ENG2022-0489 ROW PERMIToff' EIDM
�~ o�RIGHT OF WAY EUC PERMIT
o
,
EdmondsCity of Edmonds PERMIT NUM
98020 1 1 •
www.edmondswa.gov i
RL)
Description: COMCAST-BORING SERVICE FROM POLE TO PROPERTY INSTALL HH
ISSUED: 02/27/2023
Address: 20708 MAPLEWOOD DR EDMONDS WA 98026-6677
EXPIRES:08/27/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00567400000500
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT VINICIUS FREITAS 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
CONTACT INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
CONTRACTOR INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
OWNER NALIN & SHERIDAN KARA SOOD 20708 MAPLEWOOD DR, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
ENGINEERING INSPECTION FEE $220.00 $220.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 02/27/2023
Printed: Monday, February 27, 2023 3:47:24 PM 1 of 2
RIGHT PERMIT
PERMIT NUM
City of Edmonds
www.edmondswa.gov / 425.1 1
CONDITIONS
CONDITION TYPE
NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL"
E-7 RESTOR LIMITS
Printed: Monday, February 27, 2023 3:47:24 PM 2 of 2
/0 OF EVAIO41
INC. 1890
SECTION A
RECEIVED
Oct 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E6�.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General Info
Project Name 687353 - 20708 MAPLE WOOD DR
Site Address or if no site address use Property Address at NW corner of project area: 20708 MAPLE WOOD DR
Associated Permits: I BLD PLN ENG
Owner and Entity Holding pp
Name of any COMCAST Franchise Ordinance No:
Point of Contact JESSAMIN SANTOS
Title COORDINATOR 2
Address 410 VALLEYAVE
City PUYALLUP State WA Zip 98371
Phone 206-401-2188
Email JESSAMIN SANTOS@CABLE.COMCAST
•
Name of Company INFRAWEST INC
I 1
Primary Name VINICIUS FREITAS
Agent Name VINICIUS FREITAS
Title
Title
Mobile (425) 949-9293
Address 11335 NE 122ND WAY ste 105
Email VINNY.FREITAS@INFRAWEST.NET
City KIRKLAND State WA Zip 98034
Secondary Name
Phone (425) 949-9293
Title
Email VINNY.FREITAS@INFRAWEST.NET
Mobile
City of Edmonds Business License No:
Email
State License No: INFRAI*793NP
® Contractor verifies it is currently bonded
® Contractor verifies it currently has general liability insurance
lvvtc: auvu its. oo.o2o requires mat the Appucanon oe signea oy a ttcensea ana oonaea contractor unless otnerwtse approvea oy the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
x Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
ProjectDescription
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
. The work in the right of way is on or for the following type of facilities:
* telecommunications x cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of •Completed
1. 1 Does the utility owner have existing overhead infrastructure in the area of work?
X
2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
X
Details
of • to be Completed Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes: X
How many are existing? 1 1 1 How many are to be added? 1
City of Edmonds ROW constriction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
1
What is the height of the existing poles?
35'
How many poles are to be removed?
0
Are additional poles to be laced?
X
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
VINICIUS FREITAS
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
DATE: 10/02/2022
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
RECEIVED
Oct 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
EXISTING UTILITIES PLAN PAGE 2 OF 2
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
Utility patches shall be combined and full width or half
width overlay will be required depending on the extent
of disturbance. Where utility patches fall entirely within
one travel lane, the overlay shall extend to the
centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
JQ�tV��„UQ 02/03/2023
RECEIVED
Oct 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SITE PLAN 687353 - 20708 MAPLEWOOD DR, EDMONDS
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT
FROM THE UTILITY POLE TO PROPERTY 20708. BORE 35' OF SOFT
SURFACE FROM THE POLE TO THE ROAD. BORE 25' UNDER THE
ROAD (MAPLEWOOD DR), BORE 15' OF SOFT SURFACE FROM THE
ROAD TO WHERE THE NEW COMCAST HANDHOLE WILL BE
INSTALLED. HAND HOLE MEASURING 11 INCHES IN DIAMETER
AND 12 INCHES DEEP. FROM THE COMCAST HANDHOLE WILL
CONTINUE TO BORE IN PRIVATE PROPERTY TO THE POWER METER
OF HOUSE 20708 MAPLEWOOD DR. WILL BORE WITH A
DIRECTIONAL DRILL AT A MINIMUM DEPTH OF 36 INCHES. WILL
MAINTAIN A MINIMUM OF 5 FEET HORIZONTAL AND 12 INCHES
VERTICAL SEPARATION BETWEEN ALL UTILITIES. ALL DISTURBED
AREAS WILL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS.
PAGE 1 OF 2
:::nPECTRA COAST
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
RESUB
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25 1
30
1 35 1
40
1 45
1 50
1 55
1 60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 lbs.
HOST VEHICLE WEIGHT
> 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100'
123'
172'
74'
100,
150,
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
ONE LANE
ROAD
AHEAD
48"
300'
SIGN SPACING = X (1)
RURAL HIGHWAYS 60 165 MPH
800't
RURAL ROADS 45/55 MPH
500't
RURAL ROADS & URBAN ARTERIALS 35/40 MPH
350't
RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200't (2)
URBAN STREETS 25 MPH OR LESS
100't (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
JAN 20 2023
CITY OF EDMONDS
W20.7B (OPTIONAL IF DEVELOPMENT
40 MPH OR LESS) SERVICES DEPARTMENT
48" 48'
BE ROAD
PREPARED WORK
TO STOP AHEAD
48" 46" qg• 48'
. W20.713 ONE LANE W20.1
ROAD
AHEAD
48" 48"
W20-7A W20-4
BE
PREPARED W20-76 (OPTIONAL IF
40 MPH OR LESS)
48" W20-4 48• W20-7A K I TO STOP
ROAD BE y I x qg• 48'
WORK PREPARED w I
it ONE LANE W20-7B ENGINEERING DIVISION
50' TO 100' 59TO 100'
6 DEVICE 6 DEVICE
MI I R B MIN.
