.96 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 112. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 130.84 SF 0.00+ 0.25 = 4.29 8.18 45.18 15 % waste added for Additional labor cost for Berber or patterned carpets. Totals: Entry-1 300.61 572.60 3,163.61 GREGORY_COMMON_REP 5/16/2022 Page:16 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 a' a � Stairsl-2 Missing Wall 1--4' 3nN34---41' aII 1 IF Missing Wall Missing Wall Missing Wall q131" Missing Wall CAT SEL CALC Stairsl-2 300.66 SF Walls 337.14 SF Walls & Ceiling 7.18 SY Flooring 17.33 LF Ceil. Perimeter 4' 3" X 20' 5 15/16" Subroom: Landing (2) 225.57 SF Walls 269.99 SF Walls & Ceiling 4.94 SY Flooring 15.83 LF Ceil. Perimeter 4' 3 " X 14' 2 15/16 " 4' 6 " X 14' 2 15/16 " 4' 3" X 14' 2 15/16" Subroom: Stairs2-2 (1) 191.28 SF Walls 227.05 SF Walls & Ceiling 7.26 SY Flooring 17.00 LF Ceil. Perimeter 4' 3" X 14' 2 15/16" ACT DESCRIPTION QTY REMOVE REPLACE Height: 20' 6" 36.48 SF Ceiling 64.62 SF Floor 20.72 LF Floor Perimeter Opens into Exterior Height: 14' 3" 44.42 SF Ceiling 44.42 SF Floor 15.83 LF Floor Perimeter Opens into STAIRS_12 Opens into ENTRY1 Opens into STAIRS_22 Height: 14' 3" 35.77 SF Ceiling 65.33 SF Floor 20.21 LF Floor Perimeter Opens into LANDING TAX O&P TOTAL 113. FCC PFE + Pad - felt MAINT 64.62 SF 0.00+ 0.64 = 5.43 10.34 57.13 Material component pricing is subject to Itel analysis and local market conditions 114. FCC GDC + Glue down carpet - heavy traffic (MAIN.F)*1.15 74.31 SF [*] 0.00+ 4.10= 39.99 76.17 420.83 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 115. FCC STP + Step charge for "waterfall" carpet installation 15 15.00 EA 0.00+ 10.35 = 20.38 38.82 214.45 GREGORY_COMMON_REP 5/16/2022 Page:17 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Stairs1-2 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 116. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 200.52 SF 0.00+ 0.25 = 6.58 12.53 69.24 15 % waste added for Additional labor cost for Berber or patterned carpets. Totals: Stairsl-2 72.38 137.86 761.65 Total: Stairsl 568.33 1,082.48 5,980.69 Restrooms Restrooms CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 117. CLN FINALC + Final cleaning - construction - Commercial F 584.50 SF 0.00+ 0.32 = 24.55 46.76 258.35 Total: Restrooms 24.55 46.76 258.35 Height: 12' 457.33 SF Walls 90.42 SF Ceiling ff*HHall 547.75 SF Walls & Ceiling 90.42 SF Floor 10.05 SY Flooring 31.67 LF Floor Perimeter 46.17 LF Ceil. Perimeter Door 3' X 6' 8" Opens into STORAGE_Q Door 2' 6" X 6' 8" Opens into CLOSET Door 3' X 6' 8" Opens into Exterior Door 3' X 6' 8" Opens into MEN Door 3' X 6' 8" Opens into WOMEN CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL GREGORY_COMMON_REP 5/16/2022 Page:18 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Hall CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 118. INS BT4 + Batt insulation - 4" - RI I- unfaced batt 10 10.00 SF 0.00+ 0.71 = 0.94 1.78 9.82 119. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 63 63.00 SF 0.00+ 2.98 = 24.64 46.93 259.31 120. DRY PATCHJ + Tape joint for new to existing drywall - per LF PF 31.67 LF 0.00+ 11.66 = 48.46 92.32 510.05 121. DRY TEX + Texture drywall - light hand texture 127 127.00 SF 0.00+ 1.14 = 19.00 36.20 199.98 122. PNT SP + Seal/prime then paint the surface area (2 coats) 127 127.00 SF 0.00+ 0.97 = 16.16 30.80 170.15 123. PNT P + Paint the walls - one coat W 457.33 SF 0.00+ 0.68 = 40.81 77.75 429.54 124. