Loading...
ENG2022-0489 ROW PERMIToff' EIDM �~ o�RIGHT OF WAY EUC PERMIT o , EdmondsCity of Edmonds PERMIT NUM 98020 1 1 • www.edmondswa.gov i RL) Description: COMCAST-BORING SERVICE FROM POLE TO PROPERTY INSTALL HH ISSUED: 02/27/2023 Address: 20708 MAPLEWOOD DR EDMONDS WA 98026-6677 EXPIRES:08/27/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00567400000500 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT VINICIUS FREITAS 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293 CONTACT INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293 CONTRACTOR INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293 OWNER NALIN & SHERIDAN KARA SOOD 20708 MAPLEWOOD DR, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $220.00 $220.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 02/27/2023 Printed: Monday, February 27, 2023 3:47:24 PM 1 of 2 RIGHT PERMIT PERMIT NUM City of Edmonds www.edmondswa.gov / 425.1 1 CONDITIONS CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" E-7 RESTOR LIMITS Printed: Monday, February 27, 2023 3:47:24 PM 2 of 2 /0 OF EVAIO41 INC. 1890 SECTION A RECEIVED Oct 04 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E6�. If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name 687353 - 20708 MAPLE WOOD DR Site Address or if no site address use Property Address at NW corner of project area: 20708 MAPLE WOOD DR Associated Permits: I BLD PLN ENG Owner and Entity Holding pp Name of any COMCAST Franchise Ordinance No: Point of Contact JESSAMIN SANTOS Title COORDINATOR 2 Address 410 VALLEYAVE City PUYALLUP State WA Zip 98371 Phone 206-401-2188 Email JESSAMIN SANTOS@CABLE.COMCAST • Name of Company INFRAWEST INC I 1 Primary Name VINICIUS FREITAS Agent Name VINICIUS FREITAS Title Title Mobile (425) 949-9293 Address 11335 NE 122ND WAY ste 105 Email VINNY.FREITAS@INFRAWEST.NET City KIRKLAND State WA Zip 98034 Secondary Name Phone (425) 949-9293 Title Email VINNY.FREITAS@INFRAWEST.NET Mobile City of Edmonds Business License No: Email State License No: INFRAI*793NP ® Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance lvvtc: auvu its. oo.o2o requires mat the Appucanon oe signea oy a ttcensea ana oonaea contractor unless otnerwtse approvea oy the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) x Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ProjectDescription Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 72 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. . The work in the right of way is on or for the following type of facilities: * telecommunications x cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of •Completed 1. 1 Does the utility owner have existing overhead infrastructure in the area of work? X 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? X Details of • to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 1 1 How many are to be added? 1 City of Edmonds ROW constriction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? 1 What is the height of the existing poles? 35' How many poles are to be removed? 0 Are additional poles to be laced? X How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: VINICIUS FREITAS NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE DATE: 10/02/2022 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 RECEIVED Oct 04 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT EXISTING UTILITIES PLAN PAGE 2 OF 2 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED JQ�tV��„UQ 02/03/2023 RECEIVED Oct 04 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SITE PLAN 687353 - 20708 MAPLEWOOD DR, EDMONDS WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE UTILITY POLE TO PROPERTY 20708. BORE 35' OF SOFT SURFACE FROM THE POLE TO THE ROAD. BORE 25' UNDER THE ROAD (MAPLEWOOD DR), BORE 15' OF SOFT SURFACE FROM THE ROAD TO WHERE THE NEW COMCAST HANDHOLE WILL BE INSTALLED. HAND HOLE MEASURING 11 INCHES IN DIAMETER AND 12 INCHES DEEP. FROM THE COMCAST HANDHOLE WILL CONTINUE TO BORE IN PRIVATE PROPERTY TO THE POWER METER OF HOUSE 20708 MAPLEWOOD DR. WILL BORE WITH A DIRECTIONAL DRILL AT A MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN A MINIMUM OF 5 FEET HORIZONTAL AND 12 INCHES VERTICAL SEPARATION BETWEEN ALL UTILITIES. ALL DISTURBED AREAS WILL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS. PAGE 1 OF 2 :::nPECTRA COAST SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM RESUB BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 1 30 1 35 1 40 1 45 1 50 1 55 1 