�OTR.A
D
O
I n
I x 4f
•
I .I 4
I
3 x V
rc 4 W20-7A
c� I
CHANNELIZATION DEVICE
SPACING (FEET)
MPH
TAPER
TANGENT
50/65
10 TO 20
80
35/45
10 TO 20
60
25/30
10 TO 20
40
AHEAD TO STOP —I
481, °8" I
4 ROAD
AHEAD
APPROVED AS NOTED
W20.1 W20-7B 1
x 48" qg•
W20
40 M (OPTIONAL IF I
40 MPH OR LESS)
W20 4 ROAD
,,I
�1 p f j9L j4S,.Hn1 02/03/2023
1
4 WORK
NOTES
AHEAD
I
TRAFFIC CONTROL INSPECTION SHALL BE 1
48'
1. ALL SIGNS ARE BLACK ON ORANGE.
LEGEND REQUIRED WHENEVER WORK ZONE IS SET UP
YJ20.1
2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS
SHOULDER IS RECOMMENDED.
FLAGGING STATION
3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT
b
TEMPORARY SIGN LOCATION
TWO-WAY TRAFFIC CONTROL
FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS
FOR ADDITIONAL DETAILS.
D
CHANNEONE-LANE,
DEVICES WITH
FLAGGERS
°
®
PROTECTIVE
PROTECTIVE VEHICLE
4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
NOT
TO SCALE
FILE NAME
S:\Desi n R P& SW-Standardsl2-Plan
Sheet Libra \01.Published PST\ TC Work Zone
Traffic Control\
TC-1
One Lane,
Two WayTraffic Control with
Flaggers\TC-l.dgn
Ts
" E
Amok
�
�I/
Washington State
Department of Transportation
Plot 1
—N asr
TC7�
TIME 3,05,14 PM
.—
FED.AID PROJ.NO.
DATE 1/212015
WAS
PLOTTED BY Ilddslf
DESIGNED BY
+"e xuNNEN
sxreT
or
NNE
ENTERED BY
CHECKED BY
coxTNnm x"wnoN
No.
TRAFFIC CONTROL PLAN
PROJ. ENGR.
REGIONAL ADM.
REVISION
DATE
BY
RECEIVED
Oct 04 2022
\ CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
CITY OF EDMONDS
MyBuildingPermit.com
Right -of -Way Application #1210095 - 687353 - 20708 MAPLEWOOD DR
Applicant
First Name Last Name Company Name
VINICIUS FREITAS INFRAWEST INC
Number Street Apartment or Suite Number E-mail Address
11335 NE 122ND WAY 105 vinny.freitas@infrawest.net
City State Zip Phone Number Extension
KIRKLAND WA 98034 (425) 949-9293
Contractor
Company Name
INFRAWEST INC
Number Street Apartment or Suite Number
11335 NE 122ND WAY 105
City State Zip Phone Number Extension
KIRKLAND WA 98034 (954)756-0230
State License Number License Expiration Date UBI # E-mail Address
INFRAI*793NP 7/23/2023 RD477f115g vinny.freitas@infrawest.net
Project Location
Number Street Floor Number Suite or Room Number
20708 MAPLEWOOD DR
City Zip Code County Parcel Number
EDMONDS 98026 00567400000500
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Nalin & Sheridan Kara L Sood
Number Street Apartment or Suite Number
20708 MAPLEWOOD DR
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 10/2/2022 Submitted By: VINICIUS FREITAS
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1210095 - 687353 - 20708 MAPLEWOOD DR
Project Contact
Company Name: INFRAWEST INC
Name: VINICIUS FREITAS Email: vinny.freitas@infrawest.net
Address: 11335 NE 122ND WAY 105 Phone #: (425) 949-9293
KIRKLAND WA 98034
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project 687353 - 20708 MAPLEWOOD DR
Name:
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE UTILITY
POLE, BORE 35FT OF SOFT SURFACE FROM THE POLE TO THE ROAD. BORE 25FT
UNDER THE ROAD MAPLEWOOD DR, BORE 15FT OF SOFT SURFACE FROM THE ROAD
TO WHERE THE NEW COMCAST HANDHOLE WILL BE INSTALLED. HAND HOLE
Description MEASURING 11 INCHES IN DIAMETER AND 12 INCHES DEEP. FROM THE COMCAST
of Work: HANDHOLE WILL CONTINUE TO BORE IN PRIVATE PROPERTY TO THE POWER METER
OF HOUSE 20708 MAPLEWOOD DR. WILL BORE WITH A DIRECTIONAL DRILL AT A
MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN A MINIMUM OF 5 FEET HORIZONTAL
AND 12 INCHES VERTICAL SEPARATION BETWEEN ALL UTILITIES. ALL DISTURBED
AREAS WILL BE RESTORED TO ORIGINAL OR BETTER CONDITIONS.
Project Details
Project Information
Job Number
687353
Page 2 of 2