Loading...
Building Permit (3)Type: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED Parcel No: 00555000004100 Subdivision: 005550 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 24132 102ND PL W EDMONDS,WA 98020-5716 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: ROOSENDAAL- PLUMBING FOR REMODEL BLD2022-0763 Applied: 2/22/2023 Issued:2/23/2023 Final: Expiration Date: 8/22/2023 Issued by: NED I WA State Contractor L & I #: COPPEPL794RN I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JAMES DUFFIELD 5714 PARKVIEW LN, EVERETT (206)914-2085 COPPERWORKSPLUMBINGLLC@GMAI WA 98203 L.COM CONTACT COPPERWORKS PLUMBING 5714 PARKVIEW LN, EVERETT (206)914-2085 copperworksplumbingllc@gmail.com WA 98203 CONTRACTOR COPPERWORKS PLUMBING 5714 PARKVIEW LN, EVERETT (206)914-2085 copperworksplumbingllc@gmail.com LLC WA 98203 DARRYL W & LAMONA G 24132 102ND PL W, EDMONDS OWNER ROOSENDAAL WA 98020-5716 •' ' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 2/23/23 R26632 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/23/23 R26632 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $180.00 $180.00 2/23/23 R26632 TRAP WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 2/23/23 R26632 EXPANSION TANK TOTALS: $285.00 $285.00 CONDITION TYPE STATUS NOTES Printed: Thursday, February 23, 2023 9:16:18 AM 1 of 2 PLUMBING Permit City of • • • - •:� i 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B 3 PLUMB ROUGH IN X-0 PLUMBING FINAL** Printed: Thursday, February 23, 2023 9:16:18 AM 2 of 2