Building Permit (3)Type: COMMERCIAL BLDG Subtype: COM DECK OR PATIO I Status: ISSUED
Parcel No: 27032300104500 Site Address: 178 SUNSET AVE S EDMONDS,WA 98020-4134 Applied: 9/15/2022
Subdivision: 004548 Lot: 0 Issued: 3/2/2023
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $5,900.00 Occupancy Type: Construction Type: VB Expiration Date: 2/25/2024
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC
Scope of Work: NILES PEACOCK -DECK COVER
I WA State Contractor L & I #: WALTIHL824RS I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JONATHAN RADER
19705 61ST PLACE NE,
(206)883-4510
JON.RADER@GMAIL.COM
KENMORE WA 98028
CONTACT
RADER ARCHITECTURE
19705 61ST PLACE NE,
(206)883-4510
jonathan@raderarch.com
STUDIO
KENMORE WA 98028
10016 EDMONDS WAY, SUITE
CONTRACTOR
WALTIER HOMES LLC
zwaltier@waltierhomesinc.com
C124, EDMONDS WA 98020
OWNER
BRENDA SALISH CROSSING
113 113 CHERRY STREET 83202,
(206)859-4500
LLC
SEATTLE WA 98104
•' 0
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/16/22
R23143
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
12/29/22
R25294
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$257.20
$257.20
12/29/22
R25294
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$218.62
$218.62
9/16/22
R23143
TOTALS: $540.82
$540.82
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, March 02, 2023 8:52:33 AM 1 of 2
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2022-1225
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
E" INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
X-1 FIRE FINAL
A-1 BUILDING PRECON
X-3 BUILDING FINAL"
B-5 BLDG SPECIAL
Welding certifications and inspection documents to
INSPECTION
be provided.
B-4 FRAMING
Welding certifications and inspection documents to
be provided prior to framing approval.
Printed: Thursday, March 02, 2023 8:52:33 AM 2 of 2