Building PermitType: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED
Parcel No: 27032500306200 Site Address: 750 EDMONDS WAY EDMONDS,WA 98020-5126
Subdivision: 006107, BLA LL-2000-134, SP 93-30, 005546 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SUNRISE SR LIVING -MECHANICAL, REPLACE RTU
Applied: 11/21/2022
Issued:12/16/2022
Final:
Expiration Date: 6/14/2023
Issued by: JOK
I WA State Contractor L & I #: COMFOSU842LB I
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MISTY POMADA
17683 128TH PL NE,
(425)883-9224
MPOMADA@CSUSANW.COM
WOODINVILLE WA 98072
CONTACT
COMFORT SYSTEMS
17683 128TH PL NE,
(425)883-9224
mpomada@csusanw.com
NORTHWEST
WOODINVILLE WA 98072
17683 128th PI NE,
CONTRACTOR
COMFORT SYSTEMS
USA NW
(425)883-9224
mpomada@csusanw.com
WOODINVILE WA 98072
BROOKFIELD PL NEW YORK,
OWNER
SJV1 EDMONDS LLC
NEW YORK NY 10281
•' •
IF
DESCRIPTION
7,Bz�E��
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
FEE FOR MECHANICAL
001.000.322.10.000. 00
$50.00
$50.00
12/16/22
R25041
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
12/16/22
R25041
PUMP - 1.75 BTU OR LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
12/16/22
R25041
PER PERMIT
MECHANICAL PLAN REVIEW FEE
001.000.345.83.000.00
$110.00
$110.00
12/16/22
R25041
TOTALS: $250.00
$250.00
7
• •
CONDITION TYPE
STATUS
NOTES
Printed: Friday, December 16, 2022 12:27:09 PM 1 of 2
PermitMECHANICAL
City of • • • PERMIT NUM
Edmonds ' 1 1 : •
• • • • 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
B-3 MECH ROUGH IN
X-0 MECH FINAL"
Printed: Friday, December 16, 2022 12:27:09 PM 2 of 2