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 31.67 LF 0.00+ 3.74 = 15.55 29.62 163.62 125. PNT B2 + Paint baseboard - two coats PF 31.67 LF 0.00+ 1.48 = 6.15 11.72 64.74 126. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 103.98 SF [*] 0.00+ 4.10 = 55.95 106.58 588.85 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 127. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 103.98 SF 0.00+ 0.25 = 3.41 6.50 35.91 15 % waste added for Additional labor cost for Berber or patterned carpets. 128. DOR DOR-RS + Interior door - Detach & reset - slab only 1 1.00 EA 0.00+ 26.67 = 3.50 6.67 36.84 129. PNT OP 1 + Paint door or window opening - 1 coat (per side) 5 5.00 EA 0.00+ 21.84 = 14.34 27.30 150.84 Totals: Hall 248.91 474.17 2,619.65 GREGORY_COMMON_REP 5/16/2022 Page:19 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 Janitor Closet 1-9' 3"1 277.33 SF Walls 8' 7„ 1 Janitor Closet oo N 308.81 SF Walls & Ceiling 1 i 3.50 SY Flooring 24.50 LF Ceil. Perimeter Door 2' 6" X 6' 8" CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE Height: 12' 31.47 SF Ceiling 31.47 SF Floor 22.00 LF Floor Perimeter Opens into HALL TAX O&P TOTAL REFERENCE Totals: Janitor Closet 0.00 0.00 0.00 r Janitor Closet Hall x 1- stoa�' O Y V 3„� Door CAT SEL CALC Storage Q 540.00 SF Walls 666.60 SF Walls & Ceiling 14.07 SY Flooring 46.67 LF Ceil. Perimeter 3'X6'8" ACT DESCRIPTION QTY REMOVE REPLACE Height: 12' 126.60 SF Ceiling 126.60 SF Floor 43.67 LF Floor Perimeter Opens into HALL TAX O&P TOTAL 130. INS BT4 + Batt insulation - 4" - Rl 1- unfaced batt 12 12.00 SF 0.00+ 0.71 = 1.11 2.13 11.76 131. DRY 5/8- + 5/8" drywall - hung, taped, ready for texture 87 87.00 SF 0.00+ 2.98 = 34.03 64.82 358.11 132. DRY PATCHJ + Tape joint for new to existing drywall - per LF 44 44.00 LF 0.00+ 11.66 = 67.34 128.26 708.64 133. DRY TEX + Texture drywall - light hand texture 175 175.00 SF 0.00+ 1.14 = 26.19 49.88 275.57 134. PNT SP + Seal/prime then paint the surface area (2 coats) 175 175.00 SF 0.00+ 0.97 = 22.28 42.44 234.47 135. PNT P + Paint the walls - one coat W 540.00 SF 0.00+ 0.68 = 48.20 91.80 507.20 136. FNC B3M+ + Baseboard - 3 1/4" MDF w/profile PF 43.67 LF 0.00+ 3.74 = 21.44 40.83 225.60 GREGORY_COMMON_REP 5/16/2022 Page:20 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 CONTINUED - Storage Q CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX O&P TOTAL 137. PNT B2 + Paint baseboard - two coats PF 43.67 LF 0.00+ 1.48 = 8.49 16.15 89.27 138. FCC GDC + Glue down carpet - heavy traffic (F)*1.15 145.59 SF [*] 0.00+ 4.10 = 78.35 149.23 824.50 Material component pricing established by Itel lab analysis and is subject to local market conditions 15 % waste added for Glue down carpet - heavy traffic. 139. FCC AVB + Additional labor cost for Berber or patterned carpets (F)*1.15 145.59 SF 0.00+ 0.25 = 4.78 9.10 50.28 15 % waste added for Additional labor cost for Berber or patterned carpets. 140. DOR DOR-RS + Interior door - Detach & reset - slab only 1 1.00 EA 0.00+ 26.67 = 3.50 6.67 36.84 141. PNT OP 1 + Paint door or window opening - 1 coat (per side) 1 1.00 EA 0.00+ 21.84 = 2.86 5.46 30.16 Totals: Storage Q 318.57 606.77 3,352.40 Total: Restrooms 592.03 1,127.70 6,230.40 Total: COMMON AREAS 4,403.32 8,387.17 46,338.56 Line Item Totals: GREGORY COMMON REP Grand Total Areas: 11,128.12 SF Walls 2,605.68 SF Floor 0.00 SF Long Wall 2,605.68 Floor Area 7,607.61 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 4,403.32 8,387.17 46,338.56 2,436.52 SF Ceiling 13,564.63 SF Walls and Ceiling 289.52 SY Flooring 