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. HOST VEHICLE WEIGHT > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100' 123' 172' 74' 100, 150, PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED ONE LANE ROAD AHEAD 48" 300' SIGN SPACING = X (1) RURAL HIGHWAYS 60 165 MPH 800't RURAL ROADS 45/55 MPH 500't RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350't RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200't (2) URBAN STREETS 25 MPH OR LESS 100't (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. JAN 20 2023 CITY OF EDMONDS W20.7B (OPTIONAL IF DEVELOPMENT 40 MPH OR LESS) SERVICES DEPARTMENT 48" 48' BE ROAD PREPARED WORK TO STOP AHEAD 48" 46" qg• 48' . W20.713 ONE LANE W20.1 ROAD AHEAD 48" 48" W20-7A W20-4 BE PREPARED W20-76 (OPTIONAL IF 40 MPH OR LESS) 48" W20-4 48• W20-7A K I TO STOP ROAD BE y I x qg• 48' WORK PREPARED w I it ONE LANE W20-7B ENGINEERING DIVISION 50' TO 100' 59TO 100' 6 DEVICE 6 DEVICE MI I R B MIN. �OTR.A D O I n I x 4f • I .I 4 I 3 x V rc 4 W20-7A c� I CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 10 TO 20 40 AHEAD TO STOP —I 481, °8" I 4 ROAD AHEAD APPROVED AS NOTED W20.1 W20-7B 1 x 48" qg• W20 40 M (OPTIONAL IF I 40 MPH OR LESS) W20 4 ROAD ,,I �1 p f j9L j4S,.Hn1 02/03/2023 1 4 WORK NOTES AHEAD I TRAFFIC CONTROL INSPECTION SHALL BE 1 48' 1. ALL SIGNS ARE BLACK ON ORANGE. LEGEND REQUIRED WHENEVER WORK ZONE IS SET UP YJ20.1 2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS SHOULDER IS RECOMMENDED. FLAGGING STATION 3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT b TEMPORARY SIGN LOCATION TWO-WAY TRAFFIC CONTROL FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS FOR ADDITIONAL DETAILS. D CHANNEONE-LANE, DEVICES WITH FLAGGERS ° ® PROTECTIVE PROTECTIVE VEHICLE 4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. NOT TO SCALE FILE NAME S:\Desi n R P& SW-Standardsl2-Plan Sheet Libra \01.Published PST\ TC Work Zone Traffic Control\ TC-1 One Lane, Two WayTraffic Control with Flaggers\TC-l.dgn Ts " E Amok � �I/ Washington State Department of Transportation Plot 1 —N asr TC7� TIME 3,05,14 PM .— FED.AID PROJ.NO. DATE 1/212015 WAS PLOTTED BY Ilddslf DESIGNED BY +"e xuNNEN sxreT or NNE ENTERED BY CHECKED BY coxTNnm x"wnoN No. TRAFFIC CONTROL PLAN PROJ. ENGR. REGIONAL ADM. REVISION DATE BY RECEIVED Oct 04 2022 \ CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1210095 - 687353 - 20708 MAPLEWOOD DR Applicant First Name Last Name Company Name VINICIUS FREITAS INFRAWEST INC Number Street Apartment or Suite Number E-mail Address 11335 NE 122ND WAY 105 vinny.freitas@infrawest.net City State Zip Phone Number Extension KIRKLAND WA 98034 (425) 949-9293 Contractor Company Name INFRAWEST INC Number Street Apartment or Suite Number 11335 NE 122ND WAY 105 City State Zip Phone Number Extension KIRKLAND WA 98034 (954)756-0230 State License Number License Expiration Date UBI # E-mail Address INFRAI*793NP 7/23/2023 RD477f115g vinny.freitas@infrawest.net Project Location Number Street Floor Number Suite or Room Number 20708 MAPLEWOOD DR City Zip Code County Parcel Number EDMONDS 98026 00567400000500 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Nalin & Sheridan Kara L Sood Number Street Apartment or Suite Number 20708 MAPLEWOOD DR City State Zip EDMONDS WA 98026 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 10/2/2022 Submitted By: VINICIUS FREITAS Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1210095 - 687353 - 20708 MAPLEWOOD DR Project Contact Company Name: INFRAWEST INC Name: VINICIUS FREITAS Email: vinny.freitas@infrawest.net Address: 11335 NE 122ND WAY 105 Phone #: (425) 949-9293 KIRKLAND WA 98034 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project 687353 - 20708 MAPLEWOOD DR Name: WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE UTILITY POLE, BORE 35FT OF SOFT SURFACE FROM THE POLE TO THE ROAD. BORE 25FT UNDER THE ROAD MAPLEWOOD DR, BORE 15FT OF SOFT SURFACE FROM THE ROAD TO WHERE THE NEW COMCAST HANDHOLE WILL BE INSTALLED. HAND HOLE Description MEASURING 11 INCHES IN DIAMETER AND 12 INCHES DEEP. FROM THE COMCAST of Work: HANDHOLE WILL CONTINUE TO BORE IN PRIVATE PROPERTY TO THE POWER METER OF HOUSE 20708 MAPLEWOOD DR. WILL BORE WITH A DIRECTIONAL DRILL AT A MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN A MINIMUM OF 5 FEET HORIZONTAL AND 12 INCHES VERTICAL SEPARATION BETWEEN ALL UTILITIES. ALL DISTURBED AREAS WILL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS. Project Details Project Information Job Number 687353 Page 2 of 2