897.69 LF Floor Perimeter 0.00 SF Short Wall 1,012.99 LF Ceil. Perimeter 2,820.96 Total Area 8,445.76 Interior Wall Area 646.44 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Hip Length GREGORY_COMMON_REP 5/16/2022 Page:21 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 Summary Line Item Total 33548.07 Overhead 5:032.28 Profit 3,354.89 Sales Tax 4,403.32 Replacement Cost Value $46,338.56 Net Claim $46,338.56 Deb Hardy Project Manager GREGORY_COMMON_REP 5/16/2022 Page:22 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 Recap by Category O&P Items Total % CLEANING 833.81 1.80 % DOORS 53.34 0.12% DRYWALL 11,934.16 25.75% ELECTRICAL 26.60 0.06% FLOOR COVERING - CARPET 9,662.08 20.85% FINISH CARPENTRY / TRIMWORK 2,283.49 4.93% FINISH HARDWARE 25.68 0.06% INSULATION 230.04 0.50% PAINTING 8,498.87 18.34% O&P Items Subtotal 33,548.07 72.40% Overhead 5,032.28 10.86% Profit 3,354.89 7.24% Sales Tax 4,403.32 9.50% Total 46,338.56 100.00% GREGORY_COMMON_REP 5/16/2022 Page:23 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 1 1-Itel - Carpet & pad Date Taken: 2/28/2022 ■■ M76 Corporate Center Parkway ttn: ay ie emp mrc: ustomef xperi— ep aw-Ai j__� Pa Rk—wii1lle,FL 1335 o: at McleodMcleod Co�nstr-u ctio n-u coon LLCtErca: cus[omerexperience�itelinc. CARPET EVALUATION :ustomer: Generic Customer!, FL CUSTOMER Comm[# INFORMATION CX56170389 Additional: Mdeod Construction LLC :ust ID. CU ST"114 Date Received: 2125I2022 Vendor Jobe:: 2022010305 tdjuster: Pre -Paid Not a Bill Date Invoiced: 2)25I2t)22 Contact K3ylie Klemp, omments: -mn INSURED INFORMATION :laim #: NOT PROVIDED TO ITEL Loss Date: V312022 .cured Name: The Gregery COA Rooms Damaged: Stairs :ity,StateZip: Edmonds, WA 90020 Flooring Color. Brown omme B ill: Style: Fiber: Width: hiladelphia SP696 Unbranded Nylon 12H hiladelP h13 SP507 Unb ra nded NYlon 12tt hiladelphia Live Unbranded Nylon 12H hiladelphi3 Metro Life Unbranded Nylon 12tt ommems: Pattern and colorations may vary. l The selections)listed amfmmourcommerdaldatabaseandwere matched to the above spec3Ficauons only. In some dreumstances, commercial carpet must meet building codes and regulations. The installershoufd check alf regulations before installation.) FTEL BEHC HMA RIf PRI C E AN ALYSIS n er 9gYd: Carpet =27.91 Flooring Labor. =7.03 Pad: $ 2.65 Pad Labor: {0.99 Total: Ss9.2 er Sq Ft: Carpet;3-09 Flooring Labor. j0-07 Pad: jg-29 Pad Labor: $0.11 Total: $4.3 • Excludes tax, but includes standard shipping fees. Other'minimum freight' rates may apply on small orders- ommen s: CARPET ANALYSIS onstru coon: Tufted Multi Level Loop Gauge: 17t0 in Face Weight': 29.6 oz 7ibeVFiber Type: Nylon r BCF Stitches Per Inch: fo.0 13—king Material: Synthti ec Tiber Ply: Multi Ply Pile Height- 0.14 in TufWSO loch: 100 :ommenls: The accuracy or he carpet test may have been degraded due to the small sample size received.!' Based on HUDIFHI st.ndards, mill published face weights may va ry by u p to +1-7%. PAD ANALYSIS 'ad Type: Pad Height Pad Dens9 (Ih.) or Pad Weight (oz.): iynthefic bf16" 18.0 ozysquarn yard :omrn-ts: Products matching all ofthe sped nations ofthe sa mple(s) provided were not found. Pad analysis is Lased on the doses available prod uct(s). ) iN VOIC E ontrol #: CX99170309 Test Fee: $TI.95 :ust—r ID: CUSTNO4 Shipping: $16.50 Total Due: ;00.45 lease note Customer ID 4 and Conhol # on all correspondence. FEDERAL TAX ID NUMBER: 26-25TC% :omments: THIS INVOICE IS FOR YOUR RECORD DNLYI Our records indicate thatthis invoice has been pre -paid by credit card a check. I GREGORY_COMMON_REP 5/16/2022 Page:24 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 2-Vestibule GREGORY_COMMON_REP 5/16/2022 Page:25 mcleod Mcleod Construction LLC construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 3-Vestibule (2) GREGORY_COMMON_REP 5/16/2022 Page:26 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 4 4-Hall 1 i GREGORY_COMMON_REP 5/16/2022 Page:27 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC#MCLEODCL951DD (206) 545-7837 5-Elevator Lobby GREGORY_COMMON_REP 5/16/2022 Page:28 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 6-Hall 2 GREGORY_COMMON_REP 5/16/2022 Page:29 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 7 7-Hall 2 (2) GREGORY_COMMON_REP 5/16/2022 Page:30 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 8 8-Hall 2 (3) I anj Joe O�e kf(• wwwwo, door fn+ni yvul GREGORY_COMMON_REP 5/16/2022 Page:31 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 9 9-Stairs 1 GREGORY_COMMON_REP 5/16/2022 Page:32 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 10 10-Stairs 1 (4) GREGORY_COMMON_REP 5/16/2022 Page:33 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 11 11-Stairs 1 (5) GREGORY_COMMON_REP 5/16/2022 Page:34 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 12 12-Stairs 1 (3) GREGORY_COMMON_REP 5/16/2022 Page:35 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 13 13-Stairs 1 (6) GREGORY_COMMON_REP 5/16/2022 Page:36 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 14 14-Stairs 1 (2) GREGORY_COMMON_REP 5/16/2022 Page:37 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 15 15-Stairs 2 GREGORY_COMMON_REP 5/16/2022 Page:38 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 16 16-Stairs 2 (2) GREGORY_COMMON_REP 5/16/2022 Page:39 �d80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC#MCLEODCL951DD (206) 545-7837 17 17-Stairs 2 (3) GREGORY_COMMON_REP 5/16/2022 Page:40 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 18 18-Stairs 2 (4) GREGORY_COMMON_REP 5/16/2022 Page:41 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 19 19-Stairs 2 (5) GREGORY_COMMON_REP 5/16/2022 Page:42 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 20 20-Stairs 2 (6) GREGORY_COMMON_REP 5/16/2022 Page:43 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 21 21-Stairs 2 (7) GREGORY_COMMON_REP 5/16/2022 Page:44 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 22 22-Stairs 2 (8) GREGORY_COMMON_REP 5/16/2022 Page:45 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 23 23-Stairs 2 (9) GREGORY_COMMON_REP 5/16/2022 Page:46 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 24 24-Stairs 2 (10) GREGORY_COMMON_REP 5/16/2022 Page:47 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 25 25-Restroom Hall GREGORY_COMMON_REP 5/16/2022 Page:48 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 26 26-Storage Q GREGORY_COMMON_REP 5/16/2022 Page:49 �t80 mcleod Mcleod Construction LLC f� construction McLeod Construction, LLC 1115 N 140th St Seattle, WA 98133 LIC4MCLEODCL951DD (206) 545-7837 27 27-Storage Q (2) GREGORY_COMMON_REP 5/16/2022 Page:50 Vestibule IT 6" Vestibule GREGORY_COMMON_REP 5/16/2022 Page:51 Hallways Hallways GREGORY_COMMON_REP 5/16/2022 Page:52 Stairs 1 i 1 i 1 101311 i 1 i 1 10' 3" 1 NS Stairs 1 GREGORY_COMMON REP 5/16/2022 Page: 53 Stairs2 t t 15' 10' 4" t t I i6' 11"i 60 0 1 Stairs2 GREGORY_COMMON REP 5/16/2022 Page: 54 Restrooms 19'8" 9'3" 191611 51211 Restrooms GREGORY_COMMON_REP 5/16/2022 Page:55